CONCRETE REPAIR NOTES:
1. THE SPECIFICATIONS ARE AN INTEGRAL PART OF CONCRETE REPAIR AND SHOULD BE USED AS PRIMARY DIRECTIONS FOR REPAIRS. THE SECTIONS AND DETAILS ON THESE S20X DRAWINGS ARE SUPPLEMENTARY AND DESCRIPTIVE ONLY AND THE SPECIFICATIONS HOLD PRIORITY.
2. THE TWO SETS OF CONCRETE REPAIR PLAN DRAWINGS DESCRIBE THE LOCATIONS OF VARIOUS
ITEMS OF DAMAGE. THE DAMAGE IS LOCATED AND QUANTIFIED ON THE TABLES ON THOSE SHEETS AS “SURVEYED” QUANTITIES.
3. THE “SURVEYED” QUANTITIES WERE SUMMED BY CATEGORY AND INCREASED TO ALLOW FOR
PLANNED REPAIR DETAILS AND IS PROVIDED IN THE BID TABULATION. A FURTHER “ALLOWANCE” WAS ALSO PROVIDED AS A SEPARATE LINE ITEM IN THE BID TABULATION TO PROVIDE A BUDGET CONTINGENCY.
4. PAYMENT FOR REPAIR WILL BE BASED ON ACTUAL QUANTITIES MEASURED DURING THE REPAIR
PROCESS, REPORTED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. SPACE IS PROVIDED ON THE DRAWING TABLES FOR NOTES. OFFICIAL MEASUREMENTS FOR PAYMENT WILL BE RECORDED BY THE CONTRACTOR ON THE PROVIDED EXCEL SPREADSHEET AND VERIFIED BY THE ENGINEER AS A DAILY/WEEKLY AGREED PROCEDURE.
5. EACH REPAIR IS NOTED WITH A “PRIORITY” NUMBER. THE PRIORITY NUMBER SYSTEM IS
EXPLAINED ON DRAWINGS S301 AND S401 AND IDENTIFY WHICH REPAIRS ARE TO BE MADE AND WHICH ARE DEFERRED. SOME REPAIRS MAY BE ADDED OR REMOVED BASED ON FURTHER OBSERVATIONS.
6. PRIORITY 3 REPAIRS MAY BE ADDED TO THE WORK IF FUNDING IS AVAILABLE AND DETERMINED
APPROPRIATE. 7. PRIORITY 4 REPAIRS MAY BE CHANGED BY ADDITIONS OR REMOVALS IF IT IS DETERMINED THAT
SOME STRUCTURE IMPROVEMENTS ARE NOT TO BE ACCOMPLISHED. REMOVALS WILL BECOME PRIORITY 1 OR 2. ADDITIONS ARE NOT EXPECTED BUT MIGHT BE THE RESULT OF MOVING A PLANNED ROADWAY.
8. CONCRETE SHALL BE EDGE CUT, REMOVED, ROUGHENED AND FULLY PREPARED PER
SPECIFICATIONS. 9. REINFORCING STEEL SHALL BE ADDED PER THE SPECIFICATION OR AS DIRECTED BY THE
ENGINEER. MEASUREMENT QUANTITIES SHALL BE PROVIDED ON THE SPREADSHEET AND PAID FOR AS USED. WELDING AND OTHER DETAILS ARE CONSIDERED PART OF THE REINFORCEMENT BID ITEM AND NOT PAID SEPARATELY.
10. REPAIR MATERIAL SHALL BE MACHINE APPLIED CONCRETE/MORTAR AS SPECIFIED. HAND
APPLIED CONCRETE/MORTAR REPAIRS ARE ALLOWED AS DESIRED BY THE CONTRACTOR BUT EXPECTED TO BE USED IN ONLY HARD TO REACH AREAS.
11. SLAB SOFFIT REPAIRS SHALL BE AS SHOWN ON DETAILS A AND B. REINFORCING REPAIRS, IF
REQUIRED SHALL BE AS SHOWN ON DETAILS R1, R2 AND R3. 12. BEAM AND GIRDER REPAIRS SHALL BE AS SHOWN ON DETAILS E & F ON DRAWING S204.
REINFORCING REPAIRS, IF REQUIRED, SHALL BE AS SHOWN ON DETAILS R1, R2 AND R3 ON DRAWING S203.
13. WELDED WIRE FABRIC SHALL BE 2 X 3 ‐ #12 X #12 GALVANIZED. SECURE IN PLACE BY WIRE TIED
TO EXISTING REINFORCEMENT AT NOT MORE THAN 18” CENTERS. WHERE EXISTING REINFORCEMENT IS NOT ADEQUATE TO SECURE FABRIC, CONTRACTOR SHALL PROPOSE PREFERRED APPROACH SUCH AS POWDER DRIVEN ANCHORS.
14. CRACK REPAIRS SHALL BE AS DIRECTED IN THE FIELD AND AS DETERMINED BY FURTHER
EXPLORATORY INVESTIGATION PAID FOR BY A BID ITEM ALLOWANCE. A. STRUCTURAL CRACKS WITHOUT SIGNIFICANT REBAR CORROSION SHALL HAVE EPOXY‐
INJECTED CRACK REPAIR PER SPECIFICATIONS AND DETAIL D. B. NON‐STRUCTURAL CRACKS SHALL EITHER BE CONSIDERED FOR FUTURE REPAIR AS
PRIORITY 3 OR SHALL BE SEALED PER SPECIFICATION “GROOVE AND SEAL” METHOD AND PER DETAIL C.
C. IN ADDITION TO PROVIDING MEASUREMENT FOR PAYMENT BY THE PROVIDED SPREADSHEET, THE CONTRACTOR SHALL MAP PRIORITY 3 CRACKS THAT ARE POSTPONED FOR FUTURE REPAIR.
-
wsTypewritten Text452
wsTypewritten Text451
wsTypewritten Text450
wsTypewritten Text449
wsTypewritten Text448
wsTypewritten Text447
wsTypewritten Text446
wsTypewritten Text445
wsTypewritten Text444
wsTypewritten Text443
wsTypewritten Text6' #7, 14' #6
wsTypewritten Text1' #7, 19' #6
wsTypewritten Text3' #7, 17' #6
wsTypewritten Text4' #7, 16' #6
wsTypewritten Text3' #7, 17' #6
wsTypewritten Text5' #7, 15' #6
wsTypewritten Text5' #7, 15' #6
wsLine
wsCalloutGate 4
wsLine
wsTypewritten Text6 SF Soffit Repair
wsTypewritten Text24 SF Soffit Repair
wsTypewritten Text15 SF Soffit Repair
wsTypewritten Text26.5 SF Soffit Repair
wsTypewritten Text26 SF Soffit Repair
wsTypewritten Text80 SF Soffit Repair
wsTypewritten Text442
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsTypewritten Text463
wsTypewritten Text462
wsTypewritten Text461
wsTypewritten Text460
wsTypewritten Text459
wsTypewritten Text458
wsTypewritten Text457
wsTypewritten Text456
wsTypewritten Text455
wsTypewritten Text454
wsTypewritten Text453
wsTypewritten Text4' #7, 16' #6
wsTypewritten Text5' #7, 15' #6
wsTypewritten Text5' #7, 15' #6
wsTypewritten Text5' #7, 15' #6
wsTypewritten Text5' #7, 15' #6
wsTypewritten Text3' #7, 17' #6
wsTypewritten Text4' #7, 16' #6
wsTypewritten Text3' #7, 17' #6
wsTypewritten Text6' #7, 13' #6
wsTypewritten Text20' #6
wsLine
wsCalloutGate 4
wsTypewritten Text16.5 SF Soffit Repair
wsTypewritten Text29 SF Soffit Repair
wsTypewritten Text25 SF Soffit Repair
wsTypewritten Text9 SF Soffit Repair
wsRectangle
wsRectangle
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsTypewritten Text473
wsTypewritten Text472
wsTypewritten Text471
wsTypewritten Text470
wsTypewritten Text469
wsTypewritten Text468
wsTypewritten Text467
wsTypewritten Text466
wsTypewritten Text465
wsTypewritten Text464
wsTypewritten Text463
wsTypewritten Text20' #6
wsTypewritten Text20' #2
wsTypewritten Text20' #2
wsTypewritten Text20' #2
wsTypewritten Text20' #2
wsTypewritten Text20' #6
wsTypewritten Text20' #6
wsTypewritten Text20' #2
wsTypewritten Text20' #2
wsCalloutNew Reinforcement intercepts angled beams. See Turner RFI 111 for clarifications.
wsLine
wsLine
wsLine
wsCalloutNew Reinforcement intercepts steel beam at East end. See Turner RFI 112 and 114 for clarifications
wsLine
wsTypewritten Text9 SF Soffit Repair
wsRectangle
-
wsTypewritten Text485
wsTypewritten Text484
wsTypewritten Text483
wsTypewritten Text482
wsTypewritten Text481
wsTypewritten Text480
wsTypewritten Text479
wsTypewritten Text478
wsTypewritten Text477
wsTypewritten Text476
wsTypewritten Text475
wsTypewritten Text474
wsTypewritten Text473
wsTypewritten Text20' #6
wsTypewritten Text20' #6
wsCalloutGate 3
wsLine
wsLine
wsTypewritten Text72 SF Soffit Repair
wsPolygonal Line
-
wsTypewritten Text496
wsTypewritten Text495
wsTypewritten Text494
wsTypewritten Text493
wsTypewritten Text492
wsTypewritten Text491
wsTypewritten Text490
wsTypewritten Text489
wsTypewritten Text488
wsTypewritten Text487
wsTypewritten Text486
wsTypewritten Text#4 Repair
wsTypewritten Text#4 Repair
wsTypewritten Text18' #2 Repair
wsTypewritten Text18' #2 Repair
wsTypewritten Text#4 Repair
wsPolygonal Line
wsPolygonal Line
wsCalloutExisting Vault Structures excavation, formed, and poured per attached detail.
wsLine
wsLine
wsCalloutGate 3
wsLine
wsTypewritten Text41 SF Soffit Repair
wsTypewritten Text72 SF Soffit Repair
wsTypewritten Text52 SF Soffit Repair
wsTypewritten Text80 SF Soffit Repair
wsTypewritten Text80 SF Soffit Repair
wsTypewritten Text65 SF Soffit Repair
wsTypewritten Text68 SF Soffit Repair
wsTypewritten Text68 SF Soffit Repair
wsTypewritten Text65 SF Soffit Repair
wsPolygon
wsPolygonal Line
wsRectangle
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygon
wsPolygon
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsTypewritten Text508
wsTypewritten Text507
wsTypewritten Text506
wsTypewritten Text505
wsTypewritten Text504
wsTypewritten Text503
wsTypewritten Text502
wsTypewritten Text501
wsTypewritten Text500
wsTypewritten Text499
wsTypewritten Text498
wsTypewritten Text497
wsTypewritten Text5' #7, 13' #6
wsTypewritten Text5' #7, 13' #6
-
wsTypewritten Text514
wsTypewritten Text513
wsTypewritten Text512
wsTypewritten Text511
wsTypewritten Text510
wsTypewritten Text509
wsTypewritten Text7' #7, 13' #6
wsTypewritten Text5' #7, 13' #6
wsLine
wsLine
wsLine
wsCalloutGate 2
wsTypewritten Text50 SF Soffit Repair
wsTypewritten Text75 SF Soffit Repair
wsTypewritten Text94 SF Soffit Repair
wsTypewritten Text95 SF Soffit Repair
wsTypewritten Text58 SF Soffit Repair
wsTypewritten Text68 SF Soffit Repair
wsTypewritten Text90 SF Soffit Repair
wsTypewritten Text54 SF Soffit Repair
wsTypewritten Text54 SF Soffit Repair
wsTypewritten Text74 SF Soffit Repair
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsTypewritten Text4' #7, 3' #6
wsTypewritten Text6' #6
wsTypewritten Text2' #7, 3' #6
wsCalloutSeawall Repair - See Attached Detail
wsTypewritten Text525.5
wsTypewritten TextA
wsTypewritten TextC
wsTypewritten TextB
wsTypewritten TextD
wsTypewritten Text90 SF Soffit Repair
wsTypewritten Text27 SF Soffit Repair
wsTypewritten Text52 SF Soffit Repair
wsTypewritten Text78 SF Soffit Repair
wsTypewritten Text33 SF Soffit Repair
wsTypewritten Text70 SF Soffit Repair
wsTypewritten Text8 SF Soffit Repair
wsTypewritten Text41 SF Soffit Repair
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsTypewritten TextA
wsTypewritten TextB
wsTypewritten TextC
wsTypewritten TextD
wsTypewritten Text534
wsTypewritten Text535
wsLine
wsLine
wsCalloutGate 1
wsLine
wsTypewritten Text33 SF Soffit Repair
wsTypewritten Text64 SF Soffit Repair
wsTypewritten Text50 SF Soffit Repair
wsTypewritten Text63 SF Soffit Repair
wsTypewritten Text72 SF Soffit Repair
wsTypewritten Text72 SF Soffit Repair
wsTypewritten Text56 SF Soffit Repair
wsTypewritten Text55 SF Soffit Repair
wsTypewritten Text32 SF Soffit Repair
wsTypewritten Text53 SF Soffit Repair
wsTypewritten Text22 SF Soffit Repair
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
wsPolygonal Line
-
wsCalloutDetail 3 S204
wsCalloutDetail 3 S204
-
wsCalloutDetail 3 S204
wsCalloutDetail 3 S204
wsTypewritten Text535
wsTypewritten Text534
wsTypewritten Text533
wsTypewritten Text532
wsTypewritten TextA
wsTypewritten TextB
wsTypewritten TextC
wsTypewritten TextD
wsPolygonal Line
wsLine
wsLine
wsLine
wsLine
wsCalloutBeam Repair Detail 3 S204
wsCalloutBeam Repair Detail 3 S204
-
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsRectangle
wsCalloutExisting Drain Re-Installed
wsCalloutNew Zurn Drain
wsCalloutNew Zurn Drain
wsCalloutNew Zurn Drain
wsCalloutNew Zurn Drain
wsTypewritten TextPier 30-32 Media Filers * The 9 EA 4'x4' locations indicated belowwere demolished and repaired perthe attached sketch. Drains werere-installed at 5 locations.
-
12a
I-ra—S‘V-4’4I-’
‘3e
NN
V‘3
//
—r
j
I
C
)
-t‘-I
41
4
C4
-A
cs“V4VI
I
4
3—
43-,
Ii
4V
4V
—
-S
V4
SJ
I5)4
t’l
II‘
——
3—
fln
’
I
wsTypewritten TextMedia Filter Slab Repair Detail
-
Beam Encasement
Beam Number QuantitiesOr Nearest Bay Repair Lenght(LF) Demo (CF) Type 1 Detail G Type 2 RC Beam Type 3 Weld Web Ledger? Type 4 Abutment Type 5 Paint Type 6 Encaps. Type 7 Weld/Encaps. # Dowels Status Date Completed Port Signature Repair Cost
501 20 75.0 X 14 Complete 11/29/2012 26,600.00$ 502 20 75.0 X 14 Complete 12/14/2012 26,600.00$ 503 20 75.0 X 14 Complete 11/29/2012 26,600.00$ 504 20 75.0 X 14 Complete 12/14/2012 26,600.00$ 505 20 75.0 X 14 Complete 12/20/2012 26,600.00$ 506 20 75.0 X 14 Complete 12/20/2012 26,600.00$ 507 NA 4.0 X 8 Complete 1/4/2013 16,592.84$ 508 NA 4.0 X 8 Complete 1/10/2013 16,592.84$ 509 18 36.0 X 14 Complete 12/20/2012 23,940.00$ 510 18 36.0 X 14 Complete 12/20/2012 23,940.00$
Total Cost 240,665.68$ Total Contract 175,000.00$ Total Change Order 65,665.68$
Gate 1 NR
Gate 2512/513 20 15.0 1 13 7 Complete 1/24/2013 15,935.54$
Gate 3 NR
Gate 4450/451 20 15.0 1 16.83333333 3.166666667 Complete 1/30/2013 15,216.06$ 451/452 20 15.0 1 14.58335 5.41665 Complete 1/24/2013 15,638.36$ 452/453 20 15.0 1 14.75 5.25 Complete 1/24/2013 15,607.08$ 453/454 20 15.0 1 15.75 4.25 Complete 1/24/2013 15,419.39$
77,816.44$
Dimensions
Extra Work
Total Gate Beam Encasement
-
Beam Encasement
Beam Number QuantitiesOr Nearest Bay Repair Lenght(LF) Demo (CF) Type 1 Detail G Type 2 RC Beam Type 3 Weld Web Ledger? Type 4 Abutment Type 5 Paint Type 6 Encaps. Type 7 Weld/Encaps. # Dowels Status Date Completed Port Signature Repair Cost
Dimensions
Additional Work
443/444 20 15.0 1 14.375 5.625 Complete 1/30/2013 15,677.47$ 444/445 20 15.0 1 19 1 Complete 1/30/2013 14,809.40$ 445/446 20 15.0 1 16.54166667 3.458333333 Complete 1/30/2013 15,270.80$ 446/447 20 15.0 1 15.79166667 4.208333333 Complete 1/30/2013 15,411.57$
454/455 20 15.0 1 15.5 4.5 Complete 1/24/2013 15,466.32$ 455/456 20 15.0 1 15.25 4.75 Complete 1/24/2013 15,513.24$ 456/457 20 15.0 1 15.25 4.75 Complete 1/30/2013 15,513.24$ 457/458 20 15.0 1 15.41666667 4.583333333 Complete 1/30/2013 15,481.96$ 458/459 20 15.0 1 16.95833333 3.041666667 Complete 1/30/2013 15,192.60$ 459/460 20 15.0 1 16.29166667 3.708333333 Complete 1/30/2013 15,317.73$ 460/461 20 15.0 1 17.04166667 2.958333333 Complete 2/6/2013 15,176.96$ 461/462 20 15.0 1 14.25166667 5.748333333 Complete 2/6/2013 15,700.61$ 462/463 20 15.0 1 20 Complete 2/6/2013 14,621.71$ 463/464 20 15.0 1 20 Complete 2/6/2013 14,621.71$
468/469 20 15.0 20 Complete 2/6/2013 12,757.80$ 469/470 20 15.0 20 Complete 2/6/2013 12,757.80$
476/477 20 15.0 20 Complete 2/14/2013 12,757.80$ 477/478 20 15.0 20 Complete 2/14/2013 12,757.80$
490/491 N/A 4.0 1 Complete 12/27/2012 16,592.84$
507/508 18 15.0 1 13 5 Complete 2/14/2013 14,284.38$ 508/509 18 15.0 1 13 5 Complete 2/14/2013 14,284.38$
522/523 7 5.3 1 2.625 4.375 Complete 1/24/2013 COR 4523/524 5.5 4.1 5.5 Complete 1/24/2013 COR 4524/525 5 3.8 1 2.75 2.25 Complete 1/24/2013 COR 4
309,968.11$
Extra Work
Total Marginal Wharf Beam Encasement
-
Soffit Repairs
Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes
515 50 5 20.8 X 18 10 Complete 12/14/2012516 75 5 31.3 X 18 14 Complete 12/14/2012517 94 4 31.3 X 18 18 Complete 12/14/2012518 95 4 31.7 X 25 18 Complete 11/29/2012519 58 5 24.2 X 18 12 Complete 11/29/2012520 90 8 60.0 X 60 22 Complete 1/30/2013521 27 4 9.0 X 6 8 Complete 11/29/2012522 52 4 17.3 X 16 12 Complete 12/14/2012523 78 4 26.0 X 25 14 Complete 12/14/2012524 33 4 11.0 X 8 8 Complete 12/14/2012525 70 4 23.3 X 20 14 Complete 12/28/2012526 8 4 2.7 X 6 3 Complete 11/29/2012527 41 4 13.7 X 16 8 Complete 12/14/2012528 33 4 11.0 X 12 8 Complete 12/14/2012529 64 4 21.3 X 22 12 Complete 11/16/2012530 50 5 20.8 X 18 8 Complete 11/16/2012531 63 4 21.0 X 24 10 Complete 11/16/2012532 72 5 30.0 X 28 14 Complete 11/16/2001533 72 5 30.0 X 28 14 Complete 11/16/2012
Dimensions Quantities
-
Soffit Repairs
Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes
Dimensions Quantities
Gate 1 Completed531 A531 B531 C531 D532 A 56 4 18.7 X 34 10 Complete 1/18/2013 16,800.00$ 532 B532 C532 D533 A 55 4 18.3 X 16 10 Complete 1/18/2013 16,500.00$ 533 B533 C533 D
534 32 4 10.7 X 12 6 Complete 1/18/2013 9,600.00$ 534 A 53 4 17.7 X 12 10 Complete 1/18/2013 15,900.00$ 534 B 22 2 3.7 X 0 0 Complete 1/24/2013 5,060.00$ 534 C534 D535 A535 B535 C535 D536 C536 D537 D
63,860.00$ Total Gate 1 Soffit Repairs
Extra Work
-
Soffit Repairs
Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes
Dimensions Quantities
Gate 2 Completed509510 68 4 22.7 X 24 20 Complete 1/4/2013 20,400.00$ 511 90 4 30.0 X 16 26 Complete 1/4/2013 27,000.00$ 512 54 4 18.0 X 25 18 Complete 1/4/2013 16,200.00$ 513 54 4 18.0 X 31 18 Complete 12/28/2012 16,200.00$ 514 74 4 24.7 X 42 20 Complete 12/28/2012 22,200.00$
102,000.00$
Gate 3 Completed484 72 5 30.0 X 38 18 Complete 1/18/2013 21,600.00$
21,600.00$
Gate 4 Compeleted448 6 4 X 4 2 Complete 1/30/2013 1,380.00$ 449 24 4 X 16 6 Complete 1/30/2013 5,520.00$ 450 15 5 X 8 4 Complete 1/30/2013 3,450.00$ 451 26.5 5 X 18 8 Complete 1/30/2013 6,095.00$ 452 26 5 X 18 8 Complete 1/30/2013 5,980.00$ 453 16.5 5 X 6 6 Complete 1/30/2013 3,795.00$ 454 29 5 X 20 10 Complete 1/30/2013 6,670.00$
32,890.00$
220,350.00$
FO 114 Completed442 80 3 X 42 20 Pour 2/21/13 2/21/2013 24,000.00$ 455 25 3 X 16 8 Pour 2/21/13 2/21/2013 7,500.00$ 461 9 3 X 12 4 Pour 2/21/13 2/21/2013 2,700.00$ 466 9 3 X 12 4 Pour 2/21/13 2/21/2013 2,700.00$ 489 41 3 X 36 14 Pour 2/21/13 2/21/2013 12,300.00$ 490 72 3 X 50 22 Pour 2/21/13 2/21/2013 21,600.00$ 491 52 3 X 40 18 Pour 2/21/13 2/21/2013 15,600.00$ 492 80 3 X 40 20 Complete 2/14/2012 24,000.00$ 493 80 3 X 40 20 Complete 2/14/2012 24,000.00$ 494 65 3 X 36 16 Complete 2/14/2012 19,500.00$ 495 68 3 X 46 22 Pour 2/21/13 2/21/2013 20,400.00$ 496 65 3 X 36 16 Complete 2/14/2012 19,500.00$
193,800.00$
Extra Work
Total Soffit Repairs
Total Gate 2 Soffit Repairs
Total Gate 3 Soffit Repairs
Total Gate 4 Soffit Repairs
Total Gate Soffit Repairs
-
Beam Repairs
Beam # Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Pour CY Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes
311 8.25 11 0.28 7.6 X 8 4 Complete 11/16/2012312 8.25 12 0.31 8.3 X 6 4 Complete 12/28/2012335 8 12 0.30 8.0 X 4 4 Complete 11/29/2012338 8 12 0.30 8.0 X 6 4 Complete 11/29/2012
Gate 1 Repair Length LF531 A 0.00 0.0531 B 0.00 0.0531 C 0.00 0.0531 D 0.00 0.0532 A 17.25 12 0.64 17.3 X 2 10 Complete 1/18/2013 15,766.50$ 532 B 0.00 0.0532 C 0.00 0.0532 D 0.00 0.0533 A 17.25 12 0.64 17.3 X 2 10 Complete 1/18/2013 15,766.50$ 533 B 0.00 0.0533 C 0.00 0.0533 D 0.00 0.0
534 4 4 0.05 1.3 X Complete 1/24/2013 1,160.00$ 534 A 0.00 0.0534 B 0.00 0.0534 C 0.00 0.0534 D 0.00 0.0535 A 0.00 0.0535 B 0.00 0.0535 C 0.00 0.0
32,693.00$
Dimensions Quantities
Extra Work
Total Gate 1 Beam Repairs
-
wsTypewritten TextSeawall Repair Detail
-
wsLine
wsLine
wsTypewritten TextAfter Cleaning and WeldingEncapsulate with WWM and ConcretePer Repair Option 6.
wsTypewritten TextRepair Option 7
wsTypewritten Text`
wsTypewritten Text
-
wsLine
wsLine
wsTypewritten Text7" Depth
wsTypewritten Text#5
wsTypewritten Text24"
wsTypewritten Text#6
wsLine
wsLine
wsLine
wsLine
wsLine
wsLine
wsTypewritten TextVault Repair
-
Fax: Telephone:
Project # 1836001-CO
AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W
November 29, 2012
RFI
RFI #: 111 11/28/2012Date Required:11/21/2012Date Created:
TO: FROM:
Nicholas PellegrinoWayne Stonecipher
Power Engineering Construction Company Turner Construction Company
Pier 29 1/2
San Francisco, CA 94111
1501 Viking Street Suite 200
Alameda, CA 94501
415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510
DisciplineSubject Category
Confirmation OnlyStructuralPier 30-32 – Concrete Beam Encasement
at Marginal Wharf Intercepts Angle Beam
TitleRevision DateRev NoDwg No.
Drawing References: Spec Section References:
Sketch References:
Question:
There are ten encasement beams in the original contract that have been changed to a reinforced concrete
beam detail in response to Power’s RFI 106. As the work has proceeded we have noted that 7 of the 10 beams
have an angled concrete encapsulated steel beam that intercepts the beam we are required to repair. These
beams are not shown on the drawings and result in additional demolition, rebar splices, and formwork in order
to complete the contract repairs. We feel we have the information to complete these repairs, but the additional
time required should be at extra cost.
Suggestion:
Answer: Date Answered: 11/29/2012
Please proceed with repair. Specified new rebar in beam needs to continue through the angled beam
(continuously)-Richard Rhee
Company Name Contact Name Copies NotesCc: Fax Number
TCCO - RFI Individual Printout_V4.rpt
Page 1 of 1RPT Revised: 9/16/2009
Turner Construction Company
-
Fax: Telephone:
Project # 1836001-CO
AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W
December 03, 2012
RFI
RFI #: 112 11/28/2012Date Required:11/21/2012Date Created:
TO: FROM:
Nicholas PellegrinoWayne Stonecipher
Power Engineering Construction Company Turner Construction Company
Pier 29 1/2
San Francisco, CA 94111
1501 Viking Street Suite 200
Alameda, CA 94501
415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510
DisciplineSubject Category
Confirmation OnlyStructuralPier 30-32 – Concrete Beam Encasement
Connection in Marginal Wharf at East
End
TitleRevision DateRev NoDwg No.
Drawing References: Spec Section References:
Sketch References:
Question:
There are ten encasement beams in the original contract that have been changed to a reinforced concrete
beam detail in response to Power’s RFI 003. The repair requires dowels 7 EA #8 dowels at each end of the
beam. When the East end of the new concrete beams intercepts a pile we have good concrete to dowel into.
However the beams being encased are spaced approximately 5’ on center and the piles are approximately 15’
on center. The intermediate beams between piles join a steel encased concrete beam similar to the one being
repaired. This is unreinforced concrete which is not efficient for the dowels to be placed.
At these beam locations we could weld the bar to the perpendicular North-South beam flange or web in place
of dowels?
As a secondary option, should the dowels at the East end be installed with hooks placed through the web of
the perpendicular beam? This would allow us to pour the beam and create a beam pocket on the East side of
the North-South intercepting beam. This beam pocket could be reinforced or doweled up into the slab above to
tie the two beams together?
Suggestion:
Answer: Date Answered: 12/3/2012
Please see attached sketch-Richard Rhee
Company Name Contact Name Copies NotesCc: Fax Number
TCCO - RFI Individual Printout_V4.rpt
Page 1 of 1RPT Revised: 9/16/2009
Turner Construction Company
-
Fax: Telephone:
Project # 1836001-CO
AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W
December 05, 2012
RFI
RFI #: 114 12/11/2012Date Required:12/4/2012Date Created:
TO: FROM:
Nicholas PellegrinoWayne Stonecipher
Power Engineering Construction Company Turner Construction Company
Pier 29 1/2
San Francisco, CA 94111
1501 Viking Street Suite 200
Alameda, CA 94501
415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510
DisciplineSubject Category
Drawing ClarificationStructuralPier 30-32 – Reinforcement Details in RFI
111 and 112
TitleRevision DateRev NoDwg No.
Drawing References: Spec Section References:
Sketch References:
Question:
RFI 111 gave reinforcement details for a new reinforced concrete
beam. The reinforcement will exist both where the bottom flange
is intact and where it is deteriorated. We assumed that the bottom
bars would be installed below the bottom flange of the steel beam
to provide containment for the concrete beam. RFI 112 indicates
that the bottom bars of the new reinforced beam are placed above
the bottom flange of the steel beam leaving the concrete below
unreinforced.
We would propose to install the reinforcement below the flange of
the existing beam. At the East end of the beam where we need to
connect to an existing steel beam running North South addressed in
RFI 112, we could install “Z” shaped bars to lap the new steel. The
middle bar will have to be placed through the bottom flange in
order to be embedded in the North South beam. See attached
sketches.
Is this acceptable?
Please advise.
Suggestion:
Answer: Date Answered: 12/5/2012
TCCO - RFI Individual Printout_V4.rpt
Page 1 of 2RPT Revised: 9/16/2009
Turner Construction Company
-
Project # 1836001-CO
AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W
December 05, 2012
RFI
[One Per Page]
They shall be installed below bottom of the flange. As for RFI 112, the "lapping" rebar being attached to girder
will be installed as shown in the sketch. Please have field crew talk to Tim with that sketch.-Richard Rhee
Company Name Contact Name Copies NotesCc: Fax Number
TCCO - RFI Individual Printout_V4.rpt
Page 2 of 2RPT Revised: 9/16/2009
Turner Construction Company