  • wsTypewritten TextAS Built 3/14/13

  •  CONCRETE REPAIR NOTES:  

    1.  THE SPECIFICATIONS ARE AN INTEGRAL PART OF CONCRETE REPAIR AND SHOULD BE USED AS PRIMARY DIRECTIONS FOR REPAIRS. THE SECTIONS AND DETAILS ON THESE S20X DRAWINGS ARE SUPPLEMENTARY AND DESCRIPTIVE ONLY AND THE SPECIFICATIONS HOLD PRIORITY. 

     2.  THE TWO SETS OF CONCRETE REPAIR PLAN DRAWINGS DESCRIBE THE LOCATIONS OF VARIOUS 

    ITEMS OF DAMAGE. THE DAMAGE IS LOCATED AND QUANTIFIED ON THE TABLES ON THOSE SHEETS AS “SURVEYED” QUANTITIES.  

     3.  THE “SURVEYED” QUANTITIES WERE SUMMED BY CATEGORY AND INCREASED TO ALLOW FOR 

    PLANNED REPAIR DETAILS AND IS PROVIDED IN THE BID TABULATION. A FURTHER “ALLOWANCE” WAS ALSO PROVIDED AS A SEPARATE LINE ITEM IN THE BID TABULATION TO PROVIDE A BUDGET CONTINGENCY. 

     4.  PAYMENT FOR REPAIR WILL BE BASED ON ACTUAL QUANTITIES MEASURED DURING THE REPAIR 

    PROCESS, REPORTED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. SPACE IS PROVIDED ON THE DRAWING TABLES FOR NOTES. OFFICIAL MEASUREMENTS FOR PAYMENT WILL BE RECORDED BY THE CONTRACTOR ON THE PROVIDED EXCEL SPREADSHEET AND VERIFIED BY THE ENGINEER AS A DAILY/WEEKLY AGREED PROCEDURE. 

     5.  EACH REPAIR IS NOTED WITH A “PRIORITY” NUMBER. THE PRIORITY NUMBER SYSTEM IS 

    EXPLAINED ON DRAWINGS S301 AND S401 AND IDENTIFY WHICH REPAIRS ARE TO BE MADE AND WHICH ARE DEFERRED. SOME REPAIRS MAY BE ADDED OR REMOVED BASED ON FURTHER OBSERVATIONS. 

     6.  PRIORITY 3 REPAIRS MAY BE ADDED TO THE WORK IF FUNDING IS AVAILABLE AND DETERMINED 

    APPROPRIATE.   7.  PRIORITY 4 REPAIRS MAY BE CHANGED BY ADDITIONS OR REMOVALS IF IT IS DETERMINED THAT 

    SOME STRUCTURE IMPROVEMENTS ARE NOT TO BE ACCOMPLISHED. REMOVALS WILL BECOME PRIORITY 1 OR 2. ADDITIONS ARE NOT EXPECTED BUT MIGHT BE THE RESULT OF MOVING A PLANNED ROADWAY. 

     8.  CONCRETE SHALL BE EDGE CUT, REMOVED, ROUGHENED AND FULLY PREPARED PER 

    SPECIFICATIONS.   9.  REINFORCING STEEL SHALL BE ADDED PER THE SPECIFICATION OR AS DIRECTED BY THE 

    ENGINEER. MEASUREMENT QUANTITIES SHALL BE PROVIDED ON THE SPREADSHEET AND PAID FOR AS USED. WELDING AND OTHER DETAILS ARE CONSIDERED PART OF THE REINFORCEMENT BID ITEM AND NOT PAID SEPARATELY. 

     10. REPAIR MATERIAL SHALL BE MACHINE APPLIED CONCRETE/MORTAR AS SPECIFIED. HAND 

    APPLIED CONCRETE/MORTAR REPAIRS ARE ALLOWED AS DESIRED BY THE CONTRACTOR BUT EXPECTED TO BE USED IN ONLY HARD TO REACH AREAS. 

     

     11.  SLAB SOFFIT REPAIRS SHALL BE AS SHOWN ON DETAILS A AND B. REINFORCING REPAIRS, IF 

    REQUIRED SHALL BE AS SHOWN ON DETAILS R1, R2 AND R3.  12. BEAM AND GIRDER REPAIRS SHALL BE AS SHOWN ON DETAILS E & F ON DRAWING S204. 

    REINFORCING REPAIRS, IF REQUIRED, SHALL BE AS SHOWN ON DETAILS R1, R2 AND R3 ON DRAWING S203. 

     13. WELDED WIRE FABRIC SHALL BE 2 X 3 ‐ #12 X #12 GALVANIZED. SECURE IN PLACE BY WIRE TIED 

    TO EXISTING REINFORCEMENT AT NOT MORE THAN 18” CENTERS. WHERE EXISTING REINFORCEMENT IS NOT ADEQUATE TO SECURE FABRIC, CONTRACTOR SHALL PROPOSE PREFERRED APPROACH SUCH AS POWDER DRIVEN ANCHORS. 

     14. CRACK REPAIRS SHALL BE AS DIRECTED IN THE FIELD AND AS DETERMINED BY FURTHER 

    EXPLORATORY INVESTIGATION PAID FOR BY A BID ITEM ALLOWANCE.  A.  STRUCTURAL CRACKS WITHOUT SIGNIFICANT REBAR CORROSION SHALL HAVE EPOXY‐

    INJECTED CRACK REPAIR PER SPECIFICATIONS AND DETAIL D. B.  NON‐STRUCTURAL CRACKS SHALL EITHER BE CONSIDERED FOR FUTURE REPAIR AS 

    PRIORITY 3 OR SHALL BE SEALED PER SPECIFICATION “GROOVE AND SEAL” METHOD AND PER DETAIL C.  

    C.  IN ADDITION TO PROVIDING MEASUREMENT FOR PAYMENT BY THE PROVIDED SPREADSHEET, THE CONTRACTOR SHALL MAP PRIORITY 3 CRACKS THAT ARE POSTPONED FOR FUTURE REPAIR. 

  • wsTypewritten Text452

    wsTypewritten Text451

    wsTypewritten Text450

    wsTypewritten Text449

    wsTypewritten Text448

    wsTypewritten Text447

    wsTypewritten Text446

    wsTypewritten Text445

    wsTypewritten Text444

    wsTypewritten Text443

    wsTypewritten Text6' #7, 14' #6

    wsTypewritten Text1' #7, 19' #6

    wsTypewritten Text3' #7, 17' #6

    wsTypewritten Text4' #7, 16' #6

    wsTypewritten Text3' #7, 17' #6

    wsTypewritten Text5' #7, 15' #6

    wsTypewritten Text5' #7, 15' #6

    wsLine

    wsCalloutGate 4

    wsLine

    wsTypewritten Text6 SF Soffit Repair

    wsTypewritten Text24 SF Soffit Repair

    wsTypewritten Text15 SF Soffit Repair

    wsTypewritten Text26.5 SF Soffit Repair

    wsTypewritten Text26 SF Soffit Repair

    wsTypewritten Text80 SF Soffit Repair

    wsTypewritten Text442

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsTypewritten Text463

    wsTypewritten Text462

    wsTypewritten Text461

    wsTypewritten Text460

    wsTypewritten Text459

    wsTypewritten Text458

    wsTypewritten Text457

    wsTypewritten Text456

    wsTypewritten Text455

    wsTypewritten Text454

    wsTypewritten Text453

    wsTypewritten Text4' #7, 16' #6

    wsTypewritten Text5' #7, 15' #6

    wsTypewritten Text5' #7, 15' #6

    wsTypewritten Text5' #7, 15' #6

    wsTypewritten Text5' #7, 15' #6

    wsTypewritten Text3' #7, 17' #6

    wsTypewritten Text4' #7, 16' #6

    wsTypewritten Text3' #7, 17' #6

    wsTypewritten Text6' #7, 13' #6

    wsTypewritten Text20' #6

    wsLine

    wsCalloutGate 4

    wsTypewritten Text16.5 SF Soffit Repair

    wsTypewritten Text29 SF Soffit Repair

    wsTypewritten Text25 SF Soffit Repair

    wsTypewritten Text9 SF Soffit Repair

    wsRectangle

    wsRectangle

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsTypewritten Text473

    wsTypewritten Text472

    wsTypewritten Text471

    wsTypewritten Text470

    wsTypewritten Text469

    wsTypewritten Text468

    wsTypewritten Text467

    wsTypewritten Text466

    wsTypewritten Text465

    wsTypewritten Text464

    wsTypewritten Text463

    wsTypewritten Text20' #6

    wsTypewritten Text20' #2

    wsTypewritten Text20' #2

    wsTypewritten Text20' #2

    wsTypewritten Text20' #2

    wsTypewritten Text20' #6

    wsTypewritten Text20' #6

    wsTypewritten Text20' #2

    wsTypewritten Text20' #2

    wsCalloutNew Reinforcement intercepts angled beams. See Turner RFI 111 for clarifications.

    wsLine

    wsLine

    wsLine

    wsCalloutNew Reinforcement intercepts steel beam at East end. See Turner RFI 112 and 114 for clarifications

    wsLine

    wsTypewritten Text9 SF Soffit Repair

    wsRectangle

  • wsTypewritten Text485

    wsTypewritten Text484

    wsTypewritten Text483

    wsTypewritten Text482

    wsTypewritten Text481

    wsTypewritten Text480

    wsTypewritten Text479

    wsTypewritten Text478

    wsTypewritten Text477

    wsTypewritten Text476

    wsTypewritten Text475

    wsTypewritten Text474

    wsTypewritten Text473

    wsTypewritten Text20' #6

    wsTypewritten Text20' #6

    wsCalloutGate 3

    wsLine

    wsLine

    wsTypewritten Text72 SF Soffit Repair

    wsPolygonal Line

  • wsTypewritten Text496

    wsTypewritten Text495

    wsTypewritten Text494

    wsTypewritten Text493

    wsTypewritten Text492

    wsTypewritten Text491

    wsTypewritten Text490

    wsTypewritten Text489

    wsTypewritten Text488

    wsTypewritten Text487

    wsTypewritten Text486

    wsTypewritten Text#4 Repair

    wsTypewritten Text#4 Repair

    wsTypewritten Text18' #2 Repair

    wsTypewritten Text18' #2 Repair

    wsTypewritten Text#4 Repair

    wsPolygonal Line

    wsPolygonal Line

    wsCalloutExisting Vault Structures excavation, formed, and poured per attached detail.

    wsLine

    wsLine

    wsCalloutGate 3

    wsLine

    wsTypewritten Text41 SF Soffit Repair

    wsTypewritten Text72 SF Soffit Repair

    wsTypewritten Text52 SF Soffit Repair

    wsTypewritten Text80 SF Soffit Repair

    wsTypewritten Text80 SF Soffit Repair

    wsTypewritten Text65 SF Soffit Repair

    wsTypewritten Text68 SF Soffit Repair

    wsTypewritten Text68 SF Soffit Repair

    wsTypewritten Text65 SF Soffit Repair

    wsPolygon

    wsPolygonal Line

    wsRectangle

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygon

    wsPolygon

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsTypewritten Text508

    wsTypewritten Text507

    wsTypewritten Text506

    wsTypewritten Text505

    wsTypewritten Text504

    wsTypewritten Text503

    wsTypewritten Text502

    wsTypewritten Text501

    wsTypewritten Text500

    wsTypewritten Text499

    wsTypewritten Text498

    wsTypewritten Text497

    wsTypewritten Text5' #7, 13' #6

    wsTypewritten Text5' #7, 13' #6

  • wsTypewritten Text514

    wsTypewritten Text513

    wsTypewritten Text512

    wsTypewritten Text511

    wsTypewritten Text510

    wsTypewritten Text509

    wsTypewritten Text7' #7, 13' #6

    wsTypewritten Text5' #7, 13' #6

    wsLine

    wsLine

    wsLine

    wsCalloutGate 2

    wsTypewritten Text50 SF Soffit Repair

    wsTypewritten Text75 SF Soffit Repair

    wsTypewritten Text94 SF Soffit Repair

    wsTypewritten Text95 SF Soffit Repair

    wsTypewritten Text58 SF Soffit Repair

    wsTypewritten Text68 SF Soffit Repair

    wsTypewritten Text90 SF Soffit Repair

    wsTypewritten Text54 SF Soffit Repair

    wsTypewritten Text54 SF Soffit Repair

    wsTypewritten Text74 SF Soffit Repair

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsTypewritten Text4' #7, 3' #6

    wsTypewritten Text6' #6

    wsTypewritten Text2' #7, 3' #6

    wsCalloutSeawall Repair - See Attached Detail

    wsTypewritten Text525.5

    wsTypewritten TextA

    wsTypewritten TextC

    wsTypewritten TextB

    wsTypewritten TextD

    wsTypewritten Text90 SF Soffit Repair

    wsTypewritten Text27 SF Soffit Repair

    wsTypewritten Text52 SF Soffit Repair

    wsTypewritten Text78 SF Soffit Repair

    wsTypewritten Text33 SF Soffit Repair

    wsTypewritten Text70 SF Soffit Repair

    wsTypewritten Text8 SF Soffit Repair

    wsTypewritten Text41 SF Soffit Repair

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsTypewritten TextA

    wsTypewritten TextB

    wsTypewritten TextC

    wsTypewritten TextD

    wsTypewritten Text534

    wsTypewritten Text535

    wsLine

    wsLine

    wsCalloutGate 1

    wsLine

    wsTypewritten Text33 SF Soffit Repair

    wsTypewritten Text64 SF Soffit Repair

    wsTypewritten Text50 SF Soffit Repair

    wsTypewritten Text63 SF Soffit Repair

    wsTypewritten Text72 SF Soffit Repair

    wsTypewritten Text72 SF Soffit Repair

    wsTypewritten Text56 SF Soffit Repair

    wsTypewritten Text55 SF Soffit Repair

    wsTypewritten Text32 SF Soffit Repair

    wsTypewritten Text53 SF Soffit Repair

    wsTypewritten Text22 SF Soffit Repair

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

    wsPolygonal Line

  • wsCalloutDetail 3 S204

    wsCalloutDetail 3 S204

  • wsCalloutDetail 3 S204

    wsCalloutDetail 3 S204

    wsTypewritten Text535

    wsTypewritten Text534

    wsTypewritten Text533

    wsTypewritten Text532

    wsTypewritten TextA

    wsTypewritten TextB

    wsTypewritten TextC

    wsTypewritten TextD

    wsPolygonal Line

    wsLine

    wsLine

    wsLine

    wsLine

    wsCalloutBeam Repair Detail 3 S204

    wsCalloutBeam Repair Detail 3 S204

  • wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsRectangle

    wsCalloutExisting Drain Re-Installed

    wsCalloutNew Zurn Drain

    wsCalloutNew Zurn Drain

    wsCalloutNew Zurn Drain

    wsCalloutNew Zurn Drain

    wsTypewritten TextPier 30-32 Media Filers * The 9 EA 4'x4' locations indicated belowwere demolished and repaired perthe attached sketch. Drains werere-installed at 5 locations.

  • 12a

    I-ra—S‘V-4’4I-’

    ‘3e

    NN

    V‘3

    //

    —r

    j

    I

    C

    )

    -t‘-I

    41

    4

    C4

    -A

    cs“V4VI

    I

    4

    3—

    43-,

    Ii

    4V

    4V

    -S

    V4

    SJ

    I5)4

    t’l

    II‘

    ——

    3—

    fln

    I

    wsTypewritten TextMedia Filter Slab Repair Detail

  • Beam Encasement

    Beam Number QuantitiesOr Nearest Bay Repair Lenght(LF) Demo (CF) Type 1 Detail G Type 2 RC Beam Type 3 Weld Web Ledger? Type 4 Abutment Type 5 Paint Type 6 Encaps. Type 7 Weld/Encaps. # Dowels Status Date Completed Port Signature Repair Cost

    501 20 75.0 X 14 Complete 11/29/2012 26,600.00$ 502 20 75.0 X 14 Complete 12/14/2012 26,600.00$ 503 20 75.0 X 14 Complete 11/29/2012 26,600.00$ 504 20 75.0 X 14 Complete 12/14/2012 26,600.00$ 505 20 75.0 X 14 Complete 12/20/2012 26,600.00$ 506 20 75.0 X 14 Complete 12/20/2012 26,600.00$ 507 NA 4.0 X 8 Complete 1/4/2013 16,592.84$ 508 NA 4.0 X 8 Complete 1/10/2013 16,592.84$ 509 18 36.0 X 14 Complete 12/20/2012 23,940.00$ 510 18 36.0 X 14 Complete 12/20/2012 23,940.00$

    Total Cost 240,665.68$ Total Contract 175,000.00$ Total Change Order 65,665.68$

    Gate 1 NR

    Gate 2512/513 20 15.0 1 13 7 Complete 1/24/2013 15,935.54$

    Gate 3 NR

    Gate 4450/451 20 15.0 1 16.83333333 3.166666667 Complete 1/30/2013 15,216.06$ 451/452 20 15.0 1 14.58335 5.41665 Complete 1/24/2013 15,638.36$ 452/453 20 15.0 1 14.75 5.25 Complete 1/24/2013 15,607.08$ 453/454 20 15.0 1 15.75 4.25 Complete 1/24/2013 15,419.39$

    77,816.44$

    Dimensions

    Extra Work

    Total Gate Beam Encasement

  • Beam Encasement

    Beam Number QuantitiesOr Nearest Bay Repair Lenght(LF) Demo (CF) Type 1 Detail G Type 2 RC Beam Type 3 Weld Web Ledger? Type 4 Abutment Type 5 Paint Type 6 Encaps. Type 7 Weld/Encaps. # Dowels Status Date Completed Port Signature Repair Cost

    Dimensions

    Additional Work

    443/444 20 15.0 1 14.375 5.625 Complete 1/30/2013 15,677.47$ 444/445 20 15.0 1 19 1 Complete 1/30/2013 14,809.40$ 445/446 20 15.0 1 16.54166667 3.458333333 Complete 1/30/2013 15,270.80$ 446/447 20 15.0 1 15.79166667 4.208333333 Complete 1/30/2013 15,411.57$

    454/455 20 15.0 1 15.5 4.5 Complete 1/24/2013 15,466.32$ 455/456 20 15.0 1 15.25 4.75 Complete 1/24/2013 15,513.24$ 456/457 20 15.0 1 15.25 4.75 Complete 1/30/2013 15,513.24$ 457/458 20 15.0 1 15.41666667 4.583333333 Complete 1/30/2013 15,481.96$ 458/459 20 15.0 1 16.95833333 3.041666667 Complete 1/30/2013 15,192.60$ 459/460 20 15.0 1 16.29166667 3.708333333 Complete 1/30/2013 15,317.73$ 460/461 20 15.0 1 17.04166667 2.958333333 Complete 2/6/2013 15,176.96$ 461/462 20 15.0 1 14.25166667 5.748333333 Complete 2/6/2013 15,700.61$ 462/463 20 15.0 1 20 Complete 2/6/2013 14,621.71$ 463/464 20 15.0 1 20 Complete 2/6/2013 14,621.71$

    468/469 20 15.0 20 Complete 2/6/2013 12,757.80$ 469/470 20 15.0 20 Complete 2/6/2013 12,757.80$

    476/477 20 15.0 20 Complete 2/14/2013 12,757.80$ 477/478 20 15.0 20 Complete 2/14/2013 12,757.80$

    490/491 N/A 4.0 1 Complete 12/27/2012 16,592.84$

    507/508 18 15.0 1 13 5 Complete 2/14/2013 14,284.38$ 508/509 18 15.0 1 13 5 Complete 2/14/2013 14,284.38$

    522/523 7 5.3 1 2.625 4.375 Complete 1/24/2013 COR 4523/524 5.5 4.1 5.5 Complete 1/24/2013 COR 4524/525 5 3.8 1 2.75 2.25 Complete 1/24/2013 COR 4

    309,968.11$

    Extra Work

    Total Marginal Wharf Beam Encasement

  • Soffit Repairs

    Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes

    515 50 5 20.8 X 18 10 Complete 12/14/2012516 75 5 31.3 X 18 14 Complete 12/14/2012517 94 4 31.3 X 18 18 Complete 12/14/2012518 95 4 31.7 X 25 18 Complete 11/29/2012519 58 5 24.2 X 18 12 Complete 11/29/2012520 90 8 60.0 X 60 22 Complete 1/30/2013521 27 4 9.0 X 6 8 Complete 11/29/2012522 52 4 17.3 X 16 12 Complete 12/14/2012523 78 4 26.0 X 25 14 Complete 12/14/2012524 33 4 11.0 X 8 8 Complete 12/14/2012525 70 4 23.3 X 20 14 Complete 12/28/2012526 8 4 2.7 X 6 3 Complete 11/29/2012527 41 4 13.7 X 16 8 Complete 12/14/2012528 33 4 11.0 X 12 8 Complete 12/14/2012529 64 4 21.3 X 22 12 Complete 11/16/2012530 50 5 20.8 X 18 8 Complete 11/16/2012531 63 4 21.0 X 24 10 Complete 11/16/2012532 72 5 30.0 X 28 14 Complete 11/16/2001533 72 5 30.0 X 28 14 Complete 11/16/2012

    Dimensions Quantities

  • Soffit Repairs

    Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes

    Dimensions Quantities

    Gate 1 Completed531 A531 B531 C531 D532 A 56 4 18.7 X 34 10 Complete 1/18/2013 16,800.00$ 532 B532 C532 D533 A 55 4 18.3 X 16 10 Complete 1/18/2013 16,500.00$ 533 B533 C533 D

    534 32 4 10.7 X 12 6 Complete 1/18/2013 9,600.00$ 534 A 53 4 17.7 X 12 10 Complete 1/18/2013 15,900.00$ 534 B 22 2 3.7 X 0 0 Complete 1/24/2013 5,060.00$ 534 C534 D535 A535 B535 C535 D536 C536 D537 D

    63,860.00$ Total Gate 1 Soffit Repairs

    Extra Work

  • Soffit Repairs

    Bay Number Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes

    Dimensions Quantities

    Gate 2 Completed509510 68 4 22.7 X 24 20 Complete 1/4/2013 20,400.00$ 511 90 4 30.0 X 16 26 Complete 1/4/2013 27,000.00$ 512 54 4 18.0 X 25 18 Complete 1/4/2013 16,200.00$ 513 54 4 18.0 X 31 18 Complete 12/28/2012 16,200.00$ 514 74 4 24.7 X 42 20 Complete 12/28/2012 22,200.00$

    102,000.00$

    Gate 3 Completed484 72 5 30.0 X 38 18 Complete 1/18/2013 21,600.00$

    21,600.00$

    Gate 4 Compeleted448 6 4 X 4 2 Complete 1/30/2013 1,380.00$ 449 24 4 X 16 6 Complete 1/30/2013 5,520.00$ 450 15 5 X 8 4 Complete 1/30/2013 3,450.00$ 451 26.5 5 X 18 8 Complete 1/30/2013 6,095.00$ 452 26 5 X 18 8 Complete 1/30/2013 5,980.00$ 453 16.5 5 X 6 6 Complete 1/30/2013 3,795.00$ 454 29 5 X 20 10 Complete 1/30/2013 6,670.00$

    32,890.00$

    220,350.00$

    FO 114 Completed442 80 3 X 42 20 Pour 2/21/13 2/21/2013 24,000.00$ 455 25 3 X 16 8 Pour 2/21/13 2/21/2013 7,500.00$ 461 9 3 X 12 4 Pour 2/21/13 2/21/2013 2,700.00$ 466 9 3 X 12 4 Pour 2/21/13 2/21/2013 2,700.00$ 489 41 3 X 36 14 Pour 2/21/13 2/21/2013 12,300.00$ 490 72 3 X 50 22 Pour 2/21/13 2/21/2013 21,600.00$ 491 52 3 X 40 18 Pour 2/21/13 2/21/2013 15,600.00$ 492 80 3 X 40 20 Complete 2/14/2012 24,000.00$ 493 80 3 X 40 20 Complete 2/14/2012 24,000.00$ 494 65 3 X 36 16 Complete 2/14/2012 19,500.00$ 495 68 3 X 46 22 Pour 2/21/13 2/21/2013 20,400.00$ 496 65 3 X 36 16 Complete 2/14/2012 19,500.00$

    193,800.00$

    Extra Work

    Total Soffit Repairs

    Total Gate 2 Soffit Repairs

    Total Gate 3 Soffit Repairs

    Total Gate 4 Soffit Repairs

    Total Gate Soffit Repairs

  • Beam Repairs

    Beam # Status Date Completed Port Signature Repair CostSF Of Repair (SF) Demo Depth (IN) Pour CY Demo (CF) Hand Patch Formed Concrete # Dowels # Anodes

    311 8.25 11 0.28 7.6 X 8 4 Complete 11/16/2012312 8.25 12 0.31 8.3 X 6 4 Complete 12/28/2012335 8 12 0.30 8.0 X 4 4 Complete 11/29/2012338 8 12 0.30 8.0 X 6 4 Complete 11/29/2012

    Gate 1 Repair Length LF531 A 0.00 0.0531 B 0.00 0.0531 C 0.00 0.0531 D 0.00 0.0532 A 17.25 12 0.64 17.3 X 2 10 Complete 1/18/2013 15,766.50$ 532 B 0.00 0.0532 C 0.00 0.0532 D 0.00 0.0533 A 17.25 12 0.64 17.3 X 2 10 Complete 1/18/2013 15,766.50$ 533 B 0.00 0.0533 C 0.00 0.0533 D 0.00 0.0

    534 4 4 0.05 1.3 X Complete 1/24/2013 1,160.00$ 534 A 0.00 0.0534 B 0.00 0.0534 C 0.00 0.0534 D 0.00 0.0535 A 0.00 0.0535 B 0.00 0.0535 C 0.00 0.0

    32,693.00$

    Dimensions Quantities

    Extra Work

    Total Gate 1 Beam Repairs

  • wsTypewritten TextSeawall Repair Detail

  • wsLine

    wsLine

    wsTypewritten TextAfter Cleaning and WeldingEncapsulate with WWM and ConcretePer Repair Option 6.

    wsTypewritten TextRepair Option 7

    wsTypewritten Text`

    wsTypewritten Text

  • wsLine

    wsLine

    wsTypewritten Text7" Depth

    wsTypewritten Text#5

    wsTypewritten Text24"

    wsTypewritten Text#6

    wsLine

    wsLine

    wsLine

    wsLine

    wsLine

    wsLine

    wsTypewritten TextVault Repair

  • Fax: Telephone:

    Project # 1836001-CO

    AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W

    November 29, 2012

    RFI

    RFI #: 111 11/28/2012Date Required:11/21/2012Date Created:

    TO: FROM:

    Nicholas PellegrinoWayne Stonecipher

    Power Engineering Construction Company Turner Construction Company

    Pier 29 1/2

    San Francisco, CA 94111

    1501 Viking Street Suite 200

    Alameda, CA 94501

    415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510

    DisciplineSubject Category

    Confirmation OnlyStructuralPier 30-32 – Concrete Beam Encasement

    at Marginal Wharf Intercepts Angle Beam

    TitleRevision DateRev NoDwg No.

    Drawing References: Spec Section References:

    Sketch References:

    Question:

    There are ten encasement beams in the original contract that have been changed to a reinforced concrete

    beam detail in response to Power’s RFI 106. As the work has proceeded we have noted that 7 of the 10 beams

    have an angled concrete encapsulated steel beam that intercepts the beam we are required to repair. These

    beams are not shown on the drawings and result in additional demolition, rebar splices, and formwork in order

    to complete the contract repairs. We feel we have the information to complete these repairs, but the additional

    time required should be at extra cost.

    Suggestion:

    Answer: Date Answered: 11/29/2012

    Please proceed with repair. Specified new rebar in beam needs to continue through the angled beam

    (continuously)-Richard Rhee

    Company Name Contact Name Copies NotesCc: Fax Number

    TCCO - RFI Individual Printout_V4.rpt

    Page 1 of 1RPT Revised: 9/16/2009

    Turner Construction Company

  • Fax: Telephone:

    Project # 1836001-CO

    AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W

    December 03, 2012

    RFI

    RFI #: 112 11/28/2012Date Required:11/21/2012Date Created:

    TO: FROM:

    Nicholas PellegrinoWayne Stonecipher

    Power Engineering Construction Company Turner Construction Company

    Pier 29 1/2

    San Francisco, CA 94111

    1501 Viking Street Suite 200

    Alameda, CA 94501

    415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510

    DisciplineSubject Category

    Confirmation OnlyStructuralPier 30-32 – Concrete Beam Encasement

    Connection in Marginal Wharf at East

    End

    TitleRevision DateRev NoDwg No.

    Drawing References: Spec Section References:

    Sketch References:

    Question:

    There are ten encasement beams in the original contract that have been changed to a reinforced concrete

    beam detail in response to Power’s RFI 003. The repair requires dowels 7 EA #8 dowels at each end of the

    beam. When the East end of the new concrete beams intercepts a pile we have good concrete to dowel into.

    However the beams being encased are spaced approximately 5’ on center and the piles are approximately 15’

    on center. The intermediate beams between piles join a steel encased concrete beam similar to the one being

    repaired. This is unreinforced concrete which is not efficient for the dowels to be placed.

    At these beam locations we could weld the bar to the perpendicular North-South beam flange or web in place

    of dowels?

    As a secondary option, should the dowels at the East end be installed with hooks placed through the web of

    the perpendicular beam? This would allow us to pour the beam and create a beam pocket on the East side of

    the North-South intercepting beam. This beam pocket could be reinforced or doweled up into the slab above to

    tie the two beams together?

    Suggestion:

    Answer: Date Answered: 12/3/2012

    Please see attached sketch-Richard Rhee

    Company Name Contact Name Copies NotesCc: Fax Number

    TCCO - RFI Individual Printout_V4.rpt

    Page 1 of 1RPT Revised: 9/16/2009

    Turner Construction Company

  • Fax: Telephone:

    Project # 1836001-CO

    AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W

    December 05, 2012

    RFI

    RFI #: 114 12/11/2012Date Required:12/4/2012Date Created:

    TO: FROM:

    Nicholas PellegrinoWayne Stonecipher

    Power Engineering Construction Company Turner Construction Company

    Pier 29 1/2

    San Francisco, CA 94111

    1501 Viking Street Suite 200

    Alameda, CA 94501

    415-233-9249Phone: Fax:Fax:Phone: 510-337-3808510-502-1510

    DisciplineSubject Category

    Drawing ClarificationStructuralPier 30-32 – Reinforcement Details in RFI

    111 and 112

    TitleRevision DateRev NoDwg No.

    Drawing References: Spec Section References:

    Sketch References:

    Question:

    RFI 111 gave reinforcement details for a new reinforced concrete

    beam. The reinforcement will exist both where the bottom flange

    is intact and where it is deteriorated. We assumed that the bottom

    bars would be installed below the bottom flange of the steel beam

    to provide containment for the concrete beam. RFI 112 indicates

    that the bottom bars of the new reinforced beam are placed above

    the bottom flange of the steel beam leaving the concrete below

    unreinforced.

    We would propose to install the reinforcement below the flange of

    the existing beam. At the East end of the beam where we need to

    connect to an existing steel beam running North South addressed in

    RFI 112, we could install “Z” shaped bars to lap the new steel. The

    middle bar will have to be placed through the bottom flange in

    order to be embedded in the North South beam. See attached

    sketches.

    Is this acceptable?

    Please advise.

    Suggestion:

    Answer: Date Answered: 12/5/2012

    TCCO - RFI Individual Printout_V4.rpt

    Page 1 of 2RPT Revised: 9/16/2009

    Turner Construction Company

  • Project # 1836001-CO

    AC34 Pier Repairs (Pier 27 Cruis Ship Terminal CO W

    December 05, 2012

    RFI

    [One Per Page]

    They shall be installed below bottom of the flange. As for RFI 112, the "lapping" rebar being attached to girder

    will be installed as shown in the sketch. Please have field crew talk to Tim with that sketch.-Richard Rhee

    Company Name Contact Name Copies NotesCc: Fax Number

    TCCO - RFI Individual Printout_V4.rpt

    Page 2 of 2RPT Revised: 9/16/2009

    Turner Construction Company