Artisitic Millinersssmain
-
Upload
syed-danish-ghani -
Category
Documents
-
view
96 -
download
1
Transcript of Artisitic Millinersssmain
ARTISTIC MILLINERS
LEED (Leadership in Energy Environmental Design) by United States Green Building Council.
CertificationPrepared by
SYED DANISH GHANI
2
Leadership in Energy & Environmental Design®
A leading-edge system for designing,constructing, operating and certifying the
world’sgreenest buildings.
3
INTRODUCTION:Artistic Milliner , Pvt , Ltd Will be the first LEED facility in Pakistan Design for LEED Gold,
It is a leading multinational apparel manufacturer in Karachi, in which we employing over 10,000 peoples since many years. The company has initiated an Energy & Water Efficiency Improvement program with the intention of increasing energy and water efficiency leading to M&S Plan A certification and thereafter, LEED GOLD certification.
Main features Reduction of water use with efficient fixtures and use of treated water for
flushing. Efficient lighting and controls (mostly use natural light or LED). Efficient HVAC (heating ventilation and air condition ) systems. Improve erosion and sedimentation control to reduce negative impacts on
water and air quality. Additional Energy and water flow metering for measurement and verification. Earmarked areas for parking fuel efficient and pool vehicles. Better waste management - storage and collection program for waste
generated . Indoor air quality (IAQ) improvements. High performance glass to reduce heat gain. Heat recovery from generators to generate steam using heat recovery boilers. Use of generator jacket water for running an absorption chiller to air condition
cooling in merchandising and office spaces.
EnergySolve International (Pvt) Ltd 4
Benefits & Impacts Tangible benefits:
Over 25% reductions in energy consumption. Over 45% reductions in water consumption.
Intangible benefits: Green image for the facility and group Health and safety of the building occupants Enhanced occupant comfort Higher productivity of occupants Best operating practices Incorporate latest techniques / technologies
EnergySolve International (Pvt) Ltd 5
Energy Monitoring MetersElectricity
Production
Lighting
Office
Air Conditioning
Compressed air system
Boiler
RO Plant
EnergySolve International (Pvt) Ltd 6
Electricity
Production
Lighting
Office
Air Conditionin
g Compresse
d air system
Boiler
RO Plant
Water Management Efficient water fixtures installed Rain water harvesting used for flushing Water sub meters installed Daily water usage monitoring implemented to
reduce its usage Awareness program on water conservation
conducted
EnergySolve International (Pvt) Ltd 7
Low flow self-closing taps in wash basins, canteen
EnergySolve International (Pvt) Ltd 8
Installed manual flush valves in worker toilets
ECO Factory Policy & Management
ECO factory policy established Environmental sustainability plan developed and
practicing ECO factory delivery manager & team appointed Waste control, reduction & recycling plan implemented Preventive maintenance schedule implemented
EnergySolve International (Pvt) Ltd 9
Waste Reduction & Recycling Waste control, reduction and recycling plan
implemented Waste bins are clearly marked and located Segregation completed at the central waste
recycling storage area A Bulb eater installed for safe disposing of
mercury in florescent lamps Contracts signed with recyclers Awareness program is conducted to reduce
waste Waste is 100% recycled and zero to landfill!
EnergySolve International (Pvt) Ltd 10
Way forward…. Regular monitoring of performance to sustain
benefits Further improvements to HVAC, compressed air and
boiler/steam distribution system Further reduction of waste Annual energy and water audits from a third party Certification
EnergySolve International (Pvt) Ltd 11
EnergySolve International (Pvt) Ltd 12
EnergySolve International (Pvt) Ltd 13
EnergySolve International (Pvt) Ltd 14
Conclusions When completed, Artistic Milliners a new
facility in Karachi, Pakistan will be a LEED “GREEN” installation and it will stand out as a proud Achievement.
The LEED rating will result in a high performance building with substantial reduction in operating costs to Artistic Milliners, owner of the facility.
Energy Solve will facilitate and hand hold Artistic Milliners project team right from LEED registration.
EnergySolve International (Pvt) Ltd 15
16
THANKYOU
Prepared bySYED DANISH GHANI