Arroyo SecoEcosystem RestorationIntegrated Feasibility Study
BUILDING STRONG®And Taking Care Of People!
• Study Overview• Background• Civil Works/SMART Planning Process• Schedule• Preliminary Study Objectives• Measures and Alternatives
• CEQA Overview
Meeting Objectives
BUILDING STRONG®And Taking Care Of People!
Federal – Local Partnership
U.S. Army Corps of EngineersLead Agency
Los Angeles CountyFlood Control District
Lead Local Sponsor
BUILDING STRONG®And Taking Care Of People!
Local Partnerships
Council of ArroyoSeco Agencies
BUILDING STRONG®And Taking Care Of People!
2005Partnershipbetween Corpsand LACFCD
2008PartnershipbetweenLACFCD andlocal agencies
2002Corps completesArroyo SecoWatershedReconnaissanceStudy
2011Corps completes ArroyoSeco WatershedFeasibility ScopingMeeting Documentation(Baseline Conditions)
2013Corps holdsrescoping charetteworkshop
Study Timeline
2017Corps to submitFinal Report
2014Corps holds NEPA PublicScoping Meeting(Start of 3-year Studyperiod)
2012CorpsmodernizesPlanningprocess -SMART
BUILDING STRONG®And Taking Care Of People!
ARROYO SECO ECOSYSTEMRESTORATION FEASIBILITY STUDY
BUILDING STRONG®And Taking Care Of People!
RECONNAISSANCEPHASE
REPORT
FEASIBILITYPHASE
REPORT
FINAL DESIGN
CONSTRUCTIONDOCUMENTS
CONSTRUCTION
PROJECT
OPERATION ANDMAINTENANCE
(BY LOCALSPONSOR)
Civil Works Process
CongressionalAuthorization
BUILDING STRONG®And Taking Care Of People!
6
5
4
3
2
1
In Progress
Six Step Planning Process
BUILDING STRONG®And Taking Care Of People!
SMART Process
RECONNAISSANCEPHASE
REPORT
RECONNAISSANCEPHASE
REPORT
FEASIBILITYPHASE
REPORT
FINAL DESIGN
CONSTRUCTIONDOCUMENTS
FINAL DESIGN
CONSTRUCTIONDOCUMENTS
CONSTRUCTION
PROJECT
CONSTRUCTION
PROJECT
OPERATION ANDMAINTENANCE
(BY LOCALSPONSOR)
OPERATION ANDMAINTENANCE
(BY LOCALSPONSOR)
BUILDING STRONG®And Taking Care Of People!
Milestones Date
Charette November 2013
Review Plan approved August 2014
Alternative Milestone May 2015
Tentatively Selected Plan March 2016
Agency Decision Milestone September 2016
Submit Final Report March 2017
CWRB May 2017
Signed Chief’s Report June 2017
Termination Date August 2017
Study Schedule
BUILDING STRONG®And Taking Care Of People!
• Decision document
• Includes
• Recommended action
• Cost estimate for action
• NEPA and CEQA document
• Leads to request for Congressional authorization forfunding towards design and construction
Integrated Feasibility Study Report
BUILDING STRONG®And Taking Care Of People!
12
Those restoration opportunities that are associated withwetlands, riparian and other floodplain and aquaticsystems are most appropriate for Corps involvement.
Ecosystem Restoration Fundamentals
BUILDING STRONG®And Taking Care Of People!
Almost complete loss of stream conditions (structure andfunction) that support aquatic species & their habitats.
Identified Problem
BUILDING STRONG®And Taking Care Of People!
Restore quality and quantity of aquatic, wetlands, andriparian habitats
Restore natural channel sinuosity
Improve Aquatic Habitat
Enhance Recreational Opportunities (compatible withrestoration; passive; example – nature trail, educationalsignage)
Planning Objective and Study Goals
BUILDING STRONG®And Taking Care Of People!
Maintain flood risk management function/capability of existing ArroyoSeco system
Maintain Devil’s Gate Dam flood storage capacity
Avoid Hazardous and Toxic Waste (HTW) site at Jet Propulsion Lab
Minimize impacts to transportation infrastructure such as highwaysand bridges
Minimize adverse impacts to nearby residences, especially historicand culturally significant districts and properties
Minimize impacts to existing facilities and infrastructure such asRose Bowl
Planning Constraints andConsiderations
BUILDING STRONG®And Taking Care Of People!
CHAP evaluation –Combined HabitatAssessment Protocol
Allows comparison ofquality of existinghabitat versusalternatives
Assists in selection ofthe recommendedplan
Habitat Evaluation
BUILDING STRONG®And Taking Care Of People!
Study Location
BUILDING STRONG®And Taking Care Of People!
Arroyo Seco Watershed
BUILDING STRONG®And Taking Care Of People!
StudyReaches
BUILDING STRONG®And Taking Care Of People!
Reach 1
BUILDING STRONG®And Taking Care Of People!
Reach 2
BUILDING STRONG®And Taking Care Of People!
Reach 3
BUILDING STRONG®And Taking Care Of People!
Reach 4
BUILDING STRONG®And Taking Care Of People!
Reach 5
BUILDING STRONG®And Taking Care Of People!
Reach 6
BUILDING STRONG®And Taking Care Of People!
Reach 7
BUILDING STRONG®And Taking Care Of People!
Reach 8
BUILDING STRONG®And Taking Care Of People!
No Action: Under this alternative, the Corps wouldtake no action to restore any ecosystem functions orvalues within the Arroyo Seco study area.
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
Parallel Natural System: Low-Flow Channel
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
Parallel Natural System: RCB Culverts with low-flowchannel
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
Notched Side-Walls with low-flow channel
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
Floodplain Benching
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
Sheet-pile Bank Protection with Floodplain Benching
Focused Array of Alternatives(Under Evaluation)
BUILDING STRONG®And Taking Care Of People!
34
California Environmental Quality Act(CEQA)
BUILDING STRONG®And Taking Care Of People!
35
CEQA Environmental Impact Report(EIR) Process
BUILDING STRONG®And Taking Care Of People!
Notice of Preparation (NOP) and scoping meeting
Draft EIR
45-day review and comment period
Public meeting
Public Participation
BUILDING STRONG®And Taking Care Of People!
Tentatively Selected Plan March 2016
Draft Study/EIS/EIRDocument• 45 day Public Review
Period• Public Meeting
June – July 2016
Agency Decision Milestone September 2016
Milestones Date
Charette November 2013
Review Plan approved August 2014
Alternative Milestone May 2015
Tentatively Selected Plan March 2016
Agency Decision Milestone September 2016
Submit Final Report March 2017
CWRB May 2017
Signed Chief’s Report June 2017
Termination Date August 2017
Schedule
BUILDING STRONG®And Taking Care Of People!
Tentatively Selected Plan March 2016
Draft Study/EIS/EIRDocument• 45 day Public Review
Period• Public Meeting
June – July 2016
Agency Decision Milestone September 2016
Schedule
BUILDING STRONG®And Taking Care Of People!
Aesthetics
Agriculture and ForestryResources
Air Quality
Biological Resources
Cultural Resources
Geology & Soils
Greenhouse Gas Emissions
Hazards & HazardousMaterials
Cumulative Impacts
Hydrology & Water Quality
Land Use & Planning
Mineral Resources
Noise
Population & Housing
Public Services
Recreation
Traffic & Transportation
Utilities & Service Systems
Mandatory Findings ofSignificance
Issues to be Analyzed
BUILDING STRONG®And Taking Care Of People!
40
Public ParticipationNOP and Scoping Meeting
NOP can be downloaded here: goo.gl/XEhAKp
Fill out comment response forms
Limit oral comments to three minutes
BUILDING STRONG®And Taking Care Of People!
County of Los Angeles Department of Public Works
Watershed Management Division, 11th Floor
Attention: Mr. Patrick Goodfellow
900 South Fremont Avenue
Alhambra, CA 91803
or by email to: [email protected]
Submit comments by May 23, 2015
Public ParticipationWritten Comments
BUILDING STRONG®And Taking Care Of People!
Questions
U.S. ArmyCorps of Engineers
Los Angeles CountyFlood Control District
Priyanka Wadhawan915 Wilshire Blvd, Suite 980Los Angeles, CA 90017(213) [email protected]
Patrick Goodfellow900 S. Fremont AvenueAlhambra, CA 91803(626) [email protected]
For more information on the Study: