AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009AREVA NP All rights are reserved, see liability notice. 1
AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009AREVA NP All rights are reserved, see liability notice. 2
Life Extension Program for Western Europe Nuclear Power Plants -
Using the Example of NPP Borssele
Elisabeth Keim, Julia BarthelmesAREVA NP GmbH, Germany
André de JongEPZ Netherlands
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved.
3AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
4AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
5AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
History of NPP Borssele> Siemens PWR > 1973:
1st criticalityNeutron fluence calculation of RPV inner sideDesign fluence after 32 EFPY: 3.5E19 n/cm² with standard core loading Change to Low-Leakage actual fluence less than design fluence
> 1976: withdrawal of irradiation capsule SOP 1> 1978: withdrawal of irradiation capsule SOP 2
Neutron fluence calculation of SOP 1 and 2Determination of fluence not for E > 1 MeV KWU made estimations
6AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
History of NPP Borssele
Irradiation Surveillance Program
• Determination of RTNDT, ∆T41, RTNDTj
Values better than design fluence• Safety of RPV
- Maximum allowable RTNDT = 31 °C - Weld metal is leading RTNDTj of WM = 9°C
Safety against brittle failure of RPVfor EOL proven
AREVA NP
7AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
History of NPP Borssele
> 2006: agreement between government and plant owners on extended operation by 2034 (60 years of operation)
> 2007: new RPV surveillance program realizedState of the art approach: both established (Charpy-V/RTNDT) and new (fracture toughness/Master Curve) conceptsInsertion of both new irradiation sets SOP 3 and 4 in RPV duringrevision 09/2007New un-irradiated set of specimens manufactured and tested
> 2008: Comprehensive neutron fluence calculations SOP 2, 3, 4 and RPV inner side
8AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Current status of NPP Borssele
> In October 2013 KCB will reach 40 years of operation time
> For these 40 years a formal verification based on the results ofSOP 1 and SOP 2 exists
New surveillance program and improved fluence calculations are needed as well as a state of the art RPV integrity analysis
AREVA NP
9AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
10AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Thermal Ageing
> Thermal ageing dependent on Cu content of material
> Cu is deemed to be initiator for precipitation
> Cu content KCB RPV
BM: 0,04 wt%
WM: 0,09 wt%
> No thermal ageing at Cu < 0,25 wt% and T < 325°C
> Cu content in KCB RPV materials < 0,2 wt%
> Mean value for irradiation temperature at 305°C
Thermal ageing for KCB RPV can be neglected
AREVA NP
11AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Irradiation Induced Ageing (1)
> Changes in material behavior due to neutron irradiation
> For KCB RPV use of RTNDT concept
> Quantity for changes in material behavior is ∆T41
> Assessment of irradiation induced ageing via RTNDTj
AREVA NP
12AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Irradiation Induced Ageing (2)
Ausgangs-zustand
RTNDT (°C) ∆T41 (K) RTNDTJ (°C) ∆T41 (K) RTNDTJ (°C)Ring 03 -10 9 -1 12 2Ring 04 -20 17 -3 18 -2
WEZ -5 11 6 24 19Schweiß-
gut -45 34 -11 40 -5
15 VLJ 1.6E19 n/cm2
17 VLJ 1.9E19 n/cm2
SOP1 (KWU-Bewertung)
SOP2 (KWU-Bewertung)
Ausgangs-zustand
RTNDT (°C) ∆T41 (K) RTNDTJ (°C) ∆T41 (K) RTNDTJ (°C) ∆T41 (K) RTNDTJ (°C) ∆T41 (K) RTNDTJ (°C) ∆T41 (K) RTNDTJ (°C)Ring 03 -10 8 -2 9 -1 12 2 16 6 20 10Ring 04 -20 13 -7 17 -3 18 -2 26 6 31 11
WEZ -5 16 11 11 6 24 19 33 28 41 36Schweiß-
gut -45 27 -18 34 -11 40 -5 54 9 65 20
Extrapolation
9 VLJ 1E19 n/cm²
15 VLJ 1.6E19 n/cm2
17 VLJ 1.9E19 n/cm2
32 VLJ 3.5E19 n/cm2
48 VLJ 5.25E19 n/cm2
Extrapolation SOP1 (KWU-Bewertung)
SOP2 (KWU-Bewertung) Extrapolation
13AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Irradiation Induced Ageing (3)
Extrapolation of RTNDTj
-50
-40
-30
-20
-10
0
10
20
30
40
0 1E+19 2E+19 3E+19 4E+19 5E+19 6E+19
Fluence (n/cm2)
Ring 03, measuredRing 04, measuredHAZ, measuredSG, measuredRing 03, extrapolatedRing 04, extrapolatedHAZ, extrapolatedSG, extrapolatedPTS LimitSOP 1 KEMASOP 2 KEMA
32 VLJ48 VLJ
SOP 115 FPY
SOP 217 FPY
9 VLJ
RT N
DTj
(°C
)
HAZ not representative because higher Co content of weld
14AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
15AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Changes in Regulatory and PraxisSince Start of Operation of KCB 1973 (1)
> Sampling direction today transversal (T-L) to the main forging direction
> HAZ is no longer safety related since it is covered by the base metal
> Performance of notched impact test only instrumented
T
S
L
AREVA NP
16AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Changes in Regulatory and PraxisSince Start of Operation of KCB 1973 (2)
> KTA 3203/01 (replaces KTA 3203/84):„Surveillance of the Irradiation Behaviour of Reactor Pressure Vessel Materials of LWR Facilities“
Alternative to the direct use of ∆T41 a RTlimit curve is used as a base
RTlimit :The limiting value for the reference temperature RTlimit is the highest reference temperaturewhich is based on the proof ofsafety against brittle failure
AREVA NP
17AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Changes in Regulatory and Praxis Since Start of Operation of KCB 1973 (3)
18AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Changes in Regulatory and Praxis Since Start of Operation of KCB 1973 (4)
Possible validation of RPV using Pellini- and Charpy-V tests according to RTNDT concept (indirect verification)
Possible validation of RPV using directly measured fracture mechanics values according to RTT0 concept
RTNDT concept and RTT0 concept:
• Equivalent use of both concepts
• indirect determination of RTNDT, direct determination of RTT0 using fracture mechanics tests
AREVA NP
19AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
20AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Requirements for Life Extension KCB (1)
> A life extension to 60 operation years is possible if an appropriate proof of safety is shown
> Requirements for life extension to 60 operation years
Specimen fluence from irradiation surveillance programs is related to the RPV fluence after 60 operation years
RTNDTj and RTT0, respectively < RTNDT allowable
AREVA NP
21AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Requirements for Life Extension KCB (2)
Temperature
Load
Material
∆T
22AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Requirements for Life Extension KCB (3)
> RTNDT allowable :Intersection of material and stress curve
> RTNDT allowable = 31°C
(according to the state of currently valid stress curves of 1985)
23AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
24AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (1)
> Transformation of CARISMA results on KCB RPV
Due to similar CARISMA and KCB material concerning chemicalcomposition and mechanical properties possible transformation
> Anew calculation of current fluence of RPV and SOP 2, scraping samples
> Alternative neutron sources
> Irradiation of further specimen set inside the KCB reactor
Urgency to prove safety until 2013
New calculation for lead factor of KCB irradiation channels
possible necessity for two further specimen sets
AREVA NP
25AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (2)
> MaterialAvailability of unirradiated remaining material of KCB RPV
Enough material (BM and WM) for further specimen sets available
AREVA NP
26AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (3)
Specimens
Provision of specimens for RTNDT concept
Provision of specimens for RTT0 concept
Achieving this strategy by using
• Cv compact specimens
• Fracture mechanics specimens, bending and/or CT specimens or prefatigued cv specimens
AREVA NP
27AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (4)
Irradiated specimen sets
Use of unirradiated specimens
Testing of transversal specimens (T-L)
Determination of T0 and RTNDT, respectively
Material selection:
• Use of specimens from the core shells 03 and 04 as well as the work sample W03 (weld seam)
• Use of HAZ specimens not required from the updated regulatory
AREVA NP
28AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (5)
Unirradiated specimen set
Testing of transversal specimens (T-L)
Determination of T0 and RTNDT, respectively
Material selection:
• Use of specimens from the core shells 03 and 04 as well as the work sample W03 (weld seam)
• Use of HAZ specimens not required from the updated regulatory
AREVA NP
29AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Procedure for Life Extension (6)
Specimen Number acc. to KTA 3203 (RTNDT concept):
Additional Specimen (RTT0 concept):
Tensile Specimen
Charpy-V-Specimen
3 PB-Specimen
SOP 3: 12 SOP 4: 12 unir: 12
∑ 36
SOP 3: 3 SOP 4: 3 unir: 3
∑ 9
SOP 3: 10 SOP 4: 10 unir: 10
∑ 30
30AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Content
> Introduction of NPP BorsseleHistory
Current status
> Assessment of the RPV Regarding OperationThermal ageing
Irradiation induced ageing
> Changes in Regulatory and Praxis> Requirements for Life Extension KCB> Procedure for Life Extension> Additional Irradiation Surveillance Program
Testing SOP 0a
Manufacturing of additional irradiation sets
Fluence calculations
AREVA NP
31AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Testing SOP 0a
> Change in orientation of Tensile and Charpy-V specimens for BM (SOP 0: L-S; SOP 0a: T-L)
Only influence of specimen orientation on the upper shelf energy
> Additional T0 testing of core material
AREVA NP
32AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Testing SOP 0a
> Evaluation of RTNDT
NDT-T from the Pellini drop weight testTAV(68J) - 33K and TAV(0,9mm) - 33K from Charpy test
Influence of specimen orientation on TAV(68J) - 33K and TAV(0,9mm) - 33K
The values for RTNDT up to now are still valid
AREVA NP
33AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Manufacturing of Additional Irradiation Sets (1)
One capsule holder for each setTwo standard irradiation capsules (20x30x486 mm) per set and holder
four irradiation capsules containing
• original RPV material of the core shells 03 and 04
• of the work sample of the weld AW 03.1
• all in all 25 specimens per set
Fabrication of two irradiation sets (SOP 3 and SOP 4):
AREVA NP
34AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Manufacturing of Additional Irradiation Sets (2)
Charpy Specimens
Tensile SpecimensFracture Toughness Specimens
35AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Manufacturing of Additional Irradiation Sets (3)
50 cm
Irradiation column
Insertion position of the columns
Insertion of the irradiation capsules in September 2007
36AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Manufacturing of Additional Irradiation Sets (4)
> Withdrawal of SOP 3 and SOP 4
Based on the requirements to show a proof of safety until 2013 and the estimated lead factor it is recommended to use two irradiation specimen capsules• Withdrawal of SOP 3 in 2013
• Withdrawal of SOP 4 after 2013 when achieving the RPV fluence for 60 years
• Intermediate proof by extrapolating and transformation of results from CARISMA and other data on KCB
AREVA NP
37AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Manufacturing of Additional Irradiation Sets (5)
> Specimen sets
Basis: safety regulation KTA 3203, 06/01
BM: Base metalWM: weld metal
≥ 100 % Assessment fluence3331212123
~ 50 % Assessment fluence3331212122
unirradiated3331212121
WMBM IIBM IWMBM IIBM I
WithdrawalTensile specimensCharpy-V SpecimensSpecimen set number
AREVA NP
38AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Main Steps
> Checking the intactness of the irradiation channels> Preparation of documents and release by regulatory > Provision of materials> Manufacturing of specimens
Unirradiated setIrradiated sets
> Manufacturing and loading of capsulesManufacturing of capsule piecesTesting work samplesLoading with specimens, filling material,temperature monitors,neutron fluence detectors Closing and testing of capsules
> Manufacturing of specimen columns> Packing and transport> Insertion KCB
End capFilling material Temperature monitors
NbFe Detector
Temperature monitors
FeNb Detector
Filling material
Irradiation diraction
Capsule sheet
Capsule draft
39AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (1)
> Innovations of fluence calculations:
Use of neutron sources pin by pin (205 Values per FE, before 9 Values)
More precise calculation of neutron source (CASCADE-3D)
Use of more detailed geometric models for the neutron transport calculation
3D performance of the neutron transport calculation due to higher capacities of the processors
Improvement of the accuracy of results for the theoretical neutron fluence
AREVA NP
40AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (2)
> Fast neutron fluence (E > 1 MeV) calculation at the RPV inner side for operating cycle 1 to 33
> Fast neutron fluence (E > 1 MeV) calculation for the irradiationcapsules SOP 2, SOP 3 and SOP 4
> RPV fluence extrapolation based on the flux average of cycle 31 to 33
Maximum fluence (E > 1 MeV) at the inner side of RPV will reach3.22E19 n/cm2 after 55 EFPY
AREVA NP
41AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (3)
42AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (4)
313029
28272625
242322212019181716
151413121110
987654321
32
0
5
10
15
20
25
30
35
40
45
50
55
6019
7319
7419
7519
7619
7719
7819
7919
8019
8119
8219
8319
8419
8519
8619
8719
8819
8919
9019
9119
9219
9319
9419
9519
9619
9719
9819
9920
0020
0120
0220
0320
0420
0520
0620
0720
0820
0920
1020
1120
1220
1320
1420
1520
1620
1720
1820
1920
2020
2120
2220
2320
2420
2520
2620
2720
2820
2920
3020
3120
3220
3320
34
calendar year
EFPY
extrapolation withaveraged data fromcycle 31 to 32 (33)
cycle no.
43AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (5)
44AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculations (6)
> Theoretical and experimental fluences of SOP 2 have been compared
Nb detectors
• systematically too low compared with theory• are not reliable
Fe detectors
• show better agreement, but…• unexpected wide range of values compared with theory• only few values statistical treatment problematic
In order to get a better validation of the theoretical fluence via experiment the taking of scraping samples is recommended
AREVA NP
45AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Fluence Calculation - Scraping Samples
46AREVA NP All rights are reserved, see liability notice.AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009
Summary
> In October 2013 KCB will reach 40 years of operation time
> For these 40 years a formal verification based on the results ofSOP 1 and SOP 2 exists
> In June 2006 KCB received the approval to apply for a plant life extension to 60 years of operation
> Necessary: verification of a safe operation during the plant life of 60 operation years
new surveillance program: SOP 0a tested, SOP 3 and 4 implemented
improved fluence calculations performed
scraping samples for fluence status
state of the art RPV integrity analysis underway
status report for proof of RPV integrity for 60 years
AREVA NP
AREVA NP GmbH - Elisabeth Keim - NTCMF-G, Erlangen / Reginal Workshop on Structural Integrity on LWR, Belo Horizonte, Brazil, 23-26 June 2009AREVA NP All rights are reserved, see liability notice. 47
Any reproduction, alteration, transmission to any third
party or publication in whole or in part of this document
and/or its content is prohibited unless AREVA NP has
provided its prior and written consent. This document
and any information it contains shall not be used for any
other purpose than the one for which they were
provided. Legal action may be taken against any
infringer and/or any person breaching the
aforementioned obligations.