Area - LIDE Italia · • Total area land: 1,860 hectares. • Offshore bridge 3.5 km long, with...
Transcript of Area - LIDE Italia · • Total area land: 1,860 hectares. • Offshore bridge 3.5 km long, with...
Area
(6.6% of Brazil)
Coastline
Cities
15.2 million (PNAD 2015)
1st Northeast
4th Brazil
72.1% (BA)
98,3% (RMS – Greater Salvador)
US$ 72.2 billion
1st Northeast 2011 | 28.3 %
7th Brazil 2011 | 3.8 %
506.8 thousand new jobs (2007 – 2015)
US$ 16.3 billion = Exports + Imports
53.8% of all foreign trade (Northeast) and 4.1% (Brazil)
Source: IBGE, MDIC,CAGED
SOCIAL AND ECONOMIC INDICATORS
Trade Flow (2015)
Jobs (2014)
Urban population
Population
GDP (2015)
21 de março 2016Moody's America Latina Ltda.
("Moody's") today assigned issuer ratings of Ba2 on a global scale, and Aa2.br on a national scale to the state of Bahia .
BAHIA | Investments for 2016-2018
BAHIA
519 Enterprises
54,451 Jobs
US$ 23.5 billion
GREATER SALVADOR
22% Enterprises
35% Jobs
15% Investments
COUNTRYSIDE
78% Enterprises
65% Jobs
85% Investments
LUÍS EDUARDO
MAGALHÃES BARREIRAS
AREA: 564,692 km2 (6.6% of Brazil)
COASTLINE: 1,188 km
CITIES AND TOWNS: 417
JUAZEIRO
SUBAÉ
BAHIA
SANTO ANTÔNIO DE
JESUS
VITÓRIA DA
CONQUISTA
EUNÁPOLIS
SIMÕES FILHO
CAMAÇARI
ILHÉUS
BAHIA | Renewable Energy
Wind
HIGHEST WIND POTENTIAL IN BRAZIL
REGULATED MARKET (232 / 5,360 MW)
Solar
HIGHEST SOLAR POTENTIAL IN BRAZIL
REGULATED MARKET (32 / 894 MW)
LUÍS EDUARDO
MAGALHÃES BARREIRAS
BAHIA
VITÓRIA DA
CONQUISTA
JUAZEIRO
SUBAÉ
SIMÕES FILHO
CAMAÇARI
SANTO ANTÔNIO DE
JESUS
ILHÉUS
EUNÁPOLIS
LEADER IN PROJECTS
POTENTIAL AT (150M - 195,000 MW)
LEADER IN PROJECTS
INDUSTRIAL HUB
BAHIA | Agribusiness
JUAZEIRO
WESTERN BAHIA IS THE
OF GRAINS IN BRAZIL
SUBAÉ
LUÍS EDUARDO
MAGALHÃES BARREIRASHIGHEST MILK BAHIA
SANTO ANTÔNIO DE
SIMÕES FILHO
CAMAÇARIPRODUCTIVITY IN BRAZIL
JESUS
VITÓRIA DA
CONQUISTA
ILHÉUS
EUNÁPOLIS
SECOND LARGEST PRODUCER
AND HAS THE
NORTHERN BAHIA IS THE
OF WINE IN BRAZIL
SECOND LARGEST PRODUCER
EASTERN BAHIA HAS THE LARGEST
IN BRAZIL
EUCALYPTUS PLANTATION
BAHIA | Implemented PPP Projects
Suburb’s Hospital Itaipava Fonte Nova Arena Marine Outfall
Hospital for Infectious Diseases Salvador Metro System Diagnostic Imaging
OVER US$ 165 MILLION A YEAR IN PUBLIC PAYMENTS AND
MORE THAN US$ 1,65 BILLION IN INVESTMENTS
BAHIA | Infrastructure and Logistics
WEST VECTOR SYSTEM | Salvador-Itaparica Bridge – BR 242 Interconnection
Bridge | 12.3 km LONG | 32 m WIDE
INVESTMENT: US$ 2 BILLION
BAHIA | Infrastructure | FIOL
FIOL (WEST-EAST INTEGRATION) PORT - AIRPORT - RAILROAD
• FIOL 1,527 km (1,100km in Bahia)
• Capacity: 65 million tons / year
• Investment US$ 1.8 billion
• Model - Railroad right of way
• Outstanding Investment - Section I (Ilhéus to Caetité) US$ 341 million.
• Section II (Caetité to Barreiras) US$ 706 million
BAHIA | Infrastructure | SOUTH PORT
PROJECT FOR TWO TERMINALS FOR MINERAL AND AGRICULTURAL SHIPPING
• Location: Aritaguá district on the coast, 10km north of Ilhéus.
• Investment US$ 550 million (construction) + US$ 100 million (equipment)
• Investment: US$ 650 million
• Total area land: 1,860 hectares.
• Offshore bridge 3.5 km long, with one iron ore berth and one berth for bulk
agricultural goods.
Infrastructure – ZPE Bahia S.A.
1. Land Rental
• Rental of a "standard area" of 10,000 m2 / 1 ha (there are no limits on rents). Facilities constructions are of the companies responsibility.
2. Warehouse rental “Builttosuit”
• Alternatively, depending on the negotiations, ZPE Bahia would build the facilities/warehouses tailored ("Built to suit") and charge a higher rental fee (depending on the cost of construction, plus a margin - with full transparency).
3. Other alternatives
• Warehouses "Plug and play" as in Suape “CONE”: ZPE Bahia would finance the building of few standard warehouses, so that the investor could occupy immediately.
Investments alternativesCompanies interested in settling at the EPZ of Ilhéus will have available the following rentaloptions:
Letters of IntentCompanies such as AIRBUS, Antilles Seaplane and Anotonov have already confirmedtheir intent in implementing projects at ZPE Bahia S.A.
Infrastructure – ZPE Bahia S.A.
Exemption of investment
Reduction of bureaucracy
Flexibility of Currency Exchange
Suspension and Exemption of Taxez
Customs agility
Legal Security
Available logistics and easy access, currently formedby the Porto de Ilhéus (Harbour) and the futureAirport of Ilheus and the Porto Sul (Harbour) and theFerrovia (railway) Oeste Leste (FIOL)
The construction of the Porto Sul has beenapproved, with completion deadline for 2018, thefinal destination of the FIOL railway.
Next to GASENE (Gas pipeline Southeast toNortheast)
Large presence of raw-material.
Competitive Advantages
Infrastructure – ZPE Bahia S.A.
IRR of the project 16,24%
IRR of the shareholders 35,35%
Shareholders Payback 7 Anos7 years
(0) (0) 3 12 18 22
28
35 40
47 51 56
60 65 68 68 68
52,6%
82,9% 88,1% 90,2% 90,6% 92,2% 91,9% 92,9% 92,7% 93,2% 93,0% 93,4% 93,5% 93,5%
10, 0%
20, 0%
30, 0%
40, 0%
50, 0%
60, 0%
70, 0%
80, 0%
90, 0%
100 ,0%
(10)
-
10
20
30
40
50
60
70
80
20
16
20
17
20
18
20
19
20
20
20
21
20
22
20
23
20
24
20
25
20
26
20
27
20
28
20
29
20
30
20
31
20
32
Fluxo de Caixa Operacional Margem EBITDA
Maurity
Beginning
-
50.000.000
100.000.000
150.000.000
200.000.000
250.000.000
300.000.000
350.000.000
400.000.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Receita Operacional Bruta
Constructions period when there are no revenue for the EPZ
Step 7 finished (100% rented by 2027).Maturation
Início
BAHIA | Infrastructure | ROADS
BA-052 System
• Requalification and maintenance of the road system comprising BA052, BA148,BA432 and BA160 roads. (685 km)
• Current phase: modeling in
partnership with BNDES/IFC
• Public consultation: Jul/2016
• Tender: Oct/2016
• Contract: Feb/2017
• Investment:
US$ 300 million
BAHIA | Infrastructure | AIRPORTS
New llhéus Airport
• Two 3000-meter runways
• Investment: US$ 67.5 million
Porto Seguro Airport
• 2000 x 45 meter runway
• Proposed investment to upgradepassenger terminal and fire-fighting terminal
SALVADOR
ILHÉUS
PORTO SEGURO
RENOVATION AND UPGRADE OF
SALVADOR INTERNATIONAL AIRPORT
Salvador International Airport
• The new runway construction• Expansion of the passenger terminal
with 11 bridges
INVESTMENT: US$ 750 MILLION
SUPORTE DO GOVERNO ESTADUAL
Incentivos Tributárioas
Programa Desenvolve (Lei 7.980/01 e Dec. 8.205/02) e
Indústria Eletroeletrônica (Dec. 4316/1995)Convênio ICMS Nº 130/2015 Desoneração da duplatributação ICMS
Redução do imposto de renda (75%) - incentivo do Governo Federal
27% do ICMS para importação de equipamentos de energia quando equipamento similares são produzidos na Bahia
Suporte para obtenção de Licenciamento Ambiental - CTGA
Intermediação junto aos agentes de financimento (Desenbahia e BNB)
Áreas para implantação dos projetos com valores subsidiados
Disponibilização de serviços de utilizadades (água, gás, eletricidade)
Acesso rodoviário às plantas
Projeto Estadual de Incentivo à Concessãode Estágio e Primeira Experiência Profissional
Ações para assegurar a contratação de serviços e aquisição de equipamento locais, movimentando a economia local
Desenvolvimento de Centros de Formação Profissionais em polos geradores de energia, ampliando as oportunidades de empregos locais
Articulação com órgãos do Governo Estadual e Federal além de Associações deIndústrias e Comércio
Superintendent of Investment PromotionSecretariat of Economic Development – SDE
Bahia State Government
+55 71 3115-7981+55 71 99624-1237www.sde.ba.gov.br
Paulo Roberto Britto Guimarães
Vice-GovernorSecretary of Planning – SEPLAN
Bahia State Government
+55 71 3115-3694www.seplan.ba.gov.br
João Felipe de Souza Leão