ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

18
Creating Value Through Collaboration Dick Hill VP Manufacturing Advisory Services ARC Advisory Group [email protected]

description

ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum in Orlando, FL

Transcript of ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

Page 1: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

Creating Value Through Collaboration

Creating Value Through Collaboration

Dick HillVP Manufacturing Advisory ServicesARC Advisory [email protected]

Page 2: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

2© ARC Advisory Group

Wise Men Once Said…Wise Men Once Said…

“It is probably not love that makes the world go around, but rather those mutually supportive alliances through which partners recognize their dependence on each other for the achievement of shared and private goals.”

Fred Allen

“It is not necessary to change. Survival is not mandatory.”

W. Edwards Deming

Page 3: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

3© ARC Advisory Group

Concept: The Plant as a Node in a Value Network (CMM)Concept: The Plant as a Node in a Value Network (CMM)

Customers

Process Plant

CMM Nodes:

A process plant, for example, must collaborate with upstream and downstream operations

to fulfill the mission.

Collaborative Manufacturing Management considersthe relationship between all the nodes on the Value

Network.

Page 4: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

4© ARC Advisory Group

Today’s Operating ChallengesToday’s Operating Challenges

Design

Support

Business

Customers

Production

Suppliers

Lifecycle Domain

Value Chain Domain

Enterprise Domain

FulfillmentMaterials Mgt

RD&E

Services

Process Plant

Operations

Collaboration is essential to meet

business objectives

Page 5: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

5© ARC Advisory Group

Business Objectives – Creating ValueBusiness Objectives – Creating Value

Value to Shareholder

Customer Satisfaction

Health, Safety Environment

Page 6: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

6© ARC Advisory Group

Levers to Meet ObjectivesLevers to Meet Objectives

People

ProcessTechnology

Page 7: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

7© ARC Advisory Group

Alignment of Objectives and LeversAlignment of Objectives and Levers

ShareholderValue

Customer Satisfaction

Health, Safety & Environment

People

ProcessTechnology

Information and Collaboration Make it Happen

Page 8: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

8© ARC Advisory Group

Collaboration - in the Value Chain AxisCollaboration - in the Value Chain Axis

Materials Mgt FulfillmentCustomersSuppliers

Page 9: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

9© ARC Advisory Group

Feedstock and Raw Material SuppliersFeedstock and Raw Material Suppliers

Topic From To

Inventory You Order it They Anticipate your need

Service Process for Resolving Disputes

Eliminate Cause For Dispute

Quality Inspect and Verify Trusted

Operations Visibility Restricted Collaborative

Work Processes Separate Synchronized

Relationship Supplier - Customer Business Partner

Objective: Zero Feedstock Surprises

Page 10: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

10© ARC Advisory Group

Customer RelationshipCustomer Relationship

Topic From To

Inventory They Order it You Anticipate their need & manage it

Service Process for Resolving Disputes

Eliminate Cause For Dispute

Quality Inspect and Verify You Guarantee

Operations Visibility Restricted Collaborative

Work Processes Separate Synchronized

Relationship Supplier - Customer Business Partner

Objective: Zero Customer Disappointments

Page 11: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

11© ARC Advisory Group

Collaboration – on the Lifecycle AxisCollaboration – on the Lifecycle Axis

Design

Support

RD&E

Services

Page 12: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

12© ARC Advisory Group

Plant LifecyclePlant Lifecycle

Topic From To

Design Documentation As-Built at Startup Living Database for Operations

Design, Operate and Maintain Integration

None to Limited Custom interfaces

Standards-based Interoperability

Plant Asset Management

Maintenance’s Responsibility for Availability

Active Management by Both Operations and Maintenance

Design Objectives Designed for Low Cost Startup

Designed for Optimum Operation Benefits

Work Processes Separate Synchronized - DOM

Objective: Maximum Asset Performance

Page 13: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

13© ARC Advisory Group

Product LifecycleProduct Lifecycle

Topic From To

Design Processes Sequential Product and Process Design

Concurrent Product and Process Design

Design - Build Integration

Design validation during startup

Virtual validation before startup

Design, Build and Service Integration

None to Limited Custom interfaces

Standards-based Interoperability

Design Objectives Time to ProductionLow Cost to Make

Optimize Profit of Product

Work Processes Separate Synchronized – Digital Factory

Objective: Maximum Product Performance

Page 14: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

14© ARC Advisory Group

Collaboration – on Plant-Business AxisCollaboration – on Plant-Business Axis

Operations

Business

Production

Page 15: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

15© ARC Advisory Group

Finding the Hidden CapacityFinding the Hidden Capacity

Topic From To

Production Variance Conservative Targets Push Limits

Which Machine is the problem?

Experience Data-driven Evidence - OEE

Unscheduled Downtime

Reactionary Predicting

Instrumentation Behavior

Manual maintenance Program guided maintenance

Availability vs Utilization

Maintenance: AvailabilityOperations: Utilization

Collaboration & Work Processes

Objective: Optimize Production

Page 16: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

16© ARC Advisory Group

Proactive versus Reactive Energy ManagementProactive versus Reactive Energy Management

Topic From To

Energy Consumption Consumption History Forecast Consumption

Peak Loads Monitor Predict

Energy Balance Daily Summary Real Time Balance

Operational Options Try it and see ‘What-if’ simulation

Co-Generation Uncontrolled Power Purchases

Tie-Line Control

Production vs energy Scheduled independent

Optimize schedule and energy

Objective: Meet Energy Needs at Lowest Cost

Page 17: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

17© ARC Advisory Group

Collaboration: Users and SuppliersCollaboration: Users and Suppliers

Supplier Customer

Projects, Products, Operations…

Let’s Discuss What Works and What are the Results

ShareholderValue

Customer Satisfaction

Health, Safety & Environment

People

ProcessTechnology

ShareholderValue

Customer Satisfaction

Health, Safety & Environment

People

ProcessTechnology

Page 18: ARC's Dick Hill's Creating Value Through Collaboration Presentation at ARC's 2008 Industry Forum

18© ARC Advisory Group

Thank You.Thank You.For more information, contact [email protected] or visit

our web pages atwww.arcweb.com

“I not only use all the brains that I have, but all that I can borrow.”

Woodrow Wilson