DRAWING SCHEDULE
PROJECT NUMBER:
6 ENGINEER SUPPORT REGIMENTZABUL LINES, SAPPERS WAY, AMBERLEY QLD 4306
ARCHITECTURAL STRUCTURAL CIVIL
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A
A001 LOCATION PLANA002 AGR LAYOUTA003 AGR DRAINAGE PLANA004 TOWER PLANA005 TOWER ELEVATIONSA006 THROWING BAY STANDINGA007 THROWING BAY KNEELINGA008 THROWING BAY PRONEA009 AMMUNITION PREP BAY PLANA010 AMMUNITION PREP BAY ELEVATIONSA011 BULK AMMUNITION STORE PLANA012 BULK AMMUNITION STOREA013 30 PERS WAITING BAY FLOOR PLANA014 30 PERS WAITING BAY ROOF PLANA015 30 PERS WAITING BAY ELEVATIONSA016 30 PERS WAITING BAY ELEVATIONSA017 SCHEDULESA018 SIGNAGEA019 TYPICAL TARGET DETAILSA020 TARGET DETAILS 1 - 3A021 TARGET DETAIL 4 - 5
S001 TOWER PLANS002 TOWER SECTIONS003 TOWER DETAILSS004 THROWING BAY STANDINGS005 THROWING BAY KNEELINGS006 THROWING BAY PRONES007 THROWING BAY DETAILSS008 AMMUNITION PREPARATION BAYS009 BULK AMMO STORE PLANS010 BULK AMMO STORE FORMWORK PLANS011 BULK AMMO STORE SECTIONSS012 30 PERS WAITING BAY PLANS013 30 PERS WAITING BAY LINTEL PLANS014 30 PERS WAIT BAY FORMWORK PLANS015 30 PERS WAIT BAY START BAR PLANS016 30 PERS WAITING BAY SECTIONSS017 DETAILSS018 NOTES GENERALS019 NOTES CONCRETES020 NOTES REINFORCEMENTS021 NOTES STEELS022 NOTES STEEL / FORMWORKS023 NOTES MASONRY
C019 IMPACT AREA CROSS SECTION 5 OF 11C020 IMPACT AREA CROSS SECTION 6 OF 11C021 IMPACT AREA CROSS SECTION 7 OF 11C022 IMPACT AREA CROSS SECTION 8 OF 11C023 IMPACT AREA CROSS SECTION 9 OF 11C024 IMPACT AREA CROSS SECTION 10 OF 11C025 IMPACT AREA CROSS SECTION 11 OF 11C026 SUB SOIL DRAINAGE PLANC027 IMPACT AREA SECTIONSC028 SUBSOIL DRAINAGE DETAILSC029 DRAIN OUTLET DETAILSC030 AGR DRAINAGE INFRASTRUCTUREC031 HEAD WALL DETAILSC032 GENERAL SIGNAGEC033 RANGE ENTRY GATEC034 GENERAL SIGNAGE
C001 RANGE DESIGNC002 ROAD DESIGNC003 ACCESS ROAD ALIGNMENT LONG SECTIONC004 ROAD CROSS SECTION 1 OF 8C005 ROAD CROSS SECTION 2 OF 8C006 ROAD CROSS SECTION 3 OF 8C007 ROAD CROSS SECTION 4 OF 8C008 ROAD CROSS SECTION 5 OF 8C009 ROAD CROSS SECTION 6 OF 8C010 ROAD CROSS SECTION 7 OF 8C011 ROAD CROSS SECTION 8 OF 8C012 ROAD DETAILSC013 IMPACT AREA PLANC014 IMPACT AREA LONG SECTIONC015 IMPACT AREA CROSS SECTION 1 OF 11C016 IMPACT AREA CROSS SECTION 2 OF 11C017 IMPACT AREA CROSS SECTION 3 OF 11C018 IMPACT AREA CROSS SECTION 4 OF 11
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 5000
LOCATION PLAN
A001 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 5000LOCATION PLAN
ASSAULT GRENADE RANGE
NW SENTRY POINTWITH RDA GATES
GR 56J 19667 98537
SW RDA GATESGR 56J NP 19114 97374
6X9 SHELTERON CONCRETE SLAB
BULK AMMUNITION STORE, DMEO AND PORTALOO SHELTERS
HARDSTANDING FORPORTALOO AND
FOUR BUSHMASTERS
20
98
0 FOR CONSTRUCTION A.W* 13/06
TOWER
TARGET AREA
STANDING BAY KNEELING BAY PRONE BAY KNEELING BAY STANDING BAY WAITING BAY 1
AMMUNITION PREP BAY 1
WAITING BAY 2
AMMUNITION PREP BAY 2
6700 50002880
10500 10500 10500 10500 10500 105002880
5000 6700
2490
1150
040
000
5399
0
BULK AMMUNITION STORE, DMEOAND PORTALOO SHELTER
DatumPointE : 520092.855N : 6898150.755RL: 286.000 AHDWGS 84
EXISTING THROWING BAYSAND TOWER
2M GRAVEL PATH
EXISTING TRACK
2
3
4
1
NEW TRACK
94160
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
AGR LAYOUT
A002 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 500AGR LAYOUT
NOTE:DIMENSION ARE FOR BUILDINGLAYOUT. REFER TO C001 FORSLAB LAYOUT
RANGE COORDINATES
1: 56J NP 20056 981382: 56J NP 20068 981003: 56J NP 20130 981634: 56J NP 20142 98125
0 FOR CONSTRUCTION A.W* 13/061 DATUM HEIGHT CHANGED A.M 07/08I.F
TARGET AREA
EXISTING TRACK
100mm PVC PIPE FROMTHROWING BAYS.1 in 100 FALL TO PIT,WITH MIN 450mm COVER
900 x 900 RAISED GRATEDRAIN WITH 300mmCONCRETE PIPE UNDER ROADTO DAYLIGHT1 in 200
TOWER
STANDING BAY KNEELING BAY PRONE BAY KNEELING BAY STANDING BAY WAITING BAY 1
AMMUNITION PREP BAY 1
WAITING BAY 2
AMMUNITION PREP BAY 2
2M GRAVEL PATH
NEW TRACK
CO IO IO IO CO
IO
COSUB SOIL DRAIN CO
COCO
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
AGR DRAINAGE PLAN
A003 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 500AGR LAYOUT
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
IO - INSPECTION OPENING
CO - 45° CLEAR OUT OPENING
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
CO
NC
4000
CONC
3400
1200X1200CONC. PAD
500 2400 500
1200
1650
800
2400
800
1
A004
AGV
AGV
AGV
GATE
WEB FORGELANDING
710
2400
90
3200
600
1600
200
400 1600 400
2400
1
A004
W1 W1
W1
LANDING LEVEL
TOWER PITCHPOINT
70 X 50mm ROUGH SAW,HARD WOOD, TIMBER
CLADDING ON 70 X 35mmVERTICAL ROUGH SAW,HARD WOOD BATTENS
AT 750mm MAX CENTRES
BLK WEBFORCE TREAD - 76
HR 7
200 PFC STRINGER
AGV
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
TOWER PLAN
A004 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A26 JUN 2014
1 : 100GROUND FLOOR
1 : 100LANDING EVEL
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
AGV - DENOTES ARMOURED GLASS VIEWING PANEL
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
1 : 50A004Section 41
0 FOR CONSTRUCTION A.W* 13/061 TOWER DIMENSIONS A.R 26/06A.W*
AGV
GALVANISEDSTAIRS
ROUGH SAWNHARD WOODTIMBER CLADDING
SPEAKER
W1
3000
LANDING LEVEL
AGV
GATE
ROUGH SAWNHARD WOODTIMBER CLADDING
TOWER PITCHPOINT
ROUGH SAWNHARD WOOD
TIMBER CLADDING
CONCRETE
SPEAKERSPEAKER
1
A004
W1
DOUBLE SWINGCHAIN WIRE MESHLOCKABLE GATES
FIXED CHAIN WIREMESH PANEL
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
TOWER ELEVATIONS
A005 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50SIDE ELEVATION
1 : 50REAR ELEVATION
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
AGV - DENOTES ARMOURED GLASS VIEWING PANEL
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
990 2500 990
190
1120
190
ROUGH SAWNHARD WOOD
TIMBER CLADDING
2
A006
190 2500 190
100mm MIXTURE OF FINEAGGREGATE MAX 10mm
SIZE OVER CONCRETE SLAB100mm HIGH UPSTAND
100mmØ UPVC DRAIN
NOMINAL LOCATION OFTOE OF CONCRETE
MOUND BATTER
4480
800
1500
100
THROWING LINE
500
1200
300
EB EB
200um PLASTIC
75 CONCRETE SLABMOUND TO FRONT OF
THROWING BAYS.NOMS 1:2 SLOPE
SL72 MESH CENTRAL
ROUGH SAWNHARD WOOD
TIMBER CLADDING
SURROUNDING GROUND TO BEFLUSH TO CONCRETE EDGE LEVELAND FREE DRAINING AWAY FROMTHROWING POINT
GALVANISED DRAIN COVERGEOTECH FABRIC OVERWHOLE OF BASE
PROVIDE GROUTED SLOPE TO TOPOF BLOCKWORK, FALL TOWARDSIMPACT AREA AT MIN 1:10 SLOPE
100mm MIXTURE OF FINEAGGREGATE MAX 3 - 7mm SIZEOVER CONCRETE SLAB
100 Ø UPVC DRAINTO SUITABLELOCATION1:80 FALL
IMPACT AREAGRAVEL FILL
300 DEEP
550
FLOOR LEVEL
ROUGH SAWNHARD WOOD
TIMBER CLADDING
2
A006
1200
LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACE
FORMED SLOPE TOTOP OF WALL
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY STANDING
A006 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
1 : 50PLAN
1 : 20A006SECTION2
1 : 50ELEVATION
0 FOR CONSTRUCTION A.W* 13/06
1000
EB EB
GALVANISED DRAIN COVERGEOTECH FABRIC OVERWHOLE OF BASE
500
ROUGH SAWNHARD WOOD
TIMBER CLADDING75 CONCRETE
MOUND TO FRONTOF THROWING BAYS.
NOMS 1:2 SLOPESL72 MESH CENTRAL
100mm MIXTURE OF FINEAGGREGATE MAX 3 - 7mm SIZEOVER CONCRETE SLAB
SURROUNDING GROUND TO BEFLUSH TO CONCRETE EDGE LEVELAND FREE DRAINING AWAY FROMTHROWING POINT
PROVIDE GROUTED SLOPE TO TOPOF BLOCKWORK, FALL TOWARDSIMPACT AREA AT MIN 1:10 SLOPE
IMPACT AREAGRAVEL FILL
300 DEEP
200um PLASTIC
100 Ø UPVC DRAINTO SUITABLELOCATION1:80 FALL
635
1
A007
190
1120
190
100mm MIXTURE OF FINEAGGREGATE MAX 10mm
SIZE OVER CONCRETE SLAB
800
1500
100mm HIGH UPSTAND
100
100mmØ UPVC DRAIN
4480
990 2500 990
NOMINAL LOCATIONOF TOE OF CONCRETE
MOUND BATTER
190 2500 190
ROUGH SAWNHARD WOOD
TIMBER CLADDINGTHROWING LINE
FLOOR LEVEL
1
A007
ROUGH SAWNHARD WOOD
TIMBER CLADDING
1000
LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY KNEELING
A007 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
1 : 20A007SECTION1
1 : 50PLAN
1 : 50ELEVATION
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
600
EBEB
500
GALVANISED DRAIN COVERGEOTECH FABRIC OVERWHOLE OF BASE
100mm MIXTURE OF FINEAGGREGATE MAX 3 - 7mm SIZEOVER CONCRETE SLAB
SURROUNDING GROUND TO BEFLUSH TO CONCRETE EDGE LEVELAND FREE DRAINING AWAY FROMTHROWING POINT
PROVIDE GROUTED SLOPE TO TOPOF BLOCKWORK, FALL TOWARDSIMPACT AREA AT MIN 1:10 SLOPE75 CONCRETE SLAB
MOUND TO FRONT OFTHROWING BAYS.NOMS 1:2 SLOPE
SL72 MESH CENTRAL
ROUGH SAWNHARD WOOD
TIMBER CLADDING
IMPACT AREAGRAVEL FILL
300 DEEP
200um PLASTIC
100 Ø UPVC DRAINTO SUITABLELOCATION1:80 FALL
720
1
A008
990 2500 990
190
1120
190
800
190 2500 190
100mm MIXTURE OF FINEAGGREGATE MAX 10mm
SIZE OVER CONCRETE SLAB 100mm HIGH UPSTAND
100mmØ UPVC DRAIN
NOMINAL LOCATIONOF TOE OF CONCRETE
MOUND BATTER
ROUGH SAWNHARD WOOD
TIMBER CLADDING
100
800
1500
THROWING LINE
DATUM POINT
4480
FLOOR LEVEL600
1
A008
ROUGH SAWNHARD WOODTIMBER CLADDING
LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY PRONE
A008 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
1 : 20A008SECTION1
1 : 50PLAN
1 : 50ELEVATION
0 FOR CONSTRUCTION A.W* 13/06
600
2500
190
600
2690
600 190 2500 190 600
2880
A010
1
A010
3
A010 4A0102
1
A009
THROWING LINE
185 100
250
300
FALL
1
A009
FLOOR LEVEL
2200 ROOF LINE
5A010
220025
75
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
AMMUNITION PREP BAY PLAN
A009 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A26 JUN 2014
1 : 50FOOTING AND SLAB PLAN
1 : 50ROOF SLAB PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
NOTE:
THE SACRIFICIAL TIMBER IS TO BEINSTALLED ON THE INWARD ANDFORWARD FACES OF THE BUILDINGS
1 : 50A009SECTION1
0 FOR CONSTRUCTION A.W* 13/061 FOOTING DIMENSIONS A.R 26/06A.W*
185100
BLK BLK
ROUGH SAWNHARD WOODTIMBER EDGING
BLK
220025
75
FLOOR LEVEL
2200 ROOF LINE
CONC
ROUGH SAWNHARD WOODTIMBER CLADDING
FLOOR LEVEL
2200 ROOF LINE
ROUGH SAWNHARD WOODTIMBER CLADDING
CONCCONC
BLK
220025
75
5°
FLOOR LEVEL
2200 ROOF LINE
25mm ARRIS CORNERSTO EDGES
CONCRETE
FORMED 25mm DRIPGROVE ALL AROUND
CONCRETE BLOCK WORK
SEAL ALL BLOCKWORKBEFORE FIXING BATTENS
70 X 50mm ROUGH SAW,HARD WOOD, TIMBERCLADDING ON 70 X 35mmVERTICAL ROUGH SAW,HARD WOOD BATTENSAT 750mm MAX CENTRES
CONCRETE MOWING STRIPTO BE SLOPED AWAYFROM BUILDING
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
AMMUNITION PREP BAY ELEVATIONS
A010 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50FRONT ELEVATION
1 : 50REAR ELEVATION
1 : 50SIDE ELEVATION
1 : 50SIDE ELEVATION
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
NOTE:
THE SACRIFICIAL TIMBER IS TO BEINSTALLED ON THE INWARD ANDFORWARD FACES OF THE BUILDINGS
1 : 25A009AMMUNITION STORE SECTION5
0 FOR CONSTRUCTION A.W* 13/06
FALL
A0122
A012
1
2
S011
LOCKABLE CHAIN WIREMESH DOUBLE GATEWITH TUBULAR FRAMING
ROOF LINE OVER
3
S011
300
2500
1500
1
S011
700 300190
510190
2120 190 2500 1000
7700
300
690
1000
A012 3
4
S011
1:10
FAL
L
2800
2650
150
2500
150
850
150 700
150 2500
150
690
200
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
BULK AMMUNITION STORE PLAN
A011 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50FLOOR PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50ROOF PLAN
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
2200 ROOF LINE
LOCKABLE CHAIN WIREMESH DOUBLE GATEWITH TUBULAR FRAMING
SINGLE LOCKABLE GATE
400
2200
50
335
3521
65
DMEO ROOF LINE
185
700
300 STEEL PLATES
CHAINWIRE PANEL
FLOOR LEVEL
2200 ROOF LINE
2535
2200
DMEO ROOF LINE
2600
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
BULK AMMUNITION STORE
A012 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50BULK AMMO STORE FRONT
1 : 50BULK AMMO STORE RIGHT
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50BULK AMMO STORE LEFT
0 FOR CONSTRUCTION A.W* 13/06
A016
A015
A016
A015
1190 1600 1120 1600 1190
600
600
2480
600
600
1900
4880
1000
800 600 900 2100 900 600 800
190 6320 190
1000 6700 1000
1
12
2
AGV-S
VEN
TVE
NT
AGV-S
W3 W3
W2W2
W5
W5
W4W4
D119
045
0019
0
DOOR LATCH
THROWING LINE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY FLOOR PLAN
A013 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50FLOOR PLAN
AGV-S - DENOTES ARMOURED GLASS VIEWINGPANEL WITH SACRIFICIAL PROTECTIVEPOLYCARBONATE PANEL
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
NOTE:
THE SACRIFICIAL TIMBER IS TO BEINSTALLED ON THE INWARD ANDFORWARD FACES OF THE BUILDINGS
0 FOR CONSTRUCTION A.W* 13/061 DIMENSION CHANGE & THROWING LINE A.M 07/08I.F
185 6700 100
1:10
FAL
L
250
4880
300
6985
5430
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY ROOF PLAN
A014 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50ROOF PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
VENTVENT
HEA
D H
EIG
HT
2100
CONC
1100
PERSPEX WINDOW
PERSPEXWINDOW
W3
W4 W4
W3
2400 ROOF LINE
D1
LOCKABLEDOUBLE DOOR
FLOOR LEVEL
CONC
AGV-S AGV-S
2985
SILL
HEI
GH
T
1300
W2 W2
2400 ROOF LINE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY ELEVATIONS
A015 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50ELEVATION
1 : 50ELEVATION
AGV-S - DENOTES ARMOURED GLASS VIEWING PANELWITH SACRIFICIAL PROTECTIVEPOLYCARBONATE PANEL
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
VENT VENT
BLK
CONC
200
2200
2985
W5 W5
2400 ROOF LINE
FLOOR LEVEL
ROUGH SAWNHARD WOODTIMBER CLADDING
CONC
2400 ROOF LINE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY ELEVATIONS
A016 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50ELEVATION
1 : 50ELEVATION
AGV - DENOTES ARMOURED GLASS VIEWING PANELWITH SACRIFICIAL PROTECTIVEPOLYCARBONATE PANEL
BLK - DENOTES BLOCKWORK WALL
CONC - DENOTES CONCRETE
LEGEND
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
STAINLESS STEEL KICK PLATETO BOTH SIDES
NOTE:
DOOR HARDWARE ASPER SPECIFICATION
2100
2100
250
500
1600
500
1600
800
600
800
600
2000
600
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
SCHEDULES
A017 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
Door Schedule
DOOR TYPEDOOR
NUMBER COUNT WIDTH HEIGHT
2100 X 2100 SOLID CORE DOUBLE SWING DOOR D1 2 2040 2080
Window Schedule
WINDOW TYPEWINDOWNUMBER COUNT WIDTH HEIGHT REMARKS
123 3 1600 5001600 X 500 FIXED PANE WINDOW AGR W1 3 1600 5001600 X 500 FIXED PANE WINDOW AGR W2 4 1600 500 TO HAVE A SACRIFICIAL PROTECTIVE POLYCARBONATE PANEL COVER600 x 800 FIXED PANE WINDOW AGR W3 4 600 800600 X 800 LOUVERED PANEL WITH MESH W4 4 520 720 TO HAVE VERMIN PROOF WIRE MESH ATTACHED600 X 2000 LOUVER WITH MESH W5 4 520 1920 TO HAVE VERMIN PROOF WIRE MESH ATTACHED
DOOR SCHEDULE LINTEL SCHEDULE
WINDOW SCHEDULE
W1 W2 W3 W4 W5
W1
LINTEL SCHEDULE
BLOCK OPENING NO. COURSES BAR
1 N16 - EACH COURSE
1- N20 EACH COURSE
1 N20 EACH COURSE
1200mm
2400mm
3000mm
1
2
3
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :SIGNAGE
A018 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
WAITING BAYS THROWING BAYS BULK AMMUNITION BAY
AMMUNITION BAYS
2 BAYS SIGN 1(QTY 1)
SIGN 2(QTY 1)
SIGN 3(QTY 2)
SIGN 4(QTY 2)
2 BAYSSIGN 5(QTY 2)
SIGN 6(QTY 2)
SIGN 7(QTY 1)
1 BAY SIGN 9(QTY 1)
SIGN 10(QTY 1)
2 BAYS SIGN 8(QTY 2)
SIGN 9(QTY 2)
2 BAYS
1 BAYS
R of A SIGNTO ALLBUILDINGSEXCEPTAGRTHROWINGBAYS
SIGN 11(QTY 8)
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
TARGET POST250mm Ø HDPESLEAVE
7mm NOMINALIMPACT GRAVEL
CONCRETE
100
300
800
200
600 DIA
CONCRETE RAKINGTO FOOTING
1
A019
250mm DIA HPDESEAVE
6N16
R-10-20050 COVER
TARGET POST
A019 3
800
150 100
80
FALL2 No. COUNTERSUNK 12Ø GALV \BOLTS TO FIX HWD PLATE
NOM. 250mmØ H4 TARGET HARD WOODPOST RRIMMED TO PROFILE SHOWN
TARGET BY COMMONWEALTH
9mm SLOT25Ø HOLE THROUGH POST
FALL
4A019
75
60mm Ø 6mm SS PLATE
15mm Ø SS PIN WITHPOINTED ENDS
2 No. 8mm Ø SS BOLTS
WELDED100 X 38 HARD WOODTIMBER PLATE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
TYPICAL TARGET DETAILS
A019 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A26 JUN 2014
1 : 20A019TYPICAL TARGET POLE FOOTING1
1 : 20TYPICAL TARGET POLE FOOTING
1- ALL TARGET POSTS AND POLES MADE FROM HARD WOOD POLES DIAMETER TO SUIT 250MM DIA SLEEVE
2- ALL CONCRETE BASES TO BE RAKED TO PREVENT GRENADE RESTING AGAINST POSTS.
NOTE:
1 : 10A019TARGET 1 POST DETAIL3
1 : 10A019SS MOUNTING PIN4
0 FOR CONSTRUCTION A.W* 13/06
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1700 1700
1200 1200
1250
1250
1 1
1
1 1
A020
1 A020
2
TIMBER POSTTO FORMWINDOW FRAME
CONCRETE RAKINGTO FOOTING
1760
2400
2400
100
20Ø X 400 GALV PIN
RECESS END OF PIN
TIMBER POST TOFORM WINDOW FRME
CONCRETERAKING
REFER TO DETAIL 01-C20FOR DETAIL
1760
RAIL
A020
3
TIMBER POSTTO FORMWINDOW FRAME
CONCRETE RAKINGTO FOOTING
1160
250
600
100
20Ø X 400 GALV PIN
RECESS END OF PIN
TIMBER POST TOFORM WINDOW FRME
CONCRETERAKING
REFER TO DETAIL 01-C20FOR DETAIL
RAIL
1160
2400
2100
1000
250
CONC RAKING
TARGET BY COMMONWEALTHHOLES PUNCHED IN TARGET
SUPPORT TIE OFF POINTS
TIMBER TARGET POST
SS PIN FOR MOUNTING OF TARGET
2 No. COUNTER SUNK 12Ø GALVBOLTS TO FIX TIMBER PLATE 4
A019
REFER TO DETAIL 02FOR FOOTING DETAIL
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
TARGET DETAILS 1 - 3
A020 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A26 JUN 2014
1 : 50TARGET 1 TROOPS IN OPEN
1 : 50TARGET 2 WINDOW
1 : 50A020TARGET 2 WINDOW2
1 : 50TARGET 3 DOOR
1 : 50A020TARGET 3 DOOR3
1 : 50A020TARGET 1 POLE FOOTING1
0 FOR CONSTRUCTION A.W* 13/06
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
A021
2
3
A021
TIMBER TARGET POSTRAIL ON GROUND
CONC RAKING
250
250
1760
600
3
A021
CONC POLE FOOTINGSEE DETAIL 01-C20
TIMBER TARGET POST.REFER DETAILSRAIL ON GROUND
RECESS END OF PIN20Ø X 400 GALV PIN
1250
1360
1760
RAIL
4A021
CONC RAKING
RAIL
125
600
TIMBER RAIL ON GROUND
CONCRETE RAKING
N12 - 300
150
130
4N12
A021
7
6
A021
20mm GAP AT MITRESFOR DRAIN
300
2000
300
500
1000
500
WOODEN TARGET POST
LINE OF CONCRETEBELOW
RAIL ON GROUND
RAIL ON GROUND
TIMBER TARGET POST
CONC POLE FOOTINGSEE DETAIL 01-C20
1000 300
1250
4A021
TIMBER TARGET POST
CONC POLE FOOTINGSEE DETAIL 01-C20
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
TARGET DETAIL 4 - 5
A021 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A26 JUN 2014
1 : 50TARGET 4 RAIL ON GROUND
1 : 50A021TARGET 4 RAIL ON GROUND2
1 : 50A021SECTION3
1 : 20A021TYPICAL RAIL ON GROUND4
1 : 50TARGET 5 MORTAR PIT
1 : 50A021SECTION6
1 : 50A021ELEVATION7
0 FOR CONSTRUCTION A.W* 13/06
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
4000
0
DatumPointE : 520092.855N : 6898150.755RL: 286.000 AHDWGS 84
94160
87003400
4080 7660 4480 6020 4480 6020 4480 6020 4480 6020 4480 7660 40803400
8700
1200
1650
4000
1070
0
TOWER
TARGET AREA
STANDING BAY KNEELING BAY PRONE BAY KNEELING BAY STANDING BAY WAITING BAY 1
AMMUNITION PREP BAY 1
WAITING BAY 2
AMMUNITION PREP BAY 2
1200
3400
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
RANGE DESIGN
C001 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
0 FOR CONSTRUCTION A.M 20/06
1 : 500AGR LAYOUT
1 NEW SLAB LAYOUT PLAN A.R 26/06A.M
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
2 NEW CIVIL DATA UPDATED I.F 01/08A.M3 DATUM HEIGHT CHANGED I.F 07/08A.M
N NNNNNNNNNNNNNNNN 666 666N6
S NSS6NSNSSNSSNN S66 666 NS6N8
6 NDNSNNNNSDNNSS 666 N66SS
N
S
6 NDNSNNNNSDNNSS
NSS6NSNSSNSSNN
NNNNNNNNNNNNNNNN
S66
666
666
666 N66SS
NS6N8
666N6
N9N68669
N9N686655
NNNSNNNNNNNSN
NNNSNN69N6NS6NNNNSLNLS9NDNN6SNNN9
SNNLLNSDNNSNSSNNNN6NSNNDNNSNL6NN6NSNNNN8NNN699NNNNNNNN6L9SN9NN6NNNNNNND6NSNNSNNSNNSSNSN6NSNSN6NN
N69LNmNN69LNmNSLNSN6NNNDNNSN6NNLLNmNSS6mLNNNNNSNSNSNSSNNNSSNNNN6SN6ENSN6SS
NSNNNNSN6NNNNNN6NNN6SNN6NNNNNNNNN
N6NNN69NNNNN6NS
NSSSSNNNSNNNSND6NNNNSN
NSNNNNSN6NNNNNN6NNN6SNN6NNNNNNNNN
N6NNN69NNNNN6NS
SKNNNNNSNNN6NK
SSNNNNSNNNN
66SNS6SNNN
TTTTT T T T
,6LN9N9NNSNNN6SSSNNND6N,66LSN9SN,N69SNm6N6
N222222222N2N22N566SN2N25NN2222L22222N2N22N566SN2N66
NN69S2
S6NSNSN6DN2
SN6DNNLN2
NNNDSNNN2
66N6SSNN2N22
SNN:SNNNSNS2
SNN:SNNN6SN2
SNN:SNNNSNN2
SNN:SNN2
NNN9S2NN,S2
66
SN6DNNSNNN6LSN2 SN6DNNSNNN6NNN2
NSNN6NNNNN
NSNNNS66SNNN
DNSNNNNKSNN
9NNKNSN
66:N6NNN
9NNN9N:NSNNNNN
6SNNNSNNNLNNS6SNNNN6NNNSN6NNN6NNNNSN6NS6
NN6SNSSNNSN
NNN6 NNNNNNNNNN6NNNDN6NSm
NSD LN NSKSNSKSNSKS S6NSS6NSS6NS
300mmPAVEMENT THICKNESS
31
3
13%
3500CARRAIGEWAY
GROUND LEVEL
31
31
3311
3%
3500CARRIAGEWAY
GROUND LEVEL
3
1
EXISTING SUBGRADE
100mm - 150mm NOMINAL ROCKPLACED AT 6 METER INTERVALSFOR DRAINS WITH A GRADE >5%.0.15M X 1M X 1M
ROCK LINED SWALE
3
1
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
ROAD DETAILS
C012 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A23 JUN 2014
1 : 10PAVEMENT DETAIL
1 : 50TYPICAL CROSS SECTION - FILL
1 : 50TYPICAL CROSS SECTION - CUT
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 20ROCK LINES SWALE DETAIL
0 FOR CONSTRUCTION A.M 23/06A.R
mmmmmm
mmmmmm
mmmmmm
mmmmmmm
mm
EmEEmEmmm
mmEEEm
EmEE
mmm3333m
mm
mmmmmm
mmmmmm
mmTmmm
E
T3mmE m
EEmmmEmE
Em
EEm3T3
m
mmmmmm
mmmmmm
mmmmmm
EmEEEmmmmmm
.3
33
3
T333
33
m3
.3
mEEmmEmm mmmmE
mmmmEmEEEmmmmmmmmmmEmEmmmmmEmmEmmmmmFmmmmmFmmmmmmmmmm mEmmFmmE
EmEEEmmmmmmmL mmEEmEmmEEEm. 3333 3 3 33333mmm 3333 TT 33333 .3 3333 mm 33333mm. 3333m. 3 3333.m3
mEmEmmEEmmm
mSEmmSEmEm
TTTTT T T T
,mmmmmmmmEmmmmEEEmmmEm,,mSmEmmE,,m6mmmTmm
E222222222m2m.2m3m .m.m.3mF2222m22222m2m.2m3m .m.m33
mEmmE2
mmEEmmmmEm2
mmmEmmm,2
mmmEE,mm2
Smmm Emm2m22
Emm:EEEmEm 2
Emm:EEEmS m2
Emm:EEEmmmm2
Emm:EEE2
EmEmE2mm,E2
mm
mmmEmm mmmSmEm2 mmmEmm mmEmEmm2
mEmmSmmmmm
mEmmEEmSEmmm
Em.mEmmYEm,
mEmYmEm
Sm:mSmmm
mEEmmm:mEmmEmm
m mmmEFmmmmmESEmEmEmmmm mmmEmmmmmm mmmEm
mSEmEEmmmEmmEmmm
Em.m FmmmEmmmEmmmmmEm3m.T
mEE m, EEYmEEYmEEYm mmEEmmEEmmEE
m
3
.
m FmmmEmmmEmmEEmmm
EmEEEmmmmmmmmmmEm
mEmmEEmmEEm EEm
mmmmmmEmEEmSmEEm
E3S
m3F
m3S
m3S
m3S
m3S mm1..
m.1m3
m31m.
3m1m
1
C027
AGR THROWING BAYS
1%
SEE SUB SOIL DRAINOUTLET DETAILS
SUBSOIL DRAIN
1%1%
IMPACT AREA
0.2% 0.2%
SEE SUB SOIL DRAINOUTLET DETAILS
IMPACT AREA TO BE LINED WITH BITIMMINIMUM 150mm OVERLAP
2
C027
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
SUB SOIL DRAINAGE PLAN
C026 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 500DRAINAGE PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
CONTROL TOWER
THR
OW
ING
LIN
E
1%SEE BUND DETAIL
SUB SOIL DRAINSEE C014 FOR DETAIL
SUB SOIL OUTLETSEE C014 FOR DETAIL
IMPACT AREA
3C027
AGR TARGETS
4C028
4C027
SUBSOIL DRAIN
1:1 BATTER
AGR IMPACT SURFACE
500
500 200 500
INVERT OF DRAIN
BUND TO BE LINEDWITH JUTE MAT
1:1 BATTER
AGR IMPACT SURFACE
BUND TO BE LINEDWITH JUTE MAT
500 200 500
500
300
100 - 150 NOMINAL ROCKDRAIN UNBOUND
200
LOOSE FINE GRAVEL7mm NOMINAL
SUBGRADE
GEOTEXTILE OR FILTERFABRIC EQUIVALANT
TO 220 l/m²/s
300
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
IMPACT AREA SECTIONS
C027 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 200C026IMPACT AREA TYPICAL SECTION1
1 : 25C027IMPACT AREA REAR SECTION3
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 25C026IMPACT AREA LEFT SECTION2
1 : 25C027IMPACT AREA SECTION4
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
IMPACT AREA 300mm FILL
SCREEN MATERIAL REFERTO SPEC FOR DETAILSGEOTEXTILE OR FILTERFABRIC EQUIVALANT TO 220 l/m²/s90MM SLOTTEDUPVC PIPE DRAIN WITHKNITTED FILTRATION SOCK
300
295
100mm - 150mmNOMINAL ROCK
UNBOUND
CONCRETE HEAD WALL
1100
600
NON RETURN FLAPS
100mm - 150mm NOMINAL ROCKUNBOUND
PVC NON RETURN FLAPS
CONCRETE HEAD WALL N20/20150
280
150
1000
150
UPVC CONNCECTIONSTAPED JOINT
200mm OVERLAP OF UPVC PIPEAND POLYTHYLENE PIPE
100mm Ø CORUGATRED SLOTTEDPOLYTHYLENE PIPE DRAIN WITHKNITTED FILTRATION SOCK
UPVC OUTLET PIPE
45° CLEAR OUT JOINT WITHSCREW CAP LOCATED UNDERIMPACT AREA GRAVEL COVER
CONCRETE TO BE PLACEDUNDER CHANGE OF DIRECTIONAND CLEAR OUTS JOINTS
90MM SLOTTEDUPVC PIPE DRAIN WITHKNITTED FILTRATION SOCK
45° CLEAROUT JOINT
SCREW CAP
CONCRETE SUPPORT
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 10
SUBSOIL DRAINAGE DETAILS
C028 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 10SUB SOIL DRAIN
1 : 10SUB SOIL ELEVATION
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 10C027SUB SOIL DRAIN OUTLET4SUBSOIL DRAINAGE OUTLET JOINT
1 : 10TYPICAL CLEAR OUT SECTION
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
C029
C029
2
1
SUBSOIL DRAIN
OUTLET TRENCHBACK FILLED WITH
INSITUTE MATERIALDEPTH AS REQUIRED
2 X 90mm Ø DRAIN PIPESAS SPECIFIED
UPVC PIPE AND JOINTS
CLEAROUT JOINTSCREW CAP
SUBSOIL DRAIN
OUTLET TRENCH
TAPED JOINT
CONCRETE SUPPORT
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 10
DRAIN OUTLET DETAILS
C029 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 10CIVIL DRAINAGE OUTLET JOINT
1 : 10C029REAR ELEVATION1
1 : 10C029SIDE ELEVATION2
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :AGR DRAINAGE INFRASTRUCTURE
C030 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
HEAD WALL DETAIL
STORM WATER PIT DETAIL SURCHARGE GRATE DETAIL
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
300 Ø BARREL PIPE
HEAD WALL
100 - 150 NOMINAL ROCK
100
1000
1
C031
300 Ø BARREL PIPE
HEAD WALL
100 - 150 NOMINAL ROCK
100
1500
2
C031
100mm - 150mm NOMINAL ROCK UNBOUND
CONCRETE HEAD WALL N20/20
1000
300 Ø CONCRETE PIPE
150
100mm - 150mm NOMINAL ROCK UNBOUND1% FALL
CONCRETE HEAD WALL N20/20
1500
300 Ø CONCRETE PIPE
150
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 20
HEAD WALL DETAILS
C031 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 20HEADWALL INLET PLAN
1 : 20HEADWALL OUTLET PLAN
1 : 20C031INLET SECTION1
1 : 20C031OUTLET SECTION2
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
5075
225Ø
750
1600
MIN
20mm FALL AWAY FROM POST
MASS CONCRETE BASE(N20)
12 Ø X 100LG GALV. PINTACK WELD TO PIPE
60.3mm GALV. STEEL PIPE(4.5mm MIN. WALL THICKNESS)
SIGN FIXED TO POST WITH 8mm X 25LONG GALV GRADE 250 (HEX HEAD)BOLTS AND NUTS. 2 NO. MINIMUM.
END CAP OVER POST
50-1
00
100
DELINEATOR
600
+/- 1
00
1000
(OR
TO
MAN
UFA
CTU
RER
SSP
ECIF
ICAT
ION
S)
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 20
GENERAL SIGNAGE
C032 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
1 : 20TYPICAL SIGN POST DETAIL
1. PROVIDE FLEXIBLE GUIDE POSTS: 100mm WIDE WHITE PLASTIC ORFIBREGLASS STRIPS OF APPROVED TYPE, CAPABLE OF SELF-RECOVERYAFTER KNOCKDOWN
2. ROAD FURNITURE SHALL CONFORM TO THE REQUIREMENTS SPECIFIED INAS1742.2 CLAUSE 4.2.5
3. FOUR GUIDE POSTS SHALL BE LOCATED AT EACH CULVERT EITHER SIDELEVEL WITH CULVERT HEAD WALL.
4. SIGN LOCATION, ORIENTATION, LATERAL PLACEMENT, HEIGHT ANDMATERIAL SELECTION SHALL BE IN ACCORDANCE WITH APPENDIX D OFAS 1742.2.
5. BETWEEN CH79 & CH108 ON THE HORIZONTAL CURVE, GUIDE POST SPACING SHALL BE :- 6m ON OUTSIDE CURVE- 12m ON INSIDE CURVE.
1 : 20FLEXIBLE GUIDE POST
NOTES:
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER AND NOTES CHANGED . A.M 04/08I.F
SENTRY BOX
RANGE ENTRANCE SIGN
RANGE GATE
RANGE ENTRY ROAD
FLAG POLE
C033
1
WIDTH OF ROAD TO DETERMINE WIDTH
WHITE COLOUR PANELSA&NZ STOP SIGN
REFLECTIVE HAZARD PANEL
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
RANGE ENTRY GATE
C033 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
DESCRIPTION1. RDA GATES ARE A PAIR OF COMMERCIAL SHELF PURCHASEDAGRITURAL GATES WTH STEEL ENDS ASSEMBLIES , ODRERED TO SIZE,ALLOWING THE GATES TO CLOSE TOGETHER IN THE CENTRE OF THE ROADOR TRACK WITH THE END ASSEMBLIES CLEAR OF THE VERGE.
SITING
2. THE WIDTH OF THE ROAD OR TRACK WILL DETERMINE THE SIZE OFTHE GATES REQUIRED, IE: 8FT, 10FT, 12FT AND 14FT. THE END ASSEMBLIESARE TO BE SITED THAT WHEN THE GATES ARE SECURED OPEN THEY DONOT IMPEDE THROUGH TRAFFIC.
ANCILLARY ATTACHMENTS TO BE SECURED TO THE RDA GATE
3. AN A&NZ STANDARDS TRAFFIC STOP SIGNS (600mm X 600mm) ISPOSITIONED CENTRE RIGHT OF THE LEFT GATE OPPOSING THEAPPROPRIATE TRAFFIC.
4. A SIGN STATING 'DANGER NO ENTRY WHILST LIVE FIRING IS INPROGRESS' (600mm x 600mm) (RED ON WHITE REFLECTIVE), IS POSITIONEDON THE RIGHT GATE OPPOSITE THE STOP SIGN.
5. 2X WHITE BOND PANEL S ARE SECURED TO EACH GATE AT EITHEREND TO PROVIDE VISIBILITY AT NIGHT TO DRIVERS USING NIGHT VISIONAIDS.
6. A FLAT PLATE STEEL PANEL (3mm x 60mm x LENGTH) IS TO BEWELDED TO BOTH GATE TOP BARS TO ALLOW THA PPLICATION OFREFLECTIVE HAZARD DECALS.
7. THE ORIGINAL GATE SECURING CHAINS FURNISHED WITH THEGATES ARE REMOVED AND REPLACED WITH LIGHT DOG CHAIN TO ALLOWEMERGENCY VEHICLES T OEASILY DRIVE THROUGH THE GATES WHENCLOSED. RDA GATES ARE NEVER LOCKED FOR THIS REASON.
8. DEMARCATION FENCE. WHERE APPROPRIATE AND AS A MINIMUM ATHREE STRAND FENCE IS PROVIDED. IT IS TO EXTEND APPROXIMATELY 20METERS OR TO THE TREE LINE TO THE LEFT AND RIGHT OF THE RANGEACCESS GATES WHERE THE TERRAIN PERMITS.
1 : 100SENTRY POINT LAYOUT
1 : 25C033RANGE ENTRY GATE1
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :GENERAL SIGNAGE
C034 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A01 AUG 2014
SPEED SIGN (QTY 1)R4-1
SIZE 450X 600
RANGE ENTRANCE SIGN (QTY 2)SIZE - 1800 X 1000
DANGER SIGN (QTY 2)SIZE - 600 X 600
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
ONE WAY SIGN (QTY 1)R2-17
SIZE - 450 X 800
NOTE
TRAFFIC SIGN NUMBERS ARE DESIGNEDBY QLD TANSPORT AND MAIN ROADSSTANDARD SIGN NUMBERS
STOP SIGN (QTY 2)R1-1
SIZE 600X 600
NO ENTRY SIGN (QTY 1)R2-4
SIZE 450X 450
0 FOR CONSTRUCTION A.M 23/06A.R1 PAGE NUMBER CHANGED A.M 04/08I.F
1
S002
200 PFC STRINGER2-M20 CHEMSET
1200X1200 X 200D STAIR LANDINGSL92 MESH TOP AND BTM
"U" B
ARS
N16
@ 2
00 C
TRS
TOP AND BOTTOM 'U' BARS
N16 @ 200 CTRS
800
800
900
1
S002
4-M16 CHEMSET
200 PFC STRINGER 200 PFC WELDED FRAMEWITH STRINGER AND BEAMSTEEL STAIR FRAME200 PFC BEAM WELDEDWITH STRINGER
2400
2400
GATE
2020
N12 BARS1 EACH CORE
N12 BARS1 EACH CORE
1
S002
FALL
N12 VERTICALS
N12 - 400 HORIZONTAL
BLOCKWORK
BC2
BC1
LL
L
N12 - VERTICALS
BC2
BC1
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
TOWER PLAN
S001 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A03 JUL 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50FOOTINGS PLAN
1 : 50UPPER LEVEL PLAN
1 : 50LINTEL PLAN
LEGEND
L - DENOTES BLOCKWORK LINTEL
BC - DENOTES REINFORCEDBLOCKWORK COLUMN
- DENOTES BLOCKWORK WALL
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
LINTEL SCHEDULE
BLOCK OPENING NO. COURSES BAR
1 N16 - EACH COURSE
1- N20 EACH COURSE
1 N20 EACH COURSE
1200mm
2400mm
3000mm
1
2
3
LINTLES ARE TO EXTEND 400 PAST EACH SIDE OF OPENING
0 FOR CONSTRUCTION A.W* 13/061 FOR CONSTRUCTION A.W* 03/07A.R
LANDING LEVEL
N16-200 TOP AND BTMEACH WAY
300
4000
2000
N12-800VERTICAL BARS
N12-800
N12-800 STARTER BAR
N12-800
N12-800
2-M16 HOLDING BOLT200 EMBEDMENT
SL92 TOP AND BTM
200 PFC STRINGER
4-M16 CHEMSET
200 PFC WELDEDWITH STRINGER
1200200um PLASTIC MEMBRANE50mm BEDDING SAND
HOT DIPPEDGALVANISED
BALLISTIC GLASSWINDOWS
TOWER PITCHPOINT
5°
50 GROUT PAD
25
STARTER BARS TOMATCH WALLREINFORCEMENT
N12 BARS @ 800 CRSCOGGED
150 THICK SLABSL 92 TOPSL 92 BOTTOM25mm COVERT.B.
130 THICK SLAB - N 40 CONCRETESL 92 MESH TOP AND BOTTOMTOP COVER 30mm,BOTTOM COVER 25mm
3S003
2S003
1S003
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
TOWER SECTION
S002 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50S001SECTION1
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
200um PLASTIC MEMBRANE50mm BEDDING SAND
STARTER BARS TOMATCH WALLREINFORCEMENT
N16-200 TOP AND BTMEACH WAY
N12-800 VERTICAL BARS600 LAP
N12-400HORIZONTAL BARS
LANDING LEVEL
N12-800 500 X 500L BAR
N12-800
N12-800
150 THICK SLABSL 92 TOPSL 92 BOTTOM25mm COVERT.B.
N12-400HORIZONTAL BARS
CLEAN OUT BLOCK TOWER PITCHPOINT
N12 BARS @ 800 CRSCOGGED 500 X 500L
130 THICK SLAB - N 40CONCRETESL 92 MESH TOP AND BOTTOMTOP COVER 30mm,BOTTOM COVER 25mm
N12-400HORIZONTAL BARS
N12 VERTICAL BARS
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 15
TOWER DETAILS
S003 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 15S002FOOTING DETAIL1
1 : 15S002LANDING DETAIL2
1 : 15S002TOWER DETAIL3
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
1
S004
150 COURSE
200 BLOCK WALL
LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACE
1200
EBEB
EB
EB
LOCALLY DEPRESSEDMESH FOR FALL2-N12 TOP BARSUNDERMESH
1600
FLOOR LEVEL
N16-400 VERTN12-400 HORZ
EB EB
N12 AT 300
N12 BAR
SLAB 100mm MINTYPICAL
SL62
190
MIN
OVE
RLA
P
300
300 300
300
200
1S007
2S007
N12 - 600'Z' BARS3L11TM
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY STANDING
S004 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50ELEVATION
1 : 50SLAB PLAN
1 : 20S004SECTION1
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
1
S005
EB
EB
EBEB
LOCALLY DEPRESSEDMESH FOR FALL2-N12 TOP BARSUNDERMESH
1600
FLOOR LEVEL
1
S005LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACEFORMED SLOPE TO
TOP OF WALL
200 BLOCK WALL 1000
FLOOR LEVEL
N16-400 VERTN12-400 HORZ
EB EB
N12 AT 300
N12 BAR
SLAB 100mm MINTYPICAL
SL62
300
200
190
300 3001S007
2S007
3L11TM
N12 - 600'Z' BARS
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY KNEELING
S005 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50PLAN
1 : 50ELEVATION
1 : 20S005SECTION1
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
EB EB
N12 AT 300
300
200
190
N16-400 VERTN12-400 HORZ
N12 BAR
SLAB 100mm MINTYPICAL
SL62
300 3001
S007
2S007
3L11TM
N12 - 600'Z' BARS
1
S006
EBEB
EB
LOCALLY DEPRESSEDMESH FOR FALL2-N12 TOP BARSUNDERMESH
1600
FLOOR LEVEL
1
S006
600
LINE OF TOP OF CONCRETE MOUNDAGAINST BLOCKWORK ONEXTERNAL FACEFORMED SLOPE TO
TOP OF WALL
200 BLOCK WALL
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
As indicated
THROWING BAY PRONE
S006 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 20S006SECTION1
1 : 50PLAN
1 : 50ELEVATION
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - DENOTES EDGE BEAM
- DENOTES BLOCKWORK WALL
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
300
GRAVEL COVER
SL72 MESH
EARTH FILL
100
100
200 120
GALV R16 DOWELS@ 400 CRS.DO NOT EPOXY INTOBLOCKWORK
260
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 5
THROWING BAY DETAILS
S007 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - EDGE BEAM
SC - SAW CUT
DJ - DOWEL JOINT
- DENOTES BLOCKWORK WALL
LEGEND
1 : 5S004SACRIFICAL CONCRETE FOOTING1 1 : 5S004
SACRIFICIAL CONCRETE ANCHOR2
0 FOR CONSTRUCTION A.W* 13/06
130 THICK SLAB, N40 CONCRETESL92 MESH TOP AND BOTTOM30mm TOP COVER25mm BOTTOM COVER
1:10
FAL
LM
IN
EJ
TJ
TJ
DJ
EJ
EB1
EB1
EB1
EB1
EJ
EJ
TJTJEJ EJ
TJ TJTJEJ EJ
IJ
IJIJ
TJ
TJ
TJ
TJ
TJ
FLOOR LEVEL
2200 ROOF LINE
CONC
DJIJ
N12 - VERT AND HORIZONTAL 800 CRS
N12 COG BARS - 800 CRS500 X 500L BAR
1
S008
WA
LKW
AY
1200
WALKWAY
1200
PROPRIETRY CLAMPSON SAFETY RAILSALL AROUND
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
AMMUNITION PREPARATION BAY
S008 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50ROOF SLAB PLAN
EB1 - EDGE BEAM
IJ - ISOLATION JOINT
EJ - EXPANSION JOINT
TJ - TOOL JOINT
DJ - DOWEL JOINT
- DENOTES BLOCKWORK WALL
- 130 X 77 TRUFORM, 1600 MAX SPAN,1200mm MAX SPACING
- 90 X 65 @450 CTS, TRUFORM,1200mm MAX SPAN
- SUPPORT FRAME STRUCTURE TO BEBRACED IN BOTH DIRECTIONS(PROPRIETARY)
USE F14 PLYWOOD, 17-5-7COLUMN MAX SAFE LOAD WORKING LOAD IS 1500 KG
LEGEND
1 : 50FOOTING AND SLAB PLAN
BOTTOM STEEL TOP STEEL
LAY FOURTH
LAY THIRD
LAY FIRST
LAY SECOND
1 : 50SECTION
1 : 50FORMWORK PLAN
0 FOR CONSTRUCTION A.W* 13/06
2
S011
3
S011
4300
700 300 5700 1000
300
690
1000
810
1500
1
S011
1:10
FAL
L
500
2400 700
4
S011
EB1EB1
EB1
EB1
EB1
EJ
EJ
TJ
TJ
EJ
TJ
EJ
EJ
TJ
EJ EJ
EJ TJ
TJ EJDJ
DJ
DJ
IJ
IJ
IJ
IJ
DJ
DJDJ
STACK BONDED CONTROL JOINT
TJTJTJ
2800
2650
150
2500
150
850
150 2500
1040
150 700
130 THICK SLAB, N40 CONCRETESL92 MESH TOP AND BOTTOM30mm TOP COVER25mm BOTTOM COVER
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
BULK AMMO STORE PLAN
S009 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50FOOTING PLAN
1 : 50ROOF SLAB PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB1 - EDGE BEAM
IJ - ISOLATION JOINT
EJ - EXPANSION JOINT
TJ - TOOL JOINT
DJ - DOWEL JOINT
LEGEND
0 FOR CONSTRUCTION A.W* 13/06
WALKWAY
1200
WALKWAY
1200
WA
LKW
AY
1200
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
BULK AMMO STORE FORMWORK PLAN
S010 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50ROOF FORMWORK PLAN
- 130 X 77 TRUFORM, 1600 MAX SPAN,1200mm MAX SPACING
- 90 X 65 @450 CTS, TRUFORM,1200mm MAX SPAN
- SUPPORT FRAME STRUCTURE TO BEBRACED IN BOTH DIRECTIONS(PROPRIETARY)
USE F14 PLYWOOD, 17-5-7COLUMN MAX SAFE LOAD WORKING LOAD IS 1500 KG
LEGEND
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
FLOOR LEVEL
2200 ROOF LINE
2200
5°
DMEO ROOF LINE
EB1 EB150mm BEDDING SAND
DJIJ
N12-800 CRS500 X 500L BAR
200 um PLASTIC MEMBRANE
IJ
2200 ROOF LINE
DMEO ROOF LINE
4
S011
400
2200
IJ DJFLOOR LEVEL
600 LAP200 COGSTARTER BARS TO MATCH WALLREINFORCEMENT
N12 - 400VERTICAL AND HORIZONTAL
IJ DJ
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
BULK AMMO STORE SECTIONS
S011 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50A011SECTION2
1 : 50A011SECTION1
1 : 50A011SECTION3
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 50A011SECTION4
0 FOR CONSTRUCTION A.W* 13/06
1
S016
2
S016
EB1
EB1
EB1
EB1
EJ
EJEJ EJ
EJ
EJ
EJ
TJ
TJ
TJ
TJ
TJ
TJ
EJTJ TJ TJ TJ
IJ IJ
IJ
DJ
TJ TJ TJ TJ
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY PLAN
S012 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50FOOTING AND SLAB PLAN
EB - EDGE BEAM
EJ - EXPANSION JOINT
TJ - TOOL JOINT
IJ - ISOLATION JOINT
DJ - DOWEL JOINT
LEGEND
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
1
S016
2
S016
L LL
L
L
L
L
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY LINTEL PLAN
S013 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50LINTEL PLAN
L - LINTEL
LEGEND
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
LINTEL SCHEDULE
BLOCK OPENING NO. COURSES BAR
1 N16 - EACH COURSE
1- N20 EACH COURSE
1 N20 EACH COURSE
1200mm
2400mm
3000mm
1
2
3
LINTLES ARE TO EXTEND 400 PAST EACH SIDE OF OPENING
0 FOR CONSTRUCTION A.W* 13/06
1:10
FAL
L
4500
WALKWAY
1200
WALKWAY
1200
WA
LKW
AY
1200
WA
LKW
AY
1200
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAIT BAY FORMWORK PLAN
S014 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50FORMWORK PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
1
S016
2
S016
N12 - 800STARTERS ALL AROUND
4880
6680
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAIT BAY START BAR PLAN
S015 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50STARTER BAR PLAN
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
IJ
EB1 EB1
DJ
LL
50mm BEDDING SAND
2985
N12-800 CRS COG N12-800 E.W.
2400
N12-800 COG
150 THICK ROOF - N40 CONCRETEN12 - 250 BOTTOM (E.W.)SL82 MESH TOP25 BTM COVER30 TOP COVER
NOTE: N12 BARS COGGING INTO ROOF TO BE 500 X 500L BAR
FLOOR LEVEL
IJ IJ
EB1 EB1
2400 ROOF LINE
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 50
30 PERS WAITING BAY SECTIONS
S016 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 50S012SECTION 11
1 : 50S012SECTION 22
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
EB - EDGE BEAM
DJ - DOWEL JOINT
ET - EDGE THICKENING
L - LINTEL
LEGENDLINTEL SCHEDULE
BLOCK OPENING NO. COURSES BAR
1 N16 - EACH COURSE
1- N20 EACH COURSE
1 N20 EACH COURSE
1200mm
2400mm
3000mm
1
2
3
0 FOR CONSTRUCTION A.W* 13/06
2510
0
400
100
SL82 MESH
'Z' BAR N12-600 CRS
3L11TM50mm BOTTOM COVER
COG TO MATCH BLOCKREINFORCEMENT
IJ
SL62 CENTRALLYLOCATED
0.2 POLYTHENE50 BEDDING SAND
200 SERIES BLOCK WALL
1:100 FALL12 X 12 EMER-SEAL PUGOOR APPROVED EQUIVALENTWITH APPROVED BOND BREAKERTAPE UNDER
12 THICKFLEXI CORE
BONDED CORE FILLER(OR APPROVED EQUIVALENT)
50
BOLSTER CUT AND TOOL JOINT25 DEEP X 10 WIDE WHEN
CONCRETE IS PLACEDFILL WITH 'SELOSEAL P'
REMOVE EVERY SECONDWIRE FROM FABRIC
150
TOOLED EDGE
FLEXIBLE JOINTFILLER AND 10X10
APPROVED SEALANT
R10 DOWELS 450 LONG AT 300 CRS.GREASE ONE END. DOWELS TO BESAW CUT. EXTERNAL DOWELS HOTDIP GALVANISED
50 THICKENING
PAINT CONCRETEINTERFACES WITHBITUMASTIC BOND BREAKER
MAKE 15 X 15 DEEP GROVEFIT BACKING ROD AND
SEALANT 15 X 15
100
DANLEY 110 SQ X 6THICK DIAMOND PLATEDOWELS @ 600CRS
GALANISED DOWELS FOREXTERNAL PURPOSES
50 THICKENING
N12
N20
N20
N12
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 10
DETAILS
S017 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
1 : 10EDGE BEAM 1 : 10
ISOLATION JOINT
1 : 10TOOL JOINT
1 : 10EXPANSION JOINT
1 : 10DOWEL JOINT
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
1 : 10LINTEL DETAIL
0 FOR CONSTRUCTION A.W* 13/06
1. READ THESE NOTES IN CONJUNCTION WITH ARCHITECTURAL AND OTHER ENGINEERINGDRAWINGS AND SPECIFICATIONS, AND WITH SUCH OTHER WRITTEN INSTRUCTIONS ISSUED.REFER TO ARCHITECTURAL DRAWINGS FOR SETTING OUT AND DETAIL DIMENSIONS. INCASE OF DISCREPANCY, PRECEDENCE IS GIVEN TO DRAWINGS, THEN NOTES, THENSPECIFICATION.
CARRY OUT WORK IN A SAFE MANNER IN ACCORDANCE WITH APPLICABLE STATUTORYREGULATIONS, BY-LAWS OR RULES. CONTRACTOR IS RESPONSIBLE FOR OCCUPATIONALHEALTH AND SAFETY OF SITE PERSONNEL AND GENERAL PUBLIC IN ACCORDANCE WITHLEGISLATIVE REQUIREMENTS, INDUSTRIAL AGREEMENTS AND ACCEPTED INDUSTRYPRACTICE.
REFER DISCREPANCIES TO ARCHITECT BEFORE PROCEEDING WITH WORK.
SUBMIT DETAILS OF CHANGES TO SCOPE, WORK METHODS OR MATERIALS etc FOR APPROVALBEFORE PROCEEDING. APPROVAL DOES NOT AUTHORISE A VARIATION TO THE CONTRACT.
CHECK STRUCTURAL DRAWINGS AGAINST ARCHITECTURAL, MECHANICAL, ELECTRICALSERVICES AND OTHER DRAWINGS FOR REQUIREMENTS FOR PENETRATIONS, CONDUITS,DUCTS, PIPES, etc.
NOMINATION OF PROPRIETARY ITEMS DOES NOT INDICATE EXCLUSIVE PREFERENCE, BUTINDICATES REQUIRED PROPERTIES OF ITEM. SIMILAR ALTERNATIVES HAVING REQUIREDPROPERTIES MAY BE OFFERED FOR APPROVAL. APPROVAL DOES NOT AUTHORISE A VARIATIONTO THE CONTRACT. INSTALL PROPRIETARY ITEMS IN ACCORDANCE WITH MANUFACTURER’SREQUIREMENTS AND RECOMMENDATIONS.
DO NOT OBTAIN DIMENSIONS BY SCALING FROM DRAWINGS.
DIMENSIONS ARE IN MILLIMETRES, LEVELS ARE IN METRES UNO.
WORKMANSHIP AND MATERIALS TO COMPLY WITH REQUIREMENTS OF SAA CODES, BUILDINGCODE OF AUSTRALIA AND BY-LAWS AND ORDINANCES OF RELEVANT BUILDING AUTHORITIES.ALL CODES REFERRED TO ARE THOSE CURRENT (AS AMENDED) AT COMMENCEMENT OFCONTRACT.
MAINTAIN STRUCTURE IN A STABLE CONDITION DURING CONSTRUCTION AND PROVIDETEMPORARY BRACING AND/OR SUPPORT AS REQUIRED. PROVIDE SPREADERS AT LOADSAND/OR LIFTING POINTS WHERE REQUIRED. ENSURE NO PART IS OVERSTRESSED. DO NOTPLACE OR STORE BUILDING MATERIALS ON STRUCTURAL MEMBERS WITHOUTSUPERINTENDENT’S APPROVAL.
THESE DRAWINGS DO NOT DETAIL TEMPORARY WORKS. CONSTRUCTION METHODS ANDTEMPORARY WORKS ARE RESPONSIBILITY OF THE BUILDER.
SEPARATE METALS FROM INCOMPATIBLE MATERIALS (eg GALVANIZED AND UNGALVANIZEDSTEEL, TREATED TIMBER AND STEEL etc) BY CONCEALED LAYERS OF SUITABLE INERTMATERIALS OF SUITABLE THICKNESSES. USE PLASTIC SLEEVES AND WASHERS FOR BOLTS, etc.
G1.
G2.
G3.
G4.
G5.
G6.
G7.
G8.
G9.
G10.
G11.
G12.
GENERAL NOTES:STRUCTURAL WORK HAS BEEN DESIGNED FOR FOLLOWING LOADS: - PERMANENT DEAD LOAD OF STRUCTURE AS SHOWN ON DRAWINGS
- LIVE LOADS TO AS/NZS11702 kPa ROOF3 kPa GENERAL
- BUILDING IMPORTANCE LEVEL = 2- WIND LOADS TO AS1170.2:
REGION BTERRAIN CATEGORY 3ULT WIND SPEED: 49 m/s
SUPPLY RELEVANT NOTES, DRAWINGS AND SPECIFICATIONS etc TO SUB-CONTRACTORS.
UNO=UNLESS NOTED OTHERWISE SLS=SERVICEABILITY LIMIT STATE ULS=ULTIMATE LIMITSTATE.
BUILD, FABRICATE AND PROCURE ONLY FROM DRAWINGS ‘ISSUED FOR CONSTRUCTION’.
KEEP ON SITE A COMPLETE SET OF CONTRACT DOCUMENTS (INCLUDING DRAWINGS ANDSPECIFICATIONS) AND SITE INSTRUCTIONS.
VERIFY ON SITE SETTING OUT DIMENSIONS AND EXISTING MEMBER SIZES SHOWN ONDRAWINGS BEFORE SHOP DRAWINGS, CONSTRUCTION AND FABRICATION IS COMMENCED.
TAKE PRECAUTIONS TO ESTABLISH LOCATION OF AND PROTECT EXISTING SERVICES AT SITE.SERVICES SHOWN ON DRAWINGS ARE IN APPROXIAMATE LOCATIONS ONLY. SERVICES OTHERTHAN THOSE SHOWN MAY EXIST NO SITE. HAND EXCAVATE WITHIN ONE METRE OF IN-GROUND SERVICES.
TEST 10% OF ALL MASONRY ANCHORS TO 1.5 x WORKING LOAD CAPACITY. TEST INACCORDANCE WITH MANUFACTURERS REQUIREMENTS.
G13.
G14.
G15.
G16.
G17.
G18.
G19.
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES GENERAL
S018 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
WORKMANSHIP AND MATERIALS TO COMPLY WITH AS3600, AS2870, AS3610, AS1379, AS1478, AS3582, ANDAS3972.
WET CONCRETE TO BE UNIFORM, HOMOGENEOUS, COHESIVE AND ABLE TO WORK READILY INTOCORNERS AND AROUND REINFORCEMENT COMPLETELY FILLING FORMWORK WITHOUT SEGREGATION,EXCESS FREE WATER ON SURFACE, LOSS OF MATERIAL OR CONTAMINATION.
CONCRETE STRENGTH TO BE N32, 80 mm SLU MP, MAXX AGG 20 mm U.N.O.B1 EXPOSURE CLASS FOR EXTERNAL, A1 EXPOSURES CLASS EVERYWHERE ELSE.
USE READY MIXED CONCRETE MIXED BY BATCH PRODUCTION PROCESS DELIVERED IN AGITATINGTRUCKS. FOR EACH BATCH SUPPLY A DOCKET LISTING INFORMATION REQUIRED BY AS1379 CLAUSE 1.8.3AND FOLLOWING:
- SERIAL NUMBER OF IDENTIFICATION CERTIFICATES OF EACH BATCH- NAME OF CONCRETE DELIVERY SUPERVISOR- ELEMENT FOR WHICH CONCRETE WAS ORDERED AND WHERE IT WAS PLACED- METHOD OF PLACEMENT AND CLIMATIC CONDITIONS DURING POUR- TOTAL AMOUNT OF WATER REQUIRED BY MIX DESIGN - TOTAL AMOUNT- WATER ADDED AT PLANT
C1.
C2.
C3.
C4.
CONCRETE NOTES:
SITE IS CLASSIFIED AS CLASS M TO AS2870.
FOOTINGS HAVE BEEN DESIGNED FOR A SAFE WORKING BEARING PRESSURE OF 100kPa.CONSTRUCT FOOTINGS FOUNDED IN THESE MATERIALS AS SHOWN ON DRAWINGS. REMOVESOFTENED OR LOOSE MATERIAL AND MATERIAL THAT DOES NOT ACHIEVE THESE PRESSURES.THE FOUNDING LAYER SHALL BE VERIFIED BY THE BUILDERS GEOTECHNICAL ENGINEERS. WHERESLAB PANELS AND INTERNAL BEAMS ARE FOUNDED ON CONTROLLED FILL, CONTROLLED FILLMUST CONTINUE AT LEAST ONE METRE PAST BUILDING.
REMOVE TOP SOIL CONTAINING GRASS ROOTS OR OTHER ORGANIC MATTER, RUBBLE AND / ORDEBRIS AND OTHER UNSUITABLE MATERIAL BELOW FOUNDATIONS.
“CONTROLLED FILL” IS: SAND FILL UP TO 800 mm DEEP, WELL COMPACTED IN LAYERS < 300 mmTHICK BY VIBRATING PLATE OR VIBRATING ROLLER, OR NON-SAND FILL UP TO 400 mm DEEP, WELLCOMPACTED IN LAYERS <150 mm THICK BY MECHANICAL ROLLER. (CLAY FILL TO BE MOIST DURINGCOMPACTION), OR OTHER MATERIAL PLACED AND COMPACTED IN ACCORDANCE WITHSPECIFICATION.
LOCATE FOOTINGS CENTRALLY UNDER WALLS AND COLUMNS UNO.
KEEP EXCAVATIONS FREE OF WATER. PROVIDE ADEQUATE DRAINAGE TO ENSURE FORMATION ISNOT AFFECTED BY MOISTURE. PREVENT FOUNDATION DRYING OUT DUE TO EXPOSURE. PLACEBLINDING, FOOTINGS, PILES AND BACKFILL AS SOON AS PRACTICABLE AFTER EXCAVATION.
ENSURE EXCAVATIONS ARE STABLE AND PROTECT SURROUNDING PROPERTY AND SERVICESFROM ADVERSE EFFECTS OF GROUND WORKS. PROVIDE TEMPORARY WORKS AS REQUIRED.
BACKFILL FOR RETAINING WALLS TO BE FREE DRAINING GRANULAR MATERIAL. PROVIDEDRAINAGE BEHIND RETAINING WALLS COMPRISING CONTINUOUS SLOTTED DRAIN WITH GRANULARSURROUND, OR NYLEX “COREDRAIN” CONNECTED TO RETICULATED STORMWATER DRAINAGESYSTEM. PROVIDE WEEPHOLES AT 1500 MAXIMUM CENTRES AT BASE OF WALL.
F1.
F2.
F3.
F4.
F5.
F6.
F7.
F8.
FOUNDATIONS/SLABS ON GROUND NOTES:DO NOT ADD WATER TO CONCRETE AFTER TRUCK HAS LEFT BATCHING PLANT.
CONSTRUCTION TOLERANCES TO BE TO AS3610.
REMOVE FREE WATER, DUST AND DEBRIS, STAINS etc FROM FORMS, EXCAVATIONS etc BEFORE PLACINGCONCRETE. IN HOT CONDITIONS DAMPEN FORMWORK AND/OR SUB-GRADE BEFORE PLACINGCONCRETE.
PROTECT FRESH CONCRETE FROM PREMATURE DRYING - PARTICULARLY IN HOT, WINDY OR DRY (LOWHUMIDITY) CONDITIONS, EXCESSIVELY HOT OR COLD TEMPERATURES, RAIN, etc. PROVIDE WINDBREAKS. MAINTAIN CONCRETE AT A REASONABLY CONSTANT TEMPERATURE WITH MINIMUM MOISTURELOSS FOR CURING PERIOD.
COMMENCE CURING OF CONCRETE TO AS3600 AS SOON AS POSSIBLE AFTER PLACING AND FINISHINGOR STRIPPING, AND WITHIN ONE HOUR. ENSURE EXPOSED SURFACES ARE NOT STAINED. ACCEPTABLEMETHODS OF CURING INCLUDE:
- RETENTION OF FORMWORK- PONDING OR CONTINUOUS SPRINKLING WITH WATER (MOIST CURING)- AN IMPERMEABLE MEMBRANE (USE WHITE OR LIGHT COLOURED PLASTIC IN HOT CONDITIONS). SEAL AROUND EDGES.- AN ABSORPTIVE COVER KEPT CONTINUOUSLY WET
CURE CONTINUOUSLY UNTIL NUMBER OF DAYS DURING WHICH AIR TEMPERATURE IS ABOVE 10°CTOTALS:
- 3 DAYS FOR EXPOSURES CLASSIFICATION A1 AND A2- 7 DAYS FOR EXPOSURE CLASSIFICATION B1, B2 AND C.
PROVIDE EXPOSED EDGES AND RE-ENTRANT CORNERS WITH 45 DEGREES x 25 mm CHAMFERS ORFILLETS UNO
FORM CONSTRUCTION JOINTS AND USE ONLY WHERE SHOWN OR WHERE APPROVED BYSUPERINTENDENT. CONSTRUCTION JOINTS IN SLABS TO BE VERTICAL. TO ACHIEVE ADEQUATE BONDENSURE ENTIRE SURFACE IS CLEAN, FREE OF LAITANCE, AND INTENTIONALLY ROUGHENED TO A FULLAMPLITUDE OF NOT LESS THAN 5 mm WITH COARSE AGGREGATE EXPOSED.
PROVIDE PROPOSED LOCATIONS AND DETAILS OF CONSTRUCTION JOINTS FOR SUPERINTENDENT’SAPPROVAL PRIOR TO CONSTRUCTION.
SAW CUT CRACK CONTROL JOINTS AS SOON AFTER CASTING AS PRACTICABLE TO AVOID SPALLING ORRAVELLING OF JOINT EDGES, AND WITHIN 16 HOURS OF CASTING TO PREVENT THERMAL AND/ORSHRINKAGE CRACKING OF SLAB. IMMEDIATELY AFTER SAW CUTTING FLUSH OUT JOINTS TO REMOVESAWING RESIDUE AND INSERT A TEMPORARY FOAMED PLASTIC BEAD TO KEEP JOINT CLEAN PRIOR TOFILLING OR SEALING. PROTECT SAW CUTS FROM WHEEL LOADS FOR AT LEAST ONE WEEK AFTERCUTTING.
INSTALL BRITTLE FINISHES (eg TILES etc), JOINT FILLERS AND SEALANTS A MINIMUM OF 3 MONTHS AFTERCASTING CONCRETE. USE A FLEXIBLE TILE GROUT AND WEAK TILE MORTAR.
COVER IS CLEAR DISTANCE BETWEEN ANY REINFORCEMENT (INCLUDING LIGATURES, TIE WIRE etc) ANDOUTSIDE SURFACE OF STRUCTURAL CONCRETE.
WHERE CONCRETE BEARS ON LOAD BEARING MASONRY AND BRICKWORK, TROWEL SMOOTH AND FLAT A5 mm THICK LAYER OF MORTAR AND SEPARATE CONCRETE THERE FROM WITH TWO LAYERS OF “SUPERALCOR”.
CONCRETE SLABS TO FALL AT 1:100 (TYP)
C5.
C6.
C7.
C8.
C9.
C10.
C11.
C12.
C13.
C14.
C15.
C16.
C17.
C18.
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES CONCRETE
S019 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
SYMBOLS ON DRAWINGS FOR GRADE AND TYPE OF REINFORCEMENT ARE AS FOLLOWS:R: DENOTES STRUCTURAL GRADE 250 PLAIN ROUND BAR TO AS/NZS4671N: DENOTES HOT ROLLED GRADE 500 DEFORMED (RIBBED) BAR DUCTILITY CLASS N TOAS/NZS4671SL: DENOTES HARD DRAWN WIRE GRADE 500 SQUARE REINFORCING MESH DUCTILITYCLASS L TO AS/NZS4671RL: DENOTES HARD DRAWN WIRE GRADE 500 RECTANGULAR REINFORCING MESH DUCTILITYCLASS L TO AS/NZS4671TM: DENOTES HARD DRAWN STEEL GRADE 500 TRENCH MESH DUCTILITY CLASS L TOAS/NZS4671
PROVIDE ACRS (AUSTRALIAN CERTIFICATION AUTHORITY FOR REINFORCING STEEL LTD)CERTIFICATION OF COMPLIANCE WITH AS/NZS4671 FOR ALL REINFORCEMENT. PROVIDECERTIFICATION OF COMPLIANCE WITH AS1311 FOR ALL PRESTRESSING TENDONS.
USE MESH SUPPLIED IN FLAT SHEETS UNLESS APPROVED OTHERWISE.
REINFORCEMENT TO BE CLEAN, FREE OF LOOSE MILL SCALE, RUST, OIL, GREASE, MUD OR OTHERMATERIAL THAT MIGHT REDUCE BOND BETWEEN REINFORCEMENT AND CONCRETE.
FOLLOWING ABBREVIATIONS APPLY TO LOCATION OF REINFORCEMENT:EW: EACH WAY FF: FAR FACE BB: BOTTOM BOTTOM (LAID FIRST)EF: EACH FACE B: BOTTOM TT: TOP TOP (LAID LAST)NF: NEAR FACE T: TOP CP: CENTRALLY PLACED
PROVIDE STANDARD COGS AND HOOKS TO AS3600. TERMINATE ENDS OF COLUMN AND BEAMLIGATURES IN A HOOK OF AT LEAST 135 DEGREES. PROVIDE FIRST LIGATURE WITHIN 50 mm OFFACE OF SUPPORT.
PROVIDE ONE CONTINUOUS BAR PARALLEL TO (WITHIN 75 mm OF) CONCRETE EDGES, INCLUDINGCONSTRUCTION JOINTS UNO.
PROVIDE N12 DIAGONAL TRIMMER BARS BY 2000 mm LONG AT EACH LAYER OF REINFORCEMENT ATRE-ENTRANT CORNERS, OPENINGS, SERVICE PENETRATIONS etc UNO.
REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND IS NOT NECESSARILY IN TRUEPROJECTION. SET REINFORCEMENT OUT AT EQUAL CENTRES IF SPACING IS NOT NOMINATED.
SECURE REINFORCEMENT IN POSITION AGAINST DISPLACEMENT AND MAINTAIN SPECIFIED CLEARCONCRETE COVER TO REINFORCEMENT (INCLUDING FITMENTS) BY APPROVED CHAIRS, SPACERS,LIGATURES OR TIES AT 800 mm MAXIMUM CENTRES EACH WAY UNO.. PROVIDE ADEQUATESUPPORT TO PREVENT DISPLACEMENT OF REINFORCEMENT BY WORKMEN OR EQUIPMENT DURINGCONCRETE PLACEMENT.
SUPPORT REINFORCEMENT ON PROPRIETARY CONCRETE, METAL OR PLASTIC SUPPORTSADEQUATE TO WITHSTAND CONSTRUCTION AND TRAFFIC LOADS AND MAINTAIN DURABILITY OFFINISHED CONCRETE STRUCTURE.
DO NOT PLACE OR MOVE REINFORCEMENT DURING OR AFTER CONCRETE PLACEMENT.
SPLICE REINFORCEMENT ONLY AT LOCATIONS SHOWN ON DRAWINGS OR AS APPROVED BYSTRUCTURAL ENGINEER. STAGGER LAPS WHERE POSSIBLE. LAP LENGTHS TO COMPLY WITHAS3600, OR FOR SLAB AND WALL REINFORCEMENT WITH CLEAR SPACING BETWEEN BARS > 150 mmWITH THE FOLLOWING UNO:
R1.
R2.
R3.
R4.
R5.
R6.
R7.
R8.
R9.
R10.
R11.
R12.
R13.
REINFORCEMENT NOTES:BAR SIZE
COVER
25304050
F'c
20253240
N12
500400400400
N16
800600500500
N20
1150850650650
N24
15501250850750
N28
-15001100900
N32
--
1350900
N36
--
16501300
MESH TYPE
RECTANGULAR MESHESSQUARE MESHES SL102 TO SL42SL81TRENCH MESH
END LAP
225225125500
SIDE LAP
125225125N/A
DO NOT INTERPOLATE INTERMEDIATE VALUES OF BAR LENGTHS. LONGITUDINAL BARS IN BEAMS ANDCOLUMNS, ETC, WILL REQUIRE LONGER LAP LENGTHS. REFER TO AS3600 OR STRUCTURAL ENGINEER.
LAY MESH REINFORCEMENT SO THAT MINIMUM COVER IS TO MAIN WIRES UNO.
PROVIDE MINIMUM MESH LAPS TO CROSS WIRES OF REINFORCING MESH, SO THAT TWO OUTERMOSTWIRES OF ONE SHEET OVERLAP TWO OUTERMOST WIRES OF ADJACENT SHEET BY AT LEAST 25 mm,THUS:
USE LAP LENGTHS BASED ON LARGEST WIRE SPACING. DO NOT LAP MORE THAN THREE SHEETS ATANY ONE POINT.
DO NOT CUT, BEND NOR HEAT REINFORCEMENT ON SITE WITHOUT STRUCTURAL ENGINEERS PRIORWRITTEN APPROVAL.
R14.
R15.
R16.
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES REINFORCEMENT
S020 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
WORKMANSHIP AND MATERIALS TO COMPLY WITH AS4100 AND AS/NZS1554.
PROVIDE STEEL IN ACCORDANCE WITH:- AS1163 GRADE C350 FOR RECTANGULAR AND SQUARE HOLLOW SECTIONS,- AS1163 GRADE C250 OR C350 FOR CIRCULAR HOLLOW SECTIONS, AS NOTED ON DRGS- AS/NZS3678 FOR PLATES AND FLOOR PLATE,- AS/NZS3679 PART 1 GRADE 300 OR BHP GRADE 300 PLUS FOR UNIVERSAL BEAMS, UNIVERSAL COLUMNS, PARALLEL FLANGE CHANNELS AND ANGLES,- AS1397 GRADE G450 FOR PURLINS AND GIRTS,- OTHERWISE TO COMPLY WITH AS/NZS3678 OR AS/NZS3679 GRADE 250 UNO.
MARK STEEL GRADES ON STRUCTURAL MEMBERS IN NON-CRITICAL AREAS. USE IDENTIFICATION MARKSCOMPATIBLE WITH AND VISIBLE THROUGH PAINT SYSTEM.
CARRY OUT WELDING TO AS/NZS1554: ALL INTERFACES BETWEEN STEEL SECTIONS TO BE CONNECTED WITH 6mm CONTINUOUS FILLET WELDS ALL ROUND, BOTH SIDES UNO. WELDS TO BE SHOP WELDED UNO. WELDSTO BE CATEGORY SP. BUTT WELDS TO BE FULL (COMPLETE) PENETRATION UNO. ELECTRODES TO BE LOLWCARBON CLASSIFICATION E48XX, PRE-APPROVED TO AS/NZS1554
PROVIDE STEEL MEMBERS MADE FROM WHOLE LENGTHS WHEREVER POSSIBLE. SEEK APPROVAL TO MAKELENGTHS UP OF SECTIONS JOINED BY COMPLETE PENETRATION FULL STRENGTH BUTT WELDS GROUNDFLUSH WHERE REQUIRED. WHERE PROPOSED, SHOW JOINTS ON SHOP DRAWINGS. ENSURE MEMBERS ARECONCENTRIC AT CONNECTIONS (GRAVITY- OR GAUGE-LINES TO INTERSECT) UNO.
M16 AND LARGER BOLTS TO BE HIGH STRENGTH STRUCTURAL BOLTS, 8.8/S PROCEDURE AND M12 SIZE BOLTSSHALL BE COMMERCIAL BOLTS, 4.6/S PROCEDURE UNO.
MAKE BOLTED STRUCTURAL CONNECTIONS WITH 10 mm THICK CLEAT PLATES AND 2 M16 8.8/S BOLTS UNO.USE M12 4.6/S BOLTS FOR PURLINS UP TO 250 DEEP UNO. STIFFENERS, PURLIN AND GIRT CLEATS AND FLYBRACE CLEATS TO BE 8 mm THICK UNO.
USE BOLTS WITH THREADS IN COMPLIANCE WITH AS1275. BOLTS OF STRENGTH GRADE 4.6 TO BECOMMERCIAL GRADE BOLTS TO AS1111 AND 1112. BOLTS OF STRENGTH GRADE 8.8 TO BE HIGH STRENGTHSTRUCTURAL BOLTS, NUTS AND WASHERS TO AS/NZS1252. MECHANICAL PROPERTIES OF BOLTS, NUTS,SCREWS AND STUDS TO COMPLY WITH AS /NZS4291.2. WASHERS TO COMPLY WITH AS1237. TIGHTENINGPROCEDURES TO COMPLY WITH AS4100: S SNUG TIGHT.
CROP INTERNAL CORNERS OF CLEATS AND STIFFENERS, etc TO FACILITATE DRAINAGE. PROVIDE DRAINAGEHOLES TO PREVENT WATER PONDING ON STRUCTURAL ELEMENTS DURING CONSTRUCTION. SHOWPROPOSED HOLES ON SHOP DRAWINGS.
HOT DIP GALVANIZE BOLTS, SCREWS, NUTS AND WASHERS TO AS1214. TAP GALVANIZED NUTS 0.4 mmOVERSIZE TO SUIT GALVANIZED THREADS TO AS1214 AND OIL FOR PROTECTION. INSTALL WASHERS UNDERBOLT HEAD AND NUT. PROVIDE TWO WASHERS UNDER BOLT HEAD IF HEAD IS USED FOR TIGHTENING. USETAPERED WASHERS AS REQUIRED.
HOLDING DOWN BOLTS TO BE GRADE 4.6 UNO. SUPPLY HOLDING DOWN BOLTS WITH TWO CLASS 5HEXAGONAL HEAD NUTS AND TWO EXTRA LARGE FLAT WASHERS. HOT DIP GALVANIZE HOLDING DOWNBOLTS, NUTS AND WASHERS TO AS1214. TIE HOLDING DOWN BOLT GROUPS RIGIDLY TOGETHER PRIOR TOINSTALLATION (eg. TACK WELD WITH 10 mm DIAMETER REINFORCING BAR TO FORM A RIGID CAGE) TO ENSURECORRECT BOLT LOCATIONS, AND SET OUT USING A 3 mm MILD STEEL TEMPLATE SUPPLIED BY STEELWORKFABRICATOR. PROVIDE 4 N12 LIGATURES TO FIX HOLDING DOWN BOLT CAGE SECURELY TO SLAB/FOOTINGREINFORCEMENT.
GROUT BASE PLATES, HOLDING-DOWN BOLTS, REBATES etc BEFORE COLUMNS LOADED OR WALLS ERECTED.USE APPROVED HIGH-STRENGTH NON-SHRINK PRE-MIXED RAMMED GROUT.
S1
S2.
S3
S4.
S5.
S6.
S7.
S8.
S9.
S10.
S11.
S12.
STEEL NOTES: STEEL NOTES (CONT):DRILL HOLES FULL SIZE OR REAM TO FULL SIZE AFTER SUB-DRILLING OR SUB-PUNCHING. SUB-DRILLED ORSUB-PUNCHED HOLES TO BE AT LEAST 3 mm UNDERSIZE. FLAME CUTTING OF HOLES IS NOT PERMITTED.BOLT HOLE SIZE TO BE:
- BOLT DIAMETER PLUS 2 mm FOR STEEL TO STEEL CONNECTIONS.- BOLT DIAMETER PLUS 4 mm FOR STEEL TO CONCRETE CONNECTIONS.- BOLT DIAMETER PLUS 6 mm FOR HOLDING DOWN BOLTS.
DO NOT COMMENCE FABRICATION UNTIL SHOP DRAWINGS AND CALCULATIONS HAVE BEEN REVIEWED.ALLOW 7 DAYS FOR STRUCTURAL ENGINEERS REVIEW. REVIEW DOES NOT INCLUDE CHECKING OFDIMENSIONS, AND DOES NOT RELIEVE CONTRACTOR OF RESPONSIBILITY FOR COMPLIANCE WITH DRAWINGSAND SPECIFICATIONS.
AFTER COMPLETION OF FABRICATION, PREPARATION FOR SURFACE TREATMENT TO BE: ROUND OFFROUGH WELDS, SHARP EDGES, BURRS, ARRISES, WELD SPLATTER AND SLAG, etc. REMOVE GREASE, OIL ANDOTHER CONTAMINANTS TO AS1627.1. REMOVE RUST, MILLSCALE, OXIDE DEPOSITS, OLD PAINT FILMS, etc BYABRASIVE BLAST CLEANING TO AS1627.4 CLASS 2½ TO 35 MICRONS PROFILE HEIGHT OR BY POWER TOOLCLEANING TO AS1627.2 CLASS 2. REMOVE ALL DUST BY BRUSHING OR VACUUM CLEANING.APPLY SURFACE TREATMENT AS SOON AS PRACTICABLE AFTER PREPARATION, WITHIN FOUR HOURS ANDBEFORE A RUST BLOOM APPEARS. APPLICATION OF SURFACE TREATMENT TO COMPLY WITHMANUFACTURER’S RECOMMENDATIONS.
PROTECTIVE COATINGS ARE TO BE SHOP APPLIED AND CURED IN WORKSHOP IN ACCORDANCE WITHMANUFACTURER’S RECOMMENDATIONS UNLESS APPROVED OTHERWISE IN WRITING BY SUPERINTENDENT.PROTECTIVE COATINGS ARE TO BE SMOOTH, UNIFORM AND WITHOUT RUNS, BEADS, PINHOLES, SURFACECRAZING OR OTHER IMPERFECTIONS.
PROTECT COATINGS FROM DAMAGE AND DETERIORATION DURING HANDLING, TRANSPORT, STORAGE ANDERECTION. REPAIR DAMAGE TO PROTECTIVE COATINGS TO REINSTATE INTEGRITY OF NOMINATEDCOATING IN ACCORDANCE WITH MANUFACTURERS’ RECOMMENDATIONS AND SPECIFICATION. EDGES OFPATCH REPAIRS TO BE FEATHERED.
PROVIDE PURLINS AND GIRTS WITH GALVANIZED COATING OF 350 g/m2 = MINIMUM COATING MASS TO AS1397UNO.
REFER SPECIFICATION FOR DECORATIVE COATINGS.
STEELWORK NOMINATED TO BE HOT DIPPED GALVANISED SHALL BE IN ACCORDANCE WITH AS4680 ANDAS1214. THICKNESS OF GALVANIZED COATINGS TO AS4680. ZINC IN GALVANIZING BATH TO BE NOT LESSTHAN 98% PURE BATH TEMPERATURE, TIME OF IMMERSION AND WITHDRAWAL SPEED AS REQUIRED TOACHIEVE SPECIFIED COATING THICKNESS AND FINISH. ZINC COATING TO BE CONTINUOUS, ADHERENT, FREEFROM LUMPS, SPIKES, DAGS, RUNS, BLISTERS, ROUGHNESS, GRITTY AREAS, UNCOATED SPOTS, ACID ANDBLACK SPOTS, DROSS, FLUX AND OTHER IMPERFECTIONS. STRAIGHTEN MEMBERS DISTORTED DURINGFABRICATION AND/OR GALVANIZING PROCESS USING AN APPROVED METHOD. ANNEAL COLD WORKED ITEMSTO 650°C PRIOR TO GALVANISING. TREAT CONTACT SURFACES OF FRICTION-TYPE BOLTED JOINTS BY WIREBRUSHING OR LIGHT BLASTING TO EXTENT NECESSARY TO ACHIEVE REQUIRED SLIP FACTOR. PASSIVATEGALVANIZED STEEL TO BE IN CONTACT WITH CONCRETE BY DIPPING IN 0.2% SODIUM DICHROMATESOLUTION.REPAIR DAMAGE TO GALVANIZED COATING BY POWER TOOL CLEANING TO AS1627.2 OR IF INACCESSIBLE BYHAND TOOL CLEANING TO AS 1627.7, FOLLOWED BY SOLVENT CLEANING/DEGREASING TO AS 1627.1 ANDAPPLY TWO COATS OF AN ORGANIC ZINC RICH PRIMER EACH 60 MICRONS DRY FILM THICKNESSOVERLAPPING SOUND METALLIC ZINC.DO NOT PAINT GALVANIZED STEELWORK UNLESS SPECIFIED ON THE ENGINEERING DRAWINGS.PREPARE GALVANIZED SURFACES TO BE PAINTED USING AN ETCH PRIMER TO ENSURE ADHESION OR TOMANUFACTURERS RECOMMENDATIONS AND APPLY PAINT IN THE WORKSHOP.COATING APPLICATOR TO PROVIDE A 10 YEAR WARRANTY OF THE COATING SYSTEM.
S13.
S14.
S15.
S16.
S17.
S18.
S19.
S20.
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES STEEL
S021 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
DO NOT STRIP FORMWORK PRIOR TO 10 DAYS AFTER PLACEMENT.
DO NOT STRIP FORMWORK UNTIL CONCRETE IS HARDENED SUFFICIENTLY TO WITHSTAND MOVEMENT ANDFORM REMOVAL WITHOUT DAMAGE.
STRIP FORMWORK TO AS3600 CLAUSE 17.6. REMOVE FORM TIE BOLTS WITHOUT DAMAGING CONCRETE.PARTS OF BOLTS LEFT IN CONCRETE MUST NOT INTRUDE INTO COVER CONCRETE. FLUSH FILL HOLES USINGPRE-MIXED NON-SHRINK CEMENTITIOUS REPAIR MORTAR MATCHING CONCRETE SURFACE COLOUR, STRENGTHAND DURABILITY AND ADEQUATE BOND.
THE DESIGN LOAD FOR STACKED MATERIALS SHALL BE MAXIMUM 400 KG.
THE MAXIMUM DESIGN LIVE LOAD TO THE ROOF IS 200 KG
CLASS M SITE.
SURFACE FINISH TO BE CLASS 3
PROVIDE SCAFFOLDING, BARRIERS, FALL RESTRAINT, HAND-MID RAILS AND TOE BOARDS FOR WORK ATHEIGHT. ERECT ACCESS STAIRS AT EARLIEST OPPORTUNITY TO REDUCE OPEN SHAFT HAZARDS ANDFACILITATE ACCESS. MAINTAIN SAFETY MESH AND BARRIERS TO ALL OPENINGS AND ELEVATED EDGES.
PROVIDE TEMPORARY BRACING WHERE REQUIRED FOR STRUCTURAL ELEMENTS OR FRAMES STABILIZED BYMASONRY, PRECAST CONCRETE OR OTHER ELEMENTS CONSTRUCTED AFTER ERECTION OF THE STRUCTURALELEMENT OR FRAME, AND SHOW ON SHOP DRAWINGS.
DO NOT SUPPORT OR RESTRAIN FORMWORK ON PERMANENT WORKS WITHOUT SUPERINTENDENT’S WRITTENAPPROVAL.
CONSTRUCT FORMWORK TO COMPLY WITH AS3610 AND CLAUSE 17.6 OF AS3600 WHERE THIS IS MORESTRINGENT SO CONCRETE WILL HAVE DIMENSIONS, SHAPE, LOCATION AND FINISH SPECIFIED. PROVIDEOPENINGS OR REMOVABLE PANELS FOR INSPECTION AND CLEANING. APPLY RELEASE AGENTCOMPATIBLE WITH CONTACT SURFACES TO INTERIOR OF FORMWORK (EXCEPT WHERE CONCRETE IS TORECEIVE AN APPLIED FINISH FOR WHICH THERE IS NO COMPATIBLE RELEASE AGENT). WHERENECESSARY CLEAN REINFORCEMENT TO REMOVE TRACES OF RELEASE AGENT. SEAL JOINTS BETWEENFORMWORK PANELS, AND TO HARDENED CONCRETE WITH A FLEXIBLE RUBBER STRIP. SET OUTFORMWORK TO GIVE A REGULAR ARRANGEMENT OF PANELS, JOINTS, BOLT HOLES AND SIMILAR VISIBLEELEMENTS IN FORMED SURFACE.
DO NOT USE FORMWORK HARDWARE THAT FORMS A COMPLETE HOLE THROUGH CONCRETE ELEMENTS.DO NOT USE REINFORCEMENT TO SUPPORT FORMWORK.
PROVIDE HOLES IN REBATE FORMERS, etc, AS REQUIRED TO PREVENT AIR ENTRAPMENT.
SUPPORT COLUMNS MUST BE SUPPORTED AT THEIR BASE BY CONCRETE OR STABLE MATERIAL WITH AMINIMUM BEARING CAPACITY OF 100 KPA.
THE FORMWORK PRODUCT TO BE USED SHALL BE FORMrite (CarterHoltHarvey) OR AND APPROVEDEQUIVALENT.
FORMWORK NOTES:S21.
S22.
S23.
UNLESS NOTED OTHERWISE ON DRAWINGS OR IN SPECIFICATION, SURFACE TREATMENT OF STEELWORKTO BE: - APPLY ONE COAT INORGANIC ETHYL SILICATE ZINC PRIMER TO 60-75 MICRONS DRY FILMTHICKNESS. APPLY TWO COATS WATER MISCIBLE ACRYLIC PIGMENTED TO COLOUR TO 60 MICRONS DRYFILM THICKNESS. REPAIR DAMAGED COATING BY POWER TOOL CLEANING TO AS1627.2, OR IF INACCESSIBLEBY HAND TOOL CLEANING TO AS1627.7 FOLLOWED BY SOLVENT CLEANING DEGREASING TO AS1627.1, ANDAPPLY TWO PACK EPOXY ZINC-RICH PRIMER TO 75 MICRONS DRY FILM THICKNESS LAPPING SOUND PRIMERFOLLOWED BY TOP COATS TO MATCH SURROUNDING PAINT SYSTEM.
PREPARE WORKSHOP DRAWINGS, AND SUBMIT THREE COPIES OF EACH FOR SUPERINTENDENT’SREVIEW OF GENERAL COMPLIANCE WITH DESIGN CONCEPT. SHOP DRAWINGS TO SHOW A MEMBERSCHEDULE TABLE ON THE GA FRAMING PLANS, RELEVANT DETAILS OF EACH ASSEMBLY, COMPONENTAND CONNECTION, TOGETHER WITH INFORMATION RELATIVE TO FABRICATION, SURFACE TREATMENTAND ERECTION, INCLUDING IDENTIFICATION, STEEL TYPE AND GRADE, DIMENSIONS OF ITEMS,REQUIRED CAMBER (WHERE APPLICABLE), LOCATION, TYPE AND SIZE OF WELDS OR BOLTS, WELDCATEGORIES AND BOLTING CATEGORIES, WELD PROCEDURES, SURFACE PREPARATION METHODS ANDCOATING SYSTEM, VENT/DRAIN HOLES FOR HOT DIP GALVANISING, PROPOSED JOINTS IN STEELMEMBERS, etc.
DO NOT COMMENCE FABRICATION UNTIL SHOP DRAWINGS HAVE BEEN REVIEWED. ALLOW 14 DAYS FORSUPERINTENDENT’S REVIEW. SUPERINTENDENT’S REVIEW DOES NOT INCLUDE CHECKING OFDIMENSIONS, AND DOES NOT RELIEVE CONTRACTOR OF RESPONSIBILITY FOR COMPLIANCE WITHDRAWINGS AND SPECIFICATIONS.
STEEL NOTES (CONT):F1.
F2.
F3.
F4.
F5
F6.
F7.
F8.
F9.
F10
F11
F12
F13
F14
F15
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES STEEL / FORMWORK
S022 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06
MASONRY WORK TO BE TO AS3700 AND AS/NZS4455.
STEEL LINTELS TO BE HOT DIPPED GALVANIZED.
USE GRADE 20 CONCRETE BLOCKS ie MINIMUM CHARACTERISTIC UNCONFINED COMPRESSIVE STRENGTH(Cu)= 20 MPa TO AS/NZS4455 UNO AND OF DIMENSIONAL CATEGORY DW4 TO AS/NZS4455. COLOUR ANDTEXTURE OF MASONRY UNITS TO BE WITHIN AN AGREED RANGE.
FOR CONCRETE BLOCKWORK USE CLASS M3 MORTAR MADE WITH 1 PART CEMENT: 5 PARTS SAND AND AMETHYL CELLULOSE WATER THICKENER (eg: `DYNEX’ AS PRODUCED BY A.V. SYNTEC) TO AS3700.
DO NOT CHASE HOLLOW BLOCKWORK. DO NOT CHASE MASONRY WITHOUT PRIOR APPROVAL. ENSURE THATPERPENDS AND BEDS ARE COMPLETELY FILLED WITH MORTAR. MORTAR BED JOINTS AND PERPENDS TO BEFULLY BEDDED, AND 10 mm MAXIMUM.
CLEAN MASONRY PROGRESSIVELY AS WORK PROCEEDS. CLEAN FACE WORK TO REMOVE MORTAR SMEARS,STAINS, DISCOLOURATION, etc. KEEP CAVITIES CLEAR OF MORTAR FINS, DROPPINGS, etc.
CONTROL JOINTS TO BE 20 mm WIDE WITH 25 mm DIAMETER CLOSED CELL POLYETHYLENE FOAM BACKINGROD AND APPROVED POLYSULPHIDE SEALANT AT EXTERNAL FACE UNO. FINISH SEALANT IN LINE WITHMORTAR JOINTS. TOLERANCE ON WIDTH +5, -0 mm. PROVIDE JOINTS IN WALL FINISHES AT CONTROL JOINTSIN MASONRY. PLACE POLYSTYRENE IN VERTICAL JOINTS DURING CONSTRUCTION TO ENSURE THAT MORTARDROPPINGS AND OTHER HARD MATERIALS DO NOT FALL INTO OR REMAIN IN CONTROL JOINTS. REMOVEPOLYSTYRENE AT COMPLETION.
INSTALL CONTROL JOINTS IN MASONRY AT 8 METRE MAXIMUM CENTRES (3 METRES MAXIMUM FROMCORNERS, AND AS SHOWN ON DRAWINGS.
WHEN BUILDING IN STEEL DOOR FRAMES etc, FILL BACKS OF JAMBS AND HEADS SOLID WITH MORTAR ASWORK PROCEEDS.
USE CONCRETE GROUT FOR FILLING CORES WITH: - MINIMUM f’c = 20 MPa TO AS3600. - MINIMUM CEMENTCONTENT = 300 kg/m3. - MAXIMUM AGGREGATE SIZE = 10 mm. - SLUMP = 230 ± 30 mm TO AS1012.3.
FOR BOND BEAMS USE CONCRETE WITH f’c = 20 MPa TO AS3600, SLUMP = 80 ±15 mm TO AS1012.3.
PROVIDE 15 mm MINIMUM COVER TO REINFORCEMENT TO AS3700 CLAUSE 6.8 FROM INSIDE FACE AND BASEOF BLOCKS. MAINTAIN COVER BY USE OF “KNOCK-OUT” BLOCKS AND SPACERS, OR BY OTHER APPROVEDMEANS. SET OUT STARTER BARS USING A TEMPLATE.
DO NOT PROCEED WITH BLOCKWORK CONSTRUCTION MORE THAN 6 COURSES AHEAD OF CONCRETEPLACEMENT.
STOP CONCRETE 50mm BELOW TOP OF BLOCKS TO PROVIDE KEY FOR FOLLOWING CONCRETE POUR.ENSURE PROPER COMPACTION OF CONCRETE BY 'RODDING' OR OTHER APPROVED MEANS.
M1.
M2.
M3.
M4.
M5.
M6.
M7.
M8.
M9.
M10.
M11.
M12.
M13.
M14.
MASONRY NOTES:
DRAWING STATUS :DRAWING NUMBER :
TITLE :
A3MANAGER (S) :
PROJECT ENG :
PROJECT :
BY CHKD DATEREV DESCRIPTION
AMMENDMENTS
6 ENGINEERSUPPORT REGIMENTZABUL LINES SAPPERS WAY,AMBERLEY, QLD 4306Telephone (07) 5361 7075 Facsimile (07) 5361 7022
PROJECT MGR :
PROJECT DIR :
DRAWN BY :
SURVEYOR : SCALE :
DATE DRAWN :
SIZE :
1 : 500
NOTES MASONRY
S023 FOR CONST
AGR REFURBISHMENTCANUNGRA TRAINING AREA
985-6ESR-003A13 JUN 2014
SPR CHAMPION
SPR JONES, SPR ROWELL
WO1 CORKERY
LT KOEN
MAJ MOON
LTCOL JOHNSTON
0 FOR CONSTRUCTION A.W* 13/06