Architectural Design ProcessProgram Statement
Data Gathering
Site Analysis
Schematic Design
Design Development
Construction Documents
Construction
Completion
Cairo University
Faculty of Engineering
Department of Architecture
ARC101-Architectural Design (2)
First year 2010-2011
-
7/29/2019 Architectural Design Process 21.03.2011
2/36
Program Statement List of required
spaces and areas
-
7/29/2019 Architectural Design Process 21.03.2011
3/36
Data Gathering
Infos @ Site: location, weather, proximity from important destinations
Needs of the community
Similar projects: Kinder-garden, Hospital, Housing, Library
Standards & measures: Dimensions of spaces & suitablefurniture
Important: Only useful & really needed
information
-
7/29/2019 Architectural Design Process 21.03.2011
4/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
5/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
6/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
7/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
8/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
9/36
Site Analysis
Panoramic photo of Site
-
7/29/2019 Architectural Design Process 21.03.2011
10/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
11/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
12/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
13/36
Site Analysis
-
7/29/2019 Architectural Design Process 21.03.2011
14/36
Schematic Design
-
7/29/2019 Architectural Design Process 21.03.2011
15/36
-
7/29/2019 Architectural Design Process 21.03.2011
16/36
Schematic Design
Bubble Diagram
-
7/29/2019 Architectural Design Process 21.03.2011
17/36
Schematic Design
conceptual 3 D-Modeling
-
7/29/2019 Architectural Design Process 21.03.2011
18/36
Schematic Design
Module (Grid)
-
7/29/2019 Architectural Design Process 21.03.2011
19/36
Schematic Design
-
7/29/2019 Architectural Design Process 21.03.2011
20/36
Schematic Design
-
7/29/2019 Architectural Design Process 21.03.2011
21/36
Schematic Design
-
7/29/2019 Architectural Design Process 21.03.2011
22/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
23/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
24/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
25/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
26/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
27/36
Design Development
-
7/29/2019 Architectural Design Process 21.03.2011
28/36
Design Development
Final 3 D-Model
-
7/29/2019 Architectural Design Process 21.03.2011
29/36
Construction Documents
-
7/29/2019 Architectural Design Process 21.03.2011
30/36
Construction Documents
-
7/29/2019 Architectural Design Process 21.03.2011
31/36
Construction Documents
-
7/29/2019 Architectural Design Process 21.03.2011
32/36
Construction Documents
-
7/29/2019 Architectural Design Process 21.03.2011
33/36
Construction
-
7/29/2019 Architectural Design Process 21.03.2011
34/36
Completion
-
7/29/2019 Architectural Design Process 21.03.2011
35/36
After Completion
Interior design landscape
-
7/29/2019 Architectural Design Process 21.03.2011
36/36
References
http://www.jkjaniga.com/contact/index.html
http://www.jkjaniga.com/contact/index.htmlhttp://www.jkjaniga.com/contact/index.html