Aracatuba gp01-gep-grupo01
-
Upload
marco-coghi -
Category
Documents
-
view
584 -
download
0
Transcript of Aracatuba gp01-gep-grupo01
![Page 1: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/1.jpg)
ENGBIO ENGENHARIA LTDA
GREEN MILL PROJECT
![Page 2: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/2.jpg)
![Page 3: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/3.jpg)
APRESENTAÇÃO
Este trabalho tem por objetivo
apresentar os documentos
gerados durante o gerenciamento
do escopo do
“Green Mill Project”
![Page 4: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/4.jpg)
SUMÁRIO
1. TAP – TERMO DE ABERTURA DO PROJETO 2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 5: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/5.jpg)
1. TAP – TERMO DE ABERTURA DO PROJETO
![Page 6: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/6.jpg)
SUMÁRIO
1. TAP – TERMO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS3. D REQ - DECLARAÇÃO DE REQUISITOS
(PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 7: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/7.jpg)
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
![Page 8: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/8.jpg)
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
![Page 9: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/9.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 10: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/10.jpg)
3. D REQ - DECLARAÇÃO DE REQUISITOS DO PROJETO
![Page 11: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/11.jpg)
3. D REQ - DECLARAÇÃO DE REQUISITOS DO PRODUTO
![Page 12: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/12.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 13: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/13.jpg)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
![Page 14: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/14.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 15: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/15.jpg)
5. D-WBS – DICIONÁRIO DO WBS
![Page 16: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/16.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 17: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/17.jpg)
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
![Page 18: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/18.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 19: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/19.jpg)
7. SM – SOLICITAÇÃO DE MUDANÇAS
![Page 20: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/20.jpg)
7. SM – SOLICITAÇÃO DE MUDANÇAS
![Page 21: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/21.jpg)
7. SM – SOLICITAÇÃO DE MUDANÇAS
![Page 22: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/22.jpg)
SUMÁRIO
1. TAP – TER MO DE ABERTURA DO PROJETO
2. ISH – IDENTIFICAÇÃO DE STAKEHOLDERS
3. D REQ - DECLARAÇÃO DE REQUISITOS (PROJETO E PRODUTO)
4. WBS – ESTRUTURA DE DECOMPOSIÇÃO DO TRABALHO
5. D-WBS – DICIONÁRIO DO WBS
6. LVQ – LISTA DE VERIFICAÇÃO DA QUALIDADE
7. SM – SOLICITAÇÃO DE MUDANÇAS
8. PREMISSAS E RESTRIÇÕES
![Page 23: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/23.jpg)
8. PREMISSAS E RESTRIÇÕES
Premissas:
1. Liberação da licença ambiental dentro do prazo de 3 meses;
2. Garantir a qualidade das estradas e acessos;
3. Ter energia elétrica no canteiro de obras de 1MW,
4. 20% da mão-de-obra tem q ser local.
Restricão: Entrega da fábrica funcionando antes do inicio da safra.
![Page 24: Aracatuba gp01-gep-grupo01](https://reader033.fdocuments.net/reader033/viewer/2022052910/559a0ff91a28ab98098b482c/html5/thumbnails/24.jpg)
FGV / CAMPUS ARAÇATUBA -GERENCIAMENTO DE PROJETOS I
DISCIPLINA: GERENCIAMENTO DE ESCOPO
EQUIPE:• ADÃO CÉSAR
• DIONISIO F. PEGORETTI
• RAQUEL DAVID SCARABELLO
• RENATA MEIRA
PROFESSOR: MARCO ANTÔNIO COGHI
ARAÇATUBA, 18 DE MARÇO DE 2012