Arabian Raw Team

22

Transcript of Arabian Raw Team

Page 1: Arabian Raw Team
Page 2: Arabian Raw Team

Once upon a time there was an Arabian rowing team

Page 3: Arabian Raw Team

Arabian team and Japan agreed to do an annual

rowing race. Each team should contain 8 men.

Page 4: Arabian Raw Team

Both teams worked really hard to get in the best shape.

The day the race started both teams were in similar

condition. ....the Japanese won by 1 mile.

....

Page 5: Arabian Raw Team

FINISH

Page 6: Arabian Raw Team

The mood in the Arabian team was really close to the freeze point.

The top management decided to win the race next year. So they

established a team of analysts to observe the situation and

recommend an appropriate solution.

....

Page 7: Arabian Raw Team
Page 8: Arabian Raw Team

After several detailed analysis the team found out that

Japanese had 7 rowers and only one captain.

7

Page 9: Arabian Raw Team
Page 10: Arabian Raw Team

Of course the Arabian team had 7 captains but only one rower.

7

Page 11: Arabian Raw Team
Page 12: Arabian Raw Team

Facing such critical scenario the management showed an unexpected

wisdom: they hired the consulting company to restructure the

Arabian team.

Page 13: Arabian Raw Team
Page 14: Arabian Raw Team

After several months the consultants came up with

the conclusion that there were too many captains

and too few rowers in the Arabian team. A solution

was proposed based on this analysis: the structure

of the Arabian team has to be changed!

Page 15: Arabian Raw Team

As of today there will be only 4 captains in the team led by 2

managers, one top-manager and one rower. Besides that, they

suggested to improve the rower’s working environment and to give

him higher competencies.

4

Page 16: Arabian Raw Team
Page 17: Arabian Raw Team

Next year the Japanese won by 2 miles.

2

Page 18: Arabian Raw Team

FINISH

Page 19: Arabian Raw Team

The Arabian team immediatelly displaced the rower from the

team based on his unsatisfactory performance.

Page 20: Arabian Raw Team

But the bonus award was paid to the management for

the strong motivation the the team showed during the

preparation phase.

Page 21: Arabian Raw Team

The consulting company prepared a new analysis,

which showed that the strategy was good, the

motivation was O.K. but the used tool has to be

improved.

Performed by ROCE

Page 22: Arabian Raw Team

Currently the Arabian team is designing a newboat.