Aproplan for construction safety

24
APROPLAN APROPLAN FOR CONSTRUCTION SAFETY MTECH Engineering Co.,Ltd. 2015 http://try.aproplan.com/safety-visit/

Transcript of Aproplan for construction safety

APROPLANAPROPLANFOR CONSTRUCTION SAFETY

MTECH Engineering Co.,Ltd. 2015

http://try.aproplan.com/safety-visit/

TopicsBusiness ChallengesAproplan for Construction SafetyConclusion

MTECH Consulting Services

TopicsBusiness ChallengesAproplan for Construction SafetyConclusion

MTECH Consulting Services

Summary of Challenges and Solutions

Crane Inspection & Certification Bureau, LLC - © 2011

4

Five Critical Challenges Facing Every Owner and Manager

Challenges SolutionsImpact of Near Misses, Accidents, Injuries, and Deaths Compliance with Safety Standards, Proper and

Frequent Inspection and Robust Training Reduce Number of Incidents Significantly.

OSHA Regulations, Investigations, Compliance Costs, and Imposed Fines

A Safety Analysis/Risk Assessment provides a snapshot of a company to determine if policies and procedures need improvement to avoid these costs.

Equipment Damage, Failure, Replacement Costs, Rental Costs, Lost Time, & Project Delays

Routine Inspections by properly trained inspectors and operators ensure equipment is properly checked and maintained for more reliability, increased life and fewer incidents.

Increased Insurance Premiums and Litigation, Legal Exposure, and Expenses due to Deaths or Serious Injuries

Providing proper policies , procedures and training, which include contractor and equipment rental provider requirements, will result in lower incident rates.

Cost of Providing Safety Training, due to a lack of understanding of the positive benefits of offsetting training costs and ROI

Investing in Training for operators, inspectors and supervisors for the purpose of reducing accidents is also an investment in ensuring projects are completed on time and under budget.

Challenges on Safety InspectionCreate a Safety Plan with Clear Instructions and Responsibilities

Implementing “each shift”, “monthly” and “annual / comprehensive” inspections

• Reduce workers’ exposure to accidents and equipment failure

Collection of Non-compliance

Instant react

Monitoring

Record keeping

MTECH Consulting Services

ON SITE IN THE OFFICE1 HOUR 1 HOUR=

Each site visit creates an important administrative burden1 hour of work on site is equivalent to 1 hour of administration in the office

The Administrative Burden

6

TopicsBusiness ChallengesAproplan for Construction SafetyConclusion

MTECH Consulting Services

Steps To Success

MTECH Consulting Services

Plan

• Site petro• Plan a list

of safety items to check from a predefined catalogues in AproPLAN

Check

• Quick and complete check of points on site

• Provide the non-conforming elements with a picture and a specific explanation and place them on a plan.

Level of emergency

• Depending on your observation on site, define a level of emergency to each point.

• Make sure that all the most important points are group together.

To-Do-List

• Sorting• Automatic

creation of the to do list

• Rapid distribution to the right person in charge

Monitor

• Traceability of the follow up actions guaranteed

• Keep record

http://try.aproplan.com/safety-visit/

FOLLOW THE SAFETY ISSUES

FROM THE APPLICATION

ONSITE

ATTHE OFFICE

AproPLAN offers a complete solution

Solutions To The Challenges

9

Visit

Photo

Record

Distribute

Meeting

Done

Report

Plan

Construction Construction SafetySafety

ManagementManagement

Aproplan - Streamline the Operation

MTECH Consulting Services

Detail

Point

Project

List

Everything is about the project or the file, in the construction sector.

Each project consists of several safety lists : Electrical, Working At Height, Machinery, Signage,…

Each list contains different safety issue.

Each issue contains several details like a person in charge, an end date, a plan, a photo,…

Structure Of The Project

11

Plan

MTECH Consulting Services

Check

MTECH Consulting Services

Level of Emergency

MTECH Consulting Services

A = MajorA = Major----requires immediate actionrequires immediate actionB = SeriousB = Serious----requires shortrequires short--term actionterm actionC = MinorC = Minor----requires longrequires long--term actionterm action

To-Do-List

MTECH Consulting Services

Report Genertion

MTECH Consulting Services

Automatic Reporting

xxxxxxxx

Follow Through a Task

MTECH Consulting Services

Monitoring

MTECH Consulting Services

Instant Communication

On Site Engineers

Back office

Client

MTECH Consulting Services

TopicsBusiness ChallengesAproplan for Commissioning & FMConclusion

MTECH Consulting Services

The Deliverables

MTECH Consulting Services

OPEN DISCUSSIONIt's one thing to have the technology at your fingertips and

use it to it's full extent. Some people just like to do things the way they have always done it, even if it's inefficient, costly

and not very accurate.

www.aproplan.comwww.mtech.com.hk