100% Design Community Meeting
Please sign in on your mobile device: https//communitymeeting.ocps.net/
April 17, 2019
Pinar Elementary School
Pinar Elementary SchoolMeeting AgendaApril 17, 2019 6:00 PM
• Welcome – School Board Member Johanna López
• Introductions – Lauren Roth/ Facilities Communications
• Project Update – Architect – Contractor R. L. Burns
• Questions and Answers
• Adjournment
2
LAKE COUNTYPOLK COUNTY
ORANGE COUNTYOSCEOLA COUNTY
North
Pinar Elementary School
Avalon Rd.
CURRY FORD RD
S. ECH
ON
LOC
KHATEE TR
.
S. CH
ICKASAW
TR.
S. ECH
ON
LOC
KHATEE TR
.
S. G
OLD
ENR
OD
RD
.
Surrounding Context
3
Existing Retention
AvalonR
d.
PO
WE
R E
AS
EM
EN
T
A N T H O N Y L A N E
CURRY WOODS CIRCLE
MATTILUCK CIRCLE
EXISTING SITE +/- 15.0 ACRES
EXISTING SCHOOL
PLAY FIELD
COVERED PLAY
COURTS
PLAYGROUND
EXIS
TIN
G B
LDG
TO
REM
AIN
north0’ 100’
EXISTING WETLANDS
MATTILUCK CIRCLE
CURRY WOODS CIRCLE
Site Aerial Map
Pinar Elementary School 4
north
0’ 100’FRONT DOOR
Gate
ES CONCEPT INFORMATION:Parking: 140 carsStacking: 153 cars (30.6%)
PLANNING PARAMETERS:• 500 Student School with 500 Core• Current enrollment 412• Target +/-150 Parking• School currently has 1 bus• Bus loop accommodates 20 buses• Plan for 12 future portables
Fence
Gate
Gate
Final Site Plan
Pinar Elementary School
Parent Drop
Bike
Bike
1 STORYELEMENTARY
SCHOOL
Bus Drop
EXISTING CLASSROOM
BLDG.
Courts
Youth
TotRetention
Service
Retention
FUTURE
Play Field
CEP
5
TO C
HIC
KASA
W T
RAI
L
Exterior Elevation
8
Exterior Elevation
9
Exterior Elevation
10
Interior Spaces
11Pinar Elementary SchoolExample images from previous projects
ADMIN. RECEPTION ADMIN. RECEPTION
LOBBYLOBBY
Interior Spaces
12Pinar Elementary SchoolExample images from previous projects
ART
CLASSROOM MEDIA CENTER
MUSIC
Exterior Spaces
13Pinar Elementary SchoolExample images from previous projects
COVERED PLAY CANOPY PLAY LOTS
OUTDOOR COURTS
• Water Spring Elementary• Deerwood Elementary School • Hungerford Elementary School • Maxey ES / Site 207-E-W-7• Laureate Park Elementary School• Meadow Woods Elementary School • Ventura Elementary School • Independence Elementary School• Eagle Creek Elementary School• John Young Elementary School • Shingle Creek Elementary School • Wheatley Elementary School
Previous OCPS Schools using the same/similar prototype
Pinar Elementary School 14
Sustainability
15Pinar Elementary School
Site• Native/low water plants – reduce water consumption• Low Impact Design (LID) stormwater design
Building• 10% more energy efficient than ASHRAE 90.1 standard• Lighting system and power outlets designed to turn lights and
power off in unoccupied spaces (energy reduction)• High Efficiency Chillers (10% energy reduction)• Light colored roof to reduce heat gain and improves energy
performance• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms in the new building have daylighting• Over 75% of ALL spaces in the new building have daylighting• Thermal efficient windows/glazing
• The new Pinar Elementary School is designed to meet Green Globes sustainable building standards. Sustainable Features Include:
Design, Permitting, Bidding
New Campus Construction (11 Months)
May 2020
August2018
June2019
Move-In
August2020
Schedule
Pinar Elementary School 16
north
’
Phas
e Se
para
tion
Line
EXISTING CLASSROOM
BLDG.
ES CONCEPT INFORMATION:Parking: 140 carsStacking: 153 cars (30.6%)
Site Plan - Phase 1 & II May 2019 - August 2020
Pinar Elementary School
1 STORYELEMENTARY
SCHOOL
Bus Drop
FRONT DOOR
Service
Retention
CEP
Phas
e Se
para
tion
Line
17
0’ 100’
TO C
HIC
KASA
W T
RAI
L
Summer 2019
Summer 2019 Phase I – May 15, 2019 - August 15, 2019
Construct portion of pond and transfer fill to north side of site.Begin renovation in building 200
Phase II – August 15, 2019- May 20, 2020Complete the main building and portion of the parking and access drive
north
0’ 100’FRONT DOOR
Gate
ES CONCEPT INFORMATION:Parking: 140 carsStacking: 153 cars (30.6%)
PLANNING PARAMETERS:• 500 Student School with 500 Core• Current enrollment 412• Target +/-150 Parking• School currently has 1 bus• Bus loop accommodates 20 buses• Plan for 12 future portables
Fence
Gate
Gate
Site Plan Phase III May 2020 - July 2020
Pinar Elementary School
Parent Drop
Bike
Bike
1 STORYELEMENTARY
SCHOOL
Bus Drop
EXISTING CLASSROOM
BLDG.
Courts
Youth
TotRetention
Service
Retention
FUTURE
Play Field
CEP
18
TO C
HIC
KASA
W T
RAI
L
Phase III – May 20, 2020 – July 15, 2020Complete the renovation of existing building 200 & 300Complete the access drive and pond on south side of property
Summer 2020
Sum
mer
20
20
north
0’ 100’FRONT DOOR
Gate
ES CONCEPT INFORMATION:Parking: 140 carsStacking: 153 cars (30.6%)
PLANNING PARAMETERS:• 500 Student School with 500 Core• Current enrollment 412• Target +/-150 Parking• School currently has 1 bus• Bus loop accommodates 20 buses• Plan for 12 future portables
Fence
Gate
Gate
Site Plan Phase IV July 2020 -November 2020
Pinar Elementary School
Parent Drop
Bike
Bike
1 STORYELEMENTARY
SCHOOL
Bus Drop
EXISTING CLASSROOM
BLDG.
Courts
Youth
TotRetention
Service
Retention
FUTURE
Play Field
CEP
19
TO C
HIC
KASA
W T
RAI
L
Phase IV – July 15, 2020- November 23, 2020Demolish the existing building and complete playfields
Phase IV
Questions & Answers
20Pinar Elementary School