Apresentação do PowerPoint - Consulting Engineers South ... - FIDIC 2014 - Plenary... ·...
Transcript of Apresentação do PowerPoint - Consulting Engineers South ... - FIDIC 2014 - Plenary... ·...
3
The Technological challenge
__
Maintain the technological system
recognized for offering technologies
that contribute to the sustainable
growth of the Company
People
Petrobras Research Center (August 2014)
__
Technician
college
587
1343
Degree
professional
Masters (456)
Graduates(646)
PhD (241)
143Consultants
117Consultants
seniores
15Consultants
masters
1973
2010
9
Infrastructure
Petrobras Research Center
__
Total area - 308 thousands m2
227 laboratories
More than 8 thousand equipments
5 semi-industrial experimental plants
throughout Brazil
Infrastructure
Our R&D facilities
__
Six – Refining
Technological Center
(São Mateus do Sul)
Fortaleza Experimental
nucleus (CE)
Aracaju Experimental
nucleus (Aracaju – SE)
Taquipe Experimental
nucleus (BA)
Cenpes
(Rio de Janeiro – RJ)
Miranga Experimental
nucleus (BA)
11
Investment
Resources for technological development
—2011-13
Average:
US$ 1,243
million
US$
million
2001-03
Average:
US$ 160
million
8X
US$ 6.5 billion
12
Investment
Resources for technological development 2014 - 2018
—
60%
22% 2%
3%
12%
1%
E&P
Downstream
Gas and Energy
Biofuels
Engineering, Technology and Materials
Other areas*
UFSC
UEM
UFPA
UFRN
UFS
Processes
Thematic Networks Relationship with R&D Institutions
__
More than 100 universities and research
institutions
49 Thematic Networks
More than 200 laboratories built since 2009
More than 8000 researchers involved in
projects of Petrobras
13
Technological Focus Organized by business segment
__
New frontiers
Potential reserves of natural
gas
Well construction optimization
Pre-salt production
Offshore logistics
Production optimization of
mature fields
Subsea systems
Maximization of middle
distillates
Pre-salt oil refining
Optimization and integration
of logistics operations
Innovative productsBioproducts
Geological processes simulation
Maritime production systems
Mobility
Nanotechnology
New materials
Gas hydrates
Flow enhancement for
petrochemical
Construction and assembly
Productive processes optimization
Integrity, safety and reliability
CO2 and other emissions
Water
Impacted areas
Monetization of new potential of
natural gas
Energy supply and demand
integration and flexibility
Natural gas logistics
Cost reduction
Adding value to gas
Gas processing
14
2014
Refap – Portfolio Diesel2 diesel hydrotreating units and 1 hydrogen generation unit
(Canoas)
Rio Grande do Sul
—
Rio Grande do Sul
—
2016
FPSO P-67Project of FPSO Replicants
Rio Grande Shipyard (Rio Grande)(Lula Norte Field – Santos Basin)
Santa Catarina
—
8 modules of Fuel Gas and Gas Dehydration and
16 modules of Generation Project of FPSO Replicants
DM TKK Construction (Itajaí)
2014
Fertilizer Plant (UFN III)Capacity 761 thousand ton/year of ammonia and 1223 ton/year of urea(Três Lagoas)
Mato Grosso do Sul
—
2014
Ammonium Sulfate UnitNitrogen Fertilizer Plant
Petrobras first plant of ammonium sulfate(Laranjeiras)
Sergipe
—
2017
Camaçari Industrial ComplexUTE-Muricy II and Pecem II
Installed capacity of each - 140MWh(Camaçari)
Bahia
—
Espírito Santo
—
2017
FPSO P-68Project of FPSO Replicants
Jurong Shipyard (Aracruz)(Lula Sul Field – Santos Basin)
2016
Fertilizer Plants José AlencarProduction of 519 thousand tons/year of ammonia(Uberaba)
Minas Gerais
—
2014
RPBC – Portfolio Diesel6 units of chemical processing to produce diesel S-10(Cubatão)
São Paulo
—
Rio de Janeiro
—
2014
Ilha Comprida Terminal Storage and disposal of 4,080 tons of LPG per day(Baía de Guanabara - RJ)
2016
Processing unit of natural gas – TecabExtends the capability of processing natural gas and condensate(Macaé)
2016 and 2017
P-67 and P-70Project of FPSO Replicants
Construction of modules and integration
Porto do Açu (São João da Barra)
2013
FPSO Cidade de São Paulo120 thousand bpd of oil and 5 MM m3/d of gas(Sapinhoá Field – Santos Basin)
2013
FPSO Cidade de Niterói100 thousand bpd of oil and 3,5 MM m3/d of gas(Marlim Leste Field – Campos Basin)
2013
FPSO P-58180 thousand bpd of oil and 6 MM m3/d of gas(North of Parque das Baleias – Campos Field)
2013
FPSO Cidade de Paraty120 thousand bpd of oil and 5 MM m3/d of gas(Lula Nordeste Field –Santos Basin)
2014
FPSO Cidade de Mangaratiba150 thousand bpd of oil and 8 MM m3/d of gas(Iracema Sul Field – Santos Basin)
2014
FPSO Cidade de Ilhabela150 thousand bpd of oil and 6 MM m3/d of gas(Sapinhoá Norte Field – Santos Basin)
Seek the monetization of natural gas reserves
Production capacity of nitrogen fertilizers
2020
169%
Natural gas consumption by distributors 33%
Capacity of thermal generation 20%
We produce gasoline, diesel and other derivatives
Average quantity processed
2014
2,1million bpd
2020
3,3million bpd