EP Engenharia
Technologies and Equipments for the benefit of the Environment
Grupo EP Engenharia do ProcessoSince 1974
Complete systems, including turn-key solutions.
Engineering, project, and construction (EPC) contracts, including turn-key solutions for water and wastewater treatment.
Assisted Operation
Laboratory for Chemical Analysis
Treatability Study and
Support for Research and Development
Components and equipments for water and
wastewater treatment systems
Chemical Products for:
Cooling Systems,
Steam Generation and
Water/wastewater Systems
• Technology Research and Development for industrial and domestic water and wastewater.
• Develop basic and detailed engineering
• Manufacturing, inspection, execution and supervision of civil works and installation, commissioning, start-up and training.
• Operation and Control of water and wastewater Systems.
About EP Engenharia do ProcessoOur Business
ISO 9001/2000 pela GLC
ISO 14.001
REBLAS
INEA – RJ
ISO 17025 pelo INMETRO
Supply Award – Volkswagen
CRCC (Petrobras)
Certifications
• Guarulhos – SP
– Laboratories of chemical analysis and technological researches;
– Projects Structure;– Main Office.
• Nazaré Paulista – SP
– Steel shop – Maintenance Factory– Equipments Deposit– Chemical Products Factory
• Total Employees: 300
Infrastructure
EP Analítica – Laboratory for Chemical Analysis
Headquarters - Guarulhos
Plant - Nazaré Paulista
REFERENCES
PETROBRÁS FAFEN (Petrochemical) – Camaçari, BA
Water Treatment System for industrial use and desmineralized water, with its orign from deep tubular well.
Processes and Technologies: clarification, microfiltration and desmineralization using reverse osmosis processes followed by mixed bed. Fully automatic system.
600 m³/h - industrial water280 m³/h - desmi water – RO + MB
Water Treatment System for industrial use, with its orign from contamined water with domestic wastewater from Cunha channel.
Processes and Technologies : phisico-chemical process, followed by final polish with send filter and two steps of reverse osmosis, generationg desmineralized water for the production process. 100% automized unit with CLP.
Total flow rate - 120 m³/h – industrial wastewater + sewage
PROSINT (Petrochemical) – Rio de Janeiro, RJ
Water Treatment and Demineralization Plant
Processes: Reverse Osmosis / Mix Bed
Conductivity must be less then 0,5 microS/cm
260 m³/h - Pre Tratament + RO + MB
PQU QUATTOR (Petrochemical) – Mauá, SP
Water Treatment System and Demineralization Unit
Processes:WTP – Coagulation / Floculation / FiltrationDEMINERALIZATION – Ion Exchange followed by mix bed. Totally automatic plant controlled by CLP
COPEBRÁS (Petrochemical) – Catalão, GO
Flow rate: 600m³/h
Supply of WTP - Turn key Project
Processes: RO permeate polish system using Mix Bed
Flow Rate: 300 m³/h
GEOPLAN (Environmental Technology) – RJ
Supply of WWTP recycling 75% of industrial and domestic wastewater using the following technologies:
- Phisical-chemical clarification, DAF, biological treatment (activated sludge), tertiary tratament and demineralization by RO.
- System totally automatic system controlled by CLP
- EP is the responsible of the operation and analytical control of this unit since 2004.
Flow rate: 20m³/h
MAXION FUMAGALLI (Autoparts) – Limeira, SP
Tertiary Treatment and Water Recycling
RO Unit
Flow rate: 20m³/h
MAXION FUMAGALLI (Autoparts) – Limeira, SP
Processes:Anaerobic SystemAerobic SystemPhisical-chemicalPolishingMFRO
Turn Key Project
MASTERFOODS (Food) – Mogi Mirim, SP
Flow rate: 35m³/h
Turn Key Project – WWTP
Processes: MBBR technology for high BOD removal from Guaraná concentrate
AMBEV (Beverage) – Maués, AM
Flow rate: 20m³/h
WTP + Demineralization - Turn Key Project
Processes: RO System followed by mixed bed.
Flow rate: 60m³/h
OXITENO (Petrochemical) – Mauá, SP
WWTP – BOT Project Processes: RO pre tratament using microfiltration
EP is responsible for the operation and chemical analisys control since 2009
Other Services: Recycling System Retrofit
VOLKSWAGEN (Automotive) – Taubaté, SP
Flow rate: 150m³/h
WTP - Turn Key Project
Processe exclusively designed by EP laboratories for selenium removal
Services: Project, supply of Equipments, civil works, assembling, eletrical and automation works.
AMBEV (Beverage) – Dominican Republic
Flow rate: 180m³/h
WWTP
Supply of biological system and outsourcing operation
Flow rate: 65m³/h
BUNGE ALIMENTOS (Food) – Bauru, SP
WTP followed by microfiltration and RO system (BOO)
Services: Operation and chemical supply
Flow rate: 35m³/h
Carbon Filter
VOLKSWAGEN (Automotive) – São Bernardo do Campo, SP
RO System provides demineralizated water for painting processes and boilers.
WWTP
EP is responsible for operation and chemical analysis control os this plant since 2001.
Flow rate: 20m³/h
VOLKSWAGEN - Trucks (Automotive) – Resende, RJ
RECENT PROJECTS
WTP – Turn key project
Supply of equipments and services that allows the water captation and treatment from Perequê river, for industrial use.
Technologies: Convention process followed by Send Filter
Flow rate: 150m³/h
PETROCOQUE (Petrochemical) – Cubatão, SP
Service: WWTP and Recycling System for the new GM Factory
Technologies: biological system using "Wetland" technology followed by RO system for 75% recovery.
GENERAL MOTORS (Automotive) – Joinville, SC
WWTP for the new Pepsico factory
Technologies: pre-treament with DAF, Activated Sludge, Recycling system (80%) using desinfecction , filtration, MF, softening and demineralization by RO processes.
PEPSICO (Food) – Feira de Santana, BA
Flow rate: 25m³/h
Pre-treatment System retrofit to optimizate phisico-chemical and biological processes.
A new Equalization Tank and a water-oil separator system were bilt.
PEPSICO (Food) – Itu, SP
Pre-treatment and WWTP retrofit with rotary screen instalation and two DAF systems.
EP is also responsible for the operation and chemical anaylis control of this plant.
Flow rate: 100m3/h
PEPSICO (Food) – Sete Lagoas, MG
Technical Information:Capability: 100m³/hOrganic Load: 2500mg/L (BOD)Technologies: • Flotation (DAF)• Activated Sludge Outlet BOD < 20mg/L
PEPSICO (Food) – Sete Lagoas, MG
Service: Project, construction and start-up of the WWTP
Technologies: Pre-tratament by phisical-chemical process, followed by Activated Sludge
Flow rate: 25m³/h
BOMBRIL (Hygiene) – Recife, PE
Wastewater: contaminated with oil and grease
Flow rate: 35m³/h
Technologies: Conventional phisical-chemical Oil-Water sepatator
Lamellar Settler Automated System
LATAPACK-BALL (Packing) – Alagoinhas, BA
WWTP
LATAPACK-BALL (Packing) – Alagoinhas, BA
Clarified water
Press filter
MBR system RO system
WWTP using MBR technology for domestic and industrial wastewater treatment.
Recovery of 75% with two RO steps for industrial water
Flow rate: 5m³/h
IHARABRAS (Pesticides) – Sorocaba, SP
MAXION (Autoparts) – Cruzeiro, SP
Supply of WWTP – Turn key project
Flow rate: 30m³/h
WWTP extension
Processes: calamity tank for pH correction
Flow rate: 120m³/h
COCA COLA (Beverage) – Jundiaí, SP
Mobile Units for Pilot Tests - CENPES - PETROBRÁS
Technologies:
• Conventional phisical-chemical treatment• Send Filtration - POLARTACK®• Activated Carbon• UF• RO• Advanced Oxidative Processes: Ozone Chlorine Dioxide UV Fentom
• Softning• Demineralization – Ion Exchange• Polishing – Mix Bed• Demineralization – EDR• Polisshing – EDI• CO2 removal by membranes - GTM• Decarbonator Tower
PEPSICO (Food) – Guarulhos, SP
WWTP – Turn key project
Processes: Phisical-chemical process by flotation followed by bilological (MBBR)
Flow rate: 35m³/h
Fone: 11 2463-7700