APPROACH TO IMPLEMENT THE PRP

13
Italian Committee of United Cities (CICU) PHARE - twinning Project SK02/IB/EN01 Slovak Hydrometeorological Institute PRP as a tool for: •Reduce overall polluting pressures •Protect and restore water ecological status •Achieve the environmental objectives as set by the common frame for water policy (Dir. 2000/60/CE) APPROACH TO IMPLEMENT THE PRP

description

APPROACH TO IMPLEMENT THE PRP. Italian Committee of United Cities ( C ICU). Slovak Hydrometeorological Institute. PHARE - twinning Project SK02/IB/EN01. PRP as a tool for : Reduce overall polluting pressures Protect and restore water ecological status - PowerPoint PPT Presentation

Transcript of APPROACH TO IMPLEMENT THE PRP

Page 1: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

PRP as a tool for:

•Reduce overall polluting pressures

•Protect and restore water ecological status

•Achieve the environmental objectives as set by the common frame for water policy (Dir. 2000/60/CE)

APPROACH TO IMPLEMENT THE PRP

Page 2: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

Directive 76/464/CE and daughter directives

•Identify polluting substances with priority set on toxicity, persistance and bio accumulation

•Set EQS to prevent dangerous effects

•Programmes of measures to achieve DS emission reduction in waters PRPPRP

Reduce pollution

Page 3: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

WFD approach:

All water bodies should achieve a GOODGOOD Ecological Status within 2015

• protect water bodies at HIGH or GOOD Ecological Status

•reduce/ cancel polluting input in water bodies at risk not achieving the environmental objective

Protect & Restore Water Ecological Status

Page 4: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

WFD approach: in the RIVER BASIN

• identify water bodies at risk of achieving environmental objectives

•Assess pressures and impacts (quality/quantity)

Protect & Restore Water Ecological Status 2

Page 5: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

Protect & Restore Water Ecological Status 3: Known PS

ELEMENT HIGH STATUS GOOD STATUS LESS THAN GOOD STATUS

Specific synthetic pollutant

Conc. close to ZERO or below the limits of detection of the MOST ADVANCE analytical techniques in general use

Conc. < EQS Conditions consistent with the achievement of the environmental objective for biological QE

Specific non- synthetic pollutant

Conc. == background level

Conc. < EQS (*) Conditions consistent with the achievement of the environmental objective for biological QE

(*) EQS > bgl

Page 6: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

Page 7: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

Page 8: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

The Combined Approach (WFD art 10)

•Emission controls based on Best Available Technologies (BAT)

•Relevant emission limit values

•Diffuse impacts: Best Environmental Practices (BEP)

• If Quality objective or Quality standard pursuant any relevant Directive are at risk: set more stringent emisson controls

Page 9: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

Programmes of measures (WFD art 11)

•BASIC MEASURES (among others….):

1) point discharge sources: prohibition on the entry of pollutant into water, prior authorisation, prior registration laying down emissions controls

2) periodical revisionand update

3) prohibition of discharge of pollutants in GW (derogations)

SUPPLEMENTARY MEASURES

Any other measure implemented to achieve environmental objectives

Page 10: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

UP DATING PS LIST

•DB on Priority Substances: IPPC, EPR, Monitoring (results from quality, bathin, drinking water monitoring rogrammes), Tox&Ecotox results•Investigative monitoring : whath new?•Expert judgement : re examination and procedure of WFD Annex 5(1.2.6 Procedure to assess EQS)•Formal Committee? (refer to Art 21 Committee of WFD), : lacking EQs, New PS, reporting

PRP

Knowledge Integration

Page 11: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

New PRP

•GIS :sources,volumes, pollutants and territory (no all pollutants in all regions: cost-benefit!!!)

•Re examination of discharge permits vs. receiving waters environmental objectives

•Re examination of derogation regime

Page 12: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

River Basin Management Plan

•Water protection plan : WB at risk

•PRP

•Economic analysis

•Public partecipation

Page 13: APPROACH TO IMPLEMENT THE PRP

Italian Committee of United Cities (CICU)

PHARE - twinning Project SK02/IB/EN01

Slovak Hydrometeorological Institute

THE PROCESS

RBMP

MonitoringAssessment

Reporting

PRP