APPLIED ENGINEERING
Page 1
INDE X
DESCRIPTION
A
B
C
D
E
F
G
H
GENERAL INFORMATION MANPOWER COMPANY’S PROFILE QHSE POLICY EXPERIENCE EQUIPMENTS & INSTRUMENTS CERTIFICATE & LICENCES PRE-QUALIFICATIONS
![Page 2: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/2.jpg)
APPLIED ENGINEERING
Page 2
GENERAL INFORMATION
![Page 3: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/3.jpg)
APPLIED ENGINEERING
Page 3
A. GENERAL INFORMATION: 1. Name of Firm : APPLIED ENGINEERING 2. Address, Telephone & Fax Nos. : 38-A, Unit No. 3, Latifabad, Hyderabad-71800, Pakistan Phone # +92-22-2100311-12 Fax # +92-22-2100313 Email: [email protected] Email: [email protected] Email: [email protected] 3. National Tax Number : 0676537-8 4. Sales Tax Registration Number : 12-00-2800-140-82
5. Date of Establishment : 1st January 1987
We have been carrying out the business on the name of Applied Engineering Services (Pvt.) Limited and since 1st August 1996 as Applied Engineering. All manpower and equipment stand transferred to Applied Engineering.
6. Natural of Ownership : Partnership Firm 7. Chief Executive: a) Name : Mr. Dabirul Mulk b) Qualification : B.Sc. (Engg.) Mech. c) Nationality : Pakistani
![Page 4: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/4.jpg)
APPLIED ENGINEERING
Page 4
ORGANIZATION CHART
Sr. Manager (Technical)
Radiation Protection Officer
(RPO)
CHIEF EXECUTIVE
Manager Administration/MR
Manager (Finance)
Site RPOs / Site Incharges
Engineer (Design and
Development)
Engineers (Cathodic Protection)
Engineer (Construction)
Executive Director
Manager (Lahore Office)
Manager (Karachi Office)
Third Party Inspector
Director Marketing
Radiographer Welding Inspector
Personal Assistant
![Page 5: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/5.jpg)
APPLIED ENGINEERING
Page 5
MANPOWER
![Page 6: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/6.jpg)
APPLIED ENGINEERING
Page 6
B. MANPOWER: (Including Chief Executive)
Sr. No.
Name of Person / Present Assignment
Academic and Professional Qualification Membership of institute Relevant Courses Attended
1.
2.
3.
4.
5.
6.
7.
Mr. Dabirul Mulk Chief Executive Mr. Syed Shoaib Shahid Executive Director Syed Sultan Alam Sr. Manager (Technical) Mr. M.Zubair Lodhi Manager (Administration) / Management Representative Ghazanfar Hussain Manager (Finance) Abdul Khalique Rajput Engineer (Cathodic Protection) Mohsin Ali Engineer (CP)
BSc. (Engg.) MECH a) Life member Institute of
Engineering Pakistan. b) Member engineering Council of
Pakistan. c) Member American Society of
Mechanical Engineering (ASME).
d) Member Nation Association of Corrosion Engineers (NACE).
e) Life Member of Pakistan Atomic Energy.
MBA (IB) MCS BSc MBA (Management) M.Com BE (Electrical) BE(Telecommunications) ME(Communication Systems & Networks a) Member engineering Council of Pakistan
1. Advance Industrial
Radiography. 2. Special Course in
Petroleum Engineering (Canada).
3. Course in Investment Analysis and Decision Making.
SAP (Basic) a) ASNT Level-II (IR) b) Magnetic Particle & Dye Penetrate Testing Conducted Level-I Pakistan Atomic Energy Commission Islamabad. c) PNRA Course (Transport Safety and Security of Radioactive Material / Sources) Diploma in I.T Internal Quality Auditor Video Analyst a) NACE Basic Corrosion Course at Karachi. b) NACE Corrosion Prevention Course at Karachi. c) 4 Week Corrosion Control Course at British Gas, UK. a) PLC Course (PLC)
![Page 7: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/7.jpg)
APPLIED ENGINEERING
Page 7
8.
9.
10
11
12
13
14
15
16
17
18
19
20
21
Arshad Azeem Engineer (Construction) S.M.Saleem Incharge (Electrical) Gul Hassan Qureshi Regional Manager (Karachi) Aftab Hussain Shah Regional Manager (Lahore) Muhammed Tahir Regional Manager (Hyderabad) Malik Muhammed Afzal WIR Muhammed Khalid WIR Muhammed Ajmal WIR Akhtar Abbas Radiographer Ghulam Shabbir WIR Syed Pervaiz Akhtar WIR Khalil-ur-Rehman Zaheer WIR Syed Mohsin Abbas Shah Radiographer Fateh Muhammed Radiographer
BE (Civil) Associate Engineer Intermediate MSC (Chemistry) BA B.Com BA Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate
Wireman Course. Electrical Supervisor Course. Radiography Course from PSNT, Nilore, Rawalpindi. Ex-Executive of SSGC. Ex-Executive of SSGC ASNT Level-II (RT). Certified Industrial Radiographer from PNRA. ASNT Level-II (RT) Certified Industrial Radiographer from PNRA. ASNT Level-II (RT) Certified Industrial Radiographer from PNRA. ASNT Level-II (RT). Certified Industrial Radiographer from PNRA. ASNT Level-II (RT). Certified Industrial Radiographer from PNRA ASNT Level-II (RT). Certified Industrial Radiographer from PNRA ASNT Level-II (RT). Certified Industrial Radiographer from PNRA ASNT Level-II (RT). Certified Industrial Radiographer from PNRA ASNT Level-II (RT). Certified Industrial Radiographer from PNRA ASNT Level-II (RT).
![Page 8: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/8.jpg)
APPLIED ENGINEERING
Page 8
22
23
24
25
26
27
28
29
30
31
32
33
34
Asif Mehboob Radiographer Abdul Rauf Radiographer Faisal Irshad Radiographer Muhammed Yousuf Radiographer Muhammed Imran Radiographer Usman-ul-Haque WIR Usman Wajid Radiographer Ansar Ahmed Ultrasonic Inspector Mahmood Bhurgari Sr. Inspector Junaid Waqar nspector Naveed-ur-Rehman Inspector Nazeer Ahmed, Inspector Bilal Ahmed Khan, Inspector
Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate DAE (Electrical) BA BA DAE (Mechanical) B.Com DAE (Civil) Matriculation BA B.Com DAE (Mechanical)
ASNT Level-II (RT). ASNT Level-II (RT). ASNT Level-II (RT). ASNT Level-II (RT). ASNT Level-II (RT). ASNT Level-II (RT). ASNT Level-II (UT) PAEC Level-I (Eddy Current) PAEC Level-I (UT)
Note: Additional required staffs are recruited in accordance with the projects under execution.
![Page 9: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/9.jpg)
APPLIED ENGINEERING
Page 9
COMPANY’S PROFILE
![Page 10: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/10.jpg)
APPLIED ENGINEERING
Page 10
APPLIED ENGINEERING AE has been established as high performance engineering Company acting all over Pakistan. AE has proved its proficiency both as a general Consultant and as a consortium member in the field of design, construction supervision and construction of pipelines and gas treating plant, civil works, piling works etc. Scope of work also includes survey work and selection of pipeline route and design of pipeline crossings, also include the services of Non Destructive Testing NDT and Cathodic Protection of underground structures.
APPLIED ENGINEERING AE undertakes the delivery and construction of project works and provides engineering and specialized services which includes as under: BASIC ENGINEERING Civil, Mechanical, Electrical and Instrumentation, Plant Piping and Transmission and Distribution Pipeline, Steel Structures and Survey. DETAIL ENGINEERING Detailed design of the projects, Preparation of material specification, BOQ’s, preparation of drawings, activity schedules, reports, Tender, Contract etc. CONSTRUCTION WORK AND SUPERVISION Non Destructive Testing (NDT) and Engineering Inspection Services Authority Approvals Project & Site Management Commissioning Support Cathodic Protection of Pipelines Storage tanks and structures exposed to corrosive environment. Our major activities centre on design pipelines and piping systems in industrial and gas plants, establishment of pipeline route. We are specialized in Non Destructive Testing (NDT) and engineering Inspection Services as well. Our staff’s know how extend beyond the technical and engineering requirement of the jobs and familiar with the local conditions, which are particularly important for expediting the pace of progress and removing the bottlenecks encountered during execution of the works.
![Page 11: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/11.jpg)
APPLIED ENGINEERING
Page 11
BASIC AND DETAIL ENGINEERING Our experience staff prepares the Basic Engineering documents on client requirement for detail engineering. Our motivated teams work closely with client. They have the support of specialist in all technical and engineering fields in order to find the most effective solution of problems encountered during the work execution.
RANGE OF SERVICES Document preparation in respect of detail engineering includes. • Project plants and schedules. • Plans and schedule of pipeline projects,
equipment, boilers and NDT. • Plans and schedule of Bridges and piling work. • Plans and schedule of pipelines and piping
system of plants. • Land and pipeline route survey. • Plan and schedule of structural steel. • Detail and shop drawings on Auto CAD. • Preparation of data and construction work
details. • Work schedules. • Authority approvals. • Cost estimates. • Material specifications. • Bill of Quantities. • Tender and contract documents.
![Page 12: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/12.jpg)
APPLIED ENGINEERING
Page 12
CONSTRUCTION WORK Our highly experienced engineers and staff are capable of execution of construction work of all types related to civil, mechanical, pipelines, plant, piping, structural steel, electrical and instrumentation, land and pipeline route survey. In the time completion of work and meeting the quality requirement of the work are our major approach to satisfy the client.
RANGE OF SERVICES • Construction of all types of civil, mechanical and
electrical works. • Construction of gas water and oil pipelines. • Structural steel works. • Land and pipeline route survey. • Preparation of As-built documentation/drawings
after work completion. • Supervision and Inspection of construction
activities. • Quality control of work. • Project site management. • Utilities approval. • Job safety.
![Page 13: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/13.jpg)
APPLIED ENGINEERING
Page 13
NON DESTRUCTIVE TESTING (NDT) AND ENGINEERING INSPECTION SERVICES The company’s philosophy is to provide technical services in quality inspection and NDT examination based on established engineering codes and practices, as well as surveys in engineering works during manufacturing and on stream operations. The company also provides third party inspection services, welding procedures and welders qualifications and on stream plant inspection.
RANGE OF SERVICES The technique involved in NDT examination is based on established codes like API, ASME, ASTM which include: • Radiography • Ultrasonic • Magnetic particles • Dye Penetrate Third party inspection services in accordance with the specified code, specification like API, ASTM, BS etc. includes: • Mill inspection of linepipe for oil and gas industry
and civic institutions. • Quality inspection in engineering works during
manufacturing the materials like valves, regulators fittings etc. for use in gas and oil industry.
• Welding procedure and welders qualification
testing. • On stream plant inspection.
![Page 14: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/14.jpg)
APPLIED ENGINEERING
Page 14
AUTHORITY APPROVALS APPLIED ENGINEERING (AE) has the experienced staff who have local know how to make approach to the concerned authority for approvals wherever these are essential to expedite the work. However such exercise require client’s supporting documents for effective action.
RANGE OF SERVICES • Approvals from local Government and Union
Council. • Approvals from Highways Authority. • Approvals from Irrigation Authority. • Approvals from Railways Authority. • Approvals from Building Control Authority. • Land Acquisition documents. • Approvals from Concerned Ministry. • Approvals from Chief Inspector of Explosives
Government of Pakistan.
![Page 15: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/15.jpg)
APPLIED ENGINEERING
Page 15
PROJECT AND SITE MANAGEMENT An efficient project team guarantees proper execution of a Contract. Depending on the size of a project, a team of personnel’s having relevant experience of work is organized to execute the work. Following personnel are available to execute the project management tasks: • Project Managers. • Construction Managers. • Site Engineers. • Cost; budgeting and scheduling Engineers and
other supporting staff.
RANGE OF SERVICES • Project Scheduling. • Cost Estimates and Control. • Construction Site Management. • Procurement. • Client and Sub-Contractor Coordination. • Scope of Responsibility. • Safety. • Coordination with Client and Consultant.
![Page 16: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/16.jpg)
APPLIED ENGINEERING
Page 16
COMMISSION SUPPORT On completion of a project work of any disciplines/nature, we offer comprehensive technical support to our clients. The work/project is put into commission whether it is occupied or run the commodity. For all purposes the experienced personnel are made available to undertake the tasks.
RANGE OF SERVICES • Preparation of procedure for taking over
works/units by the clients and occupants. • Preparation of document in case there is any
legal functional or operational matters are involved.
• Startup testing procedure preparation in respect
of plant or pipeline and machinery/equipment commissioning of system, plant, pipeline etc.
• Handing over/taking over notes/procedure for
Contractor and client.
![Page 17: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/17.jpg)
APPLIED ENGINEERING
Page 17
CATHODIC PROTECTION (CP) Corrosion is a natural phenomenon which follows the law of nature. It has devastating effects, on pipelines, storage tanks, bridges, offshore plat forms and metallic structures and cost billions of Dollars/Rupees. This tremendous loss could be saved by controlling corrosion through numerous methods including material selection protective coating and chemical inhabitation. However one of the most effective method for combating corrosion is Cathodic Protection (CP). APPLIED ENGINEERING provides corrosion control engineering services including survey, designing and installation of Cathodic Protection Systems for pipelines, storage tanks, various submerged structures etc.
RANGE OF SERVICES • Selection of appropriate material for any
corrosive environment. • Selection of coating material. • Resistivity Survey. • Designing and installation of Cathodic Protection
System adopting any of the following system:
• Imprest current system using Transformer Rectifier, Thermal Generator, Solar Energy Power etc.
• Galvanic System i.e. Sacrificial Anodes
System.
• Maintenance and monitoring of Cathodic Protection System.
• Corrosion Audit.
![Page 18: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/18.jpg)
APPLIED ENGINEERING
Page 18
QHSE POLICY
![Page 19: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/19.jpg)
APPLIED ENGINEERING
Page 19
EXPERIENCE
![Page 20: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/20.jpg)
APPLIED ENGINEERING
Page 20
CONSTRUCTION PROJECTS
![Page 21: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/21.jpg)
APPLIED ENGINEERING
Page 21
A) CONSTRUCTION PROJECTS COMPLETED:
S. No. Description Job Carried Out Year
1.
2.
3.
4.
5.
6.
7.
8.
Installation of 3 Km of 16” diameter Oil Pipeline (Aviation Fuel) and Cathodic Protection System and Welding Stainless Steel Piping. Designing & Construction of 3 Km of 10” diameter steel pipelines with Water Pumping Station including eight sedimentation tanks of capacity 100,000 gallons each for 150 MW F.B.C. coal power station. Designing & Laying of 4.5 Km of 8” dia steel pipeline from sedimentation tanks to residential colony WAPDA’s coal power station. Construction of underground 1230 meters of 1420 mm X 10 mm and 90 meter of 1020 mm X 10 mm pipelines with various fittings for circulating water system at 150 MW (3 X 50 MW). Thrust Boring of twin 24” diameter pipeline crossing under Railway Track for water flow. Fabrication of Hot and Cold Air Ducts for boiler at Lakhra Power Station. Fabrication and erection of the following tanks: 1. 300m3 demineration water tanking weight
14.6 tons each – 2 set. 2. 150m3 soften water tanks, weight 4.786
ton – 1 set. 3. 30m3 Drain Water Tank, weight 2.962 ton
each – 2 sets. 4. 20m3 Oil Tank, weight 2.405 tons – 2 sets. 5. 2m3 Makeup Oil Tanks, weight 0.68 ton –
1 set Painting of Equipment and piping 16522m2.
Civil Aviation Authority through M/s. SOGEA of
France. Jinnah Terminal, Karachi
International Airport.
WAPDA Lakhra near Hyderabad
WAPDA Khanote near Hyderabad
WAPDA through Dong Fong Electric
Corporation of China. Lakhra Power Station.
WAPDA Nawabshah
WAPDA through Dong Fong Electric
Corporation of China. Lakhra Coal Power
Station.
WAPDA through Dong Fong Electric
Corporation of China. Lakhra Coal Power
Station.
WAPDA through Dong Fong Electric
Corporation of China. Lakhra Coal Power
Station.
![Page 22: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/22.jpg)
APPLIED ENGINEERING
Page 22
9.
a)
b)
c)
d)
e) f)
10.
a)
b)
c)
d)
e) f)
g)
h) i)
Fabrication and Installations works for 50 MW combined cycle power plant at Kotri were carried out as mentioned below. Installation and Fabrication of inlet and out ducts and chimneys for boilers. Installation of piping system (Carbon Steel and Stainless) for condensate water of sizes from 25 mm to 325 mm. Installation and Fabrication of complete high pressure steam boiler carbon and alloy, steel piping having sizes from 79 mm to 610 mm with thickness varying from 6 mm to 20 mm. The system was welded with combination of GTAW and SAW with 100% X-Ray inspection. Installation of complete firm fighting system with piping. All piping system in other areas like, turbine house, pump houses etc. Circulating water pipings system. Construction (Civil Construction) of the followings in 150 MW (3 X 50 MW) (FBC) coal fired thermal power station at Khanot near Hyderabad. Chemical water treatment plant building. Acid and base storage. Neutralizing pool. Coal handling switch rooms building. Machine shop. Garage and fire station. Soft water treatment building. Industrial water pump house. Glass fibber cooling tower.
WAPDA through HUBAI
Electric Power Corporation (HEPEC)
China. Kotri near Hyderabad.
WAPDA through Dong
Fong Electric Corporation of China. Larkhra 50 Km from
Hyderabad.
![Page 23: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/23.jpg)
APPLIED ENGINEERING
Page 23
j)
k)
11.
12.
13.
14.
15.
16.
17.
18
Demineralized water tank. Refrigeration and air conditioning plants building. Construction of 22.5 Km of natural gas distribution network of steel pipes of sizes 2”, 4”, 6” and 8” at Karachi. Construction of 7.5 Km of steel pipelines for natural gas distribution having sizes of 8” and 12” diameter. Construction of 112 Km of steel pipeline of natural gas distribution network comprising 6”, 2” and 1” dia in Shahdad Kot and Kumbe Ali Khan Towers near Larkana. Cleaning, preparing and painting of weld seam and interior of 3000 / 3300 mm dia steel conduit / siphon at Pehur High Level Canal Project at Turbela constructed by STFA / Ciltug of Turkey. Total area painted: 88582 sq ft. Welding / Construction / Installation of 6” dia above ground feeder line for well-3 at Kandhkot Gas Field. Installation of MS Grating on ADAM X-1 (Hala Project) Construction of 1 Diesel Storage Tank at Khewali Pump Station (KPS) and 1 Condensate Settling Tank at Sui Gas Field (Sui) Construction of 5 Kms long, 4” NPS, Schedule 40 Line Pipe at Sui Gas Field
SSGC Industrial Area North
Karachi.
SSGC Karachi City
SSGC District Larkana Sindh
Province
STFA Construction Company
Pakistan Petroleum Limited
Pakistan Petroleum Limited
Pakistan Petroleum
Limited
Pakistan Petroleum Limited
Apr 2006 to July 2006
Mar 2008 to Apr 2008
2010
10th February, 2011 to 12th September, 2011
![Page 24: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/24.jpg)
APPLIED ENGINEERING
Page 24
POLYETHYLENE PIPELINES
![Page 25: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/25.jpg)
APPLIED ENGINEERING
Page 25
B) POLYETHYLENE PIPELINES
S. No. Name of Client Job Carried Out Year
1. 2.
3.
4.
5.
6.
7.
Indus Gas Co. (now SSGC) BHP Zamzama Gas Field, Dadu Agha Khan Hospital, Karachi S.S Engineers (Pvt) Limited BHP Petroleum Pakistan Limited Descon Engineering Limited Descon Engineering Limited
Designing and supervision of laying of Gas PE pipeline networks involving 125mm, 63 and 20mm dia pipes in Gas Company by CEO of Applied Engineering. Laying of the following PE pipeline network at BHP Zamzama Gas Field. a. Fire Water System
160mm PE 80 SDR-9 – 572 meters 110mm PE 80 SDR-9 – 223 meters 40mm PE 80 SDR-9 – 78 meters
b. Potable Water System
90mm PE 80 SDR-11 – 332 meters 40mm PE 80 SDR-11 – 152 meters
Laying PE pipelines for Gas.
125mm PE 80 SDR – 460 meters 63mm PE 80 SDR-11 – 100 meters
Butt Fusion Welding of 160mm PE Pipe. Repair of 162 mm Dia Polyethylene Pipeline at Zamzama Gas Field, Dadu Laying of HDPE Portable & Fire Water Line at BHP Zamzama FEC Project, Dadu, Sindh Welding & Hydrotesting of HDPE Pipe DN90
-
2000
2002
Feb 2007 to Mar 2007
February, 2009
March, 2010
December, 2011
![Page 26: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/26.jpg)
APPLIED ENGINEERING
Page 26
RADIOGRAPHIC INSPECTION
![Page 27: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/27.jpg)
APPLIED ENGINEERING
Page 27
C) Radiographic Inspection
S. No. Name of Client Job Carried Out Year
1.
Sui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines Limited in various areas of Punjab and Frontier Province were carried. a). 116 Km of 24” diameter pipeline SNGPL/Near
Sharifabad.
b). 61 Km of 10” diameter pipeline Gujranwala.
c). 60 Km of 10” diameter Ismail Kot-Tarnab Farm
(Frontier).
d). 22 Km of 8” diameter.
e). 10 Km of 24” diameter Sadiqabad Ahmedpur.
f). 86 Km of 16” diameter Dhulian near Rawalpindi.
g). 26 Km of 18” diameter near Faisalabad.
h). 58.7 Km of 16” diameter near Havalian.
i). 32 Km of 16” diameter Rawat to Faisalabad
(Islamabad).
j). 47.7 Km of 18” diameter 25.76 Km of 30”
diameter near Panjnab. k). 18” dia X 89 Miles Sahiwal, Lahore. l). 42 Km of 16” dia Sheikhupura to Gujranwala.
m). 19 Km of 24” dia Naughazi to Islamabad Site.
n). 45 Km of 8” Gujranwala to Sialkot Project.
o). 82 Km of 8” Jauharabad to Chashma.
p). 17 Km of 8” Dipalpur Project.
q). Charsada and Khazana Sugar Mills.
r). 29 Km of 36” dia A4-AC4 Section.
s). 11.52 KM of 8” dia Pindori to Bhangali.
From 1987 to 1991
0.54
1.17
0.6
1.07
1995
Feb.97 to June 97 Feb.97 to August 99
March 2002 to
July 2002
Under execution since September 2002
![Page 28: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/28.jpg)
APPLIED ENGINEERING
Page 28
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Sui Northern Gas Pipelines Limited
//
//
//
//
//
// // // // // // // // // //
Radiography & Welding Inspection for 16” dia from Sheikupura to Gujranwala. Radiography & Welding Inspection for 8” dia from Gujranwala to Sialkot. Radiography & Welding Inspection for 8” dia at Depalpur. Radiography & Welding Inspection for 8” dia from Jauharabad to Chashma Gas pipeline Radiography & Welding Inspection for 16” dia from Sheikhupura to Gujranwala. Radiography & Welding Inspection for 24” dia at Sadiqabad, Sui Field. Welding Inspection and Radiograph size 36” 18km (Loopline) A4-AC4 section. 18 Miles (Loopline) A4-AC4 section of 36” dia at Sardar Garh Camp. Modification of compressor station Sui-Peshawar section to Multan. Modification of compressor station Sui-Peshawar section to Faisalabad. Modification of compressor station at AC-0 (Sui Field) at Bhong District Sadiqabad. Modification of compressor station at Sui Field. Welding Inspection 6”, 8” and 10” dia Assorted operational phases in Peshawar Distribution Region. Welding Inspection & Radiography of 36” dia x 3.5 Kms AV-17-A20. Welding Inspection and Radiography of 20.09 Kms CC1-CC3 line of 30” dia and 0.80 kms of 30” dia Soan River Crossing at Fateh Jang Tala Gung Road, Dhunal(Main Road). Welding Inspection & Radiography 6” dia and 8” dia operational phases, Peshawar.
1997
1997
1999
1999
2001
2002
2002
2003
2003
2003
2003
2003
2003
2003
2003
![Page 29: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/29.jpg)
APPLIED ENGINEERING
Page 29
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
Sui Northern Gas Pipelines Limited
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
Welding Inspection & Radiography of 36” dia x 28kms AV-22-AC6 Multan. Welding Inspection & Radiography of 10” dia x 78kms Guguri-Kohat. Welding Inspection & Radiography of 16” dia x 23kms Malikwal CV 12A-CV134 C1 Welding Inspection & Radiography of 30” dia x 30kms CC1-04 Haranpur Chakwal. Welding Inspection & Radiography of 18” dia x 27kms Tobba-Gojra. Welding Inspection & Radiography of 10” dia x 43kms Sahiwal-Pakpattan. Welding Inspection & Radiography of 8” dia x 22.40 kms Depalpur-Basirpur. Welding Inspection & Radiography of 12” dia x 28.23 kms CV12A-Khatlia Sheikhan. Compression construction work compressor stations. Welding Inspection & Radiography of 12” dia x 90kms Mina Chanu-Hasilpur. Welding Inspection & Radiography of 8” dia x 37kms Manjuwal-Bannu. Welding Inspection & Radiography of 8” dia x 101kms Kharapa Mor-D.I Khan. Welding Inspection & Radiography of 20” dia x 47kms Fatima Fertilizer. Welding Inspection & Radiography of 8” dia x 37.14 kms AV-40 Sirhmir-Bhawana. Welding Inspection & Radiography 8” dia x 40kms AV40-Dijkot Tanlianwala. 8” dia x 14 Kms Chand Mela. Welding Inspection & Radiography of 6” dia Above assorted Phases Islamabad Region.
2004
2004
2004
2004
2006
2006
2006
2007 to 2008
2007
2007
2007
2007 to 2008
2007
2007
2007
2007
January, 2008 to April, 2009
![Page 30: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/30.jpg)
APPLIED ENGINEERING
Page 30
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45
46
47
Sui Northern Gas Pipelines Limited
//
//
// // //
//
//
//
//
//
//
//
Welding Inspection & Radiography of 24” dia x 112 kms Sahiwal-Bhari Pheru (Phool Nagar). 36” dia x 40 Kms SMS Mian Channu-Sahiwal. Welding Inspection & Radiography 8” dia x 32kms Pezu Tank. Welding Inspection Services Contract for Compression Construction Works at AC-0, AC-1X, AC-4, AC-6, AC-7, AC-8, CC-1 and CC-3 Compressor Stations. Welding Inspection Services Contract for 8” x 9.90Kms, 12” x 9.10Kms & 18” x 23.60Kms Gas Gathering System of M/s Mol Pakistan. Welding Inspection & Radiography 8” dia x 37.64kms D.I Khan-Bhakkar Main Line. Welding Inspection Services Contract for 28” dia x 12 Kms Raw Water Pipeline for Fatima Fertilizer. Welding Inspection Services Contract for 8” dia x 28.50 Kms Pasroor-Offtake-Narowal Transmission Line (Phase-I) Welding Inspection Services Contract for 6” dia and above Assorted Operation Phases in Peshawar Distribution Region Welding Inspection Services Contract for 24” Dia X 53.68 Kms Head Balloki – Dadud Hercules (MP 59) Transmission Line Welding Inspection Services Contract for 8” Dia x 22.45 Kms Kot Addu-Chowk Khokhar Textile Transmission Line Welding Inspection Services Contract for Compressor Construction Works at AC-0, AC-1X, AC-4, AC-6, AC-8, CC-1 and CC-3 Compressor Stations Welding Inspection Services Contract for Construction of 8” dia x 20 kms SMS Okara-Satgarh & Chak No. 11 R NA-143 Lahore Transmission Line
24th July, 2007 to 27th April, 2009
January, 2008 to April, 2009
May, 2007 to October, 2008
12th October, 2007 to October, 2009
31st March, 2008 to 20th August, 2009
13th September, 2008 to 10th May, 2009
24th August, 2008 to 13th August, 2009
22nd November, 2008 to 26th June, 2009
April, 2009 to 30th March, 2010
28th April, 2009 to 31st January, 2010
23rd November, 2009 to 19th April, 2010
1st November, 2009 12th
October, 2010
29th January, 2010 to 4th June, 2010
![Page 31: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/31.jpg)
APPLIED ENGINEERING
Page 31
48.
49
50.
51.
52.
53.
54.
55.
56.
57
58
59
60
Sui Northern Gas Pipelines Limited
//
//
//
//
//
//
//
//
// // // //
Welding Inspection Services Contract for 24” dia x 32.71 Kms Dawood Hercules (MP59) – Repeat Station B3 (Shahdra) Loopline (Project – IX) Welding Inspection Services Contract for 6” Dia and above assorted operational phases in Islamabad & Abbottabad Distribution Region Welding Inspection services Contract for Qadirpur Interim Front End Compression Project Welding Inspection Services Contract for 8” Dia x 26.70 Kms Shiwal – Sillanwali Line Welding Inspection Services Contract for 12” Dia x 47.17 Kms Mandi Bahauddin (V/A Mangat) to V/A Lala Musa Line WIS & Radiography Services Contract for 12” Dia x 16.40 Kms Makori Line WI / RS Contract for 2” Dia & Above Assorted Operational Phases in Multan & Bahawalpur Distribution Regions WI / RS Contract for 2” Dia & Above Assorted Operational Phases in Peshawar Distribution Region WI / RS Contract for 2” Dia & Above Assorted Operational Phases in Faisalabad & Sargodha Distribution Regions WI / RS Contract 12” Dia X 14.7 Kms Maramzai Extension MOL Line WI /RS Contract for 16” Dia X 20 Kms, 16” Dia X 22.4 Kms & 6” Dia X 2 Kms Flow Lines for Latif Gas Field WI /RS Contract for 42” Dia x 21.45 Kms Sawan Qadirpur Transmission Line WIS Contract for 2” Dia & Above Assorted Operational Phases in Peshawar Distribution Region
13th February, 2010 30th November, 2010
12th April, 2010 31st May,
2011
30th June, 2010 to 15th October, 2010
4th September, 2010 to 30th December, 2010
17th December, 2010 to 2nd March, 2011
19th June, 2011 to 31st December, 2012
2nd April, 2012 to 5th April, 2013
2nd April, 2012 31st March, 2013
2nd April, 2012 to 3rd April, 2013
15th January, 2013 to July, 2013
14th February, 2013 to August, 2013
4th April, 2013 to 28th Apr, 2015
1st April, 2013 to 31st March, 2014
![Page 32: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/32.jpg)
APPLIED ENGINEERING
Page 32
61
62
63
64
65
66
67
68
69
70
71
72
73
Sui Northern Gas Pipelines Limited
// // // //
// // // // // // // //
WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Peshawar Distribution Region WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Faisalabad Distribution Region WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Sargodha Distribution Region WIS Contract for 24” Dia X 145.8 Kms Kohat – Dakhni – Dhullian – Gali Jagir Transmission Line WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Peshawar Distribution Region WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Faisalabad Distribution Region WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Sargodha Distribution Region WIS for 42” Dia X 57.36 Kms LNG SV3 – SV4 and SV5 – Qadirpur Transmission Line 100% WI / RS Contract for Qadirpur – AC1X, 42” Dia X 71 Kms Transmission Line 100% WI / RS Contract for 10” Dia X 10 Kms Trunkline from Mardankhel V/A to Mardankhel VA-2 & 12” Dia X 12.22 Kms Trunkline from Mardankhel VA-2 to Makori GPF / Manzalai CPF WI & RS Contract for ¾” to 2” Dia and Above Assorted Operational Phases in Peshawar Distribution Region WI & RS Contract for ¾” to 2” Dia and Above Assorted Operational Phases in Sargodha Distribution Region WI & RS Contract for ¾” to 2” Dia and Above Assorted Operational Phases in Faisalabad Distribution Region
1st April, 2014 to 31st Mar,
2015
1st April, 2014 to 31st Mar, 2015
1st April, 2014 to 31st Mar, 2015
24th April, 2014 to 27th Jan, 2016
1st Apr, 2015 to 31st Mar, 2016
1st Apr, 2015 to 31st Mar, 2016
1st Apr, 2015 to 31st Mar, 2016
12th May, 2015 to 16th Sep, 2015
19th November, 2015 (In Progress)
8th Feb, 2016 (In Progress)
1st Apr, 2016 (In Progress)
1st Apr, 2016 (In Progress)
1st Apr, 2016 (In Progress)
![Page 33: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/33.jpg)
APPLIED ENGINEERING
Page 33
74
75
76
77
01.
Sui Northern Gas Pipelines Limited
// // //
Sui Southern Gas Company Ltd
WI & RS Contract for ¾” to 2” Dia and Above Assorted Operational Phases in Bahawalpur Distribution Region WI & RS Contract for ¾” to 2” Dia and Above Assorted Operational Phases in Sahiwal Distribution Region Welding Inspection & Radiography Services Contract for 36” Dia X 64 Kms AC1X-A3 Transmission Line Welding Inspection & Radiography Services Contract for 24” Dia X 85 Kms (D/H Offtake-Nandipur Power Plant) Transmission Line Welding and Radiographic Inspection for the following pipeline projects constructed by Sui Southern Gas Company Limited has been completed. a) 43 Km of 8” diameter pipeline Quetta. b) 22 Km of 12”, 8”, 4” and 2” diameter gas
pipeline Hub Town Lasbella. c) Sibi compression station piping system 6 month
project Sibi-1995. d) 135 Km of 24” diameter X-60 pipeline
Kandanwari Gas Field to Nawabshah 230 Km of 20” diameter form Nawabshah to Karachi (25 months during) Welding x-ing involving radiography and dye penetrent for Indus River x-ing structure.
e) 20” dia X 5 Km Pakland – ICI Plant. f) 12” dia X 1.5 Km PRL Realignment. g) 24” dia X 30 Km Bin Qasim Hydrocracker. h) 12” dia Scheme 33 Gulshan-e-Iqbal. i) Welding and Radiographic Inspection of 30 Km
of 8” pipeline (Quetta to Pishin). j) 30 Km of 24” dia of Hydrocracker high pressure
line.
1st Apr, 2016 (In
Progress)
1st Apr, 2016 (In Progress)
19th Jun, 2016 (In Progress)
5th Oct, 2016 (In Progress)
1994 to 1996
1991 to 1993
1996
Dec. 1996 to July 1997
Aug. 1995 to Nov. 1997
Dec. 1996 to Aug. 1997
Dec. 1996 to July 1997
![Page 34: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/34.jpg)
APPLIED ENGINEERING
Page 34
02
03
04
05
06
07
01.
01.
01.
Sui Southern Gas Company Limited
// // // // //
Indus Steel Pipes Limited Pakistan Refinery Limited Hyundai Engineering and Construction Company (IMS) (Oil and Gas Deve. Corp.) Project
k) 13 Km of 30” dia KESC Bin Qasim Pipeline
Project. l) Welding and Radiographic Inspection of 30 Km
of 8” pipeline (Quetta to Pishin). m) 30 Km of Hydrocracker high pressure line. n) 13 km of 30” dia KESC Bin Qasim Pipeline
Project. WIS for 16” Dia required for Reinforcement Work of Quetta Mastung Pipeline WIS for for Reinforcement Work on 16” Dia X 20 Kms Quetta Mastung Pipeline (Phase II) WIS for for 24” Dia X 33 Kms API 5L X70 (PSL-2) Tando Adam to Massu Pipeline & related Valve Assemblies WIS for for 42” Dia X 20 Kms API 5L X70 Pipeline (PSL-2) & related Valve Assemblies for MVA Nara - Sawan Welding Inspection Services for Construction of Pipelines & Related Valve Assemblies, Filter Separators, Scrubbers & Headers at HQ-2, Daur, Nawabshah Welding Inspection Services for 24” Dia X 34 Kms Loop line from Shikarpur to Jacobabad & 12” Dia X 23 Kms, Re-Routing of QPL Segment Radiographic Inspection of Weld seam of API Spiral Weld Pipes manufactured by ISPL. Radiographic Inspection of Weld at Plant. Compressor station piping at Pirkoh.
Aug. 1995
to Nov. 1996
Dec. 1996 to Aug. 1997
24th Mar, 2015 to 30th Jun, 2015
1st Jun, 2015 to 25th August, 2015
1st Feb, 2015 to 31st December, 2015
(Rs.
1st Jun, 2015 to 30th November, 2015
25th Oct, 2016 (In Progress)
(In Hand)
1986 to 2008
1993 to 2009
July 1998 to June 1999
![Page 35: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/35.jpg)
APPLIED ENGINEERING
Page 35
01.
01.
01.
01.
02.
03.
04.
05.
06.
07.
08.
09
S&N International Sadat Enterprises Techno Engg.
Pakistan Petroleum
Limited //
//
//
// //
//
//
//
5.34 Km of 48” 5.8 Km of 36” 15.4 Km of 30” 1.9 Km of 18” of CDA water pipeline system. 6 Km of 30” dia water pipeline of Rawalpindi Development Authority. White Oil Pipeline project NDT services, section-4 from Fazil Pur to Mahmood Kot. Welding Inspection and Radiography for 4” dia well#5 Feeder Line and 1” dia domestic gad line at Adhi Field. Welding Inspection and Radiography of 10” dia coated line pipe, Kandhkot. Welding Inspection and Radiography for Replacement of 20” dia line pipe MP-13 to MP-25. Storage Tanks Mazarani Gas Field. Welding Inspection and Radiography of 20” dia x 7kms Sui-KPS. Providing Visual and Radiographic Inspection Services during welding / construction / laying of 20” dia linepipe to replace pipeline section of about 10km of existing and operation water pipeline between MP13 to MP25 and pipeline cleaning pigging from MP-0 to MP-20. Providing Visual & Radiographic Inspection Services during construction of above ground vertical steel storage tanks for water (02 Nos at Sui Field and 02 Nos at Khewali Pump Station(Kps) near Kashmore) and 01 No Condensate Oil service (01 No at Sui Gas Field) Providing Visual & Radiographic Inspection Services during Construction of above ground Vertical Steel Storage Tank for Raw Water Service of Capacity 350.000 IMP Gallons in Sui Purification Plant at Sui Gas Field Providing Visual and Radiographic Inspection Services during construction of Adhi-18 Feederline
July 2000
Feb. 2001 to August 2001
2003
2003
2007
2007
2007
2007
06th October, 2008 to 30th June, 2009
15th December, 2008 to 10th June, 2009
01st February, 2009 to 30th November, 2009
2nd July, 2009 to 18th October, 2009
![Page 36: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/36.jpg)
APPLIED ENGINEERING
Page 36
10
11.
12.
13.
14.
15.
16.
17
18
19
20
Pakistan
Petroleum Limited
// //
// //
// // // // // //
Radiographic Inspection Services during welding / construction / laying of 8” Dia Feederline and surface fittings of Well Sui-88 (M) Providing Visual and Radiographic Inspection Services during replacement of 20 Kms Long 20” Dia Sui-KPS Water Line Providing Visual and Radiographic Inspection services during construction of above-ground vertical steel storage tanks for water 06 numbers at Sui Field and 01 number at KPS near Kashmore Providing Visual and Radiographic Inspection Services during welding / construction / laying of 8” Dia Feeder Line and surface fittings of Well-89 (M) at Sui Gas Field Providing Visual and Radiographic Inspection Services during replacement of 4.8 Kms long, 20” Dia Sui-KPS Water Line within plane premises and outside plant premises Providing Visual and Radiographic Inspection Services during construction of Gas Gathering Main 7 Feeder Lines at Section VI, Kandhkot Gas Field Providing Visual and Radiographic Inspection Services during welding / construction / laying of 4” Dia Feederline and surface fittings for Chachar-4 Well at Chachar Gas Field near Kandhkot Providing Visual & Radiographic Inspection Services during Construction of Feeder Lines for Well KDT-28(M) at Sui Gas Field Radiographic Testing Services during ATA at Chachar Gas Field Visual & Radiographic Inspection during Construction of Feederlines for Well Adhi-19 (T/K) at Adhi Gas Field Visual & Radiographic Inspection for Construction of 01 Number Vertical Cylindrical, Above Ground Steel Storage Tank for NGL Service (T-101B), Capacity 5000 BBLS at Adhi Gas Field to replace existing damaged tank
1st November, 2009 to 25th December, 2009
16th October, 2010 to
31st August, 2011
1st May, 2011 to 31st August, 2012
9th June, 2011 30th August, 2011
1st October, 2011 7th June, 2012
26th July, 2011 to 30th November, 2011
10th October, 2011 to 20th December, 2011
26th December, 2012 to May, 2013
April, 2013
July, 2013 to November, 2013
16th March, 2014 to 5th September, 2014
![Page 37: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/37.jpg)
APPLIED ENGINEERING
Page 37
21
22
23
24
25
26
27
28
29
30
31
Pakistan
Petroleum Limited
// // // // //
//
// // // //
Visual & radiographic Inspection during Construction / Welding / Installation of 4” Dia Buries / Above Ground Pipeline from Chachar Plant to Kandhkot Well-03 including Above Ground Piping, Riser Assemblies for Tie-in Connections Visual & radiographic Inspection for Construction of 6” NPS, Underground Feederline for Well Adhi-20 (T/K) & Well 21 (T/K) Visual & Radiographic Inspection for 16” Dia Sales Gas Line & 8” Dia Kinza Feederline at gambit Sindh Visual & Radiographic Inspection for Adam X-1 Feederline to Hala Plant Visual & Radiographic Inspection for Shahdad X-1 Feederline Visual & Radiographic Inspection for Design, Supply of all Material and Construction of 01 Number Vertical, Cylindrical, Above Ground Steel storage Tank for Fire Water Services, capacity 300 CU.M at SFGS, Sui Gas Field to replace existing Corroded Tank including Dismantling and Shifting of existing tank Visual & Radiographic Inspection for Design, Supply of all Material and Construction of 01 Number Vertical, Cylindrical, Above Ground Steel storage Tank at Adhi Field, Punjab 3rd Party Inspection Services during Construction / Welding / Installation of WHSF, 10” NPS Duplex Feederline and 8” NPS CS Sales Gas Line for Sharaf X-1 at GPF II 3rd Party Inspection Services during Construction of Fire Water Tank at Hala (5000 BBLS) Visual & Radiographic Inspection Services during Construction of 6” NPS, Underground Feederline for Well Adhi-27 at Adhi Gas Field Visual & Radiographic Inspection Services during Construction of Sharaf X-2 Feederline, Gambat South
12th March, 2014 to
13th June, 2014
15th May, 2014 9th Nov, 2014
29th Sep, 2014 to 31st Mar, 2015
1st Apr, 2015 to 30th May, 2015
16th Jun, 2015 to 12th Oct, 2015
21st Oct, 2015 to 20th Jan, 2016
15th Oct, 2015 to 17th Aug, 2016
1st Feb, 2016 to 5th Apr, 2016
15th Apr, 2016 (In Progress)
22nd Sep, 2016 (In Progress)
(In Hand)
![Page 38: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/38.jpg)
APPLIED ENGINEERING
Page 38
01.
02
03
04
05
06
07
01
01
02
01
02
01
Mari Petroleum Company Limited
// // // // // //
PSS Asia
Pakistan (Pvt) Limited
Petroleum Exploration
Limited
//
Oil & Gas
Development Company Limited
//
Kerui Group,
China
Welding Inspection at Central Manifold-I, II & Sub Manifolds at MSCL-Field, Deharki NDT Inspection Services for Pipeline Welding and Fabrication for Koonj 1-A, Sukkur NDT Inspection of Pipeline & Surface Fittings at Habib Rahi Infill Wells NDT & QA / QC Inspection Services during fabrication work of Piping & Fittings at Sujawal X-1 NDT & QA / QC Inspection during fabrication works of Piping & Fittings at Halini-I Hiring of NDT Services Contractor during Mechanical Fabrications Works at Zarghun Gas Field NDT Services for inspection during fabrication works of Phase 1, Kalabagh EPF Radiographic Services at POGC Project, District Dadu 3rd Party Inspection Services for Construction / Laying of 4” Dia Feederline from Hassan-4 to Tie-in Point at Hassan-I 3rd Party Inspection Services for Construction / Fabrication of 6” Dia Pipeline from Badar – 2 to Tie-in Point at Badar - 1 Radiography Inspection Services for Storage Tanks, TOC, Dacharpur, Kunnar LPG Plant / Sinjhoro Gas Plant, Sanghar related all locations of FGCP-II Radiography Inspection Services for Storage Tanks, TOC, Dacharpur, Kunnar LPG Plant / Sinjhoro Gas Plant, Sanghar related all locations of FGCP-II NDT Inspection Services at Kunnar LPG Plant
15th March, 2008 to
17th September, 2009
18th November, 2009 to 16th January, 2010
July, 2012 to September, 2012
28th November, 2012 to 23rd March, 2013
June, 2013 to July, 2013
27th February, 2014 to 15th June, 2014
10th November, 2015 to 15th December, 2015
8th April, 2013 to June, 2013
8th May, 2014 to 21st June, 2014
1st Dec, 2014 to 17th Mar, 2015
January, 2011 to April, 2014
1st May, 2014 (In Progress)
1st Jan, 2015 to 17th Aug, 2015
![Page 39: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/39.jpg)
APPLIED ENGINEERING
Page 39
02
Kerui Group,
China
Radiography Inspection & NDT Services at Kunnar Field, OGDCL Gas Plant, Tando Jam,
22nd Feb, 2016 to 8th
Jun, 2016
![Page 40: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/40.jpg)
APPLIED ENGINEERING
Page 40
ULTRASONIC INSPECTION PROJECTS
![Page 41: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/41.jpg)
APPLIED ENGINEERING
Page 41
D) ULTRASONIC INSPECTION PROJECTS COMPLETED:
S. No. Job Carried Out Job Carried Out Year
1 2 3 4 5 6 7 8 9
10
11
12
Ultrasonic testing of weld seam of 1000 meter of 24” diameter spirally welded API pipes. Ultrasonic Thickness testing of boiler tubing of two boilers of 50 MW power station. Ultrasonic Testing of welding seam of 4000 meter of 8” diameter spirally welded API pipe. Ultrasonic Testing of four Steel Structure of Pipe Bridge over Pakistan Steel Intake Channel (Total length 2668 inches) Overall supervision of on line Ultrasonic Testing of Spiral Welding of pipe manufacturing at Indus Steel Pipe manufacturing. Ultrasonic Testing of Welding joints of pipes of 3150, 3250 and 3350 mm OD and 6.5 Km long pipeline 900 joints having scanning length of 9400 meter. Ultrasonic Testing of 109 Weldolet joints on 30” and 36” pipes on Sui Northern Gas Pipeline Limited (SNGPL) pipeline system at various stations from Sui to Peshawar. Ultrasonic Work at Jamshoro Power Station Ultrasonic Test of 18” Norma Sleeves on 18” Dia Line at MP-252.71 (AV-30-AV-31 Segment) at Multan Ultrasonic Work at Jamshoro Power Station Ultrasonic Work at Jamshoro Power Station Ultrasonic Thickness Work at Port Qasim & Ibrahim Hyderi 3 Submarine, Karachi
ISPL Kotri
Finance & Trade Center, Karachi
ISPL Kotri
STFA, Tarbela
SNGPL
Rayan Engineering Services
SNGPL
Rayan Engineering Services
Rayan Engineering
Services
Joseph Lubo (Pvt) Limited
1989
1993
1991
Since 1991
July 2000 to November 2002
September 2001
2011
2012
2012
2014
2014
![Page 42: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/42.jpg)
APPLIED ENGINEERING
Page 42
THIRD PARTY INSPECTION
![Page 43: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/43.jpg)
APPLIED ENGINEERING
Page 43
E) THIRD PARTY INSPECTION:
S. No. Name of Client Job Carried Out Year
1.
Sui Northern Gas Pipelines Limited
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
100% Mill Inspection / Loading Supervision of 17.50 Km 12” X 0.219” Dia Pipeline API-5L Grade-B at ISPL Kotri. 100% Mill Inspection / Loading Supervision of 30 Km 6” X 0.188” Dia Pipeline API-5L Grade-B at ISPL Kotri. 100% Mill Inspection / Loading Supervision of 140 Km 4” X 0.188” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore. 100% Mill Inspection / Loading Supervision of 101 Km 2” X 0.154” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore. 100% Mill Inspection / Loading Supervision of 555 Km 3/4” X 0.133” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore. 100% Mill Inspection / Loading Supervision of 17 Km of 36” X 0.500” (12.7) API X-70 manufactured at Crescent Steel and Allied Products, Nooriabad. 100% Mill Inspection / Loading Supervision of 36 Km of 36” X 0.500” (12.7 mm), API X-70 Linepipe manufactured at Crescent Steel and Allied Products, Nooriabad. 100% Mill Inspection / Loading Supervision of 13 KM of 36” Dia X 0.562” WT API X-70 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad. 100% Mill Inspection / Loading Supervision of 35 KM of 36” Dia X 0.500” WT API X-70 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad. 100% Mill Inspection / Loading Supervision of 26.50 KM of 36” Dia X 0.500” WT API X-70 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad.
Feb-2000 to April-2000
June-2000 to Aug-2000
July-2000 to July-2001
July-2000 July-2001
July-2000 to Jan-2001
August-Sept-2001
Nov-2001 to Dec-2001
April 2002 to June 2002
June 2002 to August 2002
August 2002 to September 2002
![Page 44: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/44.jpg)
APPLIED ENGINEERING
Page 44
11.
12.
13.
14.
15.
16.
17.
18.
19.
100% Mill Inspection / Loading Supervision of 41.95 KM and 2.76 KM of 30” Dia X 0.438” WT and 30” X 0.562” WT, API Grade X-60 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad. 100% Mill Inspection / Loading Supervision of 47.600 KM of 24” Dia X 0.312” WT API 5L Grade X-70 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad. 100% Mill Inspection / Loading Supervision of 47.600 KM of 24” Dia X 0.312” WT API 5L Grade X-70 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad. 100% Mill Inspection / Loading Supervision of 26.50 KM of 36” Dia X 0.500” WT API 5L Grade X-70 Linepipe at Data Steel Pipe Industries (Pvt.) Ltd, at Sadiqabad. 100% Mill Inspection / Loading Supervision of 36800 Meter Steel Linepipe size 1” X 0.133” at International Industries Limited, Karachi. 100% Mill Inspection / Loading Supervision of the following Steel Linepipe API 5L Grade-B at BBJ Pipe Industries (Pvt.) Limited, Lahore. 1. 3/4" X 0.133” – 115000 Meter (195.50 MT) 2. 6” X 0.188” – 16292 Meter (315.25 MT) 100% Mill Inspection / Loading Supervision of the following sizes of API 5L Grade-B Steel Linepipe at Indus Steel Pipes Limited, Kotri. 1. 8” X 0.219” – 75000 Meter 2. 10” X 0.219” – 25000 Meter 3. 12” X 0.219” – 15000 Meter 4. 16” X 0.250” – 10000 Meter 100% Mill Inspection / Loading Supervision of 250000 Meter (630 MT) Size 1” X 0.133” at Pioneer Steel Mills (Pvt.) Limited, Lahore. 100% Mill Inspection / Loading Supervision of the following Steel Linepipe conforming to API 5L X-70 PSL-2 at Data Steel Pipe Industries Limited, Sadiqabad. 1. 36” X 0.500” WT – 24000 Meter (6774.480 MT) 2. 36” X 0.562” WT- 2000 Meter (634.54 MT).
September 2002 to
November
December 2002 to February 2003
December 2002 to February 2003
December 2002 to February 2003
1st August 2002 to 26th November 2002
26th December 2002 to 8th February 2003
15th December 2002
16th May 2002 to 18th February 2003
29th July 2003
![Page 45: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/45.jpg)
APPLIED ENGINEERING
Page 45
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
100% Mill Inspection / Loading Supervision of API 5L Grade-B Steel Linepipe of size 1” X 0.154” for 120000 meters (302.40 MT) at BBJ Pipe Industries (Pvt.) Limited, Lahore. 100% Mill Inspection / Loading Supervision of API 5L Grade-B Steel Linepipe of size 3/4” X 0.113” for 120000 meters (204 MT) at BBJ Pipe Industries (Pvt.) Limited, Lahore. 100% Mill Inspection / Loading Supervision in the following API 5L Grade-B, Steel Linepipe at International Industries Limited, Karachi. 1. 3/4" X 0.113” WT – 80000 Meter 2. 1” X 0.133” WT – 60000 Meter 3. 2” X 0.154” WT – 40000 Meter 100% Mill Inspection / Loading Supervision at Indus Steel Pipeline Kotri. 1. 8” X 0.219” – 75,000m 2. 10” X 0.219” – 25,000m 3. 12” X 0.219” – 15,000m 4. 16” X 0.219” – 10,000m
100% Mill Inspection / Loading Supervision at 1. 1” X 1.133” – 400,000m 2. 2” X 0.154” – 200,000m
100% Mill Inspection / Loading Supervision of Steel line pipe of dia 2” X 0.154” WT 31500m at International Industries Ltd. 100% Mill Inspection / Loading Supervision of steel line pipe of 4” X 0.188” WT 36000m 100% Mill Inspection / Loading Supervision of steel line pipe of 4” dia 25000m at Akbar & Zikria Pipes Pvt Ltd. 100% Inspection of Steel Linepipe, 24” Dia at M/s Shashi Steel Pipe Works, Islamabad 100% Mill Inspection / Loading Supervision of steel line pipe of 6” X 0.188” WT 25000m at International Industries Ltd. 100% Inspection of Steel Linepipe, 24” Dia (27,000 Meters) at M/s Crescent Steel & Allied Products, Nooriabad
1st August 2003
15th August 2003
10th September 2003
15 Dec 2002
Jan 2007
Feb 2007
Feb 2007
Feb 2007
Apr, 2007 to May, 2007
March 2007
Apr, 2007 to Jul, 2007
![Page 46: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/46.jpg)
APPLIED ENGINEERING
Page 46
31.
32.
33.
34.
35
36
37
38
39
40.
41.
42.
43.
44.
45.
100% Inspection of Steel Linepipes, 10” Dia (40,000 Meters) & 12”Dia (33,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of Steel Linepipe, 24” Dia at M/s Shashi Steel Pipe Works, Karachi 100% Inspection of Steel Linepipe, 24” Dia (25,000 Meters) at M/s Data Steel Pipe Industries, Sadiqabad 100% Inspection of Steel Linepipe, 36” Dia (20,000 Meters & 11,500 Meters) at M/s Crescent Steel & Allied Products, Nooriabad 100% Inspection of PE Pipe Size 1-1/4” Dia (100,000 Meters) at M/s IIL, Karachi 100% Inspection of Temper Proof Gas Service Valves ¾” Size (57,000 Numbers) at M/s Universal Engineering Corporation, Lahore 100% Inspection of Gas Service Tees ¾” Size at M/s Osaka Steel & Rubber Works, Lahore. 100% Inspection of Steel line pipe dia 6” at M/s IIL, Karachi. 100% Inspection of Tamper Proof Gas Service Valves ¾” size (with tail piece) at M/s Universal Engineering Corporation, Lahore. 100% Inspection of Steel line pipe dia 16”X0.219” WT at M/s Data Steel pipe Industries, Sadiqabad. 100% Inspection of Steel line pipe dia 10”X0.219”WT at BBJ Pipe Industries, Lahore. 100% Inspection of Gas Service Tees ¾” Size at M/s Osaka Steel & rubber Works, Lahore 100% Inspection of Meter Coupling (Aluminum) ¾” size at M/s Rashid Engineering, Lahore 100% Inspection of Socket Weld Elbows ¾” Size at M/s Usman & Sons, Lahore 100% Inspection of Meter Coupling (Aluminum) ¾” Size (320,000 Numbers) at M/s Rashid Engineering, Lahore
Aug, 2007 to Oct, 2007
Sep, 2007 to Nov, 2007
Aug, 2007 to Nov, 2007
Sep, 2007 to Nov, 2007
Nov, 2007 to Dec, 2007
Oct, 2007 to May, 2008
Jan 2008 to July 2008
June 2008 to July 2008
Aug 2007 to June 2008
2008
2008
2008
2008
2008
Nov, 2007 to Jan, 2008
![Page 47: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/47.jpg)
APPLIED ENGINEERING
Page 47
46.
47.
48.
49.
50.
51.
52.
53
54
55
56
57
58
100% Inspection of Socket Weld Elbows ¾” Size (66,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of PE Pipe Size 4” Dia (51,000 Meters) at M/s Sun International Company (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size3/4” Dia (50,000 Meters) at M/s Hi-Tech Pipe & Engineering Industries, Lahore 100% Inspection of Steel Linepipe 36” Dia (400 Meters) at M/s Data Steel Pipe Industries (Pvt) Limited, Sadiqabad 100% Inspection of PE Pipe Size 1-1/4” Dia (390,000 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of PE Pipe Size 1-1/4” Dia (96,000 Meters) at M/s Hi-Tech Pipe & Engineering Industries, Lahore 100% Inspection of PE Pipe Size 4” Dia (20,000 Meters) at M/s Hi-Tech Pipe & Engineering Industries, Lahore 100% Inspection of Steel Linepipe Dia 36” (44,800 Meters) at M/s Crescent Steel & Allied Products, Nooriabad 100% Inspection of PE Pipe Size 2” Dia (239,000 Meters) at M/s IIL, Karachi 100% Inspection of Gas Service Tees ¾” Size (40,000 Numbers) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of Steel Linepipe Size ¾” Dia (500,000 Meters) at M/s Pioneer Steel Mills (Pvt) Limited, Lahore 100% Inspection of Steel Linepipe Size ¾” Dia (500,000 Meters) at M/s Pioneer Steel Mills (Pvt) Limited, Lahore 100% Inspection of Steel Linepipe Dia 10” (50,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore
Nov, 2007 to Jan, 2008
Dec, 2008 to Jan, 2008
Jan, 2008
Jan, 2008
Dec, 2007 to Feb, 2008
Dec, 2007 to Feb, 2008
Jan, 2008 to Feb, 2008
Dec, 2007 to Mar,
2008
Dec, 2007 to Mar,
2008
Jan, 2008 to Jul, 2008
Feb, 2008 to Aug, 2008
May, 2008 to Sep, 2008
Aug, 2008 to Oct, 2008
![Page 48: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/48.jpg)
APPLIED ENGINEERING
Page 48
59
60
61
62
63
64
65
66
67
68
69
70
71
72
100% Inspection of Steel Linepipe 16” Dia (4,500 Meters) at M/s Data Steel Pipe Industries (Pvt) Limited, Sadiqabad 100% Inspection of PE Pipe Size 4” & 6” Dia at M/s Dadex Eternit, Lahore 100% Inspection of PE Pipe Size 6” Dia (2,000 Meters) at M/s International Industries (Pvt) Limited, Karachi 100% Inspection of PE Pipe Size 4” Dia (1,687 Meters) at M/s International Industries (Pvt) Limited, Karachi 100% Inspection of Socket Weld Elbows ¾” Size (150,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of Gas Service Tees ¾” Size (15,000 Numbers) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 2” Dia (300,000 Meters) at M/s Akbar & Zikria Pipes (Pvt) Limited, Islamabad 100% Inspection of Gas Service Tees ¾” Size (15,000 Numbers) at M/s Universal Engineering Corporation, Lahore 100% Inspection of PE Pipe Size 4” Dia (4,000 Meters) & 6” Dia (1,500 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of Gas Service Tees ¾” Size (15,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of Gas Service Tees ¾” Size (15,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of PE Pipe Size 4” Dia (1,687 Meters) at M/s IIL, Karachi 100% Inspection of PE Pipe Size 6” Dia (1,500 Meters) at M/s IIL, Karachi 100% Inspection of Gas Service Tees ¾” Size (15,000 Numbers) at M/s Ahmed Enterprises, Lahore
Nov, 2009
2009
2009
2009
Apr, 2009
May, 2009 to Jul, 2009
Jun, 2009 to Nov, 2009
May, 2009 to Nov, 2009
Nov, 2009
Oct, 2009 to Dec, 2009
Jun, 2009 to Jan, 2010
Jan, 2010
Jan, 2010
Aug, 2009 to Feb, 2010
![Page 49: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/49.jpg)
APPLIED ENGINEERING
Page 49
73
74
75
76
77
78
79
80
81
82
83
84
85
100% Inspection of Socket Weld Elbows ¾” Size (90,000 Numbers) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of Socket Weld Elbows ¾” Size (60,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of Gas Service Tees ¾” Size (90,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of PE Pipe Size 2” Dia (428,000 Meters) & 4” Dia (285,000 Meters) at M/s BBJ Polymer (Pvt) Limited, Lahore 100% Inspection of Meter Couplings Aluminium Size ¾” (400,000 Nos) at M/s Rashid Engineering Works, Lahore 100% Inspection of Meter Couplings Aluminium Size ¾” (335,000 Nos) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 4” Dia (100,000 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of Steel Linepipe 6” Dia, Grade X-42, PSL-1 (170,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 1-1/4” Dia (211,000 Meters), 2” Dia (27,300 Meters), 4” Dia (15,400 Meters) & 6” Dia (11,900 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of Steel Linepipe 1” Dia (300,000 Meters) 2” Dia (168,000 Meters) & 4” Dia (149,500.00 Meters), Grade B at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 1-1/4” Dia (700,000 Meters) & 2” Dia (392,000 Meters) at M/s Akbar & Zikria (Pvt) Limited, Islamabad 100% Inspection of PE Pipe Size 4” Dia (308,000 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of Steel Linepipe 16” Dia (1,335 Meters), Grade X-70, PSL-2 at M/s Data Steel Pipe Industries (Pvt) Limited, Karachi
May, 2009 to Mar,
2010
Jun, 2009 to Mar, 2010
May, 2009 to Apr, 2010
2012-2013
2012
2010
2012
2011
2013
2012
2013
2012
2012
![Page 50: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/50.jpg)
APPLIED ENGINEERING
Page 50
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
100% Inspection of PE Pipe Size 1-1/4” Dia (104,914 Meters) & 2” Dia (14,691.00 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 2” Dia (398,000 Meters) at M/s Dadex Eternit Limited, Lahore 100% Inspection of PE Pipe Size 3/4” Dia (125,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of Gas Service Tees ¾” Size (75,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of Gas Service Tees ¾” Size (75,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of Socket Weld Elbows ¾” Size (75,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of Socket Weld Elbows ¾” Size (75,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of Gas Service Tees ¾” Size (90,000 Numbers) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of Polyethylene Fittings at M/s Mechfit Industries, Lahore 100% Inspection of Gas Service Tees ¾” Size (90,000 Numbers) at M/s Usman & Sons, Lahore 100% Inspection of PE Pipe Sizes 1-1/4”, 2”, 4” & 6” Dia at M/s Dadex Eternit Limited, Lahore 100% Inspection of Polyethylene Fittings at M/s Volta Dies & Moulds, Lahore 100% Inspection of PE Pipe Sizes 1-1/4”, 2”, 4” & 6” Dia at M/s Dadex Eternit Limited, Lahore 100% Inspection of GI Pipe Size 3/4” Dia at M/s IIL, Karachi 100% Inspection of Polyethylene Fittings at M/s Mechfit Industries, Lahore 100% Inspection of PE Pipe Sizes 1-1/4” & 4” Dia at M/s Dadex Eternit Limited, Lahore
2013
2013
2013
2013
2013
2013
2013
2013
2013
2014
2014
2015
2014
2014
2015
May, 2015
![Page 51: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/51.jpg)
APPLIED ENGINEERING
Page 51
102
103
104
105
106
107
108
109
110
111
112
113
114
115
100% Inspection of Gas Service Tees ¾” Size (50,000 Numbers) at M/s Universal Engineering Corporation, Lahore 100% Inspection of Polyethylene Fittings at M/s Mechfit Industries, Lahore 100% Inspection of Domestic Gas Regulators ¾” Size (197,000 Numbers) at M/s Osaka Steel (Pvt) Limited, Lahore 100% Inspection of Polyethylene Fittings at M/s Mechfit Industries, Lahore 100% Inspection of PE Pipe Size 3/4” Dia at M/s Akbar & Zikria Pipes (Pvt) Limited, Islamabad 100% Inspection of Domestic Gas Regulators ¾” Size (210,000 Numbers) at M/s Qadir Engineering, Lahore 100% Inspection of Gas Service Tees ¾” Size (81,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of PE Pipe Size 1-1/4”, 2”, 4” & 6” Dias at M/s Akbar & Zikria Pipes (Pvt) Limited, Islamabad 100% Inspection of PE Pipe Size 1-1/4”, 2”, 4” & 6” Dias at M/s Dadex Eternit Limited, Lahore 100% Inspection of PE Pipe Size 1-1/4”, 2”, & 4” Dias at M/s Dadex Eternit Limited, Lahore 100% Inspection of PE Pipe Size 2” Dia at M/s Alpha Pipe Industries (Pvt) Limited, Sawabi 100% Inspection of PE Pipe Size, 3/4” Dia at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 1-1/4”, 2”, 4” & 6” Dias at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of Steel Linepipe Sizes, 3/4”, 2” & 4” Dias at M/s BBJ Pipe Industries (Pvt) Limited, Lahore
Aug, 2014 to Feb,
2015
May, 2014 to Jan, 2015
Jun, 2014 to Jun, 2016
Sep, 2014 to Jul, 2015
Oct, 2014 to Aug, 2015
Nov, 2014 to Aug,
2015
Jan, 2015 to Oct, 2015
Apr, 2015 to May, 2015
May, 2015 to Jun, 2015
Jun, 2015
Jun, 2015
Jul, 2015 to Sep, 2015
Aug, 2015 to Sep, 2015
Sep, 2015 to Mar, 2016
![Page 52: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/52.jpg)
APPLIED ENGINEERING
Page 52
2.
116
117
118
119
120
121
122 Sui Southern Gas Company Limited
1.
2.
3.
4.
100% Inspection of Steel Linepipe Size, 12” Dia at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of Socket Weld Elbows ¾” Size (50,000 Numbers) at M/s Rashid Engineering Works, Lahore 100% Inspection of PE Pipe Size, 3/4” Dia at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size 2” Dia at M/s Alpha Pipe Industries (Pvt) Limited, Sawabi 100% Inspection of Gas Service Valves Size ¾” with Tail Piece (120.000 Numbers) at M/s Universal Engineering Corporation, Lahore 100% Inspection of Steel Linepipe Size, 3/4” Dia (350,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Inspection of PE Pipe Size, 1-1/4” Dia (400,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 100% Mill Inspection / Loading Supervision of 36760 meter of 24” OD X 0.375”; API X-60 and 5200 meter of 24” OD X 0.562”; API X-60 Grades; (Bare and 3 Layers Pre-coated) Linepipe manufactured at Data Steel Pipe Industries, Sadiqabad. 100% Mill Inspection / Loading Supervision of 8700 meter, 20” OD X 0.312”; API X-60 and 5500 meter of 24” OD X 0.562; API x-60 Linepipe (Bare and 3 Layers Pre-coated) manufactured at Crescent Steel and Allied Products, Nooriabad. 100% Mill Inspection / Loading Supervision of 24” X 0.312”; X-42 and 7500 16” X 0.375”; X-60 Linepipe (Bare and Pre-coated) at Indus Steel Pipes Limited, Kotri. 100% Mill Inspection / Loading Supervision of ERW Linepipe of the following pipes at International Industries Limited. 1. 3/4” Dia X 0.113” 90000 Meters 2. 1” Dia X 0.133” 100000 Meters 3. 2” Dia X 0.154” 54000 Meters 4. 4” Dia X 0.188” 30000 Meters 5. 6” Dia X 0.188” 24000 Meters
May, 2016 to Jul, 2016
Mar, 2016 to Jun, 2016
May, 2016 to Jun, 2016
Jul, 2016
Oct, 2015 to Aug, 2016
May, 2016 to Aug, 2016
Jul, 2016 to Sep, 2016
Aug. 2001 to Nov. 2001
Sep-2001 to Oct-2001
July-2001 to Dec-2001
Feb-2002 to May-2002
![Page 53: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/53.jpg)
APPLIED ENGINEERING
Page 53
3.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Pakistan State Oil
100% Mill Inspection / Loading Supervision Services of 22 Kms, 18” diameter pipes for decoating, recoating and end beveling. 100% Mill Inspection / Loading Supervision Services of Linepipe ¾” , 1”, 2”, 4”, 6” diameter at International Industries Limited. 100% Mill Inspection / Loading Supervision Services of PE coating of 8” dia Linepipe 30000m at Crescent Steel & Allied Products. 100% Mill Inspection / Loading Supervision Services of steel Linepipe of 8” X 48000m at BBJ Pipe Industries. 100% Mill Inspection / Loading Supervision Services of ½” to 12” dia steel Linepipe coating at Bashir Pipe Industries. 109000m 73000m 20000m 100% Mill Inspection / Loading Supervision Services of API 5L grad X 70 (PSL-2) 4 steel Linepipe coating at M/S Sashi Steel Pipe works. 100% Mill Inspection / Loading Supervision Services of steel Linepipe 1” X 0.133” WT 45000m at Bashir Pipe Industries. 100% Mill Inspection / Loading Supervision Services of 3 Layer PE coating of 4” dia MS Linepipe at Crescent Steel & Allied Products. 100% Mill Inspection / Loading Supervision Services of steel Linepipe of 2” dia 659000m. 3rd Party Inspection Services of Manufacturing, Supervision of Loading & Un-loading and Coating of 42” Dia X 338 Kms Pipeline at M/s North China Petroleum Company, China & M/s Data Steel pipes, Sadiqabad 100% Mill Inspection / Loading Supervision of the pipes conforming to API 5L Grade B and Coating to DIN 30670 (3 Layers PE) for the following Linepipe. 1. 24” X 0.312 6500 Meters 2. 18” X 0.375 300 Meters
Aug-2002 to Oct-2002
Dec 2002
Jan 2006
Jan 2006
April 2006
June 2006 to ongoing
Sept 2006
Nov 2006
Dec 2006
27th Sep, 2015 to 25th Aug, 2016
![Page 54: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/54.jpg)
APPLIED ENGINEERING
Page 54
4.
5.
6.
7.
Reliance Inspection (Pvt.) Ltd. (for SSGC)
1.
2.
3.
S&N International Shell Pakistan Limited
1.
2.
3.
4.
5.
Tullow Pakistan
100% Mill Inspection / Loading Supervision of 13200 meters 30” X 11.10 pipe conforming API 5L X 42 and coating to DIN 30670 at Crescent Steel and Allied Product, Nooriabad. 100% Mill Inspection / Loading Supervision of 48700 meters 20” X 8.74 pipe conforming API 5L X-60 and coating to DIN 30670 at Crescent Steel and Allied Product, Nooriabad. 100% Mill Inspection / Loading Supervision of the following pipes conforming to API X-60 coating to DIN 30670 at Crescent Steel and Allied Product, Nooriabad. 1. 18” X 0.312 71000 Meters 2. 18” X 0.375 20000 Meters 3. 18” X 0.406 45000 Meters 4. 18” X 0.406 1000 Meters 100% Mill Inspection / Loading Supervision Conforming to API-5L Bare pipe 3 layers PE Coating to DIN-30670 and Cement lining to BS-534 for the following: 1. 48” X 0.438” Qty-1800 Meters 2. 30” X 0.312” Qty-1100 Meters Inspection of laying of 8” dia pipeline from PARCO to Shell Installations at Shikarpur. Inspection of laying of 6” dia pipeline from Shell Installation at Chaklala to Airport Islamabad. Inspection of installation of meters (Smith) at Daulatpur. Welding inspection of 8” dia pipe for fire fighting at Keamari Installation. Inspection of erection of SP-14 (Fuel Tank) at Keamari Installation. Inspection of laying of 8” dia pipeline at Tullow Pakistan (Development) Limited
We had a working
arrangement with M/s. Reliance Inspection for Ex-Mill Pipe Inspection
Dec-95 to Aug-96.
Inspection carried out during 1996.
Feb-97 to June-97
Dec-2000 to Jan-2001
April-99 to June-99
June-99 to Dec-99
Sept-99 to Dec-99
July-99 to Sept-99
Nov-2000 to Jan-2001
![Page 55: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/55.jpg)
APPLIED ENGINEERING
Page 55
8.
9.
Pakistan Petroleum Limited
1.
2.
3.
4.
5.
6.
7.
8
9
10
11
Capital Development Authority
Radiography and Inspection Services for 4” dia Well-5 Feeder Line and 1” dia Adhi Field. Radiography and Inspection Services for 4” Wellhead Fittings and 6” dia Feeder Line for Adhi Well-13. Third Party Inspection during construction and laying of 8” dia high pressure buried sales gas transmission pipeline from Mazarani Gas Field to Larkana. Third Party Inspection Service during manufacture of 20” x 10,000 Meters Coated Linepipe for Sui Kashmore water pipeline at M/s Data Steel Pipe Industries, Sadiqabad. Third Party Inspection Services during Manufacturing of 20” Dia, 20,000 Meter Water Line for Sui-Kashmore at CS&AP. 3rd Party Inspection of 6” Dia API Seamless Line Pipe at M/s Huffaz Seamless Pipe, Nooriabad 3rd Party Inspection of 20” Dia Sui-KPS Water Line between MP32 to MP35 (6.8 Kms) during manufacturing at M/s CS&AP, Nooriabad Services of Welding Inspector during Construction activities of replacement of Bottom Plates at Adhi Gas Field 3rd Party Inspection of Seamless linepipes at premises of M/s Huffaz Seamless Pipe Industries Limited, Nooriabad Services of 3rd Party Welding Inspector for Tank T – 101B at Adhi Gas Field Services of 3rd Party Welding Inspector for Tank T – 101B at Adhi Gas Field 100% Mill Inspection of Mild Steel Spirally Welded Pipe at CS&AP, Nooriabad
a) 18” x 6.4mm (2610 Meters) b) 24” x 7.9mm (2000 Meters) c) 30” x 7.9mm (5713 Meters)
May 2002 to July 2002
August 2002 to September 2002
August 2002 to November 2002
April 2008 to July 2008
March, 2010 to April, 2010
2010
2011
2011
2011-2012
Oct, 2013 to Mar, 2014
Mar, 2014 to Apr, 2014
2009
![Page 56: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/56.jpg)
APPLIED ENGINEERING
Page 56
CATHODIC PROTECTION PROJECTS
![Page 57: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/57.jpg)
APPLIED ENGINEERING
Page 57
F) CATHODIC PROTECTION PROJECTS COMPLETED:
S. No. Description Agency / Location Year
1.
2.
3.
4.
5.
6.
7.
8.
9.
Designed and Installed the Cathodic Protection System for 50 Km of 16” diameter pipeline Khandkhot to Guddu thermal power station natural gas pipeline. Designed and installed the Cathodic Protection System for 24 Km of 8” diameter Attock Refinery Limited, Sihala and Pipeline. Design and installation supervision of 32 Km of 10” diameter oil pipeline system was designed with Solar Power System. Installation of Cathodic Protection System on 16” diameter aviation fuel pipeline at Jinnah Terminal No.4, Karachi. Cad Welding Brazing etc. Designing of Cathodic Protection System for 22 Km of 6” and 12” diameter of gathering lines and main track respectively at Dhodak Oil Field. Construction of 3 Km of 10” dia Steel water with pumping station and Cathodic Protection System. Design and Installation of Cathodic Protection System for Two underground Oil Storage Tanks Design supply and installation of Cathodic Protection System for 3 Km of 6” dia pipeline from Chaklala Shell Terminal to Airport Islamabad. Consultant to NESPAK for Cathodic Protection on 135 Km long 56” dia and 8 Km of 16” dia desalinated water transmission pipeline system in Saudi Arabia (Alkhuber to Huffuf)
WAPDA Guddu
Pakistan State Oil (PSO)
Rawalpindi
Pakistan State Oil (PSO)
Mahmood Kot to Kot Addn near
Muzzafarabad Gurh in Punjab
CAA through M/s. Sogea
of France, Karachi
OGDC through Engineering Co. of
Australia. Dhodak near Dera Ghazi
Khan
WAPDA Lakhra
M/s. King Crete Builders (For Ormara Naval Base).
Shell Pakistan Limited
NESPAK Lahore
1987
1987
1990
1991
1993
1992
1997
1999
Since 2000
![Page 58: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/58.jpg)
APPLIED ENGINEERING
Page 58
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Design, supply and installation of Deepwell Groundbed for 7 Km Shell 6” dia Pipeline from POL refinery to Chaklala Shell Terminal. Soil Resistivity Survey on 15 KM section from PARCO CP-06A to value Assembly No.17 of White Oil Pipeline Project. Installation of Deepwell Groundbed on 7 KM 6” dia Shell Oil Pipeline from ARL Refinery to Chaklala Shell Terminal Rawalpindi. Removal and installation of CP Test Posts at NRL K-K Pipeline with the provision of 58 Nos. of Cadwelds with the cables. Installation of under ground piping CP system at BHP Zamzama I Project. Contract for monitoring of the following Shell Oil Pipelines. 1. Shell installation to PARCO Station
Shikarpur. 2. Shall installation to PARCO station at
Mahmood Kot. 3. Attock Refinery to Shell installation
Chaklala. 4. Shell Chaklala installation to Air Port. Designing material, supply and installation of Two, 20000 litre and one, 30000 litre underground Diesel Tank for Pakistan International Containers Terminal Power Satiation at Karachi Port. Designing material, supply and installation of under ground piping system and slap vessel for Pakistan Petroleum Limited. Adhi Plant II Client : Ranhill Berhad Designing, Supply of material, Installation, Testing and Commissioning of CP System at PPL Adhi LPG/NGL Plant II Project Installation of underground piping CP system at BHP Zamzama II Project. Report on CP System Aviation Fueld on hydrant pipeline at Jinnah International Airport
Shell Pakistan Limited
White Oil Pipeline Project
(China Petroleum)
Shell Pakistan Limited
National Refinery Limited
BHP - Billiton
Shell Pakistan Limited
Diesel Power System (Pvt.) Limited
Pakistan Petroleum Limited.
Ranhill for PPL
BHP
Shell
2001
January 2002
March 2002
August 2002 to September 2002
March 2003
2004
March 2004
December,2005
April, 2006
June,2006
2007
![Page 59: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/59.jpg)
APPLIED ENGINEERING
Page 59
21
22
23
24
25
26
27
28
29
30
31
Installation of Tank bottom CP system at Parco Bubak Terminal. Inspection and Maintenance Contract of existing CP System at Shikarpur, Machike, Kemari and Chaklala CP System for relocated CKL-ISB Pipeline Design, Supply of Material, Installation and Commissioning of CP System at 10” Dia underground Pipeline at Bulk Oil Depot at Machike of Total Parco Pakistan Limited Supply, Construction, Installation, Testing and Commissioning of CP System at Adam X-1 Well Casing, Close Drain Vessel and Sales Gas Pipeline at Hala Gas Field Inspection and Maintenance Contract of CP System at Chaklala, Kemari, Machike and Shikarpur Installation and Commissioning of CP System of 28” Dia Pipeline at Bosicor Refinery Design, Supply of Material, Installation, Commissioning & Testing of CP System at Mari Gas, Sujawal X-1, Sujawal Site Design & Installation of Sacrificial CP System of 8” Dia 950 Meter Fuel Line at HPL Shikarpur Depot as per specification of Hascol Petroleum Limited & Zeeshan Engineering Supply, Installation, Testing & Commissioning of CP System for Protection of 762 mm dia & 7.75 Kms Long Underground PE Coated MS Water Pipeline for 7 MGD Waterline Project Supply, Installation, Testing & Commissioning of CP System for Hascol, Machike
BHP
Shell
Shell
Petrocon
PPL / Hala Gas Field
Shell
Petrocon for Bosicor
Joint Engineering Services for Mari Gas
IIW – Industrial Engineers & Contractors
FFBL – Fauji Fertilizer Bin Qasim Limited
IIW – Industrial Engineers & Contractors
January,2007
2007-2008
2008
February, 2008
August, 2009
2010 (In Progress)
2010
2013
April, 2013
May, 2013 to December, 2013
April, 2014
![Page 60: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/60.jpg)
APPLIED ENGINEERING
Page 60
CONSULTANCY SERVICES
![Page 61: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/61.jpg)
APPLIED ENGINEERING
Page 61
G) CONSULTANCY SERVICES:
S. No. Name of Client Job Carried Out Year
1.
2.
3.
4.
Sui Northern Gas Pipelines Limited
i)
ii)
Sui Southern Gas Company Limited Sui Northern Gas Pipelines Limited Sui Northern Gas Pipelines Limited
Consultancy Services for the Development of Comprehensive Business Plan and preparation Feasibility Studies for the following Bottling and Marketing of LPG Cylinders including establishment of the Bottle Filling Stations Supply of LPG in the form of Synthetic Natural Gas (LPG-Air Mix) through distribution pipeline network Consultancy Services for development of SSGC’s SNG Projects and Evaluation of Bidders for Design, Supply, Installation & Commissioning of two LPG-Air Mix Plants Capacity 50MMCFD. Consultancy Services for Evaluation of the bidder for supply of two LPG-Air Mix plants of 50MMCFD equivalent of Natural Gas capacity. Consultancy Services for Evaluation of the following bids for Design, Supply of Installation & Commissioning of LPG-Air Mix (SNG) Plants 1. 1x2 MMCFD (80 MMBTU/Hr) of Natural Gas
Equivalent 2. 1x5 MMCFD (200 MMBTU/Hr) of Natural Gas
Equivalent 3. 1x10 MMCFD (400 MMBTU/Hr) of Natural Gas
Equivalent 4. 2x20 MMCFD (800 MMBTU/Hr) of Natural Gas
Equivalent
December 2011
January, 2012 Continue
July, 2012
2012-2013
![Page 62: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/62.jpg)
APPLIED ENGINEERING
Page 62
GENERAL WORKS
![Page 63: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/63.jpg)
APPLIED ENGINEERING
Page 63
METER READING
S. No. Name of Client Description Agency /
Location Year
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
Sui Southern Gas Company
// // // // // // // // //
Domestic & Commercial Meter Reading in Karachi & Hyderabad Regions Domestic & Commercial Meter Reading in Karachi & Hyderabad Regions Commercial Meter Reading in Hyderabad Region Domestic & Commercial Meter Readings in Hyderabad, Larkana & Sukkur Regions Domestic & Commercial Meter Reading in Nawabshah Region Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah
Karachi & Hyderabad
Karachi & Hyderabad
Hyderabad
Hyderabad, Larkana &
Sukkur
Nawabshah
Hyderabad
Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
16th Nov, 2000 to 15th Nov, 2001
16th Nov, 2001 to 15th Feb, 2002
16th Apr, 2002 to 15th Apr, 2003
July, 2005 to June, 2007
July, 2005 to June, 2007
July, 2007 to
September, 2007
October, 2007 to
December, 2007
January, 2008 to
June, 2008
July, 2008 to
December, 2008
January, 2009 to
June, 2009
![Page 64: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/64.jpg)
APPLIED ENGINEERING
Page 64
11
12
13
14
15
16
17
18
19
20
Sui Southern Gas Company
// // // // // // // // //
Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Domestic & Commercial Meter Reading in Hyderabad, Larkana, Sukkur & Nawabshah Gas Meter Reading at Hyderabad Region and Malir Zone of Karachi Region Gas Meter Reading at Hyderabad Region and Malir Zone of Karachi Region Gas Meter Reading at Hyderabad Region and Malir Zone of Karachi Region Gas Meter Reading at Hyderabad Region and Malir Zone of Karachi Region
Hyderabad
Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad Larkana Sukkur
Nawabshah
Hyderabad & Malir, Karachi
Hyderabad & Malir, Karachi
Hyderabad & Malir, Karachi
Hyderabad & Malir, Karachi
July, 2009
to December, 2009
January, 2010 to
March, 2010
April, 2010 to
June, 2010
July, 2010 to
December, 2010
January, 2011 to
June, 2011
July, 2011 to
September, 2011
16th October, 2011 to 15th October,
2012
October, 2012 to September, 2013
October, 2013 to June, 2014
July, 2014 to December, 2014
![Page 65: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/65.jpg)
APPLIED ENGINEERING
Page 65
HAND DELIVERY OF BILLS
S. No. Name of Client Description Agency /
Location Year
1.
2.
3.
4.
5.
6.
7.
8.
9.
Sui Southern Gas Company
// // // // // // // //
Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Hyderabad Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Hyderabad Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Hyderabad & Nawabshah Regions. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Hyderabad Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Nawabshah Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Nawabshah Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Nawabshah Region. Hand Delivery of Industrial, Commercial & Domestic Gas Bills at Nawabshah Region. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad Region & Domestic & Commercial Gas Bills at Karachi Region.
Hyderabad
Hyderabad
Hyderabad Nawabshah
Hyderabad
Nawabshah
Nawabshah
Nawabshah
Nawabshah
Hyderabad Karachi
16th August, 2002
to 15th August, 2004
16th August, 2004 to
15th October, 2004
16th Nov, 2004 to
15th Nov, 2005
16th Nov, 2005 to
15th Dec, 2005
16th Nov, 2005
to 15th Nov, 2006
16th Nov, 2006 to
15th Mar, 2007
16th Mar, 2007
to 15th June, 2007
16th June, 2007 to
15th July, 2007
16th July, 2007 to
15th July, 2008
![Page 66: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/66.jpg)
APPLIED ENGINEERING
Page 66
10.
11
12.
13.
14
15
16
1.
2.
3.
Sui Southern Gas Company
//
// // //
// //
Sui Northern Gas Pipeline Limited
// //
Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Hand Delivery of Domestic, Commercial & Industrial Gas Bills at Hyderabad & Karachi Regions. Gas Bill Distribution in Multan Region. Gas Bill Distribution in Multan Region. Gas Bill Distribution in Multan Region.
Hyderabad
Karachi
Hyderabad Karachi
Hyderabad Karachi
Hyderabad Karachi
Hyderabad Karachi
Hyderabad Karachi
Hyderabad Karachi
Multan
Multan
Multan
16th July, 2008
To 15th July, 2009
16th July, 2009 to 15th Sep, 2009
16th Sep, 2009 to
15th Nov, 2009
16th Nov, 2009 to
15th Feb, 2010
16th Feb, 2010 to
15th May, 2010
16th May, 2010 to
15th Nov, 2010
16th Nov, 2010 to
15th Feb, 2011
1st Sep, 2007
To 31st Aug, 2008
2nd Sep, 2008 To
1st Sep, 2009
1st Sep, 2009 To
31st Aug, 2010
![Page 67: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/67.jpg)
APPLIED ENGINEERING
Page 67
4. 1 1 2 3 4 5 6 7
Sui Northern Gas Pipeline Limited
Pakistan Telecommunication Company Limited Karachi Electric Supply Company Limited
// // // // // //
Gas Bill Distribution in Multan Region. Distribution of PTCL Bills for Lyari Exchange, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi Electricity Bill Distribution Service for VIBC Lyari & Lyari 2, Karachi
Multan
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
1st Sep, 2010
To 30st Oct, 2010
Jan, 2009 to Dec, 2009
Mar, 2011 to Feb, 2012
01.03.2012 to 28.02.2013
01.03.2013 to 28.02.2014
March, 2014 to May, 2014
June, 2014
July, 2014 to June, 2015
July, 2015 to June, 2016
![Page 68: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/68.jpg)
APPLIED ENGINEERING
Page 68
Gas Leakage Rectification and Survery
S. No. Name of Client Description Agency /
Location Year
1.
2.
3.
4.
5.
6. 7
Sui Southern Gas Company
// // // // // //
Gas Leakage Rectification of Domestic and Commercial connection of 11,666 Meters. Gas Leakage Rectification of Domestic and Commercial connection of 11,360 Meters. Gas Leakage Rectification of Domestic and Commercial connection of 6,666 Meters. Gas Leakage Rectification of Domestic & Commercial Connection of 20,000 Meters at Hyderabad Overhead Gas Leakage Survey & Rectification Work of 6,428 Connections at Karachi Overhead Gas Leak Survey & Rectification of 10,000 Connections at Karachi Overhead Gas Leak Survey and Rectification Work of 8,182 Connections at Karachi Region
Karachi
Karachi
Karachi
Hyderabad
Karachi
Karachi
Karachi
Apr, 2005
To Sep, 2005
Jan, 2007 To
June, 2007
May, 2008 to October, 2008
September, 2009 to February, 2014
22nd Jan, 2010 to 8th June, 2010
October, 2010 to February, 2012
April, 2012 to October, 2012
![Page 69: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/69.jpg)
APPLIED ENGINEERING
Page 69
EQUIPMENT & INSTRUMENTS
![Page 70: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/70.jpg)
APPLIED ENGINEERING
Page 70
A. LIST OF EQUIPMENTS / MACHINERY & TOOLS
S.NO. EQUIPMENT NAME WITH ACCESSORIES QUANTITY CONDITION REMARKS
1 Welding Plant 500 Ampere 6 Nos. Satisfactory
2 Welding Rectifiers 500 Ampere 6 Nos. Satisfactory
3 Air Compressor 380 CFM 1 No. Satisfactory
4 Crane 5 Ton To 20 Ton 3 Nos. Satisfactory
5 Side Boom 1 No. Satisfactory
6 Generator 90 Kva 1 No. Satisfactory
7 Excavator 1 No. Satisfactory
8 Hydrostatic Pump 1 No. Satisfactory
9 De Watering Pump 4 Nos. Satisfactory
10 Dozer 1 No. Satisfactory
11 Tractor 2 Nos. Satisfactory
12 Vehicle 4 Nos. Satisfactory
13 Grinder Angle 9" 8 Nos. Satisfactory
14 Grinder Angle 7" 4 Nos. Satisfactory
15 Grinder Angle 5" 4 Nos. Satisfactory
16 Pencil Grinder 2 Nos. Satisfactory
17 Baby Grinder 4 Nos. Satisfactory
18 Bevel Machine 2 Nos. Satisfactory
19 Cutting Set 3 Nos. Satisfactory
20 External Clamp ( 6" To 20" Dia ) 1 No. Satisfactory
21 Fabrication Clamp ( 4" to 20" Dia ) 1 No. Satisfactory
22 Spanner 1 No. Satisfactory
23 Stacking Spanner ( 2" to 10"Dia ) 2 Nos. Satisfactory
![Page 71: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/71.jpg)
APPLIED ENGINEERING
Page 71
B. LIST OF EQUIPMENTS / INSTRUMENTS FOR SURVEY & MONITORING /
INSPECTION OF CATHODIC PROTECTION SYSTEM
S.NO. EQUIPMENT NAME WITH ACCESSORIES QUANTITY CONDITION REMARKS
Cathodic Protection
1 Nilson Current Interrupter 1 No Satisfactory
2 Soil Resistivity Meter (Tinker & Rasor) 1 No Satisfactory
3 Current Supply Unit 10 Volts, 10 Amp (Tinker & Rasor) 1 No Satisfactory
4 Soil Resistivity Meter (Vibroground) 1 No Satisfactory
5 Holiday Detector Complete (Tinker & Rasor) 1 Set Satisfactory
6 Pearson Survey Meter (Tinker & Rasor) 1 No Satisfactory
7 Half Cells (Tinker & Rasor) 05 Nos Satisfactory
8 Multi Combination Meter 3 Nos Satisfactory
9 Insulation Tester (TES-3660) 1 No Satisfactory
10 Digital Multimeter (215) 1 No Satisfactory
11 Digital Multimeter (Kyoritsu Model 1008) 1 No Satisfactory
12 Digital Multimeter (Kyoritsu Model 2001) 1 No Satisfactory
13 Other Accessories and Tools Lot Satisfactory
![Page 72: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/72.jpg)
APPLIED ENGINEERING
Page 72
C. LIST OF EQUIPMENTS / INSTRUMENTS FOR NON-DESTRUCTIVE TESTING (NDT) AND THIRD PARTY INSPECTION
S.NO. EQUIPMENT NAME WITH ACCESSORIES QUANTITY CONDITION REMARKS
NDT and Third Party Inspection
1 Sentinel Delta 880 Gamma Ray Projector with Remote Control Winding Mechanism 04 Nos Satisfactory
2 Tech Ops Model 660 Gamma Ray Projector with Remote Control Winding Mechanism 08 Nos Satisfactory
3 Isotope Four Channel Transport Container 03 Nos Satisfactory
4 Complete Radiographic Accessories Kit 15 Nos Satisfactory
5 Films Processing unit with Accessories 15 Units Satisfactory
6 Films Cassettes with Lead Intensifying Screens 1000 Nos. Satisfactory
7 Films Viewers 12 Nos Satisfactory
8 Films Densitometer 03 Nos Satisfactory
9 Radiation Survey Meter 14 Nos Satisfactory
10 Radiation Dosimeters with Charging Unit 25 Nos. Satisfactory
11 Long Tong (2 Meter) 09 Nos Satisfactory
12 Collimators 12 Nos Satisfactory
13 Hi-Lo Gauge 05 Nos Satisfactory
14 Cirometer Tape 06 Nos Satisfactory
15 Micro Meter (INSIZE) &( MITUTOYO) 02 No Satisfactory
16 Vernier Calipers 04 Nos Satisfactory
17 Digital Vernier Caliper (INSIZE) 01 No Satisfactory
18 Digital Clamp Meter 01 No Satisfactory
19 Digital Clamp Meter – TES-3020 01 No Satisfactory
20 Dial Indicator (Thickness Gauge) Pecock Y01529 01 No Satisfactory
21 Infra Red Thermometer, Summit SIR 100 R 03 No Satisfactory
22 Measurement Tape 15 Meter (KNIGHT) 05 No. Satisfactory
23 Bevel Gauge 02 Nos Satisfactory
24 Thread Gauge 02 Nos Satisfactory
25 Ultrasonic Thickness Gauge 01 No Satisfactory
26 Ultrasonic Testing Unit USM3 02 No Satisfactory
27 Calibration Block (V1) 02 No Satisfactory
28 Magnetic Particle Testing Unit (Yoke) 01 Set Satisfactory
29 Dye penetrate Test As required Satisfactory
30 Tong Tester – Ac / Dc 01 No Satisfactory
![Page 73: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/73.jpg)
APPLIED ENGINEERING
Page 73
D. LIST OF EQUIPMENTS / INSTRUMENTS FOR GAS LEAKAGE SURVEY
S.NO. EQUIPMENT NAME WITH ACCESSORIES QUANTITY CONDITION REMARKS
Gas Leakage Survey
1 Bender Machine 01 Satisfactory
2 Pipe Range Spanner 12” 20 Satisfactory
3 Pipe Range Spanner 14” 20 Satisfactory
4 Screw Spanner 10 Satisfactory
5 Screw Set 10 Satisfactory
6 Vice 05 Satisfactory
7 Die Set 10 Satisfactory
8 Hammer 10 Satisfactory
9 Nail 10 Satisfactory
10 Hacksaw Blade 10 Satisfactory
11 Whole Punch 10 Satisfactory
12 Measurement Tape 10 Satisfactory
![Page 74: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/74.jpg)
APPLIED ENGINEERING
Page 74
CERTIFICATE & LICENCES
![Page 75: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/75.jpg)
APPLIED ENGINEERING
Page 75
PRE-QUALIFICATIONS
![Page 76: APPLIED ENGINEERING INDEX - appengg.com.pkappengg.com.pk/pdf/Company_Profile.pdf · Ex-Executive of SSGC. Ex-Executive of SSGC . ASNT Level-II ... documents on client requirement](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aeebc457f8b9a45569180d7/html5/thumbnails/76.jpg)
APPLIED ENGINEERING
Page 76
PRE-QUALIFIED WITH THE FOLLOWING ORGANIZATION:
1) Sui Northern Gas Pipelines Limited (SNGPL)
2) Sui Southern Gas Company Limited (SSGC)
3) Pakistan Refinery Limited (PRL)
4) National Refinery Limited (NRL)
5) Pakistan State Oils Limited (PSO)
6) Shell Pakistan Limited
7) Tullow Pakistan (Developments) Limited
8) Water & Power Development Authority (WAPDA)
9) Indus Steel Pipe Limited (ISPL)
10) Siemens Pakistan Engineering Company Limited
11) Pakistan Petroleum Limited (PPL)
12) Oil & Gas Development Corporation Limited (OGDCL)
13) Caltex Oil (Pakistan) Limited
14) K Electric
15) Agha Khan University / Hospital
16) Descon Engineering (Pvt) Limited, Lahore
17) Mari Petroleum Company Limited (MPCL)
18) British Petroleum (BP)
19) SGS Pakistan
20) PSS Asia Pakistan (Pvt) Limited
21) Petroleum Exploration Limited
22) Kerui Group, China
23) Capital Development Authority
24) Fauji Fertilizer Bin Qasim Limited