  • G3 Terminal Vancouver Port Metro Vancouver Project Permit Application

    APPENDIX TViewscape & Shadow Study

    AP

    PEN

    DIX

    T

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Table of Contents

    i

    TABLE OF CONTENTS

    STUDIES AND REPORTS ................................................................................................................... 1

    Viewscape Analysis ................................................................................................................. 1

    Observations ................................................................................................................... 35

    Shade Analysis ...................................................................................................................... 35

    Methodology .................................................................................................................... 35

    Observations ................................................................................................................... 52

    List of Exhibits

    Exhibit 1: Site Plan and Key Structures ...................................................................................... 2

    Exhibit 2: Profile of the Cleaning Building and the Gain Silos .................................................... 3

    Exhibit 3: Viewpoint Locations .................................................................................................... 4

    Exhibit 4: Cloverly Park (City of North Vancouver: Moodyville) ................................................. 5

    Exhibit 5: View From Harbour View Park (City of North Vancouver on water) .......................... 8

    Exhibit 6: View from Kennard Avenue and Cloverly (City of North Vancouver: Moodyville) .... 11

    Exhibit 7: View from Brooksbank Avenue and Cotton Road (City of North Vancouver: Moodyville) .................................................................................................................................. 14

    Exhibit 8: View from New Brighton Park (City of Vancouver: Hastings – Sunrise) .................. 17

    Exhibit 9: View from New Brighton Park (City of Vancouver: Hastings – Sunrise) .................. 20

    Exhibit 10: View from New Brighton Park (City of Vancouver: Hastings – Sunrise) .................. 23

    Exhibit 11: View from north end of 3rd Street Overpass ............................................................. 26

    Exhibit 12: View from middle of 3rd Street Overpass .................................................................. 29

    Exhibit 13: View from corner of Gladstone and Adderly ............................................................. 32

    Exhibit 14: Spring Equinox: March 21 ........................................................................................ 36

    Exhibit 15: Summer Solstice: June 21 ........................................................................................ 40

    Exhibit 16: Fall Equinox: September 21 ..................................................................................... 44

    Exhibit 17: Winter Solstice: December 21 .................................................................................. 48

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    1

    STUDIES AND REPORTS

    Viewscape Analysis

    As part of the PMV Project and Environmental Review process, PMV has established View and Shade Impact

    Guilelines (July 2015) to assist applicants of projects on lands and waters managed by PMV, when considering

    view and shade impacts of proposed new buildings and structures.

    The G3 Terminal Vancouver Project has been evaluated based on how proposed siting, massing and the height

    of varoius structures associated with development may have view or shade impacts on the surrounding

    community (neighbourhood of Moodyville) and public view points. View impacts were assessed from a variety

    public, private and skyline locations to illustrate the potential impacts. Renditions of the facility were superimposed

    on photographs taken of these varoius view points as part of this reports preparation. This was accomplished

    utilizing google earth and google street view and the existing three (3) dimensional model of the G3 Terminal

    Vancouver to illustrate what the project would look like, before and after. Those buildings with the greatest heights

    potentially creating either view or shade impacts are illustrated on the exhibit below. Key structures assessed in

    the view and shade analysis include the cleaning building and the grain storage silos, as depicted on the plan

    below. Other buildings, used for weighing the products, conveyors, used for transporting the material around the

    site, and the ship loaders, used for loading the ships are also noted for context.

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    2

    Exhibit 1: Site Plan and Key Structures

    From a view and shade perspective, the proposed G3 Terminal Vancouver facility consists of buildings potentially

    creating view and shade impacts, the highest of which is the cleaning building at 80 m (264 ft.) above grade. The

    supporting storage/grain silos which comprise the largest composite structure have a height at 42 m (140 ft.)

    above grade (refer to Exhibit 1).

    For comparative purposes PMV, issued project permit (PP2012-099) to Richardson International for their

    proposed grain Storage Capacity Project. The project consisted of the construction of two 40,000 metric tonne

    concrete storage annexes approximately 54 m high (174 ft.). The Richardson storage annexes are higher than

    those proposed at the G3 Terminal Vancouver and slightly less in length. Immediately west of the G3 Terminal

    Vancouver project, the Neptune Potash Shed #2 roof line is 37m (122 ft.)1 . A profile drawing of the G3 Terminal

    Vancouver cleaning building and the silos is illustrated below.

    1 PMV Project Permit Number 2012-041

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    3

    Exhibit 2: Profile of the Cleaning Building and the Gain Silos

    A series of sensitive locations/receptor locations within the community and surrounding the Burrard Inlet were

    chosen to illustrate the potential view impacts of the proposed G3 Terminal Vancouver. Port Metro Vancouver

    reviewed the locations proposed and added addtional locations. The view locations have been selected to

    illustrate how the facility will be viewed from a variety of locations, including, the neighbourhood of Hastings and

    Sunrise, Community of Moodyville (City of North Vancouver) and from the water. Strategic locations utilized to

    illustrate and consisted of:

    • Cloverly Park (City of North Vancouver: Moodyville) • Harbour View Park (City of North Vancouver on water) • Kennard Avenue and Cloverly (City of North Vancouver: Moodyville) • Brooksbank Avenue and Cotton Road (City of North Vancouver) • New Brighton Park (City of Vancouver, Sunrise and Hasting neighbourhood) • North end of 3rd street overpass • Middle of 3rd street overpass • Corner of Gladstone and Adderly

    It is noted that during project planning and design the grain silos were repositioned from an east-west to a north-

    south direction resulting in a reduction to the massing of the facility from a waterfront view perspective. The

    orientation of the silo's represents a key design measure to mitigate and reduce overall visual disruption. The

    figure below illustrates the locations chosen.

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    4

    Exhibit 3: Viewpoint Locations

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    5

    Exhibit 4: Cloverly Park (City of North Vancouver: Moodyville)

  • Cloverly Park Without Terminal

  • Cloverly Park With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    8

    Exhibit 5: View From Harbour View Park (City of North Vancouver on water)

  • Harbourview Park Without Terminal

  • Harbourview Park WithTerminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    11

    Exhibit 6: View from Kennard Avenue and Cloverly (City of North Vancouver: Moodyville)

  • Cloverly Park Without Terminal

  • Cloverly Park With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    14

    Exhibit 7: View from Brooksbank Avenue and Cotton Road (City of North Vancouver: Moodyville)

  • Brooksbank and Main/Cotton Dr Without Terminal

  • Brooksbank and Main/Cotton Dr With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    17

    Exhibit 8: View from New Brighton Park (City of Vancouver: Hastings – Sunrise)

  • New Brighton Park Without Terminal

  • New Brighton Park With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    20

    Exhibit 9: View from New Brighton Park (City of Vancouver: Hastings – Sunrise)

  • New Brighton Park Without Terminal

  • New Brighton Park With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    23

    Exhibit 10: View from New Brighton Park (City of Vancouver: Hastings – Sunrise)

  • New Brighton Park Without Terminal

  • New Brighton Park With Terminal

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    26

    Exhibit 11: View from north end of 3rd Street Overpass

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    29

    Exhibit 12: View from middle of 3rd Street Overpass

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Viewscape Analysis

    32

    Exhibit 13: View from corner of Gladstone and Adderly

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    35

    Observations

    The G3 Terminal Vancouver will be visible within the context of the Vancouver and City of North Vancouver

    skyline as evident from the locations and vantage points utilized in this assessment. Specifically the cleaning

    building and the grain silos represent the most visible structures, it is however noted that the overall view impacts

    are lessened due to the presence of similar developments on the waterfront and in proximity to the G3 Terminal

    Vancouver project such as Neptune Coal Terminal and the Richardson Grain Terminal, and the predominantly

    industrial nature of the north shore waterfront in this area. The use of grey concrete and coloring of the facilities

    (e.g. grain silos and maintenance cleaning facility, refer to Buildings Structures and Equipment) further reduces

    view impacts, as the buildings blend into the existing built environment.

    While travelling along Marine Drive (City of North Vancouver) the new facility will be visible.

    The facility (specifically the cleaning facility and the grain silos), will also be visible from locations within the

    Moodyville neighbourhood, however in some instances the views are lessened due to the presence of vegetation

    that blocks views. This is evident at Cloverly Park.

    On the south shore (views from New Brighton Park in Vancouver's Sunrise Hastings neighbourhood), the G3

    Terminal Vancouver will be visible. As noted the magnitude of the view impacts are lessened as the facilities are

    reflective of the industrial nature of the waterfront and other similar facilities on the north shore.

    Shade Analysis

    As part of the PMV Project and Environmental Review process, the PMV has established View and Shade Impact

    Guilelines (July 2015) to assist applicants of projects on lands and waters managed by PMV.

    The assessment of potential shade impacts of the proposed G3 Grain Terminal and the surrounding community

    has been prepared during four time periods throughout the year:

    • Spring Equinox (March 21) • Summer Solstice (June 21) • Fall Equinox (September 21) • Winter Solstice (December 21)

    Further the review considers impacts for each at 9 am,12 pm and 3 pm.

    Methodology

    The shadow study was completed by exporting the 3 dimensional design model from Revit into AutoCAD where

    the models were simplified to remove unnecessary elements (i.e. interior and underground features).

    Subsequently the files were converted into Google Sketchup. Geo-location from Google Earth was imported into

    the Sketchup model, then shadow settings were applied based on the requested dates and times as per PMV

    guidelines.

    Images were then exported from those models. For clarity, Photoshop was used to enhance the contrast of the

    shadows that fall outside of the plant area. The final images are presented as .jpg files. The following exhibits

    illustrate.

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    36

    Exhibit 14: Spring Equinox: March 21

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    40

    Exhibit 15: Summer Solstice: June 21

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    44

    Exhibit 16: Fall Equinox: September 21

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    48

    Exhibit 17: Winter Solstice: December 21

  • G3 Terminal Vancouver: Port Metro Vancouver

    Project Permit Submission

    Shade Analysis

    52

    Observations

    The proposed G3 Grain Terminal is located within a predominantly industrial area, the overall impacts of shade

    throughout the year on the surrounding residential community are minimal, although shade effects are evident

    within the Moodyville neighbourhood during winter solstice period, specifically noting the early mornings (9 am).

    During the winter solstice there will be increased shade within a portion of the Moodyville neighbourhood to the

    west of the facility due to the grain cleaning building (80 m (264 ft.) in height above grade).

    The shade effects of the silos ( the buildings representing the greatest massing) themselves (at 42 m (140 ft.)) are

    predominantly restricted within the footprint of the existing Neptune facility, immediately to the west of the

    proposed G3 Grain Terminal.

    As the sun continues to rise during the winter solstice (12 pm and 3 pm) the shade impacts are restricted and

    contained predominantly within the industrial/commercial areas within the City of North Vancouver.

    Overall, the increase in shade during the winter solstice will impact a number of residences in the early mornings,

    however this will not impact residential areas during the spring, summer and fall equinox.

    As noted earlier the orientation of the grain silos as part of site optimization has further reduced the potential

    effects on views and shade within the local community, however the design requires the location of the grain

    cleaning building to be sited as such.