Appendix A List of Preparers

Transcript of Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of...

Page 1: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Appendix AList of Preparers

Page 2: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

This page intentionally left blank.

Page 3: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

LIST OF PREPARERS

DRAFT IS/MND A-1 JANUARY 2017

Appendix A. List of Preparers A consultant team headed by Ecology and Environment, Inc. prepared this document under the direction of the California Public Utilities Commission. The preparers and reviewers of this document are provided below. Lead Agency California Public Utilities Commission, Energy Division Personnel Role Billie Blanchard Project Manager Greg Heiden Attorney

Project Management and Document Production Ecology and Environment, Inc.—Prime Contractor Personnel Role Silvia Yánez Project Manager, Noise Kristi Black Deputy Project Manager, Project Description, Cultural Resources, Mandatory

Findings of Significance Rachel James Quality Assurance and Quality Control Meghan Albers Mitigated Negative Declaration, Environmental Determination, Introduction

to Initial Study, Report Preparation Amanda Bocutti Editing Roya Compani-Tabrizi

Land Use and Planning, Utilities and Service Systems, Public Services

Amy Cook Ph.D. Technical Editing Amy DiCarlantonio Transportation and Traffic, Quality Assurance and Quality Control Joe Donaldson Aesthetics, Agriculture and Forest Resources, Quality Assurance and Quality

Control Howard Edwards Hazards and Hazardous Materials, Hydrology and Water Quality Andrés Estrada Geology and Soils, Mineral Resources Pasquale Franzese Air Quality, Greenhouse Gases Paul Jones Geology and Soils, Hazards and Hazardous Materials, Mineral Resources Deb Linton Graphics Jessica Midbust Aesthetics, Agriculture and Forest Resources, Recreation, Mitigation

Monitoring and Reporting Plan Lara Rachowicz Ph.D. Biological Resources, Quality Assurance and Quality Control Carl Sadowski Transportation and Traffic Amber Santilli Document Production and Formatting Jenny Vick Biological Resources

Page 4: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

LIST OF PREPARERS

DRAFT IS/MND A-2 JANUARY 2017

Ecotech Resources, Inc. Personnel Role Jeff Root Population and Housing

The Sanberg Group Personnel Role Judy McKeehan Cultural Resources

ZGlobal, Inc. Personnel Role Brian Rahman, P.E. Project Description and Objectives

Persons and Agencies Contacted The agencies and individuals that were consulted during the preparation of this document are identified below. California Department of Conservation Representative Title Michael Kisko Environmental Scientist, California Department of Conservation, Farmland

Mapping and Monitoring Program California Department of Fish and Wildlife Representative Title Sarah Bahm Environmental Scientist, Pacific Gas and Electric Company Liaison,

California Department of Fish and Wildlife Region 4 City of Fowler Representative Title David Weisser Public Works Director

City of Sanger Representative Title John Mulligan Public Works Director, City of Sanger Public Works Department

Fresno County Representative Title Chris Motta Principal Planner, Development Service Division, Fresno County Department

of Public Works and Planning John Adams Planner, Fresno County Department of Public Works and Planning

Page 5: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Appendix BReferences

Page 6: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

This page intentionally left blank.

Page 7: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-1 JANUARY 2017

Appendix B. References 1 2 Aesthetics 3

FHWA (United States Department of Transportation, Federal Highway Administration). 1988. Visual 4 Impact Assessment for Highway Projects. Washington, D.C. Office of Environmental Policy. 5 Available: www.dot.ca.gov/ser/downloads/visual/FHWAVisualImpactAssmt.pdf. Accessed: 6 February 26, 2016. 7

_______. 2015. Guidelines for the Visual Impact Assessment of Highway Projects. Washington, 8 D.C. Available: http://www.environment.fhwa.dot.gov/guidebook/documents/VIA_Guidelines_f9 or_Highway_Projects.pdf. Accessed: February 26, 2016. 10

Fresno County. 2000. Fresno County General Plan, 2000. As amended through September 2014. 11

_______. 2016. Fresno County Office of Tourism. Fresno County Blossom Trail. 12 Available: http://goblossomtrail.com/. Accessed: May 5, 2016. 13

USFS (U.S. Forest Service). 1991. Land and Resource Management Plan. 14 Available: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5373730.pdf. Accessed: 15 June 14, 2016. 16

Agriculture and Forestry Resources 17

CDC (California Department of Conservation). 2012. Fresno County Williamson Act Status. 18 Available: ftp://ftp.consrv.ca.gov/pub/Dlrp/WA/. Accessed: January 28, 2015. 19

_______. 2014. Fresno County Important Farmland. Available: ftp://ftp.consrv.ca.gov/pub/dlrp/FMMP/. 20 Accessed: December 15, 2016. 21

_______. 2015. Important Farmland Categories. 22 Available: http://www.conservation.ca.gov/dlrp/fmmp/mccu/Pages/map_categories.aspx. Accesse23 d: December 30, 2015. 24

CDFA (California Department of Food and Agriculture). 2013. California Agricultural Statistical Review, 25 2012 – 2013. Sacramento, California. 26 Available: https://www.cdfa.ca.gov/statistics/pdfs/2013/FinalDraft2012-2013.pdf. Accessed: 27 December 29, 2015. 28

CAL FIRE (California Department of Forestry and Fire). 2010. California’s Forest and Rangelands: 2010 29 Assessment. Fire and Resource Assessment Program. 30 Available: http://frap.fire.ca.gov/assessment/2010/document. Accessed: December 29, 2015. 31

Fresno County. 2000. Fresno County General Plan, 2000. As amended through September 2014. 32

Fresno County Farm Bureau. n.d. Fresno County Ag. Available: http://www.fcfb.org/Fresno-Ag/Fresno-33 Ag.php. Accessed: January 25, 2016. 34

Galloway, Devin, David R. Jones, and S.E. Ingebritsen. 1999. Land Subsidence in the United States. 35 United States Geological Survey Circular 1182: 23–36 34. Available: http://pubs.usgs.gov/circ/circ1182/. Accessed: December 29, 2015. 37

Page 8: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-2 JANUARY 2017

Governor’s Office of Planning and Research. 2003. California General Plan Guidelines. Sacramento, 1 California. Available: https://www.opr.ca.gov/docs/General_Plan_Guidelines_2003.pdf. 2 Accessed: February 29, 2016. 3

Kisko, Michael. 2016. Personal Communication. Ecology and Environment, Inc., Lancaster, New York. 4 Telephone and Email Conversation with Michael Kisko, Environmental Scientist, California 5 Department of Conservation, Sacramento, California, on March 7, 2016. 6

NRCS (Natural Resources Conservation Service). 2016. Web Soil Survey. 7 Available: http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx. Accessed: June 24, 8 2016. 9

Air Quality 10

CARB (California Air Resources Board). 2005. Air Quality and Land Use Handbook: A Community 11 Health Perspective. Available: http://www.arb.ca.gov/ch/handbook.pdf. Accessed: July 12, 2016. 12

_______. 2015a. Air Quality Data Statistics. Available: http://www.arb.ca.gov/adam/index.html 13 Accessed: January 26, 2016. 14

_______. 2015b. Ambient Air Quality Standards. Last edited 10/1/2015. 15 Available: http://www.arb.ca.gov/research/aaqs/aaqs2.pdf. Accessed: January 26, 2016. 16

Colucci, J. and Barnes, G. 1970. Abstract: Evaluation of Vehicle Exhaust Gas Odor Intensity Using 17 Natural Dilution. SAE Technical Paper 700105. February 1, 1970. 18 Available: http://papers.sae.org/700105. Accessed: March 27, 2014. 19

OEHHA (Office of Environmental Health Hazard Assessment). 2015a. Air Toxics Hot Spots Program - 20 Guidance Manual for Preparation of Health Risk Assessments, Risk Assessment Guidelines. 21 Available: http://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf. Accessed: June 22 1, 2016. 23

_______. 2015b. Air Toxics Hot Spots Program - Guidance Manual for Preparation of Health Risk 24 Assessments, Appendices A-F. 25 Available: http://oehha.ca.gov/media/downloads/crnr/2015gmappendicesaf.pdf. Accessed: June 26 1, 2016. 27

SCAQMD (South Coast Air Quality Management District). 2006. PM 2.5 Working Group Meeting #2 - 28 July 11, 2006, Available: http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-29 significance-thresholds/particulate-matter-(pm)-2.5-significance-thresholds-and-calculation-30 methodology/pm2-5-working-group-meeting-2-construction-mitigation-measures.doc. Accessed: 31 May 17, 2016. 32

SJVAPCD (San Joaquin Valley Air Pollution Control District). 2002. Guide for Assessing and Mitigating 33 Air Quality Impacts: Technical Document – Information for Preparing Air Quality Sections in 34 EIRs. 35 Available: http://valleyair.org/transportation/CEQA%20Rules/GAMAQI%20Tech%20Doc%20Ja36 n%202002%20Rev.pdf. Accessed: June 1, 2016. 37

_______. 2015a. Final Guidance for Assessing and Mitigating Air Quality Impacts - 2015. 38 Available: http://www.valleyair.org/transportation/GAMAQI_3-19-15.pdf. Accessed: January 39 26, 2016. 40

Page 9: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-3 JANUARY 2017

_______. 2015b. Ambient Air Quality Standards & Valley Attainment Status. 1 Available: http://www.valleyair.org/aqinfo/attainment.htm. Accessed January 26, 2016. 2

_______. 2015c. Air Monitoring Sites in Operation. 3 Available: http://valleyair.org/aqinfo/MonitoringSites.htm. Accessed: January 26, 2016. 4

_______. Undated. San Joaquin Valley Air Pollution Control District. Air Quality Thresholds of 5 Significance – Toxic Air Contaminants. http://www.valleyair.org/transportation/0714-GAMAQI-6 TACs-Thresholds-of-Significance.pdf. Accessed: January 26, 2016. 7

Biological Resources 8

APLIC (Avian Power Line Interaction Committee). 2006. Suggested Practices for Avian Protection on 9 Power Lines: The State of the Art in 2006. Edison Electric Institute, APLIC, and the California 10 Energy Commission. Washington, D.C. and Sacramento, California. 11

_______. 2012. Reducing Avian Collisions with Power Lines: the State of the Art in 2012. October. 12

Bahm, Sarah. 2016. Personal Communication with Lara Rachowicz, Biologist, Ecology and Environment, 13 Inc. March 30, 2016. 14

Bunkley, Jessie Patrice and Jesse Rex Barber. 2015. Noise Reduces Foraging Efficiency in Pallid Bats 15 (Antrozous pallidus). Ethology 121 (2015) 1116-1121. 16

CDFW (California Department of Fish and Wildlife). 2000a. Recommended Timing and Methodology 17 for Swainson’s Hawk Nesting Surveys in California’s Central Valley. Swainson’s Hawk 18 Technical Advisory Committee. May 31, 2000. 19

_______. 2000b. California Wildlife Habitat Relationship System for Kit Fox. California Interagency 20 Wildlife Task Group. May 2000. 21

_______. 2005. California Wildlife Habitat Relationships System for White-Tailed Kite. California 22 Interagency Wildlife Task Group. February 2005. 23

_______. 2009. Protocols for Surveying and Evaluating Impacts to Special Status Native Plant 24 Populations and Natural Communities. California Natural Resource Agency. November 24, 2009. 25

_______. 2010. Vegetation Classification and Mapping Program: List of Vegetation Alliances and 26 Associations. Available: http://www.dfg.ca.gov/biogeodata/vegcamp/. Accessed: December 29, 27 2015. 28

_______. 2012. Staff Report on Burrowing Owl Mitigation. State of Caifornia Natural Resource Agency 29 Department of Fish and Game. March 7, 2012. 30

_______. 2015a. RareFind 5-California Natural Diversity Database (CNDDB). 31 Available: http://www.dfg.ca.gov/biogeodata/cnddb/mapsanddata.asp. Accessed: December 23, 32 2015. 33

_______. 2015b. Threatened and Endangered Species Lists and Accounts. 34 Available: http://www.dfg.ca.gov/wildlife/nongame/t_e_spp/. Accessed: December 30, 2015. 35

Page 10: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-4 JANUARY 2017

_______. Undated a. California Wildlife Habitat Relationship System for Pallid Bat. California 1 Interagency Wildlife Task Group. 2 Available: https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=2349. 3

_______. Undated b. California Wildlife Habitat Relationship System for Western Red Bat. California 4 Interagency Wildlife Task Group. 5 Available: https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=2339. 6

CNPS (California Native Plant Society). 2015. Rare and Endangered Plant Inventory, Version 8. 7 Available: http://www.rareplants.cnps.org/result.html?adv=t&quad=36119F5:9. Accessed: 8 December 23, 2015. 9

_______. 2016. A Manual of California Vegetation, Online Edition. Sacramento, CA. Available: 10 http://www.cnps.org/cnps/vegetation/. Accessed: May 10, 2016. 11

eBird. 2016. eBird: An Online Database of Bird Distribution and Abundance. 12 Available: http://ebird.org/content/ebird/. Accessed: December 29, 2015. 13

Fresno County. 2000. Fresno County General Plan Open Space and Conservation Element. As amended 14 through September 2014. 15

Google Earth. 2016. Version 6.2.1.6014. Accessed: May 10, 2016. 16

Jepson Flora Project. 2016. Jepson eFlora. Available: http://ucjeps.berkeley.edu/eflora/. Accessed: May 17 10, 2016 18

Jones & Stokes. 2006. Pacific Gas & Electric Company San Joaquin Valley Operations and Maintenance 19 Habitat Conservation Plan (includes updated Chapter 4 and Tables 5-3, 5-4 and 5-5, December 20 2007). December (J&S 02-067). Sacramento, California. 21

NRCS (Natural Resources Conservation Service). 2015. United States Department of Agriculture. U.S. 22 General Soil Map. Available: http://sdmdataaccess.nrcs.usda.gov/. Accessed: December 30, 2015. 23

NSR (North State Resources, Inc.). 2015. Sanger Substation Expansion Project Biological Resources 24 Technical Report. Prepared for Cardno on behalf of Pacific Gas and Electric Company. 25 Unpublished technical report. June 2015. 26

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 27 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 28

Shuford, W.D., and Gardali, T., editors. 2008. California Bird Species of Special Concern: A ranked 29 assessment of species, subspecies, and distinct populations of birds of immediate conservation 30 concern in California. Studies of Western Birds 1. Western Field Ornithologists, Camarillo, 31 California, and California Department of Fish and Game, Sacramento, California. 32

USFS (U.S. Forest Service). 1991. Land and Resource Management Plan. 33 Available: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5373730.pdf. Accessed: 34 June 14, 2016. 35

USFWS (U.S. Fish and Wildlife Service). 2011. Standardized Recommendations for Protection of the 36 Endangered San Joaquin Kit Fox Prior to or During Ground Disturbance. Sacramento Fish and 37 Wildlife Office. January 2011. 38

Page 11: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-5 JANUARY 2017

_______. 2015a. Endangered Species Database. Available: http://www.fws.gov/endangered/. Accessed: 1 December 21, 2015. 2

_______. 2015b. Information for Planning and Conservation (IPaC) Trust Resource Report. 3 Available: http://ecos.fws.gov/ipac/project/LUTNH-SVRHF-CD3FK-KMMJS-A5GOF4. 4 Accessed: December 30, 2015. 5

Vick, Jenny. 2016. Sanger Substation Expansion Project Initial Site Visit. Memo to Billie Blanchard. 6 Ecology and Environment, Inc. San Francisco, CA. February 18, 2016. 7

Cultural Resources 8

Clifford, Heather L. and Jessica L. DeBusk. 2015. Paleontological Inventory and Evaluation for the 9 Sanger Substation Expansion Project, Fresno County, California. 10

Fresno County. 2000. Fresno County General Plan, 2000. As amended through September 2014. 11

Morlet, Aubrie, Andrew P. Monastero, Mary Clark Baloian, and Josh Smallwood. 2012. Cultural 12 Resources Studies for Sanger Substation Expansion Project, Fresno County, California. July. 13

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 14 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 15

USFS (U.S. Forest Service). 2014. Decision Memo: Pacific Gas & Electric Company Fence Meadow 16 Communications Site 17 Upgrades. http://a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai.com/115518 8/www/nepa/98216_FSPLT3_2346986.pdf. August 29, 2014. 19

Geology and Soils 20

Bryant, W.A. 2009. Surface Fault Displacement Hazard Workshop. University of California Berkeley. 21 Available: http://peer.berkeley.edu/events/2009/sfdc_workshop/Bryant_AP_PEER-2.pdf. 22 Accessed: December 28, 2015. 23

CGS (California Geological Survey). 2008. Ground Motion Interpolator. State of California Department 24 of Conservation. Available: http://www.quake.ca.gov/gmaps/PSHA/psha_interpolator.html. 25 Accessed: December 21, 2015. 26

_______. 2015. CGS Information Warehouse: Regulatory Maps. State of California Department of 27 Conservation. 28 Available: http://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=regulator29 ymaps. Accessed: April 27, 2016. 30

Fresno County. 2000a. Fresno County General Plan, 2000. As amended through September 2014. 31

_______. 2000b. Fresno County General Plan Background Report. Adopted October 3, 2000. 32

Galloway, D. and F. S. Riley. 1999. San Joaquin Valley, California. Land subsidence in the United States: 33 United States Geological Survey Circular, 1182: 23-34. 34 Available: http://pubs.usgs.gov/circ/circ1182/pdf/06SanJoaquinValley.pdf. Accessed: December 35 28, 2015. 36

Page 12: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-6 JANUARY 2017

Hart, E.W. 1984. Fault Evaluation Report FER-160: Nunez Fault, Fresno County, California. California 1 Division of Mines and Geology. 2 Available: ftp://ftp.consrv.ca.gov/pub/dmg/pubs/fer/160/032384.pdf. Accessed: December 28, 3 2015. 4

Kleinfelder. 2015. Geotechnical Investigation Report: PG&E Sanger Substation Improvements East 5 Jensen Avenue and McCall Avenue Sanger, California. Sacramento, California. 6

NRCS (Natural Resources Conservation Service). 2013. “Web Soil Survey.” 7 Available: http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm. Accessed: December 23, 8 2015. 9

Smith T. 1983. Fault Evaluation Report FER-144: Pond Fault, Northern Kern County. California 10 Division of Mines and Geology. Unpublished. 11

Stover, C. W. and J.L. Coffman. 1993. “Seismicity of the United States, 1568-1989 (Revised).” United 12 States Geological Survey Professional Paper 1527: 171-172 Washington, D.C: United States 13 Government Printing Office. 14

USGS (United States Geological Survey). 2012. “7.5 Minute Quadrangle Topographic Map.” Sanger 15 Quadrangle, 1:24,000. 16

_______. 2016. Earthquake Hazards 101 – the Basics. 17 Available: http://earthquake.usgs.gov/hazards/about/basics.php#why. Accessed: April 27, 2016. 18

Greenhouse Gases 19

CARB (California Air Resources Board). 2014. First Update to the Climate Change Scoping Plan: 20 Building on the Framework: Pursuant to AB 32, he California Global Warming Solutions Act of 21 2006. May 2014. 22

_______. 2015a. California Greenhouse Gas Emission Inventory - 2015 Edition. 23 Available: http://www.arb.ca.gov/cc/inventory/data/data.htm. Accessed: January 18, 2016. 24

_______. 2015b. Greenhouse Gas Inventory – 2020 Emissions Forecast. Last revised May 6, 2015. 25 Accessed June 2, 2016. 26

EPA (US Environmental Protection Agency). 2015. State CO2 Emissions from Fossil Fuel Combustion, 27 1990-2013. Available: https://www.epa.gov/sites/production/files/2016-28 03/documents/co2ffc_2013.pdf. Accessed: May 16, 2016. 29

IPCC (International Panel on Climate Change). 2012. Errata to the Working Group I contribution to the 30 IPCC fourth Assessment Report. Last Updated June 15, 2012. 31

SCAQMD (South Coast Air Quality Management District) 2008. Board Meeting Agenda Item No. 31, 32 Interim CEQA GHG Significance Threshold for Stationary Sources, Rules, and Plans. December 33 5, 2008. Available: http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-34 (ghg)-ceqa-significance-thresholds/ghgboardsynopsis.pdf?sfvrsn=2. Accessed: January 18, 2016. 35

SJVAPCD (San Joaquin Valley Air Pollution Control District). 2008. Climate Change Action Plan. 36 Adopted August 2008. Available: http://www.valleyair.org/Programs/CCAP/CCAP_menu.htm. 37 Accessed: January 18, 2016. 38

Page 13: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-7 JANUARY 2017

_______. 2009a. Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New 1 Projects under CEQA. December 2009. 2

_______. 2009b. District Policy: Addressing GHG Emission Impacts for Stationary Source Projects 3 Under CEQA When Serving as the Lead Agency. December 2009. 4

_______. 2015. Guidance for Assessing and Mitigating Air Quality Impacts. March 19, 2015. 5 Available: http://www.valleyair.org/transportation/GAMAQI_3-19-15.pdf. Accessed: July 12, 6 2016. 7

WRI (World Resources Institute). 2015. Climate Analysis Indicator Tools (CAIT). 8 Available: http://cait.wri.org/. Accessed: January 18, 2016. 9

Hazards and Hazardous Materials 10

CAL FIRE (California Department of Fire and Forestry Protection). 2007. “Draft Fire Hazard Severity 11 Zones in Local Responsibility Area, Fresno County.” California Department of Forestry and Fire 12 Protection, 1:250,000. Available: http://www.fire.ca.gov/fire_prevention/fhsz_maps_fresno. 13 Accessed: December 16, 2015. _______. 2012a. “State Responsibility Areas for Fire Protection, 14 Fresno County.” California Department of Forestry and Fire Protection, 1:250,000. 15 Available: http://www.fire.ca.gov/fire_prevention/fhsz_maps_fresno. Accessed: December 16, 16 2015. 17

_______. 2012b. FRAP mapping datasets. California Department of Forestry and Fire Protection, 18 1:250,000. Available: http://frap.cdf.ca.gov/data/frapgisdata-subset. Accessed: June 14, 2016. 19

DTSC (California Department of Toxic Substances Control). 2015. “Envirostor Database.” 20 Available: http://www.envirostor.dtsc.ca.gov/public. Accessed: December 16, 2015. 21

DigAlert (Underground Service Alert of Southern California). 2014. FAQs. 22 Available: http://www.digalert.org/faq.html. Accessed June 17, 2014. 23

EDR (Environmental Data Resources, Inc.). 2012. The EDR Radius Map Report with Geocheck, North 24 McCall Avenue/Jensen Avenue, Sanger, CA. Environmental Data Resources, Inc. Milford, 25 Connecticut. Report No.3290411.2s. 26

Fresno County. 2009. Fresno County Multi-Hazard Mitigation Plan. January. 27

FCOE (Fresno County Office of Education). 2016. Fresno County Public School Map. 28 Available: http://ww2.fcoe.org/maps/. Accessed: April 28, 2016. 29

PG&E (Pacific Gas and Electric Company). 2015. California Environmental Reporting System Submittal 30 Summary for PG&E Sanger Substation (CERS ID: 10128688). 31

SWRCB (State Water Resources Control Board). 2015. GeoTracker. Available: 32 http://geotracker.waterboards.ca.gov/. Accessed: December 16, 2015. 33

USFS (U.S. Forest Service). 1991. Land and Resource Management Plan. 34 Available: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5373730.pdf. Accessed: 35 June 14, 2016.Hydrology and Water Quality 36

FEMA (Federal Emergency Management Agency). 2015. Flood Insurance Rate Map (FIRM) Panel 37 06019C2155H. 38

Page 14: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-8 JANUARY 2017

Available: http://fema.maps.arcgis.com/home/webmap/viewer.html?webmap=cbe088e7c87044641 aa0fc34eb99e7f30. Accessed: January 6, 2016. 2

Fresno County. 2000. Fresno County General Plan Background Report. Adopted October 3, 2000. 3

Fresno Irrigation District. 2014. Fresno Area Regional Groundwater Management Plan 2014 Annual 4 Report. Available: http://www.fresnoirrigation.com/index.php?c=42. Accessed: January 4, 2016. 5

_______. 2015. Fresno Area Regional Groundwater Management Plan 2015 Depth to Groundwater 6 Report. Available: http://www.fresnoirrigation.com/index.php?c=42. Accessed: January 4, 2016. 7

Google Earth, Inc. 2016. Elevation data. Accessed: January 4, 2016. 8

King Basin Water Authority. 2012. Kings Basin Integrated Regional Water Management Plan, Adopted 9 October 17, 2012. 10 Available: https://www.ci.sanger.ca.us/Public%20works/Documents/Water/ATT%20IRWMP%211 0Oct%202012.pdf. Accessed: April 29, 2016. 12

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 13 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 14

USGS (U.S. Geological Survey). 2012. U.S. Topo Quadrangles: Sanger, California. 15

USGS (U.S. Geological Survey) and SWRCB (California State Water Resources Control Board). 2012. 16 Groundwater Quality in the Southeast San Joaquin Valley, California. 17 Available: http://pubs.usgs.gov/fs/2011/3151/. Accessed: February 5, 2015. 18

Weisser, David. 2016. Public Works Director for City of Fowler, California. Personal communication 19 with Roya Compani-Tabrizi, Environmental Planner for Ecology and Environment, Inc. January 20 14, 2016. 21

Land Use and Planning 22

CPUC (California Public Utilities Commission). 1995. CPUC General Order Number 131-D. Effective 23 September 1995. Available: http://docs.cpuc.ca.gov/PUBLISHED/Graphics/589.PDF. Accessed: 24 December 16, 2015. 25

Fresno County. 2000. Fresno County General Plan, 2000. Agriculture and Land Use Element. As 26 amended through September 2014. 27

Jones & Stokes. 2006. Pacific Gas & Electric Company San Joaquin Valley Operations and Maintenance 28 Habitat Conservation Plan. Sacramento, California. 29

Mandatory Findings of Significance 30

Amick, Hal and Michael Gendreau. 2000. Construction Vibrations and Their Impact on Vibration-31 Sensitive Facilities. 32 Available: http://www.colingordon.com/upload/document/32c91f6970ad9129b256ebf026d08cd4.33 pdf. Accessed: February 22, 2016. 34

Caltrans (California Department of Transportation). 2016. Long-Term Socio-Economic Forecasts by 35 County. Available: http://www.dot.ca.gov/hq/tpp/offices/eab/socio_economic.html. Accessed: 36 May 4, 2016. 37

Page 15: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-9 JANUARY 2017

CARB (California Air Resources Board). 2005. Air quality and land use handbook: A community health 1 perspective. April. 2

_______. 2014. First Update to the Climate Change Scoping Plan: Building on the Framework: Pursuant 3 to AB 32, the California Global Warming Solutions Act of 2006. May 2014. 4

CDC (California Department of Conservation). 2014. Farmland Mapping and Monitoring Program GIS 5 Data. Available: ftp://ftp.consrv.ca.gov/pub/dlrp/FMMP/2014/. Accessed: December 30, 2015. 6

City of Sanger. 2016a. Welcome to Water Division. Available: http://www.ci.sanger.ca.us/water.asp. 7 Accessed: January 12, 2016. 8

_______. 2016b. Agreement for Development, Tract No. 5383, Royal Woods Subdivision – Phase 3. 9

Colucci, J. and Barnes, G. 1970. Abstract: Evaluation of Vehicle Exhaust Gas Odor Intensity Using 10 Natural Dilution. SAE Technical Paper 700105. February 1, 1970. 11 Available: http://papers.sae.org/700105. Accessed: March 27, 2014. 12

Fresno County. 2000. Draft Environmental Impact Report for County General Plan. February. 13

_______. 2014a. Inter Office Memo: Initial Study Application No. 6484 and Classified Conditional Use 14 Permit Application No. 3349. April 29, 15 2014. http://www2.co.fresno.ca.us/0110a/Questys_Agenda/MG210929/AS210952/AS210954/AI16 211005/DO211022/DO_211022.PDF. 17

_______. 2014b. Inter Office Memo: Initial Study Application No. 6736, General Plan Amendment 18 Application No. 537 and Amendment Application No. 3799 (Applicant: John Arabian). 19 September 20 30. http://www2.co.fresno.ca.us/0110a/questys_Agenda/MG214442/AS214465/AS214467/AI21421 588/DO214589/DO_214589.pdf. 22

_______. 2014c. 2014 General Plan Annual Progress Report. March. 23

Fresno County Farm Bureau. N.d. Fresno County Ag. Available: http://www.fcfb.org/Fresno-Ag/Fresno-24 Ag.php. Accessed: January 7, 2016. 25

Google Earth. 2015. Aerial Imagery, March 18. Street view, August. Accessed: March 18, 2016. 26

Motta, Chris. 2015. Personal Communication with Kristi Black, Planner, Ecology & Environment. 27 December 21, 2015. 28

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 29 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 30

SJVAPCD (San Joaquin Valley Air Pollution Control District). 2015. Guidance for Assessing and 31 Mitigating Air Quality Impacts. March 19. 32

Sheppard, Dick. 2015. Lennar rescues troubled Royal Woods subdivision. Sanger Herald. Published 33 October 22, 2015. Available: 34 http://thesangerherald.com/articles/2015/10/22/news/doc5628ec1ba51cc758307490.txt. 35 Accessed: December 16, 2015. 36

Page 16: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-10 JANUARY 2017

Weisser, David. 2016. April 27, 2016. Personal Communication. Ecology and Environment, Inc., 1 Lancaster, New York. E-mail exchange with David Weisser, Public Works Director for the City 2 of Fowler, City of Fowler, California. 3

Mineral Resources 4

Fresno County. 2000a. Fresno County General Plan Background Report. Adopted October 3, 2000. 5

_______. 2000b. Fresno County General Plan. As amended through September 2014. 6

Young, L.G. 1998. Generalized Mineral Land Classification of Aggregate Resources In The Fresno P-C 7 Region. Updated from Cole and Fuller (1988). California Department of Conservation, Division 8 of Mines and Geology. 9

Noise 10

California Board of Forestry and Fire Protection. 2016. Vegetation Treatment Program Environmental 11 Impact Report, Chapter 4. 12 Available: http://bofdata.fire.ca.gov/board_committees/resource_protection_committee/current_13 projects/vegetation_treatment_program_environmental_impact_report_(vtpeir)/preliminary_draft14 _vtp_eir_jan_2016/new_chapter_4_affected_environment_mitigations_and_effects.pdf. 15 Accessed: June 15, 2016. 16

Caltrans (California Department of Transportation). 1987. California Vehicle Noise Emission Levels 17 (Final Report). Division of Construction, Office of Transportation Laboratory. January. 18 Available: http://www.dot.ca.gov/hq/env/noise/pub/CA%20Vehicle%20Noise%20Emission%2019 Levels.pdf. Accessed: July 12, 2016. 20

_______. 2013. Transportation and Construction-Induced Vibration Guidance Manual. September. 21

FHWA (Federal Highway Administration). 2006. U.S. Department of Transportation. FHWA Roadway 22 Construction Noise Model User’s Guide. Final Report. Washington, D.C. January. 23

Fresno County. 2000a. Fresno County General Plan Background Report. Adopted October 3, 2000. 24

_______. 2000b. Fresno County General Plan, 2000. As amended through September 2014. 25

FTA (Federal Transit Administration). 2006. Transit Noise and Vibration Impact Assessment. 26 Washington, DC. 27

Municipal Code Corporation. 2016. Chapter 8.40 – Noise Control. Available: 28 https://www2.municode.com/library/ca/fresno_county/codes/code_of_ordinances?nodeId=TIT8H29 ESA_CH8.40NOCO. Accessed: February 23, 2016. 30

NEMA (National Electrical Manufacturers Association). 2014. NEMA TR1-2013. Transformers, Step 31 Voltage Regulators and Reactors. Rosslyn, Virginia. 32

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 33 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 34

EPA (U.S. Environmental Protection Agency). 1978. Protective Noise Levels. Condensed Version of 35 EPA Levels Document. EPA 500/9-79-100. November. 36

Page 17: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-11 JANUARY 2017

USFS (U.S. Forest Service). 2010. Travel Management Final Environmental Impact Statement, Chapter 1 3.3 Recreation Resources. 2 Available: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5326027.pdf. Accessed: 3 June 14, 2016. 4

Recreation 5

City of Sanger. 2003. City of Sanger 2025 General Plan adopted November 6, 2003. 6

Fresno County. 2000. Fresno County General Plan. As amended through September 2014. 7

U.S. Census Bureau. 2014a. Quick Facts from the US Census Bureau: City of Fresno. 8 Available: http://www.census.gov/quickfacts/table/PST045215/0627000,00. Accessed: January 9 2016. 10

_______. 2014b. Quick Facts from the US Census Bureau: City of Sanger. 11 Available: https://www.census.gov/quickfacts/table/PST045215/0667056,00. Accessed: January 12 2016. 13

Population and Housing 14

Caltrans (California Department of Transportation). 2016. Long-Term Socio-Economic Forecasts by 15 County. Available: http://www.dot.ca.gov/hq/tpp/offices/eab/socio_economic.html. Accessed: 16 May 4, 2016. 17

Fresno County. 2015. County of Fresno 2008-2015 Housing Element. Adopted December 8, 2015. 18

_______. 2016. Fresno Multi-Jurisdictional 2015-2023 Housing Element. Final Draft February 2016. 19

U.S. Census Bureau. 2016a. U.S. Census Bureau. Population Estimates. City and Town Totals, Vintage 20 2014. Available: http://www.census.gov/popest/data/cities/totals/2014/index.html. Accessed: 21 May 4, 2016. 22

_______. 2016b. U.S. Census Bureau. Population Estimates. County Totals, Vintage 2015. Available: 23 http://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml. Accessed: May 4, 2016. 24

Project Description 25

California Joint Utility Traffic Control Committee. 1999. Work Area Protection and Traffic Control 26 Manual. August. 27

Kleinfelder. 2015. Geotechnical Investigation Report: PG&E Sanger Substation Improvements East 28 Jensen Avenue and McCall Avenue Sanger, California. Sacramento, California. 29

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 30 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 31

SJVAPCD (San Joaquin Valley Air Pollution Control District). 2015. Final Guidance for Assessing and 32 Mitigating Air Quality Impacts - 2015. 33 Available: http://www.valleyair.org/transportation/GAMAQI_3-19-15.pdf. Accessed: January 26, 34 2016. 35

Page 18: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-12 JANUARY 2017

Public Services 1

FCFPD (Fresno County Fire Protection District). 2015. Fresno County Fire Protection District. 2 Available: http://fresnocountyfire.org/index.php?c=2. Accessed: December 30, 2015. 3

Fresno County Sheriff’s Office. 2016. Area 3. Available: 4 http://www.fresnosheriff.org/units/enforcement/patrol-areas/area-3.html. Accessed: June 9, 2016. 5

Sanger Unified School District. 2015. Sanger Unified School District. 6 Available: http://www.sanger.k12.ca.us/. Accessed: December 30, 2015. 7

USFS (United States Forest Service). Not dated. 8 Available: http://www.fs.usda.gov/detail/sierra/landmanagement/?cid=stelprdb5442506. 9 Accessed: June 14, 2016. 10

Transportation and Traffic 11

California Joint Utility Traffic Control Committee. 1999. Work Area Protection and Traffic Control 12 Manual. August. 13

Caltrans (California Department of Transportation). 2002. Guide for the Preparation of Traffic Impact 14 Studies. December. 15 Available: http://www.dot.ca.gov/hq/tpp/offices/ocp/igr_ceqa_files/tisguide.pdf. Accessed: April 16 21, 2016. 17

_______. 2014a. 2014 Traffic Volumes on California State Highways. Available: http://traffic-18 counts.dot.ca.gov/. Accessed: February 2, 2016. 19

_______. 2014b. California County-Level Economic Forecast 2013-2040. 20 Available: http://www.dot.ca.gov/hq/tpp/offices/eab/socio_economic_files/2013/Revised_Full_R21 eport.pdf. Accessed: April 19, 2016. 22

_______. 2016a. Encroachment Permit Permits. 23 Available: http://www.dot.ca.gov/hq/traffops/developserv/permits/. Accessed: February 3, 2016. 24

_______. 2016b. Transportation Permits. Available: http://www.dot.ca.gov/hq/traffops/permits. 25 Accessed: February 3, 2016. 26

CFCG (Council of Fresno County Governments). 2009. Fresno County Congestion Management Process. 27 Available: http://www.fresnocog.org/congestion-management. Accessed: October 29, 2015. 28

Fresno County. 2000. Fresno County General Plan, 2000. As amended through September 2014. 29

_______. 2013. Fresno County Regional Bicycle and Recreational Trail Master Plan. 30 Available: http://www.co.fresno.ca.us/DepartmentPage.aspx?id=37187. Accessed: February 3, 31 2016. 32

_______. 2014. Guidelines for the Preparation of Traffic Impact Studies within the County of Fresno. 33 County of Fresno Department of Public Works and Planning. February 2014. 34

Fresno County Rural Transit Agency. Not dated. Orange Cove Service Map. 35 Available: http://www.ruraltransit.org/. Accessed: February 3, 2016. 36

Page 19: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-13 JANUARY 2017

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 1 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 2

TRB (Transportation Research Board of the National Academies). 2010. Highway Capacity Manual 3 2010. Washington D.C. 4

U.S. Government Publishing Office. 2016. Electronic Code of Federal Regulations. Title 14 Aeronautics 5 and Space. 6

Utilities and Service Systems 7

CalRecycle (California Department of Resources Recycling and Recovery). 2006. Countywide, 8 Regionwide, and Statewide Jurisdiction Diversion/Disposal Progress Report. 9 Available: http://www.calrecycle.ca.gov/LGCentral/Reports/jurisdiction/diversiondisposal.aspx. 10 Accessed: January 13, 2016. 11

_______. 2012. Jurisdiction Diversion/Disposal Rate Summary. 12 Available: http://www.calrecycle.ca.gov/LGCentral/Datatools/Reports/DivDispRtSum.htm. 13 Accessed: January 27, 2016. 14

_______. 2016a. Facility/Site Summary Details: City of Clovis Landfill. Available: 15 http://www.calrecycle.ca.gov/SWFacilities/Directory/10-AA-0004/Detail/. Accessed: January 6, 16 2016. 17

_______. 2016b. Facility/Site Summary Details: American Avenue Disposal Site (10-AA-0009). 18 Available: http://www.calrecycle.ca.gov/SWFacilities/Directory/10-AA-0009/Detail//. Accessed: 19 January 6, 2016. 20

City of Sanger. 2016a. Welcome to Water Division. Available: http://www.ci.sanger.ca.us/water.asp. 21 Accessed: January 12, 2016. 22

_______. 2016b. Fresno-Clovis Regional Wastewater Reclamation Facility. 23 Available: http://www.fresno.gov/Government/DepartmentDirectory/PublicUtilities/Wastewater/24 Fresno-Clovis+Regional+Wastewater+Reclamation+Facility/RWRFHistory.htm. Accessed: April 25 27, 2016. 26

Fresno County. 2000a. Fresno County General Plan Update Final Environmental Impact Report. 4.8 27 Water Resources. Available: 28 http://www2.co.fresno.ca.us/4510/4360/General_Plan/GP_Final_EIR/EIR/water4-8.pdf. 29 Accessed: January 6, 2016. 30

_______. 2000b. Fresno County General Plan, 2000. As amended through September 2014. 31

_______. 2014. County of Fresno Water Conservation Ordinance. Board of Supervisors of the County of 32 Fresno. Effective October 30, 2014. 33

_______. 2016. Construction and Demolition Debris Recycling Requirements. Available: 34 http://www.co.fresno.ca.us/DepartmentPage.aspx?id=57327. Accessed: January 13, 2016. 35

Mulligan, John. 2016. Personal Communication. Ecology and Environment, Inc., Lancaster, New York. 36 Email Conversation with John Mulligan, Public Works Director for the City of Fowler, City of 37 Sanger, CA. April 28, 2016. 38

Page 20: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

SANGER SUBSTATION EXPANSION PROJECT

REFERENCES

DRAFT IS/MND B-14 JANUARY 2017

PG&E (Pacific Gas and Electric Company). 2015. Proponent’s Environmental Assessment for the Sanger 1 Substation Expansion Project, as supplemented by Deficiency Responses and Data Requests. 2

Provost and Pritchard Engineering Group, Inc. 2010. South and Highland Basin Feasibility Study. 3 Available: http://www.water.ca.gov/irwm/grants/docs/Archives/Prop84/Submitted_Applications/ 4 P84_Round1_Implementation/Upper%20Kings%20Basin%20IRWM%20Authority/Att3_IG1_W5 orkplan_2of5.pdf. Accessed: January 6, 2016. 6

USFS (U.S. Forest Service). 1991. Land and Resource Management Plan. 7 Available: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5373730.pdf. Accessed: 8 June 14, 2016. 9

Waste Management, Inc. 2016. Waste Management Incorporated- Your local waste management 10 facilities. Available: http://www.wm.com/find-a-11 facility.jsp#/?address=fresno%20usa&radius=80500. Accessed: March 30, 2016. 12

Weisser, David. 2016a. Personal Communication. Ecology and Environment, Inc., Lancaster, New York. 13 E-mail exchange with David Weisser, Public Works Director for the City of Fowler, City of 14 Fowler, CA. April 27, 2016 15

_______. 2016b. Personal Communication. Ecology and Environment, Inc., Lancaster, New York. 16 Telephone Conversation with David Weisser, Public Works Director for the City of Fowler, City 17 of Fowler, CA. January 14, 2016. 18

Page 21: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Appendix CAir Quality and Greenhouse Gas Emissions

Calculations

Page 22: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

This page intentionally left blank.

Page 23: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

1.0 Project Characteristics

1.1 Land Usage

Page 1 of 38

Sanger Substation Expansion Project

Fresno County, Annual

Date: 1/4/2016 6:23PM

Land Uses 1 Size . .. . 1 Metric 1 Lot Acreage Floor Surface Area 1 Population

General Light Industry , 0.00 , 1000sqft , 7.00 0.00 , 0 ................................................................................ , ................................................................................... ______________________ : .......................................................... _ ......................... : ...................................... ..

Other Non-Asphalt Surfaces : 0.00 : 1 11.00 1 1 0 ' ' : : :

1.2 Other Project Characteristics

Urbanization

Climate Zone

Utility Company

C02 Intensity (lb/MWhr)

Rural Wind Speed (m/s)

3

Pacific Gas & Electric Company

641.35 CH41ntensity (lb/MWhr)

1.3 User Entered Comments & Non-Default Data

2.2

0.029

Precipitation Freq (Days)

Operational Year

N20 Intensity (lb/MWhr)

45

2019

0.006

A-2

Page 24: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 2 of 38 Date: 1/4/2016 6:23PM

Project Characteristics -

Land Use- Based on PEA, Section 2.0 Project Description, substation expansion will occur on 7 acres and will result in temporary disturbance to 11 acres.

Construction Phase - Based on Construction Equipment and Schedule by Phase table developed by PGE.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table. Puller and tensioner under "Other General Industrial Equipment."

Off-road Equipment - Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Trips and VMT- Trip information taken from Table 3.16-3: Estimated Truck Trips.

Construction Off-road Equipment Mitigation-

Table Name I Column Name I Default Value New Value

tbiConstructionPhase , NumDays ! 300.00 66.00 .............................................................................. , .............................................................................. ~ ······································································

tbiConstructionPhase ! NumDays ! 300.00 261.00 .............................................................................. , .............................................................................. ._ _____________________________ ······································································

tbiConstructionPhase ! NumDays ! 30.00 66.00 .............................................................................. , .............................................................................. J------------ ······································································

tbiConstructionPhase ! NumDays ! 30.00 44.00 .............................................................................. , .............................................................................. J--------·--·-·-----·---·--·-·--·--- ······································································

tbiConstructionPhase ! NumDays ! 20.00 43.00 .............................................................................. , .............................................................................. J----------------- ······································································

tbiConstructionPhase ! NumDays ! 20.00 66.00 .............................................................................. , .............................................................................. * --······································································ tbiConstructionPhase ! NumDays ! 10.00 22.00

.............................................................................. , .............................................................................. ·--·---·------·------·--·-----·---·- ······································································ tbiConstructionPhase ! NumDays ! 10.00 23.00

.............................................................................. ,............................................................................... . .................................................................... . tbiConstructionPhase : PhaseEndDate : 10/31/2018 4/30/2018

' ' .............................................................................. , .............................................................................. ·----------- ······································································ tbiConstructionPhase : PhaseEndDate : 12/3/2018 12/31/2018

' . .............................................................................. , .............................................................................. ·---·-·---·-·-·-·----·-·--·------·---·- ······································································ tbiConstructionPhase : PhaseStartDate : 9/1/2018 3/1/2018

' . .............................................................................. , .............................................................................. ~-------------·---1······································································ tbiConstructionPhase : PhaseStartDate : 9/1/2018 10/1/2018

•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ; •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• f-;' ------------~······································································ tbiConstructionPhase : PhaseStartDate : 6/30/2018 7/1/2018

' ' A-3

Page 25: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 3 of 38 Date: 1/4/2016 6:23PM

tbiGrading AcresOfGrading 99.00 \ 7.00 ' ' : ··············································································•·············································································+····················································································································································

tbiGrading ! AcresOfGrading ! 66.00 4.11

··············································································1··············································································•----------------------------------- ······································································ tbllandUse ! Lo!Acreage ! 0.00 7.00

.............................................................................. , .............................................................................. f.- -- ······································································ tblOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 1.00 0.00

.............................................................................. , .............................................................................. ..__ __________ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 1.00 0.00

··············································································1··············································································•----------------------- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 2.00 0.00

.............................................................................. , .............................................................................. f.- ..................................................................... . tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 3.00 1.00

··············································································l··············································································f------------- ······································································ tbiOffRoadEquipment ! OffRoadEquipmen!Uni!Amount ! 3.00 1.00

········································································-·····1··············································································•-------------------------·------ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 1.00 0.00

··············································································l··············································································f-- ······································································ tblOffRoadEquipment ! OffRoadEquipmen!Uni!Amount ! 1.00 0.00

.............................................................................. , .............................................................................. f.- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 2.00 1.00

.............................................................................. , .............................................................................. .__ ____________________ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 2.00 1.00

··············································································l··············································································f------------- ······································································ tblOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 1.00 0.00

.............................................................................. , .............................................................................. f.- ······································································ tbiOffRoadEquipment ! OffRoadEquipmen!Uni!Amount ! 2.00 1.00

··············································································1··············································································•--------------------------------- ······································································ tbiOffRoadEquipment ! OffRoadEquipmen!Uni!Amount ! 2.00 1.00

··············································································l··············································································f-- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 3.00 1.00

.............................................................................. , .............................................................................. f.- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 3.00 0.00

··············································································1··············································································•--------------------------------- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 4.00 3.00

.............................................................................. , .............................................................................. ..__ __________ ..................................................................... . tbiOffRoadEquipment ! OffRoadEquipmen!Uni!Amount ! 1.00 0.00

··············································································1··············································································•---------------------------- ······································································ tblOffRoadEquipment ! OffRoadEquipmentUni!Amount ! 1.00 0.00

.............................................................................. , .............................................................................. ..__ --······································································ tbiOffRoadEquipment ! UsageHours ! 7.00 8.00

·············································································+·············································································f.- --······································································ tbiProjectCharacteristics ! OperationaiYear ! 2014 2019

··············································································1··············································································•------------------- ······································································ tb!Projec!Characteristics ! Urbanizationlevel ! Urban Rural

.............................................................................. , .............................................................................. ..__ --······································································ tblTripsAndVMT ! HaulingTripNumber ! 0.00 18.00

··············································································l··············································································f------------- ······································································ tbiTripsAndVMT ! HaulingTripNumber ! 0.00 12.00

.............................................................................. , .............................................................................. ._ _____________________________ ······································································ tbiTripsAndVMT ! HaulingTripNumber ! 0.00 8.00

.............................................................................. , .............................................................................. f.- ······································································ tbiTripsAndVMT : HaulingTripNumber : 0.00 4.00

.............................................................................. j ............................................................................. .l ······································································ tbiTripsAndVMT : HaulingTripNumber : 0.00 2.00

' !

A-4

Page 26: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 4 of 38 Date: 1/4/2016 6:23PM

tbiTripsAndVMT HaulingTripNumber 0.00 ; 6.00 ' ' : ··············································································t··············································································~·············································································· · ..................................................................... .

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 2.00

··············································································1··············································································-J--·------·--·-----·--·-·--·--·-·-----·- ······································································ tbiTripsAndVMT ! HaulingTripNumber ! 0.00 224.00

··············································································•··············································································.J------------..................................................................... . tbiTripsAndVMT ! VendorTripNumber ! 0.00 16.00

.............................................................................. ; .............................................................................. ;-. ······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 16.00

··············································································I··············································································.J-···-----·-------------------- ······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 10.00

··············································································•··············································································.J-·-----------······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 8.00

.............................................................................. ; .............................................................................. ;-. --······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 22.00

.............................................................................. ; .............................................................................. .J--·-·--·-----·-·--·------·--·--·-·--·---- ······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 8.00

.............................................................................. ; .............................................................................. .;-. --······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 12.00

.............................................................................. ; .............................................................................. .;-. ..................................................................... . tbiTripsAndVMT ! VendorTripNumber ! 0.00 12.00

··············································································I··············································································.J---·--·----·-------·--·----·---·- ······································································ tbiTripsAndVMT ! WorkerTripNumber ! 20.00 60.00

.............................................................................. , .............................................................................. .;-. --······································································ tbiTripsAndVMT ! WorkerTripNumber ! 0.00 60.00

··············································································•··············································································.J------------..................................................................... . tbiTripsAndVMT ! WorkerTripNumber ! 0.00 60.00

··············································································•··············································································.J--·-·--·---·-----·---·-·-·--·-·-·--·--·- ..................................................................... . tbiTripsAndVMT ! WorkerTripNumber ! 8.00 0.00

··············································································•··············································································.J------------- ······································································ tbiTripsAndVMT ! WorkerTripNumber ! 18.00 0.00

··············································································•··············································································.J------------······································································ tbiTripsAndVMT ! WorkerTripNumber ! 13.00 0.00

··············································································1··············································································-J--·-·-----·--·---·---·--·-·--·--·-·--·---· ..................................................................... . tbiTripsAndVMT : WorkerTripNumber : 10.00 0.00

.............................................................................. ; .............................................................................. : ..................................................................... . tbiTripsAndVMT ! WorkerTripNumber ! 33.00 60.00

2.0 Emissions Summary

A-5

Page 27: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.1 Overall Construction

Unmitigated Construction

ROG NOx

Year

co S02 Fugitive PM10

Exhaust PM10

tons/yr

PM10 Total

Page 5 of 38

Fugitive I Exhaust PM2.5 PM2.5

Date: 1/4/2016 6:23PM

PM2.5 Total BiO:. C02 NBio.. C02 Total C02 CH4 N20 C02e

MT/yr

2011 ii 0.2814 . 2.6243 : 2.2905 . 3.8;g~e-~ o.0941 . o.1450 . 0.2391 . o.0246 . 0.1348 • o.1594 ~ o.oooo . 334.5546,334.55461 0.0110 . o.oooo . 336.0453

ooooooooooooooooooooooooooooooP.•--n•-•••n•-~•unooo••••ouoou~unoU•oonunoo"t--•••-o•n••-•-t•••oonoo••oonU••~••••••••-•-•••••-t••••ouo••••ouo•••~-·••••nn••••••-t••••nouooououo~o•nnooouno••••n•oooooooooooooooooo~ooonnooooouoo•o~u-•••••••n••••o~nooonOOOo•oooO

2018 :l 0.3945 l 3.7817 i 3.2798 i 5.6300e- i 0.1068 i 0.2051 l 0.3119 i 0.0283 i 0.1907 l 0.2190 : 0.0000 i 486.0469 i 486.0469 i 0.1083 l 0.0000 i 488.3222

~~ ~ i ~ 003 ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ l Total 0.6759 6.4061 5.5703 9.4900e- 0.2009 0.3501 0.5510 0.0529 0.3255 0.3784 0.0000 820.6015 820.6015 0.1793 0.0000 824.367 4

003

Mitigated Construction

RQG NOx co S02 Fugitive Exhaust PM10 PM10

Year ·· tons/yr

PM10 Total

Fugitive PM2.5

Exhaust PM2.5 Total Bio.. C02 NBio.. C02 Total C02 PM2.5

MT/yr

CH4 N20 C02e

2017 :1 0.2814 2.6243 2.2905 3.8600e- ~ 0.0941 0.1450 0.2391 0.0246 0.1348 0.1594 : 0.0000 334.55431 334.55431 0.0710 0.0000 336.0450

''''''''''''''''''''''''''''''~"""""""'"-"""'"""~'""'"'n••••••••••~•••••n•••••••••-~•••-•~~=••-•_;•••n••••••nn•••~...,-·•-·-•~•••••n••-•nn••~-••••-·--~••••••n•••••••n•~•••n••••••••••*-•••i••••••••••••••••••~uou•-•••n•••••+••-••••--•••••~•••••••••••••••••• 2018 :i 0.3945 l 3.7817 i 3.2798 i 5.6300e- i 0.1068 i 0.2051 i 0.3119 i 0.0283 i 0.1907 l 0.2190 : 0.0000 i 486.0465 i 486.0465 i 0.1083 l 0.0000 i 488.3217

:~ ~ f i 003 ~ 1 ~ ~ ~ i = ! ~ ~ ~ ~ Total 0.6759 6.4061 5.5703 9.4900e- 0.2009 0.3501 0.5510 0.0529 0.3255 0.3784 0.0000 820.6008 820.6008 0.1793 0.0000 824.3667

003

ROG NOx co 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio·C02 NBio-C02 Total C02 CH4 N20 C02e .·· PM10 PM10 Total PM2.5 PM2.5 Total

Percent 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 Reduction

A-6

Page 28: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.2 Overall Operational

Unmitigated Operational

ROG

Category

Page 6 of 38 Date: 1/4/2016 6:23PM

C02e

Area ;j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ·= • ·= . oooooooooooooooooooooooooooooo;;.•••••••••••-•-••~'"*,.. .. ,,.., .. ,,,..,.,.~, ... ,, .... ,,,,,,.,..,~ .... ,,.,._,,.,,,...,,,~,,,,,,,,,,,,,,. .... u~oo•••••••••• .. ,. .... ~"*''''''""'.,.""*'_.;.._,.,,,,,.,,.,.,.,..,, .. ,,,~,,,,,,,.,.,,. .... ,,,,~,,,,,,,.,,. .... , ...... ,,~,,,,,,,,,,,,,,,,,,~,,,,,,,.,. .. , .. ,,,,,.;,,,,.,.,,.,.,. .. .,,,,.,,,,__;.,,,,,,.,.,., .. , .. ,,,,~,,,,. .. ,,.,. .. ,, .. ,,,,i•••••••ooooooooo•o•

Energy :1 0.0000 l 0.0000 1 0.0000 1 0.0000 l 1 0.0000 l 0.0000 1 1 0.0000 l 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 l 0.0000 i 0.0000

.............................. ~-------·-----4--------------···-l------------··----l-----------4---------·--·--·--l--------------1------·------------~-----------l----------·------.l----·---------------i .................. L ............... J ______________ J __________________ J ________________ .. J .................. . Mobile :1 0.0000 l 0.0000 i 0.0000 1 0.0000 l 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 l 0.0000 i 0.0000

······························~---------------.l---------·--··-····L----·--·---·--·-l--------·----.l. .................. l ... ____________ J ___________________ L-------------l-----·--··-··--..l----------·--·------i .................. L ............... J. _______________ J _________________ J _________________ J .................. . Waste :1 i 1 1 i 1 o.oooo i o.oodb 1 1 o.oooo l o.oooo : o.oooo ; o.oooo 1 o.oooo l o.oooo l o.oooo ; o.oooo

······························~----------------L----·-·----·----l-----·------------l--------------L---------·--·---l----------------L----··----··--·-l-----------------.l .................. l. ................... i .................. L ................ l ........... ------l----·--·--·------.l---·----·-----·--·J .................. . Water :1 l l l l i 0.0000 l 0.0000 l 1 0.0000 l 0.0000 : 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000

=~ ~ ~ ~ j ! ~ ! l ~ : l ~ ~ ~ l Total 0.0000 0.0000 0.0000

A-7

Page 29: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.2 Overall Operational

Mitigated Operational

ROG ~ NOx ~

Category

co I S02 I Fugitive I Exhaust PM10 PM10 PM10 Total

I tons/yr

Page 7 of 38

Fugitive I Exhaust PM2.5 PM2.5

Date: 1/4/2016 6:23PM

PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 I C02e

.· MT/yr

Area ;j 0.0000 0.0000 l, 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 t: •

OOoooooooooooooooooooooooooooo~-•nooo--nuo~ooooooonnooouoo•~•nooo••••oouoooo~•••o•n••-••••-o4ooooooooonoooooooo;,._ .. ,.,_,,,,,_ .. ,.,J,.,.._,.,.,,,,_.._.,_,~---•••••••uoo~•••••non••••••o•~o•oooooononh•••••toooooooooooooooooo~oooonu•ooooooooo~••••••••••-•noo..;ooUOUOoooooo•noJoooooouon•ooooonlooooooooooooooooooo Energy ;! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

.............................. ll.-... ____ J .................. l.. .............. ..l ........ ____ J .................. L .. --------L ................ l,. .. ___ J _________________ J. __________________ J .................. L ................ ! .... _______ J __________________ J. _________________ J .................. . Mobile ;! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

.............................. u ... _________ J _________________ J __________________ J. _______________ J ................... L-----·----1-----------·------·L-----------.l-·--··-----·-----·L-----·-·--·------.i .................. L ................ J. ................ .l ................ ..l ................. .J .................. . Waste :! ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

.............................. f:.--------~---··············-+----·············-+---------------~-----············-+----------~---······-·····--~--------- ! ···-············-~---··········-----·~··················t----.............. ~-------------~---""""'"""""'~""'"""'"""'""""~''''''''''''''''''' Water ,; ; ; : ; : 0.0000 ; 0.0000 ; : 0.0000 : 0.0000 , 0.0000 : 0.0000 : 0.0000 : 0.0000 ; 0.0000 : 0.0000

=~ ~ ! ~ ~ ~ ~ ~ ! i : ~ ~ ~ ~ ~ Total 0.0000 J 0.0000 I 0.0000 J 0.0000 1 0.0000 I 0.0000 0.0000 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000

ROG NOx co S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio-C02 NBio-C02 Total C02 CH4 N20 C02e PM10 PM10 Total PM2.5 PM2.5 Total I

Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction

3.0 Construction Detail

Construction Phase

A-8

Page 30: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

Phase Number

Phase Name Phase Type

Page 8 of 38

Start Date End Date Num Days Num Days Week

Date: 1/4/2016 6:23 PM

Phase Description

!Phase 1-Substation Grading and !Grading ~3/1/2017 1,_5/31/2017 5l. 66l. •Access • ;

···················~································································~···························································' ;,, .................... ~ ...................... j ................................................................. . 2 :Phase2-Substation Foundations :Building Construction !6/1/2017 !8/31/2017 ; 5! 66!

:and Footings ; ! ! i ! i ···················~································································.J ........................................................... ,; ___ ., ___ --F---------+········ .. ····--······+······················.i. ................................................................ . 3 :Phase 3-Substation Equipment :Building Construction i 9/1/2017 i 8/31/2018 ! 5! 261 i ................... J~~~!!:!!!!:!~.i.?.~ ........................................... ..l ........................................................... 1 ~ ! ...................... L ................... .l. ................................................................ . 4 !Phase 4a-Power line re-route: !Paving j3/1/2018 ! 4/30/2018 : 5! 43!

•Install TSP Foundations • i ! ! ! ! ................... .; ................................................................ ~ ...........................................................• ________ _._ _______ ..; ...................... ; ..................... +································································· 5 iPhase4b-Powerlinere-route: !Grading j5/1/2018 !6/29/2018 ! 5j 44!

···················-i-~~~!!:1!!.!~.~---·········································-i····· .. ··· ................................................. ~ 1 i ...................... l-..................... 1 ................................................................. . 6 :Phase4c-Powerlinere-route: :sitePreparation !7/1/2018 !7/31/2018 ! 5! 22!

:string Power line : i i i i i 7···············l~-:~~~:·~~f~:·~~~-~~:t~~i;:···········isii~-p~~;;~~:;ii·~~ .............................. 18/1/2o18 ____ . 8f31/20W---r··············· .. 5]· .................. 23r························-....................................... .

; property : ! l ! ................................................................................................................................................... . ............................................. ~ ................................................................ .. 8 :Phase 5: Equipment Removal and :Paving ! 10/1/2018 !.12/31/2018 ! 5! 66!

:Clean-up : i i i i

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 0

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating- sqft)

OffRoad Equipment

Phase Name 1 Offroad Equipment Type 1 Amount I Usage Hours I Horse Power Load Factor

Phase 1-Substation Grading and Access ;Excavators ! Ol 8.00j 1621 0.38 .......................................................................... ~----------------------1' ............................................. : : ................................... 1 .................................... . Phase 1-Substation Grading and Access ;Graders 1! 8.00! 174 0.41

' ! : Ph:;~·~-1~-s~·t;~i~ii~~ .. G~~d·i·~~-~~·d·A~~~~~-~ other construction Equipment l ........................................... 1T ___ ---s.OoT ........................... 1.71' ............................. o.'42 .......................................................................... ;.----------·------·----·---·t ............................................. : : ....................................................................... . Phase 1-Substation Grading and Access tPiate Compactors i 1 i 8.00! 8 0.43

~~~:~:~:~:~~~:~~~~~~~~::~~~~i:~~:~~:~:~~~~~~:rcll~s------------------·t:::::::::::::::::::::::::::::::::::::::::::~:L-~r::::::::::::::::::::::::::::~~j:::::::::::::::::::::::::::::~~~~ Phase 1-Substation Grading and Access ;Rubber Tired Dozers 1 Oj 8.00! 2551 0.40 oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo••T•••uouooooooooOououuoooooooonouuuoooooooOoOUOOOOOooooooooouo-!-ouooooooooo•ooouooooooooooooouooooooooooo00-------:----•---•--•--•-~ooooooooooooooooooooooooooooooooooooo

Phase 1-Substation Grading and Access :scrapers ! 1! 8.00! 361! 0.48 ' : : : :

A-9

Page 31: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 9 of 38 Date: 1/4/2016 6:23PM

Phase 1-Substation Grading and Access :skid Steer Loaders ; 1l 8.00] 64) 0.37 Ph~·~·~·1~s~·b~i~i~~~··G~~d•i•~;·~~d·;.:;;~~~·j·;:;;;j~~~~L~~d~~~ii3~~kho~~~oooooooooooooooooooojoo••••oooooooooooooo•••••oooooo•••••••••••2!"""""""""ooo•••••••••••••a:oo1"""""""""ooooooooooooooooooo•••97i•••••ooooooooo•ooooooooooooooo:i? Ph~~-~-Z~S~b·~-i~ii~~ .. F~~-~d~ii~~-~··;~d00000000 !Air Compressors r ......................................... 1.r- 8.00 i ............................... 78joo•••ooooooooooooooooooooooooci:48 ~~~!~~~-~ .......................................................... J ..................................................................... L. .......................................... i _____ _J ______________ ~····································· Phase 2-Substation Foundations and !Bore/Drill Rigs ~ 1! s.ooi 2051 0.50 :~:~~~;~-s~b~i~i~~~--F~~·~;;~ii~~~--~~d········h~·;~~~~·········· ... ··········································+·········································at------y:o~----------22J····························a:29 Footings ! i i I J Ph~~-~-2~-s~b"~i~i~~~--F~~·~;;~ii~~~··;~d········rE~~~~~~~~~·················································-r-·········································1·i 8.00! --··-···--··--1621······························a:3ii ~~~!~~~-~ .......................................................... .1 ..................................................................... 1.. .......................................... ~----~ -

::gyr::;:::::;;:::::::: -l;:~~:;;s;;; ····- ······ ····-···-··+--·- ... ·- ·······-····-···--:! :::1----~ ::: ~;l~:ts;~~;;~~:~~;~~;;o :)~~~~~;:':~~::~ ~ = ~t==~===:=~t--~:···:·:::::·: ~37 Phase 2-Substation Foundations and !Tractors/Loaders/Backhoes ~ 1j 8.0oj 971 0.37 :~:~~~;~s~t;~i~i~~~--F~~·~;;~ii~~~--~~;;········lw;i;;~;~······················································i··········································at------a:o~-------·---46~······························a:45 Footings : i ! i .......................................................................... : ........................................................••............ L ..•.........•.......•.•........•........... .I---------1---·-------- ····································· Phase 3-Substation Equipment :Air Compressors i 1 j 8.ooj 781 0.48 Installation ! i i i

oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo .. oo••••oonooooooooooooooooooooooooooooooooooouoououoooooooooo•oooo•foonoooooooooooooooonoooooouooooooooonou > --··--•"•••••••--•••• oooo ooooooooooooooooooooooooooooooooo

Phase 3-Substation Equipment :Cranes i 01 7.00 i 226 0.29 Installation ! i ! l oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo••oooo .. oooooooooooooooooooooooooooooooooooooooooooooooooooooooo••••ooooooooo•!'unoonououo•o•u•ouuooouooouoooooooo~---------r---·----·---- oo•••••oooooo••••ooooooo••••••ooooo••

Phase 3-Substation Equipment :Forklifts l 1 i 8.00j 89 0.20 :~::!~~i~Lb~i~i~~~·•Eq·~~;;~·~~i••••••••••••••••••lG~~~·~~i~;·s~i~••oooooo••••oooooooooooooooooo•••oooooooo+ooooooooooooooooooo•oooooooooooooooooooooQ I 8• 00 I •••-••ooooo••••••••••o•oo84 •••••••••••••••••••••oooooooooo."?4 Installation i i ! I ·Ph·~-~-~-3~s~·t;~i~i~~~·E-q~;;;~~~i··················:-oit;~;·<3~~-~~~i·i~d"~~i;i·~i·Eq·~;;;~·~~i······r-·········································1r-----a:oor---·----·----B?;·····························a·:34

• 0 0 I I :~:!~~i~;~-t;~i~ii~~-·E-q~;;;~·;~i··················i·s·k·i;;··s!;~··c~~;;;;~·-································+·········································1·; 8.oo 1 .............................. 641·····························a·.·3:; Installation i i ; i ·Ph·~~~-3~s~·t;~i~ii~~-·E-q~;;;~~~i··················r;:;~~i~~~~L~~;;~~~is~~kh~~····················r··········································ar-----7.oor--------·--97~·····························a·:3?

:~:;~~~~;~t;~i~i~~~-·Eq·~;;;~~~i··················iw·;i;;~;~·····················································+·········································at-----s.oof-------·---46 ·····························a·:45 Installation i l l I Ph~·~·;·4~~-p~~;·i;~~-;~~~~i~~·i·~~i~ii·:r·srri3~~;;.io~iii.Ri9~···········································r········································11 8. oo ~··········-···-·····--·2a5 ·····························a·.·5a

• : I I

:~~::~~~:~~;·i;~;·;~;~~i;~--~~~i~ii·:r·sri"C";~~~~·······················································+·········································1t------8.o~----------226 ·····························a:29 :.:?.~~~-~~~?.~~ .................................................... L .................................................................... L .......................................... l I ····---···--··-·-·L .................................. .

~;~;;~1;;~~=~-~~~~-~.:~.~-~~~~-~-~-~~~~~-~-~~r~~-~~~~~ ....................................................... ! 0 ~ .......................... ~:~~.~ 8t ........................... ~.--~~ Phase 4a-Power line re-route: Install TSP:Generator Sets i Ol,_ 8.00l,_ 84l 0.74 Foundations : l l

A-10

Page 32: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 10 of 38 Date: 1/4/2016 6:23PM

Phase 4a-Power line re-route: Install TSP:Skid Steer Loaders 1j 8.00j 64j 0.37

:~~:·!~!~:~~-ii~~·~;~-~~i~~--~~~i~ii·:rs·ri·r~~~i~~~"il~~d~;~i·Ei~~kh~~····················l···································-·····a-!"···········-···········a~oat·············-················9:;l'·····························a:37 Foundations : i i 1

t.;~;;~;;~~=~:~i:~~:~:~:~:~~~::~:~~~~~~:~:~~i:~~~~~:~::::::::::::::::::::::::::::::::::::::::::::::::::::::r::::::::::::::::::::::::::::::::::::::::~L-----~~~r=:~~~=:~~----4~r:::::::::::::::::::::::::::~:·:~~ Phase 4b-Power line re-route: Install TSP~Aerial Lifts j 1! 8.00! 621 0.31 ··········································································f-----------------------1·············································: ' .................................. .J .................................... . Phase 4b-Power line re-route: Install TSP~ Graders 1l 8.00! 17 41 0.41

! ; l I Ph~-~-~-4b~P·~~;·ii~~·;;~~~i~~--i~~i~ii.rs.ri Other construction Equipment , ........................................... 1·~--3.0o1·····························1·71T···························a·:42

·Ph~~-~-4t;~r·~~~-ii~~·;;~~~i~:··i~~i~ii.rsrtP";~~-----·---------------t· ........................................ a.l 8.oo! ............................. 1.25j ............................. a·:42 .......................................................................... ~ ._t ............................................. L---~···································j····································· Phase 4b-Power line re-route: Install TSP; Paving Equipment ; 0 i 8.00! 130 0.36 .......................................................................... l---------·----------------1 ............................................. ! ; ................................... j .................................... . Phase 4b-Power line re-route: Install TSPiPiate Compactors j 1! 8.00! 81 0.43

~~~=~~::~~~';~~:~:~~c----1 ::::: .. :~~: = ~~ - ::::f:::::::::::::::::::::::::~~~1j·:::·· ... : ............ ::::: .. ~~~ • I ' : .......................................................................... .:..----------------------·---·+···································· .. ·······= : ................................... ·····································

i~~~;§::~~~~~::]~~ :~: ::::::~1 ::l=iJ:::··:·::::::·· ~~; Phase 4c-Power line re-route: String :Air Compressors i oj 6.00! 7~1 0.48 Power line ! i ! !

;~:::~::~~;~~:~~:~: ~~~~~::.~:: ::~·:: ::r~:~::~~~~=::J---:r-~: ~:: Power line ! i I ! I .................................................................................................................................................. a. ............................................... +---------+---·----------1····································· Phase 4c-Power line re-route: String !Other General Industrial Equipment ! 21 8.00! 871 0.34

!:.~~~-l_i_':l_~ ....................................................... t ..................................................................... ~ ............................................ t--------~---·-----·-----·j····································· ;,~~r.;_;;;;_~;;~~;~~~;,-~;~~--~~.:~~~---··i.~~:~ .. ~~-~-~-~-~~~~~-~---····················-············! .......................................... ~! 8.00! -----···-······----------~-~ ····························-~---~~ Phase 4d-Power line re-route: Remove :Tractors/Loaders/Backhoes 1 3; 8.001 97 0.37 pull site and restore property ! i i i ................................................................................................................................................................................................... .,.__-------+--------------;·····································

i:::::~::::=~=:::::l:;:;:'.::::~.... ... ·-·· -····1-······ ... ........ ..; ! :::1-------;,jl·····························::-:: up : ! ! i ....................................................................................................................................................................................................... ---------t--------------· .................................... . Phase 5: Equipment Removal and Clean-!Graders ~ 1! 8.001 1741 0.41

~-~·-··················································"''''''''''''''': ........................................................................ ~ ............................................. : ~ ............. _ ..... _ ....................... ~ .................................... . Phase 5: Equipment Removal and Clean-!Other Construction Equipment ! 1 j 8.00j 1711 0.42

~.P. ..................................................................... i ...................................................................... : : .................................. !-! -------!····································· Phase 5: Equipment Removal and Clean-!Pavers ! 1! 8.00! 125:. up • l : :

0.42

A-11

Page 33: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 11 of 38 Date: 1/4/2016 6:23PM

Phase 5: Equipment Removal and Clean-;Piate Compactors 11 8.001 81 0.43

·~~~·~·s~··Eq.~i·;;~~~·i·R:~~;~~~·~~;;·ci~~~·~1·R:~ii~~~·························································\·-······-···········-···-······-······;l·························a.·aa1··························-···aa11 ······························a·.·3a up : : ! I .................................................................................................................................................. t............................................ 0 ................. - .... _ ............... _.. .. - ... •••••••••••••••••••••••••••••••••••••

Phase 5: Equipment Removal and Clean-:scrapers l 1; 8.00j 361 0.48 up : ! I ! ooooooooooooooooooooooooooooooooo•oooooooooooooooooooooooooooooooooooooooo .. oooouooooooooooooooooooooooooooooooouooooooooooooooooouuoooooooooo!-ouoo•nnoooooouououooounooooooooooooot------::-r--·-----·-----• •••••••••••••••••••••••••••••••••••••

Phase 5: Equipment Removal and Clean-iSkid Steer Loaders l 21 8.001 641 0.37 up : ! ! Ph~~·~·s:··Eq~·i·;;~~~~·R:~~~~~;·~·~;;·ci~~~~rr~~~i~~~~t:~~d~;~is~~kh·~~····················l 31··························a:aa·1 97l·····························a·:37 up ; 1 l l l

Trips and VMT

Phase Name Offroad Equipment ! , Count · ..

Worker Trip Number

Vendor Trip Number

Hauling Trip Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

Vendor Hauling Vehicle Class Vehicle Class

Phase 1-Substation I 8 60.00 16.00 18.00j 16.80 6.60j 20.00! LO_Mix j HOT _Mix l HHOT G.r:~di!:'r.t .. ?.nd .. {\r.r..t?:~.~ ...... : : : · : :

~~!~~.~?.~~;~~~!;~~~~,!~L--------~ :::::::::::::::::~~:~~: :::::::::::::::::~:~:~~: :::::::::::::::~~:~:~1:::::::::::::::::::~:~:~~: :::::::::::::::::::~:~~J::::::::::::::::~~:~~~:~~~~!~::::::::::::::::::::::fw~Mi;--1:~~~~::::::::::::::: Phase 3-Substation ; 4 60.00 10.00 8.00! 16.80 6.60! 20.00! LD_Mix j HOT_Mix 1 HHOT E.~~.1.i,":",T,f;-!':',f,,~nf::!:~,ll,~!,i,r;.,t;;',,,: ••••uuoooooo•••••••••••••• ••••••••••••••••••••••••••• •••••••••••••••••••••.o••i••••••••••••••u•o••••••••••• •••n••••••••••••••••••uoo!ooooo•••••••••••••••••o.o.!oooo••••••••••••••••••••••••••••••••L_ ___ ;,,,,,,,,,,,,,,,,,,,,,,,,,,,

Phase 4a-Power line ; 3 0.00 8.00 4.ooi 16.80 6.60i 20.ooj LO Mix ! HOT Mix 1 HHOT r.~r.'J.~!te: .. 1.tJc:-.t~!!.:r.c;;.£?..F..~.f.-------- ....................................................... ......................... 1 ....................................... u .................. l .......................... l ..... :: ............................ i - : .......................... .

~!:.:..~:~.~.~~~~~ ..... 1--------~ .................... ~:~.~. ················~-~:~~- ·················=--·~·~!.. ................. ~.~.:~~ .................... ~:~.~1 ............... ~.~:~~.~.~~.~~~~······················ i HOT _Mix ~.~.~·~·~··············· Phase4c-Powerline : 5 o.oo 8.00 6.ooj 16.80 6.6oj 20.oojLO_Mix \HOT_Mix \HHOT !:?.-;!:~·.!te: .. Str.i.~~ .. l?.!)~~.-er .. 1.i: ....................................................... ......................... i ........................................................ i .......................... ! .................................... L_ _____ i ......................... .. Phase 4d-Power line ; 41 0.00 12.00 2.00\ 16.80 6.60\ 20.ooj LO_Mix j HOT _Mix \ HHOT .':~;!:,~lo!te-: .. 9.&"-,~~!!f;',!:",l,~l}.,r;-,.j.,oooooooooooOoOooooooooooooooooo .. oooo~OOoooooooooooooooooooooooooo, :""""''"'""'""'''"''' :"'""""""'""""''".i""""'"'""""""'"'""'"" I o ' '""''''"'""''''''"''

Phase5: Equipment ! 131 6o.oo: 12.00!.' 224.00\. 16.801. 6.601. 20.001.LD_Mix 1.HOT_Mix [.HHOT Porn <::~1 -::.nN ;..lo n_ll : :

3.1 Mitigation Measures Construction

Clean Paved Roads

A-12

Page 34: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 12 of 38 Date: 1/4/2016 6:23PM

3.2 Phase 1-Substation Grading and Access- 2017

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

..

Category tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

MT/yr

CH4 N20 C02e

Fugitive Dust :1 3.7100e- i 0.0000 3.7100e- i 4.0000e- i 0.0000 4.0000e- : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 :! 003 : 003 l 004 l 004 :

000000000000000000000000000000 ~"''"''""""n'•••••~•nuonuoooooou~nu•••••••nonuf•-•n•n•••••-••~uouooooonuouuj..••••--u•••••••~uon•••••""nouo~•--••••-••••••••..;o .... un•••••••••n~•••••••••uoo•••••ootoooooooo•ooooooooo~ono•••••••••n•o•~•••••••n-•••••••f...,,...,, .... ,,,,,_.,,,~,,,,,,,,,.,.,,_., .... ,~,,,,,,,,,,,,,,,,,,, Off-Road :! 0.1312 i 1.4366 ! 0.9121 ! 1.2700e- ! ! 0.0764 ! 0.0764 ! ! 0.0703 ! 0.0703 : 0.0000 ! 117.8456! 117.8456! 0.0359 ! 0.0000 ! 118.5995

:~ l ~ ~ 003 ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 0.1312 1.4366 0.9121 1.2700e- 3.7100e- 0.0764 0.0801 4.0000e- 0.0703 0.0707 0.0000 117.8456 117.8456 0.0359 0.0000 118.5995

003 003 004

Unmitigated Construction Off-Site

ROG co S02 I Fugitive I Exhaust I PM10 I Fugitive I Exhaust PM10 PM10 Total PM2.5 PM2.5

CH4 N20 I C02e NOx PM2.5 Total Bio- C02 NBio- C02 Total C02

Category tons/yr MT/yr

. ·.

Hauling :1 1.9000e- 2.1000e- l. 2.1200e- l. 1.0000e- l. 1.5000e- 3.0000e- 1.9000e- f 4.0000e- 3.0000e- l. 7.0000e- : 0.0000 0.6044 0.6044 0.0000 0.0000 0.6045 :! 004 : 003 ' 003 : 005 ' 004 : 005 . 004 : 005 : 005 . 005 : i . . . .

000000000000000000000000000 ,,,;;.,.,.,,.,._,.,.,..,_,.,,.~""""""--'"''"""'''~''''"""""''--••U•o+---•••••-oo••••-OO~""U""'""uuno•••+•••••--•-•••~•••••n••••••••n•~•••••-•--•-•--••~n•••••••u•••••••~n••••••••••••n••••toooooooooooooooooo+•••••un•••••U••~oo•••••••--•--•••••+•••n••••••••n Vendor :1 5.9700e- 1 0.0431 ! 0.0713 ! 1.1000e- ! 3.1100e- i 7.0000e- 1 3.8100e- ! 8.9000e- i 6.5000e- i 1.5400e- : 0.0000 ! 10.2108 ! 10.2108 i 9.0000e- ! 0.0000 ! 10.2126

:! 003 i i i 004 i 003 i 004 ! 003 i 004 i 004 i 003 : i i i 005 i i 0000 000000 00 000000 000 •••• 00000 ;;. .. ., ... ,.,.0 """""""'" ... ..;..., ... .,,..,.,.,,...,._., ... ~.,._.,.,.,.,,.,.., .. .,.,.,.,,.,.~--·-•••••••••••-~u•••••"""'""n•••••~•""""""""""""--""".;."""""uoo••••••u•~•--••••••-•••••••4•••••••••••n•••••.;.•••••••••••n•••••••t ooo ooo • • •oooo o o o•• +•••••n•••••••no.,.;_,..,.,,.,.,.,...,.,.,.,,..,.,,....;.,.,.,.,.,.,.,.,,.,..,.,. • .,.,.,.,~.,,.,..,.,., • .,.,.,.,.,,._.,_~ • ••• ooo ooo• o•• • ••••

Worker :! 7.3000e- ! 0.0124 ! 0.1184 ! 2.8000e- i 0.0246 i 1.6000e- ! 0.0248 ! 6.5400e- ! 1.5000e- ! 6.6900e- : 0.0000 ! 20.3084 ! 20.3084 ! 1.0100e- ! 0.0000 ! 20.3295 :! 003 ! i i 004 i i 004 i i 003 ! 004 i 003 : 1 i i 003 i i t: ! ! : : ! : : ! : I : ! ! : :

0.0576 0.0000 0.1919 14.0000e-~ 0.0279 ,8.9000e-, 0.0288 ,7.4700e-,8.3000e- 8.3000e-004 004 003 004 003

Total 0.0135 31.1236 31.1236 1.1000e- 0.0000 131.1466 003

A-13

Page 35: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 13 of 38 Date: 1/4/2016 6:23PM

3.2 Phase 1-Substation Grading and Access - 2017

Mitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 PM10

·•· .·

Category tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

.. MT/yr

CH4 N20 C02e

Fugitive Dust :l 3.7100e- i 0.0000 3.7100e- 4.0000e- i 0.0000 4.0000e- : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 :i 003 l 003 004 i 004 :

000000000000000000000000000000 ;;...,_,.,,..,,...,,,_~n ...... ,, .. ,,, .. ,~,,,,.,,,, .. ,,.,,.,, .. ~..,, .. ,,.._ ... ,,.,,..~, .. ,,,.,,,,,, .. .,,,,.;.._ .. ,,.,.,.., ... ,..,,..,~, .... ,.,,,, .. ,.,, .. ,+ ... , ..... .,,.,,,..,.,.,,f ...... , .. ,,,.,,.,,, .. f,,, .. ,.,,.,,,,, .. ,.,,,,~,,,,,,,,,,,,,,,,,,~ .. ,,, .... ,,,, .. ,,,f-,,,.,,. .. ,,,..,,..,,.,,~, .. ,,,,, .. .,,,,,,,,~,,,,, .. ,,,, .... .,,,~,,,,,,,,,,,,,,,,,,, Off-Road :i 0.1312 i 1.4366 i 0.9121 i 1.2700e- i i 0.0764 i 0.0764 i i 0.0703 i 0.0703 : 0.0000 i 117.8454 i 117.8454 i 0.0359 i 0.0000 i 118.5993

=~ ~ ~ ~ 003 ! ~ ~ ~ ~ l : ~ ~ ~ ~ ~ Total 0.1312 1.4366 0.9121 1.2700e- 3. 71 OOe- 0.0764 0.0801 4.0000e- 0.0703 0.0707 0.0000 117.8454 117.8454 0.0359 0.0000 118.5993

003 003 004

Mitigated Construction Off-Site

PM10 I Fugitive I Exha.ust IPM2.5 Total Total PM2.5 PM2,5

Fugitive I E.xhau. st PM10 PM10

co S02 ROG NOx

...

Bio- C02 I NBio- C02' Total C02! CH4 N20 I C02e

Category toris/yr MT/yr

·.·.

Hauling :l 1.9000e- 2.1000e- 1. 2.1200e-11.0000e-11.5000e- .. l 3.0000e- 1.9000e- i.' 4.0000e- ~- 3.0000e- i.' 7.0000e- : 0.0000 0.6044 0.6044 0.0000 0.0000 0.6045 :i 004 : 003 . 003 : 005 : 004 . 005 . 004 . 005 . 005 • 005 : i . . . .

oooooooooooooooooooooooooooooo;;,.. _____ .,..,.,f,, .. ,., .. .,.,,,,.,,,,,~,,,.,,,,,,,,.,,.,,,.,,f.-.. ,._-,---i-••••••••••••••••••+-•••"---·~••••••••••••••••••~·-•-••--•4••••••••••••••••••~•-••••••••••n•••••~••••••••••••••••••~••••••••••u••••••~"-" ..... "'"'"..., ..... "'""~""'"""""""""""""'"""~""""" .... '"""'""'""""""~''''"'''"'''"'''"'' Vendor :i 5.9700e- i 0.0431 i 0.0713 i 1.1000e- i 3.1100e- i 7.0000e- i 3.8100e- i 8.9000e- i 6.5000e- i 1.5400e- : 0.0000 i 10.2108 i 10.2108 i 9.0000e- i 0.0000 i 10.2126

=~ 003 l 1 l 004 i 003 ~ 004 l 003 l 004 ~ 004 l 003 : ~ l l 005 l ~ ••••••••••••••••••••••••••••••~--··-•-•••--t••••n••••n••••••~••••••••••••••••••~---·--·-----·-~•••••••••••••••••••!---••••••----·-t•••••••••n••••n•~•••n•""""""""-""tn•••••••••••••u•'t••••n•••••••••••••• .. ••••••••••••••••••t•n•••••••••••••••~-•••--••••••-••~n••••••H••••••••"!'••••••••••••••••••~•••••••••••••••••••

Worker :i 7.3000e- i 0.0124 i 0.1184 i 2.8000e- i 0.0246 i 1.6000e- i 0.0248 i 6.5400e- i 1.5000e- i 6.6900e- : 0.0000 i 20.3084 i 20.3084 i 1.0100e- i 0.0000 i 20.3295

Total

:i 003 i i i 004 i i 004 i i 003 i 004 i 003 : i i i 003 i i ·= : : ! : : : : : : ' : : : : :

0.0135 0.0576 0.1919 14.0000e-004

0.0279 J 8.9000e-004 003 004 003

0.028817.4700e-,8.3000e-,8.3000e- 0.0000 I 31.12361 31.123611.1gg~e- 0.0000 I 31.1466

A-14

Page 36: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEModo20130202 Page 14 of 38 Date: 1/4/2016 6:23PM

3.3 Phase 2-Substation Foundations and Footings - 2017

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category ' tons/yr

Off-Road Oo0614 006304 0.4725 8o8000e- Oo0359 ! 004 !

Total 000614 0.6304 Oo4725 8o8000e- Oo0359 004

Unmitigated Construction Off-Site

PM10 Fugitive Exhaust PM2o5 Total Bio-C02 NBio- C02 Total C02 CH4 N20 C02e Total PM2o5 PM2o5

MT/yr

Oo0359 000336 000336 • 000000 8008478 8008478 000225 000000 8103206 . • . • Oo0359 000336 000336 OoOOOO 80o8478 8008478 Oo0225 OoOOOO 81.3206

ROG NOx co S02 Fugitive Exhaust PM10 PM10

PM10 Total

Fugitive I Exhau. st PM205 PM2o5

PM2o5 Total Bio- C02' NBio- C02 I Total C02' CH4 I N20 I C02e

Category tons/yr MT/yr

Hauling :i 1.3000e- 1.4000e- 1.41 OOe- 1 0.0000 1o0000e- l 2.0000e- 1.2000e- 300000e- 10

2o0000e- 1 5.0000e- ! 000000 1 0.4029 l 0.4029 l 0.0000 000000 0.4030 :! 004 : 003 : 003 : : 004 : 005 0 004 • 005 0 005 ; 005 • ; ; ; 0 0

oooooooooooooooooouoooooooooo;+"""'""-"""'"-*"~nn••••••n•nn•~•••••nno•n•••••+•-••-••••••••-~o••••••••n•••on•+-·--••••••-4uunoooooo--••n•~••••-••••••-••••+••••••oooouoo•••o~o•n•n••--•••••••n•ooooooooooooooooo•f•••••o•ono•n••••~•••••"'""'""'"""""+n•uooo•ooo Vendor :! 5.9700e- ! 000431 i 0.0713 i 1.1000e- i 3o1100e- ! 7.0000e- i 3.8100e- i 8o9000e- i 6.5000e- i 1.5400e- : OoOOOO i 10.2108 i 10.2108 i 9.0000e- i 0.0000 i 10.2126

:! 003 i i i 004 i 003 i 004 i 003 i 004 i 004 i 003 : i i i 005 i i 000 ooooooooooooooooooooooooo 00 ;f,,...,.,..,,.,, .... ,,,.,..,4•••n•••••••uouo~•••••••nouon•••f•-•••-•••-•••-~nooooououoooooo•~-••••••••••••••••~oooonooo•••••••••~•-•••••••u-••••~••ouoouooooooooo~oon•••••••••nuuo~••••••••••••••••••+••••••••••••••••u~o•o•••••••••••-•••~•••••••••••u•••••~oououou••••••••~••••••

Worker :i 7o3000e- ! 0.0124 i 001184 i 2o8000e- i 000246 i 1o6000e- i 0.0248 i 6.5400e- i 1o5000e- i 6.6900e- : 000000 i 20.3084 i 20.3084 i 1.0100e- i 000000 i 20.3295

Total

:i 003 i i i 004 i i 004 i i 003 i 004 i 003 : i i i 003 i i t: : : : : : : : : : • : : : : :

Oo0134 Oo0569 Oo1912 3o9000e-004

Oo0278 8o8000e- Oo0287 004

7 o4600e-~8o2000e- 8o2800e-003 004 003

0.0000 I 30o9221 130o9221 11.1~~~e-1 0.0000 I 30o9451

A-15

Page 37: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 15 of 38 Date: 1/4/2016 6:23PM

3.3 Phase 2-Substation Foundations and Footings- 2017

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 Fugitive PM10 PM10 Total PM2.5

'--Category tonslyr

Off-Road .: 0.0614 0.6304 0.4725 8.8000e- 0.0359 0.0359 " ! " 004 " ~ "

Total 0.0614 0.6304 0.4725 8.8000e- 0.0359 0.0359 004

Mitigated Construction Off-Site

ROG .I NOx co I S02 Fugitive I E. xh. a us. t I PM1 0 I Fugitive. PM10 PM10 Total PM2.5

I Category tons/yr.

... ..

Exhaust PM2.5Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5

MT/yr

0.0336 0.0336 • 0.0000 80.8477 80.8477 0.0225 0.0000 81.3205 • .. • • 0.0336 0.0336 0.0000 80.8477 80.8477 0.0225 0.0000 81.3205

Exhaust PM2.5 Total Bio- C02,NBio- C02j Total C02 PM2.5 I CH4 N20 C02e

MT/yr

Hauling :l 1.3000e- l 1.4000e- l.' 1.41 DOe- ,l 0.0000 1.0000e- 2.0000e- 1.2000e- i 3.0000e- 2.0000e- 5.0000e- ! 0.0000 1 0.4029 1 0.4029 1 0.0000 0.0000 0.4030 :i 004 : 003 • 003 . • 004 : 005 : 004 : 005 : 005 : 005 • : : : i :

oooooooooooooooooooooooooooooo~-----••--4-••u••-••••••••••~n••••••n..,noo••+-·-·----~•o•ono•o•••nuoo+--·-·-·--4•••UUOUOoooo-•~••••••-••--•--.;•••ooun .. ••••oooo~•-••••-•••-••••-~OOOOOoooo•oooooooo;o .. •oooooooo .. "*"'~"'"_" __ '"'"-.."'""_;.""''''''"*""*"'""'~"*U"oooooono•o••~OOOOOOOoooooooooooo Vendor :i 5.9700e- i 0.0431 l 0.0713 i 1.1000e- l 3.1100e- i 7.0000e- ! 3.8100e- ! 8.9000e- l 6.5000e- i 1.5400e- : 0.0000 i 10.2108 ! 10.2108 ! 9.0000e- ! 0.0000 i 10.2126

:i 003 i l i 004 l 003 i 004 i 003 i 004 i 004 i 003 : i i i 005 i i oooooooooooooooooooooooooooooo;;.,... ... ,,,., .. ., ... ,.-l,, .. , .. , .. ,..,,,,, .. .i, .. ,,,,, .. , .. ,,, .. l,._ .... .,-.. .. ,. .. ,.,.l, .. , .. ,,,,,.,,, .. ,,,L ....... _u ______ .i, •••••• ._,.,.u •• ••nl..•••••'""•-••••--..l•••••••nuuuo •• l ......... ,.._. .. ._ ... t.,,,,,,,,,,,,,,,,,l ..... ._,.,.. .. ,,,.,..,.,.l.. ....... --•••--•••••l .... ._ .... ,. .. ,.,. ...... l ..................... J.,,,.,,, .. ,,,.,,,., ..

Worker :l 7.3000e- l 0.0124 j 0.1184 l 2.8000e- j 0.0246 l 1.6000e- l 0.0248 j 6.5400e- l 1.5000e- l 6.6900e- : 0.0000 l 20.3084 j 20.3084 l 1.0100e- l 0.0000 l 20.3295

Total

:\ 003 \ i \ 004 i \ 004 i i 003 i 004 i 003 : i i i 003 i \ ·= : : : : : : : : : • : : : : : 0.0134 I 0.0569 0.1912 13.9000e-

004 0.0278 18.8000e-~ 0.0287 17.4600e-

004 003 8.2000e-

004 8.2800e-

003 0.0000 I 30.9221 I 30.9221 1.1000e-

003 0.0000 30.9451

A-16

Page 38: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 16 of 38 Date: 1/4/2016 6:23PM

3.4 Phase 3-Substation Equipment Installation- 2017

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category tons/yr

Off-Road .: 0.0475 0.3912 0.3101 4.3000e- 0.0301 " " ! 004 " " Total 0.0475 0.3912 0.3101 4.3000e- 0.0301

004

Unmitigated Construction Off-Site

PM10 Total

0.0301

0.0301

Fugitive Exhaust PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

MT/yr

0.0285 0.0285 • 0.0000 38.9490 38.9490 8.9900e- 0.0000 39.1379 • . 003 • • 0.0285 0.0285 0.0000 38.9490 38.9490 8.9900e- 0.0000 39.1379

003

ROG I NOx I co I S02 I Fugitive I Exhaust PM10 PM10

PM10 I Fugitive Total PM2.5

Exhaust PM2.5

PM2.5 Total Bio- C02 NBio- C02 I Total C02~ CH4 I N20 I C02e

Category tons/yr MT/yr

Hauling :! 3.0000e- 3.1 OOOe- 3.1 OOOe- ~ 0.0000 6.0000e- 0.0000 6.0000e- 11.0000e- ~ 0.0000 2.0000e- : 0.0000 0.0885 0.0885 0.0000 0.0000 0.0885 ~~ 005 ; 004 ; 004 ; ; 005 ; : 005 ; 005 ; ; 005 ! ; ; : l ;

oooooooooooooooooooooooooooooott••-••••-••••••--1-••••••••••••••••d"!'•""'"""'""""'"""""''"""!'"''"""-"'""'-""''""!''''uonun•ouoo~-·•••••--••••-!'••••••••••••••••••"!'••-•n-•••••••••-t•nnn••nno"'*"'"!''...,*"*""*"n*"ouou.ooooooooo•••oooo••t•••••••••••••••

Vendor :; 4.8600e- ; 0.0351 i 0.0581 i 9.0000e- i 2.5300e- ; 5.7000e- 1 3.1000e- i 7.2000e- 1 5.3000e- l 1.2500e- : 0.0000 1 8.3157 1 8.3157 1 7.0000e- 1 0.0000 1 8.3171 :! 003 ; i ; 005 l 003 ; 004 ! 003 ; 004 ; 004 ; 003 : ! ; ! 005 ; ;

000 , 0000000000000 , 000000000000 ~...,..,.,.,.,.,, ... u,. 0••~*""*"'*"'*"'n••••~••••••••••••••••••f•-••••••••n-n•~nnu•unu•un+••-••••••••••••••~••••••••••••••••••+--•••••••••-••••~•••••••••••••u•u~nuunn•u•nn••~•••,.•••••••••••••+••••••••••••••••••~••••••••••••••••••~""""""""""""""""""~"""nu•••n••••••~••••••••••••• Worker :i 9.5200e- i 0.0162 i 0.1543 ; 3.7000e- i 0.0321 i 2.1000e- i 0.0323 1 8.5200e- 1 2.0000e- ! 8.7200e- : 0.0000 i 26.4624 1 26.4624 1 1.3100e- i 0.0000 1 26.4900

:i 003 i ; i 004 ! i 004 ! i 003 ; 004 ! 003 : i i ; 003 ! ; t: : : : : : : : : : II : : : : :

Total 0.0144 I 0.0516 I 0.2127 14.6~~:e-~ 0.0347 17.8~~:e- 0.0354 19.2;~~e- 7.3~~:e- 9.9;~~e- 0.0000 34.8666 I 34.8666 11.3~~~e-l 0.0000 I 34.8956

A-17

Page 39: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 17 of 38 Date: 1/4/2016 6:23PM

3.4 Phase 3-Substation Equipment Installation- 2017

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category tons/yr

:'

Off-Road ,: 0.0475 0.3912 0.3101 4.3000e- 0.0301 " " 004 " "

Total 0.0475 0.3912 0.3101 4.3000e- 0.0301 004

Mitigated Construction Off-Site

ROG NOli: co S02 Fugitive Exhaust PM10 PM10 ., ·.·

Categol)t tons/yr

.: . > . . •·

PM10 Total

I

0.0301

0.0301

PM10 Total

' .

Fugltive Exhaust pM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

MT/yr

0.0285 0.0285 • 0.0000 38.9490 38.9490 8.9900e- 0.0000 39.1378 • • 003 • • 0.0285 0.0285 0.0000 38.9490 38.9490 8.9900e- 0.0000 39.1378

003

Fugitive Exhaust PM2.5 Total Bio- C02 I NBio- C02 Total C02 I CH4 N20

1 C02e

PM2.5 PM2.5

MT/yr

Hauling :i 3.0000e- 3.1 OOOe- 3.1 OOOe- ~ 0.0000 6.0000e- 0.0000 6.0000e- ~ 1.0000e- 0.0000 2.0000e- ! 0.0000 0.0885 0.0885 0.0000 0.0000 0.0885 :~ 005 i 004 : 004 i : 005 : : 005 1 005 1 : 005 1 : 1 : l :

0000 ,, 0000 ,,, 00000000000000000 ~-·-•__,.-t••uno••••••nn•-t••••••••••••nun-t•-"'"""'"""'"_..""!'"'''"''"''"'"'''"'""!'"-••-••-•-•-t•••••••••••-noo•-t•-•-••-•••-1'•••••n•••n•••n•otnn•n••-••••••••••••••••••••••••••••tu .. nuno•nouo't"'•-•••••"-•••••"t•••••••••no•••-•"t••n .. uuuno"''"~'''''''''''''''''''

Vendor :! 4.8600e- i 0.0351 i 0.0581 i 9.0000e- i 2.5300e- i 5.7000e- i 3.1000e- i 7.2000e- i 5.3000e- i 1.2500e- 1 0.0000 i 8.3157 i 8.3157 i 7.0000e- i 0.0000 i 8.3171 :i 003 i i i 005 i 003 i 004 i 003 i 004 i 004 i 003 1 i i i 005 i i

000000000000000000000000000000 ~-·-•••-••••••••~••••••••••••••••••~nounununou~•••-n•-••--•-~•••••n•••nnn•u~----••n•••-•••~••nnuuonuou~ .. ,..,.,,.,.,.,.,.,. ....... ,.~ .. uno•••••••••••~uou•••••••••••••••t••••••••••••••••••+•nu•n•ooou••••~·--•••••••••••--~••••••••••nn•u•~•n••••••••••n•••~••••••••••••••••••• Worker :i 9.5200e- i 0.0162 i 0.1543 i 3.7000e- i 0.0321 i 2.1000e- 1 0.0323 i 8.5200e- i 2.0000e- ! 8.7200e- 1 0.0000 i 26.4624 i 26.4624 1 1.3100e- i 0.0000 1 26.4900

:: 003 1 i i 004 i i 004 i i 003 1 004 i 003 1 i i 1 003 i 1 t: : : : : : : : : : • : : : : :

0.0000 134.8666 34.8666 11.3800e-003

0.0000 I 34.8956 7.8000e- 0.0354 9.2500e- 7.3000e- 9.9900e-004 003 004 003

0.2127 4.6000e- 0.0347 004

Total 0.0144 0.0516

A-18

Page 40: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment Installation - 2018

Unmitigated Construction On-Site

ROG NOx co

Category

'

Off-Road .: 0.0838 0.7025 0.6192 " " ~ " "

Total 0.0838 0.7025 0.6192

Unmitigated Construction Off-Site

ROG I NOx co

Category

S02

8.8000e-004

8.8000e-004

I S02

Fugitive Exhaust PM10 PM10

tons/yr

Fugitive PM10

0.0516

0.0516

Exhaust PM10

tons/yr

PM10 Total

0.0516

0.0516

PM10 Total

Page 18 of 38

Fugitive PM2.5

Fugitive PM2.5

Exhaust PM2.5

0.0488

0.0488

PM2.5 Total

0.0488 • • • . • 0.0488

Date: 1/4/2016 6:23PM

Bio- C02 NBio- C02 Total C02 CH4 N20 C02e

MT/yr

0.0000 78.4636 78.4636 0.0180 0.0000 78.8413

0.0000 78.4636 78.4636 0.0180 0.0000 78.8413

CH4 I N20 I C02e

MT/yr

Hauling :f 5.0000e- 5.6000e- i 5.9000e- j 0.0000 6.0000e- 1.0000e- 7.0000e- i 2.0000e- 1.0000e- !. 3.0000e- : 0.0000 0.1769 0.1769 0.0000 0.0000 0.1769 !\ 005 i 004 i 004 i i 005 i 005 i 005 i 005 i 005 : 005 : : : i : :

ooooooooooooooooooooooooooooooJt'""'""""'""-''"'"'*"..,'t''''''"n"'"'"'"*"'"~'*"'"'"''*""''"''"''t"'"'"'"'""'""-""'"""-~''.,.'"*"'''''"u•••"t•-••••--•--••'t*"*"'''"'""'-•••••~•••••-••••-"'""""'t"''"""*"*"''''"''""''t*""''''''"'"*"'''''"••••••••••••ooooooo

Vendor :1 8.4700e- 1 0.0642 1 0.1075 1 1.9000e- 1 5.1500e- i 1.0700e- 1 6.2100e- l 1.4700e- l 9.8000e- i 2.4600e- : 0.0000 1 16.6221 l 16.6221 i 1.4000e- l 0.0000 i 16.6249 :i 003 i l i 004 l 003 i 003 i 003 l 003 i 004 i 003 : i i i 004 i i

0000 00000000 000 000 000 0000 ,,,,,;;_,,.,.,.,.,..,..,,..,, ... .,..,.~ 0uooououuo••••~•••*"'''''""*"''"'~ .... ,.,,., ... .,.,,.,.,_,.~ ...... uoo•••••u•n•~••••••••n...,••••••~•••••••••u•o•••••~•••••••••-••••-•~••••••••••••••••••~••••••••••••••••••••~ ••• ••• •• ••••• o o ••• +•--•••••••••••••u~••••••-•-·---~--•••••••••u•••••4•••u•••••••••••n~ • ••• ••• •••• ••• •••••

Worker :i 0.0170 i 0.0296 l 0.2794 l 7.6000e- l 0.0653 l 4.2000e- l 0.0657 ! 0.0173 i 3.9000e- i 0.0177 : 0.0000 i 52.0147 l 52.0147 i 2.4600e- i 0.0000 i 52.0665

Total

!! l ~ i 004 ~ i 004 l ~ i 004 i : l ~ i 003 ~ i 0.0255 I 0.0943 0.3875 19.5000e-

004 0.0705 1.5000e-

003 0.0720 0.0188 1.3800e-~ 0.0202

003 0.0000 168.81371 68.8137 J 2.6

0o0o3oe-, 0.0000 I 68.8683

A-19

Page 41: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 19 of 38 Date: 1/4/2016 6:23PM

3.4 Phase 3-Substation Equipment Installation - 2018

Mitigated Construction On-Site

.ROG NOx co $02 Fugitive Exhaust PM10 PM10

Category tofts/yr

. •.

Off-Road .: 0.0838 0.7025 0.6192 8.8000e- 0.0516 " " ~ 004 " "

Total 0.0838 0.7025 0.6192 8.8000e- 0.0516 004

Mitigated Construction Off-Site

PM10 Fugitive Exnaust PM2.5Total Bio-C02 NBio- C02 Total C02 CH4 N20 C02e Total PM2.5 PM2.5

MT/yr

0.0516 0.0488 0.0488 • 0.0000 78.4635 78.4635 0.0180 0.0000 78.8412 • • • . 0.0516 0.0488 0.0488 0.0000 78.4635 78.4635 0.0180 0.0000 78.8412

CH4 N20 I C02e ROG NOx co S02 Fugitive Exha. us( I PM1 0 I Fu.gitive I Exh.aust 1 PM2;5 Total Bio- C02,NBio- C02! Total C02 PM10 . PM10 Total PM2.5 PM2.5 J 1

Category tons/yr MT/yr

·.

Hauling :l 5.0000e- l 5.6000e- i.· 5.9000e- l. 0.0000 6.0000e- i 1.0000e- 7.0000e- i 2.0000e- i.· 1.0000e- 1_= 3.0000e- : 0.0000 0.1769 0.1769 0.0000 0.0000 0.1769 !1 005 1 004 l 004 l ! 005 1 005 l 005 ! 005 : 005 : 005 : l ! : l :

000000000000000000 , 0 , 000000000 f'!',._""-'"",._,,,..,..,. .... ,..,,.,, .. ,.,,,,u't•n•••••••-••nn"t<--·-•--••~n•••••••o•nn•••~---•-••"tn••n•••••-••-·~·-•·---·"t•••noo••••••nooo"t••••••no ... •••••••n•••••••••••••••••••t••nnoo•••••••n•'t••••-•-•-•••-"tn•••••••uoooo ... •"t••unoo•••••ono•~•••oooooooooooooooo

Vendor :1 8.4700e- 1 0.0642 ! 0.1075 ! 1.9000e- ! 5.1500e- 1 1.0700e- i 6.2100e- ! 1.4700e- 1 9.8000e- 1 2.4600e- : 0.0000 1 16.6221 ! 16.6221 i 1.4000e- ! 0.0000 1 16.6249 !1 003 l l l 004 l 003 l 003 l 003 i 003 l 004 l 003 : l l l 004 l l

oooooooooooooooooooooooo••••••ft••• .. .._...,, .. ,,,...,.,'t,..•••••on••••••••-tuunoooooooonn"!'-•••n•,._..., .. ,...,'t''u"o"""un••n••~••••n•--•----·-t••uno••••uuoo•'!'••n...,•...,-•••••••"!'•••••n•••uo ....... -tu•••••••••nnu .......... ,,,,,,.,,,,,,,,.,.,.,.,.,.,.., .. , •• ..,,. .. ,,.'!'"""_,""""""""""""'t"""'un•u•••••••"!'•••••••••nnno•o~ooooooooooooooooooo

Worker :i 0.0170 l 0.0296 ! 0.2794 1 7.6000e- ! 0.0653 l 4.2000e- l 0.0657 ! 0.0173 l 3.9000e- ! 0.0177 : 0.0000 1 52.0147 ! 52.0147 l 2.4600e- l 0.0000 l 52.0665

Total

i\ l i l 004 l l 004 l l l 004 l : l l l 003 l l 0.0255 0.0943 0.3875 ,9.5000e-

004 0.0705 1.5000e-, 0.0720 I 0.018811.3800e-, 0.0202

003 003 0.0000 168.81371 68.8137 2.6000e-

003 0.0000 I 68.8683

A-20

Page 42: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 20 of 38 Date: 1/4/2016 6:23PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations - 2018

Unmitigated Construction On-Site

ROG NOx co S02

Category

Fugitive Exhaust PM10 PM10

tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- .C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

MT/yr

Off-Road :1 0.0200 0.2528 0.1242 3.5000e- 9.8300e- 9.8300e- ~ 9.0400e- 9.0400e- : 0.0000 32.1570 32.1570 0.0100 0.0000 32.3672 :i 004 003 003 i 003 • 003 :

oooooooooooooooooooooooooooooo;;.,,.,. .. ,.,..,. .. ,.,.,..,.,l,.,..,.,,,,,.,,..,,..,,.,.,l,,,,.,..,.,,,,,.,.,. .. .,l,,.,.,,,.,,,,,,.,,. ... .,,i,,,,._.,..,._.,,,,..,,.,t,.,,,,,,., ... ,,,,,,,,l,._.,., .. uo .. o••••l•-••u•oooooo•-•l•••••••uoooooon•l•••••••••••nooooooo~•••••••••oooooooooiuu••••••••••nu.l .. .,,,.,,,,,,,,,, ... .,.l .... .,. ...... ,,,,,,j,,,.,., .. ,,. ........ ,J,,,,,,,,,,,,,,,,,,,

Paving :! 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 l ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

Total

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ i ~ ~ 0.0200 0.2528 0.1242 3.5000e-

004 9.8300e- 9.8300e-

003 003 9.0400e- 9.0400e- 0.0000 32.1570 32.1570 0.0100 0.0000

003 003 32.3672

Unmitigated Construction Off-Site

ROG I NOx I co I S02

Category

.. ..

Fugitive PM10

Exhaust PM10

tons/yr

PM10 I Fugitive I Exhaust IPM2.5 Total Bio- C02,NBio- C02 I Total C02 I Total PM2.5 PM2.5 I I

MT/yr

CH4 N20 I C02e

Hauling :! 4.0000e- ! 4.2000e- ! 4.4000e- ! 0.0000 ! 3.0000e- l 1.0000e- ! 4.0000e- ! 1.0000e- ! 1.0000e- l 2.0000e- : 0.0000 ! 0.1319 ! 0.1319 l 0.0000 ! 0.0000 l 0.1319 :i 005 i 004 i 004 i i 005 i 005 i 005 i 005 i 005 i 005 : i i i i i

000000000000000000000000000 ''';;'*"'"""''"''""-""'~' .. "*''"""'"""' .. ,.~••••••unuooo•••+•-••••--••••••~nonn•••••••nu+--••-•••••-•f•••••••nn•un••~-••••••••••--•-+nuonon••••••n+••n•••••-•••nouo~••••••••••••••••••+••••••n•n•u••••+"""..,"""'""""'"•••••+•••nn•••••••••••~••n••••••••••••••~••••••••••••••••••• Vendor :i 1.6700e- i 0.0126 i 0.0211 i 4.0000e- i 1.0100e- i 2.1000e- i 1.2200e- i 2.9000e- i 1.9000e- i 4.8000e- : 0.0000 i 3.2674 i 3.2674 i 3.0000e- i 0.0000 i 3.2680

:i 003 i l i 005 i 003 i 004 i 003 i 004 i 004 l 004 : i i i 005 l i oooooooooooooooOoooooooooooooo;+,.,....,,. ... ,._.,.,. • ..,.,,..,f,.,.,.,. ••••• o•••uoo~o••••••••••oooon•f•••••••••-•••••••~o•nooo••••••••••••~-••••••••-•-•••+•••••••nouon•••+•-••n•oooo-••••+noonooo•••••••••+uoo•••••••UUOOOOo~oooooooooooooooo••+••••noouooooooo•+••ooooo•••••••••••~oo•n••••••••ooooo~o••••••••••noo•oo~oooooooooooooooooo

Worker :! 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000

Total

il l ~ ~ ~ 1 l ~ ~ ~ : ! ~ ~ ~ l 003 005

1.7100e-~ 0.0130 I 0.0216 ,4.0000e- 1.0400e-003

2.2000e-004

1.2600e-,3.0000e-,2.0000e-,5.0000e-003 004 004 004

0.0000 I 3.3993 I 3.3993 13.0~~~e- 0.0000 I 3.3999

A-21

Page 43: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 21 of 38 Date: 1/4/2016 6:23PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations - 2018

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

L Category tons/yr

·.·

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

MT/yr

CH4 N20 C02e

Off-Road :,1.' 0.0200 0.2528 j 0.1242 i 3.5000e- 9.8300e- 1 9.8300e- j 9.0400e- 9.0400e- : 0.0000 32.1570 32.1570 0.0100 l 0.0000 32.3672 " l ! 004 003 1 003 ! 003 003 : :

.............................. ;;. ........................ -~ .................. ~ ................... f ......... - .............. ~ ................... ~ .......................... f .................... ~ ........................ f ................... f .................... ~ .................. + .................. ~ ............................ f .................. ~ .................... ~ .................. . Paving :1 0.0000 1 ! 1 ! 1 0.0000 1 0.0000 ! 1 0.0000 ! 0.0000 : 0.0000 1 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

~~ ~ ~ ~ ! ~ ~ ! ~ i i ~ ~ ~ ~ ~ Total 0.0200 0.2528 0.1242 3.5000e- 9.8300e- 9.8300e- 9.0400e- 9.0400e- 0.0000 32.1570 32.1570 0.0100 0.0000 32.3672

004 003 003 003 003

Mitigated Construction Off-Site

ROG NOx co I Category

S02 Fugitive PM10

Exhaust PM10

tons/yr

PM16 I Fugitive Total PM2.5

..

Exhaust PM2.5

PM2.5 Totai Bio- C02 NBio- C02 Total C02 CH4 I N20 I C02e

MT/yr

I Hauling :i 4.0000e- 4.2000e- l 4.4000e- 0.0000 l 3.0000e- 1.0000e- 4.0000e- 11.0000e- 1.0000e- 2.0000e- : 0.0000 0.1319 0.1319 0.0000 0.0000 0.1319

:1 005 : 004 : 004 : : 005 : 005 : 005 : 005 : 005 . 005 : 1 : : • . oooooooooooooooooooooooooooooo;+,..,.,,...,..,,_..,,..,,.+••••••••••••••• .. •~•••••• .. ••-••••••+---•••••-4·•~••••n•••••••••+•--••-·~••••n•••~•-•••••~••••---••••~••••••••••••••••••+•~•••••••••••••~••••~oooooooooo••••••••+•~•••••••••~••~•••~·--------~••••••••••••~~·-·~••nn••••••~·~•••~ooooooooooooooooooo

Vendor :1 1.6700e- ! 0.0126 1 0.0211 1 4.0000e- ! 1.0100e- 1 2.1000e- 1 1.2200e- 1 2.9000e- ! 1.9000e- ! 4.8000e- : 0.0000 1 3.2674 ! 3.2674 ! 3.0000e- 1 0.0000 ! 3.2680 :1 003 ! ! ! 005 ! 003 1 004 ! 003 ! 004 ! 004 ! 004 : 1 1 ! 005 ! 1

oooooooooooooo•ooooooooooooooo~---·--•"""""~""~•~~••••nn•n•~••~••~~••••nu•u~•••~•••••n-•-••~~-~~••••un•••••••~~-~-·------·~••n••••••••••••n+•••--n••••••-i-•••••••n••n•••••~•••••••••n••,.n•••~••••••••••••••••••+••••••••un••••••~•••-••••-•••••••~••••••••u•• Worker :1 0.0000 i 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 1 0.0000 l 0.0000 i 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 1 0.0000 ! 0.0000 1 0.0000

Total

il ~ ~ l ~ ~ l ~ ~ ~ : ! ~ l ~ l 1.7100e-

003 0.0130

005 003 004 0.0216 14.0000e- 1.0400e- 2.2000e- 1.2600e-~3.0000e- 2.0000e-

003 004 004 5.0000e-

004 0.0000 3.3993 3.3993 3.0000e-~ 0.0000 I 3.3999

005

A-22

Page 44: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.6 Phase 4b-Power line re-route: Install TSP- 2018

Unmitigated Construction On-Site

co ROG NOx S02 Fugitive Exhaust PM10 PM10

Category tons/yr

PM10 Total

Page 22 of 38 Date: 1/4/2016 6:23PM

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

MT/yr

Fugitive Dust :i 2.1~0o~e- l 0.0000 l 2.1~~3oe- l 2.4000e- l 0.0000 i 2.4000e- ! 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000

........ oo:•;;,····· .. ·fl-o:oo;;;-j··-o:;;-;;·j··-;;:;;;;o·j-,:':Fj-··-···-jomo;-"j"·-o:o;-;;··t--'-~:.-to:o;;;-"j"··o::~;··-!···o:·oooo .. 'f""o;;:;·;;;·t-;;:-,-,;;lo:;;;;;-t·-o:oooo-j···o;:;o;o· .. Total 0.0647 0.7245 0.4848 7 .5000e- 2.1800e- 0.0351 0.0372 2.4000e- 0.0323 0.0325 0.0000 68.1197 68.1197 0.0211 0.0000 68.5620

004 003 004

Unmitigated Construction Off-Site

ROG I NOx I co I S02

Category

Fugitive PM10

Exhaust PM10

tons/yr

PM10 I Fugiti.ve 1 Exhaust. IPM2.5 Total Bio- C021NBio- C02 I Total C02 Total PM2.5 PM2.5 I CH4 N20 1 C02e

MT/yr

Hauling !~ 2.0~~5oe- 2.10o~Je- j 2.2~~Je- 0.0000 2.0~~5oe- 0.0000 2.0~~~e- j 0.0000 ~ 0.0000 ~ 1.0000e- ! 0.0000 ~ 0.0660 ~ 0.0660 ~ 0.0000 0.0000 0.0660

oooooooooooooooooooooooooooooo~_,,...,,.,..,,._.,,,.,.,,.,.f,,,,,.,,,.,,,,,,,.,,.,.~,..,,,.,.,.,..,,. ... ,, .. u.;.._..,.,,.,. .. _,.,,.,.,.~,,,,,.,.,., .. ,..,,...,,..,.;,.,._.,_.,.,., .. ,.,,.,.,.4,,.,,,.,,.,,,.,,,.,,.,,.,..;_,. .. ,,.,..., .... ,,.,.,.,,.,~,,,,.,,.,,,,,,,,,,,.,~,,,.,,,.,~~=u•unioooooooo•oooo•••••~••••••••••••••••••~•--•-ooo•oo"""~'''''uo•o•o••••••~••••••••••••••••••~••••••••••••••••••• Vendor :1 4.6900e- ! 0.0355 1 0.0594 ! 1.0000e- 1 2.8500e- ! 5.9000e- ! 3.4400e- 1 8.2000e- 1 5.4000e- 1 1.3600e- : 0.0000 ! 9.1944 1 9.1944 ! 8.0000e- 1 0.0000 1 9.1960

:1 003 1 1 1 004 1 003 1 004 1 003 1 004 1 004 1 003 : i 1 1 005 1 1 .............................. ;+-~-~------------·~--..................... ~-------.--~--~~-~-f .................. ______ ~-----··············~·-·····-·-·-··-~--- ....... .-~ ........ ~-+~-·-·········-··~·-··· .. ·······---·~·-·····~--~~-······-t .................. + ............. ~--·~---+---·-··~··-·····-~---....................... ~ ............... ~ .... ~.~-·-·············· ..

Worker :1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000

Total

il ~ ~ ~ ~ l l ~ ~ 1 : l ~ ~ l ~ 4.71 OOe-~ 0.0357 I 0.0597 11.0000e-

003 004 2.8700e-

003 5.9000e-

004 3.4600e-,8.2000e-~5.4000e-~1.3700e-

003 004 004 003 0.0000 I 9.2603 I 9.2603 B.OOOOe-

005 0.0000 I 9.2619

A-23

Page 45: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 23 of 38 Date: 1/4/2016 6:23PM

3.6 Phase 4b-Power line re-route: Install TSP- 2018

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exh<Just PM10 PM10

•• Category. tons/yr

..

PM1o Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM.2.5 PM2.5

MT/yr

CH4 N20 C02e

Fugitive Dust !! 2. ~~~e- 0.0000 2.108~3oe- j 2-~~~e- j 0.0000 ! 2.400~~e- l 0.0000 ! 0.0000 j 0.0000 ! 0.0000 0.0000 0.0000

oooooooooooooooooooooooooooooo~ooooo•••-•••••--~ouooon•unoun~ooo•••••••••••••••~--~·-•-n•--~nu•u••••oooooooo~o-•-•--•-•••~oooooooooononuo~o-•""'"'""''""""'"~'nouonouoo••••~•••••••nooooonono~oooooooooooooooooo~oooooooonuoonoo~o"""'"'-'''..,''""'~''''''''UO Off-Road :1 0.0647 1 0.7245 ! 0.4848 1 7.5000e- ! 1 0.0351 1 0.0351 ! 1 0.0323 1 0.0323 : 0.0000 1 68.1196 1 68.1196 1 0.0211 1 0.0000 ! 68.5619

;~ ~ ~ ~004~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ Total 0.0647 0.7245 0.4848 7 .5000e· 2.1800e· 0.0351 0.0372 2.4000e- 0.0323 0.0325 0.0000 68.1196 68.1196 0.0211 0.0000 68.5619

004 003 004

Mitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category tons/yr

PM10 Total

Fugitive Exhaust IPM2.5 Total Bio- C02 NBio- cozj Total C02 PM2.5 PM2.5 I

MT/yr

CH4 N20 ~ C02e

Hauling ;j 2.0000e- 2.1 OOOe- 2.2000e- i 0.0000 2.0000e- i 0.0000 i 2.0000e- i 0.0000 i 0.0000 i 1.0000e- : 0.0000 i 0.0660 0.0660 0.0000 0.0000 0.0660 " 005 004 004 1 005 1 1 005 ! 1 1 005 : 1

••••••••••••••o•o•oooooooooooo~'""'""'""'""""-•~nn••••ouon••••~ouoo••n• .... n••••+••••---••••••-••~n•n•n•n•••••n+-•--••••---••~onuuo••••••••••~•----·-•••-~••nnun••••••••+••••••••••••••••u••tooooooooooooooooo•+•n••••••••..,•••••~·----•••••-•-4•••n•n••n••••••~•••n•••••••••••••~••••••••••••••••••• Vendor :i 4.6900e- i 0.0355 ! 0.0594 i 1.0000e- 1 2.8500e- 1 5.9000e- i 3.4400e- i 8.2000e- 1 5.4000e- i 1.3600e- : 0.0000 i 9.1944 1 9.1944 i 8.0000e- ! 0.0000 1 9.1960

!! 003 i i i 004 i 003 i 004 i 003 i 004 i 004 i 003 ! i i i 005 i i oooooooooooooooooooooooooo••••r.--•••••••""""""-!'""""""""""""U""""~".,.""nu•nnu••"t••••••••-••--•••~••••••••••••••••n•~---••••----••••-f'•••••••••••••••n•~•-•••••n•••••""•"!'••••••••••••un••-!'u•nn•u•n••••••••••••••••••••••••••t••••••••••••••••••"t•----•

Worker :i 0.0000 i 0.0000 i 0.0000 1 0.0000 1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 1 0.0000 1 0.0000 i 0.0000

il ! ~ l ~ ! ~ ~ ~ ~ : ! ~ ~ ~ ~ 1.0000e- 2.8700e- 5.9000e- 3.4600e- 8.2000e- 5.4000e-~1.3700e-

004 003 004 003 004 004 003 0.0000 9.2603 I 9.2603 8.0000e· 0.0000 I 9.2619

005 0.0597 Total 4.7100e· 0.0357

003

A-24

Page 46: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 24 of 38 Date: 1/4/2016 6:23PM

3. 7 Phase 4c-Power line re-route: String Power line - 2018

Unmitigated Construction On-Site

ROG NOx co 802 Fugitive Exhaust PM10 PM10

Category tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

MT/yr

CH4 N20 C02e

Fugitive Dust :i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 t: • ·= . .

oooooooooooooooooooooooooooooo;,;.,,,.,,...,u,.o•••••••~••••nouuuooooo~nouoooon•••••••~••••n--.o•n..,o•~•••••••••••••••••••~•••••-n••••-•n+••u••••••••••••n~n••••••n•••••••-i-••••••••••••••••••+uouuonon•••••••~••••••••oooooooooo~nuoononon••••~••••••••••••• Off-Road :! 0.0150 ! 0.1553 E 0.0968 ! 1.5oooe- E ! 9.2700e- ! 9.2700e- E ! 8.5300e- ! 8.5300e- : o.oooo ! 13.9462 E 13.9462 ! 4.3400e- E o.oooo ! 14.0374

Total

:! ! E ! oo4 ! ! oo3 l oo3 ! l oo3 ! oo3 : ! E ! oo3 ! ! •: : : : : : : : : : . : : : : :

0.0150 0.1553 0.0968 1.5000e-004

0.0000 9.2700e- 9.2700e- 0.0000 8.5300e- 8.5300e- 0.0000 13.9462 13.9462 4.3400e- 0.0000 003 003 003 003 003

14.0374

Unmitigated Construction Off-Site

I ROG I NOx I 802 I Fugitive I Exhaust PM10 PM10

co

Category tons/yr

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- C02' NBio- C02! Total C02' CH4 I N20 I C02e

MT/yr

Hauling :i 6.0000e- 6.3000e- ~ 6.5000e- 0.0000 5.0000e- ! 1.0000e- 6.0000e- 1.0000e- ! 1.0000e- ! 2.0000e- ! 0.0000 ! 0.1979 l 0.1979 ! 0.0000 0.0000 0.1979 :~ 005 i 004 i 004 ~ ~ 005 ~ 005 i 005 ~ 005 i 005 i 005 : ~ ~ ~ : :

oooooooo••••ooooooooooooooo•••Jt••-••--•--••1-••••••"•un••n••"t•••••••••••••*-•••~••••--••••-••••-t•o•••••••••••••u-t•••·---·-----t•••u•n••••••••••"!'•--•-----••••••••1-••••••••nu••o••"t•--•••••••••••n•••••••••••••••••••••••~••••••••••••••••••"!'•"--"""'" .. ,.,."!'••••••••••u•n•••"!•••••••••••••••••••

Vendor :1 8.5000e- l 6.4600e- l 0.0108 ! 2.0000e- E 5.2000e- l 1.1000e- l 6.2000e- j 1.5000e- l 1.0000e- ! 2.5000e- : 0.0000 ! 1.6717 E 1.6717 ! 1.0000e- l 0.0000 l 1.6720 :l 004 l 003 l l 005 l 004 l 004 ! 004 l 004 l 004 l 004 : l l l 005 l !

"''"''''''''"'"'"'"""'''"'''"";;."""""--'""'""""""'""'"~"""""""uu•••••••~•••••••••••n•n••~••••••••-••••-••~••••••••••••••--oo•;...••••--•••••"•"'"""~""" .... """""""""""~"-"""'"""""""""""...;""""""""""""""""""+""""*-.... """"""""""t''''"''""'''''""'"+""""""""""""""0"0 ~"""""'"""""""'"""""~"""'"""""""""""..,"~u•o••••••••••••••~••••••••••••••••••• Worker :! o.oooo l o.oooo E o.oooo l o.oooo E o.oooo l o.oooo l o.oooo E o.oooo l o.oooo ! o.oooo ! o.oooo l o.oooo E o.oooo l o.oooo l o.oooo l o.oooo

Total

!l ~ ~ ~ ~ ~ 1 ~ l ~ : l ~ l ~ ~

004 003 005 004 004 9.1000e-,7.0900e-~ 0.0115 ,2.0000e-,5.7000e-,1.2000e- 6.8000e-

004 1.6000e-

004 1.1000e-

004 2.7000e-

004 0.0000 ,1.8696 ,1.8696 ,1.o0o~~e-, 0.0000 I 1.8699

A-25

Page 47: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 25 of 38 Date: 1/4/2016 6:23PM

3.7 Phase 4c-Power line re-route: String Power line- 2018

Mitigated Construction On-Site

NOx, co S02 Fugitive EXhaust PM10 PM10

ROG .·

Category ··. tons/yr.

.. ·

PM10 :j"o.tal

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

. MT/yr

CH4 N20 C02e

Fugitive Dust i! i j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ! 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

••••••••o•oooooooooooooooooooo;;_,,.,....,...,,...,,,,...,...,,~.,,.,,,,,, .... ,..,,u~on•••••••••o•on•~•-•••••••·--·-~unou••••noun+•••n••--•-•••-•~uo•••••oonnoon~o-• .. •...,.•••--••~•o•nuoonuu•oo~ounou••••••n••••,ooooooooooooooooo•+•••uuuuoooooo•~•--••••••---•-...;•••o•o•uonoooon~•••••••nonoooo••~•••oooooooooooooooo Off-Road :i 0.0150 i 0.1553 i 0.0968 i 1.5000e- i i 9.2700e- i 9.2700e- i i 8.5300e- i 8.5300e- : 0.0000 i 13.9462 i 13.9462 i 4.3400e- i 0.0000 i 14.0374

:: i i i 004 i i 003 i 003 i i 003 i 003 : i i i 003 i i •: : : : : : : : : : . : : : : :

Total 0.0150 0.1553 0.0968 1.5000e- 0.0000 9.2700e- 9.2700e- 0.0000 8.5300e- 8.5300e- 0.0000 13.9462 13.9462 4.3400e- 0.0000 14.0374 004 003 003 003 003 003

Mitigated Construction Off-Site

NOx l CO 1 SQ2 Fugitive I Exh. a·u.st PM10 PM10

CH4 N20 I C02e PM10 J Fugitive I EXhaust IPM2,5 Total Bio- C02,NBio- C02! Total C02 iota! PM2.5 PM2.5 I ROG

Category • tons/yr MTlyr

. · ' . ·. . Hauling i! 6.ogg

5oe- j 6.3gg

4oe- • 6.s

0o0o1e- j o.oooo i 5.o0o0o~e- ! 1.o0o0o~e- ! 6.o

0og

5oe- ! 1.ogg~e- ! 1.ogg~e- ! 2.og0o~e- ~ o.oooo ! 0.1979 ! 0.1979 • o.oooo . o.oooo . 0.1979

oo••••oooooooooooooooooo••••••~··---•--i-••••••--•••oo•o•••~••••••••••••••••••+---~,.,.~.,•-~ .... 4~-·~•n•••••••••••+---••---·~••••••••••••••••••~------•••4••••n•••n•••••••~•••~•••••••nu"n"•t••••••••••••••••••+••••••••••••••••••~-•••""""""._"_'"4•••n•••••••n•-•~••••••••n•un•••~••••••••••••••••••• Vendor :i 8.5000e- i 6.4600e- i 0.0108 i 2.0000e- i 5.2000e- i 1.1000e- i 6.2000e- i 1.5000e- i 1.0000e- i 2.5000e- : 0.0000 i 1.6717 i 1.6717 i 1.0000e- i 0.0000 i 1.6720

:: 004 i 003 i i 005 i 004 i 004 i 004 i 004 i 004 i 004 : i i i 005 i i .............................. ;f .... .__ .......... - ..... ~ ........................ ~ ............................ .;.--.-· ................. .;. ........................ ..;._ ........ ____ .. _..., .. .;. ............................ .;. .............................. 4 ........................ .;. ............................ ~ .................. f .......................... .;. ....... _______ .......... .;. ........................ .;. .......................... ~ .................. .

Worker :i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000

Total

il l ~ ~ ~ l ~ ~ ~ ! : l ~ ~ ~ ~ 9.1000e-

004 003 005 7 .0900e- J 0.011512.0000e-

004 004 5.7000e-~1.2000e- 6.8000e- I 1.6000e-~1.1 OOOe-~2. 7000e-

004 _I 004 004 004 0.0000 I 1.8696 I 1.8696 1.0000e-

005 0.0000 11.8699

A-26

Page 48: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 26 of 38 Date: 1/4/2016 6:23PM

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018

Unmitigated Construction On-Site

ROG I NOx I CO I S.02

Catl;QOI)f

Fugitive 1 Exhaust 1 F'M10 PM10 1 PM10 J Total

tons/yr

·.

I Fugitiv~ I Exhaust .I PM2.5 Jotal PM2.5 PM2.5 I N20 C0:2e Bio- C02 NBio· C02 Total C02 CH4

.. MT/yr

Fugitive Dust !! 0.0000 l 0.0000 0.0000 0.0000 l 0.0000 1 0.0000 ! 0.0000 l 0.0000 j 0.0000 l 0.0000 0.0000 0.0000

000000000000000000000000000000 ~---•-••-••4•••••••••o•owooooo~ooooooooooooooo•••+-••-••••••••~o•••••o.ouoooooo•+•·--·-••--4••••••••••••••••••4-•-•••••••••••~•uooooonoooooooo~oooo•Oo••ooonooooooi••••••••••o•••••••~oooooowowoooowo•••+-••••••-•••••-•4••••••••••••••••••~••••••••••••••••••~ Off-Road ;1 0.0102 1 0.1045 j 0.0964 1 1.3000e- j 1 7.1000e- 1 7.1000e- j j 6.5300e- 1 6.5300e- ! 0.0000 1 11.9246 1 11.9246 1 3.7100e- 1 0.0000 1 12.0026

Total

:1 l i l 004 l l 003 ! 003 i l 003 l 003 : ! ! l 003 ! i 0.0102 I 0.1045 I 0.0964 11.3~~~e- 0.0000 J 7.1000e- I 7.1000e-~ 0.0000 16.5300e-~6.5300e-

003 J 003 003 003 0.0000 111.9246 11.9246 3.7100e-

003 0.0000 12.0026

Unmitigated Construction Off-Site

I ROG I Fugitive Exhaust PM10 PM10

PM10 I Fugitive I E.xhaust IPM2.5 Total Total PM2.5 PM2.5

N20 I C02e I S02 NOx co Bio- C02\ NBio- C02' Total C02' CH4 I . Category tonstyr MTJyr

Hauling :! 2.0000e- ! 2.1 OOOe- l 2.2000e- ! 0.0000 ! 2.0000e- ! 0.0000 ! 2.0000e- l 0.0000 ! 0.0000 ! 1.0000e- ! 0.0000 ! 0.0660 ! 0.0660 ! 0.0000 l. 0.0000 0.0660 !! 005 i 004 i 004 i i 005 ! l 005 i l l 005 : l i l : :

••••••••••••••••••••••••••••••Jt-••••••-•••••--•-!-••••••••••u••••••t•••••••.o•u••••••~••••••••--•-•--••t•••••••••••••••••••~•-•••••••••••-•'f•••ooooonoo••••ut-••••••••••••••-•-t••••••••••••u••••-t•••••••••oon••••••••••••••••••••••••••~••••••••u••••••••t- .. o•t••••""'""''"'"'"~•••••••••••••••••••

Vendor :! 1.3400e- ! 0.0101 l 0.0170 ! 3.0000e- ! 8.1000e- ! 1.7000e- ! 9.8000e- l 2.3000e- ! 1.5000e- ! 3.9000e- : 0.0000 ! 2.6215 l 2.6215 ! 2.0000e- ! 0.0000 ~ 2.6220 :~ 003 ~ l i 005 l 004 ~ 004 i 004 l 004 i 004 i 004 : i l i 005 l l

.............................. ~ ............................ .;. ................... ~ ...................... f .... - .... ·-----~-·-·--··----------+···--------------+·---·--·----···--·~----------·-····+----·····--··--···+-----····-----------t .................. + ...................... .f ................... __ .;. ................... ~ ..................... ~ .................. . Worker :! 0.0000 ! 0.0000 l 0.0000 ! 0.0000 l 0.0000 ! 0.0000 ! 0.0000 l 0.0000 ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 l 0.0000 ! 0.0000 l 0.0000 ! 0.0000

Total

!l i ~ ~ ~ l ~ ~ l ! : ! ~ ~ ~ ~ 1.3600e-~ 0.01 03

003 0.0172 13.0000e-

005 8.3000e·

004 1.7000e-

004 1.0000e-~2.3000e-~1.5000e-~4.0000e-

003 004 004 004 0.0000 I 2.6875 I 2.6875 0.0000 I 2.6880 1

2.0000e-~ 005

A-27

Page 49: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 27 of 38 Date: 1/4/2016 6:23 PM

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018

Mitigated Construction On-Site

C02e

Fugitive Dust :! i 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 1 0.0000 ! 0.0000 1 0.0000 ~ 0.0000 1 0.0000 0.0000 0.0000 •: : : : : : : . . .

OOOOoooooooooooooooooooooooooo~--•••-••~•+••••••-••••••••••~••••••••••••••••••~------~•••••ooooooooou••+-•-•--••-•4••••••••••••••••••~••--•-•••-•••••~••••••••••••••••••+••n••oooooooooooouiooooooooooooooooootooooooooaooooooooo~ooo--•-·•-•~•••ooooooooooo•-• Off-Road :! 0.0102 i 0.1045 i 0.0964 i 1.3000e- i ! 7.1000e- i 7.1000e- i l 6.5300e- l 6.5300e- : 0.0000 l 11.9246 i 11.9246 l 3.7100e- ! 0.0000 ! 12.0026

!1 1 ! 1 004 ! 1 003 1 003 ! 1 003 1 003 ! 1 ! 1 003 ! 1 Total 0.0102 0.1045 0.0964 1.3000e- 0.0000 7.1000e- 7.1000e- 0.0000 6.5300e- 6.5300e- 0.0000 11.9246 11.9246 3.7100e- 0.0000 12.0026

004 003 003 003 003 003

Mitigated Construction Off-Site

C02e

'

::\ 2.0000e- .! 2.1 OOOe- .i 2.2000e- .i 0.0000 :! 2.0000e- :i 0.0000 .\ 2.0000e- .i 0.0000 .i 0.0000 :i 1.0000e- ,:,' 0.0000 ·.:l 0.0660 ,i·'· 0.0660 ,l,: 0.0000 i,,,· 0.0000 . 0.0660 :l 005 i 004 i 004 i l 005 l i 005 i i l 005

ooooooooooooooooooooooooooooooJt-•••••--•••-•'f•••••••••••••uo•o't••••••••••••••••••'t-•-••••••••--'+•-••••••••oooooooo~•••••--·----•'f••-••ooo•••••••••~ooowo-•-•-•-•-t••••••••••••••••••-t••••----••••••••••••••••••••••••••oooootn••••••--••••••n~•----•••••

Vendor :i 1.3400e- l 0.0101 i 0.0170 i 3.0000e- i 8.1000e- l 1.7000e- l 9.8000e- i 2.3000e- l 1.5000e- l 3.9000e- : 0.0000 l 2.6215 l 2.6215 l 2.0000e- l 0.0000 i 2.6220 :l 003 l l l 005 l 004 i 004 l 004 i 004 l 004 l 004 : ! i i 005 l !

······························:i---····---·~·-····------····-~-·-····--··-...... .;. ...... -----····~·-····----···· .. --f-····-·····-··~ .................... ~ ............................. f ....................... f ........................ :. .................. + .................... .;._ .......................... f ......................... ~ .................... ~ ................. .. Worker :1 0.0000 l 0.0000 i 0.0000 i 0.0000 i 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 i 0.0000

:~ ! ~ ~ ~ 1 i ~ l ! : l ~ ~ ~ ~

Hauling

Total 1.3600e- 0.0103 1. 7000e- 1.0000e- 1.5000e- 4.0000e- 0.0000 2.6875 2.6875 2.0000e- 0.0000 2.6880 003 004 003 004 004 005

A-28

Page 50: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 28 of 38 Date: 1/4/2016 6:23PM

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 . Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM10 PM10 Total PM2.5 PM2.5

Category tonsfyr MTfyr

Off-Road !l 0.1544 1.6181 1.1827 1.7J0o3oe- 0.0887 0.0887 0.0821 0.0821 ! o.oooo 160.8783 j 160.8783~ 0.0474 o.oooo 161.8745

·····························-~---··-........ , ___ + .................... J .................... .; ......................... ~ ................... ~ .......... _. _____ ,+-.................. ~ .......................... + .................... + ....................... i .................. ~ ..................... ~ ... -................... + ................... ~ ...................... ~ .................. . Paving :t 0.0000 [ i [ [ [ 0.0000 [ 0.0000 i [ 0.0000 [ 0.0000 : 0.0000 [ 0.0000 i 0.0000 [ 0.0000 i 0.0000 i 0.0000

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ j Total 0.1544 1.6181 1.1827 1.7700e-

003 0.0887 0.0887 0.0821 0.0821 0.0000 160.8783 160.8783 0.0474 0.0000 161.8745

Unmitigated Construction Off-Site

ROG co S02 Fugitive Exh. a.ust I PM10 I Fugitive J Exhaust IPM2.5 Total PM10 PM10 Total PM2.5 PM2.5

N20 I C02e NOx Bio- C02' NBio- C02,Total C021 CH4 I Category tons/yr MTfyr

Hauling :! 2.0900e- 0.0234 0.0244 8.0000e- 1.9200e- l 3.9000e- 2.3100e- 5.3000e- l. 3.6000e- l 8.9000e- ! 0.0000 l 7.3875 l 7.3875 l 5.0000e- l o.oooo 7.3887 !~ oo3 i ~ E oos ~ oo3 ~ oo4 i oo3 E oo4 : oo4 i oo4 : i ~ i oos i ~

oooooooooooooooooo••••••••••••lt-''""'"""'"'"*-·--"!'•u•n*•••••••n••~•••••u•n•n•••••"t•-.,••-••••-•~•n•••••••"*""*•••~••-•••-••••-"!'n•n••~•••-••n•~••••-•••••"-"'"'~"'•••nn•n•••••••"t••n••••••••••uuut-••••••••••••••••••t•••••••n•••••••••'t•••••••••••••-••

Vendor :t 3.8400e- i 0.0291 i 0.0486 [ 9.0000e- i 2.3300e- l 4.8000e- [ 2.8100e- l 6.7000e- [ 4.4000e- l 1.1100e- : 0.0000 [ 7.5227 i 7.5227 l 6.0000e- i 0.0000 [ 7.5240 :t 003 i i i 005 i 003 i 004 i 003 i 004 l 004 i 003 : i i i 005 i i

.............................. ;+ ............................... -~ ......................... ~ ............................. ~ .................................. ~ ............................ ~ ............ _ .... __ , ..... ~ ......................... ~ ................................. ~ ........................ ~ .............................. ~ .................. f ....................... ~ .............................. ~ ......................... ~ ..................... ~ .................. . Worker :t 6.3900e- [ 0.0112 i 0.1054 i 2.8000e- l 0.0246 1 1.6000e- l 0.0248 i 6.5400e- l 1.5000e- l 6.6900e- : 0.0000 l 19.6170 l 19.6170 l 9.3000e- l 0.0000 l 19.6365

:t 003 i i i 004 i ! 004 i i 003 i 004 i 003 : i l ! 004 l i ·= : : : : : : : : : • : : : : : 1.0300e-, 0.0299 ,7.7400e- I 9.5000e-~8.6900e-

003 003 1 004 003 0.0000 I 34.5272 I 34.527211.0:~e-l 0.0000 I 34.5491 0.0636 0.1785 4.5000e- 0.0289

004 Total 0.0123

A-29

Page 51: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 29 of 38 Date: 1/4/2016 6:23PM

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Mitigated Construction On-Site

ROG Nox co S02 Fugitive Exi:Jaust PM10 PM1.0

..

Category tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

MT/yr

CH4 N20 C02e

Off-Road !l 0.1544 l 1.6181 ~ 1.1827 1.7J~~e- 0.0887 ~ 0.0887 0.0821 0.0821 ! 0.0000 160.8781 160.8781 0.0474 0.0000 161.8743

000000000000000000000000000000 ~...,.,...,,,_...,,,,....,,~._,,,,, .. ._,,._, .. 4,,,,, .. ._ .. ,,._,,,~,,.,...,,.,..,...,,. ...... ., .. ~,,,,_._.,,.,,,, .... ,~,.,. .. ,,,._.., __ ,~ .. ,.,,,, .. ,. .. ._,,,,~.,.,._...,._ .. ,...,,....,__;, .. ._,,,,,._ .. , ... ~,._,,,.,,,.,,,,.__., .. i,,,,,,,,,,,,,,,,,,+,._ .. ,.,,.,,._ .. ,._.,,f-,,,...,...,,.,,_,,.,.4, ... ,,,,,._,,, .. ,,4._,._,,,,,,, .. , .. ,~,,,,,,,,,,,,.,,,,,, Paving :! 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

Total

ii ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ 1 ~ ~ 0.1544 1.6181 1.1827 1.7700e-

003 0.0887 0.0887 0.0821 0.0821 0.0000 160.8781 160.8781 0.0474 0.0000 161.8743

Mitigated Construction Off-Site

·.·.

ROG NOx co S02 Fugitive Exllaust PM10 PM10 .

Category tons/yr

PM10 Total

Fugitive Exhaust PM2.5 Total Bio-. C02 NBio- C02 Total C02 PM2;5 PM2.5

MT/yr

··•.·

CH4 N20 C02e

Hauling :1 2.0900e- 0.0234 0.0244 8.0000e- l. 1.9200e- ~ 3.9000e- 1. 2.3100e- j 5.3000e- ! 3.6000e- 1 8.9000e- : 0.0000 7.3875 7.3875 5.0000e- !. 0.0000 7.3887 !1 003 : : : 005 : 003 ! 004 : 003 ! 004 ~ 004 ! 004 ! ! ! ! 005 : :

••••oooooooooooooooo••••••••••:r•••--•••-t••••••--••n••••••:••no•nn .. o•••••:•••--:••••n••n•••••n•:------tn••-••••••-•••nt•••------t••••••n•on••••••tn•n••••••••••n•••t••••••••••••••••••t•u•••••••••••••••t•--••-•...,.-•-:•••un•••••••••••t•""""""""""""""""":•••••••••••••••••••

Vendor ,; 3.8400e- : 0.0291 ; 0.0486 ; 9.0000e- ; 2.3300e- : 4.8000e- : 2.8100e- : 6.7000e- : 4.4000e- : 1.1100e- , 0.0000 : 7.5227 ; 7.5227 ; 6.0000e- ; 0.0000 : 7.5240 :! 003 i i i 005 ! 003 ! 004 ! 003 ! 004 i 004 ! 003 : ! ! ! 005 ! !

••••••••••••••••••••••••••••••:f-•••--•••••••••~••••••••••••••••u~•n•••••••••••••••~---·---···-~"""""""""""""""""""~--•n••-•••••-•4••••••••••••"""""".;.'"""""""""""""_"...;."""""""""""""""" ... ~""""""""""..,"" .. """"t'"''''''"'"''"''"+•••••••••• ...... ••••.;.-.,.,.,...,.,...,.,...,.,,_f.,. ... .,.,.,.,.,., • ., ........ .,~.,.,.,., • .,., •• .,., .. .,.,.,., ... ~,,.,,,,,,,,,,,,, •• , Worker :! 6.3900e- ! 0.0112 ! 0.1054 ! 2.8000e- i 0.0246 i 1.6000e- i 0.0248 ! 6.5400e- i 1.5000e- ! 6.6900e- : 0.0000 i 19.6170 ! 19.6170 ! 9.3000e- ! 0.0000 i 19.6365

:! 003 i i ! 004 i ! 004 ! ! 003 ! 004 i 003 : ! ! ! 004 i i ·= : : : : : : : : : • : : : : : Total 0.0123 0.0636 0.1785 4.5000e- 0.0289 1.0300e- 0.0299 7.7400e- 9.5000e- 8.6900e- 0.0000 34.5272 34.5272 1.0400e· 0.0000 34.5491

004 003 003 004 003 003

4.0 Operational Detail - Mobile

A-30

Page 52: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 30 of 38 Date: 1/4/2016 6:23PM

4.1 Mitigation Measures Mobile

II ROG I NOx I co I S02 I Fugitive I Exhaust I I"M10 lf'"ugitive I Exhaust. I PM2.5 Total Bio- C02' NBio- C02' Total C02' CH4 I N20 I C02e PM10 PM10 Total PM2.5 PM2.5

Category tons/yr MT/yr

Mitigated .: 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 " • " . " • " • ······························ . : ------ .................. ________ ,..,,., ...............

Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 " • " • " . " •

4.2 Trip Summary Information

Average Daily Trip Rate Unmitigated Mitigated

Land Use Weekday I Saturday Sunday Annua1VMT Annua1VMT

General Light Industry • 0.00 0.00 0.00 • • • • ' Total 0.00 I 0.00 0.00

4.3 Trip Type Information

Miles Trip% Trip Purpose %

Land Use H-Worc~w.l H-SorC-C I H-OorC"NW H-W vSr C- I H-S or C-C I H-0. or C-NW Primary I Diverted I Pass-by

General Light Industry 14.70 6.60 6.60 ' 59.00 28.00 13.00 ' 92 ' 5 . 3 • : : : :

LOA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHO I HHD I OBUS I UBUS I MCY I SBUS I MH

0.438302! 0.063917~ 0.163234~ 0.169914~ 0.042886~ 0.007084~ 0.019490~ 0.082149~ 0.002063~ 0.001756~ 0.006579~ 0.000764~ 0.001861

A-31

Page 53: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 31 of 38 Date: 1/4/2016 6:23PM

Historical Energy Use: N

5.1 Mitigation Measures Energy

C02e

Electricity :1 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated :~ . :

000000000000000000000000000000 ;;.,.,._.,,.,,..,,.-4••ouo ... ••••n••ui•--••••••u•nu .. _;.,..,. .... ,.,,.,.,.,._..,_i•••• .. ••••••••••••+-•••-------+•••• .. •• .. ••••••••~-----••••~••••nn••••••••••.f..,,.,,...,,,.,.,,,, .. ..,,~,,,,,,,,,,,,,,,,,,f,,,..,,,..,,..,,.,,,,,,~-"''"'""-•u••f••••••••oouo••""'.f•••••o .. o .. ••••••o~ooooooooo•ooooooooo Electricity :i i l i l i 0.0000 i 0.0000 i i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000

····-~-~~~~i-~-~~~-~ ..... ll.--····--·---l. ................ .l .................. l.--···-----l ................... L----·-··-··-.l .................. l------·----.l ................. .l .................. ..i .................. L. ............... .l ... -............. l ................. .l .................. J .................. . NaturaiGas :1 0.0000 i 0.0000 i 0.0000 i 0.0000 l i 0.0000 i 0.0000 i i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 ! 0.0000

........ ~~:i.~-~.:~.~ ...... ..!l ! ! ! ! ! ! ! ! l : .................. ! l l ! ! .................. . NaturaiGas Unmitigated

:1 0.0000

" " "

0.0000 0.0000 0.0000

5.2 Energy by Land Use - NaturaiGas

Unmitigated

Land UsE!

l\ll!tural(3a s(Jse

kBTI.J/yr

ROG NOx co

0.0000 0.0000

S02 Fugitive Exhaust PM10 PM10

tons)yr

.PM10 Total

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Fugitive Exhaust .PM2.5 Tqtal Bio,. C02 NBio,. C02 Total C02 CH4 PM2.5 PM2.5

MT/yr .·

0.0000

.N20 C02e

Other Non- 0 ll 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 l 0.0000 1 0.0000 l 0.0000 0.0000 0.0000

-~~-~-~-~~~-~-~~~~~~•• •ooo .. oooooooo••••ll.••••••••••noooooo~••••••••• .. o•ooooo~,..., ... .,..,,.,.,.,...,,._~•••••••••n•••••••~••••--••-•••4•oouo•u•••••••••~---""""'""""""__;,.,.,..,.,..,.,.,.,.,.,._,.,.,.,.~ .... ,.,..,.,.,.,..,.,..,.,. ... +. ..... -••••'""•••••-i••••••••••••••••••~•••"""'""""""""'""""!"""""""'""""""""'"""4"""""""""""*""""""+-•••••""'""""""'""'""~''''"""""""'""''""" General Light 0 :! 0.0000 ! 0.0000 i 0.0000 i 0.0000 i i o.oooo i o.oooo i ! 0.0000 i o.oooo : o.oooo i 0.0000 i o.oooo ! o.oooo l 0.0000 i o.oooo

Industry !1 l l l l l l l l l : l l l l l Total 0.0000 o.oooo 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

A-32

Page 54: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

5.2 Energy by Land Use - NaturaiGas

Mitigated

Land Use.

NaturaiGa s Use

I<BTU/yr

ROG NOx co S02 Fugitive PM10

Exhaust PM10

tons/yr

Page 32 of 38

PM10 Total

Fugitive PM2.5

Date: 1/4/2016 6:23PM

Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5

MT/yr

CH4 I N20 C02e

Ge~:~~~~ht 0 ~~ 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ~ 0.0000 I 0.0000 ! 0.0000 l 0.0000 ~ 0.0000 I 0.0000 0.0000 0.0000

.............................. ...................... f+ ...................... ~ ................... + .. --.................... ..;. ................... ~ ........................ + ................... ~ .......................... + ................... + .................... ~ ............... _ ......... ~ .................. ; ........ --............. +---···············+ .................... ~ ..................... _,_~ .................. . Other Non- 0 :: 0.0000 i 0.0000 i 0.0000 i 0.0000 i i 0.0000 i 0.0000 i i 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000

Asphalt Surfaces :f 1 1 1 1 1 1 i i 1 : i i 1 1 l Total 0.0000 0.0000 0.0000

5.3 Energy by Land Use - Electricity

Unmitigated

Land Use

Electricity Total C02 Use

kWh/yr

CH4

MT/yr

N20

0.0000

C02e

General Light 0 :! 0.0000 0.0000 0.0000 0.0000

Industry =~ : . . 000000000000000000000000000000 ,., .. ,,,,,...,,,,,.,,.tt••• .... ••••••••ooo~o••••••••••• .. uu~""""""-""-"~'''''''''''''''''''

Other Non- 0 :i 0.0000 i 0.0000 i 0.0000 l 0.0000 Asphalt Surfaces :l l l i

Total 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 0.0000

A-33

Page 55: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CalEEMod.2013.2.2

5.3 Energy by Land Use - Electricity

Mitigated

Electricity Total C02 Use

CH4 N20 C02e

... · ... . .. ·

Lanc!Use kWh/yr-. MT/yr

General Light 0 •i 0.0000 0.0000 0.0000 0.0000 I :~ ! ndustry :i i . .

ooooooooooooo••••••ooooooooooo •••oonooo•n•••••~•••nonou•••••••••n••••••••••oono~•·--·-•-•--•-1•••••••••••••••••••

Other Non- 0 :l 0.0000 i 0.0000 i 0.0000 i 0.0000 Asphalt Surfaces :i i i i

•: : : :

Total 0.0000 0.0000 0.0000 0.0000

6.0 Area Detail

6.1 Mitigation Measures Area

cCategory

Mitigated " 0.0000 0.0000 0.0000 0.0000 " " " " ..............................

Unmitigated ,: 0.0000 0.0000 0.0000 0.0000 " " " "

0.0000

0.0000

Page 33 of 38

0.0000 0.0000 ! !-----+----+

0.0000 0.0000

Date: 1/4/2016 6:23PM

C02e

MT/yr

o.o:~:-l .... ~ ... ~.~.~-~ .... L:~~:~:--+_o._o_oo_o ...... ~o_._oo_o_o---fl,~o-~.o0~0~0o0--:,'=,· .... ~o.:_~o.~o.~o-~o ..... 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 ' : ' : ' :

A-34

Page 56: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

6.2 Area by SubCategory

Unmitigated

ROG NOx

Subcategory

co Fugitive I Exhaust PM10 PM10

S02

tons/yr

Page 34 of 38

PM10 I Fugitive Total PM2.5

Exhaust IPM2.5 Total PM2.5

Date: 1/4/2016 6:23PM

Bio- C02 I NBio- C02' Total C02' CH4 I N20 I C02e

MT/yr

Architectural :1 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

......... ~~-~-~~~=-········ll.------------.l-·------·-··---·---f----·---------·---+---·-----------4---·------····-----f------------------4----········------·f---------·-------+------------·---·-4--····--·---·-----··i .................. t .................. ~------------------+---··----··--·--) ................... ! .................. . Consumer :1 0.0000 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000

........ :.~~-~-~-~-~~ ...... ,.u. __________ J ________________ _J ________________ l., ___________ J ______________ _J _________ J ________ ,,, .. ,.J ____________ J ............... J ................ J .................. L.. ............... l.. ................ J ................. ,J .................. l .................. . Landscaping :1 0.0000 l 0.0000 ! 0.0000 1 0.0000 ! ! 0.0000 ! 0.0000 ! 1 0.0000 1 0.0000 : 0.0000 1 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 1 0.0000

:~ ~ ! ! ~ ! ~ ~ l ~ : 1 ! ~ ~ ~ Total 0.0000 0.0000 0.0000

Mitigated

ROG NOx co

·SubCategory

0.0000

S02 Fugitive PM10

I 0.0000 0.0000 I

Exhaust I PM1 0 I Fugitive PM10 Total PM2.5

tons/yr

0.0000 I 0.0000 0.0000 I 0.0000 I 0.0000 .I 0.0000 I

Exhaust IPM2.5 Tofal Bio- C02 NBio- C02 Total C02 PM2.5

MT/yr

CH4

0.0000 I 0.0000

N20 I. C02e

Architectural :1 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 l 0.0000 . 0.0000 l 0.0000 0.0000 0.0000

oooooooo•~-~-~~~~~ooo••••••!l••••.o-•••-•-••~ooooooowooooooooooo~ooooooououoooooo+•-•••-•••••-•-!•••••••••*-•uooooo~•••••-••••••-•-~•••uooooonoouooo~••••-••••-••••••~••••••••••••••••••~••••uoooooooo••••••t••••••••••••••••••; ... ,, .... ,,._ ..... l.,,,_,,.,_,.,,,_-4,, .. ,,,,,,,,,,, .. ,~,,,,,,,,,,,, .. ,,,,,l,,,,,,,,,,,,,,,,,,, Consumer :1 0.0000 l ! 1 ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 i 0.0000

........ :.~.~-~-~-~:.~ ........ n .................. l .................. l .................. l ................. J .................. l ................. J .................. l .................. l. ................. l .................... i .................. L ................. l_ ............... l .................. l .................. ~ .................. . Landscaping :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 l ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 1 0.0000 ! 0.0000

il ~ ! ~ ~ l ~ l ! ~ : l ~ ! ~ ~ Total 0.0000 0.0000 0.0000 I 0.0000 0.0000 I 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000

7.0 Water Detail

A-35

Page 57: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

7.1 Mitigation Measures Water

,: " " " ······························'~'---+--

Unmitigated :1 0.0000 0.0000

" " "

7.2 Water by Land Use

Unmitigated

Indoor/Out Total C02 door Use

Land Use .·. Mgal

..

General Light 0/0 •: 0.0000 " Industry " " ., Total 0.0000

C02e

0.0000

!---~··················· 0.0000 0.0000

CH4 N20

MT/yr

; 0.0000 0.0000

~ 0.0000 0.0000

Page 35 of 38 Date: 1/4/2016 6:23PM

C02e

0.0000

0.0000

A-36

Page 58: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

7.2 Water by Land Use

Mitigated

Indoor/Out Total C02 door Use

CH4 N20

Land Use Mgal MT/yr

..

General Light 0/0 ·= 0.0000 0.0000 0.0000 0: Industry 0:

0: 0:

Total 0.0000 0.0000 0.0000

8.0 Waste Detail

8.1 Mitigation Measures Waste

Category Near

Total C02~ CH4 I N20 I C02e

· .. · MT/yr

..

Mitigated ,: 0.0000 0.0000 0.0000 0.0000 0: 0: 0:

" ······························ ··················· Unmitigated ,: 0.0000 0.0000 0.0000 0.0000

" " " 0:

Page 36 of 38 Date: 1/4/2016 6:23PM

C02e

0.0000

0.0000

A-37

Page 59: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

8.2 Waste by Land Use

Unmitigated

General Light Industry

Total

Mitigated

Land Use

'

General Light Industry

Total

0

0.0000

Waste Total C02 Disposed

tons

' .·· '···

0 .: 0.0000 " t:

" " 0.0000

9.0 Operational Offroad

Equipment Type

0.0000

0.0000 0.0000

CH4 N20

MTfyr

0.0000 0.0000

0.0000 0.0000

Number

Page 37 of 38 Date: 1/4/2016 6:23PM

C02e

0.0000

0.0000

C02e

·.·

0.0000

0.0000

Hours/Day Days/Year HorsePower Load Factor Fuel Type

A-38

Page 60: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 38 of 38 Date: 1/4/2016 6:23PM

10.0 Vegetation

A-39

Page 61: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

1.0 Project Characteristics

1.1 Land Usage

Page 1 of 33

Sanger Substation Expansion Project

Fresno County, Summer

Date: 1/4/2016 6:20PM

Land Uses ·J Size 1 Metric 1 Lot Acreage Floor Surface Area 1 Population

General Light Industry , 0.00 , 1000sqft . 7.00 0.00 , 0 ················································································•················································································f-----------------'······································ --···--·-·--··-·····-····--··········: ....................................... .

Other Non-Asphalt Surfaces : 0.00 : [ 11.00 [ 1 0 ' ' : : :

1.2 Other Project Characteristics

Urbanization

Climate Zone

Utility Company

C02 Intensity (lb/MWhr)

Rural Wind Speed (m/s)

3

Pacific Gas & Electric Company

641.35 CH41ntensity (lb/MWhr)

1.3 User Entered Comments & Non-Default Data

2.2

0.029

Precipitation Freq (Days)

Operational Year

N20 Intensity (lb/MWhr)

45

2019

0.006

A-40

Page 62: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 2 of 33 Date: 1/4/2016 6:20PM

Project Characteristics -

Land Use - Based on PEA, Section 2.0 Project Description, substation expansion will occur on 7 acres and will result in temporary disturbance to 11 acres.

Construction Phase - Based on Construction Equipment and Schedule by Phase table developed by PGE.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table. Puller and tensioner under "Other General Industrial Equipment."

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Trips and VMT- Trip information taken from Table 3.16-3: Estimated Truck Trips.

Construction Off-road Equipment Mitigation -

Table Name l Column Name I Default Value New Value

tblConstructionPhase NumDays : 300.00 66.00 .............................................................................. ; .............................................................................. *------------- .................................................................... .. tbiConstructionPhase ! NumDays ! 300.00 261.00

.............................................................................. , ....................................................................................... ________________________________ ..................................................................... . tbiConstructionPhase ! NumDays ! 30.00 66.00

.............................................................................. , .............................................................................. ;.- __ ..................................................................... . tbiConstructionPhase ! NumDays ! 30.00 44.00

.............................................................................. , ............................................................................... ________________________________________ ..................................................................... . tbiConstructionPhase ! NumDays ! 20.00 43.00

.............................................................................. , .............................................................................. ;.- __ .... , ................................................................ . tbiConstructionPhase ! NumDays ! 20.00 66.00

.............................................................................. , .............................................................................. ;.------------ ..................................................................... . tbiConstructionPhase ! NumDays ! 10.00 22.00

.............................................................................. , ............................................................................... ______________________________________ .................................................................... .. tbiConstructionPhase ! NumDays ! 10.00 23.00

.............................................................................. , .............................................................................. ;.- __ ..................................................................... . tbiConstructionPhase : PhaseEndDate : 10/31/2018 4/30/2018

' ' .............................................................................. , .............................................................................. ;.------------..................................................................... . tbiConstructionPhase : PhaseEndDate : 12/3/2018 12/31/2018 ' . .............................................................................. , ............................................................................... _______________________________________ ..................................................................... . tbiConstructionPhase : PhaseStartDate : 9/1/2018 3/1/2018

' ' .............................................................................. , .............................................................................. ;.------------..................................................................... . tbiConstructionPhase : PhaseStartDate : 9/1/2018 10/1/2018

.............................................................................. ; .............................................................................. : ..................................................................... . tbiConstructionPhase : PhaseStartDate : 6/30/2018 7/1/2018

' ' A-41

Page 63: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 3 of 33 Date: 1/4/2016 6:20PM

tbJGrading AcresOfGrading 99.00 1 7.00 ' ' : .............................................................................. , .............................................................................. ~ .............................................................................. · .................................................................... ..

tbiGrading ; AcresOfGrading ! 66.00 4.11 .............................................................................. ; .............................................................................. ~-----------·---------------·---- .................................................................... ..

tbJLandUse : LotAcreage : 0.00 7.00 .............................................................................. ; .............................................................................. f--______________ .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00 .............................................................................. ; .............................................................................. ;-. ..................................................................... .

tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 1.00 0.00 .............................................................................. ; .............................................................................. ~--------·--·--------- ..................................................................... .

tblOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 2.00 0.00 .............................................................................. ; .............................................................................. ;-.- __ .................................................................... ..

tbJOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 1.00 .............................................................................. ; .............................................................................. ;-. ..................................................................... .

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 3.00 1.00 .............................................................................. ; .............................................................................. ~---·--·---·-----------·--·--·-·--·---·- ..................................................................... .

tbJOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00 .............................................................................. ; .............................................................................. ;-.- ..................................................................... .

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00 .............................................................................. ; .............................................................................. ;-. -- ..................................................................... .

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 2.00 1.00 .............................................................................. ; .............................................................................. ~-----------------·-·--·- ..................................................................... .

tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 2.00 1.00 .............................................................................. ; .............................................................................. ;-. .................................................................... ..

tbJOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 1.00 0.00 .............................................................................. ; .............................................................................. ;-.-__________ ..................................................................... .

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 2.00 1.00 .............................................................................. ; .............................................................................. ~------·------·-----------·------ .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 2.00 1.00 .............................................................................. ;.............................................................................. __ .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 1.00 .............................................................................. ; .............................................................................. ;-.- ..................................................................... .

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 0.00 .............................................................................. ; .............................................................................. ~---·--·-----·-·-----·-·-·--·--·-·--·---- .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 4.00 3.00 .............................................................................. ; .............................................................................. ;-. .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 1.00 0.00 .............................................................................. ; .............................................................................. ~-------------·-----------·- .................................................................... ..

tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00 .............................................................................. ;.............................................................................. .. ................................................................... .

tbiOffRoadEquipment ; UsageHours ! 7.00 8.00 .............................................................................. ; .............................................................................. ;-.----------- .................................................................... ..

tbiProjectCharacteristics ! OperationaiYear ! 2014 2019 .............................................................................. ; .............................................................................. ~----------------------- .................................................................... ..

tbiProjectCharacteristics ! UrbanizationLevel ! Urban Rural .............................................................................. ; .............................................................................. ;-. ..................................................................... .

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 18.00 .............................................................................. , .............................................................................. ;-.----------- .................................................................... ..

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 12.00 .............................................................................. ; .............................................................................. ~------·-·--------·-------- ..................................................................... .

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 8.00 .............................................................................. ; .............................................................................. ;-. ..................................................................... .

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 4.00 .............................................................................. ,.............................................................................. .. .................................................................. ..

tbiTripsAndVMT ! HaulingTripNumber ! 0.00 2.00

A-42

Page 64: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 4 of 33 Date: 1/4/2016 6:20PM

tbiTripsAndVMT , HaulingTripNumber , 0.00 : 6.00 .............................................................................. , .............................................................................. , .............................................................................. · ..................................................................... .

tbiTripsAndVMT ; HaulingTripNumber f 0.00 2.00

··············································································•··············································································.J-··---·---·-·-·--·----·-·-----·------ ······································································ tbiTripsAndVMT ; HaulingTripNumber ! 0.00 224.00

.............................................................................. , .............................................................................. ;- --······································································ tbiTripsAndVMT : VendorTripNumber : 0.00 16.00

' ' .............................................................................. ; .............................................................................. ;..-- ······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 16.00

··············································································•··············································································f-----------·--·-----·-·-·---·-·---- ······································································ tbiTripsAndVMT f VendorTripNumber ! 0.00 10.00

··············································································•··············································································.J------------······································································ tbiTripsAndVMT : VendorTripNumber : 0.00 8.00

.............................................................................. i .............................................................................. 1-- --······································································ tbiTripsAndVMT f VendorTripNumber ; 0.00 22.00

··············································································1··············································································-J--·---·-----·-------·--·---------·---·- ······································································ tbiTripsAndVMT f VendorTripNumber f 0.00 8.00

··············································································•··············································································l- ······································································ tbiTripsAndVMT ! VendorTripNumber ! 0.00 12.00

.............................................................................. , .............................................................................. ;- ······································································ tbiTripsAndVMT ; VendorTripNumber ; 0.00 12.00

··············································································1··············································································-J--·-·--·--·--·-·-----·----·-·-·--- ······································································ tbiTripsAndVMT ! WorkerTripNumber ! 20.00 60.00

··············································································l··············································································l- ······································································ tbiTripsAndVMT : WorkerTripNumber : 0.00 60.00

··············································································i·-············································································1-------------······································································ tbiTripsAndVMT ! WorkerTripNumber ! 0.00 60.00

··············································································•··············································································.J---·--·---·-·-------·--·-·----·-·--·---·- ······································································ tbiTripsAndVMT ! WorkerTripNumber ! 8.00 0.00

.............................................................................. ; .............................................................................. ;- ······································································ tbiTripsAndVMT ; WorkerTripNumber f 18.00 0.00

.............................................................................. , .............................................................................. ;- --······································································ tbiTripsAndVMT ; WorkerTripNumber ! 13.00 0.00

··············································································l··············································································f--·-·--·---·---·--·--·--·-·--·---·--·---·- ······································································ tbiTripsAndVMT : WorkerTripNumber : 10.00 0.00

.............................................................................. i .............................................................................. : ······································································ tbiTripsAndVMT ! WorkerTripNumber ! 33.00 60.00

2.0 Emissions Summary

A-43

Page 65: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.1 Overall Construction (Maximum Daily Emission)

Unmitigated Construction

.·.

II ROG

II .··· NOx

.•

Year'

co S02

.. Fugitive

PM10 Exhaust

PM10 .

lb/day

PM10 Total

Page 5 of 33 Date: 1/4/2016 6:20PM

fugitive Exhaust PM2.5 Total BiO:. C02 NBio- C02 Total C02 CH4 N20 C02e PM.2.5 PM2.5

lb/day

2017 !l 4.4090 45.1985 1 33.6380 0.0518 . 0.9799 2.3428 3.3227 0.2442 2.1561 2.4003 ! 0.0000 15,043.2842! 5,043.2842! 1.2357 0.0000 i 5,069.2348

o•••oooooooooooooooooooooooooo~•-•••••-••••••-~ou•••••••••unn~••••onon••••••n~••••••-••••--•~un•••••onon•••+•-••-•-•'"""...,....,.~,_.oooooooouon•••~••-•-•••••-n••~uooo••••onoooo•o~noonoo•nn .. oo•••t•ooooooooooooooooo~••ouoooooo•••ouo~•••••,.•••••••• .. n~uoo•o .... ooo•••••~•--•••••noooooooni•••••o•oooooooooooo 2018 :! 5.0768! 50.8719! 41.3567! 0.0684! 1.0595! 2.7184! 3.6164! 0.2693 ! 2.5178! 2.7579 : 0.0000 !6,592.1210!6,592.1210! 1.6195! 0.0000 !6,626.1314

=~ ~ ~ ~ ~ ~ ~ ~ ~ i : ~ ~ ~ ~ 1 Total 9.4857 96.0705 74.9948 0.1201 2.0394 5.0612

Mitigated Construction

·.···

502 I Fug. itive Exhaust PM10 PM10

·.

NOx co ROG

Year .... . ·.· . lb/day

6.9391

PM10 Total

0.5135 4.6739 5.1582 0.0000 11,635.405 11,635.405 2.8553 2 2

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 PM2.5 PM2.5

lb/day

0.0000 11,695.366 2

N20 C02e

2017 :1 4.4090 45.1985 33.6380 0.0518 0.9799 2.3428 3.3227 0.2442 2.1561 2.4003 : 0.0000 ! 5,043.284215,043.2842! 1.2357 1 0.0000 :5,069.2348

.............................. ~---···----~·-·''"'"'''''"''''~''''''''''''''''''~'···········-···-~-·-··············~----·····-+·········-·······~---··-····-~··················~·-·····-··········.i .................. t.. ................ l ......... _ .... ,l .................. l .................. J .................. . 2018 :! 5.0768 ! 50.8719 i 41.3567 i 0.0684 ! 1.0595 i 2.7184 i 3.6164 i 0.2693 i 2.5178 i 2.7579 : 0.0000 !6,592.1210!6.592.1210! 1.6195 i 0.0000 !6,626.1314

!i ~ ! ~ i ~ ! ~ i i : ~ ~ ~ ~ ~ Total 9.4857 96.0705 74.9948 0.1201 2.0394 5.0612 6.9391 0.5135 4.6739 5.1582 0.0000 11,635.405 11,635.405 2.8553 0.0000 11,695.366

2 2 2

ROG NOx co 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio·C02 NBio.C02 Total C02 CH4 N20 C02e PM10 PM10 Total PM2.5 PM2.5 Total

Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction

A-44

Page 66: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.2 Overall Operational

Unmitigated Operational

ROG NOx II

Category

co S02 Fugitive Exhaust PM10 PM10

lb/day

PM10 Total

Page 6 of 33 Date: 1/4/2016 6:20PM

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lblday

Area ;j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 •: .

······························~---···············l ....................... l ..................... l ... h-······-···-l ....................... l ..................... l .................... t .. _______________ l ................... l ..................... i .................. l ................... t .................. l .................. l .................. .l .................. . Energy ;j 0.0000 l 0.0000 j 0.0000 j 0.0000 l j 0.0000 l 0.0000 j l 0.0000 j 0.0000 : ! 0.0000 j 0.0000 l 0.0000 j 0.0000 j 0.0000

.............................. ll, ......... ___ J .................. l. ................. l. ..... -··-··-l.·-··············l.···-··········l. ................. l.. __________ l. ................. l. ................... i .................. L ................. L. ___________ l .................. L ................ J .................. . Mobile ;j 0.0000 j 0.0000 i 0.0000 i 0.0000 j 0.0000 i 0.0000 j 0.0000 i 0.0000 ! 0.0000 j 0.0000 : ! 0.0000 i 0.0000 i 0.0000 j i 0.0000

=~ ~ ! ~ ~ l ~ l ~ ~ : l ! ~ ~ l Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mitigated Operational

ROG NOx I co I S02

Category

I Fugitive I Exh. aust I PM10 PM10

lblday

PM10 I Fugitiv. e .Total PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CQ2 NBio-.C02 Total C02' CH4 I lb/day

N20 I C02e

Area ;j 0.0000 j 0.0000 j 0.0000 i 0.0000 j i 0.0000 j 0.0000 i i 0.0000 l 0.0000 : i 0.0000 i 0.0000 i 0.0000 i l 0.0000

.............................. u ......... ______ t .................. L ............... .l ...... _. _______ J .................. J ... -........... J .................. t.--·····-···-.l .................. t ................... i .................. t .................. t.--·····-····-.l ................ .J ................... i .................. . Energy :i 0.0000 i 0.0000 i 0.0000 1 0.0000 i 1 0.0000 i 0.0000 i i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000

.............................. ll.-.·-·····-·-J····-············l.·-·············-l.·-····-········j··-··············J·····-···········J .................. J._ .............. .l .................. J .................... i .................. L. ................ J .... -....... _ .. .l .................. l. ................. J .................. . Mobile :1 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

=~ ~ ! ~ ~ ! ~ ~ ! ~ : ! 1 ! i l

Total 0.0000 0.0000 I 0.0000 I 0.0000 I 0.0000 I 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 I 0.0000 I 0.0000

A-45

Page 67: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 7 of 33 Date: 1/4/2016 6:20PM

ROG .

Percent 0.00 Reduction

3.0 Construction Detail

Construction Phase

Phas~. Number

Phas~.t-Jame

NOx co

0.00 0.00

S02 Fugitive Exhaust PM10 PM10 PM10 Total

0.00 0.00 0.00 0.00

phase Type Start Date

.·. . . .·.

Fugitive Exhaust PM2.5 PM2.5

0.00

End Date

PM2.5 Total

0.00 0.00

NumDays Week

Bio-C02

0.00

NumDays

:Phase 1-Substation Grading and :Grading i 3/1/2017 ! 5/31/2017 5! 66!

NBio.-C02 Total C02 CH4

0.00 0.00 0.00

Phase Des<;ription

:Access ; I i I ! ! oo••ooooooooooooooo~oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo.JuoooouoooooouooooooooooooononoooouuoouuuooouooooJ---------i---------4•••Uooooooooouooooooioooooooooooooooooooooolooo•••••oooooooooooooooooooooooooooooooooooooooooooooooo

2 :Phase2-Substation Foundations :Building Construction !6/1/2017 !8/31/2017 i 5! 661 :and Footings ! I ! ! i I ................... .; ................................................................ ~............................................................ .. .................... ; ...................... ! ................................................................. .

3 !Phase 3-Substation Equipment ! Building Construction 1 9/1/2017 l. 8/31/2018 5! 261! ; Installation • ! . : ! !

···················~································································~·······································--·········--···---·~ ---!---------+······················~······················~·································································· 4 :Phase 4a-Power line re-route: ; Paving ; 3/1/2018 : 4/30/2018 ! 5! 43!

................... l-~.~~!~!!.::.~.~ .. ~~~.~.~~!!~~.~ ..................... 1 ........................................................... i i i ...................... L ................... .J ................................................................. . 5 iPhase4b-Powerlinere-route: !Grading j5/1/2018 !6/29/2018 i 5! 44!

•lnstaiiTSP • ! ! ! ! ! ................... .; ................................................................ ~ ........................................................... 1----~------+·· ................... ; ...................... ! ................................................................ .. 6 !Phase4c-Powerlinere-route: :sitePreparation j7/1/2018 !7131/2018 I 5! 22!

•String Power line • l ! I ! ! 7 ................. 1'rt;~~~·4~i~P~~~·ii~~·;~·;~~~~: ........... !sii~.r~~p~~~~~~~ .............................. 1811t2o 1a ____ 873112o 18---T ................. s] ................... 231' ................................................................ . !Remove pull site and restore i I I i ; property : i I ! ................... ~.............................................................................................................................. . ............................................. ~ ................................................................ ..

8 :Phase 5: Equipment Removal and :Paving ! 10/1/2018 !,.12/31/2018 ! 5! 66i :clean-up l ! i i i

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 0

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating- sqft)

OffRoad Equipment

N20

0.00

C02e

0.00

A-46

Page 68: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 8 of 33 Date: 1/4/2016 6:20PM

.. Phase Name 1 Offroad Equipment Type Amount I Usage Hours ·I Horse Power Load Factor

Phase 1-Substation Grading and Access iExcavators oi 8.00! 1621 0.38

Ph~-~-~-1~8~-t;~i~ii~~--G~~d·i-~g·~~·d·A~~~~~-i Graders i ···········································1·r----8.0ot-···························1·74j .. ···························a·.·41

.......................................................................... :.--------·------·---·--·!. ........................................... .' : ................................... l.. .................................. . Phase 1-Substation Grading and Access ~Other Construction Equipment I 1 i 8.00! 1711 0.42

Ph~-~-~-:;~·s~·t;~i~ii~~--8~~d·i·~9·~~·d·A~~~~~·tPiat~c;-~p-;;;!;;-------------·J' ···········································1·i 8.oo i ·································aj·························· .. ·a-:43

.......................................................................... : _ ............................................. ....__ _____ _;,, .................................. i·····································

~~~-~-~-~~-:~-:~-~~~:~~ .. :~~:~-~-~-~~-~ .. ~~-~~~~-r.~~ers -----------·--------4-. ........................................ ~.! 8.00! ............................... ~~1~ .............................. ~ ... ~~ ;.~~~,~~'-;::_::~~::~:~:§;;~:~;,:~---r~~ : : : =:::L __ _;;j :: : ~:;c ~:: Phase 1-Substation Grading and Access tSkid Steer Loaders 1 1! 8.00! 64 1 0.37 .......................................................................... :.--------·-------·--------.j ............................................. ' ' ....................................................................... . Phase 1-Substation Grading and Access ~Tractors/Loaders/Backhoes i 2! 8.00i 97 0.37 Ph;~·~-2~-s~·t;~i~ii~~--F~~-~d~ii~~·;·~~d ........ fAir co~pre~;·;;------------·---·t .......................................... :;l 8.oo , ............................... 7.8, ............................. 0 . .'48 !:'.~~!~~~-~ ........................................................... !.. .................................................................... 1.. .......................................... i .................................. !.. .................................. . Phase 2-Substation Foundations and !Bore/Drill Rigs ! 11 8.00! 2051 0.50 Footings : i I i I

~;.;;;~~~:~~:~~~~~:~~:~~~:~~~~:~~:~::~~~::::::::r~:~~~:~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::r:::::::::::::::::::::::::::::::::::::::::~r-----7~~~~~:~~~~~:~~~~~r::::::::::::::::::::::::::~-:~~ Phase 2-Substation Foundations and :Excavators ! 1 i 8.00j 1621 0.38

!:'.~~!!~.~-~ .......................................................... J ...................................................................... t ............................................ ~--------4---·------------~ ................................... .. Pha~e 2-Substation Foundations and !Forklifts ! 1 j 8.00II 89' 0.20 Footmgs : : .;.! ______

4 .Ph·~~-~-2~-s~·t;~i~ii~~--F~~-~d~ii~~-~--~~;; ....... T8~~;~~i~~-s~I~ ......................................... T ......................................... o i 8.oo 1 .............................. 84 ............................. 0.'74

Footings i i 1 i ••••••••••••••••••••••••• 0 •••••••••••••••••••••••••••••••••••••••••• .............................................................................. t········--······--····--···················· 0 ··-····------·········------··· •••••••••••••••••••••••••••••••••••••

Phase 2-Substation Foundations and :skid Steer Loaders j 2j 8.00j 64j 0.37

:~:!l~~:~-s~·t;~i~i~~~--F~~-~d~i~~~-~--~~d········i·;:~~~i~~~~L~~"d~;~iEi~~kh·~~--.................. ~ .......................................... :;t-----8~~------------g-~·························· .. ·a·:37

:~:!l~~:~-s~-t;~i~i~~~--F~~-~d~i~~~-~--~~d········iw~id~~~ ...................................................... f .......................................... a i 8.oo i ............................. 4.6j~ ............................. o.'45 Footings i i i i oooooooooooooooooooOOO+ooooooooooooooooooooooooooooooooooooooooooooooooooo .. ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooool.ooooonoooooooooooooooooooooooooooouooooou.J.-.------~----------· ooooooooooooooooooooooooooooooo••••••

:~=:r::::::::::::;::...... -l;;:~~~~~··- -·- -·-1- - - --- ;! :::1 --J~ ............................. ::-:: I II . ' · · · -;~::~~ti~·t;~i~i~~~ .. E~·~;~~~-~i .................. j·F~;klifi~ ....................................................... t .......................................... 1t-----8~---·----·----89+ ............................ o_.2a !.~.~-~~!!~!!~~ ....................................................... ~ ...................................................................... ~ ............................................ i 1 .................................. 1 ................................... . Phase 3-Substation Equipment :Generator Sets i Oj 8.00j 841 0.74 Installation : i i ! i Ph~~-~-3~s~b-~i~ii~~ .. Ei~-~~~~~~i ................. 'foih~;·G~~~;~i·i~-d~~i;i·~·i·E~·~;~~~~i ...... r- 1 ! ......................... iaa·i 87! ............................. 0.'34

Installation • i i i i

A-47

Page 69: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 9 of 33 Date: 1/4/2016 6:20PM

Phase 3-Substation Equipment ;Skid Steer Loaders 1:. 8.00:. 64:. Installation : ~ : : : ··········································································4······································································~·········-···········-···········-······-t-················-·-···········•-···········-···················j··

~~=:~~::::::::::=: m••••••••l::::;.':":~:.".:::~=••••••••••m••l•••••• ••••••m••••• •••••••••:I :::1--·--:jl•••••••••••••••••••••••••••••:~:: Installation i i : i ·················································································································································!············································+---------+--·-----·-----· ····································· Phase 4~-Power line re-route: Install TSP:Bore/Drill Rigs l 1 i 8.001 205 1 0.50 .F.:~~~-~~!~~~~ .................................................... l ...................................................................... t ............................................ i . ·-··-····-·-··-····-········1·····································

:~~:1::~:=:.;;::-~:~:::: .. ;.::::;;.:::l::;;:;""""""""""""""'""""'"""""""""""""t"''''''"''"''''''"'"'''''''''"'"'''l-----;~~-------·---~~6~"""""'"""""""""""""""""""""":":":: Foundations : i I i ................................................................................................................................................................................................... .;_ _____ ____... ______________ ····································· Phase 4a-Power line re-route: Install TSP:Generator Sets l ol 8.001 841 0.74

~~~~i~~~~~=:=~=~=:t:=.=~=::=:=~~~~~~~~~~~~=~~~~~ ~;~;,;~!;;~~-~-~~-~~~~-~:~.~~~~~--~-~~~~~~-~-~~1-~~~:~:~.~:.~:~~-~~~~-~~:~.~-:~ .................... ! .......................................... ~! 8.00: ··-···-·-··· ............. ~.~ ·····························~---~~ Phase 4a-Power line re-route: Install TSP: Welders l 0 i 8.00 i 46 1 0.45

;:;:~;;~;;,;;;;;;;;;;;:;;;:;~ ,;;;;;:;sei;;;:;;;u;;·----·- -·- --·-t-·-· -·--·-+------,~····························o:;; ~~~~:~:~~~~~~~:~~~~:~~~~~~~~::~:~~~~~~:~~~iGraders ___________________ !::::::::::::::::::::::::::::::::::::::::::~:r---B.Oor::::::::::::::::::::::::::~:~~C::::::::::::::::::::::::::~:-:~~

::=~:::~::::=~~:::::~:~~~ : ~~~~~~:~ ::::- •m• -m;~: m•••••••m m~:: .......................................................................... L-------------i ............................................ .i 8.oor::::::::::::::::::::::::::::~~~r:::::::::::::::::::::::::::~::~~ :~::•:•::~:·:=~-:;~:.;:;:~::~••:•~:::;:.~::t:~:~~~~~~~------·--·ti """""""""""""""""""""""""""""""""""""""""""~"! ::::: ooooo••••••••••••"'""""""""""""a:l••••o•ooooooooooooooo•ooooooo:•:•::

! ! : l Ph;~~-4b~P·~~;-jj~~-;~;~~i~~ .. j~~i~ii.Ts.P; Scrapers 1 ........................................... 1.1 8.ool .......................... 361.1 ............................. (i:48

·Ph;~-~-4i;~r~~;·ii~~-;~;~~i~~ .. i~~i~ii.:rs·Pfskid"steer Load-e7s"""'---·-------t .......................................... :;·j 8.oo; .............................. 64]········ ..................... ci:37 .......................................................................... .;.,_ _____________________ J, ............................................ i i ................................... ' .................................... .

;Zl~~:;:::::::::::::m l.:;;~~~;mm -••••••••-•••-••!•••••• ••••••• m••••••m:l ::1---;,j"""""""""""""""""""""""""""""":~:: Power line i i ! i .................................................................................................................................................. t ............................................ -f--------+-------------- ····································· Phase 4c-Power line re-route: String ! Cranes i 1j 8.00 I 2261 0.29 ~~~~.1.i.~~ ....................................................... l ...................................................................... t ............................................ ! . -·--·--···-·-··---J .................................... . Phase 4c-Power line re-route: String iForklifts i 1j 8.ooj 891 0.20 Power line : i i i ooooooooooooooooooooooooooooooooooooooOOooooooooooooOOooooooOooOoooooooo00¥00000oOOooooOooOooOOOoo000""""'""""""""""""'""""""""'""'""o 0oooooooooo.,ooOOOOOOOooooOoo"oOOO!-, -------i•oooooooooooooooooooooooooooooooooooo

Phase 4c-Power line re-route: String :other General Industrial Equipment j 2i 8.00j 871,_ Power line : ~ ~ ~

0.37

0.34

A-48

Page 70: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page10of33 Date: 1/4/2016 6:20PM

Phase 4d-Power line re-route: Remove :Skid Steer Loaders . 1 [ 8.00 [ 64 [ 0.37 pull site and restore property : [ [ i i ·Ph;~·~·4;;~p·;;;;;;~·i;~~·;~;;~i~~··R·~~~~~·····1·-r~~~i~~·~·iL:~~;;·~~~is~~kh·~~····················r··------·--·-······---------------·····3r········------·········-a:aar···········------·----------971·····························a:37

:~~:·:~~~~~~%~~{-~?~Z~i·~·~·d·ci~~~~~A~~·c;~;;·;~~~~~~·······································}···--·--·------·--··------·--·----···--·--1: 8.oo i .............................. 78~- ............................. o.'4ii

up ' ' . . .......................................................................... : ....................................................................... ~ .............................................. L--------t--------·----- ····································· Phase 5: Equipment Removal and Clean-:Forklifts i 1! 8.001 891 0.20

~.~ .................................................................... J ...................................................................... L .......................................... 1 ~----------------------------1 ................................... .. Phase 5: Equipment Removal and Clean- :Graders 1 1 i 8.00 i 17 4l 0.41 up : i i i Ph~~~·5:·E;;~·i·p-~~~i .. R·~~~~~i·~-~d·ci~~~~!·aih~~·c;~~i~~~ii~~··Eq~~p~·~~i····· .. ······ .. t .......................................... 1f _____ sffiit---------·---;-71 ·····························a.42

up ! 1 ! i .................................................................................................................................................. f ................................................ -t--------::-r------------- ................................... .. Phase 5: Equipment Removal and Clean-!Pavers l 1j 8.001 1251 0.42 up : : : i I rh·~·~·~·5:··Eq~i·p-~~~~·R~~~~~·~··~~d·ci~~~·~!-ri~!~-c~~;;·~~i~~·~··· .................................. T ......................................... 1 1 8.oo i ................. ____ ........ ii1·····························ci."43

*~~~·~·5:··E;;·~·i·p-~~~·i·R~~~~~i··~~d·ci~~~·~f'R;ii~;~ ......................................................... f .......................................... 1t-----8~--------------a-a11

............................. o._.3ii

~.e ..................................................................... l ...................................................................... ~ ............................................ ! 1----------·----------------·-- •••••••••••••••••••••••••••••••••••••

Phase 5: Equipment Removal and Clean-!Scrapers l 1j 8.001 361 0.48 up : : 1 ; 1 ................................................................................................................................................................................................. ,._ _______ ...., ______________ -1····································· Phase 5: Equipment Removal and Clean-!Skid Steer Loaders l 2j 8.00! 641 0.37 up : ; i .................................................................................................................................................. • .................................. !-. -------! .................................... . Phase 5: Equipment Removal and Clean- :Tractors/Loaders/Backhoes i 3i 8.00~ 9i up : [ [ [

Trips and VMT

Phase Name Offroad Equipment Count

WorkerTrip Number

Vendor Trip Number

Hauling Trip Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

0.37

Vendor Hauling Vehicle Class Vehicle Class

Phase 1-Substation ! 8 60.00 16.00 18.00j 16.80 6.60l 20.00~ LO_Mix l HOT Mix \ HHOT G.r;~dir.'.':' .. ~~d..!!r.t:.?S.~ ...... f.--------------- ......................................................... .......................... i··--······--···----·••••••••· ............................... %···· .. ··••••• .................................................. : .·······•••••••• .. •·····•••• Phase 2-Substation i 71 60.00 16.00 12.001 16.80 6.60j 20.00j LO_Mix j HOT_Mix j HHOT

;;;:~";:;;'~;;~-;;i~;';'~ - - ·;;ooo - ·- 10:00 - ·- s:ooj·· ·- 1680 - -·- S:Soi - ·--;ooojco~;;·-- --- i HOT _M;, : HHDT m m

E~.'-'.i.r:'.m~r.-! .. '.~f:t.?.IJ:?t.i.':".r:-... • ................................................................................. .;. .......................................................... .; .......................... ~ ..................................... +---------; ......................... .. Phase4a-Powerline t 3 0.00 8.00 4.001 16.80 6.601 20.00jLO_Mix jHOT_Mix ~HHOT !:~.!'".~1.!t~: .. l.~~.t::;o!!.T.S.I?..En.:,._________ ............................ """'""''""''"''''"'""'"" ......................... ~ ............................. ........................... .; ................. ,.,, ..... t••••"•'"'""'""'""''"''''"''"''"''': :•••••••••••••••••••••••••··

~!~:.\~:~!.~:~~~~ ..... 1 __________ 7~~ .................... ~:~.~- ................ :.~:~~-[ ................. ~~.~-~!... ................ ~.~:~~ .................... ~:~.~1... ............ :.~:~~1~~.:~~~-..................... ~ HOT_Mix !.~~.~-~ .............. . Phase 4c-Power line t 5 0.00 8.00 6.00j 16.80 6.60j 20.00j LO_Mix l HOT _Mix 1 HHOT

~~:~·;~d~~:~~~~~;r . .l} i 4J .................... a:a·a· ................. 1.2:ao'[ ................. 2:·a·at ................... 1.6:iia· ................... 6:6a1 ............... 2a:aal·co~M·i~· ..................... tHoT-=Mi;--i·HHor···············

.r.~?..r.~·.!te: .. l?.."?.mn~te.!:'.'.!•.' .. r; • .;....................................... .............................. . :............................... : .......................... ; .................................... : ~ .......................... .

Phase 5: Equipment : 13[ 60.00[ 12.00[ 224.00[ 16.80[ 6.60[ 20.00j LO_Mix j HOT_Mix j HHOT o.,~no vl r'l 'on ' : : ' : : : ' ' '

A-49

Page 71: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.1 Mitigation Measures Construction

Clean Paved Roads

3.2 Phase 1-Substation Grading and Access - 2017

Unmitigated Construction On-Site

ROG NOli co :

S02 Fugitive Exflaust 1 PMHl PM10 .. ·.· ..

Category ... . ·· . lb/day .. .

Page 11 of 33 Date: 1/4/2016 6:20 PM

PM1ci Fugitive Exhaust PM2.5Total Bio-.C02 NBio-C02 Total C02 CH4 N20 C02e Total PM2 .. 5 .PM2.5

•. lb/day

Fugitive Dust :1 0.1125 0.0000 0.1125 0.0121 0.0000 0.0121 0.0000 0.0000

" " oooooo•••••o•oouooooooooooooo~•-•-•-oo••~•••u•-••n•n•••~•••••n•"•••••nu+.-----·---~un•on••••••n••+----·--~-•••••••n ... ,,.,,.;._.,.,,,_.,,...,. ...... ,..;., .. ,.._ ... ,,,.,,,.,+,.•••'"''""nuoo•••,•ooooooooooooooooo~•••••••n•n••••••~---.. ..--•••.,-+•••••••n•••••••••+nouo••••••••••••~••••••••••••ooooooo Off-Road :i 3.9768 i 43.5320 i 27.6392 i 0.0386 i i 2.3157 i 2.3157 i i 2.1312 j 2.1312 : j3,936.4398j3,936.4398i 1.1991 i j3,961.6216

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : l ~ ~ ~ ~ Total 3.9768 43.5320 27.6392 0.0386 0.1125 2.3157 2.4282 0.0121 2.1312 2.1433 3,936.4398 3,936.4398 1.1991 3,961.6216

Unmitigated Construction Off-Site

ROG NOx CQ

Category ·•.

S02 f'ugitive PM10

Exhaust . PM10

lb/day

PM10 Total

Fugitive PM2.5

Exhaust IPM2.5 Total Bio- C02,NBio- C02! Total C02! PM2.5 I I CH4. ~ N20 I C02e

lbiday ·

Hauling :1 5.3400e- 0.0608 0.0545 2.0000e- 4.7800e- ! 9.7000e- ! 5.7500e- ~ 1.3100e- ! 8.9000e- ! 2.2000e- ! 20.2077 20.2077 1.5000e- i 20.2107

.............................. !L ... 00: .. .-+ .................. 4 .................. +----~~--f ....... ~.~-: ...... J ...... ~~: ..... J ....... ~.~.: ...... ~---~~:-J ...... ~.~~ ...... J ....... ~~: .... J .................. t .................. f ........ - ...... ~ ....... ~-~.: ...... l.. .............. ) ···················

Vendor :i 0.1660 i 1.2564 l 1.7685 l 3.4700e- i 0.0963 i 0.0212 i 0.1175 i 0.0275 ! 0.0195 ! 0.0470 : i 342.2817 i 342.2817 i 2.8200e- i i 342.3409

.............................. ll. .................. l ................. .l .................. l---~~: ...... l .................. l.. ................ l .................. l ................. .l ................. .l .................... i .................. L ................ .l-................. 1 ....... ~.~.: ..... -l .................. l .................. . Worker :! 0.2608 ! 0.3494 i 4.1759 ! 9.4600e- i 0.7664 i 4.9500e- i 0.7713 l 0.2032 i 4.5500e- i 0.2078 : i 744.3551 i 744.3551 i 0.0337 i ! 745.0617

ii i i i 003 ~ i 003 i ~ i 003 i ! i ~ i i i Total 0.4322 1.6666 5.9988 0.0131 0.8674 0.0271 0.8945 0.2320 0.0249 J 0.2569 11,107.6133

A-50

Page 72: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 12 of 33 Date: 1/4/2016 6:20PM

3.2 Phase 1-Substation Grading and Access- 2017

Mitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

lblday

CH4 N20 C02e

Fugitive Dust ;i 0.1125 0.0000 0.1125 0.0121 0.0000 0.0121 0.0000 0.0000

" •••••••••••ooooooooooooooo••••~-••n•-•••••••••J•••uoon••••••••~••••uoouooo•••••~•""".,."'_...,,,,,,~,,,,.,.,.,,.,.,.,,,,,~,,...,,,..,.,,.no•••-•~•••••••••nn•oon~•••••••••••n•-••~•••••••••••••nou~uo••••••oooun••uiooooo•o••ooooooooo~oooo•o•••••••••u•~•-•••• Off-Road :! 3.9768 ! 43.5320 ! 27.6392 ! 0.0386 ! ! 2.3157 ! 2.3157 ! ! 2.1312 ! 2.1312 : 0.0000 !3,936.4398!3,936.4398! 1.1991 ! p,961.6216

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 3.9768 43.5320 27.6392 0.0386 0.1125 2.3157 2.4282 0.0121 2.1312 2.1433 0.0000 3,936.4398 3,936.4398 1.1991 3,961.6216

Mitigated Construction Off-Site

ROG NOx co

Category

S02

.

I Fugitive J Exhaust j PM10 l PM10 I

lb/day

PM1 0 I Fugitive I Exhaust Total PM2.5 PM2.5

·.

PM2.5Total Bio- C02' NBlo- C02 I Total C02 I CH4 I N20 I C02e

lb/day

Hauling :i 5.3400e- 0.0608 0.0545 2.0000e- 4.7800e- 9.7000e- 5.7500e- 1.3100e- ! 8.9000e- 2.2000e- : 20.2077 20.2077 1.5000e- ! 20.2107 :! 003 004 003 004 003 003 i 004 003 : 004 i

oooooooooooooooooooooooooooooo;+,,...,.,,.,.,,.,., .... , .... , .. .;..,.._,,.,,,,,.,,,. .. ,.~..,,.,.,,,,,..,.,.,.,n,f•--••••-•••-•••+•••nn•n••••••••+•••••••-•-•••-•+•••••••••••-•n-+••••••-••-•••••+•••unu•••••••••+••n•u•••••••••••n~••••••••••••••••••+•••••"*uu,..,,,,.,.,+.,••••••••••••-•••+••••n••••••••••n+••n••••••••"*""""~••••••••••••••••••• Vendor :! 0.1660 l 1.2564 ! 1.7685 ! 3.4700e- ! 0.0963 ! 0.0212 ! 0.'1175 ! 0.0275 ! 0.0195 ! 0.0470 : ! 342.2817 ! 342.2817 ! 2.8200e- ! ! 342.3409

.............................. ~ .................. l. ................. l .................. l ...... ~~-~ ..... l. ................ ..t ................. .l .................. l .................. l. ................. l .................... i .................. L. ................ l .................. l ....... ~.~.: ...... L ................. l .................. . Worker :! 0.2608 ! 0.3494 ! 4.1759 ! 9.4600e- ! 0.7664 ! 4.9500e- ! 0.7713 ! 0.2032 ! 4.5500e- ! 0.2078 : ! 744.3551 ! 744.3551 l 0.0337 ! ! 745.0617

!! l ~ l 003 ~ l 003 i ~ ~ 003 ~ ! l ~ i i i Total 0.4322 1.6666 5.9988 I 0.0131 I 0.8674 I 0.0271 I 0.8945 I 0.2320 I 0.0249 0.2569

1

1.106.8444

1

1.106.8444! 0.0366 I ,1,107.6133

A-51

Page 73: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 13 of 33 Date: 1/4/2016 6:20PM

3.3 Phase 2-Substation Foundations and Footings- 2017

Unmitigated Construction On-Site

ROG NOx I co S02 Fugitive Exhaust

.I PM10 PM10 ·

Category ·. lb/day

·. . .

Off-Road . : 1.8599 19.1037 14.3191 0.0267 1.0869 t: t: t: ! t:

Total 1.8599 19.1037 14.3191 0.0267 1.0869

Unmitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category '·.

lb/day

.•

PM10 Fugitive Exhaust PM2.5Total BiO.:C02 NBio- C02 Total C02 CH4 N20 C02e Total PM2.5 PM2.5

'. lb/day

1.0869 1.0184 1.0184 • 2,700.5888 2,700.5888 0.7521 2,716.3828 • • • • 1.0869 1.0184 1.0184 2,700.5888 2,700.5888 0.7521 2,716.3828

PM10 I Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C0.2 Total PM2.5 PM2.5 .

CH4 N20 C02e

lb/day

Hauling :1 3.5600e- 0.0406 0.0363 1.4000e- :.: 3.1900e- ! 6.5000e- ! 3.8300e- ! 8.7000e- ! 6.0000e- ! 1.4700e- ! 13.4718 13.4718 1.0000e- 13.4738 =~ 003 i ~ ~ 004 i 003 ~ 004 ; 003 ~ 004 ~ 004 ~ 003 : : ~ i 004 i ~

000000000000000000000000000000 f!"--•---·"t••••••••••n••••••~••••••••oouo•••••~··----·----t•••••o•ouu••••••~-------1'•••••••••••"'''""'~"",._'_"'"~'''''"''""''''no•"t••••••n••••••••••u•••••••••••••••••••t•••onoooooo••••••~•-•-•••"•-"t•••••••••••uooooo't••••••••••••••••n"!••••••••••••••

Vendor :! 0.1660 i 1.2564 i 1.7685 i 3.4700e- i 0.0963 ! 0.0212 i 0.1175 i 0.0275 i 0.0195 i 0.0470 : ! 342.2817 ! 342.2817 i 2.8200e- ! ! 342.3409

.............................. ~---·--··---l .................. l .................. !----~~:. ...... L ................. L ................ ! .................. l ................. .l .................. ! ................... .i .................. L ................. l ................. .l ....... ~.~-~-.... 1 .................. ~ .................. . Worker :! 0.2608 i 0.3494 i 4.1759 i 9.4600e- i 0.7664 i 4.9500e- i 0.7713 ! 0.2032 i 4.5500e- i 0.2078 : i 744.3551 ! 744.3551 i 0.0337 ! ! 745.0617

!! ! ! ! 003 ! ! 003 1 1 1 003 1 ! ! 1 ! ! ! Total 0.4304 1.6463 5.9807 0.0131 0.8658 0.0268 0.8926 J 0.2316 0.0246 0.2562 1,100.1085 1,100.1085 0.0366 1,100.8764

A-52

Page 74: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.3 Phase 2-Substation Foundations and Footings - 2017

Mitigated Construction On-Site

ROG NOx co 502 ~ive Exhaust 10 PM10

Category lb/day

... · .

Off-Road .: 1.8599 19.1037 14.3191 0.0267 1.0869 " ; " " ! "

Total 1.8599 19.1037 14.3191 0.0267 1.0869

Mitigated Construction Off-Site

ROG I NOx I co I 502 I Fugitive I Exhaust I PM10 PM10

Category lb/day

Page 14 of 33 Date: 1/4/2016 6:20PM

PM10 Fugitive Total PM2.5

1.0869

1.0869

PM10 I Fugitive Total PM2.5

Exhaust PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 PM2.5

lbfday

1.0184 1.0184 • 0.0000 2,700.5888 2,700.58881 0.7521 • • • • 1.0184 1.0184 0.0000 2,700.5888 2,700.5888 0.7521

Exhaust IPM2.5 Total Bio- C02 NBio- C02,Total C02 PM2.5

CH4

lb/day

N20 C02e

2,716.3828

2,716.3828

N20 I C02e

Hauling :l 3.5600e- 0.0406 0.0363 1.4000e- 1. 3.1900e- 6.5000e- 3.8300e- ~ 8.7000e- 1. 6.0000e- 1.4700e- : 13.4718 13.4718 1.0000e- ~ 13.4738 :! 003 : . : 004 • 003 : 004 : 003 : 004 . 004 : 003 : . . i 004 : .

00000000000000 , 0000000000000 ,,;;_,,.,,.,._,,.,.,,.,,..,~0 ,,,,,.,,., .. ,,,,,,,~.,,..,.,.,.,,,.,.,.,,,,.,,.;.,,,._,,,,_,.,,.,,.~,,,,,,..,..,.,.,,,,,,,f,,.,_,.,.,_,,,,,4••••••••••••••nu.f.•••••••••••-••••~•••n•oono•••••o~nuooo•••••••nono:o•••••••ooooooooo•+•-•nuuoo•••••••.f.••••-•-•-••-•~•••••••••*'"u"o-•~•••••••••n•u•o••~•••• Vendor :! 0.1660 ! 1.2564 ! 1.7685 ! 3.4700e- ! 0.0963 ! 0.0212 ! 0.1175 ! 0.0275 ! 0.0195 ! 0.0470 : ! 342.2817 ! 342.2817 ! 2.8200e- ! · ! 342.3409

.............................. ll. ................. .l .................. l. ................. l ...... ~~=----1 ................... ~ ....... -........ l .................. l ................. .l .................. l ................... .i .................. L ................. l .................. l ...... ~.~-: ...... l .................. J .................. . Worker :! 0.2608 ! 0.3494 ! 4.1759 ! 9.4600e- i 0.7664 ! 4.9500e- i 0.7713 i 0.2032 i 4.5500e- i 0.2078 : i 744.3551 i 744.3551 i 0.0337 i i 745.0617

!! i 1 1 °03 1 i 003 i 1 i 003 i : i l i i i Total 0.4304 I 1.6463

,5.98071 0.0131 I 0.8658 I 0.0268 I 0.8926 I 0.2316 0.0246 I 0.2562 1,100.1085 1,100.1085 0.0366 ,1,100.8764

A-53

Page 75: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment Installation - 2017

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category ·. lb/day

·. .. .·

Off-Road .: 1.1050 9.0971 7.2117 0.0101 0.7010 " " " l "

Total 1.1050 9.0971 7.2117 0.0101 0.7010

Unmitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

.· .. .·

Category .. lblday

·.

I PM10 Total

0.7010

0.7010

PM10 Total

·. . .

Page 15 of 33 Date: 1/4/2016 6:20PM

Fugitive Exhaust PM2.5 Total Bio..C02 NBio-C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

0.6634 0.6634 • 998.4634 998.4634 0.2306 1,003.3053 • • • • 0.6634 0.6634 998.4634 998.4634 0.2306 1,003.3053

Fugitive Exhaust PM2.5 Total Bio.. C02 NBio- C02 TotaiC0.2 PM2.5 PM2.5

CH4 N20 I C0.2e

lb/day

Hauling :! 6.0000e- 6.8400e- 6.1200e- ! 2.0000e- ! 1.3600e- 1.1000e- 1.4700e- j 3.5oooe-j_ 1.0000e- ;_. 4.5000e- ! 2.2711 2.2711 2.ooooe- '.! 2.2715 :: 004 . 003 . 003 i 005 i 003 . 004 . 003 : 004 . 004 . 004 • : : : 005 . .

000000000000000000000000000000 ;;.----·•--i-••••••-••••••••n4••••••••oo .... o•n••+·----•••-i•--•••ooooooo•••••+--·-·--~•ononooo••••••••~•--·-"--•-+•n••••••u•nnoo~o-•o•••••••••••un .. ooooooooooooooooo•+••••nooon••••••••+-•-•--•••-4••••••n••••••••••4••u•noo••••nn•~••••••••••••••••••• Vendor :i 0.1038 i 0.7852 i 1.1053 i 2.1700e- i 0.0602 i 0.0132 i 0.0734 i 0.0172 i 0.0122 i 0.0294 : i 213.9261 i 213.9261 i 1.7600e- i i 213.9630

.............................. ll.-------.... -l ............. _ .. .J ........ ___ ..... l----~~=--... L-........ -.. --L ..... -..... _.J ........... _ .... _J. ___ .. ______ J ......... -..... -l .. -........ _ .... J .................. L ... -..... ___ .J ___ ...... -.... .l ... -.. ~-~-: ...... 1 .... -............ j .................. . Worker :i 0.2608 i 0.3494 i 4.1759 i 9.4600e- i 0.7664 i 4.9500e- i 0.7713 i 0.2032 i 4.5500e- i 0.2078 l i 744.3551 i 744.3551 i 0.0337 i i 745.0617

:i ! l ! 003 l i 003 i l i 003 i ! i l l l i Total 0.3652 1.1414 5.2873 0.0117 0.8279 0.0183 0.8462 0.2208 0.0168 0.2376 960.5522 960.5522 0.0354 1961.2962

A-54

Page 76: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 16 of 33 Date: 1/4/2016 6:20PM

3.4 Phase 3-Substation Equipment Installation- 2017

Mitigated Construction On-Site

ROG NOx co

Category

Off-Road . : 1.1050 9.0971 7.2117 " ! " " ~ "

Total 1.1050 9.0971 7.2117

Mitigated Construction Off-Site

ROG I NOx co

Category

· .

S02 Fugitive Exhaust PM10 PM10 PM10 Total

lb/day

0.0101 0.7010 0.7010

0.0101 0.7010 0.7010

I S02 I Fugitive I Exhaust I PM10 PM10 PM10 Total

lb/day

Fugitive Exhaust PM2.5 Total Bio- C02 NBio-C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

0.6634 0.6634 • 0.0000 998.4634 998.4634 0.2306 1,003.3053 • . • • 0.6634 0.6634 0.0000 998.4634 998.4634 0.2306 1,003.3053

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 .I PM2.5

lb/day

Hauling ;! 6.0000e- 6.8400e- 6.1200e- 1 2.0000e- 11.3600e- 11.1000e- 1. 1.4700e- 1. 3.5000e- 1. 1.0000e- 1 4.5000e- ! 2.2711 2.2711 2.0000e- 2.2715 :l 004 : 003 . 003 : 005 ; 003 : 004 . 003 . 004 . 004 : 004 ' . 0 l 005 : :

ooooooooo•oooooooooooooooooooo;;_...,,,.,,,,,, .... ,.,.,._,.~.._,._,,,, .. ,,,,,,,4,.•••••n•noonouo.f-••••---•••••-~••••o••••••••••••+•-•-•••••••••~o•n•••••••••••u•~•-••-•••-•••••~••••••"*•nunuo~n•n•••••••••••••••t•ooooooooooooooo••f•••••••••••••nn•~•••••-••••--•••••~••••••••••••••••u~••••••••••••••••••~••••••••ooooooooooo Vendor :i 0.1038 i 0.7852 i 1.1053 i 2.1700e- i 0.0602 i 0.0132 i 0.0734 i 0.0172 i 0.0122 i 0.0294 : i 213.9261 i 213.9261 i 1.7600e- i i 213.9630

.............................. ll. .................. l .................. !. ................. l ...... ~~-~----·l .................. .l, ................ .l .................. l .................. ,l ................. .l .................. ..i .................. ! ................. .l .................. ,l ....... ~~-~---···l .................. ~ .................. . Worker :i 0.2608 i 0.3494 i 4.1759 i 9.4600e- i 0.7664 i 4.9500e- i 0.7713 i 0.2032 i 4.5500e- i 0.2078 : i 744.3551 i 744.3551 i 0.0337 i i 745.0617

ii i ~ i 003 ~ i 003 i ~ i 003 i : i ~ i ~ : Total 0.3652 I 1.1414 5.2873 I 0.0117 I 0.8279 I 0.0183 I 0.8462 0.2208 0.0168 0.2376 960.5522 960.5522 0.0354 961.2962

A-55

Page 77: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment Installation- 2018

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

•.

Category lb/day

Off-Road . : 0.9572 8.0281 7.0765 0.0101 0.5891 " ; " " ~ "

Total 0.9572 8.0281 7.0765 0.0101 0.5891

Unmitigated Construction Off-Site

ROG

..•. ·

NOx co S02 Fugitive I Exhaust PM10 PM10 ..

Category lb/day

~

Page 17 of 33

PM10 Fugitive Total. PM2.5

0.5891

0.5891

PM10 I Fugitive Total PM2.5

Exhaust PM2.5

0.5581

0.5581

Exhaust PM2.5

Date: 1/4/2016 6:20PM

PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e

. lb/day

· .

0.5581 • 988.4721 988.4721 0.2266 993.2298 • • • • 0.5581 988.4721 988.4721 0.2266 993.2298

PM2.5 Total Bio- C02 NBio- C02' Total C02 CH4 N20 I C02e

lb/day

.. .. .. ·.·· ·.. .·

Hauling ~~ 5."g~1e- . 6.101~3oe-~ 5.5g~~e- ~ 2.0~~~e-1 7."g0o1e- : 1.1~~1e- . 8."g~1e- : 2.0~~1e-11.0~~4oe- . 2.9~~1e- ! . 2.2308 : 2.2308 . 2.o0o0o~e-1 . 2.2312

••••oooooooooooooooooooooooooo~-·-·--•-4nu•o-ononoooo~•u•••••••-••••••+·---•••-•~uooooooooonuooo+.-----·•-+•••••••••••-•••••+•·--•-•-•-•+••••••••••••oouoof•-•••••••••••••••••~••••ooooo•••••••••+••••••••••••••••••+ .. ---••-...,....,..,...,_;,,,.,,,,,,,,,,,,...,.,~, .. ..,,,,,,._,,,,,.,,~,,,,,,,:,,,,,,,,,,, Vendor :i 0.0893 i 0.7063 i 0.9764 i 2.1600e- i 0.0602 i 0.0121 i 0.0723 i 0.0172 i 0.0111 i 0.0283 : i 210.1444 i 210.1444 i 1.7100e- i i 210.1804

!i i i i 003 i i i i i i ! i i i 003 i i oooooooooooo•ooooooooooooooo••f!'--••••••••--•-!'••••••••••o•n••••~•oooonooonuu••~•--•••••••n••n"tnn•u•nn••u•••!-••••••••---•n'"!'••••••••••unn••~••••-••••••--••'"!'•nnu•••••••••n'"!'•••••••••••••••••••••••••••••••••••••••+••••••••••••••••n~•••-••••••••••

Worker :i 0.2301 i 0.3139 i 3.7334 i 9.4800e- i 0.7664 i 4.8200e- ! 0.7712 i 0.2032 i 4.4600e- i 0.2077 : i 719.0587 i 719.0587 i 0.0311 i i 719.7108

!l l l i 003 1 i 003 i i l 003 i ! i 1 1 1 l Total 0.3199 1.0263 4.7154 0.0117 0.8273 I 0.0171 0.8443 I 0.2206 0.0157 0.2363 931.4340 1931.4340 0.0328 1932.1224

A-56

Page 78: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment Installation - 2018

Mitigated Construction On-Site

ROG NOx co

Category

Off-Road ·= 0.9572 8.0281 7.0765 " ! " " ~ "

Total 0.9572 8.0281 7.0765

Mitigated Construction Off-Site

ROG NOx co

Category

S02

0.0101

0.0101

S02

..

Fugitive Exhaust PM10 PM10

lb/day

Fugitive PM10

0.5891

0.5891

Exhaust PM10

lb/day

Page 18 of 33 Date: 1/4/2016 6:20PM

PM10 Fugitive Exhaust PM2.5 Total 13io- C02 Nl3io- C02 Total C02 CH4 N20 C02e Total PM2.5 PM2.5

lb/day

0.5891 0.5581 0.5581 • 0.0000 988.4721 988.4721 0.2266 993.2298 • • • • 0.5891 0.5581 0.5581 0.0000 988.4721 988.4721 0.2266 993.2298

PM10 I Fugitive J Exhaust 1 PM2.5 Total Bio- C02 1 NBio- C02j Total C02j Total PM2.5 PM2.5 J J I l CH4 I N20 ~ C02e

lb/day

Hauling :1 5.4000e- 6.1100e- j 5.5300e- 2.0000e- 7.4000e- 1 1.1000e- 8.4000e- 1 2.0000e- 11.0000e- i 2.9000e- : 2.2308 2.2308 2.0000e- 1 2.2312 !! 004 i 003 ! 003 ! 005 ! 004 i 004 i 004 ! 004 ! 004 i 004 : ! ! ! 005 ! !

'''''•••••••••••••••••••••••••r,••••••••••""••••--1'"'uo0,., 0,,,,.,.,,.,.~,,,,, .. ,,,.,h,,,..,,~,,, .... ,,.,..,.,.,,..,.,,,~.,,., .. ,,,,,,,.,._.,,,~..,.,..,.,,.,..,,,. .... ,,,,,-!',,_.,,,, .. .,,.,., .. ,,-=-••••*"'''""'''*'""'"'t''''"'""'"uoo•••••'tn••••••••••u•••u••••••••••••••••••••-e-•••••••u•ouo••••"!'-••-•-•--•••••-t•••••••••uoo•••••"tnu•••••••••n•u"'!•••••••••••••••••••

Vendor :i 0.0893 i 0.7063 i 0.9764 i 2.1600e- i 0.0602 i 0.0121 i 0.0723 i 0.0172 i 0.0111 i 0.0283 : i 210.1444 i 210.1444 i 1.7100e- i i 210.1804

.............................. ~ ................. .l .................. l. ................. l. ..... ~~~ ...... l .................. J .................. l. ................. l .................. l .................. l .................. ..i .................. L. ................ l. ................. l ....... ~-~-: ..... .l .................. j .................. . Worker :i 0.2301 i 0.3139 ! 3.7334 i 9.4800e- i 0.7664 i 4.8200e- i 0.7712 ! 0.2032 i 4.4600e- i 0.2077 : i 719.0587 i 719.0587 i 0.0311 i i 719.7108

!! i i i 003 1 i 003 i i i 003 i ! i i i i 1 Total II 0.3199

1.0263 4.7154 0.0117 0.8273 0.0171 0.8443 I 0.2206 I 0.0157 I 0.2363

1

931.4340

1

931.4340 I 0.0328 I 1932.1224

A-57

Page 79: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 19 of 33 Date: 1/4/2016 6:20PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations - 2018

Unmitigated Construction On-Site

ROG NOx co S02

Category

I

Fugitive Exhaust PM10 PM10

lb/day

.·.

PM10 Total

Fugitive Exhaust PM2.5T6tal Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

Off-Road ii 0.9279 i 11.7599 5.7783 0.0164 l 0.4572 i 0.4572 0.4206 0.4206 i j1.648.6993l1,648.69931 0.5133 11,659.4778

000000 , 0000000000000 oooooooooo~••••••••--•-•-~ooou••••n•••u•o~••••n•••uuonoo~-••••"""""""..,'"""~'no•nn•ouonu~""""'"""-'""""-•4•n•nooouoon•••+un••-•••--•4••••nuunhoooo~ouuuuoouoooun:.oooooooooo••••••••+•u••••••••••uou+--••••••-•••••~ooooonooooooooo••J••••••••ono•ouoo~ooooooo Paving :! 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : ! ! 0.0000 ! ! ! 0.0000

~~ { ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ Total 0.9279 11.7599 5.7783 0.0164 0.4572

Unmitigated Construction Off-Site

ROG NOx co S02 Fugitive I Exh·a .. ust PM10 PM10

Category lb/day

.. .·.

0.4572

PM10 I Fugitive Total PM2.5

.• ..

0.4206 0.4206 1 ,648.6993 1 ,648.6993 0.5133

Exhaust 1 PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 I

lb/day

CH4

1,659.4778

N20 C02e

Hauling :! 1.6400e- O.Q185 0.0168 7.0000e- 1.6300e- ! 3.2000e- 1.9500e- 1 4.5000e- i 3.0000e- i 7.5000e- : 6.7703 6.7703 5.0000e- i 6.7713

.............................. ll.---~~=-4---··············-~·-················+---~~=--~·-····-~-~-~------L--~~-+--.. ·--~~-~-----L--~~---.l ....... ~~-~--···-l·-···-~~~---·...i .................. f .................. ~.--·------~·-····-~-~-: ...... L. ............... ~ .................. . Vendor :! 0.0715 ! 0.5650 ! 0.7812 ! 1.7300e- ! 0.0481 ! 9.7000e- ! 0.0578 ! 0.0137 ! 8.9200e- ! 0.0227 : i 168.1155! 168.1155! 1.3700e- i i 168.1443

.............................. ~---···-····-l ................. .l .................. l.--.~~: ___ J. ................. J ..... -~=----.l .................. J ...... -..... _J ....... ~.~-: ...... l ................... .i .................. !.. ................ l. .......... -... .1 ....... ~.~-: ...... l .................. j .................. . Worker :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 i 0.0000 i 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 : i 0.0000 ! 0.0000 i 0.0000 i i 0.0000

=~ l ~ l ~ l ~ ~ 1 ~ : ~ ~ ~ ~ 1

Total 0.0731 0.5836 0.7979 1.8000e· 003

0.0498 I 0.0100 0.0598 I 0.0142 9.2200e- I 0.0234

003 l 174.8858 174.8858 1.4200e-

003 174.9156

A-58

Page 80: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 20 of 33 Date: 1/4/2016 6:20PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations- 2018

Mitigated Construction On-Site

ROG NOx co S02

Category

Fugitive Exhaust PM10 PM10

lblday

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lblday

Off-Road !1 0.9279 . 11.7599 5.7783 0.0164 0.4572 0.4572 0.4206 0.4206 ! o.oooo i 1,648.6993j 1,648.6993! 0.5133 11,659.4778

··········p~~-~-~········ .. ~----a~aoaa·-j .................. l .................. l .................. l .................. t" ... a~aaaa···t .... a~aaaa .. "t· ................ l .... a:aaaa ... l ..... a~ciaa·a ..... l .................. t .................. j .. ·o:aaoa ... l .................. j .................. j .... o:oooo····

Total 0.9279 11.7599 5.7783 0.0164 0.4572 0.4572 0.4206 0.4206 0.0000 1,648.6993 1,648.6993 0.5133 1,659.4778

Mitigated Construction Off-Site

ROG NOx I co I S02 I Fugitive I Exhaust I

PM10 PM10 PM10 I Fugitive I Exhaust IPM2.5 Total Bio- C02,NBio- C02 Total C02 Total PM2.5 PM2.5

CH4 N20 I C02e

Category lblday lb/day

. .··.

Hauling :! 1.6400e- 0.0185 0.0168 7.0000e- 1.6300e- 1 3.2000e- l 1.9500e- j_ 4.5000e- ~. 3.0000e- ~ 7.5000e- ! 6.7703 6.7703 5.0000e- ~ 6.7713 :: 003 : : . 005 : 003 : 004 : 003 . 004 . 004 : 004 • . . i 005 : .

oooooooooooooooooooooooooooooo~••••---••--•-~••••••--•••••uno~uuooooooooooOoOoo~"'"'"""_...,,,,,,....,,~,.,.,.,,..,,.uooonn•nf-•••••••••--••~onou~oooooooooOo~"'"""-""""-"'""~'''''"''''"u"•no~ooon•••••-•••••••••~OOOOOOOOoooooooooo~••••••••••••onuo.;_.,,,,, Vendor :! 0.0715 ! 0.5650 i 0.7812 i 1.7300e- i 0.0481 i 9.7000e- ! 0.0578 i 0.0137 i 8.9200e- i 0.0227 : i 168.1155 i 168.1155! 1.3700e- i i 168.1443

.............................. ll. ................. .l .................. ! .................. l----~~= ...... ! ................... ~---.. ~~: ...... l .................. L ..... _ ........ J ....... ~~-~--.... !. ................. ..i .................. L ................. !. ................. !. ...... ~-~-~----.. 1--................ j .................. . Worker :! 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 ! 0.0000 i 0.0000 i 0.0000 i 0.0000 : ! 0.0000 i 0.0000 i 0.0000 i i 0.0000

Total

!1 l ~ ~ ~ l l ~ ~ ~ : 1 ~ l ~ ~ 0.0731 0.5836 I 0.7979

1

1.8000e-, 003

0.0498 I 0.0100 I 0.0598 I 0.0142

19.2200e-~

003 0.0234 1174.8858 174.8858 1.4200e-

003 1174.9156

A-59

Page 81: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 21 of 33 Date: 1/4/2016 6:20PM

3.6 Phase 4b-Power line re-route: Install TSP - 2018

Unmitigated Construction On-Site

ROG NOx CO S02 Fugitive Exhaust ·. PM10 PM1Q

Category lb/day ·.

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

lb/day

CH4 N20 C02e

Fugitive Dust :l 0.0991 0.0000 i, 0.0991 0.0107 0.0000 0.0107 : 0.0000 0.0000 ·= .

oooooooooooo••••••••••oooooooo~----·--•---•~••••n•ononnoooJo•u••••••••••ouo~--n•--•••-4•unu ...... .,..,.,,~,,.,.,.,...,..., ... .,.,.,~,,,,,.,..,..,.,,.,..,..,~,,,,,, .... .,.,,..,_,~,,,,.,..,..,.,.,.,,,,,~.,.,,,,,,,.,..,. .. ,.,.,,i,,,,,,,,,,,,,,,,,,i._,,,,,,.,,.,.,,,.,,,,~ .. .,,,.,,.,,.,.,,,,,.,.,,..,~.,,,.,..,..,..,.,.,.,,.,.~.,..,.,,.,,.,..,..,..,..,.~,,,,,,,,,,,,,,,,,,, Off-Road :! 2.9426 ! 32.9315 ! 22.0345 ! 0.0341 ! ! 1.5933 ! 1.5933 ! ! 1.4666 ! 1.4666 : ! 3,413.1390!3.413.1390! 1.0554 ! !3.435.3025

:~ ~ i ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ Total 2.9426 32.9315 22.0345 0.0341 0.0991 1.5933

Unmitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

·.·· .· ·.

1.6924

PM10 Total

0.0107 1.4666 1.4773 3,413.1390 3,413.1390 1.0554

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 PM2.5 PM2.5

lb/day

3,435.3025

N20 C02e

Hauling :i 8.0000e- 9.0600e- 8.2000e- l 3.0000e- ! 8.0000e- l 1.6000e- 9.6000e- l 2.2000e- 1.5000e- 3.6000e- : 3.3082 3.3082 2.0000e- ! 3.3087 ~~ ~ ~!~1~!~ ~!~ ~ ~= ~!

oooooooooooooooooooooooooooooo;;.__.. .. ,,, ... ,,,,,,,.,,~,.,,,.,...,,,.,.,,,,.,.~,.,..,,.,.,..,,,,,,,,,,,,.,;_ ... _,..,._,.,_~,, .. ,,,,,.,.,.,,,,,,.,.;..._,,_,....,,._.,+•~••••••••••••••••.;...•••--•--•~••••••••••••••••••+•••••••••••••n•••••~••••••••••••••••••+••••••••••••u••~·+---••••-•••••-•~•••u•••••••••••••+•••••••u•••••••••~••••••••••••••••••• Vendor :! 0.1965 ! 1.5538 ! 2.1482 ! 4.7600e- 1 0.1324 ! 0.0267 ! 0.1590 ! 0.0378 ! 0.0245 ! 0.0623 : ! 462.3177 ! 462.3177 ! 3.7700e- ! ! 462.3969

!! i i i 003 1 i i 1 i i ! i i 1 °03 1 i oooooooooooooooooooooooooooooott••••••n••-•••-~n•••n•••••••••••-t•••••••n•n•n•••"!'-•••--•••---t•••••••n••••••••u!"""""""""""""-"""~"U"U"U"••••••••~•-•-•••-••••-~u•u•n••oeuoooo~••••••••••••••••n•••oooooooooooooooooot••••••••••••••••••~•••••••••••••n•••-!-

Worker :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 ! ! 0.0000

Total

=~ l ~ ~ ~ ~ l ~ l ~ : ~ ~ l ~ ~ 0.1973 1.5629 2.1564 4.7900e- 0.1332 0.0268

003 0.1600 0.0380 0.0247 0.0627 465.6259 465.6259 3. 7900e-

003 465.7056

A-60

Page 82: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 22 of 33 Date: 1/4/2016 6:20PM

3.6 Phase 4b-Power line re-route: Install TSP - 2018

Mitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 PM10 .

Category ..

lb/day

PM10 Total

Fugitive Exhaust PM2.5 Total Bio· C02 NBio- C02 Total C02 PM2.5 PM2.5

lb/day

CH4 N20 C02e

0.0000 Fugitive Dust !! 1

0.0991 0.0000 0.0991 0.0107 0.0000 0.0107 ! 0.0000 .,!

1: a I

ooooooooooooooooooooooooooooo,;;_,.,,,.,.,,.,...,n•--+•••unooooono•••4••••nouon••••••+•-••••••-•••••-~uooonno•••••••u~•••••--•••••••n~uoo•••••••••••n•.;.••••-••••-u•••n+••••••••••nouon+••••••••••nn•uontooooooooooooooo•••+•••••••••••••n•••+•••••••••••-•--• Off-Road :1 2.9426 ! 32.9315 1 22.0345 ! 0.0341 1 ! 1.5933 ! 1.5933 1 ! 1.4666 ! 1.4666 : o.oooo ! 3,413.1390!3.413.13901 1.0554 ! !3.435.3025

:~ ! ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 2.9426 32.9315 22.0345 0.0341 0.0991 1.5933 1.6924 0.0107 1.4666 1.4773 0.0000 3,413.1390 3,413.1390 1.0554 3,435.3025

Mitigated Construction Off-Site

502 ROG I NOx Fugitive Exhaust

. PM10 PM10 .·

co

Category lb/day

..

PM10 Total

Fugitive I Exhaust. IPM2.5 Total PM2.5 PM2.5

Bio- C02 I NBio- C02 I Total C02l... GH4 I N20 I C02e

lblday

Hauling :i 8.0000e- 9.0600e- ~ 8.2000e- ! 3.0000e- ~ 8.0000e- l 1.6000e- 9.6000e- ~ 2.2000e- ~ 1.5000e- 3.6000e- ! 3.3082 3.3082 2.0000e- ~ 3.3087 !! 004 i 003 1 003 i 005 : 004 i 004 i 004 1 004 i 004 ; 004 : ; ; ! 005 1 i

oooooooooooooooooooooooooooooo~•••-•-•--••"t••••n•nuo••••••..,n••••••••••••nn~•---•-••-•••~••••n••••••••••••-t-----••••••--t••••••nu••••••••"!'•••---••••••••••-t•••••••••n•••n••-t•••uuu••••••••no .. oooooooooooooooo••t••••••nn••••••••"!''""""'"_" __ ,._., __ 't•••••••••••n•••••-!-•••••••u•••••••••~00000000°oooooooooo

Vendor :1 0.1965 1 1.5538 1 2.1482 1 4.7600e- 1 0.1324 1 0.0267 ! 0.1590 1 0.0378 1 0.0245 1 0.0623 : ! 462.3177 1 462.3177 1 3.7700e- 1 1 462.3969

.............................. ll. .................. l ................. .l ................. .l ...... ~~~ ...... l. ................. l ................. .l .................. l .................. l .................. l ................... .i .................. L ................ l ................ -l ...... ~.~.~ ...... l .................. ~ .................. . Worker :1 0.0000 ! 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 ! 0.0000 1 0.0000 i 0.0000 ! 0.0000 : i 0.0000 i 0.0000 ! 0.0000 1 ! 0.0000

Total

=~ l ~ ~ ~ ~ ~ ~ l i : l ~ ~ ~ ~ 0.1973 ,1.5629 2.1564 4.7900e·

003 0.1332 0.0268 0.1600 0.0380 I 0.0247 .I 0.0627 1465.6259,465.6259,3.7;g~e-, 1465.7056

A-61

Page 83: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

I

CaiEEMod Version: CaiEEMod.2013.2.2 Page 23 of 33 Date: 1/4/2016 6:20PM

3.7 Phase 4c-Power line re-route: String Power line- 2018

Unmitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 .. PM1Q

· ..

Category lb/day

.

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

-- •. · . . lbtday

.· • .

Fugitive Dust :1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i, 0.0000 t: •

oooooooooooooooooooooooooooooo~---------•-•••~••••••o••uon••••~••noaoooooooonno~---·-•-•••--•o~oon•oooonoooa<ooootoo...,o----•••-•--•~•nnon•oooonno~oo•o-•aoo--ooo-~Uooonunooooooo~n••••••noounooooioooooooooo•ooooooo~oooonnu•o•oo .... o~uo ... ooon•-•••~noo .... ••oo .... u .... oo~oooonouoooo .... uo~ooooooooooooooooooo Off-Road :i 1.3594 i 14.1168 i 8.7966 i 0.0139 i i 0.8425 i 0.8425 i i 0.7751 i 0.7751 : i 1,397.551411,397.55141 0.4351 1 11,406.6880

i~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : 1 ~ ~ ~ ~ Total 1.3594 14.1168 8.7966 0.0139 0.0000 0.8425 0.8425 o.oooo 0.7751 0.7751 1,397.5514 1,397.5514 0.4351 1,406.6880

Unmitigated Construction Off-Site

ROG NOx co S02

· ..

Category

.··

Fugitive Exh<!USt. PM10 PM10

lb/day

PM10 Total

Fugitive Exh<!USt PM2.5 Total Bio- C02 NBio- C02 To!l!l C02 PM2.5 PM2.5

CH4 N20 I C02e

lb/day

Hauling :1 4.8100e- 0.0544 0.0492 2.0000e- ~. 4.7800e- 9.5000e- ~. 5.7300e- ~. 1.3100e- ~. 8.8000e- l. 2.1900e- i 19.8492 19.8492 1.4000e- ~. 19.8522 :~ 003 ! . . 004 . 003 . 004 . 003 . 003 . 004 . 003 • . . . 004 . .

.............................. ;;.----------~---....................... ~ ..................... .;. ...... _ .... __ , __ ~ ___ .................. f ........ _ ... __ -4 ....................... .;.. ..... ___ ......... _ .. 4· ..................... f._ ......................... ~ .................. ,; .................... .;..-..... __ .................. + .......................... ~ ......................... ~ .................. . Vendor :! 0.0715 ! 0.5650 i 0.7812 i 1.7300e- i 0.0481 ! 9.7000e- i 0.0578 1 0.0137 1 8.9200e- i 0.0227 : i 168.1155 i 168.1155 i 1.3700e- i i 168.1443

.............................. ll.---···-·--·l. ................ .l .................. l-... ~~.:. __ J. ................. L ... -~=-···l .................. l.-···-···-··-.l ....... ~.~.~ ...... l .................. ..i .................. L. ................ l.-·-·-···-···-l. ...... ~.~.~ ...... l. ................. j .................. . Worker :: 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 1 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

Total

=~ l ~ ~ ~ 1 ~ ~ ~ ! : ! ~ ! ~ ~ 0.0763 0.6194 0.8303 1.9300e- 0.0529 0.0107

003 0.0636 0.0151 9.8000e-

003 0.0249 187.9647 187.9647 1.5100e-

003 1187.9965

A-62

Page 84: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 24 of 33 Date: 1/4/2016 6:20PM

3.7 Phase 4c-Power line re-route: String Power line- 2018

Mitigated Construction On-Site

ROG NO :X co S02 Fugitive EXhaust PM10 PM10 .

·.. Category .· ·. lb/da)'

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

· .. · lb/day

CH4 N20 C02e

Fugitive Dust :i 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 : 0.0000 0.0000 :~ . : :

•••••••••••••••••••••••••••••• ;; ........... _ ............ ~ .................... ~ ................... ~ ........................... ~ ...................... ~ •• - ....................... ~ ............. *" ...... ~ .......................... ~ ................... ~ ..................... :. •••••••••••••••••• + ..................... ~---·············~-................... ~ .................. ~ .................. . Off-Road :! 1.3594 ! 14.1168 ! 8.7966 ! 0.0139 l ! 0.8425 ! 0.8425 l ! 0.7751 ! 0.7751 : 0.0000 ! 1,397.5514j1,397.5514! 0.4351 l [1,406.6880

=~ ~ ~ ~ ~ ~ ~ ~ ~ j : ~ ~ ~ ~ j Total 1.3594 14.1168 8.7966 0.0139 0.0000 0.8425 0.8425 0.0000 0.7751 0.7751 0.0000 1,397.5514 1,397.5514 0.4351 1,406.6880

Mitigated Construction Off-Site

PM10 J Fugitive 1 Exhaust IPM2.5 Total Bio- C02 I NBio- C02! Total C02 Total PM2.5 J PM2.5 I I CH4 I

I N20 I C02e ROG co S02 Fugitive Exhaust ·J

PM10 PM10 NOx

. Category lb/day lb/day

Hauling :: 4.8100e- 0.0544 0.0492 2.0000e- 4.7800e- l 9.5000e- ! 5.7300e- 11.3100e- l 8.8000e- l 2.1900e- i 19.8492 19.8492 1.4000e- l 19.8522 !! 003 i l l 004 : 003 i 004 i 003 : 003 ! 004 i 003 : ! : : 004 : :

······························tt·-····-------"t--···········--·~·-········---.. ··-t·--···-· ...... -~ ...................... ~ ............ _ ... _ ... _ ... .,. ......................... ~ .. ---····--···-t······-.............. .,. .............................................. ~ .................... .,. ........... _ .. _,. .... ____ .,. __ .................... ~ ....................... ~ .................. . Vendor :! 0.0715 ! 0.5650 l 0.7812 l 1.7300e- ! 0.0481 l 9.7000e- i 0.0578 l 0.0137 ! 8.9200e- ! 0.0227 : ! 168.1155 ! 168.1155 ! 1.3700e- i ! 168.1443

.............................. ll. ................. .l ................. .l. ................. l. ..... ~-~: ..... 1 ................... [ ....... ~~-~---... l. ................. l ................. .l ....... ~.~-~----.. l .................. ..i .................. l.. ................ l .................. l. ...... ~.~-~-····.l .................. l .................. . Worker :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 l 0.0000 ! 0.0000 ! 0.0000 l 0.0000 ! 0.0000 ! 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 l ! 0.0000

Total

!l 1 ~ l ~ ~ l ~ ~ l : l ~ l ~ ~ 0.0763 0.6194 0.8303 1.9300e-

003 0.0529 0.0107 I 0.0636 I

1

9.8000e-, 003

0.0249 0.0151 1187.9647,187.9647 1.5100e-003

1187.9965

A-63

Page 85: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 25 of 33 Date: 1/4/2016 6:20PM

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018 Unmitigated Construction On-Site

ROG NO~ S02

Category · ..

.........

F~gitive E)dJaust PM10 PM10

lb/day ·.·

· ..

PM10 Total

.. ·

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

Fugitive Dust il i 0.0000 l 0.0000 l 0.0000 i 0.0000 l 0.0000 l 0.0000 : 0.0000 : 0.0000

oooooooooooooooooooooooooooooo~---4••••"''"'"''''n•uo~ooou"U"•-••••••+------4•••••••••••••••n•~-~oooo•ooooooooo••••+-·--~•••••••••ooooouoo~ooooooooo-oooooooooiooooooooooOOOooooo~oOOooooooooou••••4-----~•••••••oooooooo--•~oonooonooooooooo~OOooooooooOOooooo Off-Road :i 0.8885 i 9.0836 i 8.3809 i 0.0114 i i 0.6173 \ 0.6173 i l 0.5679 l 0.5679 : i 1,143.012311,143.01231 0.3558 l i 1,150.4849

i! ! I ~ i ~ i ~ ! ~ i i ~ ~ ~ 1

Total 0.8885 9.0836 8.3809 0.0114 0.0000 0.6173 0.6173 0.0000 0.5679 0.5679 1 '143.0123 1 '143.0123 0.3558 1,150.4849

Unmitigated Construction Off-Site

ROG NOx co S02 Fugitive El<haust PM1o l Fugitive I Exhaust .. , PM2.5 Total Bio- C02' NBio- C02' Totai.C02 CH4 N20 C02e PM10 PM10 Total PM2.5 PM2.5

..

category lblday lb/day

·. ' .· . ·.

Hauling 6.3297 :1 1.5300e- i 0.0173 i 0.0157 ,i, 6.o0o0o5oe- ,:_' 1.5

020o3oe- :'.; 3.o

0o0o4oe- ·:l 1.8300e- i 4.2000e- i 2.8000e- l 7.0000e- l .,i, 6.3287 6.3287 i 5 OOOOe- i

:l 003 l i 003 l 004 l 004 i 004 : ! . 005 i oooooooooooooooooooooooooooooo;f ...... -----•••-•4••••••••••••oooooo~ooaoooUOonooooo•f--·----·---~oooooooo•ooooouu+~-------•••+•.-n•••••••o.••••+--•--•--•••---•~••••••••••••••••••4•••n••••••n•oooooa~•••••ooooooooooooo~oOOooaooaooa•ooooo4•••-•••••-••--~•••••••••uooooo••4••••••••••••••••••~•••••

Vendor ;1 0.1072 l 0.8475 ~ 1.1717 l 2.5900e- l 0.0722 i 0.0146 l 0.0868 ~ 0.0206 i 0.0134 l 0.0340 : i 252.1733 ~ 252.1733 l 2.0600e- l ~ 252.2165

······························f·-· .......... ~ .................. J .................. J .... ~~=-.... ~ .................. J ......... _ .... ~ .................. J __ ............ l ................. l ................... ~ .................. t .................. J .................. J ....... ~.~.~ ...... +. ................. ~ .................. . Worker ,; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 ; 0.0000 • ; 0.0000 ; 0.0000 ; 0.0000 ; ; 0.0000

Total

:~ i i ~ ~ ! i ~ ~ i : ! ~ i ~ ~ 0.1087 0.8649 1.1874 2.6500e-

003 0.0737 0.0149 0.0886 I 0.0210 I 0.0137 I 0.0347 1258.5020 1258.5020 2.1100e-

003 258.5462

A-64

Page 86: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 26 of 33 Date: 1/4/2016 6:20PM

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018

Mitigated Construction On-Site

ROG NOx co S02

,

Fugitive Exhaust PM10 PM10

PM10 Total

CH4 I N20 I C02e Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

Category lb/day lb/day

Fugitive Dust ~~ 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 ~ 0.0000 ! . 0.0000 0.0000

.............................. it.-~--·----4--.--·--·········-~-----.--·--······f------~---·············· .. +---------+---··············--i--·-------+-.--·-············~---·················i .................. t ................... ~--------····--·+·-················~---··············-~·-················· Off-Road :1 0.8885 1 9.0836 1 8.3809 1 0.0114 1 1 0.6173 1 0.6173 1 1 0.5679 1 0.5679: 0.0000 11,143.012311,143.01231 0.3558 i 11,150.4849

il ! ~ ! ~ ! ! ~ ~ ~ : l ~ ! ~ 1 Total 0.8885 9.0836 8,3809 0.0114 0.0000 0.6173 0.6173 0.0000 0.5679 0.5679 0.0000 1,143.0123 1,143.0123 0.3558 I 11,150.4849

Mitigated Construction Off-Site

NOx l .. CO Fugitive I Exhaust I PM10 PM10

·,

ROG S02

Category lb/day

PM10 l Fugitive Total PM2.5

Exhaust PM2.5

PM2.5 Total Bio- C02 NBio- C02 Total C02

lb/day

CH4 N20 C02e

Hauling :1 1.5300e- 1 0.0173 ! 0.0157 i 6.0000e- i 1.5200e- i 3.0000e- i 1.8300e- i 4.2000e- i 2.8000e- i 7.0000e- : l. 6.3287 6.3287 l. 5.0000e- 1. 6.3297 !1 003 l l l 005 l 003 l 004 l 003 l 004 l 004 l 004 : i l i 005 i i

•••••••••••.•oooooooooooooooooo~---••••--••••••••"!'••••••••••••••••••~•uooouoooooooooo~•--•••--•••--•••~•••••••••••n••••••~••••••••••---·-t••n••••••••••••••~•-•••--••••---••~••••••••••uuoooo-t•••••••••••••••••••••••••••••••••••••••t••u••••••••••••••~•·•

Vendor :i 0.1072 i 0.8475 i 1.1717 1 2.5900e- i 0.0722 ! 0.0146 i 0.0868 i 0.0206 1 0.0134 i 0.0340 : i 252.1733 ! 252.1733 i 2.0600e- ! ! 252.2165

.............................. ll.-·-·-··---·-···.l .................. l.. ................ L---·~~=----·l. ................. l. ................. l .................. l ................. J .................. l .................. ..i .................. L ................. l ................. J ....... ~.~.~ ...... l. ................. J .................. . Worker :i 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 : ! 0.0000 1 0.0000 i 0.0000 i ! 0.0000

Total

i! ! ~ ~ ~ l i ~ l ~ : l ~ ~ ~ ~ 0.1087 0.8649 11.1874 2.6500e·

003 0.0737 I 0.0149 I 0.0886 I 0.0210 0.0137 0.0347 258.5020 258.5020 2.1100e-

003 258.5462

A-65

Page 87: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 27 of 33 Date: 1/4/2016 6:20PM

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust F'M10 PM10

. ·. ..

category • ..

lb/day

. ..

PM10 Total

. .. .

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

·. lb/day

CH4 N20 C02e

Off-Road ~~ 4.6797 ~ 49.0341 35.8395 0.0538 ~ 2.6872 2.6872 2.4890 2.4890 ! ! 5,373.8768! 5,373.8768~ 1.5846 ~ 5.407.1542

.............................. ~---.. ·-------~-.................. 4 .................... J .......................... ~ .................... ~ .... -.................. +---······----~-------··-··-..; ................... 4 ........ _ ............ i .................. t .................... 4 ...... :. ................. ~ ..................... ~ .................... ~ .................. . Paving :1 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : ! ! 0.0000 ! ! ! 0.0000

i~ ~ ~ ~ i ~ ~ ~ ~ ~ i ~ ~ l ~ ~ Total 4.6797 49.0341 35.8395 0.0538 2.6872 2.6872 2.4890 2.4890 5,373.8768 5,373.8768 1.5846 5,407.1542

Unmitigated Construction Off-Site

RQG C02e

Hauling :1 0.0598 0.6764 0.6121 2.5300e- ! 0.0595 0.0119 0.0713 0.0163 0.0109 0.0272 : l, 247.0121 1, 247.0121 1.8000e- ! ,,1 247.0498 :: 003 : : 003 i

•••••••••••••ooooooooooooooooo~"'"--"-+••••••-••••••o•n~n••nn••••••••••+-•••••---·~oaooooooo•••••••••+·----+•nnn••••••nou~-•••._,.,._...,~,.,,,,, ... u.,.,•••••~•--•••••••n•n•n••~••••••••••••••••••+••••••••••••••••••~•,_.,.,.,., .. .,,..,.,._~u••••••••••••••""~'"u"n"""""••••••~••••••••••••••••••• Vendor :! 0.1072 ! 0.8475 ! 1.1717 ! 2.5900e- ! 0.0722 ! 0.0146 ! 0.0868 ! 0.0206 ! 0.0134 i 0.0340 : ! 252.1733 ! 252.1733 ! 2.0600e- ! ! 252.2165

~~ ~ l ~ 003 l l l l l l i l l l 003 l l ••••••••••••••••••••••••••••••f'!'-•--n-•--•••-•"t••••••••••••••••••~•••n•n••••••••••~•••••n•--•-•••••~•uu•nn•••••••••~··-•--•••---•~•nu•••••••••••••~•••--•••••••••"'t••n•••••••••••u•-tn••••••••••••••••••t-••••••••••••••••••t•••n••n•••••••••~•·-••n•••••••

Worker :! 0.2301 ! 0.3139 i 3.7334 ! 9.4800e- ! 0.7664 ! 4.8200e- ! 0.7712 ! 0.2032 ! 4.4600e- ! 0.2077 : ! 719.0587 ! 719.0587 ! 0.0311 ! ! 719.7108

!! l l l 003 l l 003 l l l 003 l i l l l l l Total 0.3971 1.8378 5.5173 0.0146 0.8980 0.2689 0.0349 1,218.9771

A-66

Page 88: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Mitigated Construction On-Site

ROG NOx co

category

S02 Fugitive PM10

Exhaust PM10

lblday ··

PM10 Total

Page 28 of 33

Fugitive PM2:5

·.

Exhaust PM2.5

Date: 1/4/2016 6:20PM

PM2.5 Total Bio- C02 NBio· C02 Total C02 CH4 N20 C02e

. I

lb/day

Off-Road il 4.6797 49.0341 35.8395 0.0538 2.6872 2.6872 2.4890 2.4890 i 0.0000 !5,373.8768! 5,373.8768! 1.5846 !5,407.1542

00000000000 o 00 oooooooooooooooo;;..,,,.,,.,,,.,,,,.,_.,_+••••••nuuuuoo4ooonun•••••••••~••n•n•n••••••••~unoo•••••••••••••~-••n••••*•••••••+uno•••••••••••••~••u•u.uoon•••-•4n••••n••••••••••+•••••••••••uooonu~ooooooooooo•••••••+•••••••u••ouuu+••••••••••••••••••+••••••••••• Paving :! 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : ! ! 0.0000 i ! ! 0.0000

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ j Total 4.6797 49.0341 35.8395 0.0538 2.6872 2.6872 2.4890 2.4890 0.0000 5,373.8768 5,373.8768 1.5846 5,407.1542

Mitigated Construction Off-Site

502 Fugitive Exhaust PM10 PM10

PM10 I Fugitive I Exhaust IPM2.5 Total Total PM2.5 PM2.5

ROG NOx co N20 1 C02e Bio- C02' NBio- C02' Total C02 I CH4 I Category lb/day lblday

Hauling :! 0.0598 0.6764 0.6121 2.5300e. ~ 0.0595 0.0119 0.0713 0.0163 0.0109 0.0272 ! 247.0121 247.0121 1.8000e- j 247.0498

.............................. ll. ........ -----~·-·----........ ~---·-···--.... ~ ..... ::::: ___ ~ .................. ~---·-·-·······~--................ ~ ................. ~ .................. ~ .................. ..i .................. L ................ ~ .............. -~ ....... ~.~-~ ...... ~ .................. ~ .................. . Vendor :! 0.1072 ! 0.8475 i 1.1717 i 2.5900e. ! 0.0722 i 0.0146 i 0.0868 ! 0.0206 i 0.0134 i 0.0340 : i 252.1733 ! 252.1733 i 2.0600e- i ! 252.2165

.............................. ll. .................. l .................. l. ................. l ...... ~~: ...... l. ................. l ................. l .................. l. ................. l .................. l ................... .i .................. L ................. l. ................. l ....... ~-~-~ ...... 1-................ J .................. . Worker :! 0.2301 i 0.3139 ! 3.7334 i 9.4800e- i 0.7664 i 4.8200e. ! 0.7712 ! 0.2032 i 4.4600e. ! 0.2077 : ! 719.0587 ! 719.0587 ! 0.0311 ! i 719.7108

!! ~ i ~ 003 i i 003 i i i 003 i ! i i i i i Total 0.3971 1.8378 5.5173 0.0146 0.8980 0.0312 0.9293 I 0.2402 I 0.0287 I 0.2689

1

1.218.2442

1

1.218.2442

1

0.0349 I 11,218.9771

4.0 Operational Detail - Mobile

A-67

Page 89: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 29 of 33 Date: 1/4/2016 6:20PM

4.1 Mitigation Measures Mobile

CH4 N20 C02e

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

.............................. fi----+----+· Unmitigated :~ o.oooo 0.0000 o.oooo

!----+---+----+---f------t .................. ~---+----!----+-· ---~ ................. ..

" " "

4.2 Trip Summary Information

LantWse

General Light Industry

Total

4.3 Trip Type Information

•• .··

0.0000 0.0000

.... Weekday . 0.00 • I 0.00

Miles

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

AverageDailyTrip Rate Unmitigated Mitigated

I Saturday ··•· Sunday AnnuaiVMT AnnuaiVMT ',

0.00 0.00 ' ' ' ' ' I 0.00 0.00 I I

,'

Tripo/o Trip Purpose %

.. Land Use H-W or C-W .• , H-S or .C-C ,. H~O or C~~W H-Wor G-r H-S or C-C I H-0 or C-NW Primary I Diverted I Pass-by

. w. .·.· · .

General Light Industry ! 14.70 6.60 6.60 ' 59.00 28.00 13.00 ' 92 ' 5 ' 3 ' ' ' '

LOA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHO I HHD l OBUS I UBUS I MCY I SBUS I MH

0.438302! 0.0639171 0.1632341 0.1699141 0.0428861 0.0070841 0.0194901 0.0821491 0.0020631 0.0017561 0.0065791 0.0007641 0.001861

0.0000

A-68

Page 90: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

Historical Energy Use: N

5.1 Mitigation Measures Energy

S02

Natural Gas 0.0000 0.0000 0.0000 0.0000 Mitigated

.............................. NaturaJGas 0.0000 0.0000 0.0000 0.0000 Unmitigated

5.2 Energy by Land Use - NaturaiGas

Unmitigated

LatidUse

NaturaJGa s Use

kBTU!yr

ROG NOx co

..

S02

0.0000 0.0000

0.0000 0.0000

Fugitive Exhaust PM10 PM10

lb/day

Page 30 of 33 Date: 1/4/2016 6:20PM

C02e

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

·················· ................... 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 PM2.5 PM2.5

lb/day

C02e

General Light 0 :! 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 t 0.0000 l 0.0000 0.0000 0.0000 0.0000

ooooooooo~~o~o~o~o:~ooooooooo ••••nunn••••••ll.uun••••ouoou•~••••••onooo••••••~••••••••••••-n•o~ooooouonou•••••~no••••n•••••••n.;oo••••••uuoou••~•••••...,•-••••••...,.;••••••••••••••nnl.,,,,.,.,,,,,.,,,,,,.;,.,..,.,,,,,..,.,,..,,.,..,,..,i,,,,,,,,,,,,,,,,,,;,,.,,,.,,,...,,,,,,.,.,,.~ ...... ..,.,,,,,,,,,,,,.~,,,,,,,,,,,,,,,,,,, Other Non- 0 :1 0.0000 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 i 0.0000 1 1 0.0000 i 0.0000 : 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000

Asphalt Surfaces !i i i ! l i l i ! l t ! i ! ! l Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

A-69

Page 91: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

5.2 Energy by Land Use - NaturaiGas

Mitigated

NaturaiGa ROG NOx co s Use

.· / I ... · ..

• Land Use / kBTU/yr ·.·

••

S02 Fugitive Exhaust PM10 PM10 . .. · .•

lblday•· ..

Page 31 of 33 Date: 1/4/2016 6:20PM

PM10 Fugitive Exhaust PM2.5 Total Bio-C02 NBio- C02 Total C02 CH4 N20 C02e Total PM2.5 PM2.5

.··

·. ... . . lb/day

General Light 0 il 0.0000 '.: 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000 Industry o: 0

ooooooooooooooOooooooooooooooo •••nuooooou••••;.;.onnnnouoo••••4o•nooonooooooon~•oon••-•--•••--4u•oooonouoouu~o•o...,,. .... , ... .,,..,,..,~noo••••••••oouu~...,o••-•-•--••••o~nooooOooooono•oo~Uooooonuoon•••~••o••••••--•U•••--oo,oooooooooooooooooo~••••••••----•--•-+••••onnoun .. ••+oounooo•••••noo+----••••--•----~ooooooooooooooooooo Other Non- 0 :1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 : 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000

Asphalt Surfaces i\ \ \ \ \ \ \ j l ! : \ \ l ! \ Total 0.0000 0.0000

6.0 Area Detail

6.1 Mitigation Measures Area

Category

Mitigated " " " " 0.0000

······························~!-"---~ Unmitigated ;~ 0.0000

" 0:

"

0.0000 ! 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

C02e

0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • !------!---~--------i··················~--------+----i----+·---------· .................. .

0.0000 0.0000 0.0000 : 1 0.0000 0.0000 0.0000 0.0000 ' : ' : ' :

0.0000

A-70

Page 92: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 32 of 33 Date: 1/4/2016 6:20PM

6.2 Area by SubCategory

Unmitigated

ROG I NOx

SubCategory

co I Fugitive I Exhaust I PM10 PM10 I S02

lb/day

PM10 I Fugitive I Exhaust Total PM2.5 PM2.5

C02e PM2.5 Total Bio- C02 NBio- C02 I Total C02 CH4 N20

lb/day

Architectural :l 0.0000 • 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000

······---~-~-~~-i-~~---·····-~·-·····-·····-4·-·············-... L ............... .+ .................. 4 ................... f .................. 4 ................... f .................. .f .................. 4 .................... i .................. t .................. .f .................. .f .................. ~ ................... j .................. . Consumer ;: 0.0000 : : : : : 0.0000 : 0.0000 : : 0.0000 : 0.0000 : : : 0.0000 : : : 0.0000

........ :..~~-~-~-~-~~········~--............ ! .................. ! .................. ! ............... ) .................. J .............. _ _J.. ............... _J ................. _J ............... ) .................... ~ .................. ! .................. ! ............... ) .................. !, ................. ~ .................. . Landscaping .: 0.0000 ; 0.0000 : 0.0000 : 0.0000 ; : 0.0000 ; 0.0000 : : 0.0000 ; 0.0000 , : 0.0000 : 0.0000 : 0.0000 : : 0.0000

:~ ~ ! ~ ~ ! ~ ~ ! ~ : ~ ~ ! ~ l I 0.0000 I I 0.0000 I 0.0000 Total 0.0000 0.0000

II

Mitigated

ROG NOx co 802 Fugitive Exhaust PM10 PM10

SubCategory lb/day

I 0.0000 I

PM10 T6tal

I 0.0000 0.0000 0.0000 I 0.0000 0.0000

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 PM2:5 PM2.5

lb/day

0.0000

N20 C02e

..

.... ~:~~~~~~~: ..... ~ .... ~-~~~-~~ .... 4 ................... ~ .................. ~ ................. .f ................... f .... ~-~~~-~-~--4 .... :::::: .... f ............... ...l .... ~-~~-:::.) ..... ~-~:~-~-~ .... .L .............. ) ................. ) .... ~~::~:. ... l.. ................ ~ ................ ) .... ~:~~-~~- .. . Consumer :1 0.0000 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 : 1 1 0.0000 1 1 i 0.0000

........ :.~~-~-~-~:.~ ........ ~ ..... -........ l .................. l .................. l .......... -.... .l .................. l ........ -...... J .................. l ..... _ ......... .l .................. l .................... i .................. L ................. ~ ................ .l .................. l .................. j .................. . Landscaping :1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 1 0.0000 1 0.0000 1 1 0.0000 i 0.0000 : 1 0.0000 1 0.0000 1 0.0000 1 i 0.0000

=~ ~ i ~ ~ 1 ~ ~ 1 ~ : 1 1 ~ ~ l Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

7.0 Water Detail

A-71

Page 93: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 33 of 33 Date: 1/4/2016 6:20PM

7.1 Mitigation Measures Water

8.0 Waste Detail

8.1 Mitigation Measures Waste

9.0 Operational Offroad

EquipmentType Hours/Day Days/Year HorsePower Load Factor Fuel Type

10.0 Vegetation

A-72

Page 94: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

1.0 Project Characteristics

1.1 Land Usage

Page 1 of 33

Sanger Substation Expansion Project

Fresno County, Winter

Date: 1/4/2016 6:16PM

Land Uses •1 Size 1 Metric . 1 Lot Acreage Floor Surface Area J Population

General Light Industry 0.00 1000sqft 7.00 0.00 ! 0 ................................................................................ ; ................................................................................ f-------------------L .................................... ·············-··-················-·······-..! ....................................... .

Other Non-Asphalt Surfaces : 0.00 : ! 11.00 ! ~ 0 ' ' : : :

1.2 Other Project Characteristics

Urbanization

Climate Zone

Utility Company

C02 Intensity (lb/MWhr)

Rural Wind Speed (m/s)

3

Pacific Gas & Electric Company

641.35 CH41ntensity (lb/MWhr)

1.3 User Entered Comments & Non-Default Data

2.2

0.029

Precipitation Freq (Days)

Operational Year

N20 Intensity (lb/MWhr)

45

2019

0.006

A-73

Page 95: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 2 of 33 Date: 1/4/2016 6:16PM

Project Characteristics -

Land Use - Based on PEA, Section 2.0 Project Description, substation expansion will occur on 7 acres and will result in temporary disturbance to 11 acres.

Construction Phase- Based on Construction Equipment and Schedule by Phase table developed by PGE.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment -Construction equipment based on "Construction Equipment and Schedule by Phase" table. Puller and tensioner under "Other General Industrial Equipment."

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Off-road Equipment- Construction equipment based on "Construction Equipment and Schedule by Phase" table.

Trips and VMT- Trip information taken from Table 3.16-3: Estimated Truck Trips.

Construction Off-road Equipment Mitigation-

Table Name I Column Name I Default Value New Value

tbiConstructionPhase : NumDays : 300.00 66.00 .............................................................................. j .............................................................................. : --······································································

tbiConstructionPhase ! NumDays ! 300.00 261.00 ··············································································f··············································································.J---------------------------------- ······································································

tbiConstructionPhase ! NumDays ! 30.00 66.00 .............................................................................. , .............................................................................. ;.- --······································································

tbiConstructionPhase ! NumDays ! 30.00 44.00 ··············································································•··············································································•------------------·-·----------- ..................................................................... .

tbiConstructionPhase ! NumDays ! 20.00 43.00 ..............................................................................•.............................................................................. ;.-- ······································································

tbiConstructionPhase : NumDays : 20.00 66.00 .............................................................................. j .............................................................................. : ..................................................................... .

tbiConstructionPhase ! NumDays ! 10.00 22.00

··············································································•··············································································•---·-----·-·------------·----······································································ tbiConstructionPhase ! NumDays ! 10.00 23.00

.............................................................................. , .............................................................................. ;.-- ······································································ tbiConstructionPhase : PhaseEndDate : 10/31/2018 4/30/2018 • • .............................................................................. , .............................................................................. ;.-----------------i······································································ tbiConstructionPhase : PhaseEndDate : 12/3/2018 • • 12/31/2018

··············································································•··············································································•-·-·-------·--------------·-······································································ tbiConstructionPhase : PhaseStartDate : 9/1/2018 3/1/2018 . ' .............................................................................. , .............................................................................. ;.-------·---------1······································································ tbiConstructionPhase : PhaseStartDate : 9/1/2018 10/1/2018

··············································································'··············································································t-'' --------------!······································································ tbiConstructionPhase : PhaseStartDate :

' ' 6/30/2018 7/1/2018

A-74

Page 96: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 3 of 33 Date: 1/4/2016 6:16PM

tbiGrading AcresOfGrading 99.00 1 7.00 ' ' : ··············································································•··············································································~·············································································· · ..................................................................... .

tbiGrading ; AcresOfGrading ; 66.00 4.11 .............................................................................. , .............................................................................. *-···-·-·---·--·--·-----·-·-·--·-·-·--·- ······································································

tbllandUse ; LotAcreage ; 0.00 7.00

··············································································I··············································································;-- ·-······································································ tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ! 1.00 0.00

.............................................................................. , .............................................................................. ;...-- ·-······································································ tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 1.00 0.00

··············································································'··············································································*----·---·-·--·------------·- ······································································ tbiOffRoadEquipment : OffRoadEquipmentUnitAmount : 2.00 0.00

··············································································f··············································································i--------------·-..................................................................... . tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 3.00 1.00

.............................................................................. , .............................................................................. *- ·-······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 1.00

.............................................................................. , .............................................................................. *--·-·----·--·-·--·-----·--·--·-·--·---- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00

.............................................................................. ; .............................................................................. *----------·-······································································ tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 1.00 0.00

.............................................................................. , .............................................................................. ;...-- ·-······································································ tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ; 2.00 1.00

.............................................................................. , .............................................................................. *--·----·--·-------------·--·-·--·---·- ······································································ tbiOffRoadEquipment : OffRoadEquipmentUnitAmount : 2.00 1.00

.............................................................................. ; .............................................................................. ;._ _______________ ······································································ tbiOffRoadEquipment : OffRoadEquipmentUnitAmount : 1.00 0.00

.............................................................................. j .............................................................................. .j.. _______________ ······································································ tbiOffRoadEquipment ; OffRoadEquipmentUnitAmount ! 2.00 1.00

.............................................................................. , .............................................................................. *---·--·--·---------·---·-·--·-·--·---·- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 2.00 1.00

.............................................................................. ; .............................................................................. ;..------------ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 1.00

.............................................................................. , .............................................................................. *-___________ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 3.00 0.00

··············································································1··············································································*---------·--·-·--·---·--·-·--·-·--·---·- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 4.00 3.00

.............................................................................. ; .............................................................................. *-___________ ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ! 1.00 0.00

··············································································1··············································································*-------·------·--·-------·--·---·--- ······································································ tbiOffRoadEquipment ! OffRoadEquipmentUnitAmount ; 1.00 0.00

.............................................................................. ; .............................................................................. *- ······································································ tbiOffRoadEquipment ; UsageHours ; 7.00 8.00

··············································································'··············································································*------------ ..................................................................... . tbiProjectCharacteristics ! OperationaiYear ! 2014 2019

.............................................................................. , .............................................................................. *-·------·-·-·--·---·-·--·-------- ······································································ tbiProjectCharacteristics ; Urbanizationlevel ; Urban Rural

.............................................................................. , .............................................................................. *- --······································································ tbiTripsAndVMT ; HaulingTripNumber ; 0.00 18.00

.............................................................................. , .............................................................................. *- ······································································ tbiTripsAndVMT ! HaulingTripNumber ! 0.00 12.00

.............................................................................. , .............................................................................. *··-·---·---·--·-·--·--·--·---·-·-·--·---- ······································································ tbiTripsAndVMT ; HaulingTripNumber ! 0.00 8.00

.............................................................................. ; .............................................................................. ;.. ······································································ tbiTripsAndVMT : HaulingTripNumber : 0.00 4.00

.............................................................................. ; .............................................................................. : ······································································ tbiTripsAndVMT : HaulingTripNumber : 0.00 2.00

: ' A-75

Page 97: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 4 of 33 Date: 1/4/2016 6:16PM

tbiTripsAndVMT HaulingTripNumber 0.00 j 6.00 ' ' : ··············································································•··············································································•·············································································· · ..................................................................... .

tbiTripsAndVMT ; HaulingTripNumber ; 0.00 2.00 ............................................................................................................................................................. ._ ______________________________ .................................................................... ..

tbiTripsAndVMT ; HaulingTripNumber ; 0.00 224.00 .............................................................................. , .............................................................................. ;.------------ ..................................................................... .

tbiTripsAndVMT ; VendorTripNumber ; 0.00 16.00 ............................................................................................................................................................. ;.- ..................................................................... .

tbiTripsAndVMT ; VendorTripNumber ; 0.00 16.00 ............................................................................................................................................................. .___ ___________________ .................................................................... ..

tbiTripsAndVMT ; VendorTripNumber ! 0.00 10.00 ............................................................................................................................................................. -- .................................................................... ..

tbiTripsAndVMT i VendorTripNumber ; 0.00 8.00 ............................................................................................................................................................. ;.- .................................................................... ..

tbiTripsAndVMT ; VendorTripNumber ; 0.00 22.00 ............................................................................................................................................................. ._ ______________________________ .................................................................... ..

tbiTripsAndVMT i VendorTripNumber ! 0.00 8.00 ............................................................................................................................................................. ;.- -- .................................................................... ..

tbiTripsAndVMT i VendorTripNumber ! 0.00 12.00 ............................................................................................................................................................. ;.- __ .................................................................... ..

tbiTripsAndVMT ! VendorTripNumber ; 0.00 12.00 ............................................................................................................................................................. f------------------------------- ..................................................................... .

tbiTripsAndVMT ! WorkerTripNumber ; 20.00 60.00 ............................................................................................................................................................. ;.- ..................................................................... .

tbiTripsAndVMT i WorkerTripNumber ; 0.00 60.00 ............................................................................................................................................................. ;.------------ .................................................................... ..

tbiTripsAndVMT ! WorkerTripNumber ! 0.00 60.00 .............................................................................. , .............................................................................. f------------------------------ ..................................................................... .

tbiTripsAndVMT ; WorkerTripNumber ; 8.00 0.00 ............................................................................................................................................................. ;.-- .................................................................... ..

tbiTripsAndVMT ! WorkerTripNumber ! 18.00 0.00 .............................................................................. ; .............................................................................. ;.------------ .................................................................... ..

tbiTripsAndVMT ; WorkerTripNumber ! 13.00 0.00 ............................................................................................................................................................. f-------------------------- .................................................................... ..

tbiTripsAndVMT ; WorkerTripNumber ; 10.00 0.00 .............................................................................. i .............................................................................. ; ..................................................................... .

tbiTripsAndVMT ! WorkerTripNumber ! 33.00 60.00

2.0 Emissions Summary

A-76

Page 98: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

2.1 Overall Construction (Maximum Daily Emission)

Unmitigated Construction

ROG NOx co S02 Fugitive Exhaust PM10 PM10.

Yel!r lb/day

PM10 Total

Page 5 of 33 Date: 1/4/2016 6:16PM

CH4 N20 C02e Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02j Total C02 PM2.5 PM2.5 I .· lb/day

2017 :! 4.4124 . 45.3327 33.9483 0.0506 0.9799 2.3431 3.3230 0.2442 2.1564 2.4006 ! 0.0000 l4,947.8769l4,947.8769 i 1.2358 0.0000 ! 4,973.8293

oooooooooooooooooooooooooooooo~•••••••••-•••••-~uon••••••••••••n~oo•oounono•••••-f•-•-•-••n••-•~•••••••••••••nouo~•••-•-••••••••••~•••nnooouuno••~••••-•••nn•n•o~nu•noo•••••••••~•u ........ ooonnu••••t•••••••••ooooooooo~ooooo••••••••••••••~•n••-•••••-•••..;••••••••u•••••uo~ununo••••••••••i••••••••••••••••••• 2018 :~ 5.0740 ~ 51.0166 ~ 41.7475 ~ 0.0672 ~ 1.0595 ~ 2.7186 ~ 3.6167 ~ 0.2693 ~ 2.5180 ~ 2.7582 : 0.0000 ~6,500.0138;6,500.0138~ 1.6196 ~ 0.0000 ~6,534.0260

=~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 9.4865 96.3493 75.6958 0.1177 2.0394 5.0617

Mitigated Construction

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Year lb/day

6.9397

PM10 Total

0.5135 4.6744 5.1587 0.0000 11,447.890111,447.890

1 I 1

2.8555

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 PM2.5 PM2.5

Jb/day

0.0000

N20

11,507.855 4

C02e

2017 :! 4.4124 45.3327 33.9483 0.0506 0.9799 2.3431 3.3230 0.2442 2.1564 2.4006 : 0.0000 ! 4,947.8769! 4,947.8769! 1.2358 ! 0.0000 ! 4,973.8293

.............................. ll.. ................. ~ .................. ~ ................. .+ .................. ~ ................. .+ .................. ~ ................. .+ ........... -... -~ .................. ~ .................... i .................. L ................ ~ .... -.......... l ....... ~ .......... l. ................. j .................. . 2018 ;~ 5.0740 ~ 51.0166 ~ 41.7475 ~ o.0672 ~ 1.0595 ~ 2.7186 ~ 3.6167 ~ o.2693 ~ 2.5180 ~ 2.7582 : o.oooo ;6,500.0138~6,500.013B~ 1.6196 i o.oooo ;6,534.0260

:~ ~ ! ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 9.4865 96.3493 75.6958 0.1177 2.0394 5.0617 6.9397

ROG NOx co 502 Fugitive Exhaust PM10 PM10 PM10 Total

Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction

0.5135 4.6744 5.1587

Fugitive Exhaust PM2.5 PM2.5 PM2.5 Total

0.00 0.00 0.00

0.0000 11,447.890 11,447.890 2.8555 7 7

Bio·C02 NBio..C02 Total C02 CH4

0.00 0.00 0.00 0.00

0.0000 11,507.855 4

N20 C02e

0.00 0.00

A-77

Page 99: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 6 of 33 Date: 1/4/2016 6:16PM

2.2 Overall Operational

Unmitigated Operational

C02e

Area 0.0000 0.0000 ~ 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ! 0.0000 0.0000 0.0000 0.0000

.............................. ;; ........................... ~ ......................... ; .......................... + .......................... ~ ................................ ~ ........................... ~ .............................. ;._ ....................... f ............................... ~ ......................... ; .................. ~ ....................... f ........................... +-··-*"········-~ ........................ j •..•.••.••••...•... Energy :~ 0.0000 ! 0.0000 ~ 0.0000 ~ 0.0000 ! ~ 0.0000 ! 0.0000 ~ ~ 0.0000 ~ 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000

·····························-~------l ..................... l ................... L--l------------------ ~ -- ~---------·------l-----l----------·-------l--·---------·----.i .................. L .... ------·--·-1--------l----·-------------l---·-----·------·-J .................. . Mobile :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 i 0.0000 ! 0.0000 ! 0.0000 i 0.0000 : ~ 0.0000 ! 0.0000 ! 0.0000 ! ! 0.0000

il ~ ! ~ ~ l ~ ! ! ~ : ~ ~ ! ~ 1 Total

Mitigated Operational

ROG NOx co S02

II . Category .. .

~_. .• .. ... . .. ·.·.· .

F··.·ugitiv··.e.. I Exlu1ust I PM10 PM10 .··. ·. L

lb/day <

PM10 Tqtal

.

F· .. ug. itive I Exha. ust PM2.5 PM2.5

· .. ·

·. -"'··

0.0000 0.0000

PM2.5 Tqtal Bio- C02 NBio- C02 Total C02 CH4 N20 C02e

lb/day

Area !~ 0.0000 ~ 0.0000 ~ 0.0000 0.0000 0.0000 0.0000 l ~ 0.0000 0.0000 ! ~ 0.0000 0.0000 ~ 0.0000 j 0.0000

ooooooooooooo••••••ooooooooooo~------·--~••••••••••••ou•u•~•••••••••••••••n•+-•••--•--4••••••••••nu•o•••~•••-•--•---~•nnuoo•••••••••+---•••-••••••~••••••••••ouuooo~••••••••••••••••••••i••••••oooooooooooot .............. ,,.._. ••• ~ ...................... ,. •• ~ ••••••••• ._ ••• ,,.,~ ..................... ~,,,,,,,,,,,,,,,,,,, Energy :1 0.0000 l 0.0000 l 0.0000 l 0.0000 l ! 0.0000 i 0.0000 ! ! 0.0000 i 0.0000 : i 0.0000 ! 0.0000 ! 0.0000 i 0.0000 ! 0.0000

······························~-------------l·-----·------·--·-1----·-----·------l----------l-·--·--·------·---l------------l---·--------------l-------------J-----·------------l·--·-----------·---i .................. ! ...... ----·------1-------------l--·------·-----·-·l--------··----·---j .................. . Mobile :! 0.0000 i 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 i 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 l i 0.0000

=~ ~ i ~ ~ ~ ~ ~ ! ~ : ~ ~ ~ i l Total 0.0000 0.0000 0.0000 0.0000 0.0000 l 0.0000 I 0.0000 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

A-78

Page 100: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 7 of 33 Date: 1/4/2016 6:16PM

ROG

Percent 0.00 Reduction

3.0 Construction Detail

Construction Phase

Phase Number

Phase Name

NOx co

0.00 0.00

S02 Fugitive Exhaust PM10 PM10 PM10 Total

0.00 0.00 0.00 0.00

Phase Type Start Date

Fugitive Exhaust PM2.5 Bio-C02 PM2.5

0.00

End Date

PM2.5 Total

0.00 0.00 0.00

NumDays Num Days Week

NBio-C02 Total C02 CH4

0.00 0.00 0.00

Phase Description

!Phase 1-Substation Grading and !Grading j 3/1/2017 ~ 5/31/2017 i 5~ 66~ ···················~-~.?.?.~?.~ .................................................. l .......................................................... .J _______ _j_ _____ ..j ...................... ~ ...................... i.. ............................................................... . 2 :Phase 2-Substation Foundations :Building Construction j 6/1/2017 j 8/31/2017 j 51 66J

:and Footings ! I i I I ! •••••••••••••••••••-l••ooo•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••'l'•••••••••••••oouooooooooooooooooooooooooooooo••o••••••••••

1 ooooooouooooooo••••••-:••••••oouoo••••••••••~••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••

3 :Phase 3-Substation Equipment :Building Construction i 9/1/2017 l 8/31/2018 5~ 261 ~

.................. .11.~~!~!!~!!~.~ ............................................ .1.. ........................................................ .1 _J_ _____ -l ...................... L .................... L ................................................................ . 4 :Phase 4a-Power line re-route: :Paving I 3/1/2018 ~ 4/30/2018 ~ 5~ 431

................... JI.~~!~!!.!~.~ .. ~~~.~-~~!!~~~ ................... ..1 ........................................................... I ~ ! ...................... L ................... .l ................................................................. . 5 !Phase 4b-Power line re-route: !Grading j 5/1/2018 j 6/29/2018 ! 51 44j ................... ~.~-~~!~!!.!~.~ ............................................ i .......................................................... .J ______ J.. ______ J .................... .,l .................... ..J ................................................................. . 6 :Phase4c-Powerlinere-route: :sitePreparation 171112018 [7/31/2018 i 5j 22[

:string Power line : i ! ! ! ! ................... ~ ................................................................ : ........................................................... 1-------·,--------i"""""""""""""""""""l" ...................... l ................................................................. . 7 !Phase 4d-Power line re-route: :site Preparation j 8/1/2018 8/31/2018 I 5 23[

:Remove pull site and restore : ; i I ; property : I ! ! ................... "' ................................................................ 1............................................................. . ............................................. ~ ................................................................ ..

8 !Phase 5: Equipment Removal and !Paving ~ 10/1/2018 ~: 12/31/2018 ~ 5~ 66\ •Clean-up • : : : :

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 0

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating- sqft)

OffRoad Equipment

N20

0.00

C02e

0.00

A-79

Page 101: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 8 of 33 Date: 1/4/2016 6:16PM

.•.·. Phase Name 1 Offroad Equipment Type Amount 1 Usage Hours 1 Horse Power Load Factor

Phase 1-Substation Grading and Access ~Excavators Oj 8.00j 162 0.38

·Ph~~-~·1·~·s~·t;;i~ii~~--8~~d·i·~9·~~·d"·A:~~~~~-i Graders ,··········································:;r--- 8. oo i ····························:;·?4j·····························(i."41 ! : : .......................................................................... ;.__________ --t············································· • ................................... ·····································

:~::-:-~~:~-::::::~~--:;::-:-~:-:~-:-::::::·t~~;;~~~~~ Equipment ·-j··························· . <i :::! ....................... 1~:1······················ :~; Ph~~-~-1-~s~·t;;i~ii~~--G~~di.~g·~~"d·A:~~~~~-; Rollers i .......................................... :;·r----"8.0o+····························aaJ·····························ci."38 ··········································································f--·-----------------t ............................................. : ' ....................................................................... . Phase 1-Substation Grading and Access ~Rubber Tired Dozers 1 Ol 8.00i 255] 0.40 .......................................................................... .!.----------------- ............................................. : : ................................... ····································· Phase 1-Substation Grading and Access ;scrapers 1 i 8.00! 3611 0.48

• i i ! Ph~~-~-1~-s~·t;;i~ii~~ .. G~~d·i-~g·~~d·A~~~~~- ;skid Steer Loaders ............................................ 1.j ---s.oot .............................. 64]" ........................... o."37 Ph~~-~-1~-s~·t;;i~ii~~--G~~d·i-~g·~~d·A~~~~~-i T;;;~i;~s/Lo~-;;;stBaZkhoe~-------t .......................................... 2.~ 8. oo i ............................... 97f ............................ (i."37

:~=~,;~~~~:~~~:~~~~~~~: ~:;,~~- -==r:· : :: : ~ ~~ :::1 :· ==~~!~·:·::·········•••••••• :~ Footings ! i I i ........................................................................................................................................................ _. ...................................... ,._ _______ ...j.____________ .................................... . ~;,;!1;,~~~~~-~-~-~~~~~~-~~~-~-~~~~~~-~--~~~ ........ l.~~~~~: ......................................................... l .......................................... ~! 7.00 ! ........... -........ -.... ~~ ............................. ~~-~~ ~;;!1;,~~~-~~-~~~~~~~~ .. :~.~-~~~~~~-~-~ .. ~~~ ...... .J.~~~~-~-~~~~: .................................................. L ..................................... J ___ _:j _____ . __ _:J... .......................... ~.--~~ ~;;!1;,~~~-~~-~~-~~~~~~-.:~~-~-~~~~~~-~--~~~ ....... ,j.:~~-~~~~~ ....................................................... i .......................................... ~ ! 8.00 1 ....... ·--·-·····--····-~·~l······························~~-~~ ~=~~J~::=:::::::= 1:=:;;=:,~ mm ••m• •l•m •• -••• • :1 ::1--~••••m m•• m :.~: '.~~;~9~m•••••••••••••••••••• •mm•m••••••••••••L••••••••••m•••••••••••••••••••••••••••••••••••••••••••••m••••L•••••·-•••-••••••·-••-1 of---·-----~""'"''"""'"""""'"'""'"'' ~:1:,!~:;::::;:;::::::=-m·C:::~'-:~.:~::~~::m... ml··-··- m·····-···· -:! ::+--;/ m ............... m;:: Footings i l i i .......................................................................... ~ ................................................................................................................... -+------+-----·- ................................... .. Phase 3-Substation Equipment !Air Compressors 1 11 8.001 781 0.48

·t~l:!~~~~~~·t;;i~~~~~··E~,~~~~~-~i''''''''''''''''''l'C'~~~;~· .. ••"•'"•'"•'"'"''"'"'''''"'"''"''"'''""''"'"'"'l"" ... "'"'"'"'""'''" ... '"" ... '""(i ~ 7.00 l·---··--.. --••••••22'6j"'''''''''''"''''''"''''''Ci."29 :~l:!;;~2~-b~i~i~~~ .. E~·~;~~~-~i .................. i·;;~~klifi;· ...................................................... l .......................................... t-----8~---·-----·----8;J· .......................... a.:2o Installation i i i i J Ph~~-~-3~s~·t;;i~i~~~--E~·~;~~;~i········· .. ·······r8~~~-;~i~;·s~~~ ........................................... i .......................................... o, 8.oo! ··-·--···-·---·a-41 ............................. '0_.74 Installation ! i ! ! i ·Ph~~-~-3~-s~b';i~i~~~ .. E~-~~~~~-~i .................. roih~·;·8~~·~;~i·i~-d~~i~i-~i·Eq~~~~-~~i ...... 1 1 : .......................... ii:oa·: 87: ............................. o . ."34 Installation i i 1 i i

A-80

Page 102: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 9 of 33 Date: 1/4/2016 6:16PM

Phase 3-Substation Equipment :Skid Steer Loaders 1 i 8.00: 64: Installation : : ; : : Ph·~~-~-3~s~·t;~i~i~~~-·Eq~i;;;;;~~i··················1r~~~i~~~-it:~~d·~~~ii3~~kh·~~····················r·······································ar························7:aar··················-· .. ·····9=rl·····························a:37 Installation : i ! j I Ph~~-~-3~s~b";i~i~~~-·E;;-~i;;;;;~·~i··················:w-~id~~~·······················································r·········································a 1 8. oo ~ ···········-····-···········46j·····························a·:.;;;;

t ' ' I

w~::!:1:P~~~-ii~~-;~~~~i~~--~~~i~ii.rs·Phi~-~~io~iii.Ri9~··········································+·········································J------s:oof-------·---2o5 ·····························a··;;a ~~~~-~-~~~~~~ .................................................... 1-.................................................................... L .......................................... ! 1.. ........ ·-········-······· .... j ............................... ." .... . Phase 4a-Power line re-route: Install TSP!Cranes ! 1! 8.00! 226j 0.29 :~~~-:~~~:~~-i~~~-;~~~~i~:·i~-~-i~ii·:r·spi·F~~-kiifi~······················ .. ································t··········································ai------8o~--------·----a~ ............................. a .. 2o ~~~~-~-~!~i~~ .............................. : ..................... L .................................................................... L .......................................... L------~J--·----·----·~·······························--····· ~;~;-~~1;;~~:.~.~~~~-~:~.~~~~~--~-~~~~~~-~~~1.~::~~~~~~--~-~-~~---········································1 .......................................... ~ I 8.00 '--··-·--····--···--~~-·····························~-:~~ Phase 4a-Power line re-route: Install TSP! Skid Steer Loaders ! 1 ! 8.00 l 64! 0.37

~~~~~~:~:~:~:::!~~~~~~::~~~ ~:: :::j:::== ~~··~~= ~·:~--~=--==-~: .. ::::: .. : .. : ... :.:: ~:: :~~~:~l~~;.~~~·i~~~--~~;~~i~·:··i~~i~ii·:rs·p1·A~~~~i·t:ifi~ .. ·················································r~ ··········································:;t-----a:oo!---J······················ '" .......................................................................... • -·············································..___------i··································+···································· Phase 4b-Power line re-route: Install TSP;Graders j 1: 8.00! 174j 0.41

:~::::::~~::::~:;;~::~:~:~~:~::::~:~:;;:~:::~~~~~~~~str~~U~~~~~~~~~-=~=~:+11 : : : :: : : ~~ ::::! :: : : ;~~~ ::: .......................................................................... ~ _ ........................................... ) --1 .................................. .! .................................... . Phase 4b-Power line re-route: Install TSP~ Paving Equipment , 0! 8.00! 1301 0.36 .......................................................................... .:..--------------------------~ ............................................. : : ................................... ····································· Phase 4b-Power line re-route: Install TSP!Piate Compactors I 1! 8.00! 8j 0.43 .......................................................................... .:....-·--------·--------·-----·---·t·············································' . ···································l····································· Phase 4b-Power line re-route: Install TSP!Rollers 1 f 8.00j 80j 0.38 Ph~~·~·.;;t;~;;·~~;·ii~~-·~~;~~i~~ .. i~~i~ii.rs.Pi scrapers j .......................................... :;·r-----s.oot···························36;·j·····························a."48 .......................................................................... :.--------------·------·+············································-' ····································j····································· Phase 4b-Power line re-route: Install TSPiSkid Steer Loaders j 1l 8.001 64! 0.37 t~:~·j~~p~~·;·ii~~-;~;~~i~:··si;i·~9 ....... T;;;ialt:ift;----------·-------T ......................................... 1.1 8.ool ............................... 62j ............................. a."31

rh~-~-~-4~~;;·~~·;·ii~~-;~;~~i~:··si;i·~9········-rA"i;·c-~;;;~·;;~;~;~ ...................................... r······· ................................. Ci i 6.oo i ···········-··-···········-7·8 ·····························a·:.;;8 Power line i ! i ! rh~~~-.;;~~-;;~~~-ii·~;·;~~~~i~~-8i;i·~·9········-rc-;~~~~ .. ······················································r····························· .. ·········;T-----8.0of ____________ 226 ............................. ()."29

Power line : i +i -------+ Ph~~·~-4~~;;~~;·i~~~-;~;~~i~:··si;i·~9········-rF~;k"iifi;······················································r········································:; i 8.001 ·······-·--··-·····-·······89 ·····························a·:;;a Power line : i ' l I .......................................................................... .,....................................................................... .................................... . ................................... .

0.37

Phase 4c-Power line re-route: String !Other General Industrial Equipment j 2! 8.00j 87:, Power line • ~ ~ ~

0.34

A-81

Page 103: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 10 of 33 Date: 1/4/2016 6:16PM

Phase 4d-Power line re-route: Remove :skid Steer Loaders . 1 ~ 8.00~ 64~ 0.37 pull site and restore property : ; ; ; j ·p;;~·~·~·4d~P~;;;;;~·ii~~·~~;~~i~:··R;~~~~·····t-r;~~i~;~·il:~~d;~~is~~k;;·~~···················r···-··············-···········-·····3r··-······-···-·-···s-:aaf"··············-···········9:r1·····························ci."37 pull site and restore property : ~ l I I r;;;~·~-5~··Eq.~i·~;;;~~·i·R~;;;~~~~··~~d·ci~~~·~1·Ai·;·c-~;;;·p-;~~~~-;~····································· .. i··················· ....................... 1

1 8.oo l .. - ... - ................. 78j .............................. o:48

up : : I i oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo .. ooooooooooooooooooooooooooooooooooooooooooooooooooooooouuooooooooooofoo•oooouoooooonoonnoono•oooooouoouuo-f----------t--•----------• ooooooooooooooooooooooooooooooooooooo

Phase 5: Equipment Removal and Clean-iForklifts j 11 8.001 89 0.20 up : : i ,,,,,,,,,, .. ,,,,,, .. ,,.,,,,,,,, .. ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, .......... , .. ,, .............................. , .. ,,,,, ... , .......... ,,.,,,,fuou ... , .... ,,.,, .......... ,, ...... ,, .. ,, .. , I ·--·--····-•••••--···• •••••••••••••••••••••••••• .. •••••••••

Phase 5: Equipment Removal and Clean-:Graders 1 1j 8.0oi 174 0.41

~·~·~·~·s:··Eq.~i·~;;;~~·i·R~;;;·~~~~-·~~d-ci~~~·i·ai;;~;·c-~~~i·;~~i·i~~·E·q~i;;~~~i···············i···----····· .. ···--· ...................... 1 i 8 o~------·--1711·····························a .. 42 .~.~ .......... : ......................................................... ] ...................................................................... L .......................................... ~------~L------·-----~·······························--····· ~;~~:~~~~~~::~".::'':'~':::!:~:~- - -- ------ J_ - - ---~1 8.001 ~--······--- --~~2 ~~.~-~.~.~~ .. ~~-~-i·~=~~.~-~~=.~-~~~ .. ~.~~-~~~~~.J~~:~~--~-~=~-~-~-~~~~ ...................................... [ .......................................... ~~-----8_._ol------·-----~8l·····························~---~~ i~:::::::::::::::::::::::J:;;~-· m m m••m m •lm•m mmm ••• ; ~~ ::::1 ............................ 3:; ... ,, ......................... ::.:: up • ' ' .......................................................................... .: ...................................................................... ~ ............................................ -t--------;;t---------- .................................... . Phase 5: Equipment Removal and Clean-iSkid Steer Loaders j 21 8.00! 641 0.37 up : : i , ··········································································~··..................................................................... .··································.!----------l····································· ~~ase 5: Equipment Removal and Clean-Fractors/Loaders/Backhoes ~ 3~ 8.00~ 97!

Trips and VMT

Phase Name Offroad Equipment Count

Worker Trip Number

Vendor Trip Number

Hauling Trip · Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

0.37

Vendor Hauling Vehicle Class Vehicle Class

Phase 1-Substation ! 81 60.00 16.00 18.00j 16.80 6.601 20.ooj LO_Mix j HOT_Mix [ HHOT

~§ggi~~:r==?J:=:~ ~:-:: ==:~::: ===~f~:r:~~~;~~: =:==~:-:r= ~:~:~:1~~~~~~ :~=:: ::~=~:: ::::~ : En~.·.i.r;o..me!:'.~.~.n~t.?.l.l;-:!}.':'.r:':. .. i ~ ................................................................................ ~ ............................... ........................... ~ ........................... t .................................... -i-....-------; .......................... .

:.~~:..~:~;:~~~~~~En j -------~···················-~:~.~ ................... ~:~~- ................. ~~-~-~! ................... ~.~:~~ .................... ~:.~.~L ............. ~.~:~~.~.~~~~~~ ...................... ! HOT _Mix !.~.~-~~-·-············

:;~~~~~-! ~-------~:~ ----~:~ m ----~-:~!--- -:~z ·-·-· -:~:! ---~:::~~~~:~;:-- ---: ::~-~: :::~~ -······ r.~r.m:te: .. S!r.\':1(l.!?.nw~r.!}! -=! ................................................................................ !.. ..................................................... .1 .......................... ! ...... ~ ............................ ~-...::----l··························· Phase 4d-Power line ; 41 0.00 12.00 2.001 16.80 6.601 20.001 LO_Mix I HOT _Mix [ HHOT .r.~.r.~·.!t~: .. P.emn~te.r:-.1.!1.1 .. r;.,i. ...................................... J............................. ~................................. ~ .......................... ~ .................................... ; ~ .......................... . ~~ase 5: Equ~~ent l 13~ 60.00~ 12.00~ 224.00~ 16.80~ 6.60~ 20.00~ LD_Mix ~HOT _Mix f HHOT

A-82

Page 104: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.1 Mitigation Measures Construction

Clean Paved Roads

3.2 Phase 1-Substation Grading and Access - 2017

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM1.0 PM10 .

Cate~;~ol)' lb/day

.· · .. · .·

PM10 Total

Page 11 of 33 Date: 1/4/2016 6:16PM

Fugitive Exhaust PM2.5 Total Bio- C02 NBio~ C02 Total C02 CH4 N20 C02e PM2.5 PM2:5

lb/day

Fugitive Dust :1 0.1125 0.0000 0.1125 0.0121 0.0000 0.0121 0.0000 0.0000

" " oooooooooooooo••••••••••••••••;;.••••••••••-••••••+••uo--••••••••••~*"'""nuonn••no+••••••••••••••••••~••••••••••••unu+••-•-••••••••••+n•uono•••••••••+••""'"'"''""""'"'""'+'''''''•••••uuoo+••••••••••••••uo•••~••••••••••••••••••+•••nuounoooooo+•••--••-••••• Off-Road i! 3.9768 ! 43.5320 I 27.6392 ! 0.0386 I I 2.3157 ! 2.3157 I I 2.1312 ! 2.1312 i ,3,936.4398,3,936.43981 1.1991 I ! 3,961.6216

Total 3.9768 43.5320 27.6392 0.0386 0.1125 2.3157 2.4282 0.0121 2.1312 2.1433 3,936.4398 3,936.4398 1.1991 3,961.6216

Unmitigated Construction Off-Site

RbG C02e

Categol)'

Hauling :1 6.2800e- 0.0648 0.0779 2.0000e- 4.7800e- 1 9.7000e- 5.7500e- 1.3100e- 1 9.0000e- 2.2100e- : 20.1602 20.1602 1.5000e- 1 20.1633

0 ' 0000000000000000 ' 00000000000!'0'00~~=-••••+••••••••••••••••••+•••••••••••••••••-+••oooo~~~oooo••+•••••••~~o:ooooooL ... ~~~---+••••••~~o:ooo•••+-••ooo~o~o:o•••..l.•••••~•~~••••••+••ooooo~~=••••j"''''''''''''''''i"""'"'""""+"""""'"'""+""'"~'~~"""t"'"""'"'"'~''''''''''''''''''' Vendor :1 0.2064 1 1.3232 i 2.7007 i 3.4600e- i 0.0963 1 0.0215 i 0.1178 i 0.0275 1 0.0198 i 0.0472 : 1 339.4124 i 339.4124 i 2.9000e- 1 1 339.4734

.............................. ll, ................. .l .................. J,. ................ l ...... ~~= ...... l .................. l .................. l, ................. l, ................. l, ...... · ........... l .................. ..i .................. L. ................ l .................. l ....... ~.~-: ...... 1 .................. 1 .................. . Worker :1 0.2230 i 0.4127 1 3.5305 i 8.2700e- i 0.7664 i 4.9500e- 1 0.7713 i 0.2032 1 4.5500e- i 0.2078 ! i 651.8645 i 651.8645 1 0.0337 i 1 652.5711

!! ! ~ ! 003 ~ ! 003 ! ~ ! 003 ! ! ! ! ! ! ! Total 0.4357 1.8007 6.3091 0.0119 0.8674 0.2572 1,012.2078

A-83

Page 105: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 12 of 33 Date: 1/4/2016 6:16PM

3.2 Phase 1-Substation Grading and Access- 2017

Mitigated Construction On-Site

Fugitive Dust :l " "

ROG NOx

. /

co S02

. ..

Fugitive PM10 .

Exhaust

IPM10 .. .. ·j

·. 10/day ....

0.1125 0.0000

PM1P Fugitive Total PM2:s ... . .

0.1125 0.0121

Exhaust PM2.5

·.·

0.0000

PM2.5 Total Bier- C02 NBio- CQ2 Total C02 CH4 N20 C02e

..

lb/day

0.0121 0.0000 0.0000

,,,, 000000000000 ,,,,,,,,,,,,,,;,;.,,.,,,..,,,,,,,,,,_,~nouonou•••••••~••onunoooooo•••f•--••n•-•••.,_,..~,,,,,,._ • .., .. ,.,,.,,,~,,, .. ...,, .... -..,,,.;.,_.,, .. ._,,,,,,,,,~,,.,, .. ,,.,,,,,,, .... ,.4•uooooo•unuuo+•••••••••ononnou:.oooooooooo•ooooooo~ooooooooonuuooo~o••--•--•--••n••_;.,.,,,,,,,,._ .. ..,,,.;.,,.,,,.,,,.., .. _., .. ,.~,,,,,,,,,,,,,,,,,,, Off-Road :! 3.9768 ! 43.5320 ! 27.6392 ! 0.0386 ! ! 2.3157 ! 2.3157 ! ! 2.1312 ! 2.1312 : 0.0000 ! 3,936.4398!3,936.4398! 1.1991 ! p,961.6216

:~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 3.9768 43.5320 27.6392 0.0386 0.1125 2.3157 2.4282 0.0121 2.1312 2.1433 0.0000 3,936.4398 3,936.4398 1.1991 3,961.6216

Mitigated Construction Off-Site

C02e

Hauling :1 6.2800e- 0.0648 0.0779 2.0000e- 4.7800e- j 9.7000e- 5.7500e- ! 1.3100e- j 9.0000e- 2.2100e- : 20.1602 20.1602 1.5000e- j 20.1633 !! 003 . : . 004 • 003 i 004 . 003 ~ 003 i 004 . 003 ! . . . 004 i .

•••••oooooooooooooooooooo•••••f!"•••-••••-•••-"t••••••••••••••o•n"t••••••n••--••••••"t--•••-•••-••••••"t••••••n••n•u•••"t••--••-••-••--~•••••n•n••••••••~•·--•---••••--1-••nnu••••••••••"t•••n•n•••n••••••••••••••••••••••••••+•••••••••••u•n••"t-•-••--••••••-

Vendor :! 0.2064 ! 1.3232 ! 2.7007 ! 3.4!)00e- ! 0.0963 ! 0.0215 ! 0.1178 ! 0.0275 ! 0.0198 ! 0.0472 : ! 339.4124 ! 339.4124 1 2.9000e- 1 ! 339.4734

.............................. t .. -......... -... l. ................. l. ................. l. ..... ~~3-.•. ..l ................... L.-............... l. ................. l. ..... -......... l .................. l. ................. ..i .................. L ................. l. ................. l ...... ~.~-~ ...... l.. ............... .J .................. . Worker :! 0.2230 ! 0.4127 ! 3.5305 ! 8.2700e- ! 0.7664 ! 4.9500e- ! 0.7713 ! 0.2032 ! 4.5500e- 1 0.2078 : ! 651.8645 1 651.8645 ! 0.0337 ! ! 652.5711

!! i l i 003 l i 003 i i i 003 i ! i i i i i Total 0.4357 1.8007 6.3091 0.0119 0.8674 0.0274 0.8949 0.2320 0.0252 0.2572 1,012.2078

A-84

Page 106: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.3 Phase 2-Substation Foundations and Footings - 2017

Unmitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 PM10

Category lb/day

Off-Road .: 1.8599 19.1037 14.3191 0.0267 1.0869 " " " "

Total 1.8599 19.1037 14.3191 0.0267 1.0869

Unmitigated Construction Off-Site

ROG .I NOx co 502 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

1.0869

1.0869

PM10 Total

Page 13 of 33

Fugitive Exhaust PM2.5 Total PM2.5 PM2.5

1.0184 1.0184

1.0184 1.0184

Fugitive I Exhaust JPM2.5 Total PM2.5 l PM2.5

• • • • •

Date: 1/4/2016 6:16PM

Bio- C02 NBio-C02 Total C02 CH4 N20 C02e

lb/day

2,700.5888 2,700.58881 0.7521 2,716.3828

2,700.5888 2,700.5888 0.7521 2,716.3828

Bio- C02,NBio- C02' Total C02 I CH4 I N20 I C02e

lb/day

Hauling :1 4.1900e- 0.0432 0.0519 1.4000e- ~ 3.1900e- l 6.5000e- l 3.8300e- ~ 8.7000e- ~ 6.0000e- l 1.4700e- i 13.4402 13.4402 1.0000e- l 13.4422 i! 003 ; i i 004 i 003 i 004 i 003 : 004 : 004 i 003 : ; ; l 004 ; :

ooooooooooo•ooooooooooooo•••••r.-----••-••••"t•n•u...,._,,,,,..,..,~.,.,.,,,,,,.,,.,.,.,.,,,'t""'-••---••"""'~•••••••••••nnu•-t--••••-••-•-•'tnn••••••••••n••~•••--••••••••'t••n•••••••••nn•"t•••••nn"'''''"''''*''''''''''''''''''''!''"'""''"n"'o•••••••'t"' .. unou•••••'tun••••••••••nu~oo•••••••••••••••••

Vendor :i 0.2064 i 1.3232 i 2.7007 i 3.4600e- i 0.0963 i 0.0215 i 0.1178 i 0.0275 i O.D198 i 0.0472 : i 339.4124 i 339.4124 i 2.9000e- i i 339.4734

.............................. ll, .................. l .................. J .................. J ...... ~~=-·-··J ................... ~ .................. l .................. J ................. J .................. J .................. ..i .................. t.. ................ J .................. J ...... ~.~.: ..... J .................. J .................. . Worker :\ 0.2230 1 0.4127 ~ 3.5305 ~ 8.2700e- ~ 0.7664 1 4.9500e- 1 0.7713 ~ 0.2032 ~ 4.5500e- j 0.2078 : 1 651.8645 ~ 651.8645 1 0.0337 1 1 652.5711

!1 1 ~ 1 003 ~ 1 003 1 ~ 1 003 i : 1 i 1 l 1 Total 0.4336 I 1.7791 6.2832 0.0119 0.8658 0.0271 0.8929 0.2316 I 0.0249 .I 0.2565

1

1.004.7171

1

1.004.7171! 0.0367 I 11 ,005.4867

A-85

Page 107: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 14 of 33 Date: 1/4/2016 6:16PM

3.3 Phase 2-Substation Foundations and Footings- 2017

Mitigated Construction On-Site

ROG NOx co

Category

· .

Off-Road . : 1.8599 19.1037 14.3191 t: t: t: t:

Total 1.8599 19.1037 14.3191

Mitigated Construction Off-Site

ROG NOx co .. - .• -- .. .

Category

S02

·.

0.0267

0.0267

S02

Fugitive Exhaust PM10 PM10

.. _,_

lb/day ·

Fugitive PM10

--~

1.0869

1.0869

Exhaust PM10 _--:_o_

lb/day -

PM10 Total

1.0869

1.0869

PM10 Total

-·.

Fugitive PM2:5

·.---

Fugitive PM2:5

._··

Exhau'st PM2.5

1.0184

1.0184

Exhaust PM2.5

PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e

' lb/day

1.0184 • 0.0000 2,700.5888 2,700.5888 0.7521 2,716.3828 • • • • 1.0184 0.0000 2,700.5888 2,700.5888 0.7521 2,716.3828

pM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e

lb/day

Hauling :1 4.1900e- 0.0432 0.0519 1.4000e- 3.1900e- 6.5000e- 3.8300e- j 8.7000e- j 6.0000e-l 1.4700e- ! 13.4402 13.4402 1.0000e- l-. 13.4422 !! 003 i l i 004 i 003 i 004 i 003 i 004 i 004 ; 003 : i i i 004 i ;

0000000 ooooooooooooooooooooooo~••-••---t•--•••-•••n•••n-t•••••oono..,o•••••~•·---·---t••n•••••••o•n•u"t-•----•"t••u•••••••-•n••-t------••••"t••••••••oon••••••"t••••••n••••n•••••••••••••••••••••••••t•••••••uuuooo••"t••-..,.,,...._, ... ,.,.."t•nn••••••n•o•n't••••••••oonoo••••"!•••••••••••oooooooo

Vendor li 0.2064 i 1.3232 i 2.7007 i 3.4600e- i 0.0963 i 0.0215 i 0.1178 i 0.0275 i 0.0198 i 0.0472 : i 339.4124 i 339.4124 l 2.9000e- i i 339.4734

.............................. ll. .................. l. ................. J ................. .l----~~-~---.l ................... L .... ______ J .................. l. ................ .l .................. J .................. ..i .................. L. ................ l. ................ .l ....... ~-~-~ ...... J .................. J .................. . Worker :i 0.2230 i 0.4127 i 3.5305 i 8.2700e- l 0.7664 i 4.9500e- i 0.7713 i 0.2032 i 4.5500e- i 0.2078 : i 651.8645 i 651.8645 i 0.0337 i i 652.5711

!! i l l 003 l i 003 i i i 003 i ! i i i i i Total 0.4336 1.7791 6.2832 0.0119 0.8658 0.0271 0.8929 0.2316 0.0249 0.2565 1,004.7171 1,004.7171 0.0367 1,005.4867

A-86

Page 108: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment Installation- 2017

Unmitigated Construction On-Site

ROG NOx co

Category >

Off-Road .: U050 9.0971 7.2117 " ! " " ~ "

Total 1.1050 9.0971 7.2117

Unmitigated Construction Off-Site

ROG NOx co ..

Category

S02

0.0101

0.0101

I S02

Fugitive Exhaust PM10 PM10

lb/day

0.7010

0.7010

I Fugitive I Exhaust I PM10 PM10

>

lb/day

Page 15 of 33

PM10 Fugitive Total PM2.5

>

0.7010

0.7010

PM10 I Fugitive Total PM2.5

Exhaust PM2.5

0.6634

0.6634

Exhaust PM2.5

Date: 1/4/2016 6:16PM

PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e

lb/day

0.6634 • 998.4634 998.4634 0.2306 1,003.3053 • • • • 0.6634 998.4634 998.4634 0.2306 1,003.3053

PM2.5 Total Bio- C02 NBio- C02 Total C02 I CH4 I N20 I C02e

lb/day

Hauling :! 7.1000e- 7.2800e- 8.7600e- 1 2.0000e- 1.3600e- 11.1000e- 11.4700e- l 3.5000e- 11.0000e-l 4.5000e- ! 2.2658 2.2658 2.0000e- 1 2.2661 !! 004 ! 003 i 003 ! 005 i 003 ! 004 ! 003 ! 004 ! 004 ; 004 : ; ; i 005 ; ;

''''''''''''''''''''''''''''''11''"*"""''''"'-"'"""'*'tn••••••••••••••••~••••••••••••••••••"t•-•-•oooo_oo..., .... •~•••n•••••••••••••-!-••••••--••••---"t••"'"'""'"'"u"'u'"u"~"""""-"---"''""'''t"'""''"''''''"'"'"'t"""""'"""'"'"'""''""""' .. ''''''''''''''''''~'"'"'''''''''"''""'~'-'""-"''""""""'"'t"""'""'""'"'"'"n"o"!'nounouuoun•"!•••••••••••oooooo••

Vendor :! 0.1290 ! 0.8270 i 1.6879 i 2.1600e- i 0.0602 i 0.0134 ! 0.0736 i 0.0172 ! 0.0124 i 0.0295 : ! 212.1328 i 212.1328 i 1.8100e- i i 212.1708

.............................. ll. ................. .l ................. ,l. ................. l. ..... ~~~--··.J .................. ,l. ................. l .................. l ................. .l .................. l .................. ..i .................. l. ................. l. ................. l ....... ~-~.~ ...... 1 .................. ~ .................. . Worker :! 0.2230 ! 0.4127 i 3.5305 ! 8.2700e- i 0.7664 i 4.9500e- ! 0.7713 i 0.2032 ! 4.5500e- ! 0.2078 : i 651.8645 i 651.8645 i 0.0337 i i 652.5711

!! i i i 003 l i 003 i l i 003 i ! i i i i i Total 0.3527 1.2470 5.2272 I 0.0105 I 0.8279 I 0.0185 I 0.8464 I 0.2208 0.0170 0.2378 866.2630 866.2630 I 0.0355 I 1867.0081

A-87

Page 109: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 16 of 33 Date: 1/4/2016 6:16PM

3.4 Phase 3-Substation Equipment Installation - 2017

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 N20 C02e PM10 PM10 Total PM2.5 PM2.5

" ". I I.

Category ··. ·• lb/day · .. ·. lb/day

I• I• . •••

Off-Road ·= 1.1050 9.0971 7.2117 0.0101 0.7010 0.7010 0.6634 0.6634 0 0.0000 998.4634 998.4634 0.2306 1,003.3053 " 0

" 0

" 0

" 0

Total 1.1050 9.0971 7.2117 0.0101 0.7010 0.7010 0.6634 0.6634 0.0000 998.4634 998.4634 0.2306 1,003.3053

Mitigated Construction Off-Site

ROG I NOx I co I S02 Fug·.ltive I Exh.aust PM10 PM10

Category lb/day

... ··

PM10. I Fugitive Total PM2.5

·.

Exhaust PM2.5

PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e

lb/day

Hauling :! 7.1000e- 7.2800e- 8.7600e- ! 2.0000e- ~- 1.3600e- 1.1000e- 1.4700e- !. 3.5000e- 1.0000e- 4.5000e- : 2.2658 2.2658 2.0000e- ~- 2.2661 :! 004 ! 003 l 003 ! 005 l 003 ! 004 : 003 : 004 ! 004 : 004 : l i ; 005 ; !

000000000000 ooooooooooooooo•••f'!'•--·----'"-"'t""""""-'"u"ooon"t••••••••••••••••••"t-•••--•-•"t•n•••••n••••••••"t•-••--""...,_"t••••••••••••••••n~-----•"t•••••••nonnono't•"""u•••-•••••••••••••••••••••••oooo•~nnouono•n•u•"!'-""...,..., .... ,.,.,._-1'•nouuu•ouo .... o't•••••••••••••••n•~•••••••••••••••••••

Vendor :i 0.1290 i 0.8270 i 1.6879 i 2.1600e- i 0.0602 i 0.0134 i 0.0736 i 0.0172 i 0.0124 i 0.0295 : i 212.1328 i 212.1328 i 1.8100e- i ! 212.1708

.............................. ~ ................. .l ................. .l .................. !. ..... ~~: ..... .l .................. J ................. .l .................. l. ................. J. ................. J .................. J .................. L ................ J ... _ ........... .l ....... ~-~-~ ...... J .................. ~ ...... ······ ...... . Worker :i 0.2230 i 0.4127 i 3.5305 i 8.2700e- i 0.7664 ! 4.9500e- i 0.7713 ! 0.2032 i 4.5500e- i 0.2078 l i 651.8645 i 651.8645 i 0.0337 i ! 652.5711

;~ i ~ i 003 i i 003 i ~ i 003 i ! i ~ i ~ i Total 0.3527 I 1.2470 I 5.2272 I 0.0105 0.8279 I 0.0185 0.8464 I 0.2208 0.0170 0.2378 866.2630 866.2630 0.0355 867.0081

A-88

Page 110: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.4 Phase 3-Substation Equipment .Installation - 2018

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

Off-Road .: 0.9572 8.0281 7.0765 0.0101 0.5891 " " ~ " "

Total 0.9572 8.0281 7.0765 0.0101 0.5891

Unmitigated Construction Off-Site

ROG NOx I CO I S02 I Fugitive I Exha. u .. st I PM10 PM10

Category lb/day

Page 17 of 33 Date: 1/4/2016 6:16PM

PM10 Total

0.5891

0.5891

PM10 I Total

Fugitive PM2.5

Fugitive PM2.5

Exhaust PM2.5 Total Bio-C02 NBio-C02 Total C02 CH4 PM2.5

' lb/day

0.5581 0.5581 I 988.4721 988.4721 0.2266 I I I I

0.5581 0.5581 988.4721 988.4721 0.2266

Exhaus.t I PM2.5 Total Bio- C02 .NBio- C02 Total C02 PM2.5 I

CH4

lb/day

N20 C02e

993.2298

993.2298

N20 I C02e

Hauling ;~ 6.2000e- 6.5100e- 8.2300e- 2.0000e- l. 7.4000e- 1.1000e- 8.4000e- ~- 2.0000e- l. 1.0000e- 2.9000e- : 2.2256 2.2256 2.0000e- j 2.2259 :l 004 : 003 : 003 : 005 : 004 : 004 : 004 • 004 . 004 : 004 : . : l 005 : .

oooooooooooooooooooooooooooooo~'"'"'"""-'"''""•••-4-nuo•••••••nou•~••••nunnoo••••+""'""_.,,.,.,...,.,.,.,.~no••••"*nuuooo+•---•••••••••••+•••o••••••••••n•~•••-••••---·~••uonu•••••••••+••u•••••-••nooono~••••••••••••••••••+•••n•o•o•••••••u~••--•••"'"""'""" Vendor :1 0.1094 ! 0.7432 ! 1.5613 l 2.1500e- ! 0.0602 l 0.0123 ! 0.0725 ! 0.0172 i 0.0113 i 0.0285 : i 208.3768 i 208.3768 i 1.7600e- i l 208.4138

.............................. ll.---·-····-·---l. ................. l. ................. l. ..... ~~-: .. _ .. l. .................. L ..... -......... l .................. l. ........ -·-···-l. ................. l. ................. ..i .................. l.. ................ l. ................ .l ....... ~.~-: ..... .l ................. .J .................. . Worker :! 0.1940 l 0.3703 ! 3.1232 ! 8.2900e- l 0.7664 ! 4.8200e- ! 0.7712 i 0.2032 l 4.4600e- i 0.2077 : l 629.6534 ! 629.6534 ! 0.0311 ! ! 630.3055

!\ \ \ \ 003 l \ 003 \ ~ ~ 003 ~ ! \ ~ \ \ \ Total 0.3040 1.1200 I 4.6927 I 0.0105 j 0.8273 I 0.0172 I 0.8445 I 0.2206 0.0159 I 0.2365 840.2558 840.2558 0.0328 1840.9453

A-89

Page 111: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 18 of 33 Date: 1/4/2016 6:16PM

3.4 Phase 3-Substation Equipment Installation - 2018

Mitigated Construction On-Site

ROG NOx co 502 Fugitive Exhaust PM10 PM10

Category ..

lb/day

· .. . Oft-Road .: 0.9572 8.0281 7.0765 0.0101 0.5891 t:

t: t: t:

Total 0.9572 8.0281 7.0765 0.0101 0.5891

Mitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Fugitive Exhaust PM2.5Total Bio- C02 NBio-C02 Total C02 CH4 N20 C02e Total PM2.5 PM2.5

. lb/day

0.5891 0.5581 0.5581 • 0.0000 988.4721 988.4721 0.2266 993.2298 • • . • 0.5891 0.5581 0.5581 0.0000 988.4721 988.4721 0.2266 993.2298

PM10 ~ F.ugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 Total PM2.5 PM2.5

CH4 N20 C02e

lb/day

Hauling :1 6.2000e- 6.51 OOe- 8.2300e- l 2.0000e- 7 AOOOe- l 1.1 OOOe- l 8.4000e- l. 2.0000e- J 1.0000e- l. 2.9000e- : 2.2256 2.2256 2.0000e- l 2.2259 :i 004 : 003 : 003 : 005 : 004 : 004 : 004 • 004 : 004 . 004 • i : : 005 : :

00 ,, 0000000000 , 000000000000 , 00 f,_,........,_..,,,.,....,,+un•••••ounoooo-!••••unooon•••••+n••-'"""""''""'...,"t"••••••n•n••••••+•••••••••••-•--t••noon••••••••••t••••••••••-•••-•t••uoou•u .. •u•o+•-•••n•--••u .. oo•t••••••oooooooooooo+ouoooo .. ooooo•u•f-••••••--""...,-t••••nuooooooooo•+•nooooounn••••~ooooooooooooooooooo Vendor ,; 0.1094 ; 0.7432 ; 1.5613 ; 2.1500e- ; 0.0602 ; 0.0123 ; 0.0725 ; 0.0172 ; 0.0113 ; 0.0285 , ; 208.3768; 208.3768; 1.7600e- ; ; 208.4138

.............................. ll.----·-·---l .................. l .................. l ...... ~~~----·l .................. J __________ J .................. L ................ J .................. l .................... i .................. ! .................. L .. -........... J ....... ~.~-~ ..... .l .................. j .................. . Worker :i 0.1940 i 0.3703 i 3.1232 i 8.2900e- i 0.7664 i 4.8200e- i 0.7712 i 0.2032 i 4.4600e- i 0.2077 : i 629.6534 i 629.6534 i 0.0311 i i 630.3055

!1 l l l 003 l 1 003 ! ! ! 003 ! : 1 ! ! l l Total 0.3040 1.1200 4.6927 O.G105 0.8273 0.0172 0.8445 I 0.2206 0.0159 0.2365 840.2558 840.2558 0.0328 840.9453

A-90

Page 112: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 19 of 33 Date: 1/4/2016 6:16PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations - 2018

Unmitigated Construction On-Site

ROG NOx co 802

Category

..

Fugitive PM10

Exhaust PM10

lb/day

·.

PM10 Total

Fugitive PM2.5

Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5

lb/day

CH4 I N20 C02e

Off-Road i! 0.9279 11.7599 . 5.7783 0.0164 0.4572 0.4572 0.4206 0.4206 l >648.6993j 1 ,648.6993j 0.5133 j 1,659.4778

··········p~~·~·~··········~-··a.a<iaa··t········· ........ i .................. ! ................. 'f' .................. l .... o~aaaa·-~--;;:;;;;;;;;-·1"-------·t"-;;:;;;;;;;;-·t-·-a.·a·;;aa·-l··················t-·-·-·-··--t-·a:aaaa--~---------~---·--···--~····a:aaaa·· .. Total 0.9279 11.7599 5.7783 0.0164 0.4572 0.4572 0.4206 0.4206 1,648.6993 1,648.6993 0.5133 I 1,659.4778

Unmitigated Construction Off-Site

NOx co 802 Fugitive I Exh. aust I PM10 PM10

ROG

Category lb/day

...

PM10 I Fugitive I Exhaust Total PM2.5 PM2.5

PM2.5 Total Bio- C02 NBio- C02 Total C02 I CH4 I lb/day

.

N20 I C02e

Hauling :! 1.8900e- 0.0197 0.0250 7.0000e- l1.6300e- 3.3000e- 1. 1.9600e- l. 4.5000e- 1 3.0000e- 1. 7.5000e- ! 6.7544 6.7544 5.0000e- 1 6.7554 :! oo3 , i , oo5 , oo3 , oo4 . oo3 . oo4 , oo4 . oo4 , , , , oo5 , .

0000 000 000 0000 , 000 ••••••• ooo ••=+•"'"""*""'""'--""'""~''''''"''"''''''""~'""''"uuu"noun.;_••••-•••••-••••~••••••••u•••u•••+•....,....,,.,.,,..,,.,., .. ...,,.f,,,,,,,.,,,.,,.,.,,.,,,~,.,.,.,.,.,.,,.,._...,.,_+•••••••n•••••••••~•••••••••••••n•••••~•• ooo ooo ooo ooo o o••+••••••••••••••••••~*"'""'"""''"""'-"'"'"''"_f..,,uououoo••-•~••••••••••••••••••~•• o •••••• oo •••• o ooo

Vendor :! 0.0875 ! 0.5946 ! 1.2490 ! 1.7200e- ! 0.0481 ! 9.8400e- ! 0.0580 ! 0.0137 ! 9.0500e- ! 0.0228 : ! 166.7014! 166.7014! 1.4100e- ! ! 166.7311

.............................. ll. ................. .l .................. l. ................. l ...... ~~:. .... .l .................. .L ..... ~~= ...... l .................. l .................. l ...... ~~-~---.. l. ................. ..i .................. L. ................ l ................. .l ....... ~.~-~-... .l .................. J .................. . worker :! o.oooo i o.oooo i o.oooo i o.oooo i o.oooo i o.oooo i o.oooo i o.oooo i o.oooo i o.oooo : i o.oooo i o.oooo i o.oooo i i o.oooo

Total

!l 1 ~ ~ ~ l l ~ l ~ : l ~ l ~ ~ 0.0894 0.6143 1.2740 1.7900e·

003 0.0498 I 0.0102 I 0.0599 I 0.0142 19.3;~~e- 0.0235 173.4558 173.455811.4600e-~

003 1173.4865

A-91

Page 113: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 20 of 33 Date: 1/4/2016 6:16PM

3.5 Phase 4a-Power line re-route: Install TSP Foundations- 2018

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10 PM10 Total

c;

category ', ·' lb/day

.. c '

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

Off-Road !I 0.9279 ! 11.7599 l 5.7783 . 0.0164 • . 0.4572 . 0.4572 • . 0.4206 . 0.4206 ! o.oooo 11,648.699311.648.69931 0.5133 . 11,659.4778

oooooooooooooooooooooooooooooo~-·--••-••••••-•~oooono•n•nooon~•on•onoooonnon!'..,,...,., ... .,,,,,..,,.,.,~,,,,, .. ,uononoao~-------·-•-tnonoanoon•ono~ooooo•-•-••n•••-t•n .. ouoaooo•••••"t••ooooooooaoaoa .. oao.oooooooooooooooooo'!'ooa•o• .. oooooooooo~oooooooooooooooo...,-toaooonooooOo•o .... ~.,,,,,.,,,,,,,,, .... ~ooooooooooooooooooo

Paving :! 0.0000 ! ! ! ! ! 0.0000 ! 0.0000 ! ! 0.0000 ! 0.0000 : ! ! 0.0000 ! ! ! 0.0000

;~ ~ ~ ~ i ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ Total 0.9279 11.7599 5.7783 0.0164

Mitigated Construction Off-Site

ROG NOx co I 502

Category

c'

Fugitive PM10

0.4572

Exhaust PM10

lb/day

0.4572

PM10 I Fugitive To.tal PM2.5

cC

0.4206 0.4206 0.0000 1 ,648.6993 1,648.6993 0.5133

Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5

lb/day

CH4 N20

1,659.4778

C02e

Hauling :! 1.8900e- 0.0197 0.0250 7.0000e- 1.6300e- 1.' 3.3000e- 1.9600e- 1 4.5000e- 3.0000e- 7.5000e- : l. 6.7544 6.7544 5.0000e- •• ! 6.7554 :! 003 ! . . 005 . 003 . 004 . 003 : 004 . 004 . 004 : . • . 005 • .

••••••••••••••••••••••••oooo••~--·-·-•4••-••-••o .. o••••~o .. ,.,.,, .. ,..., ...... ,.;. .... .,...,,...., .. ..,., ... _.,~._,..,..,., .... ,. .............. +•-••-•••••-••••~•nnun•u••••••~---••••-••-••~••••nnun••un~•••••••••-•••••••••t••••••••••••••••••f••••n••n••••••n~...,.,,..,..,.,. • .,,. • ...,.,4u••••n•••••••"'""~"""""""""""""""U"~'"''''''''''''''"'" Vendor :! 0.0875 ! 0.5946 ! 1.2490 ! 1.7200e- l 0.0481 ! 9.8400e- l 0.0580 ! 0.0137 l 9.0500e- l 0.0228 : ! 166.7014 l 166.7014 l 1.4100e- l ! 166.7311

.............................. f, .................. + .................. + .................. J. ..... ~~: ...... + ................... ~·-·-~~= ...... + .................. +. ................. + ...... ~.~.: ...... J .................... ~ .................. t .................. + .................. J. ...... ~.~.: ...... J. ................. ~ .................. . Worker ,; 0.0000 : 0.0000 ; 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 , : 0.0000 : 0.0000 : 0.0000 : : 0.0000

Total

!l l ~ ~ ~ l 1 ~ l ! : 1 ~ ! ~ ~ 0.0894 0.6143 1.2740 ,1.7900e-

003 0.0498 0.0102 0.0599 I 0.0142 9.3500e·

003 0.0235 173.4558 173.4558 1.4600e-

003 173.4865

A-92

Page 114: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 21 of 33 Date: 1/4/2016 6:16PM

3.6 Phase 4b-Power line re-route: Install TSP - 2018

Unmitigated Construction On-Site

ROG NOx co 802 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

lb/day

CH4 N20 C02e

Fugitive Dust ;~ 0.0991 0.0000 0.0991 0.0107 0.0000 0.0107 : 0.0000 0.0000 ·= . •

ooooooooooooooooo•••••••••••••~-••••n•••n-•-~oouooooou .. uuo!n•"'"'"'""'"'"*'"''"~""" ... " ... """"""""'"~"*"''uouooounn~•"**'...,, ... ,.,.,.,,.,.,,~,,,,,,,,,,,,,,,, .. .;..,, .. ,..,,....,,,,,,, .. ~,, .... ,,.,,.,, .. ,. .. ,~,,,,,,,,,,,,,,, .... ,i,,,,,,,,,,,,,,,,,,+ ..... ,,,,.,.,,,,,,,,,,4, .... ,.,,.,,,,,,.,,....,,,.~ ................... ~,,.,,.,,.,,,,,,,,,,,,~,,,,,,,,,,,,,,,,,,, Off-Road :! 2.9426 ! 32.9315 ! 22.0345 ! 0.0341 ! ! 1.5933 ! 1.5933 ! ! 1.4666 ! 1.4666 : ! 3,413.1390!3.413.1390! 1.0554 ! ! 3,435.3025

il l ~ l ~ l l ~ l ~ : l ~ l ~ l Total 2.9426 32.9315 22.0345 0.0341 0.0991 1.5933 1.6924 0.0107 1.4666 1.4773 3,413.1390 3,413.1390 1.0554 3,435.3025

Unmitigated Construction Off-Site

ROG NOx co C02e

Category lb/day

Hauling ;~ 9.2000e- 9.6500e- 0.0122 3.0000e- ! 8.0000e- 1.6000e- 9.6000e- ~ 2.2000e- ! 1.5000e- 3.6000e- : 3.3004 3.3004 2.0000e- ! 3.3009 !! 004 . 003 • . 005 l 004 . 004 . 004 l 004 i 004 . 004 ! : . . 005 1 .

ooooooooooooooooooooooooooooo•::••-••••-·-:••••••-••••••••••"t••••••••••-••••••t••-·-·-·-•:••••••••••••••••••:•••••••-•-•-:•••••••••••-•••••:••--••••-••-••t••••••••••••••••••t•••••••••-•••••••••t••••••••••••••••••t••••••••••••••••••:••••••--•••••••t•••••••••••n•••••t••••••••••••••un:•••oooooooooooooooo

Vendor ,; 0.2407 ; 1.6350 ; 3.4348 ; 4.7400e- ; 0.1324 ; 0.0271 ; 0.1594 ; 0.0378 ; 0.0249 ; 0.0627 , ; 458.4289 ; 458.4289; 3.8800e- ; ; 458.5104

.............................. ll..·-·-·-········l .................. l. ................. l.--.~~~---··l. .................. L. ........ _____ .l .................. l. _____________ .l .................. l. ................. ..i .................. l.. ................ l. .. _ .... -... __ l. ...... ~.~-~---···l.. ................ l .................. . Worker •! 0.0000 i 0.0000 i 0.0000 i 0 0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 ' i 0 0000 i 0 0000 i 0 0000 i i 0 0000

!j ~ ~ ~ . ~ ~ ~ ~ ~ ~ i ~ . ~ . ~ . ~ ~ . Total 0.0630 461.8114

A-93

Page 115: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.6 Phase 4b-Power line re-route: Install TSP- 2018

Mitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Page 22 of 33 Date: 1/4/2016 6:16PM

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

Fugitive Dust ~~ 0.0991 0.0000 0.0991 0.0107 ~ 0.0000 : 0.0107 i 0.0000 0.0000

ooo•oooooooooooooo•oooooooo•••;,;._, ___ ,,,. ........ ,.i ................ , .. .i,u, ...... , ...... ,l, .... ,, ..... _., .. ,.,. .... .i ........ ,.,,,., .... t .. , ... ,.,.,, .... , .... , .. .i ...... ,, .......... .l..,., ..... ,.,,,... .. ,,. .. ..l ..... , .. , .. , ...... l .......... ,, .. ,,, .. ,~,,,,,,,,,,,,,,,,,,i .... ,., .... , ... ,.,.i,,, ..... ,,,,, ..... ,,,,l .. ,,,,,.,, .. ,.,.,,.i, .. , .. , .. ,,.,,.,,.J,,,,,,,,,,,,,,,,,,,

Off-Road :l 2.9426 l 32.9315 ~ 22.0345 ~ 0.0341 ~ l 1.5933 l 1.5933 ~ l 1.4666 ~ 1.4666 : 0.0000 l3.413.1390~ 3,413.1390~ 1.0554 ~ ~ 3,435.3025

!~ 1 ~ ~ ~ ~ ~ ~ ~ ~ : l ~ ~ ~ ~ Total 2.9426 32.9315 22.0345 0.0341 0.0991 1.5933 1.6924 0.0107 1.4666 1.4773 0.0000 3,413.1390 3,413.1390 1.0554 3,435.3025

Mitigated Construction Off-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C021NBio- C02 I Total C02 PM2.5 PM2.5 I

lb/day

CH4 N20 I C02e

Hauling ;l 9.2000e- 9.6500e- 0.0122 3.0000e- ~ 8.0000e- l 1.6000e- l 9.6000e- l 2.2000e- l 1.5000e- l. 3.6000e- ! 3.3004 3.3004 2.0000e- ~. 3.3009 !! oo4 ! oo3 E ~ oos i oo4 ! oo4 i oo4 ~ oo4 ! oo4 : oo4 : j ~ : oos : ~

oooooooooooooooooooooooooooo••~•••-•••••-•--t••••u•uo .. ., ... ,,~,. .. ,,, .. ,.,,.,,,,,'t""""",..""-"""'""""'t""""""un•n•n••~•••••-•••-••••••-t•••••••n•••••••••"!-....,,..--••--••"tn••••••••u••••n-t•-uu"""'"u""•••nt••••••••••••••••••t••••••••••••••••••-t--·---••••-•-t•n•••uu••n••••"t••nn••••n•n•••-!••••••••••••ooooooo

Vendor :i 0.2407 i 1.6350 i 3.4348 i 4.7400e- i 0.1324 i 0.0271 i 0.1594 i 0.0378 i 0.0249 i 0.0627 : i 458.4289 i 458.4289 i 3.8800e- i i 458.5104

.......................... , ... ll. ................. .l .................. l. ................. l. ..... ~~~----·-l ................... L ................ .l .................. l. ..... -... --.l. ................. l .................. J .................. L. ................ l ................. .l ...... ~.~-~----·-l .................. ~ .................. . Worker :i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

Total

il ! ~ ~ ~ ! ~ l ~ l i ! ~ ~ ~ ~ 0.2416 1.6447 3.4470 4.7700e-

003 0.1332 0.0272 0.1604 0.0380 0.0250 0.0630 1461.72931461.7293 3.9000e-

003 1461.8114

A-94

Page 116: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 23 of 33 Date: 1/4/2016 6:16PM

3.7 Phase 4c-Power line re-route: String Power line- 2018

Unmitigated Construction On-Site

ROG NOx co S02 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02j Total C02 PM2.5 PM2.5 I

lb/day

CH4 N20 C02e

Fugitive Dust ;! 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 ·= . ·= . •

oooooooooooooooooooooooooooooo;;.,.,._.,.,.,.,.,., __ ,,.,.,_~uuouooonouoo•~o•n•••••••••u•••~•••-•••••••n••••4••••unouu .. u .. ~•••••••••••••••--•~"""'*"""*"'''''0'~"-''""""""''"""_".;,'''""'''''''*" .. ''+•••--••••••• ........ ~ooooooooooooooo•••+••••'"""''"'"*"'''''~*""-•-••••••--~••••••••••••••*"••~•••*"*"'"'"'''' .. '~''''''''''''''''''' Off-Road :! 1.3594 ! 14.1168 ! 8.7966 ! 0.0139 ! ! 0.8425 ! 0.8425 ! ! 0.7751 ! 0.7751 : ! 1,397.5514! 1,397.5514! 0.4351 ! ! 1,406.6880

:~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 1.3594 14.1168 8.7966 0.0139 0.0000 0.8425 0.8425 0.0000 0.7751 0.7751 1,397.5514,1,397.5514 0.4351 1,406.6880

Unmitigated Construction Off-Site

Category

Hauling

I S02 I NOx I ROG Fugitive Exhaust PM10 PM10

co

lb/day

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- C02' NBio- C02! Total C02' CH4 I lblday

;! 5.5500e- 0.0579 0.0732 2.0000e- 4.7800e- 1 9.6000e- j 5.7300e- j 1.3100e- 1 8.8000e- 1 2.1900e- ! 19.8025 19.8025 1.5000e- j

N20 I C02e

19.8056 !1 003 ! ! ! 004 ! 003 ! 004 ; 003 ! 003 ! 004 ! 003 : ; ; ; 004 1 ;

oooooooooooooooooo••••••••••••ft'-•·-·-·-~••••••--••••••••*"~'' .. '" .. "'""""""""~"""-"" ___ ,.,..,,.~•unou•o•n•••••~••-n••-•-"""1'""""""""un••u•o~•••••--••••oo-~••••••••••••••n••~•-••••••-•••••••n•••••••••••••••••oot••u•••u•••••••••~••-••-••••••---"t••••••••••••••••••~••••••••••••••••••"!•••••••••••••••••••

Vendor :! 0.0875 ! 0.5946 ! 1.2490 ! 1.7200e- i 0.0481 ! 9.8400e- ! 0.0580 ! 0.0137 ! 9.0500e- ! 0.0228 : ! 166.7014 ! 166.7014 ! 1.4100e- ! ! 166.7311

······························~···-··-···-·-l .................. l .................. l_ .... ~~~----L ................. L ... -~~~ ...... l .................. l ........... _ ... J ....... ~.~~ ...... l. ................. ..i .................. L. ................ l.-........... _ . .J ...... ~.~-~---··.l .................. ~ .................. . Worker ;! 0.0000 ! 0.0000 1 0.0000 ! 0.0000 1 0.0000 ! 0.0000 1 0.0000 1 0.0000 ! 0.0000 ! 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 ! ! 0.0000

Total

il l ~ ~ ~ l l ~ l ~ : ~ ~ l ~ ~ ,1.3223

1

1.9200e-, 003

0.0529 0.0931 0.6524 0.0108 0.0637 0.0151 9.9300e-003

0.0250 1186.5367

A-95

Page 117: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 24 of 33 Date: 1/4/2016 6:16PM

3. 7 Phase 4c-Power line re-route: String Power line - 2018

Mitigated Construction On-Site

NOx co S02 Fugitive PM10

Exhaust PM10

PM10 Fugitive Total "i PM2.5

ROG

·-

,,' I, ,,1 ,,, Category lb/day

',_

Exhaust PM2.5 Total BiO.: C02 NBio- C02 Total C02 PM2.5

o'

lb/day

,CH4 N20 C02e

Fugitive Dust !I . ; . . 0.0000 . 0.0000 I 0.0000 I 0.0000 . 0.0000 • 0.0000 j . . 0.0000 I . . 0.0000

oooooooooooooooooooooooooooooo~o•-•--n••---tn•••••••••unon.,uonn•••••••noo-t•-n•---·--.,oooooon•••nnno"t"o-•--·---•-t•••••••no•nu•••~o•n--•••n•-•~nunuon•o•o•o•-tonuuuoooooonon.oooooooooooooooooo~uoooooooooooooon~•on•o-n••--••-t••ouo••••nooono'tnoooouoooou

Off-Road :i 1.3594 i 14.1168 i 8.7966 i 0.0139 i i 0.8425 i 0.8425 i i 0.7751 i 0.7751 : 0.0000 i 1,397.5514! 1,397.5514! 0.4351 i i 1,406.6880

!i ~ ~ ~ ~ ~ ~ ~ ~ i : ~ ~ l ~ ~ Total 1.3594 14.1168 8.7966 0.0139 0.0000 0.8425 0.8425 0.0000 0.7751 0.7751 0.0000 1,397.5514 1,397.5514 0.4351 1,406.6880

Mitigated Construction Off-Site

co Fugitive Exhaust PM10 PM10

C02e ',

PM10 j F.ugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 Total l f'M2:5 PM2.5

S02 ROG NOx CH4 N20

Category lb/day lb/day

' •,

Hauling ;j 5.5500e- 0.0579 0.0732 2.0000e- 4.7800e- l 9.6000e- l 5.7300e- l 1.3100e- l 8.8000e- l 2.1900e- : 19.8025 19.8025 1.5000e- i 19.8056 ~~ ~ ~:~:~:~:~: ~: ~i

000000000000000000000000000000?:--·--•+nuoo-••••••••••i•••n•ouo ... o•u•o+•---•••---•t•••••u•n••••••••+•·-----·-...r••n•n•••••••••••t------·t••••••u••••••••••+•-••nn...,n•••••••t••••••••••••••••••+•••••••••••••••n•-f••••••••-•-••-•t•••••••••••o•••••t••u•••••••••••n•~••••••••••••••••••• Vendor ,; 0.0875 i 0.5946 ; 1.2490 ; 1.7200e- ; 0.0481 : 9.8400e- : 0.0580 ; 0.0137 : 9.0500e- : 0.0228 , : 166.7014; 166.7014; 1.4100e- ; : 166.7311

······························~-·-···-·····-l. ................. l. ................ .l----~~~--..l ................... ~---0~~--.l .................. l. ........ _, ___ j_ ..... ~~~ ..... .l .................. ..i .................. L. ................ l. ... _ .......... -l ....... ~.~-~ ..... .l ................. .J .................. . Worker :i 0.0000 i 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

Total

!1 ~ ~ ~ ~ l ~ ~ ! ~ : l ~ ~ ~ ~ 0.0931 0.6524 1.3223 1.9200e- 0.0529

003 0.0108 0.0637 I 0.0151 9.9300e-

003 0.0250 186.5039 186.5039 1.5600e-

003 186.5367

A-96

Page 118: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

I

CaiEEMod Version: CaiEEMod.2013.2.2

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018

Unmitigated Construction On-Site

ROG NOx Cb Sb2

category

Fugitive Exhaust PM10 PM10

·. lb/day

PM10 Total

Page 25 of 33 Date: 1/4/2016 6:16PM

Fugitive Exhaust PM2:5 Total Bio- C02 NBio- C02 Total C02 PM2.5 PM2.5

CH4 N20 I C02e

lb/day

Fugitive Dust !1 ~ 0.0000 : 0.0000 1 0.0000 ~ 0.0000 ~ 0.0000 1 0.0000 ! 0.0000 . 0.0000

000000000000000000000000000000;;.o-0-00000-0000~00000000000U .... 000~000000000000000000+0000000000o-OOOO~OOOOOOOOOOOOOOOOOO+------······---~OUOM0000000000000~0-000---00000000~000MOOOOOMOOOOOOOO+M000000000000M000000tOOOOOOOOOooOOOOOOO+OOOOOOOM0000000000+00000000000-0-~MOOOOOOM000000o00o+OOOOMOOOMOOOOOOMOO~OOOOOOOOOooOOOOOOOO Off-Road :1 0.8885 ! 9.0836 ! 8.3809 ! 0.0114 1 1 0.6173 1 0.6173 1 1 0.5679 1 0.5679 : 11.143.012311,143.01231 0.3558 1 11.150.4849

i! ~ ~ ~ ~ ! ! ~ ! ! : ! ! ~ ! ~ Total 0.8885 9.0836 8.3809 0.0114

Unmitigated Construction Off-Site

ROG NOx I CO. I 802

Category

0.0000 0.6173 0.6173

Fugitive I Exhaust I PM10 PM10 PM10 Total

lb/day

0.0000

Fugitive PM2.5

0.5679 0.5679 1,143.0123 1 '143.0123 0.3558

Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 PM2.5.

lb/day

Hauling :1 1.7700e- ! 0.0185 ! 0.0234 ! 6.0000e- ! 1.5200e- ! 3.ooooe- ! 1.8300e- ! 4.2000e- ! 2.8000e- ! 7.0000e- : l 6.3139 6.3139 l. 5.0000e- l.

11,150.4849

N20 I C02e

6.3148 !! 003 l i l 005 i 003 l 004 l 003 i 004 l 004 l 004 ! i i ; 005 ; ;

••••••••••••••••••••••••••••••f!"•••••-•••••••••--of•••ooo.oMOo-•••••"t•n~ooooouo.woooo~•---•••-••-•--!'•••••••••ooooouoo•!"-•••••••~••••••••~•••••••~••••••••••~••••••-•-•-••••~•••••u•••••••••••~••••••••••••••••••n•••••••••••••••••••t•••n .. ooo.woo••o•~••••-••••••••--•~••••••••••••••••••-!'••••••••••••••••••-!•••••••••••••••••••

Vendor :! 0.1313 ! 0.8918 ! 1.8736 ! 2.5800e- ! 0.0722 ! 0.0148 ! 0.0870 ! 0.0206 ! 0.0136 ! 0.0342 : ! 250.0521 1 250.0521 ! 2.1200e- ! ! 250.0966

.............................. ll.-.............. .l .................. l.. ................ t ...... ~~~----l .................. t .................. t .................. l .................. t .................. l ................... .i .................. l.. ................ t .................. t ....... ~-~-~ ...... l .................. j .................. . Worker :! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 l 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 ! 0.0000 : ! 0.0000 ! 0.0000 ! 0.0000 l ! 0.0000

Total

!1 ~ ~ i ! ! ! ~ ~ ! : ! ~ ~ ~ ~ 0.1331 0.9103 11.8969 12.6400e-

003 0.0737 I 0.0151 I 0.0888 0.0210 0.0139 0.0349 256.3660 256.3660 2.1700e-

003 1256.4114

A-97

Page 119: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 26 of 33 Date: 1/4/2016 6:16PM

3.8 Phase 4d-Power line re-route: Remove pull site and restore property - 2018

Mitigated Construction On-Site

C02e

Fugitive Dust jj l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 l 0.0000 ! 0.0000 0.0000

.............................. ;;__ .. --~---~---·-------------~---······-----.. ·-+-----------~--------.---------+----4---·······-------+----------~------------------+--------------------i .................. +-------···········~--------------+------------------+----------·····---~---················ Off-Road :1 0.8885 l 9.0836 l 8.3809 l 0.0114 l l 0.6173 l 0.6173 l l 0.5679 l 0.5679 : 0.0000 i 1,143.0123! 1,143.0123! 0.3558 i i 1,150.4849

!l ~ ~ ~ ~ ! l ~ ! ~ : ! ~ ~ ~ ~ Total 0.8885 9.0836 8.3809 0.0114 0.0000 0.6173 0.6173 0.0000 0.5679 0.5679 0.0000 1,143.0123 1,143.0123 0.3558 1,150.4849

Mitigated Construction Off-Site

RQG NOx

·. ... . ·

C<ttegory

>.

co S02 Fugitive PM10

EXhaust

I_ 1>~1o lb/day.

PM10 Total

.•.....

Fugitive . PM2:5

EXhaust PJ\112.5

PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e

lb/day

Hauling i! 1.1;g~e- ~ 0.0185 I o.0234 I 6.ogg~e-~1.5~g3oe-l 3.ogg~e-~1.8gg~e-~ 4.2gg~e-~ 2.8gg~e-~ 7.ogg~e- i I 6.3139 l 6.3139 I 5.ogg~e-~ : 6.3148

••••••••••••••oooooooooo••••••Jt---·----·-•--~oooooowouoooooooo~ooouo•ohoOooowoo~•----•-•-----t••••••••••••••uuo!"•••••-•••---•-•'f••••••••••••u•ou~o-•--•••-•-•-~••n••••••••••••••-t•••n••••••••••••••••••o•oooooooooooooot••••••••.o••••••••~••••-••••••--••-

Vendor :i 0.1313 i 0.8918 ~ 1.8736 ~ 2.5800e- l 0.0722 i 0.0148 i 0.0870 ~ 0.0206 i 0.0136 i 0.0342 : i 250.0521 ~ 250.0521 i 2.1200e- ~ i 250.0966

.............................. L ... _ ... _ .... l .................. l. ................. l. .... ~::.: ..... .l .................. l. .. -...... -... l .................. L ............. -l .................. l .................. ..i .................. L. ................ l ................. .l ....... ~.~.: ..... .l .................. J .................. . Worker :i 0.0000 i 0.0000 ~ 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 ~ 0.0000 ~ 0.0000 : i 0.0000 i 0.0000 ~ 0.0000 i l 0.0000

Total

!l ~ ~ ~ ~ l ! ~ ~ ~ : ! ~ i ~ ~ 0.1331 0.9103 1.8969 2.6400e- 0.0737 0.0151

003 0.0888 0.0210 0.0139 0.0349 256.3660 256.3660 2.1700e-

003 256.4114

A-98

Page 120: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Unmitigated Construction On-Site

ROG NOx co $02 Fugitive Exhaust PM10 PM10

Category lb/day

PM10 Total

Page 27 of 33 Date: 1/4/2016 6:16PM

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2.5 PM2.5

lb/day

Off-Road ~~ 4.6797 49.0341 i 35.8395 0.0538 2.6872 2.6872 2.4890 l 2.4890 ! !5,373.8768~ 5,373.8768~ 1.5846 !5,407.1542

oooooooooooooooooooooooooooooo:+••-•••-•••-•••~ooonuounonooo~ouoooooonooun+••••oo•••••--•••••4•••••••••••••••••••~•••n••-•-•••n•~n•uoonnnnon~•-•--•••••n•--••~ono•ooouooououfouoounoonoonno~oooooooooooooooooo+••noooooonoooooo~••••••----••••••--~oooooooooooo Paving :! 0.0000 ! i i i ! 0.0000 ! 0.0000 i ! 0.0000 ! 0.0000 : ! i 0.0000 i ! i 0.0000

:~ i ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 4.6797 49.0341 35.8395 0.0538 2.6872

Unmitigated Construction Off-Site

ROG I NOx I I Fugitive I Exhaust PM10 PM10 I S02 co

Category lb/day

2.6872

PM10 Total

Fugitive PM2.5

2.4890

Exhaust PM2.5

2.4890

PM2.5 Total Bio- C02

5,373.8768 5,373.8768 1.5846 5,407.1542

NBio- C02' Total C02' CH4 I N20 I C02e

lb/day

Hauling :l 0.0690 0.7204 0.9113 2.5300e- 1 0.0595 0.0119 0.0714 0.0163 0.0109 0.0272 ! 1 246.43141 246.4314 i 1.8200e- 1 246.4697

·····························-~·--------------~····---............ ~ ....................... ~ .......... ~~= .... -.... ~ .................................. ~ .............. _ .................. ~ .................. -.......... ~ .......................... -...... ~ ..................... ~ .................................... i .................. ~ .............................. ~--·-·------····l .......... ~ .. ~-: ........... 4 .................................. ~ .................. . Vendor :i 0.1313 ! 0.8918 i 1.8736 i 2.5800e- i 0.0722 ! 0.0148 ! 0.0870 i 0.0206 ! 0.0136 ! 0.0342 : ! 250.0521 i 250.0521 i 2.1200e- i i 250.0966

.............................. ll, ................. .l ................. J .................. l. ..... ~~~ ...... l. ................. .L ................ ,J .................. l. ................ J .................. l .................. ..i .................. L. ................ l. ................ J ....... ~.~.: ..... .l. ................. ~ .................. . Worker :! 0.1940 ! 0.3703 i 3.1232 i 8.2900e- i 0.7664 i 4.8200e- ! 0.7712 i 0.2032 i 4.4600e- i 0.2077 : i 629.6534 i 629.6534 i 0.0311 i i 630.3055

~~ ~ ~ ~ 003 ~ i 003 i ~ i 003 i ! ~ i i i i Total 0.3943

1

1.9825 I 5.9080 I 0.0134 I 0.8980 I 0.0315 0.9295 0.2402 0.0290 0.2691 1,126.1370

1

1.126.1370! 0.0350 I ,1,126.8718

A-99

Page 121: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

3.9 Phase 5: Equipment Removal and Clean-up - 2018

Mitigated Construction On-Site

Category ·.·

' ; .

ROG NOx co S02 Fugitive Eldlaust PM1P PM1.0

· lb/da:y

.. ·.

PM10 Total

Page 28 of 33 Date: 1/4/2016 6:16PM

Fugitive Eldlaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 C02e PM2:5 PM2.5

lb/day

· .

Off-Road !I 4.6797 I 49.0341 I 35.8395 . 0.0538 ; . 2.6872 . 2.6872 . . 2.4890 . 2.4890 i 0.0000 15,373.876815,373.87681 1.5846 • 15,407.1542

oooooooooooooooooooooooooooooo~ ...... u ... ooono'"""'t"nonononooono'!'•••u•••onooowno't•-•n••-•••--'!'nouon•••o•non-!''"" ... ' ...... "'"' ... "u"tn•uu••••onown'!'•-•--•••••n••"t••uooo••nnnuo-tnno•••o•n•nnooo.ooooooooo•••••oo•o~nuooouoo•••••••'!'••••••-n•-••-"!'••uonnuuoo•u'!'•••••••nonnoooo~••••ooooooooooooooo

Paving :1 0.0000 1 i i i 1 0.0000 1 0.0000 i 1 0.0000 i 0.0000 : 1 l 0.0000 i 1 i 0.0000

!~ 1 i ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ Total 4.6797 49.0341 35.8395 0.0538 2.6872 2.6872 2.4890 2.4890 0.0000 5,373.8768 5,373.8768 1.5846 5,407.1542

Mitigated Construction Off-Site

ROG NOx co S02 Fugitive Eldlaust PM10 Fugitive Eldlaust PM2.5Total Bio- C02! NBio- C02 I Total C02 I CH4 I N20 I C02e PM10 PM10 Total PM2.5 PM2.5

I· ' .

Category lb/day lb/day

i .. ·•. •. · .. ··· '•' ... .. . ... i . ..

Hauling :1 0.0690 1 0.7204 0.9113 2.5300e- ~ 0.0595 0.0119 1 0.0714 ~ 0.0163 O.D109 0.0272 1 246.4314 1 246.431411.8200e- ~ 246.4697

oooooooooooooooooooooooooooooo~ ......... ,--... ... , ... l, ... ,....,,..,.,...,,,.. .. ~,,,,..,,,,,,,.,,, .. ,.,.~~.:.-~ .... .,.,.,.,.,.,.,..,.,.,..,.,.~---·--~•••••••••••-•••••~----·--~•••••••u••nn•..-J•••••••••-•••u••ni••••••••••••••••••l••••••••••••n•u•l•••-••••----~u••n•~•~•~••••••~•••nuu•n»•••••~••••••••••••••••••• Vendor :! 0.1313 ! 0.8918 i 1.8736 ! 2.5800e- i 0.0722 ! 0.0148 ! 0.0870 i 0.0206 ! 0.0136 ! 0.0342 : ! 250.0521 i 250.0521 ! 2.1200e- i ! 250.0966

.............................. ll, .................. l .................. l .................. l----~~3--···!. .................. ~ ................ .l .................. !. ..... --.--.l .................. l .................. J .................. L ................. l .................. l ...... ~~-~ ...... l ................. ) .................. . Worker :! 0.1940 ! 0.3703 i 3.1232 i 8.2900e- ! 0.7664 ! 4.8200e- ! 0.7712 i 0.2032 i 4.4600e- ! 0.2077 : ! 629.6534 i 629.6534 ! 0.0311 ! ! 630.3055

!! ! ! ! 003 ! ! 003 ! ! ! 003 ! : ! ! ! ! 1

Total 0.3943 1.9825 5.9080 0.0134 0.8980 0.0315 0.9295 0.2402 0.0290 0.2691

11.126.1370

1

1.126.1370! 0.0350 I ,1,126.8718

4.0 Operational Detail - Mobile

A-100

Page 122: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2 Page 29 of 33 Date: 1/4/2016 6:16PM

4.1 Mitigation Measures Mobile

ROG I NOx I co I S02 I Fugitive I Exhaust I PM10 I Fugitive I Exhaust I PM2.5 Total Bio- C02 NBio- C02' Total C02 I CH4 I N20

J C02e

PM10 PM10 Total PM2.5 PM2.5

Category ' lbtday ,•

lb/day

Mitigated .: 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 " • " ! • " ! • " • ······························ .: --- --·---· ·················· ---·--......................

Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 0.0000 0.0000 0.0000 " ' " ' " ' " '

4.2 Trip Summary Information

Average Daily Trip Rate Unmitigated Mitigated

Land Use Weekday I Saturday Sunday AnnuaiVMT AnnuaiVMT

General Light Industry • 0.00 0.00 0.00 ' ' • ' ' ' Total 0.00 I 0.00 0.00 I I

4.3 Trip Type Information

Miles Trip% Trip Purpose%

Land use H-W orc-w J H-s or c~c • J H~o or C-NW H~W ~r C- I H-S or c~c I H-0 or c~Nw Primary I Diverted I Pass-by

General Light Industry i 14.70 6.60 6.60 ' 59.00 28.00 13.00 ' 92 ' 5 ' 3 • ' ' ' '

LD~ I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHO I' HHD I OBUS I UBUS I MCY I' SBUS I MH

0.438302! 0.063917~ 0.163234: 0.169914~ 0.042886~ 0.007084~ 0.019490~ 0.082149: 0.002063~ 0.001756~ 0.006579l 0.000764: 0.001861

A-101

Page 123: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CalEEMod.2013.2.2

Historical Energy Use: N

5.1 Mitigation Measures Energy

NaturaiGas 0.0000 0.0000 0.0000 0.0000 Mitigated

.............................. ,; Natural Gas "

0.0000 0.0000 0.0000 0.0000 Unmitigated " " "

5.2 Energy by Land Use - NaturaiGas

Unmitigated

NaturaiGa sU.se

·.

Land Use .• · kBTU/yr

.··

ROG NOx co

.·. · ..

0.0000 0.0000

0.0000 0.0000

S02 Fugitive Exhaust PM10 PM10

.·· lb/day

Page 30 of 33

PM10 Total

0.0000

0.0000

Fugitive PM2.5

Date: 1/4/2016 6:16PM

C02e

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

·················· ................... 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Exhaust PM2.5 Total Bio.. C02 NBio.. C02 Total C02 CH4 N20 C02e PM2.5 ... .

lb/day

0.0000 0.0000 0.0000 0.0000 0.0000 General Light 0 :l 0.0000 l 0.0000 0.0000 l. 0.0000 0.0000 0.0000 0.0000 0.0000 ! Industry ., • •

000000000000000000000000000000 ••••••nnnoo••n:+••onuonnooouo~o•ononoonuo•••+•·----·--•--•~nou•oo•oouonn~•-----•---•••..; .. , .. ,,,,.,,,,,,_.,_; .. ,,., .. ,..,,. .... ,,.,.f,,,, .. ,_._..,,,,,,,f._.._ .. , .. ,,,,,, .. ,~ .... , .. ,.,,._,.,, ........ ~,,,,,,,.,,,,,,,,,,; .. , .... ,. ........ .,_f, .. ,,, .. .._,,,,,,,,.;., .. ,,_..,,,,,,, .... .; ........ ,. .. ,.., .. .,,,.~,,,,,,,,,,,,,,,,,,, Other Non- 0 :1 0.0000 1 0.0000 t 0.0000 1 0.0000 l l 0.0000 l 0.0000 l l 0.0000 l 0.0000 : ; 0.0000 l 0.0000 l 0.0000 l 0.0000 ~ 0.0000

Asphalt Surfaces i! l l l l l l l l l : l l l l l Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

A-102

Page 124: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

5.2 Energy by Land Use - NaturaiGas

Mitigated

Land' Use

NaturaiGa s Use

kBTU!yr

ROG NOx co S02 Fugitive Exhaust PM10 PM10

lb/day

Page 31 of 33 Date: 1/4/2016 6:16PM

PM10 Total

Fugitive Exhaust PM2.5 Total Bio- C02 NBio- C02 Total C02 CH4 N20 PM2.5 PM2.5

..

lb/day

C02e

General Light 0 :1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 0.0000

......... ~~-~-~-~-~~·-······· .................. ll .................. ~ ................. ..j. ............ - .. .1 .................. ~ ... -............ ~ .................. ~ .................. ~ ................... f .................. ~ .................... i .................. ~ .................. ~ .................. ~ .................. ~ .................. ~ .................. . As~~~~rs~~~~es 0 ij o.oooo l o.oooo j 0.0000 j 0.0000 j j o.oooo j o.oooo l j 0.0000 l o.oooo ! j o.oooo j o.oooo j o.oooo j o.oooo j o.oooo

•: : : : : : : : : : . : : : : :

Total 0.0000 0.0000

6.0 Area Detail

6.1 Mitigation Measures Area

Mitigated :1 0.0000

" " ······························t+"---~ Unmitigated :1 0.0000

" " "

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

-+----~----·----~--~---~ 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

C02e

0.0000 : 0.0000 0.0000 0.0000 0.0000

-·---l .................. L------·-+---+---+·------1<·················· 0.0000 : ~ 0.0000 0.0000 0.0000 0.0000

' : ' : ' :

A-103

Page 125: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

6.2 Area by SubCategory

Unmitigated

Page 32 of 33 Date: 1/4/2016 6:16PM

Exhaust PM2.5 Total Bio· C02 NBio-C02 Total C02 PM2.5

Architectural 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000

·········~-~-~-t~-~~ ......... ;+ .................. ~ ................... f .................. ~ .................. ~ .................. .j. ............. - .. 4 ................... f .................. .j. .................. ~ .................... i .................. + .................. .j. .................. .j. .................. ~ ................... ; .................. . Consumer :~ 0.0000 ~ ~ ~ ~ ~ 0.0000 ~ 0.0000 ~ ~ 0.0000 ~ 0.0000 : ~ ~ 0.0000 ~ i ~ 0.0000

........ :.~.~-~-~-~:~ ........ ~----..l .................. l.. .............. J .... _____ J .................. L-----·...J .................. L----J ................ J .................. ..i .................. L.. ............... l.. ............... J .................. l.. ................ l .................. . Landscaping :i 0.0000 i 0.0000 i 0.0000 i 0.0000 i i 0.0000 i 0.0000 i i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

=~ ~ j ! ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ 1

Total 0.0000 0.0000 0.0000 0.0000

Mitigated

ROG NOx co S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5Total Bto- C02 ., NBio- C02rotal C02 t CH4 N20 I C02e PM10 PM10 Jot<d PM2.5 PM2.5

" ,. . .. .. .··

SubCateg~l)t ··• •••••• ···. lb/day . ... lb/day

. ·.· . •• u •• •• • ·, .. .·

Architectural :! 0.0000 0.0000 0.0000 l 1 0.0000 i 0.0000 0.0000 1 0.0000

ooooooooo~o~o~~io~: •• ,,,,,,o~---------~•••••••••••••••••••~••••••••••••••••••+•-·--•••--•-!•••••••••••uooo••+----·---~•uunoo••••••••••~---·--•••~•••••••••••uoooool•••••••••-•••••••notoooooooooo•ooooo+o+••••u•••uooouoo+••••---·-·-4•••••••on••••••••~•••••••••••••••••••~••oooooo Consumer :i 0.0000 i i i l i 0.0000 i 0.0000 ~ ~ 0.0000 i 0.0000 : i i 0.0000 i i i 0.0000

........ :.~~-~-~-~-~~ ........ ~ .. -............. l .................. l .................. i .............. _J .................. l .... ___ .. J .................. J. _________ J .................. l .................... i .................. L ................. l ............ __ J .................. l ................. ) .................. . Landscaping :i 0.0000 i 0.0000 i 0.0000 i 0.0000 i i 0.0000 i 0.0000 i i 0.0000 i 0.0000 : i 0.0000 i 0.0000 i 0.0000 i i 0.0000

!~ ~ i I ~ ~ ~ ! ! j : ! ! ~ ~ ~ Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 I 0.0000 I 0.0000

7.0 Water Detail

A-104

Page 126: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

CaiEEMod Version: CaiEEMod.2013.2.2

7.1 Mitigation Measures Water

8.0 Waste Detail

8.1 Mitigation Measures Waste

9.0 Operational Offroad

Equipment Type Number

10.0 Vegetation

Hours/Day

Page 33 of 33 Date: 1/4/2016 6:16PM

Days/Year Horse Power Load Factor Fuel Type

A-105

Page 127: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Appendix DCultural Resources Consultation Documentation

Page 128: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

This page intentionally left blank.

Page 129: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Organization Contact Letter E-mail Other CommentsNative American Heritage Commission Dave Singleton 12/6/2011 — — Sacred Lands File failed to indicate the presence of

sacred sites in the project area. Provided a list of local Native American contacts.

Big Sandy Rancheria of Mono Indians Chairperson, Liz Hutchins Kipp 3/7/2012 4/12/2012

Cold Springs Rancheria of Mono Chairperson, Robert Marquez 3/7/2012 4/12/2012Santa Rosa Rancheria Chairperson, Rueben Barrios 3/7/2012 4/12/2012Sierra Nevada Native American Coalition

Chairperons, Lawrence Bill 3/7/2012 Phone

Choinumni Tribe; Choinumni/ Mono Lorrie Planas 3/7/2012 4/12/2012 Responded by e-mail (4/12/2012) that she has no issues or comments.

Table Mountain Rancheria Bob Pennell, Cultural Resources Director

3/7/2012 4/12/2012 Received a letter dated 3/28/2012 declining participation at this time. However, would like to be notified in the unlikely event that cultural resources are identified.

Kings River Choinumni Farm Tribe Chairperson, John Davis 3/7/2012 Phone Attempted to call on 4/25/12, number incorrect.Dunlap Band of Mono Historical Preservation Society

Chairperson, Mandy Marine 3/7/2012 4/12/2012

Native American Consultation LogPG&E Sanger Substation Expansion Project

Preservation SocietyEsohm Valley Band of Indians/ Wuksache Tribe

Chairperson, Kenneth Woodrow 3/7/2012 4/12/2012

Choinumni Tribe of Yokuts Chairperson, Rosemary Smith 3/7/2012 4/12/2012Traditional Choinumni Tribe Chairperson, David Alvarez 3/7/2012 4/12/2012N/A Frank Marquez 3/7/2012 4/12/2012 Phone Called on 4/25/12 @ 10:50AM, message left.Santa Rosa Tachi Rancheria Lalo Fanco, Cultural Coordinator 3/7/2012 4/12/2012 Responded by e-mail (4/13/2012) with no

immediate concerns; however, recommended construction be monitored by an archaeologist and that all parties be made aware of the recommended actions to be taken in the event of a discovery of any cultural features.

Dumna Wo Wah Tribe Chairperson, Robert G. Ledger, Sr. 3/7/2012 — —

Page 130: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 131: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 132: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 133: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 134: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 135: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

EEEXXXAAAMMMPPPLLLEEE

Page 136: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 137: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 138: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

From: Mary Baloian [[email protected]]Sent: Thursday, April 12, 2012 12:43 PMTo: 'Robert Marquez'Subject: PGE Sanger Substation Expansion ProjectDear Mr. Marquez, Applied Earthworks, Inc. (Æ) recently sent you a letter (dated March 7, 2012) informing you about the PG&E’sSanger Substation Expansion Project in Sanger, Ca. The project will include the replacement of nine breakers,24 switches/disconnects, 18 structures, and the control building at the existing Sanger Substation, theconstruction of a new substation on an adjacent site approximately 9 acres in size, and the replacement oftransmission poles on the adjacent property. Æ is currently providing cultural resource services in support ofthe project and have contacted the Native American Heritage Commission (NAHC) regarding the potential forsacred sites in the project area. The NAHC has provided your name as a person who may have knowledge ofcultural resources in the project area. That is why we contacted you in March. I am now following up to inquire whether you wish to comment on this project or are willing to share anyinformation you may have regarding cultural resources (e.g., former village sites, traditional food gatheringplaces, sacred sites, etc.) within the project area. If so, please don’t hesitate to contact me by mail (seeaddress above), email ([email protected]) or by phone (559 229 1856, Ext. 11). I would bemost grateful for any information you might provide. Be assured that any locations of archaeological sites,cemeteries, or sacred places will be treated confidentially, as required by law, and not disclosed in anydocument available to the general public. Thank you for your assistance, Mary Clark Baloian, Ph.D., RPA | Applied EarthWorks, Inc.Senior Archaeologist

1391 W. Shaw Ave., Ste. CFresno, CA 93711-3600559.229.1856 x-11 office 559.801.1652 mobile

EEEXXXAAAMMMPPPLLLEEE

Page 139: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

From: [email protected]: Thursday, April 12, 2012 4:31 PMTo: Mary BaloianSubject: Re: PGE Sanger Substation Expansion ProjectI have no issues or comments. Lorrie

From: "Mary Baloian" <[email protected]>To: [email protected]: Thursday, April 12, 2012 12:46:46 PMSubject: PGE Sanger Substation Expansion Project

Hi Lorrie, Applied Earthworks, Inc. (Æ) recently sent you a letter (dated March 7, 2012) informing you about the PG&E’sSanger Substation Expansion Project in Sanger, Ca. The project will include the replacement of nine breakers, 24switches/disconnects, 18 structures, and the control building at the existing Sanger Substation, the constructionof a new substation on an adjacent site approximately 9 acres in size, and the replacement of transmission poleson the adjacent property. Æ is currently providing cultural resource services in support of the project and havecontacted the Native American Heritage Commission (NAHC) regarding the potential for sacred sites in theproject area. The NAHC has provided your name as a person who may have knowledge of cultural resources inthe project area. That is why we contacted you in March. I am now following up to inquire whether you wish to comment on this project or are willing to share anyinformation you may have regarding cultural resources (e.g., former village sites, traditional food gatheringplaces, sacred sites, etc.) within the project area. If so, please don’t hesitate to contact me by mail (seeaddress above), email ([email protected]) or by phone (559 229 1856, Ext. 11). I would bemost grateful for any information you might provide. Be assured that any locations of archaeological sites,cemeteries, or sacred places will be treated confidentially, as required by law, and not disclosed in any documentavailable to the general public. Thank you for your assistance, Mary Clark Baloian, Ph.D., RPA | Applied EarthWorks, Inc.Senior Archaeologist

1391 W. Shaw Ave., Ste. CFresno, CA 93711-3600559.229.1856 x-11 office 559.801.1652 mobile

Page 140: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

From: Hector Franco [[email protected]]Sent: Friday, April 13, 2012 10:30 AMTo: Mary BaloianSubject: RE: PGE Sanger Substation Expansion ProjectApril 13, 2012 To:  Mary Baloian. Applied Earth Works Analyst From:  Lalo Franco. Cultural Specialist/NAGPRA Coordinator              Santa Rosa Rancheria Tachi Yokut Tribe Re:  Sanger Sub Station Expansion Project Dear Mary Baloian The Santa Rosa Rancheria appreciates the opportunity to comment on the proposed Sanger Sub StationExpansion. After a careful review of the information you have sent us and a careful review of our Tribal Records  theTachi Yokut Tribe has no immediate concerns that this project will impact any cultural features such as burialgrounds or gathering areas.  This not to say that no culture features may be encountered during the courseof earth moving activities. The City of Sanger and this particular part of the county has a long history ofoccupation by the Chounumni Tribe. Our recommendations are that Applied Earth Works urge the City of Sanger to proceed with caution duringthe course of construction and that they hire an Archeological Monitor to oversee the project and that allparties involved receive all the relative information that address the recommended actions to be taken inthe event of a  discovery of any cultural features (Public Resource Codes) The Santa Rosa Rancheria is also available to consult with in the event of a discovery or if any cultural itemsmay need to be curated. Thank you for kind attention Mary. Lalo Franco. Cultural Specialist/NAGPRA CoordinatorSanta Rasa Rancheria Tachi Yokut Tribe(559) 924‐1278  ext 4011  

From: Mary Baloian [mailto:[email protected]]Sent: Thursday, April 12, 2012 12:42 PMTo: Hector FrancoSubject: FW: PGE Sanger Substation Expansion Project Dear Mr. Franco, Applied Earthworks, Inc. (Æ) recently sent you a letter (dated March 7, 2012) informing you about the PG&E’sSanger Substation Expansion Project in Sanger, Ca. The project will include the replacement of nine breakers, 24switches/disconnects, 18 structures, and the control building at the existing Sanger Substation, the constructionof a new substation on an adjacent site approximately 9 acres in size, and the replacement of transmission poleson the adjacent property. Æ is currently providing cultural resource services in support of the project and havecontacted the Native American Heritage Commission (NAHC) regarding the potential for sacred sites in theproject area. The NAHC has provided your name as a person who may have knowledge of cultural resources inthe project area. That is why we contacted you in March.

1 of 2

Page 141: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

I am now following up to inquire whether you wish to comment on this project or are willing to share anyinformation you may have regarding cultural resources (e.g., former village sites, traditional food gatheringplaces, sacred sites, etc.) within the project area. If so, please don’t hesitate to contact me by mail (seeaddress above), email ([email protected]) or by phone (559 229 1856, Ext. 11). I would bemost grateful for any information you might provide. Be assured that any locations of archaeological sites,cemeteries, or sacred places will be treated confidentially, as required by law, and not disclosed in any documentavailable to the general public. Thank you for your assistance, Mary Clark Baloian, Ph.D., RPA | Applied EarthWorks, Inc.Senior Archaeologist

1391 W. Shaw Ave., Ste. CFresno, CA 93711-3600559.229.1856 x-11 office 559.801.1652 mobile

2 of 2

Page 142: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015

Kings River Choinumni Farm Tribe

Stan Alec

3515 East Fidora Avenue

Fresno, CA 93726

RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California

Dear Stan Alec:

Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric

Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno

County, California (see included map). The project will include the replacement of nine breakers,

twenty-four switches/disconnects, eighteen structures, and the control building at the existing

Sanger Substation. Due to congestion and lack of space inside the substation, and based on the

major civil and electrical requirements of the breakers, structures, and switch replacement work,

PG&E proposes to build a new substation on an adjacent location approximately nine acres in

size. As part of these services, Cardno, Inc. requested a sacred lands search and list of

individuals who may have knowledge of the cultural resources within the project area from the

Native American Heritage Commission (NAHC). The sacred lands search did not indicate the

presence of any areas of concern. Your name appears on the NAHC list of individuals who may

know more about the cultural resources of the project area. Any information you have in this

regard would greatly help our effort to identify all properties of concern for this project.

If you have information about cultural resources within the project area or any questions please

write to:

Joshua Peabody

Cardno, Inc.

701 University Avenue, Suite 200

Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you

have any questions.

Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected]

Writer: MR

Page 143: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015

Chowchilla Tribe of Yokuts

Jerry Brown

10553 N. Rice Road

Fresno, CA 93730

RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California

Dear Jerry Brown:

Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric

Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno

County, California (see included map). The project will include the replacement of nine breakers,

twenty-four switches/disconnects, eighteen structures, and the control building at the existing

Sanger Substation. Due to congestion and lack of space inside the substation, and based on the

major civil and electrical requirements of the breakers, structures, and switch replacement work,

PG&E proposes to build a new substation on an adjacent location approximately nine acres in

size. As part of these services, Cardno, Inc. requested a sacred lands search and list of

individuals who may have knowledge of the cultural resources within the project area from the

Native American Heritage Commission (NAHC). The sacred lands search did not indicate the

presence of any areas of concern. Your name appears on the NAHC list of individuals who may

know more about the cultural resources of the project area. Any information you have in this

regard would greatly help our effort to identify all properties of concern for this project.

If you have information about cultural resources within the project area or any questions please

write to:

Joshua Peabody

Cardno, Inc.

701 University Avenue, Suite 200

Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you

have any questions.

Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected]

Writer: MR

Page 144: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015

Dunlap Band of Mono Indians

Benjamin Charley Sr., Chairperson

P.O. Box 45

Dunlap, CA 93621

RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California

Dear Chairperson Charley:

Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric

Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno

County, California (see included map). The project will include the replacement of nine breakers,

twenty-four switches/disconnects, eighteen structures, and the control building at the existing

Sanger Substation. Due to congestion and lack of space inside the substation, and based on the

major civil and electrical requirements of the breakers, structures, and switch replacement work,

PG&E proposes to build a new substation on an adjacent location approximately nine acres in

size. As part of these services, Cardno, Inc. requested a sacred lands search and list of

individuals who may have knowledge of the cultural resources within the project area from the

Native American Heritage Commission (NAHC). The sacred lands search did not indicate the

presence of any areas of concern. Your name appears on the NAHC list of individuals who may

know more about the cultural resources of the project area. Any information you have in this

regard would greatly help our effort to identify all properties of concern for this project.

If you have information about cultural resources within the project area or any questions please

write to:

Joshua Peabody

Cardno, Inc.

701 University Avenue, Suite 200

Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you

have any questions.

Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected]

Writer: MR

Page 145: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015

Cold Springs Rancheria of Mono Indians

Tribal Administrator

P.O. Box 209

Tollhouse, CA 93667

RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California

Dear Tribal Administrator:

Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric

Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno

County, California (see included map). The project will include the replacement of nine breakers,

twenty-four switches/disconnects, eighteen structures, and the control building at the existing

Sanger Substation. Due to congestion and lack of space inside the substation, and based on the

major civil and electrical requirements of the breakers, structures, and switch replacement work,

PG&E proposes to build a new substation on an adjacent location approximately nine acres in

size. As part of these services, Cardno, Inc. requested a sacred lands search and list of

individuals who may have knowledge of the cultural resources within the project area from the

Native American Heritage Commission (NAHC). The sacred lands search did not indicate the

presence of any areas of concern. Your name appears on the NAHC list of individuals who may

know more about the cultural resources of the project area. Any information you have in this

regard would greatly help our effort to identify all properties of concern for this project.

If you have information about cultural resources within the project area or any questions please

write to:

Joshua Peabody

Cardno, Inc.

701 University Avenue, Suite 200

Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you

have any questions.

Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected]

Writer: MR

Page 146: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Dunlap Band of Mono Indians Florence Dick, Tribal Secretary P.O. Box 344 Dunlap, CA 93621 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Florence Dick: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 147: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

September 16, 2015 North Fork Mono Tribe Ron Goode, Chairperson 13396 Tollhouse Road Clovis, CA 93619 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Chairperson Goode: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected]

Writer: MR

Page 148: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Dumna Wo-Wah Tribal Goverment John Ledger, Assistant Cultural Resource Manager 2216 East Hammond Street Fresno, CA 93602 (or 93703) RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear John Ledger: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 149: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Cold Springs Rancheria of Mono Indians Jeffrey Lee, Chairperson P.O. Box 209 Tollhouse, CA 93667 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Chairperson Lee: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 150: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Picayune Rancheria of Chukchansi Reggie Lewis, Chairperson 8080 Palm Avenue, Suite 207 Fresno, CA 93711 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Chairperson Lewis: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 151: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Picayune Rancheria of Chukchansi Mary Matola, THPO 8080 Palm Avenue, Suite 207 Fresno, CA 93711 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear THPO Matola: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 152: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Table Mountain Rancheria Michael Russell, Tribal Administrator P.O. Box 410 Friant, CA 93626 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Michael Russell: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 153: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Dumna Wo-Wah Tribal Goverment Eric Smith, Cultural Resource Manager 2216 East Hammond Street Fresno, CA 93602 (or 93703) RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Eric Smith: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 154: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Cold Springs Rancheria of Mono Indians Jamie Smith, Environmental Coordinator P.O. Box 209 Tollhouse, CA 93667 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Jamie Smith: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 155: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Dunlap Band of Mono Indians Jeneen Tex, Chief Executive Officer P.O. Box 44 Dunlap, CA 93621 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Jeneen Tex: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 156: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno 701 University Avenue Suite 200 Sacramento, CA 95825 USA Phone 916 923 1097 Toll-free 800 368 7511 Fax 916 923 6251 www.cardno.com

Australia • Belgium • Canada • Ecuador • Indonesia • Kenya • New Zealand • Papua New Guinea Peru • United Arab Emirates • United Kingdom • United States • Operations in 70 countries

September 16, 2015 Table Mountain Rancheria Leanne Walker-Grant, Chairperson P.O. Box 410 Friant, CA 93626 RE: Pacific Gas & Electric Company’s Sanger Substation Project, Fresno County,

California Dear Chairperson Walker-Grant: Cardno Inc. is currently providing cultural resource services in support of Pacific Gas & Electric Company’s (PG&E) Sanger Substation Project, located west of the city of Sanger, Fresno County, California (see included map). The project will include the replacement of nine breakers, twenty-four switches/disconnects, eighteen structures, and the control building at the existing Sanger Substation. Due to congestion and lack of space inside the substation, and based on the major civil and electrical requirements of the breakers, structures, and switch replacement work, PG&E proposes to build a new substation on an adjacent location approximately nine acres in size. As part of these services, Cardno, Inc. requested a sacred lands search and list of individuals who may have knowledge of the cultural resources within the project area from the Native American Heritage Commission (NAHC). The sacred lands search did not indicate the presence of any areas of concern. Your name appears on the NAHC list of individuals who may know more about the cultural resources of the project area. Any information you have in this regard would greatly help our effort to identify all properties of concern for this project. If you have information about cultural resources within the project area or any questions please write to:

Joshua Peabody Cardno, Inc. 701 University Avenue, Suite 200 Sacramento, CA 95825

Or email me at [email protected]. You may also call me at (916)386-3826 if you have any questions. Sincerely,

Joshua Peabody Senior Consultant/Cultural Resources Specialist for Cardno, Inc. Direct Line 916 386 3826 Email: [email protected] Writer: MR

Page 157: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Stan Alec Time:

10:30am

Company:

Kings River Choinumni Farm

Tribe

Project Name:

Sanger Substation

Phone No.:

559-647-3227 (cell) Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the number provided for Mr. Alec. Spoke with him briefly, he explained he received the letter and had

no comments toward the Project.

Follow-up:

Page 158: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Jerry Brown Time:

10:35am

Company:

Chowchilla Tribe of Yokuts Project Name:

Sanger Substation

Phone No.:

559-434-3160 changed to

559-284-6776

Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called Mr. Brown at the phone number provided. Operator stated number had been changed (see above).

Spoke with Mr. Brown briefly and he explained the Project does not pertain to his tribe since the Project

location falls outside of his tribe’s territory.

Follow-up:

Page 159: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Benjamin Charley Sr.,

Chairperson

Time:

10:45am

Company:

Dunlap Band of Mono

Indians

Project Name:

Sanger Substation

Phone No.:

559-338-2545 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Mr. Charley and left a voicemail on his answering machine explaining

why I was calling and left my return phone number.

Follow-up:

Page 160: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Tribal Administrator Time:

10:55am

Company:

Cold Springs Rancheria of

Mono Indians

Project Name:

Sanger Substation

Phone No.:

559-855-5043 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for the Tribal Administrator. Left a voicemail on the answering machine

stating why I was calling and left a return phone number.

Follow-up:

Page 161: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Florence Dick, Tribal

Secretary

Time:

10:50am

Company:

Dunlap Band of Mono

Indians

Project Name:

Sanger Substation

Phone No.:

559-338-2329 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Ms. Dick. Operator explained the phone number had been disconnected

or was no longer in service.

Follow-up:

Page 162: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Ron Goode, Chairperson Time:

11:05am

Company:

North Fork Mono Tribe Project Name:

Sanger Substation

Phone No.:

559-299-3729 (home), 559-

355-1774 (cell)

Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the cell phone number provided for Mr. Goode and spoke with him briefly. He stated he received the

letter but had no comments, questions, or concerns otherwise he would have responded.

Follow-up:

Page 163: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

John Ledger, Assistant

Cultural Resource Manager

Time:

11:10am

Company:

Dumna Wo-Wah Tribal

Government

Project Name:

Sanger Substation

Phone No.:

559-519-1742 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for J. Ledger. Spoke with Chairperson Ledger, he explained both J. Ledger

and E. Smith were in the field and that he was not aware of any letter received pertaining to the Project.

Chairperson Ledger asked that I email him a copy of the letter and Project map at [email protected]. I

emailed Chairperson Ledger shortly after our phone conversation.

Follow-up:

Page 164: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Jeffrey Lee, Chairperson Time:

10:55am

Company:

Cold Springs Rancheria of

Mono Indians

Project Name:

Sanger Substation

Phone No.:

559-855-5043 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Mr. Lee. Left a voicemail on the answering machine stating why I was

calling and left a return phone number.

Follow-up:

Page 165: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Reggie Lewis, Chairperson Time:

11:25am

Company:

Picayune Rancheria of

Chukchansi

Project Name:

Sanger Substation

Phone No.:

N/A Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: There was no contact information provided for R. Lewis- He was not contacted.

Follow-up:

Page 166: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Mary Matola, THPO Time:

11:25am

Company:

Picayune Rancheria of

Chukchansi

Project Name:

Sanger Substation

Phone No.:

Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: There was no contact information provided for M. Matola- She was not contacted.

Follow-up:

Page 167: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Michael Russell, Tribal

Administrator

Time:

11:30am

Company:

Table Mountain Rancheria Project Name:

Sanger Substation

Phone No.:

559-822-2587 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Mr. Russell. Secretary (Keri) explained that M. Russell was no longer a

tribal administrator for the Table Mountain Rancheria and had not been with them for a while.

Follow-up:

Page 168: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Jamie Smith, Environmental

Coordinator

Time:

10:55am

Company:

Cold Springs Rancheria of

Mono Indians

Project Name:

Sanger Substation

Phone No.:

559-855-5043 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Jamie Smith. Left a voicemail on the answering machine stating why I

was calling and left a return phone number.

Follow-up:

Page 169: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Eric Smith, Cultural Resource

Manager

Time:

11:10am

Company:

Dumna Wo-Wah Tribal

Government

Project Name:

Sanger Substation

Phone No.:

559-519-1742 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Mr. Smith. Spoke with Chairperson Ledger, he explained both J. Ledger

and E. Smith were in the field and that he was not aware of any letter received pertaining to the Project.

Chairperson Ledger asked that I email him a copy of the letter and Project map at [email protected]. I

emailed Chairperson Ledger shortly after our phone conversation.

Follow-up:

Page 170: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological
Page 171: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Jeneen Tex, Chief Executive

Officer

Time:

10:45am

Company:

Dunlap Band of Mono

Indians

Project Name:

Sanger Substation

Phone No.:

559-338-2545 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: The phone number provided for Ms. Tex is the same phone number for Benjamin Charley, Sr. Chairperson.

Left a voicemail on answering machine regarding why I was calling and left a return phone number.

Follow-up:

Page 172: Appendix A List of Preparers - California Public Utilities ... IS M… · Appendix A. List of Preparers ... 5 Impact Assessment for Highway Projects. ... 36 United States Geological

Cardno, Inc.

701 University Ave., Suite 200

Sacramento, CA 95825

(916)923-1097 | Fax (916) 923-6251

www.cardno.com

CONVERSATION RECORD

Telephone

Personal Contact (i.e., lunch, meeting, etc.)

Date: 11/04/2015

By:

M. Rossi

Conversed With:

Leanne Walker-Grant,

Chairperson

Time:

11:30am

Company:

Table Mountain Rancheria Project Name:

Sanger Substation

Phone No.:

559-822-2587 Project No.:

N/A

Subject:

Follow-up phone calls to letters mailed out on September 16, 2015, regarding Pacific Gas &

Electric Company’s Sanger Substation Project

Remarks: Called the phone number provided for Ms. Walker-Grant. She was unavailable and directed my call to their

Cultural Resources Manager, Bob Panel. I left a voicemail on B. Panel’s answering machine stating why I was

calling and left a return phone number.

Follow-up: