APPENDIX 6 STORMWATER MANAGEMENT …...Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot...
Transcript of APPENDIX 6 STORMWATER MANAGEMENT …...Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot...
APPENDIX 6
STORMWATER MANAGEMENT (SERLING CONSULTING)
Bellevue Primary School
Redevelopment
City of Swan, Western Australia
Stormwater Drainage Strategy
Report
Lot 3 and Lot 15597
Our Ref: SC00182.010
September 2014
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Bellevue Primary School Redevelopment
City of Swan, Western Australia
Our Ref: SC00182.010
Serling Consulting (Australia) Pty Ltd
ABN 15 162 648 222
Unit 1, 61 Guthrie Street
Osborne Park WA 6017
Tel: +61 8 6500 8802
Web: www.serlingconsulting.com.au
COPYRIGHT: The concepts and information contained in this document are the property of Serling Consulting (Australia) Pty Ltd. Use or copying of this document in whole
or in part without the written permission of Serling Consulting (Australia) Pty Ltd constitutes an infringement of copyright.
Stormwater Drainage Strategy Report
Lot 3 and Lot 15597
REV 2
September 2014
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
PAGE i
Contents
1. Introduction 5
1.1 Background 5
1.2 Previous Reports and Assessments 5
2. Proposed Development 6
3. Design Criteria 7
3.1 Water Quantity Management 7
3.2 Water Quality Management 7
3.3 Disease Vector and Nuisance Insect Management 7
4. Pre-development Environment 8
4.1 Surface Water Hydrology 8
4.2 Surface Water Quality 8
5. Stormwater Management Strategy 10
5.1 Catchment Area 10
5.2 Lot and Road Drainage 10
5.3 Detention Storage Requirements 11
5.4 Stormwater Quality 12
6. Groundwater Management Strategy 13
6.1 Clearance to Groundwater 13
6.2 Subsurface Drainage 13
7. Implementation 14
Appendix A Locality Plan 15
Appendix B Concept Plan 16
Appendix C Bellevue Drain 17
Appendix D Catchment Areas 18
Appendix E Site Plan and Proposed Basin Location 19
Appendix F Living Stream Concept 20
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
PAGE ii
Document history and status
Revision Date issued Reviewed
by
Approved
by
Date
approved Revision type
A 16/06/14 G Alexander G Alexander 16/06/14 Draft
0 26/6/14 G Alexander G Alexander 26/6/14 Final
1 28/8/14 G Alexander G Alexander 28/8/14 Final
Distribution of copies
Revision Copy no Quantity Issued to
A 1 1 Gil Alexander
A 1 1 Taliska Securities Pty Ltd
0 1 1 City of Swan, Shire of Mundaring,
Taliska Securities
1 1 1 City of Swan, Shire of Mundaring,
Taliska Securities
2 1 1 City of Swan, Taliska Securities
Printed: 10 September 2014
Last saved: 10 September 2014
File name: 140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Author: Willem du Toit
Project Manager: Willem du Toit
Name of Organisation: Serling Consulting (Australia) Pty Ltd
Name of project: Bellevue Primary School Redevelopment
Name of document: 140910 Bellevue Primary School Redevelopment Drainage Strategy
Document version: Rev 2
Project number: SC00182.010
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
5
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
1. Introduction
1.1 Background
This Stormwater Drainage Strategy Report has been prepared in support of a redevelopment and
amalgamation application for Lot 3 and Lot 15597. The subject land includes the previous Bellevue
Primary School, a section of Wilkins Street, a City of Swan drainage easement and vacant land next
to the Roe Highway / Clayton Street road reserves.
The site is situated approximately 16km north-east of the Perth CBD and approximately 3km south-
east of the Midland town centre. The lots are within the boundaries of City of Swan, with the southern
boundary of the Wilkins Street road reserve, the border with Shire of Mundaring.
The primary school buildings have not been used in recent years and part of the site is currently used
as a nursery. The subject site, as well as the properties Lots 800 and 239 to the south, have a single
owner.
A site locality plan is included in Appendix A.
1.2 Previous Reports and Assessments
A District Water Management Strategy (DWMS) for Lots 800 and 239 Wilkins Street Bellevue has
been completed by RPS. (Report No D12146, Rev 1, March 2013) and has been submitted to the
City of Swan Planning Department before.
This previously submitted DWMS has included review and comments on Lots 3 and 15597 and this
Stormwater Drainage Strategy should be read in conjunction with the DWMS.
This Stormwater Drainage Strategy will include information on Stormwater Management and will not
repeat information on Geology, Acid Sulfate Soils, Flora and Fauna, Heritage, Environmental issues,
Groundwater Hydrology, Water Supply Planning or monitoring requirements. These issues are
covered in the DWMS.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
6
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
2. Proposed Development
Following amalgamation, it is proposed to develop the site as one Group Housing site with a
combination of Grouped dwellings and Multiple dwellings, as shown in the concept design layout
attached in Appendix B.
The Grouped dwellings will be developed on a 5,690 square metre area with a yield of 19 dwellings.
The Multiple dwellings will be developed on 7,100 square metre area with a yield of 53 dwellings.
It is proposed to incorporate the fronting section of Wilkins Street as part of the private development.
Pascoe Street will be widened to a boulevard cross section, which will also be the main entry of the
future development of Lots 800 and 236 to the south.
The land has a very gentle slope from north-east to south-west and these natural grades will be
incorporated in the proposed drainage designs.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
7
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
3. Design Criteria
3.1 Water Quantity Management
The objective is to have the post-development annual discharge volume and peak flows maintained
relative to pre-development conditions. The intention is to implement water sensitive urban design
(WSUD) measures that provide the best outcome in relation to water management for the site. The
following would be specific design criteria:
• Calculate pre-development and post-development flows to confirm they are maintained.
• Confirm that 1 year ARI event is maintained, as this may impact on desirable environmental
flows.
• Confirm the 1:100 year ARI post-development flows are contained on site similar to the pre-
development flows as part of flood management.
3.2 Water Quality Management
The objective is to maintain surface water and ground water quality at pre-development levels and, if
possible, improve the quality of water leaving the development area.
The design criteria is for the development to meet relevant water quality guidelines stipulated in the
“National water quality management strategy, 1994”
All runoff contained within the drainage infrastructure network will receive treatment prior to discharge
to a receiving environment. This includes outflows from subsoils.
3.3 Disease Vector and Nuisance Insect Management
Retention and detention treatments would be designed to ensure that between the months of
November and May, detained immobile stormwater is fully infiltrated within a time period not
exceeding 96 hours.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
8
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
4. Pre-development Environment
Details of the existing environment with regard to landform, topography and soils, Phosphorus
Retention Index (PRI), Acid Sulphate Soils (ASS), Flora and Fauna, Conservation Areas, Cultural
Heritage, Floodways and Surface water hydrology, Surface water quality, Groundwater hydrology,
Groundwater quality and information on monitoring sites are all covered in the DWMS prepared by
RPS and this information is also relevant to the Bellevue Primary School site.
A number of specific issues related to the pre-development environment will be discussed in this
report.
4.1 Surface Water Hydrology
An existing drain, the Bellevue drain, passes through the property. It is located in an easement in
favour of the City of Swan and conveys stormwater from external catchments to the north and north-
west of the site. It consists of a number of larger diameter pipes. Although no stormwater from Lots 3
and 15597 would be added to the closed section of the Bellevue drain in the pre-development
environment, site runoff would reach the downstream open section of the drain. Photos of the pipe
culvert outlet and open drain are included in Appendix C.
The Bellevue drain currently carries significant flows from upstream catchments (quoted as in the
order of 4 – 6 m3 /sec for the critical 1:5 year ARI event in the DWMS). Flows from Lots 3 and 15597
would only be a very small percentage of these values, as shown in the table below.
Table 4.1: Pre-development and post-development flows:
Although the site has been split up into two catchments for the pre-development scenario, all pre-
development runoff from the site will eventually discharge towards the southern side and the open
section of the Bellevue drain, either as overland flow or via existing underground stormwater systems
in Wilkins Street.
The insitu material is mostly clay and most of the catchment can be classified as impervious.
4.2 Surface Water Quality
A sample of the Bellevue drain was taken on 3 September 2012 to provide a preliminary qualitative
assessment of stormwater flows discharging through this drainage network.
Sub-Catchment
A1
A20.039 0.076
Post-development flow
(m3/sec)
0.0230.007
1 in 1 year 1 in 5 year
Pre-development flow
(m3/sec)
Post-development flow
(m3/sec)
0.071
Pre-development flow
(m3/sec)
0.031
Sub-Catchment
A1
A20.235
0.083
1 in 100 year
Pre-development flow
(m3/sec)
Post-development
flow (m3/sec)
0.195
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
9
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
The DWMS includes details of the results, showing Total Nitrogen (TN) exceeding the ANZECC
guidelines for lowland rivers. The other water quality parameters are generally within the guidelines. It
can be assumed that the water quality results are related to flows from the upstream catchment and
not the very small percentage of flows from the Bellevue Primary School site.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
10
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
5. Stormwater Management Strategy
5.1 Catchment Area
The proposed development includes a combination of grouped dwellings (19 dwellings) and multiple
dwellings (53 dwellings). It is a medium density development in a clay environment so it was
assumed that all dwelling roof runoff will be connected to an underground street stormwater drainage
system. Assuming some planting and vegetation, the overall catchment was assumed to be 80%
impervious (paved) and 20% pervious. A clay / silt soil type was selected for the “pervious” vegetation
areas.
No upstream catchments feeds into the site, as these are all discharging to existing road systems
and then into the Bellevue drain. Major overland flow paths follow roads around the proposed
development site and not through the site.
The development site was divided into 7 sub-catchments as shown in Appendix D. Wilkins Street
and the proposed Pascoe Street Boulevard were included. The 7 sub-catchments were modelled
assuming all of the catchment area contributing to the discharge from the catchment. Several of the
sub-catchments actually feed into downstream sub-catchments of the proposed development and
eventually discharge into a proposed drainage basin directly south of the development. A preliminary
layout of pits and stormwater pipes for each sub-catchment are shown in Appendix D as well.
A breakdown of the catchment areas are shown in the table below:
Table 5.1: Sub-catchments
Sub-Catchment
Number (Post-
development)
Catchment
Area Minor
Storms (ha)
Catchment
Area Major
Storms (ha)
Impervious
Catchment
Area Minor
Storms (ha)
Impervious
Catchment
Area Major
Storms (ha)
Receiving
Basins
Infiltration
Rate
(m/day)
1 0.4300 0.4300 0.3440 0.3440 Basin 1 0.1
2 0.2500 0.2500 0.2000 0.2000 Basin 1 0.1
3 0.2550 0.2550 0.2040 0.2040 Basin 1 0.1
4 0.0700 0.0700 0.0560 0.0560 Basin 1 0.1
5 0.2750 0.2750 0.2200 0.2200 Basin 1 0.1
6 0.1600 0.1600 0.1280 0.1280 Basin 1 0.1
7 0.2600 0.2600 0.2080 0.2080 Basin 1 0.1
5.2 Lot and Road Drainage
The proposed development will be a group housing development of medium density. In the clay
environment, it is proposed that all lots will have direct connection to the piped road drainage network
and all flows will be directed towards a discharge point on the south-western side of the site.
The piped road drainage network shall be sized to convey up to the 5 year ARI rainfall event. Rainfall
events larger than the 5 year ARI event, will be contained within the road reserve and discharge to
the lower areas on the south-western side of the proposed development site.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
11
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
5.3 Detention Storage Requirements
The long term drainage strategy for the area downstream of Lots 3 and 15597 is described in the
DWMS prepared by RPS. A key part of the long term strategy is the conversion of the existing
Bellevue open drain section into a natural living stream. It will become a central urban design feature.
The aesthetic and biological functioning of the proposed living stream will have to be maintained and
in addition to that, consistent flows through the system will have to be provided to reduce water
stratification in the downstream wetlands and increase dissolved oxygen levels in the water bodies.
It is therefore important to maintain first flush and larger event runoffs from the primary school
development site into the Bellevue drain. As the proposed development will be medium density and
impervious areas will be increased significantly, total runoff from pre-development to post-
development will be increased. Detention storage will have to be provided to reduce the peak runoff
for both minor and major rainfall events.
The proposed Lot 3 and Lot 15597 development will be in the upper catchment of the future
development of Lots 800 and 239 Wilkins Street and it is proposed to combine the drainage
strategies for the two developments. As no detail calculations for Lots 800 and 236 are available, a
temporary solution is proposed, which may also become part of the future longer term drainage
strategy.
It is proposed to excavate a temporary drainage basin directly south-west of Lots 3 and 15597 and
next to the open section of the Bellevue drain, as shown in Appendix E. The proposed basin will
have a small diameter (150mm diameter in the current model) low flow outlet to make sure pre-
development flows are maintained and at the same time prevent water from ponding in the basin for
extended periods of time. Details of the basin storage parameters are included in the tables below.
Table 5.2: Basin Size and Storage Details
Basin / Storage
Parameters Basin 1
Invert Level (m
AHD) 14.8
Side Slopes (V:H) 1:6
Depth (m) 1.2
Basin Area at base
(m²) 100
Total Volume (m³) 417
Basin Area at top
(m²) 595
MGLs (m AHD) -
Base separation
from MGL (m) -
*AAMGLs (m AHD) 11.0
Base separation
from AAMGL (m) 3.8
* AAMGL assumed to be 0.5m above the 03/09/12 measurements by RPS
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
12
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
The basin and detention calculations can then be incorporated into the future living stream
calculations and designs once the future development goes ahead. Refer Appendix F for concepts
of the future development.
5.4 Stormwater Quality
Prior to discharging to the proposed drainage basin, stormwater will be treated by passing through a
pollutant trap. As the stormwater drainage system will be designed to convey the 5 year ARI rainfall
event, all first flush runoff will pass through the pollutant trap prior to discharging into the temporary
drainage basin and the Bellevue drain.
Area
Inundated
(m²)
Storage
Volume (m³)
Water Depth
(m)
Area
Inundated
(m²)
Storage
Volume
(m³)
Water
Depth (m)
Area
Inundated
(m²)
Storage
Volume
(m³)
Water
Depth
(m)
484 285 1.0 452 241 0.9 338 148 0.7
1:100 yr ARI 1:5 yr ARI 1:1 yr ARI
Basin Number
Max
Infiltration
Time (hrs)
1: 100 yr
overflow /
outflow
(m³/sec)
Basin 1 25 0.235
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
13
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
6. Groundwater Management Strategy
6.1 Clearance to Groundwater
Preliminary groundwater monitoring results are included in Table 7 in the DWMS prepared by RPS.
Bore ID C01 is the only one close to Lots 3 and 15597 and this shows groundwater elevations of
9.99m AHD on 28 June 2012 and 10.5m AHD on 3 September 2012 respectively. The existing
surface level at this point is 16.49m AHD.
Perth Groundwater Atlas shows groundwater levels below these values for Lots 3 and 15597 and in
the absence of more detail information, it was assumed that maximum groundwater levels will be in
the order of 11.0m AHD.
Existing site levels are generally over 16.0m AHD, resulting in groundwater clearances of
approximately 5.0m. As a result of structural design clearance requirements for building footings
above clay layers, it is expected that final lot levels will generally be the same or higher than existing
levels.
6.2 Subsurface Drainage
As there may be a risk of localised perched groundwater in the clay environment, it is proposed to
install a subsurface drainage system along one side of all of the internal roads to improve the flow of
groundwater away from both buildings and lots in the clay environment. The design shall be in
accordance with the City of Swan design standards.
The subsurface drainage system will be connected to the upstream side of drainage pits and
discharge to the last drainage manhole directly upstream of the pollutant trap.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
14
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
7. Implementation
Applications for the amalgamation of the subject lots have been submitted to the local authorities and
this drainage strategy will be submitted in support of those applications.
Following approvals to proceed with the development, a detail design development stage will
commence. It is during this stage that the following more detail work will be completed:
- Earthworks design and final lot levels;
- More detail drainage designs based on final building and road layout;
- Testing of soil to confirm clay content and impact on drainage design;
- Details of WSUD applications;
- Details of pollutant traps and other possible stormwater treatment methods;
- Cover over existing underground section of the Bellevue Drain and invert level requirements
for the stormwater drainage system;
- Subsurface drainage design requirements, levels and discharge;
- Landscaping and vegetation that may form part of the stormwater drainage system eg
planting in the temporary basin; and
- Interaction between the road reserve and lot drainage systems.
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
15
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix A Locality Plan
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
16
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix B Concept Plan
Clayton Street
Pas
coe
Stre
et
Wilkins Street
Concept plan – Density compliance mackay urbandesign
Belle View Estate: Bellevue Primary School concept design: March 2014
Grouped dwellings
Grouped Dwellings Grouped dwelling site area: 5,690sqm Residential yield:19 dwellings Average site area per dwelling: 299sqm R-code minimum average: 220sqm COMPLIANT
Multiple Dwellings Multiple dwelling site area: 7,100sqm Residential yield: 53 dwellings
11x 1-bed apts @ 55sqm: 605sqm 42x 2-bed apts @ 74sqm: 3,108sqm
Total Plot Ratio floorspace: 3,713sqm Plot Ratio: 0.52 R-Code maximum PR: 0.6 COMPLIANT
Multiple dwellings
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
17
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix C Bellevue Drain
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
18
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix D Catchment Areas
Concept plan mackay urbandesign
Belle View Estate: Bellevue Primary School concept design: March 2014
Clayton Street
Pas
coe
Stre
et
Wilkins Street
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
19
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix E Site Plan and Proposed Basin Location
Serling Consulting (Australia) Pty Ltd Bellevue Lot 3 and Lot 15597 Our Ref: SC00182.010
20
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\140910 Bellevue Primary School Redevelopment Drainage Strategy Rev 2.docx
Appendix F Living Stream Concept