Appendix 16.4: Construction traffic distribution plan · 2018-11-06 · Appendix 16.4: Construction...
Transcript of Appendix 16.4: Construction traffic distribution plan · 2018-11-06 · Appendix 16.4: Construction...
Appendix 16.4: Construction traffic distribution plan
M1
A43
To M40
To London
To Leeds
Junction 15A
M1
Site Access
Cars: 75, 12.2%
HGVs: 29, 12.8%
Cars: 614
HGVs: 228
Cars: 539, 87.9%
HGVs: 199, 87.2%
Cars: 158, 25.7%
HGVs: 90, 39.5%
Cars: 123, 20.1%
HGVs: 36, 15.8%
Cars: 232, 37.8%
HGVs: 71, 31.3%
Cars: 81, 13.2%
HGVs: 24, 10.5%
Cars: 148, 24.0%
HGVs: 45, 19.6%
Cars: 60, 9.8%
HGVs: 2, 1.0%
Cars: 58, 9.4%
HGVs: 34, 14.7%
Cars: 6, 0.9%
HGVs: 0, 0%
A45
A5076
INDICATIVE
W E
S
of
Her Majesty's Stationery Office. Crown Copyright - Licence No. AL100034021
RESERVED COPYRIGHT
PROJECT:
TITLE:
STATUS:
REVISION:DRAWING NO:JOB NO:
CLIENT:
SCALE: DATE: DRAWN: CHECKED: APPROVED:
DateRev Details
CheckedDrawn
byby
Approved
by
A2
ORIGINAL
PLOT SIZE
25 King Street
BristolBS1 4PB
0117 925 9400
Construction Traffic
Distribution
1:20,000 07.02.18 DR AS MB
1211-80 SK210
KEY
Approximate Site Boundary
Construction Traffic Route