APPENDIX 1 - Nanaimo

43
APPENDIX 1 Receipt Confirmation

Transcript of APPENDIX 1 - Nanaimo

Page 1: APPENDIX 1 - Nanaimo

APPENDIX 1

Receipt Confirmation

Page 2: APPENDIX 1 - Nanaimo

RECEIPT CONFIRMATION FORM

Invitation to Tender No. 1809

NANAIMO LAKES ROAD CULVERT RELINING

Closing date and time: 3:00 PM, Pacific Standard Time, Wednesday, 2016-AUG-10

As receipt of this document, and to directly receive any further information about

this Tender, please return this form to:

Attention: Kurtis Felker

Manager, Purchasing & Stores City of Nanaimo

2020 Labieux Road, Nanaimo, BC, V2T 4M7 Fax: 250.756.5327

Email: [email protected]

COMPANY NAME: ________________________________________________

STREET ADDRESS: _______________________________________________

CITY/PROVINCE: _________________________________________________

POSTAL CODE: __________________________________________________

PHONE NUMBER: ________________________________________________

FAX NUMBER: ___________________________________________________

CONTACT PERSON: ______________________________________________

EMAIL ADDRESS: ________________________________________________

SIGNATURE: ___________________________________________________________

Page 3: APPENDIX 1 - Nanaimo

APPENDIX 2

Asbestos Cement Pipe Safework Procedures City of Nanaimo, Jan. 30, 2015

Page 4: APPENDIX 1 - Nanaimo

Department: Public Works

Subject: AC Pipe Cutting and Disposal Procedures

Asbestos Cement Pipe Safe Work Procedures Background: Although AC pipe will not be used in new installations, there is still a need for work to be done on existing AC pipe. Cutting into AC pipe sections may sometimes be required for repair or tying into new connections. Exposure to asbestos can occur during work performed on AC pipes. To minimize fiber release, and prevent exposure to fibers during work activities, the following procedures are to be followed when performing work on AC pipe. All employees and contractors throughout The City of Nanaimo must understand the requirements of these procedures prior to conducting any work on AC pipe. The following procedures are for snap cutters, handsaws, tapping machines and hand drills. The operation of hand tools with AC pipe has been determined to be a Moderate Risk Work Activity as outlined in Worksafe Regulation 6.1. Snap cutters (roller chain cutters) consist of deep penetrating cutting wheels mounted in a chain that is wrapped around the pipe barrel. A cut is made when pressure is applied by means of a hydraulic pump or a manual ratchet depending on the size of the pipe. Hazards: • The use of powered disc saws (cut-off saw, K-5 saw, stihl saw, etc) MUST NOT be used to cut

AC pipe. The use of such abrasive disc saws will release excessive levels of asbestos fibres into the atmosphere and cause over-exposure to employees, contractors and the public.

• Exposure to asbestos fibres can lead to grievous long term illness and death. All efforts must be made to avoid exposure to asbestos fibres. If an exposure is suspected during your shift, report this suspected exposure to the OH&S Department without delay.

• If clothing is exposed to asbestos fibres, that clothing needs to be bagged, marked and cleaned appropriately. Don’t risk bringing asbestos home to your family.

• Heat Exposure is amplified during the summer months while performing this procedure due to the use of Tyvex suits. Workers and supervisors must be aware of the signs and symptoms of Hyperthermia (unsafe increase in the body’s core temperature). If the worker is feeling these signs and symptoms, they must follow decontamination procedures to exit the “Asbestos Work Zone” and take a break in a cool place while having some water.

PPE Required: The use of disposable material is to ensure asbestos fibres that can be found in the AC pipe debris do not get transferred out of the asbestos workzone. • ½ Mask Respirator with a

“100” (HEPA) filter • Disposable Coveralls – Impermeable protective coveralls must

have a hood, and elastic seals • Rubber Boots - NO laces • Disposable Gloves • Hardhat • Eye Protection (Where Required) • Hearing Protection (Where Required) Special Equipment Required: • Asbestos Disposal Bags

• Asbestos Warning Tape

• Snap Cutters or other non

powered hand tools. • Duct Tape for

sealing bags. • Asbestos Hazard Warning Signs

• 4 “Candle Stick” style traffic delineators for creating the 4 corners of the “Asbestos Work Zone”, OR, any other suitable posts or stakes

Page 5: APPENDIX 1 - Nanaimo

Pre Set-Up: • Perform pre-excavation hazard identification and risk assessment through the use of a Pre-

Excavation Checklist. Keep completed checklist on site. • Complete the appropriate WSBC NOP for work on Asbestos Containing Materials. Ensure that

a copy of the NOP(A) is on site at all times. • Ensure that the Pre-Ex is on site and utilities have been marked out before carrying out any

excavations. • Set up work zone appropriately – utilize traffic control if needed. • Ensure all workers on site are trained and aware of the hazards which exist. • Any workers who are going to be carrying out AC Pipe procedures need to have attended an

AC Pipe Procedures safety talk. • Ensure this procedure and the AC Pipe Exposure Control Plan are on site and that all workers

have been trained in both. • Ensure a continuous water supply is available on site. Procedure: • Expose AC Pipe in accordance with City of Nanaimo Excavation and Trenching Safety

program. • Create an “Asbestos Work Zone”. Use four “Candlestick” style traffic control posts as the

corners of the work zone. Use “Asbestos Hazard” warning tape to create a barrier surrounding the work zone, connecting all 4 corners. The work zone barrier must keep all non protected workers 10 feet away from the work zone. Post Asbestos Warning Signs where appropriate.

• Employees entering the “Asbestos Work Zone” must be wearing the required personal protective equipment.

• Low flow water must be constantly applied to the area being cut and continued until the cutting is complete. Ensure the water is applied in sufficient quantities so that the area being cut is continuously wet and no asbestos fibres are being released.

• Operate the cutting tool in accordance with the manufacturer’s instructions and City of Nanaimo SWPs until cutting is complete. Snap Cutters are generally the preferred tool for cutting AC Pipe.

• If the use of snap cutters is impractical, other non powered hand tools may be utilized as per manufacturer’s instructions and city policies. All the same controls used for snap cutters must still be utilized (i.e. continuous flow water.

• Once the final cut has been completed, thoroughly wash the cutting equipment in the excavation with a hose using clean water to remove all AC pipe debris. Pass tools out of the excavation once they are cleaned.

• If flowing water is not available, wash the equipment in large buckets of water and dump that water into the excavation.

• There are two different options for the waste pipe: 1) Remove from trench and dispose in asbestos waste bin: Cut the pipe into short enough pieces (4 foot lengths) to fit into the Asbestos Waste Bags

while still in the trench. Place the pipe of piece and any visible pieces or debris into the Asbestos Waste Bag. Twist the top of the bag to close it, and then fold over twisted portion and use duct tape

to tape the twisted portion to the bag. Place the bagged section near the edge of the “Asbestos Work Zone”. Wipe down bag with a wet disposable cloth to remove any asbestos debris. Place the bag into a second Asbestos Waste Bag and duct tape closed the same way. Where use of Asbestos Waste Bags is not applicable (i.e. length of AC

Pipe to be removed is longer than 4 feet or too large for the bag to contain) Polyethylene drop sheets can be utilized. Two layers of Polyethylene drop sheets will be placed on the edge of the trench. Once removed, the AC Pipe will be placed directly onto the

Page 6: APPENDIX 1 - Nanaimo

Polyethylene drop sheets. The first layer of the Polyethylene drop sheet will be used to contain the AC Pipe by wrapping around the pipe and tying the ends in a goose neck fashion and sealing with duct tape. The second layer of Polyethylene sheeting will be utilized to further contain the AC Pipe by double-wrapping the pipe and tying the ends in a goose neck fashion and sealing with duct tape. The double wrapped AC Pipe will then be labelled with an Asbestos Warning Sticker or marked appropriately with other means.

Place the bag back of truck and dispose of in the designated Asbestos Disposal Bin at the back of the yard and advise Stores that you have done so. AC Pipe must never be left in the back of a truck overnight.

2) Leave in trench whole: If the trench is large enough to leave the AC Pipe section in the trench, this is another

option. However, this practice is discouraged as the remaining AC Pipe must now be marked on the City of Nanaimo Asbestos Inventory and an exposure control plan must be implemented for future work in the area.

Cut AC Pipe into sections small enough to either fit into Asbestos Waste Bags or small enough to be able to wrap poly around it.

Place the AC Pipe section into an Asbestos Waste Bag and seal in a goose neck fashion with duct tape. Place that bagged piece into a second bag and seal in the same fashion.

If section is too big to fit into Asbestos Waste Bag, wrap with poly and mark the poly wrap with Asbestos Hazard Stickers.

Place “Asbestos Hazard” warning tape over the waste pipe during back fill. Forward location of buried and marked AC Pipe to OH&S and Public Works for

placement into the Asbestos Inventory. When backfilling, bury asbestos hazard tape 2 feet below grade above the waste pipe.

Post Procedure/Take Down 1.) Decontaminate equipment:

Once the final cut has been completed, thoroughly wash the cutting equipment in the excavation with clean, low pressure water to remove all AC pipe debris.

Wash down excavator bucket and thumb with low flow water to remove all AC pipe debris and asbestos fibers.

Remove all cleaned tools from the excavation. 2.) Decontamination of all workers handling asbestos (other than last worker to decontaminate)

Proceed to where the wash station/ asbestos & asbestos waste bag is Thoroughly wash off boots & hard hat with low flow water.

Remove gloves (first aid method turning inside out) and place in the asbestos waste bag

Remove Tyvek and gently place in Asbestos Waste Bag Wash face and any exposed hair & hands with water and rag/ wet wipes Remove respirator cartridges and place into asbestos waste bag Thoroughly clean safety glasses & respirator with a disposable wet cloth/ wet wipes Throw away all clothes/ wet wipes into asbestos waste bag Step out of Asbestos Work Zone

3.) Last person out of excavation to decontaminate Take down barrier and dispose of tape in asbestos waste bag Proceed to where the wash station/ asbestos waste bag is Thoroughly wash off boots & hard hat Remove gloves (first aid method turning inside out) and place in the asbestos waste

bag Remove Tyvek and gently place in asbestos waste bag Thoroughly clean safety glasses & respirator with a disposable wet cloth/ wet wipes Put all disposable clothes/ wet wipes in asbestos waste bag With respirator still on:

Page 7: APPENDIX 1 - Nanaimo

o Wash respirator, face and any exposed hair & hands with water and rag/ wet wipes

o Gently twist the Asbestos Waste Bag closed (Do NOT squish out the air) and then fold over twisted portion (goose neck) and duct tape closed.

o Wipe down the outside of the asbestos waste bag and place aside momentarily

o Remove cartridges and place into second asbestos waste bag o Remove respirator, wipe down and set aside. o Place first asbestos waste bag into second asbestos waste bag (has your

respirator cartridges already in it) o Twist the top of the bag to close it, and then fold over twisted portion and use

duct tape to tape the twisted portion to the bag o Place asbestos waste bags into bin with rest of double wrapped AC Pipe

4.) Backfill excavation as per usual procedures.

Other Considerations 1. Specific Respirator Maintenance

• Clean respirator by washing with respirator wipes • Rinse in clean, warm water • Wipe dry and hang to complete drying • Visually inspect inhalation and exhalation valve before replacing

2. Contingency Plan – Spill/ Split Double Bag or Poly Wrap The section is to be used in the event a bag breaks open, a wrapped asbestos containing pipe is dropped or the double poly breaks open or other small spill of pre-bagged asbestos containing material.

• Immediately soak down the contents with low flow water and barricade the area that the spill has occurred to keep unprotected workers and public out of area:

o Create an “Asbestos Work Zone”. Use four “Candlestick” style traffic control posts as the corners of the work zone. Use “Asbestos Hazard” warning tape to create a barrier surrounding the work zone, connecting all 4 corners. The work zone barrier must keep all non protected workers 10 feet away from the work zone. Post Asbestos Warning Signs where appropriate.

o Employees entering the “Asbestos Work Zone” must be wearing the required personal protective equipment.

• If workers are not already in Tyvek and other required PPE or workers with Tyvek and all other required PPE are unavailable Have workers don all appropriate personal protective equipment required for Moderate Risk Asbestos Procedures.

• Rewrap the Asbestos:

o Small Debris - Use the double bagging procedure: Place the pipe of piece and any visible pieces or debris into the Asbestos

Waste Bag. Twist the top of the bag to close it, and then fold over twisted portion and

use duct tape to tape the twisted portion to the bag. Place the bagged section near the edge of the “Asbestos Work Zone”. Wipe down bag with a wet disposable cloth to remove any asbestos

debris. Place the bag into a second Asbestos Waste Bag and duct tape closed

the same way.

Page 8: APPENDIX 1 - Nanaimo

o Large Debris: Wrap the first layer of poly over the pipe like a present and tape into

position. Wipe down 1st layer with damp cloth to eliminate any fibers. Wrap the second layer of poly over the pipe (again like a present) and

tape down. Apply asbestos hazard labels Dispose of in bin with other double wrapped AC Pipe

• In addition to the above:

o If contents were spilled on soil: Ensure a layer of top soil is removed with the asbestos debris to

minimize future exposure. • Utilizing a flat faced spade style shovel, dig horizontally deep

enough under the surface to capture all of the fibers that may have been collected within the surface soils.

• Gently place each shovel full into an Asbestos Waste Bag. • Seal bag as per “Small Debris” procedures above. • Decontaminate shovel with running water prior to removing from

“Asbestos Work Zone”

o If contents were spilled on asphalt, concrete or other hard surface: Hepa vac contents up using DOP tested hepa vacuum Wet wipe the area with disposable wet rags Dispose of rags in double bag

Created: 2010-Mar-08 Revised: 2015-Jan-30

Created by: Jason Duchak Revised by: Jason Duchak

Page 9: APPENDIX 1 - Nanaimo

APPENDIX 3

DuroMaxx® Steel Reinforced PE Liner Pipe Unloading, Handling,

& Installation Guide Contech Engineered Solutions

Page 10: APPENDIX 1 - Nanaimo

ENGINEERED SOLUTIONS

DuroMaxx® Steel Reinforced PE Liner Pipe Unloading, Handling & Installation Guide

STEEL REINFORCED PE TECHNOLOGY

Page 11: APPENDIX 1 - Nanaimo

2

PREfacE

This instruction book is for your crews. Distribute it to help them install Contech® DuroMaxx® liner pipe correctly. DuroMaxx is a steel reinforced polyethylene, segmental pipe that is inserted (sliplined) into an existing deteriorated pipe, or a into casing pipe or into a tunnel as a carrier pipe.

Do not assume experienced workers know all the answers. Review these instructions with your supervisors and crews. It can mean a safer and better job for you and your customer.

We recommend a preconstruction meeting with a Contech representative and all interested parties to ensure everyone involved in your project has a high level of understanding on what means and methods will be used to prepare for, install and grout the new structure(s).

If performance testing of the joints is required, we suggest testing the first few manhole runs in the early stages to ensure that jointing procedures are correct.

If you have any questions about these instructions, call your Contech representative.

contEntS PaGE

Safety Instructions for Unloading & Handling ......................... 3

Existing (Host) Pipe Preparation .............................................. 4

Assembly and Installation References ...................................... 6

Cutting Instructions ................................................................ 7

Grouting (Annular Space) ....................................................... 8

Flotation ..........................................................................9Maximum Pressure ......................................................... 10Heat of Hydration .......................................................... 10

Pipe Dimensions and Handling Weights ................................ 11

Installation Tips, Curved Sewers and Taps ............................. 11

Repairs .................................................................................11

Page 12: APPENDIX 1 - Nanaimo

3

This safety alert symbol indicates important safety messages. When you see this symbol, it will alert you to hazards or unsafe practices that CAN result in severe personal injury (including death) or property damage. Be sure you understand the message that follows.

SafEty InStRUctIonS

Failure to follow these instructions can result in serious injury, death and/or damage to pipe.

1. Only trained and authorized equipment operators are to be permitted to unload the trailer.

2. Wear approved safety hat and shoes, gloves and eye protection.

3. Park the truck and trailer on level ground before you start unloading.

4. Keep all unauthorized persons clear of the area when the driver releases the binders from the trailer and during unloading.

5. Do not release steel strapping around the wood frame until the pallets or bundles have been placed on level ground and will not be moved again as a unit or until proper pipe chocks have been put in place.

6. When pipe has been shipped as nested loads, cut the longitudinal straps that pass through the pipe and hold the nested diameters in place prior to unloading. Failure to do so may result in pipe damage.

7. Know the capabilities and rated load capacities of your lifting equipment. Never exceed them.

8. Do not stand or ride on the load of pipe while it is being unloaded.

9. If unloading at multiple points, secure pallets between drop off points. Always unload the top pallets or bundles first.

10. Never attach chains or wire rope to the pipe. They could damage the pipe. Use nylon lifting slings for unloading and handling pipe.

11. Do not push pallets off the trailer or permit pipe to drop to the ground.

12. Do not drag DuroMaxx liner pipe across the ground.

13. Do not stack DuroMaxx liner pipe higher than the original stacked on the delivery truck. Stacking too high can damage bottom pipes and can become unstable.

14. Always follow all project, local, state, and OSHA rules and safety requirements – including but not limited to confined space, trenching, shoring and excavation procedures.

(�rst)

(last)

END OF TRAILER

UnLoaDInG

1. Before unloading, observe the pipe for damage while it is still on the truck. Note any pipe damage on the bill-of-lading and have the truck driver initial the notes. Also, report any shipping damage to your local Contech representative.

2. Do not overtighten strapping as it may cause dimpling. If dimpling occurs, unstrap pipe to allow for rebound to occur at the dimpling of the pipe.

3. on nested loads, cut the internal strapping prior to unloading. Unload each pipe size independently.

4. Use a forklift with full-length forks or fork extensions (typically 8 feet), front-end loader or backhoe with fork adapters at full length to engage entire pallet width. Make sure back of forklift is free of protrusions or spikes that could damage the pipe.

5. Use Nylon lifting slings of sufficient strength, length and specifically intended to safely handle entire pallet or individual pipe, whichever is being lifted.

6. For 30” diameter pipe, one sling point located at mid-length is generally sufficient.

7. Use two (2) sling points for lifting sizes greater than 30” diameter. Sling spacing equal to 1/3rd of the pipe length is generally sufficient.

8. An approved unloading pole can be used inside the pipe to unload and handle individual pipe sections. Using forks or unapproved poles inside the pipe will result in damage.

9. Do not use steel cables, chains and/or hooks to unload or handle pipe.

10. Do not stand or ride on the pipe load during unloading or handling.

11. Do not scoop the pipe or strike with forks.

12. Do not drag or drop the pipe.

13. Proper on-site bell and spigot pipe storage practices and blocking should be used to avoid deformation of the pipe bells.

Page 13: APPENDIX 1 - Nanaimo

4

PREPaRatIon foR SLIPLInInG

Follow all requirements of the project plans and specifications. Prior to sliplining, the following procedures should be performed to ensure satisfactory results are obtained.

1. The existing sewer line or drainage structure should be inspected to determine the condition of the line and identify problem areas or obstructions such as displaced joints, crushed pipe, protruding service laterals, roots, unstable pipe, debris, out-of-roundness, or inside diameter reductions.

2. Verify and record the location, number, and size of all service laterals and connections.

3. Where the pipe is to be pushed through existing manholes or elbows, check the alignment and clearance.

4. Check for alignment changes, sags or other situations that could hinder the movement of the new pipe segments through the line.

5. Remove any obstructions in the existing line that will prevent insertion of, or cause damage to, the new liner pipe. Large joint offsets or severely deteriorated pipe may need to be removed or repaired prior to installing the pipe. These may be good locations for insertion pits or point repairs.

6. Consult with the Engineer for guidance when changes to construction methods could impact the intended end results for the project.

7. Thoroughly clean the existing line as required (high-pressure water, buckets, reamers, or other mechanical methods). Dirt and debris can result in excessive jacking/pulling loads or liner pipe hang ups that could damage the new liner pipe.

8. Verify adequate clearance for the liner pipe. Measure the inside diameter (ID) of the existing pipe at the worst location and compare the dimension to the liner pipe outside diameter (OD). Observe the general alignment of the existing pipe. Shorter liner pipe lengths may benefit in navigating past misalignment or curvature in the existing pipe. Depending on the condition of the existing pipe and the obstructions present, it may be desirable to pull a trial liner or mandrel of the same outside diameter as the liner pipe (outside diameters are listed in figure 11). The trial liner may be a short section of DuroMaxx liner pipe and should be attached to pulling cables at each end.

9. Develop and install a skid rail system in the invert of the existing pipe to protect the liner pipe during the insertion process. Contech can also provide factory attached HDPE skids at an additional charge (see figure 1).

InSERtIon LocatIonS

DuroMaxx liner pipe is installed from an excavated insertion pit or other location allowing access to the existing pipe (such as manholes, shafts or culvert ends).

When insertion locations have not been designated by the engineer or owner, the following conditions should be considered when selecting locations:

• Changes in line and grade

• Large joint offsets

• Severely deteriorated pipe sections

• Manholes being replaced

• Service laterals

• Accessibility (structures, traffic and existing utilities)

• Soil conditions

• Ability to redirect, bypass or pipe through the effluent with pumps, cofferdams or other means the Engineer has deemed to be appropriate

• Pushing and pulling distances

It is possible to reduce the number of insertion pits or the push/pull distance by sliplining in both directions from one location (or both ends of a culvert or sewer run). Depending on the liner pipe diameter, the condition of the existing line or casing pipe and safe jacking loads, sliplining up to 1,000 feet or more from a single location is possible. In some cases (tunnels, long runs of large diameter pipe, etc.) it may be desirable to insert and position individual pipe sections or pipe “trains” into the existing pipe and then join the pipe sections together while inside the existing pipe to extend the allowable working distance from one location.

When insertion pits are to be used and locations have been designated or selected, the required size of the pit should be determined. DuroMaxx liner pipe comes in standard lengths of 14 feet or 24 feet (20 feet for 60” and 120” diameters) are available. The insertion pit length should allow for the longest length of pipe being used, clearance for joining pipe sections, adequate space for pushing/pulling equipment and trench sheeting or shoring. The width of the insertion pit should be sufficient to accommodate the new liner pipe diameter plus provide safe working room for the crew. The depth of the insertion pit should allow for exposing and removing the existing pipe’s top down to the springline. The remaining bottom half of the existing pipe can serve as an open channel to maintain water flow. By-pass pumping is generally not required for segmental sliplining. A clean, level work area between the existing pipe and trench shoring will minimize dirt and debris from being washed back into the opened pipe.

If sliplining will occur from an open end of a culvert or pipeline, a timber positioning frame or level work platform might be helpful to align each new liner pipe section.

Page 14: APPENDIX 1 - Nanaimo

5

contInUoUS PUSHInG MEtHoD

1. This liner pipe installation method may be suitable for existing culverts or manhole runs where the length of the existing pipeline is equal to or less than the published allowable jacking distances shown in figure 3. The continuous pushing method involves placing each section of pipe from one location, homing of each joint at that location and pushing the pipe run into the existing pipe until the next piece of liner pipe is ready to be joined and pushed. As each pipe section is placed and joined, the amount of the liner pipe being pushed increases in length.

2. Before liner pipe insertion begins, a skid rail or runner system should be developed and put in place to ease liner installation and to protect the liner pipe exterior from excessive abrasion at the sliding surface. Contech can supply attached HDPE skid angles or skid pipes that may be suitable depending on the application (see figure 1).

3. DuroMaxx liner pipe having bell and spigot ends is placed spigot end first with the bell end trailing.

4. A pushing ring (or push piece) should be used in the bell end to evenly distribute the load from the pushing equipment. The pushing ring can be a short, sacrificial piece of liner pipe or a timber or metal frame.

Do not push on the end of the bell.

5. Both the spigot gasket and the inside of the bell should be lubricated prior to placing the pipe into the existing (host) pipe and prior to joining. See the Assembling Gasketed Joints section on page 6 for more information on joining pipe sections.

6. Set the first pipe into the existing pipe and push until only 2 to 3 feet remain exposed. The pipe should be restrained in preparation for joint assembly with dog collar (this is simply a top side collar that has the ability to sit down in between the pipe ribs and hold the pipe in place while the next piece of pipe is pushed into place to complete the joint), inflatable air bags, wedges, or other devices. After several pipes are installed, a restraining device may not be necessary.

7. Lubricate and lower the next piece of pipe into position for joining. The spigot end is joined into the previously placed pipe’s bell. Pipe sections can be joined using pushing/pulling equipment or a come-along.

8. Repeat steps 4, 5 and 6 until liner pipe installation is complete. The pipe pushing/pulling loads should be monitored. Excessive force can “telescope” pipe joints and/or buckle the liner pipe. On some installations, it may be

DUROMAXX LINER PIPE

AS REQUIRED

EXISTING PIPE

SKIDS

DUROMAXX RIBS

HDPE SKID ANGLESDUROMAXX LINER PIPE

AS REQUIRED

EXISTING PIPE

SKIDS

DUROMAXX RIBS

HDPE SKID ANGLES

Optional DuroMaxx Skid Angle and Skid Pipe Detail

Figure 1

Figure 2

Page 15: APPENDIX 1 - Nanaimo

6

feasible to swab the exterior surface of the liner pipe skids with lubricant to reduce friction.

9. When liner pipe has been installed in both directions from a single insertion pit, the terminal ends are joined with closure pieces and welded couplings or a new manhole.

10. Where DuroMaxx liner pipe has been installed continuously through manholes, cut and remove the pipe from within the manholes as required.

11. Cement or concrete bulkheads should be formed to seal the annular space between the liner pipe and the existing pipe at each culvert end or at all manhole and insertion pit entries and exits, as required. If the entire annular space between bulkheads is to be filled with grout or blown sand, then bulkheads should be constructed to provide adequate resistance to grouting pressures and to provide appropriate vent and drainage tubes. When service and lateral connections are to be connected, it may be desirable to complete downstream bulkheads for the line segment after connections have been reinstated to provide an outlet for sewage/drainage between the pipes.

SEGMEntaL PUSHInG MEtHoD

1. The segmental pushing method involves pushing single sections of pipe or pipe “trains” into final position one at a time. A pipe “train” is constructed from several sections of pipe that have been joined together and then handled as a single unit. This method works well for existing culvert or manhole runs where the length of the existing pipeline is longer than the published allowable jacking distances shown in figure 3.

2. Each liner pipe section is aligned at or inside the insertion location and then carefully pushed into its final location.

3. After properly positioned in the existing pipe, the liner pipe sections are typically braced or blocked into place (unless the new pipe line will be floated to the crown of the host pipe).

4. When blocking the back end of a section, use blocking that extends out far enough to provide blocking for the next section to be placed.

5. Secure the blocking using wedges or fasteners. Tie them together across the crown as pipe movement can dislodge them.

6. If bell and spigot joints are not used, place internal joining system in accordance with the approved drawings.

7. Cement or concrete bulkheads are normally used on both ends of the existing pipe run, however, if the grouting plan includes intermediate bulkheads then install them at the locations needed.

PULLInG MEtHoD

The pulling method is similar to the pushing method. A steel cable is threaded through the existing pipe and attached to a pulling ring (plate or frame) positioned inside the liner pipe bell or against the trailing liner pipe end.

The cable is attached to a winch assembly to facilitate pulling the liner through the existing pipe section. After each pull, the steel cable is disconnected from the pulling ring and threaded through the next liner pipe section to be joined. After the pulling ring is reconnected to the cable, the process is repeated.

When using gasketed joints, do not attempt to pull the leading spigot end. Doing so will disjoin gasketed liner sections. Optional fusion-welded joints may allow for pulling from the leading spigot end.

The pipe pushing/pulling loads should be monitored. Excessive force can “telescope” pipe joints and/or buckle the liner pipe. On some installations, it may be feasible to swab the exterior surface of the liner pipe skids with lubricant to reduce friction.

aSSEMBLInG GaSKEtED JoIntS

DuroMaxx liner pipe gaskets are fitted on the spigot end of the pipe at the factory. Follow these steps:

1. Remove the protective film from the gasket prior to applying the lubricant or joining the pipe.

2. If the gasket is removed, make sure the gasket seat is clean and then reinstall properly.

3. Make sure the bell and spigot are thoroughly clean and free of soil of any type.

4. Use a johnny mop or brush to apply a liberal amount of gasket lube to the gasket and to swab the inside of the bell.

JacKInG LoaD anD DIStancEDiameter (in) Safe Jacking

Load (lbs)Allowable

Jacking Distance (ft)1

Allowable Jacking Distance

(ft)2

30 2,000 426 1,06436 2,400 407 1,01742 2,800 415 1,03748 3,750 487 1,21854 4,240 470 1,17560 4,710 439 1,09866 5,260 370 92472 5,810 354 88684 6,910 362 90696 8,010 368 921

108 9,110 365 914120 10,220 375 938

1 Based on Slide coefficient of 0.25 2 Based on Sliding coefficient of 0.10

Figure 3

Page 16: APPENDIX 1 - Nanaimo

7

5. Align the spigot end of the pipe into the bell’s leading edge during joining process - being careful not to allow soil or debris into the connection. User of a mat or plastic liner below the bell will eliminate debris when joining the pipe,

6. Do not push directly on the bell of the pipe! Use either a pushing ring, pulling ring, or other appropriate device to distribute the load in the bell to prevent damage. Do not use a cable or chain wrapped around the pipe to join the pipe. Use of a nylon strap or a come-a-long to pull the liner pipe sections together is also a commonly used method to join pipe sections (see figure 2).

7. Push or pull the pipe from the trailing end until the edge of the bell aligns with the home mark on the spigot end. Maintain joining pressure on the joint momentarily to ensure that the joint does not separate. When pushing the joint home, make sure that debris or dirt is not pulled into the bell by the spigot. Material such as small stones or sand pulled into the bell as the pipe is stabbed can impair gasket sealing and cause leaks.

8. Cold Weather Note: Rubber gaskets become harder as the ambient temperature decreases. Gaskets tend to compress less and jointing becomes less forgiving. Proper bell-spigot alignment, adequate bell and spigot lubrication and recommended joining procedures all become more essential as temperatures decreases.

fIELD cUttInG PIPE

Once DuroMaxx liner pipe is field cut, the cut end is no longer compatible with the factory bell. Field cutting should only be done at the end of pipe runs.

1. The recommended cutting tool for DuroMaxx liner pipe is a chop saw and abrasive saw blade (see figure 5). Refer to the Operating Instructions from the saw manufacturer for additional information.

2. Blade thickness should be no less than 1/8” thick and is recommended to be made of 2 ply material that is used to cut ductile iron pipe (see figure 4).

3. Use the leading edge of the blade to cut into the steel ribs of the pipe.

4. Bury the blade as much as possible into the pipe as you proceed to aid in keeping field cuts as square and true as possible.

5. The alternative cutting tool for DuroMaxx is a handheld reciprocating saw.

Always use safety glasses when cutting DuroMaxx liner pipe and use protective gloves in case sharp edges are exposed.

Figure 5

Figure 4

Page 17: APPENDIX 1 - Nanaimo

8

On larger diameters, multiple lift(s) will be needed to control uplift, flotation and deformation. The unit weight of the fluid grout directly impacts the upward buoyant forces and the lateral side pressures. Buoyant force is defined as the weight of displaced fluid and acts upwards (see figure 7). Unrestrained buoyant forces can cause major problems and must be evaluated and considered by the installing contractor and any grouting subcontractor if used.

annULaR SPacE GRoUtInG

Most sliplining installations require the annular space between the existing (host) pipe and the liner pipe to be grouted. Grouting of the annular space fixes the position of the new liner pipe, provides uniform support, increases allowable external hydrostatic pressure on the liner pipe and inhibits further failure of the host pipe. Introducing the grout into the annulus is accomplished by gravity flow or by low pressure pumping. Properly controlled grouting is essential to prevent liner pipe flotation, deformation or liner pipe buckling/collapse.

If the annular space will not be grouted, full length skids or pipe supports should be utilized to provide long-term uniform liner pipe support.

Placement

There are many acceptable grouting methods, and they usually fall under two general categories: monolithic grouting and staged grouting.

1. Monolithic grouting involves filling the entire annular space with one grout lift or one step. Grout is injected under low pressure from the upstream end of the pipe run from manhole to manhole, from an insertion pit to manhole or from an upstream bulkhead toward a downstream bulkhead.

2. Staged grouting involves placement of the grout in multiple lifts and when done properly can eliminate liner flotation. The liner pipe is grouted into a cradle in the first stage. After the first lift of grout has achieved initial set and is no longer fluid, the next lift of grout is placed and allowed to set. This process is repeated for remaining grout lifts until the annular space is completely filled. Factory installed grout ports (see figure 6) are optional and can simplify the grouting process. Locations of grout ports must be included with material orders.

Optional 2” grout ports shown installed in DuroMaxx® Liner pipe

TRIMMED BACK DUROMAXX RIBS

2ӯ GROUT PORT

2ӯ GROUT PORT

THREADED GROUT PLUG

THREADED GROUT PLUG

INSIDE OF DUROMAXX PIPE

RETAINING NUT

2ӯ GROUT PORT

TRIMMED BACK DUROMAXX RIBS

TRIMMED BACK DUROMAXX RIBS

2ӯ GROUT PORT

2ӯ GROUT PORT

THREADED GROUT PLUG

THREADED GROUT PLUG

INSIDE OF DUROMAXX PIPE

RETAINING NUT

2ӯ GROUT PORT

TRIMMED BACK DUROMAXX RIBS

Figure 6

Figure 7

Other grout placement methods include grouting from the surface through drilled holes and slick-line grouting from a tube within the annulus.

For all placement methods, the annular space should be uniformly and completely filled on both sides of the liner simultaneously or in a balanced manner with no more than one foot differential from one side to the other. Unbalanced or uneven grouting can affect the liner pipe’s shape, line and grade.

Page 18: APPENDIX 1 - Nanaimo

9

Flotation Control

When project plans and specifications require the liner pipe to be positioned on the invert of the existing pipe, flotation of the liner pipe resulting from grouting operations should be addressed. Depending on the type of grout and the grouting method being used, it may be necessary to perform one or more of the following to offset buoyant forces on the pipe:

a. Fill the liner pipe with water, partially or fully, depending on the grout density and grout lift thickness. For monolithic grouting, the liner pipe should be full of water, and the grout density must be lower than that of the pipe when full of water.

b. Stage grout with a suitable lift thickness, depending on grout density.

c. Attach continuous blocking and spacers to the pipe exterior with strapping or other means.

d. Attach continuous blocking and spacers to the interior of the existing pipe’s crown.

e. Use internal screw jacks (sometimes referred to as “basement” or “floor” jacks) and spreader beams on the liner pipe invert that pass through liner grout ports (12 o’clock position) to offset buoyant forces (see figure 8).

1. If buoyant forces are expected to exceed the weight of the new liner pipe (plus any counter weighting such as sand bags or contained water) then blocking and bracing techniques are required. This involves placement of blocking that will act both as a spacer between the host and new liner pipes and as a means to transfer the buoyant forces up to the host pipe’s crown. Blocking can be attached to the exterior of the new liner pipe at two locations (for example 11:00 and 1:00 locations). If blocking alone with no screw jacks is used, the blocking must be nearly continuous (no more than a 1 foot gap longitudinally).

2. Another common technique employed with staged grouting uses blocking at the joint locations and screw jacks at specific locations along the centerline of the new pipe and in between the joint areas (see figure 8). The screw jacks extend freely through the 12:00 grout ports at the top of the liner pipe, and extend down to a longitudinal spreader beam on the liner pipe invert. The spreader beam is nearly continuous (no more than a 1’ gap between segments of the beam). The beam is normally a 4”x4” or 4”x6” timber depending on the anticipated loads. The buoyant forces are transferred from the new liner pipe upward to the spreader beams and then transferred through the screw jacks and into the crown of the existing (host) pipe. If the existing (host) pipe is corrugated, the bearing surface of the top section of the jack needs to be a 6”x 6” plate so that the top end of the jack can bear across two corrugations and not slide when loaded.

3. After all necessary bracing and blocking are in place, the grout placement begins.

Figure 8

Figure 9

Floating the Liner pipe

When permitted in project specifications, allowing the liner pipe to float to the crown of the existing (host) pipe during the grouting operation can be an acceptable procedure (see fig. 9). The grouting procedure and liner pipe flotation should be controlled such that liner pipe deflection is minimal (less than 2%) and that final liner pipe position provides a relatively uniform line and grade for efficient water flow after rehabilitation.

Contact your local Contech representative for more information on recommended grout lift thicknesses to control liner flotation, grout pressure and liner deflection.

Page 19: APPENDIX 1 - Nanaimo

10

Grout Placement

For monolithic techniques, the grout hose can be advanced with the liner pipe on long runs versus attempting to pump or gravity flow grout a long distance from a single upstream location. Guides or the blocking (placed at about 11:00 and 1:00 positions) keep the grout hose at the top of the pipe as it is extracted. Careful monitoring of pumping rates, grout delivery volumes and the anticipated grout quantity on a per foot basis help determine the hose extraction rate.

For stage grouting, the grout hose is attached to the lowest and most downstream grout port (as provided). If a high slump mix is used then connection to some ports along the same elevation (or gradient line if sloped) can be skipped and instead used as viewing ports to observe the elevation of the grout until such time that they need to be plugged.

After the elevation of the grout reaches the lowest grout port the hose is moved to the opposite side in order to balance out the lift from side to side. If this level is the height limit per the grouting plan then the grouting operation ceases until the first lift achieves initial set.

This process continues upstream and upwards as dictated by the grouting plan. Side to side hose movement is necessary to prevent an imbalance of grout on one side of the pipe compared to the other.

After grout achieves initial set at and below the springline, the screw jacks and spreader beams on the invert can be removed.

The final grout lift is normally placed through the 12:00 grout ports and therefore, shut off valves will be needed for these locations. The quantity of shut off valves depends on the slope of the new pipe, the volume of grout to be placed, the length of the void space and the slump of the grout

Important Grouting Tip

Use a ½” x ½” or ¾”x ¾” screen over the grout hopper when accepting delivery from a truck. The likelihood of the delivery truck containing large aggregate from a prior delivery is high. Large aggregate can bind up in the grouting equipment and create high back pressure and then a liner pipe blowout.

Maximum Pressure

The recommended maximum grouting pressure for DuroMaxx liner pipe will vary depending on specific site conditions and pipe stiffness. Appropriate gages or other methods should be used to monitor external pressures on the liner pipe. Generally recommended pressures are shown in figure 10.

Bulkhead designs should provide adequate venting and draining tubes. Hydrostatic head pressure (grout) resulting from the grout lift thickness, the slope of the pipe, elevation change between the gage and the pipe, elevation difference between grout pump and the nozzle, etc. should be considered in addition to the grouting pressure on the gage. The hydrostatic head pressure combined with the pressure on the gage should not exceed the recommended maximum pressure. Contact your local Contech representative for more information.

Heat of Hydration

During the grout curing process, heat is generated which can affect a thermoplastic liner pipe. A safe operating temperature for most thermoplastic pipe is approximately 140°F (60°C). There are many grout mixes available that cure below 120°F (49° C). Several factors can determine the amount of heat generated: the cement content, the cement type, and the volume of grout in the annular space. Heat buildup can be controlled by staged grouting, by filling the liner pipe with water, and by selecting suitable grout mixtures. American Concrete Institute practice 305R is a good source for additional information on controlling heat in concrete or grout mixes.

REcoMMEnDED MaxIMUM PRESSUREDiameter

(in)Recommended Maximum

Grout Pressure1* (psi)

30 10.3

36 8.5

42 6.7

48 6.4

54 5.6

60 4.9

66 5.0

72 3.9

84 4.6

96 3.1

108 2.2

120 1.61 Contact your local Contech representative for more information about

recommended grout pressure and grout procedures* Includes a Factor of Safety (FS) = 2.0 for liner pipe with 2% deflection.

Figure 10

Page 20: APPENDIX 1 - Nanaimo

11

InStaLLatIon tIPS

1. For curved sewers or severely misaligned sewers, using shorter DuroMaxx liner pipe sections may reduce pushing or pulling forces and prevent hang ups. Curved sewers may be built by cocking the pipe joint to a maximum of 1 degree . Safe jacking loads will be reduced as a result of uneven loading across a cocked joint. For large diameter sewers or tunnels, individual pipe lengths or pipe “trains” can be pulled through the line and joined within the line when necessary. When pulling individual pipe lengths, care should be taken to prevent damage to the spigot ends and gaskets.

2. When the annular space between the liner pipe and the existing pipe is to be filled with grout, estimating the required grout volume before grout placement begins is important. The estimate may include grout volume requirements for filling voids or sink holes outside the existing (host) pipe.

REPaIRS

1. Should damage to the pipe occur at any point during installation, the Engineer and your local Contech representative should be contacted immediately.

2. For smaller abrasions or exposed steel, an approved rubberized undercoating spray can be used to cover the steel.

3. Contact your local Contech representative if you have any questions or concerns or need recommendations.

taPS

1. DuroMaxx liner pipe can be supplied with standard prefabricated taps, fittings or components per job plans after pre-fabrication drawings are reviewed by Contech Engineering and approved by the Engineer.

2. DuroMaxx can be field tapped using Inserta-Tees®.

3. Reconnect required service laterals before grouting the annular space.

4. Consult the Engineer and your local Contech representative for further assistance.

DIMEnSIonS & HanDLInG WEIGHtSPipe Dia.

(in)Min. Outside

Dia. (in)Max. Inside

Dia. (in)Bell Outside

Dia. (in)Approx. Weight

(lbs/ft)

30 30.9 29.6 34.0 18.8

36 37.0 35.5 39.9 23.6

42 42.9 41.4 45.8 27.0

48 49.4 47.3 52.3 30.8

54 55.4 53.2 58.2 36.1

60 61.4 59.1 64.1 42.9

66 67.8 65.1 NA 56.9

72 73.7 71.0 77.6 65.6

84 85.8 82.9 NA 76.3

96 97.7 94.7 NA 87.0

108 111.3 108 NA 99.7

120 121.3 118.3 NA 109.0

Figure 11

Page 21: APPENDIX 1 - Nanaimo

© 2015 Contech Engineered Solutions LLC800-338-1122 | www.ContechES.com

ENGINEERED SOLUTIONS

DMX Liner Pipe Installation Guide 1/15 PDF

Support My Primary Contech Contact: ______________________________________________________________________________Phone: —————————————————————————————————————————————————My Customer Solutions Coordinator (CSC) is: —————————————————————————————————Phone: —————————————————————————————————————————————————Project Site Address: ———————————————————————————————————————————

————————————————————————————————————————————————————

————————————————————————————————————————————————————NOTES: ————————————————————————————————————————————————

————————————————————————————————————————————————————

————————————————————————————————————————————————————

————————————————————————————————————————————————————

————————————————————————————————————————————————————

————————————————————————————————————————————————————

• Drawings and specifications are available at www.ContechES.com.

• Site-specific design support is available from our engineers.

• Additional safety information can be found at www.ContechES.com/safety.

Contech Engineered Solutions provides site solutions for the civil engineering industry. Contech’s portfolio includes bridges, drainage, sanitary sewer, stormwater, earth stabilization and wastewater treatment products. For information on other Contech division offerings, visit www.ContechES.com or call 800-338-1122.

NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS AN EXPRESSED WARRANTY OR AN IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE. SEE THE CONTECH STANDARD CONDITIONS OF SALE (VIEWABLE AT WWW.CONTECHES.COM/COS) FOR MORE INFORMATION.

for more information on installing DuroMaxx, refer to aStM D2321.

Arizona DOT Reline Project

Page 22: APPENDIX 1 - Nanaimo

APPENDIX 4

Section 11 Water Sustainability Act

Correspondence

Page 23: APPENDIX 1 - Nanaimo

1

Jamie Rose

From: Kevin BrydgesSent: Friday, June 10, 2016 3:10 PMTo: Jamie RoseSubject: FW: City of Nanaimo Application for Change Approval and Notification (Changes In and About

a Stream) - 100172006 ConfirmationAttachments: Notification Terms and Conditions Letter.pdf; Change Approval and Notification (Changes In

and About a Stream) 100172006.pdf

FYI

From: [email protected] [mailto:[email protected]]

Sent: Friday, June 10, 2016 3:09 PM To: Kevin Brydges

Subject: City of Nanaimo Application for Change Approval and Notification (Changes In and About a Stream) - 100172006 Confirmation

City of Nanaimo, We have received your application for Change Approval and Notification (Changes In and About a Stream). Please find attached a copy of your application in PDF format. Your application was assigned the following tracking number: 100172006 Please quote this number in all your inquiries.

Important Notice: The Habitat Officer may contact you within 45 days of the time of your submi! ssion to specify

additional terms and conditions specific to your project if warranted. If you do not hear back from a Habitat Officer

in that time period you may proceed with the works subject to the terms and conditions described above.

Did you select to mail in outstanding consent forms? Please note that your application will not be processed until we received and processed all of your outstanding consent forms. Please mail the filled out and signed forms to one of the FrontCounter BC offices. You can find the addresses at http://www.frontcounterbc.ca/locations/.

If you do have any questions or concerns please contact us by email

at [email protected] or by phone at 1-877-855-3222 or check our website at www.frontcounterbc.ca.

Page 24: APPENDIX 1 - Nanaimo

2

Thank you, FrontCounter BC

Page 25: APPENDIX 1 - Nanaimo
Page 26: APPENDIX 1 - Nanaimo
Page 27: APPENDIX 1 - Nanaimo
Page 28: APPENDIX 1 - Nanaimo
Page 29: APPENDIX 1 - Nanaimo
Page 30: APPENDIX 1 - Nanaimo
Page 31: APPENDIX 1 - Nanaimo
Page 32: APPENDIX 1 - Nanaimo
Page 33: APPENDIX 1 - Nanaimo

1

Jamie Rose

From: Kevin BrydgesSent: Wednesday, June 22, 2016 4:08 PMTo: Jamie RoseSubject: FW: Response to Section 11 Notification ~ 1003455 - Unnamed Str into Chase Rv

FYI Section 11 for Nanaimo Lakes Rd culvert

From: Roden, Jacqueline FLNR:EX [mailto:[email protected]]

Sent: Tuesday, June 21, 2016 2:42 PM To: Kevin Brydges

Subject: Response to Section 11 Notification ~ 1003455 - Unnamed Str into Chase Rv

Habitat Officer Grant Bracher has reviewed your application and you may proceed with your proposed

changes with the following conditions:

• Take appropriate erosion and sediment control measures;

• The relined culvert must be at least 600 mm in diameter;

• Do work in dry or isolate the site and do pump around;

• Use clean rip rap; and

• Complete work on or before September 15, 2016.

Notifications received by this office will be used to plan and carry out on-site inspections and monitoring

during and after the works are completed.

This email provides direction under Section 11 of the Water Sustainability Act only, and does not constitute

permission or consent under any other Act or Authority. It is your responsibility to consult with Fisheries and

Oceans Canada (DFO) and the local government (municipality or regional district) to determine if there are any

additional requirements for your proposed works.

Thank you,

Jacqueline Roden

Page 34: APPENDIX 1 - Nanaimo

2

Administrative Assistant

Phone (250) 751-7352

Forest Lands and Natural Resource Operations

_____________________________________________

From: Roden, Jacqueline FLNR:EX

Sent: Friday, June 17, 2016 2:19 PM To: '[email protected]'

Subject: Section 11 Notification ~ 1003455 - Unnamed Str into Chase Rv

File: 1003455

Tracking Number: 100172006

Ministry of Forests, Lands and Natural Resource Operations has received your Water Sustainability Act Section

11 Notification. Please quote the above file number, if you have any questions.

It is the applicant's responsibility to ensure that all sections of the notification form are complete, as processing

of this notification will not commence until we have a complete application. We remind you that by signing the

notification, you are accepting the legal responsibility for this work.

The Habitat Officer will usually confirm acceptance of the application or ask for clarification of details of the

project within 10 working days. Once the Habitat Officer has completed the review, you will receive a response

that may include further conditions or information. If after 45 days you have not received a response from the

Habitat Officer, you may proceed with the work, subject to the following:

• West Coast Region Terms and Conditions of the Habitat Officer (please see the attached pdf)

<< File: VI-HabitatOfficer_TermsandConditions_Feb11.pdf >>

• User’s Guide to Working In and Around Water

http://www.env.gov.bc.ca/wsd/water_rights/licence_application/section9/index.html

We recommend that you also review the following information.

• Best Management Practices (BMP’s) Instream Works

http://www.env.gov.bc.ca/wld/instreamworks/index.htm#

If you plan to remove/salvage fish, you will require a Fish Salvage Permit before work can proceed. Please

contact FrontCounter BC at 1 877-855-3222 or go to

http://www.env.gov.bc.ca/pasb/applications/process/scientific_fish_collect.html#new for application forms and

information. Please provide our office with a copy of your approved permit.

Thank you,

Jacqueline Roden

Page 35: APPENDIX 1 - Nanaimo

3

Forests, Lands and Natural Resource Operations

103 - 2100 Labieux Rd.

Nanaimo, BC V9T 6E9

[email protected]

Page 36: APPENDIX 1 - Nanaimo
Page 37: APPENDIX 1 - Nanaimo
Page 38: APPENDIX 1 - Nanaimo
Page 39: APPENDIX 1 - Nanaimo
Page 40: APPENDIX 1 - Nanaimo
Page 41: APPENDIX 1 - Nanaimo
Page 42: APPENDIX 1 - Nanaimo
Page 43: APPENDIX 1 - Nanaimo