Appendix 1 - ANNEX D – Technical Specification - unido.org

43
Project: “Mainstreaming Climate Change Adaptation through Water Resource Management in Leather Industrial Zone Development” (GEF ID 5666; SAP ID 150052) “Common Effluent Treatment Plant for Sialkot Tannery Zone” 22 FEBRUARY, 2019 Appendix 1 - ANNEX D – Technical Specification – Mechanical

Transcript of Appendix 1 - ANNEX D – Technical Specification - unido.org

Page 1: Appendix 1 - ANNEX D – Technical Specification - unido.org

Project: “Mainstreaming Climate Change Adaptation through Water Resource Management in Leather Industrial Zone Development” (GEF ID 5666; SAP ID 150052)

“Common Effluent Treatment Plant for Sialkot Tannery Zone”

22 FEBRUARY, 2019

Appendix 1 - ANNEX D – Technical Specification – Mechanical

Page 2: Appendix 1 - ANNEX D – Technical Specification - unido.org
Page 3: Appendix 1 - ANNEX D – Technical Specification - unido.org

Project:

“Mainstreaming Climate Change Adaptation through Water Resource

Management in Leather Industrial Zone Development” (GEF ID 5666; SAP ID 150052)

Common Effluent Treatment Plant

For Sialkot Tannery Zone

Technical Specification (Mechanical)

October 01, 2018

A project of:

United Nations Industrial Development Organization (UNIDO)

Page 4: Appendix 1 - ANNEX D – Technical Specification - unido.org

1

TECHNICAL SPECIFICATIONS

SUPPLY AND INSTALLATION OF EQUIPMENT AND MACHINES FOR COMBINED EFFLUENT TREATMENT PLANT INCLUDING TRAINING<COMMISSIONING AND TRIAL

OPERATION

UNIDO Project “Common Effluent Treatment Plant (CETP) for Sialkot Tanner Zone” 1. The Scope of Supply/Technical Specifications The process flow diagram of CETP is par of this Technical specification. Following is the functional description of CETP: Description of each component with its design and basis of design is presented in the following sections: FUNCTIONAL DESCRIPTION OF MECHANICAL The preliminary treatment units from pre-screen chamber to oil and grease separators are designed for ultimate flow of 16,000 m3/day. However, from equalization tanks onwards the treatment scheme is designed for the current predicted flow of 4,000 m3/day. A. PRE-SCREEN CHAMBER

The chambers are provided to act as a receiving structure for the wastewater from the industrial estate. It will receive wastewater for screening through RCC sewers through gravity. It is recommended that the Pre-Screen Chamber shall be provided for the ultimate flow of 4,500 - 6,000 m3/day for beam house and 7,500 - 10,000 m3/day for tanning and post tanning effluents, so that future Phases could start directly from here. In case of complete accidental shutdown of CETP, the chamber will also act as the bypass structure so that all the effluent can be bypassed directly to the ultimate disposal point. For this purpose, the chambers will be equipped with a penstock, each, at the inlet point. B. COARSE SCREENS

From the pre-screen chamber, the wastewater will flow into the coarse screen channel through gravity which will be provided with mechanically cleaned screens. At the top of the screening channels, RCC platforms, of adequate space, shall be provided for O&M, operation of the sluice gates and other purposes. The screenings shall be disposed to the landfill site along with dewatered sludge. For safe operation, 1 + 1 screens having a bar spacing of 15 mm with 60-degree angle for each wastewater stream shall be provided, each capable of handling the full flow.

Two numbers of screening channels for each stream (beam house and tan house) of wastewater in parallel will be constructed. The channels shall be of rectangular geometry in plan. Both of the channels will be equipped with mechanically operated coarse screens. Two (2) sluice gates at inlet and outlet of each screen channel are also provided to take any channel out of operation for maintenance purpose. Under normal operating conditions, the wastewater will flow through all channels.

Page 5: Appendix 1 - ANNEX D – Technical Specification - unido.org

2

Following are the key components of the Coarse Screens:

− Two Screening Compartments (RCC), in parallel, with 1 Penstock (CI) each, at its inlet

and outlet to the common Influent & Effluent Chamber, in order to bring any of the compartments out of operation

− Two mechanically cleaned Screens in both channels. − Two Operating Platforms constructed 1 each in the 2 Screening Compartments, at level

of top of screens, in order to receive screenings, for their subsequent transfer to the ground level

− Common Effluent Chamber (RCC) − One effluent channel (RCC), to the Grit Chamber. − Access Walkways − Screen Washers, where screens after screening process is collected in FRP bin of 1.1

m3 volume. The screens in the bin is processed through screen washers to remove Liquefied organics and return it to plant flow. The other purpose is to achieve the compaction of screens thus reducing the volume of screenings that must be hauled away easily.

C. VORTEX GRIT CHAMBER

The screened wastewater through gravity will pass through grit chamber prior to entering the respective equalization tanks. Grit removal is essential for safe operations of pumps and to avoid overloading of the aeration tanks with inert inorganic material. The grit chamber is designed on a loading rate of 0.03 – 0.04 m3/m2/sec for effective grit removal. It should be noted that for each module one number vortex grit chamber is proposed as duty. For ultimate capacity two numbers are proposed as standby. One of the standby, will be constructed during Phase I and other will be constructed in other Phases of the CETP. Each vortex grit chamber is equipped with: − Motion unit − Central shaft with paddles − Air lift for extraction of grit − Coaxial gearmotor − Grit classifier D. OIL & GREASE SEPARATOR

After de-gritting, the effluent shall pass through gravity from the oil separator. It is a packaged device to remove oil from water. The separated oil is collected inside the separator unit while the wastewater is directed to the effluent line. The flow capacity of oil separator for beam-house effluent is 95 Lt/sec, and for tanning & post tanning effluents is 160 Lt/sec. E. EQUALIZATION TANK # 1 WITH SULPHIDE CATALYTIC OXIDATION – BEAM

HOUSE EFFLUENT

Beam house wastewater, after passing through respective oil & grease separator through gravity will enter into the designated Equalization Tank. This tank will equalize the

Page 6: Appendix 1 - ANNEX D – Technical Specification - unido.org

3

characteristics and flow for onward treatment processes. The equalization tank will also act as a reserve buffer for storage and onward unhindered supply of wastewater to the biological reactors. Other main function of this equalization tank is to provide sulphide elimination by catalytic oxidation through MnSO4. MnSO4 and HCl will be pumped thorugh a chemical dosing pumps (1 duty + 1standby) for each chemical dosing system. Continuous agitation in equalization tank will be done by two Jet Aerators type Submersible Ejector Shaft having air discharge of 18 Nm3/min and head of 4.0 meters. F. EQUALIZATION TANK # 2 – TANNING AND POST TANNING EFFLUENT

Tanning & post tanning wastewater, after passing through respective oil & grease separator through gravity will enter into the designated Equalization Tank. This tank will equalize the characteristics and flow for onward treatment processes. The equalization tank will also act as a reserve buffer for storage and onward unhindered supply of wastewater to the biological reactors. Continuous agitation in equalization tank will be done by Jet Aerator type Submersible Ejector Shaft having air discharge of 30 Nm3/min and head of 4.0 meters. G. WASTEWATER PUMPING STATION

From both Equalization tanks, wastewater shall be pumped to coagulation and flocculation tank. In wastewater pumping station 4 (2 duty + 2 standby) wastewater pumps having capacity 70 m3/h and head of 9.0 m and capacity 70 m3/h and head of 9.0 m, for beam house and tan house equalization tanks respectively, will be installed. Total of eight level switches are provided on both equalization tanks to control the pumps, two for each pump with LL and HH. Dry well of wastewater pumping station is equipped with two submersible bilge pumps having IP-68, insulation class F motors; to discharge the raw wastewater coming in dry well due to any reason (leakages, rain etc) and to keep the dry well dry and clean. H. COAGULATION AND FLOCCULATION

The pumped wastewater shall be transported to common coagulation and flocculation units. Alum will be used as Coagulant and A-polymer Flocculants will be used for proper flocs formation. Dosing of Alum and A-polyner will be done by chemical dosing pumps 01 + 01 standby each for Alum and A-polymer. In coagulation tank rapid mixing will be done by turbine propeller (type: Top Entry, Turbine 6 Blades with 45˚ with Agitator Shaft) with a velocity gradient of 1500/sec. In flocculation tank gentle mixing will be done by paddle mixers (type: Top Entry, Paddle Type) with output speed of rotation of 10-15 rpm. I. PRIMARY SETTLING TANKS

Wastewater from flocculation unit shall gravitate to the primary settling tanks (PSTs). There is one (01) primary sedimentation tank. The PST involves physical separation of suspended solids, where suspended solids are allowed to settle via gravity under quiescent condition. Settled sludge is collected and removed through an opening provided in the sludge hopper at bottom, whereas clarified wastewater is collected through overflow weirs. The sludge settled at the bottom (having a slope of 1:12) of clarifier is collected with the help of a mechanical scraper to a sludge hopper provided at center of PST. Fixed full bridge mechanical sludge scraper is selected for the purpose. Scraper is driven by two carriage travelling around the tank’s periphery. The unit incorporates a small electric motor and gearbox which drive the unit to give a speed of between 1 and 2 meters a minute. Scraper

Page 7: Appendix 1 - ANNEX D – Technical Specification - unido.org

4

blades are designed in a helical curve formation which maximizes scraping efficiency and thus sludge removal. The settled sludge is pumped to the sludge thickeners with the help of screw impeller type centrifugal installed in the primary sludge pumping room. After the settling of solids, the clarified effluent from will be collected into distribution box 01 for distribution to the aeration tank pre-selectors. J. PRE-SELECTOR AND AERATION TANK

The wastewater from distribution box 01 shall enter in to two pre-selectors. In pre-selectors agitation of wastewater will be done with the help of Mechanical Turbine Propeller Mixers (type: Top Entry, Turbine 6 Blades with 45˚ with Agitator Shaft). The operation of these agitators will be continuous with output speed of rotation of 50 rpm. Aeration will be provided in two aeration tanks with the help of jet aerator. Two double sided multiple FRP nozzles jet aerators, two recirculation pumps of 870 m3/hr having head of 06 meters and (2 duty + 1 standby) blowers having aeration capacity of 170 Nm3/min and differential pressure of 0.7 bar (type: positive displacement) will be dedicated for two aeration tanks. One DO (dissolved oxygen) meter in each aeration tank will be installed. The DO meter will help in automatic switching of the blower according to oxygen demand. K. SECONDARY SEDIMENTATION TANKS

The effluent containing biosolids from two aeration tank shall flow into two secondary sedimentation tanks, where it is allowed to settle under dormant conditions. Settled sludge shall be removed from bottom of SSTs with the help of sludge scraper. Operations and mechanism of the sludge scraper bridge is same as discussed above for primary settling tanks. Settled sludge is pumped to sludge thickeners with the help of screw impeller type centrifugal pumpsinstalled in secondary sludge pumping rooms. The clarified effluent is discharged to chemical oxidation tank for further treatment. L. CHEMICAL OXIDATION TANK

The wastewater discharged from SST will still have COD greater than the PEQS values. Therefore, a chemical Oxidation unit will be required to bring the COD to the required limits. In chemical oxidation tank Fenton reagent is dosed through chemical dosing pump 01+ 01 standby. For proper mixing of the chemical, an agitator Turbine 6 Flat Blades, Vain Disk type operating continuously is installed in the tank. The treated effluent is discharged into collection pit from where it will be discharged to existing nallah. M. PRIMARY SLUDGE PUMPING STATION

Primary sludge from primary settling tanks will be directly pumped to sludge thickeners by means of primary sludge pumps installed in Primary Sludge Pumping Rooms (PSPS). Total 02 (01 + 01 standby) screw centrifugal sludge pumps of 35 m3/hr capacity, each, to transport the sludge to the thickeners. Pumping station roomis equipped with two submersible bilge pumps having IP-68, insulation class F motors; to discharge the raw wastewater coming in dry well due to any reason (leakages, rain etc) and to keep the dry well dry and clean. N. SECONDARY SLUDGE PUMPING STATION

Secondary sludge from secondary sedimentation tanks shall be pumped to sludge thickeners through secondary sludge pumps of 60 m3/hr capacity installed in the Secondary Sludge Pumping Room (SSPS). Total 04 (02 + 02 standby) screw centrifugal sludge pumps will be installed to transport the sludge to the thickeners. Pumping station roomis equipped

Page 8: Appendix 1 - ANNEX D – Technical Specification - unido.org

5

with two submersible bilge pumps having IP-68, insulation class F motors; to discharge the raw wastewater coming in dry well due to any reason (leakages, rain etc) and to keep the dry well dry and clean. O. PICKET FENCE SLUDGE THICKENERS

Sludge from primary settling tanks and secondary sedimentation tanks shall be pumped to sludge thickener by means of sludge pumps. In sludge thickener, the volume of sludge shall be reduced by the process of compression settling. The sludge, settled to the bottom, will be collected mechanically through a Centre-Driven Bottom Truss with Picket Fences, Fixed Bridge type Sludge Scraper. Superstructure comprises of steel structural bridge, spanning full diameter of the tank and is fixed. The bridge is designed to take static and dynamic load of the drive unit which is fixed at the center of the bridge. Chequered plates and hand rails are provided on the bridge to be used as walkway. Two structural steel rake arms are connected to the center shaft. The rake arms are provided with vertical pickets which stir the sludge gently, thereby opening up channels for water to escape and promoting densification, and blades which continuously scrap the sludge from bottom and draw it to the central sludge pit for withdrawal. P. THICKENED SLUDGE PUMPING STATION The thickened sludge is pumped to the belt filter press. Total 02 (01 + 01 standby) screw centrifugal sludge pumps of 20 m3/hr capacity will be installed in the Thickened Sludge Pumping Room (TSPS) to transport the sludge to the Belt Filter Press. Pumping station room is equipped with two submersible bilge pumps having IP-68, insulation class F motors; to discharge the raw wastewater coming in dry well due to any reason (leakages, rain etc) and to keep the dry well dry and clean. Q. SLUDGE BELT FILTER PRESS

Sludge from sludge thickener will be pumped by sludge pump into the belt filter press. Inline K-Polymer dosing will be done to dehydrate the sludge through chemical dosing pump 01+ 01 standby. Sludge Belt Press will dewater the sludge; the filtrate will be made to flow under gravity into equalization tank in order to mix it with untreated water and the Dried Sludge from the press will be dumped at some suitable place (designated landfill site).

Page 9: Appendix 1 - ANNEX D – Technical Specification - unido.org

6

The below outlined items by Lot are required:

LOT 1 – SUPPLY OF MECHANICAL COARSE SCREENS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supplyof Mechanical Coarse Screens (MCS01/01-02)for Beam House effluent, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supplyof Mechanical Coarse Screens (MCS02/01-02) for Tan House effluent, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supplyof Screen Washer (SW01/01-04) for beam hosue and tan house screenings, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 4

4

Supply of FRP Container 1.1 m3(FC03/01-04) for Tan House and Beam House screening, two each respectively, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 4

5

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 4 equipment have been completed.

No 4

6

The supplier must carry out trainings of serial number 1 and 3 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 2

Technical Specifications (MCS01)

Clear spacing b/w bars 15 mm Screen Chamber width 600 mm

Height of Screen 1500 mm Approach velocity and Flow 0.65 m/sec and 95 liters/sec

Screen angle with horizontal 600 Water depth 300 mm

Material Stainless Steel 316 Medium Tannery Wastewater

Technical Specifications (MCS02)

Clear spacing b/w bars 15 mm Screen Chamber width 1000 mm

Height of Screen 1500 mm Approach velocity and Flow 0.65 m/sec and 160 liters/sec

Screen angle with horizontal 600 Water depth 300 mm

Material Stainless Steel 316 Medium Tannery Wastewater

Page 10: Appendix 1 - ANNEX D – Technical Specification - unido.org

7

Technical Specifications (FC03)

Container Material FRP with vinyl ester resin Exposed Metal ANSI Type 316 stainless steel

Capacity 1.1 m3 Protected Metal ASTM A36, with fiberglass reinforced plastic coating

Technical Specifications (SW01)

Max. Throughput 2.2 m3/hr Optimized Output 1.3 m3/hr

Min. Organics Output 1.1 m3/hr 6mm Screen Water Capacity

15.8 l/sec

Screen washer including: Grinder Motor, Compaction Screw Motor, Programmable Washing Cycle, Dedicated Wash Zone, Tank Flush, Compaction Elbow Flush, and Motion Compaction-Sensor Screw,

Drawing Number: M-0119 & M-0121

Page 11: Appendix 1 - ANNEX D – Technical Specification - unido.org

8

LOT 2 – SUPPLY OF VORTEX GRIT CHAMBER

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Vortex Grit Chamber with Classifier (GC01/01-02) for Beam House effluent, including all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Vortex Grit Chamber with Classifier (GC02/01-02) for Tan House effluent, including, all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supply of FRP Container 5 m3(FC01/01-05) for Tan House and Beam House wastewatergrit, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 5

4

Supply of Fork Lifter (FL01/01-02) for all type of lifting of containers either chemical or others, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

5

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 4 equipment have been completed.

No 4

6

The supplier must carry out trainings of serial number 1 and 4 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 2

Technical Specifications (GC01)

Medium Beam House Wastewater Max overflow rate and Flow 0.030 m3/m2/sec and 95 liters/sec

HRT 60 seconds Mechanism Automatic Grit Removal Mechanism Technical Specifications (GC02)

Medium Tanning and Post TannnigWastewater

Max overflow rate and Flow 0.0314 m3/m2/sec and 160 liters/sec

HRT 60 seconds Mechanism Automatic Grit Removal Mechanism Technical Specifications (FC01)

Container Material FRP with vinyl ester resin Exposed Metal ANSI Type 316 stainless steel

Capacity 5 m3 Protected Metal ASTM A36, with fiberglass reinforced plastic coating

Technical Specifications (FL01)

Load capacity 7000 kg Engine Power 75kW (102 ps) @ 2,200 rm

Lifting speed unloaded 460 / 460 / 480 mm/s Travel speed unloaded 33.9 / 33.6 / 35 km/h

Drawing Number: M-0112 & M-0113

Page 12: Appendix 1 - ANNEX D – Technical Specification - unido.org

9

LOT 3 – SUPPLY OF OIL AND GREASE SEPARATOR

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Oil & Grease Separator (OGS01/01-02) for Beam House effluent, including all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Oil & Grease Separator (OGS01/01-02) for Tan House effluent, including, all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supply of FRP Container 2 m3(FC02/01-02) for Tan House and Beam House wastewaterwaste oil, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

4

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 3 equipment have been completed.

No 3

5

The supplier must carry out trainings of serial number 1 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 1

Technical Specifications (OGS01)

Medium Tannery Wastewater Max overflow rate 95 liters/sec

Mechanism Automatic Oil & Grease Removal Mechanism with waste oil submerssible pump Technical Specifications (OGS02)

Medium Tannery Wastewater Max overflow rate 160 liters /sec

Mechanism Automatic Oil & Grease Removal Mechanism with waste oil submerssible pump Technical Specifications (FC02)

Container Material FRP with vinyl ester resin Exposed Metal ANSI Type 316 stainless steel

Capacity 2 m3 Protected Metal ASTM A36, with fiberglass reinforced plastic coating

Drawing Number: M-0110

Page 13: Appendix 1 - ANNEX D – Technical Specification - unido.org

10

LOT 4 – SUPPLY OF WASTEWATER PUMPS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Wastewater Pump (WPS) (WSP01/01-02) in Wastewater Pumping Station (WPS) for Beam House effluent, including all piping and other accessoriesrequired inside pumping stationfor installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Wastewater Pump (WSP) (WSP02/01-02) in Wastewater Pumping Station (WPS) for Tanning and Post tanning effluent, including, all piping and other accessories required inside pumping station for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supply of Submersible Sump Pumps (Bilge Pump SBP01/01-08)1+1 standby in each Wastewater Pumping Station (WPS) and 1+1 standby in each sludge pumping rooms,including pump-motor set, pump base, anchor bolts, painting/coatings and other accessories, complete in all respects, in accordance with the contract documents.

No 8

4

Supply of Gantry Crane (GC01/01) in each Wastewater Pumping Station (WPS) including all accessories, complete in all respects, in accordance with the contract documents.

No 1

5

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 4 equipment have been completed.

No 3

6

The supplier must carry out trainings of serial number 1 and 4 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 2

Technical Specifications (WSP01)

Medium Tannery Wastewater Pump Type

Heavy-duty (horizontal, direct-coupled /vertical, pedestal mounted dry- pit), single-suction, centrifugal, CW rotation, Centrifugal

Capacity 70 m3/h Head 09 m

Free Pass 80 – 100 mm Efficiency

Guaranteed Duty Point (GDP) is between 80% and 120% of the flow rate at the Best Efficiency Point (BEP).

Pump Casing Cast Iron and shall comply with BS EN 1563 / EN-GJS-700-2 Casing Wear Ring Cast S.G. Iron and shall comply

with BS EN 1563 / EN-GJS-450-10

Page 14: Appendix 1 - ANNEX D – Technical Specification - unido.org

11

Impeller Cast S.G. Iron and shall comply with BS EN 1563 / EN-GJS-700-2 Phase/Voltage 3/400 V

Frequency 50 Hz Efficiency Motor efficiency shall comply with the requirements of IEC 60034 - 30 high efficiency Class IE2.

IP 55 Insulation Class F

Technical Specifications (WSP02)

Medium Tannery Wastewater Pump Type

Heavy-duty (horizontal, direct-coupled /vertical, pedestal mounted dry- pit), single-suction, centrifugal, CW rotation, Centrifugal

Capacity 110 m3/h Head 09 m

Free Pass 80 – 100 mm Efficiency

Guaranteed Duty Point (GDP) is between 80% and 120% of the flow rate at the Best Efficiency Point (BEP).

Pump Casing Cast Iron and shall comply with BS EN 1563 / EN-GJS-700-2 Casing Wear Ring Cast S.G. Iron and shall comply

with BS EN 1563 / EN-GJS-450-10

Impeller Cast S.G. Iron and shall comply with BS EN 1563 / EN-GJS-700-2 Phase/Voltage 3/400 V

Frequency 50 Hz Efficiency Motor efficiency shall comply with the requirements of IEC 60034 - 30 high efficiency Class IE2.

IP 55 Insulation Class F

Technical Specifications (SBP01)

Medium Tannery Wastewater Pump Type

Single stage centrifugal type having radial or mixed flow impellers and shall be suitable for continuous running under complete or partially submerged conditions.

Capacity 15 m3/h Head 10 m

Efficiency Guaranteed Duty Point (GDP) is between 80% and 120% of the flow rate at the Best Efficiency Point (BEP).

Pump Casing

High cast iron (fine grained meehanite) free from blow-holes or imperfections, of ample proportions throughout, with all internal passages finished smooth.

Impeller

High-grade cast iron shall be keyed to the shaft and secured by locking screws. Single or double shrouded, statically and dynamically balanced, with interchangeable bearings and a ball clearance of at least 100 mm, non clogging type. Back vanes shall be provided on the discharge side shroud to minimize the ingress of abrasive matter to the shaft seal.

Phase/Voltage 3/400 V

Frequency 50 Hz Efficiency

Suitable for operating below water level, protection class IP 68 (IEC 34.5/144) isolation class B (IEC 85), shall be provided with windings for 3 x 400 V-50 Hz.

IPand Insulation Class 68 and F Location Wastewater pumping station and all three sludge pumping rooms.

Page 15: Appendix 1 - ANNEX D – Technical Specification - unido.org

12

Technical Specifications (GC01)

Type Double Girder Gantry (overhead) Crane

Capacity 0.5 tons Hoisting Unit

Capable of lifting 10 m free C-type hook travel with latch, hoist shall be designed and manufactured in accordance with B.S 466 (1984) and B.S 2573 (1980) for indoor duty.

Bay Length and Span 9.0 m and 6.6 m Travel Motors

Travel motors shall be rated 60% E.D with IP 55 protection, “Insulation class F” and soft starting inertia flywheels plus soft stopping adjustable torque brakes giving the operator excellent control throughout the load spectrum.

Drawing Number: M-0122

Page 16: Appendix 1 - ANNEX D – Technical Specification - unido.org

13

LOT 5 – SUPPLY OF JET AERATORS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Jet Aerators Submersible Ejector shaft type (JA01/01-02) in Equalization tank for Beam House effluent, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Aerators Submersible Ejector shaft type (JA02/01-02)in Equalization tank for Tanning & Post Tanning effluent, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 2 equipment have been completed.

No 2

4

The supplier must carry out trainings of serial number 1 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 1

Technical Specifications (JA01)

Medium Tannery Wastewater Type

Submersible Ejector Shaft with lifting arrangement

Air Discharge (each) 18 Nm3/min Pumping Head 4.0 m

Technical Specifications (JA02)

Medium Tanning and Post Tanning Effluent Type

Submersible Ejector Shaft with lifting arrangement

Air Discharge (each) 30 Nm3/min Pumping Head 4.0 m

Drawing Number: M-0111

Page 17: Appendix 1 - ANNEX D – Technical Specification - unido.org

14

LOT 6 – SUPPLY OF TURBINE AND PADDLE MIXERS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Mixer (MRMT01/01) for Rapid Mixing Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

2

Supply of Mixer (MFT01/01) for Flocculation Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

3

Supply of Mixer (MPT01/01-02) for Pre-Selector Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

4

Supply of Mixer (MCOT01/01) for Chemical Oxidation Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

5

Supply of Mixer (MCDT01/01-04) for Chemical Dosing Tanks, including all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 8

6

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 5 equipment have been completed.

No 5

7

The supplier must carry out trainings of serial number 1 to 5 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 5

Technical Specifications (MRMT01)

Medium Tannery Wastewater Type Turbine Propeller Mixers

Tank Length 1700 mm Tank Width 1700 mm

Tank Water Depth 1250 mm Agitator type Top Entry, Turbine 6 Blades with 45˚ with Agitator Shaft

Material (Shaft & Propeller) SS 316L Material (Flange, Nuts & Bolts) SS 316L

Phase/Voltage 3/400 V Frequency 50 Hz Velocity gradient 1500/sec IP 65 Insulation Class F

Page 18: Appendix 1 - ANNEX D – Technical Specification - unido.org

15

Technical Specifications (MFT01)

Medium Tannery Wastewater Type Paddle Mixers

Tank Length 5400 mm Tank Width 5400 mm

Tank Water Depth 3000 mm Agitator type Top Entry, Paddle Type

Material (Shaft & Propeller) SS 316L Material (Flange, Nuts & Bolts) SS 316L

Phase/Voltage 3/400 V Frequency 50 Hz Speed of rotation (output) 10-15 rpm IP 65 Insulation Class F

Technical Specifications (MPT01)

Medium Tannery Wastewater Type Turbine Propeller Mixers

Tank Length 4000 mm Tank Width 4000 mm

Tank Water Depth 4000 mm Agitator type Top Entry, Turbine 6 Blades with 45˚ with Agitator Shaft

Material (Shaft & Propeller) SS 316L Material (Flange, Nuts & Bolts) SS 316L

Phase/Voltage 3/400 V Frequency 50 Hz Speed of rotation (output) 50 rpm IP 65 Insulation Class F

Technical Specifications (MCOT01)

Medium Tannery Wastewater Type Turbine 6 Flat Blades, Vain Disk

Diameter 7000 mm Tank Water Depth 3000 mm

Material (Shaft & Propeller) SS 316L Agitator type Top Entry, Turbine 6 Blades with 45˚ with Agitator Shaft

Material (Flange, Nuts & Bolts) SS 316L Phase/Voltage 3/400 V

Velocity gradient 100/sec Frequency 50 Hz Insulation Class F IP 65

Technical Specifications (MCDT01)

Medium MnSO4, Alum, K-Polymer, HCl (2 mixers), NaOH, A-Polymer, H2O2 and FeCl3

Type Propeller Mixer

Diameter 1250 mm Tank Water Depth 1500 mm

Material (Shaft & Propeller) SS 316L Agitator type Top Entry, Propeller Mixer

Material (Flange, Nuts & Bolts) SS 316L Phase/Voltage 3/400 V

Speed of rotation (output) 50 rpm Frequency 50 Hz Insulation Class F IP 65

Drawing Number: M-0114, M-0115 & M-0116

Page 19: Appendix 1 - ANNEX D – Technical Specification - unido.org

16

LOT 7 – SUPPLY OF SLUDGE SCRAPERS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of primary sedimentation tank sludge Scraper (PSCR 01/01) (Centrally Driven, Diameteral Type with scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

2

Supply of secondary sedimentation tank sludge Scraper (SSCR 01/01-02) (Centrally Driven, Diameteral Type with scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supply of picket fence sludge Scraper (TSCR 01/01) (Centrally Driven Rotating Full-Bridge Type Picket Fence Sludge Scraperwith scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

4

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 3 equipment have been completed.

No 3

5

The supplier must carry out trainings of serial number 1 to 3 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 2

Technical Specifications (PSCR01)

Medium Tannery Wastewater Type Centrally Driven, Diameteral TypeScraper

Tank diameter 14100 mm Side Liquid Depth 3000 mm

Bed Slope 1:12 Free Board (Minimum) 500 mm

Central Support Unit Type Ball type turntable Material of Fabrication SS 316L

Technical Specifications (SSCR01)

Medium Tannery Wastewater Type Centrally Driven, Diameteral TypeScraper

Tank diameter 16500 mm Side Liquid Depth 3000 mm

Bed Slope 1:12 Free Board (Minimum) 500 mm

Central Support Unit Type Ball type turntable Material of Fabrication SS 316L

Technical Specifications (TSCR01)

Medium Tannery Wastewater Type Centrally Driven Rotating Full-Bridge Type Picket Fence SludgeScraper

Page 20: Appendix 1 - ANNEX D – Technical Specification - unido.org

17

Tank diameter 15000 mm Side Liquid Depth 3000 mm

Bed Slope 1:8 Free Board (Minimum) 500 mm

Central Support Unit Type Ball type turntable Material of Fabrication SS 316L

Specifications applied for all scrapers: − The metal parts of the scrapers system should be made of stainless steel grade SS

316L or better, rectangular and round profiles pipes, plates and leaves. All components must be firmly welded together, and then etched and of course paciolan to provide corrosion protection;

− Framework of circular scraper system construction must be made of hollow profiles of stainless steel SS 316L or better; − Frame of bridge should match the diameter of the tank and must be resistant to deflection and torsion in relation to the

low total weight; − The bridge must be designed for its own weight, wind loads, load on the steps not less than 200daN.m; − Work platform and stairs should have protective lattice fence with stainless steel grade SS 316L or better; − The edge of the grate needs to be bent upwards to form the built leg protection personnel; − Scum scapers must be made of densely welded hollow profile made of stainless steel SS 316L or better; − Total weight of scum scapers should be maximally compensated for their buoyancy to minimize loads on the scum

scraper wheels; − Biaxial wheel have to be self-adjusting respectively the radius and the slope of the bottom of the tank. The wheels must

be made with pressed onto the rims of the tires of solid rubber, bearings lubricated for life; − Frame bridge must be secured and rely on a central bearing with elastic intermediate plates compensating inequality

track and minimize the deforming force; − Circular scraper system has a luff movement gear motor, greased for the entire service life that does not require

maintenance. The hollow shaft must be made of stainless steel arches of SS 316L or better. Maintenance must be minimized to checking oil level;

− Driving power is transmitted via a free elastic rubber belt to prevent overloading the scraper system and to ensure continued operation in all weather conditions;

− Automatic cleaning of surface by using floating sludge auger conveyor that moves the sludge to built-in surface suction device by their rotation;

− Automatic operation of floating sludge removal system should be provided under conditions of water level fluctuations to 500 mm;

− Control cabinet with contactor switching contacts bepotastine contacts about work and failure must be made of stainless steel. Exterior doors should be transparent and wheather protected window, internal doors should be fitted with one socket for 220 V and one outlet 400 V.

Drawing Number: M-0118 & M-0120

Page 21: Appendix 1 - ANNEX D – Technical Specification - unido.org

18

LOT 8 – SUPPLY OF JET AERATION SYSTEM

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Jet Aeration System comprising of jet aerators, air blowers and recirculation pumps for Aeration Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

1.1 Jet Aerators No 2 1.2 Air Blowers No 3 1.3 Recirculation Pumps No 2

2

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1.1 to 1.3 equipment have been completed.

No 3

3

The supplier must carry out trainings of serial number 1.1 to 1.3 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 3

Technical Specifications (Aeration Tank Dimensions)

Length 36000 mm Width 24000 mm

Water Depth 6000 mm Depth 6750 mm

Technical Specifications (Jet Nozzle Assembly)

Medium Tannery Wastewater Type Jet Aerators with Nozzles

Bubble Type Fine bubble Differential Pressure 0.7 bar

Transfer Efficiency >25 %

Technical Specifications (Air Blowers)

Type Positive Displacement Air Blowers Aeration Capacity 170 Nm3/min

Differential Pressure 0.7 bar

Technical Specifications (Recirculation Pumps)

Pump Type Horizontal, Centrifugal, Dry Mounted Efficiency >75%

Pumping Capacity 870 m3/h (approx.) Head 6.0 m

Phase/Voltage 3/400 V Frequency 50 Hz

Drawing Number: M-0123

Page 22: Appendix 1 - ANNEX D – Technical Specification - unido.org

19

LOT 9 – SUPPLY OF SLUDGE PUMPS

S.No. Item Description Unit Quantity Unit Rate in

US$ Amount in US$

1

Supply of Primary Sludge Pump (PSP01/01-02) in Primary Sludge Pumping Station (PSPS), including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including piping and all other accessories required inside pumping station for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Secondary Sludge Pump (SSP01/01-04) in Secondary Sludge Pumping Station, including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including all piping and other accessories required inside pumping station for installation, complete in all respects, in accordance with the contract documents.

No 4

3

Supply of Thickened Sludge Pump (TSP01/01-02) in Thickened Sludge Pumping Station, including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including all piping and other accessories required inside pumping station for installation, complete in all respects, in accordance with the contract documents.

No 2

4

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 3 equipment have been completed.

No 3

5

The supplier must carry out trainings of serial number 1 to 3 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 3

Technical Specifications (PSP01)

Medium Tannery Wastewater Sludge

Type

Horizontal, Dry Mounted, Screw Centrifugal Impeller

Capacity 35 m3/h Head 10 m

Sludge Type 3% Solid contents Pump casing Cast iron (EN-JL 1040, GG25, ASTM A 48 Class 40B)

Rotor 1.4301 / 304 SS, Chrome-plated tool steel

Protection Over Pressure and Dry Run Switch

Phase/Voltage 3/400 V Frequency 50 Hz

Page 23: Appendix 1 - ANNEX D – Technical Specification - unido.org

20

IP 65 Insulation Class F

Technical Specifications (SSP01)

Medium Tannery Wastewater Sludge

Type

Horizontal, Dry Mounted, Screw Centrifugal Impeller

Capacity 60 m3/h Head 10 m

Sludge Type 1-3% Solid contents Pump casing Cast iron (EN-JL 1040, GG25, ASTM A 48 Class 40B)

Rotor 1.4301 / 304 SS, Chrome-plated tool steel

Protection Over Pressure and Dry Run Switch

Phase/Voltage 3/400 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (TSP01)

Medium Tannery Wastewater Sludge

Type

Horizontal, Dry Mounted, Screw Centrifugal Impeller

Capacity 20 m3/h Head 10 m

Sludge Type 5% Solid contents Pump casing Cast iron (EN-JL 1040, GG25, ASTM A 48 Class 40B)

Rotor 1.4301 / 304 SS, Chrome-plated tool steel Protection Over Pressure and Dry

Run Switch

Phase/Voltage 3/400 V Frequency 50 Hz

IP 65 Insulation Class F

Page 24: Appendix 1 - ANNEX D – Technical Specification - unido.org

21

LOT 10 – SUPPLY OF SLUDGE BELT FILTER PRESS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Sludge Filter Press (SFP01), including foundation, anchor bolts, painting/coatings and other accessories, with wash water pump, air compressor including anchor bolts, pulsation dampers and other accessories, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of FRP Container 5 m3(FC01/01-04) for dewatered sludge, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 4

3

Supply of Ventilation System (VS01) for Sludge Belt Press Room, Watewater Pumping Station, All Sludge Pumping Rooms and Chemical Storage Area, including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 6

4

Supply of Hydrogen Sulphide Detection Equipment (HSD01/01-02) for Sludge Belt Press Room and Coarse Screen Area including, allaccessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

5

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 4 equipment have been completed.

No 4

6

The supplier must carry out trainings of serial number 1, 3 & 4 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 3

Technical Specifications (SP01)

Medium Tannery Wastewater Sludge Loading Sludge Rate 20.0 m3/hr

Input Sludge Concentration 5%

Output Sludge Concentration 15 – 20 %

Technical Specifications (FC01)

Container Material FRP with vinyl ester resin Exposed Metal ANSI Type 316 stainless steel

Capacity 5 m3 Protected Metal ASTM A36, with fiberglass reinforced plastic coating

Technical Specifications (VS01)

Type Centrifugal Fan with complete ducting Capacity 4,000 m3/hr (Air Flow)

Page 25: Appendix 1 - ANNEX D – Technical Specification - unido.org

22

Air Changes

2 air changes/hr in normal conditions 4 air changes/hr in emergency conditions

Motor Phase/Voltage = 3/400 V

Technical Specifications (HSD01)

Sensor Type Electrochemical Cell Measureing Range 0-500 ppm

Accuracy ± 2 ppm Temperature Range -40 °C to 65 °C

General Specifications: − Electrical Classifications: Explosion Proof Enclosure

o ATEX: II 2G Ex d IICT6 (Tamb= -34° to +100°C) CSA: Class I, Div 1 & 2, Groups B, C & DC22.2 No 30-M1985 & C22.2 No 142-M1987

− Ingress Protection: NEMA 4X, IP66 − Alarm Relays: Programmable Low and High Alarms, Fault Alarm SPDT Form “C” Relays 2 A @ 250 VAC or 30 VDC − Accessories: Dust or Splash guard, Flow Adapter with tube fittings, Sensor Duct Mount Kit, Pole Mount brackets.

Drawing Number: M-0117

Page 26: Appendix 1 - ANNEX D – Technical Specification - unido.org

23

LOT 11 – SUPPLY OF CHEMICAL DOSING PUMPS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Chemical Dosing Pumps (DP01) for K-Polymer Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

2

Supply of Chemical Dosing Pumps (DP02) for A-Polymer Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

3

Supply ofChemical Dosing Pumps (DP03) for Alum Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

4

Supply of Chemical Dosing Pumps (DP04) for Hydrogen Peroxide Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

5

Supply of Chemical Dosing Pumps (DP05) for Ferric Chloride Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

6

Supply of Chemical Dosing Pumps (DP06) for Manganese Sluphate Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

7

Supply of Chemical Dosing Pumps (DP07) for Sodium Hydroxide Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 2

8

Supply of Chemical Dosing Pumps (DP08) for Hydrogen Chloride Dosing Tank (02 + 02 standby, one for pH control at Beam House equalization and other at Chemical Oxidation Tank), including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 4

9

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 8 equipment have been completed.

No 8

10

The supplier must carry out trainings of serial number 1 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with

No 1

Page 27: Appendix 1 - ANNEX D – Technical Specification - unido.org

24

necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

Technical Specifications (DP01)

Medium K-Polymer Type Diaphragm with controller Capacity 100-300 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP02)

Medium A-Polymer Type Diaphragm with controller

Capacity 5-15 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP03)

Medium Alum Type Diaphragm with controller

Capacity 25-100 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP04)

Medium Hydrogen Peroxide (50%) Solution Type Diaphragm with controller

Capacity 50-120 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP05)

Medium Ferric Chloride (40%) Solution Type Diaphragm with controller

Capacity 10-25 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP06)

Medium Manganese Sulphate Type Diaphragm with controller

Capacity 5-50 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Page 28: Appendix 1 - ANNEX D – Technical Specification - unido.org

25

Technical Specifications (DP07)

Medium Sodium Hydroxide Type Diaphragm with controller

Capacity 25-100 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Technical Specifications (DP08)

Medium Hydrogen Chloride Type Diaphragm with controller

Capacity 25-100 lit/h Head Minimum Head Required

Phase/Voltage 1/200 V Frequency 50 Hz

IP 65 Insulation Class F

Page 29: Appendix 1 - ANNEX D – Technical Specification - unido.org

26

LOT 12 – SUPPLY OF DISSOLVED OXYGEN, FLOW METER, pH METER AND STANDBY GENERATOR

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of Dissolve Oxygen Meter (DO01) for Equalization tank for Beam House and Aeration Tank, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 3

2

Supply of pH Meter (pH01), including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 8

3

Supply of Wastewater FlowMeters (WFM01/01-02), including all jointing and anchoring material complete in all respects, inaccordancewiththe contract documents

No 2

4

Supply of Sludge Flow Meters (SFM01/01-04), including all jointing and anchoring material complete in all respects, in accordance with the contract documents

No 4

5

Supply of Automatic Wastewater Sampler (AS01/01-02), including all jointing and anchoring material complete in all respects, in accordancewiththe contract documents

No 2

6

Supply of Standby Diesel Generator (SG01/01) of 750 kVA, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

No 1

7

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 6 equipment have been completed.

No 6

8

The supplier must carry out trainings of serial number 1 to 6 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 6

Technical Specifications (DO01)

Page 30: Appendix 1 - ANNEX D – Technical Specification - unido.org

27

Specific Requirements

The aim of dissolved oxygen measurement is to keep the waste treatment process functioning properly and to hold the dissolved oxygen level within an acceptable range and avoid conditions detrimental to the process. The equipment shall be controlled by the PLC system. Meter shall be of the floating ball type. Measurement range 0-10 mg O2/l. Accuracy of ±0.1 on oxygen content. Accuracy on zero ± 0.1 ppm.

Medium Tannery Wastewater

Technical Specifications (pH01)

Specific Requirements Online pH measurement, range pH 2-12. Accuracy of meter ± pH 0.1.

Medium Tannery Wastewater

Technical Specifications (WFM01)

Specific Requirements Ultrasonic (Clampable)

Medium Tannery Wastewater Size DN 100-200

Technical Specifications (SFM01)

Specific Requirements Ultrasonic (Clampable)

Medium Primary and Secondary Tannery Sludge Size DN 100-200

Technical Specifications (SG01)

Specific Requirements 600 kW (750kVA) standby rating 380 V D.G Set including skid mounted fuel day tank, 4 pole auto mains failure automatic transfer panel, sound attenuated weather protective enclosure and all control wiring between D.G. Set and Low voltage Switchboard

Frequency 50 Hz Speed 1,500 rpm

Compression Ratio 13:01 Engine 4-Stroke Water-Cooled Diesel

Technical Specifications (AS01)

Specific Requirements Mobile Automatic Sampler

Cooling Capacity w/20 lbs of ice and 4-gal container full Sampling Modes

Sample Pacing: Uniform time, non-uniform time, flow, flow paced/time switched. Flow pacing is controlled by external flow pulses. Multiplexing: Samples per bottle: 1 to 50 with 100 ml bottles 1 to 17 with 350 ml bottles Bottles per sample: 1 to 24, multiple bottle compositing.

Page 31: Appendix 1 - ANNEX D – Technical Specification - unido.org

28

Pump

− Adjustable air purge before and after each sample − Suction tubing allowable length: 1 to 30 m − Maximum sample lift: 7.9 m − Pump tubing: recommended life 500,000 pump counts − Liquid presence detector: Non-wetted, nonconductive sensor detects when liquid

sample reaches the pump to automatically compensate for changes in head heights.

Page 32: Appendix 1 - ANNEX D – Technical Specification - unido.org

29

LOT 13 – SUPPLY OF PIPES AND FITTINGS

S.No.

Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply of MS Pipe (Schedule 40) including butterfly valves, tees, elbows, flanged joints, reducers, rubber gaskets, nuts and bolts including fixing the pipe with suitable flat iron strip clamps/bracket, painting etc. complete as required for delivery/suction manifold relating to the pumps, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents.

DN150 RM 100.00

DN 200 RM 150.00

Page 33: Appendix 1 - ANNEX D – Technical Specification - unido.org

30

LOT 14 – SUPPLY OF SPARE – PARTS

S.No.

Item Description Unit Quantity Unit Rate in US$ Amount in US$

1 Supply of Oil & Grease Separator (OGS01/01-02) Waste Oil Submerssible Pump for Beam House and Tan House effluent.

No 2

2 Supply of Wastewater Pump (WPS) (WSP01)and (WSP02) in Wastewater Pumping Station (WPS) for Beam House and Tan House respectively.

No 2

3

Supply of Submersible Sump Pumps (Bilge Pump SBP01) 1+1 standby in each Wastewater Pumping Station (WPS) and 1+1 standby in each sludge pumping rooms

No 5

4 Supply of Jet Aerators Submersible Ejector shaft type (JA01and JA02) in Equalization tank for Beam House and Tan House

No 2

5

Supply of Mixer Motor: MRMT1 No 1 Supply of Mixer Motor: MFT01 No 1 Supply of Mixer Motors: MPT01 No 2 Supply of Mixer Motor: MCOT01 No 1 Supply of Mixer Motors: MCDT01 No 8

6 Supply of Jet Aeration System Recirculation Pumps No 2

7 Supply of Jet Aeration System Air Blowers No 1

8 Supply of Primary Sludge Pump PSP01 No 1

9 Supply of Secondary Sludge Pump SSP01 No 1

10 Supply of Thickened Sludge Pump TSP01 No 1

11

Supply of Chemical Dosing Pumps (DP01) for K-Polymer Dosing No 1

Supply of Chemical Dosing Pumps (DP02) for A-Polymer Dosing No 1

Supply ofChemical Dosing Pumps (DP03) for Alum Dosing No 1

Supply of Chemical Dosing Pumps (DP04) for Hydrogen Peroxide Dosing No 1

Supply of Chemical Dosing Pumps (DP05) for Ferric Chloride Dosing No 1

Supply of Chemical Dosing Pumps (DP06) for Manganese Sluphate Dosing No 1

Supply of Chemical Dosing Pumps (DP07) for Sodium Hydroxide Dosing No 1

Supply of Chemical Dosing Pumps (DP08) for Hydrogen Chloride Dosing No 1

12 Supply of Dissolve Oxygen Meter (DO01) No 1

13 Supply of pH Meter (pH01) No 1

14 Supply of Wastewater Flow Meters (WFM01) No 1

15 Supply of Sludge Flow Meters (SFM01) No 1

Technical Specifications of All as mentioned from LOT 1 to 13

Page 34: Appendix 1 - ANNEX D – Technical Specification - unido.org

31

LOT 15– INSTALLATION AND COMMISSIONING OF EQUIPMENT

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Installation, testing & commissioning of Mechanical Coarse Screens (MCS01/01-02) for Beam House effluent, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

2

Installation, testing & commissioning of Mechanical Coarse Screens (MCS02/01-02) for Tan House effluent, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

3

Installation, testing & commissioning of Screen Washer (SW01/01-02) for beam hosue and tan house screenings, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

4

Installation, testing & commissioning of FRP Container 1.1 m3 (FC03/01-04) for Tan House and Beam House screening, two each respectively, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 4

5

Installation, testing & commissioning of Vortex Grit Chamber with Classifier (GC01/01-02) for Beam House effluent, including all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

6

Installation, testing & commissioning of Vortex Grit Chamber with Classifier (GC02/01-02) for Tan House effluent, including, all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

7

Installation, testing & commissioning of FRP Container 5 m3 (FC01/01-05) for Tan House and Beam House wastewater grit, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 5

8

Installation, testing & commissioning of Fork Lifter (FL01/01-02) for all type of lifting of containers either chemical or others, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

Page 35: Appendix 1 - ANNEX D – Technical Specification - unido.org

32

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

9

Installation, testing & commissioning of Oil & Grease Separator (OGS01/01-02) for Beam House effluent, including all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

10

Installation, testing & commissioning of Oil & Grease Separator (OGS01/01-02) for Tan House effluent, including, all piping and other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

11

Installation, testing & commissioning of FRP Container 2 m3 (FC02/01-02) for Tan House and Beam House wastewater waste oil, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

12

Installation, testing & commissioning of Wastewater Pump (WPS) (WSP01/01-02) in Wastewater Pumping Station (WPS) for Beam House effluent, including all piping and other accessories required inside pumping station for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

13

Installation, testing & commissioning of Wastewater Pump (WSP) (WSP02/01-02) in Wastewater Pumping Station (WPS) for Tanning and Post tanning effluent, including, all piping and other accessories required inside pumping station for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

14

Installation, testing & commissioning of Submersible Sump Pumps (Bilge Pump SBP01/01-08) 1+1 standby in each Wastewater Pumping Station (WPS) and 1+1 standby in each sludge pumping rooms, including pump-motor set, pump base, anchor bolts, painting/coatings and other accessories, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 8

15

Installation, testing & commissioning of Jet Aerators Submersible Ejector shaft type (JA01/01-02) in Equalization tank for Beam House effluent, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

16

Installation, testing & commissioning of Aerators Submersible Ejector shaft type (JA02/01-02) in Equalization tank for Tanning & Post Tanning effluent, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

Page 36: Appendix 1 - ANNEX D – Technical Specification - unido.org

33

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

17

Installation, testing & commissioning of Mixer (MRMT01/01) for Rapid Mixing Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 1

18

Installation, testing & commissioning of Mixer (MFT01/01) for Flocculation Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 1

19

Installation, testing & commissioning of Mixer (MPT01/01-02) for Pre-Selector Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

20

Installation, testing & commissioning of Mixer (MCOT01/01) for Chemical Oxidation Tank, including MS Walkway and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 1

21

Installation, testing & commissioning of Mixer (MCDT01/01-04) for Chemical Dosing Tanks, including all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 8

22

Installation, testing & commissioning of primary sedimentation tank sludge Scraper (PSCR 01/01) (Centrally Driven, Diameteral Type with scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 1

23

Installation, testing & commissioning of secondary sedimentation tank sludge Scraper (SSCR 01/01-02) (Centrally Driven, Diameteral Type with scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

24

Installation, testing & commissioning of picket fence sludge Scraper (TSCR 01/01) (Centrally Driven Rotating Full-Bridge Type Picket Fence Sludge Scraperwith scum removal mechanism), including MS Bridge and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 1

25 Installation, testing & commissioning of Jet Aeration System comprising of jet aerators, air blowers and recirculation pumps for Aeration Tank, including

Page 37: Appendix 1 - ANNEX D – Technical Specification - unido.org

34

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

Jet Aerators No 2 Air Blowers No 3 Recirculation Pumps No 2

26

Installation, testing & commissioning of Primary Sludge Pump (PSP01/01-02) in Primary Sludge Pumping Station (PSPS), including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including piping and all other accessories required inside pumping station for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

27

Installation, testing & commissioning of Secondary Sludge Pump (SSP01/01-04) in Secondary Sludge Pumping Station, including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including all piping and other accessories required inside pumping station for installation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 4

28

Installation, testing & commissioning of Thickened Sludge Pump (TSP01/01-02) in Thickened Sludge Pumping Station, including pump-motor set, pump base, anchor bolts, pulsation dampers with pressure gauges & pressure sensors (on suction & delivery sides), over pressure and dry run switches, including all piping and other accessories required inside pumping station for installation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

29

Installation, testing & commissioning of Sludge Filter Press (SFP01), including foundation, anchor bolts, painting/coatings and other accessories, with wash water pump, air compressor including anchor bolts, pulsation dampers and other accessories, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

30

Installation, testing & commissioning of FRP Container 5 m3 (FC01/01-04) for dewatered sludge, including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 4

31

Installation, testing & commissioning of Ventilation System (VS01) for Sludge Belt Press Room, Watewater Pumping Station, All Sludge Pumping Rooms and Chemical Storage Area, including, all

No 6

Page 38: Appendix 1 - ANNEX D – Technical Specification - unido.org

35

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

32

Installation, testing & commissioning of Hydrogen Sulphide Detection Equipment (HSD01/01-02) for Sludge Belt Press Room and Coarse Screen Area including, all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

33

Installation, testing & commissioning of Chemical Dosing Pumps (DP01) for K-Polymer Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

34

Installation, testing & commissioning of Chemical Dosing Pumps (DP02) for A-Polymer Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

35

Installation, testing & commissioning of Chemical Dosing Pumps (DP03) for Alum Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

36

Installation, testing & commissioning of Chemical Dosing Pumps (DP04) for Hydrogen Peroxide Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

37

Installation, testing & commissioning of Chemical Dosing Pumps (DP05) for Ferric Chloride Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

38

Installation, testing & commissioning of Chemical Dosing Pumps (DP06) for Manganese Sluphate Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

39

Installation, testing & commissioning of Chemical Dosing Pumps (DP07) for Sodium Hydroxide Dosing Tank, including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

40 Installation, testing & commissioning of Chemical Dosing Pumps (DP08) for Hydrogen Chloride No 4

Page 39: Appendix 1 - ANNEX D – Technical Specification - unido.org

36

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

Dosing Tank (02 + 02 standby, one for pH control at Beam House equalization and other at Chemical Oxidation Tank), including piping and all other accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

41

Installation, testing & commissioning of Dissolve Oxygen Meter (DO01) for Equalization tank for Beam House and Aeration Tank, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 3

42

Installation, testing & commissioning of pH Meter (pH01), including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 8

43

Installation, testing & commissioning of Wastewater Flow Meters (WFM01/01-02), including all jointing and anchoring material complete in all respects, in accordance with the contract documents and as directed by the Engineer.

No 2

44

Installation, testing & commissioning of Sludge Flow Meters (SFM01/01-04), including all jointing and anchoring material complete in allrespects, in accordance with the contract documents and as directed by the Engineer.

No 4

45

Installation, testing & commissioning of standby diesel generator of 750 kVA, including all jointing and anchoring material complete in allrespects, in accordance with the contract documents and as directed by the Engineer.

No 2

46

Installation, testing & commissioning of Automatic Wastewater Sampler (AS01/01-02), including all jointing and anchoring material complete in allrespects, in accordance with the contract documents and as directed by the Engineer.

No 1

47

Installation, testing & commissioning of of Gantry Crane (GC01/01) in each Wastewater Pumping Station (WPS) including all accessories, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

48

Installation, testing & commissioning of MS Pipe (Schedule 40) including butterfly valves, tees, elbows, flanged joints, reducers, rubber gaskets, nuts and bolts including fixing the pipe with suitable flat iron strip clamps/bracket, painting etc. complete as required for delivery/suction manifold relating to the pumps, including all accessories required for installation and operation, complete in all respects, in accordance with the contract documents and as directed by the Engineer.

DN150 RM 100.00 DN 200 RM 150.00

Page 40: Appendix 1 - ANNEX D – Technical Specification - unido.org

37

LOT 16 – SUPPLY, INSTALLATION AND COMMISSIONING OF LABORATORY EQUIPMENT FOR WASTEWATER ANALYSIS

S.No. Item Description Unit Quantity Unit Rate in US$ Amount in US$

1

Supply, installation and commisioning of Analytical Balance (AB01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

2

Supply, installation and commisioning of Water Distillation Apparatus (Water Still) (WD01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

3

Supply, installation and commisioning of Thermometer (TH01/02), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 2

4

Supply, installation and commisioning of Vacuum Pump (VP01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

5

Supply, installation and commisioning of Hot Plate Stirrer (Magnetic) (HP01/02), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 2

6

Supply, installation and commisioning of Drying Oven (DO01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

7

Supply, installation and commisioning of pH Meter (Portable) (PH01/02), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 2

8

Supply, installation and commisioning of COD Reactor (CD01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

9

Supply, installation and commisioning of BOD Reactor (BD01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

10

Supply, installation and commisioning of Incubator (IT01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

Page 41: Appendix 1 - ANNEX D – Technical Specification - unido.org

38

11

Supply, installation and commisioning of Spectrophotometer (Visible) (SPM01/01), including all accessories required for installation and operation, complete in all respects, in accordance with the provided specifications.

No 1

12

The Supplier must provide a final report (in English) should be submitted to UNIDO no later than 2 weeks after the delivery and installation of serial number 1 to 11 equipment have been completed.

No 11

13

The supplier must carry out trainings of serial number 1 and 11 equipment for the duration as per the requirements of the specific equipment on the installation site of the procure equipment and is aimed at equipping the national expertise with necessary skills and knowledge for maintenance of machines and equipment being procured and operation to produce various building components

No 1

Technical Specifications (AB01)

Maximum Capacity 220 gm Readability 0.1 mg

Technical Specifications (WD01)

Capacity 4 Liters/hour Requirement Distilled Water Production

Technical Specifications (TH01)

Temperature Range 0 – 250 °C Requirement Sample Temperature Measurement

Technical Specifications (VP01)

Capacity 2.1 m3/h Requirement Ultimate Vacuum: 70 mbar [Sample Filtration]

Technical Specifications (HP01)

Maximum Plate Temperature 450 °C Requirement Stirrer Speed: 200 to 1300 RPM [Sample Heating and Mixing]

Technical Specifications (DO01)

Chamber Capacity 32 Liter Requirement Max Temperature: 300 °C [Sample Drying]

Technical Specifications (PH01)

Measuring Range: 0.00 – 14.00 Requirement Resolution: 0.01, Accuracy +0.01, Temperature Range: (–)5 to 105 °C [pH Measurement]

Technical Specifications (CD01)

Capacity 15 Vials (16 x 100 mm) Requirement

Temperature Range: 37 – 165 °C Timer: 0 – 480 min [Sample Digestion]

Page 42: Appendix 1 - ANNEX D – Technical Specification - unido.org

39

Technical Specifications (BD01)

Operating temperature 5 to 40 ºC Storage/operating humidity

Maximum relative humidity is 80% for temperatures up to 31 ºC, decreases linearly to 50% relative humidity at 40 ºC

Altitude limit 2000 m Range Selectable, 0 to 35, 0 to 70, 0 to 350, 0 to 700 mg/L, 0 to 1000 mg/L, 0 to 1500 mg/L, 0 to 2000 mg/L,

Pollution degree 2 Capacity Six 492 mL bottles

Technical Specifications (IT01)

Capacity 260 liters Requirement Low temperature Incubator for BOD Range : 0⁰C to 35⁰C

Technical Specifications (SPM01)

Wavelength Range 320 – 1100 nm Requirement COD Measurement

Page 43: Appendix 1 - ANNEX D – Technical Specification - unido.org

63

PROCESS FLOW DIAGRAM