APPEARANCE OF THE TANK BEFORE THE COATING
description
Transcript of APPEARANCE OF THE TANK BEFORE THE COATING
![Page 1: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/1.jpg)
APPEARANCE OF THE TANK BEFORE THE COATING
INSTALLATION OF THE SCAFFOLDINGS
![Page 2: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/2.jpg)
INSTALLATION OF COMPRESSOR & PIPPING THE BLASTING POT
PREPARATION,TEST BLASTING FOR PROFILE & CHECK FOR PRESSENCE OF OIL
![Page 3: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/3.jpg)
MATERIALS TO BE USED FOR THE INTERNAL COATING
CHECKING THE SURFACE TO A WHITE METAL FINISH
![Page 4: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/4.jpg)
CONDUCT CHLORIDE TEST FOR SALT CONTAMINATION
TEST RESULT 1PPM (3 PPM IS THE MAXIMUM VALUE)
![Page 5: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/5.jpg)
APPLICATION OF ENECON PUTTY TO THE JOINT & DEEPLY PITTED AREA
CONDUCT WET FILM THICKNESS DURING APPLICATION
1ST COURSE COATED WITH ENECON CHEMCLAD SC
![Page 6: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/6.jpg)
2ND COURSE COATED WITH ENECON CHEMCLAD SC
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 1ST PART
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 2ND PART
![Page 7: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/7.jpg)
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 5TH PART
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 3RD PART
APPLICATION FROM 3RD COURSE TO THE TOP AREA, 4TH PART
![Page 8: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/8.jpg)
FINISHING OF THE TOP PART OF THE & THE ENTIRE 6 COURSE
BLASTING & PAINTING OF THE BOTTOM PART OF THE TANK
![Page 9: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/9.jpg)
AREA BEING REPAIRED A 12X16 HOLE WAS MADE & DAMAGED THE COATING
FINAL APPEARANCE OF THE AREA AFTER THE REPAIR WITH ENECON PUTTY & OVERCOAT WITH CHEMCLAD SC
![Page 10: APPEARANCE OF THE TANK BEFORE THE COATING](https://reader035.fdocuments.net/reader035/viewer/2022062521/56816692550346895dda711e/html5/thumbnails/10.jpg)
TANK 2 BEFORE ENECON CHEMCLAD SC APPLICATION
TANK 2 AFTER ENECON CHEMCLAD SC APPLICATION