APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU
-
Upload
phungthuan -
Category
Documents
-
view
252 -
download
2
Transcript of APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU
![Page 1: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/1.jpg)
APLIKASI TMC DI CATCHMENT
AREA DAS MAMASA
PT PLN (PERSERO) WILAYAH SULSELRA SEKTOR
BAKARU UNIT PLTA BAKARU
Oleh :
Sudarmadi (7906174-Z)
![Page 2: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/2.jpg)
PLTA BAKARU
• PLTA Bakaru memasok 23% dari beban puncak kebutuhan listrik di Sulawesi Selatan dengan daya mampu 126 MW dengan BPP Rp 105/kWh.
• Diresmikan pada tahun 1991, PLTA Bakaru yang berlokasi di Desa Ulusaddang, Kabupaten Pinrang ini merupakan jenis PLTA run off river yang terdiri atas 2 (dua) unit Turbin air tipe Francis dan memanfaatkan aliran Sungai Mamasa dengan elevasi 615,50 m dpl.
• Saat ini PLTA Bakaru dihadapkan pada kondisi kerusakan lingkungandengan menumpuknya sedimentasi di sekitar waduk tando harian sehingga daya tampung waduk menurun drastis dan jelas sangat berpengaruh pada pola operasi PLTA Bakaru. Terutama pada musimkemarau
![Page 3: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/3.jpg)
PLN Sektor Bakaru, 26.72%
PLN Sektor Tello,
14.00%
PT. Energi Sengkang,
45.44%
PT. Makassar
Power, 12.14%
PT. SD Sewatama,
1.69%
KOMPOSISI PRODUKSI KIT 2009
KOMPOSISI BIAYA DAN PRODUKSI
![Page 4: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/4.jpg)
MANFAAT TMC UNTUK PLTA
• Manfaat yang paling utama dari kegiatan
TMC adalah untuk mengusahakan agar
terjadinya peningkatan inflow sehingga beban
yang dibangkitkan oleh pembangkit bisa
maksimal
![Page 5: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/5.jpg)
LATAR BELAKANG PELAKSANAAN
TMC THN 2009
A. Musim kemarau
DEFISIT DAYA DI SISTEM SULAWESI YANG
DISEBABKAN OLEH:
72.13
19.51
87.76
100.49
39.65
71.14
32.69
8.62
17.07 16.84 16.7616.95
0
20
40
60
80
100
120
INFLOW RATA-RATA THN 2009
Inflow rata-rata
Discharge
C. Defisit daya sistem SULSEL 150 MW pada saat
beban puncak
B. Gangguang di beberapa pembangkit
![Page 6: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/6.jpg)
Inflow Waduk PLTA Bakaru 2003-2009 & Prediksi 2010
PLTA Bkaru 126 MW,
≈Inflow 45,0 m3/s
![Page 7: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/7.jpg)
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
450.00
500.00
550.00
600.00
01
.00
02
.00
03
.00
04
.00
05
.00
06
.00
07
.00
08
.00
09
.00
10
.00
11
.00
12
.00
13
.00
14
.00
15
.00
16
.00
17
.00
18
.00
18
.30
19
.00
19
.30
20
.00
20
.30
21
.00
21
.30
22
.00
23
.00
24
.00
MW
KOMPOSISI PEMBANGKITAN
PLTA BAKARU PLTA BILI BILI PLTGU SENGKANG SENGKANG 2
PLTU TELLO PLTD SUPPA PLTD TELLO PLTD SEWATAMA
PLTG TELLO PLTD TERSEBAR PADAM
![Page 8: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/8.jpg)
PELAKSANAAN HUJAN BUATAN
![Page 9: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/9.jpg)
GRAFIK INFLOW
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
INF
LO
W(M
3/S
EC
)
OKTOBER, NOVEMBER
DARA INFLOW SELAMA KEGIATAN TMC
INFLOW U/ 126 MW
PERIODE TMC
![Page 10: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/10.jpg)
KENDALA-KENDALA
• Kendala-kendala yang dihadapi selama
pelaksanaan TMC di lapangan:
- Catchment area PLTA Bakaru yang sempit
dan memanjang
- Tipe pembangkit PLTA Bakaru run of river
- Kerusakan hutan di daerah catchment area
DAS mamasa
![Page 11: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/11.jpg)
Catchment Area PLTA Bakaru
![Page 12: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/12.jpg)
KERUSAKAN HUTAN DI DAERAH DAS
![Page 13: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/13.jpg)
SARAN
• Sebainya kegiatan TMC dilakukan diperalihan
musim terutama pada peralihan musim hujan ke
musim kemarau dan musim kemarau ke musim
hujan.
CH
Waktu
Musim Hujan
Musim KemarauMusim Kemarau
![Page 14: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/14.jpg)
• Pelaksanaan TMC akan menjadi satu kesatuan di
dalam melaksanakan sistem water manajemen
pada pengelolaan pembangkit hydro
• Diharapkan BPPT dapat melayani sistem on call
ketika akan diperlukan
• Diharapkan agar diberi kemudahan dalam
mengakses cuaca dan curah hujan
SARAN
![Page 15: APLIKASI TMC DI CATCHMENT AREA PLTA BAKARU](https://reader034.fdocuments.net/reader034/viewer/2022052309/587766561a28ab573e8bd3f5/html5/thumbnails/15.jpg)
SEKIAN DAN TERIMA KASIH
Sahabat setia untuk kemajuan