APEX – Deep

EUROARGO

Prepared by: Ernest Petzrick, APEX Product Line Manager

Page 2: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

Thank YOU

Page 3: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Concept Guidance to TWR engineers

Design and build a profiling float capable of reaching 6,000 meters

Must be economically feasible – no titanium hull

Must have buoyancy reserve for additional sensors – CTD and ?

Use next generation controller – APF-11

Goal of at least 150 profiles using lithium batteries

Launch/Recovery with no special handling equipment

Page 4: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Historical

2011 Basic Mechanical/Electrical design Preliminary glass testing Decision to use glass spheres for hull 2012 Cycle testing of spheres – 500+ cycles, 10,000 psi Glass hole pattern and drilled pressure testing Open/Close training Build Prototypes 4,000 meter test dives Hull 2 4,062 meters Hull 3 4,069 meters Incorporate lessons learned, design mods, build

Page 5: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Status

2013 Successful profile from over 6,000 meters – FEB 26/27 Fall Primary goal = Lithium Battery Tests Secondary goal = additional sensor 2014 Commercially Available

Page 6: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Spiral 1 test

October 30, 2012 – 4,069 meters South West of Hawaii, HI

Page 7: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep FEB deployment

@6,200 meters deep

Page 8: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep FEB deployment

Page 9: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep FEB deployment First dive: 26 FEB @ 0718 UTC Depth = 6,002.82 dbar Round trip @ 20 plus hours

Page 10: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Sample Data

Page 11: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Sample Data

Page 12: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Sample Data

1,95

2

2,05

2,1

2,15

2,2

2,25

5200 5300 5400 5500 5600 5700 5800 5900 6000 6100

Temperature (C) vs Pressure (dbar)

Temp, C

Page 13: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Sample Data

2,008

2,01

2,012

2,014

2,016

2,018

2,02

2,022

5650 5700 5750 5800 5850 5900 5950 6000 6050

Temperature (C) vs Pressure (dbar)

Temp, C

Linéaire (Temp, C)

Page 14: APEX – Deep€¦ · APEX – Deep . Status . 2013 Successful profile from over 6,000 meters – FEB 26/27 . Fall Primary goal = Lithium Battery Tests . Secondary goal = additional

APEX – Deep Conclusions - Questions