A&P Higher Education
-
Upload
adolfson-peterson-construction -
Category
Documents
-
view
218 -
download
0
description
Transcript of A&P Higher Education
![Page 1: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/1.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
A&P has been successful ly
creating learning environments
on h igher educat ion
campuses across the nat ion
for nearly 70 years.
HIGHER EDUCATION
Healthcare
Higher Education
K12 Education
Aquatics & Recreation
Municipal Government
Senior Living
Office
Hospitality
Mixed-Use
Multi-Family Housing
Retail
Energy Resources
Federal Government
![Page 2: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/2.jpg)
HIGHER EDUCATION
![Page 3: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/3.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
b u i l d i n g S M A R Tenvironments
Having worked on more than 50 university and college campuses throughout the region and nationally, A&P understands the unique challenges of working in a bustling campus environment with multiple stakeholders.
Since A&P opened our Colorado office in 1981, we have specialized in institutional and educational projects and we are currently ranked the regions #1 Education Contractor (ENR 2013). Our higher education construction teams have completed projects varying from classroom and advanced laboratory buildings to facilities that house fine arts and athletics programs. A&P offers proven techniques to address campus safety, site logistics, deliveries and staging and working within the parameters of the student schedules.
![Page 4: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/4.jpg)
C o l o r a d o S c h o o l o f M i n e s Marquez Hall
Golden, Colorado
Size 93,000 sf
Owner Colorado School of Mines
Design Anderson Mason DaleBohlin Cywinski Jackson
SilverLEED
![Page 5: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/5.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This project furthers Colorado School of Mines’ position as a global leader with a unique breadth of industry expertise. With this cutting-edge building, Mines’ Department of Petroleum Engineering now pushes the forefront of new technology and remains at the top of its class in recruiting and training new petroleum engineers. Marquez Hall features customized classrooms and research and teaching laboratories; smart classrooms equipped with wireless networking and interactive audio-visual technology; a multi-purpose visualization classroom to support interdisciplinary collaboration between Petroleum Engineering, Geology and Geophysics; capacity for increased faculty research activity and enrollment of up to 400 students; offices and meeting space designed to enhance interaction between students and faculty as well as research teams, and informational displays that will educate campus visitors about the petroleum industry.
LEED Silver Citation Award for Built Architecture - AIA Colorado
b u i l d i n g S M A R Tenvironments
![Page 6: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/6.jpg)
C o l o r a d o M o u n t a i n C o l l e g e Steamboat Campus
Student Center
Steamboat Springs, Colorado
Size 65,000 sf
Owner Colorado Mountain College
Design H+L Architecture
![Page 7: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/7.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This majestic multi-purpose academic and administrative center serves as the center piece of the College. Carefully integrated into the side of a steep slope, this state-of-the-art building configured over three stories presents technologically advanced classroom space, auditoriums and student gathering components as well as many of the offices and services required for campus administration. The heart of the design is an expansive glass curtain wall and outdoor patio environment combining sweeping views with regionally appropriate building materials to create a sense of place and pride. The scope of work included the addition of a public road and related public utility improvements further connecting the new facility to the surrounding municipal interests. The improvements to public infrastructure greatly increased the need for a comprehensive process of identifying stakeholders within City of Steamboat Springs and neighborhood interests.
b u i l d i n g S M A R Tenvironments
![Page 8: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/8.jpg)
E a g l e H a l l a tC h a n d l e r G i l b e r t
C o m m u n i t y C o l l e g e
Mesa, Arizona
Size 30,000 sf
Owner Maricopa County Community College District
Design Gabor Lorant Architects
![Page 9: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/9.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Engel Hall houses the nursing and life sciences programs of the Williams-Gateway campus of Chandler-Gilbert Community College, including two life science laboratories, seven general classrooms, two lecture halls, instructional clinic for nursing and faculty offices. The building not only meets the current growing need for healthcare training in the Southeast Valley but also allows for future growth. The project also includes a new central plant that will serve both the main campus and the buildings south of campus. The facility has quickly become a signature building for the campus, setting the standard for architectural detailing that will be incorporated into future campus buildings.
LEED Gold
b u i l d i n g S M A R Tenvironments
![Page 10: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/10.jpg)
C o l o r a d o S t a t e U n i v e r s i t y Lory Student Center
Theatre Renovation
Fort Collins, Colorado
Size 20,000 sf
Owner Colorado State University
Design Aller Lingle Massey Architects PC
GoldLEED
![Page 11: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/11.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The project consisted of the renovation to the existing historical Lory Student Center Theater on the Main Campus of Colorado State University. The existing 20,000-sf, post-tension poured in place concrete structure went from a raked seating theater, to a flat floor multi-purpose space, increasing seating capacity to 605-seats. The existing post-tension balcony was completely removed to accommodate the new flat floor that was built up to the elevation of the existing lobby. The north storefront wall of the lobby was moved out to the north, but held under the existing roof structure. The mechanical and electrical was also upgraded. The outline and natural colors found in the rock formations around Horsetooth Reservoir emerged as a favorite design concept that guided the interior design decisions. Sustainable design principles and universal access were fundamental to every discussion.
LEED Gold Small Scale Commercial, Honor - Brilliance Awards
b u i l d i n g S M A R Tenvironments
![Page 12: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/12.jpg)
U n i v e r s i t y o f W y o m i n g College of Business
Addition & Renovation
Laramie, Wyoming
Size 191,000 sf
Owner University of Wyoming
Design Hatin Jorgensen ArchitectsKallmann McKinnel & WoodArchitects
GoldLEED
![Page 13: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/13.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This project consists of a 60,000-sf renovation to the current College of Business, built in 1960, and a 131,000-sf addition. It features a variety of classroom environments, including group study rooms, tiered-seating case study rooms, a multimedia laboratory, practice interview rooms, computer labs and a 150-seat auditorium. The design caters to the existing architecture and campus standards while integrating new and innovative characteristics to provide timeless elements to a landmark project. The project also includes a student lounge and an atrium.
LEED Gold National Excellence in Construction Institutional Category Pyramid Award - ABC National
Intermountain Best of 2010 Gold Award, Outstanding Higher Education Project
- Mountain States Construction
Excellence in Construction Institutional Category Excellence Award
- ABC Rocky Mountain Chapter
b u i l d i n g S M A R Tenvironments
![Page 14: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/14.jpg)
U n i v e r s i t y o f Te x a s a t D a l l a s M a t h , S c i e n c e , a n d E n g i n e e r i n g
C e n t e r
Dallas, Texas
Size 75,000 sf
Owner University of Texas at Dallas
Design Kell Munoz
![Page 15: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/15.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The University of Texas at Dallas Math, Science, and Engineering Teaching/Learning Center is a three-story facility that provides classroom and laboratory education in mathematics, physics, chemistry, geosciences and engineering for students. Additionally, it includes a major laboratory for research and development for the Department of Mathematics and Science Education, a lecture hall, recitation areas, instructional laboratories, offices for faculty and tutors and shell space for future program elements. It is constructed of concrete and structural steel and feature architectural precast and glass skin, and ties into two existing buildings.
b u i l d i n g S M A R Tenvironments
![Page 16: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/16.jpg)
C h a d r o n S t a t e C o l l e g e Armstrong Gymnasium and Event
Center Addition and Renovations
Chadron, NE
Size 113,105 sf
Owner Chadron State College
Design Leo A Daly
![Page 17: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/17.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The Chadron State College Armstrong Gymnasium and Events Center Renovation and Addition Project is a two-phased renovation of the current Armstrong PE Building. Phase one (approximately 50,000 sf) included the athletics strength and conditioning center, which involved renovating and converting the existing 6,300-sf natatorium to serve as the new home for athletics training. The second phase included the new 64,000-sf Event Center Arena (seating capacity of 2,700) with lobby area, circulation spaces, athletic offices and auxiliary spaces (including locker rooms, fan amenities, sports medicine and support spaces).
b u i l d i n g S M A R Tenvironments
![Page 18: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/18.jpg)
C o l o r a d o N o r t h w e s t e r n Community College
Craig Campus
Craig, Colorado
Size 70,000 sf
Owner Colorado Northwestern Community College
Design Anderson Mason Dale
SilverLEED
![Page 19: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/19.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The Academic Building and Career Technical Center were the first buildings built on the new Craig campus. The Academic building includes administrative areas, educational space and simulation labs for nursing, chemistry, physics, biology and earth sciences. The new building also includes a library, student government, bookstore, newspaper, student services and an arts area. The Career Technical Center is for specialized education programs such as mine training, cosmetology, massage therapy and other trades.
LEED Silver
b u i l d i n g S M A R Tenvironments
![Page 20: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/20.jpg)
C o l o r a d o S c h o o l o f M i n e s Alderson Hall
Renovations and Addition
Golden, Colorado
Size 95,000 sf
Owner Colorado School of Mines
Design RNL Design
![Page 21: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/21.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This historical renovation also included an addition to the Colorado School of Mines Alderson Hall. The main renovations included chemical and petroleum engineering laboratories with specialized blast room, fluid flow tower and a drilling simulator, four-story atrium.
b u i l d i n g S M A R Tenvironments
![Page 22: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/22.jpg)
U n i v e r s i t y o f D e n v e r Daniels College of Business
Denver, Colorado
Size 153,300 sf
Owner University of Denver
Design Anderson Mason Dale
![Page 23: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/23.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Size 153,300 sf
Owner University of Denver
Design Anderson Mason Dale
The Daniels College of Business is located in the middle of the University of Denver (DU) campus. The brick exterior with limestone accents and copper roof fit right in to the style of the previous campus buildings. This 153,000-sf higher education facility features state-of-the-art computer technology for the business curriculum. There is also a 2-level underground parking lot with 110 spaces. Flexibility and responsiveness were key to this project, because a portion of the interior finish changed significantly late in the schedule. Through the team’s flexibility and subcontractor commitment, A&P was able to complete all the major work prior to opening to the school’s staff and students.
b u i l d i n g S M A R Tenvironments
![Page 24: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/24.jpg)
F o r t L e w i s C o l l e g e B e r n d t Biology Hall
Addition and Renovation
Durango, Colorado
Size 31,300 sf
Owner Fort Lewis College
Design Anderson Mason Dale
![Page 25: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/25.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The design and construction of Berndt Biology Hall involved demolishing the central core of a single-story structure and rebuilding in-place a new three-level 32,000-sf addition while the two extant sections of the building remained in use. A severely constrained site, centrally located on an active college campus and the need to work around and maintain existing building systems in disjointed sections of the former building required extensive communication and teamwork between the College, A&P and the design team. The building program features a combination of traditional college classroom and office facilities as well as highly specialized laboratory facilities to accommodate agriculture, botany, genetics, herbarium, microbiology, physiology, zoology and anatomy.
b u i l d i n g S M A R Tenvironments
![Page 26: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/26.jpg)
F r o n t R a n g e C o m m u n i t y College Sunlight Peak and
Challenger Point Science Buildings
Fort Collins, Colorado
Size 46,600 sf
Owner Front Range Community College
Design FWA Group
GoldLEED
![Page 27: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/27.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This two-phase LEED Gold project consisted of a new science building, Sunlight Peak, and the renovation / addition of the two-story Challenger Point Building on Front Range Community College’s Larimer Campus. Sunlight Peak contains a cadaver lab and increased the campus’s science lab capacity to 10 labs, with associated prep rooms. The Challenger Point renovation converted the existing labs into classroom space to increase the total number of campus classrooms. The cast-in-place addition includes science classrooms and support facilities. The project also included an adjacent observatory. A&P was able to apply creative phasing and scheduling to this project to reduce the schedule by more than four months.
LEED Gold Best Higher Education/Research Project - ENR Mountain States
b u i l d i n g S M A R Tenvironments
![Page 28: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/28.jpg)
F r o n t R a n g e C o m m u n i t y College Student Services
and Math Building Renovations
Westminster, Colorado
Size 35,000 sf
Owner Front Range Community College
Design FWA Group
![Page 29: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/29.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Located on the Westminster Campus, this multi-phase project consolidates all student services, including admissions and registration, advisement, career counseling, tutoring, testing, financial aid, disability services and cashiers, into one central 35,000-sf location. Renovations include reconfiguration of spaces, HVAC upgrades, structural upgrades, building envelope improvements and cosmetic upgrades to the student center, mathematics department and performance and lecture hall.
b u i l d i n g S M A R Tenvironments
![Page 30: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/30.jpg)
C o l o r a d o M e s a U n i v e r s i t y Maverick Center Addition and Renovation
Grand Junction, Colorado
Size 135,000 sf
Owner Colorado Mesa University
Design Sink Combs Dethlefs
![Page 31: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/31.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Delivered in a collaborative process, the Maverick Center has become a showcase facility in the University’s recruiting and retention efforts. The Maverick Center project included converting an existing natatorium to strength and conditioning facilities and creating numerous staff offices, classroom and laboratory spaces for the school’s nursing, kinesiology and other health-related departments while updating existing locker rooms, common areas and gymnasium. The expanded facilities resulted in a new nataturium with a 50-meter competition pool, an outdoor softball stadium, football fields and other site improvements.
Excellence in Construction Institutional Category, Merit Award - ABC Western CO Chapter
Gold Hard Hat Award, Outstanding Sports/Recreation Project - Mountain States Construction
b u i l d i n g S M A R Tenvironments
![Page 32: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/32.jpg)
N o r t h e a s t e r n J u n i o r C o l l e g e Blue Spruce Residence
Hall Building
Sterling, Colorado
Size 32,500 sf
Owner Northeastern JuniorCollege
Design Anderson Mason Dale
![Page 33: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/33.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The newest residence hall at this two-year college accommodates 128 students in double rooms. The building is equipped with a kitchen, laundry facilities and a two-story lounge and study area. Located along the new pedestrian promenade, the new residence also includes a large outdoor courtyard space, complete with barbecue stations, which is shared with the adjacent residence hall. This facility increases the availability of on-campus housing and supports the college’s recruiting and retention efforts.
b u i l d i n g S M A R Tenvironments
![Page 34: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/34.jpg)
U n i v e r s i t y o f N o r t h e r n C o l o r a d o Ross Hall Chemistry Labs
Additions and Renovations
Greeley, Colorado
Size 213,000 sf
Owner University of NorthernColorado
Design PageSoutherlandPage
![Page 35: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/35.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The award-winning University of Northern Colorado Ross Hall renovation and expansion project involved the phased construction of laboratories, classrooms, lecture halls and office space for the Biological Sciences, Chemistry, Earth Sciences, Physics, Mathematical Sciences and Environmental Studies departments.
Gold Hard Hat, Outstanding Masonry Project - Colorado Construction
b u i l d i n g S M A R Tenvironments
![Page 36: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/36.jpg)
U n i v e r s i t y o f N o r t h e r n C o l o r a d o Turner Hall Renovations
Greeley, Colorado
Size 140,000 sf
Owner University of NorthernColorado
Design MOA Architecture
![Page 37: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/37.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The renovation to this 13-story, 328-bed student housing facility at the University of Northern Colorado took place over the summers of 2009 and 2010. Renovations included major abatement throughout the residence; complete replacement of data and coaxial cable in all rooms; domestic hot and cold riser replacement; addition of laundry rooms on 4 floors; demolition of a 13-story trash chute; new lighting package and reconfiguration of existing circuitry; new fire alarm panel and annunciator panel; reconfiguration of wall layout for common areas and living areas; new built-in casework and furnishings; and re-texturing of walls to knock down finish, painting and carpeting.
b u i l d i n g S M A R Tenvironments
![Page 38: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/38.jpg)
N o r m a n d a l e C o m m u n i t y C o l l e g e Academic Partnership Center
R e n o v a t i o n s
Bloomington, Minnesota
Size 29,200 sf
Owner Normandale Community College
Design Rafferty Rafferty & Tollefson Architects
![Page 39: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/39.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The 74,000-sf, three-story Academic Partnership Center (APC) building was constructed in 14 months. The 27 classrooms and 3 office suites are operated by Normandale College in collaboration with other colleges and universities within the MnSCU system. The APC was one of the first major projects completed under the new CM@R process allowed by MnSCU. This project required the connection to the newly renovated Kopp Student Center. A&P used driven piling and connected all mechanical and electrical systems to the main portion of campus without disrupting operations. The unique structural design was supported on 476 driven piling and the slab on grade was supported by rammed aggregate piers (GeoPier). The A&P team determined this to be the most cost effective solution and allowed for the future flexibility the College wanted in lieu of a structural slab. The building was completed on time and under the initial GMP submitted, allowing project dollars to be returned to the owner.
b u i l d i n g S M A R Tenvironments
![Page 40: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/40.jpg)
U n i v e r s i t y o f C o l o r a d o Health Sciences Center
Fitzsimons Campus Services Building
Aurora, Colorado
Size 68,300 sf
Owner University of Coloradoat Denver & Health SciencesCenter
Design Anderson Mason Dale
![Page 41: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/41.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Located on the University of Colorado Health Sciences Campus, the Fitzsimons Facilities Support Building is the unseen heart of the campus’ infrastructure and facilities maintenance operations. Included are vehicle storage and maintenance facilities as well as workshop spaces for the lock shop, carpentry shop, plumbing and HVAC shops; electrical shop; paint shop; landscaping services shop; welding shop; tool and parts storage areas; a mail center; and a full printing center. Providing dedicated office space for numerous departments for the University’s administration, the 68,300-sf facility consolidates many previously scattered campus services departments into one central location.
b u i l d i n g S M A R Tenvironments
![Page 42: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/42.jpg)
C e n t r a l A r i z o n a C o l l e g e ’ s S u p e r s t i t i o n M o u n t a i n C a m p u s
E x p a n s i o n
Apache Junction, Arizona
Size 46,000 sf
Owner Central Arizona College
Design Richard + Bauer
![Page 43: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/43.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The expansion at the Superstition Mountain Campus consisted of a new building housing classrooms, laboratory and science rooms for nursing school, open computer commons, facility space, testing areas and a new bookstore. This phase included renovations of existing buildings to relocate early education classrooms with a new exterior play area, a new student lounge with a serving area and multiple faculty and classroom additions.
b u i l d i n g S M A R Tenvironments
![Page 44: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/44.jpg)
U n i v e r s i t y o f M i n n e s o t a N O v A F a r D e t e c t o r
F a c i l i t y
Ash River, Minnesota
Size 39,500 sf
Owner University of Minnesota-Twin Cities
Design Burns & McDonnell Engineer Co., Inc
![Page 45: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/45.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
The NOvA Far Detector Facility is a new international physics laboratory, and the site of an upcoming experiment that will help scientists understand the origins of the universe. The experiment, which begins collecting data in 2013, will involve the study of neutrinos, subatomic particles that are among the fundamental building blocks of matter. The construction of the detector facility involved many unique logistical challenges related to the remote project site and the huge, very specialized equipment required for the experiment. The project involved building a 3.5-mile access road and supplying power to the isolated project site, blasting 40 feet into the granite to create a football field-sized space for the detector enclosure and, finally, building the massive 350-foot-long concrete facility. BIM technology was critical in identifying logistical and scheduling issues, demonstrating how the complex building components would fit together, and designing a real-time communication plan for stakeholders. A unique application of BIM technology led to the development of 3D laser scanning, which helped minimize layout time for excavation.
b u i l d i n g S M A R Tenvironments
![Page 46: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/46.jpg)
U n i v e r s i t y o f M i n n e s o t a Regis Center for the Arts
M a r q u e z H a l l
Minneapolis, Minnesota
Size 154,000 sf
Owner University of Minnesota-Twin Cities
Design Meyer Borgman & Johnson-MJB
![Page 47: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/47.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
This $28 Million, 154,000-sf building on the University of Minnesota campus includes sophisticated art teaching and research facilities. The 18-month project was completed in the midst of an active, thriving campus and included the installation of extensive mechanical and chemical handling systems. Commissioning of the complicated HVAC, electrical and mechanical systems was completed smoothly, allowing the University to quickly and easily assume the maintenance and operation of the facility.
b u i l d i n g S M A R Tenvironments
![Page 48: A&P Higher Education](https://reader031.fdocuments.net/reader031/viewer/2022020310/568c56a21a28ab4916c75c7b/html5/thumbnails/48.jpg)
innovate. collaborate. outper form.
VALUE BEYOND BUILDING
Leadership ContactsTom Horsting
Sr. Vice [email protected]
Doug Johnson, LEED APVice President
Mark Ortiz, LEED APBusiness Development
(303) 363-7101www.a-p.com
Healthcare
Higher Education
K12 Education
Aquatics & Recreation
Municipal Government
Senior Living
Office
Hospitality
Mixed-Use
Multi-Family Housing
Retail
Energy Resources
Federal Government