“Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project...

17
Maas Energy Works, Inc. “Renewable Energy that Works” Daryl Maas Chief Executive Officer

Transcript of “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project...

Page 1: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Maas Energy Works, Inc.“Renewable Energy that Works”

Daryl MaasChief Executive Officer

Page 2: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Washington & Oregon SitesCalifornia SitesMaas Energy Works Digester Projects

Page 3: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Why are we here?

Page 4: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Maas Energy Works Verified Greenhouse Gas Reduction (Tons CO2e)

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

200,000

2009 (verified) 2010 (verified) 2011 (verified) 2012 (verified) 2013 (verified) 2014 (verified) 2015 (verified) 2016 (partiallyverified)

2017(estimated)

Tons

CO2

e

TeVelde Tipton (estimated)Verwey-Madera (estimated)Verwey-Hanford (estimated)Open SkyPixley BiogasPacific RimVan WarmerdamVan Steyn (estimated)WashingtonOregon

Page 5: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Timeline of California Digester Startups from 2013 through June 2017

New Hope Pacific Rim Van Steyn Verwey-Hanford GJ TeVelde Ranch(Non-Maas) Maas Energy Works Maas Energy Works Maas Energy Works Maas Energy Works

~ Juiy, 13 Nov, 14 Sep, 15 Oct, 16 June, 17

1.1.22 - Timeline of California Digester Startups Since 2013

May, 13 Sep, 14 ~ Dec, 14 Aug, 16 May, 17Van Warmerdam Calgren Ethanol ABEC #1 (Bidart-Old River) Open Sky Ranch Verwey-Madera

Maas Energy Works Maas Energy Works (Non-Maas) Maas Energy Works Maas Energy Works

Page 6: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

Why are we here?

Page 7: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

Fewer Regulations?

Page 8: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Utility I ntertonneclion

StartTue 4/2S/17

FinishMon 1/14/19

। May '17 jjul'T7 iS^’tr j New'17 Jan "IE । Mar'IE ! May "IE Jul PIE jSep 'IE । Nov 'IE

Study Phase ContractPhase Service Planning Phase

CnnEtrurticn P^mse-

------------------«--------------------- *--------------------------------------------- ----- * + *----------*---------t--------------------

Apply for Interconnection

EHoarte Generator Interconnection

Agree ment

Utility ApprovesPrimary Servlet

Utility Completes pfo from quso Upgrades 'i

Primary Service Construction

Cdrrplcte

Utility IssuesPerm Iss Ion to Operate

Perm it Jug

StartTue 4/2S/17

FinishHon 1/14/19

i *17 Ji.1'17 jS^'W ! Nov'17 Jai’U ! Mar 'IE । May-11 Jul 'IE । Sep'IE ! Nn 'IE

count/ Minor M0D(CK?A1 County BUilOihg Permit

AIR PERMIT

Water Board |Pcmd Liner]--------«-------------

Proj cct Startup and FID Received

Costs

StartTue 4/2S/17

j w*r *17 ijnl'17 । Nw*f7 Jan’ll | Mar'IE ( May’U Jul'IE , Sep'IE ! Nov 'IE

----- • — • —---•----PreconstructionCosts T»,[»0

- • — 4------™

Pull Construction Costs *3,739,557

FinishMon 1/14/19

Develop t c it Fee M.OW

Interconnection Fee

County Mindr Mod and Air Perm It Fee

tl.Qfe

titl.EOO

BlIn MAT Application

InterconnectionSecurity Deposit -15,ODD i Requires Drawn Payment nn550Q,0<M of now Gem set S3 SO, DOC

credit;

Fot11,H»

Page 9: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

Faster Utilities!

Page 10: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

More People!

Page 11: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Maas Energy Works Full-Time Digester PersonnelProject Development and Operations

Electric Innovations, Inc.Specialty Electrical Design and Construction

Michelle Prater Accounting

Ted Thompson CEO

Aaron Angeli Automations Supervisor

Alex Nash Justin ColeDirector of Field Ops Automation Tech

Jonathan PrattElectrical Engineer

Page 12: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

• Remote Facility Management• Air / Water / Building Permits• Design (AutoCAD)• Construction Management

To A Real Office!

Maas Energy Works Company Info

Design and Projections Project Development Operations

Page 13: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and
Page 14: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

Less Standing Still

Page 15: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

What do we need in order to build more digesters?

More Money

Page 16: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

Construction Funding Revenues

• NEM• AB-32 Cap and Trade• LCFS• RINS• BioMAT

• CDFA• CEC• CPUC & Pilot Projects• Federal Grants• Federal Tax Credits• Private Funds

Page 17: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and

• BioMAT: Expand total dairy MW, especially in PG&E territory (triple!)

• Water Boards: Accommodate Digester General Order, Consider Alternative Designs

• Air Districts: Realistic BACT, Invalidation Sensitivity

• Utilities: Leadership Push for Implementation. Point of Contact for Issues.

• CEQA: High Level Support on Complicated Projects

• LCFS: Continued Clarity on Credit Generation and Flexibility on Methods

• CDFA: Reward Performance

What do we need in order to build more digesters?