“Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project...
Transcript of “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project...
![Page 1: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/1.jpg)
Maas Energy Works, Inc.“Renewable Energy that Works”
Daryl MaasChief Executive Officer
![Page 2: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/2.jpg)
Washington & Oregon SitesCalifornia SitesMaas Energy Works Digester Projects
![Page 3: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/3.jpg)
Why are we here?
![Page 4: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/4.jpg)
Maas Energy Works Verified Greenhouse Gas Reduction (Tons CO2e)
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
2009 (verified) 2010 (verified) 2011 (verified) 2012 (verified) 2013 (verified) 2014 (verified) 2015 (verified) 2016 (partiallyverified)
2017(estimated)
Tons
CO2
e
TeVelde Tipton (estimated)Verwey-Madera (estimated)Verwey-Hanford (estimated)Open SkyPixley BiogasPacific RimVan WarmerdamVan Steyn (estimated)WashingtonOregon
![Page 5: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/5.jpg)
Timeline of California Digester Startups from 2013 through June 2017
New Hope Pacific Rim Van Steyn Verwey-Hanford GJ TeVelde Ranch(Non-Maas) Maas Energy Works Maas Energy Works Maas Energy Works Maas Energy Works
~ Juiy, 13 Nov, 14 Sep, 15 Oct, 16 June, 17
1.1.22 - Timeline of California Digester Startups Since 2013
May, 13 Sep, 14 ~ Dec, 14 Aug, 16 May, 17Van Warmerdam Calgren Ethanol ABEC #1 (Bidart-Old River) Open Sky Ranch Verwey-Madera
Maas Energy Works Maas Energy Works (Non-Maas) Maas Energy Works Maas Energy Works
![Page 6: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/6.jpg)
What do we need in order to build more digesters?
Why are we here?
![Page 7: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/7.jpg)
What do we need in order to build more digesters?
Fewer Regulations?
![Page 8: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/8.jpg)
Utility I ntertonneclion
StartTue 4/2S/17
FinishMon 1/14/19
। May '17 jjul'T7 iS^’tr j New'17 Jan "IE । Mar'IE ! May "IE Jul PIE jSep 'IE । Nov 'IE
Study Phase ContractPhase Service Planning Phase
CnnEtrurticn P^mse-
------------------«--------------------- *--------------------------------------------- ----- * + *----------*---------t--------------------
Apply for Interconnection
EHoarte Generator Interconnection
Agree ment
Utility ApprovesPrimary Servlet
Utility Completes pfo from quso Upgrades 'i
Primary Service Construction
Cdrrplcte
Utility IssuesPerm Iss Ion to Operate
Perm it Jug
StartTue 4/2S/17
FinishHon 1/14/19
i *17 Ji.1'17 jS^'W ! Nov'17 Jai’U ! Mar 'IE । May-11 Jul 'IE । Sep'IE ! Nn 'IE
count/ Minor M0D(CK?A1 County BUilOihg Permit
AIR PERMIT
Water Board |Pcmd Liner]--------«-------------
Proj cct Startup and FID Received
Costs
StartTue 4/2S/17
j w*r *17 ijnl'17 । Nw*f7 Jan’ll | Mar'IE ( May’U Jul'IE , Sep'IE ! Nov 'IE
----- • — • —---•----PreconstructionCosts T»,[»0
- • — 4------™
Pull Construction Costs *3,739,557
FinishMon 1/14/19
Develop t c it Fee M.OW
Interconnection Fee
County Mindr Mod and Air Perm It Fee
tl.Qfe
titl.EOO
BlIn MAT Application
InterconnectionSecurity Deposit -15,ODD i Requires Drawn Payment nn550Q,0<M of now Gem set S3 SO, DOC
credit;
Fot11,H»
![Page 9: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/9.jpg)
What do we need in order to build more digesters?
Faster Utilities!
![Page 10: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/10.jpg)
What do we need in order to build more digesters?
More People!
![Page 11: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/11.jpg)
Maas Energy Works Full-Time Digester PersonnelProject Development and Operations
Electric Innovations, Inc.Specialty Electrical Design and Construction
Michelle Prater Accounting
Ted Thompson CEO
Aaron Angeli Automations Supervisor
Alex Nash Justin ColeDirector of Field Ops Automation Tech
Jonathan PrattElectrical Engineer
![Page 12: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/12.jpg)
• Remote Facility Management• Air / Water / Building Permits• Design (AutoCAD)• Construction Management
To A Real Office!
Maas Energy Works Company Info
Design and Projections Project Development Operations
![Page 13: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/13.jpg)
![Page 14: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/14.jpg)
What do we need in order to build more digesters?
Less Standing Still
![Page 15: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/15.jpg)
What do we need in order to build more digesters?
More Money
![Page 16: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/16.jpg)
Construction Funding Revenues
• NEM• AB-32 Cap and Trade• LCFS• RINS• BioMAT
• CDFA• CEC• CPUC & Pilot Projects• Federal Grants• Federal Tax Credits• Private Funds
![Page 17: “Renewable Energy that Works” · Maas Energy Works Full-Time Digester Personnel. Project Development and Operations. Electric Innovations, Inc. Specialty Electrical Design and](https://reader033.fdocuments.net/reader033/viewer/2022051917/60090eb7a7464953b466cf34/html5/thumbnails/17.jpg)
• BioMAT: Expand total dairy MW, especially in PG&E territory (triple!)
• Water Boards: Accommodate Digester General Order, Consider Alternative Designs
• Air Districts: Realistic BACT, Invalidation Sensitivity
• Utilities: Leadership Push for Implementation. Point of Contact for Issues.
• CEQA: High Level Support on Complicated Projects
• LCFS: Continued Clarity on Credit Generation and Flexibility on Methods
• CDFA: Reward Performance
What do we need in order to build more digesters?