Page 0 of iii Request For Proposal “Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM” TN –72 Purchaser Jaipur Vidyut Vitran Nigam Limited (JVVNL), Jaipur Office of the Superintending Engineer (IT),JVVNL, Jaipur Email: [email protected] Tel.: +91-1412741561

Transcript of “Implementation of Advanced Metering Infrastructure (AMI...

Page 1: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Page 0 of iii

Request For Proposal “Implementation of Advanced Metering Infrastructure (AMI)/ Smart

Metering System Under NSGM”

TN –72

Purchaser

Jaipur Vidyut Vitran Nigam Limited (JVVNL),

Jaipur

Office of the Superintending Engineer

(IT),JVVNL, Jaipur

Email: [email protected]

Tel.: +91-1412741561

Page 2: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Page i of iii

NOTICE INVITING TENDER

Reference No: TN - 72

Jaipur VidyutVitran Nigam Ltd. [“JVVNL”/ “Jaipur Discom”] has invited bids from competent Agency for

work of “Implementation of AMI (Advanced Metering Infrastructure/Smart Metering System

for Consumers in towns of Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli

circles under NSGM”

The contract period shall be initially for a period of Seven years including the Implementation &

Rollout period of Two Years from the date of award of contract. The contract period may further be

extendable for further two year, as per mutual agreement.

Mode of Bid Submission Online through e-Procurement/e-Tendering

system at https://eproc.rajasthan.gov.in

Tendering Authority

Superintending Engineer (IT)

Jaipur VidyutVitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur Rajasthan, 302005.

Estimated cost of Project Rs. 132Crores

Contact Persons 1) Ram Avatar Sharma SE (IT)

Office: 0141-2741561

2) RK Sharma, XEN (IT).

Submission of Banker’s Cheque/ Demand Draft in favour

of AO(IT&RE),JVVNL, Jaipur or online in the name of

AO(IT&RE), JVVNL, Jaipur, having A/c No. 51093320466

in the SBI Collectorate Branch, Jaipur having IFS Code

SBIN0031206 against Tender Document Fee

(including GST@ 18%) deposited in the office of the AO

(IT&RE) (non-refundable), payable at Jaipur, Rajasthan.

The bankers cheque / Demand Draft / copy of bank

statement showing payment of Rs. 5900/- will have to be

furnished with the Bid.

Rs. 5900/- before 08.05.2018 upto 3 P.M.

Submission Demand Draft for e-Tender Processing Fee

with AO(IT&RE) in favour of M.D, RISL payable at

Jaipur(non-refundable)

Rs. 1180/- before 08.05.2018 upto 3 P.M.

Submission of Bid Security through DD / Bankers

Cheque in favour of AO (IT&RE), JVVNL or online in the

name of AO (IT&RE), JVVNL, Jaipur, SBI Collectorate

Branch, Jaipur having IFS Code SBIN0031206, A/c No.

51093320466 or in the form of BG in the name of SE

(IT)(BG on stamp paper of 0.25% of BG amount or

maximum uptoRs. 25,000/-).

Rs. 2.64 Crore before 08.05.2018 upto 3 P.M.

Submission Date for Banker’s Cheque/ Demand Draft /

BG for Tender Fee, BID SECURITY, and Processing Fee.

The deadline for submission of these

instruments is Bid Submission Deadline. The

Bidder can submit these instruments before the

deadline. The Bidder has to submit the same in

hard copy and attach the scan of receipts with

Page 3: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Page ii of iii

online bids.

Bid submission Last Date/ Time 09/05/2018 at 14:00 Hrs.

Date & Time of Opening of Technical Bids 09/05/2018 at 15:00 Hrs.

Date & Time of Opening of Financial Bids To be intimated later

Websites for downloading Tender Document,

Corrigendum’s, Addendums etc.

https://eproc.rajasthan.gov.in.

http://www.energy.rajasthan.gov.in/jvvnl

Bid Validity&BID SECURITY Validity

Bid Validity:90 Days from the date of Financial

Bid Opening

BID SECURITY Validity: 180 days from date

of Technical Bid opening. If required, the same

shall be requested to be extended.

The prospective bidder should have the necessary competence, adequate financial standing, sufficient

experience, expertise as per Qualification Requirement detailed in this document.

Before bidding under this bid, in order to avoid non responsiveness of bid, bidder should ensure that:

1. They are qualified as per QR mentioned in this document

2. The offered solution meets the technical requirement laid down in this document.

Scope of Work is detailed out in the subsequent sections of the RFP

NOTE:

1. The bid shall only be submitted through online tendering system of

www.eproc.rajasthan.gov.in.

2. Bidders who wish to participate in this tender will have to register on

https://www.eproc.rajasthan.gov.in To participate in online tenders, Bidders will have to

procure Digital Signature Certificate (Type – II or Type – III) as per Information Technology

Act-2000 using which they can sign their electronic bids. Bidders can procure the same from

any CCA approved certifying agency i.e. TCS, Safecrypt, Ncode etc. or they may contact e-

Procurement Cell, Department of IT & C, Government of Rajasthan for future assistance.

Bidders who already have a valid Digital Certificate need not to procure a new Digital

Certificate.

Contact No. 0141 – 4022688 (Help desk of RISL - 10.00 AM to 6.00 PM on all working days)

E-mail: [email protected]

Address: e-Procurement Cell, RISL, Yojana Bhawan, Tilak Marg, C-Scheme, Jaipur.

3. Bidders should go through the website https://www.eproc.rajasthan.gov.in should refer to the

website and go through the link “Help For Contractors”, “Information About DSC”, “FAQ” and

“Bidders Manual Kit” and Section-I to know the process for submitting the electronic bids at

the website.

4. The ‘Instructions to bidders’ and other terms and conditions of this tender pertaining to the

bidding process generally follow the guidelines of e-tendering system of the government of

Rajasthan, available at URL https://www.eproc.rajasthan.gov.in. However, wherever there is

any anomaly between the conditions referred to in this tender document and the GoR e-

tendering system, the latter shall be final.

Page 4: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Page iii of iii

5. The complete tender document has been published on the websites,

www.energy.rajasthan.gov.in/jvvnl and https://www.eproc.rajasthan.gov.in for the purpose

of downloading.

6. The downloaded tender document shall be considered valid for participation in the bid process

subject to submission of required Tender fees, e-Tender Processing Fee and BID SECURITY as

mentioned in the NIT Section table. A copy of receipt of the tender fees, e-Tender Processing

Fees &BID SECURITYmust be enclosed along with the Technical bid/ proposal failing which the

bid will be summarily rejected. The last date of submission of these Original instruments is

mentioned in the NIT Table. The Bidder must take due care in submitting the instruments and

collecting receipts from Jaipur Discom so that the Originals are submitted in hard copy and

receipt scans are uploaded with the Technical Bid, before the Bid Submission Deadline.

7. All the communication/ correspondence including the bid document (Technical and Financial

Bid) should be signed digitally by the Bidder. The Technical and Financial Bid which is

uploaded on eproc portal must be signed and stamped on each relevant page by the

designated Authorized Representative of the bidder. The name, designation and authority of

the designated Authorized Representative of the Bidder shall be stated in the Bid.

8. No contractual obligation whatsoever shall arise from the tender document/bidding process

unless and until a formal contract is signed and executed between the purchaser and the

successful bidder(s).

9. JVVNL disclaims any factual/ or any other errors in this tender document (the onus is purely

on the individual bidders to verify such information) and the information provided herein are

intended only to help the bidders to prepare a logical bids.

10. Bids will be considered only in the prescribed manner. Bids not submitted in the prescribed

format will be summarily rejected without further evaluation.

11. Copies of various documents to be enclosed along with the bids must be legible and be self-

attested by the authorized signatory with official seal. Claims made by bidder related to the

project experience and other requirements shall be considered only when appropriate

supporting documents are provided.

12. The Bids can be submitted up to date and time given as specified in the NIT Table.

13. The complete bidding process is defined in the tender document.

14. In case, a bidder imposes conditions which are in addition or at variance or in conflict with the

terms and conditions as specified in this tender document, all such bids will be summarily

rejected.

15. Tendering Authority reserves the complete right to accept or reject in part or full any or all the

bids without assigning any reasons whatsoever. No further discussion/ interaction will be held

with the bidders whose bids have been disqualified/ rejected by the tendering authority.

16. In case, a dispute arises with regard to interpretation/ omission/ error in this tender

document, bid submitted, other documents; the decision of SE (IT), JVVNL, Jaipur will be final

and binding upon the bidders.

17. Interested bidders may obtain further information from the office of

The Superintending Engineer (IT),

Jaipur Vidyut Vitran Nigam Ltd,

Room No. 117 Vidyut Bhawan,

Jaipur – 302005.

Page 5: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

TABLE OF CONTENTS

NOTICE INVITING TENDER .................................................................................................................................. i

TABLE OF CONTENTS ............................................................................................................................................ 1

SECTION 1: INTRODUCTION AND OBJECTIVE ............................................................................................ 2

SECTION 2: QUALIFICATION REQUIREMENTS (QR) ................................................................................. 9

SECTION 3: INSTRUCTION TO BIDDERS .................................................................................................... 13

SECTION 4: TERMS AND CONDITIONS ........................................................................................................ 23

SECTION 5: SCOPE OF WORK ......................................................................................................................... 36

SECTION 6: GENERAL TECHNICAL SPECIFICATIONS ............................................................................. 49

SECTION 7: TECHNICAL PROPOSAL SUBMISSION SHEET ................................................................... 50

SECTION 8: OTHER UNDER TAKINGS .......................................................................................................... 72

SECTION 9: FORMAT FOR FINANCIAL BID SUBMISSION ..................................................................... 84

SECTION 10: ANNEXURES – BILL OF MATERIAL .................................................................. 87

Page 6: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION

1.1. Introduction

JAIPUR VIDYUT VITRAN NIGAM LIMITED (Jaipur Discom

Rajasthan engaged insupply and distribution of electricity in 12 districts of Rajasthan, namely Jaipur,

Dausa, Alwar, Bharatpur, Dholpur, Kota, Bundi, Baran, Jhalawar, Sawai

JVVNL intends to select an AMI

the system in Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli

would be 7.0 years (2 years implementation + 5 years operation and Maintenance). The project is on

CAPEX model that is all the supplied equipment shall be property of JVVNL.

Advanced Metering Infrastructure,

electronic meters with two-way communications technology for information, monitor, and control.

Smart Meters are advanced electronic energy measurement devices having the capacity to collect

information about energy usage at various intervals and transmitting the data through a

communication network to utility and receiving instructions from utility as well. In addition to

conventional electronic metering functionality smart meters through its built in commun

can undertake load switch activities for disconnecting/ connecting the load. Smart meters transmit

readings and other relevant data to central server at periodic interval. Smart metering system aims to

deliver multiple benefits by:

• Providing a platform for improved customer service, e.g. timely and accurate readings support billing

without need for estimation.

• Detailed and in time information of energy usage for identifying opportunities for energy savings.

• Building a platform for future smart grids.

• Allow remote connection/disconnection of supply.

• Measurement electricity exported.

The basic smart metering system is based on two

the meter). The two-way communication provi

like power quality monitoring, outage management, load limiting and remote cut

availability of ancillary devices at additional cost, similarly for analysing the data transmitted by me

for deriving meaningful information an IT system is imperative.

Smart metering is an integrated technology that pays for itself through reduced AT & C losses,

improved energy savings, and operational efficiencies.

1.1.1. Basic Functions of Smart Metering S

The basic functionalities of the Smart Metering System defined by CEA are as below.

• Remote Meter data reading at configurable intervals (push/pull)

• Time of day (TOD)/TOU metering

• Pre-paid/Post-paid functionality

• Net Metering/Billing

• Alarm/Event detection, notification and reporting

• Remote Load Limiter and connection/ disconnection at defined/on demand conditions

• Remote firmware upgrade

• Integration with other existing systems like

mapping, consumer indexing, new connections & disconnection, analysis software, Outage

Management System etc.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

2

INTRODUCTION AND OBJECTIVE

JAIPUR VIDYUT VITRAN NIGAM LIMITED (Jaipur Discom/JVVNL) is an undertaking of Government of

Rajasthan engaged insupply and distribution of electricity in 12 districts of Rajasthan, namely Jaipur,

Alwar, Bharatpur, Dholpur, Kota, Bundi, Baran, Jhalawar, Sawai Madhopur, Tonk and Karauli.

AMI System Implementation Agency that can design, deploy and maintain

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles of its licence area. Period

would be 7.0 years (2 years implementation + 5 years operation and Maintenance). The project is on

model that is all the supplied equipment shall be property of JVVNL.

Advanced Metering Infrastructure, also referred as “Smart Metering” is the combination of the

way communications technology for information, monitor, and control.

Smart Meters are advanced electronic energy measurement devices having the capacity to collect

t energy usage at various intervals and transmitting the data through a

communication network to utility and receiving instructions from utility as well. In addition to

conventional electronic metering functionality smart meters through its built in commun

can undertake load switch activities for disconnecting/ connecting the load. Smart meters transmit

readings and other relevant data to central server at periodic interval. Smart metering system aims to

• Providing a platform for improved customer service, e.g. timely and accurate readings support billing

• Detailed and in time information of energy usage for identifying opportunities for energy savings.

m for future smart grids.

• Allow remote connection/disconnection of supply.

electricity exported.

The basic smart metering system is based on two-way communication (data transferred to and from

way communication provide data to the utilities however additional functionalities

like power quality monitoring, outage management, load limiting and remote cut

availability of ancillary devices at additional cost, similarly for analysing the data transmitted by me

for deriving meaningful information an IT system is imperative.

Smart metering is an integrated technology that pays for itself through reduced AT & C losses,

improved energy savings, and operational efficiencies.

Basic Functions of Smart Metering System

The basic functionalities of the Smart Metering System defined by CEA are as below.

Remote Meter data reading at configurable intervals (push/pull)

Time of day (TOD)/TOU metering

paid functionality

Alarm/Event detection, notification and reporting

Remote Load Limiter and connection/ disconnection at defined/on demand conditions

Remote firmware upgrade

Integration with other existing systems like call centre, Billing & collection software, GIS

mapping, consumer indexing, new connections & disconnection, analysis software, Outage

Management System etc.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

) is an undertaking of Government of

Rajasthan engaged insupply and distribution of electricity in 12 districts of Rajasthan, namely Jaipur,

Madhopur, Tonk and Karauli.

System Implementation Agency that can design, deploy and maintain

of its licence area. Period

would be 7.0 years (2 years implementation + 5 years operation and Maintenance). The project is on

the combination of the

way communications technology for information, monitor, and control.

Smart Meters are advanced electronic energy measurement devices having the capacity to collect

t energy usage at various intervals and transmitting the data through a

communication network to utility and receiving instructions from utility as well. In addition to

conventional electronic metering functionality smart meters through its built in communication module

can undertake load switch activities for disconnecting/ connecting the load. Smart meters transmit

readings and other relevant data to central server at periodic interval. Smart metering system aims to

• Providing a platform for improved customer service, e.g. timely and accurate readings support billing

• Detailed and in time information of energy usage for identifying opportunities for energy savings.

way communication (data transferred to and from

de data to the utilities however additional functionalities

like power quality monitoring, outage management, load limiting and remote cut-off requires

availability of ancillary devices at additional cost, similarly for analysing the data transmitted by meter

Smart metering is an integrated technology that pays for itself through reduced AT & C losses,

The basic functionalities of the Smart Metering System defined by CEA are as below.

Remote Load Limiter and connection/ disconnection at defined/on demand conditions

collection software, GIS

mapping, consumer indexing, new connections & disconnection, analysis software, Outage

Page 7: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

• Import of legacy data from existing modules/ MDAS of RAPDRP where ever possible. The

extent and modalities of integrati

worked out by the bidder.

• Security features to prevent unauthorized access to the AMI including Smart meter & meter

data etc. and to ensure authentic.

In addition to above following functionalities a

Field replaceable Communication Module (shall be bundled in meter housing)

Pairing with Communication Module

Geo Location Identification

Time Synchronisation

1.1.2. Components of Smart Metering System

Smart Meters: Electronic energy meters, capable of two

measurement i.e. with the ability to measure the incoming and outgoing (Import and Export

energy) flow of electricity from a specific location such as a customer’s home or business.

Communication Network

meters in the field) and the Wide Area Network (LAN to central station)

infrastructure enables two

are several different ways this field

depending on the metering system selected.

Meter Data Acquisition System:

usage and event data from smart meters and manage the Local Area Network communications

infrastructure. This software is generally provided by the metering system vendor.

Meter Data Management System

analyses meter reading data prior to releasing it for integration into other operational systems

of utility such as customer billing, load forecasting and outage management.

Interfaces and Integration:

applications to handle the enhanced automated meter reading information,

interfaces between new and existing enterprise applications to support utility’s end

business processes.

Smart meters will enable customers to take advantage of new tools to save e

money. This includes:

Mobile Application: This application serves purpose of In

application used by consumer for monitoring usage.

The AMI system should support with strong user management, administrative area

management (utility administrative hierarchy like zone, circle, division, sub division etc.) and

flexible tabular, graphical reporting module.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

3

Import of legacy data from existing modules/ MDAS of RAPDRP where ever possible. The

extent and modalities of integration with the existing system including RAPDRP has to be

worked out by the bidder.

Security features to prevent unauthorized access to the AMI including Smart meter & meter

data etc. and to ensure authentic.

In addition to above following functionalities are also required.

Field replaceable Communication Module (shall be bundled in meter housing)

Pairing with Communication Module

Geo Location Identification

Components of Smart Metering System

Electronic energy meters, capable of two-way communications and two way

measurement i.e. with the ability to measure the incoming and outgoing (Import and Export

energy) flow of electricity from a specific location such as a customer’s home or business.

ommunication Network: It consists of two parts—the Local Area Network (localized to

meters in the field) and the Wide Area Network (LAN to central station)

infrastructure enables two-way transmission of data between smart meters and util

are several different ways this field-based communications infrastructure can be implemented,

depending on the metering system selected.

Meter Data Acquisition System: This software application is designed to aggregate energy

ta from smart meters and manage the Local Area Network communications

infrastructure. This software is generally provided by the metering system vendor.

Meter Data Management System: A software application that stores, validates, edits and

reading data prior to releasing it for integration into other operational systems

of utility such as customer billing, load forecasting and outage management.

Interfaces and Integration: This systems integration activity involves modifying existing

applications to handle the enhanced automated meter reading information,

interfaces between new and existing enterprise applications to support utility’s end

Smart meters will enable customers to take advantage of new tools to save e

This application serves purpose of In-Home Display (IHD) and web

application used by consumer for monitoring usage.

system should support with strong user management, administrative area

management (utility administrative hierarchy like zone, circle, division, sub division etc.) and

flexible tabular, graphical reporting module.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

Import of legacy data from existing modules/ MDAS of RAPDRP where ever possible. The

on with the existing system including RAPDRP has to be

Security features to prevent unauthorized access to the AMI including Smart meter & meter

Field replaceable Communication Module (shall be bundled in meter housing)

way communications and two way

measurement i.e. with the ability to measure the incoming and outgoing (Import and Export

energy) flow of electricity from a specific location such as a customer’s home or business.

the Local Area Network (localized to

meters in the field) and the Wide Area Network (LAN to central station)—this communication

way transmission of data between smart meters and utility. There

based communications infrastructure can be implemented,

This software application is designed to aggregate energy

ta from smart meters and manage the Local Area Network communications

infrastructure. This software is generally provided by the metering system vendor.

: A software application that stores, validates, edits and

reading data prior to releasing it for integration into other operational systems

of utility such as customer billing, load forecasting and outage management.

This systems integration activity involves modifying existing

applications to handle the enhanced automated meter reading information, and building

interfaces between new and existing enterprise applications to support utility’s end-to-end

Smart meters will enable customers to take advantage of new tools to save energy and

Home Display (IHD) and web

system should support with strong user management, administrative area

management (utility administrative hierarchy like zone, circle, division, sub division etc.) and

Page 8: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

AMI System Architecture

1.2. Project Area Profile

JVVNL decided to implement AMI system in

circles. AMI System need to be developed for approximately 285000 consumers.

project is 18,311 Square KMS and population is 3211457 as per census 2011.

Commercial Information for FY 2016

Particulars

Annual Energy Input

Annual Billed Energy

Revenue Billed

Revenue Collected

Billing Efficiency

Collection Efficiency

AT&C Loss in the System

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

4

JVVNL decided to implement AMI system in Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli

. AMI System need to be developed for approximately 285000 consumers.

project is 18,311 Square KMS and population is 3211457 as per census 2011.

Commercial Information for FY 2016-17

MU

MU

Rs., Crs.

Rs., Crs.

%

%

%

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli

. AMI System need to be developed for approximately 285000 consumers. Physical area of

58.72

49.92

3350.51

3306.38

85.01%

98.68%

16.11%

Page 9: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

1.3. Objective

AMI initiative is targeted to achieve.

Operational Efficiencies: improved reliability and lower operating costs in areas such as meter

reading, distribution system maintenance, and outage management.

Protection of Revenue: Reduced revenue loss due to the theft of power directly from the

distribution grid and tampering with the meters, as well as revenue “leakage” in some

customer processes.

Increased Cash Flow: rolling out monthly billing cycle.

Lower bills to Customer: achieving the conservation benefits, operational efficiencies, and

revenue protection lead to utility rate reductions which translate directly into customer

savings.

Improvement in Customer Service: provide real

and cost, and enable better customer communication around outages.

Conservation and Energy Efficiency: energy and capacity savings achieved through time

rates, effective communication and incentives to customers, customer

use, and grid operational improvements.

Increase in employee productivity: With lesser operational errors employees can focus on their

core jobs.

To fulfil these following activities need to be performed

• Implementation of AMI

security, MDM and associated integration, Back End requirements, O&M during project period)

• Set up require backend hardware and integration of AMI meters to the AM

the legacy system of the utilities

• Create a sustainable impact by increasing utility revenues. Hence, some of the priority focus

areas are

o Increasing the billing efficiency, increase in customer satisfaction etc.

o Better outage Management System.

o Zero number of estim

o Metering Inventory integrated with Asset Management.

• Web Based system for generation of reports & data analysis.

• Maintenance of AMI system

• Integration with Discom Billing/CCC/Feeder monitoring system/DT Metering system installed

under RAPDRP/ SCADA/Revenue Management System

as per the requirement of

1.4. The above work inc

To achieve these objectives with the functionalities mentioned above, the bidder shall

i. Supply, install, commission

Meter Box and other associated

ii. Deploy of Web Based Application on the Cloud for Meter Data Acquisition, Meter Data Analysis,

Meter Data Management, Report Generation, Integration with DISCOM Billing & other IT

Systems and Dissemination of information on Web Portal/Web

iii. Perform site survey and deciding the communication technology to ensure data availability of

all the consumers.

iv. Supply the required 4G/3G/2G/GPRS SIMS along with the

contract duration.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

5

AMI initiative is targeted to achieve.

Operational Efficiencies: improved reliability and lower operating costs in areas such as meter

reading, distribution system maintenance, and outage management.

Protection of Revenue: Reduced revenue loss due to the theft of power directly from the

bution grid and tampering with the meters, as well as revenue “leakage” in some

Increased Cash Flow: rolling out monthly billing cycle.

Lower bills to Customer: achieving the conservation benefits, operational efficiencies, and

revenue protection lead to utility rate reductions which translate directly into customer

Improvement in Customer Service: provide real-time and detailed information on consumption

and cost, and enable better customer communication around outages.

Conservation and Energy Efficiency: energy and capacity savings achieved through time

rates, effective communication and incentives to customers, customer

use, and grid operational improvements.

Increase in employee productivity: With lesser operational errors employees can focus on their

To fulfil these following activities need to be performed

Implementation of AMI solution (Smart Meters, Communication, HES,

associated integration, Back End requirements, O&M during project period)

Set up require backend hardware and integration of AMI meters to the AM

system of the utilities

Create a sustainable impact by increasing utility revenues. Hence, some of the priority focus

ncreasing the billing efficiency, increase in customer satisfaction etc.

Better outage Management System.

Zero number of estimated bills.

Metering Inventory integrated with Asset Management.

Web Based system for generation of reports & data analysis.

systemimplemented.

Integration with Discom Billing/CCC/Feeder monitoring system/DT Metering system installed

under RAPDRP/ SCADA/Revenue Management System or any other internal or external system

as per the requirement of Discom during the project tenure.

includes the following

To achieve these objectives with the functionalities mentioned above, the bidder shall

Supply, install, commission AMI system including Smart Meter, Communication Modules

ssociated accessories for consumer metering.

Deploy of Web Based Application on the Cloud for Meter Data Acquisition, Meter Data Analysis,

Meter Data Management, Report Generation, Integration with DISCOM Billing & other IT

Systems and Dissemination of information on Web Portal/Web Application and Mobile App.

ite survey and deciding the communication technology to ensure data availability of

Supply the required 4G/3G/2G/GPRS SIMS along with the appropriate

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

Operational Efficiencies: improved reliability and lower operating costs in areas such as meter

Protection of Revenue: Reduced revenue loss due to the theft of power directly from the

bution grid and tampering with the meters, as well as revenue “leakage” in some

Lower bills to Customer: achieving the conservation benefits, operational efficiencies, and

revenue protection lead to utility rate reductions which translate directly into customer

information on consumption

Conservation and Energy Efficiency: energy and capacity savings achieved through time-based

rates, effective communication and incentives to customers, customer direct control of energy

Increase in employee productivity: With lesser operational errors employees can focus on their

solution (Smart Meters, Communication, HES, Analytics, Cyber

associated integration, Back End requirements, O&M during project period).

Set up require backend hardware and integration of AMI meters to the AMI system and also to

Create a sustainable impact by increasing utility revenues. Hence, some of the priority focus

ncreasing the billing efficiency, increase in customer satisfaction etc.

Integration with Discom Billing/CCC/Feeder monitoring system/DT Metering system installed

any other internal or external system

To achieve these objectives with the functionalities mentioned above, the bidder shall

Communication Modules,

Deploy of Web Based Application on the Cloud for Meter Data Acquisition, Meter Data Analysis,

Meter Data Management, Report Generation, Integration with DISCOM Billing & other IT

Application and Mobile App.

ite survey and deciding the communication technology to ensure data availability of

appropriate data packs for the

Page 10: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

v. Deploy required manpower for repair, maintenance, replacement, updating, change

management of the system covering metering infrastructure, IT infrastructure, Hosting &

Software Solution.

vi. Depositthe replaced meters and accessories in JVVNL’s stores

1.5. AMI Solution Design Recommendations

The proposed solution should comply following basic design principles

1.5.1. Open and Industry Standards for Interoperability

The proposed solution must have highest degree of interoperability and the solution

components shall be standardbased and adopt an open approach rather than support a

specific technology.

1.5.2. Service Oriented Architecture (SOA)

AMI solution components must follow SOA principles to provide specific services using well

defined interfaces. TheA

subsystems and shall be implemented in sucha way that there is an opportunity for reuse. The

integration architecture shall be based on the concept of a serviceso all the applications of t

AMI solution are able to integrate without any complexity.

AMI system is envisaged as a

features can beaccessed via any user interface (internal or 3rd party applications) which shall

work on top of these Services

the robust and scalable

application will access AMI data directly from the storage layer or data access

internal data access also (access between various modules) there will be

direct access will be there to ensure theAMI system is scalable and secure.

1.5.3. Solution integration

• The integration middleware should be based on Service Oriented

other forms ofApplication Program Interfaces (API) and use publish / subscribe mechanism

• The integration middleware to be an open architecture based

• Implementation and configuration of functional APIs from meter manufacturers and

configuration of headend system

• All meter data of 30

polling frequencyshall be remotely configurable and can be altered as per the requirement

of JVVNL.

• The bidder must store and manage the security information related to Smart Meters.

Thisinclude Device Security keys and asset information for processing further business

flows.

• The bidder must support the mass receipt

subsequent update of MDMS with the necessary asset information to complete meter

reading and billing.

• The integration middleware/interface must validate the Data to be integrated

• It must maintain integration logs that confirm the success or otherwise of the

complete with controltotals

• The integration mechanism adopted must have minimal impact on the existing systems

The access to data will only be through

not access data directly

rules/validation/workflow.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

6

ired manpower for repair, maintenance, replacement, updating, change

management of the system covering metering infrastructure, IT infrastructure, Hosting &

Depositthe replaced meters and accessories in JVVNL’s stores aligned with defin

Recommendations

proposed solution should comply following basic design principles

Open and Industry Standards for Interoperability

The proposed solution must have highest degree of interoperability and the solution

components shall be standardbased and adopt an open approach rather than support a

Service Oriented Architecture (SOA)

AMI solution components must follow SOA principles to provide specific services using well

defined interfaces. TheAMI solution design shall be based on cross-functional components or

ubsystems and shall be implemented in sucha way that there is an opportunity for reuse. The

integration architecture shall be based on the concept of a serviceso all the applications of t

AMI solution are able to integrate without any complexity.

AMI system is envisaged as a Service driven architecture at the core of it. AMI system

features can beaccessed via any user interface (internal or 3rd party applications) which shall

Services. Adoptionof open standards are of paramount importance for

robust and scalable AMI system. Data access must be always through Services

application will access AMI data directly from the storage layer or data access

access also (access between various modules) there will be

direct access will be there to ensure theAMI system is scalable and secure.

The integration middleware should be based on Service Oriented

other forms ofApplication Program Interfaces (API) and use publish / subscribe mechanism

The integration middleware to be an open architecture based

Implementation and configuration of functional APIs from meter manufacturers and

figuration of headend system/Meter Data Acquisition System.

30 minutes block shall be polled once every 24

frequencyshall be remotely configurable and can be altered as per the requirement

store and manage the security information related to Smart Meters.

Thisinclude Device Security keys and asset information for processing further business

must support the mass receipt of data of each meters every day

update of MDMS with the necessary asset information to complete meter

The integration middleware/interface must validate the Data to be integrated

It must maintain integration logs that confirm the success or otherwise of the

complete with controltotals.

The integration mechanism adopted must have minimal impact on the existing systems

The access to data will only be through applicable business rules i.e. the application

not access data directly without going through APIs managed by business

rules/validation/workflow.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

ired manpower for repair, maintenance, replacement, updating, change

management of the system covering metering infrastructure, IT infrastructure, Hosting &

aligned with defined process.

The proposed solution must have highest degree of interoperability and the solution

components shall be standardbased and adopt an open approach rather than support a

AMI solution components must follow SOA principles to provide specific services using well

functional components or

ubsystems and shall be implemented in sucha way that there is an opportunity for reuse. The

integration architecture shall be based on the concept of a serviceso all the applications of the

driven architecture at the core of it. AMI system

features can beaccessed via any user interface (internal or 3rd party applications) which shall

. Adoptionof open standards are of paramount importance for

a access must be always through Services, no

application will access AMI data directly from the storage layer or data access layer. For every

access also (access between various modules) there will be services and no

direct access will be there to ensure theAMI system is scalable and secure.

The integration middleware should be based on Service Oriented Architecture (SOA) and

other forms ofApplication Program Interfaces (API) and use publish / subscribe mechanism

Implementation and configuration of functional APIs from meter manufacturers and

block shall be polled once every 24 hours. The duration to

frequencyshall be remotely configurable and can be altered as per the requirement

store and manage the security information related to Smart Meters.

Thisinclude Device Security keys and asset information for processing further business

meters every day and

update of MDMS with the necessary asset information to complete meter

The integration middleware/interface must validate the Data to be integrated

It must maintain integration logs that confirm the success or otherwise of the interface,

The integration mechanism adopted must have minimal impact on the existing systems.

business rules i.e. the applications will

through APIs managed by business

Page 11: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

1.5.4. Data Migration - Meter Installation Entry

AMI Rollout is mass meter replacement activity, it requires d

legacy systems as per requirement of the database shall be updated through the master data provided by the AMI Implementing

Agency.

Data to be migrated will be cleansed, rationalized, transformed (if required) and reconciled. Conversion programsmay need to be written to

The following is the indicative list of the type of data that must be migrated to/from the legacy

system.

• All Open transactions at the time of replacement of old meter with Smart meter

• Old/New customer/master data• New Meter Data

• Events and outage data for analytics, reporting purposes etc.• All meter exceptions and alarms

• All user groups and user roles

• The bidder must ensure that at all times the field data (customers, meters, etc.) shall be

in sync across allthe systems both legacy and n

1.5.5. Modular Design

The application user interface, logic, data must be separate. Th

sub-systems,application systems and databases will be ideally partitioned. These partitions

shall have well-defined interfacesestablished.

components from each other. Modular design is moreadaptive to changes in internal logic,

platforms, and structures. It is easier to support, is more scalable and supportsinteroperability.

1.5.6. High Availability, Failov

Proposed Architecture shall have adequate redundancies so as to have no single point of failure for the solution. Thesolution tier for critical applications should consist minimum of two

nodes clustered on a fail

and database servers at the Data ‘failover’ server shall take over processing, similarly on failure of a database server, the

otherserver shall continue seamlessly, thus providing the desired availability.AMI applications shall have the capability to failover to a redundant or secondary unit upon

failure of the primary unit.Likewise, the load on the primary unit shall be shared with a

secondary unit upon the primary unit reaching itscapacity.

1.5.7. Business Continuity and Disaster Recovery

In case if primary site / DC fails, the business shall continue from DR site. Connectivity

between primary site and DRsite shall be redundant. In case of Failures of Storage at DC, DR Backups shall be used to restore the Database fromthe last backup taken.

defined in Backup policy during project execution. strategy and any other additional BoM if needed to meet this requirement.

Bidders are expected to keep the above issues in mind and propose technically be

alternative to ensure that thesystem is available for the users in all times by conceptualizing

various scenarios and explaining how their solutionaddresses all the possible scenarios. While

the Bill of material proposed is the bare minimum required to Agency shall propose additional BOM as may be required to meet the above objectives.

1.5.8. Support for Cloud Enabled Deployment

Application will be hosted in a Private Cloud chosen by

VPN and Internet. AMI solution shall be cloud enabled that is technologies shall

supportdeployment on a virtualized platform. The AMI solution shall support:

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

7

Meter Installation Entry

AMI Rollout is mass meter replacement activity, it requires data is to be migrated from its

legacy systems as per requirement of the JVVNL. The DISCOM’s consumerdatabase and MBC database shall be updated through the master data provided by the AMI Implementing

Data to be migrated will be cleansed, rationalized, transformed (if required) and reconciled. Conversion programsmay need to be written to handle this task.

The following is the indicative list of the type of data that must be migrated to/from the legacy

All Open transactions at the time of replacement of old meter with Smart meter

Old/New customer/master data

and outage data for analytics, reporting purposes etc. All meter exceptions and alarms

All user groups and user roles

ensure that at all times the field data (customers, meters, etc.) shall be

in sync across allthe systems both legacy and new.

The application user interface, logic, data must be separate. The logical design of components,

systems,application systems and databases will be ideally partitioned. These partitions

defined interfacesestablished. Logical boundaries are needed to separate

components from each other. Modular design is moreadaptive to changes in internal logic,

platforms, and structures. It is easier to support, is more scalable and supportsinteroperability.

High Availability, Failover and Load Balancing

Proposed Architecture shall have adequate redundancies so as to have no single point of failure for the solution. Thesolution tier for critical applications should consist minimum of two

nodes clustered on a fail-over configuration forthe critical components like Web, application

nd database servers at the Data centre site. On failure of the primaryapplication server, the ‘failover’ server shall take over processing, similarly on failure of a database server, the

tinue seamlessly, thus providing the desired availability.AMI applications shall have the capability to failover to a redundant or secondary unit upon

failure of the primary unit.Likewise, the load on the primary unit shall be shared with a

upon the primary unit reaching itscapacity.

Business Continuity and Disaster Recovery

In case if primary site / DC fails, the business shall continue from DR site. Connectivity

between primary site and DRsite shall be redundant. In case of Failures of Storage at DC, DR Backups shall be used to restore the Database fromthe last backup taken.

defined in Backup policy during project execution. The bidder shall propose the backup strategy and any other additional BoM if needed to meet this requirement.

Bidders are expected to keep the above issues in mind and propose technically be

alternative to ensure that thesystem is available for the users in all times by conceptualizing

various scenarios and explaining how their solutionaddresses all the possible scenarios. While

the Bill of material proposed is the bare minimum required to be supplied,shall propose additional BOM as may be required to meet the above objectives.

Support for Cloud Enabled Deployment

Application will be hosted in a Private Cloud chosen by JVVNL will access theapplication over

ternet. AMI solution shall be cloud enabled that is technologies shall

supportdeployment on a virtualized platform. The AMI solution shall support:

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

ata is to be migrated from its

consumerdatabase and MBC database shall be updated through the master data provided by the AMI Implementing

Data to be migrated will be cleansed, rationalized, transformed (if required) and reconciled.

The following is the indicative list of the type of data that must be migrated to/from the legacy

All Open transactions at the time of replacement of old meter with Smart meter

ensure that at all times the field data (customers, meters, etc.) shall be

e logical design of components,

systems,application systems and databases will be ideally partitioned. These partitions

Logical boundaries are needed to separate

components from each other. Modular design is moreadaptive to changes in internal logic,

platforms, and structures. It is easier to support, is more scalable and

Proposed Architecture shall have adequate redundancies so as to have no single point of failure for the solution. Thesolution tier for critical applications should consist minimum of two

rthe critical components like Web, application

site. On failure of the primaryapplication server, the ‘failover’ server shall take over processing, similarly on failure of a database server, the

tinue seamlessly, thus providing the desired availability. AMI applications shall have the capability to failover to a redundant or secondary unit upon

failure of the primary unit.Likewise, the load on the primary unit shall be shared with a

In case if primary site / DC fails, the business shall continue from DR site. Connectivity

between primary site and DRsite shall be redundant. In case of Failures of Storage at DC, DR Backups shall be used to restore the Database fromthe last backup taken. This shall be

shall propose the backup strategy and any other additional BoM if needed to meet this requirement.

Bidders are expected to keep the above issues in mind and propose technically best

alternative to ensure that thesystem is available for the users in all times by conceptualizing

various scenarios and explaining how their solutionaddresses all the possible scenarios. While

be supplied,AMI Implementing shall propose additional BOM as may be required to meet the above objectives.

will access theapplication over

ternet. AMI solution shall be cloud enabled that is technologies shall

supportdeployment on a virtualized platform. The AMI solution shall support:

Page 12: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

• The ability to deploy and run the application within a private cloud platform to take

advantage of nextgeneration cloud features

• Run services in virtualized environments multi

1.5.9. Security Zones Deployment

The IT Infrastructure will have multiple security layers to secure the infrastructure from

threats. The proposeddeployment have shall have separate firewall in addition tothe external (Perimeter security appliances). The

firewall policies shall be configured based on zone basedrequirements.

• Zone for Production Servers (Datab

notbe accessible from Internet directly. All user traffic will to enter in this security zone

after firewall only. Theproposed solution will have provision of dedicated Internal Firewall to secure the critical production (Data baseand Application) environment.

• Web server/Applicationexternal users after authentication and trafficfiltering. This zone shall host the Web

servers, Access control a

• Testing and Development

development for applications. This zone will

direct access to Production

JVVNL is going for mixed/hybrid communication technology. i.e. communication technology need to

be decided based on field condition, and most suitable communication technology be selected for meter data acquisition. A

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION 1: INTRODUCTION AND OBJECTIVE

8

The ability to deploy and run the application within a private cloud platform to take

nextgeneration cloud features

Run services in virtualized environments multi-client capable services

Deployment

The IT Infrastructure will have multiple security layers to secure the infrastructure from

threats. The proposeddeployment have different security zones as briefed below and all zones shall have separate firewall in addition tothe external (Perimeter security appliances). The

firewall policies shall be configured based on zone basedrequirements.

Zone for Production Servers (Database and Application servers)

notbe accessible from Internet directly. All user traffic will to enter in this security zone

after firewall only. Theproposed solution will have provision of dedicated Internal Firewall al production (Data baseand Application) environment.

/Application:This security zone will host all servers that can be accessed from external users after authentication and trafficfiltering. This zone shall host the Web

servers, Access control and sign on servers, Antivirus Server etc.

evelopment Zone:This zone will host all servers required for test and

or applications. This zone will have limitedaccess and it will not have any

direct access to Production Servers Zone and the activity shall be monitored.

JVVNL is going for mixed/hybrid communication technology. i.e. communication technology need to

be decided based on field condition, and most suitable communication technology data acquisition. A typical design can be

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION 1: INTRODUCTION AND OBJECTIVE

The ability to deploy and run the application within a private cloud platform to take

client capable services

The IT Infrastructure will have multiple security layers to secure the infrastructure from

different security zones as briefed below and all zones shall have separate firewall in addition tothe external (Perimeter security appliances). The

) Zone: This zone shall

notbe accessible from Internet directly. All user traffic will to enter in this security zone

after firewall only. Theproposed solution will have provision of dedicated Internal Firewall al production (Data baseand Application) environment.

:This security zone will host all servers that can be accessed from external users after authentication and trafficfiltering. This zone shall host the Web

:This zone will host all servers required for test and

have limitedaccess and it will not have any

and the activity shall be monitored.

JVVNL is going for mixed/hybrid communication technology. i.e. communication technology need to

be decided based on field condition, and most suitable communication technology in that area shall

Page 13: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION2: QUALIFICATION REQUIREMENTS (QR)

2.1 INTRODUCTION: The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

to have been done after careful study and of its implications.

This section covers the minimum requirement with respect to experience, capability and other

particulars of the Bidder to be considered eligible for participation in the bid foThe BIDDER shall become eligible to bid on satisfying the following “BID QUALIFICATION

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

2.2 BID QUALIFICATION REQUIREMENTS

The Bidder must possess credentials prescribed as Pre

the Qualification Requirement (QR), his bid will be treated as non

correspondence/clarification will be taken into conside

It is also intimated that merely meeting the following requirements does not indicate that the bidders

shall be short listed for opening of financial bid. The short listing shall be made considering all the

technical parameters.

2.3 The Bid shall be made either by a Single Bidder

Two members as detailed hereunder.

2.3.1 The single bidder may be

I. IT Based companyOR

II. OEM/Meter Manufacturer

A. If the Bidder is a IT company, then the following Qualification requirements shall be

applicable :

QR

No.

Criteria

1 Bidder shall be incorporated under Indian

Companies Act 1956/2013from last 5 financial years

2 The bidder should be an Information

Technology Services Company and should have been continuously providing services to

power distribution utilities years as on the date of submission of bid on

BOO / BOOM / SaaS / IaaS model involving

deployment of Software, Hardware, Manpower and Associated Services in the

areas of Meter Data Downloading & Analysis / AMR/ AMI / MDAS/ MDMS implemen

consumer or system meters.

3. The bidder should have executed or

executing at least one project of Acquisition (AMR/AMI)

data through GPRS/Internet/VPN or any

other communication mode and making the

data available on central web server during

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION2: QUALIFICATION REQUIREMENTS (QR)

9

QUALIFICATION REQUIREMENTS (QR)

The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

to have been done after careful study and examination of the tender document with full understanding

This section covers the minimum requirement with respect to experience, capability and other

particulars of the Bidder to be considered eligible for participation in the bid foThe BIDDER shall become eligible to bid on satisfying the following “BID QUALIFICATION

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

BID QUALIFICATION REQUIREMENTS

credentials prescribed as Pre-Qualification Criteria. If any bidder fails to fulfil

the Qualification Requirement (QR), his bid will be treated as non-responsive and no further

correspondence/clarification will be taken into consideration for the same.

It is also intimated that merely meeting the following requirements does not indicate that the bidders

shall be short listed for opening of financial bid. The short listing shall be made considering all the

id shall be made either by a Single Bidder OR by a valid consortium of

Two members as detailed hereunder.

The single bidder may be

IT Based company

Meter Manufacturer

If the Bidder is a IT company, then the following Qualification requirements shall be

Supporting Documents Required

Bidder shall be incorporated under Indian

Companies Act 1956/2013which is existing years.

Copy of Self-Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

The bidder should be an Information

Technology Services Company and should have been continuously providing services to

power distribution utilities in India from last 5 years as on the date of submission of bid on

BOO / BOOM / SaaS / IaaS model involving

deployment of Software, Hardware, Manpower and Associated Services in the

areas of Meter Data Downloading & Analysis MDMS implemented for

meters.

Proof of Work order & performance

certificate/ work order completion certificate to be submitted

The bidder should have executed or

executing at least one project of Meter Data (AMR/AMI) for acquiring meter

data through GPRS/Internet/VPN or any

other communication mode and making the

data available on central web server during

Proof of Work Orders to be submitted.

The successful bidder shall furnish Manufacturer Authorization Form from

meter and modem manufacturer /OEM

for providing meter and modem as per

specifications provided in tender

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION2: QUALIFICATION REQUIREMENTS (QR)

The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

examination of the tender document with full understanding

This section covers the minimum requirement with respect to experience, capability and other

particulars of the Bidder to be considered eligible for participation in the bid for the proposed work. The BIDDER shall become eligible to bid on satisfying the following “BID QUALIFICATION

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

Qualification Criteria. If any bidder fails to fulfil

responsive and no further

It is also intimated that merely meeting the following requirements does not indicate that the bidders

shall be short listed for opening of financial bid. The short listing shall be made considering all the

OR by a valid consortium of maximum

If the Bidder is a IT company, then the following Qualification requirements shall be

Supporting Documents Required

Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

Proof of Work order & performance

certificate/ work order completion certificate

Proof of Work Orders to be submitted.

The successful bidder shall furnish Manufacturer Authorization Form from

meter and modem manufacturer /OEM

meter and modem as per

specifications provided in tender

Page 14: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

QR

No.

Criteria

the last five years ( Jan’13 to Dec’17) . The

communication between Meter and Data Acquisition System support tw

communication.

The Work Award for the above project shall

be for a minimum of 15000

4. The bidder should have following certificates, which should be valid as on date

of bidding:

1. ISO 9001:2008/2015

2. ISO 27001

3. CMMI Level 3 DEV or above for Software Development

** If the CMMI Level 3 DEV or above for

Software Developmentfurnished at the time of bidding, bidder may

furnish Bank Guarantee of Rs. 5.0 Lacs with

undertaking to furnish the above certificate within 2 months from the date of award of

contract. However the date of Implementation schedule shall

extended on these grounds failing which said

BG shall be invoked.

5. (i) The bidder should have average annual turnover of Rs 35 Crores of last three

financial years ending on 31for the 2014-15, 2015-

(ii) The bidder should have positive net

worth as on 31.3.17

6. The Bidder should have not been black listed

by any of Power Distribution Utilityas on date of bidding.

7. The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued

by Electrical Inspectorate of Govt.Rajasthan.

* If the above certificate is not furnished at the time of bidding, bidder may furnish Bank

Guarantee of Rs. 5.0 Lacs with undertaking to furnish the above License within 2 months

from the date of award of contract. However the date of Implementation schedule shall

not be extended on these grounds failing

which said BG shall be invoked.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION2: QUALIFICATION REQUIREMENTS (QR)

10

Supporting Documents Required

ve years ( Jan’13 to Dec’17) . The

communication between Meter and Data Acquisition System support two way

The Work Award for the above project shall

15000 meters.

document before award of contract.

The bidder should have following certificates, which should be valid as on date

ISO 9001:2008/2015

CMMI Level 3 DEV or above for Software Development **

CMMI Level 3 DEV or above for

Software Development certificate is not furnished at the time of bidding, bidder may

furnish Bank Guarantee of Rs. 5.0 Lacs with

undertaking to furnish the above certificate within 2 months from the date of award of

contract. However the date of Implementation schedule shall not be

extended on these grounds failing which said

Valid ISO Certificates should be submitted.

Certificate of Appraisal issued by authorized transition partner of CMMI institute with

SCAMPI ID to be uploaded.

In Case the CMMI Level 3 DEV or above for Software Development

available with the bidder, the bidder shall furnish an undertaking along with Bank

Guarantee of Rs. 5 Lacs (proforma enclosed)

that the same shall be furnished

months from the date of award of contract

(i) The bidder should have average annual turnover of Rs 35 Crores of last three

financial years ending on 31-Mar-2017 (i.e. -16 & 2016-17).

(ii) The bidder should have positive net

Copy of the audited statement of accounts (PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted as a proof of turnover and net worth.

The Bidder should have not been black listed

by any of Power Distribution Utility in India

Self-Declaration for No Blacklisting on

appropriate non-judicial stamp paper duly notarized.

The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued

by Electrical Inspectorate of Govt. of

* If the above certificate is not furnished at the time of bidding, bidder may furnish Bank

Guarantee of Rs. 5.0 Lacs with undertaking to furnish the above License within 2 months

from the date of award of contract. However Implementation schedule shall

not be extended on these grounds failing

which said BG shall be invoked.

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical or above electrical contractor licenses

issued by Electrical Inspectorate of

of Rajasthan.

In Case the Class ‘B’ Electrical or above electrical contractor license are not available

with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same

shall be furnished within 2 months from the date of award of contract

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION2: QUALIFICATION REQUIREMENTS (QR)

Supporting Documents Required

document before award of contract.

Valid ISO Certificates should be submitted.

Certificate of Appraisal issued by authorized transition partner of CMMI institute with

SCAMPI ID to be uploaded.

CMMI Level 3 DEV or above for Software Development certificate are not

available with the bidder, the bidder shall furnish an undertaking along with Bank

Guarantee of Rs. 5 Lacs (proforma enclosed)

that the same shall be furnished within 2

he date of award of contract.

Copy of the audited statement of accounts (PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted as a proof of turnover and net worth.

Declaration for No Blacklisting on

judicial stamp paper duly

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical or above electrical contractor licenses

issued by Electrical Inspectorate of Govt.

In Case the Class ‘B’ Electrical or above electrical contractor license are not available

with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same

within 2 months from the date of award of contract.

Page 15: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

B. If the Bidder is a METER MANUFACTURER, then the following Qualification requirements shall be applicable :

QR

No.

Criteria

1 Bidder shall be incorporated under

Companies Act 1956/20135 financial years.

2 The bidder should be Meter Manufacturer of

Electricity Meters in India should have

supplied

i. a minimum of

phase metersii. 50,000 LTTVM/HTTVM/Three

phase Whole Current meters

iii. 10,000CT Operated meters

power distribution utilities in

India in the last 3 financial years i.e. (April’14 to March ’17).

All of these meters shall have Communication ports/AMR Meters

3. The bidder should have ISO 9001:2008/2015

certified which should be valid as on date of bidding.

4. (i) The bidder should have average annual

turnover of Rs. 100 Crores of last three financial years ending on 31

for the 2014-15,2015-

(ii) The bidder should have positive net

worth as on 31.3.17.

6. The Bidder should have not been black listed by any of Power Distribution Utility in India

as on date of bidding.

7. The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued

by Electrical Inspectorate of Govt. of

Rajasthan.

* If the above certificate is not furnished at the time of bidding, bidder may furnish Bank

Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months

from the date of award of contract. However

the date of Implementation schnot be extended on these grounds failing

which said BG shall be invoked.

8. The bidder shall have IS:16444 with latest amendments

meter to be supplied against this bid.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION2: QUALIFICATION REQUIREMENTS (QR)

11

OR

If the Bidder is a METER MANUFACTURER, then the following Qualification requirements shall be applicable :

Supporting Documents Required

Bidder shall be incorporated under Indian

Companies Act 1956/2013 existing from last

Copy of Self-Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

The bidder should be Meter Manufacturer of

Electricity Meters in India should have

a minimum of 500000 of Single

phase meters 50,000 LTTVM/HTTVM/Three

phase Whole Current meters

10,000CT Operated meters for

power distribution utilities in

n the last 3 financial years i.e. (April’14 to March ’17).

All of these meters shall have Communication ports/AMR Meters

Proof of Work order & performance

certificate/ work order completion

certificate to be submitted.

The bidder shall furnish undertaking that either in-house IT software shall be used

or it shall be outsourced.

The bidder should have ISO 9001:2008/2015

which should be valid as on date of Valid ISO Certificates should be

(i) The bidder should have average annual

turnover of Rs. 100 Crores of last three financial years ending on 31-Mar-2017 (i.e.

-16 & 2016-17).

(ii) The bidder should have positive net

Copy of the audited statement of accounts

(PL Account & Balance Sheet) duly certified by the Chartered Accountant to be submitted

as a proof of turnover and net worth.

The Bidder should have not been black listed by any of Power Distribution Utility in India

Self-Declaration for No Blacklisting on appropriate non judicial stamp paper duly

notarized.

The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued

by Electrical Inspectorate of Govt. of

* If the above certificate is not furnished at the time of bidding, bidder may furnish Bank

Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months

from the date of award of contract. However

the date of Implementation schedule shall not be extended on these grounds failing

which said BG shall be invoked.

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses issued by Electrical Inspectorate of Govt.

of Rajasthan.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of Rs. 5 Lacs (proforma enclosed) that the same

shall be furnished withi

date of award of contract

The bidder shall have BIS certification for IS:16444 with latest amendments for the

meter to be supplied against this bid.

Valid certificate to be submitted. The certificate should not be older than three

years as on the date of opening of techno

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION2: QUALIFICATION REQUIREMENTS (QR)

If the Bidder is a METER MANUFACTURER, then the following Qualification

Supporting Documents Required

Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

Proof of Work order & performance

certificate/ work order completion

certificate to be submitted.

The bidder shall furnish undertaking that house IT software shall be used

or it shall be outsourced.

Valid ISO Certificates should be submitted.

audited statement of accounts

(PL Account & Balance Sheet) duly certified by the Chartered Accountant to be submitted

as a proof of turnover and net worth.

Declaration for No Blacklisting on appropriate non judicial stamp paper duly

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses issued by Electrical Inspectorate of Govt.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of Rs. 5 Lacs (proforma enclosed) that the same

within 2 months from the

date of award of contract.

Valid certificate to be submitted. The certificate should not be older than three

years as on the date of opening of techno-

Page 16: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

QR

No.

Criteria

9 The bidder shall have type DLMS compliance certificate issued by CPRI

to be supplied against this bid.

2.3.2If the Bid is made by Consortium of two members, the following Qualification criterion

shall be applicable: A. Qualification Criterion

i. The one member shall be an IT Company having qualific

(A).

ii. Another member shall be Meter Manufacturer having qualification as per above clause

2.3.1 (B).

iii. Any of the above members can be designated as a L

B. Other conditions for consortiumi. The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

the partners so as to be legally binding on all the

ii. One of the partners shall be nominated as being partner in

this authorization shall be

authorized signatories of all the partners;

iii. The partner in-charge

and on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in

partner).

iv. All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

included in the authorization as well as in the form of bid and the form o

agreement (in the case of a successful bid);

v. In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

vi. Responsibilities in respect of execution

partner) as well as of each Consortium member shall be clearly indicated in the

agreement.

vii. The Consortium agreement shall not be cancelled or amended unilaterally without consent

of the purchaser and a stat

agreement.

viii. A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than one bid

will cause all the bids in which the bidder has participated to be disqualified.

ix. Bids from agents are not acceptable in the case of Consortium and such bids will be

treated as non-responsive.

x. The Consortium should furnish the relevant information and documents as s

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

appropriate value satisfying the above conditions sindicating role and duties of each consortium member.

Note: In case of non-furnishing the requisite documents along with the bid, the bid will be

considered as non-responsive and bid may be summarily reject

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION2: QUALIFICATION REQUIREMENTS (QR)

12

Supporting Documents Required

commercial bid.

The bidder shall have type DLMS compliance certificate issued by CPRI/ERDA for the meter

o be supplied against this bid.

Valid certificate to be submitted. certificate should not be older

years as on the date of opening of technocommercial bid. For this purpose date of

conducting type test will be considered.

If the Bid is made by Consortium of two members, the following Qualification criterion

ication Criterion

The one member shall be an IT Company having qualification as per above in clause 2.3.1

Another member shall be Meter Manufacturer having qualification as per above clause

Any of the above members can be designated as a Lead Member.

for consortium The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

the partners so as to be legally binding on all the members

One of the partners shall be nominated as being partner in-charge (lead partner) and

this authorization shall be supported by submitting a power of attorney signed by legally

authorized signatories of all the partners;

charge shall be authorized to incur liabilities and receive instructions for

nd on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in

All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

included in the authorization as well as in the form of bid and the form o

agreement (in the case of a successful bid);

In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

Responsibilities in respect of execution of tendered work by the partner in

partner) as well as of each Consortium member shall be clearly indicated in the

The Consortium agreement shall not be cancelled or amended unilaterally without consent

of the purchaser and a statement to this effect should appear in the consortium

A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than one bid

e all the bids in which the bidder has participated to be disqualified.

Bids from agents are not acceptable in the case of Consortium and such bids will be

responsive.

The Consortium should furnish the relevant information and documents as s

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

appropriate value satisfying the above conditions shall be submitted to the SE(IT), JVVNL , Jaipur indicating role and duties of each consortium member.

furnishing the requisite documents along with the bid, the bid will be

responsive and bid may be summarily rejected.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION2: QUALIFICATION REQUIREMENTS (QR)

Supporting Documents Required

Valid certificate to be submitted. The certificate should not be older than three

years as on the date of opening of techno-commercial bid. For this purpose date of

conducting type test will be considered.

If the Bid is made by Consortium of two members, the following Qualification criterion

ation as per above in clause 2.3.1

Another member shall be Meter Manufacturer having qualification as per above clause

The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

charge (lead partner) and

by submitting a power of attorney signed by legally

shall be authorized to incur liabilities and receive instructions for

nd on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in-charge (lead

All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

included in the authorization as well as in the form of bid and the form of contract

In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

of tendered work by the partner in-charge (lead

partner) as well as of each Consortium member shall be clearly indicated in the

The Consortium agreement shall not be cancelled or amended unilaterally without consent

ement to this effect should appear in the consortium

A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than one bid

e all the bids in which the bidder has participated to be disqualified.

Bids from agents are not acceptable in the case of Consortium and such bids will be

The Consortium should furnish the relevant information and documents as specified under

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

hall be submitted to the SE(IT), JVVNL , Jaipur

furnishing the requisite documents along with the bid, the bid will be

Page 17: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

3.1. GENERAL INSTRUCTIONS

3.1.1. Tendering authority will receive bids in respect of services as set forth in the

document.

3.1.2. All bids shall be prepared and submitted in accordance with terms and conditions of this

Tender Document.

3.1.3. The Bidder, in his own interest is requested to read very carefully these instructions and the

terms and conditions as incorporated in General

specification before filling and submitting the Bids.

3.1.4. If the bidder has any doubt as to the meaning of any provisions or any portion thereof, he

shall before submitting the Bid, may refer the same to the Tendering Autho

in time before the specified date of opening of Bids so that such doubts may be clarified.

3.1.5. Submission of the Bid shall be deemed to be the conclusive proof of the fact that the Bidder

has acquainted himself and is in agreement with al

governing this Tender document unless otherwise specifically indicated/ commented by him in

his Bid.

3.1.6. Bids submitted after the time and date fixed for receipt of bids as set out in the invitation to

Bid shall be rejected and returned to the bidders.

3.2. FIELD CONDITIONS

3.2.1. The bidder may in its own interest, before submitting the bid, inspect and examine the area

involved and satisfy it regarding the existing system.

3.2.2. For ascertaining the existing system, condition’s etc

Authority.

3.2.3. No claim from Bidder or Agency for change in the bid or terms & conditions of the contract

shall be entertained on the ground that the conditions are different than what were

contemplated by them at the t

3.3. SUCCESSFUL IMPLEMENTATION AND GOOD PERFORMANCE

Any work if specifically, not mentioned but reasonably implied for the successful implementation and

good performance of the proposed work is deemed to be included and has to be exe

ordered price.

3.4. PREPARATION OF BIDDING DOCUMENT

3.4.1.BID SECURITY

a. The Bidder shall furnish

b. The Bidder shall deposit/submit

(IT&RE), JVVNL, and Jaipur

c. Bid uploaded but not accompanied by a copy of the receipt for depositing

rejected and the Bid will not be opened.

d. In case of bidders who are d

production of the original receipt within 15 working days after opening of financial bid.

e. Adjustments/proposals for acceptance of

connection with some other bids/orders shall not be entertained. Also, the Discom will not

adjust the Bid Securityunder this tender with the previous dues of bidder if any.

f. No interest shall be payable on

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

13

INSTRUCTION TO BIDDERS

GENERAL INSTRUCTIONS

Tendering authority will receive bids in respect of services as set forth in the

All bids shall be prepared and submitted in accordance with terms and conditions of this

The Bidder, in his own interest is requested to read very carefully these instructions and the

terms and conditions as incorporated in General Conditions of Contract and Technical

specification before filling and submitting the Bids.

If the bidder has any doubt as to the meaning of any provisions or any portion thereof, he

shall before submitting the Bid, may refer the same to the Tendering Autho

in time before the specified date of opening of Bids so that such doubts may be clarified.

Submission of the Bid shall be deemed to be the conclusive proof of the fact that the Bidder

has acquainted himself and is in agreement with all the instructions, terms and conditions

governing this Tender document unless otherwise specifically indicated/ commented by him in

Bids submitted after the time and date fixed for receipt of bids as set out in the invitation to

cted and returned to the bidders.

The bidder may in its own interest, before submitting the bid, inspect and examine the area

involved and satisfy it regarding the existing system.

For ascertaining the existing system, condition’s etc., the agency may contact the Tendering

No claim from Bidder or Agency for change in the bid or terms & conditions of the contract

shall be entertained on the ground that the conditions are different than what were

contemplated by them at the time of submitting the bids.

SUCCESSFUL IMPLEMENTATION AND GOOD PERFORMANCE

not mentioned but reasonably implied for the successful implementation and

good performance of the proposed work is deemed to be included and has to be exe

PREPARATION OF BIDDING DOCUMENT

The Bidder shall furnish Bid Securityas per the prescribed in NIT section.

deposit/submit the Bid Securityin prescribed format to the Accounts

and Jaipur within the stipulated date & time, and obtain a receipt.

but not accompanied by a copy of the receipt for depositing

rejected and the Bid will not be opened.

In case of bidders who are declared as non-responsive, Bid Security

production of the original receipt within 15 working days after opening of financial bid.

Adjustments/proposals for acceptance of Bid Security, if any, already

connection with some other bids/orders shall not be entertained. Also, the Discom will not

under this tender with the previous dues of bidder if any.

No interest shall be payable on Bid Security.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

Tendering authority will receive bids in respect of services as set forth in the Tender

All bids shall be prepared and submitted in accordance with terms and conditions of this

The Bidder, in his own interest is requested to read very carefully these instructions and the

Conditions of Contract and Technical

If the bidder has any doubt as to the meaning of any provisions or any portion thereof, he

shall before submitting the Bid, may refer the same to the Tendering Authority in writing, well

in time before the specified date of opening of Bids so that such doubts may be clarified.

Submission of the Bid shall be deemed to be the conclusive proof of the fact that the Bidder

l the instructions, terms and conditions

governing this Tender document unless otherwise specifically indicated/ commented by him in

Bids submitted after the time and date fixed for receipt of bids as set out in the invitation to

The bidder may in its own interest, before submitting the bid, inspect and examine the area

., the agency may contact the Tendering

No claim from Bidder or Agency for change in the bid or terms & conditions of the contract

shall be entertained on the ground that the conditions are different than what were

not mentioned but reasonably implied for the successful implementation and

good performance of the proposed work is deemed to be included and has to be executed within the

IT section.

in prescribed format to the Accounts Officer

within the stipulated date & time, and obtain a receipt.

but not accompanied by a copy of the receipt for depositing Bid Securityshall be

Bid Securitywill be refunded on

production of the original receipt within 15 working days after opening of financial bid.

lying with the Discom in

connection with some other bids/orders shall not be entertained. Also, the Discom will not

under this tender with the previous dues of bidder if any.

Page 18: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

g. Jaipur Discom reserves the right to forfeit

accepted the work order or not completed the contractual requirement within the specified

period.

3.4.2.TenderDocument Fee & Tender Processing Fee

a. The bidders are permitted to download the bid document from websites

https://www.eproc.rajasthan.gov.in

cost of Tender document fee and e

stipulated date & time in the office of Accounts Officer (

acknowledgement thereof. Such processing fee shall be sent to

3.5. CLARIFICATIONS AND AMENDMENTS & DEVIATION FROM TENDER DOCUMENT

3.5.1.CLARIFICATIONS TO THE TENDER DOCUMENT

a. Any prospective bidder may seek clarification within 10 days. From the date of tender

uploading.

b. Verbal clarifications and

representative(s) shall not in any way be binding on the owner.

c. The bidder is required to carefully examine the Terms & Conditions including specifications of

this Tender document and ful

any way affect the Work or the cost involved thereof.

3.5.2.CLARIFICATIONS TO THE BID

a. To assist in the examination, evaluation, comparison and post qualification of the bids, the

Tendering Authority may, at its discretion, ask any bidder for a clarification of his bid. The

Tendering Authority’s request for clarification and the response sha

the Authorized Signatory of the Bidder.

b. Any clarification submitted by a bidder with regard to his bid that is not in response to a

request by the Tendering Authority shall not be considered.

c. No change in the prices or substa

to confirm the correction of arithmetic errors discovered by the tendering authority in the

evaluation of the Bids

3.5.3. AMENDMENT OF TENDER DOCUMENT

a. At any time prior to the deadline for

it necessary to amend the Tender document, it shall do so by issuing appropriate

Corrigendum/Addendum.

b. Any Corrigendum/Addendum issued shall be a part of the Tender document and shall be

published on the website of Jaipur Discom& e

c. To give prospective Bidders reasonable time to take a Corrigendum/Addendum into account in

preparing their Bids, the tendering authority may, at its discretion, extend the deadline for the

submission of the Bids.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTIO

14

om reserves the right to forfeit Bid Security, if successful bidder either has not

accepted the work order or not completed the contractual requirement within the specified

TenderDocument Fee & Tender Processing Fee

The bidders are permitted to download the bid document from websites

https://www.eproc.rajasthan.gov.in, www.energy.rajasthan.gov.in/jvvnl

cost of Tender document fee and e-Tender processing fee as mentioned in NIT table within the

stipulated date & time in the office of Accounts Officer (IT&RE

acknowledgement thereof. Such processing fee shall be sent to RISL by

CLARIFICATIONS AND AMENDMENTS & DEVIATION FROM TENDER DOCUMENT

CLARIFICATIONS TO THE TENDER DOCUMENT

Any prospective bidder may seek clarification within 10 days. From the date of tender

Verbal clarifications and information given by the Discom or his employee(s) or his

representative(s) shall not in any way be binding on the owner.

The bidder is required to carefully examine the Terms & Conditions including specifications of

this Tender document and fully inform himself as to all the terms and conditions which may in

any way affect the Work or the cost involved thereof.

CLARIFICATIONS TO THE BID

To assist in the examination, evaluation, comparison and post qualification of the bids, the

Tendering Authority may, at its discretion, ask any bidder for a clarification of his bid. The

Tendering Authority’s request for clarification and the response shall be in writing or e

the Authorized Signatory of the Bidder.

Any clarification submitted by a bidder with regard to his bid that is not in response to a

request by the Tendering Authority shall not be considered.

No change in the prices or substance of the bid shall be sought, offered, or permitted, except

to confirm the correction of arithmetic errors discovered by the tendering authority in the

AMENDMENT OF TENDER DOCUMENT

At any time prior to the deadline for submission of the Bids, if the Tendering Authority deemed

it necessary to amend the Tender document, it shall do so by issuing appropriate

Corrigendum/Addendum.

Any Corrigendum/Addendum issued shall be a part of the Tender document and shall be

n the website of Jaipur Discom& e-proc portal.

To give prospective Bidders reasonable time to take a Corrigendum/Addendum into account in

preparing their Bids, the tendering authority may, at its discretion, extend the deadline for the

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

if successful bidder either has not

accepted the work order or not completed the contractual requirement within the specified

The bidders are permitted to download the bid document from websites

energy.rajasthan.gov.in/jvvnl but must pay the

Tender processing fee as mentioned in NIT table within the

IT&RE), Jaipur and obtain

RISL by AO (IT&RE).

CLARIFICATIONS AND AMENDMENTS & DEVIATION FROM TENDER DOCUMENT

Any prospective bidder may seek clarification within 10 days. From the date of tender

information given by the Discom or his employee(s) or his

The bidder is required to carefully examine the Terms & Conditions including specifications of

imself as to all the terms and conditions which may in

To assist in the examination, evaluation, comparison and post qualification of the bids, the

Tendering Authority may, at its discretion, ask any bidder for a clarification of his bid. The

ll be in writing or e-mail of

Any clarification submitted by a bidder with regard to his bid that is not in response to a

nce of the bid shall be sought, offered, or permitted, except

to confirm the correction of arithmetic errors discovered by the tendering authority in the

submission of the Bids, if the Tendering Authority deemed

it necessary to amend the Tender document, it shall do so by issuing appropriate

Any Corrigendum/Addendum issued shall be a part of the Tender document and shall be

To give prospective Bidders reasonable time to take a Corrigendum/Addendum into account in

preparing their Bids, the tendering authority may, at its discretion, extend the deadline for the

Page 19: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

d. Any change in date of submission and opening of bids would be published through Jaipur

Discom’s website and e-

3.5.4. DEVIATION FROM BID DOCUMENTS

a. The bidder should comply all requirements set out in the bidding document and

TECHNICAL and COMMERCIAL Deviation shall be entertained

b. The Bids with Deviation from the requirement laid down in this document shall be considered

as NON Responsive.

c. The offer must have ‘No Deviation’ certificate as per bid document.

3.6. SUBMISSION AND OPENING OF BIDS

3.6.1.COST OF BIDDING:

The Bidder shall bear all the risks and costs associated with the preparation and submission of

its Bid, and the Tendering Authority shall not be responsible or liable for those risks and costs,

regardless of the conduct or outcome of the bidding process.

3.6.2.LANGUAGE OF BIDS:

The Bid, as well as all correspondence and documents relating to the Bid exchanged by the

Bidder and the Tendering Authority, shall be written only in English Language. Supporting

documents and printed literature that are part of the Bid may be in another language provided

they are accompanied by an accurate translation of the relevant passages in English, in which

case, for purposes of interpretation of the Bid, such translation shall govern.

3.6.3.BIDS ARE TO BE SUBMITTED IN TWO PARTS

The Bid shall be submitted within the specified time on

electronic format in the following manner

Part- A (Technical Bid): will contain

a. Cover 1: Fees (to be uploaded in pdf format)

(i) Copy of receipt of submission of Tender document fees

(ii) Copy of receipt of submission of Tender processing fee

(iii) Copy of receipt of submission of

b. Cover 2: Techno-Commercial Bid (to be uploaded in pdf format):

(i) Complete Technical Bid comprising information in specified formats and schedules

(Except the price schedule) including details & design of the proposed system(s) to

meet out the work requirement

(ii) Supporting documents to ascertain the eligibility / qualification as per the QR

requirements of this tender

The Tendering Authority may

duly attested by Notary as

of three working days.

Part- B (Financial Bid): will contain

a. The Financial Bid for carrying out the scope of work defined for this project.

b. The Financial Bid is

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

15

Any change in date of submission and opening of bids would be published through Jaipur

-proc portal.

DEVIATION FROM BID DOCUMENTS

The bidder should comply all requirements set out in the bidding document and

TECHNICAL and COMMERCIAL Deviation shall be entertained.

The Bids with Deviation from the requirement laid down in this document shall be considered

The offer must have ‘No Deviation’ certificate as per bid document.

OPENING OF BIDS

The Bidder shall bear all the risks and costs associated with the preparation and submission of

its Bid, and the Tendering Authority shall not be responsible or liable for those risks and costs,

conduct or outcome of the bidding process.

The Bid, as well as all correspondence and documents relating to the Bid exchanged by the

Bidder and the Tendering Authority, shall be written only in English Language. Supporting

printed literature that are part of the Bid may be in another language provided

they are accompanied by an accurate translation of the relevant passages in English, in which

case, for purposes of interpretation of the Bid, such translation shall govern.

DS ARE TO BE SUBMITTED IN TWO PARTS

The Bid shall be submitted within the specified time on https://www.eproc.rajasthan.gov.in

electronic format in the following manner:

A (Technical Bid): will contain

Cover 1: Fees (to be uploaded in pdf format)

Copy of receipt of submission of Tender document fees

Copy of receipt of submission of Tender processing fee

Copy of receipt of submission of BID SECURITY (BG)

Commercial Bid (to be uploaded in pdf format):

Complete Technical Bid comprising information in specified formats and schedules

(Except the price schedule) including details & design of the proposed system(s) to

meet out the work requirement together with its capabilities.

Supporting documents to ascertain the eligibility / qualification as per the QR

requirements of this tender

The Tendering Authority may ask any bidder to furnish the documents in original or copy

duly attested by Notary as the case may be for verification, in physical form on short notice

B (Financial Bid): will contain

he Financial Bid for carrying out the scope of work defined for this project.

The Financial Bid is to be submitted in excel file of BOQ.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

Any change in date of submission and opening of bids would be published through Jaipur

The bidder should comply all requirements set out in the bidding document and NO

The Bids with Deviation from the requirement laid down in this document shall be considered

The Bidder shall bear all the risks and costs associated with the preparation and submission of

its Bid, and the Tendering Authority shall not be responsible or liable for those risks and costs,

The Bid, as well as all correspondence and documents relating to the Bid exchanged by the

Bidder and the Tendering Authority, shall be written only in English Language. Supporting

printed literature that are part of the Bid may be in another language provided

they are accompanied by an accurate translation of the relevant passages in English, in which

case, for purposes of interpretation of the Bid, such translation shall govern.

https://www.eproc.rajasthan.gov.in in

Complete Technical Bid comprising information in specified formats and schedules

(Except the price schedule) including details & design of the proposed system(s) to

Supporting documents to ascertain the eligibility / qualification as per the QR

bidder to furnish the documents in original or copy

the case may be for verification, in physical form on short notice

he Financial Bid for carrying out the scope of work defined for this project.

Page 20: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

c. The Financial Bid will be opened only for the Bidders shortlisted on the basis of Technical

Bid.

d. The date of opening of such Financial Bids will be intimated on the e

3.6.4.SUBMISSION OF PROPOSALS

a. Bidder shall submit their bid in electronic format, which shall be digitally signed and further

signed &stamped on each page by the designated authorized representative of the Bidder.

Bidder shall procure Digital Signature Certificate (DSC) as per the provisions mentioned

Note 2 of the NIT table.

b. Physical submission of bids is not allowed

required to submit original technical bid in hardcopy which shall be the exact replica of online

bid submitted. In case of any discrepancy

online shall prevail.

3.6.5.FILLING OF BIDS

a. Bids shall be submitted on e

document duly filled in. The completed formats and schedules shall be considere

the contract documents in case the same Bidder becomes Successful Bidder. The Bids which

are not in conformity to the schedules and formats of the Tender document, may not be

considered.

b. No alteration should be made to the format and schedules

must complyall the requirements laid down in this RFP

c. Tender should be filled in only with ink or typed and must be submitted online after signing

digitally.

d. All additions, alterations and over

representative of the bidder otherwise bid shall be summarily rejected.

e. The bidder must quote the prices strictly in the manner as indicated herein, failing which bid is

liable for rejection. The rate/prices shall be ent

not contain any additions, alterations, over

marking which leave any doubt and further may result in rejection of such Bid.

f. The Tendering Authority will not be r

or submission of bids.

g. All bids and accompanying documents shall be addressed to Jaipur Discom.

3.6.6.ALTERNATIVE BIDS

Alternative bids shall not be considered at all.

3.6.7.BID PRICES

a. All the prices should be quoted only in Indian Rupees (INR) Currency.

b. The prices quoted in BOQ.xls should be

levies as applicable. The present rates of applicable taxes shall be indicated by the bidder in its

Bid, which is subject to statuary variation and shall be borne by Discom.

c. The bidder will furnish the break

SECTION9: FORMAT FOR FINANCIAL

clearly, as per the rates prevailing within 7 days before the bid date. Any statuary variation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

16

The Financial Bid will be opened only for the Bidders shortlisted on the basis of Technical

The date of opening of such Financial Bids will be intimated on the e

SUBMISSION OF PROPOSALS

it their bid in electronic format, which shall be digitally signed and further

signed &stamped on each page by the designated authorized representative of the Bidder.

Bidder shall procure Digital Signature Certificate (DSC) as per the provisions mentioned

Note 2 of the NIT table.

Physical submission of bids is not allowed. If asked by Tendering Authority the bidder is

required to submit original technical bid in hardcopy which shall be the exact replica of online

bid submitted. In case of any discrepancy between online and hardcopy Bid, the Bid submitted

Bids shall be submitted on e-portal with the formats and schedules given in the Tender

document duly filled in. The completed formats and schedules shall be considere

the contract documents in case the same Bidder becomes Successful Bidder. The Bids which

are not in conformity to the schedules and formats of the Tender document, may not be

No alteration should be made to the format and schedules of the tender document. The Bidder

he requirements laid down in this RFP.

Tender should be filled in only with ink or typed and must be submitted online after signing

All additions, alterations and over-writing in the bid must be clearly signed by the authorized

representative of the bidder otherwise bid shall be summarily rejected.

The bidder must quote the prices strictly in the manner as indicated herein, failing which bid is

liable for rejection. The rate/prices shall be entered in words as well as in figures. These must

not contain any additions, alterations, over-writing, cuttings or corrections and any other

marking which leave any doubt and further may result in rejection of such Bid.

The Tendering Authority will not be responsible to accept any cost involved in the preparation

All bids and accompanying documents shall be addressed to Jaipur Discom.

Alternative bids shall not be considered at all.

prices should be quoted only in Indian Rupees (INR) Currency.

es quoted in BOQ.xls should be exclusive of GST/any taxes

The present rates of applicable taxes shall be indicated by the bidder in its

which is subject to statuary variation and shall be borne by Discom.

The bidder will furnish the break-up of the quoted price in Financial Bid according to the

FORMAT FOR FINANCIAL BID SUBMISSION, indicating rate and type of each tax

clearly, as per the rates prevailing within 7 days before the bid date. Any statuary variation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

The Financial Bid will be opened only for the Bidders shortlisted on the basis of Technical

The date of opening of such Financial Bids will be intimated on the e-proc website

it their bid in electronic format, which shall be digitally signed and further

signed &stamped on each page by the designated authorized representative of the Bidder.

Bidder shall procure Digital Signature Certificate (DSC) as per the provisions mentioned in

. If asked by Tendering Authority the bidder is

required to submit original technical bid in hardcopy which shall be the exact replica of online

between online and hardcopy Bid, the Bid submitted

portal with the formats and schedules given in the Tender

document duly filled in. The completed formats and schedules shall be considered as part of

the contract documents in case the same Bidder becomes Successful Bidder. The Bids which

are not in conformity to the schedules and formats of the Tender document, may not be

of the tender document. The Bidder

Tender should be filled in only with ink or typed and must be submitted online after signing

be clearly signed by the authorized

The bidder must quote the prices strictly in the manner as indicated herein, failing which bid is

ered in words as well as in figures. These must

writing, cuttings or corrections and any other

marking which leave any doubt and further may result in rejection of such Bid.

esponsible to accept any cost involved in the preparation

All bids and accompanying documents shall be addressed to Jaipur Discom.

/any taxes and other government

The present rates of applicable taxes shall be indicated by the bidder in its

which is subject to statuary variation and shall be borne by Discom.

up of the quoted price in Financial Bid according to the 0 -

, indicating rate and type of each tax

clearly, as per the rates prevailing within 7 days before the bid date. Any statuary variation

Page 21: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

and imposing of new tax by government subsequent to bid su

shall be on Discom account.

3.7. PERIOD OF VALIDITY OF BIDS

3.7.1. The bid validity period is provided in the table mentioned in the NIT section. Bids mentioning a

shorter validity period than specified are likely to be summarily reject

3.7.2. Tendering Authority may ask for extension in validity period. The Bidder will be at liberty to

accept it or not. In case Bidder agrees to extend the validity period without changing his

original offer, he will be required to extend validity period of t

against the BID SECURITY

3.8. SIGNATURE OF BIDDER

3.8.1. The bid must contain the name, address and place of business of the Bidder and must be

digitally signed and sealed by the designated Authorized Representative of

name of such person should also be typed or printed below the signature.

3.8.2. Bid by a partnership firm must be furnished with full names of all partners.

3.8.3. Bids by corporation/ company must be signed by the Authorized representative of the Bidde

with the legal name of the corporation/ company.

3.8.4. Satisfactory evidence of authority (Power of Attorney) of the person signing on behalf of the

Bidder shall be furnished with the bid.

3.8.5. The Bidder's name stated on the proposal shall be exact legal name of

3.8.6. Bids not conforming to the above requirements of signing shall be disqualified.

3.9. DELAY IN BID SUBMISSION

The tendering authority shall not consider any bid that arrives after

submission of bids as indicated in the NIT. Any bid rec

the deadline for submission of bids shall not be accepted.

3.10. RECEIPT OF BIDS

Bids shall only be received through

3.11. WITHDRAWAL, SUBSTITUTION AND MODIFICATION OF BIDS

A Bidder may substitute or modify its bid after it has been submitted before the deadline

prescribed for submission of bids as per the e

his bid after submitting it once.

3.12. BID OPENING

3.12.1. Jaipur Discom shall perform the Bid opening at the specified place, date and time in the

presence of bidders or their authorized representatives who may choose to be present.

3.12.2. Only the bids of those bidders who qualifies post the Technical Bid eva

for Financial Bid opening. The date and time of Financial Bid opening to the technically

qualified Bidders would be intimated later. The bidder who has quoted lowest shall be termed

as the successful bidder.

3.13. EVALUATION AND COMPAR

3.13.1. The evaluation of bids will be made in the following

1st Stage: Qualification Requirement

A. Qualification Requirement

bidder with respect to the requirements laid down in this RFP.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

17

and imposing of new tax by government subsequent to bid submission/currency of Contract

shall be on Discom account.

PERIOD OF VALIDITY OF BIDS

The bid validity period is provided in the table mentioned in the NIT section. Bids mentioning a

shorter validity period than specified are likely to be summarily rejected.

Tendering Authority may ask for extension in validity period. The Bidder will be at liberty to

accept it or not. In case Bidder agrees to extend the validity period without changing his

original offer, he will be required to extend validity period of the Bank Guarantee submitted

BID SECURITY suitably.

SIGNATURE OF BIDDER

The bid must contain the name, address and place of business of the Bidder and must be

signed and sealed by the designated Authorized Representative of

name of such person should also be typed or printed below the signature.

Bid by a partnership firm must be furnished with full names of all partners.

Bids by corporation/ company must be signed by the Authorized representative of the Bidde

with the legal name of the corporation/ company.

Satisfactory evidence of authority (Power of Attorney) of the person signing on behalf of the

Bidder shall be furnished with the bid.

The Bidder's name stated on the proposal shall be exact legal name of

Bids not conforming to the above requirements of signing shall be disqualified.

DELAY IN BID SUBMISSION

The tendering authority shall not consider any bid that arrives after

bids as indicated in the NIT. Any bid received by the tendering authority after

the deadline for submission of bids shall not be accepted.

Bids shall only be received through https://www.eproc.rajasthan.gov.in

SUBSTITUTION AND MODIFICATION OF BIDS

A Bidder may substitute or modify its bid after it has been submitted before the deadline

prescribed for submission of bids as per the e-tendering process but bidder cannot withdraw

his bid after submitting it once.

Jaipur Discom shall perform the Bid opening at the specified place, date and time in the

presence of bidders or their authorized representatives who may choose to be present.

Only the bids of those bidders who qualifies post the Technical Bid eva

for Financial Bid opening. The date and time of Financial Bid opening to the technically

qualified Bidders would be intimated later. The bidder who has quoted lowest shall be termed

as the successful bidder.

EVALUATION AND COMPARISON OF BIDS

The evaluation of bids will be made in the following two stages:

Stage: Qualification Requirement (Part –A)& Evaluation of Technical offer

Qualification Requirement- Each bid shall be evaluated to ascertain the

bidder with respect to the requirements laid down in this RFP.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

bmission/currency of Contract

The bid validity period is provided in the table mentioned in the NIT section. Bids mentioning a

ed.

Tendering Authority may ask for extension in validity period. The Bidder will be at liberty to

accept it or not. In case Bidder agrees to extend the validity period without changing his

he Bank Guarantee submitted

The bid must contain the name, address and place of business of the Bidder and must be

signed and sealed by the designated Authorized Representative of the Bidder. The

name of such person should also be typed or printed below the signature.

Bid by a partnership firm must be furnished with full names of all partners.

Bids by corporation/ company must be signed by the Authorized representative of the Bidder

Satisfactory evidence of authority (Power of Attorney) of the person signing on behalf of the

The Bidder's name stated on the proposal shall be exact legal name of the firm.

Bids not conforming to the above requirements of signing shall be disqualified.

The tendering authority shall not consider any bid that arrives after the deadline for

eived by the tendering authority after

https://www.eproc.rajasthan.gov.in website.

A Bidder may substitute or modify its bid after it has been submitted before the deadline

tendering process but bidder cannot withdraw

Jaipur Discom shall perform the Bid opening at the specified place, date and time in the

presence of bidders or their authorized representatives who may choose to be present.

Only the bids of those bidders who qualifies post the Technical Bid evaluation shall be eligible

for Financial Bid opening. The date and time of Financial Bid opening to the technically

qualified Bidders would be intimated later. The bidder who has quoted lowest shall be termed

& Evaluation of Technical offer

evaluated to ascertain the qualification of

Page 22: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

B. Availability for No-Deviation Certificate. If

non-responsive.

C. Technical details and proposals submitted by the bidders shall

with objectives & scope of work mainly but not limited to the following criteria:

a. Schematic diagram showing all the modules & components of the systems covered in

the specification and integration with existing systems.

b. Description of the technical solution for achieving the integrations as shown in the

above schematic diagram.

c. Compliance to the Functionalities of Solution offered.

d. Compliance to the proposed Software’s as per the RFP along with the OEM &

Versions.

e. Details of proposed

associated accessories

f. Adherence with the time period as per schedule of deliveries defined in the RFP along

with the work break down schedule.

Note: JVVNL shall prepare the list of qu

will be notified through e-portal for opening of financial bid.

2ndStage: Financial Bid Evaluation

I. Only those bidders who have quoted for all the componentsof the Financial Bid shall be

considered for evaluation.

II. The Financial Bids whic

the lowest shall be ranked as L1 bidder.

III. The Purchaser will correct arithmetical errors during evaluation of Financial Bids on the

following basis:

(i) If there is a discrepancy between the unit price and the total price that is obtained

by multiplying the unit price and quantity, the unit price shall prev

price shall be corrected, unless in the opinion of the Purchaser there is an obvious

misplacement of the decimal point in the unit price, in which case the total price as

quoted shall govern and the unit price shall be corrected;

(ii) If there is an error in a total corresponding to the addition or subtraction of

subtotals, the subtotals shall prevail and the total shall be corrected; and

(iii) If there is a discrepancy between words and figures, the amount in words shall

prevail. However, where th

error, the amount in figures shall prevail subject to (i) and (ii) above.

(iv) If there is a discrepancy between percentage and figures related to various taxes or

levies, the percentage shall prevail over

amount expressed in percentage is related to an arithmetic error, the amount in

figures shall prevail subject to (i) and (ii) above. It should also be noted that at

time of payment against, the prevailing tax/levy rate

approval of payment

(v) Except as provided in sub

reject the Price Proposal if the same contains any other computational or arithmetic

discrepancy or error.

(vi) If the Bidder does not accept the correction of errors, its Bid shall be disqualified

and its EMD shall be forfeited

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

18

Deviation Certificate. If any deviation is found,the

Technical details and proposals submitted by the bidders shall be critically examined in line

with objectives & scope of work mainly but not limited to the following criteria:

Schematic diagram showing all the modules & components of the systems covered in

the specification and integration with existing systems.

Description of the technical solution for achieving the integrations as shown in the

above schematic diagram.

Compliance to the Functionalities of Solution offered.

Compliance to the proposed Software’s as per the RFP along with the OEM &

proposed Meters, communication modules, solution architecture

associated accessories.

Adherence with the time period as per schedule of deliveries defined in the RFP along

with the work break down schedule.

JVVNL shall prepare the list of qualified bidders on the basis of above criterion and accordingly

portal for opening of financial bid.

Stage: Financial Bid Evaluation

Only those bidders who have quoted for all the componentsof the Financial Bid shall be

considered for evaluation.

The Financial Bids which are opened shall be evaluated and the bidders whose total quote is

the lowest shall be ranked as L1 bidder.

chaser will correct arithmetical errors during evaluation of Financial Bids on the

If there is a discrepancy between the unit price and the total price that is obtained

by multiplying the unit price and quantity, the unit price shall prev

price shall be corrected, unless in the opinion of the Purchaser there is an obvious

misplacement of the decimal point in the unit price, in which case the total price as

quoted shall govern and the unit price shall be corrected;

e is an error in a total corresponding to the addition or subtraction of

subtotals, the subtotals shall prevail and the total shall be corrected; and

If there is a discrepancy between words and figures, the amount in words shall

prevail. However, where the amount expressed in words is related to an arithmetic

error, the amount in figures shall prevail subject to (i) and (ii) above.

If there is a discrepancy between percentage and figures related to various taxes or

levies, the percentage shall prevail over figure mentioned. However, where the

amount expressed in percentage is related to an arithmetic error, the amount in

figures shall prevail subject to (i) and (ii) above. It should also be noted that at

time of payment against, the prevailing tax/levy rates will be used as on the date of

approval of payment

Except as provided in sub-clauses (i) to (iv) herein above, Tendering Authority shall

reject the Price Proposal if the same contains any other computational or arithmetic

discrepancy or error.

Bidder does not accept the correction of errors, its Bid shall be disqualified

and its EMD shall be forfeited

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

ION3: INSTRUCTION TO BIDDERS

,thebid shall be declared as

be critically examined in line

with objectives & scope of work mainly but not limited to the following criteria:

Schematic diagram showing all the modules & components of the systems covered in

Description of the technical solution for achieving the integrations as shown in the

Compliance to the proposed Software’s as per the RFP along with the OEM &

, communication modules, solution architectureand

Adherence with the time period as per schedule of deliveries defined in the RFP along

alified bidders on the basis of above criterion and accordingly

Only those bidders who have quoted for all the componentsof the Financial Bid shall be

h are opened shall be evaluated and the bidders whose total quote is

chaser will correct arithmetical errors during evaluation of Financial Bids on the

If there is a discrepancy between the unit price and the total price that is obtained

by multiplying the unit price and quantity, the unit price shall prevail and the total

price shall be corrected, unless in the opinion of the Purchaser there is an obvious

misplacement of the decimal point in the unit price, in which case the total price as

e is an error in a total corresponding to the addition or subtraction of

subtotals, the subtotals shall prevail and the total shall be corrected; and

If there is a discrepancy between words and figures, the amount in words shall

e amount expressed in words is related to an arithmetic

error, the amount in figures shall prevail subject to (i) and (ii) above.

If there is a discrepancy between percentage and figures related to various taxes or

figure mentioned. However, where the

amount expressed in percentage is related to an arithmetic error, the amount in

figures shall prevail subject to (i) and (ii) above. It should also be noted that at

s will be used as on the date of

clauses (i) to (iv) herein above, Tendering Authority shall

reject the Price Proposal if the same contains any other computational or arithmetic

Bidder does not accept the correction of errors, its Bid shall be disqualified

Page 23: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

(vii) The bids will be evaluated and awarded as per the evaluation criteria that “The

Bidders having lowest financial quote during Financial Bid Evaluat

considered as the L1 Bidders”.

(viii) The EMD of the other technically qualified Bidders shall be returned within 15

working days from the date of signing of Contract by the Discom with the successful

Bidder.

3.14. CONFIDENTIALITY

3.14.1. Information relating to the examination, evaluation, comparison, and post qualification of Bids,

and recommendation of contract award, shall not be disclosed to Bidders or any other persons

not officially concerned with such process until publication of th

3.14.2. Any attempt by a bidder to influence the tendering authority or other officials of Discom in the

examination, evaluation, comparison, and post qualification of the Bids or Contract award

decisions shall result in the rejection of his bid.

3.14.3. From the time of Bid opening to the time of Contract award, if any Bidder wishes to contact

the Tendering Authority on any matter related to the Bidding process, he is allowed to do so in

writing.

3.15. NON-MATERIAL NON-

3.15.1. Provided that a bid is subst

the bid related to requisite documents

information or documentation provided that the required information was in existence as on

date of opening of bid. No new information created after ope

3.16. DISQUALIFICATION

3.16.1. Tendering authority may at its sole discretion and at any time during the processing of bid,

disqualify any bidder/ bid from the bid process on following g

a. Any action on the part of the bidder to revise the rates/prices and modification in technical or

commercial substance of Bid, at their own.

b. Submission of any supplementary information unless & otherwise asked for at his own

instance after the openi

from submission of Bid to the Discom at least for one year.

c. The Bidder has been disqualified from any other Discom for any violation of code of conduct.

d. In case of bidder not adhering to t

/ offer may be rejected / non

e. In case of any misapprehension at bidder level which may lead to wrong price bidding, Discom

reserve the right to reject the bid or take necessary loadi

price as per aspersion of Discom / tender specification. Accordingly the bidders are advised to

ask to clarify about any misapprehension before bidding. No excuse shall be considered in this

regard.

f. Does not meet the Qualification Requirement (QR) as mentioned in the bidding document.

g. During validity of the bid or its extended period, if any, increases his quoted prices.

h. Has imposed conditions in his bid.

i. Has made misleading or false representations in the forms, stateme

submitted in proof of the eligibility requirements.

j. Has been black listed, by any utilities of India during

k. Has submitted bid which is not accompanied by required documentation and

SECURITY/Tender document

Note: Bidders may specifically note that while processing the bid documents, if it is found, expressly

or implied, that some bidders may have compounded in any manner whatsoever or otherwise joined

to form a cartel resulting in delay/

liable to be disqualified for the contract as well as for a further period of two years from participation

in any of the bids floated by any department, Govt. of Rajasthan.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

19

The bids will be evaluated and awarded as per the evaluation criteria that “The

Bidders having lowest financial quote during Financial Bid Evaluat

considered as the L1 Bidders”.

The EMD of the other technically qualified Bidders shall be returned within 15

working days from the date of signing of Contract by the Discom with the successful

Information relating to the examination, evaluation, comparison, and post qualification of Bids,

and recommendation of contract award, shall not be disclosed to Bidders or any other persons

not officially concerned with such process until publication of the Contract award.

Any attempt by a bidder to influence the tendering authority or other officials of Discom in the

examination, evaluation, comparison, and post qualification of the Bids or Contract award

decisions shall result in the rejection of his bid.

From the time of Bid opening to the time of Contract award, if any Bidder wishes to contact

the Tendering Authority on any matter related to the Bidding process, he is allowed to do so in

-CONFORMITIES

Provided that a bid is substantially responsive, the Tendering Authority,

the bid related to requisite documents may request the bidder to submit the necessary

information or documentation provided that the required information was in existence as on

ening of bid. No new information created after opening of bid shall be considered

Tendering authority may at its sole discretion and at any time during the processing of bid,

disqualify any bidder/ bid from the bid process on following grounds:

Any action on the part of the bidder to revise the rates/prices and modification in technical or

commercial substance of Bid, at their own.

Submission of any supplementary information unless & otherwise asked for at his own

instance after the opening of the Bid may result in rejection of the Bid and also debar him

from submission of Bid to the Discom at least for one year.

The Bidder has been disqualified from any other Discom for any violation of code of conduct.

In case of bidder not adhering to the format of financial offer given with this document the bid

/ offer may be rejected / non-responsive.

In case of any misapprehension at bidder level which may lead to wrong price bidding, Discom

reserve the right to reject the bid or take necessary loading / unloading to arrive the correct

price as per aspersion of Discom / tender specification. Accordingly the bidders are advised to

ask to clarify about any misapprehension before bidding. No excuse shall be considered in this

alification Requirement (QR) as mentioned in the bidding document.

During validity of the bid or its extended period, if any, increases his quoted prices.

Has imposed conditions in his bid.

Has made misleading or false representations in the forms, stateme

submitted in proof of the eligibility requirements.

Has been black listed, by any utilities of India during as on 31.3.17.

Has submitted bid which is not accompanied by required documentation and

/Tender document fees/Processing fees

Bidders may specifically note that while processing the bid documents, if it is found, expressly

or implied, that some bidders may have compounded in any manner whatsoever or otherwise joined

to form a cartel resulting in delay/ holding up the processing of bids then the bidders so involved are

liable to be disqualified for the contract as well as for a further period of two years from participation

in any of the bids floated by any department, Govt. of Rajasthan.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

The bids will be evaluated and awarded as per the evaluation criteria that “The

Bidders having lowest financial quote during Financial Bid Evaluation shall be

The EMD of the other technically qualified Bidders shall be returned within 15

working days from the date of signing of Contract by the Discom with the successful

Information relating to the examination, evaluation, comparison, and post qualification of Bids,

and recommendation of contract award, shall not be disclosed to Bidders or any other persons

e Contract award.

Any attempt by a bidder to influence the tendering authority or other officials of Discom in the

examination, evaluation, comparison, and post qualification of the Bids or Contract award

From the time of Bid opening to the time of Contract award, if any Bidder wishes to contact

the Tendering Authority on any matter related to the Bidding process, he is allowed to do so in

Authority, to rectify omission in

may request the bidder to submit the necessary

information or documentation provided that the required information was in existence as on

ning of bid shall be considered.

Tendering authority may at its sole discretion and at any time during the processing of bid,

Any action on the part of the bidder to revise the rates/prices and modification in technical or

Submission of any supplementary information unless & otherwise asked for at his own

ng of the Bid may result in rejection of the Bid and also debar him

The Bidder has been disqualified from any other Discom for any violation of code of conduct.

he format of financial offer given with this document the bid

In case of any misapprehension at bidder level which may lead to wrong price bidding, Discom

ng / unloading to arrive the correct

price as per aspersion of Discom / tender specification. Accordingly the bidders are advised to

ask to clarify about any misapprehension before bidding. No excuse shall be considered in this

alification Requirement (QR) as mentioned in the bidding document.

During validity of the bid or its extended period, if any, increases his quoted prices.

Has made misleading or false representations in the forms, statements and attachments

Has submitted bid which is not accompanied by required documentation and BID

Bidders may specifically note that while processing the bid documents, if it is found, expressly

or implied, that some bidders may have compounded in any manner whatsoever or otherwise joined

holding up the processing of bids then the bidders so involved are

liable to be disqualified for the contract as well as for a further period of two years from participation

Page 24: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

3.17. AWARD OF CONTRACT

3.17.1. ACCEPTANCE OF THE TENDER/BID AND NOTIFICATION OF AWARD

a. After the selection of the Successful Bidder by the Tendering Authority within the validity

period of Bid, shall inform such Bidder in writing by issuing Letter of Intent (LOI).

b. The Successful Bidder shall send an acknowledgement the LOI to the Discom, post which

Discom shall prepare and send a detailed work order to the Successful Bidder. In case, the

Successful Bidder refuses

shall be rejected with forfeiture of its

(provided he accepts the prices offered by L1 bidder)

c. Discom shall issue Work Order to the Successful Bidder requiri

things within specified timeline. If the Bidder fails to do the following things within specified

timeline, BID SECURITY

may consider the next ranked bidder.

(i) Written Letter of Acceptance of Work Order along with duly signed and sealed copy of such

Work Order as token of such acknowledgement within 7 working days.

(ii) Submission of Performance Guarantee as required to be submitted under the Contract

within 15 working day

(iii) Signing of the Contract (based on the terms & conditions of this Tender Document) with

the Discom within 15 working days after issue of Contract format by Discom to the

Successful Bidder. In case any of the party (Discom and the Successful Bidder) is un

to sign the Contract within 15 working days, it shall inform the other party in advance

regarding the same along with the reason and suitable time for signing of the Contract.

d. Decision on bids shall be taken within original validity period of offers.

acceptance or rejection of a bid cannot be taken within the original bid validity period due to

unavoidable circumstances, all the bidders shall be requested to extend validity period of their

bids up to a specified date. It is discreti

bidders who do not accept shall be discontinued form the bid process and their

may be refunded.

e. Until a formal Contract is prepared and signed, the Work Order/ LOI shall constitute a binding

Contract.

3.18. SIGNING OF CONTRACT

3.18.1. The successful bidder will, on receipt of Work Order from the Discom enter into a contract with

the DISCOM by jointly signing the Contract.

3.18.2. The draft of the contract based on terms and condition, will be forwarded

bidder for execution by the Discom.

3.18.3. The Contract will be signed within fifteen days thereafter. The person to sign the Contract

must be duly authorized by the Bidding entities.

3.19. RESERVATION OF RIGHTS

3.19.1. To take care of unexpected circumstances, Tendering Authority shall reserve the rights for the

following:

a. Extend the last date & time for submission of the bids.

b. Amend the Tender Document at any time prior to the last date & time of submission of

Bids.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

20

T

ACCEPTANCE OF THE TENDER/BID AND NOTIFICATION OF AWARD

After the selection of the Successful Bidder by the Tendering Authority within the validity

inform such Bidder in writing by issuing Letter of Intent (LOI).

The Successful Bidder shall send an acknowledgement the LOI to the Discom, post which

Discom shall prepare and send a detailed work order to the Successful Bidder. In case, the

Successful Bidder refuses to accept LOI, and not intent to perform the scope of work,

shall be rejected with forfeiture of its BID SECURITY and order may be placed to L2 bidder

(provided he accepts the prices offered by L1 bidder).

Discom shall issue Work Order to the Successful Bidder requiring him to do the following

things within specified timeline. If the Bidder fails to do the following things within specified

BID SECURITY of such Bidder may be forfeited and Tendering Authority of Discom

may consider the next ranked bidder.

en Letter of Acceptance of Work Order along with duly signed and sealed copy of such

Work Order as token of such acknowledgement within 7 working days.

Submission of Performance Guarantee as required to be submitted under the Contract

within 15 working days.

Signing of the Contract (based on the terms & conditions of this Tender Document) with

the Discom within 15 working days after issue of Contract format by Discom to the

Successful Bidder. In case any of the party (Discom and the Successful Bidder) is un

to sign the Contract within 15 working days, it shall inform the other party in advance

regarding the same along with the reason and suitable time for signing of the Contract.

Decision on bids shall be taken within original validity period of offers.

acceptance or rejection of a bid cannot be taken within the original bid validity period due to

unavoidable circumstances, all the bidders shall be requested to extend validity period of their

bids up to a specified date. It is discretion of bidder to accept the extension or not. Those

bidders who do not accept shall be discontinued form the bid process and their

Until a formal Contract is prepared and signed, the Work Order/ LOI shall constitute a binding

SIGNING OF CONTRACT AGREEMENT

The successful bidder will, on receipt of Work Order from the Discom enter into a contract with

the DISCOM by jointly signing the Contract.

The draft of the contract based on terms and condition, will be forwarded

bidder for execution by the Discom.

The Contract will be signed within fifteen days thereafter. The person to sign the Contract

must be duly authorized by the Bidding entities.

RESERVATION OF RIGHTS

To take care of unexpected circumstances, Tendering Authority shall reserve the rights for the

Extend the last date & time for submission of the bids.

Amend the Tender Document at any time prior to the last date & time of submission of

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

ACCEPTANCE OF THE TENDER/BID AND NOTIFICATION OF AWARD

After the selection of the Successful Bidder by the Tendering Authority within the validity

inform such Bidder in writing by issuing Letter of Intent (LOI).

The Successful Bidder shall send an acknowledgement the LOI to the Discom, post which

Discom shall prepare and send a detailed work order to the Successful Bidder. In case, the

intent to perform the scope of work, the offer

order may be placed to L2 bidder

ng him to do the following

things within specified timeline. If the Bidder fails to do the following things within specified

be forfeited and Tendering Authority of Discom

en Letter of Acceptance of Work Order along with duly signed and sealed copy of such

Work Order as token of such acknowledgement within 7 working days.

Submission of Performance Guarantee as required to be submitted under the Contract

Signing of the Contract (based on the terms & conditions of this Tender Document) with

the Discom within 15 working days after issue of Contract format by Discom to the

Successful Bidder. In case any of the party (Discom and the Successful Bidder) is unable

to sign the Contract within 15 working days, it shall inform the other party in advance

regarding the same along with the reason and suitable time for signing of the Contract.

Decision on bids shall be taken within original validity period of offers. If the decision on

acceptance or rejection of a bid cannot be taken within the original bid validity period due to

unavoidable circumstances, all the bidders shall be requested to extend validity period of their

on of bidder to accept the extension or not. Those

bidders who do not accept shall be discontinued form the bid process and their BID SECURITY

Until a formal Contract is prepared and signed, the Work Order/ LOI shall constitute a binding

The successful bidder will, on receipt of Work Order from the Discom enter into a contract with

The draft of the contract based on terms and condition, will be forwarded to the successful

The Contract will be signed within fifteen days thereafter. The person to sign the Contract

To take care of unexpected circumstances, Tendering Authority shall reserve the rights for the

Amend the Tender Document at any time prior to the last date & time of submission of

Page 25: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

c. To reject any bid without assigning any reasons.

d. Terminate or abandon the bidding procedure or the entire project whether before or after

the receipt of bids.

e. Seek the advice of external consultants to assist Jaipur Discom in the evaluation or review

of bids.

f. Make enquiries of any person, company or organization to ascertain information regarding

the bidder and its bids.

g. Reproduce for the purposes of the procedure the whole or any portion of the bids despite

any copyright or other intellectual property right

Note: Direct or indirect canvassing on the part of the Bidder or his representative would be a ground

for disqualification of such Bidder from this process.

3.20. LACK OF COMPETITION

A situation may arise where, after evaluation

responsive bid only. In such a situation

CLAUSE 68, “Lack of Competition”

3.21. GENERAL

3.21.1. Discom does not bind itself to accept the lowest or any bid or any part of the bid and shall not

assign any reason(s) for the rejection of any bid or a part thereof.

3.21.2. The fact of submission of bid to the Jaipur Discom shall be deemed to constitute an agreem

between the Bidder and the Discom whereby such bid shall remain open for acceptance by the

Discom and Bidder shall not have option to withdraw his offer, impair or derogate the same. If

the Bidder is notified during the period of validity of bid that h

he shall be bound by the terms of agreement constituted by his bid and such acceptance

thereof by the Discom, until formal contract of the same bid has been signed between him and

Discom in replacement of such agreement.

3.21.3. The successful bidder will have to sign the contract agreement for the proper fulfilment of the

contract. In case of ambiguous or contradictory terms and conditions mentioned in the Tender

Document/ Bid, interpretations as may be advantageous to Discom may

satisfactory clarification is not furnished within the prescribed period.

3.21.4. Discom will not be responsible for any cost or expenses incurred by the bidder in connection

with preparation or submission of bids.

3.21.5. Jaipur Discom reserves the right to:

a) Reject or accept any bid.

b) Cancel the bid process and reject all applications.

c) Jaipur Discom shall neither be liable for any action nor be under any obligation to inform

the bidders of the grounds for any of the above actions.

3.22. SPECIAL CONDITIONS OF

3.22.1. If the services of the vendor are not as per the awarded work for three consecutive months

after commencement of work then Discom will have liberty to terminate the contract.

3.22.2. The system and constituent software modules would

existing systems’ & IT Systems that may be

3.22.3. Time is the essence in this project. The successful bidder is expected to implement the

systems for the project area as

3.22.4. The service provider shall maintain the confidentiality of data base. A separate NDA (Non

Disclosure Agreement) shall be signed by the service provider.

3.22.5. The bidder shall export all the parameters or specific parameters t

government portals as and when instructed by DISCOM.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

21

reject any bid without assigning any reasons.

Terminate or abandon the bidding procedure or the entire project whether before or after

Seek the advice of external consultants to assist Jaipur Discom in the evaluation or review

Make enquiries of any person, company or organization to ascertain information regarding

the bidder and its bids.

Reproduce for the purposes of the procedure the whole or any portion of the bids despite

any copyright or other intellectual property right that may subsist in the bids.

Note: Direct or indirect canvassing on the part of the Bidder or his representative would be a ground

for disqualification of such Bidder from this process.

LACK OF COMPETITION

A situation may arise where, after evaluation of Bids, the Tendering Authority may end

responsive bid only. In such a situation, the Tendering authority shall act as per RTPP Rule 2013

Lack of Competition” shall be applicable and accordingly measures will be taken.

Discom does not bind itself to accept the lowest or any bid or any part of the bid and shall not

assign any reason(s) for the rejection of any bid or a part thereof.

The fact of submission of bid to the Jaipur Discom shall be deemed to constitute an agreem

between the Bidder and the Discom whereby such bid shall remain open for acceptance by the

Discom and Bidder shall not have option to withdraw his offer, impair or derogate the same. If

the Bidder is notified during the period of validity of bid that his bid is accepted by the Discom,

he shall be bound by the terms of agreement constituted by his bid and such acceptance

thereof by the Discom, until formal contract of the same bid has been signed between him and

Discom in replacement of such agreement.

he successful bidder will have to sign the contract agreement for the proper fulfilment of the

contract. In case of ambiguous or contradictory terms and conditions mentioned in the Tender

Document/ Bid, interpretations as may be advantageous to Discom may

satisfactory clarification is not furnished within the prescribed period.

Discom will not be responsible for any cost or expenses incurred by the bidder in connection

with preparation or submission of bids.

Jaipur Discom reserves the right to:

Reject or accept any bid.

Cancel the bid process and reject all applications.

Jaipur Discom shall neither be liable for any action nor be under any obligation to inform

the bidders of the grounds for any of the above actions.

SPECIAL CONDITIONS OF TENDER

If the services of the vendor are not as per the awarded work for three consecutive months

after commencement of work then Discom will have liberty to terminate the contract.

The system and constituent software modules would also need to interface with Billing & Other

& IT Systems that may be procured by Jaipur Discom

Time is the essence in this project. The successful bidder is expected to implement the

systems for the project area as per the schedule indicated in RFP.

The service provider shall maintain the confidentiality of data base. A separate NDA (Non

Disclosure Agreement) shall be signed by the service provider.

The bidder shall export all the parameters or specific parameters to any other central or state

government portals as and when instructed by DISCOM.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

Terminate or abandon the bidding procedure or the entire project whether before or after

Seek the advice of external consultants to assist Jaipur Discom in the evaluation or review

Make enquiries of any person, company or organization to ascertain information regarding

Reproduce for the purposes of the procedure the whole or any portion of the bids despite

that may subsist in the bids.

Note: Direct or indirect canvassing on the part of the Bidder or his representative would be a ground

of Bids, the Tendering Authority may end-up with one

act as per RTPP Rule 2013,

be applicable and accordingly measures will be taken.

Discom does not bind itself to accept the lowest or any bid or any part of the bid and shall not

The fact of submission of bid to the Jaipur Discom shall be deemed to constitute an agreement

between the Bidder and the Discom whereby such bid shall remain open for acceptance by the

Discom and Bidder shall not have option to withdraw his offer, impair or derogate the same. If

is bid is accepted by the Discom,

he shall be bound by the terms of agreement constituted by his bid and such acceptance

thereof by the Discom, until formal contract of the same bid has been signed between him and

he successful bidder will have to sign the contract agreement for the proper fulfilment of the

contract. In case of ambiguous or contradictory terms and conditions mentioned in the Tender

Document/ Bid, interpretations as may be advantageous to Discom may be taken, if

Discom will not be responsible for any cost or expenses incurred by the bidder in connection

Jaipur Discom shall neither be liable for any action nor be under any obligation to inform

If the services of the vendor are not as per the awarded work for three consecutive months

after commencement of work then Discom will have liberty to terminate the contract.

also need to interface with Billing & Other

procured by Jaipur Discom during contract tenure.

Time is the essence in this project. The successful bidder is expected to implement the

The service provider shall maintain the confidentiality of data base. A separate NDA (Non-

o any other central or state

Page 26: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

3.22.6. The vendor shall develop a Web Based project monitoring module comprising the following :

i. It can assign unique ID to each

parameters) along

ii. The software shall capture communication module ID and its basic details also and pair

it with meter.

iii. To update the details of Capital Infrastructure already available at each site, and

Capital Infrastructure

identify all such details on the basis of Unique ID.

iv. To update the details

of contract. The history of all infrastructure / item a

the tenure of contract.

v. The vendor as a proof shall update the time stamped photograph of site before and

after installation. Similar function shall be available during replacement / change of

infrastructure / item dur

vi. The software shall have features to generate month wise work done report

the CAPEX and OPEX charges

at various level for processing of bills.

vii. The software shall also automatically calculate and apply penalties if any applicable as

per the penalty clauses.

viii. The software shall get verified by the DISCOM designated Officers/committee before

the commencement of work.

ix. The Software shall have module that shall aut

substantiating the work done and generating the applicable payment for the calendar

month for that particular installation, which shall be consolidated at various levels for

verification and payment processing.

x. The software which shall capture the details of installation of infrastructure (with type

of Infra) at each site

after installation shall have to be uploaded in the software. The bidder shall capture

the details of all the

non-functional, the same shall be identified and verified by the concerned field officer

of JVVNL before new installation.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION3: INSTRUCTION TO BIDDERS

22

The vendor shall develop a Web Based project monitoring module comprising the following :

It can assign unique ID to each Meter/DCU installation location (

parameters) along-with longitude and latitude.

The software shall capture communication module ID and its basic details also and pair

To update the details of Capital Infrastructure already available at each site, and

Capital Infrastructure installed by the vendor. The software shall have features to

identify all such details on the basis of Unique ID.

To update the details of Capital Infrastructure changed / replaced during the currency

of contract. The history of all infrastructure / item at each site shall be available during

the tenure of contract.

The vendor as a proof shall update the time stamped photograph of site before and

after installation. Similar function shall be available during replacement / change of

infrastructure / item during the tenure of contract.

e software shall have features to generate month wise work done report

the CAPEX and OPEX charges applicable for each installation with option to consolidate

at various level for processing of bills.

shall also automatically calculate and apply penalties if any applicable as

per the penalty clauses.

shall get verified by the DISCOM designated Officers/committee before

the commencement of work.

The Software shall have module that shall automatically generate all the reports

substantiating the work done and generating the applicable payment for the calendar

month for that particular installation, which shall be consolidated at various levels for

verification and payment processing.

are which shall capture the details of installation of infrastructure (with type

of Infra) at each site (consumer Meter or DCU). The photograph before installation and

after installation shall have to be uploaded in the software. The bidder shall capture

he details of all the equipment installed at site, if any installed equipment is faulty or

functional, the same shall be identified and verified by the concerned field officer

of JVVNL before new installation.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION3: INSTRUCTION TO BIDDERS

The vendor shall develop a Web Based project monitoring module comprising the following :

location (based upon certain

The software shall capture communication module ID and its basic details also and pair

To update the details of Capital Infrastructure already available at each site, and

installed by the vendor. The software shall have features to

of Capital Infrastructure changed / replaced during the currency

t each site shall be available during

The vendor as a proof shall update the time stamped photograph of site before and

after installation. Similar function shall be available during replacement / change of

e software shall have features to generate month wise work done report depicting

applicable for each installation with option to consolidate

shall also automatically calculate and apply penalties if any applicable as

shall get verified by the DISCOM designated Officers/committee before

omatically generate all the reports

substantiating the work done and generating the applicable payment for the calendar

month for that particular installation, which shall be consolidated at various levels for

are which shall capture the details of installation of infrastructure (with type

. The photograph before installation and

after installation shall have to be uploaded in the software. The bidder shall capture

installed at site, if any installed equipment is faulty or

functional, the same shall be identified and verified by the concerned field officer

Page 27: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

The Terms and Conditions of the contract shall prevail and shall be binding on the Agency and

any change or variation expressed or impressed howsoever made shall be in operative unless

expressly sanction by the Jaipur Discom. The Bidder shall be deemed to have full

himself and to have specific knowledge of the provisions under terms and Conditions of this

Tender Document mentioned hereunder:

4.1. DEFINITION OF TERMS

4.1.1. In constructing these general conditions and the annexed specification, the following words

shall have the meaning here in assigned to them unless there is anything in the subject of

context in consistent with such construction. “Jaipur Discom” shall mean the Jaipur

VidyutVitran Nigam Limited or JVVNL, represented by Chairman/Managing Director an

include their legal personal representative, successors and assignees.

4.1.2. The ““Bidder” shall mean and include one or more persons or any firm or any company or

body in corporate who has submitted the tender in response to “Invitation of Tender”.

4.1.3. The “Agency / Contractor / successful bidder

accepted by Discom and shall include its heirs, legal representative, successors and assignees

approved by the Discom.

4.1.4. The “Chairman/Managing Director” shall mean the Cha

4.1.5. The “Engineer” shall mean the Chief Engineer, Dy. Chief Engineer, Superintending Engineer,

Executive Engineer, Assistant Engineer, Discom or other Engineer or Officer for the time being

or from time to time duly authorized

engineer or Inspector for the purpose of the contract. In case where no such engineer has

been so appointed, the word “Engineer” shall mean the Discom or his duly authorized

representative.

4.1.6. “Works” mean and include the work or works to be done by the Agency under the contract.

4.1.7. The “Contract” shall mean and include the following:

(i) Notice Inviting Tender

(ii) Complete Tender document including its amendments if any.

(iii) Bid submitted by bidder.

(iv) BID SECURITY.

(v) Letter of Intent and its acknowledgement.

(vi) Security Deposit/ Performance Guarantees.

(vii) Detailed Work order.

(viii) Addenda that may hereafter be issued by the Discom to the Agency in the form of letter

and covering letters and schedule of prices as agreed between the Agency

Discom.

(ix) The agreements to be entered as per Tender Document.

(x) Requisite Power of Attorney in

4.1.8. The “Specification” shall mean the specification; specific conditions annexed to the General

Conditions, the contract schedule, and the annexure thereto, if any.

4.1.9. The Month shall mean, English calendar month i.e. period of 30 days and week shall mean a

period of 7 days.

4.1.10. The “Site” shall mean the place or places named in the contract and include, wh

the lands and buildings upon or in which the works are to be executed.

4.1.11. “Acknowledgement of Letter of Intent” shall mean the Bidder’s letter conveying his acceptance

of it being successful bidder and its intent to perform the contract.

4.1.12. “Acknowledgement of Work Order” shall mean the Bidder’s letter conveying his acceptance of

the tender as per the terms and conditions as been stated therein.

4.1.13. The “Contract Price shall mean the sum named in or calculated in accordance with the

provisions of the contract purchase or any amendments thereto.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

23

: TERMS AND CONDITIONS

and Conditions of the contract shall prevail and shall be binding on the Agency and

any change or variation expressed or impressed howsoever made shall be in operative unless

expressly sanction by the Jaipur Discom. The Bidder shall be deemed to have full

himself and to have specific knowledge of the provisions under terms and Conditions of this

Tender Document mentioned hereunder:

In constructing these general conditions and the annexed specification, the following words

shall have the meaning here in assigned to them unless there is anything in the subject of

context in consistent with such construction. “Jaipur Discom” shall mean the Jaipur

VidyutVitran Nigam Limited or JVVNL, represented by Chairman/Managing Director an

include their legal personal representative, successors and assignees.

The ““Bidder” shall mean and include one or more persons or any firm or any company or

body in corporate who has submitted the tender in response to “Invitation of Tender”.

/ Contractor / successful bidder ” shall mean the Bidder whose Bid has been

accepted by Discom and shall include its heirs, legal representative, successors and assignees

approved by the Discom.

The “Chairman/Managing Director” shall mean the Chairman/Managing Director, Discom.

The “Engineer” shall mean the Chief Engineer, Dy. Chief Engineer, Superintending Engineer,

Executive Engineer, Assistant Engineer, Discom or other Engineer or Officer for the time being

or from time to time duly authorized and appointed in writing by the customer to act as

engineer or Inspector for the purpose of the contract. In case where no such engineer has

been so appointed, the word “Engineer” shall mean the Discom or his duly authorized

d include the work or works to be done by the Agency under the contract.

The “Contract” shall mean and include the following:

Notice Inviting Tender

Complete Tender document including its amendments if any.

Bid submitted by bidder.

f Intent and its acknowledgement.

Security Deposit/ Performance Guarantees.

Detailed Work order.

Addenda that may hereafter be issued by the Discom to the Agency in the form of letter

and covering letters and schedule of prices as agreed between the Agency

The agreements to be entered as per Tender Document.

Requisite Power of Attorney in favour of the authorized signatory of the Bidder.

The “Specification” shall mean the specification; specific conditions annexed to the General

Conditions, the contract schedule, and the annexure thereto, if any.

The Month shall mean, English calendar month i.e. period of 30 days and week shall mean a

The “Site” shall mean the place or places named in the contract and include, wh

the lands and buildings upon or in which the works are to be executed.

“Acknowledgement of Letter of Intent” shall mean the Bidder’s letter conveying his acceptance

of it being successful bidder and its intent to perform the contract.

owledgement of Work Order” shall mean the Bidder’s letter conveying his acceptance of

the tender as per the terms and conditions as been stated therein.

The “Contract Price shall mean the sum named in or calculated in accordance with the

contract purchase or any amendments thereto.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

and Conditions of the contract shall prevail and shall be binding on the Agency and

any change or variation expressed or impressed howsoever made shall be in operative unless

expressly sanction by the Jaipur Discom. The Bidder shall be deemed to have fully informed

himself and to have specific knowledge of the provisions under terms and Conditions of this

In constructing these general conditions and the annexed specification, the following words

shall have the meaning here in assigned to them unless there is anything in the subject of

context in consistent with such construction. “Jaipur Discom” shall mean the Jaipur

VidyutVitran Nigam Limited or JVVNL, represented by Chairman/Managing Director and shall

The ““Bidder” shall mean and include one or more persons or any firm or any company or

body in corporate who has submitted the tender in response to “Invitation of Tender”.

” shall mean the Bidder whose Bid has been

accepted by Discom and shall include its heirs, legal representative, successors and assignees

irman/Managing Director, Discom.

The “Engineer” shall mean the Chief Engineer, Dy. Chief Engineer, Superintending Engineer,

Executive Engineer, Assistant Engineer, Discom or other Engineer or Officer for the time being

and appointed in writing by the customer to act as

engineer or Inspector for the purpose of the contract. In case where no such engineer has

been so appointed, the word “Engineer” shall mean the Discom or his duly authorized

d include the work or works to be done by the Agency under the contract.

Addenda that may hereafter be issued by the Discom to the Agency in the form of letter

and covering letters and schedule of prices as agreed between the Agency and the

of the authorized signatory of the Bidder.

The “Specification” shall mean the specification; specific conditions annexed to the General

The Month shall mean, English calendar month i.e. period of 30 days and week shall mean a

The “Site” shall mean the place or places named in the contract and include, where applicable,

the lands and buildings upon or in which the works are to be executed.

“Acknowledgement of Letter of Intent” shall mean the Bidder’s letter conveying his acceptance

owledgement of Work Order” shall mean the Bidder’s letter conveying his acceptance of

The “Contract Price shall mean the sum named in or calculated in accordance with the

Page 28: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4.1.14. “Letter of Intent” Letter issued by Discom to the successful bidder informing him that the

bidder is successful bidder.

4.1.15. “Work Order” shall mean the Discom’ letter which may be issued in the way of letter

containing detailed terms and conditions of the work and such other particulars which the

Discom may like to convey to the Agency pending signing of a formal written Contract.

4.1.16. “Writing” shall include any manuscript type written or printed statement under or over

signature or seal as the case may be.

4.1.17. The Work “Codes” shall mean the Indian Electricity Act/Electricity Supply act and Indian

Electricity Rules and the rules made there under applicable in the State of Rajasthan on the

date of Letter of Intent with such s

competent State Authorities i.e. Chief Electrical Inspector of Rajasthan.

4.1.18. Works importing “PERSON” shall include firms, Companies, Corporations and other bodies

whether incorporated or not.

4.1.19. Words importing the singular only shall also include the plural and vice version where the

context requires.

4.1.20. Terms and expressions not herein defined shall have the same meaning as one assigned to

them in the Indian Contract Act (Act IX of 1872) and falling t

1897).

4.2. CONTRACT

After the selection of successful bidder Discom will issue Letter of Intent and subsequently a

detailed Work Order to such bidder. A contract shall be entered into between Discom and the

successful bidder.

4.3. CONTRACT VALUE

Contract Value shall be termed as total order value as quoted / accepted by the Successful Bidder

in the Financial Bid.

4.4. CONTRACT PERIOD

The contract period shall be initially for a period of

Rollout period of twoyear

be extendable for further

4.5. IMPLEMENTATION PERIOD

The implementation period of project for shall as defined in this document where in all

hardware, software, resources etc. should be installed/deployed

implementation period for this project shall be max

contract.

4.6. TERMINATION OF CONTRACT

If the services rendered by the

JVVNL for three consecutive months after commencement of work then Discom will have

liberty to terminate the contract.

• Average meter reading provided by the contractor is less than

months.

4.7. FALL BACK ARRANGEMENT

4.7.1. In the event of failure of the Agency to fulfil its obligations, duties and responsibilities as per

the terms & conditions of the Contract, Discom shall interalia have the right, at any time to

resort to fall back arrangement. Under such

facilities and systems whether in operation or under execution after giving suitable notice as

provided in the Contract and can recover from the BGs & other holding of agency with Discom,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

24

“Letter of Intent” Letter issued by Discom to the successful bidder informing him that the

bidder is successful bidder.

“Work Order” shall mean the Discom’ letter which may be issued in the way of letter

ing detailed terms and conditions of the work and such other particulars which the

Discom may like to convey to the Agency pending signing of a formal written Contract.

“Writing” shall include any manuscript type written or printed statement under or over

signature or seal as the case may be.

The Work “Codes” shall mean the Indian Electricity Act/Electricity Supply act and Indian

Electricity Rules and the rules made there under applicable in the State of Rajasthan on the

date of Letter of Intent with such special modification thereof as may be specially stipulated by

competent State Authorities i.e. Chief Electrical Inspector of Rajasthan.

Works importing “PERSON” shall include firms, Companies, Corporations and other bodies

whether incorporated or not.

ds importing the singular only shall also include the plural and vice version where the

Terms and expressions not herein defined shall have the same meaning as one assigned to

them in the Indian Contract Act (Act IX of 1872) and falling that in the General Clause Act,

After the selection of successful bidder Discom will issue Letter of Intent and subsequently a

detailed Work Order to such bidder. A contract shall be entered into between Discom and the

Contract Value shall be termed as total order value as quoted / accepted by the Successful Bidder

The contract period shall be initially for a period of sevenyears including the I

earsfrom the date of award of contract. The contract period

be extendable for further twoyear, as per mutual agreement.

IMPLEMENTATION PERIOD

The implementation period of project for shall as defined in this document where in all

hardware, software, resources etc. should be installed/deployed

implementation period for this project shall be maximum24 months from

TERMINATION OF CONTRACT

rendered by the vendor are failed to meet the bare minimum requirements of

for three consecutive months after commencement of work then Discom will have

liberty to terminate the contract.Bare minimum requirement is

Average meter reading provided by the contractor is less than 65% in three consecutive

FALL BACK ARRANGEMENT

In the event of failure of the Agency to fulfil its obligations, duties and responsibilities as per

conditions of the Contract, Discom shall interalia have the right, at any time to

resort to fall back arrangement. Under such arrangement, Discom shall take charge of all

facilities and systems whether in operation or under execution after giving suitable notice as

provided in the Contract and can recover from the BGs & other holding of agency with Discom,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

“Letter of Intent” Letter issued by Discom to the successful bidder informing him that the

“Work Order” shall mean the Discom’ letter which may be issued in the way of letter

ing detailed terms and conditions of the work and such other particulars which the

Discom may like to convey to the Agency pending signing of a formal written Contract.

“Writing” shall include any manuscript type written or printed statement under or over

The Work “Codes” shall mean the Indian Electricity Act/Electricity Supply act and Indian

Electricity Rules and the rules made there under applicable in the State of Rajasthan on the

pecial modification thereof as may be specially stipulated by

competent State Authorities i.e. Chief Electrical Inspector of Rajasthan.

Works importing “PERSON” shall include firms, Companies, Corporations and other bodies

ds importing the singular only shall also include the plural and vice version where the

Terms and expressions not herein defined shall have the same meaning as one assigned to

hat in the General Clause Act,

After the selection of successful bidder Discom will issue Letter of Intent and subsequently a

detailed Work Order to such bidder. A contract shall be entered into between Discom and the

Contract Value shall be termed as total order value as quoted / accepted by the Successful Bidder

including the Implementation &

from the date of award of contract. The contract period may further

The implementation period of project for shall as defined in this document where in all the

hardware, software, resources etc. should be installed/deployed by the bidder.The

months from the date of award of

failed to meet the bare minimum requirements of

for three consecutive months after commencement of work then Discom will have

65% in three consecutive

In the event of failure of the Agency to fulfil its obligations, duties and responsibilities as per

conditions of the Contract, Discom shall interalia have the right, at any time to

shall take charge of all

facilities and systems whether in operation or under execution after giving suitable notice as

provided in the Contract and can recover from the BGs & other holding of agency with Discom,

Page 29: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

the losses suffered due to such failure. I

Agency shall pay the difference to Discom failing which Discom shall have right to recover the

sum through legal or other means.

4.7.2. The Discom shall have the right in such circumstances to manage the sy

charge of the facilities as above or through any other agency as it may deem fit and no claim

of Agency for compensation in this respect shall be entered.

4.7.3. The Discom shall have the right in such circumstances to blacklist/bar/disqu

from submission of Bid to the any Discom(s) at least for

4.8. HANDING OVER ON TERMINATION/ PROJECT COMPLETION:

4.8.1. The Contract shall require the Agency to cooperate in handing back the facilities, records, da

backup and documents,

after termination of Contract.

4.8.2. In the event of termination or expiry of contract, the bidder shall b

transition activities to be completed

(within the contract period). These activities shall also be applicable in case of reduction in

scope of services if applicable. The

operations team through workshop, discussion sessions and response to

should ensure that its team has handed over administration rights/passwords to the new

operations team.

In case JVVNL observes the lack of willingness to manage transit/ sharing of in

lack of support from Service Provider end (selected through this RFP), JVVNL shall have

absolute discretion to levy severe penalties and deduct the amount from monthly billing or

performance bank guarantee.

4.9. PERFORMANCE BANK GUARANTEE:

4.9.1. A Performance Bank Guarantee equivalent to

furnished by the Successful Bidder within 15 days of receipt of Work Order from Discom, in

cash or by crossed Bank Draft or by way of Bank Guarantee. The Performance Bank

Guarantee shall be valid for three months in addition to the entire contract period. In case if

the successful bidder furnishes

than 12 months) then it would be the sole responsibility of the Suc

Performance Bank Guarantee extended well in advance to maintain the validity time. Discom

may invoke the Performance Bank Guarantee without giving any information if validity of such

Performance Security expires.

4.9.2. The Bank guarantee in the prescribed format must be from the branch of any

Nationalized/Scheduled Bank. The Agency may furnish Bank Guarantee on stamp paper of

Rajasthan state and shall furnish a certificate of Banker that the stamp duty has been paid as

per prevailing rules of that Rajasthan State.

4.10. AGENCY TO INFORM HIMSELF FULLY

The Contract shall be considered to have come into force from the date of its signing. The

contractor shall be deemed to have carefully examined the Tender document including General

Conditions, specifications and schedules. Also it shall deemed to have sa

nature and character of the work to be executed and where necessary, of the site conditions

and other relevant matters and details. Any information thus had or otherwise obtained from

the Discom or the Engineer shall not in any way

for the supplying of the

the work in terms of the contract including all details and incidental works and supply all

accessories or apparatus which may not have been specifically mentioned in the contract but

necessary for ensuring complete erection and safe and efficient working of the equipment.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

25

the losses suffered due to such failure. If the BGs & other holding of agency is insufficient, the

Agency shall pay the difference to Discom failing which Discom shall have right to recover the

sum through legal or other means.

The Discom shall have the right in such circumstances to manage the sy

charge of the facilities as above or through any other agency as it may deem fit and no claim

of Agency for compensation in this respect shall be entered.

The Discom shall have the right in such circumstances to blacklist/bar/disqu

from submission of Bid to the any Discom(s) at least for three years.

HANDING OVER ON TERMINATION/ PROJECT COMPLETION:

The Contract shall require the Agency to cooperate in handing back the facilities, records, da

backup and documents, software licences if any with documentations, manuals, etc. to Discom

after termination of Contract.

In the event of termination or expiry of contract, the bidder shall b

transition activities to be completed across a transition period of as decided by

within the contract period). These activities shall also be applicable in case of reduction in

applicable. The successful bidder shall provide knowledge transfer to

hrough workshop, discussion sessions and response to

should ensure that its team has handed over administration rights/passwords to the new

In case JVVNL observes the lack of willingness to manage transit/ sharing of in

lack of support from Service Provider end (selected through this RFP), JVVNL shall have

absolute discretion to levy severe penalties and deduct the amount from monthly billing or

performance bank guarantee.

PERFORMANCE BANK GUARANTEE:

rmance Bank Guarantee equivalent to 5% (Five Percent) oftotal

by the Successful Bidder within 15 days of receipt of Work Order from Discom, in

cash or by crossed Bank Draft or by way of Bank Guarantee. The Performance Bank

Guarantee shall be valid for three months in addition to the entire contract period. In case if

furnishes a Performance Bank Guarantee for shorter duration (not less

than 12 months) then it would be the sole responsibility of the Successful Bidder to get the

Performance Bank Guarantee extended well in advance to maintain the validity time. Discom

may invoke the Performance Bank Guarantee without giving any information if validity of such

Performance Security expires.

ee in the prescribed format must be from the branch of any

Nationalized/Scheduled Bank. The Agency may furnish Bank Guarantee on stamp paper of

Rajasthan state and shall furnish a certificate of Banker that the stamp duty has been paid as

les of that Rajasthan State.

AGENCY TO INFORM HIMSELF FULLY

The Contract shall be considered to have come into force from the date of its signing. The

contractor shall be deemed to have carefully examined the Tender document including General

Conditions, specifications and schedules. Also it shall deemed to have sa

nature and character of the work to be executed and where necessary, of the site conditions

and other relevant matters and details. Any information thus had or otherwise obtained from

the Discom or the Engineer shall not in any way relieve the contractor from his responsibility

for the supplying of the Infrastructure, hardware, software and other equipment and executing

the work in terms of the contract including all details and incidental works and supply all

us which may not have been specifically mentioned in the contract but

necessary for ensuring complete erection and safe and efficient working of the equipment.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

f the BGs & other holding of agency is insufficient, the

Agency shall pay the difference to Discom failing which Discom shall have right to recover the

The Discom shall have the right in such circumstances to manage the system itself after taking

charge of the facilities as above or through any other agency as it may deem fit and no claim

The Discom shall have the right in such circumstances to blacklist/bar/disqualify the Agency

The Contract shall require the Agency to cooperate in handing back the facilities, records, data

with documentations, manuals, etc. to Discom

In the event of termination or expiry of contract, the bidder shall be responsible for the

across a transition period of as decided by DISCOM

within the contract period). These activities shall also be applicable in case of reduction in

successful bidder shall provide knowledge transfer to

hrough workshop, discussion sessions and response to queries. The bidder

should ensure that its team has handed over administration rights/passwords to the new

In case JVVNL observes the lack of willingness to manage transit/ sharing of information or

lack of support from Service Provider end (selected through this RFP), JVVNL shall have

absolute discretion to levy severe penalties and deduct the amount from monthly billing or

totalContract value shall be

by the Successful Bidder within 15 days of receipt of Work Order from Discom, in

cash or by crossed Bank Draft or by way of Bank Guarantee. The Performance Bank

Guarantee shall be valid for three months in addition to the entire contract period. In case if

a Performance Bank Guarantee for shorter duration (not less

cessful Bidder to get the

Performance Bank Guarantee extended well in advance to maintain the validity time. Discom

may invoke the Performance Bank Guarantee without giving any information if validity of such

ee in the prescribed format must be from the branch of any

Nationalized/Scheduled Bank. The Agency may furnish Bank Guarantee on stamp paper of

Rajasthan state and shall furnish a certificate of Banker that the stamp duty has been paid as

The Contract shall be considered to have come into force from the date of its signing. The

contractor shall be deemed to have carefully examined the Tender document including General

Conditions, specifications and schedules. Also it shall deemed to have satisfied himself with the

nature and character of the work to be executed and where necessary, of the site conditions

and other relevant matters and details. Any information thus had or otherwise obtained from

relieve the contractor from his responsibility

hardware, software and other equipment and executing

the work in terms of the contract including all details and incidental works and supply all

us which may not have been specifically mentioned in the contract but

necessary for ensuring complete erection and safe and efficient working of the equipment.

Page 30: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4.11. CONTRACT DOCUMENTS

4.11.1. The order placed under this Tender document shall be governed by the terms an

as incorporated in this Tender document and as given in the detailed work order. The terms

and conditions as specified in this Tender document if differ from the terms indicated in the

detailed work order the later shall prevail.

4.11.2. The contract shall for all purposes be construed according to the Laws of India and subject to

jurisdiction of Rajasthan Courts only. For the due fulfilment of the contract, the Agency shall

execute the Contract in the prescribed form, in prescribed number of copies on

State Non-judicial stamp paper bearing stamp duty as applicable. The expenses of completing

and stamping the Contract shall be borne by the Contractor. Such Contract shall be executed

and signed by the authorized signatory of the Agency on each

4.11.3. Such complete agreement form along with the contract documents together with a “Power of

Attorney” in favour of the Executants shall be required to be returned to the Discom within a

period of 15 days from the receipt of order duly signed on

executed agreement duly signed by the Discom shall be sent to the supplier for his reference.

4.11.4. The contract documents shall mean and include the following:

(i) Contract agreement.

(ii) Notice Inviting Tender

(iii) Complete Tender document including its amendments if any.

(iv) Bid submitted by bidder.

(v) BID SECURITY.

(vi) Letter of Intent and its acknowledgement.

(vii) Security Deposit/ Performance Guarantees.

(viii) Detailed Work order& its annexure.

(ix) Addenda that may hereafter be issued b

and covering letters and schedule of prices as agreed between the Agency and the

Discom.

(x) The agreements to be entered as per Tender Document.

(xi) Requisite Power of Attorney in favour of the authorized signatory

4.12. CHANGE OF AREA/QUANTITY

a. Change of Area: This tender is meant for entire Jaipur Discom, The Vender has to provide his

services in all areas as per JVVNL requirement.

b. Change of Quantity - The quantities set out are only tentative and estimated quantities of work.

They are not to be taken as the actual and correct quantities of the work to be executed by the

contractor in the fulfilment of his obligations under the contr

variation of particular item of final

item after adjudging the field requirement.

The owner reserves the right to increase or decrease the quantities of it

at the time of award of contract

During the currency of contract if any addition of new consumers in the system is intimated

vendorwill be required to install the entire system

The payment shall be made during the

for the total/complete contract period.

4.13. GRAFTS AND COMMISSIONS ETC.

Any gift, commission, or advantage given, promised or offered by or on behalf of the

contractor or his partner, agent, officers, director, employee or servant or any one on his or

their behalf in relation to the obtaining or to the execution of this or any

the Discom, shall be, in addition to any criminal liability which it may incur, subject of any loss

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

26

CONTRACT DOCUMENTS

The order placed under this Tender document shall be governed by the terms an

as incorporated in this Tender document and as given in the detailed work order. The terms

and conditions as specified in this Tender document if differ from the terms indicated in the

detailed work order the later shall prevail.

shall for all purposes be construed according to the Laws of India and subject to

jurisdiction of Rajasthan Courts only. For the due fulfilment of the contract, the Agency shall

execute the Contract in the prescribed form, in prescribed number of copies on

judicial stamp paper bearing stamp duty as applicable. The expenses of completing

and stamping the Contract shall be borne by the Contractor. Such Contract shall be executed

and signed by the authorized signatory of the Agency on each page thereof.

Such complete agreement form along with the contract documents together with a “Power of

Attorney” in favour of the Executants shall be required to be returned to the Discom within a

period of 15 days from the receipt of order duly signed on each page. One copy of the

executed agreement duly signed by the Discom shall be sent to the supplier for his reference.

The contract documents shall mean and include the following: -

agreement.

Notice Inviting Tender

Complete Tender document including its amendments if any.

Bid submitted by bidder.

Letter of Intent and its acknowledgement.

Security Deposit/ Performance Guarantees.

Detailed Work order& its annexure.

Addenda that may hereafter be issued by the Discom to the Agency in the form of letter

and covering letters and schedule of prices as agreed between the Agency and the

The agreements to be entered as per Tender Document.

Requisite Power of Attorney in favour of the authorized signatory of the Bidder.

QUANTITY

Change of Area: This tender is meant for entire Jaipur Discom, The Vender has to provide his

services in all areas as per JVVNL requirement.

The quantities set out are only tentative and estimated quantities of work.

They are not to be taken as the actual and correct quantities of the work to be executed by the

fulfilment of his obligations under the contract. It is clarified that the quantity

variation of particular item of final BOQ shall be allowed on the awarded unit rates of particular

item after adjudging the field requirement.

owner reserves the right to increase or decrease the quantities of items as may be necessary,

at the time of award of contract.

During the currency of contract if any addition of new consumers in the system is intimated

to install the entire system and payment shall be made on unit rate basis.

e payment shall be made during the remaining period in equal EMI, for the total value payable

for the total/complete contract period.

FTS AND COMMISSIONS ETC.

Any gift, commission, or advantage given, promised or offered by or on behalf of the

contractor or his partner, agent, officers, director, employee or servant or any one on his or

their behalf in relation to the obtaining or to the execution of this or any

the Discom, shall be, in addition to any criminal liability which it may incur, subject of any loss

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

The order placed under this Tender document shall be governed by the terms and conditions

as incorporated in this Tender document and as given in the detailed work order. The terms

and conditions as specified in this Tender document if differ from the terms indicated in the

shall for all purposes be construed according to the Laws of India and subject to

jurisdiction of Rajasthan Courts only. For the due fulfilment of the contract, the Agency shall

execute the Contract in the prescribed form, in prescribed number of copies on Rajasthan

judicial stamp paper bearing stamp duty as applicable. The expenses of completing

and stamping the Contract shall be borne by the Contractor. Such Contract shall be executed

page thereof.

Such complete agreement form along with the contract documents together with a “Power of

Attorney” in favour of the Executants shall be required to be returned to the Discom within a

each page. One copy of the

executed agreement duly signed by the Discom shall be sent to the supplier for his reference.

y the Discom to the Agency in the form of letter

and covering letters and schedule of prices as agreed between the Agency and the

of the Bidder.

Change of Area: This tender is meant for entire Jaipur Discom, The Vender has to provide his

The quantities set out are only tentative and estimated quantities of work.

They are not to be taken as the actual and correct quantities of the work to be executed by the

act. It is clarified that the quantity

be allowed on the awarded unit rates of particular

ems as may be necessary,

During the currency of contract if any addition of new consumers in the system is intimated, the

and payment shall be made on unit rate basis.

for the total value payable

Any gift, commission, or advantage given, promised or offered by or on behalf of the

contractor or his partner, agent, officers, director, employee or servant or any one on his or

their behalf in relation to the obtaining or to the execution of this or any other contract with

the Discom, shall be, in addition to any criminal liability which it may incur, subject of any loss

Page 31: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

or damage to the Discom resulting from any cancellation. The Discom shall then be entitled to

deduct the amount so payable from any mon

contract.

4.14. COMPLIANCE OF LABOUR LEGISLATION:

4.14.1. The Agency shall discharge its liability of employer in respect of personnel to be

engaged for delivering service under this Contract, as laid out in EPF and MP Ac

Act, 1948 (in ESI implemented area), workmen’s compensation act, 1923 (in non ESI

implemented area) contract labour (R&A) Act, 1970, Payment of Wages Act, 1936, Minimum

Wags Act, 1948 or any other Act, Rules, Regulations as may be applicable.Th

required to get separate code under the provision of EPF and ESI Acts, if not already taken

and deposit the employer’s contribution along with employee subscription, as per rule and

submit copy of challans at the time of claiming payment, as pe

which an amount equivalent to employer’s contribution and employees subscription shall be

deducted from his each bill and deposited with the concerned authorities. The Agency shall be

solely responsible for any consequences arisi

4.14.2. The Agency shall deploy

qualifications and experience as mentioned in the Tender Document. Agency shall pay salaries

/ wages to the manpower deployed through

Division wise Sub Division wise and Employee wise salary statement with all details such as

Basic, DA, Conveyance, Bonus, EPF, ESI, PT, TDS, Net Salary etc. to Discom. Payment of

wages / salaries paid in cash

4.15. SAFETY OF SYSTEM

The Agency shall be fully responsible for upkeep, operation, maintenance, security and safety

of infrastructure, hardware, software, documents, data and other documents and records

transferred to it and developed l

updated condition and handed over back to Discom

4.16. INSURANCE

The agency at his own cost shall arrange, secure and maintain all insurance (Equipment

&manpower) as pertinent to the works and obligatory

and interest of Discom against all perils. The validity of insurance shall be valid till expiry of

contract.

4.17. REMEDY ON AGENCY’S FAILURE TO INSURANCE

If the Agency fails to effect and keep in force insurance referred

other insurance which he may be required to effect under the terms of contract then the

Jaipur Discom may effect and keep in force any such insurance and pay such premium(s) as

may be necessary for that purpose and from time t

Discom as aforesaid from any money due or which may become due to the Agency or rec

the same as debt from the

4.18. LIABILITY FOR ACCIDENTS AND DAMAGES

4.18.1. The Agency shall be liable for and shall indemnify the

person or damage to property resulting from the negligence of the Agency or his workman or

from defective work but not from any other cause.

4.18.2. Provided that the Agency shall not be liable for any loss or profit or loss of

any other claim made against the Discom not already provided for in the contract, not for any

injury or damage caused by or arising from the acts of the DISCOM or of any other person or

due to circumstances over which the agency has no control,

damage or injury under this clause exceed the total value of the Contract.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

27

or damage to the Discom resulting from any cancellation. The Discom shall then be entitled to

deduct the amount so payable from any moneys otherwise due to the Agency under the

COMPLIANCE OF LABOUR LEGISLATION:

The Agency shall discharge its liability of employer in respect of personnel to be

engaged for delivering service under this Contract, as laid out in EPF and MP Ac

Act, 1948 (in ESI implemented area), workmen’s compensation act, 1923 (in non ESI

implemented area) contract labour (R&A) Act, 1970, Payment of Wages Act, 1936, Minimum

Wags Act, 1948 or any other Act, Rules, Regulations as may be applicable.Th

required to get separate code under the provision of EPF and ESI Acts, if not already taken

and deposit the employer’s contribution along with employee subscription, as per rule and

submit copy of challans at the time of claiming payment, as per Tender document, failing

which an amount equivalent to employer’s contribution and employees subscription shall be

deducted from his each bill and deposited with the concerned authorities. The Agency shall be

solely responsible for any consequences arising out of breach of any applicable legislations.

The Agency shall deploy Skilled / Highly Skilled manpower

qualifications and experience as mentioned in the Tender Document. Agency shall pay salaries

/ wages to the manpower deployed through cheque/online transfer and submit Circle wise,

Division wise Sub Division wise and Employee wise salary statement with all details such as

Basic, DA, Conveyance, Bonus, EPF, ESI, PT, TDS, Net Salary etc. to Discom. Payment of

wages / salaries paid in cash is strictly not allowed.

The Agency shall be fully responsible for upkeep, operation, maintenance, security and safety

hardware, software, documents, data and other documents and records

transferred to it and developed later. These documents and records shall be maintained in

updated condition and handed over back to Discom.

The agency at his own cost shall arrange, secure and maintain all insurance (Equipment

&manpower) as pertinent to the works and obligatory in terms of law to protect its interest

and interest of Discom against all perils. The validity of insurance shall be valid till expiry of

AGENCY’S FAILURE TO INSURANCE

If the Agency fails to effect and keep in force insurance referred to in clause 16 hereof or any

other insurance which he may be required to effect under the terms of contract then the

Jaipur Discom may effect and keep in force any such insurance and pay such premium(s) as

may be necessary for that purpose and from time to time deduct the amount so paid by the

Discom as aforesaid from any money due or which may become due to the Agency or rec

the same as debt from the Agency.

ILITY FOR ACCIDENTS AND DAMAGES

The Agency shall be liable for and shall indemnify the Discom in respect of all injury to

person or damage to property resulting from the negligence of the Agency or his workman or

from defective work but not from any other cause.

Provided that the Agency shall not be liable for any loss or profit or loss of

any other claim made against the Discom not already provided for in the contract, not for any

injury or damage caused by or arising from the acts of the DISCOM or of any other person or

due to circumstances over which the agency has no control, not shall his total liability for loss,

damage or injury under this clause exceed the total value of the Contract.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

or damage to the Discom resulting from any cancellation. The Discom shall then be entitled to

eys otherwise due to the Agency under the

The Agency shall discharge its liability of employer in respect of personnel to be

engaged for delivering service under this Contract, as laid out in EPF and MP Act, 1952 ESI

Act, 1948 (in ESI implemented area), workmen’s compensation act, 1923 (in non ESI

implemented area) contract labour (R&A) Act, 1970, Payment of Wages Act, 1936, Minimum

Wags Act, 1948 or any other Act, Rules, Regulations as may be applicable.The Agency is

required to get separate code under the provision of EPF and ESI Acts, if not already taken

and deposit the employer’s contribution along with employee subscription, as per rule and

r Tender document, failing

which an amount equivalent to employer’s contribution and employees subscription shall be

deducted from his each bill and deposited with the concerned authorities. The Agency shall be

ng out of breach of any applicable legislations.

Skilled / Highly Skilled manpower with necessary

qualifications and experience as mentioned in the Tender Document. Agency shall pay salaries

cheque/online transfer and submit Circle wise,

Division wise Sub Division wise and Employee wise salary statement with all details such as

Basic, DA, Conveyance, Bonus, EPF, ESI, PT, TDS, Net Salary etc. to Discom. Payment of

The Agency shall be fully responsible for upkeep, operation, maintenance, security and safety

hardware, software, documents, data and other documents and records

ater. These documents and records shall be maintained in

The agency at his own cost shall arrange, secure and maintain all insurance (Equipment

in terms of law to protect its interest

and interest of Discom against all perils. The validity of insurance shall be valid till expiry of

to in clause 16 hereof or any

other insurance which he may be required to effect under the terms of contract then the

Jaipur Discom may effect and keep in force any such insurance and pay such premium(s) as

o time deduct the amount so paid by the

Discom as aforesaid from any money due or which may become due to the Agency or recover

Discom in respect of all injury to

person or damage to property resulting from the negligence of the Agency or his workman or

Provided that the Agency shall not be liable for any loss or profit or loss of Contract or

any other claim made against the Discom not already provided for in the contract, not for any

injury or damage caused by or arising from the acts of the DISCOM or of any other person or

not shall his total liability for loss,

damage or injury under this clause exceed the total value of the Contract.

Page 32: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4.18.3. The Agency will indemnify and save harmless the Discom against all actions, suits,

claims, demands, costs, or expenses arising in connection

may be attributable to the Discom or his employees) suffered prior to the date when the work

shall have been taken over hereof by persons employed by the agency on the work, whether

at common law or under the workman's co

at the date of contract relating to the question of the liability of employees for injuries suffered

by employees and will if called upon to do so take out the necessary policy or policies of insur

ances to over such indemnity.

4.18.4. The Agency shall insure against such liabilities with an insurer approved by the Discom

and shall continue such insurance, during the whole of the time that any person(s) are

employed by him on the works and shall when required produc

insurance and the receipt for payment of the current premium.

4.19. MAINTENANCE OF FACILITIES AND PERSONNEL

4.19.1. The Agency shall maintain all requisite facilities at Jaipur of its own as required to carry out

the work as per the Tende

4.19.2. Facilities

a. The Agency shall provide and maintain a controlling office with requisite infrastructure at

Jaipur with proper staff & facilities like telephone with fax, mobile phone, Internet etc. at its

own cost and shall remain open at all

4.19.3. Personnel

a. The Agency shall deploy exclusive supervisory and other personnel for efficient management

of the work under contract. Apart from the personnel specified in the scope of work. However

this contract is on service model, Agency shall be responsible for smoot

work by appointing sufficient number of manpower.

b. Manager or an alternate shall be available for communication during 9 am to 7 pm.

c. Agency shall not change the Manager/nodal officer, provide that he has not left the service.

d. Agency shall immediately inform the Discom

through Email and post.

e. Agency shall issue identification cards (ID card) to all its personnel engaged in the work under

the contract. The identification card duly signed by

of the agency. The format of such ID card shall be approved by concerned Discom Officer shall

be consisting of key details of Resume and photograph of the concerned personnel along logo

of the Agency. The Concer

same to the Agency for distribution to the concerned personnel. The IDs shall be handed over

to the concerned Discomofficerafter the completion of work under the contract.

4.19.4. Nodal Officer for Execution of Project:

After award of contract, to interact between the field offices and Agency, Discom shall appoint a Nodal

Officer if Required,similarly, the Agency shall communicate the name of the

would act as a Nodal Officer(s) from his side.

4.20. AGENCY’s RIGHTS

4.20.1. The Agency will be given rights to operate in the area during the Contract period for carrying

out the work, which shall cease to exist on

the Contract.

4.20.2. The Agency’s rights in the area will be working as an agent of Discom to

AMI (Advanced Metering Infrastructure/Smart Metering System for Consumers of

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

28

The Agency will indemnify and save harmless the Discom against all actions, suits,

claims, demands, costs, or expenses arising in connection with injuries (other than such as

may be attributable to the Discom or his employees) suffered prior to the date when the work

shall have been taken over hereof by persons employed by the agency on the work, whether

at common law or under the workman's compensation Act-1923 or any other statute in force

at the date of contract relating to the question of the liability of employees for injuries suffered

by employees and will if called upon to do so take out the necessary policy or policies of insur

over such indemnity.

The Agency shall insure against such liabilities with an insurer approved by the Discom

and shall continue such insurance, during the whole of the time that any person(s) are

employed by him on the works and shall when required produce to the Discom, such policy of

insurance and the receipt for payment of the current premium.

MAINTENANCE OF FACILITIES AND PERSONNEL

The Agency shall maintain all requisite facilities at Jaipur of its own as required to carry out

the work as per the Tender document.

The Agency shall provide and maintain a controlling office with requisite infrastructure at

with proper staff & facilities like telephone with fax, mobile phone, Internet etc. at its

own cost and shall remain open at all reasonable hours to receive communications.

The Agency shall deploy exclusive supervisory and other personnel for efficient management

of the work under contract. Apart from the personnel specified in the scope of work. However

this contract is on service model, Agency shall be responsible for smoot

work by appointing sufficient number of manpower.

Manager or an alternate shall be available for communication during 9 am to 7 pm.

Agency shall not change the Manager/nodal officer, provide that he has not left the service.

ediately inform the Discom about any change of personnel/contact numbers

through Email and post.

Agency shall issue identification cards (ID card) to all its personnel engaged in the work under

the contract. The identification card duly signed by authorized signatory of managerial position

of the agency. The format of such ID card shall be approved by concerned Discom Officer shall

be consisting of key details of Resume and photograph of the concerned personnel along logo

of the Agency. The Concerned Discom officer after countersigning these IDs, will return the

same to the Agency for distribution to the concerned personnel. The IDs shall be handed over

to the concerned Discomofficerafter the completion of work under the contract.

Nodal Officer for Execution of Project:

After award of contract, to interact between the field offices and Agency, Discom shall appoint a Nodal

, the Agency shall communicate the name of the authorized person(s) that

would act as a Nodal Officer(s) from his side.

The Agency will be given rights to operate in the area during the Contract period for carrying

out the work, which shall cease to exist on completion of the said period or on termination of

The Agency’s rights in the area will be working as an agent of Discom to

AMI (Advanced Metering Infrastructure/Smart Metering System for Consumers of

Bundi, Dholpur, Jhalawar and Karauli circles under

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

The Agency will indemnify and save harmless the Discom against all actions, suits,

with injuries (other than such as

may be attributable to the Discom or his employees) suffered prior to the date when the work

shall have been taken over hereof by persons employed by the agency on the work, whether

1923 or any other statute in force

at the date of contract relating to the question of the liability of employees for injuries suffered

by employees and will if called upon to do so take out the necessary policy or policies of insur-

The Agency shall insure against such liabilities with an insurer approved by the Discom

and shall continue such insurance, during the whole of the time that any person(s) are

e to the Discom, such policy of

The Agency shall maintain all requisite facilities at Jaipur of its own as required to carry out

The Agency shall provide and maintain a controlling office with requisite infrastructure at

with proper staff & facilities like telephone with fax, mobile phone, Internet etc. at its

reasonable hours to receive communications.

The Agency shall deploy exclusive supervisory and other personnel for efficient management

of the work under contract. Apart from the personnel specified in the scope of work. However

this contract is on service model, Agency shall be responsible for smooth & timely execution of

Manager or an alternate shall be available for communication during 9 am to 7 pm.

Agency shall not change the Manager/nodal officer, provide that he has not left the service.

about any change of personnel/contact numbers

Agency shall issue identification cards (ID card) to all its personnel engaged in the work under

authorized signatory of managerial position

of the agency. The format of such ID card shall be approved by concerned Discom Officer shall

be consisting of key details of Resume and photograph of the concerned personnel along logo

ned Discom officer after countersigning these IDs, will return the

same to the Agency for distribution to the concerned personnel. The IDs shall be handed over

to the concerned Discomofficerafter the completion of work under the contract.

After award of contract, to interact between the field offices and Agency, Discom shall appoint a Nodal

authorized person(s) that

The Agency will be given rights to operate in the area during the Contract period for carrying

completion of the said period or on termination of

The Agency’s rights in the area will be working as an agent of Discom to “Implementation of

AMI (Advanced Metering Infrastructure/Smart Metering System for Consumers of

under NSGM”

Page 33: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4.21. CONTRACT AGREEMENT

4.21.1. The Contract shall set out specific events of default by one party that will entitle the other

party to terminate the Contract. The party committing an event

being remedied, will be given a reasonable opportunity to remedy the default.

4.21.2. The Contract can however be otherwise terminated by either party by giving six

and on terms to be mutually agreed which may include p

losses suffered by the other party due to such termination.

4.21.3. Agency shall indemnify Discom against any claims, demands, costs and expenses whatsoever

which may be made against it, because of failure of the Agency or its

performance of their duties and negligence, any accident or injury to any person.

4.22. MODE AND TERMS OF PAYMENT

A. CAPEX CHARGES :

CAPEX cost includes

comprising the following:

(i) Smart Meters

(ii) Meter Box

(iii) Communication Module/NIC

(iv) Cable and other accessories

(v) Installation and Configuration charges

B. OPEX CHARGES

OPEX cost includes the charges for

the entire contract period

C. Commencement of CAPEX Charges

(i) The payment of CAPEX Charges shall be commenced after complete Installation /

readiness of the sites as defined in Payment Mechani

(ii) In certain cases, it might be possible that one or more components i.e. Meter,

communication module

circumstances, the CAPEX charges only for the items installed by the bidder and

installation and configuration charges shall be applicable.

(iii) In certain cases installations may be commenced during the tenure of the project and

after the Supply and Installation of entire system. In such case the CAPEX charges per

unit shall be divided for the remaining

awarded rate for one

commences a new installation in the 40

vendor would be entitled for payment of entire CAPEX in the remaining 20 months of the

contract period in equated monthly charges i.e. (X/20).

D. Commencement of OPEX Charges

(i) The payment of OPEX Charges shall be

of all sites and commencement of data of the sites.

(ii) The monthly payment @ OPEX price per unit / 60 months shall be made.

(iii) In certain cases installations may be commenced during the tenure of the project a

the Supply and Installation of entire system. In such cases per unit OPEX charges shall be

divided for the remaining period of contract. E.g. If ‘Y’ is the total OPEX charges for one

consumer, then monthly charges would be “Y/60”. And if the vendo

installation in the 40

the 20 months (remaining contract period from the date of installation)

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

29

CONTRACT AGREEMENT

The Contract shall set out specific events of default by one party that will entitle the other

party to terminate the Contract. The party committing an event of default, which is capable of

being remedied, will be given a reasonable opportunity to remedy the default.

The Contract can however be otherwise terminated by either party by giving six

and on terms to be mutually agreed which may include payment of suitable compensation for

losses suffered by the other party due to such termination.

Agency shall indemnify Discom against any claims, demands, costs and expenses whatsoever

which may be made against it, because of failure of the Agency or its

performance of their duties and negligence, any accident or injury to any person.

MODE AND TERMS OF PAYMENT

Supply and Installation of the entire system at eachConsumer mainly

comprising the following:

Communication Module/NIC

Cable and other accessories

Installation and Configuration charges

the charges for Data Charges(SIMS) and Operatio

contract period

of CAPEX Charges

The payment of CAPEX Charges shall be commenced after complete Installation /

readiness of the sites as defined in Payment Mechanism.

In certain cases, it might be possible that one or more components i.e. Meter,

communication module, Meter box are already available at the site. Under such

circumstances, the CAPEX charges only for the items installed by the bidder and

d configuration charges shall be applicable.

cases installations may be commenced during the tenure of the project and

after the Supply and Installation of entire system. In such case the CAPEX charges per

unit shall be divided for the remaining period of contract. E.g. If ‘X’ is per unit CAPEX

awarded rate for one consumer, then monthly charges would be X/60. And if the vendor

commences a new installation in the 40th month of the contract, then in such cases the

vendor would be entitled for payment of entire CAPEX in the remaining 20 months of the

contract period in equated monthly charges i.e. (X/20).

Commencement of OPEX Charges

The payment of OPEX Charges shall be commenced after complete Installation / readiness

of all sites and commencement of data of the sites.

The monthly payment @ OPEX price per unit / 60 months shall be made.

installations may be commenced during the tenure of the project a

the Supply and Installation of entire system. In such cases per unit OPEX charges shall be

divided for the remaining period of contract. E.g. If ‘Y’ is the total OPEX charges for one

, then monthly charges would be “Y/60”. And if the vendo

installation in the 40th month of the contract, then the OPEX charges shall be only paid for

the 20 months (remaining contract period from the date of installation)

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

The Contract shall set out specific events of default by one party that will entitle the other

of default, which is capable of

being remedied, will be given a reasonable opportunity to remedy the default.

The Contract can however be otherwise terminated by either party by giving six-month notice

ayment of suitable compensation for

Agency shall indemnify Discom against any claims, demands, costs and expenses whatsoever

which may be made against it, because of failure of the Agency or its representatives in the

performance of their duties and negligence, any accident or injury to any person.

Supply and Installation of the entire system at eachConsumer mainly

Data Charges(SIMS) and Operation & Maintenance for

The payment of CAPEX Charges shall be commenced after complete Installation /

In certain cases, it might be possible that one or more components i.e. Meter,

, Meter box are already available at the site. Under such

circumstances, the CAPEX charges only for the items installed by the bidder and

cases installations may be commenced during the tenure of the project and

after the Supply and Installation of entire system. In such case the CAPEX charges per

period of contract. E.g. If ‘X’ is per unit CAPEX

, then monthly charges would be X/60. And if the vendor

month of the contract, then in such cases the

vendor would be entitled for payment of entire CAPEX in the remaining 20 months of the

commenced after complete Installation / readiness

The monthly payment @ OPEX price per unit / 60 months shall be made.

installations may be commenced during the tenure of the project and after

the Supply and Installation of entire system. In such cases per unit OPEX charges shall be

divided for the remaining period of contract. E.g. If ‘Y’ is the total OPEX charges for one

, then monthly charges would be “Y/60”. And if the vendor commences a new

month of the contract, then the OPEX charges shall be only paid for

the 20 months (remaining contract period from the date of installation)

Page 34: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

CAPEX Part

(i) 60% payment of CAPEX in following manner

a) 30% payment against installation and successful data transfer at Data Centre provided

that this payment shall be made provided that the 50% quantity of total quantity is

installed and online data is available on the system.

b) Balance payment from the 60% pa

complete installation and Data Transfer is available.

(ii) The balance 40% of CAPEX shall be made after completion of total quantity and Data

Transfer in equal 60 instalments during the currency of the con

OPEX Part

Operational cost of the project shall be paid to vendor in equal 60 instalments during the currency

of the contract period after complete installation / readiness of all sites and commencement of

data at all sites

The payment shall be made in the following manner:

(i) The agency shall submit monthly invoice in triplicate to the Superintending

any other Nodal officer nominated by Discom, as per the rates indicated in the Contract. The

same shall be verified from the software Tool deployed for verification of work.

(ii) The invoice shall be accompanied by the following:

a) Employee wise monthly wa

b) EPF statements and challan.

c) ESI statements and challan.

d) Certifying 100% amount to be released.

(iii) 100% payment of monthly invoice shall be paid in following schedule.

a) The invoice shall be submitted within 7th of every month.

b) The SE(M&P) / Nodal

the same to the Sr. AO(CPC)

c) The AO/Sr.AO (CPC) shall release the 100% Payment within 30 days.

4.23. PENALTIES/ Service Level

The following operational penalties shall be applicable

under:

AMI

Sr. No. Particular

A Monthly ReadingReport

1 Upto 99%

2 Below 99% and Up to 95%

3 Below 95% and Up to 90%

4 Below 90 %

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

30

60% payment of CAPEX in following manner:

30% payment against installation and successful data transfer at Data Centre provided

that this payment shall be made provided that the 50% quantity of total quantity is

installed and online data is available on the system.

Balance payment from the 60% payment admissible as CAPEX shall be made after

complete installation and Data Transfer is available.

% of CAPEX shall be made after completion of total quantity and Data

Transfer in equal 60 instalments during the currency of the contract period.

Operational cost of the project shall be paid to vendor in equal 60 instalments during the currency

of the contract period after complete installation / readiness of all sites and commencement of

be made in the following manner:

The agency shall submit monthly invoice in triplicate to the Superintending

any other Nodal officer nominated by Discom, as per the rates indicated in the Contract. The

same shall be verified from the software Tool deployed for verification of work.

The invoice shall be accompanied by the following:

Employee wise monthly wages statement.

EPF statements and challan.

ESI statements and challan.

Certifying 100% amount to be released.

100% payment of monthly invoice shall be paid in following schedule.

The invoice shall be submitted within 7th of every month.

) / Nodal Officer shall verify the invoice by 15th of every month and send

the same to the Sr. AO(CPC)

CPC) shall release the 100% Payment within 30 days.

/ Service Level Agreement (SLA)

penalties shall be applicable on the Bidder and shall be calculated

Extent of penalty / No Payment

Reading of consumers & MIS

No penalty

Below 99% and Up to 95%

No payment towards

consumer Meters + 5% penalty on unit

rate on total number of non

consumer meter.

Below 95% and Up to 90%

No payment towards non reporting Consumer Meters + 10% penalty on unit

rate on total number of nonconsumer Meters.

No payment shall be made

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

30% payment against installation and successful data transfer at Data Centre provided

that this payment shall be made provided that the 50% quantity of total quantity is

yment admissible as CAPEX shall be made after

% of CAPEX shall be made after completion of total quantity and Data

tract period.

Operational cost of the project shall be paid to vendor in equal 60 instalments during the currency

of the contract period after complete installation / readiness of all sites and commencement of

The agency shall submit monthly invoice in triplicate to the Superintending Engineer(M&P) or

any other Nodal officer nominated by Discom, as per the rates indicated in the Contract. The

same shall be verified from the software Tool deployed for verification of work.

Officer shall verify the invoice by 15th of every month and send

CPC) shall release the 100% Payment within 30 days.

shall be calculated as here

Extent of penalty / No Payment

No payment towards non reporting

consumer Meters + 5% penalty on unit

rate on total number of non-reporting

consumer meter.

No payment towards non reporting onsumer Meters + 10% penalty on unit

rate on total number of non-reporting Meters.

No payment shall be made

Page 35: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

The penalty shall be calculated strictly as per above slabs and no benefit should be given

for the preceding slabs

If the defective or damaged materials are not replaced within 120 working hours from thereceipt of the intimation from the purchaser of such defects or damages, then a penalty @ Rs. 500 per 10 working hours delay shall be applicable upto maximum of Rs. 5000/Note:

(i) The firm shall furnish the daily communication report of the SIM a

The web portal should have such feature to get date and time wise report of consumer meter

communication status.

(ii) The designated officer of the Discom shall verify and certify the invoice through system

generated reports; bidder shall provide an interface for verification of the invoice in the

software to facilitate the verification authority to compute the availability of meter data

on system and amount of applicable penalty.

(iii) Integration Providing Consumer meter consumption d

System approved by JVVNL.

(iv) All %ages for SLA are to be calculated over calendar month.

4.24. IMPLEMENTATION AND ROLLOUT SCHEDULE

a. The Agency has to submit the plan for customization and rollout of the scope of the work as per

the terms and conditions of the award.

b. Penalty will be levied for delay in execution and rollout as per the Penalties given in this Tender

document.

S. No. Particular of activity

1. Submission of detailed inception report giving

the compliance sheet along with the make and

model of various infrastructure, hardware &

software that are proposed for delivery.

Specification of System Architec

Software Solution.

2. Approval of Inception Report by Discom

3. Commencement of Installation

4. Installation of Metering

5. Operation and maintenance of the system

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

31

The penalty shall be calculated strictly as per above slabs and no benefit should be given

If the defective or damaged materials are not replaced within 120 working hours from thereceipt of the intimation from the purchaser of such defects or damages, then a penalty @ Rs. 500 per 10 working hours delay shall be applicable upto maximum of Rs. 5000/-.

The firm shall furnish the daily communication report of the SIM along with the payment invoices.

The web portal should have such feature to get date and time wise report of consumer meter

The designated officer of the Discom shall verify and certify the invoice through system

der shall provide an interface for verification of the invoice in the

software to facilitate the verification authority to compute the availability of meter data

on system and amount of applicable penalty.

Consumer meter consumption data in a desired template of the DISCOM

System approved by JVVNL.

All %ages for SLA are to be calculated over calendar month.

IMPLEMENTATION AND ROLLOUT SCHEDULE

The Agency has to submit the plan for customization and rollout of the scope of the work as per

the terms and conditions of the award.

Penalty will be levied for delay in execution and rollout as per the Penalties given in this Tender

Particular of activity Time schedule desired

Submission of detailed inception report giving

the compliance sheet along with the make and

model of various infrastructure, hardware &

software that are proposed for delivery.

Specification of System Architecture and

Software Solution.

Within 30 days from the date of

Award of Contract

Approval of Inception Report by Discom Within 15 days from the date of

submission of inception report

Commencement of Installation Within 15 Days from the date of

acceptance of S

Metering system at all the sites Within 24 months from the date of

award of contract

((i) Supply and Installation of

50% of the hardware at the sites :

within 12 months from the date of

award of contract

And

(ii) Supply and Installation of

balance 50% the hardware at the

sites : within

date of award of contract)

Operation and maintenance of the system 60 months from S

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

The penalty shall be calculated strictly as per above slabs and no benefit should be given

If the defective or damaged materials are not replaced within 120 working hours from the date of receipt of the intimation from the purchaser of such defects or damages, then a penalty @ Rs. 500

long with the payment invoices.

The web portal should have such feature to get date and time wise report of consumer meter

The designated officer of the Discom shall verify and certify the invoice through system

der shall provide an interface for verification of the invoice in the

software to facilitate the verification authority to compute the availability of meter data

ata in a desired template of the DISCOM

The Agency has to submit the plan for customization and rollout of the scope of the work as per

Penalty will be levied for delay in execution and rollout as per the Penalties given in this Tender

Time schedule desired

Within 30 days from the date of

Award of Contract

Within 15 days from the date of

submission of inception report

Within 15 Days from the date of

of S.No. 2.

months from the date of

award of contract

((i) Supply and Installation of

the hardware at the sites :

months from the date of

award of contract

(ii) Supply and Installation of

balance 50% the hardware at the

sites : within 24 months from the

date of award of contract)

60 months from S.No. 4.

Page 36: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

S. No. Particular of activity

6. Installation of Software system and Data

Centre and other

7. Integration with JVVNL’s existing

billing/RAPDRP systems

8. UAT

9. Parallel Run

Note: Implementation schedule is to be complied with strictly. In case if implementation is

delayed, no contract period as specified in this RFP shall be increased and

made accordingly.

E.g. If implementation schedule is delayed by two months, then in such case the payment

shall be made only for remaining 58 months shall be paid.

4.25. GOVERNING LAWS AND JURISDICTION

The Indian Law shall govern the agreement. Only appropriate courts in Jaipur shall have exclusive

Court Jurisdiction to deal with any matter arising out of or relating to the agreement or otherwise

4.26. JURISDICTION FOR LEGAL PROCEEDINGS

The contract shall be governed by the laws of India for the time being in force and be subject to the

court of competent jurisdiction at respective Discom HQ. All disputes, differences questions

whatsoever arising between the Discom and the agency upon or in relation to or in connection with

the Contracts shall be deemed to have arisen at Discom Head Quarter only and no cour

court at Jaipur, Rajasthan shall have jurisdiction to entertain or try the same.

4.27. SETTLEMENT OF DISPUTES

In any time any question, dispute or difference what so ever which may arise between respective

Discom and the Agency, the same shall be de

committee constituted by him and shall be final and binding on both the parties.

The Discom have constituted settlement committee to settle the disputed cases. For the disputed

amount up to Rs. 3.00 Lac the

disputed amount is more than Rs. 3.00 Lac the case shall be referred to the corporate level settlement

committee. The non-refundable fees for referring the case to the settlement committe

below or prescribed time to time:

• Reference fee for CE level settlement committee

• Reference fee for corporate level settlement committee

• Fee for review of cases by corporate level settlement committee

• The settlement committee fees as shown above or prevailing at that time shall be deposited in

cash with the concerned AO.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

32

Particular of activity Time schedule desired

Installation of Software system and Data

Centre and other related infrastructure

Within 2 months from

approval of System Architecture

and Software Solution.

Integration with JVVNL’s existing

billing/RAPDRP systems

Within 6 months from

approval of System Architecture

and Software Solution

Within 1 month of Integration

completion i.e. within 7 months

from the date of approval of

System Architecture and Software

Solution.

Certificate from JVVNL shall be

taken by bidder.

For 3 months after issuance of the

UAT completion certificate.

: Implementation schedule is to be complied with strictly. In case if implementation is

delayed, no contract period as specified in this RFP shall be increased and

schedule is delayed by two months, then in such case the payment

shall be made only for remaining 58 months shall be paid.

OVERNING LAWS AND JURISDICTION

The Indian Law shall govern the agreement. Only appropriate courts in Jaipur shall have exclusive

rt Jurisdiction to deal with any matter arising out of or relating to the agreement or otherwise

URISDICTION FOR LEGAL PROCEEDINGS

The contract shall be governed by the laws of India for the time being in force and be subject to the

jurisdiction at respective Discom HQ. All disputes, differences questions

whatsoever arising between the Discom and the agency upon or in relation to or in connection with

the Contracts shall be deemed to have arisen at Discom Head Quarter only and no cour

court at Jaipur, Rajasthan shall have jurisdiction to entertain or try the same.

ETTLEMENT OF DISPUTES

In any time any question, dispute or difference what so ever which may arise between respective

Discom and the Agency, the same shall be decided by CMD/MD of Discom, or by the settlement

committee constituted by him and shall be final and binding on both the parties.

The Discom have constituted settlement committee to settle the disputed cases. For the disputed

amount up to Rs. 3.00 Lac the case may be referred to the CE level settlement committee and if the

disputed amount is more than Rs. 3.00 Lac the case shall be referred to the corporate level settlement

refundable fees for referring the case to the settlement committe

below or prescribed time to time:

Reference fee for CE level settlement committee - Rs. 1000/-

Reference fee for corporate level settlement committee-Rs. 3000/-

Fee for review of cases by corporate level settlement committee- Rs. 5000/

The settlement committee fees as shown above or prevailing at that time shall be deposited in

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

Time schedule desired

Within 2 months from the date of

approval of System Architecture

and Software Solution.

Within 6 months from the date of

approval of System Architecture

and Software Solution.

Within 1 month of Integration

completion i.e. within 7 months

from the date of approval of

System Architecture and Software

Certificate from JVVNL shall be

taken by bidder.

For 3 months after issuance of the

completion certificate.

: Implementation schedule is to be complied with strictly. In case if implementation is

delayed, no contract period as specified in this RFP shall be increased and payment shall be

schedule is delayed by two months, then in such case the payment

The Indian Law shall govern the agreement. Only appropriate courts in Jaipur shall have exclusive

rt Jurisdiction to deal with any matter arising out of or relating to the agreement or otherwise

The contract shall be governed by the laws of India for the time being in force and be subject to the

jurisdiction at respective Discom HQ. All disputes, differences questions

whatsoever arising between the Discom and the agency upon or in relation to or in connection with

the Contracts shall be deemed to have arisen at Discom Head Quarter only and no court other than

In any time any question, dispute or difference what so ever which may arise between respective

cided by CMD/MD of Discom, or by the settlement

committee constituted by him and shall be final and binding on both the parties.

The Discom have constituted settlement committee to settle the disputed cases. For the disputed

case may be referred to the CE level settlement committee and if the

disputed amount is more than Rs. 3.00 Lac the case shall be referred to the corporate level settlement

refundable fees for referring the case to the settlement committee are as given

Rs. 5000/-

The settlement committee fees as shown above or prevailing at that time shall be deposited in

Page 37: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4.28. CONDUCT OF AGENCY STAFF

If any of the Agency’s employees shall, in the opinion of Discom, is guilty of any misconduct or

incompetence or negligence, then if so directed by Discom, the Agency shall at once remove such

employee and replace him by an equally qualified and competent substitute.

4.29. LIEN

In case of any lien or claim pertaining to the work and responsibility of the Ag

might become liable, it shall have right to recover such claim amount from the Agency.

4.30. FORCE MAJEURE CONDITIONS

If at any time during the currency of the Contract the performance in whole or in part be prevented or

delayed by reason of any war hostility acts of public enemy, civil commotion, sabotage, fire floods,

explosion, epidemics, quarantine restrictions, strikes, lockouts or acts of god (hereinafter referred to

as Events) then provided Notice and adequate proof of the production/

account of these events is given within 21 days from the date of occurrence thereof the provision of

penalty Clause of this specification shall not be invoked by Discom provided further that the deliveries

under the contract shall be resumed, as soon as practicable after such event (s) has ceased to exist

and the decision of the Discom as to whether the deliveries have been so resumed or not shall be final

and conclusive provided further that in case the strike/lockout prolongs b

days, the supplier shall immediately inform about the same to the Discom in which case the Discom

reserves the right to procure the material equipment on order or part thereof from any other source at

the risk and cost of the supplier.

4.31. COMPLETENESS OF CONTRACT

The contract shall be considered completed on termination of the contract period after full handing

over of data, documents or material and clearing all dues towards the agency

document and certified by SE (IT).

4.32. INSPECTION AND TESTING

All the materials which will be supplied shall undergo pre dispatch inspection by JVVNL officers. Before

supply of items, clearance from JVVNL is required. The agency will have offered the materials in

writing for material inspection.

The designated officer/ representative of Discom shall on giving seven days, notice in writing to the

contractor setting out any grounds of objections which he may have in respect of the work, be at

liberty to reject any drawing and all or any plan

his opinion are not in accordance with the contract or are in his opinion defective for any reason

whatsoever.

The bidder shall state in his tender the places of inspection.

The vendor shall intimate at least 7 days in advance through notice(s) about the readiness of material

for dispatch commensurate with specific delivery schedule so as to enable the purchaser to depute his

representative for inspection testing and checking of the material/equipment. For

date of receipt of the letter in the office of the purchasing authority shall be deemed as the date of call

for inspection and not the date mentioned in the letter and the date of dispatch. In case,

material/equipment is not found ready b

to with tolerance of (-) 10% or if the inspection is not got carried out by any, the extent of the

quantity indicated in the inspection call reasons on account of the supplier an amount of Rs.750

only for the supplier’s work located in Rajasthan and an amount of Rs.15000/

works located outside Rajasthan will become payable by the supplier on this account to the Accounts

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

33

ONDUCT OF AGENCY STAFF

If any of the Agency’s employees shall, in the opinion of Discom, is guilty of any misconduct or

incompetence or negligence, then if so directed by Discom, the Agency shall at once remove such

employee and replace him by an equally qualified and competent substitute.

In case of any lien or claim pertaining to the work and responsibility of the Ag

might become liable, it shall have right to recover such claim amount from the Agency.

ORCE MAJEURE CONDITIONS

If at any time during the currency of the Contract the performance in whole or in part be prevented or

f any war hostility acts of public enemy, civil commotion, sabotage, fire floods,

explosion, epidemics, quarantine restrictions, strikes, lockouts or acts of god (hereinafter referred to

as Events) then provided Notice and adequate proof of the production/dispatch having suffered on

account of these events is given within 21 days from the date of occurrence thereof the provision of

penalty Clause of this specification shall not be invoked by Discom provided further that the deliveries

ll be resumed, as soon as practicable after such event (s) has ceased to exist

and the decision of the Discom as to whether the deliveries have been so resumed or not shall be final

and conclusive provided further that in case the strike/lockout prolongs beyond a period of seven

days, the supplier shall immediately inform about the same to the Discom in which case the Discom

reserves the right to procure the material equipment on order or part thereof from any other source at

er.

COMPLETENESS OF CONTRACT

The contract shall be considered completed on termination of the contract period after full handing

over of data, documents or material and clearing all dues towards the agency

IT).

INSPECTION AND TESTING

All the materials which will be supplied shall undergo pre dispatch inspection by JVVNL officers. Before

supply of items, clearance from JVVNL is required. The agency will have offered the materials in

The designated officer/ representative of Discom shall on giving seven days, notice in writing to the

contractor setting out any grounds of objections which he may have in respect of the work, be at

liberty to reject any drawing and all or any plant, or workmanship connected with such work which in

his opinion are not in accordance with the contract or are in his opinion defective for any reason

The bidder shall state in his tender the places of inspection.

east 7 days in advance through notice(s) about the readiness of material

for dispatch commensurate with specific delivery schedule so as to enable the purchaser to depute his

representative for inspection testing and checking of the material/equipment. For

date of receipt of the letter in the office of the purchasing authority shall be deemed as the date of call

for inspection and not the date mentioned in the letter and the date of dispatch. In case,

material/equipment is not found ready by the representative of the purchaser deputed for inspection

) 10% or if the inspection is not got carried out by any, the extent of the

quantity indicated in the inspection call reasons on account of the supplier an amount of Rs.750

only for the supplier’s work located in Rajasthan and an amount of Rs.15000/

works located outside Rajasthan will become payable by the supplier on this account to the Accounts

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

If any of the Agency’s employees shall, in the opinion of Discom, is guilty of any misconduct or

incompetence or negligence, then if so directed by Discom, the Agency shall at once remove such

In case of any lien or claim pertaining to the work and responsibility of the Agency for which Discom

might become liable, it shall have right to recover such claim amount from the Agency.

If at any time during the currency of the Contract the performance in whole or in part be prevented or

f any war hostility acts of public enemy, civil commotion, sabotage, fire floods,

explosion, epidemics, quarantine restrictions, strikes, lockouts or acts of god (hereinafter referred to

dispatch having suffered on

account of these events is given within 21 days from the date of occurrence thereof the provision of

penalty Clause of this specification shall not be invoked by Discom provided further that the deliveries

ll be resumed, as soon as practicable after such event (s) has ceased to exist

and the decision of the Discom as to whether the deliveries have been so resumed or not shall be final

eyond a period of seven

days, the supplier shall immediately inform about the same to the Discom in which case the Discom

reserves the right to procure the material equipment on order or part thereof from any other source at

The contract shall be considered completed on termination of the contract period after full handing

over of data, documents or material and clearing all dues towards the agencyas specified in this

All the materials which will be supplied shall undergo pre dispatch inspection by JVVNL officers. Before

supply of items, clearance from JVVNL is required. The agency will have offered the materials in

The designated officer/ representative of Discom shall on giving seven days, notice in writing to the

contractor setting out any grounds of objections which he may have in respect of the work, be at

t, or workmanship connected with such work which in

his opinion are not in accordance with the contract or are in his opinion defective for any reason

east 7 days in advance through notice(s) about the readiness of material

for dispatch commensurate with specific delivery schedule so as to enable the purchaser to depute his

representative for inspection testing and checking of the material/equipment. For this purpose the

date of receipt of the letter in the office of the purchasing authority shall be deemed as the date of call

for inspection and not the date mentioned in the letter and the date of dispatch. In case,

y the representative of the purchaser deputed for inspection

) 10% or if the inspection is not got carried out by any, the extent of the

quantity indicated in the inspection call reasons on account of the supplier an amount of Rs.7500/-

only for the supplier’s work located in Rajasthan and an amount of Rs.15000/- only for the Supplier’s

works located outside Rajasthan will become payable by the supplier on this account to the Accounts

Page 38: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Officer(IT&RE), JVVNL, Jaipur. The supplier will deposit the amount with the Account Officer

JVVNL, and Jaipur immediately under intimation to this purchasing authority, failing which the

subsequent call for inspection shall not be entertained.

The purchaser reserve to him the right of having any inspection of special test of a reasonable nature

at contracts premises or at sites in addition to those prescribed in applicable standards and the

enclosed technical specification.

Unless the inspection is specifically

clearance for dispatch by the purchase’s representative.

The purchaser reserves the right to reject all or any part of the material being manufactured of

awaiting dispatch, due to any defect or

observed during the Inspection. In case of any dispute/difference in this regard the decision of the

Chief Engineer shall be final and binding.

The purchaser also reserves the right to get the mate

Government Laboratory & claiming any compensation or rejecting the material/equipment, if not

found in accordance with the specification. All charges consequent to such rejection and

replacement/rectification shall b

4.33. DEATH BANKRUPTCY ETC.

4.33.1 If the Agency shall die or dissolve or commit any act or bankruptcy or being a corporation

commence to be wound up except for reconstruction purpose or carry on hits, business under

a receiver, the executors s

Agency or any such receiver, Liquidator, or any persons to whom to the contract may become

vested shall forth-with given notice thereof in writing to the Discom and shall for one (1)

month during which he shall take all reasonable steps to prevent stoppage of the work have

the option of carrying out the Discom subject to his or their providing such guarantee as may

be required by the Discom but not exceeding the value of the work for the time be

remaining relieve unexecuted provided however that nothing above said shall be deemed to

relieve the Agency or his successors of his or other their obligations under the contract under

any circumstances. In the event of stoppage of the work the period

clause shall be seven (7) days only. Provided that, should the above option be not exercised,

the contract may be terminated by the Discom by notice in writing to the Agency and the

same power and provisions reserved to the Discom

taking the work out of the Agency’s hand’s shall immediately become operative.

4.33.2 Change of name of the Agency at any stage after Bidding Process, the Discom shall deal the

same as per prevailing rules of the Discom

4.34. GUARANTEE AND REPLACEMENT OF DEFECTIVE/DAMAGED MATERIAL

4.34.1 GUARANTEE:

The equipment’s supplied should be guaranteed for their performance for the entire contract period.

The equipment found defective within the above guarantee period shall be repaire

supplier free of cost within one month of receipt of intimation.

Details for Guarantee are in meter specifications.

4.34.2 REPLACEMENT OF DEFECTIVE/DAMAGED MATERIALS

If the whole or part of the materials are found to be defective/damage

conformity with the specification or sample, such defects or damages in the materials

supplied shall be rectified within

at the point of destination or at the supplier’s works, at t

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

34

, JVVNL, Jaipur. The supplier will deposit the amount with the Account Officer

JVVNL, and Jaipur immediately under intimation to this purchasing authority, failing which the

subsequent call for inspection shall not be entertained.

serve to him the right of having any inspection of special test of a reasonable nature

at contracts premises or at sites in addition to those prescribed in applicable standards and the

enclosed technical specification.

Unless the inspection is specifically waived no material shall be dispatched without inspection and

clearance for dispatch by the purchase’s representative.

The purchaser reserves the right to reject all or any part of the material being manufactured of

awaiting dispatch, due to any defect or deviations from the standard specifications prescribed as

observed during the Inspection. In case of any dispute/difference in this regard the decision of the

Chief Engineer shall be final and binding.

The purchaser also reserves the right to get the material/equipment tested in any recognized

Government Laboratory & claiming any compensation or rejecting the material/equipment, if not

found in accordance with the specification. All charges consequent to such rejection and

replacement/rectification shall be borne by the supplier.

DEATH BANKRUPTCY ETC.

f the Agency shall die or dissolve or commit any act or bankruptcy or being a corporation

commence to be wound up except for reconstruction purpose or carry on hits, business under

a receiver, the executors successors, or other representatives in law of the state of the

Agency or any such receiver, Liquidator, or any persons to whom to the contract may become

with given notice thereof in writing to the Discom and shall for one (1)

ng which he shall take all reasonable steps to prevent stoppage of the work have

the option of carrying out the Discom subject to his or their providing such guarantee as may

be required by the Discom but not exceeding the value of the work for the time be

remaining relieve unexecuted provided however that nothing above said shall be deemed to

relieve the Agency or his successors of his or other their obligations under the contract under

any circumstances. In the event of stoppage of the work the period of the option under this

clause shall be seven (7) days only. Provided that, should the above option be not exercised,

terminated by the Discom by notice in writing to the Agency and the

same power and provisions reserved to the Discom as mentioned in the Tender in the event of

taking the work out of the Agency’s hand’s shall immediately become operative.

Change of name of the Agency at any stage after Bidding Process, the Discom shall deal the

same as per prevailing rules of the Discom.

GUARANTEE AND REPLACEMENT OF DEFECTIVE/DAMAGED MATERIAL

The equipment’s supplied should be guaranteed for their performance for the entire contract period.

The equipment found defective within the above guarantee period shall be repaire

supplier free of cost within one month of receipt of intimation.

Details for Guarantee are in meter specifications.

REPLACEMENT OF DEFECTIVE/DAMAGED MATERIALS

the whole or part of the materials are found to be defective/damage

conformity with the specification or sample, such defects or damages in the materials

supplied shall be rectified within 30days from the time of intimation of defect/damage either

at the point of destination or at the supplier’s works, at the cost of supplier, against proper

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

, JVVNL, Jaipur. The supplier will deposit the amount with the Account Officer (IT&RE),

JVVNL, and Jaipur immediately under intimation to this purchasing authority, failing which the

serve to him the right of having any inspection of special test of a reasonable nature

at contracts premises or at sites in addition to those prescribed in applicable standards and the

waived no material shall be dispatched without inspection and

The purchaser reserves the right to reject all or any part of the material being manufactured of

deviations from the standard specifications prescribed as

observed during the Inspection. In case of any dispute/difference in this regard the decision of the

rial/equipment tested in any recognized

Government Laboratory & claiming any compensation or rejecting the material/equipment, if not

found in accordance with the specification. All charges consequent to such rejection and

f the Agency shall die or dissolve or commit any act or bankruptcy or being a corporation

commence to be wound up except for reconstruction purpose or carry on hits, business under

uccessors, or other representatives in law of the state of the

Agency or any such receiver, Liquidator, or any persons to whom to the contract may become

with given notice thereof in writing to the Discom and shall for one (1)

ng which he shall take all reasonable steps to prevent stoppage of the work have

the option of carrying out the Discom subject to his or their providing such guarantee as may

be required by the Discom but not exceeding the value of the work for the time being

remaining relieve unexecuted provided however that nothing above said shall be deemed to

relieve the Agency or his successors of his or other their obligations under the contract under

of the option under this

clause shall be seven (7) days only. Provided that, should the above option be not exercised,

terminated by the Discom by notice in writing to the Agency and the

as mentioned in the Tender in the event of

taking the work out of the Agency’s hand’s shall immediately become operative.

Change of name of the Agency at any stage after Bidding Process, the Discom shall deal the

GUARANTEE AND REPLACEMENT OF DEFECTIVE/DAMAGED MATERIAL

The equipment’s supplied should be guaranteed for their performance for the entire contract period.

The equipment found defective within the above guarantee period shall be repaired/replaced by the

the whole or part of the materials are found to be defective/damaged or are not in

conformity with the specification or sample, such defects or damages in the materials

from the time of intimation of defect/damage either

he cost of supplier, against proper

Page 39: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

security and acknowledgement. In the alternative, the defective or damaged materials shall

be replaced free of cost within

purchaser of such defects or damages.

replaced within this period, the supplier shall pay a sum towards liquidated damages, for the

delay in rectification/replacement of the defects or damages.

The penalty will be calculated @ Rs. 500 per

damaged material or Rs. 5000/-

4.35. RULES AND REGULATION

The job shall be carried out as per the rules, regulations as prevailing in Discom, which shall be made

available to the Agency. These rules and regulations may be modified by Discom from time to time

and would be intimated to the Agency for incorporating during the currency of Contract.

The Agency will also follow the labour regulations and the directions of Government and othe

authorities enforcing the regulations and comply with any other relevant legislation in force from time

to time.

4.36. FAILURE TO EXECUTE THE CONTRACT

Agency failing to execute the order placed on them to the satisfaction of Discom under terms and

conditions set forth therein, will be liable to make good the loss sustained by the Discom, consequent

to the placing of fresh orders elsewhere at higher rate, i.e. the difference between the price accepted

in the contract already entered into and the price at which f

without prejudice to the imposition of Penalty/ Liquidated Damages and forfeiture of Performance

Security.

4.37. EFFECTIVE RECOVERIES

Any loss, arising due to non-fulfilment of this contract or any other contract, will be r

the Performance Security held and or any other amount due to the Agency from the Discom from this

Contract as well as from other contracts.

4.38. CLIMATIC CONDITIONS

The system are for use in various geographical area of respective Discom and shoul

for operation under tropical conditions of Rajasthan and shall be able to maintain the desired output

and withstand a wide range of temperature & climatic experience in the area under scope.

a. The ambient temperature will be within the rang

Centigrade.

b. The altitude will be less than 500 meters.

c. The maximum & minimum atmospheric humid

respectively.

d. Average Number of thunderstorm days per annum is 65.

e. Average Number of dust storm days per annum is 15.

f. Average Number of rainy days per annum is 65.

g. Average annual rainfall is 100 cm.

The climatic conditions are prone to wide variation in ambient condition and equipment’s offered under

this specification shall be suitabl

Discom.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION4: TERMS AND CONDITIONS

35

security and acknowledgement. In the alternative, the defective or damaged materials shall

be replaced free of cost within 30 days from the date of receipt of the intimation from the

purchaser of such defects or damages. If the defects or damages are not rectified or

replaced within this period, the supplier shall pay a sum towards liquidated damages, for the

delay in rectification/replacement of the defects or damages.

@ Rs. 500 per daydelay and shall be applicable upto maximum of

(whichever is lower).

RULES AND REGULATION

The job shall be carried out as per the rules, regulations as prevailing in Discom, which shall be made

cy. These rules and regulations may be modified by Discom from time to time

and would be intimated to the Agency for incorporating during the currency of Contract.

The Agency will also follow the labour regulations and the directions of Government and othe

authorities enforcing the regulations and comply with any other relevant legislation in force from time

FAILURE TO EXECUTE THE CONTRACT

Agency failing to execute the order placed on them to the satisfaction of Discom under terms and

et forth therein, will be liable to make good the loss sustained by the Discom, consequent

to the placing of fresh orders elsewhere at higher rate, i.e. the difference between the price accepted

in the contract already entered into and the price at which fresh orders have been placed. This is

without prejudice to the imposition of Penalty/ Liquidated Damages and forfeiture of Performance

EFFECTIVE RECOVERIES

fulfilment of this contract or any other contract, will be r

the Performance Security held and or any other amount due to the Agency from the Discom from this

Contract as well as from other contracts.

CLIMATIC CONDITIONS

The system are for use in various geographical area of respective Discom and shoul

for operation under tropical conditions of Rajasthan and shall be able to maintain the desired output

and withstand a wide range of temperature & climatic experience in the area under scope.

The ambient temperature will be within the range of + 0 Degree Centigrade to + 55 Degree

The altitude will be less than 500 meters.

The maximum & minimum atmospheric humidity will be in the range of 95%

Average Number of thunderstorm days per annum is 65.

of dust storm days per annum is 15.

Average Number of rainy days per annum is 65.

Average annual rainfall is 100 cm.

The climatic conditions are prone to wide variation in ambient condition and equipment’s offered under

this specification shall be suitable for installation at any of the location in the area of respective

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION4: TERMS AND CONDITIONS

security and acknowledgement. In the alternative, the defective or damaged materials shall

from the date of receipt of the intimation from the

If the defects or damages are not rectified or

replaced within this period, the supplier shall pay a sum towards liquidated damages, for the

shall be applicable upto maximum of cost of

The job shall be carried out as per the rules, regulations as prevailing in Discom, which shall be made

cy. These rules and regulations may be modified by Discom from time to time

and would be intimated to the Agency for incorporating during the currency of Contract.

The Agency will also follow the labour regulations and the directions of Government and other

authorities enforcing the regulations and comply with any other relevant legislation in force from time

Agency failing to execute the order placed on them to the satisfaction of Discom under terms and

et forth therein, will be liable to make good the loss sustained by the Discom, consequent

to the placing of fresh orders elsewhere at higher rate, i.e. the difference between the price accepted

resh orders have been placed. This is

without prejudice to the imposition of Penalty/ Liquidated Damages and forfeiture of Performance

fulfilment of this contract or any other contract, will be recovered from

the Performance Security held and or any other amount due to the Agency from the Discom from this

The system are for use in various geographical area of respective Discom and should be satisfactory

for operation under tropical conditions of Rajasthan and shall be able to maintain the desired output

and withstand a wide range of temperature & climatic experience in the area under scope.

e of + 0 Degree Centigrade to + 55 Degree

ity will be in the range of 95% & 10 %

The climatic conditions are prone to wide variation in ambient condition and equipment’s offered under

e for installation at any of the location in the area of respective

Page 40: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

5.1 AMI System

The project scope for AMI solution shall comprise of design, supply, install, com

maintain the Advanced Metering

Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles

reading for error free data, network problem identification, Load profile, Energy Audit and signal

partial load curtailment through deployment of

project implementation duration:

FMS/O&M for 5 years from the date of Go Live.

Key activities under the bidder scope are,a) Supply, Installation, Commissioning of

b) Setting up Communication infrastructuremeter data acquisition system

c) Meter Data Acquisition System

d) Meter Data Management System (MDMS)e) Web application with updated on

f) Mobile Application g) Integration with JVVNL”s related IT application

h) Analytics i) Return of Dismantled materials to JVVNL’s stores

The scope of work for the AMI Implementing conformity withsubsequent sections of the specifications, site survey, planning, design, engineering,

supply, manufacturing,transportation and insurance, delivery ainstallation, integration, configuration,

acceptance, training, maintenance and documentation of the

1. Carry out site Survey of site locations to

• Consumer Indexing • Smart Meter Installation

• Provisioning of Communication• Management of SIM cards pertaining to the GPRS network

2. Implement & commission AMI system architecture capable of upgrades and scaling as perrequirementswith robust System security features with due consideration of data privacy,

confidentiality cyber securityguidelines etc.

3. Installation, testing and commissioning of the proposed AMI solution.4. Deployment of all the application on Cloud including

Management System 5. Integration with existing legacy system and upcoming DISCOM systems including Metering, Billing

andCollection Systems 6. Development of Interface with mobile app and web portal/dashboard.

7. Returning of Dismantle materials to JVVNL’s stores as per agreed SOP.

8. FMS Support for the project duration.The data exchange among Smart me

fully functional AMI system.

The AMI system shall support functionalities as per

Infrastructure (AMI) in India” issued by the Central Electric

The major components of the AMI system would be:i. Smart Meters

a. Installation b. Development of Smart Meter Network

ii. Master Station/Control Centre/Central Computer System

iii. Meter Data Acquisition System that will capture

a. Load Profile with Time stamp

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

36

: SCOPE OF WORK

The project scope for AMI solution shall comprise of design, supply, install, com

the Advanced Metering Infrastructure (AMI) for consumers of all categories in

Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles. JVVNL intends to

reading for error free data, network problem identification, Load profile, Energy Audit and signal

through deployment of the AMI system with its auxiliary applications

mplementation duration: 2 years design, development, integration and Go

FMS/O&M for 5 years from the date of Go Live.

under the bidder scope are, Supply, Installation, Commissioning of Smart Meters with GPRS/RF compatible NIC

Communication infrastructure for two way communication between meters and meter data acquisition system

Meter Data Acquisition System (MDAS)

Meter Data Management System (MDMS) Web application with updated on-line data of consumers etc.

Integration with JVVNL”s related IT application

Return of Dismantled materials to JVVNL’s stores

The scope of work for the AMI Implementing Agency of this tender shall include, in complete conformity withsubsequent sections of the specifications, site survey, planning, design, engineering,

supply, manufacturing,transportation and insurance, delivery at site, unloading, handling, storage, installation, integration, configuration, testing, commissioning, integration, demonstration for

acceptance, training, maintenance and documentation of the following:-

1. Carry out site Survey of site locations to assess the following:

Smart Meter Installation

Communication Network (GPRS/RF) Management of SIM cards pertaining to the GPRS network

2. Implement & commission AMI system architecture capable of upgrades and scaling as perrequirementswith robust System security features with due consideration of data privacy,

confidentiality cyber securityguidelines etc.

3. Installation, testing and commissioning of the proposed AMI solution. 4. Deployment of all the application on Cloud including Meter Data Acquisition

5. Integration with existing legacy system and upcoming DISCOM systems including Metering, Billing

f Interface with mobile app and web portal/dashboard.

7. Returning of Dismantle materials to JVVNL’s stores as per agreed SOP.

. FMS Support for the project duration.The AMI Implementing Agency shall be responsible for proper data exchange among Smart meter, MDMS, HES andother operational/ requisite software as part of

The AMI system shall support functionalities as per “Functional Requirements of Advanced Metering

issued by the Central Electricity Authority (CEA) in August 2016.

The major components of the AMI system would be:-

Development of Smart Meter Network

Master Station/Control Centre/Central Computer System

Meter Data Acquisition System that will capture

Profile with Time stamp

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

The project scope for AMI solution shall comprise of design, supply, install, commission, integrate and

consumers of all categories in Baran,

achieve Remote meter

reading for error free data, network problem identification, Load profile, Energy Audit and signal for

the AMI system with its auxiliary applications. The

design, development, integration and Go-Live, and

compatible NIC

for two way communication between meters and

of this tender shall include, in complete conformity withsubsequent sections of the specifications, site survey, planning, design, engineering,

t site, unloading, handling, storage, testing, commissioning, integration, demonstration for

2. Implement & commission AMI system architecture capable of upgrades and scaling as per JVVNL requirementswith robust System security features with due consideration of data privacy,

Meter Data Acquisition System and Meter Data

5. Integration with existing legacy system and upcoming DISCOM systems including Metering, Billing

shall be responsible for proper ter, MDMS, HES andother operational/ requisite software as part of

“Functional Requirements of Advanced Metering

ity Authority (CEA) in August 2016.

Page 41: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

b. Voltage

c. Current

d. Energy Usage in billing cycles with TOUe. Events and generate alarms

iv. Meter data Management Systema. Energy Accounting

b. Load Analysis/Business Intelligencev. Integration With Existing Systems

vi. Analytics and reports

vii. Network and Communicationsviii. Customer/Employee Outreach and Education

5.1.1 Smart Meters

AMI meters for the project are advanced solid

sub-hourly data that includes energy consumption and may include voltage and power information.

The meter shall calculate both TOU and CPP rate based consumption. The meters shall be based on the specifications finalized by CEA and may have the following minimum features:

i. Store and communicate requested data as per programmed

ii. Detect, resolve abnormal & tamper events and store the same with alert to Employer/Utility personnel.

iii. Inbuilt memory to store all relevant meter data, events for a minimum of 35 days.iv. Facilitate both prepaid and post

v. Shall be configurable remotely including remote firmware upgradevi. Support remote load management by sending load curtailment signals that can be direct

display/SMS/Web application.

vii. Record violation of sanctioned load as per parameters set by Employer/Utilityviii. Load Reconnect / Disconnect switch

All smart meters shall have a supply Disconnect / Reconnect switch / contactor for part/full load.

The AMI system shall support remote disconnect / reconnect of customer supply only via the supply contactor.

When the smart meter performs a disconnect operation, all outgoing power circuits from

the meter shall be disconnected. To confirm the current state of a meter, the AMI system shall support "on

remote polling of the meter to determine whether the smeter is energized or not.

The meter shall provide clear local visual indication of the status (open/closed) of the Supply contactor, consumption, last bill details.

5.1.2 Master Station/Control Centre

Master station /Control centre will be located in the space provided by the EMPLOYER/UTILITY. All

hardware for MDMS will be installed in this premise and the operator(s) will be seated in this centre to manage the Smart Grid system through their desktops.

5.1.3 Meter Data Acquisition Sys

Meter Data Acquisition System, is the critical interface to the field devices, which shall support Meter

Data Acquisition, Two way communication, poll meters for data collection, send remote firmware upgrades/programmable parameter inputs to meters, se

Connect/Disconnect and sending of pricing and other signals as generated from the MDMS/Other Applications to the Smart meter. This will interface with MDMS over SOA/Web services, and the data

exchange models and interfaces shal

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

37

Energy Usage in billing cycles with TOU Events and generate alarms

Meter data Management System Energy Accounting

Load Analysis/Business Intelligence Integration With Existing Systems

Analytics and reports

d Communications Customer/Employee Outreach and Education

AMI meters for the project are advanced solid-state digital devices capable of recording hourly and

hourly data that includes energy consumption and may include voltage and power

The meter shall calculate both TOU and CPP rate based consumption. The meters shall be based on the specifications finalized by CEA and may have the following minimum features:

Store and communicate requested data as per programmed interval

Detect, resolve abnormal & tamper events and store the same with alert to Employer/Utility

Inbuilt memory to store all relevant meter data, events for a minimum of 35 days.Facilitate both prepaid and post-paid metering.

urable remotely including remote firmware upgrade Support remote load management by sending load curtailment signals that can be direct

display/SMS/Web application.

Record violation of sanctioned load as per parameters set by Employer/Utilityt / Disconnect switch – Requirements shall be :

All smart meters shall have a supply Disconnect / Reconnect switch / contactor for

The AMI system shall support remote disconnect / reconnect of customer supply only via the supply contactor.

When the smart meter performs a disconnect operation, all outgoing power circuits from

the meter shall be disconnected. To confirm the current state of a meter, the AMI system shall support "on

remote polling of the meter to determine whether the supply is open or closed/whether meter is energized or not.

The meter shall provide clear local visual indication of the status (open/closed) of the Supply contactor, consumption, last bill details.

Master Station/Control Centre

tre will be located in the space provided by the EMPLOYER/UTILITY. All

hardware for MDMS will be installed in this premise and the operator(s) will be seated in this centre to manage the Smart Grid system through their desktops.

Meter Data Acquisition System

Meter Data Acquisition System, is the critical interface to the field devices, which shall support Meter

Data Acquisition, Two way communication, poll meters for data collection, send remote firmware upgrades/programmable parameter inputs to meters, send Load Curtailment signals,

Connect/Disconnect and sending of pricing and other signals as generated from the MDMS/Other Applications to the Smart meter. This will interface with MDMS over SOA/Web services, and the data

exchange models and interfaces shall comply with CIM/XML / IEC 61968/62056.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

state digital devices capable of recording hourly and

hourly data that includes energy consumption and may include voltage and power factor

The meter shall calculate both TOU and CPP rate based consumption. The meters shall be based on the specifications finalized by CEA and may have the following minimum features:

Detect, resolve abnormal & tamper events and store the same with alert to Employer/Utility

Inbuilt memory to store all relevant meter data, events for a minimum of 35 days.

Support remote load management by sending load curtailment signals that can be direct

Record violation of sanctioned load as per parameters set by Employer/Utility

All smart meters shall have a supply Disconnect / Reconnect switch / contactor for

The AMI system shall support remote disconnect / reconnect of customer supply only via

When the smart meter performs a disconnect operation, all outgoing power circuits from

To confirm the current state of a meter, the AMI system shall support "on-demand"

upply is open or closed/whether

The meter shall provide clear local visual indication of the status (open/closed) of the Supply

tre will be located in the space provided by the EMPLOYER/UTILITY. All

hardware for MDMS will be installed in this premise and the operator(s) will be seated in this centre to

Meter Data Acquisition System, is the critical interface to the field devices, which shall support Meter

Data Acquisition, Two way communication, poll meters for data collection, send remote firmware nd Load Curtailment signals,

Connect/Disconnect and sending of pricing and other signals as generated from the MDMS/Other Applications to the Smart meter. This will interface with MDMS over SOA/Web services, and the data

l comply with CIM/XML / IEC 61968/62056.

Page 42: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.1.4 Meter Data Management System

It is the heart of AMI. MDMS shall be a single repository of all meter data.

system based on open standards and using SOA principals. It will facilitate

5.1.4.1 Energy Accounting

This module shall support the following functions:

Generate report of Loss analysis for different groups and categories of consumers on dailybasis.

Generate report of AT&C loss calculation on weekly basis.

Generate report for accounting and auditing at Feeder level, Distribution Transformer level

andDCU level.

Create graphical representation of all results that can be displayed on monitor and printed asper requirement.

5.1.4.2 Load Research

The proposed load research application s

should provide the following functions for analyzing

LT load requirements in short term and long term

Consumer load pattern

This will help the Employer/Utility in forecasting their load for short te

augmentation in long term. The data shall also be analyzed to aid in the day to day operation.

5.1.4.3 System Requirements

The minimum requirements of MDMS are listed below.

Rule based Validation, Estimation & Editing (VEE) of Detect & publish abnormal consumption events and patterns

Schedule based and on-

Receive tamper events from meters and take appropriate action including sending alerts Receive power loss/restoration events from me

generation or work order for maintenance crew The bidder to describe how the system will receive, store

sources, including customer equipment, distribution components configurable for different pricing plans, including TOU/CPP.

Enterprise class reporting engine. E.g. from Oracle, Microsoft, IBM etc.

Describe how the project is scalable to the system reqadditional meters and number of additional parameters for each meter ) withoutp

degradation with suitable hardware upgrade. Load analysis / research for decision support.

Process and generate billing for customers of pilot project area. Designed with adequate Cyber Security and Controls

Provide an interface to consumer portal

Provide an interface with already existing IT systems of thto minimize data duplicity.

5.1.5 AMI Network and Communications

5.1.5.1 AMI System Design:

The proposed solution (including the communicatio

scalable to support future customer growth at the rate of 100% in 7 years.

Detailed design of the communication infrastshould include but not limited to communication technology,communication packet sizes, data

rates, communication protocols, error detection andcorrection techniques, network data

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WO

38

Meter Data Management System

It is the heart of AMI. MDMS shall be a single repository of all meter data. The bidder

system based on open standards and using SOA principals. It will facilitate the following:

Energy Accounting

This module shall support the following functions:

Generate report of Loss analysis for different groups and categories of consumers on

Generate report of AT&C loss calculation on weekly basis.

for accounting and auditing at Feeder level, Distribution Transformer level

Create graphical representation of all results that can be displayed on monitor and printed

Load Research

The proposed load research application shall be using the data of project area LT network. This

llowing functions for analyzing:

LT load requirements in short term and long term

Consumer load pattern

This will help the Employer/Utility in forecasting their load for short term, as well as plan network

augmentation in long term. The data shall also be analyzed to aid in the day to day operation.

System Requirements

The minimum requirements of MDMS are listed below.

Rule based Validation, Estimation & Editing (VEE) of consumption data Detect & publish abnormal consumption events and patterns

-demand reading from meters

Receive tamper events from meters and take appropriate action including sending alertsReceive power loss/restoration events from meters and take appropriate action like alarm

generation or work order for maintenance crew to describe how the system will receive, store and present data from non

sources, including customer equipment, distribution automation devices, RE scomponents configurable for different pricing plans, including TOU/CPP.

Enterprise class reporting engine. E.g. from Oracle, Microsoft, IBM etc.

Describe how the project is scalable to the system requirements in terms of number of l meters and number of additional parameters for each meter ) withoutp

degradation with suitable hardware upgrade. Load analysis / research for decision support.

Process and generate billing for customers of pilot project area. uate Cyber Security and Controls

Provide an interface to consumer portal

Provide an interface with already existing IT systems of the utility– GIS, ITto minimize data duplicity.

AMI Network and Communications

AMI System Design:

oposed solution (including the communication network and equipment) should

scalable to support future customer growth at the rate of 100% in 7 years.

Detailed design of the communication infrastructure of AMI system should be should include but not limited to communication technology,communication packet sizes, data

rates, communication protocols, error detection andcorrection techniques, network data

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

The bidder shall design this

the following:

Generate report of Loss analysis for different groups and categories of consumers on

for accounting and auditing at Feeder level, Distribution Transformer level

Create graphical representation of all results that can be displayed on monitor and printed

hall be using the data of project area LT network. This

rm, as well as plan network

augmentation in long term. The data shall also be analyzed to aid in the day to day operation.

Receive tamper events from meters and take appropriate action including sending alerts e appropriate action like alarm

and present data from non-meter

automation devices, RE sources, Network components configurable for different pricing plans, including TOU/CPP.

uirements in terms of number of l meters and number of additional parameters for each meter ) withoutperformance

GIS, IT-applications so as

n network and equipment) should be

scalable to support future customer growth at the rate of 100% in 7 years.

ructure of AMI system should be provided, which should include but not limited to communication technology,communication packet sizes, data

rates, communication protocols, error detection andcorrection techniques, network data

Page 43: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

capacities, and bandwidth and margin at fullsystem load (defi

for most recent 5 and 15 minuteinterval data for all meters).

5.1.5.2 Time Synchronization:

Time Synchronization system for all

5.1.5.3 Public Network:

In case of use of public network for communication, information regarding the following

parameters must be madeavailable:

Details of the network usage in terms of cost of operation and extended life of the system. Security

Reliability

5.1.5.4 Expected operating l

i. System operating life: It is expected to be 15 years for

system.

ii. System Reliability: The system must have sufficient fault tolerance, redundancy,failover,

self-healing to guarantee system

all the elements must be done and ensure that there is no singlepoint of failure which leads to more than 2% of data disruption for not more than 24hours.

iii. Predictive/preventative reliability: Trackithe AMI system to ensure system reliability and proactively identify potentialsituations

that could become system problems.

5.1.5.5 Technical obsolescence:

The system elements which are at a risk of technical

system should be identified; this should include endthe proposed technologies.

Forward and backward compatibility need to be considered and mitigation options descri

detail. The mitigation shall not be limited to periodic update from OEM/System supplier.

5.1.5.6 Equipment siting:

The criteria and flexibility in physically siting all the equipment must be listed prior to deployment

of the system.

5.1.5.7 IT Infrastructure and

Describe the head end system/ Data concentrator functionality in detail.

The provider’s head end system/ Data Concentrator should fully support all functionality

described in the scope of work.

5.1.5.8 Interoperability criteria:

The proposal should specify the points of interface, where th

with other elements, like GIS, SCADA, DMS, portal, existapplications.

The project should use standard communication protothe system

5.1.5.9 Customer Interface:

The system shall provide periodic updates to the customers and via media (website, SMS, e

meter displays etc.) shall be clearly defined. The system shall support all the above media and delivery shall include at least three out of above.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

39

capacities, and bandwidth and margin at fullsystem load (defined as quarter

for most recent 5 and 15 minuteinterval data for all meters).

Time Synchronization:

Time Synchronization system for all Meters/DCU of the project.

Public Network:

In case of use of public network for communication, information regarding the following

be madeavailable:

Details of the network usage in terms of cost of operation and extended life of the system.

Expected operating life and performance reliability:

System operating life: It is expected to be 15 years for meters and 7 years for rest of

System Reliability: The system must have sufficient fault tolerance, redundancy,failover,

healing to guarantee system information requirements. A systematicfailure analysis of

all the elements must be done and ensure that there is no singlepoint of failure which leads to more than 2% of data disruption for not more than 24hours.

Predictive/preventative reliability: Tracking and reporting performance of all elementsof the AMI system to ensure system reliability and proactively identify potentialsituations

that could become system problems.

Technical obsolescence:

The system elements which are at a risk of technical obsolescence over the operating life of the

system should be identified; this should include end-of-sale and end-of-support policies governing

Forward and backward compatibility need to be considered and mitigation options descri

detail. The mitigation shall not be limited to periodic update from OEM/System supplier.

Equipment siting:

The criteria and flexibility in physically siting all the equipment must be listed prior to deployment

IT Infrastructure and System Integration:

Describe the head end system/ Data concentrator functionality in detail.

The provider’s head end system/ Data Concentrator should fully support all functionality

described in the scope of work.

Interoperability criteria:

hould specify the points of interface, where this part of the system interacts

with other elements, like GIS, SCADA, DMS, portal, existing metering, billing and other

The project should use standard communication protocols and describe the

Customer Interface:

The system shall provide periodic updates to the customers and via media (website, SMS, e

meter displays etc.) shall be clearly defined. The system shall support all the above media and shall include at least three out of above.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

ned as quarter-hourly requests

In case of use of public network for communication, information regarding the following

Details of the network usage in terms of cost of operation and extended life of the system.

meters and 7 years for rest of the

System Reliability: The system must have sufficient fault tolerance, redundancy,failover,

information requirements. A systematicfailure analysis of

all the elements must be done and ensure that there is no singlepoint of failure which leads to more than 2% of data disruption for not more than 24hours.

ng and reporting performance of all elementsof the AMI system to ensure system reliability and proactively identify potentialsituations

obsolescence over the operating life of the

support policies governing

Forward and backward compatibility need to be considered and mitigation options described in

detail. The mitigation shall not be limited to periodic update from OEM/System supplier.

The criteria and flexibility in physically siting all the equipment must be listed prior to deployment

Describe the head end system/ Data concentrator functionality in detail.

The provider’s head end system/ Data Concentrator should fully support all functionality

is part of the system interacts

ing metering, billing and other IT

cols and describe the protocols used for

The system shall provide periodic updates to the customers and via media (website, SMS, e-mail,

meter displays etc.) shall be clearly defined. The system shall support all the above media and

Page 44: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.1.6 Analytics and Reports

Business Intelligence tools shall be supplied to generate analytics and reports.

suggest and designthe reports in line with redesigned business processes and the details of reports are to be included in the technical proposal

reports for Time frames like weekly / daily / monthly / yearly.

Exporting to Excel, ASCII files, PDF and HTML or third party reporting tools (Crystal Reports) User based templates be created & used for reports.

Scheduling to run the reports event

Delivering the reports to the online users through email, portal, and report server. Providing for metadata objects to be viewed during reporting.

Provide for saving the report /queries for repetitive executusers.

Analysis of historical & consolidated data across systems Monitoring the performance of data warehousing system

5.1.7 Network Management

The contractor shall provide a Network Management System with the following functions: The network monitoring system shall help the computer system operators to easily identify the

problem areas and hence to take necessary corrective action remotely or manually.

The meter and the DCU and communication equipment in the network need to be monitored and tracked continuously in addition to the other IT networks.

The Network Management System shall have visibility of the accessibility of each of the end equipment, communication devices, and other intermediaries in the network to give the operator

real-time status and alarms in case of any of the nodes and channels The equipment to be monitored shall include data concentrators, backbone connectivity, last mile

connectivity, end points, etc.

The monitoring data shall be store for 1 month and shall include lost packet.

5.1.8 Network and Data Security

The following items need to be considered for adequate security at different levels i.e. systems,

data,network and security and Systematic description of how data security is maintained from the meters to the system head

end. All elements of the proposed system shall support protection of data, confidentiality, data

integrity and operational security. Physical security to prevent on System should enable creation and maintenance of accounts, passwords and

levels, along with log details. Description of the in-built anti

platforms and solutions. Description of methods to detect and prevent attacks including but not limit

and Intrusion.

5.1.8.1 Access Control

There shall be an identity and access management system which shall control and log the access control of all users to the smart grid systems.

The identity and access management system shall be able to

of each user based on roles, responsibilities or hierarchy.

The identity and access management system shall be able to define which user can access which function of the individual systems. For example, the identity and ac

system shall define which user can initiate a load disconnect function for a particular

consumer, and therefore rest of the unauthorized users will not be able to perform load disconnect function.

The identity and access management system s

Computer Systems.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

40

Analytics and Reports

Business Intelligence tools shall be supplied to generate analytics and reports.

suggest and designthe reports in line with redesigned business processes and the details of reports are to be included in the technical proposal. The bidder needs to suggest and design

Time frames like weekly / daily / monthly / yearly.

xporting to Excel, ASCII files, PDF and HTML or third party reporting tools (Crystal Reports)ser based templates be created & used for reports.

cheduling to run the reports event-based or time based

elivering the reports to the online users through email, portal, and report server.roviding for metadata objects to be viewed during reporting.

rovide for saving the report /queries for repetitive execution as and when required by the

nalysis of historical & consolidated data across systems. onitoring the performance of data warehousing system.

Network Management

ovide a Network Management System with the following functions:The network monitoring system shall help the computer system operators to easily identify the

problem areas and hence to take necessary corrective action remotely or manually.

e DCU and communication equipment in the network need to be monitored and tracked continuously in addition to the other IT networks.

The Network Management System shall have visibility of the accessibility of each of the end equipment, communication devices, and other intermediaries in the network to give the operator

time status and alarms in case of any of the nodes and channels being unThe equipment to be monitored shall include data concentrators, backbone connectivity, last mile

connectivity, end points, etc.

The monitoring data shall be store for 1 month and shall include lost packet.

Network and Data Security

he following items need to be considered for adequate security at different levels i.e. systems,

data,network and security and bidder needs to provide Systematic description of how data security is maintained from the meters to the system head

ments of the proposed system shall support protection of data, confidentiality, data

integrity and operational security. Physical security to prevent on-site tampering to be ensured.System should enable creation and maintenance of accounts, passwords and

levels, along with log details. built anti-virus capabilities provided in connection with all proposed software

Description of methods to detect and prevent attacks including but not limit

Access Control

There shall be an identity and access management system which shall control and log the access control of all users to the smart grid systems.

The identity and access management system shall be able to define the access control levels

of each user based on roles, responsibilities or hierarchy.

The identity and access management system shall be able to define which user can access which function of the individual systems. For example, the identity and ac

system shall define which user can initiate a load disconnect function for a particular

consumer, and therefore rest of the unauthorized users will not be able to perform load

The identity and access management system shall be integrated with rest of the Centralized

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

Business Intelligence tools shall be supplied to generate analytics and reports. The bidder is to

suggest and designthe reports in line with redesigned business processes and the details of such needs to suggest and design

xporting to Excel, ASCII files, PDF and HTML or third party reporting tools (Crystal Reports)

elivering the reports to the online users through email, portal, and report server.

ion as and when required by the

ovide a Network Management System with the following functions: The network monitoring system shall help the computer system operators to easily identify the

problem areas and hence to take necessary corrective action remotely or manually.

e DCU and communication equipment in the network need to be monitored and

The Network Management System shall have visibility of the accessibility of each of the end equipment, communication devices, and other intermediaries in the network to give the operator

being un-reachable. The equipment to be monitored shall include data concentrators, backbone connectivity, last mile

The monitoring data shall be store for 1 month and shall include lost packet.

he following items need to be considered for adequate security at different levels i.e. systems,

Systematic description of how data security is maintained from the meters to the system head

ments of the proposed system shall support protection of data, confidentiality, data

site tampering to be ensured. System should enable creation and maintenance of accounts, passwords and functionality access

virus capabilities provided in connection with all proposed software

Description of methods to detect and prevent attacks including but not limited to Denial of Service

There shall be an identity and access management system which shall control and log the

define the access control levels

The identity and access management system shall be able to define which user can access which function of the individual systems. For example, the identity and access management

system shall define which user can initiate a load disconnect function for a particular

consumer, and therefore rest of the unauthorized users will not be able to perform load

hall be integrated with rest of the Centralized

Page 45: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.1.8.2 Network Security:

Since Centralized Computer System has to access external environment through GPRSand Internet cloud it is important to have adequate network security systems.

There shall be intrusion detection and prevention systems deployed at the centrallayer. There shall also be firewalls which will be a separate system from the intrusionprevention

system.

The firewall shall control the demilitarized zones in the data centre and contro

the systems and ports which will be open to public network/ VPN.

If fixed IP and operator VPN is not available/possible and Dynamic IP is being used,then the devices shall support SSL/VPN and the data shall be encrypted before send /receive

GPRS/CDMA last mile network, for devices consisting of Smart Meter

5.1.8.3 Systems and Data Security:

The systems deployed shall have the application scanning, hardware scanning tools inorder to identify any vulnerability so as to mitigate any p

The application databases shall have exclusive security tools in order to prevent anypotential

internal attacks like SQL injection etc. The data shall be encrypted wherever supported by existingsystems/devices/technology.

5.1.9 Customer/Employer Outreach and Education

The customer data acquired will be the basis of the design of suitable outreach programs to be executed by EMPLOYER/UTILITY with the help of the

captured in the survey exercise. These programs will be focused to the class(es) of consumer(s) and

aim at creating awareness of the pilot and its benefit , dispel misgivings and carry all customers along with the SI/EMPLOYER/UTILITYduring the implementation of the

shows to attract customer voluntary participation, booklets for general distribution, compilation of consumer survey data, workshops etc. In all these the

preparation and the EMPLOYER/UTILITY will actually execute the programs. The expertise of the

bidder should be made available during these interactions.

5.1.10 Consumer Portal

The bidder needs to design Consumer portal on standard off the shelf product that can be easily

managed byEmployer/Utility personnel after completion of Pilot project. Consumer Portal is one of the most important components of Smart Grid. The objective of Consumer p

experience for the customers and business associates that will provide them a user friendly portal and

will make it easy for them to communicate with the Employer/Utility through the web instead of direct phone calls or visits. This portal will also act as a source of information for the customers regarding

policies and procedures. This in turn will improve customer satisfaction and reduce work load on the employee. This will host the web application for:

Display of Load profiles selectable based on organizational hierarchy of the Employer/Utility Display of Reliability Indices selectable based on organizational hierarchy of

theEmployer/Utility.

Bill payment services Other Information sharing requirements based on standard I

5.2 Meter Installation at Consumer Premises

The smart meter installation shall be done by the

installation guidelinesof the DISCOMs.

5.2.1 Scope Of Meter Installation

The scope of installation work is two

others), materials,tools and other incidental expenses in connection with additional laborequirement. The bidder shall seek for approval from

are:

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

41

Network Security:

Since Centralized Computer System has to access external environment through GPRSand Internet cloud it is important to have adequate network security systems.

be intrusion detection and prevention systems deployed at the centrallayer.There shall also be firewalls which will be a separate system from the intrusionprevention

The firewall shall control the demilitarized zones in the data centre and contro

the systems and ports which will be open to public network/ VPN.

If fixed IP and operator VPN is not available/possible and Dynamic IP is being used,then the devices shall support SSL/VPN and the data shall be encrypted before send /receive

GPRS/CDMA last mile network, for devices consisting of Smart MeterNetwork (

Systems and Data Security:

The systems deployed shall have the application scanning, hardware scanning tools inorder to identify any vulnerability so as to mitigate any potential security threats.

The application databases shall have exclusive security tools in order to prevent anypotential

internal attacks like SQL injection etc. The data shall be encrypted wherever supported by existingsystems/devices/technology.

Outreach and Education

The customer data acquired will be the basis of the design of suitable outreach programs to be executed by EMPLOYER/UTILITY with the help of the bidder if necessary

in the survey exercise. These programs will be focused to the class(es) of consumer(s) and

aim at creating awareness of the pilot and its benefit , dispel misgivings and carry all customers along with the SI/EMPLOYER/UTILITYduring the implementation of the pilot. The programs shall cover road

shows to attract customer voluntary participation, booklets for general distribution, compilation of consumer survey data, workshops etc. In all these the bidder is only expected to design and assist in

the EMPLOYER/UTILITY will actually execute the programs. The expertise of the

should be made available during these interactions.

needs to design Consumer portal on standard off the shelf product that can be easily

managed byEmployer/Utility personnel after completion of Pilot project. Consumer Portal is one of the most important components of Smart Grid. The objective of Consumer portal is to provide high quality

experience for the customers and business associates that will provide them a user friendly portal and

will make it easy for them to communicate with the Employer/Utility through the web instead of direct its. This portal will also act as a source of information for the customers regarding

policies and procedures. This in turn will improve customer satisfaction and reduce work load on the employee. This will host the web application for:-

ofiles selectable based on organizational hierarchy of the Employer/UtilityDisplay of Reliability Indices selectable based on organizational hierarchy of

haring requirements based on standard Information Architecture

Meter Installation at Consumer Premises

The smart meter installation shall be done by the AMI Implementing Agency

installation guidelinesof the DISCOMs.

Scope Of Meter Installation

is two-fold and shall include the cost of all labo

others), materials,tools and other incidental expenses in connection with additional laboshall seek for approval from JVVNL for installing smart meters.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

Since Centralized Computer System has to access external environment through GPRSand Internet cloud it is important to have adequate network security systems.

be intrusion detection and prevention systems deployed at the centrallayer. There shall also be firewalls which will be a separate system from the intrusionprevention

The firewall shall control the demilitarized zones in the data centre and control room,and also

If fixed IP and operator VPN is not available/possible and Dynamic IP is being used,then the devices shall support SSL/VPN and the data shall be encrypted before send /received on

Network (SMN).

The systems deployed shall have the application scanning, hardware scanning tools inorder to otential security threats.

The application databases shall have exclusive security tools in order to prevent anypotential

The data shall be encrypted wherever supported by existingsystems/devices/technology.

The customer data acquired will be the basis of the design of suitable outreach programs to be to address the issues

in the survey exercise. These programs will be focused to the class(es) of consumer(s) and

aim at creating awareness of the pilot and its benefit , dispel misgivings and carry all customers along pilot. The programs shall cover road

shows to attract customer voluntary participation, booklets for general distribution, compilation of is only expected to design and assist in

the EMPLOYER/UTILITY will actually execute the programs. The expertise of the

needs to design Consumer portal on standard off the shelf product that can be easily

managed byEmployer/Utility personnel after completion of Pilot project. Consumer Portal is one of the ortal is to provide high quality

experience for the customers and business associates that will provide them a user friendly portal and

will make it easy for them to communicate with the Employer/Utility through the web instead of direct its. This portal will also act as a source of information for the customers regarding

policies and procedures. This in turn will improve customer satisfaction and reduce work load on the

ofiles selectable based on organizational hierarchy of the Employer/Utility Display of Reliability Indices selectable based on organizational hierarchy of

nformation Architecture

AMI Implementing Agency as per the meter

fold and shall include the cost of all labour (electrical, civil and

others), materials,tools and other incidental expenses in connection with additional labour for installing smart meters. The details

Page 46: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.2.1.1 Meter Inventory Management

Meter management and installation shall be the responsibility shall lie with the

installation is approved byJVVNLcovered by OEM shall be the responsibility of AMI Implementing

5.2.1.2 AMI Site survey (GPRS feasibility analysis etc.)

The broad scope of site survey will include the following but are not • Capturing complete meter

consumer, etc.)

• Conducting feasibility analysis of the GPRS connectivity at individual sites and capture

details.

• Capturing details of newly installed smart • The master data populated after AMI site survey shall be

indexing survey to ensure data consistencyindexing.

• Post completion of Smart Meter

Implementing • Agency to ensure that the master data of the AMI system is in sync with that of the

RAPDRP Systems

5.2.1.3 Meter Installation

The bidder shall prepare a SOP (standard Operating Procedure) document for meter installation in consultation with JVVNL and Meter installation activity shall adhere to this document.

services shall be performed in a professional and courteous

setup tofinal installation of the meter. Customer service, effective project team and customer

communication are of the utmostimportance to this project. All site installation personnel employed on this project will be sub

suitable Govt. issues photo ID (such as Driving License

identification. Scope of AMI Implementing Agency

• Removal of Old Meter & taking down the meter re

• Installation of new smart meters with GPRS NIC card

• Install SIM Card in the meter & activate / register new meters with Head End System & MDMS• Transfer Old & new meter data to the DISCOM (DISCOM Billing Software)

• Provide or capture meter location thr• Digital photograph of meter reading before and after installation

• Train the DISCOM installation personnel

• Manage the installation performance• Provide daily, real-time project status updates of installations to

Most of the installations are

to CEA Regulations on “Installation and Operation of Meters’, 2006 to be read

in conjunction with amendments dated 04 June 2010 and 26 November 2014.

5.2.1.4 SIM Card Management

The bidder shall ensure the

incommunication module of smart meters. In order to pursue this, following points n

ensured by the system Integrator.

• Procurement and availability of SIM cardsbefore the installati• The bidder shall be responsible for management of

total installed, in-stock, replaced and rejected/suspended/terminated SIMs.• The bidder shall ensure that the SIM information is a

physical installation is carried out.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

42

Meter Inventory Management

and installation shall be the responsibility shall lie with the

JVVNL. Any physical damages including fire andtheft and damages not covered by OEM shall be the responsibility of AMI Implementing Agency.

AMI Site survey (GPRS feasibility analysis etc.)

The broad scope of site survey will include the following but are not limited to;Capturing complete meter details (Meter type, make, class, serial no., YOM, attached

)

Conducting feasibility analysis of the GPRS connectivity at individual sites and capture

Capturing details of newly installed smart meters. The master data populated after AMI site survey shall be in-

indexing survey to ensure data consistency and simultaneous update of consumer

Post completion of Smart Meter installation, it will be the responsibility o

to ensure that the master data of the AMI system is in sync with that of the

ystems.

Meter Installation

The bidder shall prepare a SOP (standard Operating Procedure) document for meter installation in consultation with JVVNL and Meter installation activity shall adhere to this document.

services shall be performed in a professional and courteous manner, from initial appointment

setup tofinal installation of the meter. Customer service, effective project team and customer

communication are of the utmostimportance to this project. All site installation personnel employed on this project will be subject to background checksand shall, at all times, carry a

suitable Govt. issues photo ID (such as Driving License, Voter Card, Aadhaar etc.) for

AMI Implementing Agency shall include:

Removal of Old Meter & taking down the meter reading

Installation of new smart meters with GPRS NIC card

Install SIM Card in the meter & activate / register new meters with Head End System & MDMSTransfer Old & new meter data to the DISCOM (DISCOM Billing Software)

rovide or capture meter location through GPS Digital photograph of meter reading before and after installation

Train the DISCOM installation personnel

Manage the installation performance time project status updates of installations to JVVNL

Most of the installations are meter replacement cases the bidder shall adhere

to CEA Regulations on “Installation and Operation of Meters’, 2006 to be read

in conjunction with amendments dated 04 June 2010 and 26 November 2014.

SIM Card Management:

shall ensure the availability, insertion and management of The SIM cards to be used

incommunication module of smart meters. In order to pursue this, following points n

Integrator.

Procurement and availability of SIM cardsbefore the installation starts. l be responsible for management of SIM inventory including but not

stock, replaced and rejected/suspended/terminated SIMs.shall ensure that the SIM information is available in the head en

physical installation is carried out.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

and installation shall be the responsibility shall lie with the bidder once meter

. Any physical damages including fire andtheft and damages not

limited to; Meter type, make, class, serial no., YOM, attached

Conducting feasibility analysis of the GPRS connectivity at individual sites and capture

-line with the consumer

and simultaneous update of consumer

will be the responsibility of the AMI

to ensure that the master data of the AMI system is in sync with that of the

The bidder shall prepare a SOP (standard Operating Procedure) document for meter installation in consultation with JVVNL and Meter installation activity shall adhere to this document. Installation

manner, from initial appointment

setup tofinal installation of the meter. Customer service, effective project team and customer

communication are of the utmostimportance to this project. All site installation personnel ject to background checksand shall, at all times, carry a

, Voter Card, Aadhaar etc.) for

Install SIM Card in the meter & activate / register new meters with Head End System & MDMS Transfer Old & new meter data to the DISCOM (DISCOM Billing Software)

JVVNL

meter replacement cases the bidder shall adhere

to CEA Regulations on “Installation and Operation of Meters’, 2006 to be read

in conjunction with amendments dated 04 June 2010 and 26 November 2014.

availability, insertion and management of The SIM cards to be used

incommunication module of smart meters. In order to pursue this, following points need to be

SIM inventory including but not limited to

stock, replaced and rejected/suspended/terminated SIMs. vailable in the head end system before

Page 47: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

• The bidder shall have ensure timely suspension, terminati

SIMs and the process shall comply

approved by JVVNL. • The bidder need to monitor the usage, alarm, event

in AMI solution. • SIMs need to be preconfigured for activation before meter installation.

• The Bidder shall ensure that communication modubefore installation.

• Replacement of faulty SIM cards as per the agreed SLA.

• Provide daily, real-time project status updates of installations to

5.3 Deployment of Web Based Software Solution along with Cloud Hosting.

5.3.1 Cloud Hosting:

The Web Based Application shall be deployed on Cloud and shall be configured to handle the data

and processing requirements of the Meter Data Acquisition, Storing, Archival, Analysis, Reporting, Information dissemination etc. The Web Application shall be hosted w

vendors. The required back up and replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The cloud infrastructure shall be scalable, elastic, robust and secure.the assignment under the RFP, the same shall be in the scope of selected

5.3.2 Web Based Software Solution:

The web-based Software shall have the following features and functionalities:

I. The Web Based Software Solution shall have all the generic functionalities for user

administration.

II. The Web Based Software shall support industry standard integration technologies for

integrating with other IT systems like Billing that are existing and any futur

that DISCOM may procure. In general, the Web Based Software shall support integration on

SOA architecture and data exchanged through web services.

III. The Web Based Software shall also have features for exporting the meter data to other

third-party systems on Standard Predefined formats like MIOS format, XML, publish to FTP

Web Portal etc.

IV. The Web Based Software shall have exclusive module for facilitating the capture of

information during installation and commissioning. The module shall capture

details with asset-coding. The module shall also facilitate uploading of photographs during

the installation and commissioning.

V. A Mobile Application to capture all the details during installation, commissioning and

onward operation and main

deployed. The mobile app shall also capture the GPS co

the same shall be stored and updated in the Web Application.

VI. The Web Based Application shall have interfac

GIS tools like Google Maps with different ICONS and colours.

VII. The Web Based Application shall have module for creating the master list of all the sites

along with the required electrical

The network details like the Feeder,

and Zone shall be provided by DISCOM.

VIII. The master data module shall also facilitate organising the site locations as per the socio

(Taluk, constituency etc

be provided by DISCOM.

IX. The Web Based Application shall have Meter Data Acquisition Module which shall primarily

facilitate all the functionalities of communicating and acquiring the specified meter data as

per the desired intervals. The raw meter data shall be

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

43

shall have ensure timely suspension, termination, activation and reactivation

SIMs and the process shall comply with the prevailing regulations of DoT / TRAI & shall

need to monitor the usage, alarm, events and connectivity

SIMs need to be preconfigured for activation before meter installation.

shall ensure that communication module is properly sealed after

Replacement of faulty SIM cards as per the agreed SLA.

time project status updates of installations to JVVNL

Deployment of Web Based Software Solution along with Cloud Hosting.

Based Application shall be deployed on Cloud and shall be configured to handle the data

and processing requirements of the Meter Data Acquisition, Storing, Archival, Analysis, Reporting, Information dissemination etc. The Web Application shall be hosted with GOI empanelled cloud

vendors. The required back up and replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The cloud infrastructure shall be and secure. In case of requirement Cyber Security Audit for carrying out

the assignment under the RFP, the same shall be in the scope of selected bidder

Web Based Software Solution:

based Software shall have the following features and functionalities:

b Based Software Solution shall have all the generic functionalities for user

The Web Based Software shall support industry standard integration technologies for

integrating with other IT systems like Billing that are existing and any futur

that DISCOM may procure. In general, the Web Based Software shall support integration on

SOA architecture and data exchanged through web services.

The Web Based Software shall also have features for exporting the meter data to other

systems on Standard Predefined formats like MIOS format, XML, publish to FTP

The Web Based Software shall have exclusive module for facilitating the capture of

information during installation and commissioning. The module shall capture

coding. The module shall also facilitate uploading of photographs during

the installation and commissioning.

A Mobile Application to capture all the details during installation, commissioning and

onward operation and maintenance to be used by the filed teams shall be designed and

deployed. The mobile app shall also capture the GPS co-ordinates of the site/consumer and

the same shall be stored and updated in the Web Application.

The Web Based Application shall have interface to view each Consumer Site on open source

GIS tools like Google Maps with different ICONS and colours.

The Web Based Application shall have module for creating the master list of all the sites

along with the required electrical network details and other meta-

The network details like the Feeder, 33kv Sub Station, DT, Sub Division, Division, Circle,

shall be provided by DISCOM.

The master data module shall also facilitate organising the site locations as per the socio

uk, constituency etc.) and geographical areas. The information and classifications shall

be provided by DISCOM.

The Web Based Application shall have Meter Data Acquisition Module which shall primarily

facilitate all the functionalities of communicating and acquiring the specified meter data as

per the desired intervals. The raw meter data shall be stored and archive

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

on, activation and reactivation of

gulations of DoT / TRAI & shall be

s and connectivity for the SIM cards used

le is properly sealed after SIM insertion

JVVNL

Deployment of Web Based Software Solution along with Cloud Hosting.

Based Application shall be deployed on Cloud and shall be configured to handle the data

and processing requirements of the Meter Data Acquisition, Storing, Archival, Analysis, Reporting, ith GOI empanelled cloud

vendors. The required back up and replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The cloud infrastructure shall be In case of requirement Cyber Security Audit for carrying out

bidder.

based Software shall have the following features and functionalities:

b Based Software Solution shall have all the generic functionalities for user

The Web Based Software shall support industry standard integration technologies for

integrating with other IT systems like Billing that are existing and any future IT systems

that DISCOM may procure. In general, the Web Based Software shall support integration on

The Web Based Software shall also have features for exporting the meter data to other

systems on Standard Predefined formats like MIOS format, XML, publish to FTP,

The Web Based Software shall have exclusive module for facilitating the capture of

information during installation and commissioning. The module shall capture all the asset

coding. The module shall also facilitate uploading of photographs during

A Mobile Application to capture all the details during installation, commissioning and

tenance to be used by the filed teams shall be designed and

ordinates of the site/consumer and

e to view each Consumer Site on open source

The Web Based Application shall have module for creating the master list of all the sites

-data of the installation.

Sub Station, DT, Sub Division, Division, Circle,

The master data module shall also facilitate organising the site locations as per the socio

) and geographical areas. The information and classifications shall

The Web Based Application shall have Meter Data Acquisition Module which shall primarily

facilitate all the functionalities of communicating and acquiring the specified meter data as

stored and archived and available for

Page 48: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

future reference.The module shall enable bidirectional communication and shall support on

demand reads in addition to schedules reads.

X. The Web Based Application shall facilitate converting of Meter Data Acquired into a common

database format.

XI. The Web Based application shall have features to capture the real

Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to

various stake holders/systems as per the requirement of the system.

email/messaging platforms shall be made available by the DISOCM.

XII. The Web Based module shall be able to acquire the data continuousl

of 30 Minutes / 15 minutes

management and analysis module once in every 24 hrs

XIII. The proposed System

essentially, though not limited to, the following parameters:

• Voltage

• Current

• Active Energy

• Reactive Energy

• Apparent Energy

• Average Power Factor

• Frequency

Maximum Load

XIV. The Web Based Meter Data Management and Analysis module shall provide the complete

360Oview of the meter data, including and not limited to Load Survey, Tampering Events,

Event Logs, Phase Association, Outages, Blackout periods, Single Phase & Three phase

Power supply etc.

XVII. The Web Based Application shall have inbuilt tools for Meter Data Validation, Examination &

Estimation

XVIII. The Web Based Application shall be able to generat

formats of the same shall be shared with the successful bidder.

XIX. The Web Based Application shall have a

report generation.

XX. The Web Based application shall have provision to

XXI. The Web Based application shall have various in built dashboards depicting the

data acquisition status for the project area. The dashboard shall have drill down options.

XXII. Dashboards for supply

etc. shall be in built.

XXIII. Any Dashboards associated with acquiring of meter data and information dissemination to

various stake holders shall be developed by the vendor without any additional costs.

XXIV. The Web Based Softwar

on the availability of the acquired data and automatically calculate the applicable penalties.

Further the module shall have the complete site monitoring including installation,

commission, uptime and the same shall be used in ge

OPEX charges. The module shall assist the officers in invoice validation and bill passing. The

module shall be verified by the designated officers for its accuracy, security and reliability.

XXV. Provision for automated SMS alerts and email. The alerts would be send directly to

respective area in charge and other integrated systems (

of events such as tamper,

The required SMS gateways shall be provided by DISCOM.

XXVI. Reading of all the consumers should be captured/ recorded at 00:00 hours on last day of

the every month along with seamless data integration with the billing system so as

enable generation of bills on

XXVII. Any other software functionality or modification or

acquisition of meter data, d

forms as required by the DISCOM shall be implemented during the project tenure.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

44

future reference.The module shall enable bidirectional communication and shall support on

demand reads in addition to schedules reads.

The Web Based Application shall facilitate converting of Meter Data Acquired into a common

The Web Based application shall have features to capture the real-

Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to

various stake holders/systems as per the requirement of the system.

email/messaging platforms shall be made available by the DISOCM.

The Web Based module shall be able to acquire the data continuousl

/ 15 minutes and all the aggregated data made available to the M

management and analysis module once in every 24 hrs.

The proposed System shall provide continuous on line monitoring and logging of

essentially, though not limited to, the following parameters: -

ctive Energy

Apparent Energy

Average Power Factor

The Web Based Meter Data Management and Analysis module shall provide the complete

view of the meter data, including and not limited to Load Survey, Tampering Events,

Event Logs, Phase Association, Outages, Blackout periods, Single Phase & Three phase

The Web Based Application shall have inbuilt tools for Meter Data Validation, Examination &

The Web Based Application shall be able to generate various predefined reports. The

formats of the same shall be shared with the successful bidder.

The Web Based Application shall have an inbuilt reporting tool for custom or on demand

The Web Based application shall have provision to import data from CMRI.

The Web Based application shall have various in built dashboards depicting the

status for the project area. The dashboard shall have drill down options.

for supply status indicating the availability of power, single phase, three phase

Any Dashboards associated with acquiring of meter data and information dissemination to

various stake holders shall be developed by the vendor without any additional costs.

The Web Based Software shall have module to capture the various non conformities based

on the availability of the acquired data and automatically calculate the applicable penalties.

the module shall have the complete site monitoring including installation,

commission, uptime and the same shall be used in generating the report for CAPEX and

OPEX charges. The module shall assist the officers in invoice validation and bill passing. The

module shall be verified by the designated officers for its accuracy, security and reliability.

Provision for automated SMS alerts and email. The alerts would be send directly to

respective area in charge and other integrated systems (e.g. customer care ce

such as tamper, no power etc. based on system analytics.) as specified by JVVNL.

The required SMS gateways shall be provided by DISCOM.

Reading of all the consumers should be captured/ recorded at 00:00 hours on last day of

month along with seamless data integration with the billing system so as

enable generation of bills on 1st of every subsequent month.

Any other software functionality or modification or change associated with the process of

of meter data, depiction, consolidation, reporting and dissemination to

forms as required by the DISCOM shall be implemented during the project tenure.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

future reference.The module shall enable bidirectional communication and shall support on

The Web Based Application shall facilitate converting of Meter Data Acquired into a common

-time events like Power

Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to

various stake holders/systems as per the requirement of the system. The required SMS and

The Web Based module shall be able to acquire the data continuously or the in the intervals

and all the aggregated data made available to the Meter Data

provide continuous on line monitoring and logging of

The Web Based Meter Data Management and Analysis module shall provide the complete

view of the meter data, including and not limited to Load Survey, Tampering Events,

Event Logs, Phase Association, Outages, Blackout periods, Single Phase & Three phase

The Web Based Application shall have inbuilt tools for Meter Data Validation, Examination &

e various predefined reports. The

inbuilt reporting tool for custom or on demand

port data from CMRI.

The Web Based application shall have various in built dashboards depicting the real-time

status for the project area. The dashboard shall have drill down options.

y of power, single phase, three phase

Any Dashboards associated with acquiring of meter data and information dissemination to

various stake holders shall be developed by the vendor without any additional costs.

e shall have module to capture the various non conformities based

on the availability of the acquired data and automatically calculate the applicable penalties.

the module shall have the complete site monitoring including installation,

rating the report for CAPEX and

OPEX charges. The module shall assist the officers in invoice validation and bill passing. The

module shall be verified by the designated officers for its accuracy, security and reliability.

Provision for automated SMS alerts and email. The alerts would be send directly to

customer care centre in case

no power etc. based on system analytics.) as specified by JVVNL.

Reading of all the consumers should be captured/ recorded at 00:00 hours on last day of

month along with seamless data integration with the billing system so as to

associated with the process of

epiction, consolidation, reporting and dissemination to various

forms as required by the DISCOM shall be implemented during the project tenure.

Page 49: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

XXVIII. Mobile App: A cross platform mobile app for information dissemination and monitoring shall

be developed by the b

to view the summary of meter data acquired, alerts, events, supply status etc., based on

various selection parameters. The inputs required for which shall be provided by the

DISCOM.

XXIX. The Web Application shall have Ticketing System inbuilt for complaint/issue recording,

resolution and escalation.

5.3.3 Operation & Maintenance.

I. The Vendor shall depute the requisite manpower at appropriate levels across the

project area for upkeep of the

(Meters/DCU/Communication Modules)

II. The Vendor has to deploy the requisite manpower at appropriate levels for

maintenance of the software system, undertaking change requests, report generation

etc.

III. The vendor shall manage all the Cloud Infrastructure with the desired uptime and

maintain high availability of the same during the contract period.

IV. The Vendor shall pay all the recurring monthly charges associated with the SIM cards

provided and other connectivity

V. DISCOM shall install any new installations or site that ae being serviced and the

required infrastructure for acquiring the data form the same based on the category

and type of installation shall be supplied and commissioned.

VI. The vendor has to maintain and continually monitor the assets installed and see to

that all the infrastructure is working for providing seamless data acquisition.

VII. The vendor shall acquire the data within the defined SLA of the RFP.

VIII. The Vendor has to impart tr

and when required by DISCOM.

IX. The vendor has to provide all the user manuals and documentation with respect to the

project to DISCOM. The training and user manuals shall also be made available onlin

in the Web application and shall be updated as when the system is updated or

changed.

X. Any additional reports required during the tenure of contract shall be developed and

made available online.

5.4 Project Management Scheduleand Documentation:

5.4.1 Project Management:

commitments and decisions that are binding on the Contractor. Purchaser will designate a

project manager to co-

purchaser and the Contractor shall be coordinated through the project managers. The project

managers shall also be responsible for all communications between other members of the

project staffs.

5.4.2 Project Schedule: The project implementation schedule is from date

upon this schedule the bidder shall submit a preliminary implementation plan along with the

bid. The detail project implementation schedule shall be submitted by the contractor after

award for purchaser’s approval, which shall inc

• Site Study • Documents submission and approval schedule.

• Factory & Site Testing Schedule.

• Database development schedule.

• Cloud Hosting & delivery policies, Software development & integration schedule.

• Installation schedule. • Training schedule.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

45

Mobile App: A cross platform mobile app for information dissemination and monitoring shall

be developed by the bidder. The Mobile app shall have facilities for various DISCOM users

to view the summary of meter data acquired, alerts, events, supply status etc., based on

various selection parameters. The inputs required for which shall be provided by the

eb Application shall have Ticketing System inbuilt for complaint/issue recording,

resolution and escalation.

Operation & Maintenance.

The Vendor shall depute the requisite manpower at appropriate levels across the

project area for upkeep of the Advanced Metering

(Meters/DCU/Communication Modules) installed at sites.

The Vendor has to deploy the requisite manpower at appropriate levels for

maintenance of the software system, undertaking change requests, report generation

shall manage all the Cloud Infrastructure with the desired uptime and

maintain high availability of the same during the contract period.

The Vendor shall pay all the recurring monthly charges associated with the SIM cards

provided and other connectivity charges for Cloud Hosting.

DISCOM shall install any new installations or site that ae being serviced and the

required infrastructure for acquiring the data form the same based on the category

and type of installation shall be supplied and commissioned.

vendor has to maintain and continually monitor the assets installed and see to

that all the infrastructure is working for providing seamless data acquisition.

The vendor shall acquire the data within the defined SLA of the RFP.

The Vendor has to impart training to the DISCOM officers for using the application as

and when required by DISCOM.

The vendor has to provide all the user manuals and documentation with respect to the

project to DISCOM. The training and user manuals shall also be made available onlin

in the Web application and shall be updated as when the system is updated or

Any additional reports required during the tenure of contract shall be developed and

made available online.

Project Management Scheduleand Documentation:

Project Management: The bidder shall assign a project manager with the authority to make

commitments and decisions that are binding on the Contractor. Purchaser will designate a

-ordinate all purchaser project activities. All communications between

ser and the Contractor shall be coordinated through the project managers. The project

managers shall also be responsible for all communications between other members of the

The project implementation schedule is from date

upon this schedule the bidder shall submit a preliminary implementation plan along with the

bid. The detail project implementation schedule shall be submitted by the contractor after

award for purchaser’s approval, which shall include at least the following activities:

Documents submission and approval schedule.

Factory & Site Testing Schedule.

Database development schedule.

Cloud Hosting & delivery policies, Software development & integration schedule.

schedule. Training schedule.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

Mobile App: A cross platform mobile app for information dissemination and monitoring shall

idder. The Mobile app shall have facilities for various DISCOM users

to view the summary of meter data acquired, alerts, events, supply status etc., based on

various selection parameters. The inputs required for which shall be provided by the

eb Application shall have Ticketing System inbuilt for complaint/issue recording,

The Vendor shall depute the requisite manpower at appropriate levels across the

etering Infrastructure

The Vendor has to deploy the requisite manpower at appropriate levels for

maintenance of the software system, undertaking change requests, report generation

shall manage all the Cloud Infrastructure with the desired uptime and

maintain high availability of the same during the contract period.

The Vendor shall pay all the recurring monthly charges associated with the SIM cards

DISCOM shall install any new installations or site that ae being serviced and the

required infrastructure for acquiring the data form the same based on the category

vendor has to maintain and continually monitor the assets installed and see to

that all the infrastructure is working for providing seamless data acquisition.

The vendor shall acquire the data within the defined SLA of the RFP.

aining to the DISCOM officers for using the application as

The vendor has to provide all the user manuals and documentation with respect to the

project to DISCOM. The training and user manuals shall also be made available online

in the Web application and shall be updated as when the system is updated or

Any additional reports required during the tenure of contract shall be developed and

The bidder shall assign a project manager with the authority to make

commitments and decisions that are binding on the Contractor. Purchaser will designate a

ordinate all purchaser project activities. All communications between

ser and the Contractor shall be coordinated through the project managers. The project

managers shall also be responsible for all communications between other members of the

of detailed order. Based

upon this schedule the bidder shall submit a preliminary implementation plan along with the

bid. The detail project implementation schedule shall be submitted by the contractor after

lude at least the following activities:

Cloud Hosting & delivery policies, Software development & integration schedule.

Page 50: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.4.3 The project schedule shall include the estimated period for completion of and its linkage with

other activities.

5.5 Training and Capacity Building Requirements

AMI Implementing Agency shall provide training sessions to office

following domains (including, but not limited to):

a) Smart meter installation and communication

b) HES and its user interface

c) MDMS and its user interface

d) AMI troubleshooting

e) Analytics software

f) Mobile app/Web Portal

g) Cloud administration services

h) Cyber Security

i) Application administration

The primary objective of the trainings is to achieve 100% user adoption through technical and

behavioural competencies. Each training session mentioned above, shall be for 2 days

(encompassing 8 working hours per day) and shall be conducted in English language. The AMI

Implementing Agency shall provide a training plan (including training curriculum and calendar)

so that there is a proper transfer of knowledge about the deployed syst

The training shall cover technical, functional aspects.

The AMI Implementing Agency is expected to complete / be involved in the following activities

but not limited to:

a) The AMI Implementing Agency shall conduct a training need analysis to identify the

training requirements of the user group to identify the criteria for training, plans and

responsibilities of the target stakeholders and knowledge sharing strategy.

b) Testing scripts shall be prepared to test the business processes and scenarios of the new

system. The project team members will further develop these testing scripts into

training documents.

c) The training has to be conducted at the training facilities of DISCOMs

facility of OEM/AMI Implementing Agency as per the Software product’s proposed in the

solution by the AMI Implementing Agency. The training has to be conducted by

Instructors of AMI Implementing Agency and OEM. All costs related to the logi

contents of the training shall be borne by the AMI Implementing Agency irrespective of

the location of the training.

d) The training and delivery options shall be on

trainings shall be interactive and ens

trainings shall mandatorily be given in pre

form of presentations etc. Training material will be organised by functional process that

will serve as the training document

e) The participants of DISCOMs will be issued a certificate from OEM and AMI Implementing

Agency for attending these courses.

f) The AMI Implementing Agency shall obtain a certificate of completion after each training

workshop.

g) The AMI Implementing Agency shall provide associated documentation for all deployed

systems to ensure a smooth transition from deployment to post

and maintenance of the system.

h) The AMI Implementing Agency shall ensure that

shall have a minimum of 5 years of experience in the domain in which he/she is

conducting the training. The AMI Implementing Agency shall provide CVs of the

proposed trainers.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

46

The project schedule shall include the estimated period for completion of and its linkage with

Training and Capacity Building Requirements

AMI Implementing Agency shall provide training sessions to officers identified by JVVNL

following domains (including, but not limited to):

Smart meter installation and communication

HES and its user interface

MDMS and its user interface

AMI troubleshooting

Mobile app/Web Portal

Cloud administration services

Application administration

The primary objective of the trainings is to achieve 100% user adoption through technical and

behavioural competencies. Each training session mentioned above, shall be for 2 days

encompassing 8 working hours per day) and shall be conducted in English language. The AMI

Implementing Agency shall provide a training plan (including training curriculum and calendar)

so that there is a proper transfer of knowledge about the deployed systems to DISCOM officers.

The training shall cover technical, functional aspects.

The AMI Implementing Agency is expected to complete / be involved in the following activities

The AMI Implementing Agency shall conduct a training need analysis to identify the

training requirements of the user group to identify the criteria for training, plans and

responsibilities of the target stakeholders and knowledge sharing strategy.

g scripts shall be prepared to test the business processes and scenarios of the new

system. The project team members will further develop these testing scripts into

training documents.

The training has to be conducted at the training facilities of DISCOMs

facility of OEM/AMI Implementing Agency as per the Software product’s proposed in the

solution by the AMI Implementing Agency. The training has to be conducted by

Instructors of AMI Implementing Agency and OEM. All costs related to the logi

contents of the training shall be borne by the AMI Implementing Agency irrespective of

the location of the training.

The training and delivery options shall be on-line, CBTs, instructor led class rooms. The

trainings shall be interactive and ensure optimum knowledge transfer hence the

trainings shall mandatorily be given in pre-production or live environment and not in the

form of presentations etc. Training material will be organised by functional process that

will serve as the training documentation for a particular functional area.

The participants of DISCOMs will be issued a certificate from OEM and AMI Implementing

Agency for attending these courses.

The AMI Implementing Agency shall obtain a certificate of completion after each training

The AMI Implementing Agency shall provide associated documentation for all deployed

systems to ensure a smooth transition from deployment to post-deployment operations

and maintenance of the system.

The AMI Implementing Agency shall ensure that the trainers conducting the training

shall have a minimum of 5 years of experience in the domain in which he/she is

conducting the training. The AMI Implementing Agency shall provide CVs of the

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

The project schedule shall include the estimated period for completion of and its linkage with

identified by JVVNL on the

The primary objective of the trainings is to achieve 100% user adoption through technical and

behavioural competencies. Each training session mentioned above, shall be for 2 days

encompassing 8 working hours per day) and shall be conducted in English language. The AMI

Implementing Agency shall provide a training plan (including training curriculum and calendar)

ems to DISCOM officers.

The AMI Implementing Agency is expected to complete / be involved in the following activities

The AMI Implementing Agency shall conduct a training need analysis to identify the

training requirements of the user group to identify the criteria for training, plans and

responsibilities of the target stakeholders and knowledge sharing strategy.

g scripts shall be prepared to test the business processes and scenarios of the new

system. The project team members will further develop these testing scripts into

The training has to be conducted at the training facilities of DISCOMs or at training

facility of OEM/AMI Implementing Agency as per the Software product’s proposed in the

solution by the AMI Implementing Agency. The training has to be conducted by

Instructors of AMI Implementing Agency and OEM. All costs related to the logistics and

contents of the training shall be borne by the AMI Implementing Agency irrespective of

line, CBTs, instructor led class rooms. The

ure optimum knowledge transfer hence the

production or live environment and not in the

form of presentations etc. Training material will be organised by functional process that

ation for a particular functional area.

The participants of DISCOMs will be issued a certificate from OEM and AMI Implementing

The AMI Implementing Agency shall obtain a certificate of completion after each training

The AMI Implementing Agency shall provide associated documentation for all deployed

deployment operations

the trainers conducting the training

shall have a minimum of 5 years of experience in the domain in which he/she is

conducting the training. The AMI Implementing Agency shall provide CVs of the

Page 51: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5.5.1 Training Programs:

The implementation partner shall conduct the following training for employees of DISCOM:

5.5.1.1 Professional Training

This is the training for the core group of implementation team of the

team will comprise of members from all the Business

implementation. Each member would be trained in the relevant function / module. This Training

would be required to be given to at least 9

Implementing Agency to delive

DISCOM for hardware, software and network preferably from the OEM partner or OEM’s certified

training partner shall be arranged for each group. The DISCOM will prefer if a portion of the

training is conducted on-site.

5.5.1.2 End User Training

The AMI Implementing Agency will provide training to an owner’s team on a "Train the Trainer"

basis. The Owner’s team so trained will then train all of the owner’s end users. It is estimated

that this training will require for divisions (approximately 75 nos.), with each group comprising

of around 5 to 10 persons. These training sessions will be required to be conducted at any of the

sites.

5.5.1.3 Train-the-Trainer Program

Development and delivery of a Train

delivery of the training program. This program will include:

a) Training the DISCOMs instructors on the customized version of the application’s as it

would be trained to an end

b) Opportunity for knowledge sharing in the areas of leading practice, concepts, new

business processes and knowledge to the DISCOMs instructors.

c) Sharing of leading practices on creating an effective classroom and an appropriate

learning environment.

d) Sharing of leading practices on classroom communication to enable the DISCOMs

instructors to encourage student involvement and student

includes instruction on nonverbal

to manage difficult

tips.

e) Training shall be provided to the DISCOM instructors on the customized version of the

application as it would be trained to the end user.

f) Each workshop shall contain at least 20 people. The workshop shall be conducted in at

least 2 batches

5.5.2 Content Development

Development of customized, modular training materials based upon user roles and business

process, and customized application. OEM consultants alon

together with DISCOMs resources to enable transfer of knowledge. The following materials will

be developed:

a) Paper-based classroom participant guides for each identified user group. These guides

include hands-on exercises

b) Paper-based classroom instructor guides including instructor notes with additional

background information and points to be highlight during the training.

c) Media-based training simulations for pre

knowledge and skills validation.

d) Assist the DISCOM team members in creating procedure documents for use in

conjunction with the other training material. A procedure docume

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

47

Training Programs:

The implementation partner shall conduct the following training for employees of DISCOM:

Professional Training

This is the training for the core group of implementation team of the DISCOM. The DISCOM’s

team will comprise of members from all the Business Functions and affected by the AMI

implementation. Each member would be trained in the relevant function / module. This Training

would be required to be given to at least 9-12 personnel of Owner. It is the responsibility of AMI

Implementing Agency to deliver this training. Standard curriculum, designed and agreed by the

DISCOM for hardware, software and network preferably from the OEM partner or OEM’s certified

training partner shall be arranged for each group. The DISCOM will prefer if a portion of the

site.

End User Training

The AMI Implementing Agency will provide training to an owner’s team on a "Train the Trainer"

basis. The Owner’s team so trained will then train all of the owner’s end users. It is estimated

will require for divisions (approximately 75 nos.), with each group comprising

of around 5 to 10 persons. These training sessions will be required to be conducted at any of the

Trainer Program

Development and delivery of a Train-the-Trainer program to prepare Organization or the

delivery of the training program. This program will include:

Training the DISCOMs instructors on the customized version of the application’s as it

would be trained to an end-user, allowing the training team to model our approach.

Opportunity for knowledge sharing in the areas of leading practice, concepts, new

business processes and knowledge to the DISCOMs instructors.

Sharing of leading practices on creating an effective classroom and an appropriate

environment.

Sharing of leading practices on classroom communication to enable the DISCOMs

instructors to encourage student involvement and student interaction. The

includes instruction on nonverbal behaviour, listening skills, questioning techniq

to manage difficult behaviours, interpreting body language, and general presentation

Training shall be provided to the DISCOM instructors on the customized version of the

application as it would be trained to the end user.

shall contain at least 20 people. The workshop shall be conducted in at

Content Development

Development of customized, modular training materials based upon user roles and business

process, and customized application. OEM consultants along with System Integrator will work

together with DISCOMs resources to enable transfer of knowledge. The following materials will

based classroom participant guides for each identified user group. These guides

on exercises and are based upon ‘Day in the Life’ scenarios.

based classroom instructor guides including instructor notes with additional

background information and points to be highlight during the training.

based training simulations for pre-class preparation, in-

knowledge and skills validation.

Assist the DISCOM team members in creating procedure documents for use in

conjunction with the other training material. A procedure docume

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

The implementation partner shall conduct the following training for employees of DISCOM:

DISCOM. The DISCOM’s

Functions and affected by the AMI

implementation. Each member would be trained in the relevant function / module. This Training

12 personnel of Owner. It is the responsibility of AMI

r this training. Standard curriculum, designed and agreed by the

DISCOM for hardware, software and network preferably from the OEM partner or OEM’s certified

training partner shall be arranged for each group. The DISCOM will prefer if a portion of the

The AMI Implementing Agency will provide training to an owner’s team on a "Train the Trainer"

basis. The Owner’s team so trained will then train all of the owner’s end users. It is estimated

will require for divisions (approximately 75 nos.), with each group comprising

of around 5 to 10 persons. These training sessions will be required to be conducted at any of the

iner program to prepare Organization or the

Training the DISCOMs instructors on the customized version of the application’s as it

odel our approach.

Opportunity for knowledge sharing in the areas of leading practice, concepts, new

Sharing of leading practices on creating an effective classroom and an appropriate

Sharing of leading practices on classroom communication to enable the DISCOMs

interaction. The program

, listening skills, questioning techniques, how

s, interpreting body language, and general presentation

Training shall be provided to the DISCOM instructors on the customized version of the

shall contain at least 20 people. The workshop shall be conducted in at

Development of customized, modular training materials based upon user roles and business

g with System Integrator will work

together with DISCOMs resources to enable transfer of knowledge. The following materials will

based classroom participant guides for each identified user group. These guides

and are based upon ‘Day in the Life’ scenarios.

based classroom instructor guides including instructor notes with additional

background information and points to be highlight during the training.

-class practicing and

Assist the DISCOM team members in creating procedure documents for use in

conjunction with the other training material. A procedure document will list all of the

Page 52: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

transactions necessary to complete a business scenario whereas a training document

lists the steps to execute a transaction. Each step will be a transaction referenced in a

training document. Procedures will be listed for all the on

scenario. In addition to functional training document binders and procedures, the project

team members will create training courses and exercises. The training courses will

contain all the training documents and necessary to

The training exercises will list common business scenarios and input data that the user

will enter to practice with the newly developed BPA software.

All the training material in hard copy soft copy including audio vi

recording of the training delivered shall be handed over to the DISCOMs and considered

DISCOMs’ property.

Following stages shall be considered while planning training for the participants from the

DISCOMs.

S. No. Training Team

1. Professional

Training

Core

Team

Members

2. End user

Training

All user

group

5.6 Inception Report 5.6.1 In order to ensure the better execution of the proposed work in a scientific and managerial

way, the bidder shall furnish an inception report within 30 days of

inception report shall contain the following:

• Detailed methodology/ project report/ modus operandi to be adopted to execute the

contract.

• Resources with list of man power to be deployed to execute the contract

• Detailed list of inputs to be required from the Discom.

• Cleary spell-out the obligation to be completed for execution of the work.

• Detailed Functional design & specification of the equipment’s to be installed at every

location with GTP (Guaranteed Technical Particulars).

• Testing procedure as per the relevant clause of the specification.

• Detailed methodology of Training system.

• Break up of total time schedule allowed for completion of supply in Gantt chart. The

Gantt chart shall include milestone of approval of types and

• Type of communication system proposed

5.6.2 The Discom on receipt of the inception report will furnish its recommendation for any

modification, if required, within 15 days of receipt the same.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION5: SCOPE OF WORK

48

transactions necessary to complete a business scenario whereas a training document

lists the steps to execute a transaction. Each step will be a transaction referenced in a

training document. Procedures will be listed for all the online steps needed to complete a

scenario. In addition to functional training document binders and procedures, the project

team members will create training courses and exercises. The training courses will

contain all the training documents and necessary to train an end-

The training exercises will list common business scenarios and input data that the user

will enter to practice with the newly developed BPA software.

All the training material in hard copy soft copy including audio visual content which includes

recording of the training delivered shall be handed over to the DISCOMs and considered

Following stages shall be considered while planning training for the participants from the

Team Module Stage

Core

Team

Members

As per the solution proposed by the

AMI Implementing

Agency, the training

for

products from

OEM

Before implementation

Continuous

Training(fortnightly) during

implementation

Handholding “Go Live”

stage

All user

group

As per the solution

proposed by the

AMI Implementing

Agency, the training

for

products from

OEM

Before implementation

Continuous

Training(fortnightly) during

implementation

Handholding “Go Live”

stage

In order to ensure the better execution of the proposed work in a scientific and managerial

way, the bidder shall furnish an inception report within 30 days of awarding the contract. The

inception report shall contain the following:

Detailed methodology/ project report/ modus operandi to be adopted to execute the

Resources with list of man power to be deployed to execute the contract

inputs to be required from the Discom.

out the obligation to be completed for execution of the work.

Detailed Functional design & specification of the equipment’s to be installed at every

location with GTP (Guaranteed Technical Particulars).

esting procedure as per the relevant clause of the specification.

Detailed methodology of Training system.

Break up of total time schedule allowed for completion of supply in Gantt chart. The

Gantt chart shall include milestone of approval of types and makes.

Type of communication system proposed

on receipt of the inception report will furnish its recommendation for any

modification, if required, within 15 days of receipt the same.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION5: SCOPE OF WORK

transactions necessary to complete a business scenario whereas a training document

lists the steps to execute a transaction. Each step will be a transaction referenced in a

line steps needed to complete a

scenario. In addition to functional training document binders and procedures, the project

team members will create training courses and exercises. The training courses will

-user in his / her role.

The training exercises will list common business scenarios and input data that the user

sual content which includes

recording of the training delivered shall be handed over to the DISCOMs and considered

Following stages shall be considered while planning training for the participants from the

Stage

Before implementation

Continuous

Training(fortnightly) during

implementation

Handholding “Go Live”

Before implementation

Continuous

Training(fortnightly) during

implementation

Handholding “Go Live”

In order to ensure the better execution of the proposed work in a scientific and managerial

awarding the contract. The

Detailed methodology/ project report/ modus operandi to be adopted to execute the

Resources with list of man power to be deployed to execute the contract

out the obligation to be completed for execution of the work.

Detailed Functional design & specification of the equipment’s to be installed at every

esting procedure as per the relevant clause of the specification.

Break up of total time schedule allowed for completion of supply in Gantt chart. The

makes.

on receipt of the inception report will furnish its recommendation for any

Page 53: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION6: GENERAL TECHNICAL SPECIFICATIONS

The General Technical Specifications of the various this tender document. These are the minimum technical specifications for the various items to be

deployed. The Bidder will have to supply the material as per the Discom at the time of bidding.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION6: GENERAL TECHNICAL SPECIFICATIONS

49

ENERAL TECHNICAL SPECIFICATIONS

echnical Specifications of the various equipment’s / items are available as . These are the minimum technical specifications for the various items to be

The Bidder will have to supply the material as per the latest approved specifications in

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION6: GENERAL TECHNICAL SPECIFICATIONS

/ items are available as Volume 2 of . These are the minimum technical specifications for the various items to be

latest approved specifications in

Page 54: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Technical offer to be furnished by the bidder on its letter head and each page

signed by the authorised signatory

An affidavit indicating that all the information, affirmation made in this

proposal shall be complied with shall be provided.

The Technical offer shall be given strictly in same sequence of order as

given in this document.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

50

7: TECHNICAL PROPOSAL SUBMISSION SHEET

Technical offer to be furnished by the bidder on its letter head and each page

signed by the authorised signatory

An affidavit indicating that all the information, affirmation made in this

proposal shall be complied with shall be provided.

The Technical offer shall be given strictly in same sequence of order as

given in this document.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Technical offer to be furnished by the bidder on its letter head and each page

An affidavit indicating that all the information, affirmation made in this

The Technical offer shall be given strictly in same sequence of order as

Page 55: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

To,

The Superintending Engineer [IT]

Jaipur Vidyut Vitran Nigam Ltd. Room No.117, Vidyut BhawanJyoti Nagar, Jaipur

Rajasthan, 302005.

SUB: Submission of Bid for

Infrastructure/Smart Metering System for Consumers of

Dholpur, Jhalawar and Karauli circles

Dear Sir,

We hereby submit our bid for

Infrastructure/Smart Metering System for Consumers of

Dholpur, Jhalawar and Karauli circles

We, the undersigned, declare that:

A. Declaration

1) We have examined and have no reservations to the Bidding Document, including

Addenda No. (if Any):

2) We offer to supply in conformity with the Bidding Document and in

the delivery schedule, and the specifications mentioned in the bid document.

3) We are submitting our bids for with complete set of enclosures.

4) We are submitting our Bid as ______ (Single Bidding company/Lead Bidder

(consortium)).

5) We agree for execution of tendered work as per the terms & conditions as specified

in this Tender Document.

6) We hereby confirm that the bid comply all requirements set out in the bidding

document and NO TECHNICAL and COMMERCIAL Deviation are contained in the Bid.

7) We understand that the Bids with Deviation from the requirement laid down in this

document shall be considered as NON Responsive

8) The prices are as mentioned in BOQ.

9) The prices quoted are valid for a period of 90 days from the date of opening of

“Financial- bids”

10) The quoted / agreed prices are exclusive of the following applicable Taxes (As per

prevailing rates):

Enclose details of taxes included in the prices

S. No. Name of Tax/Charges

11) We have noted the standard terms of payment and undertake to abide by the same.

12) The execution of work shall strictly be in accordance with work completion schedule

as given in the Tender Document. In case we

therein as per the tender specifications, the penalty provisions shall be applicable as

per provisions of the Contract.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMIS

51

Engineer [IT]

Jaipur Vidyut Vitran Nigam Ltd. Room No.117, Vidyut Bhawan

Submission of Bid for “Implementation of AMI (Advanced Metering

Infrastructure/Smart Metering System for Consumers of Baran, Bharatpur,

Dholpur, Jhalawar and Karauli circles under NSGM” against TN-71

We hereby submit our bid for“Implementation of AMI (Advanced Metering

Infrastructure/Smart Metering System for Consumers of Baran, Bharatpur, Bundi,

Karauli circles under NSGM” against TN-71

We, the undersigned, declare that:

We have examined and have no reservations to the Bidding Document, including

Addenda No. (if Any):

We offer to supply in conformity with the Bidding Document and in

the delivery schedule, and the specifications mentioned in the bid document.

We are submitting our bids for with complete set of enclosures.

We are submitting our Bid as ______ (Single Bidding company/Lead Bidder

r execution of tendered work as per the terms & conditions as specified

in this Tender Document.

We hereby confirm that the bid comply all requirements set out in the bidding

document and NO TECHNICAL and COMMERCIAL Deviation are contained in the Bid.

nderstand that the Bids with Deviation from the requirement laid down in this

document shall be considered as NON Responsive

The prices are as mentioned in BOQ.

The prices quoted are valid for a period of 90 days from the date of opening of

The quoted / agreed prices are exclusive of the following applicable Taxes (As per

Enclose details of taxes included in the prices

Name of Tax/Charges Rate of Tax/Charges

We have noted the standard terms of payment and undertake to abide by the same.

The execution of work shall strictly be in accordance with work completion schedule

as given in the Tender Document. In case we fail to execute the work as indicated

therein as per the tender specifications, the penalty provisions shall be applicable as

per provisions of the Contract.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Implementation of AMI (Advanced Metering

Baran, Bharatpur, Bundi,

71.

Implementation of AMI (Advanced Metering

Baran, Bharatpur, Bundi,

71.

We have examined and have no reservations to the Bidding Document, including

We offer to supply in conformity with the Bidding Document and in accordance with

the delivery schedule, and the specifications mentioned in the bid document.

We are submitting our Bid as ______ (Single Bidding company/Lead Bidder

r execution of tendered work as per the terms & conditions as specified

We hereby confirm that the bid comply all requirements set out in the bidding

document and NO TECHNICAL and COMMERCIAL Deviation are contained in the Bid.

nderstand that the Bids with Deviation from the requirement laid down in this

The prices quoted are valid for a period of 90 days from the date of opening of

The quoted / agreed prices are exclusive of the following applicable Taxes (As per

Rate of Tax/Charges

We have noted the standard terms of payment and undertake to abide by the same.

The execution of work shall strictly be in accordance with work completion schedule

fail to execute the work as indicated

therein as per the tender specifications, the penalty provisions shall be applicable as

Page 56: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

13) The material supplied by us shall conform your specification

14) We confirm that we agree to adhere to

well as the technical stipulation of your specification and there is No Deviation. Such

acceptance has also been confirmed in prescribed schedules of this offer.

15) We confirm that we are qualified for bidding in te

specified in the bidding documents and have submitted the requisite qualification

Certificate & data / documents with the bid.

16) Until a formal contract is prepared and executed, this together with your written

acceptance thereof in your notification of award shall constitute a binding contract

between us.

17) We understand that the quantity mentioned in the financial schedule is just for

evaluation purpose, any payment shall be made on the basis of actual numbers.

18) We understand that Jaipur Discom/Discom reserves the right to invite detailed

proposals from any private entrepreneur

the company or entrepreneur has been pre

19) We also understand that the Jaipur Discom reserves the rig

the bids without assigning any reason thereof.

20) We undertake that we shall use the

Metering Infrastructure/Smart Metering System for Consumers of

Bharatpur, Bundi, Dholpur, Jhalawar and Kara

readily fine-tuned to the requirements of Discom. We undertake to carry out all

necessary System Integration work to ensure all the requirements specified and

needed for Jaipur Discom.

21) We understand that the prices quoted in the

& the financial evaluation of the L

22) We agree to abide by all the conditions governing the proposals and decisions of the

Jaipur Discom.

B. General Profile of the Bidder

Kindly attach a copy of latest RoC to substantiate the information furnished against general

profile of the bidder

Details

Bidding Entity Nature(Single Bidder/

Consortium)

In case of consortium, mention Lead Bidder or

Consortium Partner

Full legal name of the firm

Year of establishment

Registered Office Address

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

52

The material supplied by us shall conform your specification

We confirm that we agree to adhere to all the commercial terms and conditions as

well as the technical stipulation of your specification and there is No Deviation. Such

acceptance has also been confirmed in prescribed schedules of this offer.

We confirm that we are qualified for bidding in terms of Qualification Requirements

specified in the bidding documents and have submitted the requisite qualification

Certificate & data / documents with the bid.

Until a formal contract is prepared and executed, this together with your written

ereof in your notification of award shall constitute a binding contract

We understand that the quantity mentioned in the financial schedule is just for

evaluation purpose, any payment shall be made on the basis of actual numbers.

that Jaipur Discom/Discom reserves the right to invite detailed

proposals from any private entrepreneur-company; irrespective of the fact whether

the company or entrepreneur has been pre-qualified.

We also understand that the Jaipur Discom reserves the right to reject any or all of

the bids without assigning any reason thereof.

We undertake that we shall use the “Implementation of AMI (Advanced

Metering Infrastructure/Smart Metering System for Consumers of

Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles

tuned to the requirements of Discom. We undertake to carry out all

necessary System Integration work to ensure all the requirements specified and

needed for Jaipur Discom.

We understand that the prices quoted in the BOQ are as defined in the RFP

& the financial evaluation of the L-1 bidder shall be per Bid Document.

We agree to abide by all the conditions governing the proposals and decisions of the

General Profile of the Bidder

of latest RoC to substantiate the information furnished against general

Responses

Bidding Entity Nature(Single Bidder/

In case of consortium, mention Lead Bidder or

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

all the commercial terms and conditions as

well as the technical stipulation of your specification and there is No Deviation. Such

acceptance has also been confirmed in prescribed schedules of this offer.

rms of Qualification Requirements

specified in the bidding documents and have submitted the requisite qualification

Until a formal contract is prepared and executed, this together with your written

ereof in your notification of award shall constitute a binding contract

We understand that the quantity mentioned in the financial schedule is just for

evaluation purpose, any payment shall be made on the basis of actual numbers.

that Jaipur Discom/Discom reserves the right to invite detailed

company; irrespective of the fact whether

ht to reject any or all of

Implementation of AMI (Advanced

Metering Infrastructure/Smart Metering System for Consumers of Baran,

uli circles”, which may be

tuned to the requirements of Discom. We undertake to carry out all

necessary System Integration work to ensure all the requirements specified and

BOQ are as defined in the RFP

1 bidder shall be per Bid Document.

We agree to abide by all the conditions governing the proposals and decisions of the

of latest RoC to substantiate the information furnished against general

Page 57: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Address for Correspondence

Authorized person(s) to be contacted

Telephone number(s)

Email id

Fax number

Names, Addresses, Contact Emails and Mobile

Nos. of the Key Management Personnel of

such as MD/Directors/CEO, etc.

Type of the firm Private limited/Public

limited/Government sector /other

Whether registered under companies act,

Partnership Act, or any other act applicable for

registration of Firms in India

Registration Number & Date

We hereby certify that the above information is correct.

(Please enclose the ownership structure of the company, Incorporation Certificate, MOA,

AOA duly attested by Company Secretary/ Director of the Company).

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

53

Address for Correspondence

Authorized person(s) to be contacted

Names, Addresses, Contact Emails and Mobile

Nos. of the Key Management Personnel of Firm

such as MD/Directors/CEO, etc.

Type of the firm Private limited/Public

limited/Government sector /other

Whether registered under companies act,

Partnership Act, or any other act applicable for

registration of Firms in India

Date

We hereby certify that the above information is correct.

(Please enclose the ownership structure of the company, Incorporation Certificate, MOA,

AOA duly attested by Company Secretary/ Director of the Company).

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

(Please enclose the ownership structure of the company, Incorporation Certificate, MOA,

Page 58: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

C. Financial Capabilities

CERTIFICATE OF FINANCIAL QUALIFICATION

S.

No

Financial Year Turn Over

(In INR)

1 FY 2014-2015

2 FY 2015-2016

3 FY 2016-2017

(Turnover / Net Worth/ Net Profit shall be as per the

standards prescribed by Institute of Chartered Accountants of India)

We hereby certify that the above information is correct.

(Signature of the Statutory Auditor of the Bidder)

(Note: Enclose audited Financial Statements/

signed by the Chartered Accountant.).

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

54

OF FINANCIAL QUALIFICATION

Turn Over

(In INR)

Whether Net

Worth Positive or

NOT

(Select as

applicable)

YES/NO

YES/NO

YES/NO

(Turnover / Net Worth/ Net Profit shall be as per the currently applicable accounting

standards prescribed by Institute of Chartered Accountants of India)

We hereby certify that the above information is correct.

(Signature of the Statutory Auditor of the Bidder)

(Note: Enclose audited Financial Statements/ Annual Report of the aforementioned FYs duly

signed by the Chartered Accountant.).

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

TECHNICAL PROPOSAL SUBMISSION SHEET

currently applicable accounting

Annual Report of the aforementioned FYs duly

Page 59: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

D. Compliance to Technical Specifications and other requirement of Software

Sr. No. Particular

A Cloud Hosting: The Web Based Application shall be deployed on

Cloud and shall be configured to handle the data and

processing requirements of the Meter Data Acquisition,

Storing, Archival, Analysis, Reporting, Information

dissemination etc. The Web Application shall be

GOI empanelled cloud vendors. The required back up and

replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The

cloud infrastructure shall be scalable, elastic, robust and

secure. In case of requirement Cyber Security Audit for carrying out

the assignment under the RFP, the same shall be in the scope of

selected Agency which needs to be necessarily carried out by an

Indian Computer Emergency Response Team (CERTin) empanelle

security auditor.

B Web Based Software Solution:the following features and functionalities:

1. The Web Based Software Solution shall have all the generic functionalities for user administration.

2. The Web Based Software shall support industry standard integration technologies for integrating with other IT systems like Billing that are

existing and any future IT systems that DISCOM may procure. In general, the Web Based Software shall support integra

architecture and data exchanged through web services.

3. The Web Based Software shall also have features for exporting the

meter data to other third

formats like MIOS format, XML, publish to FTP, Web

4. The Web Based Software shall have exclusive module for facilitating

the capture of information during installation and commissioning. The module shall capture all the asset details with asset

module shall also facilitate uploading of photographinstallation and commissioning.

5. A Mobile Application to capture all the details during installation, commissioning and onward operation and maintenance to be used by

the filed teams shall be designed and deployed. The mobile app shall

also capture the GPS co

shall be stored and updated in the Web Application.

6. The Web Based Application shall have interface to view each open source GIS tools like Google Maps with different ICONS and

colours.

7. The Web Based Application shall have module for creating the master

list of all the sites along with the required electrical network details and other meta data of the installation. The network details like the

Feeder, 33kv Sub Station, DT, Subshall be provided by DISCOM.

8. The master data module shall also facilitate organising the site

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

55

Compliance to Technical Specifications and other requirement of Software

The Web Based Application shall be deployed on

Cloud and shall be configured to handle the data and

processing requirements of the Meter Data Acquisition,

Storing, Archival, Analysis, Reporting, Information

dissemination etc. The Web Application shall be hosted with

GOI empanelled cloud vendors. The required back up and

replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The

cloud infrastructure shall be scalable, elastic, robust and

In case of requirement Cyber Security Audit for carrying out

the assignment under the RFP, the same shall be in the scope of

selected Agency which needs to be necessarily carried out by an

Indian Computer Emergency Response Team (CERTin) empanelle

Web Based Software Solution: The web-based Software shall have the following features and functionalities:

The Web Based Software Solution shall have all the generic functionalities for user administration.

The Web Based Software shall support industry standard integration technologies for integrating with other IT systems like Billing that are

existing and any future IT systems that DISCOM may procure. In general, the Web Based Software shall support integration on SOA

architecture and data exchanged through web services.

The Web Based Software shall also have features for exporting the

meter data to other third-party systems on Standard Predefined

formats like MIOS format, XML, publish to FTP, Web Portal etc.

The Web Based Software shall have exclusive module for facilitating

the capture of information during installation and commissioning. The module shall capture all the asset details with asset-coding. The

module shall also facilitate uploading of photographs during the installation and commissioning.

A Mobile Application to capture all the details during installation, commissioning and onward operation and maintenance to be used by

the filed teams shall be designed and deployed. The mobile app shall

capture the GPS co-ordinates of the site/consumer and the same

shall be stored and updated in the Web Application.

The Web Based Application shall have interface to view each site on open source GIS tools like Google Maps with different ICONS and

The Web Based Application shall have module for creating the master

list of all the sites along with the required electrical network details and other meta data of the installation. The network details like the

Feeder, 33kv Sub Station, DT, Sub Division, Division, Circle, and Zoneshall be provided by DISCOM.

The master data module shall also facilitate organising the site

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Compliance to Technical Specifications and other requirement of Software

Compliance

(Yes/No)

The Web Based Application shall be deployed on

Cloud and shall be configured to handle the data and

processing requirements of the Meter Data Acquisition,

Storing, Archival, Analysis, Reporting, Information

hosted with

GOI empanelled cloud vendors. The required back up and

replication shall be also built in. The bidder shall also provide

the DR services on cloud located in different seismic zone. The

cloud infrastructure shall be scalable, elastic, robust and

In case of requirement Cyber Security Audit for carrying out

the assignment under the RFP, the same shall be in the scope of

selected Agency which needs to be necessarily carried out by an

Indian Computer Emergency Response Team (CERTin) empanelled

based Software shall have

The Web Based Software Solution shall have all the generic

The Web Based Software shall support industry standard integration technologies for integrating with other IT systems like Billing that are

existing and any future IT systems that DISCOM may procure. In tion on SOA

The Web Based Software shall also have features for exporting the

party systems on Standard Predefined

The Web Based Software shall have exclusive module for facilitating

the capture of information during installation and commissioning. The coding. The

s during the

A Mobile Application to capture all the details during installation, commissioning and onward operation and maintenance to be used by

the filed teams shall be designed and deployed. The mobile app shall

ordinates of the site/consumer and the same

te on open source GIS tools like Google Maps with different ICONS and

The Web Based Application shall have module for creating the master

list of all the sites along with the required electrical network details and other meta data of the installation. The network details like the

and Zone

The master data module shall also facilitate organising the site

Page 60: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

locations as per the socio (Taluk, constituency

areas. The information and classifications shall bDISCOM.

9. The Web Based Application shall have Meter Data Acquisition Module which shall primarily facilitate all the functionalities of communicating

and acquiring the specified meter data as per the desired intervals.

The raw meter data shall be stored and archivefuture reference. The module shall enable bidirectional communication

and shall support on demand reads in addition to schedules reads.

10. The Web Based Application shall facilitate converting of Meter Data

Acquired into a common datab

11. The Web Based application shall have features to capture the real

time events like Power Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to various stake

holders/systems as per the requirement of the s

SMS and email/messaging platforms shall be made available by the DISOCM.

12. The Web Based module shall be able to acquire the data continuously or the in the intervals of 30 Minutes and all the aggregated data made

available to the Meter Data management and analysis module once in every 24 hrs.

13. The proposed System is expected to provide continuous on line

monitoring and logging of essentially, though not limited to, the

following parameters:

14. The Web Based Meter Data Management and Analysis module shall

provide the complete 360degree view of the meter data, including and

not limited to Load

Association, Outages, Blackout periods, Single Phase & Three phase Power supply etc.

15. The Web Based Application shall have inbuilt tools for Meter Data Validation, Examination & Estimation

16. The Web Based Applpredefined reports. The formats of the same shall be shared with the

successful bidder.

17. The Web Based Application shall have an inbuilt reporting tool for

custom or on demand report generation.

18. The Web Based application shall have provision to import data from

CMRI.

19. The Web Based application shall have various in built dashboards

depicting the real-time data acquisition status for the project area.

The dashboard shall have drill down options.

20. Dashboards for supply status indicating the availability of power,

single phase, three phase etc. shall be in built.

21. Any Dashboards associated with acquiring of meter data and

information dissemination to various stake holders shall be developed

by the vendor without any additional costs.

22. The Web Based Software shall have module to capture the various non conformities based on the availability of the acquired data and

automatically calculate the applicable penalties. Further the module shall have the complete si

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

56

locations as per the socio (Taluk, constituency etc.) and geographical

areas. The information and classifications shall be provided by

The Web Based Application shall have Meter Data Acquisition Module which shall primarily facilitate all the functionalities of communicating

and acquiring the specified meter data as per the desired intervals.

The raw meter data shall be stored and archived and available for future reference. The module shall enable bidirectional communication

and shall support on demand reads in addition to schedules reads.

The Web Based Application shall facilitate converting of Meter Data

Acquired into a common database format.

The Web Based application shall have features to capture the real

time events like Power Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to various stake

holders/systems as per the requirement of the system. The required

SMS and email/messaging platforms shall be made available by the

The Web Based module shall be able to acquire the data continuously or the in the intervals of 30 Minutes and all the aggregated data made

Meter Data management and analysis module once in

The proposed System is expected to provide continuous on line

monitoring and logging of essentially, though not limited to, the

following parameters: - • Voltage

• Current

• Active Energy • Reactive Energy

• Apparent Energy • Average Power Factor

• Frequency Maximum load

The Web Based Meter Data Management and Analysis module shall

provide the complete 360degree view of the meter data, including and

not limited to Load Survey, Tampering Events, Event Logs, Phase

Association, Outages, Blackout periods, Single Phase & Three phase

The Web Based Application shall have inbuilt tools for Meter Data Validation, Examination & Estimation

The Web Based Application shall be able to generate various predefined reports. The formats of the same shall be shared with the

The Web Based Application shall have an inbuilt reporting tool for

custom or on demand report generation.

application shall have provision to import data from

The Web Based application shall have various in built dashboards

time data acquisition status for the project area.

The dashboard shall have drill down options.

for supply status indicating the availability of power,

single phase, three phase etc. shall be in built.

Any Dashboards associated with acquiring of meter data and

information dissemination to various stake holders shall be developed

out any additional costs.

The Web Based Software shall have module to capture the various non conformities based on the availability of the acquired data and

automatically calculate the applicable penalties. Further the module shall have the complete site monitoring including installation,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

) and geographical

e provided by

The Web Based Application shall have Meter Data Acquisition Module which shall primarily facilitate all the functionalities of communicating

and acquiring the specified meter data as per the desired intervals.

d and available for future reference. The module shall enable bidirectional communication

The Web Based Application shall facilitate converting of Meter Data

The Web Based application shall have features to capture the real-

time events like Power Failure, Outages, Tampers, Load violations etc., further the same shall be disseminated to various stake

ystem. The required

SMS and email/messaging platforms shall be made available by the

The Web Based module shall be able to acquire the data continuously or the in the intervals of 30 Minutes and all the aggregated data made

Meter Data management and analysis module once in

The proposed System is expected to provide continuous on line

monitoring and logging of essentially, though not limited to, the

The Web Based Meter Data Management and Analysis module shall

provide the complete 360degree view of the meter data, including and

Survey, Tampering Events, Event Logs, Phase

Association, Outages, Blackout periods, Single Phase & Three phase

The Web Based Application shall have inbuilt tools for Meter Data

ication shall be able to generate various predefined reports. The formats of the same shall be shared with the

The Web Based Application shall have an inbuilt reporting tool for

application shall have provision to import data from

The Web Based application shall have various in built dashboards

time data acquisition status for the project area.

for supply status indicating the availability of power,

Any Dashboards associated with acquiring of meter data and

information dissemination to various stake holders shall be developed

The Web Based Software shall have module to capture the various non conformities based on the availability of the acquired data and

automatically calculate the applicable penalties. Further the module te monitoring including installation,

Page 61: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

commission, uptime and the same shall be used in generating the

report for CAPEX and OPEX charges. The module shall assist the officers in invoice validation and bill passing. The module shall be

verified by the design

reliability.

23. Provision for automated SMS alerts and email. The alerts would be

send directly to respective area in charge and other integrated systems (e.g. customer care centre in case of events such as tamper,

no power etc. based on system analytics.) as specified by JVVNL. The required SMS gateways shall be provided by DISCOM.

24. Reading of all the consumers should be captured/ recorded at 00:00 hours on last day of the every month along with seamless data

integration with the billing system so as to enable generation of bills on 1st of every subsequent month.

25. Any other software functionality or modification or change associated

with the process of acquireporting and dissemination to various forms as required by the

DISCOM shall be implemented during the project tenure.

26. Mobile App: A cross platform mobile app for information dissemination

and monitoring shall be developed by the bidder. The Mobile app shall have facilities for various DISCOM users to view the summary of

meter data acquired, alerts, events, supply status etc., based on various selection parameters. The inputs required for which shall be

provided by the DISCOM.

27. The Web Application shall have Ticketing System inbuilt for

complaint/issue recording, resolution and escalation.

Please provide a summary of versions of various modules, if the proposed solution is a

product. Use following format:

Table D.1: Details of Product Offered

Name of

product Module details

Table D.2:

Name of

product DISCOM

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

57

commission, uptime and the same shall be used in generating the

report for CAPEX and OPEX charges. The module shall assist the officers in invoice validation and bill passing. The module shall be

verified by the designated officers for its accuracy, security and

Provision for automated SMS alerts and email. The alerts would be

send directly to respective area in charge and other integrated customer care centre in case of events such as tamper,

no power etc. based on system analytics.) as specified by JVVNL. The required SMS gateways shall be provided by DISCOM.

Reading of all the consumers should be captured/ recorded at 00:00 ast day of the every month along with seamless data

integration with the billing system so as to enable generation of bills on 1st of every subsequent month.

Any other software functionality or modification or change associated

with the process of acquisition of meter data, depiction, consolidation, dissemination to various forms as required by the

DISCOM shall be implemented during the project tenure.

Mobile App: A cross platform mobile app for information dissemination

shall be developed by the bidder. The Mobile app shall have facilities for various DISCOM users to view the summary of

meter data acquired, alerts, events, supply status etc., based on various selection parameters. The inputs required for which shall be

ovided by the DISCOM.

The Web Application shall have Ticketing System inbuilt for

complaint/issue recording, resolution and escalation.

Please provide a summary of versions of various modules, if the proposed solution is a

format:-

Table D.1: Details of Product Offered

Module details Version and year of release

DISCOM URL

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

commission, uptime and the same shall be used in generating the

report for CAPEX and OPEX charges. The module shall assist the officers in invoice validation and bill passing. The module shall be

ated officers for its accuracy, security and

Provision for automated SMS alerts and email. The alerts would be

send directly to respective area in charge and other integrated customer care centre in case of events such as tamper,

no power etc. based on system analytics.) as specified by JVVNL. The

Reading of all the consumers should be captured/ recorded at 00:00 ast day of the every month along with seamless data

integration with the billing system so as to enable generation of bills

Any other software functionality or modification or change associated

sition of meter data, depiction, consolidation, dissemination to various forms as required by the

Mobile App: A cross platform mobile app for information dissemination

shall be developed by the bidder. The Mobile app shall have facilities for various DISCOM users to view the summary of

meter data acquired, alerts, events, supply status etc., based on various selection parameters. The inputs required for which shall be

The Web Application shall have Ticketing System inbuilt for

Please provide a summary of versions of various modules, if the proposed solution is a

Version and year of release

Page 62: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

58

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Page 63: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

E. Approach and Methodology

The Approach and Methodology to be furnished with following parameter:

i. Understanding of Purchaser and its requirement with clear mention of the

deliverables. Schematic diagram showing all the modules & components of

the systems covered in the

systems.

ii. Description of the technical solution for achieving the integrations as shown in

the above schematic diagram

iii. Project Team Structure

iv. Resource planning and estimation

v. Risk planning

vi. Detailed work plan wit

i. Understanding of Utility and its requirement of Purchaser and its requirement

with clear mention of the deliverables. Schematic diagram showing all the

modules & components of the systems covered in the specification and

integration with existing systems.

Bidder should depict complete understanding of the as

information provided in the Bid Document. It should also require to list down all the

deliverables that has been planned as a part of the overall proj

provide details of prior interaction with Utility, if any.

ii. Description of technical solution for achieving the integrations

Please provide details of integration methodology followed by your organization in

successfully implementing similar projects. Also highlight the special steps that your

organization/ consortium intends to take in order to ensure that the change from current

system to proposed one will be smooth and effective.

iii. Project Team Structure

In this section please provide detail of the team that would be deployed by your

organization to execute the project. Please provide details of the team structure in the

following format:

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

59

and Methodology

The Approach and Methodology to be furnished with following parameter:

Understanding of Purchaser and its requirement with clear mention of the

deliverables. Schematic diagram showing all the modules & components of

the systems covered in the specification and integration with existing

Description of the technical solution for achieving the integrations as shown in

the above schematic diagram

Project Team Structure

Resource planning and estimation

Detailed work plan with timelines

Understanding of Utility and its requirement of Purchaser and its requirement

with clear mention of the deliverables. Schematic diagram showing all the

modules & components of the systems covered in the specification and

ting systems.

Bidder should depict complete understanding of the as-is system of the Utility based on the

information provided in the Bid Document. It should also require to list down all the

deliverables that has been planned as a part of the overall project with timelines. Also

provide details of prior interaction with Utility, if any.

Description of technical solution for achieving the integrations

Please provide details of integration methodology followed by your organization in

ting similar projects. Also highlight the special steps that your

organization/ consortium intends to take in order to ensure that the change from current

system to proposed one will be smooth and effective.

Project Team Structure

rovide detail of the team that would be deployed by your

organization to execute the project. Please provide details of the team structure in the

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

The Approach and Methodology to be furnished with following parameter:

Understanding of Purchaser and its requirement with clear mention of the

deliverables. Schematic diagram showing all the modules & components of

specification and integration with existing

Description of the technical solution for achieving the integrations as shown in

Understanding of Utility and its requirement of Purchaser and its requirement

with clear mention of the deliverables. Schematic diagram showing all the

modules & components of the systems covered in the specification and

is system of the Utility based on the

information provided in the Bid Document. It should also require to list down all the

ect with timelines. Also

Description of technical solution for achieving the integrations.

Please provide details of integration methodology followed by your organization in

ting similar projects. Also highlight the special steps that your

organization/ consortium intends to take in order to ensure that the change from current

rovide detail of the team that would be deployed by your

organization to execute the project. Please provide details of the team structure in the

Page 64: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Table7: Proposed Project Team Structure

Name of

Staff

Positio

n

Assign

ed

Internatio

nal or

Domestic

A.

Professio

nal Staff

B.

Support

Staff

iv. Resource planning and estimation

Bidder shall provide detailed staffing schedule of the professional and support staff in the

following format:

For Professional Staff the input should be indicated

should be indicated by category (e.g.: IT administrator, field survey staff etc.).

Months are counted from the start of the assignment. For each staff indicate separately

staff input for off-site and on

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

60

: Proposed Project Team Structure

Internatio

nal or

Domestic

Fir

m

Employme

nt status

with the

firm (Full

time/

Associate)

Education

(Degree,

Year,

Institutio

n)

Resource planning and estimation

Bidder shall provide detailed staffing schedule of the professional and support staff in the

For Professional Staff the input should be indicated individually; for Support Staff it

should be indicated by category (e.g.: IT administrator, field survey staff etc.).

Months are counted from the start of the assignment. For each staff indicate separately

site and on-site work.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Area of

Expertis

e and

number

of years

of

relevant

experien

ce

Task

Assign

ed

Bidder shall provide detailed staffing schedule of the professional and support staff in the

individually; for Support Staff it

should be indicated by category (e.g.: IT administrator, field survey staff etc.).

Months are counted from the start of the assignment. For each staff indicate separately

Page 65: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Table8: Proposed Resource Planning and Estimation

No. Name of Staff Position

A. Professional

Staff

B. Support Staff

v. Risk planning

Bidder shall assess underlying risks in implementation of the Project and detail out the

methodology to mitigate them. It may include development of a risk assessment matrix

indicating severity of the risk, chance of its occurrence and its mitigation appr

Table9: Risk Planning

Risk

description

Risk

category

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

61

: Proposed Resource Planning and Estimation

Position Staff Input

In

Weeks

W1 W2 W3 W4

Bidder shall assess underlying risks in implementation of the Project and detail out the

methodology to mitigate them. It may include development of a risk assessment matrix

indicating severity of the risk, chance of its occurrence and its mitigation appr

Probability (%) Impact

(High/medium/low)

with impact

description

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

W5 ….. Total

Bidder shall assess underlying risks in implementation of the Project and detail out the

methodology to mitigate them. It may include development of a risk assessment matrix

indicating severity of the risk, chance of its occurrence and its mitigation approach.

(High/medium/low)

with impact

Mitigation

strategy

Page 66: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

vi. Detailed work plan with timelines

Please refer Schedule of Completion for the format.

S.

No.

Particular of activity

1. Submission of detailed

inception report giving the

compliance sheet along

with the make and model

of various infrastructure,

hardware & software that

are proposed for delivery.

Specification of System

Architecture and Software

Solution.

2. Approval of Inception

Report by Discom

3. Commencement of

Installation

4. Installation of system at

all the sites

5. Operation and

maintenance of the

system

6. Installation of Software

system and Data Centre

and other related

infrastructure

7. Integration with JVVNL’s

existing billing/RAPDRP

systems

8. UAT

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPO

62

Detailed work plan with timelines

Please refer Schedule of Completion for the format.

Particular of activity Time schedule desired

Submission of detailed

inception report giving the

compliance sheet along

with the make and model

of various infrastructure,

hardware & software that

proposed for delivery.

Specification of System

Architecture and Software

Within 30 days from the date

of Award of Contract

Approval of Inception

Report by Discom

Within 15 days from the date

of submission of inception

report

Commencement of Within 15 Days from the date

of acceptance of S.No 2.

Installation of system at Within 12 months from the

date of award of contract

((i) Supply and Installation of

50% of the hardware at the

sites : within 12 months from

the date of award of contract

And

(ii) Supply and Installation of

balance 50% the hardware at

the sites : within 24 months

from the date of award of

contract)

Operation and

maintenance of the

60 months from S.No 4.

of Software

system and Data Centre

and other related

Within 2 months from the

date of approval of System

Architecture and Software

Solution.

Integration with JVVNL’s

existing billing/RAPDRP

Within 6 months from the

date of approval of System

Architecture and Software

Solution.

Within 1 month of Integration

completion i.e. within 7

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Confirmation of Time

Schedule as per

bidder (Yes/No)

Within 30 days from the date

Within 15 days from the date

of submission of inception

rom the date

Within 12 months from the

((i) Supply and Installation of

50% of the hardware at the

months from

(ii) Supply and Installation of

ardware at

months

from the date of award of

Within 2 months from the

System

Architecture and Software

Within 6 months from the

System

Architecture and Software

Within 1 month of Integration

completion i.e. within 7

Page 67: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

S.

No.

Particular of activity

9. Parallel Run

F. Project Experience and Confirmation of Pre

Bidder shall provide details of projects with application modules and other requirements (as

mentioned in Eligibility Criteria,) which have been successfully completed during the last 5

financial years.

Please do not supply the names of clients who are no

The bidder is required to submit the details of Pre

&12 as the case may be.

Bidders need to submit the details as per the format in the table provided.

Table: The details of the same should be included in the following format and necessary

supporting documents should be attached

Table11: Details of Project Experience

SI

.

No

Name

of

projec

t

Brief Scope

necessarily

including

role played

by Bidder,

modules

implemente

d, sector

classificatio

n

Owner of

Project

assignment

(Client

name)

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

63

Particular of activity Time schedule desired

months from the date of

approval of System

Architecture and Software

Solution.

Certificate from JVVNL shall

be taken by bidder.

For 3 months after issuance of

the UAT completion

certificate.

Project Experience and Confirmation of Pre - Qualification Requirement

Bidder shall provide details of projects with application modules and other requirements (as

mentioned in Eligibility Criteria,) which have been successfully completed during the last 5

Please do not supply the names of clients who are no longer using your product/system.

The bidder is required to submit the details of Pre-Qualification documents in the table no 11

Bidders need to submit the details as per the format in the table provided.

same should be included in the following format and necessary

supporting documents should be attached

: Details of Project Experience

Owner of

Project

assignment

(Client

name)

Cost of

assignment

Date of

Awarded

commencem

ent

Date of

completion

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Confirmation of Time

Schedule as per

bidder (Yes/No)

months from the date of

System

Architecture and Software

hall

For 3 months after issuance of

the UAT completion

Qualification Requirement

Bidder shall provide details of projects with application modules and other requirements (as

mentioned in Eligibility Criteria,) which have been successfully completed during the last 5

longer using your product/system.

Qualification documents in the table no 11

Bidders need to submit the details as per the format in the table provided.

same should be included in the following format and necessary

Date of

completion

Was

assignment

satisfactorily

completed

Was it a

Power

Sector

Project?

(Y/N)

Provide

Detail

Page 68: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Table 12: QUALIFICATION

1. INTRODUCTION: The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

to have been done after careful study and examination of the tender document with full understanding

of its implications.

This section covers the minimum requirement with respect to experience, capability and other particulars of the Bidder to be considered eligible for participation in the bid for the proposed work.

The BIDDER shall become eligible to bid on satisfying the follow

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

2. BID QUALIFICATION REQUIREMENTSThe Bidder must possess credentials prescribed as Pre

the Qualification Requirement (QR), his bid will be treated as non

correspondence/clarification will be taken into consideration for the same.

It is also intimated that merely meeting the following requirements does not indicate t

shall be short listed for opening of financial bid. The short listing shall be made considering all the

technical parameters.

3 The Bid shall be made either by a Single Bidder OR by a valid consortium of maximumTwo members as detailed hereu

3.1 The single bidder may be

I. IT Based companyOR

II. OEM/Meter Manufacturer

A. If the Bidder is a IT company, then the following Qualification requirements shall be applicable :

QR No.

Criteria

1 Bidder shall be incorporated under Indian

Companies Act 1956/2013from last 5 financial years

2 The bidder should be an Information

Technology Services

have been continuously providing services to

power distribution utilities in India from last 5 years as on the date of submission of bid on

BOO / BOOM / SaaS / IaaS model involving

deployment of Software, Hardware, Manpower and Associate

areas of Meter Data Downloading & Analysis

/ AMR/ AMI / MDAS/ MDMS implemented for

consumer or system meters.

3. The bidder should have executed or

executing at least one project of Acquisition (AMR/AMI) for acquiring meter

data through GPRS/Internet/VPN or any other communication mode and making the

data available on central web server during the last five years ( Jan’13 to Dec’17) . The

communication between Meter and Data

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

64

Table 12: QUALIFICATION REQUIREMENT

The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

to have been done after careful study and examination of the tender document with full understanding

section covers the minimum requirement with respect to experience, capability and other particulars of the Bidder to be considered eligible for participation in the bid for the proposed work.

The BIDDER shall become eligible to bid on satisfying the following “BID QUALIFICATION

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

BID QUALIFICATION REQUIREMENTS The Bidder must possess credentials prescribed as Pre-Qualification Criteria. If any bidder fails to fulfil

the Qualification Requirement (QR), his bid will be treated as non-responsive and no further

correspondence/clarification will be taken into consideration for the same.

It is also intimated that merely meeting the following requirements does not indicate t

shall be short listed for opening of financial bid. The short listing shall be made considering all the

The Bid shall be made either by a Single Bidder OR by a valid consortium of Two members as detailed hereunder.

The single bidder may be

IT Based company

OEM/Meter Manufacturer

If the Bidder is a IT company, then the following Qualification requirements shall be

Supporting Documents Required

incorporated under Indian

Companies Act 1956/2013which is existing from last 5 financial years.

Copy of Self-Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

The bidder should be an Information

Technology Services Company and should

have been continuously providing services to

power distribution utilities in India from last 5 years as on the date of submission of bid on

BOO / BOOM / SaaS / IaaS model involving

deployment of Software, Hardware, Manpower and Associated Services in the

areas of Meter Data Downloading & Analysis

/ AMR/ AMI / MDAS/ MDMS implemented for

consumer or system meters.

Proof of Work order & performance

certificate/ work order completion certificate

to be submitted

The bidder should have executed or

executing at least one project of Meter Data Acquisition (AMR/AMI) for acquiring meter

data through GPRS/Internet/VPN or any other communication mode and making the

data available on central web server during e years ( Jan’13 to Dec’17) . The

communication between Meter and Data

Proof of Work Orders to be submitted.

The successful bidd

Manufacturer Authorization Form from meter and modem manufacturer /OEM

for providing meter and modem as per specifications provided in tender

document before award of contract.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

The Bidders are advised to study the tender document carefully. Submission of Bids shall be deemed

to have been done after careful study and examination of the tender document with full understanding

section covers the minimum requirement with respect to experience, capability and other particulars of the Bidder to be considered eligible for participation in the bid for the proposed work.

ing “BID QUALIFICATION

REQUIREMENTS” and on production of the required documentary evidences along with the Tender.

Qualification Criteria. If any bidder fails to fulfil

responsive and no further

It is also intimated that merely meeting the following requirements does not indicate that the bidders

shall be short listed for opening of financial bid. The short listing shall be made considering all the

The Bid shall be made either by a Single Bidder OR by a valid consortium of

If the Bidder is a IT company, then the following Qualification requirements shall be

Supporting Documents Required

Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

Proof of Work order & performance

certificate/ work order completion certificate

Proof of Work Orders to be submitted.

The successful bidder shall furnish

Manufacturer Authorization Form from meter and modem manufacturer /OEM

for providing meter and modem as per specifications provided in tender

document before award of contract.

Page 69: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

QR

No.

Criteria

Acquisition System support two way

communication.

The Work Award for the above project shall be for a minimum of 15000 meters.

4. The bidder should have following certificates, which should be valid as on date

of bidding:

4. ISO 9001:2008/2015

5. ISO 27001

6. CMMI Level 3 DEV or above for Software Development

** If the CMMI Level 3 DEV or above for Software Development

furnished at the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with

undertaking to furnish the above certificate within 2 months from the date of award of

contract. However the date of

Implementation schedule shall extended on these grounds failing which said

BG shall be invoked.

5. (i) The bidder should have average annual turnover of Rs 35 Crore

s of last three financial years ending on 31Mar-2017 (i.e. for the 2014

2016-17).

(ii) The bidder should have positive net

worth as on 31.3.17

6. The Bidder should have not been black listed by any of Power Distribution

as on date of bidding.

7. The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued by Electrical Inspectorate

Rajasthan.

* If the above certificate is not furnished at

the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months from the date of award of contract. However

the date of Implementation schedule shall not be extended on these grounds failing

which said BG shall be invoked.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

65

Supporting Documents Required

Acquisition System support two way

The Work Award for the above project shall minimum of 15000 meters.

The bidder should have following certificates, which should be valid as on date

ISO 9001:2008/2015

CMMI Level 3 DEV or above for Software Development **

CMMI Level 3 DEV or above for Software Development certificate is not

furnished at the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with

undertaking to furnish the above certificate within 2 months from the date of award of

contract. However the date of

Implementation schedule shall not be extended on these grounds failing which said

Valid ISO Certificates should be submitted.

Certificate of Appraisal issued by authorized

transition partner of CMMI institute with SCAMPI ID to be uploaded.

In Case the CMMI Level 3 DEV or above for Software Development

available with the bidder, the bidder shall

furnish an undertaking along with Bank

Guarantee of Rs. 5 Lacs (proforma enclosed)

that the same shall be furnished months from the date of award of contract

(i) The bidder should have average annual turnover of Rs 35 Crore

s of last three financial years ending on 31-2017 (i.e. for the 2014-15, 2015-16 &

(ii) The bidder should have positive net

Copy of the audited statement of accounts (PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted

as a proof of turnover and net worth.

The Bidder should have not been black listed by any of Power Distribution Utility in India

Self-Declaration for No Blacklisting on appropriate non-judicial stamp paper duly

notarized.

The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued by Electrical Inspectorate of Govt. of

* If the above certificate is not furnished at

the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months from the date of award of contract. However

of Implementation schedule shall not be extended on these grounds failing

which said BG shall be invoked.

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses issued by Electrical Inspectorate

of Rajasthan.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same shall be furnished within 2 months from the

date of award of contract

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Supporting Documents Required

Valid ISO Certificates should be submitted.

Certificate of Appraisal issued by authorized

transition partner of CMMI institute with SCAMPI ID to be uploaded.

CMMI Level 3 DEV or above for Software Development certificate are not

available with the bidder, the bidder shall

furnish an undertaking along with Bank

Guarantee of Rs. 5 Lacs (proforma enclosed)

that the same shall be furnished within 2 he date of award of contract.

Copy of the audited statement of accounts (PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted

as a proof of turnover and net worth.

Declaration for No Blacklisting on judicial stamp paper duly

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses issued by Electrical Inspectorate of Govt.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same within 2 months from the

date of award of contract.

Page 70: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

OR

B. If the Bidder is a METER MANUFACTURER, then the following Qualification

requirements shall be applicable :

QR No.

Criteria

1 Bidder shall be incorporated

Companies Act 1956/20135 financial years.

2 The bidder should be Meter Manufacturer of

Electricity Meters in India should have supplied

iv. a minimum of 500000 of Single phase meters

v. 50,000 LTTVM/HTTVM/Three phase Whole Current meters

vi. 10,000 CT Operated meters for

power distribution utilities in

India in the last 3 financial years

i.e. (April’14 to March ’17).

All of these meters shall have Communication ports/AMR Meters

3. The bidder should have ISO 9001:2008/2015

certified which should be valid as on date of

bidding.

4. (i) The bidder should have average annual

turnover of Rs. 100 Crores of last three

financial years ending on 31for the 2014-15, 2015-

(ii) The bidder should have positive net

worth as on 31.3.17.

6. The Bidder should have not been black listed

by any of Power Distribution Utility in India as on date of bidding.

7. The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued by Electrical Inspectorate of Govt. of

Rajasthan.

* If the above certificate is not furnished at

the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months

from the date of award of contract. However

the date of Implementation sched

not be extended on these grounds failing which said BG shall be invoked.

8. The bidder shall have BIS certification for

IS:16444 with latest amendments for the meter to be supplied against this bid.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

66

If the Bidder is a METER MANUFACTURER, then the following Qualification

requirements shall be applicable :

Supporting Documents Required

Bidder shall be incorporated under Indian

Companies Act 1956/2013 existing from last

Copy of Self-Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

The bidder should be Meter Manufacturer of

Electricity Meters in India should have

a minimum of 500000 of Single phase meters

50,000 LTTVM/HTTVM/Three phase Whole Current meters

10,000 CT Operated meters for

power distribution utilities in

in the last 3 financial years

i.e. (April’14 to March ’17).

All of these meters shall have Communication ports/AMR Meters

Proof of Work order & performance

certificate/ work order completion

certificate to be submitted. The bidder shall furnish undertaking that

either in-house IT software shall be used or it shall be outsourced.

The bidder should have ISO 9001:2008/2015

which should be valid as on date of Valid ISO Certificates should be submitte

(i) The bidder should have average annual

turnover of Rs. 100 Crores of last three

financial years ending on 31-Mar-2017 (i.e. -16 & 2016-17).

(ii) The bidder should have positive net

Copy of the audited statement of accounts

(PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted as a proof of turnover and net worth.

The Bidder should have not been black listed

by any of Power Distribution Utility in India

Self-Declaration for No Blacklisting on

appropriate non judicial stamp paper duly notarized.

The bidder should possess minimum Class ‘B’

or above electrical contractor licenses issued by Electrical Inspectorate of Govt. of

* If the above certificate is not furnished at

the time of bidding, bidder may furnish Bank Guarantee of Rs. 5.0 Lacs with undertaking

to furnish the above License within 2 months

from the date of award of contract. However

the date of Implementation schedule shall

not be extended on these grounds failing which said BG shall be invoked.

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses

issued by Electrical Inspectorate of Govt. of Rajasthan.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available

with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same shall be furnished within 2 months

date of award of contract

The bidder shall have BIS certification for

IS:16444 with latest amendments for the meter to be supplied against this bid.

Valid certificate to be submitted.

The certificate should not be older than three years as on the date of opening of techno

commercial bid.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

If the Bidder is a METER MANUFACTURER, then the following Qualification

Supporting Documents Required

Attested Incorporation

Certificate in case of Company

MOA & AOA in case of Company

Proof of Work order & performance

certificate/ work order completion

certificate to be submitted. The bidder shall furnish undertaking that

house IT software shall be used or it shall be outsourced.

Valid ISO Certificates should be submitted.

audited statement of accounts

(PL Account & Balance Sheet) duly certified

by the Chartered Accountant to be submitted as a proof of turnover and net worth.

Declaration for No Blacklisting on

appropriate non judicial stamp paper duly

Valid certificate to be submitted

Copy of Self Attested Class ‘B’ Electrical

or above electrical contractor licenses

issued by Electrical Inspectorate of Govt.

In Case the Class ‘B’ Electrical or above

electrical contractor license are not available

with the bidder, the bidder shall furnish an

undertaking along with Bank Guarantee of

Rs. 5 Lacs (proforma enclosed) that the same within 2 months from the

date of award of contract.

Valid certificate to be submitted.

The certificate should not be older than three years as on the date of opening of techno-

Page 71: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

QR

No.

Criteria

9 The bidder shall have type DLMS compliance

certificate issued by CPRI/ERDA for the meter to be supplied against this bid.

3.2 If the Bid is made by Consortium of two memshall be applicable:

A. Qualification Criterion

i. The one member shall be an IT Company having qualifi

(A).

ii. Another member shall be Meter Manufacturer having qual

(B).

iii. Any of the above members can be designated as a Lead Member.

B. Other conditions for consortiumi. The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

the partners so as to be legally

ii. One of the partners shall be nominated as being partner in

this authorization shall be supported by submitting a power of attorney signed by legally

authorized signatories of all the partners;

iii. The partner in-charge shall be authorized to incur liabilities and receive instructions for

and on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in

partner).

iv. All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

included in the authorization as well as in the form of bid

agreement (in the case of a successful bid);

v. In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

vi. Responsibilities in respec

partner) as well as of each Consortium member shall be clearly indicated in the

agreement.

vii. The Consortium agreement shall not be cancelled or amended unilaterally without consent

of the purchaser and a statement to this effect should appear in the consortium

agreement.

viii. A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than on

will cause all the bids in which the bidder has participated to be disqualified.

ix. Bids from agents are not acceptable in the case of Consortium and such bids will be

treated as non-responsive.

x. The Consortium should furnish the relevant information and

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

appropriate value satisfying the abo

indicating role and duties of each consortium member.

Note: In case of non-furnishing the requisite documents along with the bid, the bid

will be considered as non-

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

67

Supporting Documents Required

The bidder shall have type DLMS compliance

certificate issued by CPRI/ERDA for the meter o be supplied against this bid.

Valid certificate to be submitted.

certificate should not be older than three years as on the date of opening of techno

commercial bid. For this purpose date of

conducting type test will be considered.

If the Bid is made by Consortium of two members, the following Qualification criterion

Qualification Criterion

The one member shall be an IT Company having qualification as per above in clause

Another member shall be Meter Manufacturer having qualification as per above clause

Any of the above members can be designated as a Lead Member.

Other conditions for consortium The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

the partners so as to be legally binding on all the members

One of the partners shall be nominated as being partner in-charge (lead partner) and

this authorization shall be supported by submitting a power of attorney signed by legally

authorized signatories of all the partners;

charge shall be authorized to incur liabilities and receive instructions for

and on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in

All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

included in the authorization as well as in the form of bid and the form of contract

agreement (in the case of a successful bid);

In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

Responsibilities in respect of execution of tendered work by the partner in

partner) as well as of each Consortium member shall be clearly indicated in the

The Consortium agreement shall not be cancelled or amended unilaterally without consent

aser and a statement to this effect should appear in the consortium

A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than on

will cause all the bids in which the bidder has participated to be disqualified.

Bids from agents are not acceptable in the case of Consortium and such bids will be

responsive.

The Consortium should furnish the relevant information and documents as specified under

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

appropriate value satisfying the above conditions shall be submitted to the SE(IT), JVVNL , Jaipur

indicating role and duties of each consortium member.

furnishing the requisite documents along with the bid, the bid

-responsive and bid may be summarily rejected.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Supporting Documents Required

Valid certificate to be submitted. The

certificate should not be older than three years as on the date of opening of techno-

commercial bid. For this purpose date of

conducting type test will be considered.

bers, the following Qualification criterion

cation as per above in clause 3.1

ification as per above clause 3.1

The bid, and in case of a successful bid the “ Contract Agreement, shall be signed by all

charge (lead partner) and

this authorization shall be supported by submitting a power of attorney signed by legally

charge shall be authorized to incur liabilities and receive instructions for

and on behalf of any and all partner of the Consortium and the entire execution of the

contract including payment shall be done exclusively with the partner in-charge (lead

All partners of the Consortium shall be liable jointly and severally for the execution of the

contract in accordance with the contract terms and a statement to this effect shall be

and the form of contract

In the event of any default by any partner/partners of the Consortium, the other

partner/partners shall accept the liability and execute the contract in full.

t of execution of tendered work by the partner in-charge (lead

partner) as well as of each Consortium member shall be clearly indicated in the

The Consortium agreement shall not be cancelled or amended unilaterally without consent

aser and a statement to this effect should appear in the consortium

A firm can submit only one bid in the same bidding process, either individually as a bidder

or as a partner of a Consortium. A bidder who submits or participates in more than one bid

will cause all the bids in which the bidder has participated to be disqualified.

Bids from agents are not acceptable in the case of Consortium and such bids will be

documents as specified under

clause above and should satisfy the various requirements stated in other clauses also.

Original consortium agreement on Non judicial stamp paper duly registered with sub registrar office of

ve conditions shall be submitted to the SE(IT), JVVNL , Jaipur

furnishing the requisite documents along with the bid, the bid

marily rejected.

Page 72: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Facility Management Services Plan

The detail plan for FMS shall be given in accordance with the tender Document. In case of

deviations, the same should be clearly indicated in Deviation sheet.

1. Project Management Practices

Please provide high-level details of the project management practices that will be followed

to manage the project. The project management practices would include (but not be limited

to) details of:-

Bidder must provide details of how they envisage the contract be

principles such as (but not limited to) joint planning and control mechanisms; regular

and active review meetings; Project management of individual work streams and overall

program management of the entire service; Performance reporti

Bidder should outline their proposed governance structure and designate a Service

Manager to co-ordinate their activities and provide a focal point of contact to which

Utility can refer on any matter concerning the service.

Reporting lines and decision

explained

Reporting formats and templates that would be followed by the bidders

Outline the proposed escalation procedures in the event that issues arise.

2. Quality Assurance

Quality of service - Suppliers must provide details of their proposed approach to quality

assurance to ensure the quality of services in accordance with the tender document. This

should include:

Responsibility of quality of service;

How the supplier will ensure quality service

How quality will be measured

Does your company (and consortium partner) have any quality certification /

Assessment? If so, please provide your responses for the following:

Table15: Details of Certification

Description

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

68

Facility Management Services Plan

The detail plan for FMS shall be given in accordance with the tender Document. In case of

deviations, the same should be clearly indicated in Deviation sheet.

Project Management Practices

level details of the project management practices that will be followed

to manage the project. The project management practices would include (but not be limited

Bidder must provide details of how they envisage the contract being managed including

principles such as (but not limited to) joint planning and control mechanisms; regular

and active review meetings; Project management of individual work streams and overall

program management of the entire service; Performance reporting

Bidder should outline their proposed governance structure and designate a Service

ordinate their activities and provide a focal point of contact to which

Utility can refer on any matter concerning the service.

Reporting lines and decision-making powers within the bidder’s organization must be

Reporting formats and templates that would be followed by the bidders

Outline the proposed escalation procedures in the event that issues arise.

Suppliers must provide details of their proposed approach to quality

assurance to ensure the quality of services in accordance with the tender document. This

Responsibility of quality of service;

How the supplier will ensure quality service is provided;

How quality will be measured

Does your company (and consortium partner) have any quality certification /

Assessment? If so, please provide your responses for the following:

: Details of Certification

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

The detail plan for FMS shall be given in accordance with the tender Document. In case of

level details of the project management practices that will be followed

to manage the project. The project management practices would include (but not be limited

ing managed including

principles such as (but not limited to) joint planning and control mechanisms; regular

and active review meetings; Project management of individual work streams and overall

Bidder should outline their proposed governance structure and designate a Service

ordinate their activities and provide a focal point of contact to which

making powers within the bidder’s organization must be

Reporting formats and templates that would be followed by the bidders

Outline the proposed escalation procedures in the event that issues arise.

Suppliers must provide details of their proposed approach to quality

assurance to ensure the quality of services in accordance with the tender document. This

Does your company (and consortium partner) have any quality certification /

Assessment? If so, please provide your responses for the following:

Bidder’s

Response

Page 73: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Description

Certification / Assessment Name

Who issued the certification/assessment?

When was the certification/assessment obtained?

Does this certification/assessment process involve periodic reviews

and observations/ remarks after such review? If so, please

details and specify when your company is due for its next quality

review?

Please specify your company’s process for product development and enhancements.

3. Documentation

Please provide a list and brief description of all user documents that will

with the software package. This must include the following minimum documents:

System and administration manuals

Technical support handbook

User Manuals

Error Messages and their Meanings

Training Manuals

Analysis & Design Manuals with the

diagrams, schemas etc.

Additions/ changes to the documents after upgrades and

Operations Manuals.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

69

Certification / Assessment Name

Who issued the certification/assessment?

When was the certification/assessment obtained?

Does this certification/assessment process involve periodic reviews

and observations/ remarks after such review? If so, please provide

details and specify when your company is due for its next quality

Please specify your company’s process for product development and enhancements.

Please provide a list and brief description of all user documents that will

with the software package. This must include the following minimum documents:

System and administration manuals

Technical support handbook

Error Messages and their Meanings

Analysis & Design Manuals with the relevant data flow diagrams, entity relationship

Additions/ changes to the documents after upgrades and

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Bidder’s

Response

Please specify your company’s process for product development and enhancements.

Please provide a list and brief description of all user documents that will be provided along

with the software package. This must include the following minimum documents:

relevant data flow diagrams, entity relationship

Page 74: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4. Check List

Table:16

S. No Pre-Qualification Requirement

1. Is the cover letter attached with the

2. Is the tender cost attached with the proposal

3. Is the Bid Security attached with the proposal

4. Is the certificate as to corporate principal

5. Is the bidder-company statistics attached with the proposal

6. Is the bid structure

7. Is the technical specification requirement of application packages

attached with the proposal

8. Is the hardware technical specifications attached with the proposal

9. Is the Manufacturer’s Authorization Form

10. Is the necessary certificate / authorization for back to back

arrangement with respective OEM vendor for Technical support ,

Annual Maintenance / warranty etc. enclosed with the proposal

11. Is the Approach and Methodology

12. Is the Project Experience and Confirmation of Pre

Requirement

attached with the proposal

13. Is the Team Details (CVs)

14. Is the Details of Key Personnel’s

15. Is Firm Detail attached with the bid proposal

16. Is the Facility Management Services Plan attached with the proposal

17. Is the Project Management Practices

18. Is the Quality Assurance

19. Is the Documentation Details

20. Is the Confirmation of No

with the proposal

21. Is the Supporting Documents to Substantiate Meeting of Pre

Qualification requirement

22. Does the bid proposal

proposal in a sealed envelope

23. Is financial offer enclosed is duly sealed and super

provided in tender document

24. Has the bidder provided project organization structure

25. Has the bidder provided

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION S

70

Qualification Requirement

Is the cover letter attached with the bid proposal

Is the tender cost attached with the proposal

Is the Bid Security attached with the proposal

Is the certificate as to corporate principal

company statistics attached with the proposal

Is the bid structure according to proposal

Is the technical specification requirement of application packages

attached with the proposal

Is the hardware technical specifications attached with the proposal

Manufacturer’s Authorization Form attached with the proposal

Is the necessary certificate / authorization for back to back

arrangement with respective OEM vendor for Technical support ,

Annual Maintenance / warranty etc. enclosed with the proposal

Approach and Methodology attached with the proposal

Project Experience and Confirmation of Pre-Qualification

attached with the proposal

Team Details (CVs) attached with the proposal

Details of Key Personnel’s attached with the proposal

attached with the bid proposal

Is the Facility Management Services Plan attached with the proposal

Project Management Practices attached with the proposal

Quality Assurance attached with the proposal

Documentation Details attached with the proposal

Confirmation of No-Deviation and Deviation Sheet attached

Supporting Documents to Substantiate Meeting of Pre

Qualification requirement attached with the proposal

Does the bid proposal contains the part B that is the financial

proposal in a sealed envelope

Is financial offer enclosed is duly sealed and super-scribed as

provided in tender document

Has the bidder provided project organization structure

Has the bidder provided schematic flow of information

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Yes

/ No

Is the technical specification requirement of application packages

Is the hardware technical specifications attached with the proposal

proposal

Is the necessary certificate / authorization for back to back

arrangement with respective OEM vendor for Technical support ,

Annual Maintenance / warranty etc. enclosed with the proposal

Qualification

Is the Facility Management Services Plan attached with the proposal

attached with the proposal

attached

Supporting Documents to Substantiate Meeting of Pre-

contains the part B that is the financial

scribed as

Page 75: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

S. No Pre-Qualification Requirement

26. Are the technical and commercial proposals enclosed that are duly

sealed and super-scribed as provided in tender document

27. Are all the pages of the proposal signed by an authorized

representative of the bidder’s firm

the leading member’s firm)

28. Does the bid contains the name, address and place of business of

the person or persons making the bid and is the bid signed and

sealed by the bidder under his usual signature.

29. Is satisfactory evidence of authority of the person signing on behalf

of the Bidder furnished with the bid

30. Is the bidder's name stated on the proposal same as that of the

legal name of the firm

31. Do any / all erasures or other changes in the bid

the initials of the person signing the bid

32. Are all entries and amendments also signed

33. Are all pages of the attached tender specification document signed,

as a token of acceptance of the terms and conditions, except those

mentioned in the deviation list

Date :

Place :

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

71

Qualification Requirement

Are the technical and commercial proposals enclosed that are duly

scribed as provided in tender document

Are all the pages of the proposal signed by an authorized

representative of the bidder’s firm (in case of consortium, then from

the leading member’s firm)

Does the bid contains the name, address and place of business of

the person or persons making the bid and is the bid signed and

sealed by the bidder under his usual signature.

satisfactory evidence of authority of the person signing on behalf

of the Bidder furnished with the bid

Is the bidder's name stated on the proposal same as that of the

legal name of the firm

Do any / all erasures or other changes in the bid documents bear

the initials of the person signing the bid

Are all entries and amendments also signed

Are all pages of the attached tender specification document signed,

as a token of acceptance of the terms and conditions, except those

the deviation list

(Signature)……...........................

(Name)...........................

(Designation)..............................

(Common Seal).......................

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION7: TECHNICAL PROPOSAL SUBMISSION SHEET

Yes / No

Are the technical and commercial proposals enclosed that are duly

Are all the pages of the proposal signed by an authorized

(in case of consortium, then from

Does the bid contains the name, address and place of business of

the person or persons making the bid and is the bid signed and

satisfactory evidence of authority of the person signing on behalf

Is the bidder's name stated on the proposal same as that of the

documents bear

Are all pages of the attached tender specification document signed,

as a token of acceptance of the terms and conditions, except those

(Signature)……...........................

(Name)...........................

(Designation)..............................

(Common Seal).......................

Page 76: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

1. CONFIRMATION OF “NO DEVIATION” IN TECHNICAL / COMMERCIAL TERMS

AND CONDITIONS OF THIS TENDER

(To be furnished on Bidder’s Letterhead, In case of consortium both the bidders to comply)

Bidder's Name & Address:

To

The Superintending Engineer (IT)

Jaipur Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur

Rajasthan, 302005.

Dear Sirs,

Sub: Confirmation for “No Deviation” in Technical / Commercial terms &

conditions of TN-71

We hereby confirm that there is no deviation in technical /

stipulated in the bidding documents and we agree to adhere the same strictly.

(Signature)……...........................

(Name)...........................

(Designation)..............................

(Common Seal).......................

Date :

Place :

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

72

8: OTHER UNDER TAKINGS

CONFIRMATION OF “NO DEVIATION” IN TECHNICAL / COMMERCIAL TERMS

AND CONDITIONS OF THIS TENDER

(To be furnished on Bidder’s Letterhead, In case of consortium both the bidders to comply)

The Superintending Engineer (IT)

Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Sub: Confirmation for “No Deviation” in Technical / Commercial terms &

We hereby confirm that there is no deviation in technical / commercial terms & conditions

stipulated in the bidding documents and we agree to adhere the same strictly.

(Signature)……...........................

(Designation)..............................

.......

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

CONFIRMATION OF “NO DEVIATION” IN TECHNICAL / COMMERCIAL TERMS

(To be furnished on Bidder’s Letterhead, In case of consortium both the bidders to comply)

Sub: Confirmation for “No Deviation” in Technical / Commercial terms &

commercial terms & conditions

stipulated in the bidding documents and we agree to adhere the same strictly.

Page 77: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

2. UNDERTAKING FOR VARIOUS INFORMATION

(To be furnished on appropriate non

notarized)

Bidder's Name & Address:

To

The Superintending Engineer (IT)

Jaipur Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur Rajasthan, 302005.

Dear Sir,

Sub: Undertaking for various information against

We hereby confirm that that all the information against this bid and all other Certificates

etc. furnished are correct and if in future Discom discover that any information furnished is

not true, same may lead to the rejection of bid or termination of contract.

(Signature)……...........................

(Name)...........................

(Designation)..............................

(Common Seal).......................

Date :

Place :

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

73

ING FOR VARIOUS INFORMATION FURNISHED

(To be furnished on appropriate non-judicial Stamp Paper of Rs. 100/

The Superintending Engineer (IT)

Nigam Ltd.

Room No.117, Vidyut Bhawan

Sub: Undertaking for various information against TN-71

We hereby confirm that that all the information against this bid and all other Certificates

are correct and if in future Discom discover that any information furnished is

not true, same may lead to the rejection of bid or termination of contract.

(Signature)……...........................

(Designation)..............................

(Common Seal).......................

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

FURNISHED

judicial Stamp Paper of Rs. 100/-, duly

We hereby confirm that that all the information against this bid and all other Certificates

are correct and if in future Discom discover that any information furnished is

not true, same may lead to the rejection of bid or termination of contract.

Page 78: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

3. BIDDER’S AUTHORISATION CERTIFICATE

(To be furnished on Bidder’s Letterhead.)

To,

The Superintending Engineer (IT)

Jaipur Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur Rajasthan, 302005.

[Reference No. ]

I/ We <Name/ Designation>

authorized to sign relevant documents on behalf of the company/ firm in dealing with

Tender/ NIT reference No. ______________________ dated _________. He/ She is also

authorized to attend meetings & submit technical & commercial information/ cla

may be required by you in the course of processing the Bid. For the purpose of validation,

his/ her verified signatures are as under.

Thanking you,

Name of the Bidder: -

Signature:

Authorised Signatory: -

Seal of the Organization: -

Date:

Place:

Please attach the board resolution / valid power of attorney in favour of person

signing this authorizing letter.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

74

BIDDER’S AUTHORISATION CERTIFICATE

(To be furnished on Bidder’s Letterhead.)

The Superintending Engineer (IT)

Nigam Ltd.

No.117, Vidyut Bhawan

<Name/ Designation> hereby declare/ certify that <Name/ Designation>

authorized to sign relevant documents on behalf of the company/ firm in dealing with

Tender/ NIT reference No. ______________________ dated _________. He/ She is also

authorized to attend meetings & submit technical & commercial information/ cla

may be required by you in the course of processing the Bid. For the purpose of validation,

his/ her verified signatures are as under.

Please attach the board resolution / valid power of attorney in favour of person

signing this authorizing letter.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

ECTION8: OTHER UNDER TAKINGS

<Name/ Designation> is hereby

authorized to sign relevant documents on behalf of the company/ firm in dealing with

Tender/ NIT reference No. ______________________ dated _________. He/ She is also

authorized to attend meetings & submit technical & commercial information/ clarifications as

may be required by you in the course of processing the Bid. For the purpose of validation,

Verified

Please attach the board resolution / valid power of attorney in favour of person

Page 79: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

4. POWER OF ATTORNEY IN FAVOUR OF AUTHORISED SIGNATORY OF THE

BIDDER

(To be stamped Non-Judicial Stamp Paper of Rs. 500/

Bidding Entity)

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

75

POWER OF ATTORNEY IN FAVOUR OF AUTHORISED SIGNATORY OF THE

Judicial Stamp Paper of Rs. 500/- duly notarized in name of the

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

POWER OF ATTORNEY IN FAVOUR OF AUTHORISED SIGNATORY OF THE

duly notarized in name of the

Page 80: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

5. FORMAT OF BID SECURITY BANK GUARANTEE

(To be stamped in accordance with Stamp Act in the name of

Stamp Paper should be in the name of the issui

Bank Guarantee No.: ........................…

Date: ...................……...

To: (insert Name and Address of Employer)

WHEREAS M/s. …. (insert name of Bidder)…… having its Registered/Head Office at …..

(insert address of the Bidder) ………..

for the performance of the Contract for………….(insert name of the

Package)……………under………….(insert Specification No)…………… (hereinafter called "the Bid")

KNOW ALL PERSONS by these present that WE ……..

bank) ……… having its Registered/Head Office at …..…….

of the bank)…….. (hereinafter called "the Bank"), are bound unto Jaipur Vidyut

Limited (hereinafter called "the Employe

Bid Security in figures &words)

payment well and truly to be made to the said Employer, the Bank binds itself, its

successors and assigns by these presents.

Sealed with the Seal of the said Bank this ............... day of ............... 20....

THE CONDITIONS of this obligation are:

(1) If the Bidder withdraws its bid during the period of bid validity specified by the Bidder in

the Bid Form; or

(2) If the Bidder does not accept the corrections to arithmetical errors identified during

preliminary evaluation of his bid pursuant to Tender document; or

(3) If, as per the requirement of Qualification Requirements the Bidder is require

submit any Undertaking/Agreement and he fails to submit the same, duly attested by

Notary Public of the place(s) of the respective executant(s) along with the Bid within

ten days from the date of intimation of post

(4) In the case of a successful Bidder, if the Bidder fails within the specified time limit

(i) To sign the Contract Agreement, in accordance with Tender document, or

(ii) To furnish the required

document.

(5) In any other case specifically provided for in the

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

76

FORMAT OF BID SECURITY BANK GUARANTEE

(To be stamped in accordance with Stamp Act in the name of SE (

Stamp Paper should be in the name of the issuing Bank)

Bank Guarantee No.: ........................…

(insert Name and Address of Employer)

WHEREAS M/s. …. (insert name of Bidder)…… having its Registered/Head Office at …..

(insert address of the Bidder) ……….. (hereinafter called "the Bidder") has submitted its Bid

for the performance of the Contract for………….(insert name of the

Package)……………under………….(insert Specification No)…………… (hereinafter called "the Bid")

KNOW ALL PERSONS by these present that WE ……..(insert name & address of the issuing

……… having its Registered/Head Office at …..…….(insert address of registered office

…….. (hereinafter called "the Bank"), are bound unto Jaipur Vidyut

Limited (hereinafter called "the Employer") in the sum of ....................

Bid Security in figures &words).......................... ............................……………. for which

payment well and truly to be made to the said Employer, the Bank binds itself, its

assigns by these presents.

Sealed with the Seal of the said Bank this ............... day of ............... 20....

THE CONDITIONS of this obligation are:

If the Bidder withdraws its bid during the period of bid validity specified by the Bidder in

If the Bidder does not accept the corrections to arithmetical errors identified during

preliminary evaluation of his bid pursuant to Tender document; or

If, as per the requirement of Qualification Requirements the Bidder is require

submit any Undertaking/Agreement and he fails to submit the same, duly attested by

Notary Public of the place(s) of the respective executant(s) along with the Bid within

ten days from the date of intimation of post – bid discussion; or

e of a successful Bidder, if the Bidder fails within the specified time limit

sign the Contract Agreement, in accordance with Tender document, or

furnish the required performance security, in accorda

In any other case specifically provided for in the Tender document.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

SE (IT), the Non-Judicial

WHEREAS M/s. …. (insert name of Bidder)…… having its Registered/Head Office at …..

(hereinafter called "the Bidder") has submitted its Bid

for the performance of the Contract for………….(insert name of the

Package)……………under………….(insert Specification No)…………… (hereinafter called "the Bid")

ert name & address of the issuing

(insert address of registered office

…….. (hereinafter called "the Bank"), are bound unto Jaipur Vidyut Vitran Nigam

r") in the sum of ....................(insert amount of

.......................... ............................……………. for which

payment well and truly to be made to the said Employer, the Bank binds itself, its

Sealed with the Seal of the said Bank this ............... day of ............... 20....

If the Bidder withdraws its bid during the period of bid validity specified by the Bidder in

If the Bidder does not accept the corrections to arithmetical errors identified during

preliminary evaluation of his bid pursuant to Tender document; or

If, as per the requirement of Qualification Requirements the Bidder is required to

submit any Undertaking/Agreement and he fails to submit the same, duly attested by

Notary Public of the place(s) of the respective executant(s) along with the Bid within

e of a successful Bidder, if the Bidder fails within the specified time limit

sign the Contract Agreement, in accordance with Tender document, or

accordance with the Tender

.

Page 81: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

We undertake to pay to the Employer up to the above amount upon receipt of its first

written demand, without the Employer having to substantiate its demand, provided that in

its demand the Employer will note that the amount claimed by it is due to it, owing to the

occurrence of any of the above

the occurred condition or conditions.

This guarantee will remain in full force up to and inclu

the date 180 days from the date of Technical Bid Opening)……..

thereof must reach the Bank not later than the above date.

For and on behalf of the Bank

[Signature of the authorised signator

Signature_______________________

Name_______________________

Designation_______________________

POA Number_______________________

Contact Number(s): Tel.______________Mobile______________

Fax Number_______________________

Email ____________________________

Seal of the Bank______________________

Witness:

Signature_______________________

Name_______________________

Address______________________________

Contact Number(s): Tel.______________Mobile______________

Email ____________________________

Note:

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

77

We undertake to pay to the Employer up to the above amount upon receipt of its first

written demand, without the Employer having to substantiate its demand, provided that in

Employer will note that the amount claimed by it is due to it, owing to the

occurrence of any of the above-named CONDITIONS or their combination, and specifying

the occurred condition or conditions.

This guarantee will remain in full force up to and including ………..(insert date, which shall be

the date 180 days from the date of Technical Bid Opening)…….., and any demand in respect

thereof must reach the Bank not later than the above date.

For and on behalf of the Bank

Signature of the authorised signatory(ies)]

Signature_______________________

Name_______________________

Designation_______________________

POA Number_______________________

Contact Number(s): Tel.______________Mobile______________

Fax Number_______________________

____________________________

Seal of the Bank______________________

Signature_______________________

Name_______________________

Address______________________________

Contact Number(s): Tel.______________Mobile______________

__________________

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

We undertake to pay to the Employer up to the above amount upon receipt of its first

written demand, without the Employer having to substantiate its demand, provided that in

Employer will note that the amount claimed by it is due to it, owing to the

named CONDITIONS or their combination, and specifying

(insert date, which shall be

, and any demand in respect

Page 82: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

1. The Bank Guarantee should be in accordance with the proforma as provided. However,

in case the issuing bank insists for additional paragraph for limitation of liability, the

following may be added at the end of the proforma of the Bank Guarantee [

paragraph of the Bank Guarantee preceding the signature(s) of the issuing

authority(ies) of the Bank Guarantee

Quote

“Notwithstanding anything contained herein:

1. Our liability under this Bank Guarantee shall not exceed _________ (value in

figures)____________ [_____________________ (value in

words)____________].

2. This Bank Guarantee shall be valid upto ________(validity date)__________.

3. We are liable to pay the guaranteed amount or any part thereof under this Bank

Guarantee only &only if we re

________ (validity date) __________.”

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8:

78

Bank Guarantee should be in accordance with the proforma as provided. However,

in case the issuing bank insists for additional paragraph for limitation of liability, the

following may be added at the end of the proforma of the Bank Guarantee [

ragraph of the Bank Guarantee preceding the signature(s) of the issuing

authority(ies) of the Bank Guarantee]:

“Notwithstanding anything contained herein:

Our liability under this Bank Guarantee shall not exceed _________ (value in

_______ [_____________________ (value in

words)____________].

This Bank Guarantee shall be valid upto ________(validity date)__________.

We are liable to pay the guaranteed amount or any part thereof under this Bank

Guarantee only &only if we receive a written claim or demand on or before

________ (validity date) __________.”

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

OTHER UNDER TAKINGS

Bank Guarantee should be in accordance with the proforma as provided. However,

in case the issuing bank insists for additional paragraph for limitation of liability, the

following may be added at the end of the proforma of the Bank Guarantee [i.e., end

ragraph of the Bank Guarantee preceding the signature(s) of the issuing

Our liability under this Bank Guarantee shall not exceed _________ (value in

_______ [_____________________ (value in

This Bank Guarantee shall be valid upto ________(validity date)__________.

We are liable to pay the guaranteed amount or any part thereof under this Bank

ceive a written claim or demand on or before

Page 83: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

6. SELF DECLARATION OF NO BLACKLISTING

(To be furnished on appropriate non

notarized)

To,

The Superintending Engineer (IT)

Jaipur Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur

Rajasthan, 302005.

In response to the NIT Ref. No. _____________________________ dated ___________

for {Project Title}, as an Owner/ Partner/ Director/ Auth. Sign. Of

____________________________________, I/ We hereby declare that presently our

Company/ firm _________________, at the time of bidding

a. possess the necessary professional, technical, financial and managerial resources and

competence required by the Bidding Document is

b. have fulfilled my/ our obligation to pay such of the taxes payable to the Union and the

State Government or any local authority as specified in the Bidding Document;

c. is having unblemished record and is not declared ineligible for corrup

practices either indefinitely or for a particular period of time by any State/ Central

government/ PSU/ UT.

d. does not have any previous transgressions with any entity in India or any other country

during the last five years

e. Does not blacklisted by any of the Central/State power utilities in India for fraudulent

and corrupt practices as on date of bidding.

f. is not insolvent in receivership, bankrupt or being wound up, not have its affairs

administered by a court or a judicial officer, not have i

and is not the subject of legal proceedings for any of the foregoing reasons;

g. does not have, and our directors and officers not have been convicted of any criminal

offence related to their professional conduct or the making

misrepresentations as to their qualifications to enter into a contract as on date of

bidding, or not have been otherwise disqualified pursuant to debarment proceedings;

h. Does not have a conflict of interest as mentioned in the

materially affects the fair competition.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

79

SELF DECLARATION OF NO BLACKLISTING

(To be furnished on appropriate non-judicial Stamp Paper of Rs. 100/

The Superintending Engineer (IT)

Nigam Ltd.

Room No.117, Vidyut Bhawan

In response to the NIT Ref. No. _____________________________ dated ___________

for {Project Title}, as an Owner/ Partner/ Director/ Auth. Sign. Of

_______________________, I/ We hereby declare that presently our

Company/ firm _________________, at the time of bidding: -

possess the necessary professional, technical, financial and managerial resources and

competence required by the Bidding Document issued by the Discom;

have fulfilled my/ our obligation to pay such of the taxes payable to the Union and the

State Government or any local authority as specified in the Bidding Document;

is having unblemished record and is not declared ineligible for corrup

practices either indefinitely or for a particular period of time by any State/ Central

does not have any previous transgressions with any entity in India or any other country

during the last five years

ed by any of the Central/State power utilities in India for fraudulent

and corrupt practices as on date of bidding.

is not insolvent in receivership, bankrupt or being wound up, not have its affairs

administered by a court or a judicial officer, not have its business activities suspended

and is not the subject of legal proceedings for any of the foregoing reasons;

does not have, and our directors and officers not have been convicted of any criminal

offence related to their professional conduct or the making of false statements or

misrepresentations as to their qualifications to enter into a contract as on date of

bidding, or not have been otherwise disqualified pursuant to debarment proceedings;

Does not have a conflict of interest as mentioned in the bidding document which

materially affects the fair competition.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

judicial Stamp Paper of Rs. 100/-, duly

In response to the NIT Ref. No. _____________________________ dated ___________

for {Project Title}, as an Owner/ Partner/ Director/ Auth. Sign. Of

_______________________, I/ We hereby declare that presently our

possess the necessary professional, technical, financial and managerial resources and

sued by the Discom;

have fulfilled my/ our obligation to pay such of the taxes payable to the Union and the

State Government or any local authority as specified in the Bidding Document;

is having unblemished record and is not declared ineligible for corrupt & fraudulent

practices either indefinitely or for a particular period of time by any State/ Central

does not have any previous transgressions with any entity in India or any other country

ed by any of the Central/State power utilities in India for fraudulent

is not insolvent in receivership, bankrupt or being wound up, not have its affairs

ts business activities suspended

and is not the subject of legal proceedings for any of the foregoing reasons;

does not have, and our directors and officers not have been convicted of any criminal

of false statements or

misrepresentations as to their qualifications to enter into a contract as on date of

bidding, or not have been otherwise disqualified pursuant to debarment proceedings;

bidding document which

Page 84: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

i. Will comply with the code of integrity as specified in the bidding document.

If this declaration is found to be incorrect then without prejudice to any other action that

may be taken as per the provisions of the applicable Act and Rules thereto prescribed by

GoR, my/ our security may be forfeited in full and our bid, to the extent accepted, may be

cancelled

Thanking you,

Signature…………………

In the capacity of………………………

Duly authorised to sign Proposal for And on behalf of………………………..

Seal of the Organization: -

Date………………….. Place………………….

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

80

Will comply with the code of integrity as specified in the bidding document.

If this declaration is found to be incorrect then without prejudice to any other action that

e provisions of the applicable Act and Rules thereto prescribed by

GoR, my/ our security may be forfeited in full and our bid, to the extent accepted, may be

In the capacity of………………………

Proposal for And on behalf of………………………..

Date………………….. Place………………….

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

Will comply with the code of integrity as specified in the bidding document.

If this declaration is found to be incorrect then without prejudice to any other action that

e provisions of the applicable Act and Rules thereto prescribed by

GoR, my/ our security may be forfeited in full and our bid, to the extent accepted, may be

Date………………….. Place………………….

Page 85: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

7. BANK GUARANTEE AGAINST UNDERTAKING FOR CLASS ‘B’ OR ABOVE

ELECTRICAL CONTRACT LICENSES

(On Rajasthan Non-Judicial Stamp Paper worth Rs.100/

To,

The Superintending Engineer (IT)

Jaipur Vidyut Vitran Nigam Limited

Room No. 117, Vidyut Bhawan,

Jyoti Nagar,

JAIPUR.

Dear Sir,

Whereas Jaipur Vidyut Vitran Nigam Limited, Jaipur (hereinafter called the

Purchaser) has issued a tender enquiry under

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

Baran, Bharatpur, Bundi, Dholp

Whereas M/s _________________________ (hereinafter called the bidder) has

furnished a bid for implementation of ___________________ to the Superintending

Engineer (IT), Jaipur Vidyut Vitran

Whereas in accordance with the provision of the RFP of the aforesaid TN__________,

the bidder can deposit a bank guarantee for undertaking to furnish the Class ‘B’ or above

electrical contract licenses issued by Electrical Inspectorate of Govt. of Rajasthan within 2

months from the date of award of contract.

Whereas M/s _____________________ (the bidder) have requested us (Name of

the Bank) to furnish the bank guarantee, for undertaking to furnish the

contract licenses issued by Electrical Inspectorate of Govt. of Rajasthan within 2 months

from the date of award of contract, for an amount equivalent to Rs.______________ (in

words also) only.

Under this Bank Guarantee, we (Name of

unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

81

BANK GUARANTEE AGAINST UNDERTAKING FOR CLASS ‘B’ OR ABOVE

ELECTRICAL CONTRACT LICENSES

Judicial Stamp Paper worth Rs.100/-)

The Superintending Engineer (IT)

Nigam Limited

Room No. 117, Vidyut Bhawan,

Whereas Jaipur Vidyut Vitran Nigam Limited, Jaipur (hereinafter called the

Purchaser) has issued a tender enquiry under TN-71 for “Implementation of AMI

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles”

Whereas M/s _________________________ (hereinafter called the bidder) has

furnished a bid for implementation of ___________________ to the Superintending

Vidyut Vitran Nigam Limited, Jaipur or his nominated officer(s).

Whereas in accordance with the provision of the RFP of the aforesaid TN__________,

the bidder can deposit a bank guarantee for undertaking to furnish the Class ‘B’ or above

issued by Electrical Inspectorate of Govt. of Rajasthan within 2

months from the date of award of contract.

Whereas M/s _____________________ (the bidder) have requested us (Name of

the Bank) to furnish the bank guarantee, for undertaking to furnish the

contract licenses issued by Electrical Inspectorate of Govt. of Rajasthan within 2 months

from the date of award of contract, for an amount equivalent to Rs.______________ (in

Under this Bank Guarantee, we (Name of the Bank) hereby undertake

unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

BANK GUARANTEE AGAINST UNDERTAKING FOR CLASS ‘B’ OR ABOVE

Whereas Jaipur Vidyut Vitran Nigam Limited, Jaipur (hereinafter called the

Implementation of AMI

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

”.

Whereas M/s _________________________ (hereinafter called the bidder) has

furnished a bid for implementation of ___________________ to the Superintending

Nigam Limited, Jaipur or his nominated officer(s).

Whereas in accordance with the provision of the RFP of the aforesaid TN__________,

the bidder can deposit a bank guarantee for undertaking to furnish the Class ‘B’ or above

issued by Electrical Inspectorate of Govt. of Rajasthan within 2

Whereas M/s _____________________ (the bidder) have requested us (Name of

the Bank) to furnish the bank guarantee, for undertaking to furnish the Class ‘B’ electrical

contract licenses issued by Electrical Inspectorate of Govt. of Rajasthan within 2 months

from the date of award of contract, for an amount equivalent to Rs.______________ (in

the Bank) hereby undertake

unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely,

Page 86: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

the payment to the purchaser on his first demand without whatsoever right of objection on

our part and without his first claim to the bid

guarantee in figures and words).

Payment pursuant to this undertaking will be demanded by the purchaser from the

Bank and will be met by the Bank without question in the case in which the bidder, on

receipt of the order and/ or after the acceptance of this tender, makes default in furnishing

the required Class ‘B’ or above Licenses issued by Electrical Inspectorate of Govt. of

Rajasthan within 2 months from the date of award of contract. Also whether the occasio

ground has arisen for such demand the decision of the Superintending Engineer (IT), Jaipur

Vidyut Vitran Nigam Limited shall be final.

The liability of the Bank shall not at any time exceed Rs.__________ (Rupees

______________________________).

The undertaking will be determined on but will not withstanding such determination,

continue to be in force till the expiry of 3 months from that date.

No indulgence or grant of time by the purchaser to the bidder without the

acknowledgement of the Bank wi

The guarantee herein contained shall not be affected by any change in the

constitution of the bidder.

All disputes arising under the said guarantee between the Bank and the bidder or

between the bidder and the purchaser pertaining to the guarantee shall be subject to the

jurisdiction of Courts only at JAIPUR in Rajasthan.

The Bank further undertake not to revoke this guarantee during its currency except

with the previous consent of the Superintending Engineer (IT), Jaipur

Limited, Jaipur.

Notwithstanding anything contained herein before, the Bank’s liab

guarantee i.e. restricted to Rs.____________ (Rupees ______________________) and the

guarantee shall remain in force upto ____________. Unless demand or claim in

writing is presented on the Bank within three months from that d

released and discharged from all liabilities there

guarantee shall be extended as and when required by the purchaser.

IN WITNESS WHEREOF the Bank has executed these presents the day

_________ month __________and year____________.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER U

82

the payment to the purchaser on his first demand without whatsoever right of objection on

our part and without his first claim to the bidder, in the amount not exceeding (amount of

guarantee in figures and words).

Payment pursuant to this undertaking will be demanded by the purchaser from the

Bank and will be met by the Bank without question in the case in which the bidder, on

the order and/ or after the acceptance of this tender, makes default in furnishing

the required Class ‘B’ or above Licenses issued by Electrical Inspectorate of Govt. of

Rajasthan within 2 months from the date of award of contract. Also whether the occasio

ground has arisen for such demand the decision of the Superintending Engineer (IT), Jaipur

Vidyut Vitran Nigam Limited shall be final.

The liability of the Bank shall not at any time exceed Rs.__________ (Rupees

______________________________).

he undertaking will be determined on but will not withstanding such determination,

continue to be in force till the expiry of 3 months from that date.

No indulgence or grant of time by the purchaser to the bidder without the

acknowledgement of the Bank will discharge the liabilities of the Bank under this guarantee.

The guarantee herein contained shall not be affected by any change in the

All disputes arising under the said guarantee between the Bank and the bidder or

the bidder and the purchaser pertaining to the guarantee shall be subject to the

jurisdiction of Courts only at JAIPUR in Rajasthan.

The Bank further undertake not to revoke this guarantee during its currency except

with the previous consent of the Superintending Engineer (IT), Jaipur

Notwithstanding anything contained herein before, the Bank’s liab

guarantee i.e. restricted to Rs.____________ (Rupees ______________________) and the

guarantee shall remain in force upto ____________. Unless demand or claim in

writing is presented on the Bank within three months from that date, the Bank shall be

released and discharged from all liabilities there-under. However, the validity of the bank

guarantee shall be extended as and when required by the purchaser.

IN WITNESS WHEREOF the Bank has executed these presents the day

________ month __________and year____________.

Yours faithfully,

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

the payment to the purchaser on his first demand without whatsoever right of objection on

der, in the amount not exceeding (amount of

Payment pursuant to this undertaking will be demanded by the purchaser from the

Bank and will be met by the Bank without question in the case in which the bidder, on

the order and/ or after the acceptance of this tender, makes default in furnishing

the required Class ‘B’ or above Licenses issued by Electrical Inspectorate of Govt. of

Rajasthan within 2 months from the date of award of contract. Also whether the occasion or

ground has arisen for such demand the decision of the Superintending Engineer (IT), Jaipur

The liability of the Bank shall not at any time exceed Rs.__________ (Rupees

he undertaking will be determined on but will not withstanding such determination,

No indulgence or grant of time by the purchaser to the bidder without the

ll discharge the liabilities of the Bank under this guarantee.

The guarantee herein contained shall not be affected by any change in the

All disputes arising under the said guarantee between the Bank and the bidder or

the bidder and the purchaser pertaining to the guarantee shall be subject to the

The Bank further undertake not to revoke this guarantee during its currency except

with the previous consent of the Superintending Engineer (IT), Jaipur Vidyut Vitran Nigam

Notwithstanding anything contained herein before, the Bank’s liability under this

guarantee i.e. restricted to Rs.____________ (Rupees ______________________) and the

guarantee shall remain in force upto ____________. Unless demand or claim in

ate, the Bank shall be

under. However, the validity of the bank

IN WITNESS WHEREOF the Bank has executed these presents the day

Yours faithfully,

Page 87: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Witnesses:

1.

2.

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION8: OTHER UNDER TAKINGS

83

(Bankers)

EXECUTANT

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION8: OTHER UNDER TAKINGS

(Bankers)

EXECUTANT

Page 88: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

(Not to be filled here)

(Financial offer has to be furnished in BOQ excel file).

To,

The Superintending Engineer [IT]

Jaipur Vidyut Vitran Nigam Ltd.

Room No.117, Vidyut Bhawan

Jyoti Nagar, Jaipur

Rajasthan, 302005.

SUBJECT: “Implementation of AMI (Adv

Metering System for Consumers of

Karauli circles” against TN

Dear Sir,

We have procured the bid documents for engagement of Agency

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles

We are submitting our financial proposal as hereunder:

Meters/Field Equipment/Software/Hardware Cost (BOQ)

S.No. Equipment

A B

1 Meters

1.1 Single phase whole current Smart Meter

1.2 Three Phase whole current Smart Meter

1.3 Three phase CT operated Smart Meter

1.4 DCU

1.5 Meter Box For Single phase

whole current Smart Meter

1.6 Meter Box For Three Phase

whole current Smart Meter

1.7 Meter Box For Three phase CT

operated Smart Meter

1.8 Communication Modules/NIC

Sub Total 1

2 Installation and Commissioning

2.1

Installation and commissioning of Single

Phase Whole Current Smart

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

84

FORMAT FOR FINANCIAL BID SUBMISSION

Financial offer has to be furnished in BOQ excel file).

The Superintending Engineer [IT]

Nigam Ltd.

Room No.117, Vidyut Bhawan

Implementation of AMI (Advanced Metering Infrastructure/Smart

Metering System for Consumers of Baran, Bharatpur, Bundi, Dholpur, Jhalawar and

TN-71.

We have procured the bid documents for engagement of Agency “Implementation of AMI

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and Karauli circles” against

We are submitting our financial proposal as hereunder:

Meters/Field Equipment/Software/Hardware Cost (BOQ)

Unit Quantity Per Unit Cost

(INR)

C D E

Single phase whole current Nos. 135700

Three Phase whole current Nos. 12544

Three phase CT operated Nos. 845

Nos. 2500

Single phase

whole current Smart Meter Nos. 135700

Three Phase

whole current Smart Meter Nos. 12544

Three phase CT

Nos. 845

Communication Modules/NIC Nos. 149089

2 Installation and Commissioning

Installation and commissioning of Single

Phase Whole Current Smart Nos. 135700

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

anced Metering Infrastructure/Smart

Baran, Bharatpur, Bundi, Dholpur, Jhalawar and

Implementation of AMI

(Advanced Metering Infrastructure/Smart Metering System for Consumers of

” against TN-71.

Per Unit Cost Total Cost

(INR)

F=DxE

Page 89: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

Meters with meter box with

necessary accessories

/Hardware for fixing (including transportation of smart meters to installation site with communication

module

2.2

Installation and

commissioning of Three Phase Whole Current Smart Meters with meter box with

necessary accessories /Hardware for fixing

(including transportation of smart meters to installation

site with communication

module

2.3

Installation

commissioning of Three Phase CT Operated Smart

Meters with meter box with necessary accessories

/Hardware for fixing (including transportation of smart meters to installation

site with communication module

2.4

Installation and commissioning of DCU

necessary accessories

/Hardware for fixing (including transportation of smart meters to installation site with communication

module

Sub Total 2

3 Software

3.1

Meter Data Acquisition

Software (MDAS)/Head End

System (HES)

3.2

Meter data management

(MDM) capable of processing raw data, building of desired

analytics like giving demand response signal, taking

control / programming actions

based on pre-set logic, interface with billing software

being used by utility

3.3 Data Archiving and SAN

management software

3.4

Centralized network management software along

with patch management &

identity management

3.5 Identity and Access management software

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION9: FORMAT FOR FINANCIAL BID SUBM

85

Meters with meter box with

necessary accessories

/Hardware for fixing (including transportation of smart meters to installation site with communication

Installation and

commissioning of Three Phase Whole Current Smart Meters with meter box with

necessary accessories /Hardware for fixing

(including transportation of smart meters to installation

site with communication

Nos. 12544

and

commissioning of Three Phase CT Operated Smart

Meters with meter box with necessary accessories

/Hardware for fixing (including transportation of smart meters to installation

site with communication

Nos. 845

Installation and DCU with

necessary accessories

/Hardware for fixing (including transportation of smart meters to installation site with communication

Nos. 2500

Meter Data Acquisition

Software (MDAS)/Head End

Lot 1

Meter data management

(MDM) capable of processing raw data, building of desired

analytics like giving demand response signal, taking

control / programming actions

set logic, interface with billing software

Lot 1

Data Archiving and SAN

Lot 1

Centralized network management software along

with patch management & Lot 1

Identity and Access

Lot 1

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

Page 90: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

3.6 Development of Consumer

Portal

3.7 Integration Middleware, if any

3.8 Misc. item, if any

Sub Total 3

4 Basic Software License

41 Software Licenses-Server OS

4.2 Software Licenses-Database

4.3 Antivirus software

4.4 Misc. item, if any

Sub Total

Sub Total 4

5 Server Hardware & Storage system

5.1

Database and Application

Servers suitable for MDAS/HES and MDM

5.2

Application server for development, quality and

testing

5.3 Web Server for access

5.4 Data Archiving Server

5.5

Network Management server

with patch & identity

management

5.6

Centralized management

console with single monitor

5.7 SAN storage

5.8 Cable, Jacks etc.

5.9

GPS Time Synchronization

system

5.1 Misc. item, if any

Sub Total 5

6 Hardware for Network Management

6.1

Firewall with Networkintrusion prevention system

(NIPS)

6.2 Router

6.3

LAN Switch (24/48 ports,

1000 / 100 /10 Mbps)

6.4

Workstation consoles along

with Operating System &

license

Sub Total 6

7 Server Racks

7.1 Wall Mount Racks

7.2 Floor Mount Racks

Sub Total 7

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

86

Development of Consumer Lump sum 1

Integration Middleware, if any Lump sum 1

Basic Software License

Server OS Nos.

Database Nos.

Nos.

5 Server Hardware & Storage system

Database and Application

Servers suitable for

Application server for quality and

Network Management server

with patch & identity

Centralized management

console with single monitor

GPS Time Synchronization

6 Hardware for Network Management

Firewall with Network-based intrusion prevention system

LAN Switch (24/48 ports,

Workstation consoles along

with Operating System &

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION9: FORMAT FOR FINANCIAL BID SUBMISSION

Page 91: “Implementation of Advanced Metering Infrastructure (AMI ...energy.rajasthan.gov.in/content/dam/raj/energy/jaipurdiscom/pdf/tender/... · Page 0 of iii Request For Proposal “Implementation

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

8 UPS & Battery System

8.1 UPS

Sub Total 8

Grand Total (INR)

The quoted prices are exclusive

new tax by government shall be on Discom account.

Name: _____________________________

[Authorized Signatory]

SECTION10: ANNEXURES

Following details are to be furnished

(i) Details of cloud computing for hosting of application with infrastructure details to be

furnished.

(ii) Detail data sheet of Application Software

(iii) Details of Manpower, office setup etc.

(iv) Details of training to be provided

(v) Details of connectivity (all type)

(vi) Details of catalogue of services to be published

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under

SECTION10: ANNEXURES

87

exclusiveof applicable tax/GST any statutory variation and imposing

new tax by government shall be on Discom account.

Name: _____________________________

ANNEXURES – BILL OF MATERIAL

Following details are to be furnished:

Details of cloud computing for hosting of application with infrastructure details to be

Detail data sheet of Application Software indicating compliances of the specifications

Details of Manpower, office setup etc.

Details of training to be provided

Details of connectivity (all type)

Details of catalogue of services to be published

Implementation of Advanced Metering Infrastructure (AMI)/ Smart Metering System Under NSGM TN-72

SECTION10: ANNEXURES – BILL OF MATERIAL

tax/GST any statutory variation and imposing

Details of cloud computing for hosting of application with infrastructure details to be

indicating compliances of the specifications