Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental...

17
Antares Slow Antares Slow Control Status Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October 15-19, 2007 Jean-Michel Gallone Jean-Michel Gallone on behalf of the ANTARES Collaboration on behalf of the ANTARES Collaboration

Transcript of Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental...

Page 1: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Antares Slow Antares Slow Control StatusControl Status

2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October 15-19, 2007

Jean-Michel GalloneJean-Michel Galloneon behalf of the ANTARES Collaborationon behalf of the ANTARES Collaboration

Page 2: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

23 Institutes from7 European countries

40 km submarine cable

-2475m

ANTARES shore station ANTARES collaboration and ANTARES collaboration and locationlocation

Page 3: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Neutrino telescope: Detection principleNeutrino telescope: Detection principle

č

43°Sea floor

p

104

atm

p, 107

at

m

Reconstruction of trajectory (~ ) from timing and position of PMT hits

interaction

Cherenkov light from

3D PMTarray

1-100 cosm

Page 4: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Detector Detector layoutlayout

~70 m

12 lines (900 PMTs) 25 storeys / line 3 PMTs/storey

350 m

100 m

14.5 m

Junctionbox

Readout cables

40 km toshoreHorizontal layout

Sea bed ~ -2500 m

a storey

Page 5: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Hydrophone:acoustic positioning

Optical Module:10” PMT in 17” glass sphere

photon detection

Basic detection and calibration Basic detection and calibration elementselements

Local Control Module

(in Ti container):Front-end ASIC, Clock, DAQ/SC,

compass/roll/pitch

Optical Beaconwith blue LEDs:timing calibration

Page 6: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Detector line deploymentDetector line deployment

Page 7: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Submarine detector line Submarine detector line connectionconnection

Page 8: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Submarine detector line Submarine detector line connectionconnection

Page 9: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

9+1 lines in sea, 5 in 9+1 lines in sea, 5 in operationoperation

L11

L9

L10

L12

L7

L8

L6

L4

L2

L3

L5

L1

IL07

seismometer

100 m

N

Junction box

Submarinecable

to shore

42°50’ N

6°10’E

5 lines detector

(since January 29th)

(Sept. 2007)

Page 10: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Status store in Status store in DatabaseDatabase

On Shore SC System

Slow Control

DataBase

Monitor

ElectronicModule

LCMContainer

Off Shore SC SystemM

odbu

s

Polling

RunControl

SetUp

Control Room

DataWriter

DAQ

Page 11: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

DatabaseDatabase TablesTables

Construction Tables

Integration Tables

Set Up Tables

Product Structure Tables

Modbus Tables

PollingTables

Process List Tables

Oracle DataBase – Store in CCIn2p3 @ Lyon

Raw Data Tables

Parameter Tables

Run Tables

Monitored Values Tables

Calibration Tables

Page 12: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

DAQ / SC Synchronisation

StandBy Ready Running

Paused

Idle

Init Configure Start

PauseContinueQuit

Stop

ResetReset

Page 13: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Raw Data Update

On Shore SC System

DataBase

Electronic

LCM

Off Shore SC System

DBWriterMod

bus

Polling

Dispatcher SetUp

Control Room

DWDM

Page 14: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Monitoring Data Path

On Shore SC System

Set Up

DBWriter

Polling

Parser

Dispatcher

Monitor

RunControl

Control Room

Raw Data

ModBusRequests

View

MonitoredValues

Calibration

Run

Page 15: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Sample 1 : Aquadopp Monitor

Page 16: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

Sample 2 : Compass Monitor

Page 17: Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.

• 3D ANTARES detector operational with 5 lines; 4 extra lines in the sea waiting to be connected, 12 lines detector completed early 2008

• Slow control records detector status in database

• Biggest tables are about 1 Go / Years / Line

• Monitor GUI are provided but can be easily generated by users

• Several millions of down going events available to study detector behavior in various bioluminescence conditions

• First underwater neutrino candidates reconstructed in the Mediterranean sea

• MC comparison ongoing, physics results expected soon

SummarySummary