ANNUAL REPORT - Road Fund

438
ANNUAL REPORT 2015 / 16 Financing Road Maintenance Prudence - Transperancy - Integrity - Value

Transcript of ANNUAL REPORT - Road Fund

AUganda Road Fund I Annual Report FY 2015/2016

ANNUAL REPORT2015 / 16

Financing Road Maintenance

Prudence - Transperancy - Integrity - Value

iUganda Road Fund I Annual Report FY 2015/2016

Table of Contents

LIST OF FIGURES............................................................................................................................ vABBREVIATIONS AND ACRONYMS............................................................................................. viOUR VISION.................................................................................................................................... viiiOUR MISSION................................................................................................................................. viiiCORE VALUES.................................................................................................................................. viiiFOREWORD BY CHAIRPERSON OF BOARD............................................................................... ixSTATEMENT BY THE EXECUTIVE DIRECTOR............................................................................ xEXECUTIVE SUMMARY.................................................................................................................. xii1.0 General Introduction............................................................................................................... 2 1.1 Business of the Fund......................................................................................................... 2 1.2 Statutory Objectives......................................................................................................... 2 1.3 Strategic Objective............................................................................................................ 2 1.4 Specific Objectives............................................................................................................ 2 1.5 Business Processes............................................................................................................ 3 1.6 Organization Structure..................................................................................................... 3 1.7 Institutional Relationships............................................................................................... 72.0 Performance of URF in FY 2015/16.......................................................................................... 9 2.1 Overview............................................................................................................................ 9 2.2 Governance and Administration...................................................................................... 9 2.3 Performance of the Fund Management Board................................................................ 9 2.4 Performance of the Fund Secretariat in FY 2015/16........................................................ 9 2.5 Key Performance Indicators............................................................................................. 283.0 Performance of Road Maintenance Programmes.................................................................. 31 3.1 Funding Operations.......................................................................................................... 31 3.2 Financial Performance of Road Maintenance Programmes - FY 2015/16...................... 37 3.3 Physical Performance of Road Maintenance Programmes - FY 2015/16........................ 40 3.4 Physical performance by Works Category in FY 2015/16................................................ 454.0 Financial Statements............................................................................................................... 50 4.1 Overview............................................................................................................................ 50 4.2 Financial Statement.......................................................................................................... 505.0 Auditor General’s Report......................................................................................................... 57 5.1 Overview............................................................................................................................ 576.0 Challenges Experienced in FY 2015/16.................................................................................... 587.0 Plans and Strategies for FY 2016/17......................................................................................... 60 7.1 Preparation and operationalization of OYRMP for FY 2016/17...................................... 60 7.2 Planned Road Maintenance Activities in FY 2016/17...................................................... 60 7.3 Key Strategies for the Medium Term............................................................................... 618.0 Conclusion and Way forward.................................................................................................. 62 8.1 Summary of Report........................................................................................................... 62 8.2 Conclusion......................................................................................................................... 62 8.3 Recommendations............................................................................................................ 62

ii Uganda Road Fund I Annual Report FY 2015/2016

Annex 1: Key Monitoring Findings, FY 2015/16............................................................................ 65Annex 2: Summary of status of Implementation of Audit recommendations FY 2010/11 -2015/16 71Annex 3: Schedule of outstanding accountability issues from FY2010/11 to FY2015/16............. 73Annex 4: Detailed Return for Board Members and Secretariat Staff FY 2015/16........................ 77Annex 5: Performance of URF against Internal KPI’s in FY 2015/16............................................ 81Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16................................ 85Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16...................... 107Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16................................................................... 125Annex 9: Summary of Physical and Financial Performance of National Roads Maintenance, FY 2015/16.................................................................................................................. 129Annex 10: Physical Performance of DUCAR Designated Agencies in FY 2015/16........................ 133Annex 11: DUCAR Network Periodic Maintenance by Road........................................................ 151Annex 12: DUCAR Network Routine Mechanised maintenance by road.................................... 167Annex 13: DUCAR Network Routine Manual Maintenance by Road FY 2015/16........................ 215Annex 14: National Roads Network Maintenance in FY 2015/16 by Road.................................... 339Annex 15: KCCA Road Network Maintenance in FY 2015/16......................................................... 349Annex 16: Detailed Auditor General’s Report for FY 2015/16........................................................ 1

iiiUganda Road Fund I Annual Report FY 2015/2016

List of Tables

Table 1(a): Summary of Treasury Releases, URF Disbursements and Expenditures in FY 2015/16........................................................................................................................ xiiTable 1 (b): Summary of DA’s Physical Performance achieved in FY 2015/16............................ xiiiTable 1(c): Summary of achievements 0n 5-YRMP Targets for FY 2015/16............................... xvTable 1: Composition of URF Board as at 30th June 2016..................................................... 4Table 2: Filled staff positions as at 30th June 2016................................................................ 10Table 3: Key Achievements Corporate Services in FY 2015/16.............................................. 10Table 4: Summary of Agencies Monitored in FY 2015/16...................................................... 11Table 5: Geographical Coverage of M&E Activities in FY 2015/16......................................... 12Table 6: Achievements of URF in Planning and Programming Function, FY 2015/16........ 13Table 7: Achievements of URF in Fund Management Function in FY 2015/16.................... 14Table 8: Summary of DA’s covered by the Technical and Financial Audit FY 2015/16......... 14Table 9: Report of Generic Audit Issues and action matrix.................................................. 15Table 10: Summary of findings from Technical and Financial review of UNRA................... 17Table 11: Members of contracts Committee as at June 2015................................................... 21Table 12: List of Services Outsourced by the Fund in FY 2015/16.......................................... 21Table 13: The 5-YRMP for FY 2014/15-2018/19 (In US $ Mn).................................................. 25Table 14: Key Achievements on URF Corporate Plan Actions for FY 2015/16........................ 26Table 15: Summary of achievements 0n 5-YRMP Targets for FY 2015/16............................... 27Table 16: Key Achievements under the Policy & Strategy Function in FY 2015/16................ 27Table 17: Status of Key Control Documents as at 30 June 2015.............................................. 28Table 18: Summary of URF performance rating of KPI’s - FY 2015/16................................... 29Table 19: Sector Performance Scorecard in FY 2015/16 GAPR/FY 2014/15 GAPR.................. 30Table 20: Global budget allocation of funds to DA’s in FY 2015/16 (UGX bn)....................... 33Table 21: Summary of Funds inflow to vote 118, FY 2015/16.................................................... 34Table 22: Performance on KIP’s for Funds Inflow, FY 2015/16................................................ 34Table 23: Summary of Funds Disbursements–FY 2015/16...................................................... 35Table 24: DA’s Disbursements by Region in FY 2015/16.......................................................... 36Table 25: DA’s Expenditures against Available Funds in FY 2015/16....................................... 37Table 26: DLGs Funds Expenditure by Region in FY 2015/16................................................. 38Table 27: Summary of DLG’s Expenditure on DRCs in FY 2015/16......................................... 39Table 28: Road Maintenance Funding FY2010/11 – 2017/18.................................................... 39Table 29: Physical performance of National Roads Maintenance programme in FY 2015/16 40Table 30: Physical Performance of KCCA Roads Maintenance Programme for FY 2015/16 42Table 31: Physical Performance of the DLG’s Maintenance Programme in FY 2015/16........ 43Table 32: Physical Performance of MC’s Road Maintenance in FY2014/15-FY 2015/16......... 43Table 33: Summary of DUCAR (DLGs&MCs) Physical Performance in FY 2014/15 – 15/16 44Table 34: Performance of Routine Manual Maintenance on Public Roads - FY 2015/16....... 45Table 35: Routine Mechanized Maintenance by Road Surface and Road Network – FY 2014/15 46Table 36: Performance of Periodic Maintenance by Road Surface and Network Category 47Table 37: Performance of Maintenance of Bridges, Weighbridges and Ferries - FY 2015/16 48

iv Uganda Road Fund I Annual Report FY 2015/2016

Table 38: Trends in DA’s physical performance since FY 2010/11- 2015/16.............................. 49Table 39: Statement of Financial performance (Based on classification of expenditures ... by nature)................................................................................................................... 50Table 40: Statement of Financial Position............................................................................... 51Table 41: Statement of Changes in Equity (net worth)........................................................... 51Table 42: Cash flow Statement for FY 2015/16.......................................................................... 52Table 43: Reconciliation of movement of cash during the Year.............................................. 53Table 44: For purposes of the cash flow statement, cash and cash equivalents.................... 53Table 45: Statement of Appropriation Account [Based On Services Voted]......................... 54Table 46: Statement of Appropriation Account [based on nature of expenditure]............... 55Table 47: Reconciliation of Total Expenditure per Statement of Appropriation................... 56Table 48: Global Allocation of Funds, FY 2016/2017................................................................ 60Table 49: Summary of Road Maintenance Activities Planned for FY2016/17......................... 60Table 50: Strategies to Improve Road Maintenance Financing.............................................. 61

vUganda Road Fund I Annual Report FY 2015/2016

List of Figures

Figure 1: Organizational Structure of the Secretariat as of 30th June 2016............................. 5

Figure 2: Description of Organisational Functional Areas....................................................... 6

Figure 3: Institutional linkages - 30th June 2016....................................................................... 8

Figure 4: URF Funding Process.................................................................................................. 32

Figure 5: Global Budget Allocation FY 2015/16.......................................................................... 33

Figure 6: Percentage Disbursements by Category of Agencies– FY 2015/16............................ 35

Figure 7: Disbursed Funds against IPFs of DA’s and Sub-Agencies, FY 2015/16...................... 36

Figure 8: DA’s absorption against disbursed and available funds in FY 2015/16...................... 37

Figure 9: DA’s Financial Performance of Designated Agencies - FY 2015/16........................... 38

Figure 10: Trend of Road Maintenance Financing, FY 2010/11 – 2017/18................................... 40

Figure 11: Trend of UNRA performance in FY 2010/11-2015/16.................................................. 41

Figure 12: The trend of KCCA Physical performance since 2013/14 todate................................ 42

Figure 13: Trend of DUCAR Physical performance since 2010/11 todate................................... 44

Figure 14: Routine Manual Maintenance by Road Surface and Network Category.................. 45

Figure 15: Routine Mechanized Maintenance by Road Surface and Network Category.......... 46

Figure 16: Periodic Maintenance by Road Surface Type and Category in FY 2015/16............... 47

Figure 17: Performance of Bridges maintenance in FY 2015/16.................................................. 48

Figure 18: Trends in DA’s physical performance for FY 2010/11- 2015/16................................... 49

Figure 19: Trend of Bridges maintenance since FY 2010/11- 2015/16.......................................... 49

vi Uganda Road Fund I Annual Report FY 2015/2016

Abbreviations and Acronyms

ADB African Development Bank

AA Accountant Financial Accounting

ARMFA African Road Maintenance Funds Association

BARC Board Audit and Risk Committee

BCC Budget Call Circular

BFP Budget Framework Paper

CAA Civil Aviation Authority

CAO Chief Administrative Officer

CCO Corporate Communications Officer

CDC Capacity Development Component

CFO Chief Finance Officer

DANIDA Danish International Development Agency

DAs Designated Agencies

DLG District Local Government

Dips Development Partners

DRC District Roads Committee

DUCAR District, Urban and Community Access Roads

EU/ EC European Union/ European Commission

FABC Finance and Administration Board Committee

FA Force Account

FY Financial Year

GAPR Government Annual Performance Report

GoU Government of Uganda

H2 Second Half of Financial Year

HRO Human Resource Officer

IA Internal Auditor

IFMS Integrated Financial Management System

IPFs Indicative Planning Figures

JAF Joint Assessment Framework

JTSR Joint Transport Sector Review

KCC Kampala City Council

KCCA Kampala Capital City Authority

KPI Key Performance Indicator

LC Local Council

LG Local Government

LTA Long term Technical Assistance

MC Municipal Council

M&E Monitoring and Evaluation

MDA Ministries, Departments and Agencies

viiUganda Road Fund I Annual Report FY 2015/2016

MEO Monitoring and Evaluations Officer

MIS Management Information System

MFPED Ministry of Finance, Planning and Economic Development

MoLG Ministry of Local Government

MoWT Ministry of Works and Transport

MTEF Medium Term Expenditure Framework

NTR Non- Tax Revenue

OAG Office of the Auditor General

OBT Output Budgeting Tool

OPM Office of the Prime Minister

OYRMP One Year Road Maintenance Plan

PDUA Procurement and Disposal Unit Assistant

PFAA Public Finance and Accountability Act

PM Periodic Maintenance

PPDA Public Procurements & Disposal of Public Assets Authority

PPMS Procurement Performance Monitoring System

PSBC Planning and Strategy Board Committee

Q Quarter

RAMPS Road Asset Management and Planning System

RM Routine Maintenance

RMMS Road Maintenance Management and Monitoring System

RUCs Road User Charges

STE Short Term Expert

SWG Sector Working Group

TA Technical Assistance

TC Town Council

TMT Top Management Team

UBOS Uganda Bureau of Statistic.s

UGX Uganda Shillings

UNRA Uganda National Roads Authority

URA Uganda Revenue Authority

URC Uganda Railways Corporation

URF Uganda Road Fund

USD United States Dollar

WB World Bank

viii Uganda Road Fund I Annual Report FY 2015/2016

Our Vision

To provide adequate financing for maintenance of public roads

Our Mission

To provide effective and sustainable financing for maintenance of public roads; build partnerships with stakeholders and serve with integrity

Core Values

• Prudence

• Transparency

• Integrity

• Value

Prudence - Transperancy - Integrity - Value

ixUganda Road Fund I Annual Report FY 2015/2016

FOREWORD BY CHAIRPERSON OF BOARD

Merian Sebunya

BOARD CHAIRPERSON

It gives me great pleasure as the Chairperson of the Uganda Road Fund (URF) Board, to present the annual report of the Fund for the sixth full year of operation since commencement in January 2010.

The report is a statutory requirement issued in compliance with section 39 of the URF Act 2008. It details achievements of the Fund in the period of reporting. It also contains a section on the URF Audited accounts for Financial Year 2015/16 by Office of the Auditor General whose opinion has been unqualified for the period.

At the outset, I sincerely thank the Minister of Finance, Planning and Economic Development and the Ministers of Works and Transport and Local Government for effectively playing their statutory role of providing policy guidance to the Fund during the period of reporting, directly and through their respective ministries’ representatives on the Board. I also recogonise the role of the engineering and accountancy professions, passenger and goods transporters through their representatives on the Board. I also thank the Board and the URF Secretariat for judiciously managing the road maintenance funding portfolio worth UGX 418bn in FY 2015/16 which contributed to the reduction of roads in poor condition by approximately 5%.

Furthermore, I recognise the role of key stakeholders and the Development Partners support and advice on policy matters on road maintenance in the period. The ranges of outputs from the last EU Technical Support provided to the Fund from November 2012 to February 2014 have continued to yield tangible fruits in respect of systems establishment, planning, and accountability and reporting.

During the period, the Board relied more on followup of the implementation of the 5 year corporate and 5 year road maintenance strategic plans in place. It met 20 times (7 as a full Board and 13 times as Committees). The key achievements included advancement of the design for the URF permanent office, drawing up strategies for road maintenance improvement and systems for sustainable value for money practices.

However, full operationalization of the fund still remains an outstanding task for Government to carry through to completion. This requires that section 14 of the URA law get amended to enable URF directly access lines of road user charges as specified in section 21 (3) of the URF Act, with a view to stabilising road maintenance funding. I also encourage all stakeholders in Government to join effort in providing funding for mitigation of backlog escalation so as to return the dilapidated sections of the network to a maintainable state.

x Uganda Road Fund I Annual Report FY 2015/2016

STATEMENT BY THE EXECUTIVE DIRECTOR

Introduction

This report presents the performance of Uganda Road Fund during the sixth full financial year (FY 2015/16) of operation since its establishment by Act of Parliament in August 2008.

The report responds to section 39 of the URF Act by reporting achievements of the Fund for the resources appropriated to it by Parliament to finance maintenance of public roads in FY 2015/16.

During this fiscal year, revenue streams into the URF were only realized from appropriations by Parliament through quarterly Treasury releases drawn from the Consolidated Fund. Collection and direct remittance of road user charges still awaits amendment of section 14 of the URA Act. A total of UGX 417.93bn was allocated to URF for road maintenance of public roads by Parliamentary appropriations in May 2015 as part of the Transport Sector financing plan for FY 2015/16. This was UGX 10.172bn less than the UGX 428.102bn in FY 2014/15 (equivalent to 2.4%

budget decrease).

A total of UGX 357.589bn was released to URF from the Treasury, representing approximately 85.6% of the approved annual budget and reflecting funding cut of 14.4%. The Fund disbursed a total of UGX 347.909bn to the URF Designated Agencies (DAs) to finance their respective annual road maintenance programmes while a total of UGX 8.329bn (equivalent to 2.3% of the received funds) was retained for operational costs of the URF Secretariat.

Major Achievements

FY 2015/16 coincided with the 2nd year of implementation of the URF 5-year Road maintenance financing strategic plan (for the period 2014/15 – 2018/19). The year also saw accelerated implementation of the 5-year Corporate Plan (for the period 2013/14-2017/18). The achieved milestones of the Corporate Plan included advancement of the design for URF permanent office now at the approval stage, recruitment of 6 staff to fill key vacant posts including that of the Manager Policy and Strategy, preparation of the 7th OYRMP for FY 2016/17, improved oversight of DA’s through increased technical and financial audits covering 26 DAs (equivalent to 19.2% of the total agencies against a set target of 25%).

Other key achievements included the conducting of the Road Users Satisfaction Survey (RUSS) under URF, rolling out of the road maintenance management system (RMMS) to improve DA’s reporting and accountability, filing of the statutory procurement reports with PPDA and OBT reports to the Office of the Prime Minister

(OPM) and MFPED.

URF also disbursed 99.6% of the released road maintenance funds in the amount of UGX 349.260bn from the Treasury to all the 135 designated agencies of which 99.8% was utilised, undertook monitoring and evaluation in 55 agencies representing 70.5% of the target 78 funded DA’s portfolio. The Fund also prepared and submitted to the office of the Auditor General the final URF accounts for FY 2015/16 and successfully responded to queries by the OAG and PPDA.

Furthermore, the Fund engaged MFPED on the establishment of the 2nd generation road fund and the key Sector stakeholders on the ongoing review of the prevalent FA grey areas and establishment of TSUs as the way forward to ensure effective DAs oversight and sustainable value for money in road maintenance.

A special commitment in the year was the rolling out of extended periodic maintenance in form of tarmacking 12.8km of selected roads in 20 selected Town Councils and one Municipal Council to reduce on maintenance costs, control dust and stimulate development.

Challenges

The key challenge experienced by the Fund during the period was inadequate funding of road maintenance, leading to continual deferment of scheduled maintenance, a major driver for backlog. In FY 2015/16, the road maintenance budget from the Consolidated Fund (UGX 417.930) was only 28% of the required funding in URF’s Strategic Road Maintenance Financing Plan (5YRMP for FY 2014/15 – FY 2018/19) which left a funding gap of UGX 1.083

xiUganda Road Fund I Annual Report FY 2015/2016

Trillion. The Fund estimates that it requires about UGX 800bn per year to optimally finance public road maintenance but due to the underfunding over time, the backlog has kept accumulating due to the deferred maintenance.

Other challenges faced included persistent weak institutional capacities of DA’s to plan and deliver road works in time; weakness in oversight by District Road Committees (DRCs); extreme deterioration of some sections of the public road network; grey areas in force account policy implementation; poor coordination of agencies funding road maintenance in local governments; poor reporting and accountability of DAs; URA garnishing of road maintenance funds to recover taxes, slow procurement of periodic maintenance projects, lack of total quality

management systems by DAs and outdated classification of the road network.

Way forward

As a way forward, the Fund will intensify coordination with MFPED to enable Government undertake amendment of section 14 of URA law to facilitate full operationalisation of the Fund, fast track implementation of the key strategic plans (i.e. the 5-year corporate plan and the 5 year road maintenance strategic financing plan), rollout of the RMMS, liaison with UNRA on procurement delays and timely fund releases to stations, review of FA grey areas and improved oversight through establishment of regional TSUs.

Conclusion

Due to the 14.4% funding cut experienced during FY 2015/16 and the above mentioned challenges, the performance of combined routine and periodic maintenance declined by about 8.6%. URF shall focus on addressing the key challenges e.g. elimination of grey areas in Force Account, URA garnishing of maintenance funds, slow procurement, so as to realize sustainable continuous improvement in roads maintenance and value for money.

Eng. Dr. Michael M. Odongo

EXECUTIVE DIRECTOR/SECRETARY TO BOARD

xii Uganda Road Fund I Annual Report FY 2015/2016

EXECUTIVE SUMMARYIntroduction

Financial year 2015/16 was the sixth full year of operation of the Uganda Road Fund (URF). During this fiscal year, revenue streams into the URF were only realized from appropriations by Parliament through quarterly Treasury releases drawn from the Consolidated Fund. Collection and direct remittance of road user charges still awaits amendment of section 14 of the URA Act. A total of UGX 417.93bn was allocated to URF for road maintenance of public roads by Parliamentary appropriations in May 2015 as part of the Transport Sector financing plan for FY 2015/16. This was UGX 10.172bn less than the UGX 428.102bn allocated in FY 2014/15 (equivalent to 2.4% budget decrease).

During the year, a total of UGX 357.589bn was released to URF from the Treasury, representing approximately 85.6% of the annual budget representing an overall 14.4% funding cut. The Fund disbursed a total of UGX 347.909bn to the URF Designated Agencies (DAs) to finance their respective annual road maintenance programmes as summarised in Table 1(a) and illustrated in Figure 1 (a) below. A total of UGX 8.329bn was retained for operational costs of the URF Secretariat. On average, the disbursements to UNRA took an average of 9.3 calendar days and 13.2 calendar days to DUCAR agencies, from the dates of receipt of funds from MoFPED.

Table 1(a): Summary of Treasury Releases, URF Disbursements and Expenditures in FY 2015/16

Agency

Annual Budget

FY 2015/16(UGX bn)

Funds rolled

over from FY 2014/15(UGX bn)

Releases FY 2015/16(UGX bn)

Total Funds

available FY 2015/16(UGX bn)

Funds disbursed

(UGX bn)

Actual Expenditure

FY 2015/16(UGX bn)

Unspent balances

FY 2015/16(UGX bn)

% of available

funds spent FY 2015/16

(a) (b) (c) (d) = b+c) (e) (f) (g) = (d-f) (h) = f/d)

UNRA 267.917 4.251 241.098 245.349 241.098 244.964 0.390 99.8%DUCAR 122.005 3.756 93.424 97.180 92.073 91.499 5.680 94.2%KCCA 19.525 11.207 14.738 25.945 14.738 31.305 -5.359 120.7%Sub Total 409.446 19.214 349.260 368.474 347.909 367.768 0.701 99.8%URF Secretariat 8.484 - 8.329 8.329 8.329 8.326 0.000 100%

Total 417.930 19.214 357.589 376.803 356.238 376.094 0.701 99.8%

Source: URF Final Accounts & DA’s Quarterly Progress Reports for FY 2015/16

Figure 1(a): Performance of disbursements against Released Funds in FY 2015/16

xiiiUganda Road Fund I Annual Report FY 2015/2016

Although the Fund budget suffered a general cut of 14.4% in FY 2015/16, the Secretariat ensured that 100% of the allocated funds for CARs and emergencies were disbursed to the respective DA’s as they were already grappling with relatively minimal budgets. About UGX 1.4bn originally allocated for tarmacking of TC roads, was re-allocated by the Board to offset the URF offices rent increase due to forex volatility.

During the year, the public roads network was managed by 135 DAs (2 authorities (UNRA and KCCA) and 111 DLGs and 22MCs). The districts oversaw Town Councils and Sub-counties as their sub-agencies. In total there were 1,109 sub-counties and 176 town councils as sub-agencies of the respective district local governments. The DAs and sub-agencies collectively looked after a total of 107,020km of public roads made up of 20,563km of national roads under UNRA management; 1,207km of KCCA roads; 30,000km of district roads; 8,500km of urban roads managed by town councils; 4,500km of urban roads managed by Municipal Councils; and 42,250km of Community Access Roads (CARs) managed by sub-counties.

The funded road maintenance programmes during the year included routine and periodic maintenance of public roads, road safety aspects and various categories of bridges maintenance. The key innovation funded during the year was the rollout of the extended periodic maintenance to town council roads (in form of tarmacking of 12.8km of roads in selected 20 Town Councils and 01 Municipal Council). Operational expenses of UNRA and to a lesser extent for KCCA and DUCAR agencies were as well met by the Fund. The scope of work and extent of financing was agreed with DAs in the annual performance agreements signed by the Fund and the agencies.

UNRA and KCCA employed a mix of force account and contracting to deliver maintenance interventions on national and city roads respectively. The Local Governments mainly employed force account and road gangs to deliver maintenance interventions on the DUCAR network in line with the existing Force Account Policy that was introduced in FY 2012/13 and utilising Government supplied road equipment obtained from China.

During the planning process, DAs prepared annual road maintenance programmes and submitted them to URF for consolidation into the One Year Road Maintenance Plan (OYRMP) as required under Section 25 of the URF Act. The FY 2015/16 OYRMP was presented to Parliament by the Minister for roads which was approved as part of the transport sector ministerial budget policy statement in May 2015.

Disbursements to UNRA, KCCA, districts and municipalities were made on a quarterly basis. The agencies submitted accountabilities for the funds to URF on a quarterly basis as well. Sub-agencies accounted through their respective districts.

Key Achievements

During the period of reporting, the fund registered a number of achievements which included improved DA’s physical performance especially in routine maintenance across the entire road network, periodic maintenance of paved national and City roads and bridges maintenance under DUCAR.

The summary of the DA’s physical performance achievements against the plan for FY 2015/16 is shown in Table 1 (b) below:

Table 1 (b): Summary of DA’s Physical Performance achieved in FY 2015/16

SUMMARY OF DA’s PHYSICAL PERFORMANCE IN FY 2015/16 COMPARED TO FY 2014/15

S/N Works Category

FY 2014/15 FY 2015/16 % of Funded

Achieved

% of Planned Achieved

Funded Qty

Achieved Qty

% funded achieved

Planned Qty

Funded Qty

Achieved Qty

1 UNRA – Uganda National Roads Maintenance

1 Routine Maintenance

1.1 Manual (km) 12,300 12,300 100% 8,600 7,878 12,234 155% 142%

Mechanized (km) 15,500 13,178 85% 16,500 15,114 15,404 102% 93%

1.2 Periodic Maintenance

Paved (km) 95.3 20 21% 100 92 69 75% 69%

Unpaved (km) 2,125 1510 71% 2,012 1,843 901 49% 45%

1.3 Bridges

Routine (No) 286 250 87% 350 321 85 26% 24%

xiv Uganda Road Fund I Annual Report FY 2015/2016

SUMMARY OF DA’s PHYSICAL PERFORMANCE IN FY 2015/16 COMPARED TO FY 2014/15

S/N Works Category

FY 2014/15 FY 2015/16 % of Funded

Achieved

% of Planned Achieved

Funded Qty

Achieved Qty

% funded achieved

Planned Qty

Funded Qty

Achieved Qty

Periodic (No) 7 1 14% 7 6 0 0% 0%

1.4 Road safety (km)

Street lighting (km) 55 55 100% 55 50 55 110% 100%

Road Signage (km) 4000 0 0% 3,500 3,206 0 0% 0%

Road marking (km) 800 37 5% 2,479 2,271 66 3% 3%

Reserves Demc (km) 450 91 20% 520 476 294 62% 57%

Weighbridges 10 10 100% 15 15 15 100% 100%

1.5 Ferries and Landing Sites

Ferries 9 9 100% 9 9 8 89% 89%

1.6 Other Qualifying work

Low-cost sealing (km) 5 0.5 10% 2.5 2.3 0 0% 0%

2 KCCA- Kampala City Roads

2.1 Routine Maintenance

Mechanized (km) 930 939 101% 860 800 918 115% 107%

2.2 Periodic Maintenance

Paved /unpaved(km) 25.03 5.0 20.0% 10 8 10 125% 100%

3 DUCAR (DLGs & MCs)

3.1 Manual Maintenance

Manual (km) 37,393 32,462 87% 31,631 24,229 27,452 113% 87%

Mechanized (km) 10,637 9,157 86% 11,606 8,890 7,563 85% 65%

3.2 Periodic Maintenance

Paved/unpaved (km) 3,069 2,842 93% 2,967 2,273 1,669 73% 56%

3.3 Bridges

Routine/PM (No) 78 91 117% 67 51 48 94% 72%

Culvert (Lines) 5,083 3,984 78% 3,137 2,403 1,236 51% 39%

As can be observed from Table (1 b), that:

a) There was a significant improvement in periodic maintenance of paved national roads which stood at 75% of the funded target in FY 2015/16 compared to 21% registered in FY 2014/15.

b) The performance of periodic maintenance on unpaved roads and bridges and low-cost sealing under UNRA fell below average compared to what was realised in FY 2014/15.

c) The achieved KCCA routine mechanised and periodic maintenance stood at 115% and 125% of the funded activities compared to 101% and 20% respectively realised in FY 2014/15 representing an overall improvement;

d) The achieved combined DUCAR routine and periodic maintenance was 36,684km representing a decline of about 17% compared to 44,461km realised in FY 2014/15;

e) The DUCAR bridges maintenance also declined by about 27% compared to that

realised in FY 2014/15.

Other key achievements registered by the Fund in FY 2015/16 included:

a) Rolling out of the extended periodic maintenance of 12.8km in 20 selected Town Councils and one Municipal council to boost commerce and poverty reduction in local areas;

b) Implementation of the 5-year Corporate plan to address URF strategic objectives which included full operationalization of the 7S’s (i.e. systems, structure, strategy, staff, skills, styles and shared values of the Fund), advancement of the design for the URF permanent office now at the approval stage, recruitment of 6 staff to fill vacant posts and preparation of the OYRMP for FY 2016/17 among others. The overall achievements against the Corporate Plan targets for FY 2015/16 stood at 89% in FY 2015/16 compared to 78% in 2014/15 (equivalent to 11%) as shown in Table 14;

c) Improved oversight of DAs road maintenance

xvUganda Road Fund I Annual Report FY 2015/2016

activities through increased technical and financial audits to minimize misuse of funds. During the year, technical and financial Audits were undertaken in 26 agencies (out of the total 135 Agencies) equivalent to 19.2% compared to 7.8% coverage in FY 2014/15. The attendant findings were fed back into the planning and the programming process for FY 2016/17. Furthermore, Monitoring & Evaluation exercises covered 55 agencies out of the planned 78 agencies (equivalent to 70.5% of target).

d) Conducting of the Road Users Survey (RUSS) by URF for the first time, the outcome of which will be shared with stakeholders in due course.

e) Review and implementation of the communications strategy which has led to improved information flow and branding of URF;

f) Recalibration of the funds allocation formula in preparation for use in drawing up of the DAs IPFs for FY 2016/17;

g) Implementation of the 2nd year of the URF 5 year road maintenance financing strategic plan (for FY 2014/15-2018/19) developed in accordance with section 25 of the URF Act. A summary of the realised financial and physical performance in the 2nd year plan targets are outlined in Table 1 (d) while the full strategic plan is shown in Table 13.

Table 1(c): Summary of achievements 0n 5-YRMP Targets for FY 2015/16

Road Class

Road Works

Financial PhysicalUGX billion kms

2014/15 2015/16 2014/15 2015/16

5YRMP Actual % YRMP 5YRMP Actual %

YRMP 5YRMP Actual **

% YRMP 5YRMP Actual** %

YRMP

National Roads

Routine 234.9 159.8 68% 246.8 140.4 57% 20,551 16,103 78% 20,551 15,404 75%Periodic 157.5 95.5 61% 165.2 99.0 60% 8,128 1,530 19% 8,128 970 12%Bridges 13.0 1.8 14% 13.7 0.4 2.9% 293 251 86% 308 85 28%Ferries 20.0 10.0 50% 21.0 3.2 15% 9 9 100% 9 8 89%Axle Load 8.4 7.5 89% 8.8 2.3 26% 15 10 67% 15 15 100%

Sub-total* 433.8 274.4 63% 455.5 245.3 54% % RM&PM 61.5% % RM&PM 57.1%

DUCAR Network

Routine 154.4 73.8 48% 162.1 63.5 39% 86,463 41,619 48% 86,463 35,933 42%Periodic 640.2 71.8 11% 672.0 54.6 08% 11,817 2,841 24% 11,817 1,679 14%Bridges 7.7 0.9 12% 8.1 3.7 46% 67 91 136% 67 48 72%Sub-total 802.3 146.5 18% 842.2 121.8 14% % RM&PM 45.2% % RM&PM 38.3%

TOTAL (UGX)** 1,236 420.9 34% 1,298 367.1 28%

Key:Forex: 1 US $ =UGX 3,500*Exclude provisions for rehabilitation, upgrading and re-engineering of national roads (currently provided for under the UNRA Development budget).**Exclude URF Secretariat budget.RM&PM=Combined Routine manual & Periodic maintenanceIt can be observed from Table 1 (c) that:a) The overall realised funding against the 5YRMP

targets was 28% in FY 2015/16 compared to 34% in FY 2014/15 representing a decline of 6%.

b) The achieved National roads and DUCAR maintenance activities against the 5YRMP targets in FY 2015/16 stood at 57.1% and 38.3% respectively compared to 61.5% and 45.2% registered in FY 2014/15;

c) The achieved periodic maintenance was lowest on national roads and DUCAR as it stood at 12% and 14% respectively compared to 19% and

24% in FY 2014/15Challenges and proposed mitigation measuresThe key challenges experienced during the period included: 1) Inadequate road maintenance funds,

leading to continual deferment of scheduled maintenance, a major driver for backlog. In FY 2015/16, the road maintenance budget (of UGX 417.930) represented only 28% of the required funding in accordance with the URF’s Strategic Road Maintenance Financing Plan for FY 2014/15 – FY 2018/19, leaving a funding gap of UGX 1.083 Trillion responsible for the spiralling of the road maintenance backlog.

In mitigation, the following measures are needed:

a) Major capital investments to remove backlog and eliminate bottlenecks through undertakings for rehabilitation/reconstruction/upgrading of roads to bring

xvi Uganda Road Fund I Annual Report FY 2015/2016

the entire network to maintainable state. b) Government concurrent declaration of a fuel

levy by Amendment to the Uganda Revenue Authority Act to permit transfer of the road user charges to the URF account on a monthly basis; and by providing funds for maintenance backlog removal from the Treasury.

2) Several historical challenges that have compounded the effects of underfunding and have dogged effective maintenance, management and financing of the public roads network over the past decades.

These included:a) Weak institutional capacities of DUCAR

agencies especially in planning, management, reporting, and accountability which has resulted into poor maintenance practices and accumulation of backlog.

In mitigation, URF is pursuing establishment of regional TSUs and it will continue to work with other government entities in addressing the various forms of capacity gaps in DUCAR agencies.

b) Procurement delays hampering the implementation of road maintenance programmes and absorption of funds especially under UNRA.

In mitigation, URF will continue coordination with other government entities in addressing the underlying issues in delays to procurements;

c) Haphazard upgrading of community access roads especially by NGOs adding them to district roads without well-documented criteria that is uniform nation-wide.

URF proposes a review of the classification of roads in Uganda with a view of removing network size instabilities; functional inconsistencies; management ambiguities etc. The updated Roads Act is also awaited to guide on procedure of reclassifying upgraded road network.

d) Insufficient oversight among DUCAR designated agencies arising from the fact not all districts have constituted District Roads Committees (DRC) as required under section 25 of the URF Act following the 2016 elections.

In mitigation, URF plans to complete the process for establishment of DRC regulations and to dialogue with stakeholders in improving functionality of DRCs. In the meantime, personalised letters were sent to the newly elected MPs educating them on their roles as DRC members.

e) Irregular collection of data on size and condition of the DUCAR network.

In mitigation, URF will continue to coordinate with DAs, MoWT, and other stakeholders in collection of data on road inventories and condition.

f) Wide variations in unit costs of similar road maintenance works among DAs that can’t be explained by topographic and climatic differences.

In mitigation, URF is using a unit cost framework to harmonise unit rates across the different regions of the country and envelopes within which unit rates should fall per region are being issued out every FY as part of the planning and operational guidelines to URF DAs.

g) Low compliance with reporting requirements by designated agencies, which afflicts timely reporting on performance of the sector.

In mitigation URF plans to roll out use of a Road Maintenance Management and Monitoring System (RMMS) to improve planning, reporting and accountability among DAs.

h) Late release of funds from MoFPED, which in FY 2015/16 took an average of 17.8 calendar days from the start of each quarter.

In mitigation, URF will continue engaging MoFPED to ensure achievement of direct monthly remittances of RUCs to the URF account as envisaged under Section 21 (3) of the URF Act;

i) Loss of road maintenance funds to the Uganda Revenue Authority observed in some tax defaulting designated agencies.

In mitigation, URF, in its annual planning and operational guidelines to designated agencies, is advocating protection of road maintenance funds from garnishing by URA. Additionally, URF is enforcing refund of the garnished moneys from the agencies, though this takes time.

j) Grey areas in implementation of the force account policy which is the main method of road maintenance delivery in local governments.

In mitigation, URF will continue coordinating and synergizing with MoWT in revision and improvement of the Force Account policy.

k) Misuse and abuse of road maintenance funds by DAs. Audit and M&E activities carried out by the Fund in FY 2015/16 continued to uncover misuse and abuse of road maintenance funds

1Uganda Road Fund I Annual Report FY 2015/2016

by DAs. In mitigation, URF will step up its oversight functions, build synergies with audit functions of the DAs and other government entities, and actively follow up on implementation of the arising recommendations. Way forwardAs a way forward, the following key strategies are proposed to guide actions of the Fund in FY 2016/17:a) Intensified coordination with MFPED to

facilitate finalisation of the process for amendment of Section 14 of URA Act, to enable full operationalisation of Fund to a 2nd Generation Fund in the medium term;

b) Liaison with MoWT and other key stakeholders on review of FA grey areas, establishment of TSU’s and re-classification of the entire road network to remove prevalent ambiguities;

c) Instituting of total quality management systems in DAs to ensure sustainable value for money road maintenance service delivery.

ConclusionIn FY 2015/16, a total of 66,220km of combined routine and periodic maintenance was achieved by the DA’s compared to 72,413km in FY 2014/15 equivalent to a decrease of 8.6%. Similar the achieved bridges maintenance stood at 133 in FY 2015/16 compared 342 in FY 2014/15 equivalent to 61% decrease. Overall there was a decrease in the key road maintenance activities compared to that achieved in FY 2014/15.In this regard, there is need for more emphasis on roads periodic maintenance, major bridges maintenance, and installation of culverts to mitigate escalation of backlog maintenance and bottlenecks especially on DUCAR roads.

2 Uganda Road Fund I Annual Report FY 2015/2016

1.0 GENERAL INTRODUCTION1.1 Business of the Fund

The Uganda Road Fund (URF) was established by an Act of Parliament in 2008 to finance routine and periodic maintenance of public roads in Uganda principally from road user charges. The objective is to ensure that public roads are maintained at all times through provision of adequate and stable financing for routine and periodic road maintenance undertaken by Designated Agencies (DAs). It became operational in January 2010.

During FY 2015/16, the public roads network was managed by 135 DAs comprised of 111 Districts (DLGs), 2 Authorities (KCCA and UNRA) and 22 Municipalities (MCs). The districts oversaw Town Councils (TCs) and Sub-counties as their sub-agencies. In total there were 1,109 sub-counties and 174 town councils as sub-agencies of the respective district local governments. The DA’s and sub-agencies collectively looked after a total of 107,020km of public roads made up of 20,563km of national roads under UNRA management; 1,207km of KCCA roads; 30,000km of district roads; 8,500km of urban roads managed by town councils; 4,500km of urban roads managed by Municipal Councils; and 42,250km of Community Access Roads (CARs) managed by sub-counties.

Under Sections 21 and 22 of the URF Act, the Fund is required to facilitate delivery of road maintenance services through the collection of funds, principally from Road User Charges (RUCs), and financing approved annual road maintenance programmes contained in the annual road maintenance plan and expenditure programme (OYRMP). Section 22 of the Act also stipulates that the funds may be applied for routine and periodic maintenance of public roads, roads safety; operation expenses of UNRA and URF, research in road works and such activities relevant to maintenance of public roads as determined by the Board. The RUCs are supposed to accrue from fuel levies, transit fees, road license fees, axle load fines, weight/distance charges, bridge tolls and road tolls. Other sources include fines under the traffic and road safety Act; appropriations by parliament and revenues or assets received by the Fund in the performance of its functions under the Act.

During FY 2015/16, the only source of funds was appropriation by parliament. Collection and direct transfer of RUCs to URF account as envisaged in Section 21(3) of the URF Act could not take place owing to pending amendments to the Uganda Revenue Authority (URA) Act which

will enable direct transfer of funds from URA to URF. However, in FY 2014/15 the Fund established a RUCs collection and management framework in anticipation of the resolution of the lacuna in law.

Section 39 of the URF Act, requires the Board to submit to the Minister for Finance, a report after the end of each Financial Year, detailing activities and operations of the Fund. It also requires that the report should contain the audited accounts of the Fund and the Auditor General’s report on the accounts of the Fund; and such other information as the Board may consider necessary. The Minister is required to submit the annual report to Parliament within two months after receiving the report. Accordingly, this report has been prepared to cover URF performance for FY 2015/16 in fulfilment of the statutory requirements.

1.2 Statutory ObjectivesAccording to Section 6 of the URF Act, the statutory objectives of the Fund are to:

a) Finance the routine and periodic maintenance of public roads in Uganda;

b) Ensure that public roads are maintained at all times;

c) Advise the Minister, in consultation with the Minister responsible for roads and the Minister responsible for local governments on -

i) The preparation and efficient and effective implementation of the Annual Road Maintenance Programme (OYRMP); and

ii) The control of overloading of vehicles on public roads.

1.3 Strategic ObjectiveThe strategic objective of the Fund as laid out in its 5-year Corporate Plan for FY 2013/14-2017/18 is to:

Ensure adequate, reliable and timely financial resources for routine and periodic maintenance of public roads, efficient management of maintenance planning and oversight and accountability for road maintenance funds.

1.4 Specific ObjectivesThe specific objectives of the Fund to facilitate the achievement of the Strategic Objective are to:

i) Strengthen institutional capacity for better

3Uganda Road Fund I Annual Report FY 2015/2016

service delivery;

ii) Efficiently and effectively mobilise and administer funds for maintenance and safety of public roads;

iii) Ensure effective and timely preparation of road maintenance programmes;

iv) Strengthen oversight to ensure sustainable total quality management of road works and satisfactory accountability for road maintenance funds;

v) Improve coordination with stakeholders and build strong partnerships to facilitate efficient and effective policy implementation.

1.5 Business ProcessesTo fulfil its mandate the Fund functions through the key business areas of funding operations; impact of funding; corporate governance; and administration and human resource management as expounded below:

1.5.1 Funding Operations

This business area relates to how funds are sourced and applied in relation to the One Year Road Maintenance Plan (OYRMP). The functions of the Fund under this key business area include:

i) Collection of maximum proportion of potential revenue on time and ensuring deposit of the revenues to the account of the Fund;

ii) Ensuring liquidity of the Fund at all times;

iii) Ensuring that disbursement of monies of the Fund is undertaken fully in accordance with commitments and on time; and

iv) Ensuring full accountability of all disbursed funds.

1.5.2 Impact of Funding

This area relates to the judicious use of maintenance resources evidenced by improvements in factors such as percentage of road network in fair to good condition, vehicle operating costs, journey times and safety. As outlined in the OYRMP for FY 2015/16, it was envisaged that the overall road network condition would improve by 5% during the period.

The functions of the Fund under this key business area include:

a) Bringing about sustained improvement of road condition of all classes of public roads by ensuring stable and reliable financing;

b) Encouraging techniques and procurement

models that reduce the unit cost of road maintenance activities through regular and efficient monitoring and audits;

c) Reducing the incidence of fatal and personal injury accidents by improvement of road condition and by funding specific targeted improvements; and

d) Bringing about progressive increases in road user satisfaction through feedback systems including holding of regular stakeholder’s forums.

1.5.3 Corporate Governance

This business area relates to the oversight functions of the Fund Management Board as envisaged in the URF Act and in line with the best practice principles of corporate governance. Functions of the Fund under this key business area include:

i) Ensuring effective oversight by the Board through full and regular attendance of meetings by members;

ii) Developing and implementing a statistically robust and defensible programme of monitoring and evaluation, augmented by a technical and financial audit programme; and

iii) Reporting comprehensively and in a timely manner on the activities of the Fund.

1.5.4 Administration and Human Resource

This business area relates to capacity of the Secretariat and its support functions. The functions of the Fund under this key business area include:

i) Recruiting and retaining appropriately qualified, experienced and motivated secretariat staff under the leadership of the Executive Director;

ii) Administering the Fund effectively and efficiently with due regard to limitations of overhead costs within acceptable budgeted limits.

1.6 Organization StructureThe administration of the Fund has two components: the Fund Management Board who are responsible for policy/strategic guidance and governance and the Secretariat, which takes responsibility for the day-to-day administration and management of the activities of the Fund.

4 Uganda Road Fund I Annual Report FY 2015/2016

1.6.1 The Fund Management Board

The Fund is governed by a 7-member Fund Management Board, which is mandated under Section 7 of the URF Act to manage the business of the Fund in accordance with sound commercial principles to enable efficient, effective and stable road maintenance expenditures through the RUCs system.

The Management Board is comprised of three members from the public sector and four members from the private sector as shown in Table 1, which also shows the respective position holders in FY 2015/16.

Table 1: Composition of URF Board as at 30th June 2016

No. Name Representation Position1. Mrs. Merian Sebunya Freight Forwarders Chairperson2. Eng. Victor Ocaya Professional Engineers Member3. Ms. Rosemary Owino Professional Accountants Member4. Mr. Nathan Byanyima Passenger Transport Services Member

5. Mr. Kenneth Mugambe Ministry of Finance, Planning and Economic Development (MFPED) Member

6. Eng. Robert Rwanga Ministry of Works and Transport (MoWT) Member7. Mr. Paul Okot-Okello Ministry of Local Government (MoLG) Member8. Eng. Dr. Michael M. Odongo URF Secretariat ED/Board Secretary

1.6.2 The Secretariat

The Secretariat is headed by the Executive Director and is responsible for the day-to-day management of the Fund and for the implementation of the decisions of the Board in line with Section 16 of the URF Act.

In FY 2015/16, the Secretariat organisational structure was revised as shown in Figure 1. The Secretariat is functionally comprised of seven pillars that include: fund management, policy and strategy, planning and programming, monitoring and evaluation, corporate services, procurement and disposal of assets and internal audit. The functional areas of the Fund constitute the seven pillars as shown in Figure 2.

The Executive Director and the 7 departmental managers constitute the Fund Management Committee (FMC), which is the top technical and management organ of the Secretariat, reporting to the Board.

5Uganda Road Fund I Annual Report FY 2015/2016

Figu

re 1:

Org

aniz

atio

nal S

truc

ture

of t

he S

ecre

tari

at a

s of

30th

June

201

6

Boar

d of

Di

rect

ors

RFI E

xecu

tive

Dire

ctor

RF2

Man

ager

-In

tern

al A

udit

RF3

Tech

nica

l Au

dito

r

RF3

Inte

rnal

Au

dit

RF3

Fina

nce

Offic

er-F

inan

cial

Ac

coun

ting

RF4

Acco

unta

nt

Fina

ncia

l Ac

coun

ting

RF3

Mon

itori

ng &

Ev

alua

tion

Offic

er

RF3

Prog

ram

Of

ficer

Nat

iona

l Ro

ads (

Vaca

nt)

RF3

Hum

an

Reso

urce

Offi

cer

RF3

Lega

l Offi

cer

Vaca

nt

RF7

Driv

ers (

1)(V

acan

t)

RF3

Syst

ems

Adm

inis

trat

or

RF8

Offic

eAs

sist

ant

RF4

Exec

utiv

e As

sist

ant

RF3

Adm

inis

trat

ive

Offic

er

RF9

Offic

eAt

tend

ant

RF4

Proc

urem

ent &

Di

spos

al U

nit

Assi

stan

t

RF3

Corp

orat

e Co

mm

unic

atio

ns

Offic

er

RF6

Clie

nt R

elat

ions

As

sist

ant (

Vaca

nt)

RF3

Fina

nce

Offic

er-M

anag

er

Acco

untin

g

RF4

Acco

unta

nt

Man

agem

ent

Acco

untin

g (V

acan

t)

RF3

Mon

itori

ng &

Ev

alua

tion

Offic

er

(Sta

tistic

s)

RF3

Hea

d Pr

ocur

emen

t &

Disp

osal

Uni

t

RF3

Prog

ram

Offi

cer

DUCA

R

RF2

Man

ager

-Fu

nd

Man

agem

ent

RF2

Man

ager

-Pr

ogra

mm

ing

RF2

Man

ager

-M

onito

ring

&

Eval

uatio

n

RF2

Man

ager

Co

rpor

ate

Serv

ices

RF2

Man

ager

Po

licy

&

Stra

tegy

RF3

Fina

nce

Offic

er-F

inan

cial

Ac

coun

ting

RF3

Fina

nce

Offic

er-M

anag

er

Acco

untin

g

6 Uganda Road Fund I Annual Report FY 2015/2016

Figu

re 2

: Des

crip

tion

of O

rgan

isat

iona

l Fun

ctio

nal A

reas

7Uganda Road Fund I Annual Report FY 2015/2016

1.7 Institutional Relationships The Uganda Road Fund falls within the policy oversight of the Ministry of Finance, Planning and Economic Development (MFPED) while it reports and account to Parliament through the Works and Transport Sector headed by the Minister for roads.

In the Works and Transport Sector, programmes and actions of key institutions are coordinated through the Sector Working Group (SWG). The works and Transport Sector SWG is led by Ministry of Works and Transport. It composes of; MoFPED, MoLG, Institutions in the Transport Sector notably URF, UNRA, CAA and URC, Civil Society, DPs, Consultants and Contractor providers. Its functions are based on the sector wide coordination principles and framework.

In addition to the MFPED policy oversight to the Fund, there exists a consultative arrangement with the MoWT and MoLG. Figure 3 shows the key features of the sector institutional linkages with the URF. The Minister for roads is mandated under Section 28 of the Act to table Annual Road Maintenance Plans and performance statements of the Fund before Parliament.

8 Uganda Road Fund I Annual Report FY 2015/2016

Figu

re 3

: Ins

titu

tion

al li

nkag

es -

30th

June

201

6

9Uganda Road Fund I Annual Report FY 2015/2016

2.0 Performance of URF in FY 2015/162.1 OverviewThis Chapter presents the performance of the Fund in FY 2015/16 on the basis of the governance functions of the Board and the key functional areas of the Fund. It also covers rating of the FY 2015/16 key performance indicators (KPI’s) in the various business areas of the Fund and the respective component in the Government Annual Performance Report (GAPR).

2.2 Governance and AdministrationSection 7 of the URF Act established a Fund Management Board which is required to manage the business of the Fund on sound commercial principles to enable effective, efficient and stable road expenditures through implementation of a road user charges system. The Fund Management Board is responsible for the governance and general management of the Fund. The URF Secretariat on the other hand is responsible for the day-to-day management of the Fund and for the implementation of decisions of the Board. The performance of the Board and the Secretariat in FY 2015/16 are respectively outlined in sections 2.3 and 2.4

2.3 Performance of the Fund Management Board

During FY 2015/16, the Fund was supervised by a seven member Board with representatives from the engineers’ profession, accountants’ profession, passenger transporters, and freight transporters, MFPED, MoWT and MoLG as shown in Table 1. The Board membership was fully constituted in the year as required by the Act.

The three Board Committees established in FY 2011/12 to increase effectiveness of the Board in the discharge of its functions under section 14 of the URF Act operated normally throughout the year. They included the Finance and Administration Board Committee (FABC), Board Audit and Risk Committee (BARC), and the Policy and Strategy Board Committee (PSBC)). Composition of the Board Committees during the year was as shown in Table 1 and Annex 4.

In FY 2015/16, the Board held 7 full board meetings representing 87.5% of the total planned meetings compared to 10 meetings (125%) held in FY 2014/15. The Board Committees held a total of 13 meetings

disaggregated as 4 meetings for BARC; 4 for PSBC; and 5 meetings for FABC representing (125%) of the total planned Board Committee meetings. In addition, Board members attended 4 joint URF/PPDA meetings on the design and construction of offices.

2.4 Performance of the Fund Secretariat in FY 2015/16

Section 16 of the URF Act designates the Executive Director (ED) as the head of the Secretariat. The Fund Management Committee (FMC) comprises the Top Technical Team of the Secretariat whose membership includes the ED as chairperson and all departmental heads as members. In FY 2015/16 the FMC held 26 meetings (of which 22 were scheduled and 4 special meetings) against the planned 24 FMC meetings representing 108% achievement. The performance of the Fund Secretariat in FY 2015/16 under its functional areas is presented in the sections 2.4.1 – 2.4.7.

2.4.1 Corporate Services

The Corporate Services Department is responsible for human resource, legal services, general administration, corporate communications and systems administration functions of the Fund. Under this Department, the Fund undertook operational and management activities in the above areas including provision of legal Advisory and Support services to the Fund Management Board and Committees, review of the draft URF regulations 2015 and general administration works. In addition the Fund undertook revisions of the Human Resource, Administration, I.C.T Policy manuals; staff training policy / plan and routine IT resource works.

The Fund finalized the recruitment process for six staff who included the Manager Policy and Strategy(MPS), Financial Accountant (FA), Internal Auditor (IA-Technical), Human Resource Officer (HRO), Monitoring and Evaluation Officer (MEO-Statistics), and Procurement and Disposal Unit Assistant (PDUA) who reported for duty on 1st July 2015.

The staffing level of the Secretariat as at 30th June 2016 based on the positions filled stood at 30 staff out of the revised establishment of 36 as summarized in Table 2.

10 Uganda Road Fund I Annual Report FY 2015/2016

Table 2: Filled staff positions as at 30th June 2016

SN Position Establishment30th June 2015 30th June 2016

Filled Vacant Filled Vacant1. Executive Director 1 (Scale SG 1) 1 0 1 02. Managers 6 (Scale SG 2) 6 0 6 03. Officers 19 (Scale SG 3-4) 15 4 15 44. Assistants 1 (Scale SG 5-6) 2 1 1 25. Support 9 (Scale SG 7-9) 7 0 7 0Total 36 31 5 30 6

6. Interns 9 n/a 15 n/a

As result, the average percentage of filled staff positions during FY 2015/16 stood at 81.0% compared to 65.7 % in FY 2014/2015 which was a big improvement in staff availability.

The Fund also engaged a total of 15 interns from various disciplines who benefited from industrial training while side by side leveraging the staffing capacity of the Fund. Table 3 outlines a summary of key achievements of the Fund under the Corporate Services function in FY 2015/16.

Table 3: Key Achievements Corporate Services in FY 2015/16.

SN Sub-function Planned Achieved output Remark (s)1. Systems Admin Routine maintenance of ICT

infrastructure;Well maintained ICT systems.

Target achieved.

Partial upgrade of ICT systems (email server, domain controller, etc.);

Procured and installed ICT supplies e.g. replacement of batteries for IFMS UPS, etc.

Target Achieved.

Acquisition and installation of anti-virus software licence.

Anti-virus software licence acquired.

Target Achieved

2. Human Resource Recruitment of staff to fill vacant posts.

Recruitment of 6 staff (the FA, IA (T), MEO(S) HRO, PDUA, AA) and 15 interns.

Target achieved.

Training of all staff in various courses.

Various staff training done. Partially achieved.

Hold staff team building retreat. Held one staff team building retreat.

Target achieved.

Conduct staff appraisals. Scheduled staff appraisals were effected.

Target achieved.

3. Corporate Communication.

Maintenance of website and internet domain.

Maintained Website and Internet domain.

Target Achieved.

Re view of PR and communications strategy.

Enhanced strategic communication.

Target achieved.

Managing of inflow and outflow of information and advertising.

Streamed Public information for feedback e.g. disseminated OYRMP for FY 2016/17, quarterly disbursements and Fund releases to DAs.

Target achieved.

Website content management and monitoring.

Developed a new interactive URF Website theme.

Target achieved.

Enhance visibility of URF Brand. Started branding of URF through production of materials for visibility.

Target Achieved.

4. Legal Legal support to URF contracts and FMC.

Legal support to URF contracts, 22 FMC and 4 SFMC meetings provided in-house.

Target achieved.

Preparation and signing of DA’s performance agreements,

Prepared and guided signing of DA’s performance agreements FOR FY 2015/16.

Target achieved.

11Uganda Road Fund I Annual Report FY 2015/2016

SN Sub-function Planned Achieved output Remark (s)Draft Regulations pending signature by Hon. MFPED.

Followed up signing of URF regulations by MFPED;

Target achieved.

Legal support to the URF/ Board. Support to 7 Board and 13 Board Committee meetings through Minute taking and follow up of actions.

Target achieved.

5. General Admin Periodic and routine Office admin.

Routine and periodic Administration services offered including the following among others:Remuneration of staff;Management of Stores and Assets management.Customer care services;Vehicle fleet management system.

Target Achieved.

Insurance covers procured. Staff medical insurance, workman compensation and vehicle insurance provided.

Target achieved.

2.4.2 Monitoring and Evaluation

In FY 2015/16, Monitoring and Evaluation activities were undertaken in a total of 55 agencies out of the planned 78 agencies (50% of 156 agencies including 22 UNRA Stations, 1 KCCA, 111DLGs, and 22 MCs). This was equivalent to 70.5% of target achievement. The agencies monitored comprised 34 district local governments; 9 municipal councils; and 12 UNRA stations as shown in Table 4. The monitoring involved tracking of implementation of the funded work plans against the performance agreements entered into with the DAs for FY 2015/16.

Table 4: Summary of Agencies Monitored in FY 2015/16

Type of DA Planned Achieved DAs Monitored/Stations Achieved (% of Target)

UNRA (Stations) 11 12 Kampala, Luwero, Mubende, Mbale, Soroti, Tororo, Arua, Gulu, Kitgum, Lira, Kasese, Masindi

109.1%

KCCA 1 0 No division was monitored under KCCA during the period.

0.0%

District Local Governments

55 34 Mubende, Nakaseke, Buikwe, Mukono, Kiboga, Lwengo, Mpigi, Masaka, Jinja, Tororo, Manafwa, Pallisa, Sironko, Kumi, Bududa, Yumbe, Agago, Adjumani, Kitgum, Oyam, Pader, Lamwo, Zombo, Maracha, Amolatar, Otuke, Koboko, Kasese, Kiryandongo, Isingiro, Kiruhura, Ibanda, Mbarara, Kibaale

61.8%

Municipal Councils

11 9 Entebbe, Masaka, Mukono, Jinja, Mbale, Tororo, Gulu, Arua, Hoima

81.8%

Total 78 55 70.5%

The Fund used a mix of in-house capacity and outsourcing to undertake the M&E activities. Table 5 shows the geographical coverage of the M&E activities undertaken in FY 2015/16.

12 Uganda Road Fund I Annual Report FY 2015/2016

Table 5: Geographical Coverage of M&E Activities in FY 2015/16

S/N RegionDesignated agencies Agencies

covered in FY 2015/16

Agencies covered in FY 2014/15

District LGs

UNRA Stations

KCCA Divisions

Municipal Councils

01 Central 8 3 0 3 14 1002 Eastern 7 3 0 3 13 1903 Northern 12 4 0 2 18 2904 Western 7 2 0 1 10 20

Total 34 12 0 9 55 78

It can be seen from Table 5 that the coverage of M&E activities decreased from 78 agencies in FY 2014/15 to 55 agencies in FY 2015/16. This was occasioned mainly by the shift from use of a blend of in-house and outsourced capacities to exclusive use of in-house capacities towards the end of FY 2015/16.

The summary findings and mitigation actions undertaken by URF so far include among others:

i) Prevalent grey areas in implementation of the force account policy in relation to weak attraction/retention of road gangs, record keeping, poor access to zonal equipment, deduction of tools advances from gangs meagre wages of UGx 100,000 per worker per month and the high cost of repair/maintenance of equipment by FAW (the local dealer for the Chinese equipment). In mitigation, URF has requested MoWT to review the force account guidelines and explore the need to update the existing force account manual.

ii) Obsolete equipment with high breaking rate especially at UNRA stations which has led to continuous low and poor quality work. URF has urged MoWT to expedite the procurement of the replacement equipment from Japan.

iii) Too many stream crossings on the road networks in some DLGs creating many bottleneck sections. URF has decided to prioritise Bududa DLG among the DAs to benefit from URF funding of small bridges.

iv) Delayed procurement of FA materials and contracts for stations by UNRA headquarters affecting the station work outputs. To ease the process, URF has urged UNRA to decentralise the procurement of FA materials and contracts to regions.

v) Limited capacity of cross drainage systems to cope with large volumes of storm water runoffs leading to some road wash always on the

national roads network. URF has requested UNRA to provide guidance to their stations on culvert sizing and provision of adequate culverts.

vi) Loss of road maintenance funds through garnishing by URA. This mainly affected agencies with tax obligations on withholding tax, VAT and PAYE. In mitigation, as a first step, the affected DAs were requested to reimburse the road maintenance funds within specified time in order to avoid penalties.

vii) Growing scarcity of quality gravel with increasing haulage distances. URF will fast track support to DA’s in use of alternative road surfacing materials already researched on.

viii) Overloading contractors beyond their capacities which have led to poor performance and shoddy works. URF has advised UNRA to stop loading contractors with contracts beyond their capacities.

ix) Lack of road safety signages especially at sharp bends. DAs have been advised to always budget for road safety aspects where critically needed to avert accidents.

x) Late downstream distribution of funds to stations by UNRA headquarters. In mitigation, UNRA has been advised to always transfer funds to stations within a period not exceeding one week from the date of receipt of funds from URF.

xi) Non adherence to work plans and funding of non-road maintenance related aspects. In mitigation, URF is coordinating with the MoWT and MoLG on the establishment of regional TSUs to institute total quality management systems (TQMs), effective oversight among DUCAR DA’s and functionality of DRCs.

A more detailed schedule of monitoring findings and actions taken is appended in Annex 1.

13Uganda Road Fund I Annual Report FY 2015/2016

2.4.3 Planning and Programming

Planning and programming function is responsible for developing statutory road maintenance plans; allocation of funds and development of statutory road maintenance expenditure programmes; as well as issuing of annual planning guidelines to the designated agencies. Under the function, the achievements of the Fund in the year of reporting included preparation of the URF revenue and expenditure report for FY 2016/17, accountability and programme reviews and oversight for

extended periodic maintenance (sealing) of 1.0 km urban roads in selected 21 Town Councils and 1 Municipality.

The function also continued configuration of the Road Maintenance Management and Monitoring System (RMMS) whose main purpose is to improve timeliness of collection, analysis and consolidation of work plans and quarterly accountabilities. Action achievements of the function included preparation of the OYRMP and issuance of budget guidelines for FY 2016/17 as presented in Table 6.

Table 6: Achievements of URF in Planning and Programming Function, FY 2015/16

SN Sub-function Planned Achieved Remark (s)1. Planning OYRMP for FY 2016/17. Target. Achieved OYRMP and performance statement

prepared and presented to Parliament in April 2016.

Budget Guidelines FY16/17.

Target achieved. FY 2016/17 budget Guidelines were prepared and approved by PSBC on 09.11.15 and issued to DA’s immediately after.

2. Programming Funds Allocation Formula calibration.

Target partly achieved.

Allocation Formulae re-calibrated and tested in preparation for use in drawing up the DA’s IPFs for FY 2016/17.

Oversight of Board project on sealing of 1.0 km of TC roads in each of the selected DAs.

Completed designs and preparations for surfacing works in 20TCs and 01 MC.

Oversaw design and approval of the adjusted project designs by MoWT. Project scope was adjusted to 12.8km from the original 21.0km to fit the funds available. Due to various challenges, physical works for some DA’s commenced in July 2016 and others in August 2016 to end in November 2016. Progress of each beneficiary TC and MC is outlined in Annex 2.

Implementation of URF Strategic Plan.

Target achieved. Progressed URF strategic Plan implementation which commenced in FY 2014/15 - 2018/19;

3. Control Reviewed DA’s accountability reports;

Target partly achieved.

Four (4) no. DA’s accountability review reports prepared in FY 2015/16 were submitted to ED and FMC.

Reviewed performance of DA’s in line with signed performance Agreements.

Target achieved Two (2) DA’s programme review reports were prepared and issued to ED & FMC.

.4. Reporting Publication of IPF’s. Target achieved. FY 2016/17 IPFs disseminated to DA’s via email in April 2016.

Quarterly Performance reports data for FY 2015/16.

Target achieved. FY 2015/16 Q1-Q4 performance reports data collated.

Board Committees reports.

Target achieved. A total of 4 Board Committee (PSBC) reports prepared.

5. Others Review of emergency works applications;

Target achieved. 137 no. FY 2015-16 quarterly emergency requests reviewed and evaluated.

Tracking of Agency programmes.

Target partly achieved.

Undertook tracking of PM works on national roads in Q4.

Note: 40% of the planned programming Department actions were achieved while 60% was partly achieved.

2.4.4 Fund Management

Fund management function is responsible for collections and management of revenue; expenditure; and management of disbursements from the Fund. Under this function, the Fund successfully managed all disbursements for programmed works in the designated agencies; developed guidelines and procedures for management and accountability for the disbursed funds; and undertook capacity improvement programmes for accountants and auditors in the various DUCAR agencies.

14 Uganda Road Fund I Annual Report FY 2015/2016

In addition, the function prepared and submitted to office of Auditor General the final accounts for FY 2015/16. The key achievements of the Fund under the Fund Management Function in FY 2015/16 are as shown in Table 7.

Table 7: Achievements of URF in Fund Management Function in FY 2015/16

Sub-function Planned Activities Achieved Remarks1.Revenue collection

• Application to MFPED for road maintenance and secretariat operational funds-Ush417.93bn

• Collection of non- tax revenue.

• Received Ush357.589bn from MFPED.

• Collected Ush35.7mn from sale of bid documents.

• There was a shortfall in release of Ush60.341bn from MoFPED.

2.Financial Mgt Reporting

• 08 Monthly and 04 quarterly performance reports to be submitted to Board;

• Prepare 04 OBT reports for submission to MFPED;

• Prepare 04 disbursement reports to Board.

• Submitted 08 monthly and 03 quarterly reports to FABC. The forth report is the annual report being prepared;

• 4 quarterly OBT reports submitted to MFPED;

• 04 quarterly disbursement reports submitted to Board.

• All the reports were prepared as planned with the exception of the 4th quarterly report included in the annual report which is a consolidation of the URF performance for the whole year.

3.Disbursements • Effect 04 Quarterly Disbursements to 135 DAs.

• 4 quarterly disbursements to 135 DAs in the total amount of UGx.349.278bn for maintenance of National and DUCAR roads.

• Disbursements made as planned.

• 85.6% of budget disbursed as a result of shortfall in budget.

4.Financial Controls

• Continuous monitoring of budget performance,

• Timely reconciliation of bank statements with cashbooks.

• All the accounts reconciled and the financial statements prepared within the required time.

• Financial records well maintained presented in the FY 2015/16 statements.

5.Capacity building

• Mentoring DA’s on fund management and accountability.

• Monitoring financial performance and accountability at DAs.

• Physical visits made in 25 Designated Agencies to collate book records with accountability submitted.

• Activity performed as planned.

• Improvement in financial management and procurement procedures recorded.

Note: 80% of MFM Departmental targets were achieved while 20% was partly achieved.

2.4.5 Internal Audit

The purpose of the internal audit function is to provide assurance to the Board that funds are being applied as intended at disbursement. In FY 2015/16 audit activities undertaken included technical and financial reviews in 26 agencies, on road maintenance projects financed by the Fund. The coverage of the technical and financial reviews is summarised in Table 8 below.

Table 8: Summary of DA’s covered by the Technical and Financial Audit FY 2015/16

Agencies Audited Period covered

Buhweju DLG, Kabale DLG, Sheema DLG, Rakai DLG, Adjumani DLG, Dokolo DLG, Maracha DLG, Nebbi DLG, Serere DLG, Ngora DLG, Budaka DLG, Bukedea DLG (12 No)

Jan to Dec 2015

Busia DLG, Busia MC, Masaka MC, Bududa DLG and Buyende DLG (5 No.) FY2014/15Kamwenge DLG, Kyegegwa DLG, Ntoroko DLG, Kasese MC, Iganga DLG, Iganga MC, Kapchorwa DLG and Bugiri DLG (8 No.)

FY2014/15

Uganda National Roads Authority (UNRA) (1 No.) FY2013/14

The summary of the findings are shown in Table 9 while the summary status of implementation of the previous audit recommendations are shown in Annexes 1 &2.

15Uganda Road Fund I Annual Report FY 2015/2016

Table 9: Report of Generic Audit Issues and action matrix

Findings Agencies Affected Recommended Action Status of implementations

1. Non-performance by the District Roads Committees leading to poor planning and reduced oversight on implemented road maintenance works.

Iganga MC, Ntoroko DLG, Kyegegwa DLG, Kasese MC, Kapchorwa DLG, Iganga DLG and Iganga DLG Kabale DLG, Rakai DLG Adjumani DLG, Dokolo DLG, Serere DLG, Bukedea DLG and Budaka DLG

District Roads Committees were advised to hold meetings at least once every quarter to plan and perform oversight on implemented road works.

The agencies agreed to hold regular meetings going forward. URF will undertake nationwide sensitization to improve performance of the rest of the agencies.

2. Lack of budget performance data for key maintenance projects leading to failure to monitor expenditure on budget lines.

Bugiri DLG, Kapchorwa DLG and Kamwenge DLG, Kabale DLG, Rakai DLG, Sheema DLG, Buhweju DLG, Adjumani DLG, Maracha DLG, Nebbi DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG

The agencies were advised to put in place mechanisms to track their performance against the budget in order to guide the decision making processes.

The agencies have committed to improve going forward.

3. Poor quality and cost control measures manifested by use of poor quality of materials; failure to conduct site meetings; lack of material test results; poor culvert installations; lack of measurement sheets; poor drainage works and lack of project specific records for actual works done

Kamwenge DLG, Kyegegwa DLG, Ntoroko DLG, Kasese MC, Iganga DLG, Iganga MC, Kapchorwa DLG, Busia MC, Bududa DLG, Masaka MC and Bugiri DLG Kabale DLG, Sheema DLG, Buhweju DLG and Buhweju DLG; Rakai DLG, Adjumani DLG, Maracha DLG, Nebbi DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG.

Agencies were advised to test materials for suitability from recognized laboratories.The agencies should also ensure adherence to standard technical specifications set by the MoWT.Maintain independent project management files and site diaries for each project.

The agencies have committed to improve going forward. Going forward sensitization of other agencies will be done on best practices in record keeping and quality control.

4. Failure to conduct road inventory and condition assessment leading to inefficient planning, inadequate maintenance interventions and inaccurate allocation of funds by URF.

Ntoroko DLG and Kyegegwa DLG Kabale DLG, Sheema DLG, Buhweju DLG and Buhweju DLG; Rakai DLG, Adjumani DLG, Maracha DLG, Nebbi DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG.

Agencies were advised to comply with the provision of the performance agreement to submit road inventory and condition assessment.

The agencies have committed to improve going forward.

5. Non-adherence to the performance agreements and work plan for the period reviewed

Kapchorwa TC, Kamwenge TC and Iganga MC

Agencies were advised to adhere to the work plans during project implementation. Revision of work plans should obtain approvals from the authorities.

The agencies have committed to improve going forward.

6. Inconsistent and incomplete accountability reports causing difficulty to monitor physical and financial performance.

Kapchorwa DLG, Iganga DLG, Kasese MC, Iganga MC and Kamwenge DLG, Bugiri DLGKabale DLG, Sheema DLG, Buhweju DLG, Adjumani DLG, Maracha DLG, Nebbi DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG

Agencies were advised to prepare accurate accountability reports and account for discrepancies in their respective reports.

Agencies have not submitted revised accountability reports.Accountability reports are now reviewed and certified in compliance with the performance agreements.

7. Slow recovery of garnished funds by court order

Iganga MC (UGX 183M) The Accounting officer should recover the garnished funds as per MoU signed between Iganga MC and URF.

The recovery is behind schedule. The agency was advised to implement the MoU as per the agreed schedule.

16 Uganda Road Fund I Annual Report FY 2015/2016

Findings Agencies Affected Recommended Action Status of implementations

8. Understaffing of the works department leading to poor planning and implementation of URF projects.

Kapchorwa DLG The agency was advised to recruit competent and adequate staff to manage road maintenance projects

Recruitment of key personnel for Road gangs is being done. Recruitment of permanent staff awaits clearance from the Ministry of Public Service.

9. Un-supported expenditure causing uncertainty whether funds advanced for the activities were put to the right purpose.

Bugiri DLG (UGX 50.8M/=), Busia MC, Busia DLG, Bududa DLG, Buyende DLG and Masaka MC Kabale DLG (UGX 534.5M) and Rakai DLG (UGX 385M)Adjumani DLG (UGX 38M), Maracha DLG (UGX 21M), Nebbi DLG (UGX 105M), Serere DLG (UGX 39.9M)

The accountabilities for the funds should be availed for verification.

Supporting documentation were subsequently provided by all the agencies with exception of Bugiri DLG

10. Improperly kept accounting records manifested by:

• Payment vouchers not stamped “PAID”;

• Lack of subsidiary ledgers;• Non approval of payment

vouchers;• Failure to make bank

reconciliations• Missing payment records.

Kamwenge DLG, Kyegegwa DLG, Ntoroko DLG, Kasese MC, Iganga DLG, Iganga MC, Kapchorwa DLG and Bugiri DLG Kabale DLG, Rakai DLG, Sheema DLG, Buhweju DLG, Adjumani DLG, Maracha DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG

• Agencies were advised to maintain subsidiary legers for road maintenance funds.

• Ensure that all payment vouchers are approved and stamped PAID.

• Ensure that bank reconciliation statements are prepared, reviewed and certified by Head of Finance

Going forward sensitization of other agencies will be done on best practices record keeping.

11. Deviation from engineering design and implementation standards and practices:

• Inadequate quality control procedures,

• Failure to install signage,• Failure to control unit rates,• Failure to conduct road

condition surveys,• Failure to maintain

measurement records for completed works.

Kamwenge DLG, Kyegegwa DLG, Ntoroko DLG, Kasese MC, Iganga DLG, Iganga MC, Kapchorwa DLG and Bugiri DLG Kabale DLG, Sheema DLG, Buhweju DLG and Buhweju DLG; Rakai DLG, Adjumani DLG, Maracha DLG, Nebbi DLG, Dokolo DLG, Ngora DLG, Serere DLG, Bukedea DLG and Budaka DLG.

Agencies were advised to ensure that unit rates are derived for every road activity executed for proper monitoring of actual costs incurred on each project.

The agencies have committed to improve going forward.

12. Abuse of equipment under force account leading to recurrent breakdowns

Iganga MC and Iganga DLG Apply equipment appropriately and use hired equipment for heavy works.

The agencies have committed to improve going forward.

13. Absence of quarterly internal audit reports signifying reduced oversight on road maintenance activities.

Bugiri DLG Kabale DLG, Adjumani DLG, Maracha DLG, Nebbi DLG and Serere DLG

Agencies were advised to ensure adequate oversight on road maintenance activities by internal audit.

Agencies have committed to improve going forward. URF is going to improve capacity of audit in agencies through technical support.

14. Improper procurement function evidenced by:

• Failure to initiate of procurements.

• Lack of procurement action files

• Lack of contract management files

• Micro procurements not reported to CC.

• Usurping PDU powers

Iganga DLG, Kasese MC, Ntoroko DLG, Kamwenge DLG, Kyegegwa DLG, Busia DLG, Bududa DLG, Buyende DLG and Masaka MC Kabale DLG, Sheema DLG, Adjumani DLG and Nebbi DLG

Agencies were advised to ensure that all provisions of the PPDA Act and regulations are adhered to.

The agencies have committed to improve going forward.

17Uganda Road Fund I Annual Report FY 2015/2016

Findings Agencies Affected Recommended Action Status of implementations

15. Inadequacy of road maintenance interventions leading to risk of extended damage on the road assetPoor performance of road gangs for RMM

Kapchorwa DLG, Iganga DLG, Kasese MC, Iganga MC, Kamwenge DLG, Kyegegwa DLG, Bugiri DLG, Busia MC, Busia DLG, Bududa DLG, Buyende DLG and Masaka MCNtorokoDLG

The agencies were advised to undertake timely road inventories so as to implement the most critical projects and advise URF accordingly.

The agencies have committed to improve going forward.

16. Delayed release of road maintenance funds to the town council leading to delays in implementation of road maintenance activities in the sub-agency.

Ntoroko DLG The DA should ensure that funds for sub agencies are transmitted within 5 business days as stipulated in the PA.

The agency was agreed to ensure timely release of funds to the Town Council going forward.

Table 10: Summary of findings from Technical and Financial review of UNRAFindings Recommended Action Status of implementation1. Use of the Pastel accounting system

instead of the Oracle database systemDuring our review of UNRA’s financial management system, we noted that according to the UNRA FMM, the Pastel accounting system should have been replaced by the Oracle database system, IFMIS, with effect from 1 July 2008. However, this transition had not been fully adopted for management of URF funds.

UNRA should put in place mechanisms or a system which will address the challenges noted by 30 April 2017.

UNRA was in the process of procuring an Enterprise Resource Planning (ERP) tool that will integrate and align with all the business areas including IFMS by January 2017.In the meantime, Accounts Managers have been recruited to enhance closer supervision at various regions.

2. Financial reporting challenges Our review of UNRA’s reporting system noted the Pastel accounting system used for financial reporting was not online and real-time. The 22 stations had to back up their data monthly and send them back up to Headquarters for review and posting.

UNRA should put in place mechanisms or a system which will address the challenges noted by 30 April 2017.

The Financial Information management system is partly automated. UNRA was in the process of procuring ERP tool that will automate all the business processes as reported above.

3. Records not availed for review.During our review, we were not availed the following pertinent documents:• Procurement records for periodic and

term maintenance contracts at UNRA HQ;

• Project management records• Suppliers’ and works contracts and

service agreements for the procurements listed in Appendix 1.

• LBC contracts

The failure to review this information limited the scope of the review. In future all information should be made available during the time of the review.

To be implemented going forward.

4. Delayed reporting to URFWe reviewed UNRA’s reporting to URF and noted that the quarterly reports were submitted after the contractual submission dates, on average 28 days later.

UNRA to submit reports within the contractual reporting dates.

Management of UNRA committed to submitting reports within the contractual reporting dates going forward.

5. Delayed release of funds to stationsDuring our review of funds disbursement to stations, we noted that there were delays which caused the burn rate in quarter 4 to be significantly high due to the spill over from previous quarters.

Disbursements to stations should be made immediately funds are received.

Management of UNRA committed to reducing this to five working days or even less.

18 Uganda Road Fund I Annual Report FY 2015/2016

Findings Recommended Action Status of implementation6. Inconsistency in UNRA accountability

reportsDuring our review of UNRA financial reports to URF, we noted discrepancies in the recorded income. The quarter 3 and 4 reported income did not match what was actually sent by URF.In addition, our review of advances to stations revealed that they had not been consistent and accurately recorded in the quarterly accountability reports to URF.

UNRA should increase diligence in the preparation and review of the quarterly financial reports to ensure the integrity, accuracy, timeliness and consistency of the quarterly reports.UNRA should adhere to the requirements of the Public Finance Management Act regarding the refund of unspent money, or seek the relevant approval for rolling over the unspent funds into the next financial year.

Management of UNRA committed to avoid inaccuracies in future reports.

7. Expenditure outside the approved work plan

It was noted that there were several instances of expenditure outside the approved work plan and performance agreement signed between URF and UNRA.

UNRA should endeavour to curb expenditures outside the work plan.

Management of UNRA committed to avoid inaccuracies in future reports.

8. Poor management of fuelDuring our review of fuel management, it was discovered that the fuel transactions were not adequately supported or explained and that there was no contract with the supplier M/s Hared Petroleum.

The Agency should;i) Retrieve the records that

were maintained for usage of fuel during the period and confirm that the reported disbursements were accurate and reasonable.

ii) Clearly separate administrative fuel from project fuel and report as such.

iii) Record and monitor fuel usage on a project by project basis.

UNRA have formalized the contract with M/s Hared Petroleum.

9. Non-payment of withholding taxWe noted that withholding tax was not deducted on some transactions without evidence to show that the suppliers were WHT exempt.

The Agency should follow up the suppliers in question and ensure that the WHT obligations are settled by 31st December, 2016 and a report furnished to URF accordingly.

The accounting procedures and processes are being streamlined to ensure that such non compliances are not repeated.

10. Irrational budgeting leading to inefficiencies

During the review it was noted that there were irrational budget allocations by HQ to the stations without due regard to road maintenance needs. The stations undertake road condition assessments from which they derive their budget needs and execution mode (contracting or force account depending on scope) which are submitted to HQ. However, these were being scaled down arbitrarily at HQ and consequently the activities that could have been performed cheaply using force account were contracted out.Term maintenance contracts were allocated budgets that were disproportionate to interventions.

In future, if the Headquarters decide that the planned scope of maintenance works of any station needs to be scaled down for any reason, the process should be done in consultation with the station engineer.Unless substantial regravelling and culvert installation works are to be undertaken on any set of roads, mechanized routine maintenance by force account should be the first option to be considered instead of term maintenance contracting.

Term maintenance contracts are now competitively procured and the PPDA regulation requires the Accounting Officer to do a market re-assessment, therefore the issue of rates will always be justified going forward.

11. Noncompliance with criteria for selection of mode of execution (force account Vs term maintenance)

The criteria for selection of the mode of execution of works between term maintenance and force account was based on traffic levels. Highly trafficked roads were supposed to be maintained using term maintenance contract and low trafficked roads, force account.

The response to this finding is general. It does not address the issue observed in Mpigi station. It is recommended that when planning road maintenance activities, the Agency should exercise more prudence and endeavour to optimize benefits of force account compared with term maintenance contracting.

Management gradually improving the capacity of stations to implement force account.

19Uganda Road Fund I Annual Report FY 2015/2016

Findings Recommended Action Status of implementationHowever, it was found that some low trafficked roads had been under term maintenance contracts. Furthermore, it was noted that although some stations had enough equipment to maintain their networks, and there was no need for term maintenance contracting.12. Inadequacies in designing

maintenance interventionsThe review of the 29 selected national roads term maintenance contracts revealed that key routine manual maintenance activities had not been included. Subsequently, the works associated with these activities were not carried out for over 2 years.

Subsequent contracts should give drainage provisions priority to ensure sustainable interventions.

This has been addressed in subsequent contracts which give drainage priority.

13. Uncompetitive wage rates for manual routine maintenance works

The rates for manual routine maintenance (LBCs) were set more than 4 years ago and have not been revised. Other employers competing with UNRA for manual labour in the countryside, offer higher wages for the same nature of work. This makes LBCs uncompetitive and inefficient.

It is recommended that in addition to reviewing LBC rates, procedures for selection of contractors be tightened.

The management of LBC including the rates have been reviewed.

14. Failure to adhere to the procurement plan for FY2013/14

The procurement plan was not adhered to and hence a backlog in implementation works. Due to the delays in procurement, contracts were not implemented as per plan. Commencement of work on some term or periodic maintenance contracts was often beyond 18 months after the scope of works had been determined. By that time the scope of work and prices of basic inputs had changed considerably.

UNRA to reduce procurement from the 18 months to 4 months.URF will have to monitor performance in this area at least bi-annually.

The restructuring Programme has addressed all these operational weaknesses. Procurement cycle has been reduced from the previous 18 months to 4 months.

15. Use of middlemen is purchase of gravel for road maintenance projects

Compliance with the PPDA Act to obtain gravel through suppliers, has stringent requirements that cannot be fulfilled by land owners (villagers) such as registration of business, TIN, trading license etc. This leads to involvement of Kampala based suppliers who offer middlemen services to bridge the gap between the stations and the actual land owners, resulting in inflated costs of acquisition of the gravel.

Gravel should be purchased from Land owners with the involvement of Local leaders

With effect from 13th July 2015, Management made a pronouncement that gravel should be purchased from Land owners with the involvement of Local leaders and this is being implemented.

16. Unsustainable methods of road maintenance

Continuous grading and shaping operations were lowering the levels of existing roads. This had resulted into difficulties in drainage as new culverts to replace existing ones had to be installed deeper and road side drain off shoots excavated deeper and longer mostly beyond the road reserve into private land. In the long run, this mode of intervention deferred and increased the costs of restoration of the roads.

An adequately resourced plan to design and reconstruct UNRA’s un-engineered roads to national roads standards as per classification should be drawn up urgently.

Going forward all gravel roads are being re-engineered and will be designed to the National Roads Standards.

17. Weaknesses in Axle Load ControlThere were many heavy trucks carrying gypsum rock from Mt. Moroto to Tororo Cement factory causing damage to the roads in the Karamoja and Teso region

In addition to establishing a directorate of infrastructure protection, the Agency should press for quick amendments to the axle load control legislation (or harmonization of the existing laws)

This is being implemented going forward.

20 Uganda Road Fund I Annual Report FY 2015/2016

Findings Recommended Action Status of implementationand budget for and construct vehicle parking yards and storage facilities.

18. Non-compliance with technical standards

Site inspection during the review revealed that culverts were installed without head or wing walls. Road widths were not maintained to the standards set by MoWT for national roads. There were many instances where grading and shaping was not followed by watering prior to compaction.

The Agency is supposed to be the epitome of road construction standards in the country. Management must put in place an effective oversight mechanism to ensure that its staff observe and supervise construction and maintenance works to the standards set out in its various manuals.

A program was formulated to address the problem going forward.

19. Absence of quality control on term maintenance and force account operations

During the review, records of quality control tests (compaction density) for term maintenance contracts and force account projects were not found at any of the stations.

UNRA to supply quality control kits for all Stations to manage quality during execution of maintenance contracts.

UNRA acquired basic quality control kits for all Stations to manage quality during execution of maintenance contracts in addition to use of central Government materials laboratory which are located in various regions. In addition a fully-fledged quality control unit with a well-equipped laboratory will further strengthen the quality management of works.

20. Inadequate and Low Capacity of Personnel

The authority had a severe shortage of qualified personnel at both headquarters and stations. It was also observed that many of the Agency’s staff were pursuing further studies at the numerous universities and accredited professional institutions in Kampala. This was diverting their energies and concentration.There were severe capacity constraints in the Arua, Moyo, Mbale, Tororo, Jinja, Luwero, Hoima, Masaka, Mbarara and Kampala stations.

Management should put in place a robust mechanism for monitoring staff performance.

This has been addressed in the on-going restructuring.

21. Inadequate EquipmentIt was noted that several stations especially those furthest from headquarters did not have adequate or appropriate equipment to enable them implement their planned force account works efficiently.

UNRA should exercise more prudence and endeavour to optimize benefits of force account compared with term maintenance contracting.

Management is gradually equipping Stations with the necessary equipment to undertake Force Account Operations. Some equipment like; Low bed trucks, Excavators, Graders and Rollers have already been acquired and delivered to some Stations.

An analysis of the status of implementation of audit recommendations from FY2010/11 to FY2015/16 is presented in Tables 8 and 9 and the outstanding recommendations detailed in Annexes 2 and 3.

2.4.6 Procurement and Disposal Unit (PDU)

The PDU function carries out procurement and disposal functions of the Fund, consistent with PPDA law. It also facilitates function of the Contracts Committee as established by section 31 (b) of PPDA Act, 2003.

The function drew up a procurement and disposal plan for FY 2014/15 in the amount of UGX3.72 billion and implemented a worth of UGX 3.189 billion representing 85.7%. A unique method of fixed budget was applied in procurement of consultants for FY14/15. Therefore, the budget efficiency is estimated to have been over 95% with the variances resulting from mainly contracts for Hotel Services.

During FY 2015/16, the Contracts Committee was composed of four members shown in Table 11.

21Uganda Road Fund I Annual Report FY 2015/2016

Table 11: Members of contracts Committee as at June 2015

No. Name Position Organization1 Eng. Timothy Mukunyu Chairman Road Fund2 Mrs. Josephine Ssenyonjo Secretary Road Fund3 Mr. James Ekonga Member Road Fund4 Ms. Fatuma Nanziri Member/ Legal advisor Solicitor General

Table 12: List of Services Outsourced by the Fund in FY 2015/16

URF PROCUREMENTS IN FY 2015/16

SN Department Subject Contract amount

Service provider(s) Method Status

1 CS 1. Staff Identity Cards 743,400 A&S Electronics Ltd Micro Completed2. Preventive

maintenance contract for air conditioners

Micro Stalled

3. Kaspersky antivirus renewal for URF Network

USD 617.32 Business Centre Ltd Micro Completed

4. Air ticketing services under a framework contract

100,000,000 Bunyonyi Safaris Ltd UTB 2004 (U) Ltd

Macro Ongoing

5. Executive office desk and swivel chair for M&E officer

2,600,000 Spectrum Distributions Limited

Micro Completed

6. Legal Consultancy Services to institute legal proceedings for recovery of URF partitions from Soliz House or compensation.

Micro Stalled

7. Gazetting notice of appointment of new board members.

1,200,000 Uganda Printing and Publishing Corporation

Micro Completed

8. Framework for Newspaper Advertisements

12,000,000 New Vision P & P Limited

Macro Ongoing

12,000,000 Monitor Publications Ltd

12,000,000 The Observer Media Limited

12,000,000 Red Pepper Publications Ltd

9. Return Air ticket to UK for Mprog.

USD 1,021 Bunyonyi Safaris Limited

Micro Completed

10. Return Air ticket for ED to attend ARMFA in Kinshasha, DRC

USD 2,060 Bunyonyi Safaris Limited

Macro Completed

11. Tyres for Mv UAJ 681 X

3,750,000 City Tyres Limited Micro Completed

12. Return Air Ticket for MPS to attend ARMFA in Kinshasha.

USD 1,169 Bunyonyi Safaris Limited

Micro Completed

13. Supply of toner cartridges for Kyocera photocopiers

3,870,400 MFI Document Solutions Limited

Micro Completed

22 Uganda Road Fund I Annual Report FY 2015/2016

URF PROCUREMENTS IN FY 2015/16

SN Department Subject Contract amount

Service provider(s) Method Status

14. Return Air ticket for CC lawyer to Johannesburg, SA(Economy class)

USD 704 Bunyonyi Safaris Limited

Micro Completed

15. Return Air ticket for Prog. Officer to Johannesburg, SA(Economy class)

USD 704 Bunyonyi Safaris Limited

Micro Completed

16. Supply of assorted toner cartridges

25,349,983 Canon World Limited Macro Completed

17. Return Air ticket (business class) for ED to attend ARMFA focal group meeting in Zanzibar, Tanzania.

USD 1,260 UTB 2004 (U) Limited Micro Completed

18. Congratulatory message in form of a spot telecast for Independence Day.

1,200,000 UBC Television Micro

19. Conference facilities for staff retreat (15-16 October 2015).

4,389,600 Silver Springs Hotel Limited

Micro Completed

20. Conference facilities for CC retreat (12-14 October 2015)

1,695,660 Fairway Hotel Limited Micro Completed

21. Independence Advert in the Red Pepper

2,800,000 The Red Pepper Micro Completed

22. Independence Advert in the New Vision

3,300,000 The New Vision P & P Micro Completed

23. Courier Services 5,000,000 Daks Courier Limited Macro Ongoing24. Office Cleaning

services 12,744,000 R & L Cleaning

Services LimitedMacro Ongoing

25. Design and Printing of OYRMP

28,320,000 Fidelity Advertising Services Ltd

Macro Completed

26. Supply of Tyres for UAR 196Y

3,445,000 Arrow Centre Limited Micro Completed

27. Production of Identity Card Holders for URF Staff.

767,000 Jireh Group Investments Limited

Micro Completed

28. Consultancy Services For Construction Supervision Of The Proposed Head Office Building For URF And PPDA.

Macro Ongoing

29. Insurance of URF Vehicles

13,350,960 Britam Insurance Limited

Macro Ongoing

30. Furniture (3 Office Chairs)

2,175,000 Prime Impex 2001 Limited.

Micro Completed

31. Catering Services (Full English breakfast) for TC Meeting.

4,950,000 TEKK Investments Limited

Micro Completed

23Uganda Road Fund I Annual Report FY 2015/2016

URF PROCUREMENTS IN FY 2015/16

SN Department Subject Contract amount

Service provider(s) Method Status

32. Security Services for ED’s Residence.

19,200,000 Aim Security Services Ltd

Macro Ongoing

33. Procurement of a Server

51,684,000 Business Centre Limited

Macro Completed

34. Purchase of four (4) new tyres.

3,045,000 Arrow Centre Limited Micro Completed

35. URF in the Patriot Magazine

4,000,000 Patriot Magazine Micro Completed

36. Office Orthopaedic Chair for PO.

1,400,070 Performance Furnishing (U) Ltd

Micro Completed

37. Production of URF Teardrop Banners.

4,999,949 Graphic Systems(U) Limited

Micro Completed

38. Request for 5 New Tyres for UAA 864F.

3,915,000 Fontana Auto parts (u) Limited

Micro Completed

39. Purchase of Sofa Set for the Executive Director’s Office

7,300,000 Nina Interiors Limited Macro Completed

40. IT equipment maintenance services

4,984,320 Computer Point Limited

Micro Ongoing

41. Hotel Services for Evaluation of URF/PPDA Project EOI Bids.

4,645,000 Dolphin Suites Limited

Micro Completed

42. Replenishment of Toner for the new photocopier.

3,750,000 Canon World Limited Micro Completed

43. Framework Contract for Garbage Collection.

2,832,000 Nabugabo Updeal Joint Venture

Micro Ongoing

44. Procurement of an Iron Port (Email Security Appliance).

20,154,400 IT Office Uganda Limited

Macro Completed

45. Renewal of Exchange SSL Server Certificate.

1,994,790 Computer Revolution Africa

Micro Completed

46. Supply of Newspapers, Publications and Periodicals.

5,121,600 New Vision P & P Limited

Macro Ongoing

6,523,200 Monitor Publications Limited

576,000 The Observer Media1,267,200 The Pepper

Publications Limited 47. Replenishment of

Toner for the old photocopier

3,060,000 Canon World Limited Micro Completed

48. Preventative Maintenance Services for Copiers

4,800,000 MFI Document Solutions Limited

Micro Ongoing

49. Renewal of Medical Insurance Cover

108,760,407 Jubilee Insurance Co Ltd

Macro Ongoing

50. Workmen’s Compensation Insurance Cover

36,033,748 Sanlam General Insurance

Macro Ongoing

51. Engraving of Assorted Office Items.

700,000 Mukisa Embroiders Micro

24 Uganda Road Fund I Annual Report FY 2015/2016

URF PROCUREMENTS IN FY 2015/16

SN Department Subject Contract amount

Service provider(s) Method Status

52. Vehicle Cleaning Services

3,490,000 Pan World Motors Limited

Micro Ongoing

53. Renewal of Comprehensive Insurance for the Motorcycle.

1,112,688 Sanlam General Insurance

Micro Completed

54. Provision of Catering Services during the 61st Board Meeting

1,593,000 TEKK Investments Limited

Micro Completed

55. Provision of artificial flowers for the two pots in the Board room.

Micro Stalled

56. Procurement of Batteries for the IFMS UPS.

8,363,250 Computer Point Limited

Macro Completed

57. Microsoft Software 23,641,232 NITA Uganda Limited Macro Completed58. Design and Printing

of URF Annual Report FY 2014/15

29,940,966 Magic Colour Macro Completed

59. Consultant for Board evaluation retreat.

4,995,000 Institute of Corporate Governance

Macro Completed

60. Board evaluation retreat 2016.

15,611,000 Lake Victoria Serena Resort

Macro Completed

61. Printing of Staff Identity Cards.

1,350,000 A & S Electronics Limited

Micro Completed

62. Procurement of Multi-Functional Printer for Executive Director.

2,567,680 MFI Document Solutions Limited

Micro Completed

63. Repairs of Office Blinds.

3,441,220 Nina Interiors Limited Micro Completed

64. Branded materials (Executive pens and Lapel pins.

4,897,000 PH Warehouse Limited

Micro Completed

65. Lunch and refreshments for 62nd Board Meeting

1,593,000 TEKK Investments Limited

Micro Completed

66. Printer for the Executive Assistant.

2,099,500 IT Office Uganda Limited

Micro Ongoing

2 M&E 1. Printing M & E Materials (Extra copies).

4,889,920 In line Print Services Micro Completed

2. Printing Questionnaires for the M & E Road User Satisfaction Survey.

4,986,586 Jireh Group Investments Limited

Micro Completed

3. Printing of Instruction manuals and booklets & Typesetting and printing 2016 Road User Satisfaction Survey reports.

Micro Stalled

4. Supply of Bags, Umbrellas, Pens, Reflector vests and ID tags.

2,093,320 Excel Brands Micro Completed

25Uganda Road Fund I Annual Report FY 2015/2016

URF PROCUREMENTS IN FY 2015/16

SN Department Subject Contract amount

Service provider(s) Method Status

5. Typesetting and Printing of 70 copies of the report on Physical & financial Performance of URF DAs

4,047,000 Jireh Group Micro Completed

6. Hotel Services for 3 days (Non-residential) training on Road User Satisfaction Survey.

4,148,880 Silver Springs Hotel Limited.

Micro Completed

7. Printing M & E Reports for Q3 FY 2015/16.

4,951,280 In line Print Services Micro Completed

3 FM 1. Gazetting URF Audited Accounts.

14,400,000 Uganda Printing and Publishing Corporation

Macro Ongoing

Total 1,203,298,095 83.3%*

Note: Source PDU Departmental reports for FY 2015/16

* Percentage achieved compared to Plan for FY 2015/16 totalling UGX 1,444,960,460.

2.4.7 Policy & Strategy

URF established the Policy and Strategy Department which became effective on 1st July 2015. During FY 2015/16 it fast tracked the implementation of outputs of the EU-supported Technical Assistance (LTA) provided to the Fund from November 2012 to February 2014. The key ones included among others the first 5 year Corporate Plan (for the period 2013/14-17/18) and the 5 year road maintenance strategic plan (for the period FY 2014/15-18/19). The full summary of the 5-year Road Maintenance Strategic Plan (5-YRMP) is depicted in Table 13 below.

Table 13: The 5-YRMP for FY 2014/15-2018/19 (In US $ Mn)

Road Class Road WorkFiscal Year

2014/15 2015/16 2016/17 2017/18 2018/19

National Roads

Maintenance 67.1 70.5 74.0 77.7 81.6Rehabilitation 45.0 47.2 49.6 52.0 54.6Upgrading (25% RUCs share) 65.5 68.8 72.2 75.8 79.6

Bridges 3.7 3.9 4.1 4.3 4.5Ferries 5.7 6.0 6.3 6.6 7.0Axle Load 2.4 2.5 2.6 2.8 2.9Engineering Phase II 8.0 8.4 8.8 9.3 9.7Sub total 197.4 207.3 217.7 228.6 240.0

DUCAR Network

Rehabilitation 180.7 189.7 199.2 209.2 219.6Periodic Maintenance 182.9 192.0 201.6 211.7 222.3Bridges 2.2 2.3 2.4 2.6 2.7Routine Maintenance 44.1 46.3 48.6 51.1 53.6Sub total 409.9 430.4 451.9 474.5 498.3

TOTAL (USD) 607.4 637.7 669.6 703.1 738.2

Source: URF 5--Year Road maintenance Strategic Plan report.

The summary of achievements of the Fund on the target actions in the Corporate Plan for FY 2015/16 are depicted in Table 14 while those registered on implementation of the road maintenance strategic plan are shown in Table 15.

26 Uganda Road Fund I Annual Report FY 2015/2016

Table 14: Key Achievements on URF Corporate Plan Actions for FY 2015/16

SN Action Target 2015/16 Achievement FY 2015/16 Remark1.1.1 Build Capacity of Board in

leadership & organizational management

Board Retreat Held Board retreat in July 2015. Target achieved

1.1.2 Implementation of Training plan and continuous professional development (CPD).

All staff to get some training.

Trained Internal Audit and M&E Dept.’s staff on improved oversight roles.

Target Achieved

1.1.3 Periodic review of staff manual and welfare.

Annual review. HR manual reviewed – to yield Admin Manual and HR manual

Target Achieved

1.1.4 Establish adequate staffing levels & remuneration.

Filling vacancies and review of salary structure.

Recruitment done, salaries reviewed.

Target Achieved

1.2.1 Acquire permanent URF Office premises and assets.

Project start and run for 5 years.

Finalised the Design process, commenced procurement of Contractor.

Achieved Target.

2.1.2 Enhance Partnership for improved availability and utilization of road maintenance funds.

Held meetings with MFPED and wider stakeholders on amendment of URA law.

Held meetings at SWG, TMT and MFPED.

Target partially achieved.

2.2.1 Acquire tools, equipment and logistics for URF Secretariat.

Procure tools and vehicles for Secretariat.

Various tools and logistical means procured.

Target achieved.

2.2.4 Implement timely signing and enforcement of performance agreements with DA’s.

Sign performance and enforce agreements with DA’s.

Agreements signed in Q1 of FY 2015/16.

Target achieved.

2.2.5 Timely preparation & dissemination of URF performance reports.

Publish Annual report and disseminate.

Annual report for FY 2014/15 prepared, ready for publishing and dissemination.

Target partially achieved.

3.1.1 Develop Plan for road maintenance and related activities.

Prepared OYRMP for FY 2016/17.

OYRMP for FY 2016/17 was done.

Target achieved.

3.1.2 Develop plans for financing road safety and axle load control.

Include Plans for safety and Axle load control in OYRMP for FY 2016/17.

Safety and Axle load control plans included in OYRMP for FY 2016/17.

Target achieved.

3.2.1 Timely collection and analysis of road condition data by DA’s.

DA’s to handle annually. Arrangements made for DA’s to start in FY 2015/16.

Target not achieved.

4.1.1 Undertake regular monitoring and periodic evaluation of funded maintenance programmes.

M&E to be done annually.

M&E for FY 2015/16 handled and reports disseminated.

Target achieved.

4.2.1 Carry out regular technical and financial audits of road maintenance programmes in DA’s.

DA’s to handle annually. Handled Technical & Financial audit in 26 DAs equivalent to 19% of DA’s.

Revised target of 25% partially achieved.

4.2.2 Build and enhance partnership with stakeholders to strengthen oversight in utilization of road maintenance funds.

Continue engagement of Board with DRCs in DA’s to chart way forward.

Completed DRC regulations at MFPED for gazetting and guidelines to DA’s.

Target Partially achieved.

4.3.1 Undertake periodic road users’ satisfaction surveys.

Conduct surveys Annually.

The 1st URF survey was done in H1 of 2016.

Target achieved.

5.1.1 Develop and Implement the communication strategy.

Review existing communication Strategy.

Communication strategy reviewed and put to use.

Target achieved.

5.1.2 Sign and implement memoranda of understanding with key ministries and other government agencies.

Put the MoU with MoWT in place.

Draft in place, but MOU not yet approved for signature.

Target not achieved.

The road maintenance achievements against the 5 year road maintenance strategic plan (5-YRMP) targets are outlined in Table 15 below. It excludes provisions for upgrading and re-engineering of national roads (currently provided for under the UNRA Development budget) and the rehabilitation of DUCAR roads.

27Uganda Road Fund I Annual Report FY 2015/2016

Table 15: Summary of achievements 0n 5-YRMP Targets for FY 2015/16

Road Class

Road Works

Financial PhysicalUGX billion kms

2014/15 2015/16 2014/15 2015/165YRMP Actual* %YRMP 5YRMP Actual* %YRMP 5YRMP Actual %YRMP 5YRMP Actual %YRMP

National Roads

Routine 234.9 159.8 68% 246.8 140.4 57% 20,551 16,103 78% 20,551 15,404 75%

Periodic 157.5 95.5 61% 165.2 99.0 60% 8,128 1,530 19% 8,128 970 12%

Bridges 13.0 1.8 14% 13.7 0.4 2.9% 293 251 86% 308 85 28%

Ferries 20.0 10.0 50% 21.0 3.2 15% 9 9 100% 9 8 89%

Axle Load 8.4 7.5 89% 8.8 2.3 26% 15 10 67% 15 15 100%

Sub-total 433.8 274.4 63% 455.5 245.3 54% % RM&PM 61.5% % RM&PM 57.1%

DUCAR Network

Routine 154.4 73.8 48% 162.1 63.5 39% 86,463 41,619 48% 86,463 35,933 42%

Periodic 640.2 71.8 11% 672.0 54.6 08% 11,817 2,841 24% 11,817 1,679 14%

Bridges 7.7 0.9 12% 8.1 3.7 46% 67 91 136% 67 48 72%Sub-total** 802.3 146.5 18% 842.2 121.8 14% % RM&PM 45.2% % RM&PM 38.3%

TOTAL (UGX) 1,236 420.9 34% 1,298 367.1 28%

Key:Forex 1 US $ = UGX 3,500*Actual =Budget out turn (Treasury releases);**DUCAR includes DLGs, MCs and KCCA.RM&PM=Combined Routine manual & Periodic maintenance

It can be observed from Table 15 that:

a) In FY 2015/16 the national roads maintenance plan activities were funded at 54% and DUCAR at 14% compared to 63% and 18% respectively in FY 2014/15.

b) Overall in FY 2015/16, only 28% of the road maintenance strategic plan actions were funded compared to 34% in FY 2014/15.

c) The overall physical performance achieved stood at 42% compared to 47% in FY 2014/15.

d) Periodic maintenance performance for National and DUCAR networks declined to 12% and 14% in FY 2015/16 compared to 19% and 24% in FY 2014/15.

e) The rather ideal strategic financing plan targets need to be reviewed to become in harmony with current situation in respect to funding of road maintenance.

Other key Departmental achievements against the work plan for the P&S Department in FY 2015/16 are depicted in Table 16 below.

Table 16: Key Achievements under the Policy & Strategy Function in FY 2015/16

Planned Activities Achieved RemarksSetting up of policy and strategy department 1. Defined scope of responsibilities

2. Set outputs of the departmentAchieved

Implementation of technical, strategic and policy research.

1. Research guidelines under development. Not Achieved

Annual implementation of 1, 3 and 5 year road maintenance financing plans.

1. Implemented OYRMP for FY 2015/16 which is the 2nd year of 5YRMP.

Achieved

Coordinate implementation of the 5-yr Corporate Plan.

1. Implemented the 3rd year i.e. 2015/16 of corporate plan. Key achievements in Table 1.c

Achieved

URF scheduled and statutory reporting. Prepared:1. Quarterly performance reports for FY

2015/16;2. Annual Report FY 2014/15;3. Transport Sector (SWG) reports;

Achieved

28 Uganda Road Fund I Annual Report FY 2015/2016

Planned Activities Achieved RemarksMainstream sector plans, policies and standards in URF operations.

1. Kkey deliverables from the NTMP/GKMA and the draft RSDP3 aligned with 5 year road maintenance financing plans.

Achieved

Oversee formation and operation of DRCs. 1. 80% of DRCs were operational in FY 2015/16;

2. Operation of DRCs guided with guidelines.

Achieved

Management of Risk. 1. Draft Risk Register compiled. AchievedSector Coordination. 1. URF participation in transport sector forum

and related fora.Achieved

Key challenges faced by the Dept. during the period included:

a) Inadequate staffing. The department was run by one man (MPS) for a full year. Support staff recruitment is on-going.

b) Inadequate resources to implement the 5 YRMP plan for FY 2015/16 leading to huge periodic maintenance backlogs;

As a way forward, the URF will continue to push for the establishment of a 2nd Generation Road Fund as enshrined in the URF Act.

2.4.8 Establishment of Operational Procedures

Progress was made in drafting various regulations and manuals to guide and streamline various aspects of its operations and inter-relationship with agencies and stakeholders. Progress on establishment of operational procedures in key functional areas was as shown in Table 17.

Table 17: Status of Key Control Documents as at 30 June 2015

SN Functional Area Manual Regulations System1. Fund Management. Issued by Board. NA Operating IFMIS of MoFPED.2. Planning and Programming. Issued by Board. NA RMMS in place.3. Corporate Services - HR*. Issued by Board NA To be module of MIS under study.4. Monitoring and Evaluation. In process. Completed. Completed.5. Internal Audit. Issued by Board. Issued by Board. In process. 6. District Roads Committees. NA Issued by Board. NA.

*HR- Human Resource

2.5 Key Performance Indicators

Broadly, the Secretariat’s Key Performance Indicators (KPIs) cover the four business areas of Administration and Human Resource; Funding Operations; Impact of Funding; and Governance. Achievements against the Secretariat KPIs in FY 2013/14 were as discussed in sections 2.3.1- 2.3.2.

2.5.1 Performance Rating of KPIs

FY 2015/16 was the sixth year of adoption of a set of key performance indicators (KPI’s) for the operations of the Fund. Some of these indicators were adopted from headline indicators issued by African Road Maintenance Funds Association (ARMFA at www.armfa.org) while others were developed in-house.

As shown in Annex 3, the Fund used a total of 24 KPIs to monitor its performance under key business areas of administration, human resource, funding operations, impact of funding and governance. The summary of performance rating against the KPI’s in FY 2015/16 is shown in Table 18.

29Uganda Road Fund I Annual Report FY 2015/2016

Table 18: Summary of URF performance rating of KPI’s - FY 2015/16

Administration and HR

Funding Operations

Impact of Funding Governance Overall Totals

FY 2014/15Overall Totals FY

2015/16

No. of KPIs % of Total No. of

KPIs% of Total

No. of KPIs % of Total No. of

KPIs% of Total

No. of KPIs

% of Total

No. of KPIs

% of Total

Achieved 1 33.3% 6 50.0% 3 75.0% 3 60.0% 12 50.0% 13 54.2%

Not Achieved 2 66.7% 6 50.0% 1 25.0% 1 20.0% 11 45.8% 10 41.7%

No Data 0 0.0% 0 0.0% 0 0.0% 1 20.0% 1 4.2% 11 4.1%

Totals 3 100% 12 100% 4 100% 5 100% 24 100% 24 100%

From Table 17, the following can be observed:

a) A total of 24 KPIs was adopted to measure performance of the secretariat at the end of FY 2015/16 (same as at the end of FY 2014/15);

b) There was no data to enable measurement of 1 KPI (4.2% of the total) at the end of FY 2015/16 (same as at the end of FY 2014/15);

c) The number of KPIs achieved was 13 (54.2% of total) at end of FY 2015/16 – (up from 50.0% at the end of FY 2014/15); and

d) The number of KPIs not achieved was 10 (41.7% of total) at end of FY 2015/16 (Down from 45.8% at the end of FY 2014/15).

Generally, the best performing business area was impact of funding with an average score of 75.0% of its indicators achieved. This was followed by Governance at 60.0% and funding operations at 50.0%. The worst performing business area was Human Resource and Administration at 33.3%. The reasons for low performance and the corrective action being taken by URF in the respective business areas where the set targets were not achieved are clarified in section 2.4.2.

2.5.2 Actions Taken on Low Performing KPIs

Low performing KPIs in which actuals below targets are coloured red in Annex 5, were clarified and flagged for corrective actions as follows:

i) Staffing level (percentage of establishment – average over a year): Achievement was 81% against a target of 95%minimum compared to 69.4% minimum registered in FY 2014/15. The target was not achieved mainly because of 2 vacancies of officers of the policy and strategy department and the vacancy of an officer in the planning and programming department which remained unfilled for the biggest part of FY 2015/16. The target is however very ambitious since URF is in a free labour market economy with staff free to exit at any time. URF is in the process of reviewing the target to come down to a realistic level of 90% and

improve the recruitment process to ensure expedience in filling vacant positions.

ii) Administrative overheads: Achievement was 2.3% against a target of 1.7% maximum compared to 1.7% maximum realised in FY 2014/15. The target on this KPI was not achieved due to the re-allocation of UGX 1.432bn from the Board special project of tarmacking town council roads to covering shortfalls in the rent for the URF Secretariat (following the sharp increment of the UGX/Dollar exchange rate) and the costs for design of the URF/PPDA house project whose committed funds were garnished by the Treasury at end of the FY 2014/15. However, the Fund is in the process of revising the target currently at 1.7% max to be set within the 2-4% range consistent with the Africa Road Maintenance Funds Association (ARMFA) benchmark.

iii) Efficiency and timeliness of releases from MoFPED: For efficiency the achievement was 85.7% against a target of 98% min. whilst for timeliness the achievement was 17.8 calendar days against a target of 14 calendar days max compared to 21 days delay registered in FY 2014/15. The performance was contingent on releases from MFPED which contributed 16 calendar days (90.0%) of the total delay whilst URF was responsible for an average delay of 1.8 days (10%) in FY 2015/16. As a way forward, URF shall continue dialogue with MFPED and coordination with other stakeholders to enable amendment of Section 14 of the URA Act and pave way for the monthly remittance of Road User Charges to the URF Account as envisaged under Section 21 of the URF Act.

iv) Budget allocation to Routine Manual (RMM) and Routine Mechanized Maintenance (RMeM): At the end of FY2015/16, with 85.7% of the annual budget released, 81.4% of the released funds were deployed to the 3 maintenance activities in the order of 4.8% for RMM against a target of 7.7%, 33.0% for RMeM against a target of 31.8%, and 43.6% for PM against a target of 33.2%. Accordingly, the

30 Uganda Road Fund I Annual Report FY 2015/2016

target for RMM in FY 2015/16 was not achieved. Furthermore, the apparent low deployment of funds towards RMM was a result of the fact that UNRA bundled the RMM on half of its network with RMeM activities contracted out under term maintenance contracts. URF will continue to guide the DA’s on adherence to fund allocations by works categories which are based on the 5-yr Road Maintenance Strategic Financing Plan for FY 2014/15-2017/18.

v) Budget allocation to district roads and urban roads: At the end of FY 2015/16, with 85.7% of the annual budget released, actual releases by road class were at 67.9% to national roads against an allocation of 64.1%, 10% to district roads against an allocation of 14.3%, 15.1% to urban roads against an allocation of 17.3%, and 2.3% to CARs against an allocation of 1.9%. Accordingly, the targets for district and urban roads were not achieved. The relative low performance of releases to district and urban roads was due to the front loading of releases to national roads to cater for the accumulated unpaid road maintenance certificates. URF shall target the budget for FY 2016/17 towards removing the disparities in release of funds for maintenance of different categories of roads.

vi) Percentage of road users satisfied with Uganda’s public roads network: Achievement was 37.3% in FY 2015/16 down from 53.2% in FY 2014/15. This was the first Road User Satisfaction Survey (RUSS) independently undertaken by URF, having taken it over from CrossRoads. The result was majorly afflicted by 3 factors which included the budget cut during FY 2015/16, the negative visibility of the road

sub-sector created by the widely publicized tainting findings of the Judicial Commission of inquiry into UNRA mismanagement and the World Bank suspension of funding to the roads sub-sector. In addition, the survey in FY 2015/16 was undertaken during the rainy season when road users typically have negative opinions on the state of roads due to various factors. URF will improve the budget and timeliness for undertaking future RUSS in order to keep the results comparable and reliable.

vii) Punctuality in presentation of the URF Annual Report (submission of URF Annual Report to Minister responsible for Finance): Not achieved against a target of 184 calendar days after close of FY 2014/15.This was mainly due to the thin staffing of the URF Policy and Strategy department and the DA’s excessive delays in submission of their Q4 reports. URF is in the process of recruiting staff to fill the gap in the Policy and Strategy department to enable timely production of the Annual Reports.

2.5.3 URF Rating in the Government Annual Report (GAPR), FY 2014/15

The GAPR is a report compiled by the Office of the Prime Minister (OPM) on an annual basis to present performance on key performance measures for each sector. The FY 2015/16 GAPR provided an overview of Government’s performance rating during the financial year across all areas of public investment with the aim of influencing planning and budgetary allocations for the FY 2016/17. Table 19 shows the performance of URF and the Works and Transport Sector as rated in the FY 2015/16 GAPR.

Table 19: Sector Performance Scorecard in FY 2015/16 GAPR/FY 2014/15 GAPR

Transport Sector Output Performance% Achieved % Not Achieved % no data

Outputs 2014/15 2015/16* 2014/15 2015/16 2014/15 2015/16 DenominatorURF 100 67 0 33 0 0 06MoWT 79 71 21 29 0 0 28UNRA 73 82 27 18 0 0 11Sector 80 73 20 27 0 0 45

Source: GAPR for FY 2015/16, Sept, 2016.*Includes moderately satisfactory items.

It can be seen from Table 19 that a total of 6 indicators were used to measure the performance of URF in the GAPR as was the case in FY 2014/15. A total of 67% of the planned actions were achieved in FY 2015/16 compared to 100% in FY 2014/15 which was a 33% decline.

31Uganda Road Fund I Annual Report FY 2015/2016

3.0 Performance of Road Maintenance Programmes3.1 Funding Operations

Funding operations is one of the core activities of the Fund. It includes processes for determination of funding levels; budgeting procedures; allocation of funds; collection of funds and disbursement of funds to designated agencies. Performance of the Fund in these processes during FY 2015/16 is examined in sections 3.1.1 – 3.1.4.

3.1.1 Determination of Funding Levels

Determination of funding levels is a critical function of the Board as defined under Section 14 of the URF Act. Accordingly, the Board is required to recommend to the Minister of Finance, the appropriate levels of road user charges, fines, levies or any other sums to be collected and paid into the Fund. The function constitutes a major step in the Fund planning processes scheduled under Sections 24, 25, and 26 of the Act. However during FY 2015/16, some of these critical planning processes including setting of tariff levels could not be handled as funding for road maintenance was still under the Medium Term Expenditure Framework (MTEF). The funding level under the MTEF was still determined by the Treasury rather than basing on maintenance needs of the public roads network. It is anticipated that this anomaly will be sorted out once Section 14 of the URA Act is amended to facilitate direct remittance of Road User Charges (RUCS) to the Funds Account in line with Section 21 (3) of the URF Act.

3.1.2 Budgeting Procedure

In FY 2015/16, the only source of funds for road maintenance was the Consolidated Fund, remaining the same as had been the case since the establishment of the Fund. As a result, the budgeting process for road maintenance was conducted through the regular government budget process in line with provisions of the Budget Act and Public Finance Management Act 2.

In response to the Budget Call Circulars (BCC) issued by MFPED in Feb, 2015, the Fund in consultation with DA’s prepared a Budget Framework Paper (BFP), which formed part of the Transport Sector BFP submitted to MFPED. The consultation process with DA’s involved obtaining from them their Annual Programs based on IPFs declared by URF in Jan, 2015. Submission from the agencies included their physical and expenditure plans for FY 2015/16. The road maintenance budget for FY 2015/16 was prepared under Vote 118 based on three output areas of national roads maintenance, DUCAR (including KCCA) maintenance and the URF Secretariat. In addition, URF prepared the OYRMP for FY 2016/17 which was presented to Parliament by the Minister of Works and Transport as part of the Sector Ministerial Statement.

3.1.3 Funding Procedure

The operational procedure and systems followed by the Board during FY2015/16 remained the same as in FY 2014/15 as shown in the flow chart in Figure 4. The procedure was designed to ensure smooth and transparent operational mechanisms of the Fund.

32 Uganda Road Fund I Annual Report FY 2015/2016

Figure 4: URF Funding Process

Designated Agencies submit Annual Road Maintenance Programmes

Board Reviews for:(a) affordability(b) approprateness

Acceptable?

NO

Board prepares Annual Road Maintenance Plan & Expenditure Programme

YES

Board determines overall funding capacity after

consultation with MFPED & MOWT

Board informs designated agencies of road maintenance allocations and

requests submission of Annual Road Maintenance Programmes

Board sets level of non- road maintenance elements of Annual Road Expenditure Proghramme

Board prepares draft Performance Statement

and submits toMFPED & MOWT

Approved?

Board prepares 3-year & 5-year Road

Maintenance Plans

NO

MOWT Tables Performance Statement and Maintenance

Plans in Parliament

YES

33Uganda Road Fund I Annual Report FY 2015/2016

3.1.4 Allocation of Funds to Designated Agencies

A sum of UGX 417.93bn was allocated to URF for road maintenance in FY 2015/16, by Parliamentary appropriations. This was UGX 10.172bn less than the UGX 428.102bn in FY 2014/15 (equivalent to 2.4% budget reduction). The funds were allocated to various expenditure heads by category and allowed uses as shown in sections 3.1.4.1 and 3.1.4.5

3.1.5 Allocation by Category of Expenditure heads

Allocation of funds in FY 2015/16 by category of expenditure heads compared to the previous year is shown in Table 20 and illustrated in Figure 5.

Table 20: Global budget allocation of funds to DA’s in FY 2015/16 (UGX bn)

S/N Vote Function Budget FY 2014/15

%age allocation FY 2014/15

Budget FY 2015/16

%age of total budget FY

2015/16

%age Budget change

1 UNRA 274.438 64.11% 267.917 64.10% -2.38%2 DUCAR 126.440 29.53% 122.004 29.20% -3.51%3 KCCA 20.000 4.67% 19.525 4.67% -2.38%4 URF Secretariat 7.224 1.69% 8.484 2.03% 17.44%

Total 428.102 100% 417.930 100% -2.38%

Source: URF OYRMP FY 2015/16

It can be observed from Table 20 that the specific road maintenance budget allocations in FY 2015/16 declined as follows:

a) National roads maintenance (under UNRA) decreased by UGX 6.521bn (equivalent to 2.38%);b) DUCAR network decreased by UGX 4.436bn (equivalent to 3.51%);c) KCCA network decreased by UGX 0.475bn (equivalent to 2.38%);d) URF Secretariat increased by UGX 1.26bn (equivalent to 17.44%) to enable the fund implement key

actions laid out in its 5-year Corporate Plan for FY 2013/14-2017/18.

Figure 5: Global Budget Allocation FY 2015/16

3.16 Funds Inflow for FY 2015/16

In FY 2015/16, URF received a sum of UGX 357.589bn from the Treasury, in quarterly tranches, which constituted 85.6% of the approved annual budget for road maintenance. This represented an overall funding cut of 14.4%.

34 Uganda Road Fund I Annual Report FY 2015/2016

Table 21 shows Quarterly funds inflow from MoFPED to URF vote 118 in FY 2015/16.

Table 21: Summary of Funds inflow to vote 118, FY 2015/16

S/N Description Approved Annual Budget (UGX bn)

Quarterly Releases FY 2015/16 (UGX bn) Total Release (UGX bn)

% of Annual Budget Released

Q1 Q2 Q3 Q4

1 MoFPED ReleasesUNRA 267.917 66.731 95.000 28.267 51.100 241.098 90.0%DUCAR 141.529 34.810 18.818 17.834 36.700 108.162 76.4%URF Secretariat 8.484 2.941 2.571 1.322 1.495 8.329 98.2%Total Amount 417.930 104.482 116.389 47.423 89.295 357.589 85.6%

2 Dates of Release 21-Jul-15 20-Oct-15 16-Jan-16 18-Apr-16Delay (No. of calendar days from start of Quarter).

Target = 14 C/Days

20 19 15 17 17.8 (average)

It can be observed from Table 21 that:

a) The URF voted road maintenance funds suffered a funding cut of UGX 60.341 bn equivalent to 14.4% in FY 2015/16;

b) The average time delay of funds release from MFPED in FY 2015/16 was 17.8 days which was higher than the target time as shown in Table 22.

Table 22: Performance on KIP’s for Funds Inflow, FY 2015/16

KPI Target in FY 2015/16 OYRMP

Actual Realised in FY 2015/16

Remarks

1 Efficiency (% of potential revenue collected in each category).

98% min 85.6% Not Achieved.

2 Timeliness (Average days from collection to deposit for each category).

14 calendar day’s maximum.

17.8 calendar day’s average.

Not Achieved.

It can be seen from Table 22 that:

a) The performance target for Efficiency in revenue collection was not achieved due to a shortfall of 14.4%;

b) The performance target for Timeliness was also not achieved with a delay of 17.8 days compared to 3.8 days in FY 2014/15.

3.1.6 Funds Disbursements in FY 2015/16

In FY 2015/16, URF disbursed a total of UGX 347.909bn to DA’s for maintenance of all categories of public roads (equivalent to 97.7% of budget) and retained UGX 8.329bn for administrative expenses of the Secretariat (equivalent to 2.3%) as shown in Table 23.

On average, the disbursements to UNRA took 9.3 calendar days while those to DUCAR agencies took an average of 13.2 calendar days (from the dates of receipt of funds from MoFPED).

35Uganda Road Fund I Annual Report FY 2015/2016

Table 23: Summary of Funds Disbursements–FY 2015/16

S/N Description ApprovedBudget FY 2015/16(UGX bn)

Disbursements FY 2015//16 (UGX Total Disbursed(UGX bn)

% of Budget Disbursed(UGX bn)

% of TotalDisbursed Q1 Q2 Q3 Q4

1 URF DisbursementsUNRA 267.917 71.231 95.000 23.767 51.100 241.098 90.0% 67.7%KCCA 19.525 4.754 1.562 3.251 5.171 14.738 75.5% 4.1%Districts 48.307 11.762 3.865 8.043 11.821 35.491 73.5% 10.0%Municipalities 21.064 5.129 1.685 3.507 5.208 15.529 73.7% 4.4%Town Councils 20.90 5.089 1.672 3.480 5.335 15.576 74.5% 4.4%CARs 8.17 - 8.170 - - 8.170 100.0% 2.3%Mech. Imp 11.996 2.921 0.960 0.542 4.360 8.783 73.2% 2.5%Emergency 3.000 0.730 0.329 0.890 1.050 2.999 100.0% 0.8%TC Project 8.568 - 0.500 0 5.025 5.525 64.5% 1.6%Total 409.446 101.610 113.742 43.480 89.070 347.909 85.0% 97.7%URF Secretariat 8.484 2.941 2.571 1.322 1.495 8.329 98.2% 2.3%Grand Total 417.930 104.557 116.314 44.802 90.565 356.238 85.2% 100%

2 Performance of Disbursements KPIs (Calendar days)

2.1 Av. Delay of Disbursement s to UNRA

21.0 10.5 7.7 9.3* Target 14

Achieved

2.2 Av. Delay of Disbursement s to DUCAR

19.6 16.6 12.6 13.2* 14 Achieved

*Cumulative Average delay in calendar days.It can be observed from Table 23 that:a) The disbursement of road maintenance funds to DAs stood at 85.2% of the budget for FY 2015/16

compared to 99.6% in FY 2014/15;b) The underperformance in disbursements to DAs was mainly due to the MFPED funding cut of 14.4%

in FY 2015/16.The percentage disbursements to the different categories of DAs and sub-agencies are illustrated in figure 6.o. Figure 6: Percentage Disbursements by Category of Agencies– FY 2015/16

UNRA, 6

Secret

67.7%

URF tariat, 2.3%

Emerg

TC Resealing Project, 1.6%

CAR

MeDUC

gency DUCAR, 0.8%

Rs, 2.3%

ech. Imp CAR, 2.5%

R

Mun

Town Councils, 4.4

KCCA

Districts,

nicipalities, 4.4

%

A, 4.1%

10.0%

4%

It can be seen from Figure 6 that the biggest portion of the disbursements went to UNRA (67.7%) for maintenance of the national roads network while the rest was shared amongst maintenance of the DUCAR network and KCCA roads, and administration of the URF Secretariat. Furthermore, Figure 7 illustrates the performance of disbursements against the respective IPFs of DAs and sub-agencies.

36 Uganda Road Fund I Annual Report FY 2015/2016

Figure 7: Disbursed Funds against IPFs of DA’s and Sub-Agencies, FY 2015/16.

It can be seen from Figure 7 that UNRA, KCCA, DUCAR, and the URF Secretariat suffered a funding cut as they all did not realise 100% of their approved Indicative Planning Figures (IPFs). However, the URF Secretariat ensured that the DUCAR lines for CARs and emergencies were fully cushioned against the funding cuts during the FY since these were already grappling with relatively miniature budgets.

3.1.7 Performance of DA’s Disbursements by Region

Table 24 shows a summary of the DA’s disbursements against their respective budgets in FY 2015/16, with the local governments disaggregated into four regions namely: Central; East; North; West; and South.

Table 24: DA’s Disbursements by Region in FY 2015/16

Agency/Region

Annual Budget

FY 2015/16 (UGX - bn)

Disbursements FY 2015/16 (UGX

- bn)

% of Budget Disbursed, FY 2015/16

% of Budget Disbursed, FY 2014/15

% of Budget Disbursed, FY 2013/14

Agencies by region

DLGs MCs TCs SCs

UNRA 267.917 241.098 90% 95% 100% 22 Stations

KCCA 19.525 14.738 75% 142% 100% 5 Divisions

LGs - Central 22.725 18.068 80% 100% 100% 22 3 43 182

LGs - Eastern 21.123 15.878 75% 100% 100% 40 7 45 387

LGs - Northern 21.224 15.988 75% 100% 100% 23 3 27 218

LGs - Western 22.805 16.982 74% 100% 100% 26 9 59 322

Total LGs[1] 87.877 66.915 76% 100% 100% 111 22 176 1,109

Emergency 3.000 3.000 100% 100% 100%

Tarmacking TCs 8.568 5.525 64% 100% 100% 21 TCs

MCs 22.559 16.628 74% 100% 100% 22 MCs

Grand Total 409.446 347.909 85% 99% 100%

The following can be observed from Table 24 that:

a) In FY 2015/16, the disbursements to DLGs for routine and periodic maintenance averaged 76% of their budgets compared to 100% in FYs 2014/15 and 2013/14 representing a decline;

b) The tarmacking of TCs roads received 74% of their budget mainly due to delayed procurements for scarce local materials.

Details of DLGs quarterly disbursements are outlined in Annex 6 while those for DUCAR and UNRA are depicted in Annexes 7 and 8 respectively.

37Uganda Road Fund I Annual Report FY 2015/2016

3.2 Financial Performance of Road Maintenance Programmes - FY 2015/16

3.2.1 DA’s expenditures against available funds

Table 25 shows a summary of the DA’s expenditures compared to the disbursed and available funds in FY 2015/16.

Table 25: DA’s Expenditures against Available Funds in FY 2015/16

Agency

Annual Budget FY

2015/16

Funds rolled

from FY 2014/15

Releases FY 2015/16

Total Funds available FY

2015/16

Actual Expenditure

FY 2015/16

Unspent balances FY

2015/16

% of available

funds spent FY 2015/16

(UGX bn) (UGX bn) (UGX bn) (UGX bn) (UGX bn) (UGX bn)(a) (b) (c) (d) = (b+c) (e) (f) = (d-e) (g) = (e/d)

UNRA 267.917 4.251 241.098 245.349 244.964 0.390 99.8%DUCAR 122.005 3.756 93.424 97.180 91.499 5.680 94.2%KCCA 19.525 11.207 14.738 25.945 31.305 -5.359 120.7%Sub Total 409.446 19.214 349.260 368.474 367.768 0.701 99.8%URF Secretariat 8.484 - 8.329 8.329 8.326 0.000 100%

Total 417.930 19.214 357.589 376.803 376.094 0.701 99.8%

Source: URF Final Accounts and DA’s Quarterly Progress Reports for FY 2015/16

*Includes funds for tarmacking TCs and emergency interventions.

It can be observed from Table 25 that:

• UNRA‘s absorption of available funds stood at 99.8%, while KCCA stood at 120.7%, DUCAR at 94.2% compared to 98.41% by UNRA, 120.7% by KCCA, 85.9% by DUCAR in FY 2014/15.

• The DA’s and Secretariat absorption of available funds in FY 2015/16 stood at 99.8% compared to 93.0% in FY 2014/15.

Overall, the DA’s and Secretariat funds absorption in FY 2015/16 improved by 6.8% compared to that in FY 2014/15.

Figure 8 shows a graphical representation of the financial performance of the various road maintenance expenditure lines in FY 2015/16.

Figure 8: DA’s absorption against disbursed and available funds in FY 2015/16

Note: Available funds included funds rolled over from FY 2014/15.

38 Uganda Road Fund I Annual Report FY 2015/2016

It can be observed from figure 8 that:

a) KCCA over committed more than the available funds hence attracted debts to the tune of 21%;

b) DUCAR absorption of the available funds was the lowest at 94.2%;

Table 26 shows a summary of the District Local Governments (excluding MCs) expenditure disaggregated into four regions.

Table 26: DLGs Funds Expenditure by Region in FY 2015/16

S/N Agency/ Region

Rollover funds from FY2014/15 (UGX bn)

Funds Disbursed Funds

Available(UGX bn)

Actual Expenditure

FY2015/16

Unspent funds FY 2015/16 % of

released absorbed

% of available absorbedFY2015/16 (UGX bn) (UGX bn)

(UGX bn)

1 LGs - Central 0.868 18.068 18.936 17.947 0.990 99% 95%2 LGs - Eastern 0.211 15.877 16.088 16.764 -0.676 106% 104%

3 LGs -Northern 1.196 15.988 17.184 15.646 1.538 98% 91%

4 LGs- Western 0.814 16.982 17.796 16.561 1.234 98% 93% Total LGs 3.088 66.915 70.003 66.918* 3.086 100% 96%

Source: OYRMP 2015/16, Quarterly Disbursement Schedules and Accountability Reports for FY 2015/16;

* Total excludes expenditure on Tarmacking of TC roads (UGx 5.525bn) and emergency interventions (UGx 3.00bn);

The following can be observed from Table 26:

a) The DLGs funds absorption by region ranged from 91% to 104% in FY 2015/16 compared to 79.3% to 89.2% in FY 2014/15 representing an improvement;

b) The highest funds absorption was by the Eastern region at 104% and lowest by the Northern region at 91%.

The overall DA’ financial performance is illustrated in figure 9.

Figure 9: DA’s Financial Performance of Designated Agencies - FY 2015/16

It can be observed from figure 9 that:

a) The disbursements to all DA’s was affected by the 14.4% funding cut;

b) Only KCCA absorbed more than the available funds;

3.2.2. DLG’s Expenditure on DRCs

The establishment of District Road Committees (DRCs) in all Districts was provided for under Section 25(2) of the URF Act with an objective for them to provide close oversight in road maintenance activities in their respective districts.

39Uganda Road Fund I Annual Report FY 2015/2016

The Road Fund Board considered it prudent to always provide facilitation for DRC’s (as part of the 4.5% operating cost budget) to enable them execute their functions efficiently and give feedback to URF, for timely interventions.

However, due to some reasons, the establishment of DRCs has been rather slow since the establishment of the fund to date. The Fund has now prioritised DRC’s operations among the key strategies for fast tracking in FY 2016/17 to facilitate improved oversight.

The total expenditure on DRC’s by region in FY 2015/16 amounted to UGX 327.65Mn (Equivalent to 63% of the DRC’s budget), as summarised in Table 27 below and detailed in Annex 8.

Table 27: Summary of DLG’s Expenditure on DRCs in FY 2015/16

SN Region No of DRCs

Budget(UGX Mn)

ExpenditureUGX (Mn)

% DRC’s Expenditure

DRCs Operational

%DRCs Operational

01 North 28 127.06 94.75 75% 23 82%02 Eastern 34 213.49 127.86 60% 27 79%03 Central 22 70.36 34.31 49% 16 73%04 Western 27 134.81 69.64 52% 22 81%Total 111 520.82 327.65 63% 88 79%

It can be observed from Table 27 that the Northern region was the most active at 75% utilisation of availed funds while the central region was the least active at 49%. Over all 88 DRCs (equivalent to 79%) were in place during FY 2015/16 and utilised 63% of the budgeted funding.

3.2.3 Trend of Road Maintenance Financing since FY 2010/11 - FY 2015/16

Prior to the establishment of URF, road maintenance funding was disbursed directly to agencies from the Treasury, within the framework of annual budgetary appropriations. This approach did not prioritise road network maintenance needs against the backdrop of competing demands. Between 1997/98 and 2007/08, the national roads network, owing to the funding shortfall, had accumulated a maintenance backlog of 3,500km or 33% of its network of 11,000km at the time. The district roads network in poor to very poor condition escalated from 30% to 55% over the same period. Part of the reason for establishment of the Road Fund in 2008 was to address these road condition declines.

An enabled road fund offers best opportunity to ensure adequate level and predictability of road maintenance funding. URF has not yet attained this status owing to legal impediments constraining its independent realization of revenues from road user charges. As such the current method of financing road maintenance through quarterly releases from the Treasury is still not fully responsive to road condition and road network needs as to adequately control maintenance backlog growth.

Table 28 shows the Medium Term Expenditure Framework (MTEF) projections to FY 2017/18, which indicates that the available funding will only meet 28% of needs, leaving funding of 72% of needs unmet. In FY 2015/16 URF was allocated a total of UGX 417.930 billion under the MTEF, of which net allocation to road maintenance needs was UGX 409.40billion against total requirements estimated at UGX 1.273 trillion and therefore left a shortfall of UGX 863.7 billion (67.8% of total).

Table 28: Road Maintenance Funding FY2010/11 – 2017/18

FY UGX, Bn

Needs Available1 Un-met NeedsM’tce Backlog Total M’tce Others2 Total Amount %tage

2010/11 632.0 451.5 1083.50 273.1 119.5 392.6 690.9 63.8%

2011/12 672.8 579.6 1252.40 273.1 170.9 443.9 808.5 64.6%

2012/13 958.5 656.2 1614.70 273.1 359.3 632.4 982.3 60.8%

2013/14 836.4 584.2 1420.60 345.6 377.5 723.1 697.5 49.1%

2014/15 1,083.4 769.5 1852.87 420.9 410.7 831.6 1021.3 55.1%

2015/16 1,273.3 822.4 2095.64 410.9 441.6 852.5 1243.1 59.3%

2016/17 1,510.1 1,099.0 2609.08 406.7 629.5 1036.1 1572.9 60.3%

2017/18 1,614.2 1,117.9 2732.10 406.6 364.7 771.3 1960.8 71.8%

1MTEF Projections in National Budget Estim1ates, FY 2016/17

40 Uganda Road Fund I Annual Report FY 2015/2016

2Include others for rehabilitation such as PRDP, RRP, USMID and others but excluding major upgrading works.

Figure 10 shows the trend of road maintenance needs, road maintenance financing and the un-met needs (including funding under USMID, RRP and PRDP), since FY 2010/11 and as projected to FY 2017/18.

Figure 10: Trend of Road Maintenance Financing, FY 2010/11 – 2017/18

As shown in Figure 10, the total funds availed for road maintenance and rehabilitation has been growing in nominal terms from UGX 393 billion in FY 2010/11 to UGX 1,036 billion in FY 2016/17 but is projected to reduce to UGX 771 billion in FY 2017/18. On the other hand, the total maintenance needs (maintenance and rehabilitation) of the public road network is increasing steadily at a faster rate than the increment in available funds. This is expected since the funding for road maintenance and rehabilitation is not yet linked to road usage represented by both traffic loading (cargo freight) and traffic volumes (number of vehicles), which is growing at more than 10% per annum. Therefore, the total available funds need to be increased and sustained at a critical level to force a steady decrease of the total maintenance needs. Funding of road maintenance also needs to be linked to road usage through introduction of road user charges envisaged in the URF Act.

The details of financial performance by DUCAR agencies and UNRA in FY 2015/16 are depicted in Annexes 7 and 8 respectively.

3.3 Physical Performance of Road Maintenance Programmes - FY 2015/16In line with Section 22 of the URF Act, the funds appropriated to URF in FY 2015/16 were applied for various categories of road maintenance works and services as detailed in Tables 29 to 32.

3.3.1 National Roads Physical Performance output

Table 29 shows a summary of physical performance achieved under the National Roads network (UNRA) compared to the funded and originally planned activities.

Table 29: Physical performance of National Roads Maintenance programme in FY 2015/16

S/N Works CategoryFY 2014/15 FY 2015/16

Planned Qty

Funded Qty

Achieved Qty

Planned Qty

Funded Qty

Achieved Qty

% Plan Funded

% Funded Achieved

1 Routine Maintenance Manual (km) 12,300 12,300 11,580 8,600 7,878 12,234 91.6% 155.3%

Mechanised (km) 15,700 15,500 13,178 16,500 15,114 15,404 91.6% 101.9%

% funded routine achieved 89% % funded routine 92% 110%

2 Periodic Maintenance

Paved (km) 100 95.3 20 100 92 69 92% 75.0%

Unpaved (km) 2,225 2,125 1,510 2,012 1,832 901 92% 49.2%

% age funded PM achieved 69% 92% 46%Combined Routine & Periodic 87.6% 114.8%

41Uganda Road Fund I Annual Report FY 2015/2016

S/N Works CategoryFY 2014/15 FY 2015/16

Planned Qty

Funded Qty

Achieved Qty

Planned Qty

Funded Qty

Achieved Qty

% Plan Funded

% Funded Achieved

3 Bridges

Routine (No) 300 286 250 350 321 215 91.6% 67.0%

Periodic (No) 7 7 01 7 6 0 91.6% 0%

% age funded bridges 86% 92% 66%

4 Road safety (km)Street lighting (km) 55 55 55 55 50 55 91.6% 110%

Signage (km) 4000 4000 0 3,500 0 0 0% 0%

Road marking (km) 800 800 37 2,479 2,271 66 91.6% 2.9%

Road reserves (km) 450 450 91 520 476 294 91.6% 61.8%

Weighbridges (O&M) 15 10 10 15 15 15 100% 100%

5 Ferries and Landing SitesFerries (O&M) 9 9 9 9 8 8 89% 100%

6 Other Qualifying workLow cost sealing (km) 5 5 0.5 2.5 0 0 0% 0%

Source: UNRA Physical and Financial accountability report for FY 2015/16.

From Table 29 above, it can be observed that:

a) Not all UNRA’s planned quantities were funded owing to the funding cut on the national roads maintenance programme in FY 2015/16;

b) The funding of routine, periodic and bridges maintenance averaged 92% while that of road safety and ferries maintenance was 75% and 89% respectively.

c) The achieved funded routine and periodic maintenance activities stood at 110% and 46% compared to 89% and 69% respectively in FY 2014/15;

d) The achieved physical performance of the funded bridges and road safety maintenance generally declined compared to that realised in FY 2014/15;

e) In general, only the performance in routine maintenance across the national roads improved in FY 2015/16 while periodic and bridges maintenance declined compared to performance in FY 2014/15 as illustrated in figure 11 below.

Figure 11: Trend of UNRA performance in FY 2010/11-2015/16

The persistent downward trend of periodic and bridges maintenance against the funded activities was mainly due to delayed centralised procurements, poor availability of road equipment, delayed funds transfer to stations and human resource capacity gaps under UNRA.

42 Uganda Road Fund I Annual Report FY 2015/2016

3.3.2 Kampala City Roads Physical Performance output

Table 30 shows the physical performance of the activities funded under KCCA in FY 2015/16.

Table 30: Physical Performance of KCCA Roads Maintenance Programme for FY 2015/16

S/N Works Category FY 2014/15 FY 2015/16Planned

QtyFunded

QtyAchieved

Qty% of Funded

AchievedPlanned

QtyFunded

QtyAchieved

Qty% of Funded

Achieved% of Planned

Achieved

1 Routine Maintenance Mechanised (km) 69.6 930 939 101% 860 800 917.8 114.7% 106.7%

2 Periodic Maintenance Paved (km) 11.0 11.0 2.3 20.9% 9.9 8.0 10.3 128.8% 104.0%

Unpaved (km) 14.03 14.03 2.7 19.2% - - - - -

Periodic Mt’ce (paved and unpaved) 20.0% 128.8% 104.0%

Combined Routine & periodic 98.8% 114.9% 106.7%

It can be observed from figure 7 above, that not all KCCA planned quantities were funded owing to a 24.5% funding cut on the city roads maintenance programme. However, the cost of the achievements outstripped that of the funded quantities by 20.7% (as shown in table 26, which culminated into a debt of UGX 5.360bn (equivalent to 20.6% cost overrun) at close of the FY 2015/16.

The achieved physical performance of the funded routine mechanized maintenance was 114.7% while periodic maintenance for paved roads stood at 128.8% compared to 101% and 20.9% attained in FY 2014/15 respectively.

Figure 12: The trend of KCCA Physical performance since 2013/14 to date

It can be observed from figure 12 that the KCCA routine maintenance has been on a steady progress trend over the last 3 years while periodic maintenance was unstable mainly due to unpredictable funding and delayed procurements. The performance of KCC/KCCA in FY 2010/11-12/13 was combined with that of DUCAR.

3.3.3 DUCAR Roads Physical Performance Output

The physical performance of DUCAR (111 DLGs and 22MCs) is outlined in the text below.

a) DLG’s physical performance

Table 31 shows the summary of DLG’s physical performance outputs against the funded activities in FY 2015/16.

43Uganda Road Fund I Annual Report FY 2015/2016

Table 31: Physical Performance of the DLG’s Maintenance Programme in FY 2015/16

S/N Works Category

FY 2014/15 FY 2015/16

Planned Qty

Funded Qty

Achieved Qty

% of Funded

Achieved

Planned Qty

Funded Qty

Achieved Qty

% of Funded

Achieved 1 Routine Maintenance

Manual (km) 36,061 36,061 31,355 87.0% 30,299 23,209 26,430 113.9 %Mechanised (km) 10,031 10,031 8,738 87.1% 10,961 8,396 7,246 86.3%Routine maintenance (RMM&RMeM) 87% 107%

2 Periodic Maintenance

Paved/Unpaved (km) 2,823 2,823 2,623 92.9% 2,771 2,122 1,589 74.9%

Combined Routine & periodic 87.3% 104.6%

3 Bridges RM/Periodic (No) 67 67 82 122.4% 43 33 41 124.4%4 Culvert (Lines) 4,446 4,446 3,415 76.8% 2,708 2,074 1,009 48.6%

It can be observed from Table 31 that:

a) The DLGs activities were affected by the funding cut of 23.4%;

b) The achieved funded DLGs routine manual maintenance (RMM) in FY 2015/16 stood at 26,430km compared to 31,355km in FY 2014/15 which was a decline by about 16%;

c) The achieved periodic maintenance (for both the paved and unpaved roads) was 74.9% compared to 93% in FY 2014/15 which was a decline in performance by 18.1%;

d) The maintenance of bridges and installation of culverts in FY 2015/16 stood at 124% and 49% respectively compared to 122.4% and 76.8% in FY 2014/15.

Overall the achieved DLGs routine and periodic maintenance declined compared to that in FY 2014/15 mainly due to low availability of shared zonal equipment and the prevalent FA grey areas.

b) MC’s Physical performance

Table 32 shows the achieved road maintenance performance under Municipal Councils (22 major urban centres).

Table 32: Physical Performance of MC’s Road Maintenance in FY2014/15-FY 2015/16

S/N Works Category

FY 2014/15 FY 2015/16

Planned Qty

Funded Qty

Achieved Qty

% Funded

Achieved

Planned Qty

Funded Qty

Achieved Qty

% of Funded

Achieved1 Routine Maintenance

Manual (km) 1,332 1,332 1,107 83.2% 1,332 1,020 1,022 100.2%Mechanised (km) 606 606 419 69.1% 645 494 317 64.1%Routine Maintenance (RMM % RMeM) 78.7% 88.4%

2 Periodic MaintenancePaved (km) 246.0 246.0 218.4 88.8% 197 151 80 53.1%Combined Routine & Periodic 79.9% 85.2%

3 Bridges/CulvertsRoutine/Periodic 11.0 11.0 9.0 81.8% 24 18 7 38.9%Culverts (Lines) 725 637 569 89.3% 429 329 227 69.1%

It can be observed from Table 32 that:

i) The funded MCs activities were affected by the budget cut of 23.4%;

ii) The achieved funded MCs routine maintenance (RMM & RMeM) in FY 2015/16 averaged 88.4% compared to 78.7% in FY 2014/15 representing an improvement of 9.7%.

iii) The achieved funded periodic maintenance (for both the paved and unpaved roads) was 85.2% compared to 79.9% in FY 2014/15 which was an improvement by 5.3%.

44 Uganda Road Fund I Annual Report FY 2015/2016

iv) The achieved funded bridges maintenance was 38.9% compared to 81.8% in FY 2014/15 which was a decline by 42.9%.

v) The installation of culvert lines stood at 69.1% of the funded works compared to 89.3% realised in FY 2014/15 which was a decline by 20.2%.

Overall only the funded routine maintenance under MC’s in FY 2015/16 improved while periodic and bridges maintenance interventions declined compared to achievements in FY 2014/15.

c) DUCAR Physical performance

The summary of DUCAR physical performance against funded outputs in FY 2015/16 is shown in Table 33 below.

Table 33: Summary of DUCAR (DLGs&MCs) Physical Performance in FY 2014/15 – 15/16

S/N Works Category

FY 2014/15 FY 2015/16

Planned Qty

Funded Qty

Achieved Qty

% of Funded

Achieved

Planned Qty

Funded Qty

Achieved Qty

% of Funded

Achieved 1 Routine Maintenance

Manual (km) 37,393 37,393 32,462 86.8% 31,631 24,229 27,452 113.30%Mechanised (km) 10,637 10,637 9,157 86.1% 11,606 8,890 7,563 85.07%Routine Maintenance (RMM & RMeM) 86.7% 105.7%

2 Periodic Maintenance

Paved/Unpaved(km) 3,069 3,069 2,841 92.6% 2,967 2,273 1,669 73.41%

Combined Routine & Periodic 87.0% 103.7%

3 Bridges RM/Periodic (No) 78 78 91 116.7% 67 51 48 94%4 Culvert (Lines) 5,171 5,083 3,984 78.4% 3,137 2,403 1,236 51.43%

The following can be observed from Table 33:

a) All the planned DUCAR maintenance activities (Except CARs and emergencies) were affected by the funding cut.

b) The periodic maintenance for paved and unpaved roads stood at 73.4% compared to 92.6% in FY 2014/15 representing a decline by 19.2%;

c) Only routine maintenance improved during FY 2015/16 while periodic and bridges maintenance interventions declined compared to achievements in FY 2014/15 as illustrated in figure 13.

Figure 13: Trend of DUCAR Physical performance since 2010/11 to date

It can be observed from figure 13 that only routine maintenance under DUCAR remained on an upward trend for the last 3 years compared to periodic and bridges maintenance. This was mainly due to delayed procurements, persistently low availability of road equipment, FA grey areas and reductions in funding.

45Uganda Road Fund I Annual Report FY 2015/2016

3.4 Physical performance by Works Category in FY 2015/16

3.4.1 Routine Manual Maintenance

Table 34 shows the performance of routine manual maintenance by road surface type and road network type in terms of kilometres planned, funded and implemented during FY 2015/16.

Table 34: Performance of Routine Manual Maintenance on Public Roads - FY 2015/16

Road Network/ Surface

Planned (km)

Funded (km)

Actual (km)

Funded % of planned

%Achieved of planned

%Achieved of funded

Paved 1,271 1,123 2,003 88% 158% 178%Unpaved 38,960 30,983 37,683 80% 97% 122%Total 40,231 32,107 39,686 80% 99% 124%National (UNRA) 8,600 7,878 12,234 92% 142% 155%KCCA*DLGs 30,299 23,209 26,430 77% 87% 114%MC’s 1,332 1,020 1,022 77% 77% 100%Total 40,231 32,107 39,686 80% 99% 124%

Source: OYRMP 2015/16; Q4 FY2015/16 accountability reports;

*KCCA Routine manual maintenance was handled under public health care.

It can be seen from Table 34 above that:

a) A total of 40,231km equivalent to about 52% of the public roads network was planned for routine manual maintenance of which 80% was funded and 39,686km achieved equivalent to 124%;

b) The achieved routine manual maintenance on paved roads was 2,003km equivalent to 154% of the planned target while that on unpaved roads averaged 97%;

c) Over all the achieved routine manual maintenance averaged 124% of the planned works.

The routine manual maintenance handled in FY 2015/16 is illustrated in Figure 14.

Figure 14: Routine Manual Maintenance by Road Surface and Network Category

As can be seen from figure 14 that despite the funding cut, the achieved routine manual maintenance was well above the funded and planned quantities.

3.4.2 Routine Mechanized Maintenance

Table 35 shows the performance of routine mechanized maintenance by road surface type and road network in terms of kilometres planned, funded and implemented during FY 2015/16.

46 Uganda Road Fund I Annual Report FY 2015/2016

Table 35: Routine Mechanized Maintenance by Road Surface and Road Network – FY 2014/15

Road Network Planned (km)

Funded (km)

Actual (km)

Funded as % of planned

Actual as % of Planned

Actual as % of funded

Paved 3,574 3,295 2,844 92% 80% 86%

Unpaved 25,393 21,569 21,041 85% 83% 98%

Total 28,966 24,864 23,885 86% 82% 96%

National 16,500 15,114 15,404 92% 93% 102%

District 10,961 8,396 7,246 77% 66% 86%

Urban (KCCA and MCs) 1,505 1,354 1,234 90% 82% 91%

Total 28,966 24,864 23,885 86% 82% 96%

Source: OYRMP for FY 2015/16; DAs accountability reports for FY 2015/16.

It can be seen from Table 35 that:

a) A total of 28,966km of public roads was planned for routine mechanised maintenance of which 24,864km (equivalent to ) 86% was funded;

b) A total of 23,885km equivalent to 96% of the funded routine mechanised network was implemented in FY 2015/16;

Figure 15 illustrates the performance of routine mechanized maintenance on public roads in terms of road length funded as a percentage of planned; road length implemented as a percentage of planned; and road length implemented as a percentage of funded.

Figure 15: Routine Mechanized Maintenance by Road Surface and Network Category

It can be observed from figure 12 that:

a) The DLGs mechanised maintenance experienced more funding cut (at 23.4%) than under any other DAs;

b) The achieved funded routine mechanised maintenance average above 80% in all DA’s.

c) The achieved mechanised maintenance outstripped the funded targets in all DA’s.

3.4.3 Periodic Maintenance

Table 36 shows the performance of periodic maintenance on public roads by road surface type and across the different road networks during FY 15/16.

47Uganda Road Fund I Annual Report FY 2015/2016

Table 36: Performance of Periodic Maintenance by Road Surface and Network Category

Road Network Planned (km)

Funded (km)

Actual (km)

Plan % funded

Achieved % Planned

Achieved % funded

Category

Paved 301 246 160 82% 53% 65% Unpaved 4,788 3,970 2,490 83% 52% 63% Total 5,089 4,216 2,649 83% 52% 63%

National 2,112 1,935 970 92% 46% 50%

Districts (DLGs) 2,771 2,122 1,589 77% 57% 75%Urban (KCCA & MC) 207 159 90 77% 44% 57%

Total 5,089 4,216 2,649 83% 52% 63%

Source: OYRMP 2015/16; DAs accountability reports for FY 2015/16.

It can be seen from the Table 36 that:

a) A total of 5,089km was planned for periodic maintenance of paved and unpaved roads in FY 2015/16 of which 4,216km was funded and 2,649km (equivalent to 63%) implemented during the year.

b) The overall performance in periodic maintenance (on paved and unpaved roads) was 63% of the funded and 52% of the planned activities in FY 2015/16;

c) The achieved periodic maintenance averaged from 50-75% of the funded works due to various factors which included the low availability of equipment, delayed procurements, on-going restructuring at UNRA and the prevalent FA grey areas under DUCAR.

Figure 16 illustrates the performance of periodic maintenance in FY 2015/16 (in terms of road length funded as a percentage of planned; road length implemented as a percentage of planned; and road length implemented as a percentage of the funded plan).

Figure 16: Periodic Maintenance by Road Surface Type and Category in FY 2015/16

It can be observed from figure 13 that the achieved periodic maintenance (on paved and unpaved roads) averaged about 50% of the planned works in all DAs.

3.4.4 Maintenance of Bridges, Weighbridges and Ferries

Table 37 shows the physical performance of maintenance of bridges, weighbridges and ferries in FY 2015/16 in terms of numbers planned, funded and maintained during the year.

48 Uganda Road Fund I Annual Report FY 2015/2016

Table 37: Performance of Maintenance of Bridges, Weighbridges and Ferries - FY 2015/16

Designation Planned(No.)

Funded (No.)

Actual(No.)

Funded as % of planned

Actual as % of planned

Actual as % of funded

UNRA 357 327 85 92% 24% 26%

DLG 43 33 41 77% 95% 124%

Municipality 24 18 7 77% 28% 36%

Total Bridges 424 378 133 89% 31% 35%

Weigh Bridges 15 15 15 100% 100% 100%

Ferries 9 9 8 100% 89% 89%

Culverts 3,137 2,403 1,236 77% 39% 51%

Source: OYRMP FY 2015/16; DA’s Accountability Reports for FY 2015/16.

It can be observed in Table 37 that:

a) A total of 424 bridges were planned for routine and periodic maintenance in FY2015/16 out of which 378 bridges maintenance were funded (equivalent to 89%).

b) The overall achieved bridges maintenance was 133 (equivalent to 35%) of the funded bridges programme in FY 2015/16 which was mainly due to delayed procurements and the on-going restructuring at UNRA.

Maintenance of weighbridges and ferries by UNRA stood at 100% and 89% respectively of the funded activities while installation of funded culvert lines under DUCAR performed at 51% as illustrated in Figure 17.

Figure 17: Performance of Bridges maintenance in FY 2015/16

It can be observed from figure 14 that the maintenance of bridges under MCs stood at 36% of the funded target while that of UNRA averaged 26%.

3.4.5 Trends of physical performance for FYs 2010/11-2015/16

The trends of DAs physical performance (routine and periodic) for the last six years of URF operation (FY 2010/11 to FY 2015/16) are shown in Table 38 and illustrated in figure 18.

49Uganda Road Fund I Annual Report FY 2015/2016

Table 38: Trends in DA’s physical performance since FY 2010/11- 2015/16

S/N FY 2010/11 FY 2011/12 FY 2012/13 FY 2013/14 FY 2014/15 FY 2015/161 Routine (km) 39,636 54,214 43,585 64,303 67,316 63,5702 Periodic (km) 4,487 2,086 2,332 2,124 3,781 2,6493 Combined 44,123 56,300 45,917 66,427 71,097 66,2204 Bridges (No) 67 19 187 189 342 133

It can be observed from Table 38 that:

a) The achieved annual routine maintenance (RMM&RMeM) on paved and unpaved roads gradually increased from 39,636km in FY 2010/11 to 63,570km in FY 2015/16 representing a 60% increase;

b) The achieved periodic maintenance (on paved and unpaved roads) average about 2,911km per year as a result of inadequate funding, poor availability of equipment and delayed procurements.

The trends of DA’s physical performance (in routine and periodic road maintenance) for the last six full years of URF operation are illustrated in figure 18 while that of bridges maintenance is shown in figure 18.

Figure 18: Trends in DA’s physical performance for FY 2010/11- 2015/16

Figure 19: Trend of Bridges maintenance since FY 2010/11- 2015/16

It can be observed from figure 19 that the bridges maintenance which had been on an upward trend since FY 2011/12, experienced a decline in FY2015/16.

50 Uganda Road Fund I Annual Report FY 2015/2016

4.0 Financial Statements4.1 Overview

FY2015/16 was the sixth full year of operations of the Fund which operated under Vote 118 with a budget of UGX 417.93bn. These funds were appropriated by parliament for financing routine and periodic maintenance of public roads. During the period, the Fund received 357.589bn UGX from the Consolidated Fund representing 85.6% of the annual budgetary allocation. Disbursements to the designated agencies amounted to UGX 347.909bn representing 97.7% of the total funds received. The disbursements were for both planned works in all agencies and special/emergency interventions on the DUCAR network. Releases for the URF Secretariat amounted to UGX 8.329bn representing 2.3% of the total releases and 98.2% of approved annual budget. Absorption of funds received for the URF Secretariat stood at 100%. This chapter gives the financial statement of the Fund for FY 2015/16, which was audited by the Auditor General. This chapter responds to the requirements under Section 39 (2) of the URF Act, 2008.

4.2 Financial Statement

The performance statements of the Fund for the FY 2015/16 are presented in Tables 39 - 47, which respectively show: the Statement of financial performance, financial position year ended 30th June 2016; Statement of changes in equity as at 30th June 2016; Statement of cash flow, reconciliation of movement of cash; statement of appropriation account, and Statement of reconciliation between total expenditures for the Financial Year ended 30th June 2016. The detailed Financial Statement of the Fund for FY 2015/16 is included in Annex 15.

Table 39: Statement of Financial performance (Based on classification of expenditures by nature)

NoteActual

30 June 2016(Shs)

Actual30 June 2015

(Shs)OPERATING REVENUERevenue Taxes 2External Grants Received 3Transfers received from the Consolidated Fund 4 357,589,278,236 423,378,492,959Transfers from the Contingencies Fund 5Transfers received from Other Government units 6Non – Tax revenue 7 35,700,000 50,000Total operating revenue 357,624,978,236 423,378,542,959OPERATING EXPENSESEmployee costs 8 3,264,402,949 2,569,059,765Goods and services consumed 9 5,046,752,728 4,544,291,029Consumption of property, plant & equipment 10Subsidies 11Transfers to other Organizations 12 349,278,122,559 416,264,994,707Social benefits 13Other operating expenses 14Total operating expenses 357,589,278,236 423,378,345,501Excess of revenue over expenditure from operating activities 35,700,000 197,458Foreign exchange loss (Gain) 15Finance costs 16Transfers to Treasury 17 35,700,000Excess of Revenue over expenditure for the year 0 197,458

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

51Uganda Road Fund I Annual Report FY 2015/2016

Table 40: Statement of Financial Position

Notes 30 June 2016(Shs)

30 June 2015(Shs)

ASSETS Cash and cash equivalents 18 0 50,000Receivables 19 0 0Inventories 20 0 0Investments 21 0 0Non-Produced Assets 22 0 0Total Assets 0 50,000LIABILITIESBorrowings 23 0 0Payables 24 0 0Pension Liability 25 0 0Total Liabilities 0 0Net assets (liabilities) 0 50,000REPRESENTED BY:-Amounts due to the Consolidated Fund

Table 41: Statement of Changes in Equity (net worth)

Schedule 30 June 2016(Shs)

30 June 2015(Shs)

At 1 July - Net worth Last Year (B/F) 50,000 (147,458)Less: Transfers to the UCF account ( Previous Year Balances) Less: Transfers back to the Contingencies Fund+/- Adjustments ( Cash and cash equivalents)) (50,000) Payables adjustments ( See statement of outstanding commitments)Revaluation reserve Add: Excess of revenue over expenditure for the Year 0 197,458 Closing Net Financial Worth 0) 50,000

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

52 Uganda Road Fund I Annual Report FY 2015/2016

Table 42: Cash flow Statement for FY 2015/16

30 June 2016PART 2. (Shs)

30 June 2015(Shs)

CASH FLOWS FROM OPERATING ACTIVITIESRevenue from Operating activitiesTaxesExternal Grants ReceivedTransfers received from the Consolidated Fund 357,589,278,236 423,378,542,959Transfers from the Contingencies FundTransfers received from Other Government unitsNon – Tax revenue 35,700,000 0Deposits receivedAdvances recoveredLess Transfer to Treasury (Balances and NTR) (35,700,000)Total Operating revenue 357,589,278,236 423,378,542,959PAYMENTS FOR OPERATING EXPENSES:Employee costs 3,264,402,949 2,569,059,765Goods and services consumed 5,046,752,728 4,544,291,029SubsidiesTransfers to Other Organizations 349,278,122,559 416,264,994,707Social benefitsOther expensesForeign exchange loss/(gain)Net Advances paidDomestic arrears paid during the year 147,458Pension Arrears paid during the YearLosses of cashLetters of Credit receivableTotal payments for operating activities 357,589,278,236 423,378,492,959Net cash inflows/(outflows) from operating activities 0 50,000CASH FLOWS FROM INVESTING ACTIVITIESPurchase of property, plant and equipmentPurchase of non-produced assetsProceeds from sale of property, plant and equipmentPurchase of investmentsProceeds from sale of investmentsNet cash inflows/(outflows) from investing activitiesCASH FLOWS FROM FINANCING ACTIVITIESProceeds from external borrowingsRepayments of external borrowingsProceeds from other domestic borrowingsRepayments of other domestic borrowingsNet cash flows from financing activitiesNet increase (decrease) in cash and cash equivalents 0 50,000

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

53Uganda Road Fund I Annual Report FY 2015/2016

Table 43: Reconciliation of movement of cash during the Year

Notes 30 June 2016 (Shs) 30 June 2015 (Shs)At the beginning of the year 50,000 0Less: Transfers to the UCF account ( Previous Year Balances)Add/ (Less): Adjustments to the opening balance (50,000)Add/ (Less): Adjustments in cash and cash equivalentsNet increase (decrease) of cash from the Cash flow Statement 50,000PART 1. At the end of the year 0 50,000

Table 44: For purposes of the cash flow statement, cash and cash equivalents

30th June 2016 (Shs) 30th June 2015 (Shs)Cash and bank balances 19 0 50,000Less bank overdrafts 24

1.1.1 Net cash and bank balances 0 50,000

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

54 Uganda Road Fund I Annual Report FY 2015/2016

Table 45: Statement of Appropriation Account [Based On Services Voted]

4.0 Initial Approved Budget

30 June 2016(Shs)

(a)

Revised Approved

Budget30 June 2016

(Shs)(b)

Warrants30 June 2016

(Shs)©

Actual30 June 2016

(Shs)(d)

Variance30 June 2016

(Shs)(b-d)

RECEIPTSTaxesNon – Tax revenue 0 0 35,700,000 (35,700,000)Transfers received from the Consolidated Fund

417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Transfers from the Contingencies FundGrants ReceivedTransfers received from Other Government unitsLess: Transfer to treasury (35,700,000) 35,700,000Total receipts 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816EXPENDITURE- by services as per appropriation

Road Fund Secretariat 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Total Expenditure 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816Net Receipts/Payments 0 0 0 0

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

55Uganda Road Fund I Annual Report FY 2015/2016

Table 46: Statement of Appropriation Account [based on nature of expenditure]

5.0

Initial Approved Budget

30 June 2016(Shs)

(a)

Revised Approved Budget

30 June 2016(Shs)

(b)

Warrants30 June

2016

(Shs)©

Actual30 June 2015

(Shs)(d)

Variance30 June 2015

(Shs)(b-d)

RECEIPTSTaxesNon – Tax revenue 0 0 35,700,000 (35,700,000)Transfers received from the Consolidated Fund 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Transfers from the Contingencies FundGrants ReceivedTransfers received from Other Government unitsLess transfer to treasury 0Total receipts 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816EXPENDITURE-by nature of expenditureEmployee costs 3,423,110,000 3,423,110,000 3,264,402,949 158,707,051Goods and services consumed 5,061,382,052 5,061,382,052 5,046,752,728 14,629,324

Consumption of property, plant & equipmentSubsidiesTransfers to other Organisations 409,446,000,000 409,446,000,000 349,278,122,559 60,167,877,441

Social benefitsOther expenses Domestic arrears paidFinance costsTotal expenditure 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816Net Receipts/Payments 0 0 0 0

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

56 Uganda Road Fund I Annual Report FY 2015/2016

Table 47: Reconciliation of Total Expenditure per Statement of Appropriation

6.0 Actual30th June 2016

(Shs)

Actual30th June 2015

(Shs)

Total expenditure per Appropriation Account 357,589,278,236 423,378,345,501Add: Letters of credit receivable prior year but delivered during the yearForeign exchange losses (gains)Less:Letters of credit receivable at year-endDomestic Arrears paid

Total Expenditure per Statement of Financial Performance 357,589,278,236 423,378,345,501

…………………………………………………………………………………………………………………..Eng. Dr. Michael M. OdongoEXECUTIVE DIRECTOR/SECRETARY TO BOARD

57Uganda Road Fund I Annual Report FY 2015/2016

5.0 Auditor General’s Report5.1 Overview

The URF Act 2008 requires that at the end of each financial year an audit of the Fund is undertaken by the OAG. Accordingly the Auditor General audited the Fund covering FY 2015/16. The summary of the Auditor General’s report on the Financial Statements of URF is outlined below and the detailed report appended in Annex 15.

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ROAD FUND FOR THE YEAR ENDED 30TH JUNE, 2016

THE RT. HON. SPEAKER QF PARLIAMENEMT

I have audited the financial statements of the Uganda Road Fund for the year ended 30th June 2016. These financial statements comprise of the statement of financial position, statement of financial performance, statement of changes in equity, cash flow statement together with other accompanying statements, notes and accounting policies.

Management Responsibility

Under Article 164 of the Constitution of the Republic of Uganda, 1995 (Amended) and Section 45 of the Public Finance Management Act, 2015 the Accounting Officer is accountable to Parliament for the funds and resources of the Uganda Road Fund. The Accounting Officer is also responsible for the preparation of financial statements in accordance with the requirements of the Public Finance Management Act, 2015, the Financial Reporting Guide, 2008 and for such internal controls as management determines is necessary to enable the preparation of financial statements that are free from material misstatements, whether due to fraud or error.

Auditor’s Responsibility

My responsibility as required by Article 163 of the Constitution of the Republic of Uganda, 1995 (as amended) and Sections 13 and 19 of the National Audit Act, 2008 is to audit and express an opinion on these statements based on my audit. I conducted the audit in accordance with International Standards on Auditing. Those standards require that I comply with the ethical requirements, plan and perform the audit to obtain reasonable assurance whether the financial statements are free from material misstatement.

An audit involves performing audit procedures to obtain evidence about the amounts and disclosures in the financial statements as well as evidence supporting compliance with relevant laws and regulations. The procedures selected depend on the

Auditor’s judgment including the assessment of risks of material misstatement of financial statements whether due to fraud or error. In making those risk assessments, the Auditor considers internal control relevant to the entity’s preparation and fair presentation of financial statements in order to design audit procedures that are appropriate in the circumstances but not for purposes of expressing an opinion on the effectiveness of the entity’s -internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management as well as evaluating the overall presentation of the financial statements. I believe that the audit evidence I have obtained is sufficient and appropriate to provide a basis for opinion.

Part “A” of this report sets out my opinion on the financial statements. Part B which forms an integral part of this report presents in detail all the significant audit findings made during the audit which have been brought to the attention of management and will form part of my Annual Report to Parliament.

PART “A”

Opinion

In my opinion, the financial statements of the Uganda Road Fund for the year ended 30th June 2016 are prepared, in all material respects in accordance with Section 51 of the Public Finance Management Act, 2015, and the Financial Reporting Guide, 2008.

Other Matter

Without qualifying my opinion, I consider it necessary to communicate the following matter other than those that are presented in the financial statements.

• Non-collection of Designated Funds

URF was not collecting road user charges contrary to section 21 of the Uganda Road Fund Act, 2008 that mandates the Fund to collect them as one of the sources of funding. It was however noted that this was inconsistent with section 14 of the Uganda Revenue Authority (URA) Act that mandates URA to collect all Government revenues.

Non-collection of this revenue has constrained URF from implementing, its mandate as manifested by the road maintenance backlog of 107,109 km with an annual maintenance requirement estimated at US $ 637.7m,

John F.S. Muwanga AUDITOR GENERALKAMPALA 12th December, 2016

58 Uganda Road Fund I Annual Report FY 2015/2016

6.0 Challenges Experienced in FY 2015/16The key challenges experienced during FY 2015/16 included:

1) Inadequate road maintenance funding which led to deferment of scheduled maintenance especially periodic maintenance and other critical activities such as research and innovation, road safety and Axle road control envisaged in Section 22 (1) of the URF Act. Accordingly, the budget allocation from the Consolidated Fund for FY 2015/16 (UGX 417.930) was only 28% of the required funding in URF’s Strategic Road Maintenance Financing Plan for FY 2014/15 – FY 2018/19, which left a funding gap of about UGX 1.083 Trillion, contributing to the spiralling of the road maintenance backlog.

In mitigation, the following measures are proposed:

c) Government to make major capital investments to stem the escalation of road maintenance backlog and elimination of bottlenecks through undertakings for rehabilitation/reconstruction/upgrading of roads to bring the entire network to a maintainable state; and

d) Concurrent declaration of a fuel levy by Amendment of the Uganda Revenue Authority Act to permit transfer of the road user charges to the URF account on a monthly basis as envisaged in Section 21(3) of the URF Act.

2) Several historical challenges that have compounded the effects of underfunding and have dogged effective maintenance, management and financing of the public roads network over the past decades. They include:

a) Weak institutional capacities specifically understaffing of works departments both in DUCAR agencies and UNRA upcountry stations due to restructuring which is still on-going; procurement delays, which hamper implementation of maintenance programmes and absorption of funds; and weak equipment portfolio in UNRA which continues to use obsolete equipment with high breakdown rates and maintenance costs;

In coordination with other key stakeholders, URF is pursuing the establishment of regional TSUs under DUCAR to improve oversight and instituting of sustainable total quality

management systems.

b) Procurement delays hampering the implementation of road maintenance programmes and absorption of funds especially under UNRA.

In mitigation, URF will continue coordination with other government entities in addressing the underlying issues in delays to procurements;

c) Haphazard upgrading of community access roads to district roads without well-documented criteria that is uniform nation-wide.

URF proposes a review of the classification of roads in Uganda with a view of removing network size instabilities; functional inconsistencies; management ambiguities etc. The Roads Act is also awaited to guide on procedure of reclassifying upgraded road network.

d) Insufficient oversight among DUCAR designated agencies arising from the fact that not all districts have constituted District Roads Committees (DRC) as required under section 25 of the URF Act (following the 2016 elections), and inadequate funding to undertake all out grass root monitoring.

In mitigation, URF plans to complete the process for establishment of DRC regulations and to dialogue with stakeholders in improving functionality of DRCs.

e) Irregular collection of data on size and condition of the DUCAR network.

In mitigation, URF will continue to coordinate with DAs, MoWT, and other stakeholders in collection of data on road inventories and condition to enable close follow-up on the impact of funding.

f) Wide variations in unit costs of similar road maintenance works among DAs that can’t be explained by topographic and climatic differences.

In mitigation, URF is using a unit cost framework to harmonise unit rates across the different regions of the country and envelopes within which unit rates should fall per region are being issued out every FY as part of the planning and operational guidelines to URF DAs.

59Uganda Road Fund I Annual Report FY 2015/2016

g) Continued DA’s poor planning, accountability and reporting practices which afflicts timely reporting on performance of the sector.

URF is in the process of rolling out use of the piloted Road Maintenance Management and Monitoring System (RMMS) to improve planning, reporting and accountability of DAs;

h) Loss of road maintenance funds to the Uganda Revenue Authority observed in some tax defaulting designated agencies.

In mitigation, URF, in its annual planning and operational guidelines to DAs, is advocating protection of road maintenance funds from garnishing by URA. Additionally, URF is enforcing refund of the garnished moneys from the agencies, though this takes time.

i) Grey areas in implementation of the force account policy which is the main method of road maintenance delivery in local governments. As such the entrenchment of the road gang system especially under the DUCAR network is still poor.

URF will continue coordinating and synergizing with MoWT in revision and improvement of the Force Account policy.

j) Misuse of road maintenance funds by Designated Agencies - Audit and M&E activities carried out continues to uncover misuse and abuse of road maintenance funds by some DAs. The identified cases included: non-compliance to work plans and annual

budgets; diversion of funds; expenditure outside approved work plan; operational budget overruns; internal borrowing of funds; unauthorized reallocation of funds; unaccounted for funds; large cash based transactions in some agencies; accountabilities with inaccurate information; poor book keeping, among others;

In mitigation, URF will step up its oversight functions, build synergies with audit functions of the DAs and other government entities, and actively follow up on implementation of the arising recommendations.

k) Poor coordination among road maintenance funding entities including Ministries, donors, and NGOs that overlap functions of the Road Fund. This distorts planning and programming of road maintenance across the public roads network. For the DUCAR network such interventions include those under the Peace, Recovery and Development Programme (PRDP) under the Office of the Prime Minister (OPM); Community Agricultural Infrastructure Improvement Programme (CAIIP) under MoLG; urban road resealing project under MoWT; dust and mud project in Kampala Capital City; and the road interconnectivity programme under MoWT. As such there is a risk of overlaps in the funded activities which causes challenges in accountability and oversight functions.

URF will fast track coordination with key agencies in the sector to regularly harmonise responsibilities and achievements.

60 Uganda Road Fund I Annual Report FY 2015/2016

7.0 Plans and Strategies for FY 2016/177.1 Preparation and operationalization of OYRMP for FY 2016/17

The budget estimate for road maintenance under vote 118 in FY 2016/17 is UGX 417.840bn. This represents a decrement of UGX 0.090bn which is 0.022% of the FY 2015/16 approved budget. Table 48 shows the broad allocation of the funds across the various road network categories.

Table 48: Global Allocation of Funds, FY 2016/2017

No. Programme Item FY 2015/16Amount (UGX bn)

FY 2016/17Amount (UGX bn)

% of Total Allocation

1UNRA 260.438 257.917 61.73%UNRA Operations 10.000 10.000 2.39%

Total National roads 270.438 267.917 64.12%2 Districts 45.786 48.174 11.53%

CAR 8.170 8.142 1.95%Town Councils 20.900 17.973 4.30%Extended Periodic Maintenance Town Councils 8.568 2.830 0.68%Municipal Councils 21.064 25.650 6.14%KCCA 19.525 19.525 4.67%Mechanical Imprest DUCAR 11.996 11.996 2.87%Special interventions on DUCAR 3.000 3.000 0.72%Bridges - 1.568 0.38%

Total for maintenance of DUCAR network 142.962 138.859 33.23%3 URF Secretariat 8.484 8.394 2.01%

Capacity Strengthening - 2.670 0.64%Total URF Secretariat 8.484 11.064 2.65%Grand Total 417.930 417.840 100.00%

Source: URF OYRMP for FY 2016/17

Based on expressed needs of Agencies, there will be a shortfall in funding of UGX 578.756bn made up as follows: National roads UGX 275.233bn; and UGX 303.523bn for the DUCAR network including KCCA. The effect of the shortfall will be reduced level of periodic maintenance especially on the DUCAR network, which will consequently increase the maintenance backlog.

7.2 Planned Road Maintenance Activities in FY 2016/17

Table 49 shows a summary of the key road maintenance activities planned to be funded in FY 2016/17 as compared to FY 2015/16.

Table 49: Summary of Road Maintenance Activities Planned for FY2016/17

Sn Works Category

FY2015/16 FY2016/17

National Roads Network DUCAR Network National Roads

Network DUCAR Network

Qty Amount (UGX Bn) Qty Amount

(UGX Bn) Qty Amount (UGX Bn) Qty Amount

(UGX Bn)

1 Routine Maintenance Manual (km) 8,600 8.960 27,682 23.050 16,376 23.519 27,734 25.936 Mechanized (km) 16,500 92.500 16,084 200.811 19,633 102.551 12,001 35.375

2 Periodic Maintenance Paved (km) 100 47

5,395 50.94039.525 35.659

3,056 42.197 Unpaved (km) 2,012 41 2,417.61 26.043

61Uganda Road Fund I Annual Report FY 2015/2016

Sn Works Category

FY2015/16 FY2016/17

National Roads Network DUCAR Network National Roads

Network DUCAR Network

Qty Amount (UGX Bn) Qty Amount

(UGX Bn) Qty Amount (UGX Bn) Qty Amount

(UGX Bn)

3 Bridges Routine (No) 350 1.750

29 0.622333 1.886

39 1.411 Periodic (No) 7 3.650 - -

4 Culvert Installation (Lines) - - 878 3.838 - - 9,782 4.289

Source: OYRMP for FY 2016/17

It can be seen from Table 49 that: on national roads, whilst the quantities planned to be funded under periodic maintenance on unpaved roads and routine maintenance increased, the quantities planned to be funded under periodic maintenance on paved roads and bridges reduced. On the DUCAR network, whilst the quantities planned to be funded under routine manual maintenance, bridges, and culvert installation increased, the quantities planned to be funded under routine mechanised maintenance and periodic maintenance decreased.

7.3 Key Strategies for the Medium Term

In the medium term, FY 2016/17 – 2018/19, URF plans to adopt the strategies in Table 50 to improve operations of the Fund and road maintenance financing:

Table 50: Strategies to Improve Road Maintenance Financing

Sn Strategy Actions Timing Remarks1. Promote use of

road management tools/software.

• Revamping the use of road maintenance management systems like RAMPS and ROMAPS.

FY 2016/17 – 2017/18

This is expected to support planning and programming of road maintenance works in DUCAR agencies.

2. Establish regional Technical Support Units (TSUs) for LGs.

• Zone LGs into 4 regions; • competitively procure consultants to

form the TSUs;• Launch the TSUs.

FY 2016/17 TSUs will support LGs in implementation of their road maintenance programmes including preparation of good quality work plans, works implementation, preparation of good quality reports and in a timely manner.

3. Introduction of online reporting.

• Launch of a bespoke web-based Road Maintenance Management and Monitoring System (RMMS) to form an interface between URF and its DAs.

FY 2016/17 This is expected to improve management and reporting on URF business processes; and to improve planning, reporting and accountability among DAs

4. Acquire permanent premises for the Fund.

• Complete designs, procure supervision consultant and building contractor, and undertake construction.

FY 2016/17 – 2020/21

Designs of the premises were completed but statutory approvals are still being pursued

5. Build and enhance partnerships to strengthen oversight in the utilisation of road maintenance funds.

• Support and monitor functionality of DRCs;

• Establish partnerships with various categories of stakeholders;

• Build synergies with oversight functions resident in DAs/ other government institutions.

FY 2015/16 – 2018/19

6. Establish a road users forum and undertake periodic road user satisfaction surveys.

• Coordinate with key sector institutions to establish the road users forum;

• Commission periodic road user satisfaction surveys and track improvements, perceptions and draw lessons.

FY 2016/17 – 2020/21

First Road User Satisfaction Survey (RUSS) by URF, RUSS V for the year 2016 undertaken and report writing underway.

62 Uganda Road Fund I Annual Report FY 2015/2016

8.0 Conclusion and Way forward8.1 Summary of Report

FY 2015/16 was the sixth full year of operation of Uganda Road Fund. During the year, a total of UGX 417.93bn was allocated to URF to finance road maintenance on all public roads in Uganda, related services and the Secretariat costs. This was UGX 10.172bn less than the UGX 428.102 bn in FY 2014/15. Out of the UGX 417.93bn URF received UGX 357.589bn released from the Treasury in quarterly tranches. This left an overall funding cut of UGX 60.341bn equivalent to 14.4%.

During the year, URF made disbursements amounting to UGX 356.238bn (equivalent to 99.6% of budget), of which 347.909bn was disbursed to Designated Agencies responsible for public roads maintenance and UGX 8.329 bn (equivalent to 2.3% the total MFPED release) was retained for administrative expenses of the URF Secretariat. On average the Treasury quarterly releases took 17.8 calendar days while disbursements to UNRA and DUCAR took 9.3 and 13.2 calendar days from dates of receipt from MFPED.

UNRA and KCCA employed a mix of force account and contracting to deliver maintenance interventions on national and city roads respectively while DUCAR Agencies mainly employed force account and road gangs to deliver maintenance interventions in line with the current Force Account Policy introduced in FY 2012/13.

Key achievements during FY 2015/16 included improved DA’s physical performance in routine maintenance across the network, periodic maintenance of paved roads and bridges maintenance on the DUCAR network. Furthermore, higher absorption of available road maintenance funds was registered compared to FY 2014/15.

However, due to the 14.4% funding cut experienced in FY 2016/17, the overall DA’s combined routine and periodic maintenance suffered a decline of about 8.6%.

During the period, the Secretariat took giant strides in improving its internal systems, finalisation of various frameworks derived from the URF Act and overseeing the on-going road maintenance programmes. It also advanced the implementation of the 5 – year road maintenance financing strategic plan which yielded about 10% road condition improvement. The year also saw accelerated implementation of the 5 year corporate plan and furtherance of the 7Ss, fine tuning and

rollover of the Road Maintenance Management and Monitoring system (RMMS) and roll over of the extended periodic maintenance project involving tarmacking of about 12.8km roads in all the selected 20 Town Councils and 01 Municipal Council.

Other key achievements included the advancement of the design for the URF permanent office now at the approval stage, publication of the approved OYRMP for FY 2016/17, recruitment of 06 key staff to enhance the capacity of the M and E, Audit, Policy and strategy functions.

Key challenges experienced in FY 2015/16 included the continued uncertainty of URF funding as a result of the delay in the establishment of a fully-fledged 2nd Generation Road Fund as envisaged in the URF Act; and the prevalent historical challenges including weak institutional capacities of DA’s; weak oversight by District Road Committees (DRCs); dilapidated road network sections especially under KCCA and Municipal Councils, grey areas in the implementation of force account Policy and continued multiplicity of uncoordinated funding for road works mainly on the DUCAR Network which have increased the risk of comingling of various programme funds (e.g. PRDP, CAIIP 2, etc.) by some DA’s.

8.2 Conclusion

In general, the URF physical performance (in terms of combined routine and periodic maintenance) during FY 2015/16 declined by about 8.6% compared to that in FY 2014/15.

8.3 Recommendations

To ensure continuous improvement in road maintenance across all networks, the Fund shall:

a) Fast track coordination with MFPED on amendment of the URA law to enable direct remittance of RUCs to the URF Account;

b) Accelerate implementation of the key strategic plans in place including the Corporate and road maintenance financing strategic plans as well as rolling out the Road Maintenance Management and Monitoring system (RMMS) to all DUCAR agencies;

c) Roll out extended periodic maintenance to more 20 selected Town Council roads utilizing the researched low cost technologies to sustain improvement of commerce in local areas.

d) Liaise with key stakeholders on the review of Force Account to remove the prevalent grey

63Uganda Road Fund I Annual Report FY 2015/2016

areas and entrench total quality management systems;

e) Fast track coordination with UNRA on the decentralization of procurements to regions and strategies for mitigation of procurement delays especially for periodic and major bridges maintenance;

f) Pursue the establishment of TSU’s to assist DLGs in revamping use of road maintenance management tools/software for better planning, management and accountability for available funds;

g) Liaise with MoWT and other key stakeholders on updating classification of roads to iron out the prevalent ambiguities hindering efficient planning and management of road maintenance especially on the DUCAR network;

h) Take steps towards establishment of the Road Users Forum for improved feedback & oversight.

64 Annex 1: Key Monitoring Findings, FY 2015/16

65Annex 1: Key Monitoring Findings, FY 2015/16

Annex 1:

Key Monitoring Findings, FY 2015/16

66 Annex 1: Key Monitoring Findings, FY 2015/16

Annex 1: Key Monitoring Findings, FY 2015/16

SNM& E Generic Findings Agencies where

found Strategies for improvementFinding Risk/Effect

1. Recovery of money spent on acquisition of tools from the meager wages of road gang members was a challenge.

Attrition of road gangs as a result of being discouraged.

Bududa DLG, Jinja MC

URF to coordinate with MoWT in ongoing review of Force Account Guidelines to revise relevant section in the guidelines. The tools should be provided entirely at the cost of the implementing agencies.

2. Failure to attract and retain competent plant operators who find more lucrative employment in the private sector due to better pay.

Mismanagement of force account equipment.

Bududa DLG URF to coordinate with MoWT to improve remuneration of plant operators.

3. Too many stream crossings on the road network thus creating many bottlenecked sections.

Accessibility constraints on the road network.

Bududa DLG URF to prioritize Bududa DLG among the DAs to benefit from the URF funding of small bridges on the DUCAR network.

4. Obsolete equipment with high breakdown rate/high maintenance costs and insufficient for the network size

A risk of value loss through shoddy work

Jinja MC, Manafwa DLG, Mubende DLG, Mbarara DLG, Ibanda DLGSoroti UNRA,

MoWT should expedite procurement of additional equipment from Japan to augment capacity of DAs to undertake road works.

5. Difficulty in attracting and retaining road gangs due to the low wage rate of UGX 100,000 per month per worker.

A risk of failure to effectively and efficiently implement the planned RMM works.

Jinja MCMubende DLG, Mubende TC, Ibanda DLG, Rushango TC, Ibanda TC

URF coordinating with MoWT to fast-track issuing of the revised force account guidelines with enhanced wage rates for road gangs.

6. Exorbitant prices charged by FAW equipment dealership for replacement parts and services not available on the open market. As a result, some equipment is grounded due to prohibitive maintenance costs.

Slow progress of force account mechanized works.

Jinja MC, Manafwa DLG

URF to continue flagging the issue of high prices charged by FAW equipment dealership for the attention of MoWT.

7. Delayed procurement of force account materials and contractual works. Even for micro procurements, LPOs are generated at the HQ on receipt of PP Forms from stations

A risk of delayed implementation of planned works and loss of funds to Treasury at the end of FY.

Soroti UNRA UNRA should decentralize procurement of force account materials and contractual works to regions.

8. Limited capacity of cross drainage system to cope with the volume of storm water run0ff.

Road wash away when floods of big magnitude occur.

Soroti UNRA, Mubende UNRA

UNRA should provide adequate guidance to their stations on culvert sizing and undertake correction of the observed inadequate culverts.

9. Growing scarcity of gravel with increasing haulage distances.

Use of poor quality gravel on the roads

Soroti UNRA, Manafwa DLGMbarara DLG; Mubende DLG

URF to support DAs to roll out use of the several alternative road surfacing materials previously researched on

10. Some communities cultivating up to the side drains and hence impeding flow of water off the roads.

Faster road deterioration and reduced road formation widths.

Soroti UNRA UNRA should undertake community sensitization and actively protect road reserves on all national roads.

11. Road projects visited had billboards stating ‘Government of Uganda’ as the funding agency instead of URF.

This reduces the visibility of URF as a funding agency for road maintenance works in the country.

Soroti UNRA URF to issue all DAs with a standard design of billboards for road works funded by URF.

67Annex 1: Key Monitoring Findings, FY 2015/16

SNM& E Generic Findings Agencies where

found Strategies for improvementFinding Risk/Effect

12. Overloading of road maintenance contractors by giving them more work than their capacity.• Soroti UNRA: KOL

Services Limited carrying out periodic maintenance works on three different roads under Soroti UNRA Station.

• Mubende UNRA: Award of 2 concurrent Term Maintenance Contracts to the same contractor (Hands Uganda Ltd.). No equipment on site on Lusalira – Nkonge road.

Delay in execution of programmed works due to sharing of equipment and other resources across the various roads.

Soroti UNRA, Mubende UNRA

UNRA should not award contractors more works than their demonstrated capacity.

13. Frequent heavy rains and mudslides causing road wash aways and a high rate of gravel loss on the roads.

A heavy road maintenance burden.

Bududa DLG, Bududa TC, Manafwa DLG, Manafwa TC

URF to prioritize the DAs in allocation of funds and the rollout of alternative road surfacing materials previously researched upon.

14. Unabated overloading on DUCAR network.• Overloaded trucks with

timber and sand traversing district and urban roads.

Rapid deterioration of roads leading to escalated maintenance requirements.

Mubende DLG, Mubende TC(MC), Mbarara DLG

URF to engage MoWT to develop and issue policies on control of overloading on district and urban roads.

15. Communities blocking the road drainage system for:• Prevention of water being

discharged into their gardens through mitre drains

• Collection of water at the outlet side of culvert crossings to use it for domestic consumption.

Reduced longevity of the road network which hinges on the soundness of the road drainage system

Bududa DLG, Manafwa DLG,Mubende DLG, Mubende TC, Ibanda TC

DAs should undertake routine community mobilisation for maintenance of a sound road drainage system and recruit road gangs from the vicinity of the roads to be maintained to ensure vigilance

16. Lack of a designated staff for the stores management docket in works departments.

Mismanagement of stores items

Bududa DLG, Bududa TC, Jinja MC, Manafwa DLG

DAs should either fill the position of a stores assistant or designate staff to handle the portfolio.

17. Defunct hour metre of the district grader that had not been repaired.

Failure to track equipment utility

Bududa DLG, Manafwa DLG, Mubende DLG, Mbarara DLG

DAs should repair or replace the defunct hour meters of their graders

18. Leaving of windrows on the shoulders/ side drains during grading.

Material from the windrows falling back into the side drains and causing blockage.

Bududa DLG, Soroti UNRA

DAs should remove all the observed windrows from the roads.

19. Road verges overgrown with vegetation - Road gangs had not yet

received appointment letters in Manafwa DLG.

An impediment to the road drainage system

Bududa DLG, Manafwa DLG

• Bududa DLG should closely supervise the road gangs in order to improve their efficiency especially during the wet seasons

• Manafwa DLG should explain the delay and improve recruitment of the road gangs so that RMM operations always promptly start as planned.

20. Lack of warning road signage especially at sharp bends.

A risk of increased road accidents.

Bududa DLG DA should budget for and install some most critically needed road signs to avert road accidents.

68 Annex 1: Key Monitoring Findings, FY 2015/16

SNM& E Generic Findings Agencies where

found Strategies for improvementFinding Risk/Effect

21. DA was incognizant of receipt of UGX 3,072,239 disbursed by URF in respect of Q3 FY 2015/16 mechanical imprest. The funds were sent to a commercial bank – Finance Trust Bank yet the DA had been migrated to TSA

Failure to undertake all the planned mechanical repairs.

Jinja MC URF to continue coordinating with MoFPED to enhance information sharing regarding progressive migration of DAs to TSA.

22. Roads had slipped out of maintenance realm as depicted by extensive recurrent pothole patching.- Jinja MC: At a major

junction on Gable road (0.9km)

- Soroti UNRA: Soroti-Arapai Railway Station road undergoing massive base and edge failures given the extensive pothole patching.

Bloated unit costs of road maintenance

Jinja MC, Soroti UNRA,Ibanda TC, Mbarara DLG

DAs should undertake major repair works to improve the condition of the roads to the maintainable realm.

23. Blockage of the covered road side drains as a result of vendors dumping refuse at places where market areas meet with Parekh road (0.75km)- The refuse was finding its

way into the covered road side drains through the drainage inlets.

Failure to contain storm water during floods

Jinja MC DAs should sensitive the communities on good practices of solid waste management and regularly clean the susceptible side drains.

24. Late downstream disbursement of funds from the headquarter leading to delays in implementation of planned works.- It took on average 33

calendar days in FY 2015/16 for funds to reach Soroti and Mubende Stations after being released to UNRA HQ by URF.

Failure to implement works as per the work plan.

Soroti UNRA, Mubende UNRA

UNRA should transfer funds to stations within a period not exceeding 1 week from date of UNRA receipt of funds from URF as provided for in performance agreements.

25. Understaffing at the Stations following the restructuring process (e.g. there were no Maintenance Engineers at the Station).

A risk of inefficiency creeping into the maintenance operations of the Station.

Soroti UNRA UNRA should expedite staffing of the new structure in order to quickly cope with performance demands at the Stations.

26. Lack of access culverts. - Access culverts were not

provided for in the term maintenance contract of Lusalira – Kasambya road

Blocking of road side drains by communities.

Mubende UNRA

UNRA should provide access culverts to homes where feasible or pedestrian slabs under the force account scheme, sensitize the local communities on the effects of blocking side drains, and enforce protection of the roads from the offending communities.

27. Lack of culvert end structures.- Lusalira -Kasambya road

and Mwanzi – Kiboga road under Term maintenance

Erosion of culvert inlets and outlets

Mubende UNRA

UNRA should provide concrete culvert end structures on all culvert crossings along the roads.

69Annex 1: Key Monitoring Findings, FY 2015/16

SNM& E Generic Findings Agencies where

found Strategies for improvementFinding Risk/Effect

28. Funds amounting to UGX 578,304 for Q3 FY2015/16 Mubende TC Mechanical Imprest were not transferred to the TC. They were instead spent by the district yet the TC had their own equipment.

Equipment downtime and failure of Mubende TC to undertake all the planned annual mechanized road maintenance works.

Mubende DLG DA should explain the irregularity and refund the funds to Mubende Municipal Council.

29. Migration of funds totaling UGX 702,466,460 on 28th Sept. 2015 to UNRA HQ for payment of Ms Stirling with respect to contracted improvement works on Kireka – Kyaliwajjala - Namugongo road.

Non-adherence to work plan and funding of non-maintenance works.

Mubende UNRA

UNRA should explain the fate of the planned works at the station whose funds were migrated.

30. Payment vouchers not stamped “PAID” after payments had been effected.

A risk of duplication of payments using the same voucher.

Ishongorora TC & Igorora TC in Ibanda DLG

The subagencies should always stamp payment vouchers “PAID” after payments have been effected to avoid vouchers being used to duplicate payments.

70A

nnex

2:

Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of A

udit

reco

mm

enda

tions

FY

2010

/11

-201

5/16

71A

nnex

2:

Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of A

udit

reco

mm

enda

tions

FY

2010

/11

-201

5/16

Ann

ex 2

:

Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of

Aud

it

reco

mm

enda

tion

s FY

20

10/1

1 -2

015/

16

72A

nnex

2:

Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of A

udit

reco

mm

enda

tions

FY

2010

/11

-201

5/16

Ann

ex 2

: Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of A

udit

rec

omm

enda

tion

s FY

201

0/11

-201

5/16

# D

ate

of

audi

t FY

cov

ered

by

aud

it

Age

ncy

Issu

e A

mou

ntU

GX

Rec

omm

ende

d ac

tion

to b

e ta

ken

Rem

edia

lP

rogr

ess

Fina

ncia

ls (U

GX

)

Rec

over

ed a

s at

Ju

ne 2

016

Rec

over

y in

Q1

FY20

16/1

7O

utst

andi

ng

1A

pr-1

420

12/1

3 &

20

13/1

4A

mur

u D

LGD

iver

ted

Fund

s to

wat

er s

ecto

r ac

tivit

ies

113

,410

,870

Reco

ver t

he m

oney

and

mak

e a

new

wor

k pl

an fo

r it.

PI35

,852

,000

77,5

58,8

70

Sub

Tota

l Am

uru

DLG

77

,558

,870

2

Mar

-12

2009

/10

Apa

c D

LGD

iver

sion

of f

unds

28,3

76,3

06Fu

nds t

o be

reco

vere

d.PI

13,0

00,0

00

15

,376

,306

3

Oct

-15

2014

/15

Apa

c D

LGG

arni

shed

fund

s in

A

pac

TC84

,259

,804

Rec

over

the

mon

ey a

nd m

ake

a ne

w w

ork

plan

for i

t.PI

19,7

30,0

00

64

,529

,804

Sub

Tota

l Apa

c D

LG

79,9

06,1

10

4A

pr-1

420

12/1

3 &

20

13/1

5G

ulu

MC

Div

ersi

on o

f Fun

ds

32

4,13

9,96

1 Re

cove

r the

mon

ey a

nd m

ake

a ne

w w

ork

plan

for i

t.PI

91,0

80,0

00

23

3,05

9,96

1

Sub

Tota

l Gul

u M

C

233,

059

,961

5

Sep-

1420

14/1

5Ig

anga

M

CD

iver

sion

of F

unds

by

cou

rt o

rder

18

9,117

,074

Reco

ver t

he m

oney

and

m

ake

a ne

w w

ork

plan

for i

t. Su

spen

d fu

ndin

g un

til s

afet

y m

easu

res a

re in

pla

ce

PI16

,000

,000

173,

117,0

74

Sub

Tota

l Iga

nga

MC

17

3,11

7,07

4

GR

AN

D T

OTA

L73

9,30

4,01

517

5,66

2,00

00

563,

642,

015

73A

nnex

3: S

ched

ule

of o

utst

andi

ng a

ccou

ntab

ility

issu

es fr

om F

Y201

0/11

to F

Y201

5/16

.

Ann

ex 3

:

Sche

dule

of

outs

tand

ing

acco

unta

bilit

y is

sues

fr

om F

Y201

0/11

to

FY20

15/1

6.

74A

nnex

3: S

ched

ule

of o

utst

andi

ng a

ccou

ntab

ility

issu

es fr

om F

Y201

0/11

to F

Y201

5/16

.

Ann

ex 3

: Sch

edul

e of

out

stan

ding

acc

ount

abil

ity

issu

es fr

om F

Y201

0/11

to F

Y201

5/16

.

# D

ate

of

audi

tFY

cov

ered

by

audi

tA

genc

yIs

sue

Am

ount

(UG

X)

Rec

omm

ende

d ac

tion

to b

e ta

ken

Pro

gres

s N

atur

eFi

nanc

ials

(UG

X)

Acc

ount

ed

Out

stan

ding

1D

ec-1

5FY

2014

/15

Aga

go D

LGIn

adeq

uate

ly

supp

orte

d ex

pend

itur

e

465,

857,

810

Acc

ount

abili

ties

to b

e pr

ovid

ed a

nd/o

r any

un

acco

unte

d fo

r fun

ds to

be

refu

nded

NI

A

465,

857,

810

Sub

Tota

l – A

gago

465,

857,

810

2A

ug-1

5FY

201

4/15

Mas

aka

MC

Inad

equa

tely

su

ppor

ted

expe

ndit

ure

170,

407,

100

Man

agem

ent s

houl

d pr

ovid

e ac

coun

tabi

lity

NI

A

170,

407,

100

Sub

Tota

l – M

asak

a M

C17

0,40

7,15

0 3

Aug

-15

14/1

5Bu

sia

DLG

Una

ccou

nted

for

expe

ndit

ure

17,5

06,9

40M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

17

,506

,940

Sub

Tota

l Bus

ia D

LG17

,506

,940

4A

ug-1

5FY

201

4/15

Budu

da D

LGIn

adeq

uate

ly

supp

orte

d ex

pend

itur

e

31,5

07,7

64M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

31

,507

,764

Sub

Tota

l – B

udud

a D

LG

31,5

07,7

645

Aug

-15

14/1

5Bu

sia

MC

Inad

equa

tely

su

ppor

ted

expe

ndit

ure

44,8

23,0

00M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

44

,823

,000

Sub

Tota

l – B

usia

MC

44,8

23,0

006

Dec

-15

2013

/14

Sem

babu

le

DLG

Mis

sing

pa

ymen

ts

vouc

hers

318,

542,

740

Man

agem

ent s

houl

d pr

ovid

e ju

stifi

cati

on a

nd w

ere

not

sati

sfac

tory

the

fund

s sho

uld

be re

cove

red

NI

A

318,

542,

740

7D

ec-1

520

13/1

4Se

mba

bule

D

LGIn

adeq

uate

ly

supp

orte

d ex

pend

itur

e

16,5

71,0

00 A

ccou

ntab

iliti

es to

be

prov

ided

and

/or a

ny u

n ac

coun

ted

for f

unds

to b

e re

fund

ed

NI

A

16,5

71,0

00

8D

ec-1

520

13/1

4Se

mba

bule

D

LGU

nacc

ount

ed

for e

xpen

ditu

re

– Fu

el

25,5

00,0

00 M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

25

,500

,000

Sub

Tota

l-Se

mba

bule

DLG

360,

613,

740

75A

nnex

3: S

ched

ule

of o

utst

andi

ng a

ccou

ntab

ility

issu

es fr

om F

Y201

0/11

to F

Y201

5/16

.

# D

ate

of

audi

tFY

cov

ered

by

audi

tA

genc

yIs

sue

Am

ount

(UG

X)

Rec

omm

ende

d ac

tion

to b

e ta

ken

Pro

gres

s N

atur

eFi

nanc

ials

(UG

X)

Acc

ount

ed

Out

stan

ding

9A

ug-1

5FY

201

4/15

Buye

nde

DLG

Inad

equa

tely

su

ppor

ted

expe

ndit

ure

31,5

37,6

86M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

31,5

37,6

86

Sub

Tota

l-B

uyen

de D

LG

31,

537,

686

10A

ug-1

5FY

201

4/15

Bugi

ri D

LGIn

adeq

uate

ly

supp

orte

d ex

pend

itur

e

50,8

20,9

36M

anag

emen

t sho

uld

prov

ide

acco

unta

bilit

yN

IA

50,8

20,9

36

Sub

Tota

l – B

ugir

i DLG

50,8

20,9

36

Gra

nd T

otal

1,17

3,07

4,92

6

76 Annex 4: Detailed Return for Board Members and Secretariat Staff FY 2015/16

77A

nnex

2:

Sum

mar

y of

sta

tus

of Im

plem

enta

tion

of A

udit

reco

mm

enda

tions

FY

2010

/11

-201

5/16

Annex 4:

Detailed Return for Board Members and Secretariat Staff FY

2015/16

78 Annex 4: Detailed Return for Board Members and Secretariat Staff FY 2015/16

Annex 4: Detailed Return for Board Members and Secretariat Staff FY 2015/16

The hierarchical governance structure of the Uganda Road Fund (URF) is comprised of an oversight Fund Management Board on the one hand, and the Management and staff of the Secretariat.

1. URF Board

The composition of the Fund Management Board entails representation from both the public and private sectors as follows:

i) Mrs. Merian Sebunya (Chairperson) – representative of Freight Transporters;

ii) Eng. Victor Ochaya - representative of the Engineers profession;

iii) Mr. Kenneth Mugambe – representative of the Ministry for Finance, Planning and Economic Development (MFPED);

iv) Eng. Robert Rwanga – representative of the Ministry of Works and Transport;

v) Mr. Paul Okot-Okello – representative of the Ministry of Local Government;

vi) Ms. Rosemary Owino – representative of the Accountants’ profession;

vii) Mr. Nathan Byanyima– representative of Passenger Transporters;

viii) Eng. Dr. Micheal. M. Odongo – Executive Director / Secretary to the Board (Ex – Officio – Member)

Composition of Board Committees in FY 2015/16 was as shown in Table below:

Table: Composition of Board Committees in FY 2015/16

NameBoard Audit and Risk Committee

(BARC)

Finance and Admin Board

Committee (FABC)

Policy and Strategy Board

Committee (PSBC)

URF/PPDA Joint Board Committee

i) Mrs. Merian Sebunya Ex-Officio Ex-Officio Ex-Officio Chairii) Mr. Kenneth Mugambe Member Memberiii) Eng. Robert Rwanga Member Chairiv) Mr. Paul Okot-Okello Chair Memberv) Mrs. Rosemary Owino Chair Membervi) Mr. Nathan Byanyima Member Membervii) Eng. Victor Ochaya Member Member

2. URF Management and Staff

The URF organogram provides for a work force of 36 staff and as outlined in the organizational structure referred to in the main text of this document. The staff return for the Secretariat in FY 2015/16 was as follows:

i) Executive Director – Eng. Dr. Michael Moses Odongo;ii) Manager Programming – Mr. Andrew Grace Naimanye;iii) Manager Fund Management – Mr. John Ocitti;iv) Manager Corporate Services – Ms. Dorcas Apita Angom;v) Manager Internal Audit – Mr. Joseph George Etiang;vi) Manager Monitoring and Evaluation- Eng. Andrew Kagoda;vii) Manager Policy and Strategy – Eng. Ronald Namugera;viii) Programming Officer – Eng. Timothy Mukunyu;ix) Programming Officer(National Roads) – Eng. Justine Ongom Odong;x) Financial Accountant – Ms Aisha Namutebi;xi) Human Resource Officer – Ms. Jovia Bigirwaxii) Administrative Officer – Mrs. Hanifa Nakachwa Kintu;xiii) Head Procurement and Disposal - Ms. Glady’s Komugisha;

79Annex 4: Detailed Return for Board Members and Secretariat Staff FY 2015/16

xiv) Systems Administrator - Mrs. Rhoda Nattabi Ssemugera;xv) Management Accountant - Mr. James Ekonga;xvi) Monitoring and Evaluation Officer- Eng. Jessie Namara;xvii) Monitoring and Evaluation Officer ( Statistics) – Mr. Andrew Opadi;xviii) Internal Auditor- Mr. Henry Kaganda;xix) Internal Auditor (Technical) – Mr. Robert Kigozi;xx) Corporate Communications Officer – Ms. Shakila Rahim Lamar;xxi) Procurement and Disposal Unit Assistant – Ms. Brenda Ninsiima;xxii) Executive Assistant – Mrs. Josephine Namono Ssenyonjo;xxiii) Assistant Accountant –Ms. Hellen Joyce Auma; xxiv) Assistant Accountant – Vacant; xxv) Legal officer – Vacant;xxvi) Risk Officer – Vacant;xxvii) Policy and Strategy Officer – Vacant;xxviii) Client Relations Officer – Vacant;xxix) Driver – Mr. Stephen Agaba; xxx) Driver – Mr. Richard Sembatya;xxxi) Driver – Mr. Ali Anderson Ogwang;xxxii) Driver – Mr. Asuman Bamweyana;xxxiii) Driver – Mr. Aziz Wakate;xxxiv) Driver – Vacant;xxxv) Office Assistant – Mr. Tony Mugalu;xxxvi) Office Attendant – Ms. Gillian Amon.

80A

nnex

5: P

erfo

rman

ce o

f URF

aga

inst

Inte

rnal

KPI

’s in

FY

2015

/16

81A

nnex

5: P

erfo

rman

ce o

f URF

aga

inst

Inte

rnal

KPI

’s in

FY

2015

/16

Ann

ex 5

:

Perf

orm

ance

of U

RF

agai

nst I

nter

nal K

PI’s

in

FY 2

015/

16

82A

nnex

5: P

erfo

rman

ce o

f URF

aga

inst

Inte

rnal

KPI

’s in

FY

2015

/16

Ann

ex 5

: Per

form

ance

of U

RF

agai

nst I

nter

nal K

PI’s

in F

Y 20

15/1

6

Bus

ines

s A

rea

KPI

Expl

anat

ion

FY 2

014/

15

FY 2

015/

16R

emar

ksTa

rget

Val

ueA

chie

vem

ent

Rem

ark

Targ

et V

alue

Ach

ieve

men

t A

dmin

istr

atio

n an

d hu

man

re

sour

ce

Staffi

ng L

evel

Pe

rcen

tage

of e

stab

lishm

ent

(ave

rage

ove

r a y

ear)

95

% m

in65

.7%

Not

A

chie

ved

95%

min

81%

Not

A

chie

ved

Staff

Tur

nove

r Va

canc

ies a

risi

ng a

s a re

sult

of le

aver

s in

cal

enda

r yea

r as

perc

enta

ge o

f est

ablis

hmen

t

10

% m

ax12

.7%

Not

A

chie

ved

10%

max

3.4%

Ach

ieve

d

Adm

inis

trat

ive

Ove

rhea

ds

Perc

enta

ge o

f bud

gete

d ex

pend

itur

e

1.7%

max

1.7%

Ach

ieve

d1.7

% m

ax2.

3%N

ot

Ach

ieve

dFu

ndin

g op

erat

ions

Effici

ency

of r

elea

ses

Perc

enta

ge o

f pot

enti

al re

venu

e re

leas

ed fr

om T

reas

ury

98

% m

in10

0%A

chie

ved

98%

min

85.7

%N

ot

Ach

ieve

dFu

nd C

olle

ctio

nTi

mel

ines

s of r

elea

ses a

nd

depo

sit t

o ac

coun

t of F

und

Aver

age

days

from

col

lect

ion

to

depo

sit f

or e

ach

cate

gory

14

cal

enda

r day

s m

ax21

cal

enda

r da

ysN

ot

Ach

ieve

d14

cal

enda

r da

ys m

ax17

.8 c

alen

dar

days

Not

A

chie

ved

Fund

Man

agem

ent

Adh

eren

ce to

app

rove

d fu

nd m

anag

emen

t pla

nA

dver

se d

evia

tion

from

the

fund

m

anag

emen

t pla

n, w

hich

sha

ll be

an

aver

age

devi

atio

ns fr

om th

e fo

reca

st m

onth

end

bal

ance

s for

the

finan

cial

yea

r

10

% m

ax7.

6%A

chie

ved

10%

max

14.6

%N

ot

Ach

ieve

d

Fund

Allo

cati

on b

y ty

pe o

f m

aint

enan

ce w

ork:

% o

f bu

dget

Perc

enta

ge o

f ove

rall

road

m

aint

enan

ce e

xpen

ditu

re

Allo

cati

oni)

R

outi

ne M

anua

l M

aint

enan

ce8%

8.1%

Ach

ieve

d7.

7%4.

8%N

ot

Ach

ieve

d

ii)

Rout

ine

Mec

hani

zed

Mai

nten

ance

39%

32.4

%N

ot

Ach

ieve

d31

.8%

33.0

%A

chie

ved

iii

)Per

iodi

c M

aint

enan

ce24

%30

.4%

Ach

ieve

d33

.2%

43.6

%A

chie

ved

A

lloca

tion

by

road

cla

ss: %

of

bud

get

Perc

enta

ge o

f ove

rall

road

m

aint

enan

ce e

xpen

ditu

re

i)

N

atio

nal R

oads

64.1%

65.2

%A

chie

ved

64.1%

67.9

%A

chie

ved

ii)

D

istr

ict R

oads

14.3

%11.

9%N

ot

Ach

ieve

d14

.3%

10.0

%N

ot

Ach

ieve

diii

) U

rban

Roa

ds17

.3%

15.0

%N

ot

Ach

ieve

d17

.3%

15.1%

Not

A

chie

ved

iv)

C

omm

unit

y A

cces

s Ro

ads

1.9%

1.9%

Ach

ieve

d1.9

%2.

3%A

chie

ved

83A

nnex

5: P

erfo

rman

ce o

f URF

aga

inst

Inte

rnal

KPI

’s in

FY

2015

/16

Bus

ines

s A

rea

KPI

Expl

anat

ion

FY 2

014/

15

FY 2

015/

16R

emar

ksTa

rget

Val

ueA

chie

vem

ent

Rem

ark

Targ

et V

alue

Ach

ieve

men

t Fu

nd D

isbu

rsem

ent

Effici

ency

of d

isbu

rsem

ent

Perc

enta

ge v

alue

of a

ppro

ved

plan

s fu

nded

and

dis

burs

ed in

the

sam

e fin

anci

al y

ear

98

% m

in99

.3%

Ach

ieve

d98

% m

in99

.9%

Ach

ieve

d

Tim

elin

ess o

f di

sbur

sem

ent

Aver

age

lag

of d

isbu

rsem

ent a

fter

su

bmis

sion

of a

ccep

tabl

e w

ork

plan

stat

ed b

y qu

arte

r

14

cal

enda

r day

s m

ax6

cale

ndar

da

ysA

chie

ved

14 c

alen

dar

days

max

11.2

cale

ndar

da

ysA

chie

ved

Impa

ct o

f fun

ding

Road

net

wor

k co

ndit

ion

Perc

enta

ge o

f net

wor

k in

goo

d/fa

ir co

ndit

ion

N

ot s

et62

.4%

Posi

tive

Tren

dN

ot s

et70

.8%

Posi

tive

Tren

d

Cos

t of r

outi

ne

mai

nten

ance

Aver

age

cost

per

kilo

met

re(U

nit c

ost o

f RM

eM o

n na

tion

al

road

s)

U

GX

6.8

m

illio

n/km

[US

$ 1,8

88.9

/km

at e

xcha

nge

rate

of

UG

X3,

600

for 1

U

SD]

UG

X 3

0 - 6

3 m

illio

n/km

Neg

ativ

e Tr

end

UG

X 6

.8

mill

ion/

km

[US

$ 2,

005.

9/km

at

exch

ange

rate

of

UG

X3,

390

for 1

USD

]

UG

X 2

8 –

59

mill

ion/

kmPo

sitiv

e Tr

end

Ro

ad S

afet

yPe

rson

al In

jury

Acc

iden

ts p

er

mill

ion

veh.

km

. (N

atio

nal R

oads

)

Not

set

(Fat

alit

ies p

er

10,0

00 v

ehic

les)

26Po

sitiv

e Tr

end

Not

set

(Fat

alit

ies

per 1

0,00

0 ve

hicl

es)

26Po

sitiv

e Tr

end

U

ser s

atis

fact

ion

Perc

enta

ge s

atis

fied,

mea

sure

d by

an

nual

sur

vey

N

ot s

et53

.2%

Posi

tive

Tren

dN

ot s

et37

.3%

Neg

ativ

e Tr

end

Gov

erna

nce

Boar

d ov

ersi

ght

Perc

enta

ge o

f pla

nned

boa

rd

mee

ting

s he

ld

100%

min

95

.8%

Not

A

chie

ved

100%

min

125%

Ach

ieve

d

Aud

itPe

rcen

tage

of a

genc

ies a

udite

d

10%

min

7.4%

Not

A

chie

ved

10%

min

19.3

%A

chie

ved

Perc

enta

ge o

f fun

ded

budg

et

audi

ted.

Not

set

Not

mea

sure

dN

ot

asse

ssed

60%

79.9

%A

chie

ved

Repo

rtin

gPu

nctu

al p

rese

ntat

ion

of a

nnua

l re

port

18

4 ca

lend

ar

days

aft

er c

lose

of

FY

2014

/15

339

cale

ndar

da

ysN

ot

Ach

ieve

d18

4 ca

lend

ar

days

aft

er

clos

e of

FY

2014

/15

Not

yet

met

at

426

cale

ndar

da

ys a

fter

cl

ose

of F

Y 20

14/1

5

Not

A

chie

ved

Exte

rnal

Aud

itC

ompl

etio

n of

Aud

it by

OA

G

No

sign

ifica

nt

qual

ifica

tion

/re

serv

atio

n

Unq

ualifi

ed

opin

ion

Ach

ieve

dN

o si

gnifi

cant

qu

alifi

cati

on/

rese

rvat

ion

Not

mea

sure

d[R

epor

t by

OA

G n

ot y

et

rele

ased

]

Not

as

sess

ed

84 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

85Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Annex 6:

Details of Disbursements to

Designated Agencies in FY 2015/16

86 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)UGANDA NATIONAL ROADS AUTHORITY113 UNRA 71,231,345,513 95,000,000,000 23,766,619,111 51,100,000,000 241,097,964,624 113 Operational Expenses

Total 71,231,345,513 95,000,000,000 23,766,619,111 51,100,000,000 241,097,964,624 KAMPALA CAPITAL CITY AUTHORITY122 KCCA 4,754,217,994 1,562,001,975 3,251,042,129 5,171,463,889 14,738,725,987 122 Mech Imp 0 0 0 0 0

Total 4,754,217,994 1,562,001,975 3,251,042,129 5,171,463,889 14,738,725,987 DISTRICT VOTES501 Adjumani Dist. Rds 146,661,705 48,185,816 100,290,602 130,753,492 425,891,616 501 Adjumani T. C. 37,782,740 12,413,548 25,836,695 33,684,493 109,717,476 501 Adjumani Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

501 Adjumani T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

501 Adjumani CARs - 89,558,001 - - 89,558,001 501 Total 205,333,435 157,020,459 130,004,570 193,468,264 685,826,728 502 Apac Dist. Rds 118,557,472 38,952,148 81,072,289 224,014,841 462,596,750 502 Aduku T. C. 23,231,753 7,632,810 15,886,400 20,711,834 67,462,798 502 Apac T. C. 21,212,142 6,969,265 14,505,344 18,911,287 61,598,038 502 Apac Dist. Mech Imp 17,773,352 5,839,448 3,298,970 42,437,674 69,349,444 502 Aduku T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

502 Apac T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 502 Apac CARs - 76,596,465 - - 76,596,465 502 Total 187,005,995 138,037,429 115,919,610 314,735,494 755,698,527 503 Arua Dist. Rds 200,469,372 65,864,366 137,085,505 178,724,708 582,143,952 503 Arua Dist. Mech Imp 20,080,676 6,597,522 3,727,240 27,906,933 58,312,370 503 Arua CARs - 159,900,227 - - 159,900,227 503 Total 220,550,049 232,362,115 140,812,745 206,631,641 800,356,549 504 Bugiri Dist. Rds 177,058,070 58,172,565 121,076,325 334,551,967 690,858,927 504 Bugiri T. C. 31,157,947 10,236,967 21,306,511 27,778,283 90,479,709 504 Bugiri Dist. Mech Imp 17,909,077 5,884,041 3,324,162 42,761,746 69,879,026 504 Bugiri T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 504 Bugiri CARs - 112,771,771 - - 112,771,771 504 Total 229,240,732 188,088,990 146,285,302 409,421,926 973,036,949 505 Bundibugyo Dist. Rds 83,057,166 27,288,496 56,796,374 74,048,058 241,190,094 505 Bundibugyo T. C. 81,651,863 26,826,782 55,835,397 72,795,187 237,109,230 505 Nyahuka T. C. 23,933,779 7,863,461 16,366,461 21,337,711 69,501,412 505 Bundibugyo Dist.

Mech Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649

505 Bundibugyo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

505 Nyahuka T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

505 Bundibugyo CARs - 57,528,975 - - 57,528,975 505 Total 213,190,335 127,572,824 133,554,578 202,295,654 676,613,391 506 Bushenyi Dist. Rds 91,027,976 29,907,312 62,246,995 56,154,285 239,336,568 506 Bushenyi Dist. Mech

Imp17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

506 Bushenyi CARs - 54,726,622 - - 54,726,622 506 Total 108,801,328 90,473,382 65,545,965 80,854,634 345,675,309 507 Busia Dist. Rds 81,349,244 26,727,357 55,628,459 72,525,392 236,230,452 507 Busia Dist. Mech Imp 18,451,977 6,062,411 3,424,932 25,643,462 53,582,782

87Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)507 Busia CARs - 60,126,767 - - 60,126,767 507 Total 99,801,221 92,916,535 59,053,390 98,168,855 349,940,000 508 Gulu Dist. Rds 146,374,983 48,091,613 100,094,534 130,497,870 425,059,000 508 Gulu Dist. Mech Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517 508 Gulu CARs - 78,312,050 - - 78,312,050 508 Total 164,555,509 132,376,889 103,469,081 155,764,087 556,165,567 509 Hoima Dist. Rds 166,012,275 54,543,461 113,522,960 148,005,130 482,083,826 509 Kigorobya T. C. 18,152,019 5,963,860 12,412,762 16,183,092 52,711,733 509 Hoima Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

509 Kigorobya T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

509 Hoima CARs - 117,260,219 - - 117,260,219 509 Total 205,189,009 184,675,225 129,838,188 193,407,123 713,109,545 510 Iganga Dist. Rds 122,452,204 40,231,766 83,735,595 109,169,965 355,589,529 510 Busembatya T. C. 24,762,101 8,135,607 16,932,886 22,076,186 71,906,781 510 Iganga Dist. Mech

Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649

510 Busembatya T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

510 Iganga CARs - 121,740,662 - - 121,740,662 510 Total 168,646,194 177,149,499 104,646,524 161,030,920 611,473,137 511 Jinja Dist. Rds 121,001,497 39,755,135 82,743,569 107,876,615 351,376,816 511 Bugembe T. C. 36,331,437 11,936,722 24,844,261 32,390,612 105,503,032 511 Buwenge T. C. 26,037,210 8,554,545 17,804,835 23,212,986 75,609,575 511 Kakira T. C. 21,007,590 6,902,060 14,365,467 18,728,923 61,004,040 511 Jinja Dist. Mech Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722 511 Bugembe T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

511 Buwenge T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

511 Kakira T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 511 Jinja CARs - 90,695,314 - - 90,695,314 511 Total 231,090,825 166,620,382 144,716,436 219,333,404 761,761,047 512 Kabale Dist. Rds 174,146,573 57,215,990 119,085,378 155,257,111 505,705,052 512 Hamurwa T. C. 17,029,118 5,594,930 11,644,897 15,181,991 49,450,936 512 Katuna T. C. 25,387,084 8,340,946 17,360,264 22,633,379 73,721,674 512 Muhanga T. C. 20,102,398 6,604,658 13,746,476 17,921,916 58,375,449 512 Kabale Dist. Mech

Imp 19,130,601 6,285,374 3,550,893 26,586,575 55,553,444

512 Hamurwa T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

512 Katuna T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

512 Muhanga T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

512 Kabale CARs - 94,123,192 - - 94,123,192 512 Total 265,142,689 181,236,026 167,122,820 250,570,758 864,072,294 513 Kabarole Dist. Rds 135,641,230 44,565,030 92,754,550 120,928,394 393,889,204 513 Karago T. C. 22,242,412 7,307,761 15,209,866 19,829,805 64,589,843 513 Kibiito T. C. 23,031,637 7,567,062 15,749,556 20,533,424 66,881,678 513 Kijura T. C. 21,269,238 6,988,024 14,544,387 18,962,190 61,763,839 513 Kiko T. C. 20,214,671 6,641,546 13,823,250 18,022,010 58,701,477 513 Rubona T. C. 21,048,997 6,915,664 14,393,782 18,765,839 61,124,282 513 Rwimi T. C. 20,084,030 6,598,623 13,733,915 17,905,540 58,322,109 513 Kabarole Dist Mech

Imp 18,587,702 6,107,004 3,450,124 25,832,085 53,976,914

88 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)513 Karago T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

513 Kibiito T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

513 Kijura T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 513 Kiko T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 513 Rubona T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

513 Rwimi T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 513 Kabarole CARs - 83,729,487 - - 83,729,487 513 Total 300,813,743 182,562,074 187,129,253 286,758,859 957,263,929 514 Kaberamaido Dist.

Rds 75,444,238 24,787,262 51,590,482 67,260,895 219,082,877

514 Kaberamaido T. C. 18,609,057 6,114,020 12,725,296 16,590,556 54,038,929 514 Kaberamaido Dist.

Mech Imp 18,044,802 5,928,633 3,349,354 25,077,595 52,400,384

514 Kaberamaido T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

514 Kaberamaido CARs - 76,182,533 - - 76,182,533 514 Total 115,213,735 114,036,095 68,243,436 113,258,975 410,752,240 515 Kalangala Dist. Rds 100,215,164 32,925,769 68,529,403 89,344,950 291,015,285 515 Kalangala T. C. 17,257,819 5,670,070 11,801,288 15,385,885 50,115,061 515 Kalangala Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

515 Kalangala T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

515 Kalangala CARs - 53,047,108 - - 53,047,108 515 Total 137,954,797 98,372,263 84,132,387 133,195,245 453,654,693 517 Kamuli Dist. Rds 173,452,467 56,987,941 118,610,732 154,638,293 503,689,434 517 Kamuli T. C. 24,150,661 7,934,718 16,514,770 21,531,069 70,131,219 517 Kamuli Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

517 Kamuli T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

517 Kamuli CARs - 108,608,985 - - 108,608,985 517 Total 218,899,293 180,528,516 139,078,353 205,765,509 744,271,671 518 Kamwenge Dist. Rds 109,470,638 35,966,662 74,858,506 206,845,231 427,141,037 518 Kamwenge T. C. 24,554,229 8,067,311 16,790,739 21,890,862 71,303,140 518 Kamwenge Dist.

Mech Imp 18,316,252 6,017,819 3,399,739 43,733,964 71,467,773

518 Kamwenge T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

518 Kamwenge CARs - 79,054,643 - - 79,054,643 518 Total 155,456,757 130,130,080 95,627,288 276,799,985 658,014,110 519 Kanungu Dist. Rds 83,924,829 27,573,567 57,389,702 74,821,607 243,709,706 519 Butogota T. C. 18,352,554 6,029,746 12,549,893 16,361,875 53,294,068 519 Kambuga T. C. 15,859,229 5,210,562 10,844,900 14,138,998 46,053,689 519 Kanungu T. C. 24,104,767 7,919,640 16,483,386 45,546,058 94,053,851 519 Kihihi T. C. 26,790,145 8,801,923 18,319,709 23,884,251 77,796,029 519 Kanungu Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

519 Butogota T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

519 Kambuga T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

519 Kanungu T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

519 Kihihi T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

89Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)519 Kanungu CARs - 48,840,785 - - 48,840,785 519 Total 199,267,428 114,310,252 121,199,776 219,882,178 654,659,633 520 Kapchorwa Dist. Rds 49,426,903 16,239,247 33,799,238 44,065,629 143,531,017 520 Kapchorwa T. C. 22,655,203 7,443,384 15,492,142 20,197,821 65,788,551 520 Kapchorwa Dist.

Mech Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

520 Kapchorwa T. C. 3,115,638 1,023,645 578,304 4,329,929 9,047,516 520 Kapchorwa CARs - 32,713,537 - - 32,713,537 520 Total 93,378,271 63,393,039 53,244,230 93,859,596 303,875,137 521 Kasese Dist. Rds 205,241,483 67,432,247 140,348,783 182,979,194 596,001,706 521 Hima T. C. 34,657,462 11,386,736 23,699,559 30,898,210 100,641,968 521 Katwe-Kabatoro T. C. 72,222,711 23,728,827 49,387,528 136,465,115 281,804,181 521 Mpondwe-Lhubiriha

T. C. 25,277,447 8,304,925 17,285,292 47,761,843 98,629,507

521 Kasese Dist. Mech Imp

19,537,776 6,419,151 3,626,470 27,152,443 56,735,841

521 Hima T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 521 Katwe-Kabatoro T. C.

Mech Imp 3,115,638 1,023,645 578,304 7,439,251 12,156,838

521 Mpondwe-Lhubiriha T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

521 Kasese CARs - 142,180,591 - - 142,180,591 521 Total 366,283,794 262,523,413 236,082,543 444,465,237 1,309,354,987 522 Katakwi Dist. Rds 77,158,258 25,350,405 52,762,568 68,788,998 224,060,229 522 Katakwi T. C. 19,698,953 6,472,106 13,470,591 17,562,232 57,203,883 522 Katakwi Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

522 Katakwi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

522 Katakwi CARs - 47,219,180 - - 47,219,180 522 Total 117,746,201 85,904,785 70,110,432 115,381,509 389,142,928 523 Kayunga Dist. Rds 124,475,666 40,896,576 85,119,284 110,973,945 361,465,471 523 Kayunga T. C. 29,936,685 9,835,721 20,471,385 26,689,490 86,933,281 523 Kayunga Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987

523 Kayunga T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

523 Kayunga CARs - 73,806,663 - - 73,806,663 523 Total 175,165,616 131,357,461 109,442,750 166,505,091 582,470,918 524 Kibaale Dist. Rds 212,674,302 69,874,305 145,431,513 189,605,785 617,585,905 524 Kagadi T. C. 28,920,883 9,501,978 19,776,756 25,783,870 83,983,487 524 Kakumiro T. C. 21,683,131 7,124,009 14,827,417 19,331,189 62,965,746 524 Kibaale T. C. 21,367,690 7,020,371 14,611,711 19,049,963 62,049,736 524 Muhoro T. C. 24,270,206 7,973,995 16,596,517 21,637,646 70,478,364 524 Kibaale Dist. Mech

Imp 20,759,301 6,820,484 3,853,202 28,850,045 60,283,032

524 Kagadi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

524 Kakumiro T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

524 Kibaale T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

524 Muhoro T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

524 Kibaale CARs - 156,338,142 - - 156,338,142 524 Total 342,138,065 268,747,866 217,410,331 321,578,214 1,149,874,476 525 Kiboga Dist. Rds 113,417,514 37,263,411 77,557,469 101,115,257 329,353,652 525 Bukomero T. C. 21,562,256 7,084,296 14,744,760 40,741,974 84,133,286

90 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)525 Kiboga T. C. 25,900,783 8,509,722 17,711,543 48,939,638 101,061,685 525 Kiboga Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

525 Bukomero T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

525 Kiboga T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

525 Kiboga CARs - 51,742,585 - - 51,742,585 525 Total 184,478,006 112,352,976 114,393,772 229,809,854 641,034,608 526 Kisoro Dist. Rds 80,931,684 26,590,167 55,342,922 72,153,125 235,017,897 526 Kisoro T. C. 27,379,560 8,995,575 18,722,764 24,409,733 79,507,633 526 Kisoro Dist. Mech

Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649

526 Kisoro T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 526 Kisoro CARs - 60,090,536 - - 60,090,536 526 Total 129,743,133 102,717,742 78,043,729 126,347,626 436,852,230 527 Kitgum Dist. Rds 141,174,725 46,383,064 96,538,480 125,861,678 409,957,947 527 Kitgum T. C. 56,026,254 18,407,469 38,312,024 49,949,156 162,694,903 527 Kitgum Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

527 Kitgum T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

527 Kitgum CARs - 105,639,825 - - 105,639,825 527 Total 218,089,969 177,293,451 138,727,777 204,841,112 738,952,309 528 Kotido Dist. Rds 91,052,659 29,915,421 62,263,874 81,176,290 264,408,245 528 Kotido T. C. 27,976,420 9,191,674 19,130,911 24,941,852 81,240,857 528 Kotido Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590

528 Kotido T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

528 Kotido CARs - 62,914,388 - - 62,914,388 528 Total 139,375,169 108,706,207 85,171,289 134,393,931 467,646,595 529 Kumi Dist. Rds 109,118,143 35,850,850 74,617,462 97,282,234 316,868,689 529 Kumi T. C. 23,251,048 7,639,150 15,899,594 20,729,036 67,518,827 529 Kumi Dist. Mech Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722 529 Kumi T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 529 Kumi CARs - 57,017,902 - - 57,017,902 529 Total 152,851,006 107,237,217 94,318,753 146,475,680 500,882,656 530 Kyenjojo Dist. Rds 139,293,800 45,765,085 95,252,261 124,184,774 404,495,920 530 Butunduzi T. C. 22,288,902 7,323,036 15,241,657 19,871,253 64,724,849 530 Katooke T. C. 22,393,471 7,357,392 15,313,163 19,964,479 65,028,505 530 Kyarusozi T. C. 20,177,279 6,629,260 13,797,681 17,988,674 58,592,895 530 Kyenjojo T. C. 31,012,835 10,189,291 21,207,280 27,648,911 90,058,317 530 Kyenjojo Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

530 Butunduzi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

530 Katooke T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

530 Kyarusozi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

530 Kyenjojo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

530 Kyenjojo CARs - 89,255,473 - - 89,255,473 530 Total 265,809,366 176,587,344 166,499,804 252,244,025 861,140,539 531 Lira Dist. Rds 99,681,544 32,750,448 68,164,501 88,869,211 289,465,704 531 Lira Dist. Mech Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

91Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)531 Lira CARs - 72,345,028 - - 72,345,028 531 Total 117,454,896 110,934,924 71,463,471 113,569,560 413,422,851 532 Luwero Dist. Rds 141,851,973 46,605,575 97,001,598 126,465,466 411,924,611 532 Bombo T. C. 30,962,407 10,172,723 21,172,796 27,603,953 89,911,880 532 Luwero T. C. 34,648,292 11,383,723 23,693,288 30,890,035 100,615,339 532 Wobulenzi T. C. 30,136,756 9,901,454 20,608,198 26,867,860 87,514,269 532 Luwero Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

532 Bombo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

532 Luwero T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

532 Wobulenzi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

532 Luwero CARs - 128,551,686 - - 128,551,686 532 Total 264,855,420 215,570,138 167,534,954 249,706,073 897,666,584 533 Masaka Dist. Rds 82,738,488 27,183,794 56,578,455 73,763,947 240,264,684 533 Masaka Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

533 Masaka CARs - 67,943,564 - - 67,943,564 533 Total 100,104,665 100,833,028 59,801,848 97,898,429 358,637,970 534 Masindi Dist. Rds 121,177,719 39,813,033 82,864,073 108,033,722 351,888,546 534 Masindi Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

534 Masindi CARs - 68,143,634 - - 68,143,634 534 Total 138,543,895 113,662,338 86,087,466 132,168,204 470,461,903 535 Mayuge Dist. Rds 160,632,933 52,776,074 109,844,444 143,209,278 466,462,729 535 Mayuge T. C. 23,525,653 7,729,371 16,087,375 20,973,855 68,316,255 535 Mayuge Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

535 Mayuge T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

535 Mayuge CARs - 118,247,136 - - 118,247,136 535 Total 205,454,751 185,749,452 129,884,670 193,779,279 714,868,152 536 Mbale Dist. Rds 118,857,344 39,050,672 81,277,349 105,965,036 345,150,400 536 Nakaloke T. C. 22,047,861 7,243,842 15,076,828 19,656,357 64,024,888 536 Mbale Dist. Mech Imp 19,130,601 6,285,374 3,550,893 26,586,575 55,553,444 536 Nakaloke T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

536 Mbale CARs - 108,835,973 - - 108,835,973 536 Total 163,151,445 162,439,506 100,483,373 156,537,897 582,612,221 537 Mbarara Dist. Rds 126,360,289 41,515,770 86,408,033 112,654,146 366,938,238 537 Mbarara Dist. Mech

Imp 18,451,977 6,062,411 3,424,932 25,643,462 53,582,782

537 Mbarara CARs 20,090,423 82,509,051 - - 102,599,474 537 Total 164,902,689 130,087,232 89,832,964 138,297,608 523,120,493 538 Moroto Dist. Rds 71,534,962 23,502,867 48,917,230 63,775,654 207,730,713 538 Moroto Dist. Mech

Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

538 Moroto CARs - 46,319,264 - - 46,319,264 538 Total 88,629,689 75,438,617 52,090,238 87,532,891 303,691,435 539 Moyo Dist. Rds 125,297,226 41,166,500 85,681,086 111,706,391 363,851,202 539 Moyo T. C. 38,366,586 12,605,371 26,235,942 34,205,010 111,412,908 539 Moyo Dist. Mech Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987 539 Moyo T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 539 Moyo CARs - 112,556,311 - - 112,556,311 539 Total 184,417,076 173,146,683 115,769,108 174,753,057 648,085,924

92 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)540 Mpigi Dist. Rds 98,274,428 32,288,139 67,202,283 185,689,944 383,454,793 540 Mpigi T. C. 40,290,533 13,237,486 27,551,581 35,920,269 116,999,868 540 Mpigi Dist. Mech Imp 17,366,177 5,705,671 3,223,393 41,465,457 67,760,697 540 Mpigi T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 540 Mpigi CARs - 57,781,670 - - 57,781,670 540 Total 159,046,775 110,036,610 98,555,560 267,405,598 635,044,544 541 Mubende Dist. Rds 199,177,032 65,439,767 136,201,773 177,572,547 578,391,119 541 Mubende T. C. 39,346,688 12,927,385 26,906,158 35,078,802 114,259,033 541 Mubende Dist. Mech

Imp 18,994,877 6,240,781 3,525,701 26,397,952 55,159,311

541 Mubende T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

541 Mubende CARs - 142,635,649 - - 142,635,649 541 Total 260,634,234 228,267,227 167,211,936 243,379,230 899,492,628 542 Mukono Dist. Rds 172,513,179 56,679,337 117,968,426 153,800,889 500,961,831 542 Mukono Dist. Mech

Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649

542 Mukono CARs - 109,013,222 - - 109,013,222 542 Total 190,829,431 171,710,378 121,368,165 179,255,728 663,163,702 543 Nakapiripirit Dist.

Rds 102,784,102 33,769,796 70,286,101 91,635,238 298,475,238

543 Nakapiripirit T. C. 15,865,141 5,212,504 10,848,943 14,144,269 46,070,857 543 Nakapiripirit Dist.

Mech Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

543 Nakapiripirit T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

543 Nakapiripirit CARs - 80,249,392 - - 80,249,392 543 Total 139,266,783 126,005,600 84,961,933 134,432,541 484,666,857 544 Nakasongola Dist.

Rds 111,483,267 36,627,913 76,234,787 210,648,101 434,994,068

544 Kakooge T. C. 25,916,076 8,514,747 17,722,001 23,104,991 75,257,814 544 Migeera T. C. 17,439,067 5,729,619 11,925,230 15,547,474 50,641,390 544 Nakasongola T. C. 18,818,545 6,182,847 12,868,548 16,777,321 54,647,261 544 Nakasongola Dist.

Mech Imp 17,637,627 5,794,856 3,273,777 42,113,602 68,819,862

544 Kakooge T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

544 Migeera T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

544 Nakasongola T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

544 Nakasongola CARs - 53,623,939 - - 53,623,939 544 Total 200,641,496 119,544,856 123,759,254 321,181,275 765,126,881 545 Nebbi Dist. Rds 144,445,001 47,457,516 98,774,769 128,777,231 419,454,517 545 Nebbi T. C. 33,502,613 11,007,309 22,909,847 29,868,627 97,288,397 545 Pakwach T. C. 29,434,048 9,670,579 20,127,670 26,241,373 85,473,670 545 Nebbi Dist. Mech Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649 545 Nebbi T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 545 Pakwach T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

545 Nebbi CARs - 79,720,470 - - 79,720,470 545 Total 231,929,190 155,920,984 146,368,633 219,001,929 753,220,735 546 Ntungamo Dist. Rds 146,720,514 48,205,137 100,330,816 130,805,922 426,062,389 546 Kitwe T. C. 21,012,568 6,903,695 14,368,871 18,733,361 61,018,495 546 Rubare T. C. 19,858,580 6,524,552 13,579,748 17,704,545 57,667,424 546 Rwashameire T. C. 17,186,972 5,646,793 11,752,842 15,322,723 49,909,330

93Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)546 Ntungamo Dist. Mech

Imp 18,451,977 6,062,411 3,424,932 25,643,462 53,582,782

546 Kitwe T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 546 Rubare T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

546 Rwashameire T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

546 Ntungamo CARs - 103,744,961 - - 103,744,961 546 Total 232,577,524 180,158,485 145,192,119 221,199,799 779,127,927 547 Pader Dist. Rds 113,314,410 37,229,536 77,486,964 101,023,337 329,054,247 547 Pader T. C. 23,407,480 7,690,546 16,006,566 44,228,532 91,333,123 547 Pader Dist. Mech Imp 18,044,802 5,928,633 3,349,354 25,077,595 52,400,384 547 Pader T. C. Mech Imp 3,115,638 1,023,645 578,304 7,439,251 12,156,838 547 Pader CARs - 63,923,938 - - 63,923,938 547 Total 157,882,329 115,796,299 97,421,188 177,768,714 548,868,531 548 Paliisa Dist. Rds 113,704,260 37,357,622 77,753,553 101,370,900 330,186,335 548 Pallisa T. C. 35,484,876 11,658,583 24,265,363 31,635,875 103,044,698 548 Paliisa Dist. Mech

Imp 18,994,877 6,240,781 3,525,701 26,397,952 55,159,311

548 Pallisa T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 548 Paliisa CARs - 77,926,269 - - 77,926,269 548 Total 171,299,650 134,206,901 106,122,921 163,734,657 575,364,128 549 Rakai Dist. Rds 231,391,483 76,023,850 158,230,746 437,215,179 902,861,258 549 Kalisizo T. C. 111,565,693 36,654,994 76,291,152 99,464,301 323,976,139 549 Kyotera T. C. 85,871,435 28,213,126 58,720,836 76,557,067 249,362,464 549 Rakai T. C. 18,097,483 5,945,942 12,375,470 16,134,472 52,553,367 549 Rakai Dist. Mech Imp 19,130,601 6,285,374 3,550,893 45,678,398 74,645,267 549 Kalisizo T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

549 Kyotera T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

549 Rakai T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 549 Rakai CARs - 160,561,213 - - 160,561,213 549 Total 475,403,610 316,755,435 310,904,008 688,039,203 1,791,102,256 550 Rukungiri Dist. Rds 102,157,643 33,563,972 69,857,714 91,076,730 296,656,059 550 Rukungiri Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

550 Rukungiri CARs - 74,334,232 - - 74,334,232 550 Total 119,930,994 113,737,652 73,156,684 115,777,080 422,602,410 551 Sembabule Dist. Rds 115,636,725 37,992,535 79,075,016 103,093,753 335,798,030 551 Matete T. C. 20,096,406 6,602,690 13,742,379 17,916,574 58,358,049 551 Sembabule T. C. 18,182,570 5,973,897 12,433,654 16,210,329 52,800,451 551 Sembabule Dist.

Mech Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

551 Matete T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

551 Sembabule T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

551 Sembabule CARs - 82,474,388 - - 82,474,388 551 Total 177,513,155 140,796,471 109,631,049 170,014,997 597,955,671 552 Sironko Dist. Rds 90,187,430 29,631,149 61,672,211 80,404,911 261,895,701 552 Budadiri T. C. 19,359,406 6,360,548 13,238,401 17,259,515 56,217,869 552 Sironko T. C. 23,433,287 7,699,024 16,024,213 20,891,507 68,048,031 552 Sironko Dist. Mech

Imp 19,130,601 6,285,374 3,550,893 26,586,575 55,553,444

552 Budadiri T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

94 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)552 Sironko T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

552 Sironko CARs - 64,637,956 - - 64,637,956 552 Total 158,342,000 116,661,341 95,642,325 153,802,366 524,448,032 553 Soroti Dist. Rds 109,418,189 35,949,430 74,822,640 97,549,734 317,739,993 553 Soroti Dist. Mech Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855 553 Soroti CARs - 66,230,633 - - 66,230,633 553 Total 126,920,091 107,930,327 78,071,225 121,872,838 434,794,481 554 Tororo Dist. Rds 138,756,672 45,588,611 94,884,961 123,705,909 402,936,153 554 Malaba T. C. 20,133,831 6,614,986 13,767,970 17,949,939 58,466,726 554 Nagongera T. C. 24,306,450 7,985,903 16,621,302 21,669,960 70,583,616 554 Tororo Dist. Mech

Imp 18,859,152 6,196,189 3,500,509 26,209,330 54,765,179

554 Malaba T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

554 Nagongera T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

554 Tororo CARs - 97,050,363 - - 97,050,363 554 Total 208,287,381 165,483,342 129,931,349 198,194,995 701,897,068 555 Wakiso Dist. Rds 324,881,726 106,740,141 222,161,495 343,596,141 997,379,502 555 Kakiri T. C. 24,408,205 8,019,335 16,690,885 21,760,678 70,879,102 555 Kira T. C. 250,673,205 82,358,874 171,416,025 473,648,074 978,096,178 555 Masulita T. C. 20,509,057 6,738,266 14,024,559 18,284,465 59,556,347 555 Namayumba T. C. 20,958,323 6,885,873 14,331,777 18,685,000 60,860,974 555 Nansana T. C. 229,546,995 75,417,842 156,969,444 433,730,012 895,664,293 555 Wakiso T. C. 66,134,182 21,728,436 45,224,054 58,960,689 192,047,362 555 Wakiso Dist. Mech

Imp 18,587,702 6,107,004 3,450,124 25,832,085 53,976,914

555 Kakiri T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 555 Kira T. C. Mech Imp 16,551,827 5,438,115 3,072,239 39,521,023 64,583,203 555 Masulita T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

555 Namayumba T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

555 Nansana T. C. Mech Imp

16,551,827 5,438,115 3,072,239 39,521,023 64,583,203

555 Wakiso T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

555 Wakiso CARs - 273,946,244 - - 273,946,244 555 Total 1,001,265,601 602,912,827 652,726,053 1,490,858,905 3,747,763,386 556 Yumbe Dist. Rds 140,111,339 46,033,688 95,811,312 124,913,636 406,869,975 556 Yumbe T. C. 62,907,725 20,668,382 43,017,730 118,864,412 245,458,248 556 Yumbe Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

556 Yumbe T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

556 Yumbe CARs - 144,569,356 - - 144,569,356 556 Total 224,315,229 218,268,297 142,781,893 276,483,516 861,848,934 557 Butaleja Dist. Rds 71,125,571 23,368,361 48,637,279 63,410,669 206,541,880 557 Busolwe T. C. 22,914,529 7,528,586 15,669,475 20,429,018 66,541,607 557 Butaleja T. C. 19,349,140 6,357,175 13,231,381 17,250,363 56,188,058 557 Butaleja Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

557 Busolwe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

557 Butaleja T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

557 Butaleja CARs - 47,492,727 - - 47,492,727

95Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)557 Total 137,529,592 92,678,180 82,018,904 134,638,880 446,865,557 558 Ibanda Dist. Rds 80,841,393 26,560,502 55,281,179 72,072,628 234,755,701 558 Ibanda T. C. 34,528,220 11,344,273 23,611,180 30,782,987 100,266,660 558 Igorora T. C. 20,012,874 6,575,245 13,685,258 17,842,103 58,115,480 558 Ishongororo T. C. 32,050,663 10,530,270 21,916,971 28,574,168 93,072,072 558 Rushango T. C. 21,806,413 7,164,514 14,911,720 41,203,309 85,085,956 558 Ibanda Dist. Mech

Imp 18,044,802 5,928,633 3,349,354 25,077,595 52,400,384

558 Ibanda T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

558 Igorora T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

558 Ishongororo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

558 Rushango T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

558 Ibanda CARs - 76,088,343 - - 76,088,343 558 Total 219,746,917 148,286,361 135,068,877 235,981,826 739,083,982 559 Kaabong Dist. Rds 148,759,394 48,875,013 101,725,049 132,623,647 431,983,104 559 Kaabong T. C. 29,942,967 9,837,785 20,475,680 26,695,090 86,951,521 559 Kaabong Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

559 Kaabong T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

559 Kaabong CARs - 109,884,657 - - 109,884,657 559 Total 199,998,525 175,594,326 126,153,579 188,914,884 690,661,315 560 Isingiro Dist. Rds 141,943,513 46,635,650 97,064,195 126,547,077 412,190,435 560 Isingiro T. C. 32,112,085 10,550,450 21,958,972 28,628,927 93,250,434 560 Kaberebere T. C. 20,869,862 6,856,809 14,271,285 18,606,134 60,604,092 560 Kabuyanda T. C. 21,248,469 6,981,201 14,530,185 18,943,674 61,703,529 560 Isingiro Dist. Mech

Imp 18,451,977 6,062,411 3,424,932 25,643,462 53,582,782

560 Isingiro T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

560 Kaberebere T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

560 Kabuyanda T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

560 Isingiro CARs - 97,904,875 - - 97,904,875 560 Total 243,972,820 178,062,333 152,984,480 231,359,061 806,378,694 561 Kaliro Dist. Rds 84,800,210 27,861,174 57,988,307 75,602,036 246,251,727 561 Kaliro T. C. 22,585,730 7,420,559 15,444,634 20,135,884 65,586,807 561 Kaliro Dist. Mech Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590 561 Kaliro T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 561 Kaliro CARs - 47,473,510 - - 47,473,510 561 Total 127,732,029 89,439,966 77,209,446 124,013,708 418,395,150 562 Kiruhura Dist. Rds 130,018,070 42,717,537 88,909,306 115,915,172 377,560,085 562 Kazo T. C. 23,550,038 7,737,383 16,104,050 20,995,594 68,387,065 562 Kiruhura T. C. 25,661,563 8,431,126 17,547,959 22,878,085 74,518,734 562 Sanga T. C. 25,274,017 8,303,798 17,282,946 22,532,576 73,393,336 562 Kiruhura Dist. Mech

Imp 18,587,702 6,107,004 3,450,124 25,832,085 53,976,914

562 Kazo T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 562 Kiruhura T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

562 Sanga T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 562 Kiruhura CARs - 85,558,407 - - 85,558,407

96 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)562 Total 232,438,304 161,926,190 145,029,297 221,143,298 760,537,089 563 Koboko Dist. Rds 74,678,807 24,535,780 51,067,063 66,578,490 216,860,140 563 Koboko T. C. 47,081,941 15,468,808 32,195,699 41,975,021 136,721,469 563 Koboko Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

563 Koboko T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

563 Koboko CARs - 62,039,727 - - 62,039,727 563 Total 142,242,563 108,773,630 87,064,459 137,017,922 475,098,574 564 Amolator Dist. Rds 67,391,627 22,141,571 46,083,924 60,081,741 195,698,862 564 Amolatar T. C. 24,117,008 7,923,661 16,491,757 21,501,066 70,033,491 564 Namasale T. C. 17,051,395 5,602,249 11,660,131 15,201,851 49,515,625 564 Amolator Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

564 Amolatar T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

564 Namasale T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

564 Amolator CARs - 51,308,418 - - 51,308,418 564 Total 132,564,657 94,862,638 78,691,388 130,144,865 436,263,548 565 Amuria Dist. Rds 113,898,270 37,421,364 77,886,221 101,543,866 330,749,722 565 Amuria T. C. 19,073,379 6,266,573 13,042,809 17,004,513 55,387,275 565 Amuria Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

565 Amuria T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

565 Amuria CARs - 93,510,534 - - 93,510,534 565 Total 153,860,639 144,061,565 94,806,304 147,578,658 540,307,167 566 Manafwa Dist. Rds 109,927,098 36,116,632 75,170,643 98,003,442 319,217,815 566 Manafwa T. C. 24,672,283 8,106,097 16,871,467 21,996,111 71,645,957 566 Lwakhakha T. C. 20,635,041 6,779,658 14,110,709 18,396,783 59,922,192 566 Manafwa Dist. Mech

Imp 20,352,126 6,686,707 3,777,625 28,284,178 59,100,635

566 Manafwa T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

566 Lwakhakha T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

566 Manafwa CARs - 95,437,182 - - 95,437,182 566 Total 181,817,823 155,173,567 111,087,051 175,340,371 623,418,813 567 Bukwo Dist. Rds 52,257,882 17,169,367 35,735,125 46,589,535 151,751,910 567 Bukwo T. C. 16,719,968 5,493,358 11,433,494 14,906,374 48,553,195 567 Bukwo Dist.Mech Imp 18,044,802 5,928,633 3,349,354 25,077,595 52,400,384 567 Bukwo T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

567 Bukwo CARs - 26,945,293 - - 26,945,293 567 Total 90,138,290 56,560,298 51,096,277 90,903,432 288,698,298 568 Mityana Dist. Rds 103,889,112 34,132,848 71,041,732 196,298,914 405,362,605 568 Mityana T. C. 45,584,292 14,976,754 31,171,573 40,639,820 132,372,438 568 Mityana Dist. Mech

Imp 18,044,802 5,928,633 3,349,354 43,085,819 70,408,608

568 Mityana T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

568 Mityana CARs - 72,805,032 - - 72,805,032 568 Total 170,633,843 128,866,912 106,140,963 284,354,481 689,996,199 569 Nakaseke Dist. Rds 101,636,914 33,392,886 69,501,628 90,612,484 295,143,913 569 Kiwoko T. C. 18,264,010 6,000,655 12,489,344 16,282,936 53,036,945

97Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)569 Nakaseke - Butalangu

T. C. 18,363,603 6,033,376 12,557,448 16,371,726 53,326,153

569 Nakaseke T. C. 16,855,726 5,537,962 11,526,328 15,027,406 48,947,421 569 Ngoma T. C. 17,332,360 5,694,560 11,852,261 15,452,341 50,331,523 569 Semuto T. C. 20,156,423 6,622,408 13,783,419 17,970,081 58,532,331 569 Nakaseke Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

569 Kiwoko T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

569 Nakaseke - Butalangu T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

569 Nakaseke T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

569 Ngoma T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

569 Semuto T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

569 Nakaseke CARs - 73,158,825 - - 73,158,825 569 Total 226,096,303 147,442,939 137,926,109 218,255,589 729,720,941 570 Amuru Dist. Rds 91,063,311 29,918,921 62,271,158 81,185,787 264,439,177 570 Amuru T. C. 37,927,380 12,461,070 25,935,603 33,813,444 110,137,497 570 Amuru Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987

570 Amuru T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

570 Amuru CARs - 72,592,473 - - 72,592,473 570 Total 149,743,956 121,790,965 92,058,842 143,840,887 507,434,650 571 Budaka Dist. Rds 73,110,678 24,020,570 49,994,741 65,180,454 212,306,442 571 Budaka T. C. 28,954,244 9,512,939 19,799,569 25,813,613 84,080,366 571 Budaka Dist. Mech

Imp 18,180,527 5,973,226 3,374,547 25,266,217 52,794,517

571 Budaka T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

571 Budaka CARs - 38,595,578 - - 38,595,578 571 Total 123,361,087 79,125,958 73,747,160 120,590,213 396,824,418 572 Oyam Dist. Rds 114,763,455 37,705,621 78,477,854 102,315,205 333,262,135 572 Oyam T. C. 24,891,706 8,178,189 17,021,513 22,191,734 72,283,142 572 Oyam Dist. Mech Imp 18,044,802 5,928,633 3,349,354 25,077,595 52,400,384 572 Oyam T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 572 Oyam CARs - 76,573,692 - - 76,573,692 572 Total 160,815,600 129,409,781 99,427,026 153,914,462 543,566,869 573 Abim Dist. Rds 57,736,728 18,969,446 39,481,685 51,474,097 167,661,956 573 Abim T. C. 26,815,175 8,810,146 18,336,825 23,906,566 77,868,711 573 Abim Dist. Mech Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590 573 Abim T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 573 Abim CARs - 37,409,061 - - 37,409,061 573 Total 104,897,992 71,873,377 61,595,013 103,656,451 342,022,834 574 Namutumba Dist. Rds 73,998,801 24,312,363 50,602,059 65,972,243 214,885,467 574 Namutumba T. C. 22,109,357 7,264,046 15,118,880 19,711,183 64,203,467 574 Namutumba Dist.

Mech Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

574 Namutumba T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

574 Namutumba CARs - 62,007,190 - - 62,007,190 574 Total 116,589,973 100,312,916 69,522,636 114,147,837 400,573,362 575 Dokolo Dist. Rds 76,266,524 25,057,425 52,152,779 67,993,989 221,470,717 575 Dokolo T. C. 29,576,049 9,717,234 20,224,774 26,367,972 85,886,029

98 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)575 Dokolo Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

575 Dokolo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

575 Dokolo CARs - 48,872,163 - - 48,872,163 575 Total 126,867,288 90,554,508 76,280,019 123,580,862 417,282,676 576 Buliisa Dist. Rds 53,458,645 17,563,879 36,556,234 47,660,052 155,238,810 576 Buliisa T. C. 21,626,347 7,105,353 14,788,587 19,280,564 62,800,851 576 Buliisa Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

576 Buliisa T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

576 Buliisa CARs - 33,919,790 - - 33,919,790 576 Total 95,566,807 65,318,338 55,146,518 95,405,027 311,436,690 577 Maracha Dist. Rds 90,509,356 29,736,919 61,892,351 80,691,919 262,830,545 577 Maracha T. C. 21,260,076 6,985,014 14,538,122 18,954,022 61,737,235 577 Maracha Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

577 Maracha T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

577 Maracha CARs - 61,255,026 - - 61,255,026 577 Total 132,386,972 104,750,868 80,257,362 128,298,974 445,694,177 578 Bukedea Dist. Rds 65,543,641 21,534,414 44,820,229 123,844,984 255,743,267 578 Bukedea T. C. 43,422,081 14,266,358 29,693,004 38,712,142 126,093,584 578 Bukedea Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 41,141,385 67,231,115

578 Bukedea T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

578 Bukedea CARs - 43,362,983 - - 43,362,983 578 Total 129,311,811 85,848,478 78,289,737 208,028,439 501,478,465 579 Bududa Dist. Rds 60,557,738 19,896,291 41,410,755 53,989,116 175,853,900 579 Bududa T. C. 16,102,108 5,290,360 11,010,987 14,355,532 46,758,987 579 Bududa Dist. Mech

Imp 18,587,702 6,107,004 3,450,124 25,832,085 53,976,914

579 Bududa T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

579 Bududa CARs - 49,389,655 - - 49,389,655 579 Total 98,363,186 81,706,955 56,450,170 98,506,662 335,026,972 580 Lyantonde Dist. Rds 58,744,886 19,300,678 40,171,086 110,998,710 229,215,360 580 Lyantonde T. C. 19,666,294 6,461,376 13,448,258 17,533,116 57,109,044 580 Lyantonde Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 41,141,385 67,231,115

580 Lyantonde T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

580 Lyantonde CARs - 27,385,156 - - 27,385,156 580 Total 98,757,270 59,831,933 57,395,848 174,003,139 389,988,190 581 Amudat Dist. Rds 55,710,546 18,303,743 38,096,135 49,667,692 161,778,116 581 Amudat T. C. 21,244,861 6,980,015 14,527,718 18,940,457 61,693,051 581 Amudat Dist. Mech

Imp 16,959,002 5,571,893 3,147,816 23,568,615 49,247,325

581 Amudat T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

581 Amudat CARs - 30,579,096 - - 30,579,096 581 Total 97,030,046 62,458,392 56,349,972 96,506,693 312,345,103 582 Buikwe Dist. Rds 123,405,512 40,544,976 84,387,489 233,175,233 481,513,209 582 Buikwe T. C. 24,848,664 8,164,048 16,992,080 22,153,360 72,158,152 582 Lugazi T. C. 41,878,256 13,759,133 28,637,302 37,335,774 121,610,465 582 Njeru T. C. 65,118,801 21,394,832 44,529,714 58,055,446 189,098,793

99Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)582 Nkokonjeru T. C. 27,300,827 8,969,708 18,668,925 24,339,540 79,278,999 582 Buikwe Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 42,113,602 68,819,862

582 Buikwe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

582 Lugazi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

582 Njeru T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 582 Nkokonjeru T. C.

Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

582 Buikwe CARs - 93,375,068 - - 93,375,068 582 Total 312,652,238 196,097,201 198,802,501 434,492,669 1,142,044,610 583 Buyende Dist. Rds 91,916,347 30,199,186 62,854,484 81,946,295 266,916,312 583 Buyende T. C. 25,525,904 8,386,555 17,455,192 48,231,302 99,598,953 583 Buyende Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590

583 Buyende T. C. Mech Imp

3,115,638 1,023,645 578,304 7,439,251 12,156,838

583 Buyende CARs - 62,030,397 - - 62,030,397 583 Total 137,788,341 107,300,862 84,086,180 161,562,708 490,738,091 584 Kyegegwa Dist. Rds 70,713,406 23,232,944 48,355,431 63,043,211 205,344,992 584 Kyegegwa T. C. 24,264,391 7,972,084 16,592,541 21,632,463 70,461,480 584 Kyegegwa Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

584 Kyegegwa T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

584 Kyegegwa CARs - 54,983,446 - - 54,983,446 584 Total 115,595,337 92,962,383 68,774,861 113,328,707 390,661,288 585 Lamwo Dist. Rds 101,462,119 33,335,457 69,382,099 90,456,649 294,636,323 585 Lamwo T. C. 21,007,590 6,902,060 14,365,467 18,728,923 61,004,040 585 Padibe T. C. 16,263,479 5,343,379 11,121,336 14,499,400 47,227,594 585 Lamwo Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

585 Lamwo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

585 Padibe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

585 Lamwo CARs - 70,994,991 - - 70,994,991 585 Total 162,737,816 124,462,625 99,324,479 157,045,179 543,570,098 586 Otuke Dist. Rds 59,769,994 19,637,478 40,872,078 53,286,817 173,566,368 586 Otuke T. C. 22,438,452 7,372,170 15,343,922 20,004,581 65,159,125 586 Otuke Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590

586 Otuke T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 586 Otuke CARs - 28,872,376 - - 28,872,376 586 Total 102,554,536 62,566,748 59,992,505 101,567,186 326,680,974 587 Zombo Dist. Rds 70,126,424 23,040,090 47,954,040 62,519,898 203,640,451 587 Paidha T. C. 35,319,837 11,604,360 24,152,506 31,488,738 102,565,442 587 Zombo T. C. 19,498,903 6,406,380 13,333,792 17,383,881 56,622,955 587 Zombo Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987

587 Paidha T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

587 Zombo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

587 Zombo CARs - 43,320,788 - - 43,320,788 587 Total 148,814,067 92,213,764 89,870,723 144,564,102 475,462,655 588 Alebtong Dist. Rds 84,326,076 27,705,397 57,664,084 75,179,331 244,874,889

100 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)588 Alebtong T. C. 23,816,008 7,824,768 16,285,927 21,232,715 69,159,418 588 Alebtong Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987

588 Alebtong T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

588 Alebtong CARs - 67,101,912 - - 67,101,912 588 Total 128,895,349 109,450,577 77,802,092 125,253,703 441,401,721 589 Bulambuli Dist. Rds 51,812,192 17,022,936 35,430,352 46,192,188 150,457,668 589 Bulegeni T. C. 17,651,711 5,799,483 12,070,640 15,737,052 51,258,886 589 Muyembe T. C. 24,034,001 7,896,389 16,434,995 21,427,063 69,792,448 589 Bulambuli Dist. Mech

Imp 18,587,702 6,107,004 3,450,124 25,832,085 53,976,914

589 Bulegeni T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

589 Muyembe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

589 Bulambuli CARs - 32,209,044 - - 32,209,044 589 Total 118,316,882 71,082,146 68,542,719 117,848,245 375,789,992 590 Buvuma Dist. Rds 107,851,723 35,434,766 73,751,455 96,153,180 313,191,124 590 Buvuma T. C. 21,813,127 7,166,720 14,916,311 19,447,084 63,343,242 590 Buvuma Dist. Mech

Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

590 Buvuma T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

590 Buvuma CARs - 52,799,471 - - 52,799,471 590 Total 149,875,214 102,041,088 92,419,078 143,687,430 488,022,811 591 Gomba Dist. Rds 77,900,230 25,594,180 53,269,944 69,450,488 226,214,843 591 Kanoni T. C. 18,972,339 6,233,377 12,973,716 16,914,433 55,093,865 591 Gomba Dist. Mech

Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

591 Kanoni T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

591 Gomba CARs - 59,340,609 - - 59,340,609 591 Total 117,082,934 97,808,297 69,994,972 114,452,088 399,338,290 592 Kiryandongo Dist.

Rds 116,643,506 38,323,314 79,763,476 103,991,330 338,721,626

592 Bweyale T. C. 71,348,652 23,441,654 48,789,827 63,609,552 207,189,685 592 Kigumba T. C. 36,363,825 11,947,363 24,866,409 32,419,486 105,597,082 592 Kiryandongo T. C. 30,579,229 10,046,829 20,910,771 27,262,338 88,799,167 592 Kiryandongo Dist.

Mech Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

592 Bweyale T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

592 Kigumba T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

592 Kiryandongo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

592 Kiryandongo CARs - 80,470,695 - - 80,470,695 592 Total 281,376,853 172,917,277 179,238,401 264,029,730 897,562,261 593 Luuka Dist. Rds 78,236,753 25,704,745 53,500,067 69,750,510 227,192,076 593 Luuka T. C. 26,742,605 8,786,304 18,287,200 23,841,868 77,657,977 593 Luuka Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

593 Luuka T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 593 Luuka CARs - 67,856,945 - - 67,856,945 593 Total 125,596,899 109,121,903 75,614,156 122,245,412 432,578,369 594 Namayingo Dist. Rds 107,656,707 35,370,694 73,618,099 95,979,318 312,624,818 594 Namayingo T. C. 29,040,148 9,541,163 19,858,312 25,890,199 84,329,821

101Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)594 Namayingo Dist.

Mech Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

594 Namayingo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

594 Namayingo CARs - 72,643,095 - - 72,643,095 594 Total 157,178,669 124,284,268 97,278,107 150,333,928 529,074,972 595 Ntoroko Dist. Rds 54,625,991 17,947,411 37,354,492 48,700,778 158,628,672 595 Kanara T. C. 18,671,859 6,134,653 12,768,240 16,646,545 54,221,298 595 Karugutu T. C. 22,176,621 7,286,146 15,164,877 19,771,151 64,398,795 595 Kibuuku T. C. 25,378,534 8,338,137 17,354,417 22,625,756 73,696,844 595 Rwebisengo T. C. 22,548,292 7,408,259 15,419,034 20,102,507 65,478,092 595 Ntoroko Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

595 Kanara T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

595 Karugutu T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

595 Kibuuku T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

595 Rwebisengo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

595 Ntoroko CARs - 34,485,293 - - 34,485,293 595 Total 173,230,026 91,400,151 103,597,668 169,300,934 537,528,778 596 Serere Dist. Rds 89,322,671 29,347,032 61,080,869 79,633,952 259,384,524 596 Kasilo T. C. 19,639,307 6,452,509 13,429,803 17,509,055 57,030,674 596 Serere T. C. 30,578,037 10,046,438 20,909,956 27,261,275 88,795,706 596 Serere Dist. Mech Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987 596 Kasilo T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 596 Serere T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 596 Serere CARs - 68,711,226 - - 68,711,226 596 Total 163,408,917 122,399,351 99,851,013 157,575,867 543,235,148 597 Kyankwazi Dist. Rds 76,761,883 25,220,176 52,491,517 68,435,617 222,909,194 597 Butemba T. C. 23,574,138 7,745,301 16,120,530 21,017,080 68,457,049 597 Ntwetwe T. C. 20,498,985 6,734,957 14,017,671 18,275,485 59,527,099 597 Kyankwazi Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

597 Butemba T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

597 Ntwetwe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

597 Kyankwazi CARs - 47,610,240 - - 47,610,240 597 Total 144,568,184 95,108,228 87,034,911 140,711,145 467,422,467 598 Kalungu Dist. Rds 88,988,751 29,237,323 60,852,527 79,336,252 258,414,852 598 Kalungu T. C. 23,983,217 7,879,705 16,400,268 21,381,788 69,644,978 598 Lukaya T. C. 24,295,025 7,982,149 16,613,489 21,659,774 70,550,437 598 Kalungu Dist. Mech

Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

598 Kalungu T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

598 Lukaya T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

598 Kalungu CARs - 55,301,684 - - 55,301,684 598 Total 160,592,996 108,064,636 98,195,900 154,794,908 521,648,439 599 Lwengo Dist. Rds 89,985,666 29,564,860 61,534,240 80,225,033 261,309,799 599 Kyazanga T. C. 25,683,614 8,438,371 17,563,038 22,897,744 74,582,767 599 Lwengo T. C. 20,333,066 6,680,445 13,904,212 18,127,564 59,045,287 599 Lwengo Dist. Mech

Imp 17,366,177 5,705,671 3,223,393 24,134,482 50,429,722

102 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)599 Kyazanga T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

599 Lwengo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

599 Lwengo CARs - 55,990,604 - - 55,990,604 599 Total 159,599,799 108,427,240 97,381,490 154,044,681 519,453,210 600 Bukomansimbi Dist.

Rds 73,021,435 23,991,248 49,933,714 65,100,890 212,047,287

600 Bukomansimbi T. C. 21,558,847 7,083,176 14,742,429 19,220,386 62,604,838 600 Bukomansimbi Dist.

Mech Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

600 Bukomansimbi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

600 Bukomansimbi CARs - 42,170,525 - - 42,170,525 600 Total 114,790,647 79,885,080 68,427,454 112,408,442 375,511,623 601 Mitooma Dist. Rds 68,982,525 22,664,261 47,171,815 61,500,076 200,318,678 601 Kashensero T. C. 18,609,057 6,114,020 12,725,296 16,590,556 54,038,929 601 Mitooma T. C. 18,932,099 6,220,156 12,946,199 16,878,557 54,977,010 601 Mitooma Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

601 Kashensero T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

601 Mitooma T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

601 Mitooma CARs - 64,263,497 - - 64,263,497 601 Total 130,664,033 107,193,266 77,324,079 128,518,019 443,699,398 602 Rubirizi Dist. Rds 54,404,797 17,874,738 37,203,234 48,503,576 157,986,345 602 Katerera T. C. 18,117,960 5,952,670 12,389,472 16,152,727 52,612,829 602 Rubirizi T. C. 17,066,819 5,607,316 11,670,678 15,215,602 49,560,416 602 Rubirizi Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

602 Katerera T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

602 Rubirizi T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

602 Rubirizi CARs - 38,668,917 - - 38,668,917 602 Total 113,594,203 75,990,380 65,718,962 113,232,113 368,535,658 603 Ngora Dist. Rds 64,501,277 21,191,944 44,107,437 57,504,904 187,305,561 603 Ngora T. C. 17,038,426 5,597,988 11,651,262 15,190,289 49,477,965 603 Ngora Dist. Mech Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457 603 Ngora T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 603 Ngora CARs - 45,244,518 - - 45,244,518 603 Total 101,750,068 78,674,581 59,510,010 100,782,358 340,717,018 604 Napak Dist. Rds 92,271,166 30,315,763 63,097,117 82,262,628 267,946,674 604 Lorengecora T. C. 19,954,865 6,556,186 13,645,589 17,790,385 57,947,025 604 Napak Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

604 Lorengecora T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

604 Napak CARs - 54,553,377 - - 54,553,377 604 Total 132,843,571 98,199,235 80,569,595 128,706,046 440,318,447 605 Kibuuku Dist. Rds 64,501,277 21,191,944 44,107,437 57,504,904 187,305,561 605 Kibuku T. C. 18,639,917 6,124,159 12,746,398 16,618,068 54,128,542 605 Kibuuku Dist. Mech

Imp 17,773,352 5,839,448 3,298,970 24,700,350 51,612,119

605 Kibuku T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

605 Kibuuku CARs - 42,140,391 - - 42,140,391

103Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)605 Total 104,030,183 76,319,588 60,731,108 103,153,250 344,234,130 606 Nwoya Dist. Rds 67,105,772 22,047,653 45,888,450 59,826,892 194,868,767 606 Anaka T. C. 17,523,485 5,757,354 11,982,957 15,622,734 50,886,531 606 Nwoya Dist. Mech

Imp 17,094,727 5,616,486 3,173,008 23,757,237 49,641,457

606 Anaka T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 606 Nwoya CARs - 31,280,279 - - 31,280,279 606 Total 104,839,622 65,725,417 61,622,718 103,536,793 335,724,550 607 Kole Dist. Rds 84,981,892 27,920,866 58,112,546 160,573,643 331,588,947 607 Ayer T. C. 16,498,630 5,420,638 11,282,137 31,174,230 64,375,635 607 Kole Dist. Mech Imp 17,230,452 5,661,078 3,198,200 41,141,385 67,231,115 607 Ayer T. C. Mech Imp 3,115,638 1,023,645 578,304 7,439,251 12,156,838 607 Kole CARs - 57,843,275 - - 57,843,275 607 Total 121,826,612 97,869,502 73,171,187 240,328,509 533,195,810 608 Butambala Dist. Rds 46,939,681 15,422,068 32,098,419 41,848,192 136,308,360 608 Gombe T. C. 28,593,021 9,394,259 19,552,556 25,491,571 83,031,407 608 Butambala Dist. Mech

Imp 17,230,452 5,661,078 3,198,200 23,945,860 50,035,590

608 Gombe T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

608 Butambala CARs - 33,311,213 - - 33,311,213 608 Total 95,878,791 64,812,263 55,427,479 95,615,552 311,734,086 609 Sheema Dist. Rds 86,143,746 28,302,594 58,907,048 76,799,841 250,153,229 609 Bugonji T. C. 21,851,866 7,179,447 14,942,802 19,481,621 63,455,737 609 Kabwohe-Itendero

T. C. 27,067,748 8,893,129 18,509,540 24,131,743 78,602,160

609 Kibingo T. C. 27,819,293 9,140,050 19,023,464 24,801,769 80,784,575 609 Sheema Dist. Mech

Imp 17,637,627 5,794,856 3,273,777 24,511,727 51,217,987

609 Bugonji T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

609 Kabwohe-Itendero T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

609 Kibingo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

609 Sheema CARs - 62,904,244 - - 62,904,244 609 Total 189,867,193 125,285,256 116,391,542 182,716,487 614,260,478 610 Buhweju Dist. Rds 48,804,545 16,034,771 33,373,655 43,510,777 141,723,748 610 Nsiika T. C. 18,181,452 5,973,530 12,432,890 16,209,333 52,797,205 610 Buhweju Dist. Mech

Imp 17,501,902 5,750,263 3,248,585 24,323,105 50,823,855

610 Nsiika T. C. Mech Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516 610 Buhweju CARs - 35,928,058 - - 35,928,058 610 Total 87,603,537 64,710,268 49,633,434 88,373,143 290,320,381 611 Agago Dist. Rds 114,145,481 37,502,586 78,055,270 101,764,263 331,467,600 611 Kalongo T. C. 24,555,690 8,067,791 16,791,738 21,892,165 71,307,385 611 Lokole T. C. 29,140,308 9,574,071 19,926,804 25,979,495 84,620,677 611 Patongo T. C. 20,219,831 6,643,241 13,826,779 18,026,611 58,716,461 611 Agago Dist. Mech Imp 18,316,252 6,017,819 3,399,739 25,454,840 53,188,649 611 Kalongo T. C. Mech

Imp 3,115,638 1,023,645 578,304 4,329,929 9,047,516

611 Lokole T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

611 Patongo T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

611 Agago CARs - 76,508,647 - - 76,508,647 611 Total 215,724,476 147,385,089 133,735,241 206,107,160 702,951,966

104 Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)612 Kween Dist. Rds 49,045,905 16,114,070 33,538,703 43,725,957 142,424,634 612 Binyiny T. C. 17,593,487 5,780,354 12,030,826 15,685,144 51,089,811 612 Kween Dist. Mech

Imp 17,909,077 5,884,041 3,324,162 24,888,972 52,006,252

612 Binyiny T. C. Mech Imp

3,115,638 1,023,645 578,304 4,329,929 9,047,516

612 Kween CARs - 35,528,916 - - 35,528,916 612 Total 87,664,107 64,331,026 49,471,994 88,630,001 290,097,128

Grand Total 19,428,218,060 14,546,146,552 11,997,913,499 20,942,964,874 66,915,242,985 MUNICIPAL COUNCILS751 Arua MC 253,662,171 83,340,901 173,459,948 226,147,750 736,610,771 751 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 751 Total 270,213,998 88,779,017 176,532,186 249,150,497 784,675,698 752 Entebbe MC 367,539,020 120,755,227 251,331,520 694,466,522 1,434,092,289 752 Mech Imp 16,551,827 5,438,115 3,072,239 39,521,023 64,583,203 752 Total 384,090,846 126,193,343 254,403,759 733,987,544 1,498,675,492 753 FortPortal MC 219,535,148 72,128,442 150,123,115 195,722,443 637,509,148 753 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 753 Total 236,086,975 77,566,557 153,195,354 218,725,190 685,574,076 754 Gulu MC 330,463,566 108,574,059 225,978,484 294,618,594 959,634,703 754 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 754 Total 347,015,393 114,012,174 229,050,723 317,621,341 1,007,699,631 755 Jinja MC 326,244,844 107,187,994 223,093,626 290,857,471 947,383,935 755 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 755 Total 342,796,671 112,626,110 226,165,865 313,860,218 995,448,863 757 Kabale MC 238,475,315 78,351,248 163,074,831 212,608,194 692,509,589 757 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 757 Total 255,027,142 83,789,364 166,147,070 235,610,941 740,574,517 758 Lira MC 324,131,261 106,493,575 221,648,310 288,973,146 941,246,291 758 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 758 Total 340,683,088 111,931,690 224,720,549 311,975,893 989,311,219 759 Masaka MC 260,973,904 85,743,177 178,459,877 232,666,389 757,843,346 759 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 759 Total 277,525,731 91,181,292 181,532,115 255,669,136 805,908,274 760 Mbale MC 285,064,390 93,658,124 194,933,497 254,143,810 827,799,821 760 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 760 Total 301,616,217 99,096,240 198,005,736 277,146,557 875,864,749 761 Mbarara MC 274,068,875 90,045,539 187,414,515 244,340,964 795,869,893 761 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 761 Total 290,620,701 95,483,655 190,486,753 267,343,711 843,934,820 762 Moroto MC 137,491,200 45,172,839 94,019,602 122,577,700 399,261,342 762 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 762 Total 154,043,027 50,610,955 97,091,841 145,580,447 447,326,270 763 Soroti MC 294,902,709 96,890,512 201,661,163 262,914,978 856,369,361 763 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 763 Total 311,454,536 102,328,627 204,733,402 285,917,725 904,434,289 764 Tororo MC 169,024,239 55,533,043 115,582,609 150,690,389 490,830,281 764 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 764 Total 185,576,065 60,971,159 118,654,848 173,693,136 538,895,208 770 Kasese MC 245,525,742 80,667,671 167,896,073 218,893,870 712,983,356 770 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 770 Total 262,077,569 86,105,787 170,968,312 241,896,617 761,048,284 771 Hoima MC 191,659,976 62,970,032 131,061,440 170,870,857 556,562,305 771 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928

105Annex 6: Details of Disbursements to Designated Agencies in FY 2015/16

Vote DesignatedAgency

Q1Disbursed

(UGX)

Q2Disbursed

(UGX)

Q3Disbursed

(UGX)

Q4Disbursed

(UGX)

TotalDisbursed

(UGX)771 Total 208,211,803 68,408,148 134,133,679 193,873,604 604,627,233 772 Mukono MC 218,890,120 71,916,517 149,682,030 195,147,380 635,636,047 772 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 772 Total 235,441,947 77,354,632 152,754,269 218,150,127 683,700,975 773 Iganga MC 170,466,673 56,006,956 116,568,979 279,058,949 622,101,558 773 Mech Imp 16,551,827 5,438,115 3,072,239 35,342,103 60,404,284 773 Total 187,018,500 61,445,072 119,641,217 314,401,052 682,505,841 774 Masindi MC 158,501,183 52,075,685 108,386,705 141,308,756 460,272,330 774 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 774 Total 175,053,010 57,513,801 111,458,944 164,311,503 508,337,258 775 Ntungamo MC 142,705,120 46,885,877 97,584,999 127,226,073 414,402,069 775 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 775 Total 159,256,947 52,323,992 100,657,238 150,228,820 462,466,997 776 Busia MC 166,877,282 54,827,659 114,114,471 148,776,310 484,595,722 776 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 776 Total 183,429,108 60,265,775 117,186,710 171,779,057 532,660,650 777 Ishaka MC 190,071,569 62,448,160 129,975,252 311,152,740 693,647,721 777 Mech Imp 16,551,827 5,438,115 3,072,239 35,342,103 60,404,284 777 Total 206,623,396 67,886,276 133,047,490 346,494,843 754,052,005 778 Rukungiri MC 162,580,481 53,415,942 111,176,222 144,945,578 472,118,223 778 Mech Imp 16,551,827 5,438,115 3,072,239 23,002,747 48,064,928 778 Total 179,132,308 58,854,057 114,248,460 167,948,325 520,183,151

Grand Total MC 5,492,994,978 1,804,727,721 3,574,816,517 5,755,366,285 16,627,905,501

106 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

107Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Annex 7:

Financial performance of DUCAR Designated

Agencies in FY 2015/16

108 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

Uganda National Road Authority113 Road Maintenance 257,917,000,000 231,098,000,000 237,889,000,000113 Operational Expenses 10,000,000,000 10,000,000,000 10,000,000,000

Total 276,917,000,000 241,098,000,000 247,889,000,000 102.8%Kampala Capital City Authority

122 Road Maintenance 19,525,000,000 14,738,000,000 00,000Mechanical Imprest - - - Total 19,525,000,000 14,738,000,000 31,305,000,000 212.4%

Districts: Votes 501-612501 Adjumani Dist. Rds 602,322,701 425,891,616 490,097,000

501 Adjumani T. C. 155,169,353 109,717,476 59,263,000

501 Adjumani Dist. Mech Imp 72,993,104 51,612,119 18,835,000

501 Adjumani T. C. Mech Imp 12,795,566 9,047,516 2,135,000

501 Adjumani CARs 89,558,001 89,558,001 0

Total 932,838,724 685,826,728 570,330,000 83.2%

502 Apac Dist. Rds 486,901,855 462,596,750 512,607,000

502 Aduku T. C. 95,410,131 67,462,798 0

502 Apac T. C. 87,115,818 61,598,038 98,922,000

502 Apac Dist. Mech Imp 72,993,104 69,349,444 80,041,000

502 Aduku T. C. Mech Imp 12,795,566 9,047,516

502 Apac T. C. Mech Imp 12,795,566 9,047,516 0

502 Apac CARs 76,596,465 76,596,465 76,596,000Total 844,608,505 755,698,527 768,166,000 101.7%

503 Arua Dist. Rds 823,304,579 582,143,952 551,970,000

503 Arua Dist. Mech Imp 82,469,021 58,312,370 108,430,000

503 Arua CARs 159,900,227 159,900,227 159,900,000

Total 1,065,673,826 800,356,549 820,300,000 102.5%504 Bugiri Dist. Rds 727,157,062 690,858,927 839,427,000504 Bugiri T. C. 127,962,093 90,479,709 84,913,000504 Bugiri Dist. Mech Imp 73,550,511 69,879,026 66,064,000504 Bugiri T. C. Mech Imp 12,795,566 9,047,516 10,796,000504 Bugiri CARs 112,771,771 112,771,771 112,772,000

Total 1,054,237,003 973,036,949 1,113,971,000 114.5%505 Bundibugyo Dist. Rds 341,106,195 241,190,094 223,982,000505 Bundibugyo T. C. 335,334,780 237,109,230 424,555,000505 Nyahuka T. C. 98,293,267 69,501,412 61,759,000505 Bundibugyo Dist. Mech Imp 75,222,732 53,188,649 84,795,000505 Bundibugyo T. C. Mech Imp 12,795,566 9,047,516 16,021,000505 Nyahuka T. C. Mech Imp 12,795,566 9,047,516 9,785,000505 Bundibugyo CARs 57,528,975 57,528,975 57,529,000

Total 933,077,081 676,613,391 878,426,000 129.9%506 Bushenyi Dist. Rds 373,841,394 239,336,568 239,835,000506 Bushenyi Dist. Mech Imp 72,993,104 51,612,119 51,111,000506 Bushenyi CARs 54,726,622 54,726,622 54,726,000

Total 501,561,120 345,675,309 345,672,000 99.99%507 Busia Dist. Rds 334,091,958 236,230,452 227,027,000507 Busia Dist. Mech Imp 75,780,139 53,582,782 62,790,000

109Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

507 Busia CARs 60,126,767 60,126,767 0Total 469,998,863 349,940,000 289,817,000 82.8%

508 Gulu Dist. Rds 601,145,163 425,059,000 421,120,000508 Gulu Dist. Mech Imp 74,665,325 52,794,517 0508 Gulu CARs 78,312,050 78,312,050 0

Total 754,122,538 556,165,567 421,120,000 75.7%509 Hoima Dist. Rds 681,793,257 482,083,826 610,368,000509 Kigorobya T. C. 74,548,246 52,711,733 44,057,000509 Hoima Dist. Mech Imp 73,550,511 52,006,252 6,213,000509 Kigorobya T. C. Mech Imp 12,795,566 9,047,516 11,127,000509 Hoima CARs 117,260,219 117,260,219 117,259,000

Total 959,947,799 713,109,545 789,024,000 110.6%510 Iganga Dist. Rds 502,897,070 355,589,529 379,595,000510 Busembatya T. C. 101,695,091 71,906,781 62,475,000510 Iganga Dist. Mech Imp 75,222,732 53,188,649 94,824,000510 Busembatya T. C. Mech Imp 12,795,566 9,047,516 12,865,000510 Iganga CARs 121,740,662 121,740,662 121,741,000

Total 814,351,120 611,473,137 671,499,000 109.8%511 Jinja Dist. Rds 496,939,186 351,376,816 270,884,000511 Bugembe T. C. 149,209,021 105,503,032 128,444,000511 Buwenge T. C. 106,931,815 75,609,575 84,074,000511 Kakira T. C. 86,275,748 61,004,040 49,888,000511 Jinja Dist. Mech Imp 71,320,884 50,429,722 76,484,000511 Bugembe T. C. Mech Imp 12,795,566 9,047,516 12,035,000511 Buwenge T. C. Mech Imp 12,795,566 9,047,516 9,045,000511 Kakira T. C. Mech Imp 12,795,566 9,047,516 9,484,000511 Jinja CARs 90,695,314 90,695,314 16,480,000

Total 1,039,758,666 761,761,047 656,818,000 86.2%512 Kabale Dist. Rds 715,199,880 505,705,052 577,929,000512 Hamurwa T. C. 69,936,624 49,450,936 49,747,000512 Katuna T. C. 104,261,826 73,721,674 70,967,000512 Muhanga T. C. 82,558,230 58,375,449 311,138,000512 Kabale Dist. Mech Imp 78,567,173 55,553,444 47,294,000512 Hamurwa T. C. Mech Imp 12,795,566 9,047,516 6,474,000512 Katuna T. C. Mech Imp 12,795,566 9,047,516 3,358,000512 Muhanga T. C. Mech Imp 12,795,566 9,047,516 11,024,000512 Kabale CARs 94,123,192 94,123,192 105,062,000

Total 1,183,033,621 864,072,294 1,182,993,000 136.9%513 Kabarole Dist. Rds 557,062,878 393,889,204 410,956,000513 Karago T. C. 91,347,018 64,589,843 67,949,000513 Kibiito T. C. 94,588,274 66,881,678 58,095,000513 Kijura T. C. 87,350,305 61,763,839 70,168,000513 Kiko T. C. 83,019,319 58,701,477 59,609,000513 Rubona T. C. 86,445,803 61,124,282 60,372,000513 Rwimi T. C. 82,482,794 58,322,109 60,812,000513 Kabarole Dist Mech Imp 76,337,545 53,976,914 61,901,000513 Karago T. C. Mech Imp 12,795,566 9,047,516 8,715,000513 Kibiito T. C. Mech Imp 12,795,566 9,047,516 14,294,000513 Kijura T. C. Mech Imp 12,795,566 9,047,516 4,935,000

110 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

513 Kiko T. C. Mech Imp 12,795,566 9,047,516 6,772,000513 Rubona T. C. Mech Imp 12,795,566 9,047,516 8,863,000513 Rwimi T. C. Mech Imp 12,795,566 9,047,516 6,799,000513 Kabarole CARs 83,729,487 83,729,487 64,140,000

Total 1,319,136,817 957,263,929 964,379,000 100.7%514 Kaberamaido Dist. Rds 309,840,780 219,082,877 219,079,000514 Kaberamaido T. C. 76,425,252 54,038,929 54,039,000514 Kaberamaido Dist. Mech Imp 74,107,918 52,400,384 52,400,000514 Kaberamaido T. C. Mech Imp 12,795,566 9,047,516 9,048,000514 Kaberamaido CARs 76,182,533 76,182,533 70,791,000

Total 549,352,049 410,752,240 405,356,000 98.7%515 Kalangala Dist. Rds 411,572,114 291,015,285 256,575,000515 Kalangala T. C. 70,875,870 50,115,061 51,113,000515 Kalangala Dist. Mech Imp 71,320,884 50,429,722 78,508,000515 Kalangala T. C. Mech Imp 12,795,566 9,047,516 6,940,000515 Kalangala CARs 53,047,108 53,047,108 53,047,000

Total 619,611,542 453,654,693 446,183,000 98.4%517 Kamuli Dist. Rds 712,349,267 503,689,434 840,158,000517 Kamuli T. C. 99,183,980 70,131,219 0517 Kamuli Dist. Mech Imp 74,665,325 52,794,517 70,535,000517 Kamuli T. C. Mech Imp 12,795,566 9,047,516 0517 Kamuli CARs 108,608,985 108,608,985 0

Total 1,007,603,122 744,271,671 910,693,000 122.4%518 Kamwenge Dist. Rds 449,583,279 427,141,037 281,276,000518 Kamwenge T. C. 100,841,384 71,303,140 48,960,000518 Kamwenge Dist. Mech Imp 75,222,732 71,467,773 79,667,000518 Kamwenge T. C. Mech Imp 12,795,566 9,047,516 9,331,000518 Kamwenge CARs 79,054,643 79,054,643 0

Total 717,497,604 658,014,110 419,234,000 63.7%519 Kanungu Dist. Rds 344,669,589 243,709,706 219,639,000519 Butogota T. C. 75,371,822 53,294,068 0519 Kambuga T. C. 65,132,022 46,053,689 0519 Kanungu T. C. 98,995,496 94,053,851 15,257,000519 Kihihi T. C. 110,024,035 77,796,029 0519 Kanungu Dist. Mech Imp 72,993,104 51,612,119 75,940,000519 Butogota T. C. Mech Imp 12,795,566 9,047,516519 Kambuga T. C. Mech Imp 12,795,566 9,047,516519 Kanungu T. C. Mech Imp 12,795,566 12,156,838519 Kihihi T. C. Mech Imp 12,795,566 9,047,516519 Kanungu CARs 48,840,785 48,840,785 0

Total 867,209,116 654,659,633 310,835,000 47.5%520 Kapchorwa Dist. Rds 202,990,588 143,531,017 207,971,000520 Kapchorwa T. C. 93,042,305 65,788,551 6,965,000520 Kapchorwa Dist. Mech Imp 74,665,325 52,794,517 28,029,000520 Kapchorwa T. C. 12,795,566 9,047,516520 Kapchorwa CARs 32,713,537 32,713,537 0

Total 416,207,321 303,875,137 242,965,000 80.0%521 Kasese Dist. Rds 842,903,086 596,001,706 564,856,000521 Hima T. C. 142,334,198 100,641,968 101,219,000

111Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

521 Katwe-Kabatoro T. C. 296,610,339 281,804,181 282,381,000521 Mpondwe-Lhubiriha T. C. 103,811,559 98,629,507 99,206,000521 Kasese Dist. Mech Imp 80,239,393 56,735,841 86,144,000521 Hima T. C. Mech Imp 12,795,566 9,047,516 9,047,000

521 Katwe-Kabatoro T. C. Mech Imp 12,795,566 12,156,838 12,156,000

521 Mpondwe-Lhubiriha T. C. Mech Imp 12,795,566 12,156,838 12,156,000

521 Kasese CARs 142,180,591 142,180,591 142,179,000Total 1,646,465,865 1,309,354,987 1,309,344,000 100.0%

522 Katakwi Dist. Rds 316,880,064 224,060,229 218,729,000522 Katakwi T. C. 80,901,328 57,203,883 46,062,000522 Katakwi Dist. Mech Imp 72,993,104 51,612,119 71,268,000522 Katakwi T. C. Mech Imp 12,795,566 9,047,516 6,140,000522 Katakwi CARs 47,219,180 47,219,180 47,219,000

Total 530,789,242 389,142,928 389,418,000 100.1%523 Kayunga Dist. Rds 511,207,195 361,465,471 400,609,000523 Kayunga T. C. 122,946,512 86,933,281 76,296,000523 Kayunga Dist. Mech Imp 72,435,698 51,217,987 37,357,000523 Kayunga T. C. Mech Imp 12,795,566 9,047,516 9,656,000523 Kayunga CARs 73,806,663 73,806,663 73,823,000

Total 793,191,634 582,470,918 597,740,000 102.6%524 Kibaale Dist. Rds 873,428,817 617,585,905 645,939,000524 Kagadi T. C. 118,774,728 83,983,487 87,444,000524 Kakumiro T. C. 89,050,117 62,965,746 55,958,000524 Kibaale T. C. 87,754,638 62,049,736 49,374,000524 Muhoro T. C. 99,674,933 70,478,364 71,226,000524 Kibaale Dist. Mech Imp 85,256,055 60,283,032 64,614,000524 Kagadi T. C. Mech Imp 12,795,566 9,047,516 6,822,000524 Kakumiro T. C. Mech Imp 12,795,566 9,047,516 16,156,000524 Kibaale T. C. Mech Imp 12,795,566 9,047,516 2,288,000524 Muhoro T. C. Mech Imp 12,795,566 9,047,516 8,040,000524 Kibaale CARs 156,338,142 156,338,142 156,338,000

Total 1,561,459,693 1,149,874,476 1,164,198,000 101.2%525 Kiboga Dist. Rds 465,792,643 329,353,652 306,098,000525 Bukomero T. C. 88,553,699 84,133,286 400,217,000525 Kiboga T. C. 106,371,526 101,061,685 380,477,000525 Kiboga Dist. Mech Imp 71,320,884 50,429,722 73,687,000525 Bukomero T. C. Mech Imp 12,795,566 12,156,838 11,380,000525 Kiboga T. C. Mech Imp 12,795,566 12,156,838 13,302,000525 Kiboga CARs 51,742,585 51,742,585 51,743,000

Total 809,372,467 641,034,608 1,236,903,000 193.0%526 Kisoro Dist. Rds 332,377,086 235,017,897 255,708,000526 Kisoro T. C. 112,444,693 79,507,633 175,312,000526 Kisoro Dist. Mech Imp 75,222,732 53,188,649 40,756,000526 Kisoro T. C. Mech Imp 12,795,566 9,047,516 4,330,000526 Kisoro CARs 60,090,536 60,090,536 0

Total 592,930,613 436,852,230 476,106,000 109.0%527 Kitgum Dist. Rds 579,788,304 409,957,947 436,890,000527 Kitgum T. C. 230,093,361 162,694,903 165,779,000

112 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

527 Kitgum Dist. Mech Imp 72,993,104 51,612,119 62,685,000527 Kitgum T. C. Mech Imp 12,795,566 9,047,516 7,462,000527 Kitgum CARs 105,639,825 105,639,825 105,640,000

Total 1,001,310,159 738,952,309 778,456,000 105.3%528 Kotido Dist. Rds 373,942,765 264,408,245 25,055,000528 Kotido T. C. 114,895,928 81,240,857 168,132,000528 Kotido Dist. Mech Imp 70,763,477 50,035,590 115,649,000528 Kotido T. C. Mech Imp 12,795,566 9,047,516 13,065,000528 Kotido CARs 62,914,388 62,914,388 42,970,000

Total 635,312,123 467,646,595 364,871,000 78.0%529 Kumi Dist. Rds 448,135,623 316,868,689 56,074,000529 Kumi T. C. 95,489,370 67,518,827 56,074,000529 Kumi Dist. Mech Imp 71,320,884 50,429,722 12,789,000529 Kumi T. C. Mech Imp 12,795,566 9,047,516 12,789,000529 Kumi CARs 57,017,902 57,017,902 27,630,000

Total 684,759,345 500,882,656 165,354,000 33.0%530 Kyenjojo Dist. Rds 572,063,563 404,495,920 66,245,000530 Butunduzi T. C. 91,537,951 64,724,849 205,941,000530 Katooke T. C. 91,967,401 65,028,505 62,876,000530 Kyarusozi T. C. 82,865,755 58,592,895 66,157,000530 Kyenjojo T. C. 127,366,134 90,058,317 88,297,000530 Kyenjojo Dist. Mech Imp 74,665,325 52,794,517 10,375,000530 Butunduzi T. C. Mech Imp 12,795,566 9,047,516 24,143,000530 Katooke T. C. Mech Imp 12,795,566 9,047,516 8,504,000530 Kyarusozi T. C. Mech Imp 12,795,566 9,047,516 6,532,000530 Kyenjojo T. C. Mech Imp 12,795,566 9,047,516 10,952,000530 Kyenjojo CARs 89,255,473 89,255,473 0

Total 1,180,903,865 861,140,539 550,022,000 63.9%531 Lira Dist. Rds 409,380,598 289,465,704 287,807,000531 Lira Dist. Mech Imp 72,993,104 51,612,119 77,848,000531 Lira CARs 72,345,028 72,345,028 72,345,000

Total 554,718,730 413,422,851 438,000,000 105.9%532 Luwero Dist. Rds 582,569,684 411,924,611 390,128,000532 Bombo T. C. 127,159,033 89,911,880 71,801,000532 Luwero T. C. 142,296,539 100,615,339 5,171,000532 Wobulenzi T. C. 123,768,181 87,514,269 47,290,000532 Luwero Dist. Mech Imp 73,550,511 52,006,252532 Bombo T. C. Mech Imp 12,795,566 9,047,516532 Luwero T. C. Mech Imp 12,795,566 9,047,516 640,000532 Wobulenzi T. C. Mech Imp 12,795,566 9,047,516532 Luwero CARs 128,551,686 128,551,686 109,912,000

Total 1,216,282,332 897,666,584 624,941,000 69.6%533 Masaka Dist. Rds 339,797,422 240,264,684 314,412,000533 Masaka Dist. Mech Imp 71,320,884 50,429,722 57,718,000533 Masaka CARs 67,943,564 67,943,564 0

Total 479,061,870 358,637,970 372,131,000 103.8%534 Masindi Dist. Rds 497,662,907 351,888,546 424,047,000534 Masindi Dist. Mech Imp 71,320,884 50,429,722 54,291,000534 Masindi CARs 68,143,634 68,143,634 171,333,000

Total 637,127,425 470,461,903 649,671,000 138.1%

113Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

535 Mayuge Dist. Rds 659,700,920 466,462,729 463,727,000535 Mayuge T. C. 96,617,143 68,316,255 67,935,000535 Mayuge Dist. Mech Imp 74,665,325 52,794,517 3,525,000535 Mayuge T. C. Mech Imp 12,795,566 9,047,516 47,420,000535 Mayuge CARs 118,247,136 118,247,136

Total 962,026,089 714,868,152 582,607,000 81.5%536 Mbale Dist. Rds 488,133,397 345,150,400 332,082,000536 Nakaloke T. C. 90,548,022 64,024,888 23,061,000536 Mbale T.C 4,878,000536 Mbale Dist. Mech Imp 78,567,173 55,553,444 47,455,000536 Nakaloke T. C. Mech Imp 12,795,566 9,047,516 8,650,000536 Mbale CARs 108,835,973 108,835,973 103,958,000

Total 778,880,131 582,612,221 520,084,000 89.3%537 Mbarara Dist. Rds 518,947,127 366,938,238 477,171,000537 Mbarara Dist. Mech Imp 75,780,139 53,582,782 95,504,000537 Mbarara CARs 82,509,051 102,599,474 0

Total 677,236,316 523,120,493 572,675,000 109.5%538 Moroto Dist. Rds 293,785,836 207,730,713 245,006,000538 Moroto Dist. Mech Imp 70,206,070 49,641,457 50,173,000538 Moroto CARs 46,319,264 46,319,264 0

Total 410,311,170 303,691,435 295,179,000 97.2%539 Moyo Dist. Rds 514,581,247 363,851,202 358,872,000539 Moyo T. C. 157,567,140 111,412,908 42,502,000539 Moyo Dist. Mech Imp 72,435,698 51,217,987 54,382,000539 Moyo T. C. Mech Imp 12,795,566 9,047,516 3,199,000539 Moyo CARs 112,556,311 112,556,311 71,015,000

Total 869,935,961 648,085,924 529,970,000 81.8%540 Mpigi Dist. Rds 403,601,733 383,454,793 378,430,000540 Mpigi T. C. 165,468,569 116,999,868 132,659,000540 Mpigi Dist. Mech Imp 71,320,884 67,760,697 68,296,000540 Mpigi T. C. Mech Imp 12,795,566 9,047,516 3,538,000540 Mpigi CARs 57,781,670 57,781,670 120,877,000

Total 710,968,422 635,044,544 703,800,000 110.8%541 Mubende Dist. Rds 817,997,086 578,391,119 517,191,000541 Mubende T. C. 161,592,308 114,259,033 138,232,000541 Mubende Dist. Mech Imp 78,009,766 55,159,311 116,667,000541 Mubende T. C. Mech Imp 12,795,566 9,047,516 17,555,000541 Mubende CARs 142,635,649 142,635,649 142,636,000

Total 1,213,030,375 899,492,628 932,281,000 103.6%542 Mukono Dist. Rds 708,491,719 500,961,831 466,155,000542 Mukono Dist. Mech Imp 75,222,732 53,188,649 87,995,000542 Mukono CARs 109,013,222 109,013,222

Total 892,727,673 663,163,702 554,150,000 83.6%543 Nakapiripirit Dist. Rds 422,122,448 298,475,238 267,736,000543 Nakapiripirit T. C. 65,156,303 46,070,857 48,443,000543 Nakapiripirit Dist. Mech Imp 71,878,291 50,823,855 89,159,000543 Nakapiripirit T. C. Mech Imp 12,795,566 9,047,516 6,000,000543 Nakapiripirit CARs 80,249,392 80,249,392 0

Total 652,201,999 484,666,857 411,338,000 84.9%

114 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

544 Nakasongola Dist. Rds 457,848,912 434,994,068 435,632,000544 Kakooge T. C. 106,434,332 75,257,814 78,645,000544 Migeera T. C. 71,620,238 50,641,390 58,788,000544 Nakasongola T. C. 77,285,592 54,647,261 54,656,000544 Nakasongola Dist. Mech Imp 72,435,698 68,819,862 68,181,000544 Kakooge T. C. Mech Imp 12,795,566 9,047,516 5,238,000544 Migeera T. C. Mech Imp 12,795,566 9,047,516 801,000544 Nakasongola T. C. Mech Imp 12,795,566 9,047,516 9,023,000544 Nakasongola CARs 53,623,939 53,623,939 68,361,000

Total 877,635,408 765,126,881 779,325,000 101.9%545 Nebbi Dist. Rds 593,218,951 419,454,517 553,525,000545 Nebbi T. C. 137,591,367 97,288,397 41,933545 Pakwach T. C. 120,882,239 85,473,670 43,252,000545 Nebbi Dist. Mech Imp 75,222,732 53,188,649 100,814,000545 Nebbi T. C. Mech Imp 12,795,566 9,047,516 0545 Pakwach T. C. Mech Imp 12,795,566 9,047,516 0545 Nebbi CARs 79,720,470 79,720,470 156,509,000

Total 1,032,226,891 753,220,735 896,032,000 119.0%546 Ntungamo Dist. Rds 602,564,218 426,062,389 517,846,000546 Kitwe T. C. 86,296,192 61,018,495 0546 Rubare T. C. 81,556,897 57,667,424546 Rwashameire T. C. 70,584,912 49,909,330546 Ntungamo Dist. Mech Imp 75,780,139 53,582,782 75,817,000546 Kitwe T. C. Mech Imp 12,795,566 9,047,516 0546 Rubare T. C. Mech Imp 12,795,566 9,047,516 0546 Rwashameire T. C. Mech Imp 12,795,566 9,047,516546 Ntungamo CARs 103,744,961 103,744,961 11,400,000

Total 1,058,914,015 779,127,927 605,064,000 77.7%547 Pader Dist. Rds 465,369,205 329,054,247 376,003,000547 Pader T. C. 96,131,819 91,333,123 266,439,000547 Pader Dist. Mech Imp 74,107,918 52,400,384 4,347,000547 Pader T. C. Mech Imp 12,795,566 12,156,838 0547 Pader CARs 63,923,938 63,923,938

Total 712,328,447 548,868,531 646,789,000 117.8%548 Paliisa Dist. Rds 466,970,275 330,186,335 344,150,000548 Pallisa T. C. 145,732,290 103,044,698 80,521,000548 Paliisa Dist. Mech Imp 78,009,766 55,159,311 72,551,000548 Pallisa T. C. Mech Imp 12,795,566 9,047,516 11,726,000548 Paliisa CARs 77,926,269 77,926,269 77,926,000

Total 781,434,166 575,364,128 586,875,000 102.0%549 Rakai Dist. Rds 950,298,120 902,861,258 1,107,719,000549 Kalisizo T. C. 458,187,426 323,976,139 354,799,000549 Kyotera T. C. 352,664,075 249,362,464 258,347,000549 Rakai T. C. 74,324,276 52,553,367 51,505,000549 Rakai Dist. Mech Imp 78,567,173 74,645,267 73,419,000549 Kalisizo T. C. Mech Imp 12,795,566 9,047,516 9,913,000549 Kyotera T. C. Mech Imp 12,795,566 9,047,516 9,000,000549 Rakai T. C. Mech Imp 12,795,566 9,047,516 9,059,000549 Rakai CARs 160,561,213 160,561,213

Total 2,112,988,980 1,791,102,256 1,873,761,000 104.6%

115Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

550 Rukungiri Dist. Rds 419,549,650 296,656,059 399,526,000550 Rukungiri Dist. Mech Imp 72,993,104 51,612,119 59,389,000550 Rukungiri CARs 74,334,232 74,334,232 107,934,000

Total 566,876,987 422,602,410 566,849,000 134.1%551 Sembabule Dist. Rds 474,906,687 335,798,030 271,338,000551 Matete T. C. 82,533,622 58,358,049 46,352,000551 Sembabule T. C. 74,673,717 52,800,451 29,963,000551 Sembabule Dist. Mech Imp 71,320,884 50,429,722 46,232,000551 Matete T. C. Mech Imp 12,795,566 9,047,516 7,645,000551 Sembabule T. C. Mech Imp 12,795,566 9,047,516 6,868,000551 Sembabule CARs 82,474,388 82,474,388 60,720,000

Total 811,500,429 597,955,671 469,118,000 78.5%552 Sironko Dist. Rds 370,389,367 261,895,701 319,346,000552 Budadiri T. C. 79,506,845 56,217,869 49,697,000552 Sironko T. C. 96,237,804 68,048,031 68,504,000552 Sironko Dist. Mech Imp 78,567,173 55,553,444 69,020,000552 Budadiri T. C. Mech Imp 12,795,566 9,047,516 2,222,000552 Sironko T. C. Mech Imp 12,795,566 9,047,516 8,910,000552 Sironko CARs 64,637,956 64,637,956 64,638,000

Total 714,930,276 524,448,032 582,337,000 111.0%553 Soroti Dist. Rds 449,367,875 317,739,993 317,293,000553 Soroti Dist. Mech Imp 71,878,291 50,823,855 51,254,000553 Soroti CARs 66,230,633 66,230,633

Total 587,476,800 434,794,481 368,546,000 84.8%554 Tororo Dist. Rds 569,857,642 402,936,153 361,139,000554 Malaba T. C. 82,687,320 58,466,726 58,499,000554 Nagongera T. C. 99,823,787 70,583,616 64,410,000554 Tororo Dist. Mech Imp 77,452,359 54,765,179 93,777,000554 Malaba T. C. Mech Imp 12,795,566 9,047,516 7,232,000554 Nagongera T. C. Mech Imp 12,795,566 9,047,516 17,995,000554 Tororo CARs 97,050,363 97,050,363 88,711,000

Total 952,462,603 701,897,068 691,763,000 98.6%555 Wakiso Dist. Rds 1,334,251,757 997,379,502 938,238,000555 Kakiri T. C. 100,241,683 70,879,102 111,925,000555 Kira T. C. 1,029,485,926 978,096,178 991,965,000555 Masulita T. C. 84,228,331 59,556,347 280,587,000555 Namayumba T. C. 86,073,416 60,860,974 70,810,000555 Nansana T. C. 942,723,022 895,664,293 599,379,000555 Wakiso T. C. 271,605,454 192,047,362 83,454,000555 Wakiso Dist. Mech Imp 76,337,545 53,976,914 86,390,000555 Kakiri T. C. Mech Imp 12,795,566 9,047,516 7,196,000555 Kira T. C. Mech Imp 67,976,443 64,583,203 25,933,000555 Masulita T. C. Mech Imp 12,795,566 9,047,516 7,498,000555 Namayumba T. C. Mech Imp 12,795,566 9,047,516 970,000555 Nansana T. C. Mech Imp 67,976,443 64,583,203 4,629,000555 Wakiso T. C. Mech Imp 12,795,566 9,047,516 2,266,000555 Wakiso CARs 273,946,244 273,946,244 0

Total 4,386,028,527 3,747,763,386 3,211,240,000 85.7%556 Yumbe Dist. Rds 575,421,101 406,869,975 270,790,000

116 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

556 Yumbe T. C. 258,354,769 245,458,248 122,426,000556 Yumbe Dist. Mech Imp 74,665,325 52,794,517 47,117,000556 Yumbe T. C. Mech Imp 12,795,566 12,156,838 3,910,000556 Yumbe CARs 144,569,356 144,569,356 365,772,000

Total 1,065,806,116 861,848,934 810,015,000 94.0%557 Butaleja Dist. Rds 292,104,513 206,541,880 196,741,000557 Busolwe T. C. 94,107,325 66,541,607 79,761,000557 Butaleja T. C. 79,464,685 56,188,058 35,585,000557 Butaleja Dist. Mech Imp 73,550,511 52,006,252 61,908,000557 Busolwe T. C. Mech Imp 12,795,566 9,047,516 8,840,000557 Butaleja T. C. Mech Imp 12,795,566 9,047,516 10,678,000557 Butaleja CARs 47,492,727 47,492,727 47,493,000

Total 612,310,893 446,865,557 441,005,000 98.7%558 Ibanda Dist. Rds 332,006,273 234,755,701 260,275,000558 Ibanda T. C. 141,803,414 100,266,660 92,635,000558 Igorora T. C. 82,190,566 58,115,480 62,694,000558 Ishongororo T. C. 131,628,375 93,072,072 91,986,000558 Rushango T. C. 89,556,422 85,085,956 137,390,000558 Ibanda Dist. Mech Imp 74,107,918 52,400,384 53,129,000558 Ibanda T. C. Mech Imp 12,795,566 9,047,516 16,262,000558 Igorora T. C. Mech Imp 12,795,566 9,047,516 6,215,000558 Ishongororo T. C. Mech Imp 12,795,566 9,047,516 9,090,000558 Rushango T. C. Mech Imp 12,795,566 12,156,838 12,289,000558 Ibanda CARs 76,088,343 76,088,343 67,485,000

Total 978,563,575 739,083,982 809,450,000 109.5%559 Kaabong Dist. Rds 610,937,666 431,983,104 92,572,000559 Kaabong T. C. 122,972,308 86,951,521 0559 Kaabong Dist. Mech Imp 74,665,325 52,794,517 1,570,000559 Kaabong T. C. Mech Imp 12,795,566 9,047,516 0559 Kaabong CARs 109,884,657 109,884,657 0

Total 931,255,522 690,661,315 94,142,000 13.6%560 Isingiro Dist. Rds 582,945,630 412,190,435 402,002,000560 Isingiro T. C. 131,880,627 93,250,434 91,800,000560 Kaberebere T. C. 85,710,117 60,604,092 68,991,000560 Kabuyanda T. C. 87,265,010 61,703,529 51,572,000560 Isingiro Dist. Mech Imp 75,780,139 53,582,782 71,247,000560 Isingiro T. C. Mech Imp 12,795,566 9,047,516 10,678,000560 Kaberebere T. C. Mech Imp 12,795,566 9,047,516 5,549,000560 Kabuyanda T. C. Mech Imp 12,795,566 9,047,516 11,546,000560 Isingiro CARs 97,904,875 97,904,875 97,905,000

Total 1,099,873,095 806,378,694 811,291,000 100.6%561 Kaliro Dist. Rds 348,264,675 246,251,727 264,024,000561 Kaliro T. C. 92,756,986 65,586,807561 Kaliro Dist. Mech Imp 70,763,477 50,035,590 50,614,000561 Kaliro T. C. Mech Imp 12,795,566 9,047,516561 Kaliro CARs 47,473,510 47,473,510 2,059,000

Total 572,054,214 418,395,150 316,697,000 75.7%562 Kiruhura Dist. Rds 533,969,211 377,560,085 188,406,000562 Kazo T. C. 96,717,287 68,387,065 33,951,000

117Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

562 Kiruhura T. C. 105,389,079 74,518,734 2,258,000562 Sanga T. C. 103,797,470 73,393,336 28,386,000562 Kiruhura Dist. Mech Imp 76,337,545 53,976,914 1,190,000562 Kazo T. C. Mech Imp 12,795,566 9,047,516 1,000,000562 Kiruhura T. C. Mech Imp 12,795,566 9,047,516 6,398,000562 Sanga T. C. Mech Imp 12,795,566 9,047,516 1,000,000562 Kiruhura CARs 85,558,407 85,558,407 144,093,000

Total 1,040,155,698 760,537,089 406,681,000 53.5%563 Koboko Dist. Rds 306,697,245 216,860,140 154,011,000563 Koboko T. C. 193,360,098 136,721,469 131,280,000563 Koboko Dist. Mech Imp 71,320,884 50,429,722 31,440,000563 Koboko T. C. Mech Imp 12,795,566 9,047,516 14,230,000563 Koboko CARs 62,039,727 62,039,727 62,640,000

Total 646,213,519 475,098,574 393,601,000 82.8%564 Amolator Dist. Rds 276,769,635 195,698,862 197,717,000564 Amolatar T. C. 99,045,767 70,033,491 91,285,000564 Namasale T. C. 70,028,110 49,515,625 45,767,000564 Amolator Dist. Mech Imp 72,993,104 51,612,119 50,046,000564 Amolatar T. C. Mech Imp 12,795,566 9,047,516 12,796,000564 Namasale T. C. Mech Imp 12,795,566 9,047,516 12,796,000564 Amolator CARs 51,308,418 51,308,418 44,252,000

Total 595,736,166 436,263,548 454,659,000 104.2%565 Amuria Dist. Rds 467,767,053 330,749,722 323,567,000565 Amuria T. C. 78,332,167 55,387,275 54,727,000565 Amuria Dist. Mech Imp 72,993,104 51,612,119 66,114,000565 Amuria T. C. Mech Imp 12,795,566 9,047,516 9,692,000565 Amuria CARs 93,510,534 93,510,534

Total 725,398,424 540,307,167 454,100,000 84.0%566 Manafwa Dist. Rds 451,457,905 319,217,815 355,439,000566 Manafwa T. C. 101,326,217 71,645,957 62,589,000566 Lwakhakha T. C. 84,745,731 59,922,192 425,146,000566 Manafwa Dist. Mech Imp 83,583,834 59,100,635 43,396,000566 Manafwa T. C. Mech Imp 12,795,566 9,047,516 6,311,000566 Lwakhakha T. C. Mech Imp 12,795,566 9,047,516 6,100,000566 Manafwa CARs 95,437,182 95,437,182

Total 842,142,000 623,418,813 898,981,000 144.2%567 Bukwo Dist. Rds 214,617,092 151,751,910 148,770,000567 Bukwo T. C. 68,666,981 48,553,195 43,638,000567 Bukwo Dist.Mech Imp 74,107,918 52,400,384 55,875,000567 Bukwo T. C. Mech Imp 12,795,566 9,047,516 14,160,000567 Bukwo CARs 26,945,293 26,945,293

Total 397,132,850 288,698,298 262,443,000 90.9%568 Mityana Dist. Rds 426,660,595 405,362,605 395,585,000568 Mityana T. C. 187,209,425 132,372,438 4,516,000568 Mityana Dist. Mech Imp 74,107,918 70,408,608 81,614,000568 Mityana T. C. Mech Imp 12,795,566 9,047,516568 Mityana CARs 72,805,032 72,805,032

Total 773,578,535 689,996,199 481,715,000 69.81%569 Nakaseke Dist. Rds 417,411,078 295,143,913 254,611,000

118 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

569 Kiwoko T. C. 75,008,182 53,036,945 86,572,000569 Nakaseke - Butalangu T. C. 75,417,198 53,326,153 58,421,000569 Nakaseke T. C. 69,224,520 48,947,421 46,252,000569 Ngoma T. C. 71,182,004 50,331,523 51,167,000569 Semuto T. C. 82,780,103 58,532,331 51,264,000569 Nakaseke Dist. Mech Imp 73,550,511 52,006,252 79,444,000569 Kiwoko T. C. Mech Imp 12,795,566 9,047,516 3,560,000

569 Nakaseke - Butalangu T. C. Mech Imp 12,795,566 9,047,516 13,023,000

569 Nakaseke T. C. Mech Imp 12,795,566 9,047,516 11,720,000569 Ngoma T. C. Mech Imp 12,795,566 9,047,516 8,315,000569 Semuto T. C. Mech Imp 12,795,566 9,047,516 16,045,000569 Nakaseke CARs 73,158,825 73,158,825

Total 1,001,710,250 729,720,941 680,395,000 93.2%570 Amuru Dist. Rds 373,986,510 264,439,177 331,983,000570 Amuru T. C. 155,763,374 110,137,497 113,721,000570 Amuru Dist. Mech Imp 72,435,698 51,217,987 557,407,000570 Amuru T. C. Mech Imp 12,795,566 9,047,516 0570 Amuru CARs 72,592,473 72,592,473 68,963,000

Total 687,573,620 507,434,650 1,072,074,000 211.3%571 Budaka Dist. Rds 300,257,119 212,306,442 206,605,000571 Budaka T. C. 118,911,740 84,080,366 84,327,000571 Budaka Dist. Mech Imp 74,665,325 52,794,517 57,959,000571 Budaka T. C. Mech Imp 12,795,566 9,047,516 9,566,000571 Budaka CARs 38,595,578 38,595,578 38,595,000

Total 545,225,328 396,824,418 397,052,000 100.1%572 Oyam Dist. Rds 471,320,265 333,262,135 751,384,000572 Oyam T. C. 102,227,364 72,283,142 74,968,000572 Oyam Dist. Mech Imp 74,107,918 52,400,384 103,561,000572 Oyam T. C. Mech Imp 12,795,566 9,047,516 0572 Oyam CARs 76,573,692 76,573,692 76,574,000

Total 737,024,805 543,566,869 1,006,487,000 185.2%573 Abim Dist. Rds 237,118,080 167,661,956 182,979,000573 Abim T. C. 110,126,827 77,868,711 61,422,000573 Abim Dist. Mech Imp 70,763,477 50,035,590 60,130,000573 Abim T. C. Mech Imp 12,795,566 9,047,516 0573 Abim CARs 37,409,061 37,409,061 37,410,000

Total 468,213,011 342,022,834 341,940,000 100.0%574 Namutumba Dist. Rds 303,904,538 214,885,467 214,065,000574 Namutumba T. C. 90,800,579 64,203,467 66,482,000574 Namutumba Dist. Mech Imp 71,320,884 50,429,722 60,932,000574 Namutumba T. C. Mech Imp 12,795,566 9,047,516 6,674,000574 Namutumba CARs 62,007,190 62,007,190 60,571,000

Total 540,828,758 400,573,362 408,724,000 102.0%575 Dokolo Dist. Rds 313,217,812 221,470,717 262,287,000575 Dokolo T. C. 121,465,422 85,886,029 89,727,000575 Dokolo Dist. Mech Imp 73,550,511 52,006,252 77,882,000575 Dokolo T. C. Mech Imp 12,795,566 9,047,516575 Dokolo CARs 48,872,163 48,872,163 48,872,000

119Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

Total 569,901,474 417,282,676 478,768,000 114.7%576 Buliisa Dist. Rds 219,548,486 155,238,810 154,286,000576 Buliisa T. C. 88,816,912 62,800,851 62,761,000576 Buliisa Dist. Mech Imp 71,320,884 50,429,722 50,408,000576 Buliisa T. C. Mech Imp 12,795,566 9,047,516 9,087,000576 Buliisa CARs 33,919,790 33,919,790 33,920,000

Total 426,401,638 311,436,690 310,462,000 99.7%577 Maracha Dist. Rds 371,711,482 262,830,545 104,694,000577 Maracha T. C. 87,312,679 61,737,235 32,880,000577 Maracha Dist. Mech Imp 71,878,291 50,823,855 25,473,000577 Maracha T. C. Mech Imp 12,795,566 9,047,516 4,591,000577 Maracha CARs 61,255,026 61,255,026 39,700,000

Total 604,953,044 445,694,177 207,338,000 46.5%578 Bukedea Dist. Rds 269,180,169 255,743,267 204,516,000578 Bukedea T. C. 178,329,475 126,093,584 101,507,000578 Bukedea Dist. Mech Imp 70,763,477 67,231,115 38,605,000578 Bukedea T. C. Mech Imp 12,795,566 9,047,516 12,795,000578 Bukedea CARs 43,362,983 43,362,983 48,608,000

Total 574,431,669 501,478,465 406,031,000 81.0%579 Bududa Dist. Rds 248,703,643 175,853,900 165,936,000579 Bududa T. C. 66,129,499 46,758,987 44,714,000579 Bududa Dist. Mech Imp 76,337,545 53,976,914 48,797,000579 Bududa T. C. Mech Imp 12,795,566 9,047,516 11,340,000579 Bududa CARs 49,389,655 49,389,655 82,908,000

Total 453,355,908 335,026,972 353,694,000 105.6%580 Lyantonde Dist. Rds 241,258,470 229,215,360 238,557,000580 Lyantonde T. C. 80,767,200 57,109,044 0580 Lyantonde Dist. Mech Imp 70,763,477 67,231,115 66,066,000580 Lyantonde T. C. Mech Imp 12,795,566 9,047,516580 Lyantonde CARs 27,385,156 27,385,156 27,385,000

Total 432,969,869 389,988,190 332,008,000 85.1%581 Amudat Dist. Rds 228,796,783 161,778,116 174,104,000581 Amudat T. C. 87,250,192 61,693,051 273,935,000581 Amudat Dist. Mech Imp 69,648,663 49,247,325 19,576,000581 Amudat T. C. Mech Imp 12,795,566 9,047,516581 Amudat CARs 30,579,096 30,579,096

Total 429,070,299 312,345,103 467,614,000 149.7%582 Buikwe Dist. Rds 506,812,196 481,513,209 481,491,000582 Buikwe T. C. 102,050,595 72,158,152 71,330,000582 Lugazi T. C. 171,989,166 121,610,465 115,807,000582 Njeru T. C. 267,435,402 189,098,793 189,618,000582 Nkokonjeru T. C. 112,121,344 79,278,999 98,705,000582 Buikwe Dist. Mech Imp 72,435,698 68,819,862 68,860,000582 Buikwe T. C. Mech Imp 12,795,566 9,047,516 9,744,000582 Lugazi T. C. Mech Imp 12,795,566 9,047,516 14,468,000582 Njeru T. C. Mech Imp 12,795,566 9,047,516 8,866,000582 Nkokonjeru T. C. Mech Imp 12,795,566 9,047,516 9,432,000582 Buikwe CARs 93,375,068 93,375,068 93,375,000

Total 1,377,401,732 1,142,044,610 1,161,697,000 101.7%

120 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

583 Buyende Dist. Rds 377,489,831 266,916,312 326,686,000583 Buyende T. C. 104,831,941 99,598,953 112,705,000583 Buyende Dist. Mech Imp 70,763,477 50,035,590 51,756,000583 Buyende T. C. Mech Imp 12,795,566 12,156,838583 Buyende CARs 62,030,397 62,030,397 7,021,000

Total 627,911,212 490,738,091 498,167,000 101.5%584 Kyegegwa Dist. Rds 290,411,798 205,344,992 213,131,000584 Kyegegwa T. C. 99,651,055 70,461,480 0584 Kyegegwa Dist. Mech Imp 71,878,291 50,823,855 43,038,000584 Kyegegwa T. C. Mech Imp 12,795,566 9,047,516 0584 Kyegegwa CARs 54,983,446 54,983,446 4,818,000

Total 529,720,156 390,661,288 260,987,000 66.8%585 Lamwo Dist. Rds 416,693,213 294,636,323 300,496,000585 Lamwo T. C. 86,275,748 61,004,040 65,102,000585 Padibe T. C. 66,792,232 47,227,594 36,255,000585 Lamwo Dist. Mech Imp 72,993,104 51,612,119 81,088,000585 Lamwo T. C. Mech Imp 12,795,566 9,047,516 7,468,000585 Padibe T. C. Mech Imp 12,795,566 9,047,516 15,792,000585 Lamwo CARs 70,994,991 70,994,991 70,974,000

Total 739,340,420 543,570,098 577,175,000 106.2%586 Otuke Dist. Rds 245,468,470 173,566,368 131,961,000586 Otuke T. C. 92,152,131 65,159,125 208,787,000586 Otuke Dist. Mech Imp 70,763,477 50,035,590 82,583,000586 Otuke T. C. Mech Imp 12,795,566 9,047,516 13,459,000586 Otuke CARs 28,872,376 28,872,376 0

Total 450,052,020 326,680,974 436,790,000 133.7%587 Zombo Dist. Rds 288,001,130 203,640,451 146,159,000587 Paidha T. C. 145,054,496 102,565,442 128,210,000587 Zombo T. C. 80,079,744 56,622,955 77,786,000587 Zombo Dist. Mech Imp 72,435,698 51,217,987 28,360,000587 Paidha T. C. Mech Imp 12,795,566 9,047,516 15,830,000587 Zombo T. C. Mech Imp 12,795,566 9,047,516 518,000587 Zombo CARs 43,320,788 43,320,788 48,547,000

Total 654,482,987 475,462,655 445,410,000 93.7%588 Alebtong Dist. Rds 346,317,464 244,874,889588 Alebtong T. C. 97,809,597 69,159,418 60,613,000588 Alebtong Dist. Mech Imp 72,435,698 51,217,987588 Alebtong T. C. Mech Imp 12,795,566 9,047,516 9,633,000588 Alebtong CARs 67,101,912 67,101,912

Total 596,460,236 441,401,721 70,246,000 15.9%589 Bulambuli Dist. Rds 212,786,694 150,457,668 147,668,000589 Bulegeni T. C. 72,493,540 51,258,886 50,400,000589 Muyembe T. C. 98,704,869 69,792,448 27,052,000589 Bulambuli Dist. Mech Imp 76,337,545 53,976,914 84,000,000589 Bulegeni T. C. Mech Imp 12,795,566 9,047,516 15,428,000589 Muyembe T. C. Mech Imp 12,795,566 9,047,516 4,910,000589 Bulambuli CARs 32,209,044 32,209,044 27,935,000

Total 518,122,823 375,789,992 357,393,000 95.1%590 Buvuma Dist. Rds 442,934,579 313,191,124 165,936,000

121Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

590 Buvuma T. C. 89,583,996 63,343,242 44,714,000590 Buvuma Dist. Mech Imp 70,206,070 49,641,457 48,797,000590 Buvuma T. C. Mech Imp 12,795,566 9,047,516 11,340,000590 Buvuma CARs 52,799,471 52,799,471 82,908,000

Total 668,319,682 488,022,811 353,694,000 72.5%591 Gomba Dist. Rds 319,927,253 226,214,843 337,148,000591 Kanoni T. C. 77,917,208 55,093,865 76,923,000591 Gomba Dist. Mech Imp 70,206,070 49,641,457 67,977,000591 Kanoni T. C. Mech Imp 12,795,566 9,047,516 12,796,000591 Gomba CARs 59,340,609 59,340,609 1,590,000

Total 540,186,707 399,338,290 496,434,000 124.3%592 Kiryandongo Dist. Rds 479,041,420 338,721,626 341,071,000592 Bweyale T. C. 293,020,679 207,189,685 183,180,000592 Kigumba T. C. 149,342,033 105,597,082 104,704,000592 Kiryandongo T. C. 125,585,366 88,799,167 88,573,000592 Kiryandongo Dist. Mech Imp 70,206,070 49,641,457 45,754,000592 Bweyale T. C. Mech Imp 12,795,566 9,047,516 9,902,000592 Kigumba T. C. Mech Imp 12,795,566 9,047,516 5,861,000592 Kiryandongo T. C. Mech Imp 12,795,566 9,047,516 9,495,000592 Kiryandongo CARs 80,470,695 80,470,695 62,763,000

Total 1,236,052,961 897,562,261 851,302,000 94.8%593 Luuka Dist. Rds 321,309,318 227,192,076 164,938,000593 Luuka T. C. 109,828,794 77,657,977 77,797,000593 Luuka Dist. Mech Imp 71,878,291 50,823,855 59,871,000593 Luuka T. C. Mech Imp 12,795,566 9,047,516 8,227,000593 Luuka CARs 67,856,945 67,856,945 67,880,000

Total 583,668,914 432,578,369 378,714,000 87.5%594 Namayingo Dist. Rds 442,133,673 312,624,818 325,263,000594 Namayingo T. C. 119,264,535 84,329,821 342,403,000594 Namayingo Dist. Mech Imp 71,320,884 50,429,722 53,705,000594 Namayingo T. C. Mech Imp 12,795,566 9,047,516 1,500,000594 Namayingo CARs 72,643,095 72,643,095 73,000,000

Total 718,157,753 529,074,972 795,871,000 150.4%595 Ntoroko Dist. Rds 224,342,641 158,628,672 159,099,000595 Kanara T. C. 76,683,168 54,221,298 59,247,000595 Karugutu T. C. 91,076,824 64,398,795 67,052,000595 Kibuuku T. C. 104,226,711 73,696,844 73,627,000595 Rwebisengo T. C. 92,603,234 65,478,092 66,144,000595 Ntoroko Dist. Mech Imp 71,320,884 50,429,722 37,947,000595 Kanara T. C. Mech Imp 12,795,566 9,047,516 10,240,000595 Karugutu T. C. Mech Imp 12,795,566 9,047,516 9,883,000595 Kibuuku T. C. Mech Imp 12,795,566 9,047,516 9,117,000595 Rwebisengo T. C. Mech Imp 12,795,566 9,047,516 8,381,000595 Ntoroko CARs 34,485,293 34,485,293 12,267,000

Total 745,921,018 537,528,778 513,005,000 95.4%596 Serere Dist. Rds 366,837,902 259,384,524 856,306,000596 Kasilo T. C. 80,656,366 57,030,674 60,082,000596 Serere T. C. 125,580,470 88,795,706 446,878,000596 Serere Dist. Mech Imp 72,435,698 51,217,987 68,816,000

122 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

596 Kasilo T. C. Mech Imp 12,795,566 9,047,516 6,117,000596 Serere T. C. Mech Imp 12,795,566 9,047,516 4,548,000596 Serere CARs 68,711,226 68,711,226 68,077,000

Total 739,812,792 543,235,148 1,510,824,000 278.1%597 Kyankwazi Dist. Rds 315,252,197 222,909,194 241,318,000597 Butemba T. C. 96,816,262 68,457,049 66,185,000597 Ntwetwe T. C. 84,186,966 59,527,099 13,950,000597 Kyankwazi Dist. Mech Imp 71,878,291 50,823,855 25,584,000597 Butemba T. C. Mech Imp 12,795,566 9,047,516 8,239,000597 Ntwetwe T. C. Mech Imp 12,795,566 9,047,516597 Kyankwazi CARs 47,610,240 47,610,240

Total 641,335,087 467,422,467 355,276,000 76.0%598 Kalungu Dist. Rds 365,466,531 258,414,852 208,017,000598 Kalungu T. C. 98,496,306 69,644,978 73,228,000598 Lukaya T. C. 99,776,863 70,550,437 71,058,000598 Kalungu Dist. Mech Imp 70,206,070 49,641,457 98,213,000598 Kalungu T. C. Mech Imp 12,795,566 9,047,516 10,519,000598 Lukaya T. C. Mech Imp 12,795,566 9,047,516 9,040,000598 Kalungu CARs 55,301,684 55,301,684 55,302,000

Total 714,838,587 521,648,439 525,378,000 100.7%599 Lwengo Dist. Rds 369,560,747 261,309,799 261,699,000599 Kyazanga T. C. 105,479,638 74,582,767 282,720,000599 Lwengo T. C. 83,505,557 59,045,287 59,782,000599 Lwengo Dist. Mech Imp 71,320,884 50,429,722 50,156,000599 Kyazanga T. C. Mech Imp 12,795,566 9,047,516 5,893,000599 Lwengo T. C. Mech Imp 12,795,566 9,047,516 7,988,000599 Lwengo CARs 55,990,604 55,990,604 56,080,000

Total 711,448,562 519,453,210 724,318,000 139.4%600 Bukomansimbi Dist. Rds 299,890,605 212,047,287 197,434,000600 Bukomansimbi T. C. 88,539,699 62,604,838 59,031,000600 Bukomansimbi Dist. Mech Imp 70,206,070 49,641,457 63,676,000600 Bukomansimbi T. C. Mech Imp 12,795,566 9,047,516 12,621,000600 Bukomansimbi CARs 42,170,525 42,170,525 42,170,000

Total 513,602,465 375,511,623 374,932,000 99.8%601 Mitooma Dist. Rds 283,303,269 200,318,678 193,595,000601 Kashensero T. C. 76,425,252 54,038,929 62,471,000601 Mitooma T. C. 77,751,944 54,977,010 61,719,000601 Mitooma Dist. Mech Imp 73,550,511 52,006,252 56,560,000601 Kashensero T. C. Mech Imp 12,795,566 9,047,516601 Mitooma T. C. Mech Imp 12,795,566 9,047,516601 Mitooma CARs 64,263,497 64,263,497 64,263,000

Total 600,885,604 443,699,398 438,608,000 98.9%602 Rubirizi Dist. Rds 223,434,222 157,986,345 248,472,000602 Katerera T. C. 74,408,371 52,612,829 66,959,000602 Rubirizi T. C. 70,091,456 49,560,416 56,264,000602 Rubirizi Dist. Mech Imp 72,993,104 51,612,119 61,232,000602 Katerera T. C. Mech Imp 12,795,566 9,047,516 13,468,000602 Rubirizi T. C. Mech Imp 12,795,566 9,047,516 11,230,000602 Rubirizi CARs 38,668,917 38,668,917 11,600,000

Total 505,187,202 368,535,658 469,225,000 127.3%

123Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

603 Ngora Dist. Rds 264,899,301 187,305,561 175,650,000603 Ngora T. C. 69,974,849 49,477,965 50,068,000603 Ngora Dist. Mech Imp 70,206,070 49,641,457 38,085,000603 Ngora T. C. Mech Imp 12,795,566 9,047,516 3,674,000603 Ngora CARs 45,244,518 45,244,518

Total 463,120,304 340,717,018 267,477,000 78.5%604 Napak Dist. Rds 378,947,033 267,946,674 377,554,000604 Lorengecora T. C. 81,952,327 57,947,025 6,049,000604 Napak Dist. Mech Imp 71,878,291 50,823,855 50,694,000604 Lorengecora T. C. Mech Imp 12,795,566 9,047,516 8,529,000604 Napak CARs 54,553,377 54,553,377

Total 600,126,594 440,318,447 442,826,000 100.6%605 Kibuuku Dist. Rds 264,899,301 187,305,561 495,700,000605 Kibuku T. C. 76,551,987 54,128,542605 Kibuuku Dist. Mech Imp 72,993,104 51,612,119 72,969,000605 Kibuku T. C. Mech Imp 12,795,566 9,047,516605 Kibuuku CARs 42,140,391 42,140,391

Total 469,380,350 344,234,130 568,669,000 165.2%606 Nwoya Dist. Rds 275,595,663 194,868,767 281,735,000606 Anaka T. C. 71,966,931 50,886,531 59,934,000606 Nwoya Dist. Mech Imp 70,206,070 49,641,457 88,881,000606 Anaka T. C. Mech Imp 12,795,566 9,047,516606 Nwoya CARs 31,280,279 31,280,279 31,280,000

Total 461,844,509 335,724,550 461,830,000 137.6%607 Kole Dist. Rds 349,010,825 331,588,947 365,579,000607 Ayer T. C. 67,757,969 64,375,635607 Kole Dist. Mech Imp 70,763,477 67,231,115 16,546,000607 Ayer T. C. Mech Imp 12,795,566 12,156,838607 Kole CARs 57,843,275 57,843,275

Total 558,171,112 533,195,810 382,125,000 71.7%608 Butambala Dist. Rds 192,775,853 136,308,360 154,798,000608 Gombe T. C. 117,428,236 83,031,407 248,695,000608 Butambala Dist. Mech Imp 70,763,477 50,035,590 50,848,000608 Gombe T. C. Mech Imp 12,795,566 9,047,516 6,912,000608 Butambala CARs 33,311,213 33,311,213

Total 427,074,345 311,734,086 461,253,000 148.0%609 Sheema Dist. Rds 353,782,425 250,153,229 237,389,000609 Bugonji T. C. 89,743,092 63,455,737 57,443,000609 Kabwohe-Itendero T. C. 111,164,116 78,602,160 66,451,000609 Kibingo T. C. 114,250,625 80,784,575 25,807,000609 Sheema T.C 70,180,000609 Sheema Dist. Mech Imp 72,435,698 51,217,987 60,222,000609 Bugonji T. C. Mech Imp 12,795,566 9,047,516 14,984,000

609 Kabwohe-Itendero T. C. Mech Imp 12,795,566 9,047,516 5,054,000

609 Kibingo T. C. Mech Imp 12,795,566 9,047,516 14,473,000609 Sheema CARs 62,904,244 62,904,244 62,898,000

Total 842,666,896 614,260,478 614,902,000 100.1%610 Buhweju Dist. Rds 200,434,635 141,723,748 142,875,000

124 Annex 7: Financial performance of DUCAR Designated Agencies in FY 2015/16

Vote ProgrammeAmount Remark

Budget Disbursement Expenditure % utilisedUShs UShs UShs

610 Nsiika T. C. 74,669,126 52,797,205 88,297,000610 Buhweju Dist. Mech Imp 71,878,291 50,823,855 50,673,000610 Nsiika T. C. Mech Imp 12,795,566 9,047,516 9,187,000610 Buhweju CARs 35,928,058 35,928,058

Total 395,705,676 290,320,381 291,032,000 100.2%611 Agago Dist. Rds 468,782,321 331,467,600 191,527,000-611 Kalongo T. C. 100,847,387 71,307,385 78,405,000611 Lokole T. C. 119,675,883 84,620,677 23,340,000611 Patongo T. C. 83,040,511 58,716,461 60,434,000611 Agago Dist. Mech Imp 75,222,732 53,188,649 61,953,000611 Kalongo T. C. Mech Imp 12,795,566 9,047,516 7,031,000611 Lokole T. C. Mech Imp 12,795,566 9,047,516 8,992,000611 Patongo T. C. Mech Imp 12,795,566 9,047,516 6,214,000611 Agago CARs 76,508,647 76,508,647 76,509,000

Total 962,464,176 702,951,966 514,405,000 73.2%612 Kween Dist. Rds 201,425,872 142,424,634 139,704,000612 Binyiny T. C. 72,254,423 51,089,811 33,473,000612 Kween Dist. Mech Imp 73,550,511 52,006,252 54,698,000612 Binyiny T. C. Mech Imp 12,795,566 9,047,516 6,178,000612 Kween CARs 35,528,916 35,528,916 35,529,000

Total 395,555,288 290,097,128 269,582,000 92.9%Grand Total -DLGs 87,876,531,918 66,915,242,985 66,671,630,000 99.6

751 Arua MC 1,109,737,708 784,675,698 777,198,000 99.0%752 Busia MC 753,322,182 532,660,650 532,470,000 100.0%753 Entebbe MC 1,577,416,784 1,498,675,492 1,427,414,000 95.2%754 FortPortal MC 969,581,963 685,574,076 682,148,000 99.5%755 Jinja MC 1,407,826,370 995,448,863 985,710,000 99.0%756 Kabale MC 1,047,367,045 740,574,517 741,355,000 100.1%757 Lira MC 1,399,146,128 989,311,219 917,017,000 92.7%758 Masaka MC 1,139,766,151 805,908,274 740,170,000 91.8%759 Mbale MC 1,238,702,997 875,864,749 869,191,000 99.2%760 Mbarara MC 1,193,545,685 843,934,820 928,346,000 110.0%761 Moroto MC 632,636,936 447,326,270 355,752,000 79.5%762 Soroti MC 1,279,107,837 904,434,289 1,036,274,000 114.6%763 Tororo MC 762,139,486 538,895,208 386,399,000 71.7%764 Kasese MC 1,076,322,334 761,048,284 755,218,000 99.2%765 Gulu MC 1,425,152,177 1,007,699,631 988,042,000 98.0%766 Mukono MC 966,932,906 683,700,975 715,559,000 104.7%767 Hoima MC 855,101,848 604,627,233 602,275,000 99.6%768 Masindi MC 718,922,511 508,337,258 308,256,000 60.6%769 Ntungamo MC 654,049,904 462,466,997 454,622,000 98.3%770 Bushenyi- Ishaka MC 848,578,445 754,052,005 750,562,000 99.5%771 Iganga MC 768,063,399 682,505,841 582,016,000 85.3%772 Rukungiri MC 735,675,719 520,183,151 519,879,000 99.9%

Total MC’c 22,559,096,515 16,627,905,500 16,055,873,000 96.6%GRAND TOTAL DLGs& MCs 110,435,628,433 83,543,148,485 82,727,503,000 99.0%

125Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16

Annex 8:

DLG’s Expenditure on DRC’s in FY 2015/16

126 Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16

Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16

DLG’s Expenditure on DRC’s in FY 2015/16Vote District Budget UGX (‘000) Expenditure UGX (‘000) Region

573 Abim 600 - N501 Adjumani - - N611 Agago - - N588 Alebtong 2,000 1,300 N564 Amolator 4,352 2,270 N581 Amudat 11,000 8,910 E565 Amuria 8,000 - E570 Amuru 3,450 3,450 N502 Apac 4,000 - N503 Arua 30,000 47,948 N571 Budaka - - E579 Bududa 2,000 - E504 Bugiri - - E610 Buhweju 1,200 - W582 Buikwe - - W578 Bukedea 10,000 14,365 E600 Bukomansimbi - - C567 Bukwo - - E589 Bulambuli 3,000 2,400 E576 Buliisa - - W505 Bundibugyo 4,000 1,930 W506 Bushenyi 5,000 - W507 Busia 13,408 3,600 E557 Butaleja 4,000 - E608 Butambala 4,000 2,000 C590 Buvuma - - C583 Buyende 4,592 - E575 Dokolo 10,400 - N591 Gomba 800 800 C508 Gulu - - N509 Hoima 6,213 6,213 W558 Ibanda - - W510 Iganga 1,938 - E560 Isingiro 8,000 5,021 W511 Jinja 3,569 - E559 Kaabong 1,200 1,000 N512 Kabale 20,841 20,861 W513 Kabarole 5,022 5,015 W514 Kabermaido 6,800 3,412 E515 Kalangala 8,000 7,600 C561 Kaliro 4,000 1,040 E598 Kalungu - - C517 Kamuli 63,349 64,705 E518 Kamwenge 8,000 7,000 W519 Kanungu 9,702 - W520 Kapchorwa 2,000 1,000 E521 Kasese 8,000 - W

127Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16

DLG’s Expenditure on DRC’s in FY 2015/16Vote District Budget UGX (‘000) Expenditure UGX (‘000) Region

522 Katakwi 15,971 8,185 E523 Kayunga 4,000 2,500 C524 Kibaale 9,200 - W525 Kiboga - - C605 Kibuuku 2,000 1,000 E562 Kiruhura - - W592 Kiryandongo 6,000 3,000 W526 Kisoro 3,200 - W527 Kitgum 5,000 - N563 Koboko 5,000 - N607 Kole 3,000 2,000 N528 Kotido 2,200 1,000 N529 Kumi - - E612 Kween 600 441 E597 Kyankwanzi 4,800 2,048 C584 Kyegegwa 330 100 W530 Kyenjonjo 6,105 6,097 W585 Lamwo 1,000 3,000 N531 Lira - - N593 Luuka - - E532 Luwero - - C599 Lwengo 1,500 - C580 Lyantonde 4,268 3,903 C566 Manafwa 10,000 - E577 Maracha 1,800 900 N533 Masaka 6,000 - C534 Masindi 2,400 2,400 W535 Mayuge 10,000 10,000 E536 Mbale 4,500 1,125 E537 Mbarara 8,000 1,684 W601 Mitooma 5,000 - W568 Mityana 2,700 1,350 C538 Moroto 12,000 - E539 Moyo 11,102 2,775 N540 Mpigi 4,000 2,000 C541 Mubende 9,265 8,749 C542 Mukono 2,000 - C543 Nakapiripiriti 4,000 - N569 Nakaseke 4,000 - C544 Nakasongola 2,024 1,357 C594 Namanyingo 1,000 - E574 Namutumba - - E604 Napak 10,000 7,130 N545 Nebbi - - N603 Ngora 4,000 2,560 E595 Ntoroko 2,000 1,000 W546 Ntungamo - - W606 Nwoya 2,200 1,000 N

128 Annex 8: DLG’s Expenditure on DRC’s in FY 2015/16

DLG’s Expenditure on DRC’s in FY 2015/16Vote District Budget UGX (‘000) Expenditure UGX (‘000) Region

586 Otuuke 2,100 2,000 N572 Oyam 6,740 2,020 N547 Pader 920 2,704 N548 Paliisa 3,600 280 E549 Rakai 10,000 - C602 Rubirizi 7,600 1,954 W550 Rukungiri 4,000 5,962 W551 Sembabule 3,000 2,000 C596 Serere 1,600 2,500 E609 Sheema 5,000 1,400 W552 Sironko 560 - E553 Soroti - - E554 Tororo 10,000 2,341 E555 Wakiso - - C556 Yumbe 12,000 12,000 N587 Zombo 4,000 2,254 N Total 520,821 327,649

129

Ann

ex 9

: Sum

mar

y of

Phy

sica

l and

Fin

anci

al P

erfo

rman

ce o

f Nat

iona

l Roa

ds M

aint

enan

ce, F

Y 20

15/1

6

Ann

ex 9

:

Sum

mar

y of

Phy

sica

l an

d Fi

nanc

ial

Perf

orm

ance

of

Nat

iona

l Roa

ds

Mai

nten

ance

, FY

2015

/16

130

Ann

ex 9

: Sum

mar

y of

Phy

sica

l and

Fin

anci

al P

erfo

rman

ce o

f Nat

iona

l Roa

ds M

aint

enan

ce, F

Y 20

15/1

6

Ann

ex 9

: Sum

mar

y of

Phy

sica

l and

Fin

anci

al P

erfo

rman

ce o

f Nat

iona

l Roa

ds M

aint

enan

ce, F

Y 20

15/1

6

UG

AN

DA

NAT

ION

AL

RO

AD

S A

UTH

OR

ITY

PHYS

ICA

L PE

RFO

RM

AN

CE

FIN

AN

CIA

L PE

RFO

RM

AN

CE

Cat

egor

ySu

b-C

ate -

gory

Pla

nned

Q

uant

ity

Ach

ieve

d Q

uant

ity

% A

chie

ved

Sum

mar

y of

rec

eipt

s an

d ex

pend

itur

e (U

GX

‘000

)

Rou

tine

Mai

nten

ance

Bud

get (

‘000

)Ex

pend

itur

e (‘0

00)

% A

chie

ved

Rem

arks

Pa

ved

(km

) - M

anua

l 1,0

001,7

7717

8%1,0

00,0

001,4

03,4

4714

0%M

ore

road

net

wor

k m

anua

lly m

aint

aine

d th

an p

lann

ed

U

npav

ed(k

m)-

Man

ual

7,60

010

,457

138%

7,96

0,00

010

,763

,793

135%

Mor

e ro

ad n

etw

ork

man

ually

mai

ntai

ned

than

pla

nned

Pave

d (k

m) -

Mec

hani

sed

1,000

2,01

820

2%2,

500,

000

2,21

8,26

489

%

Ther

e w

as a

dis

peri

ty b

etw

een

Qua

ntit

ies a

nd le

ngth

of

exec

uted

wor

ks. U

nit o

f mea

sure

men

t for

mec

hani

sed

mai

ntai

nanc

e on

pav

ed n

etw

ork

has

been

har

mon

ised

to

be re

flect

ive

of k

ms

mai

ntai

ned

and

quan

titi

es e

xecu

ted.

U

n pa

ved

km) –

Mec

h -an

ised

5,50

07,

458

136%

22,0

00,0

0021

,182,

820

96%

The

wor

ks w

ere

resc

oped

; mor

e gr

adin

g w

orks

wer

e ex

e-cu

ted

than

pla

nned

gra

velli

ng w

orks

due

to m

aint

enan

ce

back

log.

Pa

ved

Term

Mec

h (k

m)

2,00

0

5

8 3%

20,0

00,0

003,

175,

234

16%

Del

ays

in p

rocu

rem

ent o

f Con

trac

tors

for p

lann

ed ro

ads

U

n pa

ved

Term

Mec

h8,

000

5,87

073

%48

,000

,000

72,8

06,5

6315

2%1.

Back

log

of u

npai

d in

voic

es c

arri

ed o

ver f

rom

pre

viou

s ye

ar.

2. D

elay

ed p

rocu

rem

ents

Br

idge

s M

t’ce(

No)

350

8524

%1,7

50,0

0042

6,69

224

%D

elay

ed p

rocu

rem

ents

Peri

odic

mai

nten

ance

Pa

ved

(km

) - R

esea

l10

069

69%

47,0

00,0

0064

,746

,531

138%

1. Ba

cklo

g of

unp

aid

invo

ices

car

ried

ove

r fro

m p

revi

ous

year

.

2. D

elay

ed p

rocu

rem

ents

Un

pave

d (k

m) -

Reg

rav-

ellin

g2,

000

901

45%

40,0

00,0

0033

,358

,461

83%

Reha

bilit

atio

n-La

bour

Ba

sed

120

0%1,0

00,0

0079

4,46

879

%Pa

id a

s Adv

ance

to c

ontr

acto

rs; D

elay

ed p

rocu

rem

ent

Brid

ges

Maj

or re

pair

s7

00

3,65

0,00

00

0Pe

riod

ic m

aint

enan

ce o

f bri

dges

mov

ed to

the

dire

ctor

ate

of ro

ads a

nd b

ridg

es d

evel

opm

ent

Roa

d Sa

fety

St

reet

ligh

ts (k

m)

5542

76%

1,000

,000

77,2

458%

Paym

ents

of b

ills o

nly

refle

cted

, Ent

ebbe

road

VIP

Acc

ess

paym

ent n

ot c

aptu

red,

rele

ases

to s

tati

ons

not c

aptu

red;

Ro

ad s

igna

ge (k

m)

3,50

00

0%2,

500,

000

702,

665

28%

Del

ayed

pro

cure

men

ts

M

arki

ng R

oads

/ hu

mps

(k

m)

2,47

966

3%8,

000,

000

2,41

2,19

730

%W

orks

exe

cute

d fo

r Roa

d hu

mps

not

cap

ture

d du

e di

s-pe

rity

of u

nit o

f mea

sure

.

Re

sv-D

emar

cati

on52

029

457

%1,5

00,0

0049

3,03

933

%Sl

ow p

rogr

ess o

f wor

ks d

ue to

land

com

pens

atio

n is

sues

; D

elay

ed p

rocu

rem

ent

Re

sv-p

rote

ctio

n0

00

1,000

,000

52,7

275.

27%

Litt

le a

ctiv

ity

carr

ied

out d

ue to

rest

rucu

ring

exe

rcis

e

131

Ann

ex 9

: Sum

mar

y of

Phy

sica

l and

Fin

anci

al P

erfo

rman

ce o

f Nat

iona

l Roa

ds M

aint

enan

ce, F

Y 20

15/1

6

UG

AN

DA

NAT

ION

AL

RO

AD

S A

UTH

OR

ITY

PHYS

ICA

L PE

RFO

RM

AN

CE

FIN

AN

CIA

L PE

RFO

RM

AN

CE

Cat

egor

ySu

b-C

ate -

gory

Pla

nned

Q

uant

ity

Ach

ieve

d Q

uant

ity

% A

chie

ved

Sum

mar

y of

rec

eipt

s an

d ex

pend

itur

e (U

GX

‘000

)

Rou

tine

Mai

nten

ance

Bud

get (

‘000

)Ex

pend

itur

e (‘0

00)

% A

chie

ved

Rem

arks

Axl

e Lo

ad C

ontr

ol

O

p’s a

nd M

tc’e

wei

gh-

brid

ges

(No)

1515

100%

6,50

0,00

02,

283,

030

35%

Litt

le a

ctiv

ity

due

to re

stru

ctur

ing

and

recr

uitm

ent

exer

cise

Ferr

ies

O

p’s,

Mt’c

e an

d La

ndin

g si

tes

98

89%

3,

165,

223

33%

Litt

le a

ctiv

ity

due

to re

stru

ctur

ing

and

recr

uitm

ent

exer

cise

9,

500,

000

Oth

er q

uali

fyin

g w

orks

Q

ualit

y A

ssur

ance

and

ne

twor

k co

ndit

ion

asse

ss-

men

t

3,00

0,00

0 3,

585

0.12

%Li

ttle

act

ivit

y du

e to

rest

ruct

urin

g an

d re

crui

tmen

t ex

erci

se

Pl

ant a

nd e

quip

men

t M

aint

enan

ce

14

,204

,000

5,

431,2

9138

.24%

Fund

s rel

ease

d to

sta

tion

s no

t cap

ture

d, c

hang

e of

pr

ocur

emen

t met

hod

for m

inor

, maj

or a

nd p

reve

ntiv

e m

aint

ennc

e to

Hqt

rs p

rocu

rem

ent f

rom

Sta

tion

s

Low

cos

t sur

faci

ng2.

50

01,0

00,0

000

0.00

%D

elay

ed p

rocu

rem

ent

Re

mod

elin

g St

atio

ns0

00

034

4,89

4

Paym

ent f

or re

tent

ion

on c

ompl

eted

pro

ject

s

Fu

el0

03,

696,

493

Re

leas

ed fo

r for

ce A

ccou

nt W

orks

to s

tati

ons

but i

ndic

at-

ed s

epar

atel

y fo

r eas

e of

acc

ount

ing

Ro

ad M

ater

ials

and

Too

ls0

00

11,73

7,00

0 3,

026,

019

25.7

8%In

voic

es s

pille

d in

to th

e ne

xt fi

nanc

ial y

ear

UN

RA O

pera

tion

al E

xpen

ses

UN

RA S

uppo

rt, e

tc.

00

010

,000

,000

12,3

98,8

8712

4%M

ore

fund

s pai

d du

e to

exp

ande

d st

ruct

ure

of U

NRA

in

clud

ing

Offi

ce S

pace

Va

lue

Add

ed T

ax (V

AT)

3,

119,0

00

Retu

rned

to C

onso

lidat

ed

Fund

1,0

24,7

46

Gra

nd T

otal

-

-26

7,92

0,00

024

5,98

8,31

491

.81%

A

CTU

AL

AVA

ILA

BLE

FU

ND

S24

5,34

9,00

0SP

ENT

244,

963,

568

99.8

4%A

mou

nt a

vaila

ble

incu

ded

rele

ased

of U

GX

241

.098

bn

and

rolle

rd o

ver f

rom

FY

2014

-15

of U

GX

4.2

51bn

132

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

133

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Ann

ex 1

0:

Phys

ical

Per

form

ance

of

DU

CAR

Des

igna

ted

Age

ncie

s in

FY

2015

/16

134

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Ann

ex 10

: Phy

sica

l Per

form

ance

of D

UC

AR

Des

igna

ted

Age

ncie

s in

FY

2015

/16

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)A

bim

Abi

m C

ARs

--

--

--

--

--

--

--

-A

bim

Abi

m D

istr

ict R

ds.

--

140

140

-17

17-

--

--

--

-A

bim

Abi

m T

C R

ds.

--

19.7

19.7

--

5-

--

--

--

-A

bim

Tot

al-

-15

9.7

159.

6-

1722

--

--

--

--

Adj

uman

iA

djum

ani T

C R

ds.

--

19-

--

26.1

10.8

--

1.81.1

--

--

Adj

uman

iA

djum

ani C

ARs

--

160

--

--

--

--

--

--

-A

djum

ani

Adj

uman

i Dis

tric

t Rds

.-

-42

133

0-

-12

926

--

--

--

--

Adj

uman

i Tot

al-

-60

033

0-

-15

5.1

36.8

--

1.81.1

--

--

Aga

goA

gago

Dis

t. Rd

s-

-33

2.7

332.

778

--

64.8

16.2

--

--

--

--

Aga

goK

alon

go T

.C17

17-

--

--

--

-3

1.3-

0.6

3-

Aga

goLo

kole

T.C

--

--

--

--

--

--

--

--

Aga

goPa

tong

o T.

C16

16-

--

-5

--

--

--

--

-A

gago

Aga

go C

ARs

--

--

--

--

--

--

--

--

Aga

go T

otal

23.5

23.5

23.5

23.5

23.5

--

11

-3

1.3-

63

-A

lebt

ong

Ale

bton

g TC

Rds

.-

-14

714

3-

-15

.813

.2-

-0.

20.

2-

--

-A

lebt

ong

Ale

bton

g C

ARs

--

--

--

--

--

--

--

--

Ale

bton

g To

tal

Ale

bton

g D

istr

ict R

ds.

--

147

143

--

15.8

13.2

--

0.2

0.2

--

--

Am

olat

arA

mol

atar

TC

Rds

.-

-73

73-

-3

15-

-1

--

--

-A

mol

atar

Nam

asal

e TC

Rds

.-

-16

3.8

--

4.8

2-

--

--

--

-A

mol

atar

Am

olat

ar C

ARs

--

42.1

30.5

--

--

--

--

--

--

Am

olat

arA

mol

atar

Dis

tric

t Rds

.-

-27

9.4

113.8

--

71.5

51-

--

--

-A

mol

atar

Tot

al-

-41

0.5

221.1

--

79.3

53-

-1

--

--

-A

mud

atA

mud

at T

C R

ds-

--

3-

--

6-

--

--

--

-A

mud

atA

mud

at C

ARs

--

--

-3.

23.

2-

-1

--

--

-A

mud

atA

mud

at D

istr

ict R

ds-

-13

8-

-6

6-

--

--

--

-A

mud

at T

otal

--

1311

--

9.2

15.2

--

1-

--

--

Am

uria

Am

uria

Dis

t Rds

--

169

169

--

50-

-22

22-

--

--

Am

uria

Am

uria

TC

--

178

--

2.7

1.5-

--

--

Am

uria

CA

RS-

-78

78-

--

--

--

--

--

-A

mur

ia T

otal

--

264

255

--

50-

-24

.723

.5-

--

--

Am

uru

Dis

tric

t-

271.6

271.6

--

3333

--

20.5

20.5

--

--

-A

mur

uTC

-10

.810

.8-

-8.

18.

1-

-5.

15.

1-

--

--

Am

uru

CA

RS-

88.8

88.8

--

--

--

--

--

--

-A

mur

u To

tal

--

371.2

371.2

--

41.1

41.1

--

25.6

25.6

--

--

-A

pac

Adu

ku T

C R

ds.

--

--

--

-6.

7-

--

--

--

-

135

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)A

pac

Apa

c TC

Rds

.-

--

--

-11

4-

--

--

--

-A

pac

Apa

c C

ARs

--

51.3

33.5

--

-71

--

--

--

--

Apa

cA

pac

Dis

tric

t Rds

.-

-43

421

7-

-72

91.5

--

--

22

--

Apa

c To

tal

--

485.

325

0.5

--

8317

3.2

--

--

22

--

Aru

aA

rua

TC R

ds.

--

--

--

--

--

--

--

--

Aru

aA

rua

CA

R-

-43

735

0.4

--

--

--

--

--

--

Aru

aA

rua

Dis

tric

t Rds

.

643.

5 -

643.

564

4-

-40

.8-

--

5216

--

--

Aru

a To

tal

--

1,080

.50

993.

9-

-40

.8-

--

5216

--

--

Aru

a M

CA

RUA

MC

00

31.8

31.8

00

021

.41.5

05.

50

00

0A

rua

MC

Tot

alBu

daka

Buda

ka T

C R

ds.

--

6565

--

917

.60.

30.

3-

--

-0.

10.

2Bu

daka

Buda

ka C

ARs

--

1616

--

--

--

--

--

--

Buda

kaBu

daka

Dis

tric

t Rds

.-

-25

025

0-

-48

.527

.9-

-7

7-

--

-Bu

daka

Tot

al-

-33

133

1-

-57

.545

.50.

30.

37

7-

-0.

10.

2Bu

duda

Budu

da T

C R

ds.

--

13.2

13.2

--

4.2

4.7

--

2.6

0.9

--

--

Budu

daBu

duda

CA

RS-

-20

20-

--

--

--

--

8.5

33-

Budu

daBu

duda

Dis

tric

t Rds

.-

-14

214

2-

-56

55.1

--

2.5

-1

1-

-Bu

duda

Tot

al-

-17

5.2

168.

2-

-60

.259

.8-

-5.

10.

91

9.5

33-

Bugi

riBu

giri

TC

Rds

.-

-24

.23

--

517

.2-

--

--

--

-Bu

giri

Bugi

ri C

ARS

--

85.7

--

--

38.5

--

--

--

--

Bugi

riBu

giri

Dis

tric

t Rds

.-

-32

9.3

342.

3-

-17

0.8

70.7

--

--

4-

--

Bugi

ri T

otal

--

439

345.

3-

-17

5.8

126.

4-

--

-4

--

-Bu

hwej

uN

siik

a TC

Rds

.-

-22

22-

-22

2-

-3

2-

--

-Bu

hwej

uD

istr

ict

--

221

221

--

6121

--

97

--

--

Buhw

eju

Dis

tric

t Rds

.-

-24

324

383

2312

9-

--

-Bu

ikw

eBu

ikw

e D

istr

ict R

ds.

--

138

148

--

43.8

45.8

--

--

--

-Bu

ikw

eN

koko

njer

u TC

Rds

.-

-11.

811.

8-

-4.

95.

71

-4.

24.

1-

--

-Bu

ikw

eLu

gazi

TC

Rds

.-

-20

.120

.1-

-7.

8-

--

-6.

8-

--

-Bu

ikw

eN

jeru

TC

Rds

.4.

24.

210

5.8

113.8

3.4

3.3

3.7

3.2

3.9

-6.

53.

9-

--

-Bu

ikw

eBu

ikw

e TC

Rds

.-

-21

.715

.8-

-21

.719

.7-

-2.

92.

4-

--

-Bu

ikw

eBu

ikw

e C

ARS

--

--

--

65.2

65.2

--

--

--

--

Buik

we

Tota

l4.

24.

229

7.4

309.

53.

43.

314

7.1

139.

64.

9-

13.6

17.2

--

--

Buke

dea

Buke

dea

TC R

ds.

--

26.4

8.4

-5

4.8

--

74.

3-

--

-Bu

kede

aBu

kede

a C

ARs

--

23.3

10.3

-22

.122

.1-

--

--

--

-Bu

kede

aBu

kede

a D

istr

ict R

ds.

--

303.

853

.6-

-16

.516

.5-

-4

4-

--

-Bu

kede

a To

tal

--

353.

517

2.3

--

43.6

43.4

--

118.

3-

--

-Bu

kom

an-

sim

biBu

kom

ansi

mbi

Dis

-tr

ict R

ds.

--

--

--

9476

--

--

--

--

136

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)Bu

kom

an-

sim

biBu

kom

ansi

mbi

TC

Rd

s.-

-8.

86

--

10.3

7.8

--

--

--

--

Buko

man

-si

mbi

Buko

man

sim

bi C

ARS

--

--

--

17.5

15.7

--

--

--

--

Buko

man

sim

bi T

otal

--

8.8

6-

-12

1.899

.5-

--

--

--

-Bu

kwo

Bukw

o D

ist.

Rds

--

3664

--

8484

--

--

--

72-

Bukw

oBu

kwo

T.C

--

1.18

--

1915

--

30.

5-

-24

-Bu

kwo

Bukw

o D

ist.

Mec

h Im

p-

--

--

--

--

--

--

--

-Bu

kwo

Bukw

o T.

C M

ech

Imp

--

--

--

--

--

--

--

--

Bukw

oBu

kwo

CA

Rs-

--

--

--

--

--

--

--

-Bu

kwo

Tota

l37

.172

103

993

0.5

96-

Bula

mbu

liBu

lege

ni T

C R

ds.

--

8.8

2.4

--

2.4

2-

-1.7

2.9

--

--

Bula

mbu

liBu

lam

buli

T.C

--

7.2

1.89.

217

.42.

71.2

--

--

Bula

mbu

liBu

lam

buli

CA

Rs-

-2

2-

-14

.518

.8-

--

--

--

-

Bula

mbu

liBu

lam

buli

Dis

tric

t Rd

s.-

-27

.57.

7-

-73

.140

.2-

-16

.716

.6-

--

-

Bula

mbu

li T

otal

--

4614

--

9978

--

2121

--

--

Bulii

saBu

liisa

Dis

tric

ts22

5.7

202

3Bu

liisa

Bulii

sa T

C R

ds.

--

21.2

21-

-4

4-

--

--

--

-Bu

liisa

Bulii

sa C

ARs

--

--

--

--

--

--

--

--

Bulii

sa T

otal

--

246.

922

3-

-7

4-

--

--

--

-Bu

ndib

ugyo

Bund

ibug

yo T

C R

ds.

--

27.1

21-

-27

.113

.1-

--

--

2525

Bund

ibug

yoN

yahu

ka T

own

Cou

ncil

--

18.7

18-

-15

.67.

8-

-0.

30.

3-

-12

1.7Bu

ndib

ugyo

Bund

ibug

yo C

ARs

--

43.1

34-

--

--

--

--

--

-

Bund

ibug

yoBu

ndib

ugyo

Dis

tric

t Rd

s.-

-14

3.6

32.7

--

3549

.2-

--

-1

126

16

Bund

ibug

yo T

otal

--

232.

510

5.7

--

77.7

7.8

--

0.3

0.3

11

6342

.7Bu

shen

yiBu

shen

yi T

C R

ds.

--

--

--

--

--

--

--

--

Bush

enyi

Bush

enyi

CA

Rs-

-38

21.3

--

-38

--

--

--

--

Bush

enyi

Bush

enyi

Dis

tric

t Rds

.-

-30

518

1-

-93

.682

.1-

--

--

-9

6Bu

shen

yi T

otal

--

343

202.

3-

-93

.612

0.1

--

--

--

96

Bush

enyi

Is

haka

MC

ISH

AK

A M

C

Bush

enyi

Isha

ka M

C T

otal

Busi

aBu

sia

TC R

ds.

--

21.3

21.3

-Bu

sia

Busi

a C

ARs

--

6464

--

--

--

--

--

--

Busi

aBu

sia

Dis

tric

t Rds

.-

-45

662

.3-

-53

.959

.9-

--

--

-Bu

sia

Tota

l-

-54

1.314

7.6

--

53.9

59.9

--

--

--

--

Busi

a M

CBu

sia

Mc

Busi

a M

C T

otal

137

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)Bu

tale

jaBu

tale

je T

C rd

s-

-10

10-

-9.

27.

7-

--

--

--

-Bu

tale

jaBu

solw

e T.

C-

-27

7.4

--

4.8

3.7

--

--

--

--

Buta

leja

Buta

leje

CA

RS-

-37

37-

--

--

--

--

--

-Bu

tale

jaBu

tale

ja D

istr

ict R

ds-

-15

037

.5-

-23

.516

.8-

--

--

--

-Bu

tale

ja T

otal

--

224

91.9

--

37.5

28.2

--

--

--

--

Buta

mba

laBu

tam

bala

Dis

tric

t Rds

--

201

104

--

2734

--

4-

--

14

Buta

mba

laG

ombe

TC

Rds

--

39.5

39.5

--

4.8

3.1

1-

10.3

--

-14

-Bu

tam

bala

Buta

mba

la C

ARS

--

--

--

14-

--

--

--

--

Buta

mba

la T

otal

--

240.

514

3.5

--

45.8

37.1

1-

14.3

--

-15

4Bu

vum

aBu

vum

a D

istr

ict R

ds.

--

120.

2110

.2-

--

--

--

21-

--

Buvu

ma

Buvu

ma

TC R

ds.

--

3232

--

8.5

8.5

--

--

--

0.1

0.1

Buvu

ma

Buvu

ma

CA

RS-

-42

42-

--

--

--

--

--

-Bu

vum

a To

tal

--

194

184.

2-

-8.

58.

5-

--

21-

-0.

10.

1Bu

yend

eBu

yend

e TC

Rds

.-

-57

.643

--

1616

--

--

--

--

Buye

nde

Buye

nde

CA

Rs-

--

--

--

--

--

--

-Bu

yend

eBu

yend

e D

istr

ict R

ds.

--

274.

618

2-

-58

.659

.9-

--

--

--

-Bu

yend

e To

tal

--

332.

222

5-

-74

.675

.9-

--

--

--

-D

okol

oD

okol

o D

istr

ict R

ds-

-96

27-

-90

32-

--

--

102

2D

okol

oD

okol

o TC

Rds

--

104

--

165

--

--

--

--

Dok

olo

Dok

olo

CA

RS-

-57

10-

--

--

--

--

--

-D

okol

o To

tal

--

163

41-

-10

637

--

--

-10

22

Ente

bbe

MC

Ente

bbe

Mc

Ente

bbe

Tota

lFo

rt P

orta

l M

cFo

rt P

orta

l Mc

Fort

Por

tal

Tota

l MC

Gom

baG

omba

Dis

tric

t Rds

.-

-37

7.3

94.3

--

41.6

35.8

--

--

--

--

Gom

baK

anon

i TC

Rds

.-

-52

.213

.1-

--

11

-3.

40.

7-

--

-G

omba

Kab

ulas

oke

SC C

ARs

--

--

--

--

-1

4.1

6.8

--

--

Gom

baM

addu

SC

CA

Rs-

--

--

--

--

--

--

--

-G

omba

Kyeg

onza

SC

CA

Rs-

--

--

--

--

--

--

--

-G

omba

Mpe

nja

SC C

ARs

--

--

--

--

--

--

--

--

Gom

baG

omba

CA

Rs-

--

--

--

--

--

--

--

-G

omba

Tot

al-

-42

9.2

107.

4-

-41

.636

.81

17.

57.

5-

--

-G

ulu

Gul

u TC

Rds

.-

--

--

--

--

--

--

--

-G

ulu

Gul

u C

ARs

--

142.

314

2.3

--

--

--

--

--

--

Gul

uG

ulu

Dis

tric

t Rds

.-

-55

755

7-

-22

.422

.4-

--

--

--

-G

ulu

Tota

l-

-69

9.3

699.

3-

-22

.422

.4-

--

--

--

-

138

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)G

ulu

MC

GU

LU M

CG

ulu

MC

Tot

alH

oim

aK

igor

obya

TC

Rds

.-

-31

31-

-4.

43.

1-

--

--

--

-H

oim

aH

oim

a C

ARS

--

--

--

2042

.8-

--

--

--

-H

oim

aH

oim

a D

istr

ict R

ds.

--

484

594.

2-

-20

44-

-19

302

--

-H

oim

a To

tal

--

515

625.

2-

-44

.489

.9-

-19

302

--

-H

oim

a M

CH

oim

a M

cH

oim

a M

C T

otal

Iban

daIb

anda

TC

Rds

.8

1.835

.528

.41.2

3.5

11

--

-11.

5-

--

-Ib

anda

Isho

ngor

oro

TC R

ds.

--

60.9

60.9

--

20.7

50.9

--

--

--

--

Iban

daIg

oror

a TC

Rds

.-

-18

.618

.6-

-10

.75.

3-

--

--

--

6Ib

anda

Rush

ango

TC

Rds

.-

-39

.833

.5-

-21

.825

.3-

-1.2

2-

-10

Iban

daIb

anda

CA

Rs-

--

43-

--

--

--

--

--

-Ib

anda

Iban

da D

istr

ict R

ds.

--

229

193

--

1414

--

10.2

9-

-7

131

Iban

da T

otal

81.8

383.

837

7.4

1.23.

568

.210

6.5

--

11.2

22.5

--

714

7Ig

anga

Igan

ga D

istr

ict R

ds.

--

195.

119

5.1

--

50.2

41-

-18

.89

-10

0Ig

anga

Buse

mba

tya

TC R

ds.

--

24.3

24.3

--

--

--

54.

1-

-66

60Ig

anga

Igan

ga C

ARs

--

198

198

-46

.6-

--

--

--

-Ig

anga

Tot

al-

-41

7.4

417.

4-

-50

.287

.6-

-23

.813

.1-

-16

660

Isin

giro

Isin

giro

TC

Rds

.0.

70.

749

.320

.1-

-32

32.5

--

54

--

5-

Isin

giro

Kab

erer

e TC

Rds

.-

-30

.630

.6-

-28

.54.

1-

-5

3.7

--

6-

Isin

giro

Kab

uyan

da T

C R

ds.

--

3127

.3-

-11

5.7

--

2.6

1.8-

--

-Is

ingi

roIs

ingi

ro C

ARS

--

6516

.3-

--

--

--

--

--

-Is

ingi

roIs

ingi

ro D

istr

ict R

ds.

--

384

354.

1-

-12

071

.4-

--

-2

-10

-Is

ingi

ro T

otal

0.7

0.7

559.

944

8.4

--

191.5

113.7

--

12.6

9.5

2-

21-

Jinja

Jinja

Dis

t Rds

--

147

147

--

51.3

30.3

--

24.1

11.2

--

--

Jinja

Buge

mbe

TC

--

39.6

39.6

--

--

--

4.7

0.7

--

--

Jinja

Buw

enge

TC

--

15.6

15.6

--

--

--

11.1

--

--

Jinja

Kak

ira

TC-

-49

16-

--

--

-3

-0.

1-

--

Jinja

Jinja

Dis

t. M

ech

Imp

--

--

--

--

--

--

--

--

Jinja

Buge

mbe

TC

Mec

h.

Imp

--

--

--

--

--

--

--

--

Jinja

Kak

iri T

C. M

ech.

Imp

--

--

--

--

--

--

--

--

Jinja

Jinja

CA

Rs-

--

--

--

--

46.4

7.2

--

--

Jinja

Tot

al-

-25

1.221

8.2

--

51.3

30.3

--

79.2

20.2

0.1

--

-Jin

ja M

CJin

ja M

cJin

ja M

C T

otal

Kaa

bong

Kaa

bong

TC

Rds

.-

--

--

--

--

--

--

--

-

139

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)K

aabo

ngK

aabo

ng C

ARs

--

--

--

--

--

--

--

--

Kaa

bong

Dis

tric

t Rds

.-

-57

57-

-28

28-

-40

--

--

-K

aabo

ng T

otal

--

5757

--

2828

--

40-

--

--

Kab

ale

Kat

una

TC R

ds.

--

--

--

2.5

2-

-7.

51.5

--

--

Kab

ale

Muh

anga

TC

Rds

.-

-4.

44.

4-

-3

1.4-

-3

5.-

--

44-

Kab

ale

Ham

urw

a TC

Rds

.-

-7.

72

--

--

--

6.2

3-

--

-K

abal

eK

abal

e C

ARS

--

2727

5252

--

--

--

22

Kab

ale

Kab

ale

Dis

tric

t Rds

.-

-60

060

0-

-20

7.6

185.

9-

--

--

196

196

Kab

ale

Tota

l-

-63

9.1

633.

4-

-26

5.1

241.3

--

16.7

4.5

--

242

198

Kab

ale

MC

Kab

ale

Mc

Kab

ale

MC

Tot

alK

abar

ole

Kib

iito

TC R

ds.

--

30.7

31.4

--

8.4

1.2-

-3.

52.

1-

-18

-K

abar

ole

Kar

ago

TC R

ds.

--

14.9

19.3

--

5.4

5.3

--

3.4

5.5

--

48-

Kab

arol

eK

iko

TC R

ds.

--

21.6

24.2

--

627

--

5.3

6-

-K

abar

ole

Kiju

ra T

C R

ds.

--

277

--

7-

--

3.8

3.5

--

--

Kab

arol

eRw

imi T

C R

ds.

--

38.1

22.8

--

-1

--

--

--

--

Kab

arol

eRu

bona

TC

Rds

.-

-14

.215

--

7.5

7.5

--

--

--

--

Kab

arol

eK

abar

ole

CA

RS-

--

--

-44

.4-

--

-9.

8-

--

-K

abar

ole

Kab

arol

e D

istr

ict R

ds.

--

255.

915

8.4

--

157.

8115

.6-

--

-2

16

6K

abar

ole

Tota

l-

-40

2.4

298.

1-

-23

6.5

157.

6-

-16

26.9

21

726

Kab

eram

ai-

doK

aber

amai

do D

istr

ict

Rds.

--

360.

236

0.2

--

6.4

6.4

--

--

--

--

Kab

eram

ai-

doK

aber

amai

do T

C R

ds.

11

15.8

15.8

--

--

--

1.61.6

--

--

Kab

eram

ai-

doK

aber

amai

do C

ARs

--

159

159

--

--

--

--

--

--

Kab

eram

aido

Tot

al1

153

553

5-

-6.

46.

4-

-1.6

1.6-

--

-K

alan

gala

Kal

anga

la D

istr

ict R

ds.

--

4736

--

3812

1-

--

--

--

-K

alan

gala

Kal

anga

la T

C R

ds.

-17

13.2

--

513

.5-

--

--

--

-K

alan

gala

Kal

anga

la C

ARS

--

69.5

57-

--

--

--

--

--

-K

alan

gala

Tot

al-

-13

3.5

106.

2-

-43

134

--

--

--

--

Kal

iro

Kal

iro

Dis

tric

t Rds

.-

-20

620

6-

-60

60-

--

--

--

-K

alir

oK

alir

o TC

Rds

.-

--

--

--

--

--

--

--

-K

alir

oK

alir

o C

ARs

--

--

--

--

--

--

--

--

Kal

iro

Tota

l-

-20

620

6-

-60

60-

Kal

ungu

Kal

ungu

Dis

tric

t Rds

. 2-

-36

6.8

244

--

105.

178

.5-

--

--

--

-K

alun

guK

alun

gu T

C R

ds.

--

28.2

17.3

--

6.2

4-

--

--

--

-K

alun

guLu

kaya

TC

Rds

.-

-34

.610

.1-

-4

4.5

--

--

--

--

140

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)K

alun

guK

alun

gu C

ARS

--

--

--

19.5

7-

--

--

-K

amul

iK

amul

i Dis

tric

t Rds

.-

-51

151

1-

--

--

-26

4.1

74-

-10

010

0K

amul

iK

amul

i TC

Rds

.-

-26

.153

7.1

--

9.6

--

--

6.6

--

--

Kam

uli

Kam

uli C

ARs

--

--

--

--

--

264.

174

--

--

Kam

uli T

otal

--

537.

11,0

48.10

--

9.6

--

-35

3.1

128.

6-

-10

010

0K

amw

enge

Kam

wen

ge T

C R

ds.

--

369

--

--

--

1910

--

--

Kam

wen

geK

amw

enge

CA

Rs-

--

--

--

--

-59

--

--

-

Kam

wen

geK

amw

enge

Dis

tric

t Rd

s.-

-21

621

6-

-21

654

.4-

--

-2

--

-

Kam

wen

ge T

otal

--

252

225

--

216

54.4

--

7810

2-

--

Kan

ungu

Buto

gota

T.C

--

--

--

--

--

--

--

--

Kan

ungu

Kam

buga

T.C

--

--

--

--

--

--

--

--

Kan

ungu

Kih

ihi T

.C-

--

--

--

--

--

--

--

-

Kan

ungu

Buto

gota

T.C

. Mec

h Im

p-

--

--

--

--

--

--

--

-

Kan

ungu

Kam

buga

T.C

Mec

h Im

p-

--

--

--

--

--

--

--

-

Kan

ungu

Kan

ungu

T.C

mec

h Im

p-

--

--

--

--

--

--

--

-

Kan

ungu

Kih

ihi T

.C M

ech

Imp

--

--

--

--

--

--

--

--

Kan

ungu

Kan

ungu

Dis

t.-

-10

985

.4-

-30

.823

.5-

-18

.514

.5-

--

-K

anun

guK

anun

gu T

C-

--

--

--

--

--

--

--

-K

anun

guK

anun

guC

ARS

ct R

ds.

--

--

--

--

--

--

--

--

Kan

ungu

Tot

al-

-10

985

.4-

-30

.823

.5-

-18

.514

.5-

--

-K

apch

orw

aK

apch

orD

ist R

ds-

-15

860

--

606

--

5-

--

--

Kap

chor

wa

Kap

chor

wTC

Rds

--

185.

1-

-10

9-

-2

1-

--

-K

apch

orw

aK

apch

orC

ARs

--

--

--

30-

--

--

--

--

Kap

chor

wa

Tota

l-

-17

665

.1-

-10

015

--

71

--

--

Kas

ese

Kas

ese

Dis

t Rds

--

386.

9-

--

6444

.8-

--

--

--

-K

ases

eH

ima

TC R

ds5.

6-

32.4

--

-7

--

-6.

15.

9-

--

-K

ases

eK

atw

e TC

Rd

1.8-

22.8

24.6

--

17.4

17.4

--

4.3

7.4

--

--

Kas

ese

Mpo

ndw

e TC

Rds

--

41.7

--

--

--

-8.

34.

6-

--

-K

ases

eK

ases

e C

ARS

-81

.672

--

1,346

.80

71.7

--

--

--

--

Kas

ese

Tota

l7.

4-

178.

596

.6-

-1,3

71.2

089

.1-

-18

.717

.9-

--

-K

ases

e M

CK

ases

e M

cK

ases

e M

C T

otal

Kat

akw

iK

atak

wi D

istr

ict R

ds.

--

246

200

--

118118

--

--

--

--

Kat

akw

iK

atak

wi T

C R

ds.

--

1212

--

132

--

22

--

--

141

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)K

atak

wi

Kat

akw

i CA

RS-

-10

710

7-

--

--

--

--

--

-K

atak

wi T

otal

--

365

319

--

131

120

--

22

--

--

Kay

unga

Kay

unga

Dis

tric

t Rds

.-

-32

432

4-

-34

--

-34

.519

.5-

--

-K

ayun

gaK

ayun

ga T

C R

ds.

--

28.2

28.2

--

10.2

10.4

--

1.32.

2-

--

-K

ayun

gaK

ayun

ga C

AR

--

--

--

1738

--

--

--

--

Kay

unga

Tot

al-

-35

2.2

352.

2-

-61

.248

.4-

-35

.821

.7-

--

-K

ibal

eK

agad

i TC

Rds

--

2020

--

19.5

27.4

--

--

--

43-

Kib

ale

Kak

umir

o TC

Rds

--

2929

--

88

--

--

--

--

Kib

ale

Kib

aale

Dst

Rds

--

495.

749

5.7

--

103.

610

0.7

--

11.2

22.2

--

--

Kib

ale

Kib

aale

TC

Rds

--

3636

--

18.4

8-

--

--

--

-K

ibal

eM

ouho

oroT

C R

ds-

-38

.238

.2-

-18

8-

--

--

-91

24K

ibal

eK

ibaa

le C

ARs

--

--

--

68.7

68.7

--

--

--

59.8

59.8

Kib

ale

Tota

l-

-61

8.9

618.

9-

-23

6.2

220.

8-

-11.

222

.2-

-19

3.8

83.8

Kib

oga

Buko

mer

otc

TC rd

s-

-36

26-

-9.

311.

20.

63

--

--

--

Kib

oga

Kib

oga

Dst

Rds

--

230

112.5

--

116.5

74-

-17

.517

.5-

--

-K

ibog

aK

ibog

a TC

Rds

--

4215

.9-

-11.

111.

1-

--

--

--

-K

ibog

aK

ibog

a C

ARs

--

--

--

--

--

--

--

--

Kib

oga

Tota

l-

-31

215

4.4

--

136.

996

.30.

63

17.5

17.5

--

--

Kib

uku

Kib

uku

Dis

tric

t Rds

.-

-84

.484

.4-

-10

9.2

31.1

--

--

1818

--

Kib

uku

kibu

ku T

C R

ds.

--

--

--

--

--

--

--

--

Kib

uku

kibu

ku C

ARS

--

--

--

--

--

--

--

--

Kib

uku

Tota

l-

-84

.484

.4-

-10

9.2

31.1

--

--

18-

--

Kir

uhur

aK

azo

TC R

ds.

--

--

--

--

--

--

--

--

Kir

uhur

aSa

nga

TC R

ds.

--

--

--

--

--

--

--

--

iruh

ura

Kir

uhur

a D

ist

--

178.

110

6-

-13

713

7-

-60

.7-

--

40-

Kir

uhur

aK

iruh

ura

CA

Rs-

--

--

Kir

uhur

aK

iruh

urC

ARS

.-

--

--

--

--

--

--

--

-K

iruh

ura

Tota

l-

-17

8.1

106

--

137

137

--

60.7

--

-40

-K

iruh

ura

Kaz

o TC

Rds

.-

--

--

--

--

--

--

--

-K

irya

ndon

goBw

eyal

e TC

Rds

--

51.3

38.3

--

--

--

15.7

5.8

--

--

Kir

yand

ongo

Kig

umba

TC

Rds

--

36.8

36.8

--

2.7

--

-4.

1-

--

--

Kir

yand

ongo

Kir

yan

Dis

t Rds

--

346.

532

1-

-29

.814

--

11-

--

--

Kir

yand

ongo

kiry

TC

Rds

--

2820

.8-

--

--

-4

3.6

--

--

Kir

yand

ongo

Kir

yand

CA

RS-

--

--

--

--

-18

4-

--

-K

irya

ndon

go T

otal

--

462.

641

6.9

--

32.5

14-

-52

.813

.4K

isor

oK

isor

o D

ist R

ds2.

21

251.6

66.2

--

65.5

40.2

--

--

--

--

Kis

oro

Kis

oroT

C R

ds-

-26

.73

4.6

--

--

0.2

-0.

30.

2-

--

-

142

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)K

isor

oK

isor

o C

ARs

--

--

--

--

--

--

--

--

Kis

oro

Tota

l2.

21

278.

370

.8-

-65

.540

.20.

2-

0.3

0.2

--

--

Kit

gum

Dis

tric

t Rds

.2

127

7.2

259.

3-

--

--

-22

16.5

--

--

Kit

gum

Kit

gum

TC

2.8

335

12.9

--

3.7

3.7

--

3.2

--

--

-

Kit

gum

Kit

gum

CA

RS D

istr

ict

Rds.

--

--

--

--

--

0.1

--

--

-

Kit

gum

Tot

al4.

84

312.

227

2.2

--

3.7

3.7

--

25.3

16.5

--

--

Kob

oko

Kob

oko

Dst

Rds

--

218.

551

.9-

-99

.132

--

13-

--

--

Kob

oko

Kob

oko

TC R

ds-

--

--

--

--

-6.

53.

8-

--

-K

obok

oK

obok

oCA

Rs-

-72

72-

-53

40-

--

--

-12

-K

obok

o -

-29

0.5

123.

9-

-15

2.1

72-

-19

.53.

8-

-12

-K

ole

Kol

e D

istr

ict

--

122

41-

-35

.635

.6-

-35

.6-

--

--

Kol

eAy

er T

.C-

--

--

--

--

--

--

--

-K

ole

Kol

e C

ARS

--

--

--

--

--

--

--

--

Kol

e To

tal

--

122

41-

-35

.635

.635

.6-

--

--

Kot

ido

Kot

ido

Dis

t Rds

-6

109.

610

9.6

--

31.6

76.7

--

--

--

--

Kot

ido

Kot

ido

TC R

ds-

-16

.116

.1-

-8.

38.

3-

-1.2

--

--

-K

otid

oK

otid

o C

ARs

--

--

--

--

--

--

--

--

Kot

ido

Tota

l-

-12

5.7

125.

7-

-39

.985

--

1.2-

--

--

Kum

iK

umi D

istr

ict R

ds.

66

229.

322

4.3

--

27.5

7-

-11

--

--

-K

umi

Kum

i TC

Rds

.6

625

25-

-10

.25.

41

-4

1.5-

--

-K

umi

Kum

i CA

Rs-

--

--

-36

10-

--

--

--

-K

umi T

otal

1212

254.

324

9.3

--

73.7

22.4

1-

151.5

--

--

Kwee

nKw

een

Dis

tric

t Rds

.-

-81

.625

.33

--

301.2

--

4.5

--

--

Kwee

nKw

een

TC R

ds-

-9.

14.

4-

-12

.36.

7-

--

--

--

-Kw

een

Kwee

n C

ARs

--

2929

--

--

--

--

--

--

Kwee

nBi

nyin

y-

--

--

--

--

--

--

--

-Kw

een

Tota

l-

-119

.758

.73

-12

.336

.71.2

--

4.5

--

--

Kyan

kwan

ziBu

tem

ba T

C R

ds-

-44

40.9

--

--

--

11

--

--

Kyan

kwan

ziKy

ankw

anzi

CA

Rs-

--

--

--

--

--

--

--

-Ky

ankw

anzi

Kyan

kwan

zi D

st R

ds-

-34

6.3

--

-34

24-

-13

.117

.1-

--

-Ky

ankw

anzi

Ntw

etw

e TC

Rds

--

--

--

--

--

20.5

20.5

--

--

Kyan

kwan

zi T

otal

--

390.

340

.9-

-34

24-

-34

.638

.6-

--

-Ky

egeg

wa

Dis

tric

t-

-17

017

0-

-8

8-

--

--

--

-Ky

egeg

wa

TC-

--

--

--

--

--

--

--

-Ky

egeg

wa

CA

Rs-

--

--

--

--

--

--

--

-Ky

egeg

wa

Tota

l-

-17

017

0-

-8

8-

--

--

--

-

143

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)Ky

enjo

joBu

tund

uzi T

C R

ds-

-48

48-

--

--

--

4.2

--

--

Kyen

jojo

Kat

ooke

TC

Rds

--

58.5

58.5

--

--

--

19.3

5.3

--

--

Kyen

jojo

Kyar

usoz

i TC

Rds

--

25.8

25.8

--

--

0.6

-0.

60.

6-

--

-Ky

enjo

joKy

enjo

jo D

ist R

ds-

-39

8.2

128.

3-

--

--

-10

2.9

74.3

--

--

Kyen

jojo

Kyen

jojo

TC

Rds

--

8362

--

-2

--

20.6

6-

--

-Ky

enjo

joky

enjo

CA

Rs-

--

--

--

--

--

--

--

-Ky

enjo

jo T

otal

--

613.

532

2.6

--

-2

0.6

-14

3.4

90.3

--

--

Lam

wo

Lam

wo

Dst

Rds

--

292

4-

-8.

3-

--

16.5

17-

--

-La

mw

oLa

mw

o TC

-

-16

16-

--

--

-5.

13

--

--

Lam

wo

Padi

be T

C-

-12

12.6

--

--

--

--

--

--

Lam

wo

CA

Rs-

-22

622

6-

--

--

--

--

--

-La

mw

o To

tal

--

547

259

--

8.3

--

--

--

--

-Li

raLi

ra T

C R

ds.

--

--

--

--

--

--

--

--

Lira

Lira

CA

Rs-

-34

.126

.1-

--

--

--

--

--

-Li

raLi

ra D

istr

ict R

ds.

--

455

403.

4-

-16

.216

.2-

--

--

--

-Li

ra T

otal

--

489.

142

9.5

--

16.2

16.2

--

--

--

--

Lira

MC

LIRA

MC

Lira

MC

Tot

al

Luuk

aLu

uka

Luuk

a D

istr

ict

Rds.

--

174.

617

4.6

--

18.2

36.4

--

--

--

-

Luuk

aLu

uka

Luuk

a TC

Rd

s.-

-35

.560

--

2.2

2.2

--

5.1

--

--

Luuk

aLu

uka

Luuk

a C

ARS

--

--

--

20.5

23.5

--

--

--

-

Luuk

a To

tal

--

210.

123

4.6

--

40.9

62.1

--

5.1

--

--

Luw

ero

Luw

ero

Dis

tric

t Rd

s.-

--

79.2

--

108.

6-

--

68.5

58.8

--

-

Luw

ero

Luw

ero

Bom

bo

TC-

-28

.65

--

6.9

-95

.6-

--

-6.

632

9

Luw

ero

Luw

ero

Luw

ero

TC-

-21

33.6

3.6

2-

6.9

--

2.4

--

--

Luw

ero

Luw

ero

Wob

u-le

nzi T

C-

--

--

--

--

-33

.533

.1-

--

Luw

ero

Luw

ero

Luw

ero

CA

Rs-

-13

.1-

--

6.3

--

-3.

9-

--

-

Luw

ero

Tota

l-

-62

.7117

.83.

62

121.2

6.9

95.6

-10

8.3

91.9

-6.

632

9

Lwen

goLw

engo

Dis

tric

t Rd

s.-

-27

6110

--

231.5

108

--

--

1-

-

Lwen

goLw

engo

Kyaz

anga

TC

Rds

.-

-13

.87.

2-

-21

.52

--

1-

--

-

144

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)

Lwen

goLw

engo

Lwen

go

TC R

ds.

--

--

--

-65.

23.

7-

--

--

--

Lwen

goLw

engo

Lwen

go

CA

RS-

--

--

-26

23-

--

--

--

Lwen

go T

otal

--

289.

8117

.2-

-34

4.2

141.7

--

1-

1-

-Ly

anto

nde

Lyan

tond

e D

istr

ict

--

313

90-

-26

14-

-28

.828

.8-

--

Lyan

tond

eLy

anto

nde

Lyan

-to

nde

TC

Rds.

--

3.5

1.5-

--

--

-3.

51.5

--

-

Lyan

tond

eLy

anto

nde

CA

RS-

-3.

7-

--

--

--

--

--

-Ly

anto

nde

Tota

l-

-31

792

--

2614

--

3230

--

-

Man

afw

aM

anaf

wa

Man

afw

a D

ist R

ds-

-12

9.1

126.

9-

-7.

391

--

10-

11

-

Man

afw

aM

anaf

wa

Lwak

ha-

kha

T.C

--

24.1

24.1

--

3.4

--

-3.

92.

9-

--

Man

afw

aM

anaf

wa

Man

afw

a T.

C M

ech

Imp

--

4040

--

12.1

12.1

--

33

--

60

Man

afw

aM

anaf

wa

CA

Rs-

--

--

--

--

--

--

--

Man

afw

aM

anaf

wa

Tota

l-

--

193.

219

1-

-22

.852

1.0.8

--

16.9

5.9

11

60

Mar

acha

Mar

acha

Dis

tric

t Rd

s-

-22

6.8

236

--

42.7

24-

-4.

5-

--

-

Mar

acha

Mar

acha

Mar

acha

TC

Rds

--

18.1

13-

-8.

98.

9-

--

--

--

Mar

acha

Mar

acha

CA

RS-

-14

6.4

142.

4-

--

--

--

--

--

Mar

acha

Tot

al-

-39

1.339

1.4-

-51

.632

.9-

-4.

5-

--

-

Mas

aka

Mas

aka

Dis

tric

t Rd

s.-

-79

.130

.2-

-14

8.3

66.5

--

112.1

21.5

--

-

Mas

aka

Mas

aka

Mas

aka

TC R

ds.

--

--

--

--

--

--

44.7

40.4

-

Mas

aka

Mas

aka

Mas

aka

CA

Rs-

--

--

--

--

--

--

-

Mas

aka

Tota

l-

-79

.130

.2-

-14

8.3

66.5

--

112.1

21.5

44.7

40.4

-

Mas

aka

MC

Mas

aka

MC

MA

SAK

A

MC

--

--

--

--

--

--

--

-

Mas

aka

MC

Tot

al-

--

--

--

--

--

--

--

Mas

indi

Mas

indi

Dis

tric

t-

-33

3.7

368.

6-

-39

41-

--

--

--

Mas

indi

Mas

indi

Mas

indi

TC

Rds

.-

--

--

--

--

--

--

--

Mas

indi

Mas

indi

Mas

indi

C

ARs

--

--

--

--

--

31.7

31.7

--

-

Mas

indi

Tot

al-

-33

3.7

368.

6-

-39

41-

-31

.731

.7-

--

145

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)

Mas

indi

MC

Mas

indi

MC

MA

SIN

DI

MC

3.5

3.5

215.

221

5-

-24

.714

.9-

-0.

30.

3-

--

Mas

indi

MC

Tot

alM

asin

di M

C T

otal

3.5

3.5

215.

221

5-

-24

.714

.9-

-0.

30.

3-

--

May

uge

May

uge

May

u-ge

ee D

ist

Rds

--

154.

615

4.6

--

4646

--

--

--

-

May

uge

May

uge

May

uge

T.C

--

--

--

--

--

--

--

-

May

uge

May

uge

CA

RS

--

--

--

--

--

--

--

-M

ayug

eM

ayug

e To

tal

--

154.

615

4.6

--

4646

--

--

--

-M

bale

Mba

leD

istr

ict

--

267.

712

8.2

--

36.2

36.2

--

2817

--

-

Mba

leM

bale

Nak

alok

e TC

Rds

.-

-15

.4-

--

4.9

1.5-

-6.

65.

8-

--

Mba

leM

bale

Mba

le

TCRd

s.-

-15

.4-

--

4.9

1.5-

-6.

65.

8-

--

Mba

leM

bale

Mba

le

CA

Rs-

-73

.2-

--

--

--

--

--

-

Mba

le T

otal

Mba

le T

otal

--

371.7

128.

2-

-46

39.2

--

41.1

28.6

--

-M

bale

MC

MBA

LE M

CM

bale

MC

Tot

alM

bara

raD

ist R

ds.

--

365

285.

5-

-14

887

--

--

--

--

Mba

rara

Mba

rara

CA

Rs-

--

--

--

--

--

--

--

-M

bara

raM

bara

ra D

istr

ict R

ds.

--

--

--

--

--

--

--

--

Mba

rara

Tot

al-

-36

525

5.5

--

148

87-

--

--

--

-M

bara

ra M

CM

BARA

RA M

CM

bara

ra M

C T

otal

Mito

oma

Dis

t-

-21

021

0-

-19

1.510

9-

--

--

-12

212

2

Mito

oma

Kas

he T

C R

ds M

i-to

oma

TC-

-16

15.6

--

26.5

7.9

--

--

--

36-

Mito

oma

TC M

itoom

a-

-27

33.3

--

23.8

13.3

--

--

--

66-

Mito

oma

Mito

o ca

rs-

--

--

-41

41-

--

--

--

-M

itoom

a T

otal

--

253

258.

5-

-28

2.8

171.2

--

--

--

218

122

Mit

yana

Dis

tric

t Rds

.-

-31

531

5-

-49

69.6

--

--

--

--

Mit

yana

Mit

yana

TC

Rds

.-

--

--

--

--

--

--

--

-M

itya

naM

itya

na C

ARS

--

--

--

--

Mit

yana

Tot

al-

-31

531

5-

-49

69.6

--

--

--

--

Mor

oto

Mor

oto

Dis

tric

t Rds

.-

-12

710

2-

--

91.4

32-

--

1-

--

Mor

oto

Mor

oto

TC R

ds.

--

--

--

--

--

--

--

--

Mor

oto

Mor

oto

CA

Rs-

--

--

--

--

--

--

--

-M

orot

o To

tal

--

127

102

--

-91

.432

--

51

--

-

146

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)M

orot

o M

CM

orot

o M

c-

--

--

--

--

--

--

--

-M

orot

o M

C T

otal

--

--

--

--

--

--

--

--

Moy

oM

oyo

Dis

tric

t Rds

.-

-22

0.8

216.

8-

-8

8-

-18

18-

--

-M

oyo

Moy

o TC

Rds

.-

--

20.1

--

4.5

4.5

--

23

--

-15

6M

oyo

Moy

o C

ARs

--

-17

7.7

--

42.3

42.3

--

--

--

--

Moy

o To

tal

--

220.

841

8.5

--

54.8

54.8

--

2021

--

-15

6M

pigi

Mpi

gi D

istr

ict R

ds.

--

123.

660

.9-

--

--

13.5

10.9

--

--

-M

pigi

Mpi

gi T

C R

ds.

--

5529

--

6-

--

2.3

--

--

42M

pigi

Mpi

gi S

C C

ARs

--

33.5

33.5

--

--

--

--

--

--

Mpi

gi T

otal

--

212.

112

3.4

--

6-

-13

.513

.2-

--

-42

Mub

ende

Dis

tric

t Rds

.-

-61

3.1

613.

1-

-22

8.4

189.

1-

-64

.579

.5-

--

-M

uben

deM

uben

de T

C R

ds.

--

77.7

19.4

-1.3

2613

.51.3

1.35.

55.

5-

--

-M

uben

deC

ARS

--

--

--

145

145

--

--

--

--

Mub

ende

Tot

al-

-69

0.8

632.

5-

1.339

9.4

347.

61.3

1.370

85-

--

-M

ukon

oD

istr

ict R

ds.

--

427

417

--

98.8

98.8

--

--

--

4027

Muk

ono

Muk

ono

TC R

ds.

--

--

--

--

--

--

--

-M

ukon

oM

ukon

o C

ARs

--

10.2

10.3

--

7171

-48

.748

.7-

-30

-M

ukon

o To

tal

--

437.

242

7.3

--

169.

816

9.8

--

48.7

48.7

--

7027

Muk

ono

MC

MU

KON

O M

C-

--

--

--

--

--

--

--

-M

ukon

o M

C T

otal

--

--

--

--

--

--

--

--

Nak

apir

ipir

itD

ist

--

5924

--

1616

--

--

--

--

Nak

apir

ipir

itTC

--

--

1-

11

--

--

--

--

Nak

apir

ipir

itC

ARS

--

--

--

20.8

3-

--

--

--

-N

akap

irip

irit

Tota

l-

-59

241

-37

.820

--

--

--

--

Nak

asek

eN

akas

eke

Dst

Rds

--

368

74.5

--

7480

.4-

-30

.84.

2-

-21

17N

akas

eke

Buta

lang

u TC

Rds

--

24.2

4.2

--

12.5

4.2

--

4.8

3-

--

-N

akas

eke

Kiw

oko

TC R

ds-

-15

.39.

6-

--

--

-10

.64.

9-

--

-N

akas

eke

Nak

asek

e TC

Rds

--

18.5

10.6

--

18.5

10.6

--

0.5

2.9

--

-1

Nak

asek

eN

gom

a TC

Rds

1614

.21.3

Nak

asek

eSe

mut

o TC

Rds

--

162

--

7.4

14.2

--

1.31

--

--

Nak

asek

eN

akas

eke

CA

Rs-

-20

.33.

3-

-5.

61.5

--

6.5

2.2

--

--

Nak

asek

e To

tal

--

462.

310

4.2

--

118110

.9-

-54

.518

.2-

-21

18

Nak

ason

gola

Nak

ason

gola

Dis

tric

t Rd

s.-

-39

2-

--

6361

--

4.8

4.8

--

--

Nak

ason

gola

Kak

ooge

TC

Rds

.-

-16

.316

.3-

--

--

-9

9.1

--

--

Nak

ason

gola

Mig

eera

TC

Rds

.-

10.4

6.1

--

--

3.3

--

73.

3-

--

-N

akas

ongo

laN

akas

ongo

la T

C R

ds.

11

1111

--

2.1

2.1

--

4.9

4.8

--

12-

147

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)N

akas

ongo

laN

akas

ongo

la C

ARS

--

--

--

4427

.4-

--

--

--

-N

akas

ongo

la T

otal

111.

442

5.4

27.3

--

109.

193

.8-

-25

.722

--

12-

Nam

ayin

goN

amay

ingo

Dis

tric

t Rd

s.-

-87

--

-52

24-

-13

13-

--

-

Nam

ayin

goN

amay

ingo

TC

Rds

.-

-6.

26.

2-

-11.

511.

5-

-4

4-

--

-N

amay

ingo

Nam

ayin

go C

ARs

--

--

--

4343

--

--

--

--

Nam

ayin

go T

otal

--

93.2

6.2

--

106.

578

.5-

-17

17-

--

-

Nam

utum

baN

amut

umba

Dis

tric

t Rd

s.-

-26

3.8

263.

8-

-84

59-

--

--

--

-

Nam

utum

baN

amut

umba

TC

Rds

.-

-20

20-

-6

5.5

--

--

--

27-

Nam

utum

baN

amut

umba

CA

Rs-

--

--

--

--

--

--

--

-N

amut

umba

Tot

al-

-28

3.8

283.

8-

-115

.664

.5-

--

--

-27

-N

apak

Nap

ak D

istr

ict R

ds.

-

-

169

169.

0-

-

45.

2 5

4.9

-

-

5.0

1.9

--

- -

Nap

akLo

reng

ecor

a TC

Rds

.-

-24

.16

--

3.7

7.7

--

1.41.5

- -

- -

Nap

akN

apak

CA

Rs-

- -

--

- -

- -

- -

--

- -

-N

apak

Tot

al-

-19

3.1

175

--

48.9

62.6

--

6.4

3.4

--

--

Neb

biN

ebbi

Dis

tric

t Rds

.-

-37

112

3.7

--

70.5

--

--

--

--

-N

ebbi

Neb

bi T

C R

ds.

--

75.2

26.2

--

23.1

--

--

--

--

20N

ebbi

Pack

wac

h TC

Rds

.-

-23

19-

-9

--

--

--

--

-N

ebbi

Neb

bi C

ARs

--

--

--

--

--

--

--

--

Neb

bi T

otal

--

469.

216

8.9

--

102.

690

.5-

--

--

--

20N

gora

Ngo

ra D

istr

ict R

ds.

--

140.

514

0.5

--

41.3

41.3

--

7.1

--

--

-N

gora

Ngo

ra T

C R

ds.

--

14.2

14.2

--

3.7

3.7

--

--

--

--

Ngo

raN

gora

CA

Rs-

--

--

-35

25.6

Ngo

ra T

otal

--

154.

715

4.7

--

8070

.6-

-7.

1-

--

--

Nto

roko

Nto

roko

Dis

tric

t Rds

--

43-

--

--

-32

.511.

5-

1N

toro

koK

anar

a TC

Rds

--

11-

-2.

58.

1-

-2.

53.

3-

-N

toro

koK

arug

utu

TC R

ds-

-21

.6-

-5

5-

-6.

39

44

-N

toro

koRw

ebis

engo

TC

Rds

--

6-

-2.

67.

4-

-2.

67.

4-

--

Nto

roko

Kib

uuku

TC

Rds

--

20-

-6.

56

--

0.5

3.7

--

-N

toro

koN

toro

ko C

ARS

--

--

--

--

--

--

--

Nto

roko

Tot

al-

-10

1.6-

-16

.626

.5-

-44

.335

44

1N

tung

amo

Kit

we

TC R

ds.

--

--

--

--

--

--

--

--

Ntu

ngam

oRu

baar

e TC

Rds

.-

--

--

--

--

--

--

--

-N

tung

amo

Rwas

ham

aire

TC

Rds

.-

--

--

--

--

--

--

--

-N

tung

amo

Ntu

ngam

o TC

--

8.5

17.3

--

107

--

--

--

33

Ntu

ngam

oN

tung

amo

CA

Rs-

--

--

--

--

--

--

--

-

148

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)

Ntu

ngam

oN

tung

amo

Dis

tric

t Rd

s.-

-94

.394

.3-

-50

161.2

--

--

--

--

Ntu

ngam

o To

tal

--

102.

8111

.6-

-60

168.

2-

--

--

-3

3N

tung

aMC

Ntu

ngam

o M

CN

tung

amo

MC

Tot

alN

woy

aN

woy

a D

istr

ict R

ds.

--

198

198

--

167.

516

7.5

--

2121

--

1818

Nw

oya

Nw

oya

TC R

ds.

--

3.3

3.3

--

--

--

3.7

3.7

--

1212

Nw

oya

Nw

oya

CA

Rs-

-65

.565

.5-

--

--

--

--

--

-N

woy

a To

tal

--

266.

826

6.8

--

167.

516

7.5

--

24.7

24.7

--

3030

Otu

keO

tuke

Dis

tric

t Rds

.-

-15

715

7-

-10

076

--

21

--

--

Otu

keO

tuke

TC

Rds

.-

-39

39-

-16

13-

-1

1-

--

-O

tuke

Otu

ke C

ARs

--

131

131

--

--

--

--

--

--

Otu

ke T

otal

--

327

327

--

11689

--

32

--

--

Oya

mO

yam

Dis

tric

t Rds

.-

-52

0.5

520.

5-

-23

6-

--

--

--

-O

yam

Oya

m T

C R

ds.

--

1817

.5-

--

--

-4.

92.

8-

--

-O

yam

Oya

m C

ARs

--

--

--

--

--

8.4

--

--

-O

yam

Tot

al-

-53

853

8-

-23

6-

-13

3-

--

-Pa

der

Pade

r Dis

tric

t Rds

.39

8.4

19-

-10

9-

--

37.8

19-

--

-Pa

der

Pade

r TC

Rds

.-

--

-0.

9-

--

2.5

--

--

-Pa

der

Pade

r CA

Rs-

--

--

--

--

--

--

-Pa

der T

otal

--

398.

419

--

109.

9-

--

40.3

19-

--

-Pa

llisa

Palli

sa D

istr

ict R

ds.

--

350

121.2

--

106

94.3

--

25-

--

--

Palli

saPa

llisa

TC

Rds

.-

-64

.652

.2-

-13

10.5

--

1.70.

3-

--

-Pa

llisa

Palli

sa C

ARS

--

--

--

--

--

--

--

--

Palli

sa T

otal

--

414.

617

3.4

--

11910

4.8

--

26.7

0.3

--

--

Raka

iRa

kai D

istr

ict R

ds.

--

519.

245

3.3

--

402

--

21-

--

--

Raka

iRa

kai T

C R

ds.

--

--

--

4.4

--

--

0.5

--

--

Raka

iKy

oter

a TC

Rds

.-

-1.4

5.6

--

--

--

1.40.

5-

-30

-Ra

kai

kalis

o TC

Rds

.-

-3.

5-

--

--

--

413

.5-

-40

-Ra

kai

Raka

i CA

Rs-

--

--

--

--

--

--

--

-Ra

kai

Tota

l-

-52

4.1

458.

9-

-44

.42

--

26.4

14.5

--

70-

Rubi

rizi

Rubi

rizi

Dst

Rds

--

128

30-

-35

191.2

--

--

-Ru

biri

ziK

ater

era

TC R

ds-

-22

22-

-5

6.4

3.4

0.7

--

3-

Rubi

rizi

Rubi

rizi

TC

Rds

--

265.

4-

-7

161.6

0.5

--

5-

Rubi

rizi

Rubi

rizi

CA

Rs-

--

--

-24

--

--

--

-Ru

biri

zi T

otal

--

176

57.4

--

7141

.421

1.2-

-8

-Ru

kung

iri

Ruku

ngir

i TC

Rds

.-

--

--

--

--

--

--

--

-

149

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)Ru

kung

iri

Ruku

ngir

i Dis

t Rds

--

100

30.8

--

124

117.6

--

--

--

-1

Ruku

ngir

iRu

kung

iri C

ARs

--

--

--

--

--

--

--

-54

Ruku

ngir

i Tot

al-

-10

030

.8-

-12

4117

.6-

--

--

--

55Ru

kung

iri

MC

Ruku

ngir

i Mc

--

73.4

22.7

--

56.1

48.2

0.4

0.4

11.6

11.2

11

9110

1

Ruku

ngir

i MC

Tot

al-

-73

.422

.7-

-56

.148

.20.

40.

411.

611.

21

191

101

Sem

babu

leSe

mba

bule

Dis

t. Rd

s-

-22

1.446

.5-

-92

3.1

--

155

--

--

-Se

mba

bule

Mat

ete

T. C

.-

-20

4.5

--

11-

--

2-

--

--

Sem

babu

leSe

mba

bule

T. C

.-

-18

.26.

3-

-11.

84.

5-

--

2.6

--

--

Sem

babu

leSe

mba

bule

CA

Rs-

--

--

--

--

--

--

-Se

mba

bule

Tot

al-

-25

9.2

57.3

--

114.8

7.6

--

157

2.6

--

--

Sere

reSe

rere

Dis

tric

t Rds

.-

-24

5.2

131.3

--

33.1

32.3

0.8

0.6

7.2

3.7

--

704

Sere

reK

asilo

TC

Rds

.-

-14

.46

--

3.6

2.8

--

1.31.4

--

--

Sere

reSe

rere

TC

Rds

.-

-51

.712

.6-

-2.

51.3

0.8

0.6

2.1

2.3

--

704

Sere

reSe

rere

CA

RS-

-79

78.2

--

--

--

--

--

--

Sere

re T

otal

--

390.

322

8-

-39

.236

.41.6

1.210

.67.

4-

-14

08

Shee

ma

Shee

ma

Dst

Rds

--

--

--

121

20-

--

--

--

-Sh

eem

aBu

gong

i TC

Rds

--

6757

.9-

-18

20-

--

--

--

-

Shee

ma

Kab

woh

e It

ende

ro T

C

Rds

--

17.4

--

--

--

--

--

--

-

Shee

ma

Kib

ingo

TC

Rds

--

--

--

3121

.1-

--

--

--

-Sh

eem

aSh

eem

a TC

Rds

--

6260

.2-

--

--

--

--

--

34Sh

eem

aSh

eem

a C

ARs

--

--

--

56-

--

--

--

--

Shee

ma

Tota

l-

-14

6118

.1-

-22

679

.1-

--

--

--

34Si

ronk

oSi

ronk

o D

istr

ict R

ds.

--

226

226

--

48.9

48.4

--

6.5

3-

-78

-Si

ronk

oSi

ronk

o TC

Rds

.-

-15

.115

.1-

-5.

7-

--

1.32.

81

178

-Si

ronk

oBu

dadi

ri T

C R

ds.

--

2222

--

3.3

3.3

--

4.1

5.7

--

--

Siro

nko

Siro

nko

CA

Rs-

-50

--

--

--

--

--

--

-Si

ronk

o To

tal

--

313.

126

3.1

--

57.9

51.7

--

11.9

11.5

11

156

-So

roti

Soro

ti D

istr

ict R

ds-

-16

2.2

10-

-47

.240

.1-

-18

72-

--

-So

roti

Soro

ti C

ARS

--

75.8

--

-47

.240

.1-

--

--

--

-So

roti

Tot

al-

-23

810

--

47.2

40.1

--

1872

--

--

Soro

ti M

CSo

roti

Mc

--

--

--

--

--

--

--

--

Soro

ti M

C T

otal

--

--

--

--

--

--

--

--

Toro

roTo

roro

Dis

tric

t Rds

.-

-59

5.3

99-

-77

184

--

228

--

17-

Toro

roM

alab

a TC

Rds

.-

-21

21-

-6.

36

--

37-

--

-25

Toro

roN

agon

gera

TC

Rds

.-

-27

27-

-9.

69.

6-

-5.

5-

--

96-

150

Ann

ex 1

0: P

hysi

cal P

erfo

rman

ce o

f DU

CAR

Des

igna

ted

Agen

cies

in F

Y 20

15/1

6

Dis

tric

tD

esig

nate

d A

genc

y

Rou

tine

Man

ual

Rou

tine

Mec

hani

sed

Peri

odic

Mai

nten

ance

Bri

dges

Culv

erts

Pla

nned

R

MM

(P

)

Act

ual

RM

M

(P)

Pla

nned

R

MM

(U

P)

Act

ual-

RM

M (U

P)

Pla

nned

R

MeM

(P

)

Act

ual

MeM

(P

)

Pla

nned

R

MeM

(U

P)

Act

ual

MeM

(U

P)

Pla

nned

P

M (P

)A

ctua

l P

M (P

)P

lann

ed

PM

(UP

)

Act

ual

PM

(U

P)

Pla

nned

B

ridg

esA

ctua

l B

ridg

esP

lann

ed

Culv

erts

Act

ual

Culv

erts

(L

ines

)To

roro

Toro

ro C

ARs

--

8949

--

--

--

--

--

--

Toro

ro T

otal

--

732.

319

6-

-92

.922

8.8

--

64.5

8-

-113

25To

roro

MC

Toro

ro M

c-

--

--

--

--

--

--

--

-To

roro

MC

Tot

al-

--

--

--

--

--

--

--

-W

akis

oW

akis

o D

st R

ds-

-44

1.544

1-

-20

9.9

192.

3-

-13

.112

.4-

--

-W

akis

oK

akir

i TC

Rds

--

20.2

35.6

--

54.

4-

-4.

52

--

--

Wak

iso

Kir

a TC

Rds

--

--

--

--

-2.

32

515

--

Wak

iso

Mas

uliit

a TC

Rds

--

27.3

27.3

--

--

--

45.

2-

1-

-W

akis

oN

amay

umba

TC

Rds

--

17.1

15.3

--

--

--

5.2

--

--

-W

akis

oN

ansa

na T

C R

ds-

-8.

98.

9-

-4.

1-

--

1.24.

41.2

2.4

--

Wak

iso

Wak

iso

TC R

ds-

-6.

93.

5-

-2.

55

67.

32.

2-

12

--

Wak

iso

Wak

iso

CA

RS1.8

3.4

138.

9-

--

79.4

-1.2

1.2-

--

--

-W

akis

o To

tal

1.83.

466

0.8

531.6

--

300.

920

1.77.

28.

532

.526

.917

.220

.4-

-Yu

mbe

Yum

be D

istr

ict R

ds.

--

283

283.

2-

-35

2-

--

--

37

4Yu

mbe

Yum

be T

C R

ds.

--

21.5

--

--

--

-4.

9-

--

76

Yum

beYu

mbe

CA

Rs-

--

--

--

--

--

--

-14

-Yu

mbe

Tot

al-

-30

4.5

283.

2-

-35

2-

-4.

9-

-3

2810

Zom

boZo

mbo

Dis

t Rds

--

--

--

22.2

16.5

--

25.7

14-

--

-Zo

mbo

Zom

bo T

C R

ds-

--

--

-10

13-

--

0.2

--

--

Zom

boPa

idha

TC

Rds

-0.

20.

2-

--

0.2

--

-0.

20.

2-

--

-Zo

mbo

Zom

bo C

ARs

--

--

--

--

--

--

-6

66

Zom

bo T

otal

-0.

20.

2-

--

32.4

29.9

--

25.9

--

151Annex 11: DUCAR Network Periodic Maintenance by Road

Annex 11:

DUCAR Network Periodic Maintenance

by Road

152 Annex 11: DUCAR Network Periodic Maintenance by Road

Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

611 Agago Town Council Latigo Alboro- District H/Q Earth 0.4 Regravelling & drainage works611 Agago Town Council Agago A Earth 1.6 Regravelling & drainage works

Sub- Total 2.0564 Amolatar DLG Nabweyo -Gojwe L/S road U 7.0 Regravelling & drainage works

Sub- Total 7.0509 Hoima DLG Bujawe-Kasenyi-Nyakabingo Earth 12 Grading & drainage works509 Hoima DLG Ruhunga-Kabaale Earth 7.0 Grading & drainage works509 Hoima DLG Kihombya-Kyarubanga-Kahoojo Earth 8.0 Grading & drainage works

Sub- Total 27558 Ibanda DLG Omukaceeri-Omuka-

hate-RushangoU 7.5 Regravelling & drainage works

558 Ibanda DLG Nyarukiika Market-Kyeitana Community Access Road

U 1.3 Regravelling & drainage works

Sub- Total 8.8593 Luuka Town Council A Welukwagana-Busimawo Earth 2.2 Grading & gravelling593 Luuka Town Council A School lane Earth 1.0 Grading & gravelling593 Luuka Town Council A Wunhi Earth 1.1 Grading & gravelling593 Luuka Town Council A Mukasa Earth 0.7 Grading & gravelling593 Luuka Town Council A Luwano close Earth 0.1 Grading & gravelling

Sub- Total 5.1532 Luwero DLG Bunkembya- Nakusubyaki Earth 5.7 Regravelling & drainage works532 Luwero DLG Wobulenzi- Bukalasa- Waluleta Earth 9.0 Regravelling & drainage works532 Luwero DLG Butuntumula- Lubenge Earth 11.2 Regravelling & drainage works532 Luwero DLG Bamunanika- Wabitungulu Earth 10.6 Regravelling & drainage works532 Luwero DLG Kasana- Lugogo Earth 6.7 Regravelling & drainage works532 Luwero DLG Bombo- Kalagala Earth 9.0 Regravelling & drainage works

Sub- Total 52.2532 Luwero TC Semanda Road Earth 1.1 Grading & regravelling532 Luwero TC Kyebakutiika Earth 0.8 Grading & regravelling532 Luwero TC Abby Mukwaya Rd Earth 0.2 Grading & regravelling532 Luwero TC Abdul Kasoma Earth 0.1 Grading & regravelling

Sub- Total 2.2532 Wobulenzi Town Council Alinswar road Gravel 1.2 Grading & regravelling532 Wobulenzi Town Council Tweyanze Road Earth 3.6 Grading & regravelling532 Wobulenzi Town Council Kikoma road Earth 2.1 Grading & regravelling532 Wobulenzi Town Council Kigulu road Earth 4.9 Grading & regravelling

Sub- Total 10.6532 Luwero CARs Bamunanika Earth 2.1 Grading & drainage works532 Luwero CARs Bamunanika Earth 1.5 Grading & drainage works532 Luwero CARs Butuntumula Earth 1.5 Grading & drainage works532 Luwero CARs Butuntumula Earth 1.9 Grading & drainage works532 Luwero CARs Kalagala Earth 1.5 Grading & drainage works532 Luwero CARs Kalagala Earth 2.2 Grading & drainage works532 Luwero CARs Kamira Earth 1.5 Grading & drainage works532 Luwero CARs Kamira Earth 1.5 Grading & drainage works532 Luwero CARs Katikamu Earth 1.5 Grading & drainage works532 Luwero CARs Katikamu Earth 1.5 Grading & drainage works532 Luwero CARs Kikyusa Earth 1.5 Grading & drainage works532 Luwero CARs Kikyusa Earth 1.5 Grading & drainage works532 Luwero CARs Kikyusa Earth 1.5 Grading & drainage works532 Luwero CARs Kikyusa Earth 1.5 Grading & drainage works532 Luwero CARs Luwero Earth 1.6 Grading & drainage works532 Luwero CARs Luwero Earth 1.5 Grading & drainage works532 Luwero CARs Makulubita Earth 1.8 Grading & drainage works532 Luwero CARs Makulubita Earth 1.5 Grading & drainage works532 Luwero CARs Nyimbwa Earth 1.6 Grading & drainage works532 Luwero CARs Nyimbwa Earth 1.6 Grading & drainage works

153Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

532 Luwero CARs Zirobwe Earth 2.0 Grading & drainage works532 Luwero CARs Zirobwe Earth 1.8 Grading & drainage works

Sub- Total 36.1544 Nakasongola Mamba-Kachanga Earth 4.75 Regravelling & drainage works

Sub- Total 4.75544 Nakasongola TC Wabinyonyi 2 -Kirabo (Kabe-

ja-Bakambi)Earth 0.8 Grading

544 Nakasongola TC Kazwama - Kirabo Earth 1.6 Grading544 Nakasongola TC Sebizi - Church road Earth 0.6 Grading544 Nakasongola TC Matuugo - Kasirye road Earth 1.8 Grading

Sub- Total 4.8544 Kakooge TC Bandikubi Lane Gravel 0.5 Grading & regravelling544 Kakooge TC Kyabutaika - Kiriisa- Kamukamu Gravel 2.3 Grading & regravelling544 Kakooge TC Kazzi – Kabale – Namunkanga Gravel 2.7 Grading & regravelling544 Kakooge TC Kibira - Kisiski BC Gravel 0.6 Grading & regravelling

Sub- Total 6.1544 Migeera TC Kyabachezi Earth 1.0 Grading & regravelling544 Migeera TC Kakuru Earth 0.4 Grading & regravelling544 Migeera TC Kiberu Earth 0.4 Grading & regravelling544 Migeera TC Kyakala - Nalukonge Earth 1.0 Grading & regravelling544 Migeera TC Lwamuhuku – Quary Earth 0.3 Grading & regravelling544 Migeera TC Dembe Earth 0.2 Grading & regravelling

Sub- Total 3.3543 Nakapiripirit DLG Nakapiripirit- Tokora road Gravel 8.0 Grading & drainage works543 Nakapiripirit DLG Namalu- Nabulenger road Gravel 8.0 Grading & drainage works

Sub Total 16.0543 Nakapiripirit Town Coun-

cil AMarket road Gravel 1.0 Grading

Sub Total 1.0543 Nakapiripirit CARs Kamaturu- Lokwakwa road Earth 1.5 Grading543 Nakapiripirit CARs Okirimo- Naupala & Nabilatuk

township p/sEarth 1.3 Grading

543 Nakapiripirit CARs Lolachat- Natirae road Earth 1.0 Grading543 Nakapiripirit CARs Kakomongole S/C Headquarter Earth 6.0 Grading543 Nakapiripirit CARs Lemusui- Doo road Earth 5.0 Grading543 Nakapiripirit CARs Loreng- Aoyareng road Earth 4.0 Grading543 Nakapiripirit CARs Lokitela- Loukwa road Earth 2.0 Grading

Sub Total 20.8604 Napak DLG Iriiri - Napak U 15 Grading & regravelling604 Napak DLG Kalotom - Natapari U 9 Grading & regravelling

Sub- Total 24555 Wakiso DLG Kawanda - Kayunga U 6.4 Regravelling & drainage works555 Wakiso DLG Nsangi - Buloba U 4.7 Regravelling & drainage works555 Wakiso DLG Namasuba – Ndejje - Gombe U 1.0 Grading & drainage works555 Wakiso DLG Nakusaze-Kiwande-Gombe U 2.0 Grading & drainage works

Sub- Total 14.1 555 Kiira TC Kira - Kiwologoma U 1.2 Sealing & drainage works555 Kiira TC Kira – Kamuli - Naalya P 2.3 Resealing555 Kiira TC Najeera - Kungu U 0.5 Resealing555 Kiira TC Azam - Makanga - Gwatiro U 0.4 Resealing555 Kiira TC Bethany Road P 0.6 Edge repairs555 Kiira TC Namugongo – Buto P 3.9 Edge repairs555 Kiira TC Kira – Najeera P 3.8 Edge repairs555 Kiira TC Plofra Road P 0.6 Edge repairs555 Kiira TC Bweyogerere – Buto P 2.6 Edge repairs555 Kiira TC Welcome Road P 1.2 Edge repairs

Sub- Total 17.1555 Nansana TC Western Ring Road phase III

(2nd P 1.2 Others

154 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

555 Nansana TC Naluuma Road U 1.2 Grading & sealing555 Nansana TC Naluuma Road U 1.2 Drainage works555 Nansana TC Nansana – Nabweru - Kawala U 0.8 Drainage works

Sub- Total 4.4 555 Kakiri TC Southern Bypass U 1.5 Grading & regravelling

Sub- Total 1.5555 Wakiso TC Gombe – Kayunge U 1.8 Regravelling555 Wakiso TC Mayors Road U 0.35 Regravelling555 Wakiso TC Kkoona – Kavumba U 0.5 Regravelling555 Wakiso TC PHEOBE Road U 0.3 Regravelling555 Wakiso TC Gombe Kitasa U 0.8 Regravelling555 Wakiso TC Choice Road U 2.5 Regravelling555 Wakiso TC Nayasa Kasengejje U 2.2 Regravelling

Sub- Total 8.45555 Namayumba TC Kasooma Road U 1.4 Regravelling & drainage works

Sub- Total 1.4555 Masulita TC Masulita Round about U 1.0 Regravelling & drainage works555 Masulita TC Kiziba - Kikota U 3.0 Regravelling & drainage works

Sub- Total 4.0586 Otuke DLG Nam- Agago Earth 4.0 Drainage works

Sub- Total 4.0548 Pallisa DLG Pallisa – Gogonyo U 10.2 Grading & drainage works548 Pallisa DLG Kamuge-Kalapata-Boliso U 1 Grading & drainage works548 Pallisa DLG Odusai- Chelekura U 1 Grading & drainage works548 Pallisa DLG Kibale- Akisim U 2 Grading & drainage works548 Pallisa DLG Gogonyo-Agule U 1 Grading & drainage works

Sub- Total 15.2548 Town Council A Gogonyo Road U 0.3 Grading & drainage works

Sub- Total 0.3592 Kiryandongo TC. Bagonza Street U 1.3 Regravelling & drainage works592 Kiryandongo TC. Industrial Street U 1.2 Regravelling & drainage works592 Kiryandongo TC. Kiirya Street U 1.0 Regravelling & drainage works592 Kiryandongo TC. Yonna Besisira Road U 0.2 Regravelling & drainage works592 Kiryandongo TC. Down Town Close U 0.2 Regravelling & drainage works

Sub total 3.9592 Kigumba TC Onya – Madina Road U 0.5 Regravelling & drainage works592 Kigumba TC Kinali Road U 0.7 Regravelling & drainage works592 Kigumba TC Irumba Road U 0.2 Regravelling & drainage works592 Kigumba TC Col. Byakagaba Extn. U 1.3 Regravelling & drainage works592 Kigumba TC Omonyi Road U 0.9 Regravelling & drainage works

Sub total 3.6592 Bweyale TC Okwir Road U 1.3 Regravelling & drainage works592 Bweyale TC Kichwabumgingo Kabasosolo U 2.8 Regravelling & drainage works592 Bweyale TC Okot Simon Nyakadoti road U 1.7 Regravelling & drainage works

Sub total 5.8592 Kiryandongo CARs Apodorwa -Kigangara U 4.0 Grading & drainage works592 Kiryandongo CARs Mboira-Kemenzu U 4.0 Drainage works592 Kiryandongo CARs Kirongolo-kooki-kabonyi&Nyabi-

iso Nyakagando U 5.0 Grading & drainage works

592 Kiryandongo CARs Kaduku I - Kaduku II U 1.0 GradingSub total 14.0

510 Iganga DLG C.MS Luyira Gravel 6 Regravelling510 Iganga DLG Nabitende-Kasambika-Namusisi Gravel 10.15 Regravelling510 Iganga DLG Busoga - Buligo Gravel 2.0 Regravelling & drainage works510 Iganga DLG Mulondo Tembo Gravel 2.2 Regravelling & drainage works

Sub total 20.35510 Busembatia TCA Kitandwe Earth 1.2 Gravelling510 Busembatia TCA Kakuma Earth 0.2 Gravelling510 Busembatia TCA Motbai Earth 0.6 Gravelling

155Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

510 Busembatia TCA Walera Earth 0.7 Gravelling510 Busembatia TCA Yokana Earth 0.8 Gravelling510 Busembatia TCA Waikaire Earth 0.6 Gravelling

Sub total 4.1529 Kumi DLG Kodokoto-Acapa-Akadot Gravel 6.0 Regravelling & drainage529 Kumi DLG Atutur-Ariet-Kanapa Gravel 5.0 Regravelling & drainage529 Kumi DLG Okoupa-Akarukei-Odiding Gravel 5.0 Regravelling & drainage

Sub total 16.0529 Kumi TC Emodaingat road Gravel 0.5 Regravelling529 Kumi TC Osirim road Gravel 0.8 Regravelling529 Kumi TC Oumo road Gravel 0.2 Regravelling529 Kumi TC Okunya road Gravel 0.1 Regravelling529 Kumi TC Okalebo road Gravel 0.4 Regravelling529 Kumi TC Agoos road Gravel 0.5 Regravelling

Sub total 2.5585 Lamwo DLG Lugwar- Paracelle Gravel 16.5 Regravelling & drainage works

Sub total 16.5585 Lamwo Town Council A Olebi- Pakalabule Earth 3.0 Regravelling & drainage works585 Lamwo Town Council A Olebi- okora Earth 1.0 Regravelling & drainage works585 Lamwo Town Council A Prison- Senior Qtrs Road Earth 1.0 Regravelling & drainage works585 Lamwo Town Council A Eng. Hillary Onek Road Earth 1.0 Regravelling & drainage works

Sub total 6.0597 Kyankwanzi DLG Kiyuni - Kikubya - Kitooke U 13.1 Regravelling & drainage works

Sub- Total 13.1597 Butemba Town Council Kaseeta - Bugaba (Kinawoga

swamp)U 1.0 Grading & drainage works

Sub- Total 1.0597 Kyankwanzi CARs Nsambya (Katungo - Kingalama -

Kakwampale)U 3.0 Grading & regravelling

597 Kyankwanzi CARs Kyankwanzi (Lusozi - Sunga) U 2.5 Grading & regravelling597 Kyankwanzi CARs Wattuba (Kasambya B - Kiryama-

sansa)U 2.5 Grading & regravelling

597 Kyankwanzi CARs Mulagi (Kakuto - Kitagona) U 1.5 Grading & regravelling597 Kyankwanzi CARs Ntwetwe / Kitabona (Nkagi -

Kiwawa - Kiyanja)U 3.0 Grading & regravelling

597 Kyankwanzi CARs Gayaza (Kitebika - Kikubya) U 2.5 Grading & regravelling597 Kyankwanzi CARs Butemba (Bisiika - Namukozi) U 2.0 Grading & regravelling597 Kyankwanzi CARs Bananywa (Kiryanongo - Ntun-

da)U 3.0 Grading & regravelling

597 Kyankwanzi CARs Nkandwa (Kabuuwuka west - Nakalama)

U 0.5 Grading & regravelling

Sub- Total 20.5530 Kyenjojo DLG Nyamabuga-Munobwa Road Earth 11.4 Grading & drainage works530 Kyenjojo DLG Nyarukoma-Kyakatwire Road Earth 11.4 Grading & drainage works530 Kyenjojo DLG Mabira-Kisansa Road Earth 17.3 Grading & drainage works530 Kyenjojo DLG Kaiso-Mukole Road Earth 22 Grading & drainage works530 Kyenjojo DLG Bihehe-Mugoma-Mbale Road Earth 8.6 Grading & drainage works530 Kyenjojo DLG Emmergency road maintenance

worksEarth 3.6 Grading & drainage works

Sub- Total 74.3584 Kyegegwa DLG584 Kyegegwa Town Council A Katente- Nyamuhanami U 6.0 Grading & drainage works584 Kyegegwa Town Council A Nyansore- Kasekere B U 3.1 Grading & drainage works584 Kyegegwa Town Council A Rwera- Mubwaro U 2.0 Grading & drainage works

Sub- Total 11.1533 Masaka DLG Bulayi-Kigaato U 5.1 Regravelling & drainage works533 Masaka DLG Bunnadu-Kaziru U 3.48 Regravelling & drainage works533 Masaka DLG Mitemula-Nakiyaga U 12.89 Regravelling & drainage works533 Masaka DLG Kanywa-Minyinya-Nkuke U 4.6 Regravelling & drainage works533 Masaka DLG Lwakaddu-Kyanjale U 10.71 Regravelling & drainage works

156 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

533 Masaka DLG Lwannunda-Ggulama U 5.56 Regravelling & drainage works533 Masaka DLG Matanga-Ddegeya U 2.92 Regravelling & drainage works

Sub total 45.26533 Masaka CARs Kasanje-Mukuuma U 3.3 Grading & drainage works533 Masaka CARs Ggulama-Nabinene U 1.6 Grading & drainage works533 Masaka CARs Nyondo-Birondo-Ferecio-Jamula U 4.4 Grading & drainage works533 Masaka CARs Kyanjovu-Kamyufu U 0.7 Grading & drainage works533 Masaka CARs Bisanje-Kagganda-Kasaali-Kyan-

jaleU 6.1 Grading & drainage works

533 Masaka CARs Kyanakase-Kasenyi U 4.3 Grading & drainage works533 Masaka CARs Nakitalaka-Kanogero-Mirundu U 4 Grading & drainage works533 Masaka CARs Lwemode-Bunyuma U 1.8 Grading & drainage works533 Masaka CARs Katikamu-Nabitaka-Kalokoso U 2.9 Grading & drainage works533 Masaka CARs Wakasonko-Mitemula U 3 Grading & drainage works533 Masaka CARs Ndegeya-Kalundira U 2.1 Grading & drainage works533 Masaka CARs Ndegeya-Kyaali/Nsomoko U 4.5 Grading & drainage works533 Masaka CARs Kasaana-Kalagala U 1.7 Grading & drainage works

Sub total 40.4 539 Moyo DLG Celecelea-Lama U 7.4 Regravelling & drainage works

Sub total 7.4552 Sironko DLG Buwer-Bumumuloi U 1 Grading & regravelling552 Sironko DLG Buwalasi S/C-Buwalasi TTC U 2 Grading & regravelling

Sub total 3552 Sironko T/C Kibira U 2.1 Grading & regravelling552 Sironko T/C Santu U 1.5 Grading & regravelling

Sub total 3.6552 Budadiri T/C Erias Gidud U 1.1 Grading & regravelling552 Budadiri T/C Nangodi-Gubi U 0.6 Grading & regravelling

Sub total 1.7553 Soroti DLG Arapai-Katine-Tubur U 18.0 Regravelling & drainage works

Sub- Total 18.0569 Nakaseke DLG Namilali-Katalekamese Gravel 4.2 Regravelling

Sub- Total 4.2569 Nakaseke Butalangu T/C Bwetagiro-Lukuga Earth 2.1 Regravelling & drainage works569 Nakaseke Butalangu T/C Nakonge-Mission Earth 1.3 Regravelling & drainage works

Sub total 3.4569 Nakaseke TC Mawejje Earth 2.0 Grading & regravelling569 Nakaseke TC SAB (Annexed to Mawejje) Earth 0.4 Grading & regravelling569 Nakaseke TC Musimbago Earth 0.5 Grading & regravelling

Sub total 2.9569 Ngoma TC Rulanga Earth 0.5 Grading & drainage works569 Ngoma TC Catholic Earth 0.5 Grading & drainage works

Sub total 1.0569 Kiwoko TC Kiwoko-Kabulwa Earth 0.5 Grading & regravelling569 Kiwoko TC Kyeswa-Kiko Earth 0.9 Grading & regravelling569 Kiwoko TC Kiko-Bujjubya Earth 0.4 Grading & regravelling569 Kiwoko TC Lukabwe-All Saints Earth 0.5 Grading & regravelling569 Kiwoko TC All Saints- Lwabijjogo Earth 0.6 Grading & regravelling569 Kiwoko TC All Saints- Lwabijjogo B Earth 0.5 Grading & regravelling569 Kiwoko TC All Saints- Hospital fence Earth 0.4 Grading & regravelling569 Kiwoko TC Wabitunda- Ngoma Earth 1.1 Grading & regravelling

Sub total 4.9569 Semuto TC Kimegeredde- Kijjaguzo Earth 0.6 Grading & regravelling569 Semuto TC SDA- Kambugu Earth 0.6 Grading & regravelling

Sub total 1.2524 Kibaale DLG Munsa-Nkondo U 11 Regravelling & drainage works524 Kibaale DLG Nyabarogo swamp U 1 Regravelling & drainage works

Sub total 12603 Ngora DLG Mukura- Ngora U 0.8 Regravelling & drainage works

157Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

603 Ngora DLG Akeit- Akisim U 0.4 Regravelling & drainage works603 Ngora DLG Mukura- Nyero U 0.7 Regravelling & drainage works

Sub total 1.9603 Ngora TC St Aloysius road U 1.0 Regravelling & drainage works603 Ngora TC William lane U 0.3 Regravelling & drainage works603 Ngora TC Ekurao road U 0.2 Regravelling & drainage works

Sub total 1.5563 Koboko DLG Indiga- bamure U 8 Regravelling & drainage works

Sub- Total 8563 Koboko TC Prison-Galla U 0.8 Regravelling & drainage works563 Koboko TC Lipa-Mika U 3 Regravelling & drainage works

Sub- Total 1.1565 Amuria DLG Amosing-Okoboi U 22 Regravelling & drainage works

Sub- Total 22565 Amuria TC School road U 0.9 Regravelling & drainage works565 Amuria TC Ousi road U 0.75 Regravelling & drainage works

Sub- Total 1.65565 Amuria CARs Amaseniko- Anyangareng U 4 Grading565 Amuria CARs Angopet- Akoromit P/S U 4 Grading565 Amuria CARs Town Board roads U 1 Grading565 Amuria CARs Abaniela- Angerepo U 1 Grading565 Amuria CARs Takaramyem- Ooditel U 6 Grading565 Amuria CARs Akeriau- Okude U 4 Grading

Sub- Total 20560 Isingiro DLG560 Isingiro TC Kyabishaho-Ngando Road U 1.2 Regravelling & drainage works560 Isingiro TC Ryakatimba- Nyakisharara road U 1.8 Regravelling & drainage works

Sub- Total 3.0560 Kaberebere TC Milo Mushanju- Kyenyangi Road U 3.7 Regravelling & drainage works

Sub- Total 3.7 560 Kabuyanda Town Council Iryango - Sekibu Road U 1.8 Regravelling & drainage works

Sub- Total 1.8511 Jinja DLG Lubanyi-Buwenge U 3.8 Grading & drainage works511 Jinja DLG Mafubira-Butiki U 4.4 Grading & drainage works

Sub- Total 8.2511 Bugembe Town Council Kisenyi road U 1.2 Grading & drainage works511 Bugembe Town Council Nviiri-Yalunbe road U 0.5 Grading & drainage works511 Bugembe Town Council Maternity road U 0.7 Grading & drainage works511 Bugembe Town Council Old wanyange U 1 Grading & drainage works

Sub- Total 3.4511 Kakira Town Council A Drainage Polota U 0.12 Grading & drainage works

Sub- Total 0.12511 Buwenge Town Council A Waidha Road U 1.4 Grading & drainage works511 Buwenge Town Council A Mukodha U 0.2 Grading & drainage works511 Buwenge Town Council A Kiswa, LandMark, St.Luke U 2.0 Grading & drainage works

Sub- Total 3.6511 Jinja CARs Idwenge-Naikazi U 0.8 Grading511 Jinja CARs Namizi-Budagali U 1.3 Grading511 Jinja CARs Arab-Buyala U 2.0 Grading511 Jinja CARs Bufula-Namansa U 2.5 Grading511 Jinja CARs Lukwita-Kagoma H/W U 1.0 Grading511 Jinja CARs Mawaito-Mulambe U 1.0 Grading511 Jinja CARs Buwolero-Idome U 1.5 Grading511 Jinja CARs Igombe-Mpoya U 3.0 Grading511 Jinja CARs Kiwagama-matumu road U 7.0 Grading & drainage works511 Jinja CARs Kiko-Budoma U 2.0 Grading511 Jinja CARs Nabirama-Kasozi U 2.0 Grading511 Jinja CARs Kadaya-St.Benedict U 2.0 Grading511 Jinja CARs Nkuutu road U 1.0 Grading

158 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

511 Jinja CARs Waguma-Sakabusubo U 2.0 Grading511 Jinja CARs Nakabango-Lwanda U 3.2 Grading511 Jinja CARs Budhobya-Busegula U 1.0 Grading511 Jinja CARs Budhobya-Nakitokolo U 1.5 Grading511 Jinja CARs Namisota-Kamigo U 2.0 Grading511 Jinja CARs Bukoloioboza-Nawambogo U 1.5 Grading

Sub- Total 38.3560 Kiruhura DLG Bugarihe-Kagaramira-Nkungu U 16.0 Grading & drainage works560 Kiruhura DLG Akayanja-Keikoti U 10.0 Grading & drainage works

Sub- Total 26.0560 Kiruhura Town Council Kashwa-Soweto U 4.3 Grading & regravelling

Sub- Total 4.3560 Sanga Town Council Veterinary streets U 4.0 Grading & drainage works

Sub- Total 4.0560 Kazo Town Council Kabigyema U 0.3 Grading & regravelling560 Kazo Town Council Kihika U 0.2 Grading & regravelling560 Kazo Town Council Kirimani U 0.2 Grading & regravelling560 Kazo Town Council Ruzinga Road U 3.0 Grading & regravelling

Sub- Total 3.7560 Kiruhura CARs All sub county roads U 79 Grading & regravelling

Sub- Total 79512 Kabale DLG512 Town Council A Kakatunda- Nyakanengo- Ibugwe Earth 2.5 Grading & drainage works512 Town Council A Kabura- Rwempiri U 2.0 Grading & drainage works512 Town Council A Kamuganguzi- Kitojo U 1.5 Grading & drainage works512 Town Council A Karukara- Kanyabitara- Nyaru-

teijaU 3.0 Grading & drainage works

Sub- Total 9.0513 Kabarole DLG513 Kibiito Town Council Kamara road U 1.0 Grading & drainage works513 Kibiito Town Council Josephat Mugenyi U 2.0 Grading & drainage works513 Kibiito Town Council Abel Basaija road U 4.1 Grading & drainage works

Sub- Total 7.1513 Kiko Town Council Kyamugarra road U 2.0 Grading & regravelling513 Kiko Town Council Kitabonwa road U 1.0 Grading & regravelling513 Kiko Town Council Kiko road U 1.0 Grading & regravelling513 Kiko Town Council Mparo road U 2.0 Grading & regravelling

Sub- Total 6.0513 Kijura Town Council Nsorro Kyererezi Katego U 3.5 Regravelling & drainage works

Sub- Total 3.5513 Karago Town Council Ncurrano Katunguru Katalemwa U 1.8 Regravelling & drainage works513 Karago Town Council Kitarasa Mukisenyi Kyabanyaga U 3.0 Regravelling & drainage works513 Karago Town Council Ibonde Nyakabira Mpanga Bridge U 0.6 Regravelling & drainage works

Sub- Total 5.4513 Rubona Town Council Burongo Kikaranga U 1.3 Grading & regravelling513 Rubona Town Council Rubona Katulya U 0.9 Grading & regravelling513 Rubona Town Council Rubona Kisambu U 1.5 Grading & regravelling513 Rubona Town Council Butukuru Mukyeya U 1.2 Grading

Sub- Total 4.9513 Kiboga CARs Kapeke - Katanjovu Earth 2.5 Grading & drainage works513 Kiboga CARs Biko - Kasawo Earth 2.5 Grading & drainage works513 Kiboga CARs Kisagazi - Kyakakozi Earth 3.5 Grading & drainage works513 Kiboga CARs Wabitosi - Degeya Earth 3.5 Grading & drainage works513 Kiboga CARs Bugabo - Kibira Earth 3.0 Grading & drainage works513 Kiboga CARs Sogolero-Bitibyamukasa-mwezi Earth 2.5 Grading & drainage works

Sub- Total 17.5580 Lyantonde DLG Kikasa Swamp U 2.0 Regravelling & drainage works580 Lyantonde DLG Kalyamenvu-Mpumud-

de-Buyaga-Kyemamba-KabingoU 9.0 Regravelling & drainage works

Sub- Total 11.0

159Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

580 Town Council A Kyamiyonga (Periodic) U 0.5 Regravelling & drainage works580 Town Council A Kyabuza (Periodic) U 1.0 Regravelling & drainage works

Sub- Total 1.5596 Serere DLG596 Serere TC Odeta road U 0.5 Grading & drainage works596 Serere TC Emorimor road U 0.3 Grading & drainage works596 Serere TC Iteeba road U 0.36 Grading & drainage works596 Serere TC Eriaku road U 0.3 Grading & drainage works596 Serere TC Salvation road U 0.4 Grading & drainage works596 Serere TC Serere - Bugondo road U 0.8 Grading & drainage works

Sub- Total 2.66596 Kasilo Town Council Odeng road U 0.8 Grading596 Kasilo Town Council Okupa road U 0.51 Grading

Sub- Total 1.31536 Mbale DLG Busano - Buyago U 4.5 Regravelling & drainage works536 Mbale DLG Doko - Kolonyi U 3.5 Regravelling & drainage works536 Mbale DLG Mutoto - Busimba U 2.1 Regravelling & drainage works536 Mbale DLG Nashikhaso - Namawanga U 3.5 Regravelling & drainage works536 Mbale DLG Buwalula - Nabumali U 3.0 Regravelling & drainage works

Sub- Total 16.6538 Moroto DLG Rupa- Lokeriaut road Earth 2.0 Grading

Sub- Total 2.0587 Zombo DLG Ayuda-Pakadha-Padea Earth 10 Regravelling587 Zombo DLG Nyandima-Atyak Earth 4 Regravelling

Sub- Total 14.0587 Paidha Town Council Olarker road tarmacking Earth 0.2 Sealing

Sub- Total 0.2517 Kamuli DLG Naminage-Buwala Earth 17 Grading & regravelling517 Kamuli DLG NakibunguAa-Bulopa Earth 10 Grading & regravelling517 Kamuli DLG Buwudha-Kitayunjwa Earth 14 Grading & regravelling517 Kamuli DLG Naminage-Bulange Earth 10 Grading & regravelling517 Kamuli DLG Mbulamuti-Kiswa roads Earth 23.8 Grading & regravelling517 Kamuli DLG Bugondha-Kinawampere Earth 12 Grading & regravelling517 Kamuli DLG Iganga-kiige Earth 16 Grading & regravelling517 Kamuli DLG Bulunda-Kakindu Earth 13 Grading & regravelling517 Kamuli DLG Kasambira-Bugulumbya Earth 14 Grading & regravelling517 Kamuli DLG Kisozi-Nawanyago Earth 17 Grading & regravelling517 Kamuli DLG Nabirumba-Bulopa Earth 27 Grading & regravelling

Sub- Total 173.8517 Kamuli Town Council A Wynand Earth 0.4 Grading517 Kamuli Town Council A Kyabazinga Earth 0.4 Grading517 Kamuli Town Council A Brewer Earth 1.2 Grading517 Kamuli Town Council A Mission Earth 0.5 Grading517 Kamuli Town Council A Commercial Earth 1.0 Grading517 Kamuli Town Council A Mugolo Earth 0.3 Grading517 Kamuli Town Council A Abdullar saley Earth 0.3 Grading517 Kamuli Town Council A Okurut Earth 0.4 Grading517 Kamuli Town Council A Temple Earth 0.75 Grading517 Kamuli Town Council A Cox Earth 0.3 Grading517 Kamuli Town Council A Kagoda Earth 0.2 Grading517 Kamuli Town Council A Okem Earth 0.85 Grading517 Kamuli Town Council A Sankara Earth 0.5 Grading

Sub- Total 7.1517 Kamuli CARs Butyama-Busige via Busongole in

Balawoli s/cEarth 7.0 Grading

517 Kamuli CARs Busanda-Bukula in Bugulumbya s/c

Earth 5.0 Grading

517 Kamuli CARs Roads in Bulopa T/C Earth 4.0 Grading

160 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

517 Kamuli CARs Nakanyonyi to Bugeywa in Bu-tansi S/C

Earth 5.0 Grading

517 Kamuli CARs Magogo roads in Kisozi S/C Earth 6.0 Grading517 Kamuli CARs Nawanso-Buwabaile-Butende in

Kitayunjwa S/CEarth 6.0 Grading

517 Kamuli CARs Roads in Mbulamuti TC Earth 4.0 Grading517 Kamuli CARs Kananage-Namunyingi T/C in

NabwiguluEarth 7.0 Grading

517 Kamuli CARs Bugoole via Nawankufu to Kavule trading centre in Namasagali S/C

Earth 9.0 Grading

517 Kamuli CARs Buwaibale-Butende swamp cross-ing in Namwendwa S/C

Earth 6.0 Grading

517 Kamuli CARs Busiti-Nalima in Nawanyago S/C Earth 4.0 Grading517 Kamuli CARs Luzinga-Lutebe in Wankole S/C Earth 3.5 Grading

Sub- Total 66.5519 Kanungu DLG Kambuga-Nyabushoro U 4.5 Drainage works519 Kanungu DLG Kirimbe-Kerere U 10 Drainage works

Sub- Total 14.5519 Kambuga Town Council A Kamunyu Road U 2.3 Regravelling & drainage works519 Kambuga Town Council A Katera - Nyaka Vocational U 2.2 Regravelling & drainage works519 Kambuga Town Council A Kayanga Road U 3.2 Regravelling & drainage works519 Kambuga Town Council A Nyabushoro - Mustapha Road U 2 Regravelling & drainage works

Sub- Total 9.7519 Kambuga Town Council A Mizimera-Bugongo U 1.5 Regravelling & drainage works519 Kambuga Town Council A Market-Mosque-Church of Ugan-

da roadU 1.0 Regravelling & drainage works

Sub- Total 2.5519 Butogota Town Council A Kamashwa-Biryomumisho U 0.5 Regravelling & drainage works

Sub- Total 0.5519 Kanungu Town Council A Katate (Amama road) U 0.6 Regravelling & drainage works

Sub- Total 0.6521 Kasese Town Council A Karungibate road U 1.8 Grading & gravelling521 Kasese Town Council A Kasagama close U 0.28 Grading & gravelling521 Kasese Town Council A Kisoro road U 3.8 Grading & gravelling521 Kasese Town Council A Hambumbe road U 0.8 Stone pitching521 Kasese Town Council A Kambatoto road U 1.1 Stone pitching521 Kasese Town Council A Kitandara road U 0.8 Stone pitching521 Kasese Town Council A Kikasamba road U 0.6 Grading & gravelling521 Kasese Town Council A Kyakitale road U 1.0 Grading & gravelling521 Kasese Town Council A Kabatoro zone A U 1.0 Grading & gravelling521 Kasese Town Council A Kabatoro zone B U 1.0 Grading & gravelling521 Kasese Town Council A Bwera market- Bwera SS road U 0.9 Grading & gravelling521 Kasese Town Council A Mpondwe PS- Kyabolokya I road U 2.7 Grading & gravelling521 Kasese Town Council A Bwera mosque- Pokopoko round-

about- Bwera market roadP 0.8 Drainage works

Sub- Total 16.58503 Arua DLG Invepi-Yoro-Inde U 16 Regravelling & drainage works

Sub- Total 16581 Amudat Town Council A Keikei Road U 0.4 Grading & resealing

Sub- Total 0.4571 Budaka DLG Iki-Iki-Kerekerene Gravel 7.0 NA

Sub- Total 7.0571 Budaka Town Council A Babula & Pioneer Paved 0.33 Resealing and drainage works571 Budaka Town Council A Stone Pitching (Taxi Park En-

trance)Paved 0.09 Resealing and drainage works

Sub- Total 0.42579 Bududa DLG Bushika- Buteza U 0.24 Regravelling & drainage works

Sub- Total 0.24582 Buikwe DLG Kawomya-Senyi U 9.8 Regravelling & drainage works582 Buikwe DLG Lweru-Makindu U 7.0 Regravelling & drainage works

161Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

582 Buikwe DLG Kalagala-Nalwewungula U 6.0 Regravelling & drainage works582 Buikwe DLG Ajija-Buwoya-Kigaya U 10 Regravelling & drainage works582 Buikwe DLG Najjembe-Wasswa U 8 Regravelling & drainage works582 Buikwe DLG Kisubi-Kigenda U 5 Regravelling & drainage works

Sub- Total 45.8526 Kisoro Town Council A Moon light Access Paved 0.103 Resealing526 Kisoro Town Council A Market street Paved 0.12 Resealing

Sub- Total 0.123541 Mubende Town Council Pearl-Kangulumira P 4 Grading

Sub- Total 5.5569 Nakaseke DLG Namilali-Katalekamese Gravel 4.2 Regravelling

Sub- Total 4.2566 Manafwa DLG Bumbo-Soono U 6.0 Grading & regravelling566 Manafwa DLG Bubutu-Magale U 1.0 Grading & regravelling

Sub- Total 7.0566 Lwakhakha Town Council LwakhakhaLwakhakha Town

CouncilU 1.5 Grading & regravelling

Sub- Total567 Bukwo DLG Kapsukwar- senendet- matimbei U 2.0 Grading & regravelling

Sub- Totals 2.0567 Bukwo Town Council Hospital road U 0.55 Grading & regravelling567 Bukwo Town Council Kamondo road U 0.5 Grading & regravelling567 Bukwo Town Council Cheptere Upper U 0.87 Grading & regravelling567 Bukwo Town Council Salis Close U 0.58 Grading & regravelling

Sub-Total 2.5554 Tororo DLG Totokidwe- Kalacai- Chaf Earth 8.0 Grading& regravelling

Sub- Total 8.0607 Kole DLG Ginnery Aboke - Opeta U 8.6 Grading & drainage works607 Kole DLG Akalo-Adwila U 9.0 Grading & drainage works607 Kole DLG Aumi p/s-Lira border U 18.0 Grading & drainage works607 Kole DLG Barakalo,Akalo-Amac U 0.5 Grading & drainage works

36.1 561 Kaliro DLG561 Kaliro Town Council A Lubogo U 0.44 Grading & regravelling561 Kaliro Town Council A Wanjala U 0.42 Grading & regravelling561 Kaliro Town Council A Ngobi U 0.65 Grading & regravelling561 Kaliro Town Council A Lyagoba U 0.2 Grading & regravelling

Sub- Total 1.71556 Yumbe DLG556 Yumbe Town Council Awule road Gravel 0.42 Tarmacing556 Yumbe Town Council Henry Gravel 0.09 Tarmacing556 Yumbe Town Council Kuri Gravel 0.09 Tarmacing

Sub- Total 0.6551 Sembabule DLG Miteete- Butokota- Kanoni U 12 Grading & drainage works551 Sembabule DLG Kyoja- Lusalira- Kamuli U 11 Grading & drainage works551 Sembabule DLG Lwemiyaga- Ntyazo U 12.5 Grading & drainage works551 Sembabule DLG Nambirizi- Lwebitakuli U 23 Grading & drainage works551 Sembabule DLG Kyebongotoko- Kinoni U 11 Grading & drainage works551 Sembabule DLG Lutunku- Lugusulu U 27 Grading & drainage works551 Sembabule DLG Matete- Manyama- Kinoni U 12 Grading & drainage works

Sub- Total 108.5551 Mateete Town Council Josam- Butankanja Road U 1.5 Grading & drainage works551 Mateete Town Council Mosque-Agape- Bamuwanga U 2 Grading & drainage works551 Mateete Town Council Senyondo Road U 0.5 Grading & drainage works551 Mateete Town Council Bamuwanga- Agape- wire U 0.6 Grading & drainage works

Sub- Total 4.6551 Sembabule CARs Kyemaambo- Kyatukwire road U 9 Grading & drainage works551 Sembabule CARs Makoomi- Karo Karungi road U 3.5 Grading & drainage works551 Sembabule CARs Kyambogo- Kitooke road U 5 Grading & drainage works

162 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

551 Sembabule CARs Namirembe- Lwendezi- Senyange U 15 Grading & drainage works551 Sembabule CARs Kabulangiti- Kinoni, Kasana

nvunzaU 6 Grading & drainage works

551 Sembabule CARs Kiganda- Bugenge, Nakasenyi- Lusana

U 5.5 Grading & drainage works

551 Sembabule CARs Lusalira- Kibale, Bituntu- Kitagaban

U 6.2 Grading & drainage works

Sub- Total 50.2572 Oyam DLG572 Oyam CARs Odworo swamp (Iceme s/c) Earth 0.07 Regravelling & drainage works572 Oyam CARs Ogolgol swamp (Abok s/c) Earth 3.08 Regravelling & drainage works

Sub- Total 3.15520 Kapchorwa DLG Chema- Burkoyen U 5.0 Regravelling & drainage works

Sub- Total 5.0520 Kapchorwa TC Bukwo Road U 1.0 Regravelling & drainage works

Sub- Total 1.0594 Namayingo DLG Lumboka swamp road U 4.0 Gading & regravelling594 Namayingo DLG Butebye- Mulombi- Mulwanda

roadU 9.0 Gading & regravelling

Sub- Total 13.0595 Ntoroko DLG Rwebisengo- Rwangara Earth 11.5 Grading

Sub- Total 11.5595 Kanara Town Council Kanara- Kigungu- Abala road Earth 1.0 Grading

Sub- Total 1.0595 Karugutu Town Council Health Centre Albert Valley Earth 0.5 Grading595 Karugutu Town Council Town Council boundary road Earth 0.05 Grading595 Karugutu Town Council Highway tarmac Ibanda PS Earth 0.15 Grading

Sub- Total 0.7595 Kibuuku Town Council Kibuuku sand mining site Earth 0.5 Grading

Sub- Total 0.5595 Rwebisengo Town Council Market street Earth 0.4 Grading595 Rwebisengo Town Council Haibale Earth 0.4 Grading

Sub- Total 0.8595 Ntoroko CARs Rwebisengo- Kiranga Earth 5.0 Grading595 Ntoroko CARs Umoja- Rwangara Earth 2.0 Grading

Sub- Total 7.0534 Masindi DLG Pakanyi- Nyakarongo Earth 2.0 Grading & gravelling534 Masindi DLG Nyabindo- Kitwetwe road Earth 7.7 Grading & gravelling

Sub- Total 9.7534 Masindi CARs Bwijanga Earth 3.8 Spot improvement534 Masindi CARs Budongo Earth 6.0 Spot improvement534 Masindi CARs Kimengo Earth 0.7 Spot improvement534 Masindi CARs Miirya Earth 0.2 Spot improvement534 Masindi CARs Pakanyi Earth 4.0 Spot improvement

Sub- Total 14.7549 Rakai DLG Buyamba- Dwaniro- Taba U 15 Drainage works3

Sub- Total 15549 Rakai Town Council A Katuntu- Kagasa- Nsalo U 4 Regravelling & drainage works549 Rakai Town Council A Kajooki- Mpalakalemba U 3 Regravelling & drainage works549 Rakai Town Council A Lunnya- Kibooma- Lwakagala U 3.5 Regravelling & drainage works549 Rakai Town Council A Konkolodiya- Kintu P 0.4 Drainage works549 Rakai Town Council A Sendege P 0.1 Drainage works

Sub- Total 11.0578 Bukedea DLG578 Bukedea Town Council Malinga U 0.45 Grading & regravelling578 Bukedea Town Council Rev. Ebukalin U 0.5 Grading & regravelling578 Bukedea Town Council Emokori U 0.54 Grading & regravelling578 Bukedea Town Council Akol U 0.26 Grading & regravelling

Sub- Total 1.75

163Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

612 Kween DLG Atar- Mokotyo Earth 1.2 Grading & gravellingSub- Total 1.2

593 Luuka DLG Welukwagana- Busimawo Earth 2.2 Grading & gravelling593 Luuka DLG School lane Earth 1.0 Grading & gravelling593 Luuka DLG Wunhi Earth 1.1 Grading & gravelling593 Luuka DLG Mukasa Earth 0.7 Grading & gravelling593 Luuka DLG Luwano close Earth 0.1 Grading & gravelling

Sub- Total 5.1588 Alebtong DLG Yat Amenya to Omele Earth 9.6 Grading & gravelling

Sub- Total 9.6588 Alebtong Town Council Cidon Okello road U 0.1 Grading & drainage works588 Alebtong Town Council Okodi Acur swamp U 0.1 Grading & drainage works

Sub- Total 0.2605 Kibuku Town Council A Nabulele U 0.7 Regravelling & drainage works605 Kibuku Town Council A Salim U 0.9 Grading & drainage works605 Kibuku Town Council A Mukenye U 1.0 Drainage works & edge repairs

Sub- Total 1.7776 Busia MC Tiira Road U 0.7 Sealing & shoulder regravel-

ling776 Busia MC Buchicha Road U 1.1 Sealing & shoulder regravel-

lingSub- Total 1.8

760 Mbale MC Link Road U 3.7 Regravelling & drainage works760 Mbale MC Ali Kityo Road U 3.7 Regravelling & drainage works760 Mbale MC Regravelling & drainage works U 3.7 Regravelling & drainage works760 Mbale MC Mutumba Road U 3.7 Regravelling & drainage works760 Mbale MC Wagagai Road U 3.7 Regravelling & drainage works760 Mbale MC Butebo Place U 3.7 Regravelling & drainage works760 Mbale MC Peter Natooli Road U 3.7 Regravelling & drainage works760 Mbale MC Nabumlali Road U 3.7 Regravelling & drainage works760 Mbale MC Tom Masaba U 3.7 Regravelling & drainage works760 Mbale MC Station Road U 3.7 Regravelling & drainage works760 Mbale MC Nagudi Raod U 3.7 Regravelling & drainage works760 Mbale MC Zesui Road U 3.7 Regravelling & drainage works760 Mbale MC Kimaswa Road U 3.7 Regravelling & drainage works760 Mbale MC Nakhupa Road U 3.7 Regravelling & drainage works760 Mbale MC Abasa Road U 3.7 Regravelling & drainage works

Sub- Total 55.5754 Gulu MC Laroo Road U 0.02 Grading & drainage works754 Gulu MC Justin Moro road P 0.082 Sealing & shoulder regravel-

ling754 Gulu MC Awach road P 0.264 Sealing & shoulder regravel-

ling754 Gulu MC Jinnah Abji road P 0.317 Sealing & shoulder regravel-

lingSub- Total 0.683

771 Hoima MC Buswekera-Kihukya Gravel 7.0 Regravelling & drainage works771 Hoima MC Haruna-Sheik Badru-Kyar-

wabuyamba Gravel 3.0 Regravelling & drainage works

771 Hoima MC Wabiguga-Buswekera Gravel 1.5 Regravelling & drainage works771 Hoima MC Kibingo-Kyakadongo Gravel 3.0 Regravelling & drainage works771 Hoima MC Bujumbura road Gravel 0.2 Regravelling & drainage works771 Hoima MC Kabalega(Kyarwabuyamba) Gravel 0.5 Regravelling & drainage works771 Hoima MC Stone pitching of open drainage

channel along Bujumbura roadGravel 0.2 Regravelling & drainage works

771 Hoima MC River banks clearance on three draianage structures along Biga-juka river

Gravel 0.3 Drainage works

771 Hoima MC Buswekera-Kaitira Gravel 2.2 Regravelling & drainage works771 Hoima MC Mparo-Kyedikyo Gravel 2.2 Regravelling & drainage works771 Hoima MC Mparo-Kyarwabuyamba Gravel 2.2 Regravelling & drainage works

164 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

771 Hoima MC WHT obligations on services and inputs purchased

Gravel 2.2 Regravelling & drainage works

Sub- Total 24.5773 Iganga MC Old Market Street U 0.4 Sealing773 Iganga MC Bulolo road U 0.585 Sealing773 Iganga MC Bataka U 0.15 Drainage works773 Iganga MC Wakooli road U 0.2 Regravelling

Sub- Total 1.335770 Kasese MC Mukirane road P 0.4 Resealing770 Kasese MC Balance B/F on Design 4.0km of

roadsU 0.4 Sealing

770 Kasese MC Kogere road drainage channel P 880m2 Drainage works770 Kasese MC Park rise drainage channel U 2400m2 Drainage works770 Kasese MC Rwenzori lower drainage channel U 1200m2 Drainage works770 Kasese MC Saad road U 1.0 Grading770 Kasese MC Mandela road U 0.3 Grading

Sub- Total 2.1762 Moroto MC Narwosi Closes Gravel 1.8 Regravelling & drainage works762 Moroto MC Moroto Road Gravel 0.3 Drainage works762 Moroto MC Imagit Gravel 0.9 Regravelling762 Moroto MC Bishop Mazzolidi Gravel 0.4 Regravelling

Sub- Total 3.4772 Mukono MC Nsube - nabuti P 1.0 Resealing772 Mukono MC Mulyanti road P 0.5 Regravelling

Sub- Total 1.5775 Ntungamo MC Kategaya U 1.2 Grading & regravelling

Sub- Total 1.2777 Bushenyi- Ishaka MC Nyakabirizi market U 0.4 Grading777 Bushenyi- Ishaka MC Kyakabizi- Ruhandagazi road U 1.0 Grading777 Bushenyi- Ishaka MC Rukindo- Nyarwanya U 1.0 Grading777 Bushenyi- Ishaka MC Nyakahita- Kyamutiganzi U 1.0 Grading777 Bushenyi- Ishaka MC Industrial area roads- Ishaka U 1.1 Grading777 Bushenyi- Ishaka MC Ihwera- Kyakagina road U 1.2 Grading777 Bushenyi- Ishaka MC Katungu- Begumisa U 1.5 Grading777 Bushenyi- Ishaka MC Rwemirokora- Kiwanuka U 1.5 Grading777 Bushenyi- Ishaka MC Rwibango- Katungu U 1.5 Grading777 Bushenyi- Ishaka MC Omuruhita- Nombe U 1.95 Grading777 Bushenyi- Ishaka MC Matsya- Kyeitimbe road U 2.0 Grading777 Bushenyi- Ishaka MC Kyandago- Ryansana road U 2.0 Grading777 Bushenyi- Ishaka MC Bashasha’s farm- Kikundi’s farm U 2.0 Grading777 Bushenyi- Ishaka MC Basaja balaba- Rwemirokoro U 2.25 Grading777 Bushenyi- Ishaka MC Nyaruhora- Rwemishwa- Nya U 2.6 Grading777 Bushenyi- Ishaka MC St Kagwa Nyabicerere- Katan U 2.65 Grading777 Bushenyi- Ishaka MC Kashenyi- Kizinda road U 2.7 Grading777 Bushenyi- Ishaka MC Buramba Rwakashoma road U 3.0 Grading777 Bushenyi- Ishaka MC Katungu- Omukitooma- Nyan U 3.0 Grading

Sub- Total 34.35751 Arua MC Industrial lane P 0.5 Sealing & drainage works751 Arua MC Afra road P 1.0 Grading & drainage works751 Arua MC Lumumba Road U 0.8 Grading & regravelling751 Arua MC Awudele Crescent U 0.9 Grading & regravelling751 Arua MC Koboko Road U 0.4 Grading & regravelling751 Arua MC Wathum Road U 0.3 Grading & regravelling751 Arua MC Aritua Road U 0.3 Grading & regravelling751 Arua MC Mustapha Abataki Road U 0.4 Grading & regravelling751 Arua MC Dr Eric Adriko road U 0.5 Grading & regravelling751 Arua MC Nason lane U 0.3 Grading & regravelling751 Arua MC Onzivu Primary School Road U 0.5 Grading & regravelling751 Arua MC Awindiri Crescent U 1.0 Grading & regravelling

165Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

751 Arua MC Enyau Crescent U 0.7 Grading & regravelling751 Arua MC Mududu road U 1.0 Grading & regravelling751 Arua MC Asuru Road U 1.0 Grading & regravelling751 Arua MC Terego Zone Road U 0.7 Grading & regravelling751 Arua MC Ojio Road U 0.4 Drainage works751 Arua MC Anderea Buzu Road U 0.4 Grading & regravelling751 Arua MC Simsim Road U 0.5 Grading & regravelling

Sub- Total 11.6752 Entebbe MC Bulime/ Sese P 300 Rfegravelling & drainage works752 Entebbe MC Sewabugga P 1000 Regravelling & drainage works752 Entebbe MC Movement Market P 200 Regravelling & drainage works

Sub- Total 1500755 Jinja MC Parerk road P 0.3 Reasealing755 Jinja MC Kyalyakanobe P 0.1 Resealing

Sub- Total 0.5763 Soroti MC Kamusala U 0.5 Regravelling & drainage works763 Soroti MC Asilang U 0.6 Regravelling & drainage works763 Soroti MC Aputon U 1.0 Regravelling & drainage works763 Soroti MC Orimai U 1.3 Regravelling & drainage works763 Soroti MC Prof. Odaet U 0.6 Regravelling & drainage works763 Soroti MC Okurut Close U 0.3 Regravelling & drainage works763 Soroti MC Ejoku Lane U 0.3 Regravelling & drainage works763 Soroti MC Lalle U 1.2 Regravelling & drainage works763 Soroti MC Ngora U 0.4 Regravelling & drainage works763 Soroti MC Etolu U 0.4 Regravelling & drainage works763 Soroti MC Adiamo U 0.2 Regravelling & drainage works763 Soroti MC Lumumba U 0.6 Regravelling & drainage works763 Soroti MC Eyoku U 0.5 Regravelling & drainage works763 Soroti MC Ogaino U 0.5 Regravelling & drainage works763 Soroti MC Ariko U 0.7 Regravelling & drainage works763 Soroti MC Erongu U 0.5 Regravelling & drainage works763 Soroti MC Prof. Omaswa U 0.5 Regravelling & drainage works763 Soroti MC Off sakio U 0.5 Regravelling & drainage works763 Soroti MC Malera U 0.8 Regravelling & drainage works763 Soroti MC Abosi road U 0.2 Regravelling & drainage works763 Soroti MC Ecobu road U 0.5 Regravelling & drainage works763 Soroti MC Otekat road U 0.7 Regravelling & drainage works763 Soroti MC Bugondo Crescent U 1.1 Regravelling & drainage works

Sub- Total 13.9759 Masaka MC Ssenyange Road P 0.4 Drainage works759 Masaka MC Church Road P 0.5 Drainage works759 Masaka MC Kitovu Road P 0.3 Drainage works759 Masaka MC George Street P 0.4 Drainage works759 Masaka MC Hobart Avenue P 0.32 Resealing759 Masaka MC Nyendo- Cathedral Road P 0.2 Drainage works

Sub- Total 2.12778 Rukungiri MC Kakonkoma- Nshure U 1.9 Regravelling & drainage works778 Rukungiri MC Kirite- Kabwire U 4.2 Regravelling & drainage works778 Rukungiri MC Kyatoko- Buhumuriro U 3.5 Regravelling & drainage works778 Rukungiri MC Rwempitsi- Kagashe U 3.5 Regravelling & drainage works778 Rukungiri MC Independence P 0.4 Regravelling & drainage works

Sub- Total 13.5757 Kabale MC Mukombe road Gravel 0.6 Resealing757 Kabale MC Nyemera road Earth 0.9 Grading & regravelling757 Kabale MC Kamatojo road Earth 1.4 Grading & regravelling757 Kabale MC Kekuubo- Rutooma road Gravel 1.3 Regravelling

Sub- Total 4.2758 Lira MC Abudalatif Ogut U 1.2 Regravelling & drainage works758 Lira MC Ogwang Edola U 0.78 Regravelling & drainage works

166 Annex 11: DUCAR Network Periodic Maintenance by Road

Periodic Maintenance of DUCAR FY 2015/16Vote District/ Town Council/

Sub County NameRoad / Structure Name Surface

Type (P/U)

Achieved Length

(km)

Implemented Works

758 Lira MC Sam Engola road U 1.0 Regravelling & drainage works758 Lira MC Adol Polino U 1.0 Regravelling & drainage works758 Lira MC Independence road U 0.15 Removal of bottlenecks

Sub- Total 4.13774 Masindi MC Kijura- Academy road Gravel 3.2 Tarmacing & stone pitching

Sub- Totals 3.2754 Fort Portal MC Government Avenue P 0.5 Drainage works754 Fort Portal MC Nyaika Avenue P 0.5 Drainage works754 Fort Portal MC Mill Lane P 0.4 Drainage works754 Fort Portal MC Completion of Tibeyalirwa road U 0.5 Grading & drainage works754 Fort Portal MC Kasusu - Rubingo road U 1.4 Grading & drainage works754 Fort Portal MC Kamwenge rd - Kitahuruzo - Dis-

trict head quarterU 1.7 Grading & drainage works

754 Fort Portal MC Water supply - Rwengoma - Bwamba road

U 1.7 Grading & drainage works

754 Fort Portal MC Kitumba ss U 0.3 Grading & drainage works754 Fort Portal MC St. Adolf - Nyakagongo road U 0.3 Grading & drainage works

Sub- Total 7.3775 Ntungamo MC Kategaya U 2.0 Grading

Sub- Total 2.0

167Annex 12: DUCAR Network Routine Mechanised maintenance by road

Annex 12: DUCAR Network Routine

Mechanised maintenance by road

168 Annex 12: DUCAR Network Routine Mechanised maintenance by road

Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

573 Abim Abim C.A.Rs Otalabar-Atugo Earth 2 Grading

573 Abim Abim C.A.Rs Wilela Earth 2 Grading

573 Abim Abim C.A.Rs Barlyech-Gotapwou Earth 2 Grading

573 Abim Abim C.A.Rs Adea-Nyarikidi Earth 2 Grading

573 Abim Abim C.A.Rs Oreta-Apeitholim Earth 2 Grading

573 Abim C.A.Rs Total 10

573 Abim Abim DLG Alerek-Katabok-Lotuke Earth 17 Grading

573 Abim DLG Total 17

573 Abim Abim TC Kiru Earth 1.50 Grading

573 Abim Abim TC Abim New Corner Earth 1.50 Grading

573 Abim Abim TC Oringowelo Earth 1.00 Grading

573 Abim Abim TC Angwe Earth 1.00 Grading

573 Abim TC Total 5.00

501 Adjumani Adjumani DLG Adjugopi Nyeu Section U 10.0 Spot gravelling & drains

501 Adjumani Adjumani DLG Nyumanzi-Madulu via Itoasi U 6.0 Spot gravelling & drains

501 Adjumani Adjumani DLG Dzaipi-Pamajua U 10.0 Spot gravelling & drains

501 Adjumani Adjumani DLG Openzizni-Obilokong U 9.0 Spot gravelling & drains

501 Adjumani DLG Total 35

501 Adjumani Town Council Adjumani - mission U 1 Spot gravelling & drains

501 Adjumani Town Council Muchope U 2.6 Spot gravelling & drains

501 Adjumani Town Council Mission U 1 Spot gravelling & drains

501 Adjumani Town Council Administration road U 2.6 Spot gravelling & drains

501 Adjumani Town Council Karoko U 1.4 Spot gravelling & drains501 Adjumani Town Council Market U 2.2 Spot gravelling & drains501 Town Council Total 10.8

s611 Agago DLG Omot - Okwang Earth Gravel 10.5 Grading

611 Agago DLG Lira Palwo - Omot Earth Gravel 5.0 Grading

611 Agago DLG OKWADOKO - Atut Earth Gravel Grading

611 Agago DLG Wol - Kimaiya Earth Gravel Grading

611 Agago DLG Kalongo - Lomoi (2014/2015) Earth Gravel 30.3 Grading

611 Agago DLG Adilang - Lacekoto (2014/2015) Earth Gravel 11.0 Grading

611 Agago DLG Refugee - Kazikazi (2014/2015) Earth Gravel 13.2 Grading

611 Total DLG 70.0

588 Alebtong TC Odwe JB Rd Partiall gravelled 2.20 Grading

588 Alebtong TC Apoicen road U 2.51 Grading

588 Alebtong TC Okio Mike road U 1.50 Grading

588 Alebtong TC Okello kadogo Rd U 1.37 Grading

588 Alebtong TC Adyebo Cosmas Rd U 3.90 Grading

588 Alebtong TC Okodi Acur Rd U 4.50 Grading

588 Alebtong TC Odur Yosam road Graveled 0.50 Grading

588 Total TC 15.28

564 Amolatar DLG Grabbing of 7 selected dis-trict roads U 0 Grading

564 Amolatar DLG a) Odongoyere - Etam road U 0 Grading

564 Amolatar DLG b) Odiak - Kitaleba L/S road U 10 Grading

564 Amolatar DLG c) Acii - Muchora road U 13 Grading

564 Amolatar DLG d) Abako - Kitwe L/S road U 0 Grading

169Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

564 Amolatar DLG e) Kagga - Ayamawele road U 12 Grading`

564 Amolatar DLG f) Anamwany - Odyedo road U 7.0 Grading

564 Amolatar DLG g) Chakwara - Amuk road U 8.0 Grading

564 Amolatar DLG Grabbing of 7 selected dis-trict roads U 0 Grading

564 Total DLG 50

564 Amolatar Amolatar Tc Gravelling and low spot filling of TC roads U 3 Grading

564 Amolatar Total TC 3

564 Amolatar Namasale Tc Rehabilitation of Namasale - Biko road U 8 Grading

564 Total TC 8

564 Amolatar CARS Agikdak- Ochekitol road - Ongocem swamp (3.4km) U 3.4 Grading

564 Amolatar CARS Abwochkwar - Etam road (4.0km) U 6.0 Grading

564 Amolatar CARS Ocamoyat - Aleri road (2km) U 2.0 Grading

564 Amolatar CARS Ading - Achomi via Adony-imo P/S road (7km) U 7.5 Grading

564 Amolatar CARS Ayamawele - Ojem road (2km) U 4.0 Grading

564 Amolatar CARS Atomoro P/S - Anamwany P/S road (7km) U 5.0 Grading

564 Amolatar CARS Abwochkwar - Anamido road (4.5km) U 4.5 Grading

564 Amolatar CARS Kabangala - Agikdak Board-er road (3km) U 2.0 Grading

564 Amolatar CARS Aguludia - Acii road (2.8km) U 6.0 Grading

564 Total CARS 40.4581 Amudat Amudat TC Tingas Road U 1.2 Grading

581 Amudat Amudat TC KADC Road U 0.6 Grading

581 Amudat TC Total 1.8

581 Amudat CARS Karengepoche Kokwachaya U 6 Grading

581 Total CARS 6

581 Amudat Amudat DLG Katabok - Kanareon U 5 Grading

581 Amudat Amudat DLG Loroo - Naporokocha-Kenya Boarder U 0 Grading

581 Amudat Amudat DLG Abongae-Kenya Boarder U 3 Grading

581 Amudat Amudat DLG Kachesamba - Dingdinga P/S U 3 Grading

581 Amudat DLG Total 11

565 Amuria Amuria C.A.Rs Amuria - Willa - Abota (Kuju S/C) U 5 Grading &opening

drains

565 Amuria Amuria C.A.Rs Abarilela – Ocal U 4 Grading &opening drains

565 Amuria Amuria C.A.Rs Orungo - Ogongora U 4 Grading &opening drains

565 Amuria Amuria C.A.Rs Wera - Gweri border U 4 Grading &opening drains

565 Amuria C.A.Rs Total 17.0

565 Amuria Amuria DLG Komolo - Abarilela - Acowa U 28 Spot regravelling & drains

565 Amuria Amuria DLG Amuria - Wera U Spot regravelling & drains

565 Amuria Amuria DLG Orungo - Obalanga U 20 Spot regravelling & drains

565 Amuria DLG Total 48

570 Amuru TC Lakang road, Apar road,Market Street,Olik road and School road

U 1.1 Grading

170 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

570 Amuru TC

Okot P’Bitek,Jildo Irwa,Rwot Andrea Binyi,Olya,Keyo,R-wot Onen David Acana,Dau-di Okello,Omee,Rhino Camp roads

U 1.57 Grading

570 Amuru TC Kampala Road U 5.4 Grading

570 Total TC 8.07 570 Amuru Amuru DLG Gotgweno-Maroawobi U 6.00 Grading

570 Amuru Amuru DLG Maroawobi-State farm U 6.40 Grading

570 Amuru DLG Total 12.40 502 Apac DLG Aninolal – Olomunu 0203 U 17 Pothole patching

502 Apac DLG Apac – Arido 0205 U 18 Pothole patching

502 Apac DLG Alenga – Kungu 0206 U 15 Pothole patching

502 Apac DLG Aboko – Wigweng 0213 U 10 Pothole patching

502 Apac DLG Akalo Brd – Nambieso 0212 U 12 Pothole patching

502 Total DLG 72

502 Apac Duku TC Ikwera P/S – Ikwera Girls SSS U 1.2 Pothole patching

502 Apac Duku TC Prison H/Q(Off Wipolo) – Prison Farm U 1.5 Pothole patching

502 Apac Duku TC Off Apac Main – Nambieso Road U 0.3 Pothole patching

502 Apac Duku TC Off Apac Main West– Opio Bunga Road U 0.6 Pothole patching

502 Apac Duku TC Off Nambieso Rd – Mary Ococ Rd U 0.8 Pothole patching

502 Apac Duku TC Mary Ococ Road U 1.0 Pothole patching

502 Apac Duku TC Routine Maintenance Road U 0.0 Pothole patching

502 Total TC 5.4

502 Apac Apac Saulo Opio U 0.9 Pothole patching

502 Apac Apac Ecel U 0.9 Pothole patching

502 Apac Apac Akere U 0.7 Pothole patching

502 Apac Apac Abednego Street U 1.1 Pothole patching

502 Apac Apac Market Street U 0.3 Pothole patching

502 Apac Apac Inomo Road U 0.1 Pothole patching

502 Total Apac TC 4

503 Arua Arua DLG Lokiragodo-Odramacaku u/p 15.14 Spot regravelling & drains

503 Arua Arua DLG Bondo-Obaru u/p 14 Spot regravelling & drains

503 Arua Arua DLG Cillio-Otrevu u/p 5.0 Spot regravelling & drains

503 Arua Arua DLG Koya-Mbaru u/p 6.7 Spot regravelling & drains

503 Arua DLG Total 40.84

571 Budaka DLG Naweyo -Lyama – Na-kisenye unpaved-gravel 0 Pothole patching

571 Budaka DLG Mailo Tanu - Mugiti unpaved-gravel 0 Pothole patching

571 Budaka DLG Muloni - Seku - Kerekerene unpaved-gravel 8.4 Pothole patching

571 Budaka DLG Kakule - Namirembe - Kameruka unpaved-gravel 19.6 Pothole patching

571 Budaka DLG Kabuna - Kebula - Kaderuna unpaved-gravel 0 Pothole patching

571 Budaka DLG Ugandaclays - Nyanza - Jami unpaved-gravel 0 Pothole patching

571 Total DLG 28

571 Budaka TC Society - Temuseo – Neke-miya - Zei gravel 8.1 Pothole patching

571 Budaka TC Nawojja - Lyama gravel 3.8 Pothole patching

171Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

571 Budaka TC Naudo - Jaffa - Malinga gravel 6.8 Pothole patching

571 Total TC 18.7

579 Bududa Bududa DLG Bukigai- bukalasi U 6.4 Spot regravelling & drains

579 Bududa Bududa DLG Namaistu- Bunamwaki U 7.3 Spot regravelling & drains

579 Bududa Bududa DLG Bumasata- Bushiyi U 7.0 Spot regravelling & drains

579 Bududa Bududa DLG Bumayoka- Bunandutu U 4.60 Spot regravelling & drains

579 Bududa Bududa DLG Nangara- Bubungi U 5.9 Spot regravelling & drains

579 Bududa Bududa DLG Bududa- Busano U 5.2 Spot regravelling & drains

579 Bududa Bududa DLG Nalufutu- Shanzou U 11.1 Spot regravelling & drains

579 Bududa Bududa DLG Mabale- Wakamala U 5.2 Spot regravelling & drains

579 Bududa DLG Total 52.7

579 Bududa TC Buloli – Nashula U 2.0 Grading &opening drains

579 Bududa TC Muyonga road U 0.5 Grading &opening drains

579 Bududa TC Shikhuyu p/s - Bukibokolo Busano junction road U 1.39 Grading &opening

drains

579 Bududa TC Soweto- Staff quarters U 0.9 Grading &opening drains

579 Sub Total Cars 4.79504 Bugiri DLG Bugiri - Nkaiza - Bugobi 16.4 Pothole patching

504 Bugiri DLG Naluwerere - Buluguyi - Muwayo 24.0 Pothole patching

504 Bugiri DLG Bugayi - Nsango 12.5 Pothole patching

504 Bugiri DLG Bugiri - Kitodha 6.4 Pothole patching

504 Bugiri DLG Bugiri - Kitumbezi 0.0 Pothole patching

504 Bugiri DLG Namayemba-Bugoyozi - Muterere 11.8 Pothole patching

504 Bugiri DLG Bugiri - Muterere 15.5 Pothole patching

504 Bugiri DLG Nasaga - Wakawaka 20.0 Pothole patching

504 Bugiri DLG Busimbi - Namakoko 4.5 Pothole patching

504 Bugiri DLG Wanenga - Kaato 4.5 Pothole patching

504 Bugiri DLG Walugoma - Matovu 11.8 Pothole patching

504 Bugiri DLG Mayuge -Bumwangu Road 16.4 Pothole patching

504 Bugiri DLG Kitodha - Buwuni Road 13.5 Pothole patching

504 Bugiri DLG Kiseitaka-Buwuni Road 6.0 Pothole patching

504 Bugiri DLG Saza 2.5km 2.5 Pothole patching

504 Total DLG 165.8

504 Bugiri TC Market Street 2.2 Pothole patching

504 Bugiri TC Kawaune Wakooli 0.4 Pothole patching

504 Bugiri TC Katawo 0.9 Pothole patching

504 Bugiri TC Naluwerere - Wards Lanes 0.0 Pothole patching

504 Bugiri TC Ndifakulya Ward Lanes 0.0 Pothole patching

504 Bugiri TC Bwole Ward Lanes 0.0 Pothole patching

504 Bugiri TC Nkusi Ward Lanes 0.0 Pothole patching

504 Bugiri TC Trikundas Street 3.2 Pothole patching

504 Bugiri TC Ndikabona Road 0.7 Pothole patching

504 Bugiri TC Masaba Road 0.7 Pothole patching

504 Bugiri TC Off Walkway Road 0.4 Pothole patching

172 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

504 Bugiri TC Muwayi Road 0.5 Pothole patching

504 Bugiri TC Lugido 0.6 Pothole patching

504 Bugiri TC Namadhi Road 0.5 Pothole patching

504 Bugiri TC Mutumba 0.6 Pothole patching

504 Bugiri TC Abu-Kakaire 1.8 Pothole patching

504 Bugiri TC York Avenue 0.8 Pothole patching

504 Bugiri TC Acacia Road 0.4 Pothole patching

504 Bugiri TC Mvule Road 0.3 Pothole patching

504 Bugiri TC Byakika Road 0.2 Pothole patching

504 Bugiri TC Al Bin Said Road 1.1 Pothole patching

504 Bugiri TC Kagumbulizi Road 0.6 Pothole patching

504 Bugiri TC Musene Road 0.7 Pothole patching

504 Bugiri TC Muyonda Kirevu 0.6 Pothole patching

504 Bugiri TC Ahamed Mwonda 0.4 Pothole patching

504 Bugiri TC Isaac Wangadiya Road 1.0 Pothole patching

504 Bugiri TC Igoma Road 0.4 Pothole patching

504 Bugiri TC Maserino Road 0.7 Pothole patching

504 Bugiri TC Bukooli College Road 0.6 Pothole patching

504 Bugiri TC Nakulumya Road 1.0 Pothole patching

504 Bugiri TC Busoga Avenue 1.0 Pothole patching

504 Bugiri TC Kyetunda Road 1.0 Pothole patching

504 Bugiri TC Mukova Road 1.0 Pothole patching

504 Bugiri TC Kyakulaga 0.5 Pothole patching

504 Total TC 24.2

504 Bugiri CARS Bukwaku-Nabukima in Nabukalu Subcounty 4.0 Pothole patching

504 Bugiri CARSBusowa & Busoga Town boards in Buwunga Sub-county

5.0 Pothole patching

504 Bugiri CARS Buyala -Bubolwa Road in Iwemba Subcounty 3.0 Pothole patching

504 Bugiri CARS Rand home-Nakatosi-Naka-vule in Kapyanga Subcounty 5.0 Pothole patching

504 Bugiri CARS Kayogera - Magoma - Bukiri Road in Muterere Subcounty 6.0 Pothole patching

504 Bugiri CARS Bulyayobyo-Walube Road in Budhaya Subcounty 3.0 Pothole patching

504 Bugiri CARSBulidha-Nanyonya-itoolo Butegwa Road in Bulidha Subcounty

3.0 Pothole patching

504 Bugiri CARS Namasere-Bulesa-Ikindai Road in Bulesa Subcounty 3.5 Pothole patching

504 Bugiri CARS Budunyi- Nakatosi in Bulu-guyi Subcounty 3.0 Pothole patching

504 Bugiri CARS Namutega-Katoba Road in Nankoma Subcounty 3.0 Pothole patching

504 Total CARS 38.5

610 Buhweju Buhweju C.A.Rs Karembe - Runengo U 4 Grading

610 Buhweju Buhweju C.A.Rs Kitega - Karingoma U 4 Grading

610 Buhweju Buhweju C.A.Rs Kibarya - Nyakarambi - Bur-ere Tea factory U 5 Grading

610 Buhweju Buhweju C.A.Rs Engaju - Kanoni U 4 Grading

610 Buhweju Buhweju C.A.Rs Culvert installation U 0 Grading

610 Buhweju Buhweju C.A.Rs Kayanja - Nyarujoje U 3 Grading

610 Buhweju Buhweju C.A.Rs Kikondera T/C - Kikondera Church - Kasiti U 4 Grading

173Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

610 Buhweju C.A.Rs Total 24

610 Buhweju Buhweju DLG Nyakishojwa - Musana U 11 Grading

610 Buhweju Buhweju DLG Kitojo - Kayonza U 13 Grading

610 Buhweju Buhweju DLG Kyerera - Rwanyamabare U 10 Grading

610 Buhweju Buhweju DLG Kibarya - Katinda - Bwoga U 6 Grading

610 Buhweju Buhweju DLG Karembe - Kicuzi U 3 Grading

610 Buhweju Buhweju DLG Kashenyi - Karembe - Bi-hanga U 5 Grading

610 Buhweju Buhweju DLG Kanyamugyezi - Kikamba - Kikombe U 4 Grading

610 Buhweju DLG Total 52

582 Buikwe Buikwe TC Nalubabwe - Salye Road U 2.3 Spot gravelling & drains

582 Buikwe Buikwe TC Kawulu - Buwaga Road U 1.6 Spot gravelling & drains

582 Buikwe Buikwe TC Kasujja Road U 5.8 Spot gravelling & drains

582 Buikwe Buikwe TC Kasirye Road U 2.6 Spot gravelling & drains

582 Buikwe Buikwe TC Bugeye - Kapeke Road U 1.6 Spot gravelling & drains

582 Buikwe Buikwe TC Misindye Road U 1.9 Spot gravelling & drains

582 Buikwe Buikwe TC Nantwala - Lweru Road U 1.9 Spot gravelling & drains

582 Buikwe Buikwe TC Kito - Vuluga Road U 1.95 Spot gravelling & drains

582 Buikwe Buikwe TC Kawulu - Salye Road U 0.0 Spot gravelling & drains

582 Buikwe Buikwe TC Sseruweka Road U 0.0 Spot gravelling & drains

582 Buikwe TC Total 19.65582 Buikwe Njeru TC Bujagali U 0.5 Spot gravelling & drains

582 Buikwe Njeru TC Bujowali U 2.2 Spot gravelling & drains

582 Buikwe Njeru TC Republic Way P 0.5 Spot gravelling & drains

582 Buikwe Njeru TC Veterinary road P 0.0 Spot gravelling & drains

582 Buikwe Njeru TC Nakibizzi-Nsenge P 1 Spot gravelling & drains

582 Njeru TC Total 4.2582 Buikwe C.A.Rs Nakanya-kanonge-kigali U 7 Spot gravelling & drains

582 Buikwe C.A.Rs Mayindo-Bulyantete U 3 Spot gravelling & drains

582 Buikwe C.A.Rs Naluwerere-Namilyago U 0.0 Spot gravelling & drains

582 Buikwe C.A.Rs Wabusanke-Bagana U 4.30 Spot gravelling & drains

582 Buikwe C.A.Rs Kalibala-Kayembe U 6 Spot gravelling & drains

582 Buikwe C.A.Rs Kitgoma-Buwoola-Bakata U 3 Spot gravelling & drains

582 Buikwe C.A.Rs Kiyindi- Gimbo U 4.3 Spot gravelling & drains

582 Buikwe C.A.Rs Bukasa- Mutebuka-Matale U 3.2 Spot gravelling & drains

582 Buikwe C.A.Rs Ssi-koba U 4 Spot gravelling & drains

582 Buikwe C.A.Rs Koba-Kisisita U 3.5 Spot gravelling & drains

582 Buikwe C.A.Rs Kikusa-Masaba-Ndolwa U 6 Spot gravelling & drains

582 Buikwe C.A.Rs Kitemu-Banga in kabizi parish U 4.00 Spot gravelling & drains

582 Njeru C.A.Rs Total 48.3

578 Bukedea DLG Komongomeri-Kamutur U 8.5 Pothole patching

578 Bukedea DLG Kamutur-Tajar U 4 Pothole patching

578 Bukedea DLG Bukedea-Kolir U 4 Pothole patching

578 16.5

578 Bukedea TC Bp Irigei U 0.2 Pothole patching

578 Bukedea TC Caltex U 0.3 Pothole patching

578 Bukedea TC Aide U 0.4 Pothole patching

578 Bukedea TC Owalam U 0.4 Pothole patching

174 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

578 Bukedea TC Shombai U 0.4 Pothole patching

578 Bukedea TC Okodel U 1.0 Pothole patching

578 Bukedea TC Rose Ochom U 1.0 Pothole patching

578 Bukedea TC Emokori U 1.08 Pothole patching

578 4.78

578 Bukedea CARS Acelakweng-Komongomeri U 3.5 Pothole patching

578 Bukedea CARS Katekwan-Komongomeri U 4.7 Pothole patching

578 Bukedea CARS Munyoro-Okouba-kodukul U 8.5 Pothole patching

578 Bukedea CARS Kocheka-Omoniek-Gagama U 5.4 Pothole patching

578 Total CARS 22.1

600 Bukomansimbi Bukomansimbi CARs

Lukuku Nkalwe (Butenga Sub county) U 2.5 Grading

600 Bukomansimbi Bukomansimbi CARs

Kanoni Nsubuga kawooko (Butenga Sub county) U 1 Grading

600 Bukomansimbi Bukomansimbi CARs

Kigangazi - HC II-kasenyi road(Bigasa Sub county) U 1.6 Grading

600 Bukomansimbi Bukomansimbi CARs

Kabulasoke - Makukulu road (Bigasa Sub county) U 3 Grading

600 Bukomansimbi Bukomansimbi CARs

Kikaaya - kijampiki - kaseb-wavu(Kibinge Sub County) U 3.9 Grading

600 Kayanja-Ndalage (Kitanda Sub-county) U 3.7 Grading

600 Bukomansimbi CARs Total 15.7

600 Bukomansimbi Bukomansimbi DLG Butenga-Buyoga Road U 10 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG Buyoga - Kisabwa road U 11 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG Kyaboggo -Serinya Road U 9 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG

Kigangazi -Kyaziza-Bukango road U 15 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG Kikuuta -Gayaza -Mbulire U 10 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG

Nsololo -Keleziya -Kagolo-golo - Bitetero. U 10 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi DLG Bukiri -Mirambi Road U 11 Spot gravelling & drains

600 Bukomansimbi DLG Total 76

600 Bukomansimbi Bukomansimbi TC Kawala- water source U 1.5 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi TC Bukoba - Kagado U 1.3 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi TC Kawaasi -Kitaasa U 1.9 Spot gravelling & drains

600 Bukomansimbi Bukomansimbi TC Kirembeko - Lufula U 1.1 Spot gravelling & drains

600 Bukomansimbi TC Total 5.8

567 Bukwo DLG Kortek-chesimat Unpaved 8 Grading

567 Bukwo DLG Amanang-Sungoria Unpaved 7 Grading

567 Bukwo DLG Kapkwoloswo-tartar-rwanda Unpaved 4.30 Grading

567 Total DLG 19.3

589 Bulambuli Bulambuli CARS Mabono comm. Access (Sisiyi SC) Unpaved 2.0 Pothole patching

589 Bulambuli Bulambuli CARS Bunatunga-Bulako(Bunam-butye SC) Unpaved 2.0 Pothole patching

589 Bulambuli Bulambuli CARS Gamatibeyi-Mbigi m’tce (Namisuni SC) Unpaved 2.0 Pothole patching

589 Bulambuli Bulambuli CARS Bumaena-Bulumera (Bwik-honge SC) Unpaved 2.8 Pothole patching

589 Bulambuli Bulambuli CARS Gidoi-Sisiyi (Bulegeni SC) Unpaved 2 Pothole patching

175Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

589 Bulambuli Bulambuli CARS Tagalu-Masaka(Buluganya SC) Unpaved 2.0 Pothole patching

589 Bulambuli Bulambuli CARS Bufukula - Bufumbura Tim-ber Bridge (Bukhalu SC) Unpaved 3.0 Pothole patching

589 Bulambuli Bulambuli CARS Kigomu-Kiganda(Lusha SC) Unpaved 3 Pothole patching

589 Bulambuli Bulambuli CARS Nakikololo--Point (Masira SC) Unpaved 15 Pothole patching

589 Bulambuli Bulambuli CARS Khapupu-Bufumbula(Nab-bongo SC) Unpaved 3.0 Pothole patching

589 Bulambuli Bulambuli CARS Bumugoya-Subcoun-ty(Muyembe SC) Unpaved 3.0 Pothole patching

589 Bulambuli Bulambuli CARS Kamunda-Matuba(Kamu SC) Unpaved 1.0 Pothole patching

589 Bulambuli CARS Total 40.8 589 Bulambuli Bulambuli DLG Bulegeni - Malama Unpaved 1.0 Pothole patching

589 Bulambuli Bulambuli DLG Muyembe - Jambula Unpaved 2.9 Pothole patching

589 Bulambuli Bulambuli DLG Bunambutye - Greek River Unpaved 5.0 Pothole patching

589 Bulambuli Bulambuli DLG Bugwanyi-Bulumera Unpaved 7.0 Pothole patching

589 Bulambuli Bulambuli DLG Bunamujje - Buwakanyunyi Unpaved 3.0 Pothole patching

589 Bulambuli DLG Total 18.9

589 Bulambuli Bulambuli T/C Kefa - Wamukota Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Matanda Muhammadi Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Bugwanyi Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Wamburu Road Unpaved 0.2 Pothole patching

589 Bulambuli Bulambuli T/C Wamukoko Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Walukhu Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C New Apostolic Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Pius -Wamukoko Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulambuli T/C Mission Road Unpaved 0.65 Pothole patching

589 Bulambuli Bulengeni Tc Bulegeni - Nakifumbuko Unpaved 1.5 Pothole patching

589 Bulambuli Bulengeni Tc Songoki Unpaved 0.9 Pothole patching

589 Sub Total TC 7.8

576 Bulisa Bulisa T/C Tunduru U 0.8 Spot gravelling & drains

576 Bulisa Bulisa T/C Kikungi U 0.8 Spot gravelling & drains

576 Bulisa Bulisa T/C Muhojo U 1.4 Spot gravelling & drains

576 Bulisa Bulisa T/C Kyamukatuka U 0.8 Spot gravelling & drains

576 Bulisa Bulisa T/C Pamba U 3.4 Spot gravelling & drains

576 Bulisa Bulisa T/C Kasambya U 0.5 Spot gravelling & drains

576 Bulisa Bulisa T/C Njola U 0.3 Spot gravelling & drains

576 Bulisa T/C Total 8.0

505 Bundibugyo DLG Bulyambwa - Busaru unpaved 2 Grading

505 Bundibugyo DLG Alfa-Bundingoma unpaved 3 Grading

505 Bundibugyo DLG Butama-Bunyangule (Kaku-ka - Mutiti section) unpaved 0.8 Grading

505 Bundibugyo DLG Mirambi unpaved 1.9 Grading

505 Bundibugyo DLG Busaru - Nyakakindo unpaved 3 Grading

505 Bundibugyo DLG Tokwe-Hakitara (Bundim-wendi section) unpaved 3.4 Grading

505 Bundibugyo DLG Kirumya - Kikyo unpaved 1 Grading

505 Bundibugyo DLG Kabuga - Bugando - Kinyan-kende unpaved 4 Grading

505 Bundibugyo DLG Kakuka - Mutiti unpaved 1.5 Grading

505 Bundibugyo DLG Busaru Market - Butama unpaved 7.2 Grading

505 Bundibugyo DLG Hakitengya - Buhanda unpaved 7 Grading

176 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

505 Bundibugyo DLG Harugale - Buhundu unpaved 3.5 Grading

505 Bundibugyo DLG Busaru Cocoa - Bundikuyali unpaved 7 Grading

505 Total DLG 49.2

505 Bundibugyo TC Kaindole unpaved 1.1 Grading

505 Bundibugyo TC Ndahura unpaved 0.3 Grading

505 Bundibugyo TC Bulimpiki unpaved 0.5 Grading

505 Bundibugyo TC Katanga unpaved 0.5 Grading

505 Bundibugyo TC Biira road unpaved 0.5 Grading

505 Bundibugyo TC Simoli unpaved 1 Grading

505 Bundibugyo TC Nkongozi unpaved 0.1 Grading

505 Bundibugyo TC Kabale unpaved 0.4 Grading

505 Bundibugyo Nyahuka Tc Kasiri unpaved 5.8 Grading

505 Bundibugyo Nyahuka Tc Simbya Nkuru unpaved 1.7 Grading

505 Bundibugyo Nyahuka Tc Namwigoro unpaved 0.4 Grading

505 Bundibugyo Nyahuka Tc Roberts road unpaved 3.4 Grading

505 Total TC 11.3

506 Bushenyi Bushenyi DLG Kizinda-Nkanga-Igambiro Earth 12 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kijumo-Nyakabingo-Ka-shasha Earth 7.6 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kijumo-Warugo-Kabingo Earth 8 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Butare-Kayembe Earth 24 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kashanda-Nombe Earth 3 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Ngorora-Kitojo-Kashanda Earth 8 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Bitooma-Burungira Earth 8.5 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Bumbaire-Bwera Earth 6.4 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kizinda-Nkanga-Igambiro Earth 1 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kijumo-Warugo-Kabingo Earth 0.6 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Manengo-Ngorora-Kai-jengye Earth 1 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Rwenjojo-Kyamabare-Ki-tatera Earth 1 Spot gravelling & drains

506 Bushenyi Bushenyi DLG Kitwe-Katikamwe-Kya-bugimbi Earth 1 Spot gravelling & drains

506 Bushenyi DLG Total 82.1

506 Bushenyi C.A.Rs BitoomaS -Omubunwa Earth 3.3 Spot gravelling & drains

506 Bushenyi C.A.Rs Bumbaire S/C-Numba-Ny-abiziri Village Earth 5.5 Spot gravelling & drains

506 Bushenyi C.A.Rs Ibaare S/C-Kitabi-Kwa-taekintu Earth 2.3 Spot gravelling & drains

506 Bushenyi C.A.Rs Kakanju S/C-Tenga-Bwegye-me;Bistigaire-Kigondo Earth 4.2 Spot gravelling & drains

506 Bushenyi C.A.Rs Kyabugimbi S/C-Ahari-na-Akarere-Batekateka Earth 2.7 Spot gravelling & drains

506 Bushenyi C.A.Rs Kyamuhunga S/C-Kayan-ga-Kikumbagazo Earth 5.6 Spot gravelling & drains

506 Bushenyi C.A.Rs Kyeizooba S/C-Kakam-ba-Mwengura-Rwenyena Earth 4.5 Spot gravelling & drains

506 Bushenyi C.A.Rs Nyabubare-Ncwera 2 Bridge-Nyabubare. Earth 6.6 Spot gravelling & drains

506 Bushenyi C.A.Rs Ruhumuro S/C-Kara-ma-Akasusano Earth 3.3 Spot gravelling & drains

506 C.A.Rs Total 38.0

507 Busia Busia DLG Dabani – Sibona-Nahayaka U 9 Pothole patching

507 Busia Busia DLG Masafu-Bumayi-Nasinjehe U 9 Pothole patching

507 Busia Busia DLG Kenya road U 8 Pothole patching

177Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

507 Busia Busia DLG Makunda – Busonga-Mbaale U 9.6 Pothole patching

507 Busia Busia DLG Nambweke-Lunyo SS - Mundindi U 6.3 Pothole patching

507 Busia DLG Total 41.90

557 Butaleja Butaleja DLG Bunghoma-Bugangula-Bu-gangu U 3.0 Drainage Works

557 Butaleja Butaleja DLG Hasahya-Naweyo-Kaiti U 3.00 Drainage Works

557 Butaleja Butaleja DLG Lusaka-Mugulu U 3.20 Drainage Works

557 Butaleja Butaleja DLG Buwesa-Bugangu-Muhuyu U 7.6 Drainage Works

557 Butaleja DLG Total 16.8557 Butaleja Butaleja TC Lujehe U 1 Drainage Works

557 Butaleja Butaleja TC Namulemu U 2 Drainage Works

557 Butaleja Butaleja TC Buluba U 0.4 Drainage Works

557 Butaleja Butaleja TC Hisega-Majanga U 1.5 Drainage Works

557 Butaleja Butaleja TC Bunjasi U 1.64 Drainage Works

557 Butaleja Butaleja TC Hon.Hidawuli U 1.1 Drainage Works

557 Butaleja Butaleja TC Hanjehe U 0.7 Drainage Works

557 Butaleja Butaleja TC Court U 1 Drainage Works

557 Butaleja TC Total 9.34

608 Butambala Butambala C.A.Rs Bulo (Kasekere - Bya) Gravel 3 Spot gravelling & drains

608 Butambala Butambala C.A.Rs Kalamba (Kabasanda - Ka-lamba A) Gravel 2 Spot gravelling & drains

608 Butambala Butambala C.A.Rs Kibibi(Kiguba - Katabira,-Simba A, Butaaka) Gravel 3 Spot gravelling & drains

608 Butambala Butambala C.A.Rs Budde (Lugala - Ngadwe) Gravel 3 Spot gravelling & drains

608 Butambala Butambala C.A.Rs Ngando (Kasozi - Muyanga) Gravel 3 Spot gravelling & drains

608 Butambala C.A.Rs Total 14.0

608 Butambala Butambala DLG Kalamba - Nsozibirye Gravel 5.0 Spot gravelling & drains

608 Butambala Butambala DLG Kagolo - ndibulungi - Sim-bula Gravel 12 Spot gravelling & drains

608 Butambala Butambala DLG Butawuka _ Wadduduma Gravel 9 Spot gravelling & drains

608 Butambala Butambala DLG Bulo - Bugobango Gravel 9.0 Spot gravelling & drains

608 Butambala DLG Total 35

608 Butambala TC Roads Senene Ring Road Gravel 3.0 Spot gravelling & drains

608 Gombe TC Total 3.0

590 Buvuma TC Wasswa-Bajampola U 2.5

590 Buvuma TC Lukoma-Mutebi U 6

590 Total TC 8.5

583 Buyende Buyende DLG Buyende Market-Kabukye Unpaved 18 Spot gravelling & drains

583 Buyende Buyende DLG Kitukiro-Lukotaime Unpaved 8.6 Spot gravelling & drains

583 Buyende Buyende DLG Ndulya-Nanvunano-Im-meri-Kidera Market Unpaved 14 Spot gravelling & drains

583 Buyende Buyende DLG Iraapa-Gwase Unpaved 7 Spot gravelling & drains

583 Buyende Buyende DLG Kitukiro-Kinaitakali-Buy-ende Market Unpaved 12.3 Spot gravelling & drains

583 Buyende DLG Total 59.9

583 Buyende TC Mango-Ikaliro U 4.2 Grading

583 Buyende TC Man B-Kasuku B U 6 Grading

583 Buyende TC Kitukiro-Busumba-Budope U 7 Grading583 Buyende TC Buyanja-Kiwongoire U 6.7 Grading583 Buyende TC Igwaya T/C-Buyumba T/C U 2.3 Grading

583 Buyende TC Wakyafitina- Nalina U 8 Grading

583 Buyende Town Council Tibikoma Unpaved 17 Grading

583 Town Council Total 51.2

178 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

575 Dokolo Dokolo DLG Abutadi - Amunamun Gravel 8 Pothole patching

575 Dokolo Dokolo DLG Adagnyeko - Abakuli Earth 11 Pothole patching

575 Dokolo Dokolo DLG Bata - Otuboi Gravel 10 Pothole patching

575 Dokolo Dokolo DLG Amwoma - Apiowio Earth 6 Pothole patching

575 Dokolo Dokolo DLG Dokolo-Igar-Amwoma Gravel 25 Pothole patching

575 Dokolo DLG Total 60

575 Dokolo Town Council Alokiri - Abenyo - Alwa Earth 4 Spot gravelling

575 Dokolo Town Council Adukulotong - Obacere A &B Earth 7 Spot gravelling

575 Dokolo Town Council Administration Roads Earth 3 Spot gravelling

575 Town Council Total 14

591 Gomba Gomba DLG Bukalagi-Mpunge-Makok-wa-Lwanganzi Earth 7.00 Spot gravelling & drains

591 Gomba Gomba DLG Bukalagi-Namabeya-Ka-koma Earth 8.00 Spot gravelling & drains

591 Gomba Gomba DLG Buwanguzi-Kikondo-Mpo-go-membe-Busolo-Kyaalwa Earth 8.00 Spot gravelling & drains

591 Gomba Gomba DLG Malere-Nsambwe-Kabutala Earth 12.72 Spot gravelling & drains

591 Gomba Gomba DLG Kisaaka- Buwangunzi-Kyaal-wa Earth 7.10 Spot gravelling & drains

591 Gomba Gomba DLG Kalwanga-Kakubansiri Earth 2.40 Spot gravelling & drains

591 Gomba Gomba DLG Luggaga-Kalwanga Earth 1.00 Spot gravelling & drains

591 Gomba Gomba DLG Mawuki-Bukandula Earth 1.40 Spot gravelling & drains

591 Gomba Gomba DLG Kasaka-Mamba Earth 4.00 Spot gravelling & drains

591 Gomba DLG Total 51.62

508 Gulu Gulu DLG Adak- Awalkok Earth 15 Spot gravelling & drains

508 Gulu Gulu DLG Arut - Awach Earth 30 Spot gravelling & drains

508 Gulu DLG Total 45

509 Hoima DLG Kigorobya-Icukira-Kitoba Earth 5 Grading

509 Hoima DLG Buraru-Ngangi Earth 15 Grading

509 Hoima DLG Hohwa-Kyarusesa Earth 12 Grading

509 Hoima DLG Munteme-Kajoga-Ikoba-Bu-bogo Earth 11 Grading

509 Hoima DLG Kigaaya-Kihabwmi-Kinogozi Earth 5 Grading

509 Hoima DLG Kinogozi-Kisenyi-Kirimbi Earth 5 Grading

509 Hoima DLG Buraru-Busanga-Kigona Earth 5 Grading

509 Hoima DLG Kyakapeya-Kisiita-Kibaire Earth 3 Grading

509 Hoima DLG Kitoba-Kyabasengya-Kaboi-jana Earth 5 Grading

509 Total DLG 66

509 Hoima TC Kyabisagazi Earth 1.6 Pothole patching

509 Hoima TC Kajura Earth 0.4 Pothole patching

509 Hoima TC Kamuturaki Earth 0.2 Pothole patching

509 Hoima TC Safari Earth 0.2 Pothole patching

509 Hoima TC Main street Earth 0.4 Pothole patching

509 Total TC 2.8

509 Hoima CARS Kiziranfumbi Earth 2.3 Pothole patching

509 Hoima CARS Kyangwali Earth 4.5 Pothole patching

509 Hoima CARS Kigorobya Earth 3.9 Pothole patching

509 Hoima CARS Buhanika Earth 6 Pothole patching

509 Hoima CARS Bugambe Earth 7 Pothole patching

509 Hoima CARS Buseruka Earth 4 Pothole patching

509 Hoima CARS Buhimba Earth 3.9 Pothole patching

179Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

509 Hoima CARS Kabwoya Earth 2 Pothole patching

509 Hoima CARS Kyabigambire Earth 6 Pothole patching

509 Hoima CARS Kitoba Earth 3 Pothole patching

509 Total CARS 42.6

558 Ibanda CARS Kayembe-Kashozi U 2.5 Spot gravelling & drains

558 Ibanda CARS Omukazigiti-Katengeto U 2 Spot gravelling & drains

558 Ibanda CARS Kikoni East- Katembe-Rwe-seta U 3.6 Spot gravelling & drains

558 Ibanda CARS Rwenkuba-Kakunama U 1.7 Spot gravelling & drains

558 Ibanda CARS Rwemengo-Kamigamba U 0.5 Spot gravelling & drains

558 Ibanda CARS Bwera-Katooma-Busingiro U 4.7 Spot gravelling & drains

558 Ibanda CARS Rwambu-Nfatila U 4 Spot gravelling & drains

558 Ibanda CARS Kabeza-Karutusi-Kitoma U 5 Spot gravelling & drains

558 Ibanda CARS Kankurwa-Kemitozo Boarder U 3.6 Spot gravelling & drains

558 Ibanda CARS Kinoni-Kibagarwa-Omu-kashansha U 4.9 Spot gravelling & drains

558 Ibanda CARS Ihome-Omukensiri-Katem-be U 3.1 Spot gravelling & drains

558 Ibanda CARS Kyeikucu- Katengyeto U 2.2 Spot gravelling & drains

558 Ibanda CARS Endigito-Omukagano U 1.3 Spot gravelling & drains

558 Ibanda CARS Keihangara-Kikinga U 3.9 Spot gravelling & drains

558 CARS Total 38

558 Ibanda Ibanda DLG Kabagoma-Omukitindo U 7 Spot gravelling & drains

558 Ibanda Ibanda DLG Bugarama-Kiruhura Boarder U 7.4 Spot gravelling & drains

558 DLG Total 14.4

510 Iganga Iganga DLG Bunyiro-Buwologoma Earth 8.80 Spot gravelling & drains

510 Iganga Iganga DLG Bugono Nabitende Banada Earth 8.2 Spot gravelling & drains

510 Iganga Iganga DLG Bubbala Butaba Earth 6.5 Spot gravelling & drains

510 Iganga Iganga DLG Busembatia Lumbuye Earth 4.50 Spot gravelling & drains

510 Iganga Iganga DLG namungalwe-Buwologoma Earth 13 Spot gravelling & drains

510 Iganga DLG Total 41

510 Iganga CARs Bulumwaki 3.5km Earth 3.5 Spot gravelling & drains

510 Iganga CARs KazigoB-Toka p/s -Kazigo A Earth 6.6 Spot gravelling & drains

510 Iganga CARs Kazibwe-Nawanyingi Earth 4.5 Spot gravelling & drains

510 Iganga CARs Kayongo road Earth 2 Spot gravelling & drains

510 Iganga CARs Butongole-Nabitende and karim-mwidhu. Earth 3.7 Spot gravelling & drains

510 Iganga CARs Ngangali-budwege- nawansinge Earth 3.85 Spot gravelling & drains

510 Iganga CARs Makuutu-Namavundu nabweya -namatale swamp Earth 3 Spot gravelling & drains

510 Iganga CARs Buganza-Bateme Earth 3.7 Spot gravelling & drains

510 Iganga CARs Bwigula-bukasozi-bunasibu Earth 4 Spot gravelling & drains

510 Iganga CARs Kiboyo-namusenwa-buluza gravel 3.1 Spot gravelling & drains

510 Iganga CARs Namiyangu-wilber and Buwanga-bugodandala Earth 5.1 Spot gravelling & drains

510 Iganga CARs Walanga- bulyansime -butalango Earth 3.5 Spot gravelling & drains

510 Total CARS 43.22560 Isingiro C.A.Rs Kaberebere - Mikono’igana Un paved 5 Spot gravelling & drains560 Isingiro C.A.Rs Katooma - Itare Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Rwamurunga - Busheeka - Rubirizi Un paved 8 Spot gravelling & drains

180 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

560 Isingiro C.A.Rs Rwenshebashebe - Rukuuba - Ekikoona Un paved 5 Spot gravelling & drains

560 Isingiro C.A.Rs Kabatangaare - Nyakitunda Un paved 7 Spot gravelling & drains

560 Isingiro C.A.Rs Kabingo - Kabibi - Ky-abinunga Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Kayonza - Ibumba Un paved 3 Spot gravelling & drains

560 Isingiro C.A.Rs Kashenyi - Omumishenyi Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Katanga - Kikoba - Kamaaya road in Endinzi S/C Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Rwenjeru - Nyakabingo - Bigasha Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Bizeera - Bigasha - Kakamba Un paved 5 Spot gravelling & drains

560 Isingiro C.A.Rs Rwenturagara - Kashare - Katokye Un paved 6 Spot gravelling & drains

560 Isingiro C.A.Rs Nyamarungi - Akakiri - Nshororo Un paved 4 Spot gravelling & drains

560 Isingiro C.A.Rs Kamutiganzi-Rushasha -Ndayanjojo Un paved 2 Spot gravelling & drains

560 C.A.Rs Total 65.0

560 Isingiro Isingiro DLG Endiinzi - Omukatojo Un paved 25.0 Spot gravelling & drains

560 Isingiro Isingiro DLG Nsiika - Kamutumo - Kyan-za Un paved 12.0 Spot gravelling & drains

560 Isingiro Isingiro DLG Rwenturagara - Rutunga - Kemengo - Katooma Un paved 10.0 Spot gravelling & drains

560 Isingiro Isingiro DLG Endiinzi - Mpikye - Obunazi - Ekiyonza Un paved 14.0 Spot gravelling & drains

560 Isingiro Isingiro DLG Rushonje - Kibengo Un paved 5.0 Spot gravelling & drains

560 Isingiro Isingiro DLG Nyarubungo -Omukabira - Nyamabaare Un paved 5.4 Spot gravelling & drains

560 Isingiro DLG Total 71.4

560 Isingiro Isingiro TC Mebro Road Un paved 2.1 Spot gravelling & drains

560 Isingiro Isingiro TC Mabona Link Un paved 6.4 Spot gravelling & drains

560 Isingiro Isingiro TC Mbaare - Kagarama Road Un paved 2.7 Spot gravelling & drains

560 Isingiro Isingiro TC Ruhimbo - Kamuri Road Un paved 5.0 Spot gravelling & drains

560 Isingiro Isingiro TC Kyabishaho - Kacunuzi road Un paved 1.5 Spot gravelling & drains

560 Isingiro Isingiro TC Salama - Rwengiri Road Un paved 4.7 Spot gravelling & drains

560 Isingiro Isingiro TC Rwekubo - Kakunyu Road Un paved 5.1 Spot gravelling & drains

560 Isingiro Isingiro TC Ryamihini - Kitura Road Un paved 5.0 Spot gravelling & drains

560 Isingiro Kabuyanda TC Akatembo - Nyampikye - Kaiho Un paved 4.0 Spot gravelling & drains

560 Isingiro Kabuyanda TC Akatembo - Kinangye Un paved 1.7 Spot gravelling & drains

560 TC Total 5.7

511 Jinja DLG Kabowa-Budima U 21.4 Grading

511 Jinja DLG Buyala-Mutai U 8.9 Grading

511 Total DLG 30.3

512 Kabale C.A.Rs Rusanga- Mukasiru- Buza-niro U 2 Spot gravelling & drains

512 Kabale C.A.Rs Nfasha- Karambo U 5 Spot gravelling & drains

512 Kabale C.A.Rs Kacerere- Bukumbi U 1 Spot gravelling & drains

512 Kabale C.A.Rs Nyangoye- Rukaranga- Mur-ambo- Rushebeya U 5 Spot gravelling & drains

512 Kabale C.A.Rs Bweyo- Kambibi U 4 Spot gravelling & drains

512 Kabale C.A.Rs Omunkiro- Nyakasa U 4 Spot gravelling & drains

512 Kabale C.A.Rs Karubanda- Kibuzigye- Ihanga U 5 Spot gravelling & drains

512 Kabale C.A.Rs Kabira- Kashambya- Ka-kooko U 8 Spot gravelling & drains

512 Kabale C.A.Rs Nyakahita- Habusikano U 5 Spot gravelling & drains

181Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

512 Kabale C.A.Rs Mukitojo-Kyanamira-Mu-kashekye U 7 Spot gravelling & drains

512 Kabale C.A.Rs Kariba-Kibumba U 3.5 Spot gravelling & drains

512 Kabale C.A.Rs Bwanjojo- Rwene U 2 Spot gravelling & drains

512 C.A.Rs Total 51.5

512 Kabale Kabale DLG Kabanyonyi-Karweru-Mazi-ba U 18 Spot gravelling & drains

512 Kabale Kabale DLG Rugarama-Bubare U 6 Spot gravelling & drains

512 Kabale Kabale DLG Muko-Kaara-Lyamuriro- Nshanjare U 22.1 Spot gravelling & drains

512 Kabale Kabale DLG Nyamabare- Habushuro- Kiyebe U 11.2 Spot gravelling & drains

512 Kabale Kabale DLG Kabimbiri-Wacheba-Nya-kasiru U 17.0 Spot gravelling & drains

512 Kabale Kabale DLG Kyobugombe-Sindi via Kicence U 12.8 Spot gravelling & drains

512 Kabale Kabale DLG Rushebeya-Maheru U 6 Spot gravelling & drains

512 Kabale Kabale DLG Habushuro- Mushanje- Kinyungu U 5.8 Spot gravelling & drains

512 Kabale Kabale DLG Konyo-Nyamwerambiko U 8 Spot gravelling & drains

512 Kabale Kabale DLG Kerere- Kanzehamugyera U 10 Spot gravelling & drains

512 Kabale Kabale DLG Katembe- Bushuro U 4 Spot gravelling & drains

512 Kabale Kabale DLG Murutenga-Bushure-Oweki-yanja- Ahakyapa U 24 Spot gravelling & drains

512 Kabale Kabale DLG Kabimbiri- Kamusiza U 17.0 Spot gravelling & drains

512 Kabale Kabale DLG Kyobugombe- Katenga via Kitohwa U 9.4 Spot gravelling & drains

512 Kabale Kabale DLG Rwene- Kabahesi- Nyaconga U 7 Spot gravelling & drains

512 Kabale Kabale DLG Ahabuyonza- Hakatindo U 2.3 Spot gravelling & drains

512 Kabale Kabale DLG Burambira- Buhumuriro U 6 Spot gravelling & drains

512 Kabale Kabale DLG Kaharo- Nkumbura Via Kasherere U 6 Spot gravelling & drains

512 Kabale Kabale DLG Kamwezi- Kibanda U 15 Spot gravelling & drains

512 Kabale Kabale DLG Kashasha- Ihunga U 13.2 Spot gravelling & drains

512 Kabale DLG Total 220.8

512 Kabale Muhanga TC Nyakanengo- Butare U 1 Spot gravelling & drains

512 Kabale Muhanga TC Kakatunda- Ibugwe U 1 Spot gravelling & drains

512 Kabale Muhanga TC Habufureka- Keihimbi- Kay-orero U 3 Spot gravelling & drains

512 Muhanga TC Total 5.0

513 Kabarole CARS Kakiinga-Kajumiro U 3.9 Spot gravelling & drains

513 Kabarole CARS Lyamonda Kitini Hamwani U 2 Spot gravelling & drains

513 Kabarole CARS Pida Kicwampali Keleziya U 1.5 Spot gravelling & drains

513 Kabarole CARS Kiyombya Kigoro U 1.5 Spot gravelling & drains

513 Kabarole CARS Rwenkuba Kyaruhaza Mpanga bridge U 2.5 Spot gravelling & drains

513 Kabarole CARS Ngombe Kagoro U 1.0 Spot gravelling & drains

513 Kabarole CARS Ngombe Kasanjura U 1.0 Spot gravelling & drains

513 Kabarole CARS Kyamulisa Kanyamakerre U 2.0 Spot gravelling & drains

513 Kabarole CARS Bulera Isunga (Mirongo Kasomoro) U 2.6 Spot gravelling & drains

513 Kabarole CARS Nyarugongo CoU Kasogi (Nyabyako Kasongi) U 2.0 Spot gravelling & drains

513 Kabarole CARS Kanagwa Pub - Futi Bu-tangwa U 1.7 Spot gravelling & drains

513 Kabarole CARS Kidukuru Nyanduhi U 0.9 Spot gravelling & drains

513 Kabarole CARS Mitoomi road U 1.0 Spot gravelling & drains

182 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

513 Kabarole CARS Katebwa Butyoka Masibwe U 2.0 Spot gravelling & drains

513 Kabarole CARS Nyabusheshe Kitonzi U 2.5 Spot gravelling & drains

513 Kabarole CARS Mitandi Kisomoro (Kiro-moro HU Nsongya) U 2.3 Spot gravelling & drains

513 Kabarole CARS Kananasi swamp U 0.3 Spot gravelling & drains

513 Sub Total 30.7

513 Kabarole kabarole DLG Buheesi -Kabata U 20 Spot gravelling & drains

513 Kabarole kabarole DLG Katoma Bwabya Kyembogo U 11.6 Spot gravelling & drains

513 Kabarole kabarole DLG Kichwamba Kiburara U 10 Spot gravelling & drains

513 Kabarole kabarole DLG Kisomoro Kyamatanga U 6 Spot gravelling & drains

513 Kabarole kabarole DLG Kaboyo Kyezire Kazingo U 4 Spot gravelling & drains

513 Kabarole kabarole DLG Butebe Karambi U 2 Spot gravelling & drains

513 Kabarole kabarole DLG Kinyankende Mitandi Buheesi U 5 Spot gravelling & drains

513 Kabarole kabarole DLG Kabegira Kirere U 5.6 Spot gravelling & drains

513 Kabarole kabarole DLG Kasusu Kabahango Buheei U 9.8 Spot gravelling & drains

513 Kabarole kabarole DLG Geme Kajoto U 2 Spot gravelling & drains

513 Kabarole kabarole DLG Kinyankende Mugusu U 6.4 Spot gravelling & drains

513 Kabarole kabarole DLG Kisongi Munobwa U 7 Spot gravelling & drains

513 Kabarole kabarole DLG Kisomoro Bunaiga U 1.6 Spot gravelling & drains

513 Kabarole kabarole DLG Butebe Mugusu U 8 Spot gravelling & drains

513 Kabarole kabarole DLG Kasusu Mahoma Kimuhonde U 9.7 Spot gravelling & drains

513 Kabarole kabarole DLG Kitumba District HQ Access U 0.5 Spot gravelling & drains

513 Kabarole kabarole DLG Kasusu Mugusu U 6.4 Spot gravelling & drains

513 Total DLG 115.6

513 Kabarole Kibito TC Play ground circular U 0.15 Spot gravelling & drains

513 Kabarole Kibito TC Yerya Kagoma U 1.0 Spot gravelling & drains

513 Kabarole Kibito TC Adolf Mwesige U 0.5 Spot gravelling & drains

513 Kabarole Rwimi T/C Kwehangana Markert street U 0.3 Spot gravelling & drains

513 Kabarole Rwimi T/C Misabiro Kamwenge road U 2 Spot gravelling & drains

513 Kabarole Rwimi T/C Kaburaisoke Kanyansi U 1.8 Spot gravelling & drains

513 Kabarole Rwimi T/C Kyanga Rwenkuba Kyai-bumba U 0.1 Spot gravelling & drains

513 Kabarole Kijura Tc Butuku I U 1.5 Spot gravelling & drains

513 Kabarole KiJura Tc Katusabe Kabarwani U 0.6 Spot gravelling & drains

513 Kabarole Karago Tc Karago Busoma U 1.7 Spot gravelling & drains

513 Kabarole Karago Tc Karago Kainango Kikura U 1.7 Spot gravelling & drains

513 Kabarole Karago Tc Canon Apollo Hakigere U 1.9 Spot gravelling & drains

513 Sub Total 13.25

514 Kaberamaido DLG Abalang - Idamakan Sur-ambaya Earth 3.3 Grading

514 Total DLG 3.3514 Kaberamaido TC Obwangor street Earth 4 Grading

514 Total TC 4561 Kaliro Kaliro DLG Namugongo-Nakyere Unpaved 2.5 Grading

561 Kaliro Kaliro DLG Namwiwa-Busambeko Unpaved 2 Grading

561 Kaliro Kaliro DLG Nawaikoke-Buwangala Unpaved 9.1 Grading

561 Kaliro Kaliro DLG Budhehe-kyani-kyani-Nyan-za Unpaved 10 Grading

561 Kaliro Kaliro DLG Nsololo-Nantamali Unpaved 3 Grading

561 DLG Total 26.6

183Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

561 Kaliro Kaliro CARS Butesa centre-Ihagalo Unpaved 1.5 Grading

561 Kaliro Kaliro CARS Kawolo-Maganda-Zibondo Unpaved 2 Grading

561 Kaliro Kaliro CARS Bwayuya-Nali-Butesa Unpaved 2 Grading

561 5.5

598 Kalungu Kalungu DLG Kyamulibwa-kiwaawo-lu-vule Earth 11.0 Spot gravelling & drains

598 Kalungu Kalungu DLG Mukoko-Kasali-Mabowa Earth 9 Spot gravelling & drains

598 Kalungu Kalungu DLG Kinoni-Kiwumulo-Katonga Earth 6.7 Spot gravelling & drains

598 Kalungu Kalungu DLG Kakunyu-Kintu Musoke-Ta-aba-Kiwawo-Serubambula Earth 11 Spot gravelling & drains

598 Kalungu Kalungu DLG Kanwa-Namwanzi-Vu-ma-Mabowa Earth 6 Spot gravelling & drains

598 Kalungu Kalungu DLG Kiwebwa-Kijjomanyi-But-awata Earth 24.8 Spot gravelling & drains

598 Kalungu DLG Total 68.5

598 Kalungu Kalungu TC Kabisa-Nnende Earth 2 Spot gravelling & drains

598 Kalungu Kalungu TC Kalungu-Kanika Gravel 2 Spot gravelling & drains

598 Kalungu Lukaya TC Kawanda phase II Earth 4.5 Spot gravelling & drains

598 Lukaya TC Total 8.5

598 Kalungu CARS miwula - S/c Kankoloko-lo-Johnson-Kagomba Earth 7.00 Spot gravelling & drains

598 Sub Total Cars 7.00518 Kamwenge DLG Kyakanyemera-Mpanga U 21.4 Grading

518 Kamwenge DLG Kamwenge-Kyabanda-ra-Nkongoro U 39.4 Grading

518 Kamwenge DLG Swamp rising U 10.3 Grading

518 Kamwenge DLG Ruhagura-Bwera U 15 Grading

518 Total DLG 86.1

518 Kamwenge TC Kimulikidongo – Nsambu U 3 Pothole patching

518 Kamwenge TC Kamwenge SS – kyabyoma - kabuga U 4 Pothole patching

518 Total TC 7

519 Kanungu DLG Katete-Kyeijanga U 13.5 Drainage Works

519 Total DLG 13.5

519 Kanungu Kihihi TC 2 stars-Kigoma road U 13.0 Drainage Works

519 Kanungu Kihihi TC Ngyerero-Kyarisiima U 1.5 Drainage Works

519 Kanungu Kihihi TC Kibiribiri-Dusabe U 1.5 Drainage Works

519 Kanungu Kihihi TC Nyamwegabira-Kiruruma road U 3.2 Drainage Works

519 Kanungu Kihihi TC Buzaniro-Kitusi U 3.5 Drainage Works

519 Total TC 22.7

519 Kanungu CARS Bugiri-Kasoni U 2 Drainage Works

519 Kanungu CARS Katete- HC 111 road U 0.5 Drainage Works

519 Kanungu CARS Kizagirizo-Rwangoboka U 3.2 Drainage Works

519 Kanungu CARS Kinyampimbi-Keita-Kiiga U 2.5 Drainage Works

519 Kanungu CARS Gariel-Bukorwe camp U 1.8 Drainage Works

519 Kanungu CARS Rwembwa-Kashosha U 3 Drainage Works

519 Kanungu CARS Kororo-Kimbugu-Kibimbiri U 3.2 Drainage Works

519 Kanungu CARS Kyamboza-Namunye road U 4 Drainage Works

519 Kanungu CARS Rwambogo-Kinyisa U 2 Drainage Works

519 Kanungu CARS Rwambogo-Kinyisa U 1 Drainage Works

519 Kanungu CARS Muramba-Nyamirengere U 4 Drainage Works

519 Kanungu CARS Nyakashule -Kiruruma U 5.2 Drainage Works

184 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

519 Kanungu CARS Katiba U 2.5 Drainage Works

519 Total CARS 34.9

520 kapchorwa DLG Sirimityo – Amukul U 4 Grading

520 kapchorwa DLG Kapkwirwok – Loch U 4 Grading

520 kapchorwa DLG Chema- Burkoyen U 8.8 Grading

520 kapchorwa DLG Chema –Ngasire U 2 Grading

520 kapchorwa DLG Kapchorwa-Kapkwai U 3 Grading

520 kapchorwa DLG Siron – Ngangata U 3 Grading

520 kapchorwa DLG Gamogo – Gizuswa U 3 Grading

520 Total DLG 27.8

520 kapchorwa TC Masaba U 0.7 Grading

520 kapchorwa TC Kiwanuka U 0.8 Grading

520 kapchorwa TC Ngokit U 0.6 Grading

520 kapchorwa TC Cheborion U 0.4 Grading

520 kapchorwa TC Toskin U 0.2 Grading

520 kapchorwa TC Musiwa U 0.2 Grading

520 kapchorwa TC Sumotwo road U 0.4 Grading

520 kapchorwa TC Barawa U 1.1 Grading

520 kapchorwa TC Cave Lane U 0.6 Grading

520 kapchorwa TC Kwengwa U 1 Grading

520 kapchorwa TC Kaplaton – Kapsinda U 1.5 Grading

520 kapchorwa TC chekweshek U 1.5 Grading

520 Total DLG 9

520 kapchorwa CARS Sirinda kapsikambi U 2 Grading

520 kapchorwa CARS Masabas-loch U 4.5 Grading

520 kapchorwa CARS Kapkwirwok-sipi s/c U 0.3 Grading

520 kapchorwa CARS Kapsobiko-sirinda U 6 Grading

520 kapchorwa CARS Kabukole-mukukwo U 3 Grading

520 kapchorwa CARS Chelel-yembek U 4 Grading

520 kapchorwa CARS Kaproben-koyo U 2 Grading

520 kapchorwa CARS Seron-ririkwo U 1.5 Grading

520 kapchorwa CARS Basar-cheseber river U 0.5 Grading

520 kapchorwa CARS Mutyoru-chebukat U 2.5 Grading

520 kapchorwa CARS Kwomu-kapkwai U 2 Grading

520 kapchorwa CARS Kwomu-tegeres U 2 Grading

520 kapchorwa CARS Kapkwateny-ngasire U 4.50 Grading

520 kapchorwa CARS Arapkware-munda U 12 Grading

520 kapchorwa CARS Sember-chesoyen U 3 Grading

520 CARS 49.8

521 Kasese Kasese DLG Mahango - Muhokya Un paved 23.1 Grading

521 Kasese Kasese DLG Mubuku - Karusandara - Prisons Un paved 21.7 Grading

521 Total DLG 44.8

521 Kasese Katwe Kabatoro Town Council Kitandara road 0.7km Un paved 0.7 Grading

521 Kasese Katwe Kabatoro TC Kazooba road 0.8km Un paved 0.8 Grading

521 Kasese Katwe Kabatoro TC Salt lake roads 8.2km Un paved 8.2 Grading

521 Kasese Katwe Kabatoro TC Rwenjubu road 0.7km Paved 0.7 Grading

185Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

521 Kasese Katwe Kabatoro TC Ibaba road 0.7km Un paved 0.7 Grading

521 Kasese Katwe Kabatoro TC Kambatoto road 1.1km Un paved 1.1 Grading

521 Kasese Katwe Kabatoro TC Bakiza - Jabezi Un paved 1.0 Grading

521 Kasese Katwe Kabatoro TC Hambumbe road Un paved 2.2 Grading

521 Kasese Katwe Kabatoro TC Diversion road 2km Un paved 2.0 Grading

521 Total Katwe Kabatoro T/C 17.4

521 Kasese Bugoye C.A.Rs

Isya - Kibirizi - Ibanda road Un paved 4.0 Grading

521 Kasese Bugoye C.A.Rs Ndugutu - Muhambo road Un paved 4.0 Grading

521 Kasese Buhuhira C.A.Rs Kithoma – Kyaminyoku road Un paved 3.0 Grading

521 Kasese Bwera C.A.Rs Sayuni - Kiyonga road Un paved 2.5 Grading

521 Kasese Bwera C.A.Rs Kiyonga - Mutiwanyonyi road Un paved 0.7 Grading

521 Kasese Isango C.A.Rs Makwano Un paved 1.5 Grading

521 Kasese Kirambi C.A.Rs Kalizoka – Mirami - Kasenyi U 5.0 Grading

521 Kasese Karusandara C.A.Rs Kabukere – COU - Kabaka U 3.0 Grading

521 Kasese Kisinga C.A.Rs Kamughobe- Mulimangene U 1.0 Grading

521 Kasese Kisinga C.A.Rs Nyabirong - Kasangani U 2.0 Grading

521 Kasese Kisinga C.A.Rs Kadeya – Kisangani Market U 1.0 Grading

521 Kasese Kisinga C.A.Rs Kajwenge - Kalimanga TC U 1.5 Grading

521 Kasese Kisinga C.A.Rs Kamughobe - Basisa U 1.0 Grading

521 Kasese Kisinga C.A.Rs Isemusoro Gabriel U 1.0 Grading

521 Kasese Kitswamba C.A.Rs Kitswamba – Keminyoku -Kihyo U 3.0 Grading

521 Kasese Kitswamba C.A.Rs Nyaseke – Lhume River U 1.0 Grading

521 Kasese Kyondo C.A.Rs Musasa - Katulu U 2.5 Grading

521 Kasese Lake Katwe C.A.Rs

Busunga – Kanyambara R/Post U 4.0 Grading

521 Kasese Mahango C.A.Rs Nyakabingo – Nyamusule U 5.0 Grading

521 Kasese Maliba CARS Kihindi – Kitoko SDA U 2.0 Grading

521 Kasese Maliba CARS Mukati – Kyajina U 3.0 Grading

521 Kasese Maliba CARS Mukati – Kiruli U 2.0 Grading

521 Kasese Muhokya CARS Kibiri –Rwabitoke U 4.5 Grading

521 Kasese Munkunyu CARS Kinyamaseke – Kitsutsu U 3.0 Grading

521 Kasese Munkunyu CARS Kyasero – Kitsutsu U 1.0 Grading

521 Kasese Munkunyu CARS Cardinal SS - Kanyatsi road U 3.0 Grading

521 Kasese Munkunyu CARS Kiima foods - Bwera road U 0.5 Grading

521 Kasese Nyakiyumbu CARS Kibara – Mwigha - Kalitusi U 6.0 Grading

521 Total CARS 71.7522 katakwi DLG Katakwi-Toroma Gravel 20 Drainage works

522 katakwi DLG Toroma-Akrao Earth 12 Drainage works

522 katakwi DLG Omodoi-Ngariam Earth 20.0 Drainage works

522 katakwi DLG Magoro-Opeta Earth 10.0 Drainage works

522 katakwi DLG Magoro-Bisina Earth 10.0 Drainage works

522 katakwi DLG Adacar-Arengecora Gravel 16.0 Drainage works

522 katakwi DLG Usuk-Ongongoja Earth 30.0 Drainage works

522 Total DLG 118

186 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

522 katakwi TC Road 9 Earth 0.6 Grading

522 katakwi TC Road 10 Earth 0.6 Grading

522 katakwi TC Epel Hotel Site Road Earth 0.6 Grading

522 katakwi TC Road 11 Earth 0.9 Grading

522 katakwi TC Road 12 Earth 0.8 Grading

522 katakwi TC Road 13 Earth 0.7 Grading

522 katakwi TC Road 77 Earth 0.5 Grading

522 katakwi TC Ejoku Road Earth 0.3 Grading

522 Total TC 5

523 Kayunga TC Rwamirego Rd U 0.15 Grading

523 Kayunga TC Hospital lane U 0.15 Grading

523 Kayunga TC Court lane U 0.2 Grading

523 Kayunga TC Habasa lane U 0.3 Grading

523 Kayunga TC Kennedy close U 0.2 Grading

523 Kayunga TC Sempa road U 0.2 Grading

523 Kayunga TC Kibira road U 1.5 Grading

523 Kayunga TC Sayiwa road U 0.9 Grading

523 Kayunga TC Kyasa road U 0.3 Grading

523 Kayunga TC Nakaliro Main U 1.2 Grading

523 Kayunga TC Namagabi close P 0.4 Patching

523 Kayunga TC Kyambogo-Luzira road U 2 Grading

523 Kayunga TC Nakaliro-Lower U 2 Grading

523 Kayunga TC Health centre road U 1.2 Grading

523 Kayunga TC Nakayunga road U 0.9 Grading

523 Kayunga TC Kamunye lane U 0.0 Grading

523 Kayunga TC Asoni kaggwa road U 0.6 Grading

523 Kayunga TC Church road Paved 0.6 Grading

523 Total TC 12.8

523 Kayunga CARS Nongo-Bugiri U 2 Grading

523 Kayunga CARS Bukoloto-Gaza U 1.2 Grading

523 Total CARS 3.2

524 Kibaale Kibaale DLG Part of Mugarama- Kye-bando U 42.1 Pothole patching

524 Kibaale Kibaale DLG Part of Kihumuro- Mazooba U 16 Pothole patching

524 Kibaale Kibaale DLG Part of Kyeya- Kiranzi- Nguse U 14 Pothole patching

524 Kibaale Kibaale DLG Kisuura- Kamagali U 29 Pothole patching

524 Kibaale Kibaale DLG Karama- Kitutu U 10 Pothole patching

524 Kibaale DLG Total 111.1

524 Kibaale Kibaale T/C Karuguuza market Road Earth 1 Pothole patching

524 Kibaale Kibaale T/C Katerere-st olivia Earth 0.3 Pothole patching

524 Kibaale Kibaale T/C Mulisi Sebatta Earth 1.5 Pothole patching

524 Kibaale Kibaale T/C Kikangahara Road Earth 1.6 Pothole patching

524 Kibaale Kibaale T/C Kalisa road Earth 1.6 Pothole patching

524 Kibaale Kibaale T/C Kineka road Earth 1.6 Pothole patching

524 Kibaale Muhoro T/C Kabarole Earth 1 Pothole patching

524 Kibaale Muhoro T/C Hajat saida lane Earth 0.20 Pothole patching

524 Kibaale Muhoro T/C Bisikiro Earth 0.80 Pothole patching

524 Kibaale Muhoro T/C Mulumba lane Earth 0.40 Pothole patching

524 Kibaale Muhoro T/C Nusura st Earth 0.40 Pothole patching

187Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

524 Kibaale Muhoro T/C Mukasa rd Earth 0.70 Pothole patching

524 Kibaale Muhoro T/C Kamanyire lane Earth 0.20 Pothole patching

524 Kibaale Muhoro T/C Kijojo st Earth 0.40 Pothole patching

524 Kibaale Muhoro T/C Kisenyi rd Earth 0.70 Pothole patching

524 Kibaale Muhoro T/C Market st Earth 1.00 Pothole patching

524 Kibaale Muhoro T/C Nduru close Earth 0.10 Pothole patching

524 Kibaale Muhoro T/C Nyamanga Earth 0.50 Pothole patching

524 Kibale Kagadi T/C Kiryabenju road Earth 8 Patching & opening Drains

524 Kibale Kagadi T/C Kagadi Musandika Earth 7 Patching & opening Drains

524 Kibale Kagadi T/C Mwendangobe Earth 5.0 Patching & opening Drains

524 Kibale Kagadi T/C Nyaruziba Earth 7.4 Patching & opening Drains

524 Kibale Kakumiro T/C Sekyanzi Earth 2.0 Spot gravelling & drains

524 Kibale Kakumiro T/C Mwesigwa Earth 3.2 Spot gravelling & drains

524 Kibale Kakumiro T/C BP. Baharagate Earth 2.0 Spot gravelling & drains

524 Kibale Kakumiro T/C Saaza Earth 0.6 Spot gravelling & drains

524 Kibale Kakumiro T/C Kagwa Earth 0.4 Spot gravelling & drains

524 Kibale Kakumiro T/C Dominican Earth 2 Spot gravelling & drains

524 Kibale Kakumiro T/C Kajagali Earth 2 Spot gravelling & drains

524 T/C Total 46.4524 Kibale Kibale CARS Nyansimbi- Nguse Earth 5 Pothole patching

524 Kibale Kibale CARS Kihuuna- Nyamaligita- Ki-koora Earth 6 Pothole patching

524 Kibale Kibale CARSKiryamasasa- Rukanga and Kinunda- Kijegere- Namato access roads

Earth 10 Pothole patching

524 Kibale Kibale CARS Wabitama- Kitegura Earth 16 Pothole patching

524 Kibale Kibale CARS streets in pacwa trading centre Earth 10 Pothole patching

524 Kibale Kibale CARS Kitoma- Myamiyombo-Ka-kindo Earth 5 Pothole patching

524 Kibale Kibale CARS Ndaiga- Kitebere road Earth 3 Pothole patching

524 Kibale Kibale CARS Magoma- Nyakaibo- Mu-tunguru Earth 6 Pothole patching

524 Kibale Kibale CARS Hakasaraba- Buseesa Earth 3 Pothole patching

524 Kibale Kibale CARS Kyakwezi- Kaitambaraga- Kachu- Rubona- Earth 5 Pothole patching

524 CARS Total 69525 Kiboga DLG Kyamanyooli - Busaanyi Earth 8.7 Grading

525 Kiboga DLG Kikuubo Access Roads Earth 2 Grading

525 Kiboga DLG Mwezi - Kasokolindo Earth 3.2 Grading

525 Kiboga DLG Kakunyu - Kaapa Road Earth 2.4 Grading

525 Kiboga DLG NALWANGA road Earth 2.3 Grading

525 Toatal DLG 18.6562 Kiruhura DLG Kakyenkye-Kyeera-Kyeibuza Unpaved 26 Grading

562 Kiruhura DLG Nyakashashara-Kakyeera Unpaved 16 Grading

562 Kiruhura DLG Kazo-Kyampagara-Buremba Unpaved 19.3 Grading

562 Kiruhura DLG Bugarihe-Kaga-ramire-Nkungu Unpaved 7.7 Grading

562 Kiruhura DLG Akayanja-Keikoti Unpaved 7.3 Grading

562 Kiruhura DLG Kibega-Ngira Unpaved 22 Grading

562 Kiruhura DLG Rwenjubu-Kitabo Unpaved 13.8 Grading

188 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

562 Kiruhura DLG Sanga-Rwonyo Unpaved 12.5 Grading

562 Total DLG 124.6

562 Kiruhura Kiruhura Tc Kiruhura-Bujoronga U 3.5 Grading

562 Kiruhura Kazo Tc Rwamanuma-Kyantumo U 6.4 Grading

562 Kiruhura Kazo Tc Rwamuyeye-Akashenyi road U 4.3 Grading

562 Kiruhura Sanga Tc Market street U 1.0 Grading

562 Kiruhura Sanga Tc Playground road U 1.5 Grading

562 Kiruhura Sanga Tc Veterinary streets U 4.0 Grading

562 Kiruhura Sanga Tc Commercial road U 1.5 Grading

562 Kiruhura Sanga Tc Institutional road U 2 Grading

562 Kiruhura Sanga Tc Ring road U 1.0 Grading

562 Kiruhura Sanga Tc Industrial Loop Road U 2 Grading

562 Kiruhura Sanga Tc kamugungunu Road U 1 Grading

562 Sanga Total TC 14

592 kiryandongo DLG Kisorosoro - Diika U 8 Grading

592 kiryandongo DLG Bweyale-Diika U 6 Grading

592 kiryandongo DLG Kizibu -Kaduku U 5.8 Grading

592 kiryandongo DLG Diika - Katulikire U 8 Grading

592 Total DLG 27.8

592 kiryandongo Kigumba Tc Kabukye-Kyamugenyi U 0.4 Grading

592 kiryandongo Kigumba Tc Intensive -Administration Ext. U 0.3 Grading

592 kiryandongo Kigumba Tc Max Hotel Annex U 0.2 Grading

592 kiryandongo Kigumba Tc Child fund Road U 0.1 Grading

592 kiryandongo Kigumba Tc Kobil-Nyakoojo U 0.1 Grading

592 kiryandongo Kigumba Tc Nyakoojo-Kigumba Centre U 0.1 Grading

592 Total DLG 1.2

526 Kisoro DLG Kanaba – Kateriteri - Nya-karembe U 16.5 Grading

526 Kisoro DLG Kamonyi – Buhayo- U 8.7 Grading

526 Kisoro DLG Hakasharara -k U 5 Grading

526 Kisoro DLG Mucha Mushungero U 10 Grading

526 Total DLG 40.2

527 Kitgum TC Westland roads U 4.7 Grading

527 Kitgum TC Oryang Ojuma and Ginnery roads U 7.6 Grading

527 Total TC 12.3

563 Koboko Koboko DLG keri - Ayipe - kagoropa - Korokaya U 26.5 Drainage works

563 Koboko Koboko DLG Keri - Pamodo U 13.8 Drainage works

563 Koboko Koboko DLG lima- matuma U 5.7 Drainage works

563 Koboko Koboko DLG Lima - Chakulia U 9.6 Drainage works

563 Koboko Koboko DLG Keri - nyai U 16.7 Drainage works

563 Koboko Koboko DLG Nyai - Nyori cheku p/s - lodonga U 8 Drainage works

563 Koboko Koboko DLG Small mug - tendele U 8 Drainage works

563 Koboko Koboko DLG Dabara - ludara hqr U 6 Drainage works

563 Koboko Koboko DLG Koboko - wanize U 11.3 Drainage works

563 Koboko DLG Total 105.6 563 Koboko Ludara CAR Arindrue - Kochu p/s U 12 Drainage works

563 Koboko Kuluba CAR Ayipe - morimo U 6 Drainage works

189Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

563 Koboko Midia CAR LURUNYU - DRICILE U 6 Drainage works

563 Koboko Lobule CAR padrombo - Mt liru U 3 Drainage works

563 Koboko Lobule CAR Adukulia - Lulupi U 5 Drainage works

563 Koboko Lobule CAR jabara - woi U 8 Drainage works

563 Car Sub Total 40 528 Kotido Kotido DLG Panyangara -Napumpum U 6.76 Grading

528 Kotido Kotido DLG Kokoria - Losakucha U 12.64 Grading

528 Kotido Kotido DLG Kanawat-Kamor-Napum-pum U 30.72 Grading

528 Kotido Kotido DLG Kotido Rengen U 6.62 Grading

528 Kotido Kotido DLG Lokiteleabu-Kanayete U 6.32 Grading

528 Kotido Kotido DLG Rengen-Lopuyo-Lokiding U 21.98 Grading

528 Total DLG 85.04

528 Kotido Kotido T/C Senior Quarters Road U 2.4 Grading

528 Kotido Kotido T/C Lodon Road U 2.4 Grading

528 Kotido Kotido T/C Nakarwon Road U 0.4 Grading

528 Kotido Kotido T/C Housing lane U 0.6 Grading

528 Kotido Kotido T/C Senior Quarters Lane U 1.18 Grading

528 Kotido Kotido T/C Napolokou Road U 0.9 Grading

528 Kotido Kotido T/C Nakapelimoru View U 1.5 Grading

528 Kotido Kotido T/C Lomukura Avenue U 1.46 Grading

528 Kotido Kotido T/C Lomukura Drive U 1.14 Grading

528 Kotido Kotido T/C Old Road U 1.76 Grading

528 Kotido Kotido T/C Narengemoru Drive U 2.42 Grading

528 Kotido Kotido T/C School Lane U 0.4 Grading

528 Kotido T/C Total 16.56528 Kotido CARS Lomonia Kadokin 4.0 Grading

528 Kotido CARS Nakoreto Nakwakwa 12.0 Grading

528 Total CARS 16.0

529 Kumi Kumi DLG Apaade-Omerein-Kodokoto Gravel 2 Grading

529 Kumi Kumi DLG Komolo-Nyaguwo Gravel 3.5 Grading

529 Kumi Kumi DLG Kabukol-Kamenya-Nyero Gravel 5 Grading

529 Kumi Kumi DLG Kalapata-Ogooma-Atoot Gravel 5.0 Grading

529 DLG Sub Total 15.5529 Kumi TC Ogwang Gravel 1.02 Grading

529 Kumi TC Dr. Aporu- Akol Earth 1.0 Grading

529 Kumi TC Olungia Earth 0.52 Grading

529 Kumi TC Agoos Road Gravel 2 Grading

529 Kumi TC Ariko Road Earth 1.1 Grading

529 Kumi TC Ogaino Earth 0.5 Grading

529 Kumi TC Bishop Ilukor Earth 0.88 Grading

529 Kumi TC Kabata Gravel 0.68 Grading

529 Kumi TC Opede Earth 0.6 Grading

529 Kumi TC Mary Maclees Earth 0.64 Grading

529 Kumi TC Government Earth 0.6 Grading

529 Kumi TC Opejo Earth 1.2 Grading

529 Kumi TC Ongoet Earth 0.6 Grading

529 Kumi TC Emodiangat Earth 1.2 Grading

529 Kumi TC Achoroi Earth 0.6 Grading

190 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

529 Kumi TC Kamacherere Earth 1.5 Grading

529 Kumi TC Takan Earth 0.33 Grading

529 Kumi TC Odere Earth 1.2 Grading

529 Kumi TC Okalanga Road Earth 0.3 Grading

529 Kumi TC Tank close Earth 0.6 Grading

529 Kumi TC Father Ekumu Road Earth 0.1 Grading

529 Kumi TC Kumi Girls ss Earth 1.5 Grading

529 Kumi TC Onnyu Road Earth 1.0 Grading

529 Kumi TC Market Street Earth 0.4 Grading

529 Kumi TC Ikori Road Paved 1.2 Grading

529 Kumi TC Outeke Road Gravel 0.8 Grading

529 Sub Total TC 22.07 597 Kyankwanzi DLG Katanabirwa - Ntunda U 24 Grading

597 Kyankwanzi DLG Lubiri - Mpango U 7 Grading

597 DLG Sub Total 31

584 Kyegegwa Kyegegwa DLG Completion of Kyegegwa-Ki-juma-K U 6.2 Grading

584 Kyegegwa Kyegegwa DLG Completion of kyaman-ja-kyanyambali N U 5 Grading

584 Kyegegwa Kyegegwa DLG Maintenance of Nkomanga-ni-kasesenene-K U 10 Grading

584 Kyegegwa Kyegegwa DLG Kasule – Bugogo U 12 Grading

584 Kyegegwa Kyegegwa DLG Kiterede-Nkaakwa-Rwen-yange-Kitalesa U 8 Grading

584 Kyegegwa Kyegegwa DLG Spot improvement along Migongwe - Migamba U 12 Grading

584 Kyegegwa DLG 53.2584 Kyegegwa CARS Kiyuguya-kyakatwanga road U 3 Grading

584 Kyegegwa CARS Kiremba-kinonyi-Ru-hangiire road U 4 Grading

584 Kyegegwa CARS Kikurungu-kaziizi-katamba U 7 Grading

584 Kyegegwa CARS Sigosire-kijwiga U 5.5 Grading

584 Kyegegwa CARS Kyeriso-Rutara-ka-Kacwampali U 5 Grading

584 Kyegegwa CARS Ntuntu-kyaliboni-Magoma road U 7 Grading

584 Total cars 31.5585 Lamwo DLG Lagwel-Laguri Gravel 8.3 Grading

585 Total DLG 8.3

593 Luuka TC Completion of Kabwaka-to-Welukwaga Earth 1.00 Grading

593 Luuka TC Completion of Swa-ga-Welukwagana Earth 1.00 Grading

593 Luuka TC Spot improvenment of Yesu-Amala swamp Earth 0.15 Grading

593 TC’s Total 1.15 593 Luuka C.A.Rs Nakabaale B-Isinua Boda rd Earth 2.5 Grading

593 Luuka C.A.Rs Bwelegere- Mondo in Itkai-boru Parish Earth 6 Grading

593 Luuka C.A.Rs Jaberi road Earth 2.5 Grading

593 Luuka C.A.Rs Buwutu-Bunafu T/C Earth 8 Grading

593 Luuka C.A.Rs Nakabugu P/S via Buseete - Buyunze TC Earth 4.5 Grading

593 17593 Luuka Luuka DLG Bukanga - Buwala Earth 36.4 Grading

593 Luuka DLG 36.4

191Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

532 Luwero DLG kabutusi road Earth 0.50 Grading

532 Luwero DLG hasimu road Earth 0.50 Grading

532 Luwero DLG lutamandwa road Earth 0.60 Grading

532 Luwero DLG kadala road Earth 0.70 Grading

532 Luwero DLG Kalagala road Earth 1.00 Grading

532 Luwero DLG Katanga road Earth 1.20 Grading

532 Luwero DLG Nemagaza road Earth 1.40 Grading

532 Luwero DLG Church lane,sefuka road Earth 1.00 Grading

532 Luwero DLG Gagama road Earth 0.70 Grading

532 Luwero DLG Bajjo road Earth 1.00 Grading

532 Luwero DLG Health centre road Earth 1.20 Grading

532 Luwero DLG Gagama small & dabule road Earth 1.40 Grading

532 Luwero DLG Kibuka- majonji mpalanyi road Earth 1.00 Grading

532 Luwero DLG Namaliga main Earth 0.50 Grading

532 Luwero DLG Gongonya road Earth 0.50 Grading

532 Luwero DLG Marjan rd Earth 0.60 Grading

532 Luwero DLG Namaliga cross cutting rds Earth 0.70 Grading

532 Luwero DLG Naywa rd Earth 1.00 Grading

532 Luwero DLG Kuutu road Earth 1.20 Grading

532 Luwero DLG Mpoko road Earth 1.40 Grading

532 Luwero DLG Mpakawero cross cutting roads Earth 1.00 Grading

532 Total DLG 19.10

599 Lwengo C.A.RsLwentamu -Kyasabanyi and Mayira-Musubiro in Lwengo Sub county

Earth 8.4 Grading

599 Lwengo C.A.Rs Mpumudde-Kabingo-Buyigo in Kyazanga sub county Earth 4 Grading

599 Lwengo C.A.Rs Katogole-Nkukute-Lwempa-nyi in Malongo subcounty Earth 7.6 Grading

599 Lwengo C.A.Rs Mwalo-Budda in Kkingo Subcounty Earth 4 Grading

599 Lwengo C.A.RsKiwagala-Kibombi-Nakatete and Kibombi-Kyanukuzi in Kisseka sub county

Earth 4.5 Grading

599 C.A.Rs Total 28.5599 Lwengo Kyazanga TC Bijjaba road Earth 2 Grading

599 Lwengo Kyazanga TC Mateete-Lwebidali Earth 1.8 Grading

599 Lwengo Kyazanga TC Kanyogonga-Kiyanja-Kit-wekyajonvu Earth 1.8 Grading

599 Lwengo Kyazanga TC Kyolaba street Earth 0.3 Grading

599 Lwengo Kyazanga TC Magombe Street Earth 0.2 Grading

599 Lwengo Kyazanga TC Ssekitoleko Road Earth 0.8 Grading

599 Lwengo Kyazanga TC Lwera Road Earth 2.9 Grading

599 Lwengo Kyazanga TC Magatto -Kabasengu Road Earth 2.9 Grading

599 Lwengo Kyazanga TC Kanyogonga-Mateete road Earth 3.3 Grading

599 Lwengo Kyazanga TC Masudi Road Earth 1.2 Grading

599 Lwengo Kyazanga TC Luyembe Road Earth 2.0 Grading

599 Lwengo Kyazanga TC Lwegira Road Earth 0.4 Grading

599 Lwengo Kyazanga TC Muyanja Road Earth 0.2 Grading

599 Lwengo Kyazanga TC Samula road Earth 1.2 Grading

599 Lwengo Kyazanga TC Kizito road Earth 0.9 Grading

599 Lwengo lwengo tc Lwengo Earth 1.5 Grading

192 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

599 Lwengo lwengo tc Nyenje Earth 2.0 Grading

599 Lwengo lwengo tc Alhaj Nassir Earth 1.0 Grading

599 Lwengo lwengo tc Nakafeero road Earth 1.0 Grading

599 Lwengo lwengo tc Lukande Close Earth 1.0 Grading

599 Lwengo lwengo tc Old masaka-Mateete Earth 1.0 Grading

599 Lwengo lwengo tc Industrial road 3km Earth 4.0 Grading

599 Lwengo lwengo tc Kabalungi-Kiryakuyenge Earth 4.0 Grading

599 Lwengo lwengo tc Mulyazaawo Earth 3.0 Grading

599 Lwengo lwengo tc Kyereme-Kitagomanga Earth 2.0 Grading

599 Lwengo lwengo tc Mbirinzi-Nakyenyi Earth 6.0 Grading

599 Lwengo lwengo tc Nakafeero Earth 9.4 Grading

599 Lwengo lwengo tc Market street Earth 0.9 Grading

599 Lwengo lwengo tc Ssekaddu close Earth 0.6 Grading

599 Lwengo lwengo tc Mordern sss Earth 0.8 Grading

599 Lwengo Tc 59.2599 Lwengo Lwengo DLG Kyamaganda-Kyogya-Kinene Earth 22 Grading

599 Lwengo Lwengo DLG Bunyere-Kirayango-ma-Nkunyu church Earth 4 Grading

599 Lwengo Lwengo DLG Kayirira-Kakanda-Nakalinzi Earth 8 Grading

599 Lwengo Lwengo DLG Rwekakala-Kyamatafa-li-Kyakwelebera Earth 16 Grading

599 Lwengo Lwengo DLG Katovu-Keikolongo (8km) Earth 8 Grading

599 Lwengo Lwengo DLG Kapokyi-Kyampengere-Ka-gaga Earth 16 Grading

599 DLG Sub Total 74580 Lyantonde DLG Kabundabunda do 11 Grading

580 Sub Total DLG 11

566 Manafwa DLG Namwokoyi - Shokoma - Makutano U 9 Grading

566 Total DLG 9

566 Manafwa LWAKHAKHA TC Nambufu road U 0.8 Grading

566 Manafwa LWAKHAKHA TC Market road U 0.5 Grading

566 Manafwa Manafwa TC Esau-Namutembi U 2.00 Grading

566 Manafwa Manafwa TC Tongi U 0.70 Grading

566 Manafwa Manafwa TC Mayenze Streets U 2.00 Grading

566 Manafwa Manafwa TC Liisi-Komola U 2.35 Grading

566 Manafwa Manafwa TC Commission U 0.50 Grading

566 Manafwa Manafwa TC Nafu-Namakese U 2 Grading

566 Manafwa Manafwa TC Nakhumba-Mungasa U 1.5 Grading

566 Manafwa Manafwa TC Nandere-Muliro U 1.0 Grading

566 Total TC 12.05

577 Maracha Maracha DLG Nyambira-Anyabia-DRC Unpaved 3.6 Pothole patching

577 Maracha DLG Total 3.6 577 Maracha TC Roads Ayiko road Earth 0.48 Grading

577 Maracha TC Roads Buti road Earth 0.65 Grading

577 Maracha TC Roads Ribini B road Earth 0.50 Grading

577 Maracha TC Roads Maame Samuel road Earth 0.30 Grading

577 Maracha TC Roads Avenue road Earth 0.31 Grading

577 Maracha TC Roads Commercial road Earth 0.25 Grading

577 Maracha TC Roads Arimbe road Earth 1.50 Grading

577 Maracha TC Roads Olifea road Earth 1.20 Grading

193Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

577 Maracha TC Roads Bura road Earth 1.01 Drainage works

577 Maracha TC Roads District sanitary Lane Earth 0.22 Grading

577 Maracha TC Roads Nyacu beach road Earth 0.4 Grading

577 Maracha TC Roads Yuma road Earth 0.22 Grading

577 Maracha TC Roads Agadribo francis road Earth 0.15 Grading

577 Maracha TC Roads Yecua Earth 0.74 Spot regravelling

577 Maracha TC Roads Adongoro Earth 1.00 Grading

577 Sub Total TC rds 8.93 533 Masaka Sembabule TC Kiwula-kabango U 3.10 Grading

533 Masaka Mateete TC Taaia main street to Mateete S/C U 1 Grading

533 Masaka Mateete TC Sekabito road U 3.00 Grading

533 Masaka Mateete TC Kiiganda road U 0.50 Grading

533 TC sub total 4.6

534 Masindi Masindi DLG Kisindizi – Kinumi Gravel 7.5 Grading & opening drains

534 Masindi Masindi DLG Pakanyi – nyakarongo Period 24 Swamp rising & Cul-vering

534 Masindi Masindi DLG Kitanyata - Mboira Earth 5.8 Swamp rising & Cul-vering

534 Masindi DLG Total 37.3 535 Mayuge DLG Ikulwe-Lwanika Gravel 30.0 Grading

535 Mayuge DLG Buwaaya-Mpungwe-Kioga Gravel 15.0 Grading

535 Mayuge DLG Wainha-Buluba Gravel 8.4 Grading

535 Total DLG 53.4

535 Mayuge TC Luwanula Gravel 1.1 Grading

535 Mayuge TC Waludha Gravel 0.6 Grading

535 Mayuge TC Muwumya Gravel 0.3 Grading

535 Mayuge TC Kadogo Gravel 0.7 Grading

535 Total TC 2.7

536 Mbale DLG Busano - Buwangwa 6 Grading

536 Mbale DLG Kimwanga - Musese 7.6 Grading

536 Mbale DLG Mufudu - Webuta 1.4 Grading

536 Mbale DLG Namwenula - Nabweye 6 Grading

536 Mbale DLG Mulatsi - Bukiende 7.2 Grading

536 Mbale DLG Lwaboba - Busiu TC 8 Grading

536 Total DLG 29

537 Mbarara Mbarara DLG Kinoni-Katereza-Nyakabare U 8 Grading

537 Mbarara Mbarara DLG Kashekure-Kikonko-ma-Ibumba-Ryamiyonga U 22 Grading

537 Mbarara Mbarara DLG Ntuura-Nyaminyob-wa-Nkondo U 9 Grading

537 Mbarara Mbarara DLG Mwizi-Kikunda-Omukatojo U 4 Grading

537 Mbarara Mbarara DLG Bushwere-Rwentojo-Bugam-ba U 2 Grading

537 Mbarara Mbarara DLG Kategura-Rucence-kabahesi U 2.5 Grading

537 Mbarara Mbarara DLG Ndeija-Nyindo-Nyeihanga U 6.5 Grading

537 Mbarara Mbarara DLG Rubindi-Rubaare-Mile22 U 8 Grading

537 Mbarara DLG Total 62 601 Mitooma Mitooma DLG Ncwera-Bitereko-Kati U 17 Grading

601 Mitooma Mitooma DLG Mitooma-Kabira-Kashen-shero U 17.5 Grading

601 Mitooma Mitooma DLG Mutara-Kabuceera-Nyakiz-inga U 16 Grading

194 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

601 Mitooma Mitooma DLG Rutookye - Kiyanga - Bit-ereko U 28.5 Grading

601 Mitooma Mitooma DLG Mitooma-Rutookye U 14 Grading

601 Mitooma Mitooma DLG Rwempungu-Kashongore-ro-Rushaya U 9 Grading

601 Mitooma Mitooma DLG Katunda - Kejubwe U 7 Grading

601 Mitooma Mitooma DLG Mutara- Bukongoro U 1 Grading

601 Mitooma DLG Total 110 601 Mitooma Mitooma TC MITOOMA - NSHENGA U 2.5 Grading

601 Mitooma Mitooma TC MITOOMA - NYAKAHAN-DANGAZI U 1.9 Grading

601 Mitooma Mitooma TC BUHARAMBO- NYA-KASHOJWA U 2.4 Grading

601 Mitooma Mitooma TC RUBAYA- KATOOMA U 1.7 Grading

601 Mitooma Mitooma TC BUGARAMA - NYAMPIMBI U 0.7 Grading

601 Mitooma Mitooma TC MITOOMA - KYEMENGO- MUSHUNGA U 1.2 Grading

601 Mitooma Mitooma TC MITOOMA - KATAGATA U 2 Grading

601 Mitooma Mitooma TC BIHAMA -BAHINDI U 0.5 Grading

601 Mitooma TC Total 12.9

568 Mityana Mityana CARsLight Grading of Kiton-ya-Nkwaya Rd(3km) in Kikandwa

U 3 Grading

568 Mityana Mityana CARsLight Grading of Kayun-ga-Nandwagudde-Kattamb-wa(4km) in Malangala

U 4 Grading

568 Mityana Mityana CARsLight Grading Makoba-Kas-wi road(6km) in Ssekan-yonyi

U 6 Grading

568 Mityana Mityana CARsSpot muraming of Kanam-ba-Mugongolo(4.5km) in Busimbi

U 4.5 Grading

568 Mityana Mityana CARsLight Grading of Makan-ga-Mayobyo A (2.5km) Kalangalo

U 3 Grading

568 Mityana Mityana CARsLight Grading of Gombe-Ki-wande road(3km) in kakindu

U 3 Grading

568 Mityana Mityana CARs Light Grading of Nabota-ka-Bwesige(3km) Namugo U 3 Grading

568 Mityana Mityana CARsLight Grading Sseta-Nsan-vu-Kakubansiri(3km) in Bbanda

U 3 Grading

568 Mityana Mityana CARsLight Grading of Kanyan-ya-Nsabwa(3km) in Bu-tayunja

U 3 Grading

568 Mityana Mityana CARsLight Grading of Kimu-li-Musaalaba,Kimuli-Mwalo road(km) in maanyi

U 2 Grading

568 Mityana Mityana CARs Light Grading of Bul-era-Kibale(6.5km) in Bulera U 6.5 Grading

568 Mityana CARs Total 41 568 Mityana Mityana DLG Wabiyinja-Kakindu U 6.8 Grading

568 Mityana Mityana DLG Kabasuma-Nabukondo U 7.2 Grading

568 Mityana Mityana DLG Nakwaya-kabulamulilo U 8.0 Grading

568 Mityana Mityana DLG Kakindu-kibibi U 11.0 Grading

568 Mityana Mityana DLG Nakaseta-Ndibulungi U 20 Grading

568 Mityana Mityana DLG Ttamu-Nakaziba-Wabiyinja U 7 Grading

568 Mityana Mityana DLG Kiryokya-Matte U 3.0 Grading

568 Mityana DLG Total 63

195Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

538 Moroto Moroto DLG Lia - Tepeth Gravel 2.4 Grading

538 Moroto Moroto DLG Museum road Earth 2 Grading

538 Moroto Moroto DLG Rupa - Musupo road Gravel 5 Grading

538 Moroto Moroto DLG Nadunget - Lokeriaut road Earth 10 Grading

538 Moroto Moroto DLG Nawanatau - Acherer - Lotiri Earth 8 Grading

538 Moroto Moroto DLG Loputuk - Nadunget Gravel 12 Grading

538 Moroto DLG Total 39

539 Moyo Moyo DLG Onama Road U 0.7 Grading

539 Moyo Moyo DLG Pump Road U 0.4 Grading

539 Moyo Moyo DLG Aliku Road U 0.3 Grading

539 Moyo Moyo DLG Republic Road U 0.2 Grading

539 Moyo Moyo DLG Power Road U 1 Grading

539 Moyo Moyo DLG OAU Road U 0.2 Grading

539 Moyo Moyo DLG Didi close U 0.4 Grading

539 Moyo Moyo DLG MTC PS Road U 0.4 Grading

539 Moyo Moyo DLG Moyo SS Road U 0.9 Grading

539 Moyo DLG Total 4.5540 Mpigi Mpigi CARS Buziba - sempijja Earth 2 Grading

540 Mpigi Mpigi CARS Maduka – kiwanga - kakun-gube Earth 2.0 Grading

540 Mpigi Mpigi CARS Mbute road Earth 4.5 Grading

540 Mpigi Mpigi CARS Kisozi – sijji - Manyogaseka Earth 1.5 Grading

540 Mpigi Mpigi CARS Bugona - Kirega Earth 3 Grading

540 Mpigi Mpigi CARS Maja - Buwunga Earth 2 Grading

540 Mpigi Mpigi CARS Lwamanya - lwamikoma Earth 2 Grading

540 Mpigi Mpigi CARS Nkasi - wassozi Earth 2.0 Grading

540 Mpigi Mpigi CARS Nama – Kajesi - Kigalama Earth 1.5 Grading

540 Mpigi CARS Total 20.5

540 Mpigi Mpigi DLG Kinyika – Kituntu – Muyan-ga (5.79) Earth 5.79 Grading

540 Mpigi Mpigi DLG Katebo – Buyaaya (8.43km) Earth 8.43 Grading

540 Mpigi Mpigi DLG Muyanga – Degeya (5.8km) Earth 5.3 Grading

540 Mpigi Mpigi DLG Luwunga – Busagazi (2.7km) Earth 2.7 Grading

540 Mpigi Mpigi DLG Kayabwe –bukasa–muyanga (4.81km) Earth 17.1 Grading

540 Mpigi DLG Total 39.32 540 Mpigi Mpigi TC Boza – Vvuna Earth 10 Spot gravelling

540 Mpigi Mpigi TC Kiyanja – nakaligi Earth 2.2 Spot gravelling

540 Sub Total TC 12.2541 Mubende DLG Kassanda - Kalamba U 19 Grading

541 Mubende DLG Kalamba - Manyogaseka U 19 Grading

541 Mubende DLG Kassanda - Kamuli U 10.4 Grading

541 Mubende DLG Namakonkome-Makoko-to-Nabisunsa U 12 Grading

541 Mubende DLG Bakijulula - Kawuula -Ki-koma U 15 Grading

541 Mubende DLG Kakezi-Kamwaza U 10 Grading

541 Mubende DLG Ngabano – Butta U 18 Grading

541 Mubende DLG Ngabano-Kikoma U 13 Grading

541 Mubende DLG Kiyuya-Kammondo U 1 Grading

541 Mubende DLG Kibalinga-Lwebyayi-Kibyayi U 12 Grading

196 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

541 Mubende DLG Kisekende - Kattabalanga U 7 Grading

541 Mubende DLG Kasambya - Lwabinaga - Kalwana U 9 Grading

541 Mubende DLG Namiringa - Kakindu - Busengejo U 5 Grading

541 Mubende DLG Energo - Kasawo - Kyasansu-wa U 10 Grading

541 Mubende DLG Kasawo - Kyabayima - Kyasansuwa U 11.2 Grading

541 Mubende DLG Kasolo - Mugungulu-Ma-janichai U 12 Grading

541 Mubende DLG Nsozinga-Kitovu-Kachwi U 5 Grading

541 Mubende DLG Kitovu-Lwabusana-Kagavu U 8 Grading

541 Mubende DLG Dyangoma-Bubanda U 8 Grading

541 Mubende DLG Kamusenene-Nakasag-ga-Dyangoma U 10 Grading

541 Mubende DLG Kirume-Kiwuba U 5 Grading

541 Total DLG 219.8

541 Mubende TC Mabakiliza Gravel 2.2 Grading

541 Mubende TC Old Kampala Gravel/Earth 5 Grading

541 Mubende TC Kaweeri-Kiryannongo Earth 1.5 Grading

541 Mubende TC Nakayimas way to Kibyayi Gravel 1.5 Grading

541 Mubende TC Kirungi-Kangulumira Gravel/Earth 1.5 Grading

541 Mubende TC Kaweeri-Kalagala Earth 1.5 Grading

541 Mubende TC Kaweeri-Kibyayi to Kaaba-tende Gravel/Earth 0.4 Grading

541 Mubende TC Kasadala lane Gravel/Earth 2 Grading

541 Mubende TC Kiwalabye Gravel/Earth 1 Grading

541 Mubende TC Kabasojo -Kyabbogo Gravel/Earth 1 Grading

541 Mubende TC Kikoona-Katawa Gravel/Earth 1.5 Grading

541 Mubende TC Katogo interior Gravel/Earth 0.4 Grading

541 Mubende TC Tennis court Gravel/Earth 0.8 Grading

541 Mubende TC Dravo lane Gravel/Earth 0.43 Grading

541 Total TC 20.73

542 Mukono Mukono DLG Kigombya - Seeta - Sezibwa Earth 14.0 Pothole patching

542 Mukono Mukono DLG Bumbajja - Nsonga Earth 7.50 Pothole patching

542 Mukono Mukono DLG Lubugumu - Bugigi Earth 10.50 Pothole patching

542 Mukono Mukono DLG Kabimbiri - Nkoko - Kyaba-zala Earth 12.00 Pothole patching

542 Mukono Mukono DLG Kanana - Nacyeke - Lugujje Earth 8.00 Pothole patching

542 Mukono Mukono DLG Kyabazala - Ntonto - Wa-lubira Earth 7.30 Pothole patching

542 Mukono Mukono DLG Bugereka - Kasawo Earth 21.00 Pothole patching

542 Mukono Mukono DLG Bukoza - Kizima - Kukuuta Earth 18.50 Pothole patching

542 DLG Total 98.80 569 Nakaseke Nakaseke DLG Kalagala-Semuto-Kalege Gravel 22.4 Grading

569 Nakaseke Nakaseke DLG Kiwoko-Kasambya Gravel 23.0 Grading

569 Nakaseke Nakaseke DLG Lwesindizi-Biduku-Lugogo Earth 24.8 Grading

569 Nakaseke Nakaseke DLG Lwamahungu-Kakoona Earth 1.6 Grading

569 Nakaseke DLG Total 71.8

544 Nakasongola C.A.Rs Kiraramba - Kitanswa - Kiwongoire U 4.0 Grading

544 Nakasongola C.A.Rs Kakoola - Nakinyama U 3.5 Grading

544 Nakasongola C.A.Rs Kitaleeba - Rukooge U 4.2 Grading

197Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

544 Nakasongola C.A.Rs Nalukonge Streets U 1.5 Grading

544 Nakasongola C.A.Rs Irimba - Rwakataba U 6.5 Grading

544 Nakasongola C.A.Rs Namaasa Streets U 2.0 Grading

544 C.A.Rs Total 21.7 544 Nakasongola Nakasongola DLG Kiraka - Katuugo Earth/Gravel 12.0 Grading

544 Nakasongola Nakasongola DLG Namunkanga - Nabutaka Earth/Gravel 12 Grading

544 Nakasongola Nakasongola DLG Ntuti - Nabutaka Earth/Gravel 17 Grading

544 Nakasongola Nakasongola DLG Wantabya - Kamuina Earth/Gravel 20 Grading

544 Nakasongola DLG Total 61

544 Nakasongola TC Kibengo Gravel 2.1 Grading & opening drains

544 Sub Total TC 2.1

594 Namayingo DLG Bulamba – Mukorobi – Mal-endere road U 25 Grading

594 Namayingo DLG Namayingo – Bumoli – Kito-dha Road U 23 Grading

594 Namayingo- DLG Total 48 594 Namayingo TC Osinya road U 0.5 Grading

594 Namayingo TC Opadi road U 0.6 Grading

594 Namayingo TC Ohweso road U 1.6 Grading

594 Namayingo TC Kaitabana road U 1 Grading

594 Namayingo TC sikohwe U 0.6 Grading

594 Namayingo TC Mayanja road U 1 Grading

594 Total TC 5.3574 Namutumba TC Kaluya U 1.00 Grading

574 Namutumba TC Dongo U 0.50 Grading

574 Namutumba TC Nsaduri U 0.50 Grading

574 Namutumba TC Kasajja U 0.15 Grading

574 Namutumba TC Lulimi U 0.25 Grading

574 Namutumba TC Kaduyu U 0.4 Grading

574 Namutumba TC Eseri U 0.2 Grading

574 Namutumba TC Ibaale U 0.29 Grading

574 Namutumba TC Nyombi U 0.11 Grading

574 Namutumba TC Mugoda U 0.43 Grading

574 Namutumba TC Katambala U 0.40 Grading

574 C.A.Rs Total 4.23 Grading

574 Namutumba Namutumba DLG Mazuba - Ivukula - Bugoodo U 2 Grading

574 Namutumba Namutumba DLG Nabinyonyi-Namutumba U 4 Grading

574 Namutumba Namutumba DLG Magoola-Butogoli U 3.4 Grading

574 Namutumba Namutumba DLG Kibaale T.C-Kaliro swamp U 14.5 Grading

574 Namutumba Namutumba DLG Sembela-Namato-Kigalama U 5.7 Grading

574 Namutumba Namutumba DLG Namalemba-Mawem-be-Mpande U 10.7 Grading

574 Namutumba Namutumba DLG Mpulira-Nawaibete U 10.9 Grading

574 Namutumba Namutumba DLG Nawaikona-Nakyere U 9 Grading

574 Namutumba Namutumba DLG Nsinze-Naigombwa U 5.6 Grading

574 Namutumba DLG 65.8 Grading

604 Napak Napak DLG Kangole - Matany U 6 Grading

604 Napak DLG Total 6604 Napak CARS Loputuk-Narengereng U 4.8 Grading

604 Napak CARS Lomariamony-Lokupoi U 4.0 Grading

198 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

604 Napak CARS Lomuno-Kalokengel(Ko-risae) U 6.0 Grading

604 Napak CARS Lorunget-Loparipar U 3.0 Grading

604 Napak CARS Matny-Aramam U 8.0 Grading

604 Napak CARS Kaurikiakine-Kokipurat U 3.0 Grading

604 Napak CARS Lorengecora- Cholichol U 6.0 Grading

604 Sub Total cars 34.8 545 Nebbi Nebbi DLG Nebbi-Goli-Kei Earth 18 Grading

545 Nebbi Nebbi DLG Ossi Padel Soko Payani Pangere Earth 18.2 Grading

545 Total DLG 36.2

545 Nebbi Nebbi TC Pithua Earth 1.4 Grading

545 Nebbi Nebbi TC Erussi Earth 5.6 Grading

545 Nebbi Nebbi TC Street I Earth 0.44 Grading

545 Nebbi Nebbi TC Ocego Gravel 0.8 Grading

545 Nebbi Nebbi TC Dave Showers Gravel 1.8 Grading

545 Nebbi Nebbi TC Airfield Gravel 1.8 Grading

545 Nebbi Nebbi TC Construction Gravel 1.8 Grading

545 Nebbi Nebbi TC Koch Earth 0.4 Grading

545 Nebbi Nebbi TC Obel Road Earth 0.65 Grading

545 Nebbi Nebbi TC Wamara Earth 5.8 Grading

545 Total TC 20.49

603 Ngora Ngora DLG Ngora - Kees Omaditok U 6.5 Grading

603 Ngora Ngora DLG Akeit Ogooma Kalapata U 14 Grading

603 Ngora Ngora DLG Amapu Kobuku U 3.3 Grading

603 Ngora Ngora DLG Mukura Ngora U 12 Grading

603 Ngora Ngora DLG Mukura Nyero U 5.1 Grading

603 Ngora Ngora DLG Amugagara Agirigiroi U 6.4 Grading

603 Ngora Ngora DLG Ngora - Kobwin - Aciisa U 7.5 Grading

603 Ngora DLG Total 54.8

603 Ngora Ngora TC Kabakuli Ngora High Sch road U 1.10 Grading

603 Ngora Ngora TC Okiria obore road U 1.00 Grading

603 Ngora Ngora TC omaswa road U 0.80 Grading

603 Ngora Ngora TC amonyu road U 1.00 Grading

603 Ngora Ngora TC kobwin-ngora new road U 0.30 Grading

603 Ngora Ngora TC okoona obosai U 0.90 Grading

603 Ngora Ngora TC okisimo-obosai-kobuku U 2.60 Grading

603 Ngora TC Total 7.7

595 Ntoroko Kanara TC Tranzam road Earth 0.7 Grading

595 Ntoroko Kanara TC Rwenyange T/C Earth 0.5 Grading

595 Ntoroko Kanara TC Njeni Earth 0.5 Grading

595 Ntoroko Kanara TC Kanara Earth 0.8 Grading

595 Ntoroko Kanara TC MSL Upper Earth 0.8 Grading

595 Ntoroko Kanara TC MSL Lower Earth 0.8 Grading

595 Ntoroko Kanara TC Church of Uganda Earth 0.3 Grading

595 Ntoroko Kanara TC Ntoroko stage Earth 0.3 Grading

595 Ntoroko Kanara TC Kikungu Earth 0.5 Grading

595 Ntoroko Kanara TC Byamugisha Earth 0.8 Grading

595 Ntoroko Kanara TC Rwenyange Rd Earth 0.9 Grading

199Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

595 Ntoroko Kanara TC Abala Earth 0.6 Grading

595 Ntoroko Karugutu TC Kaguta –christian fellowship Earth 0.4 Grading

595 Ntoroko Karugutu TC Kaguta –Joseph Earth 0.1 Grading

595 Ntoroko Karugutu TC Highway –Twn council HQTRS Earth 0.57 Grading

595 Ntoroko Karugutu TC Gideon –Amanyire road Earth 0.30 Grading

595 Ntoroko Karugutu TC kyalimpa Earth 0.32 Grading

595 Ntoroko Karugutu TC Jtn Mkt Street-Twn council Earth 0.31 Grading

595 Ntoroko Kibuuku TC Market lane Earth 2 Grading

595 Ntoroko Kibuuku TC Kayera-kiraguza Earth 3 Grading

595 Ntoroko Kibuuku TC Kasozi annex 11 Earth 1 Grading

595 Ntoroko Rwebisengo TC Kitundubaire Earth 0.4 Grading

595 Ntoroko Rwebisengo TC Transformer Earth 1 Grading

595 Ntoroko Rwebisengo TC Kaguta Earth 1.5 Grading

595 Ntoroko Rwebisengo TC Hakitoma Earth 1 Grading

595 Sub Total TC 19.4546 Ntugamo DLG Omungyenyi-Kashanda U 10.8 Grading

546 Ntugamo DLG Kyangara-Kahunga U 10 Grading

546 Ntugamo DLG Rwho-kirungu-Kagabagaba U 17.2 Grading

546 Ntugamo DLG Nyakibobo-Buhanama-Bu-kora U 12 Grading

546 Total DLG 50

546 Ntugamo TC Kitwe- mirama hills U 7 Pothole patching

546 Ntugamo Total TC 7

606 Nwoya DLG Alero - Aswa - Amuru Gravel 19

606 Nwoya DLG Kalang - Langol-lamogi Gravel 25

606 Total DLG 44

586 Otuke Otuke DLG TEOPOK-Alir ASTU U 10 Grading

586 Otuke Otuke DLG Olilim PS-Aleri PS U 10 Grading

586 Otuke Otuke DLG Oluru post-Namagago U 12 Grading

586 Otuke Otuke DLG Adolo swamp-Omoro border U 5 Grading

586 Otuke Otuke DLG Okwongo TC-Okere U 18 Grading

586 Otuke Otuke DLG Okwang scty-Orit bridge U 20 Grading

586 Otuke Otuke DLG Barocok-Okwang TC U 10 Grading

586 Otuke DLG Total 85 586 Otuke Town Council Adwarpida-Lai Centre U 4 Grading

586 Otuke Town Council Otuke Agro U 2 Grading

586 Otuke Town Council Okole-Okocowa U 1 Grading

586 Town Council Total 7

572 Oyam Oyam DLG Oyam TC – Alao – Amido Earth 6 Grading

572 Oyam DLG Total 6

547 Pader DLG Achilibur-Latanya unpaved 17 Pothole patching

547 Pader DLG Pader-Latanya-Dure unpaved 29 Pothole patching

547 Pader DLG Atanga-Bolo-Lagile unpaved 38 Pothole patching

547 Pader DLG Pajule-lagwai-Kimiya unpaved 26 Pothole patching

547 Total DLG 109

547 Pader TC Oginga Oginga unpaved 0.20 Pothole patching

547 Pader TC Luke Orombi unpaved 0.23 Pothole patching

547 Pader TC Julius Nyerere unpaved 0.25 Pothole patching

200 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

547 Pader TC Dr Obote unpaved 0.25 Pothole patching

547 Pader TC Mt Zion Road unpaved 0.25 Pothole patching

547 Pader TC Acan Alice unpaved 0.25 Pothole patching

547 Total TC 1.43

548 Pallisa Pallisa DLG Agule-Kameke-Ladoto U 17.4 Pothole patching

548 Pallisa Pallisa DLG Kabwangasi-Nasenyi U 7.1 Pothole patching

548 Pallisa Pallisa DLG Pallisa-Agule U 12.0 Pothole patching

548 Pallisa Pallisa DLG Omotoi-Oboliso U 5 Pothole patching

548 Pallisa Pallisa DLG Oladot-Butebo U 10 Pothole patching

548 Pallisa Pallisa DLG Omuroka-Boliso U 5.5 Pothole patching

548 Pallisa Pallisa DLG Kamuge-Kalapata-Boliso U 6.0 Pothole patching

548 Pallisa Pallisa DLG Kakoro-Kidongole U 5.4 Pothole patching

548 Pallisa Pallisa DLG Kibale -Akisim U 6.7 Pothole patching

548 Pallisa Pallisa DLG Kibale -Kamuge U 9.0 Pothole patching

548 Pallisa DLG Total 84.1 548 Pallisa Town Council Omaido rd U 1.2 Pothole patching

548 Pallisa Town Council Auk road U 3.5 Pothole patching

548 Pallisa Town Council Kaguta Road U 1.8 Pothole patching

548 Pallisa Town Council Abunirei - Mukenye U 1.5 Pothole patching

548 Pallisa Town Council Okaude Road U 1.2 Pothole patching

548 Pallisa Town Council Anguria road U 0.5 Pothole patching

548 Pallisa Town Council Mutembei road U 0.8 Pothole patching

548 Pallisa Town Council Gogonyo road U 2.60 Pothole patching

548 Town Council Total 13.1

548 Pallisa CARS Agule S/C : Oigomo-jon+B35:B42g -Midodi rd U 3.0 Grading

548 Pallisa CARS Akisim S/C: Ongarot-Oriko-sio Rd. U 2.5 Grading

548 Pallisa CARS Apopong S/C: Angolol T/C-Adal-Otut Rd U 8.5 Grading

548 Pallisa CARS Butebo s/c Kabelai- Kabu-rukou Rd U 3.1 Grading

548 Pallisa CARS Chelekura S/C : Okona Adude- Aleles Rd U 2.0 Grading

548 Pallisa CARS Gogonyo S/C: Okwi-Olwa Rd U 5.0 Grading

548 Pallisa CARS Kabwangasi S/C: Kabwan-gasi-Ogoso-Byakika Rd. U 6.0 Grading

548 Pallisa CARS Kakoro S/C: Kavule-Buka-tikoko-Teru’s corner Rd U 1.8 Grading

548 Pallisa CARS Kameke S/C : Abila-Nyakoi Rd U 3.5 Grading

548 Pallisa CARSKamuge S/C- Kamuge-Nabi-tende- Okum rd section (4,494,141l=)

U Grading

548 Pallisa CARS Kanginima S/C: Wenene-Nakaloke U 2.5 Grading

548 Pallisa CARS Kasodo S/C: Kasanvu-Na-jeniti Rd. U 2.0 Grading

548 Pallisa Cars Kibale S/C- Opogono-Quar-ter guard Rd U 4.5 Grading

548 Pallisa CARS Olok S/C - Odwarat-Onyara Rd U 1.0 Grading

548 Pallisa CARS Opwateta S/C: Kayepei-Ko-molo- Okutai Rd U 2.0 Grading

548 Pallisa CARS Pallisa S/C: Akadot Komo-lo-Apujan Rd U 2.0 Grading

548 Pallisa CARS Petete S/C: Benenego-Ko-lianga-Kabuyai p/s U 3.0 Grading

201Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

548 Pallisa Cars Puti Puti S/C- Limoto- Pa-dola Rd. U 4.5 Grading

548 Sub Total cars 56.9 549 Rakai kyotera TC Old Mutukula P 0.45 Pothole patching

549 Rakai kyotera TC Old Kooki road P 0.3 Pothole patching

549 Rakai Kalisizo TC Matyasi rd U 2 Grading

549 Rakai Kalisizo TC St.Balikuddembe rd U 2 Grading

549 Rakai Kalisizo TC Joseph Mukasa rd U 1 Grading

549 Rakai Kalisizo TC Ssediwanyu rd U 1 Grading

549 Rakai Kalisizo TC Old Masaka (kalwa-ga-kyojja) rd U 1.5 Grading

549 Rakai Kalisizo TC Old Masaka (Hospital) P 0.2 Grading

549 8.45

549 Rakai Rakai DLG Nkoko –kirumba-bootera U 5 Pothole patching

549 Rakai Rakai DLG Bethlehem-kalagala U 8 Pothole patching

549 Rakai Rakai DLG Lwenda-kakoma-makondo U 6 Pothole patching

549 Rakai Rakai DLG Bulanga-kabaale-kasoga U 5 Pothole patching

549 Rakai Rakai DLG Kyamalansi-biikira swamp U 4 Pothole patching

549 Rakai Rakai DLG Ndeeba-kacheera U 29 Pothole patching

549 Rakai Rakai DLG Gavu-malemba-kakun-gu-kamengo U 10 Pothole patching

549 Total TC 67

602 Rubirizi DLG Ryemondo-Ryemitagu-Ka-tungu U 9 Grading

602 Rubirizi DLG Nyakasharu-katerera U 10 Grading

602 Rubirizi DLG Omukanshansha-Katanda U 1 Grading

602 Total DLG 20

602 Rubirizi Rubirizi TC Ndekye T/c-Mubanda U 0.8 Grading

602 Rubirizi Rubirizi TC ndekye-mugogo U 4 Grading

602 Rubirizi Rubirizi TC Kabete-Nya-kiziba-Ndekye-Nyakabuka U 2.4 Grading

602 Rubirizi Rubirizi TC ndekye market-Kigezi U 1.9 Grading

602 Rubirizi Rubirizi TC Ndekye P/s- Ndekye C.O.U U 0.3 Grading

602 Rubirizi Rubirizi TC

Ndeekye- Agri land(2km,), Nyakasharu p/ground-kasarara(1km), Dist h/qtrs-Buhera central(1.5km), st. ag-nes-kyababuza(1km),k-abete-Kigezi(1.5kms),pos-ta-kyakabunda(1.0) Ndekye- T/c offices(0.3)

U 8.3 Grading

602 Rubirizi Katerera TC Katerera-Mutagamb-wa-Mbuga B U 1.2 Grading

602 Rubirizi Katerera TC nyakagyezi-Bayaba-begu-misa U 1.4 Grading

602 Rubirizi Katerera TC Kacuba-Kyamwiru-Kanyer-aramire bed U 1 Grading

602 Rubirizi Katerera TC Katerera-Kabaseke-kem-punu U 1.5 Grading

602 Rubirizi Katerera TC ventino road U 0.6 Grading

602 Rubirizi Katerera TC st Josephs-kyamwiru U 1 Grading

602 Rubirizi Katerera TC Nyakagyezi-bayaba-begu-misa U 1.05 Grading

602 Rubirizi Katerera TC Kacuba-Kyamwiru-Kanyer-aramire bed U 1.3 Grading

602 Rubirizi Katerera TC Katerera-Kabaseke-kem-punu U 0.5 Grading

602 Total TC 27.25

202 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

602 Rubirizi CARS Kajeje-nyandogo U 1.5 Grading

602 Rubirizi CARS Omukabare-kaberenge U 1.5 Grading

602 Rubirizi CARS Omukkakumbo-Rwandaro& KichwambaT/c- U 3 Grading

602 Rubirizi CARS Bururuma-St. Thomas-Ky-eya U 1.5 Grading

602 Rubirizi CARS katunguru-Bush lodge U 0.3 Grading

602 Rubirizi CARS Orwajinja-Kanyara U 1.5 Grading

602 Total CARS 9.3

550 Rukungiri Rukungiri DLG Kyomera-Nyabukum-ba-Ihindiro U 10.5 Grading

550 Rukungiri Rukungiri DLG Kagashe-Rwakanyegyero U 9 Grading

550 Rukungiri Rukungiri DLG Buyanja-Nyakagyeme U 18.4 Grading

550 Rukungiri Rukungiri DLG Ruhinda-Rwengiri U 1.30 Grading

550 Rukungiri Rukungiri DLG Kirimbe-Kagana-Nyakiso-roza U 13.1 Grading

550 Rukungiri Rukungiri DLG Kazindiro-Kyaburere U 11.2 Grading

550 Rukungiri Rukungiri DLG Joshwa Stage-Rweshama P/S U 4.4 Grading

550 Rukungiri Rukungiri DLG Omukishanda-Ndago U 4.1 Grading

550 Rukungiri Rukungiri DLG St.Francis-Ikuniro-Buhunga U 3.6 Grading

550 Rukungiri Rukungiri DLG Kebisoni-Mabanga-Kihanga U 16.9 Grading

550 Rukungiri Rukungiri DLG Rwamahwa-Kakindo U 4 Grading

550 Rukungiri Rukungiri DLG Rushararazi-Ihimbo U 1.8 Grading

550 Rukungiri Rukungiri DLG Omukiyenje-Ikona U 10.4 Grading

550 Rukungiri Rukungiri DLG Bikongozo-Kirimbe U 4.3 Grading

550 Rukungiri Rukungiri DLG Bugangari-Nyabitete U 3.3 Grading

550 Rukungiri Rukungiri DLG Kihanga-Rwemburara U 0.8 Grading

550 Rukungiri Rukungiri DLG Bikurungu-Kakoni U 0.50 Grading

550 DLG Total 117.6 551 Sembabule TC Kiwula-kabango U 3 Grading

551 Sembabule TC Lwendayi - kyolora U 3 Grading

551 Sembabule TC Kabuye road U 0.5 Grading

551 Sembabule TC Mijwala – Lujjula road U 2.8 Grading

551 Sembabule TC Senyondo road U 1.2 Grading

551 Sembabule TC Lujjula-kasonji road U 1.3 Grading

551 Sembabule Mateete TC Taaia main street to Matete S/c U 1 Grading

551 Sembabule Mateete TC Sekabito road U 3 Grading

551 Sembabule Mateete TC Kiiganda road U 0.5 Grading

551 Total TC 4.5

596 Serere Serere TC EWONGU ROAD U 0.2 Grading

596 Serere Serere TC ISAIAH ELOKU ROAD U 0.6 Grading

596 Serere Serere TC ESABU ROAD U 0.45 Grading

596 Serere Kasilo TC Okello road U 1.90 Grading

596 Serere Kasilo TC Mairo mukaga - Kololo U 0.879 Grading

596 Kasilo TC Total 2.779

596 Serere Serere DLG Kabulabula - Ajuba U 5.86 Grading

596 Serere Serere DLG Koluo Corner - Nakabaale L/s U 6.40 Grading

596 Serere Serere DLG Kateta - Acomia - Pingire U 16 Grading

596 Serere DLG Total 28.26

609 Sheema Bugongi Tc Bugongi - Kasusano U 1.8 Grading

203Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

609 Sheema Bugongi Tc Kaziko - Kyabuyongo U 1 Grading

609 Sheema Bugongi Tc Kyakajumba - Rwenkuba U 1.3 Grading

609 Sheema Bugongi Tc Nyabubare I - Murari U 2.4 Grading

609 Sheema Bugongi Tc Matsya - Kyarwera U 4 Grading

609 Sheema Bugongi Tc Karukwereza-Kabutonda -Kamushasha U 2.5 Grading

609 Sheema Bugongi Tc Lower Street U 3.0 Grading

609 Sheema Bugongi Tc Kaako - Rwamutunga U 2 Grading

609 Sheema Kabweohe Iten-dero Rwabutura - Itendero U 0.5 Grading

609 Sheema Kabweohe Iten-dero Kemikyera - Roadside U 2 Grading

609 Sheema Kabweohe Iten-dero Rushoroza Mukurura U 1.3 Grading

609 Sheema Kabweohe Iten-dero Omukatete - Nyaruhanga U 2.5 Grading

609 Sheema Kabweohe Iten-dero Nyakashambya - Kacura U 2 Grading

609 Sheema Kabweohe Iten-dero Kyatamba - Kacindo U 1.5 Grading

609 Sheema Kabweohe Iten-dero Rwembogo - Muko U 1.5 Grading

609 Sheema Sheema TC Kibingo - Mushanga U 5 Grading

609 Sheema Sheema TC Sheema Town Council Road U 2 Grading

609 Sheema Sheema TC Kyabandara T/C - Mikyerere U 2 Grading

609 Sheema Sheema TC Nyamufumura - Mukinga - Kagongi U 4 Grading

609 T/C Total 42.3

609 Sheema Sheema CARS St Joseph-Mabare11 Rweicu-mu,Nyakanoni-Nyakayojo U 4 Grading

609 Sheema Sheema CARS Mashojwa Kooga U 7 Grading

609 Sheema Sheema CARS Bubaare- Kyabigo- Kitun-tu,Kasana-Munyogyere U 9 Grading

609 Sheema Sheema CARSKaagati Nyakabirizi-Okyo-orafuzi-Omukapolisi Kashekuro

U 8 Grading

609 Sheema Sheema CARS Kyeruma Rushozi Migamba Nyamufumura U 13 Grading

609 Sheema Sheema CARS Nyakizinga -Rwabuza Ka-gorogoro U 7 Grading

609 Sheema Sheema CARS Katooma Par-ish-Nyarubare-Kyengando U 5 Grading

609 Sheema Sheema CARS Rwakizibwa-Kitugunda U 1 Grading

609 Total CARS 54609 Sheema DLG Rwengando - Ngoma U 7 Grading

609 Sheema DLGKanyeganyegye-Burin-go-Nyakambu-Muko-no-Masheruka

U 16 Grading

609 Sheema DLG Rwengando-Kihunda-Kya-bahaya U 9 Grading

609 Sheema DLG Itendero- Kanyeganyegye U 18 Grading

609 Total DLG 50552 Sironko Sironko DLG Bukhulo-Nalikhuba 4.5 Drains& grass cutting

552 Sironko Sironko DLG Bumudu-Namanyonyi 4.2 Drains & grass cutting

552 Sironko Sironko DLG Sironko-Bugusege 5 Drains & grass cutting

552 Sironko Sironko DLG Busulani-Bunaseke 1.5 Drains & grass cutting

552 Sironko Sironko DLG Bugusege-Bunazami 6 Drains & grass cutting

552 Sironko Sironko DLG Nakiwondwe-Bugitimwa 1.5 Drains & grass cutting

204 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

552 Sironko Sironko DLG Patto-Kaduwa 2 Opening Drains & grass cutting

552 Sironko Sironko DLG Bunabuka-Bukiyi 4 Drains & grass cutting

552 Sironko Sironko DLG Nakiwondwe-Makutana 5.2 Drains & grass cutting

552 Sironko Sironko DLG Nagudu-Bugusege 2 Drains & grass cutting

552 Sironko Sironko DLG Buhugu-Bukyabo 3 Drains & grass cutting

552 Sironko Sironko DLG Buhugu S/C-Nandere 4 Drains & grass cutting

552 Sironko Sironko DLG Namangi-Bumukone 4 Drains & grass cutting

552 Sironko Sironko DLG Bukimali-Bumausi 0.5 Drains & grass cutting

552 Sironko TT DLG 47.4

552 Sironko Sironko T/C Maidadi 1.7 Drains & grass cutting

552 Sironko Sironko T/C Bishop Masaba 1 Drains & grass cutting

552 Sironko Sironko T/C Elgon 0.6 Drains & grass cutting

552 Sironko T/C Total 3.3

553 Soroti Soroti DLG Kamuda-Olobai Un Paved 21.6 Grading

553 Soroti Soroti DLG Soroti-Opiro-Aukot Un Paved 9 Grading

553 Soroti Soroti DLG Amukaru-Obule Un Paved 10.5 Grading

553 Soroti DLG Total 41.1 554 Tororo Malaba TC Muruga Earth 3 Grading

554 Tororo Malaba TC Asinge Community Earth 2 Grading

554 Tororo Malaba TC Majengo road Earth 1 Grading

554 Tororo Malaba TC Ekabat road Earth 0.3 Grading

554 Tororo Nagongera TC Ramogi road Earth 2.4 Grading

554 Tororo Nagongera TC Katandi road Earth 3.6 Grading

554 Tororo Nagongera TC Ligaga road Earth 3.6 Grading

554 Tororo Nagongera TC Station road Earth 2.6 Grading

554 Tororo Nagongera TC Opeti 1 road Earth 4.4 Grading

554 Tororo Nagongera TC Were road Earth 8.4 Grading

554 Tororo Nagongera TC Ochola road Earth 2.2 Grading

554 Tororo Nagongera TC Opedo road Earth 8 Grading

554 Tororo Nagongera TC Mission road Earth 3.2 Grading

554 TC Total 44.7554 Tororo Tororo DLG Paya – Busibira Earth 6 Grading

554 Tororo Tororo DLG Tuba-merekit Gravel 10.6 Grading

554 Tororo Tororo DLG Mukuju-Akoret Earth 5.4 Grading

554 Tororo Tororo DLG Dakimach-Petta Earth 3.8 Grading

554 Tororo Tororo DLG Pochoa-Lwala Earth 4.3 Grading

554 Tororo Tororo DLG Matawa Ruywelo Earth 3.8 Grading

554 Tororo Tororo DLG Osia-kagwara Earth 10 Grading

554 Tororo Tororo DLG Pajwenda-Pasindi Gravel 10.2 Grading

554 Tororo Tororo DLG Paya-Nawire-Pakoi Gravel 10 Grading

554 Tororo Tororo DLG Tororo-kwapa-salosalo Gravel 18.6 Grading

554 Tororo Tororo DLG Poyawo-Magola-Gule Gravel 10 Grading

554 Tororo Tororo DLG Mukuju PTC-Totokidwe Gravel 5.9 Grading

554 Tororo Tororo DLG Morukatipe-Oriyoi-Water Gravel 7 Grading

554 Tororo Tororo DLG Angorom-Asinge Earth 7 Grading

554 Tororo Tororo DLG Mukuju-Peipei-Marikiswa Gravel 11 Grading

554 Tororo Tororo DLG Adumai-Mella-koitangiro Gravel 8 Grading

554 Tororo Tororo DLG Paya-Senda Earth 8 Grading

205Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

554 Tororo Tororo DLG Kinyili N-Angololo-kalait Gravel 7 Grading

554 Tororo Tororo DLG Achilet-kidera-Osia Gravel 8 Grading

554 Tororo Tororo DLG UTRO-Buyemba Gravel 4.6 Grading

554 Tororo Tororo DLG Kwapa Morukebu-kalait Gravel 13.7 Grading

554 Tororo Tororo DLG TGS – Water works-Oriyoi Gravel 8.5 Grading

554 Tororo DLG Total 181.4 555 Wakiso C.A.Rs Nanvubya-Lugungudde Unpaved 2 Grading

555 Wakiso C.A.Rs Kimbejja-Nabbingo Unpaved 3 Grading

555 Wakiso C.A.Rs Kyengera-Nkokonjeru Unpaved 2 Grading

555 Wakiso C.A.Rs Migadde-Kikandwa Unpaved 2.6 Grading

555 Wakiso C.A.Rs Kakerenge-kasambya-Na-makonkome Unpaved 2.8 Grading

555 Wakiso C.A.Rs Sittankya-Ssagala Unpaved 2.1 Grading

555 Wakiso C.A.Rs Kyankima-Nakigoya Unpaved 4 Grading

555 Wakiso C.A.Rs Kabunza rd Unpaved 6 Grading

555 Wakiso C.A.Rs Sanda-Nalubi-Bulondo Unpaved 2 Grading

555 Wakiso C.A.Rs Katubwe-Banda Unpaved 2 Grading

555 Wakiso C.A.Rs Kaapa-Makanga-Kyuma Unpaved 3 Grading

555 Wakiso C.A.Rs Bugera-kayengere Unpaved 2 Grading

555 Wakiso C.A.Rs lumpalanga-Masajja Unpaved 2 Grading

555 Wakiso C.A.Rs Kanaaba-Buggu-Kibuloka Unpaved 3 Grading

555 Wakiso C.A.Rs Kaggwa - Kabira Unpaved 3 Grading

555 Wakiso C.A.Rs Zimwe- masajja Unpaved 1 Grading

555 Wakiso C.A.Rs Gangu - Kabuma -Kibiri Unpaved 3 Grading

555 Wakiso C.A.Rs Bujuuko-Kigoma-Bukasa Unpaved 4 Grading

555 Wakiso C.A.Rs Buyera-Kawoko-Bujuuko Unpaved 4 Grading

555 Wakiso C.A.Rs Nankonge-Butakesu-Jun-go-Bulwanyi Unpaved 7 Grading

555 Wakiso C.A.Rs Nkumba-Kisembi Unpaved 4 Grading

555 Wakiso C.A.Rs Kiganda-Bemba Unpaved 3 Grading

555 Wakiso C.A.Rs Kagave-Kelezia-Nalugala Unpaved 3 Grading

555 Wakiso C.A.Rs Kabana-Kaboona Unpaved 4 Grading

555 Wakiso C.A.Rs Bukemba-Nabutiti- Unpaved 2 Grading

555 Wakiso C.A.Rs Kawanda police-Kirinyabi-go-Kakologo Unpaved 4.1 Grading

555 Wakiso C.A.Rs Wagaba-Buzimba-Kamuli Unpaved 2.5 Grading

555 C.A.Rs Total 83.1555 Wakiso Wakiso DLG Gombe - Kungu-Buwambo Unpaved 9.6 Grading

555 Wakiso Wakiso DLG Nkowe - Mende - Sanga Unpaved 14 Grading

555 Wakiso Wakiso DLG Gobero - Masulita Unpaved 7.2 Grading

555 Wakiso Wakiso DLG Kinawa- Kyengera Unpaved 2.2 Grading

555 Wakiso Wakiso DLG Seguku - Kasenge - Buddo Unpaved 6 Grading

555 Wakiso Wakiso DLG Sentema - Mengo Unpaved 13.4 Grading

555 Wakiso Wakiso DLG Manyangwa - Kattabaana Unpaved 7 Grading

555 Wakiso Wakiso DLG Kattabaana - Nasirye - Bulesa Unpaved 6.3 Grading

555 Wakiso Wakiso DLG Nampuge - Ddambwe Unpaved 5.2 Grading

555 Wakiso Wakiso DLG Kiziri - Kiwenda Unpaved 7.1 Grading

555 Wakiso Wakiso DLG Mikka - Buwembo - Kitayita Unpaved 14.5 Grading

555 Wakiso Wakiso DLG Mabamba - Bwayise - Kiny-wante Unpaved 6.3 Grading

555 Wakiso Wakiso DLG Kisindye - Mabamba Unpaved 9 Grading

206 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

555 Wakiso Wakiso DLG Kawaliira - Kakiri Unpaved 4 Grading

555 Wakiso Wakiso DLG Kireka - Bbira - Nansana Unpaved 6.6 Grading

555 Wakiso Wakiso DLG Ssisa - Kitovu - Kitende Unpaved 6.8 Grading

555 Wakiso Wakiso DLG Ggulwe - Bubajja - Nakusaz-za Unpaved 5.3 Grading

555 Wakiso Wakiso DLG Nabweru - Wamala Unpaved 7.8 Grading

555 Wakiso Wakiso DLG Kasozi - Kabbubu Unpaved 5.8 Grading

555 Wakiso Wakiso DLG Kitezi - Kiti - Namulonge Unpaved 20 Grading

555 Wakiso Wakiso DLG Kitanda - Sayi - Kiweebwa Unpaved 8.8 Grading

555 Wakiso Wakiso DLG Star - Bunamwaya Unpaved 1.2 Grading

555 Wakiso Wakiso DLG Namulanda - Bweya - Ddewe Unpaved 2.5 Grading

555 Wakiso Wakiso DLG Kitovu - Ssangu - Kitemu Unpaved 11.3 Grading

555 Wakiso Wakiso DLG Nsangi-Mukono-Kitemu Unpaved 4.4 Grading

555 Wakiso DLG Total 192.3555 Wakiso Wakiso TC Wakiso Central - Dist Htrs P 1.2 Grading

555 Wakiso Wakiso TC Gombe - Kitasa P 2.5 Grading

555 Wakiso Nansana TC Western Ring Road I & 2 P 2.0 Grading

555 Wakiso Nansana TC Western Ring Road III (Hump construction) P 2.4 Grading

555 Wakiso Nansana TC Nabweru Lugoba P 2 Grading

555 Wakiso Nansana TC Eastern Ring Road P 2.1 Grading

555 Wakiso Nansana TC Nansana Nabweru- Kawala rd P 2.7 Grading

555 Wakiso Nansana TC Opening of Nansana sec. sch U 1 Grading

555 Wakiso Nansana TC Wamala - Kageye U 0.8 Grading

555 Wakiso Nansana TC Mpanga road U 0.6 Grading

555 Wakiso Nansana TC Opening Makolo rd U 0.6 Grading

555 Wakiso Kakiri TC Bukalango-Kagala U 1.5 Grading

555 Wakiso Kakiri TC Kiteredde-Kambe 1 U 2.3 Grading

555 Wakiso Kakiri TC Nakyerongoosa-Mpeggwe U 0.6 Grading

555 TC Total 22.3

556 Yumbe Town Council Green Valley G 4.56 Grading

556 Yumbe Town Council Ogorondu G 6.88 Grading

556 Yumbe Town Council Gogo G/E 3.05 Grading

556 Yumbe Town Council Kuri G 1.98 Grading

556 Yumbe Town Council Oluke G 2.34 Grading

556 Yumbe Town Council Chonga G 0.89 Grading

556 Yumbe Town Council Abiriga G 0.82 Grading

556 Yumbe Town Council Odriga G 1.8 Grading

556 Yumbe Town Council Moses G 1.81 Grading

556 Yumbe Town Council Diku G 1.25 Grading

556 Yumbe Town Council Yuku G 0.32 Grading

556 Total TC 25.7

556 Yumbe Yumbe DLG Odravu-Lodonga E 2 Grading

556 Yumbe DLG Total 2

556 Yumbe CARS Juba II- Lobe Earth 2 Grading

556 Yumbe CARS Kochi –Goboro IDP Earth 6 Grading

556 Yumbe CARS Alaba –Lodenga Earth 4 Grading

556 Yumbe CARS AIIVU –Loli Earth 4 Grading

556 Yumbe CARS Kenyanga Post-kenyanga PS Earth 2 Grading

207Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR Network-Routine Mechanised Maintenance FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

556 Yumbe CARS Kerila-Apo seed SS Earth 2.5 Grading

556 Yumbe CARS Bidibidi-lyete road Earth 1 Grading

556 Total CARS 21.5587 Zombo Zombo TC Tengo-Oyeyo Earth 2 Grading

587 Zombo Zombo TC Atyenda-Fada Earth 10 Grading

587 Zombo Zombo TCCongumwochi-Otheyolem-be (Changed to Korombo mission Road)

Earth 3 Grading

587 Zombo TC Total 15587 Zombo Zombo DLG Gamba-Alangi-Warr Girls Earth 6 Grading

587 Zombo Zombo DLG Paidha-Otheko Earth 0 Grading

587 Zombo Zombo DLG Police-Ayaka Earth 6 Grading

587 Zombo Zombo DLG Pakadha-Konga-Akwanji Earth 6 Grading

587 Zombo DLGTotal 28

208 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

751 Arua Arua MC Odaka rd U 3751 Arua Arua MC Okuti Lane U 1.6751 Arua Arua MC Ezaga Lane U 0.8

751 Arua Arua MC Adam Makelele, Afroa, Lemerijo U 6.2

751 Arua MC Total 11.6776 Busia Busia MC MugeniRoad U 0.30 Grading776 Busia Busia MC Alupe Road U 1.80 Grading776 Busia Busia MC Wesonga Road U 0.30 Grading776 Busia Busia MC Arubaine Road U 0.40 Grading776 Busia Busia MC Mugungu Road U 0.38 Grading776 Busia Busia MC Nahaime Road U 0.40 Grading776 Busia Busia MC Nagwe Road U 0.37 Grading776 Busia Busia MC Omukada Link U 0.49 Grading776 Busia Busia MC Jacob Aryada U 0.21 Grading776 Busia Busia MC Ogema Road U 0.39 Grading776 Busia Busia MC Taxi Park U 0.20 Grading776 Busia Busia MC Albert Wabudi Road U 0.47 Grading776 Busia Busia MC Obernester Road U 0.90 Grading776 Busia Busia MC Hadongole Road U 0.60 Grading776 Busia Busia MC Nakomolo Road U 0.70 Grading776 Busia Busia MC Madonya Road U 0.70 Grading776 Busia Busia MC Matayo Road U 0.50 Grading776 Busia Busia MC Buchicha-Sikuda U 0.90 Grading776 Busia MC Total 10.01752 Entebbe Entebbe MC Kitoro Paved 0.04 Patching 752 Entebbe Entebbe MC Babiha Paved 0.02 Patching 752 Entebbe Entebbe MC Johnson Paved 0.01 Patching 752 Entebbe Entebbe MC Alex Ojera Paved 0.01 Patching 752 Entebbe Entebbe MC Manyago Paved 0.02 Patching 752 Entebbe Entebbe MC Kampala Paved 0.02 Patching 752 Entebbe Entebbe MC Kiwafu Paved 0.16 Patching 752 Entebbe Entebbe MC Uring Crescent Paved 0.22 Patching 752 Entebbe Entebbe MC Circular Paved 0.30 Patching 752 Entebbe Entebbe MC Lutwama Paved 0.10 Patching 752 Entebbe Entebbe MC Gowers Paved 0.01 Patching 752 Entebbe Entebbe MC Erick Magara Paved 1 Patching 752 Entebbe Entebbe MC Combe Paved 0.6 Patching 752 Entebbe Entebbe MC 1st Street Paved 1 Patching 752 Entebbe Entebbe MC Park Paved 0.45 Patching 752 Entebbe Entebbe MC Convent Paved 0.2 Patching 752 Entebbe Entebbe MC Convent Close Paved 0.3 Patching 752 Entebbe Entebbe MC Edna Paved 1 Patching 752 Entebbe Entebbe MC Kitasa Paved 0.7 Patching 752 Entebbe Entebbe MC Mugula Paved 0.3 Patching 752 Entebbe Entebbe MC Deven port Paved 0.4 Patching 752 Entebbe Entebbe MC Temple Paved 0.6 Patching 752 Entebbe Entebbe MC Martin Luther King Paved 1 Patching 752 Entebbe Entebbe MC Chadwick Paved 1 Patching 752 Entebbe Entebbe MC Mpigi Paved 0.6 Patching 752 Entebbe MC Total 10.06753 Fortportal Fortportal MC Rukidi III Street Paved 0.375 Pothole patching753 Fortportal Fortportal MC Kaboyo road Paved 0.45 Pothole patching753 Fortportal Fortportal MC Malibo Road Paved 0.225 Pothole patching753 Fortportal Fortportal MC Moledina Street Paved 0.225 Pothole patching753 Fortportal Fortportal MC Magambo Street Paved 0.225 Pothole patching753 Fortportal Fortportal MC Kahinju road Paved 0.45 Pothole patching753 Fortportal Fortportal MC Mutaleesa road Paved 0.225 Pothole patching753 Fortportal Fortportal MC Lugard road Paved 1.575 Pothole patching

209Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

753 Fortportal Fortportal MC Kakiiza road Paved 0.375 Pothole patching753 Fortportal Fortportal MC Njara Road Paved 0.75 Pothole patching753 Fortportal Fortportal MC Toro road Paved 0.2 Pothole patching753 Fortportal Fortportal MC Balya Road Paved 0.15 Pothole patching753 Fortportal Fortportal MC Mugurusi road Paved 0.6 Pothole patching753 Fortportal Fortportal MC Maguru - Virika road Paved 0.35 Pothole patching753 Fortportal Fortportal MC Cathedral road Paved 0.15 Pothole patching753 Fortportal Fortportal MC Kamuhinga road Paved 0.225 Pothole patching753 Fortportal Fortportal MC Nyamitoma road Paved 0.125 Pothole patching753 Fortportal Fortportal MC Muchwa lane Paved 0.25 Pothole patching753 Fortportal Fortportal MC Kaija road UnPaved 0.80 Grading 753 Fortportal Fortportal MC Nyabukara - Bulyanyaje UnPaved 1.00 Grading 753 Fortportal Fortportal MC Rwengoma Road Net work UnPaved 1.70 Grading

753 Fortportal Fortportal MC Nyaika - Kiteere - Kibimba rd UnPaved 3.10 Grading

753 Fortportal Fortportal MC Mukubo - Kakiiza Road UnPaved 1.50 Grading 753 Fortportal Fortportal MC Duke of Abrose road UnPaved 0.4 Grading

753 Fortportal Fortportal MC Bank Side - Bulyanyenje Road UnPaved 0.60 Grading

753 Fortportal Fortportal MC Buraro - Nyakagongo road UnPaved 1.40 Grading 753 Fortportal Fortportal MC Nyakagongo - Mukonomura UnPaved 1.00 Grading 753 Fortportal Fortportal MC Kanyamakere UnPaved 1.10 Grading 753 Fortportal Fortportal MC Kitebutura - Kaihokwa raod UnPaved 1.50 Grading 753 Fortportal Fortportal MC Bugunda road UnPaved 1.00 Grading 753 Fortportal Fortportal MC Ngobe road UnPaved 0.60 Grading 753 Fortportal Fortportal MC Itara - Maguru UnPaved 1 Grading 753 Fortportal Fortportal MC Harukoto Circular drive UnPaved 1.4 Grading 753 Fortportal Fortportal MC Kuku - Karamaga road UnPaved 1 Grading 753 Fortportal Fortportal MC Nyanduhi road UnPaved 0.5 Grading 753 Fortportal Fortportal MC Butangwa - Musozi rd UnPaved 0.3 Grading 753 Fortportal MC Total 26.825754 Gulu Gulu MC Alur road U 0.02 Pothole patching754 Gulu MC Total 0.02 771 Hoima Hoima MC Millennium - Seminary Gravel 1.00 Grading771 Hoima Hoima MC Bujumbura -Cathedral Gravel 2.60 Grading771 Hoima Hoima MC Kyarwabuyamba Gravel 2.6 Grading771 Hoima Hoima MC Bunyoro-Kitara Gravel 0.5 Grading771 Hoima Hoima MC Hospital Gravel 0.7 Grading771 Hoima Hoima MC Rusembe I Gravel 2.20 Grading771 Hoima Hoima MC Rusembe II Gravel 1.70 Grading771 Hoima Hoima MC Rumbiha Gravel 0.60 Grading771 Hoima Hoima MC Mandela Gravel 0.60 Grading771 Hoima Hoima MC Kalyabuhiire Gravel 0.20 Grading771 Hoima Hoima MC Tayali Gravel 0.20 Grading771 Hoima Hoima MC Masindi-Kampala bypass Gravel 0.50 Grading771 Hoima Hoima MC Seed school Gravel 0.50 Grading771 Hoima Hoima MC Mosque road Gravel 0.10 Grading771 Hoima Hoima MC Kaibalya Earth 2.0 Grading771 Hoima Hoima MC Bakecura Gravel 0.4 Grading771 Hoima Hoima MC Palace-Magezi roads Gravel 0.6 Grading771 Hoima Hoima MC Kikwite Gravel 1.00 Grading771 Hoima Hoima MC kiryatete-Winyi Gravel 1.20 Grading771 Hoima Hoima MC Ginney Gravel 0.40 Grading771 Hoima Hoima MC Round abt-Duhaga Sec Gravel 0.50 Grading771 Hoima Hoima MC Makidadi Gravel 0.80 Grading771 Hoima Hoima MC Bujwahya-Rwenkondwa Gravel 1.20 Grading771 Hoima Hoima MC Rukurato Gravel 0.30 Grading771 Hoima Hoima MC Kamurasi Gravel 0.60 Grading771 Hoima Hoima MC Ngura Gravel 0.50 Grading

210 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

771 Hoima Hoima MC Bishops House-Seminary Gravel 0.50 Grading771 Hoima Hoima MC 0.80 Grading771 Hoima MC Total 23.7 773 Iganga Iganga MC Musa Kasolo road U 0.6 Grading773 Iganga Iganga MC Wakooli road U 0.2 Grading773 Iganga Iganga MC Balilete road U 0.5 Grading773 Iganga Iganga MC Ziraba Muzaale road U 0.2 Grading773 Iganga Iganga MC Tabingwa road U 0.09 Grading773 Iganga Iganga MC Nakavule road U 0.65 Grading773 Iganga Iganga MC Nabidongha road U 0.25 Grading773 Iganga Iganga MC Mwondha close U 0.15 Grading773 Iganga Iganga MC Dauid Waiswa road U 0.25 Grading773 Iganga Iganga MC Malala road U 0.3 Grading773 Iganga Iganga MC Masaka Close U 0.2 Grading773 Iganga Iganga MC Kyeyago Ismail road U 0.22 Grading773 Iganga Iganga MC Kyeyune road U 0.2 Grading773 Iganga Iganga MC Kayaga lane U 0.2 Grading773 Iganga Iganga MC Kakugulu road U 0.25 Grading773 Iganga Iganga MC Kabaka Muzaale road U 0.7 Grading773 Iganga Iganga MC Kasokoso Annex road U 0.5 Grading773 Iganga Iganga MC Balidawa road U 0.07 Grading773 Iganga Iganga MC Bugumba road U 0.1 Grading773 Iganga Iganga MC Bukyabubi road U 0.45 Grading773 Iganga Iganga MC Bwana Ali road U 0.45 Grading773 Iganga Iganga MC Edwau road U 0.28 Grading773 Iganga Iganga MC Gulumye road U 0.4 Grading773 Iganga Iganga MC Gulume road U 0.35 Grading773 Iganga Iganga MC Kigulu Close U 0.1 Grading773 Iganga Iganga MC Leo road U 0.4 Grading773 Iganga Iganga MC Magala road U 0.2 Grading773 Iganga Iganga MC Nkono road U 0.3 Grading773 Iganga Iganga MC Wakabi road U 0.19 Grading773 Iganga Iganga MC Wakinankali road U 0.25 Grading773 Iganga Iganga MC Bukyabubi road U 0.45 Grading773 Iganga MC Total 9.45755 Jinja Jinja MC Odwe JB Rd Patching 0.01 Grading755 0.01

757 Kabale Kabale MC Grabbing of 7 selected dis-trict roads P 6.75 Grading

757 Kabale Kabale MC Odongoyere - Etam road P 4.25 Grading757 Kabale MC Total 11770 Kasese Kasese MC Landfill U 0.5 Grading770 Kasese Kasese MC Saluti U 0.8 Grading770 Kasese Kasese MC Kamulikwizi U 1.1 Grading770 Kasese Kasese MC Kanyangeya U 1.1 Grading770 Kasese Kasese MC Kigoro - Kabughabugha U 3.0 Grading770 Kasese Kasese MC Majengo U 5.0 Grading770 Kasese Kasese MC Nyamutswa U 1.1 Grading770 Kasese Kasese MC Nyakasanga U 2.6 Grading770 Kasese Kasese MC Kyebambe U 3.0 Grading770 Kasese Kasese MC Golf-Kibenge U 6.0 Grading770 Kasese Kasese MC Matebere U 0.4 Grading770 Kasese Kasese MC Korokoro U 0.6 Grading770 Kasese Kasese MC Rwabwogo U 1.0 Grading770 Kasese Kasese MC Rukidi U 0.6 Grading770 Kasese Kasese MC Binyonyi I &11 U 1.8 Grading770 Kasese Kasese MC Cathedral U 2.0 Grading770 Kasese Kasese MC Rukidi U 0.6 Grading770 Kasese Kasese MC Mbogo U 1.5 Grading

211Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

770 Kasese Kasese MC Kyanjuki U 1.5 Grading770 Kasese Kasese MC Mbabu U 0.6 Grading770 Kasese Kasese MC Crescent U 0.0 Grading770 Kasese Kasese MC Basecamp lower U 0.0 Grading770 Kasese MC Total 35.80758 Lira Lira MC Obote Avenue P 1.30 Grading758 Lira Lira MC soroti Rd P 0.40 Grading758 Lira Lira MC Agoro Rd P 0.50 Grading758 Lira Lira MC Note-ber-Rd P 1.00 Grading758 Lira Lira MC Obangaker Rd P 0.20 Grading758 Lira Lira MC Okello O Rd U 0.5 Grading758 Lira Lira MC Imat apuli U 1.3 Grading758 Lira Lira MC Alyai Rd U 0.6 Grading758 Lira Lira MC Adyei Primary Rd U 0.8 Grading758 Lira Lira MC Ekii Erifasi U 1.6 Grading758 Lira Lira MC Omito II Rd U 1.1 Grading758 Lira Lira MC Eng.Otim U 4.4 Grading758 Lira Lira MC Jackson O U 1.0 Grading758 Lira Lira MC Lumumba-Agengo U 2.7 Grading758 Lira Lira MC Starch Factory U 1.3 Grading758 Lira Lira MC Boundary R U 1.0 Grading758 Lira Lira MC Mathiew Alunga Rd U 0.8 Grading758 Lira Lira MC Ober and Bua Yeko Rd U 2.5 Grading758 Lira Lira MC Nyokorac Rd U 0.8 Grading758 Lira Lira MC Ameto Awany Rd U 2.6 Grading758 Lira MC Total 23.0759 Masaka Masaka MC Speke Road U 1.00 Grading 759 Masaka Masaka MC Elgin Street P 1.3 Grading 759 Masaka Masaka MC Hobart Str. P 1.3 Grading 759 Masaka Masaka MC Kooki Road P 0.4 Grading 759 Masaka Masaka MC Katwe Bypass P 1.42 Grading 759 Masaka Masaka MC Alex Ssebowa Road P 2.0 Grading 759 Masaka Masaka MC Katwe Road P 1.0 Grading 759 Masaka Masaka MC Birch p 1.0 Grading 759 Masaka Masaka MC Victoria P 1.1 Grading

759 Masaka Masaka MC Nyendo- Cathedral- Hos-pital P 6.0 Grading

759 Masaka Masaka MC Mwami Street P 0.32 Grading 759 Masaka Masaka MC Grant Street P 0.98 Grading 759 Masaka Masaka MC Ssese Str. P 0.46 Grading 759 Masaka Masaka MC Kabula Street P 0.60 Grading 759 Masaka Masaka MC Jathebai street P 0.29 Grading 759 Masaka Masaka MC EdwardAvenue P 1.20 Grading 759 Masaka Masaka MC Mawogola Road P 0.40 Grading 759 Masaka Masaka MC Baines Terraces P 0.78 Grading 759 Masaka Masaka MC Alexander Road P 0.84 Grading 759 Masaka Masaka MC Hill Road P 1.06 Grading 759 Masaka Masaka MC Nakayiba- Kitovu P 1.40 Grading 759 Masaka Masaka MC Ssomero U 0.6 Grading 759 Masaka Masaka MC Kajjansembe U 2.20 Grading 759 Masaka Masaka MC Kasijjagirwa Road U 1.50 Grading 759 Masaka Masaka MC Kirumba Av. U 2.0 Grading 759 Masaka Masaka MC Nekongolero Road U 2.80 Grading 759 Masaka Masaka MC Kimaanya Road U 3.0 Grading 759 Masaka Masaka MC Kabulasoke Road U 2.40 Grading 759 Masaka Masaka MC Ssenyange Road U 7.0 Grading 759 Masaka MC Total 46.45774 Masindi Masindi MC Kiisanja-Kichope Earth 6.8 Grading 774 Masindi Masindi MC Kyamugweri-Kijambura Earth 6.6 Grading 774 Masindi MC Total 13.40

212 Annex 12: DUCAR Network Routine Mechanised maintenance by road

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

760 Mbale Mbale MC North road, Naboa road, Cathedral P 31.2 Grading

76 Mbale MC Total 31.2761 Mbarara Mbarara MC Kijungu Road Paved 4.4 Pothole patching761 Mbarara Mbarara MC Buremba Road Paved 1.8 Pothole patching761 Mbarara Mbarara MC Bishop Willis Street Paved 1.4 Pothole patching761 Mbarara Mbarara MC Bucunku Road 0.4km Paved 1.6 Pothole patching761 Mbarara Mbarara MC Mubangizi Road section1 Paved 4.2 Pothole patching761 Mbarara Mbarara MC Galt road Paved 2.12 Pothole patching761 Mbarara Mbarara MC Stanley road Paved 3.2 Pothole patching761 Mbarara Mbarara MC Bishop Stretcher road Paved 0.9 Pothole patching761 Mbarara Mbarara MC Kananura drive Unpaved 1.0 Pothole patching

761 Mbarara Mbarara MC Rwagaju - Kishasha - Kako-ma road Unpaved 6.0 Pothole patching

761 Mbarara Mbarara MC Kamatarisi - Kyarukofu road Unpaved 6.0 Pothole patching761 Mbarara Mbarara MC Mile 2 - Rwariire - Kibona Unpaved 20.0 Pothole patching

761 Mbarara Mbarara MC Kabagarame - Kanyegany-egye Unpaved 14.0 Pothole patching

761 Mbarara Mbarara MC Mubangizi Road section 2 Unpaved 6.9 Pothole patching761 Mbarara Mbarara MC Kenkombe Road Unpaved 10.5 Pothole patching761 Mbarara Mbarara MC Mugume Road Unpaved 6.3 Pothole patching761 Mbarara Mbarara MC Lower Circular Road Unpaved 3.16 Pothole patching761 Mbarara Mbarara MC Nyamityobora Road Unpaved 4.2 Pothole patching761 Mbarara Mbarara MC Katanywa Road Unpaved 6.26 Pothole patching761 Mbarara Mbarara MC Ruti Circular road Unpaved 2.8 Pothole patching761 Mbarara MC Total 107.14762 Moroto Moroto MC Adyebo Gravel 1.5 Grading 762 Moroto Moroto MC Singila Gravel 1 Grading 762 Moroto Moroto MC Nakapelimen Link Gravel 0.8 Grading 762 Moroto Moroto MC Independence Gravel 1.5 Grading 762 Moroto Moroto MC Circular Gravel 3.7 Grading 762 Moroto Moroto MC Soroti Gravel 1.9 Grading 762 Moroto MC Total 10.4772 Mukono Mukono MC Kauga Gravel 1.6 Grading 772 Mukono Mukono MC Upper Kauga Prison Earth 0.5 Grading 772 Mukono Mukono MC Prison – Bugujju Earth 1 Grading 772 Mukono Mukono MC Church – Goma Earth 1 Grading 772 Mukono Mukono MC Bugujju – Ankrah Earth 1 Grading 772 Mukono Mukono MC Bugujju – Nabuti Earth 1 Grading 772 Mukono Mukono MC Wakigu – Nabuti Earth 1 Grading 772 Mukono Mukono MC Albert Cook Paved 0.4 Grading 772 Mukono Mukono MC Seth Lane Earth 0.4 Grading 772 Mukono Mukono MC Nkoyoyo Earth 1.2 Grading 772 Mukono Mukono MC Sezi- Kongo Earth 0.8 Grading 772 Mukono Mukono MC Katali Nkoyoyo Paved 0.5 Grading 772 Mukono Mukono MC Valley Avenue Earth 1 Grading 772 Mukono Mukono MC Nabuti – Nsuube Gravel 5 Grading 772 Mukono Mukono MC Nabuti-Nsube-Namumira Earth 1.5 Grading 772 Mukono Mukono MC Namumira Nile Rose Earth 2.5 Grading 772 Mukono Mukono MC Lweza Earth 2 Grading 772 Mukono Mukono MC Lweza – Nabuti Earth 0.8 Grading 772 Mukono Mukono MC Kigombya-Namumira Earth 1.5 Grading 772 Mukono Mukono MC Kirangira Gravel 1.5 Grading 772 Mukono Mukono MC Kitete Earth 2.5 Grading 772 Mukono Mukono MC Ssaza Earth 1.2 Grading 772 Mukono Mukono MC Kyaggwe Road Earth 1.0 Grading 772 Mukono Mukono MC Paulo Kavuma Link Earth 0.3 Grading 772 Mukono Mukono MC Gulama - Bugujju Earth 0.5 Grading 772 Mukono Mukono MC Gwafu - Bulabiro Earth 1.5 Grading 772 Mukono MC Total 33.2

213Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR/MC’s Network-Routine Mechanised Maintenance FY 2015/16

District District Name Road / Structure Name Surface Type (P/UP)

Achieved length (KM)

Implemented Works

778 Rukungiri Rukungiri MC Nyakibale-kinyasano U 2.20 Grading 778 Rukungiri Rukungiri MC katerera U 0.7 Grading 778 Rukungiri Rukungiri MC Butimba ring U 1.8 Grading 778 Rukungiri Rukungiri MC kifunjo U 1.0 Grading 778 Rukungiri Rukungiri MC Stadium bend U 0.4 Grading 778 Rukungiri Rukungiri MC Rukungiri Inn U 0.2 Grading 778 Rukungiri Rukungiri MC Butagatsi ring U 0.9 Grading 778 Rukungiri Rukungiri MC kyabalongo U 3.3 Grading 778 Rukungiri Rukungiri MC Ndimbirwe U 1.8 Grading 778 Rukungiri Rukungiri MC kakonkoma U 3.5 Grading 778 Rukungiri Rukungiri MC kitimba U 1.6 Grading 778 Rukungiri Rukungiri MC kyatoko U 2.0 Grading 778 Rukungiri Rukungiri MC kakabada Iane U 5.8 Grading 778 Rukungiri Rukungiri MC Rujumbura U 2.8 Grading 778 Rukungiri Rukungiri MC Nyamayenje-Marumba U 2.5 Grading 778 Rukungiri Rukungiri MC kakyeka-kabwire U 3.2 Grading 778 Rukungiri Rukungiri MC kasozi-kamuri U 1.8 Grading 778 Rukungiri Rukungiri MC Rugarama U 1.8 Grading 778 Rukungiri MC Total Roads 39.50 763 Soroti Soroti MC Mohameddan Gravel 2.9 Grading 763 Soroti Soroti MC Okijji Gravel 0.45 Grading 763 Soroti Soroti MC pamba Gravel 0.9 Grading 763 Soroti Soroti MC egwau Gravel 0.3 Grading 763 Soroti Soroti MC esabu Gravel 0.7 Grading 763 Soroti Soroti MC tisai Gravel 0.5 Grading 763 Soroti Soroti MC kakungulu Gravel 1.0 Grading 763 Soroti Soroti MC emokori Gravel 0.8 Grading 763 Soroti Soroti MC Esungget Gravel 0.6 Grading 763 Soroti Soroti MC Aleklek Gravel 0.6 Grading 763 Soroti Soroti MC Solot Avenue Gravel 0.7 Grading 763 Soroti Soroti MC Okurut close Gravel 0.34 Grading 763 Soroti MC Total Roads 9.79

214 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

215Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

Annex 13:

DUCAR Network Routine Manual

Maintenance by Road FY 2015/16

216 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

Annex 13: DUCAR Network Routine Manual Maintenance by Road FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Abim Abim DLG Alerek-Katabok-Lotukei U 42.0 Opening of drains & grass cuttingAbim Abim DLG Abuk-Awach-Agago border U 16.0 Opening of drains & grass cuttingAbim Abim DLG Aninata-Adwal U 8.0 Opening of drains & grass cuttingAbim Abim DLG Alertek-Kulodwong U 8.0 Opening of drains & grass cuttingAbim Abim DLG Orwamuge-Gangming U 12.0 Opening of drains & grass cuttingAbim Abim DLG Adea-Gulopono U 8.0 Opening of drains & grass cuttingAbim Abim DLG Aremo-Angolebwal U 6.0 Opening of drains & grass cuttingAbim Abim DLG Pupukamuya-Apeipopong U 6.0 Opening of drains & grass cuttingAbim Abim DLG Rachkoko-Akwangagwel U 4.0 Opening of drains & grass cuttingAbim Abim DLG Katala U 4.0 Opening of drains & grass cuttingAbim Abim DLG Opopongo U 4.0 Opening of drains & grass cuttingAbim Abim DLG Otumpili-Olem U 4.0 Opening of drains & grass cuttingAbim Abim DLG Atunga-Koya U 8.0 Opening of drains & grass cuttingAbim Abim DLG Katabok-Aywelu U 10.0 Opening of drains & grass cutting Abim DLG Total 140.0 Abim Abim TC Abim P/S East Lane U 0.8 Opening of drains & grass cuttingAbim Abim TC Hospital Lane U 0.4 Opening of drains & grass cuttingAbim Abim TC Market Lane U 0.4 Opening of drains & grass cuttingAbim Abim TC School Drive U 0.8 Opening of drains & grass cuttingAbim Abim TC Market Drive U 0.2 Opening of drains & grass cuttingAbim Abim TC Hospital Drive U 0.3 Opening of drains & grass cuttingAbim Abim TC Mission Drive U 0.2 Opening of drains & grass cuttingAbim Abim TC Obangaber Close U 0.3 Opening of drains & grass cuttingAbim Abim TC Nyemo Lane U 0.3 Opening of drains & grass cuttingAbim Abim TC Mission Avenue U 1.2 Opening of drains & grass cuttingAbim Abim TC Nyunenyune Street U 0.5 Opening of drains & grass cuttingAbim Abim TC Bus Park Street U 0.3 Opening of drains & grass cuttingAbim Abim TC Bus Park Road U 0.4 Opening of drains & grass cuttingAbim Abim TC Nyunenyune Lane U 0.5 Opening of drains & grass cuttingAbim Abim TC Omwony Ojwok Road U 0.3 Opening of drains & grass cuttingAbim Abim TC Abim ss Approach U 1.2 Opening of drains & grass cuttingAbim Abim TC Ating road U 0.8 Opening of drains & grass cuttingAbim Abim TC Sewerage Lane U 0.7 Opening of drains & grass cuttingAbim Abim TC Water Reservoir Road U 0.9 Opening of drains & grass cuttingAbim Abim TC Pump Station Road U 0.7 Opening of drains & grass cuttingAbim Abim TC Office Avenue U 0.5 Opening of drains & grass cuttingAbim Abim TC Omwony Ojwok Street U 0.3 Opening of drains & grass cuttingAbim Abim TC Angwee Road U 0.5 Opening of drains & grass cuttingAbim Abim TC Angwee Street U 0.7 Opening of drains & grass cuttingAbim Abim TC Angwee Lane U 0.8 Opening of drains & grass cuttingAbim Abim TC Kiru roads U 0.5 Opening of drains & grass cuttingAbim Abim TC Abim New corner roads U 4.0 Opening of drains & grass cuttingAbim Abim TC Oringowelo roads U 0.8 Opening of drains & grass cuttingAbim Abim TC Angwee roads U 2.6 Opening of drains & grass cuttingAbim Abim TC Angwee roads U 0.5 Opening of drains & grass cutting Abim TC Total 22.4 Adjumani Adjumani DLG Mungula Junction-Zoka U 9.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ciforo-Liri U 8.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ofua -Subbe-Mirieyi U 1.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Kureku-Fuda-Birra U 9.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Pakele-Mirieyi U 7.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Dzaipi-Pamajua U 16.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ukusijoni-Ajeri U 17.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Adjugopi-Nyeu U 16.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Pacara-Ogujebe U 10.0 Opening of drains & grass cutting

217Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Adjumani Adjumani DLG Ciforo-Agojo-Ogujebe section U 10.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Pakele Dzaipiloop U 18.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ciforo-Openzinzi U 5.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Tete-ogolo-Liri U 15.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Arra-Ogujebe U 14.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Openzinzi-Obilokong U 9.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Adjugopi-Miniki U 4.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ukusijoni-Gulinya U 10.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Oddu-Kolididi U 6.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Pakele-Ibibiaworo U 3.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Obilokong-Ayiri U 12.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Olia-Jurumini U 4.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Kulukulu-Zoka U 10.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Dzaipi-Magara-Pagirinya U 14.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ofua Central-Fuda U 9.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Loa-LIRI Loop U 12.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Ciforo-Magburu U 5.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Aliwara-Okawa U 12.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Kolididi-Zoka U 6.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Kureku-Amelo U 4.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Pakele-Fuda-Lowi U 9.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Oddu-Pakwinya U 1.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Esia-Ukusijoni via Atura U 6.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Palemoderi-Ciforo U 3.1 Opening of drains & grass cuttingAdjumani Adjumani DLG Kureku-Subbe U 4.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Bari Mokolo yoro U 8.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Maiaciku-Marindi U 5.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Kerelu-Amelo U 5.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Olua Melijo U 4.0 Opening of drains & grass cuttingAdjumani Adjumani DLG Guda-Egge U 3.5 Opening of drains & grass cuttingAdjumani Adjumani DLG Agojo-Opejo Health unit U 2.4 Opening of drains & grass cuttingAdjumani Adjumani DLG Nyumanzi-Madulu Via Itoasi U 3.0 Opening of drains & grass cutting

Adjumani DLG Total 329

Adjumani Town Council Karai Road U 0.8 Opening of drains & grass cuttingAdjumani Town Council Wani Road P 0.4 Opening of drains & grass cuttingAdjumani Town Council Mangi Road P 0.8 Opening of drains & grass cuttingAdjumani Town Council Illa Road P 0.785 Opening of drains & grass cuttingAdjumani Town Council Asiku Road U 0.4 Opening of drains & grass cuttingAdjumani Town Council Tereza lane U 0.1 Opening of drains & grass cuttingAdjumani Town Council Oloya Road U 0.1 Opening of drains & grass cuttingAdjumani Town Council Yusuf Road U 0.1 Opening of drains & grass cuttingAdjumani Town Council Iraku Road U 0.1 Opening of drains & grass cuttingAdjumani Town Council Bamure U 0.8 Opening of drains & grass cuttingAdjumani Town Council Kelvin U 2.6 Opening of drains & grass cuttingAdjumani Town Council Maci U 0.1 Opening of drains & grass cuttingAdjumani Town Council Karoko U 0.1 Opening of drains & grass cutting Town Council Total 1.0

Agago Agago DLG Adilang- Lacek oto Earth/Gravel 11.0 Opening of drains & grass cutting

Agago Agago DLG Adilang- Namodio Earth/Gravel 15.6 Opening of drains & grass cutting

Agago Agago DLG Patongo- Kotomor Earth/Gravel 14.4 Opening of drains & grass cutting

Agago Agago DLG Corner Aculu- Puranga Boarder Earth/Gravel 27.0 Opening of drains & grass cutting

Agago Agago DLG Omot -Okwang Earth/Gravel 10.5 Opening of drains & grass cutting

218 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Agago Agago DLG Kwon Kic- Arum Earth/Gravel 10.2 Opening of drains & grass cutting

Agago Agago DLG Refugee Camp- Kazikazi Earth/Gravel 13.2 Opening of drains & grass cutting

Agago Agago DLG Lukole- Awuch Earth/Gravel 19.0 Opening of drains & grass cutting

Agago Agago DLG Agago- Lapono Earth/Gravel 20.0 Opening of drains & grass cutting

Agago Agago DLG Olung- Amyel Earth/Gravel 12.8 Opening of drains & grass cutting

Agago Agago DLG Kabala- Kaket Earth/Gravel 11.0 Opening of drains & grass cutting

Agago Agago DLG Kalongo- Lomoi Earth/Gravel 30.0 Opening of drains & grass cutting

Agago Agago DLG Wol- Kimiya Earth/Gravel 14.9 Opening of drains & grass cutting

Agago Agago DLG Okwadoko- Atut Earth/Gravel 16.0 Opening of drains & grass cutting

Agago Agago DLG Arum- Puranga Boarder Earth/Gravel 3.6 Opening of drains & grass cutting

Agago Agago DLG Lira Palwo- Omot Earth/Gravel 10.2 Opening of drains & grass cutting

Agago Agago DLG Biwang - lacek Earth/Gravel 11.0 Opening of drains & grass cutting

Agago Agago DLG Lira Palwo- Acuru Earth/Gravel 18.1 Opening of drains & grass cutting

Agago Agago DLG Corner Paicam - Obolokome Earth/Gravel 16.0 Opening of drains & grass cutting

Agago Agago DLG Odokomit - olyelo wii dyel Earth/Gravel 18.1 Opening of drains & grass cutting

Agago Agago DLG Geregere - Okol Earth/Gravel 28.0 Opening of drains & grass cutting

Agago Agago DLG Lira palwo - Lacek Earth/Gravel 10.5 Opening of drains & grass cutting

Agago Agago DLG Ladigi - Lapono Earth/Gravel 10.0 Opening of drains & grass cutting

Agago Agago DLG Lira Kato - tekato Earth/Gravel 10.0 Opening of drains & grass cutting

Agago Agago DLG Agago - Ladere Earth/Gravel 10.0 Opening of drains & grass cutting

Agago Agago DLG Lira Kato - Obur Gulu Earth/Gravel 15.0 Opening of drains & grass cutting

Agago Agago DLG Lacekoto - kulaka Earth/Gravel 9.0 Opening of drains & grass cutting

Agago DLG Total 395.1

Agago Kalongo TC Dr. Ambrosoli Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Paul Akera Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Kalongo TC Eture Eboto Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Kalongo TC Michael Ojwang Earth/ Gravel 1.3 Opening of drains & grass cutting

Agago Kalongo TC Prof. Ogenga Latigo Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Kalongo TC Aguu Emma Avenue Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Tookema Joseph Avenue Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Opio Nicolas Avenue Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Kalongo TC Opoka Labokoloro Earth/ Gravel 0.8 Opening of drains & grass cutting

219Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Agago Kalongo TC Oryem Canogura Earth/ Gravel 0.7 Opening of drains & grass cutting

Agago Kalongo TC Lagony Justine Earth/ Gravel 0.7 Opening of drains & grass cutting

Agago Kalongo TC Adoko Avenue Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Oryem Justine Latongo Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Ojok Aywee Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Omara Benjamin Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Kalongo TC Lodoviko Lopiti Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Elem Peter Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Kalongo TC Ocan Alfred Earth/ Gravel 0.7 Opening of drains & grass cutting

Agago Kalongo TC Patongo Road Earth/ Gravel 3.5 Opening of drains & grass cutting

Agago Kalongo TC Church Road Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Kalongo TC Kitgum Road Earth/ Gravel 2.0 Opening of drains & grass cutting

Agago Kalongo TC Akon Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Kalongo TC Okedi Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Kalongo TC Delphina Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Kalongo TC Daniel Churu Earth/ Gravel 0.4 Opening of drains & grass cutting

Agago Kalongo TC Oola Francis Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Okello John Wilfred Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Kalongo TC Paimol Road Earth/ Gravel 2.0 Opening of drains & grass cutting

Agago Kalongo TC COU Road Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Kalongo TC Total 18

Agago Agago TC Obote Alii Road Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Agago TC Akello Franca Road Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Agago TC Aliboro Road Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Agago TC Prof. Ogenga Latigo Road Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Agago TC Odok Peter Earth/ Gravel 0.9 Opening of drains & grass cutting

Agago Agago TC Patongo SS Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Agago TC Health Centre Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Agago TC Lapono Earth/ Gravel 0.9 Opening of drains & grass cutting

Agago Agago TC Council Avenue Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Agago TC Okot John Amos Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Agago TC Highway Earth/ Gravel 0.9 Opening of drains & grass cutting

220 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Agago Agago TC Ongee Marino Lol Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Agago TC Market Square Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Agago TC Pader Road Earth/ Gravel 1.0 Opening of drains & grass cutting

Agago Agago TC Patongo Kalongo Earth/ Gravel 5.4 Opening of drains & grass cutting

Agago Agago TC Ngora Earth/ Gravel 2.6 Opening of drains & grass cutting

Agago Agago TC Pampara Earth/ Gravel 2.6 Opening of drains & grass cutting

Agago Agago TC Latigo Aliboro Road Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Agago TC Total 18.8

Agago Patongo TC Owiny Dollo Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Rwot Okori Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Obama Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Patongo TC Oliga Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Queens Avenue Earth/ Gravel 0.4 Opening of drains & grass cutting

Agago Patongo TC Market Street Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Patongo TC Kaguta Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Patongo TC Alfonsio Abari Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Patongo TC Oyaro John Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Patongo TC Yoromoi Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Okot Jovino Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Patongo TC Otukumaro Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Patongo TC Odongo Anyango Earth/ Gravel 0.5 Opening of drains & grass cutting

Agago Patongo TC Okello Balmoi Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Acayo Margaret Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Ongom Philips Earth/ Gravel 1.0 Opening of drains & grass cutting

Agago Patongo TC Everest Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Omel James Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Patongo TC Omaido Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Patongo TC Obina Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Patongo TC Abodio Obia Earth/ Gravel 0.2 Opening of drains & grass cutting

Agago Patongo TC Churchil Earth/ Gravel 0.7 Opening of drains & grass cutting

Agago Patongo TC Okello Quinto Earth/ Gravel 0.4 Opening of drains & grass cutting

Agago Patongo TC Muzendu Earth/ Gravel 3.0 Opening of drains & grass cutting

221Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Agago Patongo TC Oyoo Agara Earth/ Gravel 0.7 Opening of drains & grass cutting

Agago Patongo TC Oweka Bostify Earth/ Gravel 1.0 Opening of drains & grass cutting

Agago Patongo TC Bus Park Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Patongo TC Pirina Lawino Earth/ Gravel 0.6 Opening of drains & grass cutting

Agago Patongo TC Oceng Awoi Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Omara Batista Earth/ Gravel 0.1 Opening of drains & grass cutting

Agago Patongo TC Antonio Oyee Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Onencan Earth/ Gravel 0.3 Opening of drains & grass cutting

Agago Patongo TC Molo Dam Earth/ Gravel 0.6 Opening of drains & grass cutting

Patongo TC Total 16.4 Alebtong Alebtong TC Okwingo Rd Unpaved 2.6 Opening of drains & grass cuttingAlebtong Alebtong TC Okodi Acur Rd Unpaved 1.2 Opening of drains & grass cuttingAlebtong Alebtong TC Okio mike Rd Unpaved 1.5 Opening of drains & grass cuttingAlebtong Alebtong TC adyebo Cosmas Rd Unpaved 2.5 Opening of drains & grass cuttingAlebtong Alebtong TC Odwe JB Rd Unpaved 1.2 Opening of drains & grass cuttingAlebtong Alebtong TC Okello Kadogo Rd Unpaved 1.4 Opening of drains & grass cuttingAlebtong Alebtong TC Enyok Etuku Rd Unpaved 0.5 Opening of drains & grass cuttingAlebtong Alebtong TC Amuka Rd Unpaved 0.5 Opening of drains & grass cuttingAlebtong Alebtong TC Nganga Stephen Rd Unpaved 0.7 Opening of drains & grass cutting Alebtong TC Total i.4 Amolatar Amolatar DLG Amolatar - Abeja road U 17.9 Opening of drains & grass cuttingAmolatar Amolatar DLG Cr. Aputi - Amai Landing Site U 15.5 Opening of drains & grass cuttingAmolatar Amolatar DLG Kagga Junction - Ayamawele U 20.0 Opening of drains & grass cutting

Amolatar Amolatar DLG Anamwany - Odyedo Landing Site U 3.5 Opening of drains & grass cutting

Amolatar Amolatar DLG Otangocinge - Ojem Landing Site U 5.7 Opening of drains & grass cutting

Amolatar Amolatar DLG Amai - Otangocinge U 9.5 Opening of drains & grass cuttingAmolatar Amolatar DLG Anyangoga - Akongomit U 7.1 Opening of drains & grass cuttingAmolatar Amolatar DLG Cr. Odiak - Kitaleba Landing Site U 10.0 Opening of drains & grass cuttingAmolatar Amolatar DLG Abarikori - Aromi P/School U 12.0 Opening of drains & grass cuttingAmolatar Amolatar DLG Bei Ibil - Amai P/School U 11.5 Opening of drains & grass cutting

Amolatar Amolatar DLG Abako Acii - Muchora Landing Site U 2.2 Opening of drains & grass cutting

Amolatar Amolatar DLG Nabweyo - Bangaladesh Landing Site U 6.0 Opening of drains & grass cutting

Amolatar Amolatar DLG Lubiri - Akol - Buruburu U 8.3 Opening of drains & grass cuttingAmolatar Amolatar DLG Ojem - Awelo U 6.0 Opening of drains & grass cuttingAmolatar Amolatar DLG Chakwara - Awikori U 6.0 Opening of drains & grass cuttingAmolatar Amolatar DLG Aromi - Abalodyang U 4.5 Opening of drains & grass cuttingAmolatar Amolatar DLG Chakwara - Abako Atidi U 7.4 Opening of drains & grass cuttingAmolatar Amolatar DLG Abarler - Nakatiti HC II U 6.5 Opening of drains & grass cuttingAmolatar Amolatar DLG Abarler - Agwenonywal U 6.2 Opening of drains & grass cutting DLG Total 165.8 Amolatar Amolatar TC Aputi U 4.5 Opening of drains & grass cuttingAmolatar Amolatar TC Nalubwoyo U 2.0 Opening of drains & grass cuttingAmolatar Amolatar TC Abeja U 4.0 Opening of drains & grass cuttingAmolatar Amolatar TC Bale Pe Tek U 4.4 Opening of drains & grass cuttingAmolatar Amolatar TC Arwotokwe U 0.4 Opening of drains & grass cuttingAmolatar Amolatar TC Okot Obonyo U 2.0 Opening of drains & grass cutting

222 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Amolatar Amolatar TC Omara Ebek U 0.4 Opening of drains & grass cuttingAmolatar Amolatar TC Awongo U 1.2 Opening of drains & grass cuttingAmolatar Amolatar TC Otim Ben U 0.3 Opening of drains & grass cuttingAmolatar Amolatar TC Kira Misaki U 0.3 Opening of drains & grass cuttingAmolatar Amolatar TC Alele Augustine U 0.2 Opening of drains & grass cuttingAmolatar Amolatar TC Inomo U 0.5 Opening of drains & grass cuttingAmolatar Amolatar TC Olobo U 0.2 Opening of drains & grass cuttingAmolatar Amolatar TC Jabulon U 6.4 Opening of drains & grass cutting Amolatar TC Total 26.8 Amolatar C.A.Rs Agikdak Sub-County U 3.4 Opening of drains & grass cuttingAmolatar C.A.Rs Agwingiri Sub-County U 6.0 Opening of drains & grass cuttingAmolatar C.A.Rs Akwon Sub-County U 2.0 Opening of drains & grass cuttingAmolatar C.A.Rs Aputi Sub-County U 7.5 Opening of drains & grass cuttingAmolatar C.A.Rs Arwotcek Sub-County U 4.0 Opening of drains & grass cuttingAmolatar C.A.Rs Awelo Sub-County U 5.0 Opening of drains & grass cuttingAmolatar C.A.Rs Etam Sub-County U 4.3 Opening of drains & grass cuttingAmolatar C.A.Rs Muntu Sub-County U 2.0 Opening of drains & grass cuttingAmolatar C.A.Rs Namasale Sub-County U 6.0 Opening of drains & grass cutting C.A.Rs Total 40.2 Amolatar Namasale TC Namasale - Kayago U 3.0 Pothole repair & opening drainsAmolatar Namasale TC Aweipeko road U 0.1 Pothole repair & opening drainsAmolatar Namasale TC Church road U 0.7 Pothole repair & opening drains Namasale TC Total 3.8 Amudat Amudat DLG LOPEDOT - KENYA BOARDER 3 Opening of drains & grass cutting AmudatDLG Total 3 Amudat Amudat C.A.Rs LOROO - KATOTIN 8.0 Opening of drains & grass cuttingAmudat Amudat C.A.Rs MOTPODEREVA-NASOGOLO 5.0 Opening of drains & grass cutting C.A.Rs Total 13.0 Amuria Amuria DLG Amuria - Wera U 24.0 Opening of drains & grass cuttingAmuria Amuria DLG Wera - Abarilela -Acowa U 27.0 Opening of drains & grass cuttingAmuria Amuria DLG Obalanga - Oditel U 15.0 Opening of drains & grass cuttingAmuria Amuria DLG Asamuk - Acowa U 10.0 Opening of drains & grass cuttingAmuria Amuria DLG Orungo - Acuna U 5.5 Opening of drains & grass cuttingAmuria Amuria DLG Amosing - Okoboi - Apeitolim U 22.0 Opening of drains & grass cuttingAmuria Amuria DLG Orungo -Anyara U 8.5 Opening of drains & grass cuttingAmuria Amuria DLG Obalanga - Agonga - Amootom U 30.0 Opening of drains & grass cuttingAmuria Amuria DLG Orungo - Obalanga U 27.0 Opening of drains & grass cutting Amuria DLG Total 169Amuria Amuria TC Ousi U 0.7 Opening of drains & grass cuttingAmuria Amuria TC Otukei U 0.3 Opening of drains & grass cuttingAmuria Amuria TC Jamilah U 0.4 Opening of drains & grass cuttingAmuria Amuria TC Ediegu U 0.4 Opening of drains & grass cuttingAmuria Amuria TC Okwi Ssebi U 0.3 Opening of drains & grass cuttingAmuria Amuria TC Ewalu U 0.5 Opening of drains & grass cuttingAmuria Amuria TC School U 1.5 Opening of drains & grass cuttingAmuria Amuria TC Kakungulu U 0.3 Opening of drains & grass cuttingAmuria Amuria TC Epiangu U 0.5 Opening of drains & grass cuttingAmuria Amuria TC Ismail U 1.2 Opening of drains & grass cuttingAmuria Amuria TC Abdallah U 0.6 Opening of drains & grass cuttingAmuria Amuria TC Ereufasi Opolot U 0.4 Opening of drains & grass cuttingAmuria Amuria TC Egaus U 0.3 Opening of drains & grass cutting Amuria TC Total 7.4Amuria C.A.Rs Angica - Maga - Aeket U 5.0 Opening of drains & grass cutting

Amuria C.A.Rs Obalanga - Amare - Angeda-kiteng U 18.0 Opening of drains & grass cutting

Amuria C.A.Rs Aeket - Kapelebyong U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Acowa - Kobuin U 5.0 Opening of drains & grass cutting

223Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Amuria C.A.Rs Acowa - Angerepo U 18.0 Opening of drains & grass cuttingAmuria C.A.Rs Acowa - Acinga U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Acowa - Kapelebyong U 18.0 Opening of drains & grass cuttingAmuria C.A.Rs Orungo - Moruinera U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Orungo - Ogongora U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Orungo - Oriebai U 8.0 Opening of drains & grass cuttingAmuria C.A.Rs Amusus - Aojakitoi U 7.0 Opening of drains & grass cuttingAmuria C.A.Rs Alereke - Abia - Amuria U 8.0 Opening of drains & grass cuttingAmuria C.A.Rs Amuria -Orengkipi - Tubur U 4.0 Opening of drains & grass cuttingAmuria C.A.Rs Town board roads U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Asamuk - Olekai U 10.0 Opening of drains & grass cuttingAmuria C.A.Rs Asamuk - Oboliapesur U 18.0 Opening of drains & grass cuttingAmuria C.A.Rs Okokorio - Agule U 15.0 Opening of drains & grass cuttingAmuria C.A.Rs Amolo - Sugur U 6.0 Opening of drains & grass cuttingAmuria C.A.Rs Wera - Gweri U 10.0 Opening of drains & grass cutting

Amuria C.A.Rs Acedayapo - Apeiulai - AkoreAkore U 18.0 Opening of drains & grass cutting

Amuria C.A.Rs Kapelebyong - Okungur U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Akeriau - Otubet U 21.0 Opening of drains & grass cuttingAmuria C.A.Rs Takaramyem - Oditel U 7.0 Opening of drains & grass cuttingAmuria C.A.Rs Amuria T/C - Willa - Abota U 18.0 Opening of drains & grass cuttingAmuria C.A.Rs Kapelebyong - Apopong U 12.0 Opening of drains & grass cuttingAmuria C.A.Rs Olele Corner - Awelu - Apuret U 21.0 Opening of drains & grass cuttingAmuria C.A.Rs Morungatuny - Olwa U 7.0 Opening of drains & grass cutting C.A.Rs Total 326Amuru Amuru C A R S Bolatero Genmegi U 5.5 Opening of drains & grass cuttingAmuru Amuru C A R S Amuru TC oloyotong U 6.0 Opening of drains & grass cutting

Amuru C A R S Total 11.5

Amuru Amuru DLG Total Kaladima Guruguru U 10 Opening of drains & grass cuttingAmuru Amuru DLG Total Amuru TC U 2.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Labongogali U 14.6 Opening of drains & grass cuttingAmuru Amuru DLG Total Pyelamot pakiri U 5.2 Opening of drains & grass cuttingAmuru Amuru DLG Total Atiak karawal U 6.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Oberabic oticci U 12.7 Opening of drains & grass cuttingAmuru Amuru DLG Total Guruguru Maroawobi U 12.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Pida il jimo U 4.7 Opening of drains & grass cuttingAmuru Amuru DLG Total State farm gururguru U 11.4 Opening of drains & grass cuttingAmuru Amuru DLG Total Olwal giragira U 8.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Pabbo- juncion U 5.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Satefarm-Maroawobi U 6.4 Opening of drains & grass cuttingAmuru Amuru DLG Total Olamnyu cheri U 15.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Satefarm-olinga U 11.6 Opening of drains & grass cuttingAmuru Amuru DLG Total Palukere-Mialayab U 12.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Otwee mutema okunedi U 7.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Ober Abic aswa stream U 14.5 Opening of drains & grass cuttingAmuru Amuru DLG Total Keyo lalem U 7.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Lacaro coorom U 7.0 Opening of drains & grass cuttingAmuru Amuru DLG Total Parabongo guruguru U 11.4 Opening of drains & grass cuttingAmuru Amuru DLG Total Olamnyu atiak U 4.2 Opening of drains & grass cuttingAmuru Amuru DLG Total Okalocwan okojo apaa U 15.6 Opening of drains & grass cutting Amuru DLG Total 193.3Amuru Amuru TC Kampala road U 4.2 Opening of drains & grass cuttingAmuru Amuru TC Barack obama U 5.0 Opening of drains & grass cuttingAmuru Amuru TC okot p Bitek, Jildo U 1.6 Opening of drains & grass cutting Amuru TC Total 10.8Apac Apac DLG Aninolal-Ongica- Olomuno Gravel 17 Opening of drains & grass cutting

224 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Apac Apac DLG Alenga - Kungu Gravel 31 Opening of drains & grass cuttingApac Apac DLG Teboke- Ayer Border Gravel 1.5 Opening of drains & grass cuttingApac Apac DLG Teboke - Agong- Bala Border Gravel 1.5 Opening of drains & grass cuttingApac Apac DLG Apwori - Ayat Gravel 11 Opening of drains & grass cutting

Apac Apac DLG Apac - Ater - Inomo - Bala Border Gravel 32 Opening of drains & grass cutting

Apac Apac DLG Amonolocoo-Awiri - Adir Gravel 13 Opening of drains & grass cuttingApac Apac DLG Apac - Arido Gravel 24 Opening of drains & grass cuttingApac Apac DLG Aboko-Chawente- Wigweng Gravel 25 Opening of drains & grass cuttingApac Apac DLG Abuli - Teilwa - Abura Gravel 23 Opening of drains & grass cuttingApac Apac DLG Teilwa - Apwori Gravel 7.8 Opening of drains & grass cuttingApac Apac DLG Amii - Ayumi - Ayago Gravel 16 Opening of drains & grass cuttingApac Apac DLG Amocal - Alado Gravel 8 Opening of drains & grass cuttingApac Apac DLG Corner Dairy - Apwori Gravel 6.5 Opening of drains & grass cutting 217.3Arua Arua DLG Kubala-Tara U 1.60 Opening of drains & grass cuttingArua Arua DLG Ewuata-Ewava U 2.20 Opening of drains & grass cuttingArua Arua DLG Vura SS-Andruvu U 2.50 Opening of drains & grass cuttingArua Arua DLG Ayelembe-Anzu U 2.05 Opening of drains & grass cuttingArua Arua DLG Ambala-Ayelembe-Tilevu U 3.85 Opening of drains & grass cuttingArua Arua DLG Anzuu-Odumi-Tilevu U 3.80 Opening of drains & grass cuttingArua Arua DLG Agurua-Alikua U 3.03 Opening of drains & grass cuttingArua Arua DLG Owafa-Obayia U 3.30 Opening of drains & grass cuttingArua Arua DLG Iti-Lodonga U 3.30 Opening of drains & grass cuttingArua Arua DLG Ajono-Nunu U 3.45 Opening of drains & grass cuttingArua Arua DLG Endru-Fe U 3.69 Opening of drains & grass cuttingArua Arua DLG Anguru-Ejupala U 7.30 Opening of drains & grass cuttingArua Arua DLG Luluwiri-Okalimbe U 4.29 Opening of drains & grass cuttingArua Arua DLG Katrini-Kijomoro U 4.60 Opening of drains & grass cuttingArua Arua DLG Katrini-Aroi U 4.75 Opening of drains & grass cuttingArua Arua DLG Awindiri - Ajono U 4.80 Opening of drains & grass cuttingArua Arua DLG Yivu-Kubala U 4.80 Opening of drains & grass cuttingArua Arua DLG Ociba - Ombaci U 4.86 Opening of drains & grass cuttingArua Arua DLG Aroi - Micu U 4.91 Opening of drains & grass cuttingArua Arua DLG Cilio-Otrevu U 5.00 Opening of drains & grass cuttingArua Arua DLG Kamukamu-Fundo U 5.10 Opening of drains & grass cuttingArua Arua DLG Katrini-Owaffa U 5.48 Opening of drains & grass cuttingArua Arua DLG Nyio - Endru U 5.72 Opening of drains & grass cuttingArua Arua DLG Omoo-Pajuru-Anguru U 8.00 Opening of drains & grass cuttingArua Arua DLG Cilio-Wadra U 5.80 Opening of drains & grass cuttingArua Arua DLG Muni-Oluko U 3.80 Opening of drains & grass cuttingArua Arua DLG Koya-Mbaru-Bendulu U 6.70 Opening of drains & grass cuttingArua Arua DLG Ajia-Arivu U 7.00 Opening of drains & grass cuttingArua Arua DLG Ciaba-Oliba U 3.00 Opening of drains & grass cuttingArua Arua DLG Lukuma-Mengo U 7.00 Opening of drains & grass cuttingArua Arua DLG Onduparaka - Nyio U 7.15 Opening of drains & grass cuttingArua Arua DLG Adra - Atiak U 7.15 Opening of drains & grass cuttingArua Arua DLG Ewanga - Kulikulinga U 8.00 Opening of drains & grass cuttingArua Arua DLG Anguza-Kaza-Lazebu U 8.32 Opening of drains & grass cutting

Arua Arua DLG Emanuel Cathedral-Dada-mu-Oluko U 8.30 Opening of drains & grass cutting

Arua Arua DLG Muni-Ocoko U 3.80 Opening of drains & grass cuttingArua Arua DLG Imvenga-Eradriru U 8.60 Opening of drains & grass cuttingArua Arua DLG Arua - Nyio U 9.38 Opening of drains & grass cuttingArua Arua DLG Arivu-Jayia-Opia U 9.70 Opening of drains & grass cuttingArua Arua DLG Owaffa-Ejome U 9.79 Opening of drains & grass cuttingArua Arua DLG Abifarm - Yole U 10.73 Opening of drains & grass cutting

225Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Arua Arua DLG Utumbari HC-Yoro U 19.20 Opening of drains & grass cuttingArua Arua DLG Utumbari-Lugbari U 9.50 Opening of drains & grass cuttingArua Arua DLG Imvepi-Yoro-Inde U 25.00 Opening of drains & grass cuttingArua Arua DLG Bondo-Obaru-Ajia U 14.00 Opening of drains & grass cuttingArua Arua DLG Jiako - Odramacaku U 16.54 Opening of drains & grass cuttingArua Arua DLG Okollo-Endebu U 16.70 Opening of drains & grass cuttingArua Arua DLG Rhino Camp - Rigbo U 19.40 Opening of drains & grass cuttingArua Arua DLG Ullepi - Alijoda U 19.80 Opening of drains & grass cuttingArua Arua DLG Odupi-Lugbari-Imvepi U 21.00 Opening of drains & grass cutting

Arua Arua DLG Rigbo Landing site-Yoro Base Camp U 24.60 Opening of drains & grass cutting

Arua Arua DLG Baito-Odujo-Pawor road U 27.00 Opening of drains & grass cuttingArua Arua DLG Bondo - Koya U 27.60 Opening of drains & grass cuttingArua Arua DLG Ullepi -Offaka - Anyiribu U 31.08 Opening of drains & grass cuttingArua Arua DLG Nyio-Alla U 7.00 Opening of drains & grass cuttingArua Arua DLG Odramacaku - Lokiragodo U 15.14 Opening of drains & grass cuttingArua Arua DLG Ovisoni - Nyio U 3.83 Opening of drains & grass cuttingArua Arua DLG Leju-Obakua-Itia U 8.00 Opening of drains & grass cuttingArua Arua DLG Adraka-Odrua U 4.63 Opening of drains & grass cuttingArua Arua DLG Yinga-Imvepi U 12.80 Opening of drains & grass cuttingArua Arua DLG Ocea-Odubu U 13.50 Opening of drains & grass cuttingArua Arua DLG Yukua-Eteleva-Odrobu U 16.50 Opening of drains & grass cuttingArua Arua DLG Mile 10-Inde U 12.50 Opening of drains & grass cuttingArua Arua DLG Riki-Aya-Ajia U 22.00 Opening of drains & grass cuttingArua Arua DLG Oliba-Ejirikombeni PS U 3.20 Opening of drains & grass cuttingArua Arua DLG Oliba-Lazebu U 6.50 Opening of drains & grass cuttingArua Arua DLG Half London-Odroo U 4.00 Opening of drains & grass cuttingArua Arua DLG Odianyadri-Andelizo U 4.45 Opening of drains & grass cuttingArua Arua DLG Omoo-Amasia U 7.00 Opening of drains & grass cuttingArua Arua DLG Oluodri-Oreku U 4.50 Opening of drains & grass cutting Arua DLG Total 643.6Arua C.A.Rs Oria-Etocaka U 3.01 Opening of drains & grass cuttingArua C.A.Rs Etocaka-Sua U 6.00 Opening of drains & grass cuttingArua C.A.Rs Andelizo-oje U 5.00 Opening of drains & grass cuttingArua C.A.Rs Lia-Eku ps U 2.91 Opening of drains & grass cuttingArua C.A.Rs Kigo cope sch. U 1.80 Opening of drains & grass cuttingArua C.A.Rs Kerekere-Lugbole U 5.00 Opening of drains & grass cuttingArua C.A.Rs Gilgil -Ombelini-Ega U 2.83 Opening of drains & grass cuttingArua C.A.Rs Ediofe Youth -Nyaunyau U 2.51 Opening of drains & grass cuttingArua C.A.Rs Luluwiri-Aripezu U 5.54 Opening of drains & grass cuttingArua C.A.Rs Aripezo-Boarder U 3.80 Opening of drains & grass cuttingArua C.A.Rs BNP-Onduparaka U 3.00 Opening of drains & grass cuttingArua C.A.Rs Luluwiri TC-Urugbo U 5.00 Opening of drains & grass cuttingArua C.A.Rs Edioffe Gridge-Ania BAT U 4.00 Opening of drains & grass cuttingArua C.A.Rs Happy day-Ania-BAT U 0.50 Opening of drains & grass cuttingArua C.A.Rs Anjenoir-Egbeva U 1.00 Opening of drains & grass cuttingArua C.A.Rs Nyau Nyau-Ruva ps U 2.00 Opening of drains & grass cuttingArua C.A.Rs Ombaci-Ariceni-Dadamu U 6.00 Opening of drains & grass cuttingArua C.A.Rs Oluodri-Odravu U 4.00 Opening of drains & grass cuttingArua C.A.Rs Oluodri-Awindiri U 3.50 Opening of drains & grass cuttingArua C.A.Rs Omuaziri Forest-Odravu U 3.50 Opening of drains & grass cuttingArua C.A.Rs Robu-Ariavu U 3.00 Opening of drains & grass cuttingArua C.A.Rs Ajirikolzizi-Onezoi A U 1.00 Opening of drains & grass cuttingArua C.A.Rs Amasia road U 6.30 Opening of drains & grass cuttingArua C.A.Rs Rakai-Aliba-ps Pandura U 3.50 Opening of drains & grass cuttingArua C.A.Rs Simveni road U 2.00 Opening of drains & grass cutting

226 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Arua C.A.Rs Alivu East-Omgboo U 2.00 Opening of drains & grass cuttingArua C.A.Rs Erko-Odravu U 1.70 Opening of drains & grass cuttingArua C.A.Rs Nyai-Vudrikali U 6.00 Opening of drains & grass cuttingArua C.A.Rs karandu U 5.00 Opening of drains & grass cuttingArua C.A.Rs Aukoro-Anipala U 5.00 Opening of drains & grass cuttingArua C.A.Rs Mvara-Assa-Muni U 4.00 Opening of drains & grass cuttingArua C.A.Rs Muni ps-Ogai-Ocoko U 3.00 Opening of drains & grass cuttingArua C.A.Rs Ceford-NTC U 3.00 Opening of drains & grass cuttingArua C.A.Rs Ceford-Ayibiri U 2.00 Opening of drains & grass cuttingArua C.A.Rs Oli-Jiako U 3.00 Opening of drains & grass cuttingArua C.A.Rs Itia-Buniababa U 2.50 Opening of drains & grass cuttingArua C.A.Rs Arua PTC-Mvara U 1.06 Opening of drains & grass cutting

Arua C.A.Rs Jordan Commuinty road (Mvara SS Jn-Congo zone-Mvara) U 1.52 Opening of drains & grass cutting

Arua C.A.Rs Ndriba-Baliova U 8.00 Opening of drains & grass cuttingArua C.A.Rs Anipala-Alenzia-Manibe U 3.00 Opening of drains & grass cuttingArua C.A.Rs Pajulu-Arinze U 1.00 Opening of drains & grass cutting

Arua C.A.Rs Rippons Housing Estates-Ond-uparaka U 1.00 Opening of drains & grass cutting

Arua C.A.Rs Mvara-Orube U 2.00 Opening of drains & grass cuttingArua C.A.Rs Tanganyika-Ociba Coast U 4.00 Opening of drains & grass cuttingArua C.A.Rs Arua Cope Centre-Edroze U 1.00 Opening of drains & grass cuttingArua C.A.Rs Air field-Ondoriku U 2.00 Opening of drains & grass cuttingArua C.A.Rs Alibu-Baribu U 11.00 Opening of drains & grass cuttingArua C.A.Rs Trunkraod-Orafoot bridge U 2.00 Opening of drains & grass cuttingArua C.A.Rs Olodiova-Mile 3 U 5.00 Opening of drains & grass cuttingArua C.A.Rs Aliba-Landing site-Ojidriku U 6.50 Opening of drains & grass cuttingArua C.A.Rs Ajagoro-Awuvu-Acaa U 5.29 Opening of drains & grass cuttingArua C.A.Rs Olodiova-Oyu U 3.03 Opening of drains & grass cuttingArua C.A.Rs Taliova-Ajusiji U 10.00 Opening of drains & grass cuttingArua C.A.Rs Regerge-Iriri U 5.04 Opening of drains & grass cuttingArua C.A.Rs Alamva-Iriri U 5.20 Opening of drains & grass cuttingArua C.A.Rs Alamva-Iriri U 5.20 Opening of drains & grass cuttingArua C.A.Rs Gilgili-Ajinia U 7.00 Opening of drains & grass cuttingArua C.A.Rs Matangacia-Lionga U 6.00 Opening of drains & grass cuttingArua C.A.Rs Yelogo-Kamukamu U 3.00 Opening of drains & grass cuttingArua C.A.Rs Fundo-Aluperenga PS U 3.00 Opening of drains & grass cuttingArua C.A.Rs Awalio ps-Ayaa U 8.00 Opening of drains & grass cuttingArua C.A.Rs Aia ps-Oci U 10.00 Opening of drains & grass cuttingArua C.A.Rs Ringili-Adaku U 1.60 Opening of drains & grass cuttingArua C.A.Rs Anzuvu-Adjumani U 3.00 Opening of drains & grass cuttingArua C.A.Rs Awika-Pajulu U 2.70 Opening of drains & grass cuttingArua C.A.Rs Oleni-Ullepi U 4.00 Opening of drains & grass cuttingArua C.A.Rs Mandebaku-Iliriganju U 3.00 Opening of drains & grass cuttingArua C.A.Rs Lima Logiri Girls sss U 1.69 Opening of drains & grass cuttingArua C.A.Rs Adraka-Kampala Market U 4.51 Opening of drains & grass cuttingArua C.A.Rs Logiri-Adravu U 6.00 Opening of drains & grass cuttingArua C.A.Rs Endrivu-Endreku PS U 2.00 Opening of drains & grass cuttingArua C.A.Rs Ayelembe-Ayiova U 2.89 Opening of drains & grass cuttingArua C.A.Rs Ekarakafe-Esara Nyadri U 1.54 Opening of drains & grass cuttingArua C.A.Rs Aruaca-usindi U 2.03 Opening of drains & grass cuttingArua C.A.Rs Opia TC-Eravuni U 3.14 Opening of drains & grass cuttingArua C.A.Rs Wani-Elimani U 4.00 Opening of drains & grass cuttingArua C.A.Rs Ejupala road U 0.80 Opening of drains & grass cuttingArua C.A.Rs Ambuva-Aliko U 2.88 Opening of drains & grass cuttingArua C.A.Rs Ringili-Andifeku U 4.10 Opening of drains & grass cuttingArua C.A.Rs Agurua-Illi U 8.00 Opening of drains & grass cutting

227Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Arua C.A.Rs Aripea-Aanga U 5.00 Opening of drains & grass cuttingArua C.A.Rs Odukoa-Cillio U 4.00 Opening of drains & grass cuttingArua C.A.Rs Aripea-Erekpea-Lini U 6.00 Opening of drains & grass cuttingArua C.A.Rs Liria-Ajiraku U 4.00 Opening of drains & grass cuttingArua C.A.Rs Atukula-t Tuku HC U 2.00 Opening of drains & grass cuttingArua C.A.Rs Obizea-Andinia U 5.00 Opening of drains & grass cuttingArua C.A.Rs ofuba-Osioo U 6.00 Opening of drains & grass cuttingArua C.A.Rs Anyamgba-Ombatini U 6.00 Opening of drains & grass cuttingArua C.A.Rs Okpotani-Belia U 5.00 Opening of drains & grass cuttingArua C.A.Rs Okpotani-Oyoze U 5.00 Opening of drains & grass cuttingArua C.A.Rs Utumbari-Chakai U 3.00 Opening of drains & grass cuttingArua C.A.Rs Elefe-Imvetre U 4.00 Opening of drains & grass cuttingArua C.A.Rs Komendaku-Ill U 6.00 Opening of drains & grass cuttingArua C.A.Rs Ibia-Hills U 3.00 Opening of drains & grass cuttingArua C.A.Rs Yidu-Obiyo U 4.00 Opening of drains & grass cuttingArua C.A.Rs Illi-Gangu U 7.00 Opening of drains & grass cuttingArua C.A.Rs Leju-Alio U 8.00 Opening of drains & grass cuttingArua C.A.Rs Itia-Aripezu U 5.00 Opening of drains & grass cuttingArua C.A.Rs Badrayi-Lini U 2.00 Opening of drains & grass cuttingArua C.A.Rs Asarova-Akavu-Pawor TC U 6.00 Opening of drains & grass cuttingArua C.A.Rs Asarova-Andeni U 6.00 Opening of drains & grass cuttingArua C.A.Rs Pawor TC - Parabok landing site U 3.00 Opening of drains & grass cuttingArua C.A.Rs Amasia road U 3.00 Opening of drains & grass cuttingArua C.A.Rs Lia-Kololo U 4.58 Opening of drains & grass cuttingArua C.A.Rs Ayivuni QH-Kubo ps U 4.00 Opening of drains & grass cuttingArua C.A.Rs Kova-Olevu U 3.33 Opening of drains & grass cuttingArua C.A.Rs Roga PS-Kkiliagokili river U 6.50 Opening of drains & grass cuttingArua C.A.Rs Kango-Omuriba U 9.00 Opening of drains & grass cutting C.A.Rs Total 643Arua MC Arua Avenue P 1 Opening of drains & grass cuttingArua MC Duka Road P 0.6 Opening of drains & grass cuttingArua MC Oluko Road P 1.5 Opening of drains & grass cuttingArua MC Central Road P 0.1 Opening of drains & grass cuttingArua MC Kasaijja road P 0.8 Opening of drains & grass cutting

Arua Total 4Arua MC Staff Lane U 0.4 Opening of drains & grass cuttingArua MC Caesar Ocama Road U 0.6 Opening of drains & grass cuttingArua MC Independence Avenue U 0.4 Opening of drains & grass cuttingArua MC Independence Road U 0.3 Opening of drains & grass cuttingArua MC Tadeyo Lane U 0.7 Opening of drains & grass cuttingArua MC BatValley Close U 0.2 Opening of drains & grass cuttingArua MC Ociba Road U 0.4 Opening of drains & grass cuttingArua MC Dr. Charles Adriko Road U 1 Opening of drains & grass cuttingArua MC Nason lane U 0.2 Opening of drains & grass cuttingArua MC School Road U 0.9 Opening of drains & grass cuttingArua MC Onzivu Pri Sch Road U 0.5 Opening of drains & grass cuttingArua MC Golf Course By-Pass U 0.7 Opening of drains & grass cuttingArua MC Awindiri Crescent U 1 Opening of drains & grass cuttingArua MC Aroi Road U 0.6 Opening of drains & grass cuttingArua MC Ephraim Adrale Crescent U 0.6 Opening of drains & grass cuttingArua MC Marjan Road U 0.5 Opening of drains & grass cuttingArua MC Ojio Road U 0.5 Opening of drains & grass cuttingArua MC Awudele Close U 0.2 Opening of drains & grass cuttingArua MC Odaa Close U 0.3 Opening of drains & grass cuttingArua MC Arua 1 FM View road U 0.2 Opening of drains & grass cuttingArua MC Afro Triangle View Road U 0.1 Opening of drains & grass cutting

228 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Arua MC Enyau crescent U 0.7 Opening of drains & grass cuttingArua MC Old Jaogo Road U 0.4 Opening of drains & grass cuttingArua MC Aliga Crescent U 0.4 Opening of drains & grass cuttingArua MC Michael Ondoga Close U 0.4 Opening of drains & grass cuttingArua MC Jackson Avutia Crescent U 0.7 Opening of drains & grass cuttingArua MC Silvano Wani Road U 0.3 Opening of drains & grass cuttingArua MC Mohamed Poru Road U 0.2 Opening of drains & grass cuttingArua MC Barurku Crescent U 0.5 Opening of drains & grass cuttingArua MC Sadaraka Road U 0.2 Opening of drains & grass cuttingArua MC Ajai lane U 0.2 Opening of drains & grass cuttingArua MC Mvara Close U 0.2 Opening of drains & grass cuttingArua MC Bethany Road U 0.2 Opening of drains & grass cuttingArua MC Yusuf Riji Road U 0.5 Opening of drains & grass cuttingArua MC Ambrisio Azia Road U 0.3 Opening of drains & grass cuttingArua MC Azia crescent U 1.5 Opening of drains & grass cuttingArua MC Juma Marjan Road U 0.3 Opening of drains & grass cuttingArua MC Mudhir Road U 0.5 Opening of drains & grass cuttingArua MC Haruna Ndema Road U 0.2 Opening of drains & grass cuttingArua MC Capt. Ajobe Road U 0.9 Opening of drains & grass cuttingArua MC Adalla Tuke Road U 0.1 Opening of drains & grass cuttingArua MC Abia Raod U 0.6 Opening of drains & grass cuttingArua MC Gadaffi Road U 0.2 Opening of drains & grass cuttingArua MC Hindum Road U 0.5 Opening of drains & grass cuttingArua MC Avutia Lane U 0.2 Opening of drains & grass cuttingArua MC Guido Munduga Road U 0.2 Opening of drains & grass cuttingArua MC Abidrabo . Road U 0.3 Opening of drains & grass cuttingArua MC Lobidra Close U 0.2 Opening of drains & grass cuttingArua MC Hussein Juma Road U 0.1 Opening of drains & grass cuttingArua MC Opima Road U 0.4 Opening of drains & grass cuttingArua MC Bright Angle - Bubia Road U 0.2 Opening of drains & grass cuttingArua MC Michael Ondoga Road U 0.2 Opening of drains & grass cuttingArua MC Garbage Site Road U 1.5 Opening of drains & grass cuttingArua MC Cope Link U 0.5 Opening of drains & grass cuttingArua MC Bethany Crescent U 0.4 Opening of drains & grass cuttingArua MC Gaagaa Close U 0.1 Opening of drains & grass cuttingArua MC Abdugesi Yahaya Road U 0.4 Opening of drains & grass cuttingArua MC School crescent U 0.2 Opening of drains & grass cuttingArua MC Abdulrahman Lane U 0.2 Opening of drains & grass cuttingArua MC Ondoga Swaib Lane U 0.3 Opening of drains & grass cuttingArua MC Bibia Close U 0.2 Opening of drains & grass cuttingArua MC Muru Lane U 0.4 Opening of drains & grass cuttingArua MC Pambazuka Road U 0.4 Opening of drains & grass cuttingArua MC Arua Hill Road U 1 Opening of drains & grass cuttingArua MC Endreaku Road U 1 Opening of drains & grass cuttingArua MC Jerekede Avenue U 0.8 Opening of drains & grass cuttingArua MC Bwana Volla Crescent U 0.7 Opening of drains & grass cuttingArua MC Total 30.2Budada Bududa DLG Bukigai- bukalasi U 6.4 Opening of drains & grass cuttingBudada Bududa DLG Maduramu-Namunyu road U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Lunza- Bubiita road U 1.0 Opening of drains & grass cuttingBudada Bududa DLG Namaitsu- Bunamwaki U 7.3 Opening of drains & grass cuttingBudada Bududa DLG Malandu- Shiwandu- Tsekululu U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Bududa- Busano U 7.6 Opening of drains & grass cuttingBudada Bududa DLG Namutembi- Buwangwa U 2.0 Opening of drains & grass cuttingBudada Bududa DLG Bukigai junction- kuushu/ibaale U 1.1 Opening of drains & grass cuttingBudada Bududa DLG Nalufutu- Shanzou U 11.1 Opening of drains & grass cutting

229Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Budada Bududa DLG Bukigai forest- Bunamaye church U 1.5 Opening of drains & grass cutting

Budada Bududa DLG Malabasi- Ibaale U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Bumirume- Malabasi U 1.5 Opening of drains & grass cuttingBudada Bududa DLG Bumatanda- Malabasi U 2.0 Opening of drains & grass cuttingBudada Bududa DLG Nalufutu - Bumakhase U 2.0 Opening of drains & grass cuttingBudada Bududa DLG Bumasata- Bushiyi U 7.0 Opening of drains & grass cuttingBudada Bududa DLG Natoolo- Kikholo- Sakusaku U 2.0 Opening of drains & grass cuttingBudada Bududa DLG Matenje- Nambaten U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Muhamudu - Bunasaka U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Bumayoka- Bunandutu U 4.6 Opening of drains & grass cuttingBudada Bududa DLG Bulucheke –Ulukusi U 3.6 Opening of drains & grass cuttingBudada Bududa DLG Muchomu- Nyende U 4.9 Opening of drains & grass cuttingBudada Bududa DLG Bumushiso- Bushaki U 4.6 Opening of drains & grass cuttingBudada Bududa DLG Bunasongo- Bukitongo U 3.3 Opening of drains & grass cuttingBudada Bududa DLG Bushika- Buteza U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Shiyaanza- Bunamasa road U 3.5 Opening of drains & grass cuttingBudada Bududa DLG Bunamanda- Wonanzofu road U 4.0 Opening of drains & grass cuttingBudada Bududa DLG Munyende- Bumakhase U 6.7 Opening of drains & grass cuttingBudada Bududa DLG Bunakhayenze- Namamolo road U 3.5 Opening of drains & grass cuttingBudada Bududa DLG Namasho- Bunamwamba U 3.7 Opening of drains & grass cuttingBudada Bududa DLG Bubiita- Kuushu U 2.0 Opening of drains & grass cuttingBudada Bududa DLG Buwali- Shafusi U 1.5 Opening of drains & grass cuttingBudada Bududa DLG Kuushu- Bundesi U 2.8 Opening of drains & grass cuttingBudada Bududa DLG Mabale- Wakamala U 5.2 Opening of drains & grass cutting

Budada Bududa DLG Bulobi Cooperative Society- Bu-sanza U 2.5 Opening of drains & grass cutting

Budada Bududa DLG Nangara – Bubungi U 5.9 Opening of drains & grass cuttingBudada Bududa DLG Bubuyela- Bunambatsu U 3.0 Opening of drains & grass cuttingBudada Bududa DLG Buwakiyu- Buwamusefu U 2.0 Opening of drains & grass cuttingBudada Bududa DLG katoo- bubiita U 2.2 Opening of drains & grass cuttingBudada Bududa DLG Bumusi- Nabiyelele U 2.0 Opening of drains & grass cutting Bududa DLG Total

Buduka Budaka DLG Nandusi – Dam – Nangeye - Naboa

un paved gravel 8.7 Opening of drains & grass cutting

Buduka Budaka DLG Kakule – Naboa –Nabiketo – Namengo

un paved gravel 16.4 Opening of drains & grass cutting

Buduka Budaka DLG Kamonkoli – Nyanza swamp un paved gravel 2.7 Opening of drains & grass cutting

Buduka Budaka DLG Uganda clays – Nyanza – Jami un paved gravel 9.7 Opening of drains & grass cutting

Buduka Budaka DLG Budaka – Iki – Iki un paved gravel 12.8 Opening of drains & grass cutting

Buduka Budaka DLG Nasanga – Idudi – Buwunga swamp

un paved gravel 10.7 Opening of drains & grass cutting

Buduka Budaka DLG Iki – Iki – Kerekerene un paved gravel 7 Opening of drains & grass cutting

Buduka Budaka DLG Kameruka – Iki – Iki un paved gravel 12.9 Opening of drains & grass cutting

Buduka Budaka DLG Budaka – Lyama – Suni un paved gravel 11.5 Opening of drains & grass cutting

Buduka Budaka DLG Abuneri – Chali un paved gravel 5.3 Opening of drains & grass cutting

Buduka Budaka DLG Kameruka – Namirembe – Kakule

un paved gravel 9.8 Opening of drains & grass cutting

Buduka Budaka DLG Budaka – Bagadadi – Tademeri un paved gravel 7.8 Opening of drains & grass cutting

Buduka Budaka DLG Kerekerene- Katira – Kavule- Kakoli

un paved gravel 12.7 Opening of drains & grass cutting

230 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buduka Budaka DLG Kodiri – Kadenge – Kebula un paved gravel 18.6 Opening of drains & grass cutting

Buduka Budaka DLG Bulumba – Iki – Iki Ginnery – Naboa

un paved gravel 8.1 Opening of drains & grass cutting

Buduka Budaka DLG Jami – Sekulo – Mugiti un paved gravel 12.5 Opening of drains & grass cutting

Buduka Budaka DLG Naluwerere – Kadimukoli – Kakoli

un paved gravel 10.5 Opening of drains & grass cutting

Buduka Budaka DLG Nabulezi – Sapiri – Chali un paved gravel 5.8 Opening of drains & grass cutting

Buduka Budaka DLG Mailo Tanu – Mugiti un paved gravel 6.3 Opening of drains & grass cutting

Buduka Budaka DLG Naboa – Namusita – Kadenghe un paved gravel 10.6 Opening of drains & grass cutting

Buduka Budaka DLG Kaderuna – Kebula – Kabuna un paved gravel 10.5 Opening of drains & grass cutting

Buduka Budaka DLG Katido – Kadatumi – Puti un paved gravel 8 Opening of drains & grass cutting

Buduka Budaka DLG Iki-Iki – Kaitangole - Kameruka - Kabuyai

un paved gravel 4.8 Opening of drains & grass cutting

Buduka Budaka DLG Kavule – Kakoli un paved gravel 5.6 Opening of drains & grass cutting

Buduka Budaka DLG Kaderuna - Nabugalo - Kadoko-lene Road

un paved gravel 9.5 Opening of drains & grass cutting

Buduka Budaka DLG Kiryolo -Nalera un paved gravel 5.6 Opening of drains & grass cutting

Buduka Budaka DLG Bitu – Kadimukoli un paved gravel 5.6 Opening of drains & grass cutting

Budaka DLG Total 250.0Buduka Budaka TC Kenkebu gravel 1.4 Opening of drains & grass cuttingBuduka Budaka TC Bwase Earth 3.4 Opening of drains & grass cuttingBuduka Budaka TC Hospital gravel 0.42 Opening of drains & grass cuttingBuduka Budaka TC Abedi gravel 0.2 Opening of drains & grass cuttingBuduka Budaka TC Namego- Nawoja Earth 2.4 Opening of drains & grass cuttingBuduka Budaka TC Kabazi Paved 0.5 Opening of drains & grass cuttingBuduka Budaka TC Nyango gravel 0.8 Opening of drains & grass cutting

Buduka Budaka TC Pioneer Paved partly 0.46 Opening of drains & grass cutting

Buduka Budaka TC Namengo - Butove gravel 2.2 Opening of drains & grass cuttingBuduka Budaka TC Kolododo - Nansenye gravel 2.5 Opening of drains & grass cuttingBuduka Budaka TC Abattior Earth 0.9 Opening of drains & grass cuttingBuduka Budaka TC Buwemba - Macholi gravel 6.2 Opening of drains & grass cuttingBuduka Budaka TC Buwemba gravel 2.3 Opening of drains & grass cuttingBuduka Budaka TC Senior Quarters gravel 0.3 Opening of drains & grass cuttingBuduka Budaka TC MTN Earth 2.6 Opening of drains & grass cuttingBuduka Budaka TC Gwanyi gravel 0.6 Opening of drains & grass cuttingBuduka Budaka TC Mukamba gravel 0.35 Opening of drains & grass cuttingBuduka Budaka TC Society Earth 3.8 Opening of drains & grass cuttingBuduka Budaka TC Dupa Earth 0.9 Opening of drains & grass cuttingBuduka Budaka TC Naigobya Earth 2.4 Opening of drains & grass cuttingBuduka Budaka TC Gadumire Earth 0.15 Opening of drains & grass cuttingBuduka Budaka TC Busikwe Earth 2.1 Opening of drains & grass cuttingBuduka Budaka TC Nankone II - Baker Earth 2.4 Opening of drains & grass cuttingBuduka Budaka TC Dan- Daka - Naigumya Earth 3 Opening of drains & grass cuttingBuduka Budaka TC Nankone - Nakatooko gravel 1.4 Opening of drains & grass cuttingBuduka Budaka TC Bukabindi -Dan -Valanta Earth 3.4 Opening of drains & grass cuttingBuduka Budaka TC Nabweyo- Iman - Nalwaya Earth 3.11 Opening of drains & grass cuttingBuduka Budaka TC Hajji Asadi Earth 0.8 Opening of drains & grass cuttingBuduka Budaka TC Perekek Earth 1.6 Opening of drains & grass cutting

231Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buduka Budaka TC Kabwaka Earth 1 Opening of drains & grass cuttingBuduka Budaka TC Nakajjete –Bunjjasi Hdqtrs Earth 3 Opening of drains & grass cuttingBuduka Budaka TC Nakajjete - Budaka gravel 3.4 Opening of drains & grass cuttingBuduka Budaka TC Namengo - Nawojja gravel 3.2 Opening of drains & grass cutting

Buduka Budaka TC Nakatooko part-lypaved 1.3 Opening of drains & grass cutting

Buduka Budaka TC Babula part-lypaved 0.51 Opening of drains & grass cutting

Budaka TC Total 65.0Bugiri Bugiri DLG Bugiri - Kitodha U 20.0 Opening of drains & grass cuttingBugiri Bugiri DLG Saza U 2.5 Opening of drains & grass cuttingBugiri Bugiri DLG Bugiri - Kitumbezi U 13.6 Opening of drains & grass cuttingBugiri Bugiri DLG Buwunga - Busowa U 7.0 Opening of drains & grass cuttingBugiri Bugiri DLG Buwunga - Nankoma U 11.0 Opening of drains & grass cuttingBugiri Bugiri DLG Bugiri - Nkaiza - Bugobi U 16.4 Opening of drains & grass cuttingBugiri Bugiri DLG Mayuge - Maziriga U 11.6 Opening of drains & grass cuttingBugiri Bugiri DLG Naluwerere - Iwemba-K U 12.5 Opening of drains & grass cuttingBugiri Bugiri DLG Muterere - Makoma U 4.5 Opening of drains & grass cuttingBugiri Bugiri DLG Bugiri-Muterere U 15.5 Opening of drains & grass cuttingBugiri Bugiri DLG Naluwerere - Buluguyi - Muwayo U 24.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Namayemba - Bugoyozi - Mut-erere U 13.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Nankoma-Itakaibolu - Masita U 4.5 Opening of drains & grass cuttingBugiri Bugiri DLG Kitodha - Buwuni U 13.5 Opening of drains & grass cuttingBugiri Bugiri DLG Bugayi-Nsango U 12.5 Opening of drains & grass cuttingBugiri Bugiri DLG Iwemba - Kigulu U 5.8 Opening of drains & grass cuttingBugiri Bugiri DLG Nasaga - Busimbi U 2.8 Opening of drains & grass cutting

Bugiri Bugiri DLG Nabirere-Nalubabwe TC-Nabir-ere LS with a link to Nabirere PS U 9.3 Opening of drains & grass cutting

Bugiri Bugiri DLG Bukanda – Bulyamboli - Kazim-bakugira/TZ U 2.2 Opening of drains & grass cutting

Bugiri Bugiri DLG Bugayi-Butema U 6.0 Opening of drains & grass cuttingBugiri Bugiri DLG Muwayo Via Buyindi-Lugano U 4.4 Opening of drains & grass cutting

Bugiri Bugiri DLG Mufumi – Mayole – Isakabusolo – Makoma – Matiama U 11.5 Opening of drains & grass cutting

Bugiri Bugiri DLG Muwayo TC - Buduma B - Sido-do PS Busia Border U 7.2 Opening of drains & grass cutting

Bugiri Bugiri DLG Lwanika- Isengero - Kasita-Buty-abule-Bugobi Road U 13.1 Opening of drains & grass cutting

Bugiri Bugiri DLG Magoola PS-Makoma-Sanika U 3.8 Opening of drains & grass cutting

Bugiri Bugiri DLGKiteigalwa-Nabirala-Busoga PS-Kamwokya-Bukerekere via Kawule

U 11.4 Opening of drains & grass cutting

Bugiri Bugiri DLG Nakabale - Kitodha - Muterere U 12.0 Opening of drains & grass cuttingBugiri Bugiri DLG Namayemba - Isagaza - Bukiri U 5.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Bugiri - Kirongo - Nalumiram-pasa U 5.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Wangobo - Naigaga - Kabasala U 9.4 Opening of drains & grass cuttingBugiri Bugiri DLG Nabukalu - Nkaiza U 4.8 Opening of drains & grass cuttingBugiri Bugiri DLG Nakivamba - Nsokwe U 7.3 Opening of drains & grass cuttingBugiri Bugiri DLG Nakawa - Bulumi U 3.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Bugongo - Nawanduki - Bubu-go-Magola-Nagawoloma U 5.9 Opening of drains & grass cutting

Bugiri Bugiri DLG Kasala - Mawanga - Matiki - Bukerere U 10.0 Opening of drains & grass cutting

Bugiri Bugiri DLG Kasala - Bwalula U 11.0 Opening of drains & grass cuttingBugiri Bugiri DLG Nasaga - Kibuya - Wakawaka U 17.5 Opening of drains & grass cuttingBugiri Bugiri DLG Kiseitaka - Kayango-Buwuni U 18.6 Opening of drains & grass cuttingBugiri Bugiri DLG Buwunga -Nabina U 5.0 Opening of drains & grass cutting

232 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Bugiri Bugiri DLG Busowa - Wangobo U 14.0 Opening of drains & grass cuttingBugiri Bugiri DLG Walugoma - Matovu U 8.0 Opening of drains & grass cuttingBugiri Bugiri DLG Mayuge -Kitodha U 6.0 Opening of drains & grass cuttingBugiri Bugiri DLG Mayuge - Bumwangu U 8.0 Opening of drains & grass cuttingBugiri Bugiri DLG Buwuni - Bumbo-Bulesa U 8.0 Opening of drains & grass cutting Bugiri DLG Total 418.1Bugiri Bugiri TC Kawunhe Road U 0.8 Opening of drains & grass cuttingBugiri Bugiri TC Isaac Wangadiya Road U 0.6 Opening of drains & grass cutting

Bugiri Bugiri TC Asadi Mugoya & Aminsi Mwodha Road U 1.3 Opening of drains & grass cutting

Bugiri Bugiri TC Mwero Road U 0.7 Opening of drains & grass cuttingBugiri Bugiri TC Bukumunhe Road U 0.5 Opening of drains & grass cuttingBugiri Bugiri TC Ndeba Road U 1 Opening of drains & grass cuttingBugiri Bugiri TC Magumba Road U 0.4 Opening of drains & grass cutting Bugiri TC Total 5.3Buikwe Buikwe DLG Balimanyankya-Ngongwe U 15.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Sezibwa-Kigaya U 16.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Nyenga-Buwagajjo U 11.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Nangunga-Ssi-Nansagazi U 15.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Wakisi-Naminya U 13.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Aluwa-Kikaja U 9.4 Opening of drains & grass cuttingBuikwe Buikwe DLG Bugungu-Tongolo U 10.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Kawomya-Senyi U 9.6 Opening of drains & grass cuttingBuikwe Buikwe DLG Buikwe-Najjembe U 7.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Waswa-Najjembe U 9.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Makindu-Lweru-Busagazi U 10.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Kalagala-Nalwewungula U 8.0 Opening of drains & grass cuttingBuikwe Buikwe DLG Namukuma-Ssi U 10.0 Opening of drains & grass cutting Buikwe DLG Total 143Buikwe Buikwe TC Misindye Road U 1.9 Opening of drains & grass cuttingBuikwe Buikwe TC Nantwala - Lweru Road U 1.9 Opening of drains & grass cuttingBuikwe Buikwe TC Nalubabwe - Salye Road U 2.3 Opening of drains & grass cuttingBuikwe Buikwe TC Kawuulu - Buwagga U 1.6 Opening of drains & grass cuttingBuikwe Buikwe TC Bugeye - Kapeke U 1.6 Opening of drains & grass cuttingBuikwe Buikwe TC Kasirye Road U 1.3 Opening of drains & grass cuttingBuikwe Buikwe TC Kasujja Road U 1.0 Opening of drains & grass cuttingBuikwe Buikwe TC Kawulu - Salye Road U 1.8 Opening of drains & grass cuttingBuikwe Buikwe TC Kisitu Road U 1.2 Opening of drains & grass cuttingBuikwe Buikwe TC Sseruweka Road U 1.2 Opening of drains & grass cutting Buikwe TC Total 16Buikwe Njeru TC Nakibizi-Nsege U 3.2 Opening of drains & grass cuttingBuikwe Njeru TC Centenary road U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Nsajja U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC Spire Close U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Speke Memorial U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Garden Lane U 2.2 Opening of drains & grass cuttingBuikwe Njeru TC Kagwa Road U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Kagwa Close U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Nalubale Road U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Nalubale Close U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Source Road U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Akiiki Nyabongo U 0.1 Opening of drains & grass cuttingBuikwe Njeru TC Ssemakokiro U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Bukaya Street U 1.1 Opening of drains & grass cuttingBuikwe Njeru TC Nanteza Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Nanteza Drive U 0.3 Opening of drains & grass cutting

233Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buikwe Njeru TC Ham Mukasa U 0.8 Opening of drains & grass cuttingBuikwe Njeru TC Nalinya U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Kasule U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Kevin U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Bukaya Road U 1.1 Opening of drains & grass cuttingBuikwe Njeru TC Ben Kiwanuka U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Bugungu Road U 2.3 Opening of drains & grass cuttingBuikwe Njeru TC Chwa Close U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Eng. Zikhusoka U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Bakikibinga U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Lower Lake View U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Upper Lake View U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Kyabaggu U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Nyenga U 2.5 Opening of drains & grass cuttingBuikwe Njeru TC Owen Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Namirengo Road U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Owen Lane U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Mutesa CR U 0.8 Opening of drains & grass cuttingBuikwe Njeru TC Muwanga Close U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Estate Lane U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Tucker Road U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Tucker Close U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Mandela Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Mandela Close U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Suna Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Suna Crescent U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Suna Close U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Veterinary Road U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Kalule U 2.5 Opening of drains & grass cuttingBuikwe Njeru TC Republic Way U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Bujagali U 0.9 Opening of drains & grass cuttingBuikwe Njeru TC Estate Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Estate Close U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Bugerere U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Nanso Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Breweries Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Nile Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Ruhesi Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC School Lane U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Kigobe Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Kalule Settala Lane U 2.6 Opening of drains & grass cuttingBuikwe Njeru TC Kidda Road U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Kalule Settala Road U 2.5 Opening of drains & grass cuttingBuikwe Njeru TC Naava Road U 1.5 Opening of drains & grass cuttingBuikwe Njeru TC Paul Musoke U 1.1 Opening of drains & grass cuttingBuikwe Njeru TC Mukwanya Road U 1.3 Opening of drains & grass cuttingBuikwe Njeru TC New Mukwanya U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Nanso Lane II U 1.0 Opening of drains & grass cuttingBuikwe Njeru TC Dr. Kagoda U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Model Farm U 2.8 Opening of drains & grass cuttingBuikwe Njeru TC Lubandi Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Dungu Road U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Lubandi Lane U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Naava Bridge U 1.5 Opening of drains & grass cuttingBuikwe Njeru TC Nakya Access U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Kasanja Circular U 3.9 Opening of drains & grass cutting

234 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buikwe Njeru TC Bujjowali U 2.8 Opening of drains & grass cuttingBuikwe Njeru TC Namwezi Dispensary U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Esther Kirumira U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Kawoya U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC Parogreen U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Kisoga -Naava U 0.9 Opening of drains & grass cuttingBuikwe Njeru TC Kyabaggu 7 (Tebi) U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Ahamadiya U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC HillTop Road U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC HillTop Lane U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Hill Top Close U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Nakibizi-Namwezi U 2.1 Opening of drains & grass cuttingBuikwe Njeru TC Namwezi 7 U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC Mukunja U 1.6 Opening of drains & grass cuttingBuikwe Njeru TC Metha U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Nyangasi U 1.0 Opening of drains & grass cuttingBuikwe Njeru TC Wampala Cicular U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Wampala 7 (Kisolo) U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Zion U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Kakarie U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Wampala 5 U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Water Tank U 1.1 Opening of drains & grass cuttingBuikwe Njeru TC Sewoto U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC Lugazi 5 (Setyabule)_ U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Ssebugwawo U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Bulungu U 1.8 Opening of drains & grass cuttingBuikwe Njeru TC Nakibizzi U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Masanafu U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Lugazi Cicular U 1.6 Opening of drains & grass cuttingBuikwe Njeru TC Kulabako U 1.6 Opening of drains & grass cuttingBuikwe Njeru TC Nakibizzi-Nsenge U 2.4 Opening of drains & grass cuttingBuikwe Njeru TC Nsenge-Butema U 2.6 Opening of drains & grass cuttingBuikwe Njeru TC Bulyankuyege U 6.0 Opening of drains & grass cuttingBuikwe Njeru TC Nsenge Store U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Kanyogoga U 2.4 Opening of drains & grass cuttingBuikwe Njeru TC Nakakumbi U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Kiryowa-Nathani U 1.4 Opening of drains & grass cuttingBuikwe Njeru TC Kiryowa II U 1.2 Opening of drains & grass cuttingBuikwe Njeru TC Kiryowa Kataka Konko U 2.1 Opening of drains & grass cuttingBuikwe Njeru TC Kinyala U 1.0 Opening of drains & grass cuttingBuikwe Njeru TC Bukabala-Railway U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Lubas U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Karim U 0.8 Opening of drains & grass cuttingBuikwe Njeru TC Wampala 5 U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Okasha Road U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC Shamim Close U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Kasanja 5 U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Spire Close U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Garden Lane U 0.2 Opening of drains & grass cuttingBuikwe Njeru TC Namwezi 8 U 0.7 Opening of drains & grass cuttingBuikwe Njeru TC Kidda Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Wampala Road 1 U 2.2 Opening of drains & grass cuttingBuikwe Njeru TC Kyabaggu 5 U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Buyizzi U 2.0 Opening of drains & grass cuttingBuikwe Njeru TC Kuyabaggu 10 U 0.6 Opening of drains & grass cuttingBuikwe Njeru TC Namwezi 4 U 0.5 Opening of drains & grass cutting

235Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buikwe Njeru TC Bulamba U 1.5 Opening of drains & grass cuttingBuikwe Njeru TC Vitafoam Lane U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Buikwe Highway U 1.0 Opening of drains & grass cuttingBuikwe Njeru TC Zion- Kabunga Road U 1.0 Opening of drains & grass cuttingBuikwe Njeru TC Mukwaya U 1.3 Opening of drains & grass cuttingBuikwe Njeru TC Bujagali U 0.9 Opening of drains & grass cuttingBuikwe Njeru TC Anna Guloba Road U 0.3 Opening of drains & grass cuttingBuikwe Njeru TC Al-Hajjira U 1.3 Opening of drains & grass cuttingBuikwe Njeru TC Buvuma Lane U 0.4 Opening of drains & grass cuttingBuikwe Njeru TC St. Kaloli U 0.5 Opening of drains & grass cuttingBuikwe Njeru TC Nabisere Road U 0.7 Opening of drains & grass cutting Njeru TC Total 123.9Buikwe Lugazi TC Nkoko Rd U 5.1 Opening of drains & grass cuttingBuikwe Lugazi TC Nakazade rd U 2.5 Opening of drains & grass cuttingBuikwe Lugazi TC Ugma Rd U 2.1 Opening of drains & grass cuttingBuikwe Lugazi TC Linemulefu U 1.8 Opening of drains & grass cuttingBuikwe Lugazi TC Kasambya U 1.3 Opening of drains & grass cuttingBuikwe Lugazi TC Sempala U 0.7 Opening of drains & grass cuttingBuikwe Lugazi TC Luyanzi U 1.2 Opening of drains & grass cutting Lugazi TC Total 14.7Buikwe Nkokonjeru TC Mayirikiti-Ndolwa U 2.8 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Mulajje- Tank Hill U 1.0 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Wabiduuku-Kaseewo U 2.0 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Magulu road U 1.0 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Elly Gita-Ndolwa U 1.5 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Hilltop -Mayirikiti U 2.0 Opening of drains & grass cuttingBuikwe Nkokonjeru TC Health Centre-Abborttoir U 1.5 Opening of drains & grass cutting TC Total 11.8Bukedea Bukedea DLG Bukedea-Kamacha U 2.0 Opening of drains & grass cuttingBukedea Bukedea DLG Atutur-Malera-Koreng U 5.2 Opening of drains & grass cuttingBukedea Bukedea DLG Malera-Ongino U 2.4 Opening of drains & grass cuttingBukedea Bukedea DLG Kidongole-Kakor U 3.4 Opening of drains & grass cuttingBukedea Bukedea DLG Komuge-Kakor U 2.4 Opening of drains & grass cuttingBukedea Bukedea DLG Komongomeri-Kamutur U 4.0 Opening of drains & grass cuttingBukedea Bukedea DLG Kotiokot-Kachede U 3.0 Opening of drains & grass cuttingBukedea Bukedea DLG Kidongole-Bukedea-Kabarwa U 13.6 Opening of drains & grass cuttingBukedea Bukedea DLG Bukedea-Kawo-Katekwan U 7.2 Opening of drains & grass cuttingBukedea Bukedea DLG Kidongole-Kajamaka U 3.0 Opening of drains & grass cuttingBukedea Bukedea DLG Abilaep-Kanyipa-Miroi U 6.6 Opening of drains & grass cuttingBukedea Bukedea DLG Miroi-Apopong-Okulla U 3.6 Opening of drains & grass cuttingBukedea Bukedea DLG Apugurei-Kotolut-A.k U 8.6 Opening of drains & grass cuttingBukedea Bukedea DLG Kater-Koena mkt-Chodong U 3.6 Opening of drains & grass cuttingBukedea Bukedea DLG Kalupo-Kosire-K.K U 10.0 Opening of drains & grass cuttingBukedea Bukedea DLG Kabarwa-Kobale-Kaleu U 4.4 Opening of drains & grass cuttingBukedea Bukedea DLG Kabarwa-Kakutot-Kangole U 5.2 Opening of drains & grass cuttingBukedea Bukedea DLG Malera-Kanyanga-K U 11.6 Opening of drains & grass cutting

Bukedea Bukedea DLG Kanyanga-Kachede-Kalou-Kaso-ka U 3.4 Opening of drains & grass cutting

Bukedea Bukedea DLG Aputiput-Aloet-Kocheka-Ko-lotum U 5.6 Opening of drains & grass cutting

Bukedea Bukedea DLG Kachumbala-Kongun-ga-Aligoi-Kotia U 6.4 Opening of drains & grass cutting

Bukedea Bukedea DLG Kachumbala-Kapaang-Kokutu U 5.6 Opening of drains & grass cutting

Bukedea Bukedea DLG Kachumbala-Otimonga-Koutu-lai-Apaade U 5.4 Opening of drains & grass cutting

Bukedea Bukedea DLG Otimonga-Achibu-Nyakoi U 3.2 Opening of drains & grass cuttingBukedea Bukedea DLG Kachumbala-Aligoi-Aminit U 5.8 Opening of drains & grass cutting

236 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Bukedea Bukedea DLG Kachumbala-Kongunga U 5.0 Opening of drains & grass cuttingBukedea Bukedea DLG Kaloko-Kamon-Kachabala U 10.0 Opening of drains & grass cuttingBukedea Bukedea DLG KachumbalaKakiira-Apaade U 3.4 Opening of drains & grass cutting Bukedea DLG Total 153.6Bukedea Bukedea TC Kedi Close U 0.03 Opening of drains & grass cuttingBukedea Bukedea TC Dokotum U 0.03 Opening of drains & grass cuttingBukedea Bukedea TC Town ship U 0.03 Opening of drains & grass cuttingBukedea Bukedea TC Silvanus Isiagi ride U 0.03 Opening of drains & grass cuttingBukedea Bukedea TC Okoche U 0.03 Opening of drains & grass cuttingBukedea Bukedea TC Averege U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Igune U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Bp. Irigei U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Fr. Beam U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Ojakol U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Odea U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Omongole U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Tukan U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC C.P Okia U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Okia Ismail U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Guild U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC School U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Public lane U 0.05 Opening of drains & grass cuttingBukedea Bukedea TC Rev Osuret U 0.06 Opening of drains & grass cuttingBukedea Bukedea TC Br Orombi U 0.06 Opening of drains & grass cuttingBukedea Bukedea TC Elgon U 0.06 Opening of drains & grass cuttingBukedea Bukedea TC Jackson Osire U 0.07 Opening of drains & grass cuttingBukedea Bukedea TC Peter Esele U 0.07 Opening of drains & grass cuttingBukedea Bukedea TC Industrial Area U 0.13 Opening of drains & grass cuttingBukedea Bukedea TC Ikinyom U 0.18 Opening of drains & grass cuttingBukedea Bukedea TC Obilakol U 0.18 Opening of drains & grass cuttingBukedea Bukedea TC Karere U 0.18 Opening of drains & grass cuttingBukedea Bukedea TC St mary’s U 0.18 Opening of drains & grass cuttingBukedea Bukedea TC Okalany U 0.275 Opening of drains & grass cuttingBukedea Bukedea TC Tamula Obiro U 0.275 Opening of drains & grass cuttingBukedea Bukedea TC St Patrick U 0.35 Opening of drains & grass cuttingBukedea Bukedea TC Okodan U 0.375 Opening of drains & grass cuttingBukedea Bukedea TC Mission road U 0.55 Opening of drains & grass cuttingBukedea Bukedea TC Kaloko-Okuunguro-Kachabule U 2.6 Opening of drains & grass cuttingBukedea Bukedea TC Lubega U 0.9 Opening of drains & grass cuttingBukedea Bukedea TC Okunguro parents road U 1.1 Opening of drains & grass cutting Bukedea TC Total 8.4Bukedea C.A.R.s Kongatuny-Juba-Omunyono U 1.8 Opening of drains & grass cuttingBukedea C.A.R.s Rwatam-Morukateko-D U 1.6 Opening of drains & grass cutting

Bukedea C.A.R.s Otiisa-Kawo new p/s-Omun-yono U 1.1 Opening of drains & grass cutting

Bukedea C.A.R.s Kalengo-Bama-Chebukube U 1.4 Opening of drains & grass cutting C.A.R.s Total 5.8Bukoman-simbi Bukomansimbi TC Church Road Earth 0.8 Opening of drains & grass cutting

Bukoman-simbi Bukomansimbi TC Nanju -Banula Earth 0.8 Opening of drains & grass cutting

Bukoman-simbi Bukomansimbi TC Kigugumika -Butanga Earth 1.0 Opening Drains & grass cutting

Bukoman-simbi Bukomansimbi TC Kiryansaka-Kyango Earth 1.2 Opening Drains & grass cutting

Bukoman-simbi Bukomansimbi TC Nsubuga-Musooka Earth 0.6 Opening Drains & grass cutting

237Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Bukoman-simbi Bukomansimbi TC Bukomansimbi-Lufula Earth 1.6 Opening Drains & grass cutting

Bukoman-simbi Bukomansimbi TC Bukoba ring road 1&2 Earth 2.0 Opening Drains & grass cutting

TC Total 8Bukwo Bukwo DLG Amanang-Kapsurur U 2.6 Opening of drains & grass cuttingBukwo Bukwo DLG Bukwo-Sosyo U 1.3 Opening of drains & grass cuttingBukwo Bukwo DLG Kambi-Kapkoros U 0.6 Opening of drains & grass cuttingBukwo Bukwo DLG Kapkoros-Chemwabit-Rwanda U 1.0 Opening of drains & grass cuttingBukwo Bukwo DLG kapkwoloswo-tartar-Rwanda U 1.1 Opening of drains & grass cuttingBukwo Bukwo DLG kapnandi-Kaptolomon U 0.6 Opening of drains & grass cuttingBukwo Bukwo DLG Musalaba-Kululu-Kaptolomon U 1.9 Opening of drains & grass cuttingBukwo Bukwo DLG Kortek-Chesimat U 2.0 Opening of drains & grass cuttingBukwo Bukwo DLG Kabukwo-kamokoyon U 0.5 Opening of drains & grass cuttingBukwo Bukwo DLG Kabukwo-Kwanwa U 0.5 Opening of drains & grass cuttingBukwo Bukwo DLG Mutushet-Brim U 1.0 Opening of drains & grass cuttingBukwo Bukwo DLG Tule-Kamokoyon U 0.8 Opening of drains & grass cuttingBukwo Bukwo DLG Kapsukwar-Matimbei U 1.3 Opening of drains & grass cuttingBukwo Bukwo DLG Kamukamba-Administration U 0.2 Opening of drains & grass cutting Bukwo DLG Total 15.1 Bukwo Bukwo TC Molokonyi road U 1.4 Opening of drains & grass cuttingBukwo Bukwo TC Market street U 0.4 Opening of drains & grass cuttingBukwo Bukwo TC Mokoyon road U 0.3 Opening of drains & grass cuttingBukwo Bukwo TC Kipsongi road U 0.5 Opening of drains & grass cuttingBukwo Bukwo TC Tete Street U 0.4 Opening of drains & grass cuttingBukwo Bukwo TC Kaguta road U 1.55 Opening of drains & grass cuttingBukwo Bukwo TC Chepterere Upper U 0.1 Opening of drains & grass cuttingBukwo Bukwo TC Reuben road U 0.35 Opening of drains & grass cutting Bukwo TC Total 8.2Bulambuli Bulambula DLG Kibanda-Mbigi Unpaved 2.40 Opening Drains & grass cuttingBulambuli Bulambula DLG Tunyi(Makutana)-Buwokadala Unpaved 2.00 Opening Drains & grass cuttingBulambuli Bulambula DLG Bukibologoto- Longoti Unpaved 2.00 Opening Drains & grass cuttingBulambuli Bulambula DLG Golobateyi Ladders Unpaved 0.25 Opening Drains & grass cutting DLG Total 6.65Bulambuli Bulegeni T/C Wagabaga/Masola Unpaved 0.30 Opening of drains & grass cuttingBulambuli Bulegeni T/C Kabembe-Kapkweni Unpaved 0.40 Opening of drains & grass cuttingBulambuli Bulegeni T/C Songok Unpaved 0.40 Opening of drains & grass cuttingBulambuli Bulegeni T/C Market Road (Yoweri Museveni) Unpaved 0.50 Opening of drains & grass cuttingBulambuli Bulegeni T/C Masuswa Unpaved 0.25 Opening of drains & grass cuttingBulambuli Bulegeni T/C Tank Hill - Nana Unpaved 0.70 Opening of drains & grass cuttingBulambuli Bulegeni T/C Katongini-Karabachi Unpaved 0.60 Opening of drains & grass cuttingBulambuli Bulegeni T/C Nana-Gamatebeyi Unpaved 0.38 Opening of drains & grass cutting Bulegeni TC Total 3.5Bulambuli Bulambuli TC Wasike - Muhammadi Unpaved 0.25 Opening of drains & grass cuttingBulambuli Bulambuli TC Administration Road Unpaved 0.25 Opening of drains & grass cuttingBulambuli Bulambuli TC Namboga Road Unpaved 0.25 Opening of drains & grass cuttingBulambuli Bulambuli TC Antonia - Musawale Unpaved 0.18 Opening of drains & grass cuttingBulambuli Bulambuli TC Tsau-Bubulo Road Unpaved 0.25 Opening of drains & grass cuttingBulambuli Bulambuli TC Ambrose-Rafael Road Unpaved 0.18 Opening of drains & grass cuttingBulambuli Bulambuli TC Emron-Webundu Road Unpaved 0.20 Opening of drains & grass cuttingBulambuli Bulambuli TC Endirisa- Bugwanyi Road Unpaved 0.25 Opening of drains & grass cutting T/C Total 1.81Bulambuli Bulambuli CARs Kidodo -Logoti (Bottleneck Unpaved 8.0 Opening of drains & grass cutting CARS Total 8.0Buliisa Buliisa TC Amara U 0.5 Opening of drains & grass cuttingBuliisa Buliisa TC Katala U 1.2 Opening of drains & grass cuttingBuliisa Buliisa TC Rift Valley U 0.6 Opening of drains & grass cutting

238 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buliisa Buliisa TC Beker U 0.4 Opening of drains & grass cuttingBuliisa Buliisa TC Cohen U 0.5 Opening of drains & grass cuttingBuliisa Buliisa TC Kagwa U 0.3 Opening of drains & grass cuttingBuliisa Buliisa TC Longino U 0.3 Opening of drains & grass cuttingBuliisa Buliisa TC Kyamurwa U 0.6 Opening of drains & grass cuttingBuliisa Buliisa TC Duhaga U 0.5 Opening Drains & grass cuttingBuliisa Buliisa TC Mugasa U 0.2 Opening Drains & grass cuttingBuliisa Buliisa TC Wavery U 0.9 Opening Drains & grass cuttingBuliisa Buliisa TC Mukitale U 0.5 Opening Drains & grass cuttingBuliisa Buliisa TC Niola U 0.1 Opening Drains & grass cuttingBuliisa Buliisa TC Congo U 1.3 Opening Drains & grass cuttingBuliisa Buliisa TC Commercial Street U 1.0 Opening of drains & grass cuttingBuliisa Buliisa TC Market Street U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Kitahura U 1.5 Opening of drains & grass cuttingBuliisa Buliisa TC White U 0.9 Opening of drains & grass cuttingBuliisa Buliisa TC Kaheru U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Mutiti U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Wangalia U 0.9 Opening of drains & grass cuttingBuliisa Buliisa TC Albert U 0.5 Opening of drains & grass cuttingBuliisa Buliisa TC Galende U 0.7 Opening of drains & grass cuttingBuliisa Buliisa TC Kitoko U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Waluhoize U 1.3 Opening of drains & grass cuttingBuliisa Buliisa TC Kasemene U 1.8 Opening of drains & grass cuttingBuliisa Buliisa TC Kidali U 1.0 Opening of drains & grass cuttingBuliisa Buliisa TC Manyuru U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Speak U 0.4 Opening of drains & grass cuttingBuliisa Buliisa TC Lubanga U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Karafa U 0.5 Opening of drains & grass cuttingBuliisa Buliisa TC Yoweri U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Munywakawa U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Mulinde U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Tadwe U 0.2 Opening of drains & grass cuttingBuliisa Buliisa TC Kalinde U 0.4 Opening of drains & grass cuttingBuliisa Buliisa TC Weyale U 0.2 Opening of drains & grass cutting Buliisa TC 20.9

Buliisa Buliisa DLG Kilyango - Kharatum - Kaman-dindi. U 5.6 Opening of drains & grass cutting

Buliisa Buliisa DLG Biiso - Kampala – Katumba U 4.8 Opening of drains & grass cuttingBuliisa Buliisa DLG Biiso - Nyaramya – Waki U 8.3 Opening of drains & grass cuttingBuliisa Buliisa DLG Buliisa – Bugana U 10.7 Opening of drains & grass cuttingBuliisa Buliisa DLG Kagera -Kimbeni U 3.5 Opening of drains & grass cuttingBuliisa Buliisa DLG Kahemura – Garasoya U 3 Opening of drains & grass cuttingBuliisa Buliisa DLG Kasenyi – Avogera U 8.4 Opening of drains & grass cutting

Buliisa Buliisa DLG Kilyango – Mubaku U 6.6 Opening of drains & grass cutting

Buliisa Buliisa DLG Kisiabi- Kabolwa U 9.3 Opening of drains & grass cuttingBuliisa Buliisa DLG Kisomere – Ngwedo U 6.8 Opening of drains & grass cuttingBuliisa Buliisa DLG Musizi- Kalengeija U 6.6 Opening of drains & grass cutting

Buliisa Buliisa DLG Ndandamire - Bikongoro - Ngwedo U 10.7 Opening of drains & grass cutting

Buliisa Buliisa DLG Sitin – Kihungya U 6.6 Opening of drains & grass cuttingBuliisa Buliisa DLG Sitin- Itambiro – Udukur U 3 Opening of drains & grass cuttingBuliisa Buliisa DLG Wanseko – Ngwedo U 21.2 Opening of drains & grass cuttingBuliisa Buliisa DLG Nyamasoga – Itutwe U 1.4 Opening of drains & grass cuttingBuliisa Buliisa DLG Sitin - Kayanja – Busingiro U 3.8 Opening of drains & grass cuttingBuliisa Buliisa DLG Ngazi – Kabolwa U 4.8 Opening of drains & grass cuttingBuliisa Buliisa DLG Walukuba – Main U 1.2 Opening of drains & grass cutting

239Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buliisa Buliisa DLG Nyamukuta – Main U 1.8 Opening of drains & grass cutting

Buliisa Buliisa DLG Wanseko – Machison park U 18.6 Opening of drains & grass cuttingBuliisa Buliisa DLG Wanseko – Masaka – Katala U 9.4 Opening of drains & grass cuttingBuliisa Buliisa DLG Kijangi – Kijumbya – Kakoora U 15.5 Opening of drains & grass cuttingBuliisa Buliisa DLG Tangala – Kampala U 4.6 Opening of drains & grass cuttingBuliisa Buliisa DLG Kayanja – Akim – Garasoya U 3.8 Opening of drains & grass cuttingBuliisa Buliisa DLG Wakende L/S – Kigwera S/W U 3.8 Opening of drains & grass cutting

Buliisa Buliisa DLG Victor – Kahemura – Kayongo – Sitin U 2.7 Opening of drains & grass cutting

Buliisa Buliisa DLG St. Mary’s P/School – Kalengeija P/School – Bubwe U 5.2 Opening of drains & grass cutting

Buliisa Buliisa DLG Angolyero – Akolle – Garasoya U 2.6 Opening of drains & grass cuttingBuliisa Buliisa DLG Kisiabi - Kijangi – Uribo U 10.9 Opening of drains & grass cutting Buliisa DLG 205.2Bundibugyo Bundibugyo DLG Hakitenjya-Buhanda U 5.0 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Mirambi U 8.4 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Kirumya-Kikyo U 5.5 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Bundimulangya-Bubukwanga U 4.0 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Bumadu-Kyamukube U 6.0 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Butama-Bunyangule U 11.0 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Burondo-Rwakasenyi U 3.0 Opening of drains & grass cuttingBundibugyo Bundibugyo DLG Bundibuturo U 1.7 Opening of drains & grass cutting

Bundibugyo DLG Total 44.6

Bundibugyo Bundibugyo TC Kaindole U 1.1 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Ndahura U 0.3 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Bulimpiki U 0.5 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Katanga U 0.5 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Biira road U 0.5 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Mupalya U 0.7 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Kamanda U 0.3 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Kalisa street U 0.3 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Mutisera U 0.4 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Nyamusesa U 0.5 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Bamutirebye U 0.2 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Simoli U 0.2 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Nkongozi U 0.1 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Tarasisi U 1.0 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Vanila street U 0.1 Opening Drains & grass cuttingBundibugyo Bundibugyo TC Kibale road U 2.5 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Dumba U 1.5 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Bumate U 1.0 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Twanzane U 2.3 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Bumadu U 1.4 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Kanyasimbi U 1.1 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Gabata U 1.7 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Hamutoma U 1.7 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Kakogha U 0.6 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Kiliba U 0.8 Opening of drains & grass cuttingBundibugyo Bundibugyo TC Kawamara U 2.6 Opening of drains & grass cutting

Bundibugyo TC Total 23.9

Bundibugyo Nyahuka TC Kasiri U 3.8 Opening of drains & grass cuttingBundibugyo Nyahuka TC Bundimulinga road U 2.0 Opening of drains & grass cuttingBundibugyo Nyahuka TC Simbya Nkuru U 2.0 Opening of drains & grass cuttingBundibugyo Nyahuka TC Basongolla U 2.8 Opening of drains & grass cutting

240 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Bundibugyo Nyahuka TC Barracks street U 1.0 Opening of drains & grass cuttingBundibugyo Nyahuka TC Makwolla road U 2.0 Opening of drains & grass cutting Nyahuka TC Total 14Bushenyi Bushenyi DLG Kyamuhunga-Kyamamari Earth 4.4 Opening of drains & grass cuttingBushenyi Bushenyi DLG Kizinda-Ncwera Earth 7 Opening of drains & grass cuttingBushenyi Bushenyi DLG Butare-Kayembe Earth 16 Opening of drains & grass cuttingBushenyi Bushenyi DLG Nyaruzinga-Bumbaire-Kitabi Earth 6.6 Opening of drains & grass cuttingBushenyi Bushenyi DLG Kabushaho-Kabuba Earth 7.2 Opening Drains & grass cuttingBushenyi Bushenyi DLG Rwentuha-Kabuba Earth 6 Opening Drains & grass cutting

Bushenyi Bushenyi DLG Ryamabengwa-Kakanju-Kati-kamwe Earth 4.4 Opening Drains & grass cutting

Bushenyi Bushenyi DLG Kaziho-Kyabugimbi-R-B Earth 24.1 Opening Drains & grass cuttingBushenyi Bushenyi DLG Kakanju-Kashanda-Kashasha Earth 4 Opening Drains & grass cuttingBushenyi Bushenyi DLG Bumbaire-Bweranyangi-K-R Earth 2.8 Opening Drains & grass cuttingBushenyi Bushenyi DLG Nyabubare-Kashozi-Nyarugote Earth 7.2 Opening of drains & grass cuttingBushenyi Bushenyi DLG Butare-Kakombe-Nyakatsiro Earth 7.6 Opening of drains & grass cuttingBushenyi Bushenyi DLG Swazi-Kaitabashaki Earth 3.6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Buramba-Kijumo-Nyakabin-go-Kashasha Earth 8 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kakoni-Manengo-B-N Earth 10 Opening of drains & grass cuttingBushenyi Bushenyi DLG Kijumo-Warugo-Kabingo Earth 7 Opening of drains & grass cuttingBushenyi Bushenyi DLG Rwenjojo-Kitatera Earth 4.4 Opening of drains & grass cuttingBushenyi Bushenyi DLG Runyinya-Kyeizooba Earth 3.4 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kitwe-Rubingo-Kihumuro-Kya-bugimbi Earth 10 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Ntungamo-Kyamugambi-ra-Nyariyanga Earth 5.6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kantojo-Nyariyanga-Rwamugan-ga Earth 6.6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kizinda-Nkanga-Igambiro Earth 8 Opening of drains & grass cuttingBushenyi Bushenyi DLG Bitooma-Burungira Earth 5.6 Opening of drains & grass cuttingBushenyi Bushenyi DLG Kafunjo-Karyango-Mukora Earth 6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kyabugimbi-Rutooma-Kacwam-ba Earth 4.6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Kyarukari-Kacwamba-Kafunjo Earth 4.6 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Ihaama Bridge-Kantunda-Kein-amo Earth 10 Opening of drains & grass cutting

Bushenyi Bushenyi DLG Bumbaire-Bwera Earth 4.3 Opening of drains & grass cuttingBushenyi Bushenyi DLG Nyamirembe-Omukatensani Earth 3.7 Opening of drains & grass cuttingBushenyi Bushenyi DLG Nombe-Bwegyeme-Katimba Earth 3 Opening of drains & grass cutting Bushenyi DLG Total 205.7Busia Busia DLG Buhobe-Buwembe U 1.3 Opening of drains & grass cutting

Busia Busia DLG Nahayaka - Masaba - Lumuli - Omenya U 9.9 Opening of drains & grass cutting

Busia Busia DLG Hukemo-Mundidi-Omenya U 4.6 Opening of drains & grass cuttingBusia Busia DLG Tiira – Salaama U 1.7 Opening of drains & grass cuttingBusia Busia DLG Busia - Buyengo – Masafu U 6.1 Opening of drains & grass cuttingBusia Busia DLG Butangasi – Nahayaka U 0.9 Opening of drains & grass cutting

Busia Busia DLG Bugunduhira - Sikuda - Habuleke U 5.5 Opening of drains & grass cutting

Busia Busia DLG Dabani – Buwembe U 3.4 Opening of drains & grass cuttingBusia Busia DLG Masafu - Bumayi – Nasinjehe U 3.9 Opening of drains & grass cuttingBusia Busia DLG Dabani - Sibona – Nahayaka U 7.3 Opening of drains & grass cuttingBusia Busia DLG Amungura – Ndaiga U 4.8 Opening of drains & grass cuttingBusia Busia DLG Lumino - Masaba – Masafu U 7.7 Opening of drains & grass cuttingBusia Busia DLG Lumino - Buhehe – Masafu U 4.8 Opening of drains & grass cuttingBusia Busia DLG Busia - Tiira –Busitema U 5.8 Opening of drains & grass cuttingBusia Busia DLG Namungodi – Lumboka U 1.7 Opening of drains & grass cutting

241Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Busia Busia DLG Masafu - Butote – Busikho U 1.7 Opening of drains & grass cuttingBusia Busia DLG Mumutumba –Lumboka U 3.9 Opening of drains & grass cuttingBusia Busia DLG Buhasaba - Bunyadeti – Lumino U 4.8 Opening of drains & grass cuttingBusia Busia DLG Namutere-Sauriyako-Buwembe U 4.4 Opening of drains & grass cuttingBusia Busia DLG Dabani – Busumba U 1.3 Opening of drains & grass cuttingBusia Busia DLG Makunda - Mbehenyi U 3.0 Opening Drains & grass cuttingBusia Busia DLG Butangasi-Sifuyo – Magale U 5.8 Opening Drains & grass cuttingBusia Busia DLG Busia - Mayombe – Buwumba U 3.9 Opening Drains & grass cuttingBusia Busia DLG Kenya – Road U 3.9 Opening Drains & grass cuttingBusia Busia DLG Busikho - Buyimini – Busubo U 2.1 Opening Drains & grass cuttingBusia Busia DLG Buhobe - Sidimbire – Busitema U 4.3 Opening Drains & grass cuttingBusia Busia DLG Tiira - Ajuket – Amonikakinei U 2.0 Opening of drains & grass cuttingBusia Busia DLG Buteba Baptist -Katek -Kayoro ss U 2.1 Opening of drains & grass cutting

Busia Busia DLG Lumino - Syamalede – Nagabita U 3.4 Opening of drains & grass cutting

Busia Busia DLG Bubango-Nkona- Lumboka U 3.4 Opening of drains & grass cuttingBusia Busia DLG Makunda - Busonga – Mbaale U 4.1 Opening of drains & grass cuttingBusia Busia DLG Masaba - Budongo – Nekuku U 4.7 Opening of drains & grass cuttingBusia Busia DLG Tiira -Makina – Budda U 1.7 Opening of drains & grass cutting

Busia Busia DLG Nambweke - Lunyo SS- Mund-indi U 2.7 Opening of drains & grass cutting

Busia Busia DLG Busiwondo – Buguduhira U 1.3 Opening of drains & grass cuttingBusia Busia DLG Nambweke-Busyabala-Buhunya U 3.3 Opening of drains & grass cuttingBusia Busia DLG Mundindi-Nalyoba U 1.1 Opening of drains & grass cuttingBusia Busia DLG Bukobe-Buhonge-Sauriyako U 3.0 Opening of drains & grass cuttingBusia Busia DLG Sauriyako-Bulumbi U 1.7 Opening of drains & grass cutting Busia DLG Total 143.0Busia Busia MC Buluma Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Jacob Aryada U 0.21 Opening of drains & grass cuttingBusia Busia MC Wesonga Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Omukada Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Ojanji U 0.3 Opening of drains & grass cuttingBusia Busia MC Babu Semakula Road U 0.1 Opening of drains & grass cuttingBusia Busia MC Madonya Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Egale Road U 0.17 Opening of drains & grass cuttingBusia Busia MC Hadongole Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Ekaka Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Justice Odoki U 0.8 Opening of drains & grass cuttingBusia Busia MC Adam Road U 1.3 Opening of drains & grass cuttingBusia Busia MC Samson Were Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Hamugo Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Amisi Mafabi Road U 1.1 Opening of drains & grass cuttingBusia Busia MC Nora road U 0.2 Opening of drains & grass cuttingBusia Busia MC Mawer Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Majanji Road U 1.7 Opening of drains & grass cuttingBusia Busia MC Jinja Road U 1.7 Opening of drains & grass cuttingBusia Busia MC Tororo Road U 1.1 Opening of drains & grass cuttingBusia Busia MC Custom U 1.1 Opening of drains & grass cuttingBusia Busia MC Moni Road U 0.8 Opening of drains & grass cuttingBusia Busia MC Edumwe Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Dabani Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Elizabeth Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Equator Road U 1.1 Opening of drains & grass cuttingBusia Busia MC Ogema Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Nahaima Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Justice Ogolla Road U 1.3 Opening of drains & grass cuttingBusia Busia MC Buchicha Road U 1.8 Opening of drains & grass cutting

242 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Busia Busia MC Nyangweso Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Rashid Were Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Nakomolo Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Egessa Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Bwaku U 0.2 Opening of drains & grass cuttingBusia Busia MC Wesonga Road U 0.8 Opening of drains & grass cuttingBusia Busia MC Samia Bugwe Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Makua Lane U 0.5 Opening of drains & grass cutting

Busia Busia MC Okobio Road Okumu Oleki Road U 0.49 Opening of drains & grass cutting

Busia Busia MC Okumu Oleki Road U 0.35 Opening of drains & grass cuttingBusia Busia MC Buchunju Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Park lane U 0.1 Opening of drains & grass cuttingBusia Busia MC Muselemu Close U 0.2 Opening of drains & grass cuttingBusia Busia MC Mugungu Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Munyoro Road U 0.7 Opening of drains & grass cuttingBusia Busia MC Benesa Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Mbulu Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Buluma Road U 0.8 Opening of drains & grass cuttingBusia Busia MC Obare Road U 0.5 Opening of drains & grass cuttingBusia Busia MC Sangalo Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Osato Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Mbiiro Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Maloba Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Nami Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Sitamakoli Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Mbalagade U 0.3 Opening of drains & grass cuttingBusia Busia MC Siwundu U 0.5 Opening of drains & grass cuttingBusia Busia MC Cementery Link U 0.2 Opening of drains & grass cuttingBusia Busia MC Yusuf Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Nangwe Road U 1.2 Opening of drains & grass cuttingBusia Busia MC Obengi Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Baba Baba Road U 0.6 Opening of drains & grass cuttingBusia Busia MC Waswa Abdu Road U 0.2 Opening of drains & grass cuttingBusia Busia MC Cementery Road U 0.9 Opening of drains & grass cuttingBusia Busia MC Market Square U 0.8 Opening of drains & grass cuttingBusia Busia MC Nanguke Road U 0.9 Opening of drains & grass cuttingBusia Busia MC Sikuda Road U 0.8 Opening of drains & grass cuttingBusia Busia MC Ojara Road U 0.8 Opening of drains & grass cuttingBusia Busia MC Red cross U 0.4 Opening of drains & grass cuttingBusia Busia MC Erogo Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Arubaine Road U 0.4 Opening of drains & grass cuttingBusia Busia MC Justice Odoki U 0.8 Opening of drains & grass cuttingBusia Busia MC Berenego Road U 0.3 Opening of drains & grass cuttingBusia Busia MC Mutende Road U 0.3 Opening of drains & grass cutting

Total MC 43.32Butaleja Busolwe TC Buluba U 2 Opening of drains & grass cuttingButaleja Busolwe TC Lujehe U 1.7 Opening of drains & grass cuttingButaleja Busolwe TC Hisega U 1 Opening of drains & grass cuttingButaleja Busolwe TC Nanyulu U 1 Opening of drains & grass cuttingButaleja Busolwe TC Namubi U 1 Opening of drains & grass cuttingButaleja Busolwe TC Birabo U 0.3 Opening of drains & grass cuttingButaleja Busolwe TC Masone U 0.5 Opening of drains & grass cuttingButaleja Busolwe TC Bushilalire U 1.5 Opening of drains & grass cuttingButaleja Busolwe TC Hisoho U 1 Opening of drains & grass cutting Busolwe TC Total 10

243Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Butaleja Busolwe TC Walugo U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Ali Hasahya U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Wale U 0.300 Opening of drains & grass cuttingButaleja Busolwe TC Mbubi U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Kapere U 0.375 Opening of drains & grass cuttingButaleja Busolwe TC Water U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Wamusango U 0.550 Opening of drains & grass cuttingButaleja Busolwe TC Higenyi Muniru U 0.500 Opening of drains & grass cuttingButaleja Busolwe TC Nabala U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Church U 0.175 Opening of drains & grass cuttingButaleja Busolwe TC Multiple U 0.075 Opening of drains & grass cuttingButaleja Busolwe TC Kyalo U 0.325 Opening of drains & grass cuttingButaleja Busolwe TC Waikere U 1.000 Opening of drains & grass cuttingButaleja Busolwe TC Asan Higenyi U 0.150 Opening of drains & grass cuttingButaleja Busolwe TC Masinde U 0.175 Opening of drains & grass cuttingButaleja Busolwe TC Sefu Nasolo U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Doko U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Nabagali U 0.725 Opening of drains & grass cuttingButaleja Busolwe TC Namuhungo U 0.675 Opening of drains & grass cuttingButaleja Busolwe TC Buguna U 0.375 Opening of drains & grass cuttingButaleja Busolwe TC School lane U 0.200 Opening of drains & grass cuttingButaleja Busolwe TC Namujugo U 0.450 Opening of drains & grass cuttingButaleja Busolwe TC Walugo U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Ali Hasahya U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Wale U 0.300 Opening of drains & grass cuttingButaleja Busolwe TC Mbubi U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Kapere U 0.375 Opening of drains & grass cuttingButaleja Busolwe TC Water U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Wamusango U 0.550 Opening of drains & grass cuttingButaleja Busolwe TC Higenyi Muniru U 0.500 Opening of drains & grass cuttingButaleja Busolwe TC Nabala U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Church U 0.175 Opening of drains & grass cuttingButaleja Busolwe TC Multiple U 0.075 Opening of drains & grass cuttingButaleja Busolwe TC Kyalo U 0.325 Opening of drains & grass cuttingButaleja Busolwe TC Waikere U 1.000 Opening of drains & grass cuttingButaleja Busolwe TC Asan Higenyi U 0.150 Opening of drains & grass cuttingButaleja Busolwe TC Masinde U 0.175 Opening of drains & grass cuttingButaleja Busolwe TC Sefu Nasolo U 0.125 Opening of drains & grass cuttingButaleja Busolwe TC Doko U 0.250 Opening of drains & grass cuttingButaleja Busolwe TC Nabagali U 0.725 Opening of drains & grass cuttingButaleja Busolwe TC Namuhungo U 0.675 Opening of drains & grass cuttingButaleja Busolwe TC Buguna U 0.375 Opening of drains & grass cuttingButaleja Busolwe TC School lane U 0.200 Opening of drains & grass cuttingButaleja Busolwe TC Namujugo U 0.450 Opening of drains & grass cutting Busolwe TC Total 15Butaleja Butaleja DLG Busibira-Butesa U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Bunawale-Bulinda U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Nabbade-Gaunda U 0.5 Opening of drains & grass cuttingButaleja Butaleja DLG Buwesa-Muhuyu-Bugangu U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Napekere-Buyigi-Budembe U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Kachonga-Mudodo U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Hasahya-Naweyo-Kaiti U 2.45 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Lusaka U 1.8 Opening of drains & grass cuttingButaleja Butaleja DLG Bubinge-Nawanjofu U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Bugombe p/s-Wanghale U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Butaleja-Suni-Lwamboga U 1.5 Opening of drains & grass cutting

244 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Butaleja Butaleja DLG Lwamboga-Bingo U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Budumba-Dumbu U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Budumba U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Mulagi-Busaba-Mulanga U 2.875 Opening of drains & grass cuttingButaleja Butaleja DLG Bugalo-Budoba U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Lwamboga-Bunawale U 0.875 Opening of drains & grass cuttingButaleja Butaleja DLG Busaba-Bubuhe U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Mulagi-Bugabania U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Lwamboga-Bingo U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Wandegeya-Kanghalaba U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Busolwe-Bubalya-Busabi U 2.45 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Budumba-Luhola U 4.3 Opening of drains & grass cuttingButaleja Butaleja DLG Busibira-Paya U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Doho-Namulo U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Busibira-Butesa U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Bunawale-Bulinda U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Nabbade-Gaunda U 0.5 Opening of drains & grass cuttingButaleja Butaleja DLG Buwesa-Muhuyu-Bugangu U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Napekere-Buyigi-Budembe U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Kachonga-Mudodo U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Hasahya-Naweyo-Kaiti U 2.45 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Lusaka U 1.8 Opening of drains & grass cuttingButaleja Butaleja DLG Bubinge-Nawanjofu U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Bugombe p/s-Wanghale U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Butaleja-Suni-Lwamboga U 1.5 Opening of drains & grass cuttingButaleja Butaleja DLG Lwamboga-Bingo U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Budumba-Dumbu U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Budumba U 2.25 Opening of drains & grass cuttingButaleja Butaleja DLG Mulagi-Busaba-Mulanga U 2.875 Opening of drains & grass cuttingButaleja Butaleja DLG Bugalo-Budoba U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Lwamboga-Bunawale U 0.875 Opening of drains & grass cuttingButaleja Butaleja DLG Busaba-Bubuhe U 1.25 Opening of drains & grass cuttingButaleja Butaleja DLG Mulagi-Bugabania U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Lwamboga-Bingo U 1 Opening of drains & grass cuttingButaleja Butaleja DLG Wandegeya-Kanghalaba U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Busolwe-Bubalya-Busabi U 2.45 Opening of drains & grass cuttingButaleja Butaleja DLG Ochola-Budumba-Luhola U 4.3 Opening of drains & grass cuttingButaleja Butaleja DLG Busibira-Paya U 0.75 Opening of drains & grass cuttingButaleja Butaleja DLG Doho-Namulo U 1 Opening of drains & grass cutting Butaleja DLG Total 75Butambala Butambala DLG Nkokoma - Muyanga Earth 5 Opening of drains & grass cuttingButambala Butambala DLG Bulo -Kabasuma Earth 2 Opening of drains & grass cuttingButambala Butambala DLG Lugala - Kajoolo Earth 3.4 Opening of drains & grass cutting

Butambala Butambala DLG Busoolo - Kibibi Earth 3 Opening of drains & grass cutting

Butambala Butambala DLG Namilyango - Ssegabi Earth 8 Opening of drains & grass cuttingButambala Butambala DLG Kizito -Bunyenye - Makulungo Earth 6.4 Opening of drains & grass cuttingButambala Butambala DLG Kabalamba - Gombe Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Lwamasaka - Lwangiri Earth 13.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Ngando Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Wamala Earth 7.0 Opening of drains & grass cuttingButambala Butambala DLG Muyanga - Bulo Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Gombe - kinoni Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Butawuka - Waduduma Earth 8.5 Opening of drains & grass cuttingButambala Butambala DLG Bulo - Bugobango Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Bugobango - Simbula Earth 2.0 Opening of drains & grass cutting

245Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Butambala Butambala DLG Kibibi - Butaaka Earth 2.0 Opening of drains & grass cuttingButambala Butambala DLG Wamala - Kanyogoga Earth 8.0 Opening of drains & grass cuttingButambala Butambala DLG Kagolo - Ndibulungi Earth 12.0 Opening of drains & grass cuttingButambala Butambala DLG Kasalaba - Gomba Bord Earth 4.5 Opening of drains & grass cuttingButambala Butambala DLG Kalenge - Bujumba Earth 3.4 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Lugoye Earth 6.2 Opening of drains & grass cuttingButambala Butambala DLG Gwatiro - Makulungo Gravel 6.5 Opening of drains & grass cuttingButambala Butambala DLG Senge - Nsozibirye Gravel 11.0 Opening of drains & grass cuttingButambala Butambala DLG Kalamba - Nsozibirye Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Luzinga - Kakubo - Kitimba Earth 12.5 Opening of drains & grass cuttingButambala Butambala DLG Butende - Simbula Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Luwala - Busisi Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Tufube - Nakiju Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Kabasanda - Gavu Earth 11.0 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Mubiri Efuuka Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Mugoja - Butaaka - Mayombe Earth 4.7 Opening of drains & grass cuttingButambala Butambala DLG Kyerima - Kasoso Earth 4.0 Opening of drains & grass cuttingButambala Butambala DLG Vunda - Bubondo Earth 6.0 Opening of drains & grass cuttingButambala Butambala DLG Kikunyu - Buyenga Earth 4.0 Opening of drains & grass cuttingButambala Butambala DLG Nkokoma - Muyanga Earth 5 Opening of drains & grass cuttingButambala Butambala DLG Bulo -Kabasuma Earth 2 Opening of drains & grass cuttingButambala Butambala DLG Lugala - Kajoolo Earth 3.4 Opening of drains & grass cuttingButambala Butambala DLG Busoolo - Kibibi Earth 3 Opening of drains & grass cuttingButambala Butambala DLG Namilyango - Ssegabi Earth 8 Opening of drains & grass cuttingButambala Butambala DLG Kizito -Bunyenye - Makulungo Earth 6.4 Opening of drains & grass cuttingButambala Butambala DLG Kabalamba - Gombe Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Lwamasaka - Lwangiri Earth 13.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Ngando Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Wamala Earth 7.0 Opening of drains & grass cuttingButambala Butambala DLG Muyanga - Bulo Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Gombe - kinoni Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Butawuka - Waduduma Earth 8.5 Opening of drains & grass cuttingButambala Butambala DLG Bulo - Bugobango Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Bugobango - Simbula Earth 2.0 Opening of drains & grass cuttingButambala Butambala DLG Kibibi - Butaaka Earth 2.0 Opening of drains & grass cuttingButambala Butambala DLG Wamala - Kanyogoga Earth 8.0 Opening of drains & grass cuttingButambala Butambala DLG Kagolo - Ndibulungi Earth 12.0 Opening of drains & grass cuttingButambala Butambala DLG Kasalaba - Gomba Bord Earth 4.5 Opening of drains & grass cuttingButambala Butambala DLG Kalenge - Bujumba Earth 3.4 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Lugoye Earth 6.2 Opening of drains & grass cuttingButambala Butambala DLG Gwatiro - Makulungo Earth 6.5 Opening of drains & grass cuttingButambala Butambala DLG Senge - Nsozibirye Earth 11.0 Opening of drains & grass cuttingButambala Butambala DLG Kalamba - Nsozibirye Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Luzinga - Kakubo - Kitimba Earth 12.5 Opening of drains & grass cuttingButambala Butambala DLG Butende - Simbula Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Luwala - Busisi Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Tufube - Nakiju Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Kabasanda - Gavu Earth 11.0 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Mubiri Efuuka Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Mugoja - Butaaka - Mayombe Earth 4.7 Opening of drains & grass cuttingButambala Butambala DLG Kyerima - Kasoso Earth 4.0 Opening of drains & grass cuttingButambala Butambala DLG Vunda - Bubondo Earth 6.0 Opening of drains & grass cuttingButambala Butambala DLG Kikunyu - Buyenga Earth 4.0 Opening of drains & grass cuttingButambala Butambala DLG Nkokoma - Muyanga Earth 5 Opening of drains & grass cuttingButambala Butambala DLG Bulo -Kabasuma Earth 2 Opening of drains & grass cuttingButambala Butambala DLG Lugala - Kajoolo Earth 3.4 Opening of drains & grass cutting

246 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Butambala Butambala DLG Busoolo - Kibibi Earth 3 Opening of drains & grass cuttingButambala Butambala DLG Namilyango - Ssegabi Earth 8 Opening of drains & grass cuttingButambala Butambala DLG Kizito -Bunyenye - Makulungo Earth 6.4 Opening of drains & grass cuttingButambala Butambala DLG Kabalamba - Gombe Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Lwamasaka - Lwangiri Earth 13.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Ngando Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Kitagobwa - Wamala Earth 7.0 Opening of drains & grass cuttingButambala Butambala DLG Muyanga - Bulo Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Gombe - kinoni Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Butawuka - Waduduma Earth 8.5 Opening of drains & grass cuttingButambala Butambala DLG Bulo - Bugobango Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Bugobango - Simbula Earth 2.0 Opening of drains & grass cuttingButambala Butambala DLG Kibibi - Butaaka Earth 2.0 Opening of drains & grass cuttingButambala Butambala DLG Wamala - Kanyogoga Earth 8.0 Opening of drains & grass cuttingButambala Butambala DLG Kagolo - Ndibulungi Earth 12.0 Opening of drains & grass cuttingButambala Butambala DLG Kasalaba - Gomba Bord Earth 4.5 Opening of drains & grass cuttingButambala Butambala DLG Kalenge - Bujumba Earth 3.4 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Lugoye Earth 6.2 Opening of drains & grass cuttingButambala Butambala DLG Gwatiro - Makulungo Earth 6.5 Opening of drains & grass cuttingButambala Butambala DLG Senge - Nsozibirye Earth 11.0 Opening of drains & grass cuttingButambala Butambala DLG Kalamba - Nsozibirye Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Luzinga - Kakubo - Kitimba Earth 12.5 Opening of drains & grass cuttingButambala Butambala DLG Butende - Simbula Earth 9.0 Opening of drains & grass cuttingButambala Butambala DLG Luwala - Busisi Earth 3.0 Opening of drains & grass cuttingButambala Butambala DLG Tufube - Nakiju Earth 5.0 Opening of drains & grass cuttingButambala Butambala DLG Kabasanda - Gavu Earth 11.0 Opening of drains & grass cuttingButambala Butambala DLG Katabira - Mubiri Efuuka Earth 3.5 Opening of drains & grass cuttingButambala Butambala DLG Mugoja - Butaaka - Mayombe Earth 4.7 Opening of drains & grass cuttingButambala Butambala DLG Kyerima - Kasoso Earth 4.0 Opening of drains & grass cuttingButambala Butambala DLG Vunda - Bubondo Earth 6.0 Opening of drains & grass cuttingButambala Butambala DLG Kikunyu - Buyenga Earth 4.0 Opening of drains & grass cutting DLG Total 603.3Butambala Gombe TC Gombe - Kinoni Earth 2.3 Opening of drains & grass cuttingButambala Gombe TC Ssendagire - Nkole Earth 3 Opening of drains & grass cuttingButambala Gombe TC Kyangoma - Tamale Earth 1.5 Opening of drains & grass cuttingButambala Gombe TC Tamale - Ntolomwe Earth 1 Opening of drains & grass cuttingButambala Gombe TC Ntolomwe - Kyangoma Earth 2.5 Opening of drains & grass cuttingButambala Gombe TC Ntolomwe - Wananda swamp Earth 1 Opening of drains & grass cuttingButambala Gombe TC Kyanajjanja - Kawuku Earth 2.2 Opening of drains & grass cuttingButambala Gombe TC Gombe - Kyanajjanja Earth 3.2 Opening of drains & grass cuttingButambala Gombe TC Senene Ring Road Earth 3.2 Opening of drains & grass cuttingButambala Gombe TC Nyanama kasekere Earth 2.2 Opening of drains & grass cuttingButambala Gombe TC Kasaka - Gombe Earth 2.0 Opening of drains & grass cuttingButambala Gombe TC Kyampisi - Kyampi A Earth 0.9 Opening of drains & grass cuttingButambala Gombe TC Kasalaba - Katambala Earth 1.8 Opening of drains & grass cuttingButambala Gombe TC Badester - Ssendawula Earth 0.5 Opening of drains & grass cuttingButambala Gombe TC Hajji Bulaimu - Gombe Earth 2.0 Opening of drains & grass cuttingButambala Gombe TC Bugoya - Ring Road Earth 3.0 Opening of drains & grass cuttingButambala Gombe TC Kitto - Kibindizi Road Earth 3.0 Opening of drains & grass cuttingButambala Gombe TC Ntolomwe - Kayenje Earth 4.0 Opening of drains & grass cutting Gombe TC Total Buvuma Buvuma DLG Bukayo-Lukoma-Bbanga U 12.5 Opening of drains & grass cuttingBuvuma Buvuma DLG Bugema-Mubale-Tojjwe U 10.5 Opening of drains & grass cuttingBuvuma Buvuma DLG Mubale-Kijaka U 6.5 Opening of drains & grass cuttingBuvuma Buvuma DLG Buvuma college-Kitiko-Lukale U 16.6 Opening of drains & grass cuttingBuvuma Buvuma DLG Namatale-Nakibizi-Kazilu U 7.3 Opening of drains & grass cutting

247Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buvuma Buvuma DLG Bukayo-Namugiri U 4.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Busamuzi-Namugiri-Bugabo U 12.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Buye-Ndwasi U 4.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Kobero-Galigatya-Lukoma U 8.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Bukwaya swamp U 2.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Lukale-Musoma U 6.5 Opening of drains & grass cuttingBuvuma Buvuma DLG Kalambi-Bbuye U 4.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Namunyolo-Munyama U 3.0 Opening of drains & grass cuttingBuvuma Buvuma DLG Kulwe-Busoba U 3.5 Opening of drains & grass cuttingBuvuma Buvuma DLG Namatale-Kyanja-Kazilu U 7.5 Opening of drains & grass cutting Buvuma DLG Total tal 147.2Buvuma Town Council Mutesa-Buruku U 4.0 Opening of drains & grass cuttingBuvuma Town Council Lukoma-Mutebi U 6.0 Opening of drains & grass cuttingBuvuma Town Council Dungu-Omera U 4.0 Opening of drains & grass cuttingBuvuma Town Council kigundu-kibondwe U 4.5 Opening of drains & grass cuttingBuvuma Town Council Bajampola-Wasswa U 3.0 Opening of drains & grass cuttingBuvuma Town Council Kadinindi-Kembo U 3.0 Opening of drains & grass cuttingBuvuma Town Council Buyego-Ndotwe U 2.5 Opening of drains & grass cuttingBuvuma Town Council Walwanda-Buliba U 1.5 Opening of drains & grass cuttingBuvuma Town Council Kitamilo-Buliba U 1.5 Opening of drains & grass cuttingBuvuma Town Council Kabugombe-Buwanga U 1.5 Opening of drains & grass cutting Town Council Total 31.5Buvuma Buvuma CARs Buye-Kasenyi U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Makopa-Lwazi U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Munyama-Busoba U 6.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Ssesse -Buwangwe U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs kayola-Buyuba U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Wakikere-Kiziba U 4.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Bwime-Maye U 4.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Nakisiki-Namuzilu U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Namatooke-Bulugulu U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Zziba-Galamo U 4.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Lwagge-Ssese U 3.0 Opening of drains & grass cuttingBuvuma Buvuma CARs Bweema hqs-Kiruguma U 3.0 Opening of drains & grass cutting Buvuma CARs 42Buyende Town Council Kagaba Upaved 0.45 Opening of drains & grass cuttingBuyende Town Council Kyabazinga Upaved 6.38 Opening of drains & grass cuttingBuyende Town Council Market Street Upaved 0.2 Opening of drains & grass cuttingBuyende Town Council Balikoowa Upaved 0.75 Opening of drains & grass cuttingBuyende Town Council Mission Upaved 0.8 Opening of drains & grass cuttingBuyende Town Council Kanaku Upaved 0.65 Opening of drains & grass cuttingBuyende Town Council Council Lane Upaved 0.5 Opening of drains & grass cuttingBuyende Town Council Mwanje Upaved 5 Opening of drains & grass cuttingBuyende Town Council Nakabira Crescent Upaved 6 Opening of drains & grass cuttingBuyende Town Council Samanya Upaved 0.3 Opening of drains & grass cuttingBuyende Town Council Southern ByPass Upaved 0.9 Opening of drains & grass cuttingBuyende Town Council Rev. Father Otina Upaved 0.3 Opening of drains & grass cuttingBuyende Town Council Buseete Upaved 5 Opening of drains & grass cuttingBuyende Town Council Byekwaso Upaved 0.3 Opening of drains & grass cuttingBuyende Town Council Dr. Kagwa Upaved 0.15 Opening of drains & grass cuttingBuyende Town Council Mayengo Upaved 0.6 Opening of drains & grass cuttingBuyende Town Council Mbiiwa Upaved 0.6 Opening of drains & grass cuttingBuyende Town Council Makaya Upaved 0.7 Opening of drains & grass cuttingBuyende Town Council Lock Up Upaved 0.7 Opening of drains & grass cuttingBuyende Town Council School Lane Upaved 0.3 Opening of drains & grass cuttingBuyende Town Council Musenero Upaved 3.6 Opening of drains & grass cutting

248 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Buyende Town Council Butooli Upaved 4.5 Opening of drains & grass cutting

Buyende Town Council Kitunzi (Webukya) Upaved 4.2 Opening of drains & grass cutting

Bombo TC Total 42.88Buyende Buyende DLG Kamenya-Iringa-K L/S Unpaved 12 Opening of drains & grass cuttingBuyende Buyende DLG Njwejwe Link Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Nambula-Kakooge L/S Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Kigingi-Kasongoire l/S Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Nakawa L/S-Kisaikye L/S Unpaved 10 Opening of drains & grass cuttingBuyende Buyende DLG Kinambogo-Ikanda-k L/s Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Makanga-Iremerya Unpaved 9 Opening of drains & grass cuttingBuyende Buyende DLG Kitukiro-Lukotaime Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Bugaya-Igoola L/S Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Kidera-Kisaikye Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Kakooge-Mukuma Unpaved 4 Opening of drains & grass cuttingBuyende Buyende DLG Kidera-Itamya-Nakibengo Unpaved 5 Opening of drains & grass cuttingBuyende Buyende DLG Mpunde-Butakoma-N L/S Unpaved 19 Opening of drains & grass cuttingBuyende Buyende DLG Wesunire-Mango Unpaved 12 Opening of drains & grass cuttingBuyende Buyende DLG Nagulu L/S-Kyankoole L/S Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Ndalike-Irundu Unpaved 13 Opening of drains & grass cuttingBuyende Buyende DLG Ndolwa Link Unpaved 4.6 Opening of drains & grass cuttingBuyende Buyende DLG Kyankoole-Nawansaso-K Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Lunnar-Bekula Unpaved 10 Opening of drains & grass cuttingBuyende Buyende DLG Kakooge T/C-Mukuma Unpaved 4 Opening of drains & grass cuttingBuyende Buyende DLG Iraapa-Ngandho Unpaved 9.4 Opening of drains & grass cuttingBuyende Buyende DLG Naguru-Kyankoole L/S Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Nakabira-Bugaya Unpaved 12 Opening of drains & grass cuttingBuyende Buyende DLG Kigweri-Iraapa Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG District Access road Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Nabirumba-Kidera Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Kamenya-Iringa - K L/S Unpaved 10 Opening of drains & grass cuttingBuyende Buyende DLG Njwejwe Link Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Nambula-Kakooge L/S Unpaved 9 Opening of drains & grass cuttingBuyende Buyende DLG Kigingi-Kasongoire l/S Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Kinambogo-Ikanda-k L/s Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Makanga-Iremerya Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Kitukiro-Lukotaime Unpaved 4 Opening of drains & grass cuttingBuyende Buyende DLG Kabukye-Wakukuta-B Unpaved 5 Opening of drains & grass cuttingBuyende Buyende DLG Bugaya-Igoola L/S Unpaved 19 Opening of drains & grass cuttingBuyende Buyende DLG Kidera-Kisaikye Unpaved 12 Opening of drains & grass cuttingBuyende Buyende DLG Kakooge-Mukuma Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Kidera-Itamya-Nakibengo Unpaved 13 Opening of drains & grass cuttingBuyende Buyende DLG Mpunde-Butakoma-N L/S Unpaved 4.6 Opening of drains & grass cuttingBuyende Buyende DLG Wesunire-Mango Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Nagulu L/S-Kyankoole L/S Unpaved 10 Opening of drains & grass cuttingBuyende Buyende DLG Ndalike-Irundu Unpaved 4 Opening of drains & grass cuttingBuyende Buyende DLG Ndolwa Link Unpaved 9.4 Opening of drains & grass cuttingBuyende Buyende DLG Kyankoole-Nawansaso-K Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Lunnar-Bekula Unpaved 12 Opening of drains & grass cuttingBuyende Buyende DLG Kakooge T/C-Mukuma Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Iraapa-Ngandho Unpaved 8 Opening of drains & grass cuttingBuyende Buyende DLG Naguru-Kyankoole L/S Unpaved 6 Opening of drains & grass cuttingBuyende Buyende DLG Nakabira-Bugaya Unpaved 7 Opening of drains & grass cuttingBuyende Buyende DLG Kigweri-Iraapa Unpaved 10.5 Opening of drains & grass cuttingBuyende Buyende DLG District Access road Unpaved 1 Opening of drains & grass cuttingBuyende Buyende DLG Nabirumba-Kidera Unpaved 1 Opening of drains & grass cutting DLG Total 415.5

249Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Luwero Luwero DLG Bamunanika - Kikyusa Earth 16.00 Opening of drains & grass cuttingLuwero Luwero DLG Waluleta - Ndejje Earth 5.00 Opening of drains & grass cuttingLuwero Luwero DLG Kalagala - Namawojja Earth 8.10 Opening of drains & grass cuttingLuwero Luwero DLG Kanyogoga - Bulawula Earth 3.50 Opening of drains & grass cuttingLuwero Luwero DLG Nakivubo - Nandere Earth 7.90 Opening of drains & grass cuttingLuwero Luwero DLG Kakakala - Ndalike Swamp Earth 14.80 Opening of drains & grass cuttingLuwero Luwero DLG Kikyusa - Kyampogola - M Earth 15.70 Opening of drains & grass cuttingLuwero Luwero DLG Nkondo - Degeya Earth 8.20 Opening of drains & grass cutting DLG Total 79.2

Luwero Luwero TC Abduk kasoma,and abby Muk-waya roads P 1.00 Opening of drains & grass cutting

Luwero Luwero TC Luwero street, Katwe-kamwanyi Roads P 1.00 Opening of drains & grass cutting

Luwero Luwero TC Market street, market lane P 1.00 Opening of drains & grass cuttingLuwero Luwero TC Kyebakutiika Road P 0.80 Opening of drains & grass cutting

Luwero Luwero TC

Posta lane, Kintu diro, Kaaya cranimer, Harunah, Daudi ka-zibwe, Nnallongo Ssemwogere, Kagoye road, Rd

U 2.80 Opening of drains & grass cutting

Luwero Luwero TC seeta road, New Abbatoir Rd U 1.50 Opening of drains & grass cutting

Luwero Luwero TC Police Rd, Baaka Rd, Part of kagutta Rd, U 0.80 Opening of drains & grass cutting

Luwero Luwero TC Kizito-Kasiso road U 1.50 Opening of drains & grass cutting

Luwero Luwero TC Klezia Rd, Habitat Rd, Ndifuna Rd, U 1.00 Opening of drains & grass cutting

Luwero Luwero TCMabale Rd, Mabale by pass, walusimbi, muniro Rd, Nakayiba Rd, Kaseera Rd

U 4.00 Opening of drains & grass cutting

Luwero Luwero TC Little Angels Rd, Musooba, Serugo Rd U 2.00 Opening of drains & grass cutting

Luwero Luwero TC Plan int. Nabagaya Rd, Katende, Kaguta & works lane Rd U 4.90 Opening of drains & grass cutting

Luwero Luwero TC Nansaba Rd, Safari Rd U 0.80 Opening of drains & grass cutting

Luwero Luwero TC Kalungi Rd, Kizito Rd, Part-Kizito-Kasiso U 1.80 Opening of drains & grass cutting

Luwero Luwero TC Semanda, Simbwa Rd U 1.60 Opening of drains & grass cuttingLuwero Luwero TC Kazinga Rd, U 1.40 Opening of drains & grass cuttingLuwero Luwero TC Everest Road U 0.70 Opening of drains & grass cuttingLuwero Luwero TC Sewava, Church Rd, Kakoza Rd U 2.80 Opening of drains & grass cutting Luwero TC Total 31.4Luwero Bombo TC Katanga road earth 1.20 Opening of drains & grass cuttingLuwero Bombo TC Nemagaza road earth 1.00 Opening of drains & grass cuttingLuwero Bombo TC Church lane,sefuka road gravel 1.50 Opening of drains & grass cuttingLuwero Bombo TC Gagama road earth 1.30 Opening of drains & grass cutting

Bombo TC 5Otuke Otuke DLG Acanpii-otitilo U 12 Opening of drains & grass cuttingOtuke Otuke DLG Olilim-Aluga U 12 Opening of drains & grass cuttingOtuke Otuke DLG Amackide-Ogwete U 12 Opening of drains & grass cuttingOtuke Otuke DLG Okum PS-Aler U 6 Opening of drains & grass cuttingOtuke Otuke DLG R.moroto-otuke TC border U 9 Opening of drains & grass cuttingOtuke Otuke DLG Corner Awake-alangi P/S U 5 Opening of drains & grass cuttingOtuke Otuke DLG Ogweno-Omwonylee U 9 Opening of drains & grass cuttingOtuke Otuke DLG Otuke TC-Atangwata U 18 Opening of drains & grass cuttingOtuke Otuke DLG Oderokec-Omwonylee U 12 Opening of drains & grass cuttingOtuke Otuke DLG Okelamone jn-Abonower U 12 Opening of drains & grass cuttingOtuke Otuke DLG Alango TC-Baralegi road U 21 Opening of drains & grass cuttingOtuke Otuke DLG Abongower mrkt-Amunga pst U 13 Opening of drains & grass cuttingOtuke Otuke DLG Amunga pst-Barocok U 5 Opening of drains & grass cuttingOtuke Otuke DLG Baralegi jn-Okwang HQRTS U 3 Opening of drains & grass cutting

250 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Otuke Otuke DLG Okwang TC-Agago border U 3 Opening of drains & grass cutting Otuke DLG Total 152Otuke Town Council Otuke TC-Ogor U 4 Opening of drains & grass cuttingOtuke Town Council Alai-Obir U 5 Opening of drains & grass cuttingOtuke Town Council Corner Otema-Kristina H/C U 5 Opening of drains & grass cuttingOtuke Town Council Otlut-Police U 3 Opening of drains & grass cuttingOtuke Town Council Kwizera-Gulgoi U 1 Opening of drains & grass cuttingOtuke Town Council Gulgoi-Ogor U 1 Opening of drains & grass cuttingOtuke Town Council Kamilo- Police U 1 Opening of drains & grass cuttingOtuke Town Council Police-main road to Olilim U 1 Opening of drains & grass cuttingOtuke Town Council Abia Eunice road U 2 Opening of drains & grass cuttingOtuke Town Council market roads U 1 Opening of drains & grass cuttingOtuke Town Council Olec P/S-Anepmoroto road U 3 Opening of drains & grass cuttingOtuke Town Council Otuke TC-Otlut swamp U 3 Opening of drains & grass cuttingOtuke Town Council New roads U 5 Opening of drains & grass cuttingOtuke Town Council Oget-Alangi U 5 Opening of drains & grass cutting TC Total 40Dokolo Dokolo DLG Agee - Atwac Earth 4 Opening of drains & grass cuttingDokolo Dokolo DLG Agwata - Apac Border Gravel 2 Opening of drains & grass cuttingDokolo Dokolo DLG Alik - Adeknino - Alengi Gravel 5 Opening of drains & grass cuttingDokolo Dokolo DLG Apyee - Owiny Gravel 6 Opening of drains & grass cuttingDokolo Dokolo DLG Bata - Aminibutu Earth 6 Opening of drains & grass cutting

Dokolo Dokolo DLG Kangai - Adeknino - Awei Land-ing Site Gravel 4 Opening of drains & grass cutting

Dokolo DLG Total 27Dokolo Dokolo TC JB Okello Okello Road Gravel 0.5 Opening of drains & grass cuttingDokolo Dokolo TC DPC Okello Road Gravel 1 Opening of drains & grass cuttingDokolo Dokolo TC Akongodyek-Awinyipany Gravel 1 Opening of drains & grass cuttingDokolo Dokolo TC Akome Road Gravel 0.5 Opening of drains & grass cuttingDokolo Dokolo TC Alengo Road Earth 1 Opening of drains & grass cutting TC Total 4Gomba Gomba DLG Kifampa – Kisozi Earth 4.5 Opening of drains & grass cuttingGomba Gomba DLG Kibimba – Kifampa Earth 2.5 Opening of drains & grass cuttingGomba Gomba DLG Lumuli - Kabasuma Earth 2.5 Opening of drains & grass cuttingGomba Gomba DLG Wabibo – Kalwanga Earth 1.3 Opening of drains & grass cuttingGomba Gomba DLG Maddu – Kayunga Earth 2.5 Opening of drains & grass cuttingGomba Gomba DLG Ttaba – Wabichu Earth 1.3 Opening of drains & grass cuttingGomba Gomba DLG Kisaaka – Kyalwa Earth 1.7 Opening of drains & grass cuttingGomba Gomba DLG Kasaka - Mamba Earth 3.6 Opening of drains & grass cuttingGomba Gomba DLG Malere - Nsambwe – Kabutaala Earth 3.1 Opening of drains & grass cuttingGomba Gomba DLG Mpenja – Kitongo Earth 1.6 Opening of drains & grass cuttingGomba Gomba DLG Mpenja – Busolo Earth 3.1 Opening of drains & grass cuttingGomba Gomba DLG Kyegonza – Sembula Earth 1.5 Opening of drains & grass cuttingGomba Gomba DLG Ngomanene – Namatebe Earth 1.3 Opening of drains & grass cuttingGomba Gomba DLG Kiriri - Bujege – Nkole Earth 2.1 Opening of drains & grass cuttingGomba Gomba DLG Kigezi - Kigumba – Kyamboobo Earth 2.5 Opening of drains & grass cuttingGomba Gomba DLG Kyayi - Kyetume-Lwebilagi Earth 5.0 Opening of drains & grass cuttingGomba Gomba DLG Mpenja –Kyeggaliro Earth 1.6 Opening of drains & grass cuttingGomba Gomba DLG Buyinja – Kimwanyi Earth 0.5 Opening of drains & grass cuttingGomba Gomba DLG Kimwanyi – Katikampanda Earth 0.4 Opening of drains & grass cuttingGomba Gomba DLG Kigumba - Kashego-Buyanja Earth 5.3 Opening of drains & grass cuttingGomba Gomba DLG Mamba - Makokwa – Kigo Earth 2.3 Opening of drains & grass cuttingGomba Gomba DLG Kasasa - Golola – Kiriri Earth 3.2 Opening of drains & grass cuttingGomba Gomba DLG Nswanjere – Golola Earth 0.8 Opening of drains & grass cuttingGomba Gomba DLG Lugaaga – Sserinya Gravel 3.0 Opening of drains & grass cutting

Gomba Gomba DLG Mawuuki - Bukandula - Kigo - Nsimbiziwoome – Kandegeya Gravel 5.0 Opening of drains & grass cutting

251Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Gomba Gomba DLGKireku - Kampaama - Ntonwa - Namulaba - Bukalambajjo – Bulwadda

Gravel 2.6 Opening of drains & grass cutting

Gomba Gomba DLG Kabbankonyo - Lukoola - Kifam-pa – Matongo Gravel 2.4 Opening of drains & grass cutting

Gomba Gomba DLG Kabasuma-Nakimu-Kassasa Earth 2.0 Opening of drains & grass cutting

Gomba Gomba DLG Bukandula-Kampa-ma-Kireku-Kisigula Earth 1.4 Opening of drains & grass cutting

Gomba Gomba DLG Ngomanene -Kubamitwe-Kalya Earth 1.1 Opening of drains & grass cuttingGomba Gomba DLG Kalya-Nassozi-Buye Earth 0.7 Opening of drains & grass cuttingGomba Gomba DLG Kaggali Bridge-Kyayi Earth 0.3 Opening of drains & grass cuttingGomba Gomba DLG Busolo-Nawandigi-Betania Earth 0.7 Opening of drains & grass cutting

Gomba Gomba DLG Kawuula - Kitojo - Kibimba - Kyamuyiisa – Maddu Gravel 5.0 Opening of drains & grass cutting

Gomba Gomba DLG Nabiteete – Golola Gravel 2.5 Opening of drains & grass cutting Gomba DLG Total 80.9Gomba Kanoni TC Kanoni - Kitwe Earth 0.725 Opening of drains & grass cuttingGomba Kanoni TC Kanoni - Market Street Earth 0.075 Opening of drains & grass cuttingGomba Kanoni TC Kanoni - Police - Ssaza Hqtrs Earth 0.075 Opening of drains & grass cuttingGomba Kanoni TC Kayondo - Ssaza Hqtrs Earth 0.075 Opening of drains & grass cuttingGomba Kanoni TC Kanoni - Kuuku - Kiwanda Earth 0.325 Opening of drains & grass cutting

Gomba Kanoni TC Kasaka - Musuubula - Kyankuu-ma Earth 0.700 Opening of drains & grass cutting

Gomba Kanoni TC Kasaka - Kampungu - Kanoni Earth 1.075 Opening of drains & grass cuttingGomba Kanoni TC Tondora -Kabulasoke Earth 1.025 Opening of drains & grass cuttingGomba Kanoni TC Kayondo - Tondora Earth 0.220 Opening of drains & grass cuttingGomba Kanoni TC Police - Fabiano Earth 0.075 Opening of drains & grass cuttingGomba Kanoni TC Vietnam Earth 0.175 Opening of drains & grass cuttingGomba Kanoni TC Kyegonza - Kyampisi Earth 0.618 Opening of drains & grass cuttingGomba Kanoni TC Kampungu - Kyamuyinura Earth 0.400 Opening of drains & grass cuttingGomba Kanoni TC Nkwale-Kawoto-Mpunge Earth 0.500 Opening of drains & grass cuttingGomba Kanoni TC Kitwe TC-Mwese Earth 0.375 Opening of drains & grass cuttingGomba Kanoni TC Kitwe TC-Kansambya Earth 0.175 Opening of drains & grass cuttingGomba Kanoni TC Wanjeyo-Mayangayanga Earth 0.850 Opening of drains & grass cuttingGomba Kanoni TC Kaalo-Bwebasa Earth 0.500 Opening of drains & grass cuttingGomba Kanoni TC Kyankuma- Malyoowe Earth 0.650 Opening of drains & grass cuttingGomba Kanoni TC Kitemu- Koome Earth 0.275 Opening of drains & grass cuttingGomba Kanoni TC Ssebaggala - Akaya Earth 0.150 Opening of drains & grass cuttingGomba Kanoni TC Kato J.B. - Ssebaggala Earth 0.075 Opening of drains & grass cuttingGomba Kanoni TC Ssebaggala - Ssaza Hqtrs Earth 0.100 Opening of drains & grass cuttingGomba Kanoni TC Nkware - Kitemu Earth 1.563 Opening of drains & grass cuttingGomba Kanoni TC Koome - Mweese Earth 1.363 Opening of drains & grass cuttingGomba Kanoni TC Wasinda - Ssaza Hqtrs Earth 0.445 Opening of drains & grass cuttingGomba Kanoni TC Wasinda - Najjooki Earth 0.625 Opening of drains & grass cuttingGomba Kanoni TC Lusenke - Mweese Earth 0.325 Opening of drains & grass cuttingGomba Kanoni TC Kitwe - Kansambya Earth 0.750 Opening of drains & grass cutting Kanoni TC Total 14.28Gulu C.A.R.s Acet-Otwal Gravel 9.70 Opening of drains & grass cuttingGulu C.A.R.s Ongako-Tochi -Patuda Gravel 10.90 Opening of drains & grass cuttingGulu C.A.R.s Acutomer-Aleda Earth 9.00 Opening of drains & grass cuttingGulu C.A.R.s Oturuloya-Oitino Earth 5.00 Opening of drains & grass cuttingGulu C.A.R.s Paicho-Kicike Earth 12.00 Opening of drains & grass cuttingGulu C.A.R.s Labworomor karai-paibona Gravel 16.60 Opening of drains & grass cuttingGulu C.A.R.s Adak-Awonyim-Akwi Gravel 17.00 Opening of drains & grass cuttingGulu C.A.R.s Palenga-Labworomor Earth 10.50 Opening of drains & grass cuttingGulu C.A.R.s Acoyo-Labora Earth 13.00 Opening of drains & grass cuttingGulu C.A.R.s Abole-keto-Opit Gravel 18.60 Opening of drains & grass cutting

252 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Gulu C.A.R.s Opit-Hima Gravel 7.00 Opening of drains & grass cuttingGulu C.A.R.s Pida-Kidere Earth 13.00 Opening of drains & grass cutting C.A.R.s Total 142.3Gulu Gulu DLG Pageya-Omel-Acet Gravel 51.6 Opening of drains & grass cuttingGulu Gulu DLG Abili-Abwoch Gravel 8 Opening of drains & grass cuttingGulu Gulu DLG Lukome-Gwengdiya Gravel 13 Opening of drains & grass cuttingGulu Gulu DLG Paicho – Patiko Gravel 21.5 Opening of drains & grass cuttingGulu Gulu DLG Labora-Loyoajonga-Acet Gravel 29 Opening of drains & grass cuttingGulu Gulu DLG Bobi-Wilacic Gravel 14.7 Opening of drains & grass cuttingGulu Gulu DLG Cwero-pagik-Paibona Gravel 36 Opening of drains & grass cuttingGulu Gulu DLG Abera –Awach Gravel 19.2 Opening of drains & grass cuttingGulu Gulu DLG Palaro-Mede earth 24 Opening of drains & grass cuttingGulu Gulu DLG Lakwatomer – Abili Gravel 12.7 Opening of drains & grass cuttingGulu Gulu DLG Opit –Awor Gravel 14.2 Opening of drains & grass cuttingGulu Gulu DLG Awach –Paibona earth 19.6 Opening of drains & grass cuttingGulu Gulu DLG Cwero-Omel-Minja Gravel 41.5 Opening of drains & grass cuttingGulu Gulu DLG Palenga-Wilacic Gravel 9.7 Opening of drains & grass cuttingGulu Gulu DLG Pida pageya-Labora Gravel 11.7 Opening of drains & grass cuttingGulu Gulu DLG Laroo-Pageya Gravel 4.2 Opening of drains & grass cuttingGulu Gulu DLG Akonyibedo-Omoti Gravel 22.5 Opening of drains & grass cuttingGulu Gulu DLG Bardege-Lalem-Pugwinyi Gravel 31.8 Opening of drains & grass cuttingGulu Gulu DLG Alokolum-Ongako Gravel 12.5 Opening of drains & grass cuttingGulu Gulu DLG Tochi-Atiang-Opit Gravel 16.6 Opening of drains & grass cuttingGulu Gulu DLG Paicho-Laminto Gravel 8.1 Opening of drains & grass cuttingGulu Gulu DLG Lalogi-Bario Gravel 7.2 Opening of drains & grass cuttingGulu Gulu DLG Minakulu-Okwir-koroba Gravel 15 Opening of drains & grass cuttingGulu Gulu DLG Coope-Monroc Gravel 9.6 Opening of drains & grass cuttingGulu Gulu DLG Unyama-Pageya Gravel 4.2 Opening of drains & grass cuttingGulu Gulu DLG Laroo-Unyama Gravel 4 Opening of drains & grass cuttingGulu Gulu DLG Lakwaya-Minja Gravel 8.4 Opening of drains & grass cuttingGulu Gulu DLG Corneragula-Oleng-Dino Gravel 22.9 Opening of drains & grass cuttingGulu Gulu DLG Palenga-Ongako Gravel 14.7 Opening of drains & grass cuttingGulu Gulu DLG Coope-Cetkana-Pugwinyi Gravel 17.5 Opening of drains & grass cuttingGulu Gulu DLG Negri-Paminano-Lalem Gravel 9 Opening of drains & grass cuttingGulu Gulu DLG Adak-Awalkok-Idure Gravel 10 Opening of drains & grass cuttingGulu Gulu DLG Arut-awach Gravel 12.4 Opening of drains & grass cutting Gulu DLG Total 557Gulu Gulu MC Achili road Paved 1.1 Opening of drains & grass cuttingGulu Gulu MC Jomo Kenyatta road Paved 0.25 Opening of drains & grass cuttingGulu Gulu MC Bank lane Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Lagara-Awach road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Coronation Rd Paved 0.26 Opening of drains & grass cuttingGulu Gulu MC Andrea Olal road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Churchill Drive Paved 0.26 Opening of drains & grass cuttingGulu Gulu MC Laroo road (Eden) Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Awich road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Keyo road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Labwor road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Olya road Paved 0.23 Opening of drains & grass cuttingGulu Gulu MC Bere-Airfild road Paved 0.41 Opening of drains & grass cutting

Gulu MC Total 4.12Hoima Hoima DLG Buhimba - Kigarama-Kinogozi Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Kibiro Earth 8.6 Opening of drains & grass cuttingHoima Hoima DLG Kihukya-Mairirwe Earth 4 Opening of drains & grass cuttingHoima Hoima DLG Kafo-Kasambya-Wagesa Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Kitonya –Kyohairwe-Wagesa Earth 9.5 Opening of drains & grass cutting

253Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Hoima Hoima DLG Buraru-Busanga-Kigona Earth 13.5 Opening of drains & grass cuttingHoima Hoima DLG Mparangasi-Kiryabutuzi-Waaki Earth 17.1 Opening of drains & grass cuttingHoima Hoima DLG Bujwahya-Kisabagwa-Bugandale Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Nyamirima-Kibugubya Earth 0 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Waaki-Dwoli Earth 17.8 Opening of drains & grass cuttingHoima Hoima DLG Katugo-Bineneza Earth 6.1 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Buraru Earth 5.8 Opening of drains & grass cuttingHoima Hoima DLG Bujwahya-Nyamirima-Kakindo Earth 0 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Kibegenya Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Kitongole-Kasongoire Earth 9 Opening of drains & grass cuttingHoima Hoima DLG Kyakapeya-Kisiita-Kibaire Earth 16.5 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Waki Earth 7.2 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Icukira-Kitoba Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Kitoba-Kyabasengya-Kaboijana Earth 15 Opening of drains & grass cuttingHoima Hoima DLG Buhamba-Iseisa Earth 7 Opening of drains & grass cuttingHoima Hoima DLG Iseisa-Kiboirya Earth 6.2 Opening of drains & grass cuttingHoima Hoima DLG Kiswero-Katugo Earth 8.7 Opening of drains & grass cuttingHoima Hoima DLG Karongo-Iseisa Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Ruguse-Bujugu-Kisambo Earth 15 Opening of drains & grass cuttingHoima Hoima DLG Kitoole-Kitindura Earth 7 Opening of drains & grass cuttingHoima Hoima DLG Ruguse-Kihamba Earth 8 Opening of drains & grass cuttingHoima Hoima DLG Kyentale-Nyakabongi Earth 7.2 Opening of drains & grass cuttingHoima Hoima DLG Kinogozi-Kisenyi-Kirimbi Earth 16 Opening of drains & grass cuttingHoima Hoima DLG Kibararu-Kakooge Earth 7.5 Opening of drains & grass cutting

Hoima Hoima DLG Kigaya-Kitindura-Musaijamuku-ru Earth 13 Opening of drains & grass cutting

Hoima Hoima DLG Kabanyansi-Musaijamukuru Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Bujalya-Rwemparaki-Kitoole Earth 11.4 Opening of drains & grass cuttingHoima Hoima DLG Kikuube-Kitindura Earth 9.6 Opening of drains & grass cuttingHoima Hoima DLG Kihabwemi-Kirimbi Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Munteme-Mukabara Earth 10 Opening of drains & grass cuttingHoima Hoima DLG Butimba-Munteme Earth 9.6 Opening of drains & grass cutting

Hoima Hoima DLG Kiziranfumbi-Ki-cakamya-Ruhunga Earth 17.6 Opening of drains & grass cutting

Hoima Hoima DLG Kabwoya-Kitaganya-Maya Earth 11.5 Opening of drains & grass cuttingHoima Hoima DLG Muhwiju-Kiryamba Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Kiryamba-Kyakabale Earth 5 Opening of drains & grass cuttingHoima Hoima DLG Kigaaya-Kihabwemi-Kinogozi Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kihabwemi-Kinogozi Earth 6.2 Opening of drains & grass cuttingHoima Hoima DLG Kyangwali-Refugee-Bukinda Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kyangwali-Tontema Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Hohwa-Marongo Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Marongo-Kyarusesa Earth 6.3 Opening of drains & grass cutting

Hoima Hoima DLG Kyarubanga-Kahoojo- Kicunga-jembe Earth 8 Opening of drains & grass cutting

Hoima Hoima DLG Kabwoya-Kihooko-Rwobuhuka Earth 15.2 Opening of drains & grass cuttingHoima Hoima DLG Kitorogya-Kihohoro-Kakira Earth 14 Opening of drains & grass cutting

Hoima Hoima DLG Hohwa-Marongo-Kyarusesa Earth 12.3 Opening of drains & grass cutting

Hoima Hoima DLG Butema-Kifumura Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Kitorogya-Kihohoro-Kakira Earth 12.3 Opening of drains & grass cuttingHoima Hoima DLG Bujawe-Kasenyi-Nyakabingo Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kapapi-Runga Earth 5.5 Opening of drains & grass cutting

Hoima Hoima DLG Kiburwa-Rutoma/Bukwara-Ky-abasengya Earth 6 Opening of drains & grass cutting

254 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Hoima Hoima DLG Kisiiha-Musoma-Musaijamuku-ru Earth 12 Opening of drains & grass cutting

Hoima Hoima DLG Kihooko-Kemegere-Katooke Earth 10 Opening of drains & grass cuttingHoima Hoima DLG Munteme-Kajoga-Ikoba-Bubogo Earth 24 Opening of drains & grass cuttingHoima Hoima DLG Dwoli-Budaka-Kibanjwa Earth 9 Opening of drains & grass cuttingHoima Hoima DLG Bugambe-Kyakasoro Earth 4 Opening of drains & grass cuttingHoima Hoima DLG Buhimba - Kigarama-Kinogozi Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Kibiro Earth 8.6 Opening of drains & grass cuttingHoima Hoima DLG Kihukya-Mairirwe Earth 4 Opening of drains & grass cuttingHoima Hoima DLG Kafo-Kasambya-Wagesa Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Kitonya –Kyohairwe-Wagesa Earth 9.5 Opening of drains & grass cuttingHoima Hoima DLG Buraru-Busanga-Kigona Earth 13.5 Opening of drains & grass cuttingHoima Hoima DLG Mparangasi-Kiryabutuzi-Waaki Earth 17.1 Opening of drains & grass cuttingHoima Hoima DLG Bujwahya-Kisabagwa-Bugandale Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Waaki-Dwoli Earth 17.8 Opening of drains & grass cuttingHoima Hoima DLG Katugo-Bineneza Earth 6.1 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Buraru Earth 5.8 Opening of drains & grass cuttingHoima Hoima DLG Bulindi-Kibegenya Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Kitongole-Kasongoire Earth 9 Opening of drains & grass cuttingHoima Hoima DLG Kyakapeya-Kisiita-Kibaire Earth 16.5 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Waki Earth 7.2 Opening of drains & grass cuttingHoima Hoima DLG Kigorobya-Icukira-Kitoba Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Kitoba-Kyabasengya-Kaboijana Earth 15 Opening of drains & grass cuttingHoima Hoima DLG Buhamba-Iseisa Earth 7 Opening of drains & grass cuttingHoima Hoima DLG Iseisa-Kiboirya Earth 6.2 Opening of drains & grass cuttingHoima Hoima DLG Kiswero-Katugo Earth 8.7 Opening of drains & grass cuttingHoima Hoima DLG Karongo-Iseisa Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Ruguse-Bujugu-Kisambo Earth 15 Opening of drains & grass cuttingHoima Hoima DLG Kitoole-Kitindura Earth 7 Opening of drains & grass cuttingHoima Hoima DLG Ruguse-Kihamba Earth 8 Opening of drains & grass cuttingHoima Hoima DLG Kyentale-Nyakabongi Earth 7.2 Opening of drains & grass cuttingHoima Hoima DLG Kinogozi-Kisenyi-Kirimbi Earth 16 Opening of drains & grass cuttingHoima Hoima DLG Kibararu-Kakooge Earth 7.5 Opening of drains & grass cutting

Hoima Hoima DLG Kigaya-Kitindura-Musaijamuku-ru Earth 13 Opening of drains & grass cutting

Hoima Hoima DLG Kabanyansi-Musaijamukuru Earth 12 Opening of drains & grass cuttingHoima Hoima DLG Bujalya-Rwemparaki-Kitoole Earth 11.4 Opening of drains & grass cuttingHoima Hoima DLG Kikuube-Kitindura Earth 9.6 Opening of drains & grass cuttingHoima Hoima DLG Kihabwemi-Kirimbi Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Munteme-Mukabara Earth 10 Opening of drains & grass cuttingHoima Hoima DLG Butimba-Munteme Earth 9.6 Opening of drains & grass cutting

Hoima Hoima DLG Kiziranfumbi-Ki-cakamya-Ruhunga Earth 17.6 Opening of drains & grass cutting

Hoima Hoima DLG Kabwoya-Kitaganya-Maya Earth 11.5 Opening of drains & grass cuttingHoima Hoima DLG Muhwiju-Kiryamba Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Kiryamba-Kyakabale Earth 5 Opening of drains & grass cuttingHoima Hoima DLG Kigaaya-Kihabwemi-Kinogozi Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kihabwemi-Kinogozi Earth 6.2 Opening of drains & grass cuttingHoima Hoima DLG Kyangwali-Refugee-Bukinda Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kyangwali-Tontema Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Hohwa-Marongo Earth 6 Opening of drains & grass cuttingHoima Hoima DLG Marongo-Kyarusesa Earth 6.3 Opening of drains & grass cutting

Hoima Hoima DLG Kyarubanga-Kahoojo- Kicunga-jembe Earth 8 Opening of drains & grass cutting

Hoima Hoima DLG Kabwoya-Kihooko-Rwobuhuka Earth 15.2 Opening of drains & grass cuttingHoima Hoima DLG Kitorogya-Kihohoro-Kakira Earth 14 Opening of drains & grass cutting

255Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Hoima Hoima DLG Hohwa-Marongo-Kyarusesa Earth 12.3 Opening of drains & grass cuttingHoima Hoima DLG Butema-Kifumura Earth 7.6 Opening of drains & grass cuttingHoima Hoima DLG Kitorogya-Kihohoro-Kakira Earth 12.3 Opening of drains & grass cuttingHoima Hoima DLG Bujawe-Kasenyi-Nyakabingo Earth 13 Opening of drains & grass cuttingHoima Hoima DLG Kapapi-Runga Earth 5.5 Opening of drains & grass cutting

Hoima Hoima DLG Kiburwa-Rutoma/Bukwara-Ky-abasengya Earth 6 Opening of drains & grass cutting

Hoima Hoima DLG Kisiiha-Musoma-Musaijamuku-ru Earth 12 Opening of drains & grass cutting

Hoima Hoima DLG Kihooko-Kemegere-Katooke Earth 10 Opening of drains & grass cuttingHoima Hoima DLG Munteme-Kajoga-Ikoba-Bubogo Earth 24 Opening of drains & grass cuttingHoima Hoima DLG Dwoli-Budaka-Kibanjwa Earth 9 Opening of drains & grass cuttingHoima Hoima DLG Bugambe-Kyakasoro Earth 4 Opening of drains & grass cutting Hoima DLG Total 1196Hoima Hoima TC Balyesiima Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Baranaba Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Binagwa Earth 0.3 Opening of drains & grass cuttingHoima Hoima TC Bisuha Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Botanic Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Byakuha Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Civic Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Council Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Halimah Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Hospital Earth 1 Opening of drains & grass cuttingHoima Hoima TC Hussein Norman Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Juruga Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kababwa Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kaguta Street Gravel 1.6 Opening of drains & grass cuttingHoima Hoima TC Kajura Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kana Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Karungi Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Kibiro Earth 1.9 Opening of drains & grass cuttingHoima Hoima TC Kigorobya I Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Kikonkona Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Kitara Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Kusiimakwe Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Kwolekya Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Kyabisagazi Gravel 1.6 Opening of drains & grass cuttingHoima Hoima TC Main Street Gravel 1.6 Opening of drains & grass cuttingHoima Hoima TC Market Close Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Market road Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Mission Avenue Earth 0.8 Opening of drains & grass cuttingHoima Hoima TC Mosque Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Nathan K Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Nyabago Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Park Street Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Rev. Tibenda Earth 1.3 Opening of drains & grass cuttingHoima Hoima TC Rukyalekere Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Rwaswiri Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Sabiiti Yosia Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC School Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Tinka P Street Earth 1 Opening of drains & grass cuttingHoima Hoima TC Valley Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Zakayo Earth 1.2 Opening of drains & grass cuttingHoima Hoima TC Kihika Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Mugoowa Earth 0.05 Opening of drains & grass cuttingHoima Hoima TC Katahoire Earth 0.7 Opening of drains & grass cutting

256 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Hoima Hoima TC Balyesiima Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Baranaba Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Binagwa Earth 0.3 Opening of drains & grass cuttingHoima Hoima TC Bisuha Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Botanic Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Byakuha Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Civic Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Council Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Halimah Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Hospital Earth 1 Opening of drains & grass cuttingHoima Hoima TC Hussein Norman Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Juruga Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kababwa Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kaguta Street Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Kajura Earth 1 Opening of drains & grass cuttingHoima Hoima TC Kana Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Karungi Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Kibiro Earth 1.9 Opening of drains & grass cuttingHoima Hoima TC Kigorobya I Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Kikonkona Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Kitara Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Kusiimakwe Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Kwolekya Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Kyabisagazi Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Main Street Earth 1.6 Opening of drains & grass cuttingHoima Hoima TC Market Close Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Market road Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC Mission Avenue Earth 0.8 Opening of drains & grass cuttingHoima Hoima TC Mosque Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Nathan K Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Nyabago Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Park Street Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Rev. Tibenda Earth 1.3 Opening of drains & grass cuttingHoima Hoima TC Rukyalekere Earth 0.6 Opening of drains & grass cuttingHoima Hoima TC Rwaswiri Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Sabiiti Yosia Earth 0.1 Opening of drains & grass cuttingHoima Hoima TC School Earth 0.4 Opening of drains & grass cuttingHoima Hoima TC Tinka P Street Earth 1 Opening of drains & grass cuttingHoima Hoima TC Valley Earth 0.5 Opening of drains & grass cuttingHoima Hoima TC Zakayo Earth 1.2 Opening of drains & grass cuttingHoima Hoima TC Kihika Earth 0.7 Opening of drains & grass cuttingHoima Hoima TC Mugoowa Earth 0.05 Opening of drains & grass cuttingHoima Hoima TC Katahoire Earth 0.7 Opening of drains & grass cutting Total TC 60.5Hoima Hoima MC Kikeere-Kyabatembe Gravel 1.7 Opening of drains & grass cuttingHoima Hoima MC Busiisi-Kasasa-Ruyanja Gravel 2.7 Opening of drains & grass cuttingHoima Hoima MC Buswekera-Kayanja Gravel 5.5 Opening of drains & grass cuttingHoima Hoima MC Kyabalyanga-Kyanika Gravel 2.5 Opening of drains & grass cuttingHoima Hoima MC Kihungura-Kiporopyo Gravel 1.5 Opening of drains & grass cuttingHoima Hoima MC Dominico-Kihoroito--Kasingo Gravel 2.5 Opening of drains & grass cuttingHoima Hoima MC Bucunga-Kiryabaana Gravel 1.5 Opening of drains & grass cuttingHoima Hoima MC Butebere-Kitinti Gravel 4 Opening of drains & grass cuttingHoima Hoima MC Nyakambugu-Mbogwe Gravel 2.5 Opening of drains & grass cuttingHoima Hoima MC Kicwamba-Collin Gravel 3 Opening of drains & grass cuttingHoima Hoima MC Kyentale-Kikwatamigo Gravel 7.4 Opening of drains & grass cuttingHoima Hoima MC Mparo-Buhanika Gravel 4 Opening of drains & grass cutting

257Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Hoima Hoima MC Kiryatete-Winyi Gravel 1.2 Opening of drains & grass cuttingHoima MC Total 40

Ibanda Ibanda DLG Kakoma-Nyarukiika-Mabonwa U 12.2 Opening of drains & grass cuttingIbanda Ibanda DLG Igorora - Rwomuhuro U 12.0 Opening of drains & grass cuttingIbanda Ibanda DLG Bugarama-Kiruhura Boarder U 6.2 Opening of drains & grass cutting

Ibanda Ibanda DLG Nyabuhikye-Bwenda-Omuki-koona U 14.0 Opening of drains & grass cutting

Ibanda Ibanda DLG Kashasha-Nyakahama U 10.7 Opening of drains & grass cuttingIbanda Ibanda DLG Nyahoora-Bwahwa U 10.2 Opening of drains & grass cutting

Ibanda Ibanda DLG Kigarama-Nsasi-Rwobuz-izi-Bugarama U 18.5 Opening of drains & grass cutting

Ibanda Ibanda DLG Mabonwa-Kicuzi-Ryabatenga U 14.6 Opening of drains & grass cutting

Ibanda Ibanda DLG Kanywabongo-Irimya-Kam-wenge Boarder U 15.8 Opening of drains & grass cutting

Ibanda Ibanda DLG Rwenkobwa-Akayanja U 13.5 Opening of drains & grass cutting

Ibanda Ibanda DLG Birongo-Kinagamukono-Kyenk-anga U 5.2 Opening of drains & grass cutting

Ibanda Ibanda DLG Rwenkuba-Nyakabun-go-Nyamerebe U 3.9 Opening of drains & grass cutting

Ibanda Ibanda DLG Igorora-Kihani-Katongore U 9.8 Opening of drains & grass cutting

Ibanda Ibanda DLG Kikicu-Kasangura-Kabingo-Ka-katsi U 11.1 Opening of drains & grass cutting

Ibanda Ibanda DLG Kyabaganda-Kaburo-Rwom-uhoro U 14.5 Opening of drains & grass cutting

Ibanda Ibanda DLG Bugarama-Omwiguru U 9.8 Opening of drains & grass cuttingIbanda Ibanda DLG Kabagoma-Ekitindo U 5.4 Opening of drains & grass cuttingIbanda Ibanda DLG Mukara-Katogo U 4.0 Opening of drains & grass cuttingIbanda Ibanda DLG Kaihiro-Kabare-Kemihoko U 5.7 Opening of drains & grass cuttingIbanda Ibanda DLG Omukahate-Rushango U 0.0 Opening of drains & grass cutting Ibanda DLG Total 197.1Ibanda Ibanda T/C Kashuku road Gravel 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Buzaabo road Earth 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Muginda Earth 1.2 Opening of drains & grass cuttingIbanda Ibanda T/C Kagororgoro Earth 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Nyakatete Nyakatokye Gravel 10.0 Opening of drains & grass cuttingIbanda Ibanda T/C Bataringaya Earth 0.9 Opening of drains & grass cuttingIbanda Ibanda T/C Nyinendugu road Earth 4.0 Opening of drains & grass cuttingIbanda Ibanda T/C Bitature road Earth 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Rwabita road Tarmac 1.0 Opening of drains & grass cuttingIbanda Ibanda T/C Nyakatukura road Earth 3.4 Opening of drains & grass cuttingIbanda Ibanda T/C Kigarama-Bukuuto road Earth 1.6 Opening of drains & grass cuttingIbanda Ibanda T/C Kasharara road Earth 1.7 Opening of drains & grass cuttingIbanda Ibanda T/C Katooma-Abttoir road Gravel 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Kyarukobwa-Katooma Earth 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Kyarukoobwa -Kakunyu Tarmac 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Haji muganda road Tarmac 1.0 Opening of drains & grass cuttingIbanda Ibanda T/C Katundu road Gravel 1.0 Opening of drains & grass cuttingIbanda Ibanda T/C Jubilee street road Tarmac 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Kyaruhanga II road Tarmac 2.0 Opening of drains & grass cuttingIbanda Ibanda T/C Kitwe road Earth 0.7 Opening of drains & grass cuttingIbanda Ibanda T/C Buruhware I road Earth 1.0 Opening of drains & grass cuttingIbanda Ibanda T/C Rutehenda Earth 3.0 Opening of drains & grass cutting Ibanda T/C Total 48.5Ibanda Igorora T/C Kafeero Street UP 0.6 Opening of drains & grass cuttingIbanda Igorora T/C Rucuncu Street UP 0.4 Opening of drains & grass cuttingIbanda Igorora T/C Igorora Kigando Road UP 2.0 Opening of drains & grass cuttingIbanda Igorora T/C Kigando Nkond Kashari Boarder UP 3.0 Opening of drains & grass cuttingIbanda Igorora T/C Ntungamo Rwenshebeshebe UP 2.0 Opening of drains & grass cutting

258 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Ibanda Igorora T/C Kigando Nkondo Link UP 0.6 Opening of drains & grass cuttingIbanda Igorora T/C Kibirizi Road UP 4.0 Opening of drains & grass cuttingIbanda Igorora T/C Igorora Ngango Kashenshero UP 3.0 Opening of drains & grass cuttingIbanda Igorora T/C Embaho Road UP 1.0 Opening of drains & grass cuttingIbanda Igorora T/C Kanyeganyegye Kyarukumba UP 2.0 Opening of drains & grass cutting Igorora T/C Total 18.6Ibanda Ishogororo T/C Nakasero-Katojo-Nyanstimbo Earth 2.8 Opening of drains & grass cuttingIbanda Ishogororo T/C Kahunga-Magimpa Earth 0.9 Opening of drains & grass cuttingIbanda Ishogororo T/C Ishongororo H/S- Rweshjagwa Earth 1.0 Opening of drains & grass cutting

Ibanda Ishogororo T/C Katunu-Kashungwa-Rwenyawa-wa Earth 2.8 Opening of drains & grass cutting

Ibanda Ishogororo T/C NchwanoB C Buyonza- Katojo Earth 6.7 Opening of drains & grass cuttingIbanda Ishogororo T/C Nyabushabi-Kiburara Earth 3.9 Opening of drains & grass cuttingIbanda Ishogororo T/C Kisangani- Ishongororo Gravel 0.7 Opening of drains & grass cuttingIbanda Ishogororo T/C Katungo-Kakyindo- bukama Earth 5.2 Opening of drains & grass cuttingIbanda Ishogororo T/C Omwitagi-kiburara Earth 1.2 Opening of drains & grass cuttingIbanda Ishogororo T/C Rweshajagwa-Kitooro Earth 3.3 Opening of drains & grass cuttingIbanda Ishogororo T/C Musasizi Street Earth 0.6 Opening of drains & grass cuttingIbanda Ishogororo T/C Rweshonga Earth 1.5 Opening of drains & grass cuttingIbanda Ishogororo T/C Kiburara-Rwenyawawa Earth 3.5 Opening of drains & grass cuttingIbanda Ishogororo T/C Kakinga - Kololo Earth 7.5 Opening of drains & grass cuttingIbanda Ishogororo T/C Kiza Road Earth 0.8 Opening of drains & grass cuttingIbanda Ishogororo T/C Iyakaremye Road Earth 1.3 Opening of drains & grass cuttingIbanda Ishogororo T/C Market Street Earth 1.0 Opening of drains & grass cuttingIbanda Ishogororo T/C Busingiro Rwamugwizi Earth 2.2 Opening of drains & grass cuttingIbanda Ishogororo T/C Zaituni -akemihoko Earth 2.7 Opening of drains & grass cuttingIbanda Ishogororo T/C Katojo BC Earth 2.0 Opening of drains & grass cuttingIbanda Ishogororo T/C Tumwebaze road Earth 3.5 Opening of drains & grass cuttingIbanda Ishogororo T/C Kiduduma- Rwenyawawa Earth 2.0 Opening of drains & grass cuttingIbanda Ishogororo T/C Nzeimana - kizungu road Earth 2.0 Opening of drains & grass cuttingIbanda Ishogororo T/C Katojo COU- Nyabushabi Earth 1.8 Opening of drains & grass cutting T/C Total 60.9Ibanda Rushango T/C Sema street Earth 0.7 Opening of drains & grass cuttingIbanda Rushango T/C Guma sreet Earth 0.5 Opening of drains & grass cuttingIbanda Rushango T/C Bugwene street Earth 0.5 Opening Drains & grass cuttingIbanda Rushango T/C Kisangani street Earth 1.2 Opening of drains & grass cuttingIbanda Rushango T/C Karambi Garbage road Earth 0.5 Opening of drains & grass cutting

Ibanda Rushango T/C Rushang-Kololo-Nyamarebe road Earth 4.5 Opening Drains & grass cutting

Ibanda Rushango T/C Kololo-Itabyama-Kamatinzi road Earth 3.4 Opening of drains & grass cuttingIbanda Rushango T/C RushangoB-Omwibare road Earth 3.0 Opening of drains & grass cutting

Ibanda Rushango T/C Itabyama-Rwemirama-Kamat-inzi road Earth 5.2 Opening of drains & grass cutting

Ibanda Rushango T/C Rwemirama road Earth 3.0 Opening of drains & grass cuttingIbanda Rushango T/C Akarere-Karambi road Gravel 1.4 Opening of drains & grass cutting

Ibanda Rushango T/C Katikamwe-Rushango P/S-Karo-karungi road Earth 4.2 Opening of drains & grass cutting

Ibanda Rushango T/C Katikamwe-Mugyengezi-Kamat-inzi road Earth 3.5 Opening of drains & grass cutting

Ibanda Rushango T/C Rushango-Katebe, Ngomba bridge Earth 3.5 Opening of drains & grass cutting

Ibanda Rushango T/C Rushango-Katebe, Ngomba bridge Earth 7.0 Opening of drains & grass cutting

T/C Total 42.1

Iganga C A R S Routine maintenance of roads in Nawandala sub-county

force account 21.0 Opening of drains & grass cutting

Iganga C A R S Routine maintenance of roads Nakigo sub-county.

force account 40.0 Opening of drains & grass cutting

C A R S Total

259Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Iganga Iganga DLG Namungalwe - Bugono force account 10.00 Opening of drains & grass cutting

Iganga Iganga DLG Bubbala-Butaba- nabina force account 6.50 Opening of drains & grass cutting

Iganga Iganga DLG Nabitende(Banada)-Buwongo force account 8.45 Opening of drains & grass cutting

Iganga Iganga DLG Butongole - Idinda force account 4.55 Opening of drains & grass cutting

Iganga Iganga DLG Namungalwe - Bukona force account 9.75 Opening of drains & grass cutting

Iganga Iganga DLG Bulyansime-Nondwe-namaiga/Makuutu Namaiga

force account 18.50 Opening of drains & grass cutting

Iganga Iganga DLG Mawagala- bunirira force account 8.00 Opening of drains & grass cutting

Iganga Iganga DLG Kabayingire - Kitumbezi force account 10.40 Opening of drains & grass cutting

Iganga Iganga DLG Busembatia - Lumbuye force account 4.68 Opening of drains & grass cutting

Iganga Iganga DLG Nambale - Buwongo force account 8.45 Opening of drains & grass cutting

Iganga Iganga DLG Nakalama - Busowobi force account 4.00 Opening of drains & grass cutting

Iganga Iganga DLG Idudi-nabina force account 8.24 Opening of drains & grass cutting

Iganga Iganga DLG Bukoona - Bubala - Lwanika force account 15.20 Opening of drains & grass cutting

Iganga Iganga DLG Namalemba - Ituba force account 3.65 Opening of drains & grass cutting

Iganga Iganga DLG Butende - Walanga - Nawamp-endo

force account 12.80 Opening of drains & grass cutting

Iganga Iganga DLG Walukuba - Madhigandere - Bulowoza

force account 5.30 Opening of drains & grass cutting

Iganga Iganga DLG Bunyiiro - Buwologoma force account 8.45 Opening of drains & grass cutting

Iganga Iganga DLG Bugono - Nabitende - Banada force account 8.20 Opening of drains & grass cutting

Iganga Iganga DLG Busowobi - Nakigo force account 6.60 Opening of drains & grass cutting

Iganga Iganga DLG cms-Buwasa force account 3.89 Opening of drains & grass cutting

Iganga Iganga DLG Cms-Luyira force account 6.00 Opening of drains & grass cutting

Iganga Iganga DLG Namungalwe-Buwologoma force account 8.80 Opening of drains & grass cutting

Iganga Iganga DLG nabitende-kabira-nawandala force account 16.35 Opening of drains & grass cutting

Iganga Iganga DLG magogo-Bwanalira force account 5.35 Opening of drains & grass cutting

Iganga Iganga DLG Bukoteka-ibulanku- wa-lutente-nsaale-buyebe-idudi

force account 10.00 Opening of drains & grass cutting

Iganga Iganga DLG Nabitende - Kasambika - Namu-sisi

force account 11.15 Opening of drains & grass cutting

Iganga Iganga DLG Nabitende - Kasambika - Namu-sisi

force account 11.2 Opening of drains & grass cutting

Iganga DLG Total 234.46

Iganga T/C roads Lumonko force account 0.91 Opening of drains & grass cutting

Iganga T/C roads Wagwa force account 0.59 Opening of drains & grass cutting

Iganga T/C roads Kitandwe force account 1.32 Opening of drains & grass cutting

Iganga T/C roads Katambala force account 0.39 Opening of drains & grass cutting

260 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Iganga T/C roads Kakuuma force account 0.43 Opening of drains & grass cutting

Iganga T/C roads Mumbya force account 0.51 Opening of drains & grass cutting

Iganga T/C roads Mooga force account 0.63 Opening of drains & grass cutting

Iganga T/C roads Kireli force account 0.410 Opening of drains & grass cutting

Iganga T/C roads Indian force account 0.89 Opening of drains & grass cutting

Iganga T/C roads Nkuutu force account 0.800 Opening of drains & grass cutting

Iganga T/C roads Walebera force account 0.77 Opening of drains & grass cutting

Iganga T/C roads Patel force account 0.76 Opening of drains & grass cutting

Iganga T/C roads Tekule force account 1.01 Opening of drains & grass cutting

Iganga T/C roads Isembatia force account 1.39 Opening of drains & grass cutting

Iganga T/C roads Luwuriza kirunda force account 0.87 Opening of drains & grass cutting

Iganga T/C roads Park view force account 0.21 Opening of drains & grass cutting

Iganga T/C roads Naigombwa force account 0.51 Opening of drains & grass cutting

Iganga T/C roads Basoita force account 0.19 Opening of drains & grass cutting

Iganga T/C roads Kyaafa force account 0.52 Opening of drains & grass cutting

Iganga T/C roads Abudala mukama force account 0.44 Opening of drains & grass cutting

Iganga T/C roads Mwanja force account 0.46 Opening of drains & grass cutting

Iganga T/C roads Juma Kakaire force account 0.23 Opening of drains & grass cutting

Iganga T/C roads Kyoomi force account 0.35 Opening of drains & grass cutting

Iganga T/C roads Waikaire force account 0.65 Opening of drains & grass cutting

Iganga T/C roads Kakaire Dalausi force account 0.52 Opening of drains & grass cutting

Iganga T/C roads Besiga Jackson force account 0.45 Opening of drains & grass cutting

Iganga T/C roads William force account 0.5 Opening of drains & grass cutting

Iganga T/C roads Nakaziba force account 0.55 Opening of drains & grass cutting

Iganga T/C roads Magoola force account 0.6 Opening of drains & grass cutting

Iganga T/C roads Dhamuzungu force account 0.7 Opening of drains & grass cutting

Iganga T/C roads Yokana force account 0.835 Opening of drains & grass cutting

Iganga T/C roads Nambiro force account 0.305 Opening of drains & grass cutting

Iganga T/C roads Mugwanante force account 0.593 Opening of drains & grass cutting

Iganga T/C roads Malingumu force account 0.81 Opening of drains & grass cutting

Iganga T/C roads Isadha force account 0.398 Opening of drains & grass cutting

261Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Iganga T/C roads Mwandha force account 0.33 Opening of drains & grass cutting

Iganga T/C roads Kakaire force account 0.39 Opening of drains & grass cutting

Iganga T/C roads Mpubani force account 0.9 Opening of drains & grass cutting

Iganga T/C roads Nyende force account 0.2 Opening of drains & grass cutting

Iganga T/C roads Motbai force account 0.6 Opening of drains & grass cutting

Iganga T/C roads Erick force account 0.42 Opening of drains & grass cutting

T/C roads Total 24.34Iganga Iganga MC Abasi Kiso Road U 0.18 Opening of drains & grass cuttingIganga Iganga MC Abdalla Waibi road U 0.22 Opening of drains & grass cuttingIganga Iganga MC Agriculture Close U 0.20 Opening of drains & grass cuttingIganga Iganga MC Atiibwa Road U 0.10 Opening of drains & grass cuttingIganga Iganga MC Balita Lane U 0.22 Opening of drains & grass cuttingIganga Iganga MC Balunywa Road U 0.52 Opening of drains & grass cuttingIganga Iganga MC Bamanye Road U 0.25 Opening of drains & grass cuttingIganga Iganga MC Bataka Road U 0.30 Opening of drains & grass cuttingIganga Iganga MC Banghi road U 0.65 Opening of drains & grass cuttingIganga Iganga MC Bikaba Road U 0.33 Opening of drains & grass cuttingIganga Iganga MC Bikadho Road U 0.36 Opening of drains & grass cuttingIganga Iganga MC Budhugo Road U 0.28 Opening of drains & grass cuttingIganga Iganga MC Bulamu Road U 0.45 Opening of drains & grass cuttingIganga Iganga MC Bulolo Road U 0.60 Opening of drains & grass cuttingIganga Iganga MC Bwongo Road U 0.45 Opening of drains & grass cuttingIganga Iganga MC Catherine Road U 0.18 Opening of drains & grass cuttingIganga Iganga MC Cementry Lane U 0.25 Opening of drains & grass cuttingIganga Iganga MC Constitution road U 0.48 Opening of drains & grass cuttingIganga Iganga MC Daudi Waiswa road U 0.21 Opening of drains & grass cuttingIganga Iganga MC Dhikusooka Road U 0.51 Opening of drains & grass cuttingIganga Iganga MC Dr. Wandira Kaz.raod U 0.95 Opening of drains & grass cuttingIganga Iganga MC Hajji Munulo road U 0.11 Opening of drains & grass cuttingIganga Iganga MC Igamba Road U 0.61 Opening of drains & grass cuttingIganga Iganga MC Izid Abdu road U 0.34 Opening of drains & grass cuttingIganga Iganga MC Jalumu Road U 0.23 Opening of drains & grass cuttingIganga Iganga MC Kabaka Muzaale road U 0.55 Opening of drains & grass cuttingIganga Iganga MC Kakarewe Road U 0.40 Opening of drains & grass cuttingIganga Iganga MC Kakungulu Road U 0.22 Opening of drains & grass cuttingIganga Iganga MC Kankanan Mugwana U 0.20 Opening of drains & grass cuttingIganga Iganga MC Kasoma Road U 0.60 Opening of drains & grass cuttingIganga Iganga MC Kasumba road U 0.70 Opening of drains & grass cuttingIganga Iganga MC Katambala Road U 0.52 Opening of drains & grass cuttingIganga Iganga MC Kaziziko Road U 0.22 Opening of drains & grass cuttingIganga Iganga MC Kinyiri road U 0.55 Opening of drains & grass cuttingIganga Iganga MC Kirigeya Road U 0.31 Opening of drains & grass cuttingIganga Iganga MC Kongola Close U 0.45 Opening of drains & grass cuttingIganga Iganga MC Kyesimira road U 0.96 Opening of drains & grass cuttingIganga Iganga MC Kyeyago road U 0.50 Opening of drains & grass cuttingIganga Iganga MC Kyeyune Road U 0.19 Opening of drains & grass cuttingIganga Iganga MC Luba road U 1.08 Opening of drains & grass cuttingIganga Iganga MC Lubas Road U 0.50 Opening of drains & grass cuttingIganga Iganga MC Magezi Talemwa Road U 0.27 Opening of drains & grass cuttingIganga Iganga MC Masaka Close U 0.22 Opening of drains & grass cuttingIganga Iganga MC Mbago Road U 0.30 Opening of drains & grass cutting

262 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Iganga Iganga MC Menya Road/Hannington U 0.25 Opening of drains & grass cuttingIganga Iganga MC Mufumba Road U 0.55 Opening of drains & grass cuttingIganga Iganga MC Mugadya Road U 0.25 Opening of drains & grass cuttingIganga Iganga MC Mugolofa Road U 0.49 Opening of drains & grass cuttingIganga Iganga MC Mukwaya road U 0.30 Opening of drains & grass cuttingIganga Iganga MC Muledhu Road U 0.23 Opening of drains & grass cuttingIganga Iganga MC Munaba Road U 0.35 Opening of drains & grass cuttingIganga Iganga MC Musembya Road U 0.32 Opening of drains & grass cuttingIganga Iganga MC Mutasa road U 0.20 Opening of drains & grass cuttingIganga Iganga MC Mutekanga road U 0.70 Opening of drains & grass cuttingIganga Iganga MC Nabidongha road U 0.21 Opening of drains & grass cuttingIganga Iganga MC Nakavule road U 0.63 Opening of drains & grass cuttingIganga Iganga MC Ngobi road U 0.45 Opening of drains & grass cuttingIganga Iganga MC Nkutu road /Wakooli U 0.16 Opening of drains & grass cuttingIganga Iganga MC Nsobani road U 0.32 Opening of drains & grass cuttingIganga Iganga MC Oboja drive U 0.21 Opening of drains & grass cuttingIganga Iganga MC Oboja street U 0.68 Opening of drains & grass cuttingIganga Iganga MC Old Kaliro Road U 0.70 Opening of drains & grass cuttingIganga Iganga MC Old Market Street U 0.90 Opening of drains & grass cuttingIganga Iganga MC Tabingwa road U 0.16 Opening of drains & grass cuttingIganga Iganga MC Wagoina road U 0.58 Opening of drains & grass cuttingIganga Iganga MC Wambi road U 0.95 Opening of drains & grass cuttingIganga Iganga MC Wambuzi road U 0.45 Opening of drains & grass cuttingIganga Iganga MC Chruch Close(kasokoso)* U 0.14 Opening of drains & grass cuttingIganga Iganga MC Galyana U 0.21 Opening of drains & grass cuttingIganga Iganga MC Kasokosos Crescent U 0.24 Opening of drains & grass cuttingIganga Iganga MC Kitonto road U 0.24 Opening of drains & grass cutting

28.56isingiro Isingiro DLG Mile 5 Rwentango - Kyabwemi Unpaved 40.0 Opening of drains & grass cutting

isingiro Isingiro DLG Endiinzi - Rwenshebashebe - Omukatojo Unpaved 25.5 Opening of drains & grass cutting

isingiro Isingiro DLG Rushongi - Kibengo Unpaved 5.0 Opening of drains & grass cuttingisingiro Isingiro DLG Kaberebere - Ryamiyonga Unpaved 23.0 Opening of drains & grass cuttingisingiro Isingiro DLG Nyakitunda - Kabuyanda Unpaved 12.0 Opening of drains & grass cutting

isingiro Isingiro DLG Kamuri - Kyarugaaju - Kyei-rumba Unpaved 25.3 Opening of drains & grass cutting

isingiro Isingiro DLG Kaberebere - Nyarubungo - Nyamitsindo - Masha (12 miles) Unpaved 16.5 Opening of drains & grass cutting

isingiro Isingiro DLG Buhungiro - Rugaaga Unpaved 10.4 Opening of drains & grass cuttingisingiro Isingiro DLG Kikagate - Rwamwijuka Unpaved 13.5 Opening of drains & grass cuttingisingiro Isingiro DLG Kyeera - Kibona - Kitooha Unpaved 16.8 Opening of drains & grass cutting

isingiro Isingiro DLG Omwichwamba - Ntungu - Omukatooma Unpaved 7.0 Opening of drains & grass cutting

isingiro Isingiro DLG Kyanyanda - Kihanda - Rwen-shekye - Mbaare - Bugango. Unpaved 21.0 Opening of drains & grass cutting

isingiro Isingiro DLG Kabingo - Igayaza - Katembe - Kyarugaaju Unpaved 14.6 Opening of drains & grass cutting

isingiro Isingiro DLG Kabuyanda - Kaburara - Katanzi Unpaved 7.0 Opening of drains & grass cutting

isingiro Isingiro DLG Ngarama - Kakamba - Omuka-toogo Unpaved 12.3 Opening of drains & grass cutting

isingiro Isingiro DLG Buhungiro - Byenyi - Juru Unpaved 8.5 Opening of drains & grass cuttingisingiro Isingiro DLG Nyakigyera - Omukatooma Unpaved 15.3 Opening of drains & grass cutting

isingiro Isingiro DLG Endiinzi - Mpikye - Obunazi - Ekiyonza Unpaved 15.0 Opening of drains & grass cutting

isingiro Isingiro DLG Nsiika - Kamutomo - Kyanza Road Unpaved 12.0 Opening of drains & grass cutting

isingiro Isingiro DLG Ngarama - Kigando - Kakamba - Kasese Unpaved 21.0 Opening of drains & grass cutting

263Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

isingiro Isingiro DLG Ruhiira - Rwemango - Omu-kashansha Unpaved 7.0 Opening of drains & grass cutting

isingiro Isingiro DLG Nyarubungo -Omukabira - Nyamabaare Unpaved 5.4 Opening of drains & grass cutting

isingiro Isingiro DLG Kabuyanda - Iryango - Ruboro-gota Unpaved 8.0 Opening of drains & grass cutting

isingiro Isingiro DLG Rwenturagara - Rutunga - Ke-mengo - Katooma Unpaved 12 Opening of drains & grass cutting

Isingiro DLG Total 354.1isingiro Isingiro TC Market Street U 0.7 Opening of drains & grass cuttingisingiro Isingiro TC Isingiro - Kikuusi U 6.0 Opening of drains & grass cuttingisingiro Isingiro TC Taxi / Bus Park Roads U 0.7 Opening of drains & grass cuttingisingiro Isingiro TC Burezi Street U 0.4 Opening of drains & grass cuttingisingiro Isingiro TC Bidondo Street U 0.4 Opening of drains & grass cuttingisingiro Isingiro TC Ruhimbo - Kamuri U 5.0 Opening of drains & grass cuttingisingiro Isingiro TC Salamah - Rwengiri U 4.0 Opening of drains & grass cuttingisingiro Isingiro TC Sonko Street P 1.0 Opening of drains & grass cuttingisingiro Isingiro TC Katetegirwe Street U 1.3 Opening of drains & grass cuttingisingiro Isingiro TC Church Road U 1.3 Opening of drains & grass cutting Isingiro TC Total 20.8

isingiro Kaberebere TC Community center - Rugarama road Un paved 4.1 Opening of drains & grass cutting

isingiro Kaberebere TC Mile munaana - Kyarufumu road Un paved 1.2 Opening of drains & grass cuttingisingiro Kaberebere TC Kiiza road Un paved 1.0 Opening of drains & grass cuttingisingiro Kaberebere TC Church link - Kyenyangi road Un paved 1.1 Opening of drains & grass cuttingisingiro Kaberebere TC Rwiziringiro - Rugarama road Un paved 1.7 Opening of drains & grass cuttingisingiro Kaberebere TC Kishuro - Rutsya - Kikokwa road Un paved 3.1 Opening of drains & grass cutting

isingiro Kaberebere TC Community center - Akateete - Kikokwa road Un paved 2.2 Opening of drains & grass cutting

isingiro Kaberebere TC Ekihita - Kikokwa road Un paved 0.5 Opening of drains & grass cuttingisingiro Kaberebere TC Kakoma - Kyabutooto Road Un paved 0.5 Opening of drains & grass cutting

isingiro Kaberebere TCAdah - Muslim center - Kyabu-tooto - Kyanamira - Kakoma Road

Un paved 2.7 Opening of drains & grass cutting

isingiro Kaberebere TC Katongore road Un paved 1.2 Opening of drains & grass cuttingisingiro Kaberebere TC Kasetsya road Un paved 0.9 Opening of drains & grass cuttingisingiro Kaberebere TC Bagaramugaga road Un paved 0.5 Opening of drains & grass cuttingisingiro Kaberebere TC Leo Kiiza road Un paved 0.5 Opening of drains & grass cuttingisingiro Kaberebere TC Katomize road Un paved 0.2 Opening of drains & grass cuttingisingiro Kaberebere TC Twaha road Un paved 1.3 Opening of drains & grass cuttingisingiro Kaberebere TC Omubutimba road Un paved 2.0 Opening of drains & grass cuttingisingiro Kaberebere TC Mataara road Un paved 1.0 Opening of drains & grass cuttingisingiro Kaberebere TC Katagira Market bypass road Un paved 0.2 Opening of drains & grass cuttingisingiro Kaberebere TC Kaberebere Access road Un paved 0.3 Opening of drains & rass cuttingisingiro Kaberebere TC Peace Mayanja road Un paved 0.8 Opening of drains & grass cuttingisingiro Kaberebere TC Mayanja road Un paved 1.6 Opening of drains & grass cutting

isingiro Kaberebere TC Milo Mushanju - Kyenyangi Road Un paved 2.1 Opening of drains & grass cutting

Kaberebere TC 30.6isingiro Kabuyanda TC Karutu Road Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Katorobo Road Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Arinaitwe - Biryeija Road Un paved 0.5 Opening of drains & grass cuttingisingiro Kabuyanda TC Bingweera - Bakunda Road Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Akatembo - Nyampikye - Kaiho Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Akatembo - Kinangye Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Kabuga Road Un paved 4.0 Opening of drains & grass cuttingisingiro Kabuyanda TC Mishereko Road Un paved 2.8 Opening of drains & grass cutting Kabuyanda TC Total 27.3

264 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Jinja Roads Central division Un paved 50 Opening Drains & grass cuttingJinja Roads Mpumude division Un paved 10 Opening Drains & grass cuttingJinja Roads Walukuba division Un paved 10 Opening Drains & grass cutting

Jinja MC Total 70Kaabong Kaabong DLG Kalapta-Kamion Unpaved 16.0 Opening of drains & grass cuttingKaabong Kaabong DLG Kathile-Lotim-Kalapta Unpaved 12.0 Opening of drains & grass cuttingKaabong Kaabong DLG Kateleng-Lois-Nariamaoi Unpaved 10.0 Opening of drains & grass cuttingKaabong Kaabong DLG Pire Jn-Lokwakaramoe Unpaved 4.7 Opening of drains & grass cuttingKaabong Kaabong DLG Morukori-Lotim Unpaved 7.4 Opening of drains & grass cuttingKaabong Kaabong DLG Lopedo-Morulem Unpaved 14.0 Opening of drains & grass cuttingKaabong Kaabong DLG Lochom-Locherep Unpaved 6.1 Opening of drains & grass cuttingKaabong Kaabong DLG Nawokosiyai-Lolelia Jn Unpaved 12.7 Opening of drains & grass cuttingKaabong Kaabong DLG Sidok-Locherep Unpaved 4.0 Opening of drains & grass cuttingKaabong Kaabong DLG Lolelia-Lowakuj Unpaved 17.2 Opening of drains & grass cutting

Kaabong Kaabong DLG Kapedo-Lokial-Morunyang-Narouchom Unpaved 10.0 Opening of drains & grass cutting

Kaabong Kaabong DLG Lowakuj-Karenga Unpaved 17.0 Opening of drains & grass cuttingKaabong Kaabong DLG Lopedo jn-Ligot-Toroi Jn Unpaved 22.3 Opening of drains & grass cuttingKaabong Kaabong DLG Kapedo-Kawalakol Unpaved 7.0 Opening of drains & grass cutting

Kaabong Kaabong DLG Lowakuj-Lokasangate-Orom road Unpaved 3.0 Opening of drains & grass cutting

Kaabong Kaabong DLG Kawalakol Jn-Kocholo-Nakudonl Unpaved 8.0 Opening of drains & grass cuttingKaabong Kaabong DLG Pire-Lobalangit-Sarachom Unpaved 9.0 Opening of drains & grass cuttingKaabong Kaabong DLG Karenga-Kakwanga Unpaved 7.4 Opening of drains & grass cuttingKaabong Kaabong DLG Nameri-Kalongor Unpaved 5.2 Opening of drains & grass cutting Kaabong DLG Total 193.0Kaabong Kaabong TC Lopedo road Unpaved 1.0 Opening of drains & grass cuttingKaabong Kaabong TC Kotido road Unpaved 0.2 Opening of drains & grass cuttingKaabong Kaabong TC Circular road Unpaved 1.5 Opening of drains & grass cuttingKaabong Kaabong TC Switzerland road Unpaved 1.6 Opening of drains & grass cutting Kaabong TC Total 4.3Kabale Kabale DLG Bushuro-Rwakihirwa-Rwene Unpaved 23.9 Opening of drains & grass cuttingKabale Kabale DLG Bugongi-Bwindi-Mparo Unpaved 26.2 Opening of drains & grass cuttingKabale Kabale DLG Kacwekano-Rubaya-Kitooma Unpaved 33 Opening of drains & grass cuttingKabale Kabale DLG Kacwekano-Rubona-Kibuzigye Unpaved 13 Opening of drains & grass cuttingKabale Kabale DLG Kigarama-Kavu Unpaved 13 Opening of drains & grass cuttingKabale Kabale DLG Kagarama-Heisesero Unpaved 14.1 Opening of drains & grass cutting

Kabale Kabale DLG Kyobugombe-Katenga via Kitohwa Unpaved 9.4 Opening of drains & grass cutting

Kabale Kabale DLG Murutenga-Nyamasizi-kerere Unpaved 16 Opening of drains & grass cuttingKabale Kabale DLG Rwene-Kabahesi-Nyaconga Unpaved 7 Opening of drains & grass cuttingKabale Kabale DLG Muko-Kaara Unpaved 8 Opening of drains & grass cutting

Kabale Kabale DLG Kabanyonyi-Ruboroga- Rwa-mishekye Unpaved 9.3 Opening of drains & grass cutting

Kabale Kabale DLG Rwenkorongo- Nyombe- Kyevu- Kagoma Unpaved 24.3 Opening of drains & grass cutting

Kabale Kabale DLG Kabimbiri-Kamusiza via Ki-horezo Unpaved 17 Opening of drains & grass cutting

Kabale Kabale DLG Kabimbiri-Wacheba-Nyakasiru Unpaved 17 Opening of drains & grass cuttingKabale Kabale DLG Buhara-Kitanga-Nyarutojo Unpaved 18 Opening of drains & grass cuttingKabale Kabale DLG Kyobugombe-Sindi via Kicence Unpaved 12.8 Opening of drains & grass cuttingKabale Kabale DLG Kabanyonyi-Karweru-Maziba Unpaved 18 Opening of drains & grass cuttingKabale Kabale DLG Nyakanengo-Nyakasiru Unpaved 9 Opening of drains & grass cuttingKabale Kabale DLG Kamwezi-Kibanda Unpaved 15 Opening of drains & grass cuttingKabale Kabale DLG Sindi-Mparo-Kangando Unpaved 5 Opening of drains & grass cutting

Kabale Kabale DLG Rwakihirwa-Kasheregyenyi-Bu-ranga Unpaved 4.4 Opening of drains & grass cutting

Kabale Kabale DLG Kakoma-Rwaza Unpaved 5 Opening of drains & grass cutting

265Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kabale Kabale DLG Bukinda-Kahondo-Maziba Unpaved 26 Opening of drains & grass cuttingKabale Kabale DLG Kashambya-Bucundura Unpaved 17 Opening drains & grass cutting Kabale Kabale DLG Muko-Katojo Unpaved 6 Opening of drains & grass cutting

Kabale Kabale DLG Kekubo-Kanyankwanzi-Ha-muganda Unpaved 9 Opening of drains & grass cutting

Kabale Kabale DLG Rushaki-Kihumuro Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Rubira-Katokye Unpaved 7 Opening of drains & grass cuttingKabale Kabale DLG Karukara-Bwindi Unpaved 8.5 Opening of drains & grass cuttingKabale Kabale DLG Kashasha-Ihunga Unpaved 13.2 Opening of drains & grass cuttingKabale Kabale DLG L.Bunyonyi-Kashambya Unpaved 7.5 Opening of drains & grass cuttingKabale Kabale DLG Nyaruziba-Nyakashebeya Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Kekuubo-Kasazo Unpaved 5 Opening of drains & grass cuttingKabale Kabale DLG Nfasha-Kagunga-Mugyera Unpaved 14 Opening of drains & grass cuttingKabale Kabale DLG Konyo-Nyamwerambiko Unpaved 8 Opening of drains & grass cuttingKabale Kabale DLG Konyo-Kyanamira Unpaved 2.3 Opening of drains & grass cuttingKabale Kabale DLG Kakoma-Mugobore Unpaved 3 Opening of drains & grass cuttingKabale Kabale DLG Mwisi-Bugarama-Kabanyonyi Unpaved 13 Opening of drains & grass cuttingKabale Kabale DLG Kitumba-Habuhasha Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Rugarama-Bubare Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Rwere-Nangara-Nyamweru Unpaved 13.2 Opening of drains & grass cuttingKabale Kabale DLG Kagarama-Bubare Unpaved 5 Opening of drains & grass cuttingKabale Kabale DLG Ahabuyonza-Ahakatindo Unpaved 2.3 Opening of drains & grass cuttingKabale Kabale DLG Burambira-Buhumuriro Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Rushebeya-Maheru Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Kishanje-Mugyera Unpaved 5 Opening of drains & grass cuttingKabale Kabale DLG Nangara-Kashenyi-Nyamiyaga Unpaved 13 Opening of drains & grass cuttingKabale Kabale DLG Hamurwa-Rwondo-Kerere Unpaved 13 Opening of drains & grass cuttingKabale Kabale DLG Kaharo-Nkumbura via Kasherere Unpaved 6 Opening of drains & grass cuttingKabale Kabale DLG Mugyera-Kagoma Unpaved 11.2 Opening of drains & grass cuttingKabale Kabale DLG Butambi- Mukyogo- Rugoma Unpaved 12 Opening of drains & grass cuttingKabale Kabale DLG Hamutora- Iremera- Mufumba Unpaved 8.4 Opening of drains & grass cuttingKabale Kabale DLG Nyamabare- Habushuro- Kiyebe Unpaved 11.2 Opening of drains & grass cutting

Kabale Kabale DLG Habushuro- Mushanje- Kinyun-gu Unpaved 5.8 Opening of drains & grass cutting

Kabale DLG Total 600Kabale Muhanga TC Ibatsyo- Kigarura U 3.3 Opening of drains & grass cuttingKabale Muhanga TC Muhanga- Ruhonwa U 3 Opening of drains & grass cutting Muhanga TC Total 6.3Kabale Kabale CARs Mukirwa- Kyabakasa- U 2.0 Opening of drains & grass cutting

Kabale Kabale CARs Nyamigogo- Omuruhita- Nya-kasiru U 3.0 Opening of drains & grass cutting

Kabale Kabale CARs Kinyamari- Butanda S.S.S- Keku-boNyakasiru U 6.0 Opening of drains & grass cutting

Kabale Kabale CARs Kantare- Rushekyera U 5.0 Opening of drains & grass cutting

Kabale Kabale CARs Bwindi TC- Ikole-Nya-kasaziKekubo U 8.0 Opening of drains & grass cutting

Kabale Kabale CARs Mburameizi- Buzaniro U 2.5 Opening of drains & grass cutting Kabale CARs Total 26.5Kabale Kabale MC Jackson Paved 0.495 Opening of drains & grass cuttingKabale Kabale MC Mitchel Gravel 0.13 Opening of drains & grass cuttingKabale Kabale MC Corydon Paved 0.13 Opening of drains & grass cuttingKabale Kabale MC Johnstone Paved 0.28 Opening of drains & grass cuttingKabale Kabale MC Archer Gravel 0.3 Opening of drains & grass cuttingKabale Kabale MC Lwamafa Gravel 0.15 Opening of drains & grass cuttingKabale Kabale MC Cohen Gravel 0.31 Opening of drains & grass cuttingKabale Kabale MC Bunigo Paved 0.1 Opening of drains & grass cuttingKabale Kabale MC Crowford Gravel 0.05 Opening of drains & grass cutting

266 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kabale Kabale MC Dundas Gravel 0.2 Opening of drains & grass cuttingKabale Kabale MC Sullivan Square Gravel 0.1 Opening of drains & grass cuttingKabale Kabale MC Kikungiri Gravel 0.17 Opening of drains & grass cuttingKabale Kabale MC Mukombe Gravel 0.19 Opening of drains & grass cuttingKabale Kabale MC Bushekwire Paved 0.11 Opening of drains & grass cutting

269Kabarole Kabarole DLG Buheesi Kabata U 16.8 Opening of drains & grass cuttingKabarole Kabarole DLG Nsura Kibate U 4.0 Opening of drains & grass cuttingKabarole Kabarole DLG Kyakatabazi Kakinga U 4.9 Opening of drains & grass cuttingKabarole Kabarole DLG Kicuuna Mporampora Kyembogo U 5.6 Opening of drains & grass cuttingKabarole Kabarole DLG Buheesi Mitandi Kinyankende U 9.4 Opening of drains & grass cuttingKabarole Kabarole DLG Kisongi Munobwa U 6.4 Opening of drains & grass cuttingKabarole Kabarole DLG Mugusu Kinyankende U 7.7 Opening of drains & grass cuttingKabarole Kabarole DLG Kibiito Mujunju U 5.4 Opening of drains & grass cuttingKabarole Kabarole DLG Kichwamba Kiburara U 18.6 Opening of drains & grass cuttingKabarole Kabarole DLG Butebe Mugusu U 8.0 Opening of drains & grass cuttingKabarole Kabarole DLG Kiburara Orubanza U 6.2 Opening of drains & grass cuttingKabarole Kabarole DLG Kahangi Mbagani U 7.8 Opening of drains & grass cuttingKabarole Kabarole DLG Ruteete Mituli Rwaihamba U 5.6 Opening of drains & grass cuttingKabarole Kabarole DLG Kasuusu Mugusu U 5.3 Opening of drains & grass cuttingKabarole Kabarole DLG Butebe Karambi U 2.1 Opening of drains & grass cuttingKabarole Kabarole DLG Geme Kajoto U 3.5 Opening of drains & grass cuttingKabarole Kabarole DLG Nyabukara Harugongo U 3.4 Opening of drains & grass cuttingKabarole Kabarole DLG Kasuusu Kigwengwe Kimuhonge U 6.4 Opening of drains & grass cuttingKabarole Kabarole DLG Kakoga Kadindimo U 4.0 Opening of drains & grass cuttingKabarole Kabarole DLG Kasusu Buheesi U 7.2 Opening of drains & grass cuttingKabarole Kabarole DLG Katoma Bwabya Kyembogo U 7.5 Opening of drains & grass cuttingKabarole Kabarole DLG Kasunganyanja Kaina Kadindimo U 5.0 Opening of drains & grass cuttingKabarole Kabarole DLG Isunga Rwankenzi U 7.0 Opening of drains & grass cuttingKabarole Kabarole DLG Kisomoro Kyamatanga U 6.3 Opening of drains & grass cuttingKabarole Kabarole DLG Kicuucu Lyamabwa Kasura U 4.0 Opening of drains & grass cuttingKabarole Kabarole DLG Kaboyo Kyezire Kazingo U 4.5 Opening of drains & grass cuttingKabarole Kabarole DLG Kisomoro Bunaiga U 1.4 Opening of drains & grass cuttingKabarole Kabarole DLG Kabegira Kirere U 4.6 Opening of drains & grass cuttingKabarole Kabarole DLG Iboroga Kanyansinga U 3.0 Opening of drains & grass cutting Kabarole DLG Total Kabarole karago t/c Kitarasa Kikura U 2.5 Opening of drains & grass cuttingKabarole karago t/c Kyarutanga - Hakigere U 2.0 Opening of drains & grass cuttingKabarole karago t/c Kikura - Kainango - Karago U 1.7 Opening of drains & grass cuttingKabarole karago t/c Canon Apolo - Mucwankwanzi U 1.9 Opening of drains & grass cuttingKabarole karago t/c Kitarasa Hamabale U 2.4 Opening of drains & grass cuttingKabarole karago t/c Kitesweka Njenga Nyabigo U 1.5 Opening of drains & grass cuttingKabarole karago t/c Karago - Busoma U 1.7 Opening of drains & grass cuttingKabarole karago t/c Canon Apolo - Mpanga bridge U 1.4 Opening of drains & grass cuttingKabarole karago t/c Katuguru Katalemwa U 1.7 Opening of drains & grass cuttingKabarole karago t/c Karago - Mukivakado Bukobe U 2.3 Opening of drains & grass cutting karago t/c Total 200.7Kabarole Kibiito T/C Kibiito SS Bukara U 2.9 Opening of drains & grass cuttingKabarole Kibiito T/C Adolf Mwesige road U 3.6 Opening of drains & grass cuttingKabarole Kibiito T/C Kyatwa -Kyakahinda U 4.0 Opening of drains & grass cuttingKabarole Kibiito T/C Nkojo road U 0.9 Opening of drains & grass cuttingKabarole Kibiito T/C Aloysous Bagamba road U 2.4 Opening of drains & grass cuttingKabarole Kibiito T/C Kasekya road U 1.7 Opening of drains & grass cuttingKabarole Kibiito T/C Abel Basaija Mujunju U 6.0 Opening of drains & grass cuttingKabarole Kibiito T/C Kagoma Yerya U 1.0 Opening of drains & grass cuttingKabarole Kibiito T/C Kamara Kagoma U 1.8 Opening of drains & grass cuttingKabarole Kibiito T/C Mudaki Busamba U 1.3 Opening of drains & grass cuttingKabarole Kibiito T/C Nyamugo road U 1.0 Opening of drains & grass cutting

267Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kabarole Kibiito T/C Tugwezire road U 1.0 Opening of drains & grass cuttingKabarole Kibiito T/C Kirisi road U 1.0 Opening of drains & grass cuttingKabarole Kibiito T/C Zeresire road U 0.7 Opening of drains & grass cuttingKabarole Kibiito T/C Nyakakemba U 1.0 Opening of drains & grass cuttingKabarole Kibiito T/C Mudaki Kihorogo U 1.3 Opening of drains & grass cutting Kibiito T/C Total 31.6Kabarole kijura T/C Igogonya Paskali U 4.0 Opening of drains & grass cuttingKabarole kijura T/C Rukebuga Kihoora U 0.3 Opening of drains & grass cuttingKabarole kijura T/C Katusabe Kabarwini U 1.0 Opening of drains & grass cuttingKabarole kijura T/C Byaragasi - Full Gospel U 0.6 Opening of drains & grass cuttingKabarole kijura T/C Kahuna Nsorro U 3.3 Opening of drains & grass cuttingKabarole kijura T/C Kamusanga Miyoora U 4.0 Opening of drains & grass cuttingKabarole kijura T/C Kyaitamba Kyabaganda U 1.0 Opening of drains & grass cuttingKabarole kijura T/C Kyaitumbi U 0.6 Opening of drains & grass cuttingKabarole kijura T/C Kyajumba U 0.5 Opening of drains & grass cuttingKabarole kijura T/C Kasokero Kyabaganda U 5.5 Opening of drains & grass cuttingKabarole kijura T/C Karokarungi U 0.6 Opening of drains & grass cuttingKabarole kijura T/C Kyererezi Katego U 3.5 Opening of drains & grass cuttingKabarole kijura T/C Kyakamanya U 0.6 Opening of drains & grass cuttingKabarole kijura T/C Karangara Kyererezi U 1.6 Opening of drains & grass cutting kijura T/C Total 27.1Kabarole Kiko t/c Kanyambeho Rwamugonera U 2.2 Opening of drains & grass cuttingKabarole Kiko t/c Nyabubale Busoro U 4.3 Opening of drains & grass cuttingKabarole Kiko t/c Katoke Muganyirwa U 1.5 Opening of drains & grass cuttingKabarole Kiko t/c Banura Kaihura U 2.0 Opening of drains & grass cuttingKabarole Kiko t/c Makobyo Kyanyawara U 5.3 Opening of drains & grass cuttingKabarole Kiko t/c Kigarama Bwenderwa U 3.3 Opening of drains & grass cuttingKabarole Kiko t/c Kyakaija Banura U 2.2 Opening of drains & grass cuttingKabarole Kiko t/c Kyarutotera U 0.6 Opening of drains & grass cuttingKabarole Kiko t/c Miranga U 1.0 Opening of drains & grass cuttingKabarole Kiko t/c Bwairora U 1.2 Opening of drains & grass cuttingKabarole Kiko t/c Kitabonwa U 1.0 Opening of drains & grass cutting Kiko t/c Total 24.6Kabarole Rubona t/c Rubona Burongo U 4 Opening of drains & grass cuttingKabarole Rubona t/c Rubona Kisambu U 1.5 Opening of drains & grass cuttingKabarole Rubona t/c Rubona Buhuna Kabata U 1.5 Opening of drains & grass cuttingKabarole Rubona t/c Rubona Mahamba U 1.3 Opening of drains & grass cuttingKabarole Rubona t/c Butukuru Mukyeya U 1.4 Opening of drains & grass cuttingKabarole Rubona t/c Rubona Kamugombe U 1.2 Opening of drains & grass cuttingKabarole Rubona t/c Butukuru Bulegeya Nyakinoni U 1.8 Opening of drains & grass cuttingKabarole Rubona t/c Burongo Kabaseka U 1.2 Opening of drains & grass cuttingKabarole Rubona t/c Kisambu Kyabajwa U 1.4 Opening of drains & grass cutting Rubona t/c Total 15.3Kabarole Rwimi T/C Kabulyaisoke Nyabwina U 1.7 Opening of drains & grass cuttingKabarole Rwimi T/C Light & Guide P S Kaijansi TC U 3.0 Opening of drains & grass cuttingKabarole Rwimi T/C Hapolice - Katana U 0.8 Opening of drains & grass cuttingKabarole Rwimi T/C Rwimi -Gatyanga - Nyabwina U 7.5 Opening of drains & grass cuttingKabarole Rwimi T/C silver Inn - Naikonda U 1.0 Opening of drains & grass cuttingKabarole Rwimi T/C Market Street - Gatyanga road U 0.4 Opening of drains & grass cuttingKabarole Rwimi T/C Hakituusi -Excell U 3.0 Opening of drains & grass cuttingKabarole Rwimi T/C Kagoro Naikondo Silver Inn U 2.5 Opening of drains & grass cutting

Kabarole Rwimi T/C Silver Inn - Industrial Park -Ntabago U 0.6 Opening of drains & grass cutting

Kabarole Rwimi T/C Gatyanga II - Gatyanga III U 2.5 Opening of drains & grass cuttingKabarole Rwimi T/C Kasubi -Hajati Mawanda U 1.0 Opening of drains & grass cuttingKabarole Rwimi T/C Kirembere Gatyanga U 1.5 Opening of drains & grass cuttingKabarole Rwimi T/C Rwimi -Gatyanga I U 2.0 Opening of drains & grass cuttingKabarole Rwimi T/C Misabiro Ntabago U 0.1 Opening of drains & grass cuttingKabarole Rwimi T/C Sengoma Road U 0.1 Opening of drains & grass cutting

268 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kabarole Rwimi T/C Town Council Hqtr Kyaibumba U 0.2 Opening of drains & grass cuttingKabarole Rwimi T/C Excel Kitebe U 2.0 Opening of drains & grass cuttingKabarole Rwimi T/C Tusingwire Street U 0.2 Opening of drains & grass cuttingKabarole Rwimi T/C Kyaibumba Nyabwina U 3.81 Opening of drains & grass cuttingKabarole Rwimi T/C Nyabwina Kibiito boarder U 1.0 Opening of drains & grass cuttingKabarole Rwimi T/C Rwimi Excel Kyakatabazi U 2.0 Opening of drains & grass cuttingKabarole Rwimi T/C Kyaibumba Kirembere U 1.0 Opening of drains & grass cutting Rwimi T/C Total 37.91Kaberamaido C.A.Rs Imakioroc - Byeyale Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Kaburepoli - Apai Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Kanyalam - Oyala Earth 5.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Acwali - Oleko Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Katingi - Abalang Earth 6.5 Opening of drains & grass cuttingKaberamaido C.A.Rs Omarai - Apele Earth 8.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Olyerai - Atubot Earth 8.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Olyerai - Kakure Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Kakure - Kadiye - Lwala Earth 7.5 Opening of drains & grass cuttingKaberamaido C.A.Rs Osikai – Abalang Earth 10.1 Opening of drains & grass cuttingKaberamaido C.A.Rs Ejotu – Emotu Earth 5.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Kamidakan – Anyaramoru Earth 5.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Ataodyang – Cwaya Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Abola - kalaki boarder Earth 8.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Ocelakur – Atubot Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Omarai – Okapel Earth 10.1 Opening of drains & grass cuttingKaberamaido C.A.Rs Head quarters – Kamuk Earth 9.4 Opening of drains & grass cuttingKaberamaido C.A.Rs Olelai – Apele Earth 14.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Cuma – Kangai Earth 8.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Okile – Kalyemese Earth 6.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Anyara – Anyaramoru Earth 10.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Osele – Akisim Earth 3.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Idamakan – Opwocet Earth 4.0 Opening of drains & grass cuttingKaberamaido C.A.Rs Alere – Okwalongwen Earth 5.0 Opening of drains & grass cutting C.A.Rs Total 168.6Kaberamaido Kaberamaidoo DLG Kaberamaido - Kangai Earth 6.38 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Kalaki - Sangai Earth 14.49 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Opiro Partly Earth 19.5 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Ogobai - Okile Earth 10.8 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Bululu - Lake Kyoga Gravel 8.18 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Swagere Partly Gravel 16.6 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Kalaki - Owidi Earth 9.74 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Abalang - Anyara Earth 4.65 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Otuboi - Anyara - Orungo boarder Earth 13.68 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Kobulubulu - Okile Earth 10.23 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Otuboi - Bata Gravel 19.5 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Ochero - Bugoi Partly Earth 13.1 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Omarai - Bira Gravel 15 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Amileny Partly Earth 8.9 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Kakure - Otuboi Gravel 14.1 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Bululu - Ipenet Earth 19.25 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Kaberamaido - Amanu - Alwa Earth 11 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Lwala - Apele Olelai Gravel 14 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Okapel - Aperkira Gravel 5.6 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Okapel - Abirabira Gravel 9.4 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Alipa - Aturigalin Gravel 6 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Abalang - Idamakan Earth 16 Opening of drains & grass cutting

269Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kaberamaido Kaberamaidoo DLG Kanyalam - Doya Gravel 9.4 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Acamidako - Apai Gravel 8 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Alayaogik - Acamidako Gravel 16 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Teete - Nkokonjero Gravel 8.5 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Akwalakwala - Ogerai Murem Partly Gravel 19.35 Opening of drains & grass cutting

Kaberamaido Kaberamaidoo DLG Odoot - Ogobai Gravel 6 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Osikai - Nakasero Gravel 6 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Lwala - Amukurat Ousia Gravel 15.6 Opening of drains & grass cuttingKaberamaido Kaberamaidoo DLG Apapai - Kakure Gravel 5.6 Opening of drains & grass cutting DLG Total 360.55Kaberamaido Town Council Nkurumah Earth 1.5 Opening of drains & grass cuttingKaberamaido Town Council Ararak Gravel 1.5 Opening of drains & grass cuttingKaberamaido Town Council Esingu Earth 0.4 Opening of drains & grass cuttingKaberamaido Town Council Kaguta Earth 1.5 Opening of drains & grass cuttingKaberamaido Town Council Dubai Earth 1.5 Opening of drains & grass cuttingKaberamaido Town Council Main street Paved 0.35 Opening of drains & grass cuttingKaberamaido Town Council Market street Earth 0.8 Opening of drains & grass cuttingKaberamaido Town Council Majengo Earth 1 Opening of drains & grass cuttingKaberamaido Town Council Obote Earth 2 Opening of drains & grass cuttingKaberamaido Town Council Industrial street Earth 1 Opening of drains & grass cuttingKaberamaido Town Council Ekinu street Earth 0.55 Opening of drains & grass cuttingKaberamaido Town Council Okurut street Earth 0.35 Opening of drains & grass cuttingKaberamaido Town Council Ateker Ejalu street Earth 0.4 Opening of drains & grass cuttingKaberamaido Town Council Ebalu street Earth 1.85 Opening of drains & grass cuttingKaberamaido Town Council Ekudu street Earth 0.3 Opening of drains & grass cutting Town Council Total 15Kalangala C.A.Rs Bubeke U 10 Opening of drains & grass cuttingKalangala C.A.Rs Bujumba U 13 Opening of drains & grass cuttingKalangala C.A.Rs Bufumira U 10 Opening of drains & grass cuttingKalangala C.A.Rs Mazinga U 6 Opening of drains & grass cuttingKalangala C.A.Rs Mugoye U 9 Opening of drains & grass cuttingKalangala C.A.Rs Kyamuswa U 9 Opening of drains & grass cutting C.A.Rs Total 57Kalangala Kalangala DLG Kiwungu-Lwanabatya-Nakibanga U 18 Opening of drains & grass cutting DLG Total 18Kalangala Town Council Mweena road U 2.8 Opening of drains & grass cuttingKalangala Town Council Lutakome road U 1.2 Opening of drains & grass cuttingKalangala Town Council Kisseka road U 1 Opening of drains & grass cuttingKalangala Town Council Buggala road U 0.7 Opening of drains & grass cuttingKalangala Town Council Muteesa I Rd U 0.5 Opening of drains & grass cuttingKalangala Town Council Mweena Sozi road U 2 Opening of drains & grass cuttingKalangala Town Council Sserumanga road U 1.8 Opening of drains & grass cuttingKalangala Town Council Access to Water Pump U 0.7 Opening of drains & grass cuttingKalangala Town Council Ssemu -Buggala road U 0.8 Opening of drains & grass cuttingKalangala Town Council Ssemukadde road U 0.7 Opening of drains & grass cuttingKalangala Town Council Buggala avenue . U 0.7 Opening of drains & grass cuttingKalangala Town Council Garbage road U 0.3 Opening of drains & grass cutting Town Council Total 13.2Kaliro Kaliro DLG Muli-Nansololo-Bulike Unpaved 5.0 Opening of drains & grass cuttingKaliro Kaliro DLG Namulunga- Nabuzi- Saaka Unpaved 11.0 Opening of drains & grass cuttingKaliro Kaliro DLG Nawaikoke -Nsamule- Bulike Unpaved 13.0 Opening of drains & grass cuttingKaliro Kaliro DLG Kyani-Buyonjo Unpaved 12.0 Opening of drains & grass cuttingKaliro Kaliro DLG Buluya-Nansololo-Nantamali Unpaved 9.0 Opening of drains & grass cuttingKaliro Kaliro DLG Buvulunguti -Mailo –Nawampiti Unpaved 8.0 Opening of drains & grass cuttingKaliro Kaliro DLG Gadumire -Kisinda –Busulumba Unpaved 9.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Buzinge - Mailo - Kisanga land-ing site Unpaved 7.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Naigazi- Takira Unpaved 6.0 Opening of drains & grass cutting

270 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kaliro Kaliro DLG Bwayuya- Budhehe –Bumanya Unpaved 6.0 Opening of drains & grass cuttingKaliro Kaliro DLG Makaya- Mwiga –Budhehe Unpaved 8.5 Opening of drains & grass cuttingKaliro Kaliro DLG Nawaikoke -Jalaja Landing site Unpaved 3.3 Opening of drains & grass cuttingKaliro Kaliro DLG Namukooge –Igulamubiri Unpaved 6.0 Opening of drains & grass cuttingKaliro Kaliro DLG Kyabazinga’s Palace- Bugoodo Unpaved 7.1 Opening of drains & grass cuttingKaliro Kaliro DLG Bupyana-Wangobo-namwiwa Unpaved 9.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Bukonde-namejje TC-Makaiza Tc-Bukonde Old market-Buyinda Unpaved 9.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Bulumba -Nalenya –Masuna Unpaved 8.6 Opening of drains & grass cuttingKaliro Kaliro DLG Takira II -Kanansega –Kanantale Unpaved 7.1 Opening of drains & grass cuttingKaliro Kaliro DLG Buwangala-Beeda-Bukamba P/S Unpaved 6.0 Opening of drains & grass cuttingKaliro Kaliro DLG Namawa p/s- Kasozi Landing site Unpaved 4.0 Opening of drains & grass cuttingKaliro Kaliro DLG Bupeeni - Nsamule – Kyambaya Unpaved 9.2 Opening of drains & grass cutting

Kaliro Kaliro DLG Naigombwa- Kasokwe- Namu-gongo Unpaved 15.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Nawaikoke-Buwangala Unpaved 8.0 Opening of drains & grass cuttingKaliro Kaliro DLG Nagawolomboga – Kanankamba Unpaved 4.2 Opening of drains & grass cutting

Kaliro Kaliro DLG Buyinda -Trading Centre - Nabii-na -Kirama Unpaved 4.0 Opening of drains & grass cutting

Kaliro Kaliro DLG Buzinge - Nangala Landing ste Unpaved 3.0 Opening of drains & grass cuttingKaliro Kaliro DLG Gagawala-Kayabya-Kiwa Unpaved 4.0 Opening of drains & grass cuttingKaliro Kaliro DLG Namuzigo- Bukyonza –Nalenya Unpaved 6.0 Opening of drains & grass cuttingKaliro Kaliro DLG Ihagalo -Kananzoki – Bugodo Unpaved 7.0 Opening of drains & grass cuttingKaliro Kaliro DLG Namwiwa-Kirama-Kikooge Unpaved 12.0 Opening of drains & grass cuttingKaliro Kaliro DLG Buyinda-Buyinda-Kyanfuba Unpaved 11.0 Opening of drains & grass cutting Kaliro DLG Total 238

Kalungu Kalungu DLG Kateera- Bwanda - Bukalasa(Ka-dugala-Bwanda-Bukalasa Earth 7.8 Opening of drains & grass cutting

Kalungu Kalungu DLG Lusango - Mugumba Earth 0.8 Opening of drains & grass cuttingKalungu Kalungu DLG Galabuzi-Boosi-Ndugwa Gravel 6.5 Opening of drains & grass cuttingKalungu Kalungu DLG Kalama-Kitulikizi-Lukenke Earth 9.2 Opening of drains & grass cuttingKalungu Kalungu DLG Lukenke - Kabuye - Kaggomba Gravel 10.5 Opening of drains & grass cuttingKalungu Kalungu DLG Kitosi-Madalasati-Bulwadda Earth 8.6 Opening of drains & grass cuttingKalungu Kalungu DLG Lugasa-Kasunga-Kiti Gravel 4 Opening of drains & grass cuttingKalungu Kalungu DLG Kyanagolo-Kiweesa Gravel 3 Opening of drains & grass cuttingKalungu Kalungu DLG Lubumba-Kasunga Gravel 2.5 Opening of drains & grass cuttingKalungu Kalungu DLG Nuo-Kabale town board-Degeya Gravel 10.2 Opening of drains & grass cuttingKalungu Kalungu DLG Bulingo -Kalangal landing site Gravel 3.2 Opening of drains & grass cuttingKalungu Kalungu DLG lukaya bulingo bukulula Gravel 11.7 Opening of drains & grass cuttingKalungu Kalungu DLG Kiteredde-Birongo-Nnunda Earth 7 Opening of drains & grass cuttingKalungu Kalungu DLG Bukiri-Kalumagga-Kigaju Gravel 7 Opening of drains & grass cuttingKalungu Kalungu DLG Lwemiwafu-Kiteredde-Birongo Earth 7 Opening of drains & grass cutting

Kalungu Kalungu DLG Lukaya-kansonkego-kyamba-la-kiwomya Gravel 12.3 Opening of drains & grass cutting

Kalungu Kalungu DLG Kyamulibwa-Sebijja-busoga Earth 15 Opening of drains & grass cuttingKalungu Kalungu DLG Ntale -kabungo-Bujubi Earth 4.9 Opening of drains & grass cuttingKalungu Kalungu DLG Kitante -Kibisi Earth 5.1 Opening of drains & grass cutting

Kalungu Kalungu DLG Kiryakuyenge-kabaale-Namu-sujja Gravel 10 Opening of drains & grass cutting

Kalungu Kalungu DLG Kanyogoga-Kabugo-Kasuula Earth 6 Opening of drains & grass cuttingKalungu Kalungu DLG Kyamulibwa-Busoga-Towa-lusozi Earth 5 Opening of drains & grass cuttingKalungu Kalungu DLG Kasambu-Namuliiro Gravel 3.6 Opening of drains & grass cuttingKalungu Kalungu DLG Kyakibuta-Kambulala-Lusozi Earth 4.4 Opening of drains & grass cutting

Kalungu Kalungu DLG Mambaale-Kasembwera-Kirag-ga-Micucu Earth 6.7 Opening of drains & grass cutting

Kalungu Kalungu DLG Kasula-Katali-kalama Earth 12.2 Opening of drains & grass cutting

Kalungu Kalungu DLG Kyagambiddwa Bugomola Towa-semusoga Earth 1.5 Opening of drains & grass cutting

Kalungu Kalungu DLG Nabutongwa-Kalungu gravel 3.5 Opening of drains & grass cutting

Kalungu Kalungu DLG kaliiro _ Nabutongwa-Bwasand-eku Earth 11.4 Opening of drains & grass cutting

271Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kalungu Kalungu DLG Kaliiro-Kakunyu-Kitamba Earth 0.5 Opening of drains & grass cuttingKalungu Kalungu DLG Villamaria-kitamba-Lukerere Earth 15 Opening of drains & grass cuttingKalungu Kalungu DLG Degeya-Kawule-Kikumbi Earth 8.7 Opening of drains & grass cuttingKalungu Kalungu DLG Kyato-Bulenzi-Kyakibuta Earth 8.6 Opening of drains & grass cuttingKalungu Kalungu DLG Kasuula-Lwanume-Bwesa Earth 13.4 Opening of drains & grass cuttingKalungu Kalungu DLG Mukoko-Kikonda-Lukerere Earth 10 Opening of drains & grass cuttingKalungu Kalungu DLG Mambaale-Kisitula-Kabuye Earth 4.1 Opening of drains & grass cuttingKalungu Kalungu DLG Kampuki-Nsubuga-Bulwadda Earth 9.3 Opening of drains & grass cuttingKalungu Kalungu DLG Kiwaawo-Maguluka-Lwanume Earth 6 Opening of drains & grass cuttingKalungu Kalungu DLG Ntale-Bulwadda-Kyamulibwa Earth 9 Opening of drains & grass cutting Kalungu DLG Total 285.2Kalungu Kalungu TC Nabutongwa-Kalungu Gravel 1.8 Opening of drains & grass cuttingKalungu Kalungu TC Kalungu-Lusana-Lugazi Gravel 6.25 Opening of drains & grass cuttingKalungu Kalungu TC Mugumba-Kisawa-Kasabaale Gravel 3.8 Opening of drains & grass cuttingKalungu Kalungu TC Kalungu-Kanika Gravel 2.5 Opening of drains & grass cuttingKalungu Kalungu TC Kikukumbi-Kasabaale Gravel 3 Opening of drains & grass cuttingKalungu Kalungu TC Galunyu-Lusaana Gravel 3 Opening of drains & grass cuttingKalungu Kalungu TC kalungu kisaawa Gravel 2.5 Opening of drains & grass cuttingKalungu Kalungu TC Muwanga-Church Gravel 1.6 Opening of drains & grass cuttingKalungu Kalungu TC Batesita Gravel 1.2 Opening of drains & grass cutting Kalungu TC Total 26.7Kalungu Lukaya TC Bulakati-Lubumba Gravel 3 Opening of drains & grass cuttingKalungu Lukaya TC Sempiso-Lumbuba Gravel 3 Opening of drains & grass cuttingKalungu Lukaya TC Kelespo road Gravel 0.7 Opening of drains & grass cuttingKalungu Lukaya TC Ssendawula Gravel 0.2 Opening of drains & grass cuttingKalungu Lukaya TC Tamale road Gravel 0.8 Opening of drains & grass cuttingKalungu Lukaya TC kabaala-Wagwa Gravel 1.2 Opening of drains & grass cuttingKalungu Lukaya TC Bulayimu-Mande Gravel 3 Opening of drains & grass cuttingKalungu Lukaya TC Kawanda Gravel 1.2 Opening of drains & grass cutting Lukaya TC Total 13.1

Kamuli Kamuli DLG Nabwigulu Link earth surface 8.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulopa-Namwendwa-Ndalike earth surface 17.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bugondha-Namaganda earth surface 10.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Kisozi-Nawanyago-Buwala earth surface 17.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulange-Naminage earth surface 10.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Namasagali Link earth surface 11.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Buwudha-Butabala-Kitayunjwa earth surface 14.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulopa-Nawangoma erth sur-faced 10.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Nabirumba-Balawoli earth surface 10.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulunda-Butansi-Kakindu earth surface 13.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Naminage-Buwala gravel 17.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Itukulu-Nankandulo earth surface 12.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Wankole-Luzinga earth surface 5.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Balawoli-Kisaikye-Namasagali gravel 22.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Nabwigulu-Nabirumba earth surface 9.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Kasambira-Bugulumbya-Bu-sandha

earth surface 14.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Nakibungulya-Bulopa earth surface 7.0 Opening of drains & grass cutting

272 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kamuli Kamuli DLG Kiyunga-Nakakabala-Mbulamuti earth surface 11.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Buziibirira-Nakiwulo-Kitayunjwa earth surface 6.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Namasagali-Kananage gravel 22.0 Opening of drains & grass cuttingKamuli Kamuli DLG Namwendwa-Kyeeya-Kiseege gravel 18.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Nawantumbi-Nawantale-Ki-yunga

earth surface 11.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Kiyunga-Budhutu-Butale earth surface 8.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Nawantale-Kagumba-Kibuye earth surface 22.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulopa-Bulogo-Nabiruma gravel 24.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Kasambira-Nawandyo-Wankole earth surface 8.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Isimba-Mawoito gravel 12.0 Opening of drains & grass cuttingKamuli Kamuli DLG Nawantale-Nakabira gravel 6.5 Opening of drains & grass cuttingKamuli Kamuli DLG Balawoli-Nabulezi-Kyamatende gravel 16.4 Opening of drains & grass cuttingKamuli Kamuli DLG Kisozi-Nababirye landing site gravel 5.0 Opening of drains & grass cuttingKamuli Kamuli DLG Isimba P/S-Kakira swamp gravel 10.0 Opening of drains & grass cuttingKamuli Kamuli DLG Kisozi-Isimba landing site gravel 4.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Namwendwa- Catholi church-Bulange gravel 6.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Busimba-Mutukula-Nanvunano gravel 9.0 Opening of drains & grass cuttingKamuli Kamuli DLG Mugweri Asokolito gravel 16.4 Opening of drains & grass cuttingKamuli Kamuli DLG Buwanume-Nabigongerya gravel 9.7 Opening of drains & grass cutting

Kamuli Kamuli DLG Namisambya-Bugulusi-Mbula-muti gravel 14.4 Opening of drains & grass cutting

Kamuli Kamuli DLG Kiwolera-Namaira earth surface 12.0 Opening of drains & grass cutting

Kamuli Kamuli DLG Bulogo-Galinandha-Kinu gravel 16.0 Opening of drains & grass cuttingKamuli Kamuli DLG Bulungu-Nambale gravel 11.0 Opening of drains & grass cuttingKamuli Kamuli DLG Bugolo-Budhuli-Kiyunga gravel 6.8 Opening of drains & grass cutting

Kamuli Kamuli DLG Nankandulo-Nabukidi Landing site gravel 3.8 Opening of drains & grass cutting

Kamuli Kamuli DLG Busige-Nakiwulo-Namaganda gravel 10.0 Opening of drains & grass cuttingKamuli Kamuli DLG Nawango-Bugonda gravel 6.0 Opening of drains & grass cutting Kamuli DLG Total 511.0Kamuli Kamuli TC Brewer gravel 1.35 Opening of drains & grass cuttingKamuli Kamuli TC Mulamba gravel 0.50 Opening of drains & grass cuttingKamuli Kamuli TC Commercial gravel 0.75 Opening of drains & grass cuttingKamuli Kamuli TC Lubaga gravel 2.20 Opening of drains & grass cuttingKamuli Kamuli TC Temple gravel 0.70 Opening of drains & grass cuttingKamuli Kamuli TC Busoga Place gravel 0.32 Opening of drains & grass cuttingKamuli Kamuli TC Denning gravel 0.36 Opening of drains & grass cuttingKamuli Kamuli TC Nabikamba gravel 0.15 Opening of drains & grass cuttingKamuli Kamuli TC Mutibwa gravel 0.23 Opening of drains & grass cuttingKamuli Kamuli TC Nadiope gravel 0.20 Opening of drains & grass cuttingKamuli Kamuli TC Muwanga gravel 0.48 Opening of drains & grass cuttingKamuli Kamuli TC Badaza gravel 0.34 Opening of drains & grass cuttingKamuli Kamuli TC Mutekanga gravel 0.55 Opening of drains & grass cuttingKamuli Kamuli TC Muwebwa gravel 0.20 Opening of drains & grass cuttingKamuli Kamuli TC Cox gravel 1.20 Opening of drains & grass cuttingKamuli Kamuli TC Mission gravel 0.50 Opening of drains & grass cuttingKamuli Kamuli TC Sankara gravel 0.32 Opening of drains & grass cuttingKamuli Kamuli TC Wynand gravel 0.42 Opening of drains & grass cuttingKamuli Kamuli TC Kyabazinga gravel 0.40 Opening of drains & grass cuttingKamuli Kamuli TC Okurut gravel 0.38 Opening of drains & grass cutting

Kamuli Kamuli TC Katalo earth surface 0.45 Opening of drains & grass cutting

Kamuli Kamuli TC off Lubaga road earth surface 0.80 Opening of drains & grass cutting

273Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kamuli Kamuli TC Bukabale earth surface 1.30 Opening of drains & grass cutting

Kamuli Kamuli TC Wilson earth surface 1.18 Opening of drains & grass cutting

Kamuli Kamuli TC Okem earth surface 0.16 Opening of drains & grass cutting

Kamuli Kamuli TC Mandela earth surface 0.43 Opening of drains & grass cutting

Kamuli Kamuli TC Kagoda earth surface 0.24 Opening of drains & grass cutting

Kamuli Kamuli TC Crowford Avenue Bitumen 0.69 Opening of drains & grass cuttingKamuli Kamuli TC Adams Bitumen 0.69 Opening of drains & grass cuttingKamuli Kamuli TC Kitimbo gravel 0.20 Opening of drains & grass cuttingKamuli Kamuli TC Gabula Bitumen 0.42 Opening of drains & grass cuttingKamuli Kamuli TC Babubai Bitumen 0.27 Opening of drains & grass cuttingKamuli Kamuli TC Vithaldas Bitumen 0.69 Opening of drains & grass cuttingKamuli Kamuli TC Saza Bitumen 0.85 Opening of drains & grass cuttingKamuli Kamuli TC Buterba gravel 0.50 Opening of drains & grass cuttingKamuli Kamuli TC Byaino gravel 0.40 Opening of drains & grass cuttingKamuli Kamuli TC Kadaga gravel 0.50 Opening of drains & grass cuttingKamuli Kamuli TC Ben Lubaale gravel 0.50 Opening of drains & grass cutting

Kamuli Kamuli TC Mawerere earth surface 0.40 Opening of drains & grass cutting

Kamuli Kamuli TC Abudal Bagoth earth surface 0.60 Opening of drains & grass cutting

Kamuli Kamuli TC Nanangwe earth surface 0.65 Opening of drains & grass cutting

Kamuli Kamuli TC Sajjabi gravel 0.35 Opening of drains & grass cutting

Kamuli Kamuli TC Kabanda earth surface 0.55 Opening of drains & grass cutting

Kamuli Kamuli TC Tibita earth surface 0.65 Opening of drains & grass cutting

Kamuli Kamuli TC Kapiriri earth surface 0.35 Opening of drains & grass cutting

Kamuli Kamuli TC Dhikusoka earth surface 0.60 Opening of drains & grass cutting

Kamuli Kamuli TC Bufunvu earth surface 0.15 Opening of drains & grass cutting

Kamuli TC Total 26.12Kamwenge Kamwenge DLG Kabuga – Mpanga U 13.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kamwenge – Kabuga U 11.4 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kabujogera – Nyaruhanda U 6.7 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kiyagara – Bunoga U 10.3 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kyakanyemera – Mpanga U 9.2 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kyotamushana – Katooma U 14.2 Opening of drains & grass cuttingKamwenge Kamwenge DLG Nyabani - Kinaga – Kicwamba U 14.2 Opening of drains & grass cuttingKamwenge Kamwenge DLG Ruhiga – Kamila U 13.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Rwentuha – Mahyoro U 23.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Ruhagura – Bwera U 15.0 Opening of drains & grass cuttingKamwenge Kamwenge DLG Ntutu – Kicheche U 6.7 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kanara – Rwenshama U 9.7 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kabuga – Mpanga U 13.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kabingo – Rwensikiza U 9.8 Opening of drains & grass cuttingKamwenge Kamwenge DLG Nkoma - mahani – Biguri U 19.8 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kahunge - Nkarakara – Kizziba U 13.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Bigodi - Busiriba – Bunoga U 16.6 Opening of drains & grass cuttingKamwenge Kamwenge DLG Kamwenge – Kyabandara U 20.0 Opening of drains & grass cutting

Kamwenge DLG Total 241.6

Kanungu Butogota TC Kibiriti road U 2.1 Opening of drains & grass cuttingKanungu Butogota TC Bikuto-Nyamutuntu U 2.4 Opening of drains & grass cuttingKanungu Butogota TC Babisigaho road U 2 Opening of drains & grass cutting

274 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kanungu Butogota TC Mosque-Rusasi-tooto-philip U 1.7 Opening of drains & grass cutting Butogota TC Total 8.2Kanungu Kanungu DLG Kambuga – Rugyeyo U 11.7 Opening of drains & grass cuttingKanungu Kanungu DLG Bugongi – Nyamirama U 14.5 Opening of drains & grass cutting

Kanungu Kanungu DLG Ntungamo – Karangara – Aha-mayanja U 14.7 Opening of drains & grass cutting

Kanungu Kanungu DLG Kyeijanga – Nyamigoye U 16.8 Opening of drains & grass cutting

Kanungu Kanungu DLG Nyakatunguru-Bihombor-wa-Nyanga-Nkunda U 15.6 Opening of drains & grass cutting

Kanungu Kanungu DLG Kihihi-Nyanga-Ishasha U 10.0 Opening of drains & grass cuttingKanungu Kanungu DLG Kishenyi–Kihembe–Ishasha U 10.0 Opening of drains & grass cutting

Kanungu Kanungu DLG Kazuru-Ahamuhingo-Masya-Ka-nungu U 16.8 Opening of drains & grass cutting

Kanungu DLG Total 110.1Kanungu Kihihi TC Burwanzi road U 1.8 Opening of drains & grass cutting

Kanungu Kihihi TC Nyakiyaga-Rwemisisi-Progressive road U 2.7 Opening of drains & grass cutting

Kanungu Kihihi TC Kiruruma-Nyamwegabira U 3.3 Opening of drains & grass cuttingKanungu Kihihi TC Progressive-Yesunimurungi U 2.5 Opening of drains & grass cuttingKanungu Kihihi TC Buzaniro-Karaunda-Kaguliro U 2.8 Opening of drains & grass cuttingKanungu Kihihi TC Rukutwa,Rusika-Amama streets U 0.9 Opening of drains & grass cutting

Kanungu Kihihi TC Mugisha,Market,Garage,Isaaya streets U 1.1 Opening of drains & grass cutting

Kanungu Kihihi TC Katoma-Bugongo-Kinyashohera road U 2.2 Opening of drains & grass cutting

Kanungu Kihihi TC Tarmac road (Barageine,Kaw-ere,Nzabandora,Rusika streets) U 1.0 Opening of drains & grass cutting

Kihihi TC Total 18.3Kanungu Kambuga TC Kambuga - Zeituni - Afisa U 1.2 Opening of drains & grass cuttingKanungu Kambuga TC Bahinyoza - Rutagira U 1.1 Opening of drains & grass cuttingKanungu Kambuga TC Muhokya - Bunyinya U 2.0 Opening of drains & grass cutting Kambuga TC Total 4.3Kapchorwa Kapchorwa DLG kaserem-Kapsinda U 6 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Sirimityo-Amukul U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Sosur-Gamotui U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG kapkwirwok-Loch U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Kangowo-sanzara U 4 Opening of drains & grass cutting

Kapchorwa Kapchorwa DLG Kapkwirwok-Kamorok-Bugimo-two U 2 Opening of drains & grass cutting

Kapchorwa Kapchorwa DLG Chema-Burkoyen U 5 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Chema-Ngasire U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Kapchorwa-Kapkwai U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Towei-Chebonet U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG kapteret-Kutung U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Kapteret-tegeres U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Siron-Ngangata U 11 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Kashabul-Mokotu U 2 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG kokwomurya-Kapchesombe U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG kapkwiminy-Teryet U 6 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG kapnyikew-kaplelko U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Ngangata-Kaplelko U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Cheptuya-Kiring U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Feel free-Branch U 4 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Branch-Chekwetet U 5 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Gamogo-Gizuswa U 3 Opening of drains & grass cuttingKapchorwa Kapchorwa DLG Atar-Kamuges U 2 Opening of drains & grass cutting

Kapchorwa DLG Total 92

Kapchorwa Kapchorwa TC Masaba U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC kiwanuka U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Ngokit U 0.2 Opening of drains & grass cutting

275Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kapchorwa Kapchorwa TC kokwomurya-Chebukat U 0.5 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Cheshari U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Cheborion U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Toskin U 0.1 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Musiwa U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Sumotwo Road U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Kokwomurya U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Barawa U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Cave lane U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Bukwo U 0.2 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Down Valley U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Kwengwa U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Kenyatta U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Ruka U 0.3 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Ruka-TULULU U 0.5 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Kaplaton-Kapsinda U 0.5 Opening of drains & grass cuttingKapchorwa Kapchorwa TC Checkweshek U 0.3 Opening of drains & grass cutting

Kapchorwa TC 5.6

Kaseses C.A.Rs Kihoko - Buhathiro - Kyabithon-do road Un paved 15.0 Opening of drains & grass cutting

Kaseses C.A.Rs Kanyatsi - Kisabu road Un paved 15.0 Opening of drains & grass cutting

Kaseses C.A.Rs Repair of Kikoka - Rwesande foot bridge 5.0 Opening of drains & grass cutting

Kaseses C.A.Rs Repair of Kamakoma - Kasambya foot bridge 4.0 Opening of drains & grass cutting

Kaseses C.A.Rs Kyatoka - Kyoho road Un paved 1.0 Opening of drains & grass cuttingKaseses C.A.Rs Kinyamagana - Kaghando road Un paved 10.0 Opening of drains & grass cuttingKaseses C.A.Rs Mughete - Kihungu road Un paved 6.0 Opening of drains & grass cuttingKaseses C.A.Rs Kihungu - Kasebere road Un paved 4.0 Opening of drains & grass cuttingKaseses C.A.Rs Kyarumba - Kasanga road Un paved 10.0 Opening of drains & grass cuttingKaseses C.A.Rs Safaranta - Kamathondi road Un paved 3.0 Opening of drains & grass cuttingKaseses C.A.Rs Busara - Kyamiza road Un paved 5.0 Opening of drains & grass cuttingKaseses C.A.Rs Kahendero - Kyamiza road Un paved 1.0 Opening of drains & grass cuttingKaseses C.A.Rs Kyapa - Rwabihungu road Un paved 6.0 Opening of drains & grass cuttingKaseses C.A.Rs Kahendero - Mithi ibiri road Un paved 15.0 Opening of drains & grass cutting C.A.Rs Total 100Kaseses Kasese DLG Kasanga - Mithimusanju Un paved 4.0 Opening of drains & grass cuttingKaseses Kasese DLG Kitswamba - Kithoma - Ntunga Un paved 5.0 Opening of drains & grass cutting

Kaseses Kasese DLG Rwesande - Kyabarungira - Kirabaho Un paved 2.0 Opening of drains & grass cutting

Kaseses Kasese DLG Rugendabara - Ibuga – Kikongo Un paved 11.0 Opening of drains & grass cuttingKaseses Kasese DLG Mundongo – Nyamighera Un paved 6.0 Opening of drains & grass cuttingKaseses Kasese DLG Katholhu - Kayanzi Un paved 5.0 Opening of drains & grass cuttingKaseses Kasese DLG Munkunyu - Mundongo Un paved 3.0 Opening of drains & grass cutting Kasese DLG Total 36Kaseses Hima TC Kibedi road Unpaved 0.8 Opening of drains & grass cuttingKaseses Hima TC Makasi road Unpaved 1.1 Opening of drains & grass cuttingKaseses Hima TC Mulembia road Unpaved 1.6 Opening of drains & grass cuttingKaseses Hima TC Kisanyarazi road Unpaved 3.4 Opening of drains & grass cuttingKaseses Hima TC Nkoko road Unpaved 1.0 Opening of drains & grass cuttingKaseses Hima TC Victory road Unpaved 1.5 Opening of drains & grass cuttingKaseses Hima TC Hodari road Unpaved 1.0 Opening of drains & grass cuttingKaseses Hima TC Omunyaka road Unpaved 2.0 Opening of drains & grass cuttingKaseses Hima TC Kigere road Unpaved 0.6 Opening of drains & grass cuttingKaseses Hima TC Mubingi road Unpaved 0.4 Opening of drains & grass cuttingKaseses Hima TC Nyamutswa road Unpaved 1.0 Opening of drains & grass cuttingKaseses Hima TC Karungibate road Unpaved 3.0 Opening of drains & grass cuttingKaseses Hima TC Nyamuyonzo road Unpaved 0.8 Opening of drains & grass cutting Hima TC total 18.2Kaseses Katwe Kabatoro TC Kitandara road Unpaved 0.8 Opening of drains & grass cutting

276 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kaseses Katwe Kabatoro TC Kazooba road Unpaved 0.8 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Rwenjubu road Unpaved 0.7 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Kiganda road Unpaved 0.7 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Ibaba road Unpaved 1.0 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Kambatoto road Unpaved 1.1 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Salt lake road Unpaved 8.3 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Hambumbe road Unpaved 2.2 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Kakoni road Unpaved 0.6 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Kakiiza road Unpaved 0.6 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Institute road Unpaved 0.3 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Dispensary road Unpaved 0.1 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Munyanyange road Unpaved 1.5 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Jingo close road Unpaved 0.1 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Kyakitale road Unpaved 2.0 Opening of drains & grass cuttingKaseses Katwe Kabatoro TC Diversion road Unpaved 2.0 Opening Drains & grass cuttingKaseses Katwe Kabatoro TC Nyabwongo close Paved 1.2 Opening Drains & grass cuttingKaseses Katwe Kabatoro TC Factory road Paved 0.6 Opening Drains & grass cutting

Katwe Kabatoro TC Total 24.6

Kaseses Mpondwe-Lhubiri-ha Town Council

Edenique - Kyambogho - Cus-toms road Un paved 6.3 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Bumali - Kikwaso - Isango board-er road Un paved 0.7 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Nyabugando - Kisandu - Nyaka-hya ward road Un paved 1.7 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Pokopoko - Round about - Kasanga road Un paved 1.3 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Pokopoko - Round about - Old bridge road Un paved 0.4 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Bwera alliance SS - Muliwabyo road Un paved 2.3 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council

Pokopoko - Kighando - Bwera Hospital road Un paved 3.5 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council Nyabugando - Kibwe road Un paved 1.5 Opening Drains & grass cutting

Kaseses Mpondwe - Lhubiri-ha Town Council Ivona - Kyanzi - Kisaka road Un paved 2.4 Opening Drains & grass cutting

Total 20.1Kasese Kasese MC Margherita Tarmack 0.40 Opening Drains & grass cuttingKasese Kasese MC Rwenzori Tarmack 1.30 Opening Drains & grass cuttingKasese Kasese MC Mukirane Gravel 0.40 Opening Drains & grass cuttingKasese Kasese MC Speke Tarmack 0.20 Opening Drains & grass cuttingKasese Kasese MC Stanley Tarmack 0.40 Opening Drains & grass cuttingKasese Kasese MC Alexander Tarmack 0.40 Opening Drains & grass cuttingKasese Kasese MC Portal Gravel 0.90 Opening Drains & grass cutting

Kasese Kasese MC Rukidi Tarmac/Gravel 0.90 Opening Drains & grass cutting

Kasese Kasese MC Emin Tarmac 0.10 Opening Drains & grass cuttingKasese Kasese MC Kitalikibi Gravel 0.40 Opening Drains & grass cuttingKasese Kasese MC Third street Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC 2nd street Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC 1st street Gravel 0.40 Opening Drains & grass cuttingKasese Kasese MC Kogere Tarmac 1.20 Opening Drains & grass cuttingKasese Kasese MC Kaisiga Gravel 1.30 Opening Drains & grass cuttingKasese Kasese MC Mugurusi Gravel 0.40 Opening Drains & grass cuttingKasese Kasese MC Korokoro Gravel 0.60 Opening Drains & grass cuttingKasese Kasese MC Byensi Gravel 0.80 Opening Drains & grass cuttingKasese Kasese MC Mbogo Earth 1.50 Opening Drains & grass cuttingKasese Kasese MC Mutanywana Gravel 1.55 Opening Drains & grass cuttingKasese Kasese MC Mbogo rise I & II Earth 0.20 Opening Drains & grass cuttingKasese Kasese MC Kaisiga rises i - iv Earth 0.90 Opening Drains & grass cutting

277Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kasese Kasese MC Habitat Earth 3.44 Opening Drains & grass cuttingKasese Kasese MC Bukonzo Earth 1.50 Opening Drains & grass cuttingKasese Kasese MC Kijongo Earth 0.90 Opening Drains & grass cuttingKasese Kasese MC Kyebambe Earth 3.00 Opening Drains & grass cuttingKasese Kasese MC Buruli Earth 0.70 Opening Drains & grass cuttingKasese Kasese MC Land fill Gravel 0.50 Opening Drains & grass cuttingKasese Kasese MC Matebere Earth 0.40 Opening Drains & grass cuttingKasese Kasese MC Rweisamba Earth 0.30 Opening Drains & grass cuttingKasese Kasese MC Tibamwenda -Kapolyo Earth 1.00 Opening Drains & grass cuttingKasese Kasese MC Taxi park rises Gravel 0.60 Opening Drains & grass cuttingKasese Kasese MC Kyanzuki Earth 1.50 Opening Drains & grass cuttingKasese Kasese MC Rwabwogo Earth 1.00 Opening Drains & grass cuttingKasese Kasese MC Kasese S.S Earth 0.50 Opening Drains & grass cuttingKasese Kasese MC Mulongoti P.S Earth 0.40 Opening Drains & grass cuttingKasese Kasese MC Cathedral Earth 2.00 Opening Drains & grass cuttingKasese Kasese MC Kijongo rise Earth 0.30 Opening Drains & grass cuttingKasese Kasese MC Bukonzo rise I & II Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Portal rise Earth 0.20 Opening Drains & grass cuttingKasese Kasese MC Equator P. School Earth ‘0.30 Opening Drains & grass cuttingKasese Kasese MC Square I & II Tarmac 0.80 Opening Drains & grass cuttingKasese Kasese MC Circular road Gravel 0.90 Opening Drains & grass cuttingKasese Kasese MC Bazarabusa Gravel 0.65 Opening Drains & grass cuttingKasese Kasese MC Binyonyi I Earth 0.90 Opening Drains & grass cuttingKasese Kasese MC Binyonyi II Earth 0.90 Opening Drains & grass cuttingKasese Kasese MC Binyonyi III Earth 1.00 Opening Drains & grass cuttingKasese Kasese MC Binyonyi rise I & II Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Nyamutswa Gravel 1.10 Opening Drains & grass cuttingKasese Kasese MC Golf-Nyakasojo- Kibenge Earth 9.00 Opening Drains & grass cuttingKasese Kasese MC Basania-Kyapa Earth 6.00 Opening Drains & grass cuttingKasese Kasese MC Kamuramba Earth 0.40 Opening Drains & grass cutting

Kasese Kasese MC Kirembe-Rwebitoke- Nyamiran-gara Gravel 3.60 Opening Drains & grass cutting

Kasese Kasese MC Bukonzo close Gravel 0.60 Opening Drains & grass cuttingKasese Kasese MC Base-camp Lower Gravel 1.10 Opening Drains & grass cuttingKasese Kasese MC Mbabu Earth 2.00 Opening Drains & grass cuttingKasese Kasese MC Nyakasanga Gravel 2.60 Opening Drains & grass cuttingKasese Kasese MC Kanyangeya Earth 1.10 Opening Drains & grass cuttingKasese Kasese MC Kamulikwizi I Gravel 1.10 Opening Drains & grass cuttingKasese Kasese MC Saluti Gravel 0.90 Opening Drains & grass cuttingKasese Kasese MC Ssebwe Earth 2.00 Opening Drains & grass cuttingKasese Kasese MC Saad Earth 1.30 Opening Drains & grass cuttingKasese Kasese MC Dr. Henry Bwambale Earth 1.30 Opening Drains & grass cuttingKasese Kasese MC Zebedde Masereka Earth 1.10 Opening Drains & grass cuttingKasese Kasese MC Crescent Gravel 1.00 Opening Drains & grass cuttingKasese Kasese MC Mboghoyabo Gravel 1.50 Opening Drains & grass cuttingKasese Kasese MC Kasese Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Acholi Quarters Gravel 0.50 Opening Drains & grass cuttingKasese Kasese MC Umoja Gravel 1.50 Opening Drains & grass cuttingKasese Kasese MC Market street Earth 0.40 Opening Drains & grass cuttingKasese Kasese MC Saad close Earth 0.30 Opening Drains & grass cuttingKasese Kasese MC Kizungu Gravel 1.00 Opening Drains & grass cuttingKasese Kasese MC Nyakasanga market I & II Gravel 1.10 Opening Drains & grass cuttingKasese Kasese MC Nyamwamba P/S Gravel 0.76 Opening Drains & grass cuttingKasese Kasese MC Kizungu lane Gravel 0.50 Opening Drains & grass cuttingKasese Kasese MC Kamulikwizi II Gravel 0.50 Opening Drains & grass cuttingKasese Kasese MC Saluti rise Gravel 0.80 Opening Drains & grass cuttingKasese Kasese MC Nyakasanga West Gravel 1.20 Opening Drains & grass cuttingKasese Kasese MC Lincon Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Kyondo Earth 2.00 Opening Drains & grass cutting

278 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kasese Kasese MC Main gate Earth 6.00 Opening Drains & grass cuttingKasese Kasese MC Kihara - Misika Earth 8.20 Opening Drains & grass cuttingKasese Kasese MC Majengo Earth 5.00 Opening Drains & grass cuttingKasese Kasese MC Mwaru-Kemihoko Earth 3.00 Opening Drains & grass cuttingKasese Kasese MC Mubuku irrigation scheme Gravel 18.60 Opening Drains & grass cuttingKasese Kasese MC Kigoro/Kabughabugha Earth 3.00 Opening Drains & grass cuttingKasese Kasese MC Kasese District Head Quaters Earth 4.00 Opening Drains & grass cuttingKasese Kasese MC Kisagazi Earth 1.00 Opening Drains & grass cuttingKasese Kasese MC Maliseri Earth 1.60 Opening Drains & grass cuttingKasese Kasese MC Kihika Earth 0.30 Opening Drains & grass cuttingKasese Kasese MC Lincon rise Earth 0.20 Opening Drains & grass cuttingKasese Kasese MC Nyakasanga rise I Earth 0.30 Opening Drains & grass cuttingKasese Kasese MC Nyakasanga rise II Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Mboghoyabo rise Earth 0.60 Opening Drains & grass cuttingKasese Kasese MC Umoja rise Earth 0.60 Opening Drains & grass cutting

Kasese Kasese MC Kilembe Town site Tarmack/Gravel 4.30 Opening Drains & grass cutting

Kasese Kasese MC Namuhuga Gravel 4.00 Opening Drains & grass cuttingKasese Kasese MC Kalingolingo Earth 4.00 Opening Drains & grass cuttingKasese Kasese MC Mark Gowani Earth 3.00 Opening Drains & grass cuttingKasese Kasese MC Katiri Earth 4.00 Opening Drains & grass cuttingKasese Kasese MC Bulembia Earth 2.00 Opening Drains & grass cuttingKasese Kasese MC Kyanjuki Earth 5.00 Opening Drains & grass cuttingKasese Kasese MC Mbunga Earth 5.00 Opening Drains & grass cuttingKasese Kasese MC Buhunga I Earth 3.62 Opening Drains & grass cuttingKasese Kasese MC Buhunga II Earth 1.50 Opening Drains & grass cuttingKasese Kasese MC Kibandama I Earth 4.50 Opening Drains & grass cuttingKasese Kasese MC Kikwata Earth 2.00 Opening Drains & grass cuttingKasese Kasese MC Nyakasojo P. School Earth 3.50 Opening Drains & grass cutting Kasese MC Total 188.92Kayunga Kayunga DLG Kyerima – Nnongo Unpaved 5.1 Opening Drains & grass cuttingKayunga Kayunga DLG Bisaka – Wampologoma Unpaved 11.3 Opening Drains & grass cuttingKayunga Kayunga DLG Kalagala – Maligita Unpaved 5 Opening Drains & grass cuttingKayunga Kayunga DLG Kyampisi – Nakaseeta Unpaved 5 Opening Drains & grass cuttingKayunga Kayunga DLG Gangama – Bukamba Unpaved 11 Opening Drains & grass cuttingKayunga Kayunga DLG Walliga – Seeta Unpaved 6.7 Opening Drains & grass cuttingKayunga Kayunga DLG Busaana - Namirembe – Bisaka Unpaved 10.5 Opening Drains & grass cuttingKayunga Kayunga DLG Kitwe – Lwabyata Unpaved 8.1 Opening Drains & grass cuttingKayunga Kayunga DLG Kikwanya – Nalwewungula Unpaved 8 Opening Drains & grass cuttingKayunga Kayunga DLG Bukeeka - Soona – Kitabazi Unpaved 8 Opening Drains & grass cuttingKayunga Kayunga DLG Nakyesa – Ntenjeru Unpaved 8.4 Opening Drains & grass cuttingKayunga Kayunga DLG Butalabuna – Balisanga Unpaved 10.2 Opening Drains & grass cutting

Kayunga Kayunga DLG Kitimbwa – Namavundu – Nyondo Unpaved 13.1 Opening Drains & grass cutting

Kayunga Kayunga DLG Kanjuki – Kyanya Unpaved 11.5 Opening Drains & grass cuttingKayunga Kayunga DLG Kanjuki – Busaale – Nnongo Unpaved 11.3 Opening Drains & grass cuttingKayunga Kayunga DLG Kiyange – Misanga Unpaved 8 Opening Drains & grass cuttingKayunga Kayunga DLG Kayonza – Namatongonya Unpaved 9.2 Opening Drains & grass cuttingKayunga Kayunga DLG Kiwangula - Buguvu – Nakatooke Unpaved 12 Opening Drains & grass cutting

Kayunga Kayunga DLG Kangulumira – Wabirongo – Mayaga Unpaved 14.6 Opening Drains & grass cutting

Kayunga Kayunga DLG Kaazi – Bunyumya – Nsotooka – Namulanda Unpaved 12.5 Opening Drains & grass cutting

Kayunga Kayunga DLG Kayonza – Kawolokota – Namizo – Nyondo Unpaved 18.6 Opening Drains & grass cutting

Kayunga Kayunga DLG Kalagala – Nakirubi – Namakad-wa Unpaved 7.8 Opening Drains & grass cutting

Kayunga Kayunga DLG Kyerima – Nakaseeta – Lukonda Unpaved 11 Opening Drains & grass cuttingKayunga Kayunga DLG Lugasa – Bugonya Unpaved 12.2 Opening Drains & grass cuttingKayunga Kayunga DLG Kalagala – Kangulumira Unpaved 5 Opening Drains & grass cutting

279Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kayunga Kayunga DLG Galiraya – Nakatuli – Bbaale Unpaved 34.5 Opening Drains & grass cuttingKayunga Kayunga DLG Kisoga – Kikwanya Unpaved 7.8 Opening Drains & grass cuttingKayunga Kayunga DLG Bubajwe – Bukujju – Kanjuki Unpaved 11 Opening Drains & grass cuttingKayunga Kayunga DLG Busungire – Namalere – Lukunyu Unpaved 8.8 Opening Drains & grass cuttingKayunga Kayunga DLG Kasokwe - Gwero Unpaved 6 Opening Drains & grass cutting Kayunga DLG Total 312.2Kayunga Kayunga TC Abattoir Rd unpaved 0.5 Opening Drains & grass cuttingKayunga Kayunga TC Advent Road unpaved 0.6 Opening Drains & grass cuttingKayunga Kayunga TC Asoni Kaggwa Rd unpaved 0.5 Opening Drains & grass cuttingKayunga Kayunga TC Church road paved 0.6 Opening Drains & grass cuttingKayunga Kayunga TC Gayo Kaggwa Rd unpaved 0.6 Opening Drains & grass cuttingKayunga Kayunga TC Health Centre Rd unpaved 1.1 Opening Drains & grass cuttingKayunga Kayunga TC Hospital Lane unpaved 0.2 Opening Drains & grass cuttingKayunga Kayunga TC Kalibbala Lane unpaved 0.47 Opening Drains & grass cuttingKayunga Kayunga TC Kalya Road unpaved 0.9 Opening Drains & grass cuttingKayunga Kayunga TC Kawuuzi Rd unpaved 0.2 Opening Drains & grass cuttingKayunga Kayunga TC Kibira road unpaved 1.5 Opening Drains & grass cuttingKayunga Kayunga TC Kisaaba Road unpaved 1.2 Opening Drains & grass cuttingKayunga Kayunga TC Kisawo road unpaved 1.5 Opening Drains & grass cuttingKayunga Kayunga TC Kisombwa road unpaved 1.2 Opening Drains & grass cuttingKayunga Kayunga TC Kyambogo Luzira Rd unpaved 1 Opening Drains & grass cuttingKayunga Kayunga TC Kyambogo Main Rd unpaved 2 Opening Drains & grass cuttingKayunga Kayunga TC Lufula Rd unpaved 2 Opening Drains & grass cuttingKayunga Kayunga TC Market Road unpaved 0.18 Opening Drains & grass cuttingKayunga Kayunga TC Mission Road unpaved 0.6 Opening Drains & grass cuttingKayunga Kayunga TC Mubisi Road unpaved 0.4 Opening Drains & grass cuttingKayunga Kayunga TC Mumyuka Rd unpaved 0.5 Opening Drains & grass cuttingKayunga Kayunga TC Nakaliro-St. Regina Rd unpaved 0.9 Opening Drains & grass cuttingKayunga Kayunga TC Nakaliro Main unpaved 0.9 Opening Drains & grass cuttingKayunga Kayunga TC Sajjabi Rd unpaved 0.9 Opening Drains & grass cuttingKayunga Kayunga TC Nsibirwa Road unpaved 0.4 Opening Drains & grass cuttingKayunga Kayunga TC Rev.Fr.Mayr road unpaved 0.82 Opening Drains & grass cuttingKayunga Kayunga TC Tente Rd unpaved 3.5 Opening Drains & grass cuttingKayunga Kayunga TC Wannyanga Rd unpaved 2.8 Opening Drains & grass cutting Kayunga TC Total 27.97Kayunga Kayunga CARs 4.5 Opening Drains & grass cuttingKayunga Kayunga CARs Sobya - Kirasa road Unpaved 3 Opening Drains & grass cuttingKayunga Kayunga CARs Kawongo -Kalenge road Unpaved 2 Opening Drains & grass cuttingKayunga Kayunga CARs Kawongo - Kitwe road Unpaved 6.9 Opening Drains & grass cuttingKayunga Kayunga CARs Tangoye - Kanyogoga – Jiira Unpaved 5.4 Opening Drains & grass cuttingKayunga Kayunga CARs Badaali – Nsuube Unpaved 3.2 Opening Drains & grass cuttingKayunga Kayunga CARs Wabirumba – Namirembe Unpaved 3.9 Opening Drains & grass cuttingKayunga Kayunga CARs Nsuube – Wabirongo Unpaved 4.6 Opening Drains & grass cuttingKayunga Kayunga CARs Nateta – Kisoga Unpaved 5 Opening Drains & grass cuttingKayunga Kayunga CARs Nazigo- Kiremezi- Wabirongo Unpaved 3.5 Opening Drains & grass cuttingKayunga Kayunga CARs Kirindi- Kisega – Kiwuula Unpaved 3.5 Opening Drains & grass cuttingKayunga Kayunga CARs Katikanyonyi – Kireku Unpaved 3.7 Opening Drains & grass cuttingKayunga Kayunga CARs Kabagambe – Budoda Unpaved 9.8 Opening Drains & grass cuttingKayunga Kayunga CARs Nazigo - Gombolola- Bukamba Unpaved 3 Opening Drains & grass cuttingKayunga Kayunga CARs Kyetume – Kimanya Unpaved 4.5 Opening Drains & grass cuttingKayunga Kayunga CARs Kigobero - Kikonyongo Unpaved 7.2 Opening Drains & grass cutting

Kayunga Kayunga CARs Kyampisi - Kigombero- magala – Kotwe Unpaved 4.8 Opening Drains & grass cutting

Kayunga CARs Total 78.5Kibaale Kagadi T/C Kiyaga Road U 2 Opening Drains & grass cuttingKibaale Kagadi T/C Bishop Kihangire U 0.5 Opening Drains & grass cuttingKibaale Kagadi T/C Kabalega Road U 1.6 Opening Drains & grass cuttingKibaale Kagadi T/C Bishop Rwakaikara Road U 0.4 Opening Drains & grass cuttingKibaale Kagadi T/C URDT Road U 1.3 Opening Drains & grass cutting

280 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kibaale Kagadi T/C Kazairwe Road U 0.5 Opening Drains & grass cuttingKibaale Kagadi T/C Kagadi Street U 0.5 Opening Drains & grass cuttingKibaale Kagadi T/C Buyaga Street U 0.4 Opening Drains & grass cuttingKibaale Kagadi T/C Kagadi Market Street U 0.7 Opening Drains & grass cuttingKibaale Kagadi T/C Iguru Street U 0.9 Opening Drains & grass cuttingKibaale Kagadi T/C Kagadi Kiryabyenju Road U 4 Opening Drains & grass cuttingKibaale Kagadi T/C Mambugu Road U 3.5 Opening Drains & grass cuttingKibaale Kagadi T/C Kiryane Kyarucakaca U 1.7 Opening Drains & grass cuttingKibaale Kagadi T/C Ikumu Mambugu U 2 Opening Drains & grass cutting Kagadi T/C Total 20Kibaale Muhooro T/C Kasoro U 1.0 Opening Drains & grass cuttingKibaale Muhooro T/C Bujwera road U 1.5 Opening Drains & grass cuttingKibaale Muhooro T/C Mulindwa U 0.8 Opening Drains & grass cuttingKibaale Muhooro T/C Kihika U 1.1 Opening Drains & grass cuttingKibaale Muhooro T/C Kasaija U 0.8 Opening Drains & grass cuttingKibaale Muhooro T/C Buyaga s.s U 1.0 Opening Drains & grass cuttingKibaale Muhooro T/C Nyamanga U 0.5 Opening Drains & grass cuttingKibaale Muhooro T/C Kyakajwiga U 1.3 Opening Drains & grass cuttingKibaale Muhooro T/C Mirima U 1.5 Opening Drains & grass cuttingKibaale Muhooro T/C Kitooga U 2.0 Opening Drains & grass cuttingKibaale Muhooro T/C Kapyemi road U 1.5 Opening Drains & grass cuttingKibaale Muhooro T/C Kyema road U 0.7 Opening Drains & grass cuttingKibaale Muhooro T/C Kyanyamunyu U 2.5 Opening Drains & grass cuttingKibaale Muhooro T/C Kitooga U 1.6 Opening Drains & grass cuttingKibaale Muhooro T/C Butale road U 2.6 Opening Drains & grass cuttingKibaale Muhooro T/C Tibaita road U 1.0 Opening Drains & grass cuttingKibaale Muhooro T/C Kyamajaka road U 2.3 Opening Drains & grass cuttingKibaale Muhooro T/C Kasagate - Kiryabyenju U 2.4 Opening Drains & grass cuttingKibaale Muhooro T/C Nyanzige road U 3.7 Opening Drains & grass cuttingKibaale Muhooro T/C Kyarusa road U 2.5 Opening Drains & grass cuttingKibaale Muhooro T/C Kyamurodo road U 2.5 Opening Drains & grass cuttingKibaale Muhooro T/C Yoweri road U 3.4 Opening Drains & grass cutting Kakumiro T/C Total 38.2

Kibaale Kibaale DLG Ngangi - Nyamarwa - Mubende boarder U 25.0 Opening Drains & grass cutting

Kibaale Kibaale DLG Mugalike-Kyanaisoke U 8.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kihumuro-Mazooba U 15.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kiranzi-Katandura-Nguse U 24.0 Opening Drains & grass cuttingKibaale Kibaale DLG Mabaale Kyamasega U 15.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kakindo-Nguse U 7.6 Opening Drains & grass cuttingKibaale Kibaale DLG Munsa-Nkondo U 6.5 Opening Drains & grass cuttingKibaale Kibaale DLG Kakihimbara-Muliika-Nyamarwa U 10.5 Opening Drains & grass cuttingKibaale Kibaale DLG Kyebando-Mugarama U 14.5 Opening Drains & grass cutting

Kibaale Kibaale DLG Kiryane-Ruteete-Kurukuru-Bwi-kara U 22.7 Opening Drains & grass cutting

Kibaale Kibaale DLG Naigana-Kyenzige U 9.0 Opening Drains & grass cuttingKibaale Kibaale DLG Bagunywana-Bukuumi U 3.8 Opening Drains & grass cuttingKibaale Kibaale DLG Kiweza-Kigando-Kakindo U 22.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kyabasaija-Mubende boarder U 7.0 Opening Drains & grass cuttingKibaale Kibaale DLG Rubaya-Kikoma U 10.9 Opening Drains & grass cuttingKibaale Kibaale DLG Bukonda-Bubango-Rweega U 10.5 Opening Drains & grass cuttingKibaale Kibaale DLG Karuguuza-Bubango U 7.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kisuura-Kamagali U 14.5 Opening Drains & grass cuttingKibaale Kibaale DLG Kakindo-Kasenyi U 10.0 Opening Drains & grass cuttingKibaale Kibaale DLG Mwitanzige-Kisiita U 18.4 Opening Drains & grass cuttingKibaale Kibaale DLG Nyaburungi-Kyengabi U 8.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kisiita-Katikara U 15.9 Opening Drains & grass cuttingKibaale Kibaale DLG Kituuma-Imara-Kasimbi U 14.5 Opening Drains & grass cuttingKibaale Kibaale DLG Karama-Kitutu-Katebe U 10.0 Opening Drains & grass cutting

281Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kibaale Kibaale DLG Muhorro-Nyamacumu U 16.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kyabasaale - Mugalike U 7.0 Opening Drains & grass cutting

Kibaale Kibaale DLG Kyamujundo-Isun-ga-Kamusenene U 14.0 Opening Drains & grass cutting

Kibaale Kibaale DLG Kisalizi-Birembo U 11.6 Opening Drains & grass cuttingKibaale Kibaale DLG Kinunda-Buruuko-Irindimura U 18.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kateete-Bujogoro U 17.0 Opening Drains & grass cutting

Kibaale Kibaale DLG Kasambya-Kyerimira-Kabukuru-ra U 0.01 Opening Drains & grass cutting

Kibaale Kibaale DLG Kitemuzi-Kyadyoko U 7.0 Opening Drains & grass cuttingKibaale Kibaale DLG Kyeya-Mutunguru-Kinyarugonjo U 6.0 Opening Drains & grass cuttingKibaale Kibaale DLG Nalweyo-Kijwenge-Kiryamasasa U 0.01 Opening Drains & grass cuttingKibaale Kibaale DLG Diida-Kihuura-Hatano U 0.01 Opening Drains & grass cutting

Kibaale Kibaale DLG Kibeedi-Kayembe-Kitonezi-Ki-bogo-Kiguhyo U 9.7 Opening Drains & grass cutting

Kibaale Kibaale DLG Kayembe-Kicumazi-Kyanyi-Ka-balira U 10.4 Opening Drains & grass cutting

Kibaale Kibaale DLGKyadyoko P/S-Kiman-ya-Kasoga-Ruzaire-Hamigo-go-Kabamba

U 0.01 Opening Drains & grass cutting

Kibaale Kibaale DLG Rukayanga-Kihemba U 0.01 Opening Drains & grass cutting

Kibaale Kibaale DLG Nyabirungi-Mpasaana via Nyam-irama U 18.0 Opening Drains & grass cutting

Kibaale Kibaale DLGKamanya-Rwengo-Kijege-re-Kamugabo-Kasozi T/C-Katol-erwa-Kanala COU

U 0.01 Opening Drains & grass cutting

Kibaale Kibaale DLG Kiryamasasa-Kakiseke-Mwitan-zige U 14.0 Opening Drains & grass cutting

Kibaale Kibaale DLG Kyakatwanga-Kitengeto-Kak-waku U 20.6 Opening Drains & grass cutting

Kibaale Kibaale DLG Kobushera-Rwensenene-Rugara-ma-Nyakatojjo-Mpeefu U 16.0 Opening Drains & grass cutting

Kibaale DLG Total 495.7Kibaale Kibaale T/C Byontabala Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Kirangwa U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Kiduuli Road U 1.0 Opening Drains & grass cuttingKibaale Kibaale T/C Rukindo Road U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Busaana Stadium Road U 0.4 Opening Drains & grass cuttingKibaale Kibaale T/C Kikangahara Road U 0.1 Opening Drains & grass cuttingKibaale Kibaale T/C Kibaale Hotel Road U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Kibaale Market Street U 1.6 Opening Drains & grass cuttingKibaale Kibaale T/C Kyairungu Road U 0.7 Opening Drains & grass cuttingKibaale Kibaale T/C Kimbombo U 2.2 Opening Drains & grass cuttingKibaale Kibaale T/C Ruhara Road U 0.6 Opening Drains & grass cuttingKibaale Kibaale T/C Ruguuza Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Rugondora Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Karuguuza Park Street U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Ntogota Road U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Kiziizi Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Kirembo Road U 1.0 Opening Drains & grass cuttingKibaale Kibaale T/C Katerere – Kikonge U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Bujuni Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Kaliisa Road U 0.4 Opening Drains & grass cuttingKibaale Kibaale T/C Kabuye Road U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Nkurugusi Road U 0.2 Opening Drains & grass cuttingKibaale Kibaale T/C Karuguuza market Road U 1.0 Opening Drains & grass cuttingKibaale Kibaale T/C Karuguuza industrial road U 1.8 Opening Drains & grass cuttingKibaale Kibaale T/C Katerere-st olivia U 0.3 Opening Drains & grass cuttingKibaale Kibaale T/C Kineka road U 1.4 Opening Drains & grass cuttingKibaale Kibaale T/C Gahiaine U 0.4 Opening Drains & grass cuttingKibaale Kibaale T/C Alpha Omega Road U 2.0 Opening Drains & grass cutting Kibaale T/C Total U 18.1

282 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Ntoroko Ntoroko DLG Itojo-Karambi-Rwamabale Gravel 13.5 Opening Drains & grass cuttingNtoroko Ntoroko DLG Nombe – Wanka Earth 10.0 Opening Drains & grass cuttingNtoroko Ntoroko DLG Kanara - Kachwankumu-Ntoroko Earth 15.0 Opening Drains & grass cutting

Ntoroko Ntoroko DLG Nyabikungu - Kyamutema – Kyondo Gravel 8.0 Opening Drains & grass cutting

Ntoroko Ntoroko DLG Kachwamba - Itale – Murambe Gravel 11.0 Opening Drains & grass cutting Ntoroko DLG Total 57.5Ntoroko Kanara TC Ntoroko South road ((stage) earth 0.5 Opening Drains & grass cuttingNtoroko Kanara TC Kanara - Ntoroko (Karugutu) earth 8.5 Opening Drains & grass cuttingNtoroko Kanara TC Mutooro (abala) road earth 0.6 Opening Drains & grass cuttingNtoroko Kanara TC Transami road earth 0.7 Opening Drains & grass cuttingNtoroko Kanara TC Church of Uganda earth 0.3 Opening Drains & grass cuttingNtoroko Kanara TC Byamugisa earth 0.8 Opening Drains & grass cuttingNtoroko Kanara TC Ajeni earth 0.8 Opening Drains & grass cuttingNtoroko Kanara TC Rwenyange T.C earth 1.3 Opening Drains & grass cuttingNtoroko Kanara TC MSL ROAD earth 0.5 Opening Drains & grass cutting Kanara TC Total 14.0Ntoroko Karugutu TC Simba Street Earth 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Kabasindagizi – Kelezia Earth 2.0 Opening Drains & grass cuttingNtoroko Karugutu TC Town council street Earth 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Kisenyi street Earth 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Nyabikungu street Earth 2.0 Opening Drains & grass cuttingNtoroko Karugutu TC Kachwamba – Wasa Gravel 2.0 Opening Drains & grass cuttingNtoroko Karugutu TC Nyabuhuru Earth 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Mukirania Earth 2.0 Opening Drains & grass cuttingNtoroko Karugutu TC Kasaka Earth 1.0 Opening Drains & grass cutting

Ntoroko Karugutu TC Kachwamba Kyabanda-ra-Wasawanaba Gravel 1.0 Opening Drains & grass cutting

Ntoroko Karugutu TC George -Byereta-Kabasindagizi Earth 2.5 Opening Drains & grass cuttingNtoroko Karugutu TC Kyalimpa-Lawerence- Gravel 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Rwaheru-Katalenga Earth 1.0 Opening Drains & grass cuttingNtoroko Karugutu TC Ndahura Earth 0.4 Opening Drains & grass cuttingNtoroko Karugutu TC Joseph Ndora –Lida Earth 0.5 Opening Drains & grass cuttingNtoroko Karugutu TC Asaba- Kule Earth 0.4 Opening Drains & grass cuttingNtoroko Karugutu TC Ndahura- Moses Bazarra Earth 1.5 Opening Drains & grass cutting

Ntoroko Karugutu TC Karugutu Market-Town Council Mosque Gravel 0.6 Opening Drains & grass cutting

Karugutu TC Total 21.9Ntoroko Rwebisengo TC Hakitoma Street Earth 1.0 Opening Drains & grass cuttingNtoroko Rwebisengo TC Ngabi street Earth 2.0 Opening Drains & grass cuttingNtoroko Rwebisengo TC Bweramule street Earth 1.0 Opening Drains & grass cuttingNtoroko Rwebisengo TC Rwebisengo – Majumba Earth 1.0 Opening Drains & grass cuttingNtoroko Rwebisengo TC Rwebisengo – Kasungu Earth 1.0 Opening Drains & grass cutting TC Total 6.0Ntoroko Kibuuku T/C Kibuuku centre – Kisozi earth 2.5 Opening Drains & grass cuttingNtoroko Kibuuku T/C kibuuku-kisungu earth 1.5 Opening Drains & grass cuttingNtoroko Kibuuku T/C kibuuku t.c –kakoga earth 2.0 Opening Drains & grass cutting KibuukuT/C Total 6.0Ntoroko Ntoroko CARs Rwebisengo – Kiranga Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Kanara – Kajweka Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Katanga-Kamuga Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Katanga-Rwangara Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Umoja P. S- rwangara Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Itojo – Nyambiga Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Itojo-Kakindo Earth 1.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Busairo-Katwakare Earth 2 Opening Drains & grass cuttingNtoroko Ntoroko CARs Zakaria-Bahwere Earth 2.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Nyakatooke Psch road Earth 0.5 Opening Drains & grass cuttingNtoroko Ntoroko CARs Musandama P/s Earth 0.5 Opening Drains & grass cutting

283Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Ntoroko Ntoroko CARs Kyabukunguru –Masaka Earth 2.0 Opening Drains & grass cuttingNtoroko Ntoroko CARs Rwebisengo – Bweramule Earth 2.5 Opening Drains & grass cutting Ntoroko CARs Total 16.5Ntungamo Ntungamo DLG Nyarutuntu-Nyakyera U/P 3.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Butare-Buraro U/P 4.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Itojo-Kyabajwa U/P 2.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Nyakyera-Kitwe U/P 1.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Rwoho-Kihanga-Kabobo U/P 4.0 Opening Drains & grass cutting

Ntungamo Ntungamo DLG Kagarama-Rukarango-Rwama-bondo U/P 2.0 Opening Drains & grass cutting

Ntungamo Ntungamo DLG Rwamabondo-Nyakazinga U/P 1.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Nyamunuka-Rwitanzi U/P 4.0 Opening Drains & grass cuttingNtungamo Ntungamo DLG Nombe-Rwebogo-Nkongoro U/P 3.0 Opening Drains & grass cutting

Ntungamo Ntungamo DLG Rwamanyonyi-Kijubwe-Ka-basheshe U/P 2.5 Opening Drains & grass cutting

Ntungamo Ntungamo DLG Rubanga-Kizinga U/P 4.6 Opening Drains & grass cuttingNtungamo Ntungamo DLG Rugarama-Kyafoora U/P 3.5 Opening Drains & grass cutting

Ntungamo DLG Total 34.6

Ntungamo Ntungamo MC Victor Bwana U 0.5 Opening Drains & grass cuttingNtungamo Ntungamo MC Singahacye U 0.41 Opening Drains & grass cuttingNtungamo Ntungamo MC Karazarwe U 0.5 Opening Drains & grass cuttingNtungamo Ntungamo MC Tindibakira U 2 Opening Drains & grass cuttingNtungamo Ntungamo MC Bigyega-Karibwa U 2 Opening Drains & grass cuttingNtungamo Ntungamo MC Kanuma U 3 Opening Drains & grass cuttingNtungamo Ntungamo MC Kajinya U 1.5 Opening Drains & grass cuttingNtungamo Ntungamo MC Kaguta-Muhangi U 1.9 Opening Drains & grass cutting

11.81Nwoya Nwoya DLG Goma - Wilacic Gravel 10 Opening Drains & grass cuttingNwoya Nwoya DLG Alero - Aswa - Amuru Gravel 19.3 Opening Drains & grass cuttingNwoya Nwoya DLG Purongo - Lagazi Gravel 6.5 Opening Drains & grass cuttingNwoya Nwoya DLG Kalang - Langol Gravel 18.5 Opening Drains & grass cuttingNwoya Nwoya DLG Goma - Lii - Pajok II Gravel 36 Opening Drains & grass cuttingNwoya Nwoya DLG Anaka TC - Amuru TC Gravel 29 Opening Drains & grass cuttingNwoya Nwoya DLG Wii Anaka - Aswa - Amuru TC Gravel 50.5 Opening Drains & grass cuttingNwoya Nwoya DLG Alero - Amar Gravel 17.4 Opening Drains & grass cuttingNwoya Nwoya DLG Konalutuk - Agung Gravel 15 Opening Drains & grass cuttingNwoya Nwoya DLG Amar - Konalutuk Gravel 17 Opening Drains & grass cuttingNwoya Nwoya DLG Goma - Konalutuk Gravel 15 Opening Drains & grass cutting Nyowa DLG Total 234.2Katakwi Katakwi DLG Ktatkwi-Toroma U 20 Opening Drains & grass cuttingKatakwi Katakwi DLG Getom-Toroma U 12 Opening Drains & grass cuttingKatakwi Katakwi DLG Aleles-Omodoi-Adere U 18 Opening Drains & grass cuttingKatakwi Katakwi DLG Toroma-Kokorio U 12 Opening Drains & grass cuttingKatakwi Katakwi DLG Toroma-Akurao U 12 Opening Drains & grass cuttingKatakwi Katakwi DLG Omodoi-Ngariam U 20 Opening Drains & grass cuttingKatakwi Katakwi DLG Odoot-Olupe-Oriau U 20 Opening Drains & grass cuttingKatakwi Katakwi DLG Odoot-Ngariam U 12 Opening Drains & grass cuttingKatakwi Katakwi DLG Ngariam-Palaam-Iising U 15 Opening Drains & grass cuttingKatakwi Katakwi DLG Magoro-Opeta U 10 Opening Drains & grass cuttingKatakwi Katakwi DLG Magoro-bisina U 10 Opening Drains & grass cuttingKatakwi Katakwi DLG magoro-Angisa U 15 Opening Drains & grass cuttingKatakwi Katakwi DLG Aketa-Adacar U 13 Opening Drains & grass cuttingKatakwi Katakwi DLG Adacar-Arengecora U 16 Opening Drains & grass cuttingKatakwi Katakwi DLG Usuik-Ongongoja U 30 Opening Drains & grass cuttingKatakwi Katakwi DLG Ongongoja-Obwobwo U 6 Opening Drains & grass cuttingKatakwi Katakwi DLG Kapujan-Kokorio U 5 Opening Drains & grass cuttingKatakwi Katakwi DLG Ocorimongin-Omodoi U 16 Opening Drains & grass cutting

Katakwi DLG Total 262

284 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Katakwi Katakwi TC Amuge Rd U 0.85 Opening Drains & grass cuttingKatakwi Katakwi TC Omeke Rd U 0.9 Opening Drains & grass cuttingKatakwi Katakwi TC oyukei Rd U 0.75 Opening Drains & grass cuttingKatakwi Katakwi TC Father Collins U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC ekongot Rd U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC Engole lane U 0.65 Opening Drains & grass cuttingKatakwi Katakwi TC Chemusait Rd U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Police Rd U 0.6 Opening Drains & grass cuttingKatakwi Katakwi TC Ogeatum Rd U 0.5 Opening Drains & grass cuttingKatakwi Katakwi TC Amaitum Road U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC Amaitum Road U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC Road 95 U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC Bidandi Ssali road U 0.4 Opening Drains & grass cuttingKatakwi Katakwi TC Odongo J.J U 0.5 Opening Drains & grass cuttingKatakwi Katakwi TC Sr.Camella U 0.6 Opening Drains & grass cuttingKatakwi Katakwi TC Kania Obiga Rd U 0.1 Opening Drains & grass cuttingKatakwi Katakwi TC Corner Shop Lane U 0.1 Opening Drains & grass cuttingKatakwi Katakwi TC Bidandi-Odongo JJ Lane U 0.1 Opening Drains & grass cuttingKatakwi Katakwi TC St.Stephen Rd U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Ilemukorit Road U 0.25 Opening Drains & grass cuttingKatakwi Katakwi TC Road 11 U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Road 13 U 0.2 Opening Drains & grass cuttingKatakwi Katakwi TC Abbatwa Road U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Road 77 U 0.5 Opening Drains & grass cuttingKatakwi Katakwi TC Road 12 U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Apeleun Road U 0.3 Opening Drains & grass cuttingKatakwi Katakwi TC Yusuf-Oselle Rd U 0.6 Opening Drains & grass cuttingKatakwi Katakwi TC Township Rd U 0.6 Opening Drains & grass cuttingKatakwi Katakwi TC St.Paul Rd U 0.4 Opening Drains & grass cutting

Katakwi TC Total 12.4Katakwi Katakwi CARS Moru B-Ajesai U 4 Opening Drains & grass cuttingKatakwi Katakwi CARS Town council-Osudan U 7 Opening Drains & grass cuttingKatakwi Katakwi CARS Ocorimongin-Apoolin U 3 Opening Drains & grass cuttingKatakwi Katakwi CARS Usuk-Orungo Corner U 15 Opening Drains & grass cuttingKatakwi Katakwi CARS Aparisa-Aboloi U 4 Opening Drains & grass cuttingKatakwi Katakwi CARS Toroma-L.View U 8 Opening Drains & grass cuttingKatakwi Katakwi CARS Magoro-Osudio U 7 Opening Drains & grass cuttingKatakwi Katakwi CARS Olupe-Apeeru Odoot U 7 Opening Drains & grass cuttingKatakwi Katakwi CARS Ocwiin-Akisim U 7 Opening Drains & grass cuttingKatakwi Katakwi CARS Ocwiin-Akore U 16 Opening Drains & grass cutting

Katakwi CARS Total 78Kiboga Bukomero TC Kasokolindo – Lukuga U 12.8 Opening Drains & grass cuttingKiboga Bukomero TC Nabinene – Kakunyu U 6.0 Opening Drains & grass cuttingKiboga Bukomero TC Kateera - Rev. Kaseruzi U 12.0 Opening Drains & grass cuttingKiboga Bukomero TC Kalagala Church – Kalema U 6.0 Opening Drains & grass cuttingKiboga Bukomero TC Kalagala - Busaasa U 4.2 Opening Drains & grass cuttingKiboga Bukomero TC Bukomero Central U 1.0 Opening Drains & grass cuttingKiboga Bukomero TC Tibajjanga Road U 5.4 Opening Drains & grass cuttingKiboga Bukomero TC Kateera – Busaasa U 1.0 Opening Drains & grass cutting Bukomero TC Total 48.4Kiboga Kiboga DLG Bakijulula-Bugabo-Luti U 13.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kiboga – Kayera U 31.0 Opening Drains & grass cuttingKiboga Kiboga DLG Lunnya – Nsala U 8.0 Opening Drains & grass cuttingKiboga Kiboga DLG Jokero-Nakasozi-Kibulala U 30.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kirinda - Kagobe – Kiyuni U 12.5 Opening Drains & grass cuttingKiboga Kiboga DLG Kambugu - Lwamata U 30.0 Opening Drains & grass cuttingKiboga Kiboga DLG Lwamata-Kigatansi U 27.6 Opening Drains & grass cuttingKiboga Kiboga DLG Kajjere-Kizinga-Kisweeka U 44.0 Opening Drains & grass cuttingKiboga Kiboga DLG Dwaniro-Muynje-Masiliba U 8.5 Opening Drains & grass cutting

285Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kiboga Kiboga DLG Bukomero-Sogolero U 8.5 Opening Drains & grass cuttingKiboga Kiboga DLG Mpangala-Kabamba U 6.5 Opening Drains & grass cuttingKiboga Kiboga DLG Kapeke – Naluvule U 24.0 Opening Drains & grass cuttingKiboga Kiboga DLG Nabwendo-Kakibwa U 17.0 Opening Drains & grass cutting

Kiboga Kiboga DLG Kikuubo-Kyanamuyonjo -Kan-ziira U 10.0 Opening Drains & grass cutting

Kiboga Kiboga DLG Mataagi - Luti - Wabikunyu Ring Roads U 20.0 Opening Drains & grass cutting

Kiboga DLG Total 290.6Kiboga Kiboga TC Kateera - Rev. Kaseruzi U 3.0 Opening Drains & grass cuttingKiboga Kiboga TC Nabinene - Kakunyu U 2.1 Opening Drains & grass cuttingKiboga Kiboga TC Bukomero Central U 0.5 Opening Drains & grass cuttingKiboga Kiboga TC Namaganda Road U 1.5 Opening Drains & grass cuttingKiboga Kiboga TC Kasokolindo - Temanekali U 0.8 Opening Drains & grass cuttingKiboga Kiboga TC Tebajanga Road U 1.8 Opening Drains & grass cuttingKiboga Kiboga TC Kalagala Church - Kalema U 2.0 Opening Drains & grass cuttingKiboga Kiboga TC Kalagala - Busaasa U 2.2 Opening Drains & grass cuttingKiboga Kiboga TC Kateera - Busaasa U 1.0 Opening Drains & grass cuttingKiboga Kiboga TC Nakaziba - Mukati - Sogolero U 4.0 Opening Drains & grass cuttingKiboga Kiboga TC Kasokolindo - Lukugga U 3.0 Opening Drains & grass cuttingKiboga Kiboga TC Nalwanga Road U 1.2 Opening Drains & grass cuttingKiboga Kiboga TC Kyamanyooli - Busaanyi U 2.9 Opening Drains & grass cutting Kiboga TC Total 26Kiboga Kiboga DLG Kiboga - Kayera U 5.0 Opening Drains & grass cuttingKiboga Kiboga DLG Lunnya - Nsala U 10.0 Opening Drains & grass cuttingKiboga Kiboga DLG Jokero-Nakasozi-Kibulala U 15.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kirinda - Kagobe - Kiyuni U 6.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kambugu - Lwamata U 20.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kajjere-Kizinga-Kisweeka U 12.0 Opening Drains & grass cuttingKiboga Kiboga DLG Dwaniro-Muyenje-Masiliba U 5.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kajjere - Seeta U 4.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kalokola - Bulyankuyege U 6.0 Opening Drains & grass cuttingKiboga Kiboga DLG Bukomero-Sogolero U 8.5 Opening Drains & grass cuttingKiboga Kiboga DLG Mpangala-Kabamba U 0.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kapeke - Naluvule U 6.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kajjere - Nakasagazi - Mulagi U 5.0 Opening Drains & grass cuttingKiboga Kiboga DLG Nabwendo-Kakibwa U 12.6 Opening Drains & grass cuttingKiboga Kiboga DLG Kitankula-Kitembeyi-Kokowe U 9.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kambugu - Degeya U 8.5 Opening Drains & grass cuttingKiboga Kiboga DLG Kati - Ndiraweru U 5.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kikuubo-Kyanamuyonjo U 14.0 Opening Drains & grass cuttingKiboga Kiboga DLG Matagi - Luti Ringroads U 15.0 Opening Drains & grass cuttingKiboga Kiboga DLG Bikoobobwo -Nsal A- Tondo U 5.0 Opening Drains & grass cuttingKiboga Kiboga DLG Nabisoga - Kiwanda - Buyira U 6.7 Opening Drains & grass cuttingKiboga Kiboga DLG Kaapa - Kagogo Hill - Kalagala U 0.0 Opening Drains & grass cuttingKiboga Kiboga DLG Bulyankuyege - Kibisi U 8.5 Opening Drains & grass cuttingKiboga Kiboga DLG Lwamata - Kigatansi U 2.0 Opening Drains & grass cuttingKiboga Kiboga DLG Kiboga - Kayera U 5.0 Opening Drains & grass cutting Sub- Total Total 193.8Kiboga Kiboga TC Second Street U 1.9 Opening Drains & grass cuttingKiboga Kiboga TC Third Street U 2.3 Opening Drains & grass cuttingKiboga Kiboga TC Muteesa II U 0.7 Opening Drains & grass cuttingKiboga Kiboga TC Noah Road U 1.6 Opening Drains & grass cuttingKiboga Kiboga TC Kiboga - Kiyuuni U 2.4 Opening Drains & grass cuttingKiboga Kiboga TC Lufula Road U 1.3 Opening Drains & grass cuttingKiboga Kiboga TC Serugo Road U 0.9 Opening Drains & grass cuttingKiboga Kiboga TC Kiboga - Kirulumba U 2.2 Opening Drains & grass cuttingKiboga Kiboga TC Kabutemba Road U 2.0 Opening Drains & grass cuttingKiboga Kiboga TC Clare Road U 0.6 Opening Drains & grass cutting

286 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kiboga Kiboga TC Sunset Road U 0.4 Opening Drains & grass cuttingKiboga Kiboga TC Bamusuuta - SDA U 1.1 Opening Drains & grass cuttingKiboga Kiboga TC Kiganzi - Nasuuna U 3.2 Opening Drains & grass cuttingKiboga Kiboga TC Wamala I Road U 0.7 Opening Drains & grass cuttingKiboga Kiboga TC Kiwanguzi - Kiganzi Road U 1.6 Opening Drains & grass cuttingKiboga Kiboga TC Nabyole Road U 2.3 Opening Drains & grass cuttingKiboga Kiboga TC Kalule Road U 0.6 Opening Drains & grass cuttingKiboga Kiboga TC Ssebbowa Road U 0.4 Opening Drains & grass cuttingKiboga Kiboga TC Angella road U 0.3 Opening Drains & grass cutting

Kiboga TC 26.5Kibuku Kibuku DLG Tirinyi-Bumiza-Bulangira Unpaved 21.2 Opening Drains & grass cuttingKibuku Kibuku DLG Kadama-Kibuku-Buseta Unpaved 16.5 Opening Drains & grass cuttingKibuku Kibuku DLG Kibuku-Saala-Kirika Unpaved 10.3 Opening Drains & grass cuttingKibuku Kibuku DLG Buseta - Kasasira – Kapyani Unpaved 9.1 Opening Drains & grass cuttingKibuku Kibuku DLG Kadama-Dodoi-Kagumu Unpaved 13.2 Opening Drains & grass cuttingKibuku Kibuku DLG Kadama - Kabweri – Kagumu Unpaved 9.8 Opening Drains & grass cutting Kibuku T/C Total 84.4Kibuku Kibuku TC Salim Unpaved 3 Opening Drains & grass cuttingKibuku Kibuku TC Mukenye-Hajji Sharif Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC Nabulele Unpaved 1.2 Opening Drains & grass cuttingKibuku Kibuku TC Naumi-Bubera Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC hajji Sharif Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC Numi-Nabucha Unpaved 2 Opening Drains & grass cuttingKibuku Kibuku TC Kanku Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC Kalugana Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC kobolwa-kituti Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC kobolwa-bukalijjoko Unpaved 6 Opening Drains & grass cuttingKibuku Kibuku TC Isalanya Unpaved 1 Opening Drains & grass cuttingKibuku Kibuku TC Hajji Nangejje Unpaved 0.8 Opening Drains & grass cutting

Kibuku TC 20Kiruhura Kiruhura DLG Buremba-Kyampagara-Kazo U 19.30 Opening Drains & grass cuttingKiruhura Kiruhura DLG Sanga-Rwonyo U 12.50 Opening Drains & grass cuttingKiruhura Kiruhura DLG Kanyaryeru-Rwamuranda U 10.00 Opening Drains & grass cuttingKiruhura Kiruhura DLG Kibega ngira-Kanyanya U 23.00 Opening Drains & grass cuttingKiruhura Kiruhura DLG Kanyaryeru-Omukaku U 9.05 Opening Drains & grass cuttingKiruhura Kiruhura DLG Ruhengere-Kaikoti U 13.00 Opening Drains & grass cuttingKiruhura Kiruhura DLG Rushororo-Kigarama U 16.80 Opening Drains & grass cutting Kiruhura DLG 103.65Kiruhura Kazo TC Kabigyema Road U 0.6 Opening Drains & grass cuttingKiruhura Kazo TC Katarishwerwa Road U 0.6 Opening Drains & grass cuttingKiruhura Kazo TC Kihika Road U 0.6 Opening Drains & grass cutting

Kiruhura Kazo TC Byeshembe, Kyenshebashebe Road U 2.00 Opening Drains & grass cutting

Kiruhura Kazo TC kirimani road U 2 Opening Drains & grass cuttingKiruhura Kazo TC Kakudidi Road U 0.6 Opening Drains & grass cuttingKiruhura Kazo TC Kazo C.O.U- Ntambazi junction U 0.5 Opening Drains & grass cuttingKiruhura Kazo TC Mazimba junction U 0.8 Opening Drains & grass cuttingKiruhura Kazo TC Ntambazi Road U 1 Opening Drains & grass cutting

Kazo TC 8.7Kiryandongo Kiryandongo DLG Bweyale-Panyadoli-Kimogoro U 22 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Nyakarongo-Kiryandongo U 15 Opening Drains & grass cutting

Kiryandongo Kiryandongo DLG Nyakadote - Tecwa -Kanywa-maizi U 12.6 Opening Drains & grass cutting

Kiryandongo Kiryandongo DLG Mutunda- NandaB-opara U 6 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Mutunda- Diima U 13.2 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kiryandongo-Kitwara U 24 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kizibu- Kaduku U 5.8 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kisorosoro -Diika U 10 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kigumba - Apodorwa- Mboira U 21.7 Opening Drains & grass cutting

287Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kiryandongo Kiryandongo DLG Kiigya - Kinyara- Masindi Port U 18.2 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kitanyata- Apodorwa U 6 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Bweyale- Diika U 8.5 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kicwabugingo- Karungu U 5 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Diika- Katulikire U 14 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kididima- Kinyonga U 7.7 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kikuube-Kisekura- Nyabiiso U 7.5 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kigumba- Mpumwe U 12.3 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kaduku - Atura U 7 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kimengo- Masindi Port U 8 Opening Drains & grass cutting

Kiryandongo Kiryandongo DLG Kiryampungula- Kalwala- Kito-ngozi U 14 Opening Drains & grass cutting

Kiryandongo Kiryandongo DLG Laboke - Kololo U 11 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Rwakayata - Katamarwa U 6 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Mutunda- Kawiti- Kimogoro U 15 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Karungu-Akiiba-Nyiinga U 10 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Karuma-Okwece-Corneradek U 8 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Nyabiiso-Bunyama-Diika U 17.5 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Kimyoka -Kikaito U 5.3 Opening Drains & grass cuttingKiryandongo Kiryandongo DLG Wakisanyi -Myeeba U 9.7 Opening Drains & grass cutting Kiryandongo DLG 321Kiryandongo Kiryandongo T. C. Kisorosoro Road U 3 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Administration Road U 1.2 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kiirya Road U 0.8 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kyakalyabe Road U 2.0 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Hospital Road U 1.0 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Market Road U 0.6 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kikuube Road U 4.0 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kisorosoro- Nyabiiso Road U 3.0 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kiirya-Kitwara Road U 0.6 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kayembe first Street U 0.2 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Kayembe second Street U 0.3 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Auction Market road U 0.5 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. Karokarungi Road U 2.0 Opening Drains & grass cuttingKiryandongo Kiryandongo T. C. BCS-Kisorosoro Road U 1.6 Opening Drains & grass cutting Kiryandongo T. C. 20.8Kiryandongo Kigumba TC Musiimo Road U 1.1 Opening Drains & grass cuttingKiryandongo Kigumba TC Nyakoojo Road U 1.2 Opening Drains & grass cuttingKiryandongo Kigumba TC Kinali Street U 1.2 Opening Drains & grass cuttingKiryandongo Kigumba TC Intensive U 2.1 Opening Drains & grass cuttingKiryandongo Kigumba TC Jesse Road U 1.2 Opening Drains & grass cuttingKiryandongo Kigumba TC Ganukura Road U 1 Opening Drains & grass cuttingKiryandongo Kigumba TC Mpumwe-Water pump U 1.6 Opening Drains & grass cuttingKiryandongo Kigumba TC Masindi -Nyakatugo Road U 2 Opening Drains & grass cuttingKiryandongo Kigumba TC Tax Park road U 1 Opening Drains & grass cuttingKiryandongo Kigumba TC Kigaragara-Kirasa Road U 2.5 Opening Drains & grass cuttingKiryandongo Kigumba TC Kihuura Road U 1.5 Opening Drains & grass cuttingKiryandongo Kigumba TC Kobil- Kigaragara lane U 0.8 Opening Drains & grass cuttingKiryandongo Kigumba TC Kinyara - Comboni Parish U 1.2 Opening Drains & grass cuttingKiryandongo Kigumba TC Kinyara-Town Council U 3 Opening Drains & grass cuttingKiryandongo Kigumba TC Senior Quarter road U 1 Opening Drains & grass cuttingKiryandongo Kigumba TC Kigengere road U 1.5 Opening Drains & grass cuttingKiryandongo Kigumba TC Col. Byakagaba U 0.8 Opening Drains & grass cuttingKiryandongo Kigumba TC Kinali-onya U 0.3 Opening Drains & grass cuttingKiryandongo Kigumba TC Kobil- Intensive U 0.6 Opening Drains & grass cuttingKiryandongo Kigumba TC Onya Road U 0.5 Opening Drains & grass cuttingKiryandongo Kigumba TC Muhereza Avenue U 0.15 Opening Drains & grass cuttingKiryandongo Kigumba TC SDA Church Road U 1.2 Opening Drains & grass cuttingKiryandongo Kigumba TC PCU Church Road U 0.6 Opening Drains & grass cutting

288 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kiryandongo Kigumba TC Nuru Road U 0.45 Opening Drains & grass cuttingKiryandongo Kigumba TC Senior Quarter Annex road U 0.45 Opening Drains & grass cuttingKiryandongo Kigumba TC Kigaragara Road U 0.45 Opening Drains & grass cuttingKiryandongo Kigumba TC Kyamugenyi Road U 0.8 Opening Drains & grass cuttingKiryandongo Kigumba TC Kihuura I Road U 0.8 Opening Drains & grass cuttingKiryandongo Kigumba TC Abbatoir Road U 0.8 Opening Drains & grass cuttingKiryandongo Kigumba TC Nyakabingo Road U 3.5 Opening Drains & grass cuttingKiryandongo Kigumba TC Kihuura II Road U 1.5 Opening Drains & grass cutting 36.8Kiryandongo Bweyale TC Diika Road U 3 Opening Drains & grass cuttingKiryandongo Bweyale TC First Street-Easterly U 1.3 Opening Drains & grass cuttingKiryandongo Bweyale TC Second Street -Westerly U 0.8 Opening Drains & grass cuttingKiryandongo Bweyale TC Market Street U 0.8 Opening Drains & grass cuttingKiryandongo Bweyale TC Mosque Road U 0.8 Opening Drains & grass cuttingKiryandongo Bweyale TC Third Street Westerly U 1.2 Opening Drains & grass cuttingKiryandongo Bweyale TC Kyabakoke-camp road U 0.9 Opening Drains & grass cuttingKiryandongo Bweyale TC First Street-Westerly U 0.5 Opening Drains & grass cuttingKiryandongo Bweyale TC Diika-Ocheng Road U 0.5 Opening Drains & grass cuttingKiryandongo Bweyale TC Nyamusasa Road U 1 Opening Drains & grass cuttingKiryandongo Bweyale TC Nyakadoti-siriba U 2.4 Opening Drains & grass cuttingKiryandongo Bweyale TC Siriba-Kitereke Road U 2.5 Opening Drains & grass cuttingKiryandongo Bweyale TC Kyabakoke-Nyakadote road U 2 Opening Drains & grass cuttingKiryandongo Bweyale TC Kichwabugingo- Adugu(4km) U 4.5 Opening Drains & grass cuttingKiryandongo Bweyale TC Slaughter Yard Road U 0.9 Opening Drains & grass cuttingKiryandongo Bweyale TC Kyabakoke- Rift Valley Road U 2.9 Opening Drains & grass cuttingKiryandongo Bweyale TC Ofungi-nyinga U 2 Opening Drains & grass cuttingKiryandongo Bweyale TC Bidong Molokonyi(Kyezerebwe) U 2 Opening Drains & grass cuttingKiryandongo Bweyale TC Christine Road U 1.3 Opening Drains & grass cuttingKiryandongo Bweyale TC Okwir Road (Nyakadoti) U 1.1 Opening Drains & grass cuttingKiryandongo Bweyale TC Luke’s Street U 1.4 Opening Drains & grass cuttingKiryandongo Bweyale TC Kintu Road U 2 Opening Drains & grass cuttingKiryandongo Bweyale TC Kyabakoke- Bidong Road U 2.5 Opening Drains & grass cutting 38.3Kisoro Kisoro DLG Kaguhu-Nyanamo-Busozi U 3.5 Opening Drains & grass cuttingKisoro Kisoro DLG Mucha Mushungero- Mupaka U 9 Opening Drains & grass cuttingKisoro Kisoro DLG Nyakabingo-Gatete- Chananke U 2.7 Opening Drains & grass cuttingKisoro Kisoro DLG Kanaba- Kateriteri- Nyakarempe U 4.9 Opening Drains & grass cuttingKisoro Kisoro DLG Kabahunde- Mukozi U 1.25 Opening Drains & grass cuttingKisoro Kisoro DLG Kamonyi- Buhayo- Nyakinama U 6 Opening Drains & grass cuttingKisoro Kisoro DLG Gasovu- Kazogo U 6 Opening Drains & grass cuttingKisoro Kisoro DLG Gisorora- Mbonjera- Matinza U 2.6 Opening Drains & grass cuttingKisoro Kisoro DLG Gisorora- Rubaga U 1 Opening Drains & grass cuttingKisoro Kisoro DLG Iremerera- Ikamiro- Nyakarembe U 3 Opening Drains & grass cuttingKisoro Kisoro DLG Busanza- Busanani U 2 Opening Drains & grass cutting

Kisoro Kisoro DLG Nyakabande- Nyabihuniko- Bu-nagana U 4 Opening Drains & grass cutting

Kisoro Kisoro DLG Matinza- Giseke U 1 Opening Drains & grass cuttingKisoro Kisoro DLG Mwaro- Busengo- Kinanira U 4.25 Opening Drains & grass cuttingKisoro Kisoro DLG Iryaruhuri- Gatetete U 2 Opening Drains & grass cuttingKisoro Kisoro DLG Hakashara- Kafuga U 1 Opening Drains & grass cuttingKisoro Kisoro DLG Rwanzu- Rugabano U 2.4 Opening Drains & grass cuttingKisoro Kisoro DLG Rutaka- Rutoma- Rushabarara U 2.5 Opening Drains & grass cuttingKisoro Kisoro DLG Iryaruhuri- Cyanika U 0.7 Opening Drains & grass cuttingKisoro Kisoro DLG Nturo sooko- Kindadari U 2 Opening Drains & grass cuttingKisoro Kisoro DLG Chahafi- Karago- Maregamo U 33 Opening Drains & grass cuttingKisoro Kisoro DLG Natete- Bumfupfo- Nturo U 2.5 Opening Drains & grass cuttingKisoro Kisoro DLG Nyaruzisa- Rurembwe- Chanika U 3.5 Opening Drains & grass cuttingKisoro Kisoro DLG Murara- Foto- Muhanga U 3.3 Opening Drains & grass cutting Kisoro DLG Total 100.8

289Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kisoro Kisoro TC main street U 0.5 Opening Drains & grass cuttingKisoro Kisoro TC Mosque U 1 Opening Drains & grass cuttingKisoro Kisoro TC Chuho U 1 Opening Drains & grass cuttingKisoro Kisoro TC Hornby U 0.27 Opening Drains & grass cuttingKisoro Kisoro TC Bishop Kivengeri U 0.9 Opening Drains & grass cuttingKisoro Kisoro TC Mubano U 0.35 Opening Drains & grass cuttingKisoro Kisoro TC Mutanda U 0.58 Opening Drains & grass cuttingKisoro Kisoro TC Busamba U 1 Opening Drains & grass cuttingKisoro Kisoro TC Kibande U 0.7 Opening Drains & grass cuttingKisoro Kisoro TC Busumba U 0.5 Opening Drains & grass cuttingKisoro Kisoro TC Church U 0.34 Opening Drains & grass cuttingKisoro Kisoro TC Gasarara U 0.86 Opening Drains & grass cuttingKisoro Kisoro TC Bikoro U 0.5 Opening Drains & grass cuttingKisoro Kisoro TC Chintare U 0.26 Opening Drains & grass cuttingKisoro Kisoro TC Kabaya U 1.5 Opening Drains & grass cuttingKisoro Kisoro TC Gishegera U 0.2 Opening Drains & grass cuttingKisoro Kisoro TC Chahi U 1.4 Opening Drains & grass cuttingKisoro Kisoro TC Rwanzoka U 0.54 Opening Drains & grass cutting

Kisoro TC 12.4Kitgum Kitgum DLG Mucwini-Kitgum Matidi U 19.0 Opening Drains & grass cuttingKitgum Kitgum DLG Corner Kalabon-Akilok U 23.0 Opening Drains & grass cuttingKitgum Kitgum DLG Ayoma- Alune U 42.7 Opening Drains & grass cuttingKitgum Kitgum DLG Awuch- Lanydyang P 1.0 Opening Drains & grass cuttingKitgum Kitgum DLG Awuch- Lanydyang U 13.0 Opening Drains & grass cuttingKitgum Kitgum DLG Akworo-Okidi U 12.8 Opening Drains & grass cuttingKitgum Kitgum DLG Beyolangec-Lamugu U 7.4 Opening Drains & grass cuttingKitgum Kitgum DLG Pudo- Obyen CPT. U 12.6 Opening Drains & grass cuttingKitgum Kitgum DLG Mucwini-Abino U 11.0 Opening Drains & grass cuttingKitgum Kitgum DLG Omiya Anyima-Lagot U 12.3 Opening Drains & grass cuttingKitgum Kitgum DLG Omiya Anyima-Apotallo U 11.3 Opening Drains & grass cuttingKitgum Kitgum DLG Kitgum Matidi-Lakwor-Aloto U 12.3 Opening Drains & grass cuttingKitgum Kitgum DLG Mucwini-Namokora U 35.0 Opening Drains & grass cuttingKitgum Kitgum DLG Orom-Akilok U 18.2 Opening Drains & grass cuttingKitgum Kitgum DLG Lagoro TC-Lalano U 15.0 Opening Drains & grass cuttingKitgum Kitgum DLG Y Y Okot-Ocettoke U 8.0 Opening Drains & grass cuttingKitgum Kitgum DLG Pawidi-Lagoro U 5.7 Opening Drains & grass cuttingKitgum Kitgum DLG Oryang Ojuma-Kitgum Matidi U 16.2 Opening Drains & grass cutting Kitgum DLG Total 276.5Kitgum Kitgum TC Uhuru drive P 0.9 Opening Drains & grass cuttingKitgum Kitgum TC Hilltop P 0.5 Opening Drains & grass cuttingKitgum Kitgum TC Kitgum P 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Dr Rizzo Ivonne U 0.5 Opening Drains & grass cuttingKitgum Kitgum TC Ogwok P 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Park Avenue P 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Dr Panganini P 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Philip Adonga P 0.1 Opening Drains & grass cuttingKitgum Kitgum TC Jildo IrwaLakidi P 0.2 Opening Drains & grass cuttingKitgum Kitgum TC Uhuru drive U 3.7 Opening Drains & grass cuttingKitgum Kitgum TC Bwonagweno U 1.0 Opening Drains & grass cuttingKitgum Kitgum TC Chua U 0.9 Opening Drains & grass cuttingKitgum Kitgum TC Oneka U 0.8 Opening Drains & grass cuttingKitgum Kitgum TC Dr Lukwiya Mathew U 1.2 Opening Drains & grass cuttingKitgum Kitgum TC Patrick Lawoko U 0.6 Opening Drains & grass cuttingKitgum Kitgum TC Aruu U 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Dr Ambrozoli U 0.5 Opening Drains & grass cuttingKitgum Kitgum TC Lagoro U 1.6 Opening Drains & grass cuttingKitgum Kitgum TC Sirayo Nyeko U 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Dr Olara Otunu U 2.0 Opening Drains & grass cuttingKitgum Kitgum TC Bp Ojwang U 1.0 Opening Drains & grass cutting

290 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kitgum Kitgum TC Barnaba Julu U 0.5 Opening Drains & grass cuttingKitgum Kitgum TC Matiya Ocaya U 1.2 Opening Drains & grass cuttingKitgum Kitgum TC Kidega Lak U 0.6 Opening Drains & grass cuttingKitgum Kitgum TC Laloyo Maber U 0.4 Opening Drains & grass cuttingKitgum Kitgum TC Cardinal Emmanuel Wamala U 1.5 Opening Drains & grass cuttingKitgum Kitgum TC Lamola U 0.5 Opening Drains & grass cuttingKitgum Kitgum TC Labongo U 0.3 Opening Drains & grass cuttingKitgum Kitgum TC Bomah Avenue / Bomah Access U 0.4 Opening Drains & grass cuttingKitgum Kitgum TC Irene Gleeson U 2.0 Opening Drains & grass cuttingKitgum Kitgum TC Langalanga U 0.9 Opening Drains & grass cuttingKitgum Kitgum TC Janani Luwum P 0.2 Opening Drains & grass cuttingKitgum Kitgum TC Modesto Olal U 0.4 Opening Drains & grass cuttingKitgum Kitgum TC AJ Obol U 0.6 Opening Drains & grass cutting Kitgum TC Total 26.7Koboko Koboko DLG Koboko- Wanize U 11.3 Opening Drains & grass cuttingKoboko Koboko DLG Keri-Nyai U 16.7 Opening Drains & grass cuttingKoboko Koboko DLG Awindiri - Saliamusala U 10.2 Opening Drains & grass cuttingKoboko Koboko DLG Uganda - DRC boarder U 13.8 Opening Drains & grass cuttingKoboko Koboko DLG Keri- Ayipe- Kagoropa-Korokaya U 26.5 Opening Drains & grass cuttingKoboko Koboko DLG Koboko - Lodonga U 16.7 Opening Drains & grass cuttingKoboko Koboko DLG Lurujo - Nyai U 14.5 Opening Drains & grass cuttingKoboko Koboko DLG Midia - Dricile Kukunga U 9.0 Opening Drains & grass cuttingKoboko Koboko DLG Asunga - Kingaba U 12.4 Opening Drains & grass cutting Koboko DLG Total 131.1Koboko C A R S ginyako - dranya U 4.0 Opening Drains & grass cuttingKoboko C A R S dranya - kiru U 10.0 Opening Drains & grass cuttingKoboko C A R S alionzi - kiru U 4.0 Opening Drains & grass cuttingKoboko C A R S alionzi - dranya p/s U 6.0 Opening Drains & grass cuttingKoboko C A R S ginyako - nyangilia p/s U 6.5 Opening Drains & grass cuttingKoboko C A R S nyangilia - leiko U 5.0 Opening Drains & grass cuttingKoboko C A R S Abaci - Oraba road U 8.0 Opening Drains & grass cuttingKoboko C A R S Nyakaliso - Oraba road U 5.0 Opening Drains & grass cuttingKoboko C A R S Nyambiri - Tendele road U 8.0 Opening Drains & grass cuttingKoboko C A R S Tanyaji - Anyangaku U 5.0 Opening Drains & grass cuttingKoboko C A R S keri - Lunguma U 5.0 Opening Drains & grass cuttingKoboko C A R S Kuluba - Morimo U 6.0 Opening Drains & grass cuttingKoboko C A R S Kasoroba- Kulumbi p/s U 4.5 Opening Drains & grass cuttingKoboko C A R S Mt. Liru - Liru P/S U 3.0 Opening Drains & grass cuttingKoboko C A R S Lima - Chakulia U 8.0 Opening Drains & grass cuttingKoboko C A R S Gurepi - robe U 4.0 Opening Drains & grass cuttingKoboko C A R S Bamure - Yumbe Boarder U 2.0 Opening Drains & grass cutting C A R S Total 94.0Kole Kole DLG Aboke Mkt-Alito Hq U 19.0 Opening Drains & grass cuttingKole Kole DLG Alyat-Aboke Hciv U 5.0 Opening Drains & grass cuttingKole Kole DLG Akalo-Adwila U 10.0 Opening Drains & grass cuttingKole Kole DLG G.Aboke-Opeta U 9.0 Opening Drains & grass cuttingKole Kole DLG Balla-Akalo-Amac U 21.0 Opening Drains & grass cuttingKole Kole DLG Aromo-Ngetta U 24.0 Opening Drains & grass cuttingKole Kole DLG Akalo-Telela U 11.0 Opening Drains & grass cuttingKole Kole DLG Corner Park-Teboke Tc U 15.0 Opening Drains & grass cuttingKole Kole DLG Alito Hq-Ogur U 8.0 Opening Drains & grass cuttingKole Kole DLG Balla-Inomo U 6.0 Opening Drains & grass cuttingKole Kole DLG District Hq-Balla Tc U 14.0 Opening Drains & grass cutting Kole DLG Total 142Kotido Kotido DLG Losilang-Nakapelimoru U 9.80 Opening Drains & grass cuttingKotido Kotido DLG Panyangara - Napumpum U 4.76 Opening Drains & grass cuttingKotido Kotido DLG Potongor-Nakapelemoru U 4.86 Opening Drains & grass cuttingKotido Kotido DLG Kotido - Rengen U 6.62 Opening Drains & grass cuttingKotido Kotido DLG Rengen-Lopuyo-Lokiding U 21.98 Opening Drains & grass cutting

291Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kotido Kotido DLG Maaru - Nakwakwa- lopuyo U 8.95 Opening Drains & grass cuttingKotido Kotido DLG Lokiteleabu-Kanayete U 6.32 Opening Drains & grass cuttingKotido Kotido DLG Kanawat-Kamor-Napumpum U 15.65 Opening Drains & grass cutting

Kotido Kotido DLG Panyangara - Rikitae-Napum-pum U 15.36 Opening Drains & grass cutting

Kotido Kotido DLG Kokoria - Losakucha U 6.32 Opening Drains & grass cuttingKotido Kotido DLG Dopeth-Nakoreto-Lopuyo U 8.98 Opening Drains & grass cutting Kotido DLG Total 109.6Kotido Kotido TC Acees Lane U 0.1 Opening Drains & grass cuttingKotido Kotido TC Apalokuria Road U 0.51 Opening Drains & grass cuttingKotido Kotido TC Apaloris Drive U 0.78 Opening Drains & grass cuttingKotido Kotido TC Apeyok Lane U 0.39 Opening Drains & grass cuttingKotido Kotido TC Housing Lane U 0.3 Opening Drains & grass cuttingKotido Kotido TC Kaguta Drive U 0.78 Opening Drains & grass cuttingKotido Kotido TC Kakoro Road U 0.34 Opening Drains & grass cuttingKotido Kotido TC labwor Road U 0.38 Opening Drains & grass cuttingKotido Kotido TC Lodon Road U 1.2 Opening Drains & grass cuttingKotido Kotido TC Lokirien Road U 0.32 Opening Drains & grass cuttingKotido Kotido TC Lokori Road U 0.59 Opening Drains & grass cuttingKotido Kotido TC Narenge moru Drive U 1.21 Opening Drains & grass cuttingKotido Kotido TC Senior Quarters road U 1.2 Opening Drains & grass cuttingKotido Kotido TC Prison Road U 0.38 Opening Drains & grass cuttingKotido Kotido TC Nawoyikitoi Lane U 0.2 Opening Drains & grass cuttingKotido Kotido TC Napolokou Road U 0.45 Opening Drains & grass cuttingKotido Kotido TC market Lane U 0.14 Opening Drains & grass cuttingKotido Kotido TC School Lane U 0.2 Opening Drains & grass cuttingKotido Kotido TC Loropei Road U 0.53 Opening Drains & grass cuttingKotido Kotido TC Lomukura Avenue U 0.73 Opening Drains & grass cuttingKotido Kotido TC Lomukura Drive U 0.57 Opening Drains & grass cuttingKotido Kotido TC Nakapelimoru View U 0.75 Opening Drains & grass cuttingKotido Kotido TC Lokiria Road U 0.14 Opening Drains & grass cuttingKotido Kotido TC Senior Quarters Road U 0.59 Opening Drains & grass cuttingKotido Kotido TC Old Road U 0.88 Opening Drains & grass cuttingKotido Kotido TC Lomok Road U 0.8 Opening Drains & grass cuttingKotido Kotido TC Nakarwon Road U 0.22 Opening Drains & grass cuttingKotido Kotido TC Natumkasikou Road U 0.59 Opening Drains & grass cuttingKotido Kotido TC Keem Close U 0.26 Opening Drains & grass cuttingKotido Kotido TC Longerep Road U 0.57 Opening Drains & grass cutting Kotido TC Total 16.1Kotido Kotido CARs Losakucha Kacheri U 5 Opening Drains & grass cuttingKotido Kotido CARs Losakucha Lobanya U 6.6 Opening Drains & grass cuttingKotido Kotido CARs Kaidila Kaikir U 6.7 Opening Drains & grass cuttingKotido Kotido CARs Nakoreto Nakwakwa U 6 Opening Drains & grass cuttingKotido Kotido CARs Lodera Mesria U 6 Opening Drains & grass cuttingKotido Kotido CARs Nathedekitoie Lookorok U 4 Opening Drains & grass cuttingKotido Kotido CARs kanawat kanayete U 7.2 Opening Drains & grass cuttingKotido Kotido CARs Lookokorok Kadokin 4 Opening Drains & grass cuttingKotido Kotido CARs Kanair Brigade U 5 Opening Drains & grass cuttingKotido Kotido CARs Kamor Aduko U 14 Opening Drains & grass cuttingKotido Kotido CARs Lomonia Kadokin U 4 Opening Drains & grass cutting Kotido CARs Total 68.6Kumi Kumi DLG Atutur-Kamaca Gravel 9 Opening Drains & grass cuttingKumi Kumi DLG Kanyumu-Atutur-Malera Gravel 13.2 Opening Drains & grass cuttingKumi Kumi DLG Mukongoro-Kamaca-Bukedea Gravel 13.6 Opening Drains & grass cuttingKumi Kumi DLG Ogooma-Kalapata Gravel 14 Opening Drains & grass cuttingKumi Kumi DLG Ongino-Malera Gravel 10 Opening Drains & grass cuttingKumi Kumi DLG Ongino-Tiisai Gravel 9 Opening Drains & grass cuttingKumi Kumi DLG Orapada-Aterai-Nyero Gravel 10.8 Opening Drains & grass cuttingKumi Kumi DLG Ariet-Nyero-Mukura Gravel 12 Opening Drains & grass cutting

292 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kumi Kumi DLG Odiding-Agurut-Ariet Gravel 9.1 Opening Drains & grass cuttingKumi Kumi DLG Kamaca-Olumot-Kodokoto Gravel 10 Opening Drains & grass cuttingKumi Kumi DLG Apaade-Omerein-Kodokoto Gravel 7 Opening Drains & grass cuttingKumi Kumi DLG Atutur-Oswapai-Ongino Gravel 10 Opening Drains & grass cuttingKumi Kumi DLG Kabukol-Kamenya-Nyero Gravel 18 Opening Drains & grass cuttingKumi Kumi DLG Komolo-Nyaguwo Gravel 7.1 Opening Drains & grass cuttingKumi Kumi DLG Zagazaga-Kapasak-Tiisai Gravel 9.5 Opening Drains & grass cuttingKumi Kumi DLG Akide-Akolitorom Gravel 7 Opening Drains & grass cuttingKumi Kumi DLG Kanapa-Obotia Gravel 10 Opening Drains & grass cuttingKumi Kumi DLG Nyero-Kodike-Kalengo Gravel 3 Opening Drains & grass cuttingKumi Kumi DLG Okouba-Akarukei-Odiding Gravel 7.2 Opening Drains & grass cuttingKumi Kumi DLG Kanyumu-Oyakelo-Madang Gravel 11.3 Opening Drains & grass cuttingKumi Kumi DLG Kodokoto-Acaapa-Akadot Gravel 14 Opening Drains & grass cuttingKumi Kumi DLG Atutur-Ariet-Kanapa Gravel 15.5 Opening Drains & grass cutting Kumi DLG Total 230.3Kumi Kumi TC Ngora Road Paved 1.6 Opening Drains & grass cuttingKumi Kumi TC Oumo Road Paved 1.2 Opening Drains & grass cuttingKumi Kumi TC Market Street Paved 1.25 Opening Drains & grass cuttingKumi Kumi TC Ikori Road Paved 1.1 Opening Drains & grass cuttingKumi Kumi TC Police Lane Paved 0.19 Opening Drains & grass cuttingKumi Kumi TC Kaka Lane Paved 0.19 Opening Drains & grass cuttingKumi Kumi TC Abwongoto Road Paved 0.4 Opening Drains & grass cuttingKumi Kumi TC Ijala Road Paved 0.3 Opening Drains & grass cuttingKumi Kumi TC Outeke Road gravel 0.9 Opening Drains & grass cuttingKumi Kumi TC Kanyum Road gravel 0.09 Opening Drains & grass cuttingKumi Kumi TC Billi Street gravel 0.1 Opening Drains & grass cuttingKumi Kumi TC Laing Close gravel 1 Opening Drains & grass cuttingKumi Kumi TC Esunget Road gravel 0.9 Opening Drains & grass cuttingKumi Kumi TC Agoos Road gravel 0.9 Opening Drains & grass cuttingKumi Kumi TC Wiggins Road gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Odiit Road gravel 1.1 Opening Drains & grass cuttingKumi Kumi TC School Lane gravel 1 Opening Drains & grass cuttingKumi Kumi TC Adams Road gravel 0.15 Opening Drains & grass cuttingKumi Kumi TC Olukas Road gravel 0.6 Opening Drains & grass cuttingKumi Kumi TC Ongino Road gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Tomusange Road gravel 0.4 Opening Drains & grass cuttingKumi Kumi TC Maraka Road gravel 0.35 Opening Drains & grass cuttingKumi Kumi TC School Lane gravel 1 Opening Drains & grass cuttingKumi Kumi TC Akabwai Road gravel 0.8 Opening Drains & grass cuttingKumi Kumi TC Bisina Avenue gravel 0.15 Opening Drains & grass cuttingKumi Kumi TC Dr. Aporu- Akol Earth 0.5 Opening Drains & grass cuttingKumi Kumi TC Olungia gravel 0.52 Opening Drains & grass cuttingKumi Kumi TC Agoos Road gravel 1 Opening Drains & grass cuttingKumi Kumi TC Ariko Road Earth 1.1 Opening Drains & grass cuttingKumi Kumi TC Ogaino gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Achoroi gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Kamacherere gravel 0.34 Opening Drains & grass cuttingKumi Kumi TC Station gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Osekenyi Earth 0.3 Opening Drains & grass cuttingKumi Kumi TC Obote Earth 0.9 Opening Drains & grass cuttingKumi Kumi TC Onaba gravel 0.9 Opening Drains & grass cuttingKumi Kumi TC Erongot gravel 1.2 Opening Drains & grass cuttingKumi Kumi TC Ojangor Earth 0.8 Opening Drains & grass cuttingKumi Kumi TC Ochom gravel 0.3 Opening Drains & grass cuttingKumi Kumi TC Ajiji gravel 0.3 Opening Drains & grass cuttingKumi Kumi TC Aisu Road gravel 0.5 Opening Drains & grass cuttingKumi Kumi TC Edau Road Earth 0.8 Opening Drains & grass cutting Kumi TC Total 27.6kween Kween DLG Cheminy- Moyok earth 3.9 Opening Drains & grass cutting

293Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

kween Kween DLG Atar-Mokotyo earth 4.6 Opening Drains & grass cuttingkween Kween DLG seretyo-loch gravel 2.0 Opening Drains & grass cuttingkween Kween DLG Ngenge-Sundet Gravel 8.0 Opening Drains & grass cuttingkween Kween DLG kapcherotwa-Kitany earth 3.0 Opening Drains & grass cuttingkween Kween DLG Bugema-Terenboy earth 2.6 Opening Drains & grass cuttingkween Kween DLG Kapkoch –Kapteror earth 4.0 Opening Drains & grass cuttingkween Kween DLG Kapwata- Kwanyiy earth 2.0 Opening Drains & grass cuttingkween Kween DLG Binyiny-Tukumo earth 2.9 Opening Drains & grass cuttingkween Kween DLG Kamunarkut-Kisongi earth 1.0 Opening Drains & grass cuttingkween Kween DLG Kapkworor-Sundet gravel 1.0 Opening Drains & grass cuttingkween Kween DLG Atar bridge- Atar trading centre earth 1.0 Opening Drains & grass cutting Kween DLG Total 36.0kween Kween TC Mashandich road U 1 Opening Drains & grass cuttingkween Kween TC Tiken road U 1.4 Opening Drains & grass cuttingkween Kween TC Chekwom P/S road U 0.5 Opening Drains & grass cuttingkween Kween TC Solomon road U 1 Opening Drains & grass cuttingkween Kween TC sikoria road U 1 Opening Drains & grass cutting Kween TC Total 4.9kween Kween CARs Kitany-mwetiny road Earth 5 Opening Drains & grass cuttingkween Kween CARs National park-Nyemei road Earth 4 Opening Drains & grass cuttingkween Kween CARs Kapyatei-Moyok road Earth 2.5 Opening Drains & grass cutting

kween Kween CARs kaproron - lisoso-kapmwam road Earth 2 Opening Drains & grass cutting

kween Kween CARs Kapkwobutataki-topot road Earth 2 Opening Drains & grass cuttingkween Kween CARs Siro- Kapenguria road Earth 1.5 Opening Drains & grass cuttingkween Kween CARs Chebininy-Chemuny road Earth 2 Opening Drains & grass cuttingkween Kween CARs Posha- Rwanda Earth 2 Opening Drains & grass cuttingkween Kween CARs Moikut-Kitawoi road Earth 3 Opening Drains & grass cuttingkween Kween CARs Cheptere-Ngoryomwet road Earth 3 Opening Drains & grass cuttingkween Kween CARs Kiriki - kere road Earth 2 Opening Drains & grass cutting Kween CARs Total 29Kyankwanzi Butemba TC Caltex - Market U 0.2 Opening Drains & grass cuttingKyankwanzi Butemba TC Butcher - Butemba College U 1.7 Opening Drains & grass cuttingKyankwanzi Butemba TC Kakifulukwa - Kamirambazzi U 2.0 Opening Drains & grass cuttingKyankwanzi Butemba TC Senkungu U 2.0 Opening Drains & grass cuttingKyankwanzi Butemba TC Bukwiri - Kigambanankwale U 5.8 Opening Drains & grass cuttingKyankwanzi Butemba TC Lwebisiriza - Kyampaggi U 4.5 Opening Drains & grass cutting

Kyankwanzi Butemba TC Lwebisiriza - Bugaba - Emmanu-el Health Centre U 2.4 Opening Drains & grass cutting

Kyankwanzi Butemba TC Katanabirwa - Market Stage U 0.8 Opening Drains & grass cuttingKyankwanzi Butemba TC Kyabajojo - Kigando U 0.6 Opening Drains & grass cuttingKyankwanzi Butemba TC Kyabajojo - Rwengiri U 2.5 Opening Drains & grass cuttingKyankwanzi Butemba TC Kayunga - Kigambanankwale U 3.6 Opening Drains & grass cuttingKyankwanzi Butemba TC Kaseeta - Bugaba U 3.4 Opening Drains & grass cuttingKyankwanzi Butemba TC Kaseeta - Rwengiri U 14.0 Opening Drains & grass cuttingKyankwanzi Butemba TC Abaasi - Lumonde U 0.5 Opening Drains & grass cutting Butemba TC Total 44Kyankwanzi Ntwetwe TC Hosipital Sekasi U 0.5 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Rwenzori Road U 1.7 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Lwanjare-Ntuti U 4.7 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Kisojo-Kamu Road U 1.8 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Kitangala-Buyondo U 1.7 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Kakembo-Rwabarungi U 1.7 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Kigoma-Natyole U 2.4 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Buyondo Road U 3.0 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC Lwanjare-Nkadwa U 1.5 Opening Drains & grass cuttingKyankwanzi Ntwetwe TC semyaro road U 3.0 Opening Drains & grass cutting Ntwetwe TC Total 22.0Kyegegwa Kyegegwa DLG Kyegegwa – Nkomangani U 19.6 Opening Drains & grass cutting

294 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kyegegwa Kyegegwa DLG Kijanibarora – Kasule U 9.2 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Kyegegwa - Kijuma – Kyanyino-buro U 12.2 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Kakabara – Hapuuyo U 20 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Kasule-Bugogo-Isunga-Muky-eeya U 26 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Kyamanja-Kyanyambali-Ntuntu U 6 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Mukako-Bujubuli U 18.6 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Kabbani-Kisagazi-Bujubuli U 15.5 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Nabingoola-Kasule-Hapuuyo U 19.2 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Migongwe-Migamba-Rwentu-ha-Kazinga U 5.8 Opening Drains & grass cutting

Kyegegwa Kyegegwa DLG Bugogo-Kidindimya U 12 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Gasani-Ntutuutu U 9 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Kijongoba-Katiirwa-Karwenyi U 18 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Kasule-Kakasoro-Kikonge U 15 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Kakoni-Kamutuumi-Ljugangoma U 17 Opening Drains & grass cuttingKyegegwa Kyegegwa DLG Ntuntu-Magoma U 7 Opening Drains & grass cutting Kyegegwa DLG Total 230.1

Kyegegwa Kyegegwa TC Nyamuhanami-Kabaya-Kisim-wenda U 11.7 Opening Drains & grass cutting

Kyegegwa Kyegegwa TC Nguga-Ngata-Kanyarukoma U 3.7 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Kacumbi-Nyamigisa-Buhunga U 3.8 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Wekomiire-Byeba U 2.6 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Byeba-Kasenene U 2 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Kyegegwa-Butera-Muhangi U 4 Opening Drains & grass cuttingKyegegwa Kyegegwa TC CBD Roads U 11 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Nyamwegabira –Mitweyankoko U 3.5 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Kiranzi – Rwakaiha U 1.5 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Rwera – Kiranzi U 1.2 Opening Drains & grass cuttingKyegegwa Kyegegwa TC Kabaya-Galilaya U 2 Opening Drains & grass cutting TC Total 47Kyenjojo Kyenjojo DLG Bufunjo-Bigando Earth 1.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Butiiti-Ruhoko-Nyantungo Earth 5.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kagorogoro-Kijura Earth 6.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kaiganga-Nyakisi Earth 8.40 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kaihura-Isandara Earth 1.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kaihura-Kyarusozi Earth 6.80 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kasunga-Mirongo Earth 5.40 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kibale-Kasaba-Kyamutunzi Earth 6.20 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kiburara-Orubanza Earth 6.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kyakasura - Nyabuharwa Earth 8.40 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kyenjojo - Rwaitengya Earth 3.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Mabira - Kisansa Earth 4.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Matiri-Kawaruju-Kyamulimi Earth 1.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Mukole - Kisangi - Kaiso Earth 8.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Nyakisi - Rubango - Haikona Earth 6.20 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Nyamabuga - Munobwa Earth 5.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Nyankimba - Busaiga Earth 3.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Nyarukoma - Kyakatwire Earth 2.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Rwibale - Butunduzi - Kanyinya Earth 4.40 Opening Drains & grass cutting

Kyenjojo Kyenjojo DLG Kibira-Katunguru-Mugo-ma-Mbale Earth 4.40 Opening Drains & grass cutting

Kyenjojo Kyenjojo DLG Butara-Kyehara-Barahija Earth 3.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kaitabarogo-Kirongo-Kitabona Earth 3.40 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Mukeeya-Kakira-Mukateete Earth 2.60 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kifuka-Nkununu-Karukujenge Earth 3.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Haikoona-Nyabikoni-Nyamweezi Earth 3.00 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kifumbura-Mirambi-Rweitengya Earth 6.7 Opening Drains & grass cuttingKyenjojo Kyenjojo DLG Kyamutasa-Kipepa-Kanyandahi Earth 6.7 Opening Drains & grass cutting

295Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Kyenjojo Kyenjojo DLG Kakindo-Kyakaromba-Mubembe Earth 5.6 Opening Drains & grass cutting 192.5Lamwo Lamwo C A R S Lugwar-Lugedde Earth 5 Opening Drains & grass cuttingLamwo Lamwo C A R S Padwat-Aywee Earth 15 Opening Drains & grass cuttingLamwo Lamwo C A R S Laguri-ogwangcan-Ayon Earth 8.3 Opening Drains & grass cuttingLamwo Lamwo C A R S Kamama central-Kafata Earth 4 Opening Drains & grass cuttingLamwo Lamwo C A R S Gogo-Kapeta Earth 6.3 Opening Drains & grass cuttingLamwo Lamwo C A R S Agoro Dem-ayuu Alali Earth 8 Opening Drains & grass cuttingLamwo Lamwo C A R S Kiti-Kiti-Lugede Earth 7.5 Opening Drains & grass cuttingLamwo Lamwo C A R S Lapidiyenyi-Orii Earth 12 Opening Drains & grass cuttingLamwo Lamwo C A R S Orii-Karuma Earth 4.5 Opening Drains & grass cuttingLamwo Lamwo C A R S Potika-Dibolyec P/S Earth 11.5 Opening Drains & grass cuttingLamwo Lamwo C A R S Gem central-Kafata Earth 2.5 Opening Drains & grass cuttingLamwo Lamwo C A R S Gem Central-Anaka Earth 16 Opening Drains & grass cuttingLamwo Lamwo C A R S Gem Central-Gem Medde P/S Earth 7 Opening Drains & grass cuttingLamwo Lamwo C A R S Gem Central-Pawena Earth 12 Opening Drains & grass cuttingLamwo Lamwo C A R S Pawach-Lopulingi Earth 3 Opening Drains & grass cuttingLamwo Lamwo C A R S Agoro-Lopulingi Earth 12 Opening Drains & grass cuttingLamwo Lamwo C A R S Loromibenge-Apwoyo Earth 7 Opening Drains & grass cuttingLamwo Lamwo C A R S Agoro-Ngacino Earth 8 Opening Drains & grass cuttingLamwo Lamwo C A R S Kal-Kirombe Earth 7 Opening Drains & grass cuttingLamwo Lamwo C A R S Kwoncok-Karuma Earth 6.3 Opening Drains & grass cuttingLamwo Lamwo C A R S Kal-Karuma Earth 8 Opening Drains & grass cuttingLamwo Lamwo C A R S Orogo-Lawiye Oduny Earth 4 Opening Drains & grass cuttingLamwo Lamwo C A R S Kwoncok-Oboko Earth 8.3 Opening Drains & grass cuttingLamwo Lamwo C A R S Atwol-katum Earth 6 Opening Drains & grass cuttingLamwo Lamwo C A R S Atwol-Kolokolo Earth 4 Opening Drains & grass cuttingLamwo Lamwo C A R S Te-amat cai-Corner Dec Earth 10 Opening Drains & grass cuttingLamwo Lamwo C A R S Katum Earth 7.1 Opening Drains & grass cuttingLamwo Lamwo C A R S Pagada-Potwach-Bwotatum Earth 18 Opening Drains & grass cutting C A R S Total 228.3Lamwo Lamwo DLG Lugwar – Paracelle Gravel 12 Opening Drains & grass cuttingLamwo Lamwo DLG Palabek Kal – Lokung Gravel 25.9 Opening Drains & grass cuttingLamwo Lamwo DLG Lagwel – Laguri Gravel 8.3 Opening Drains & grass cuttingLamwo Lamwo DLG Labworoyeng – Pager Gravel 24 Opening Drains & grass cuttingLamwo Lamwo DLG Padibe – Mucwini Gravel 14 Opening Drains & grass cuttingLamwo Lamwo DLG Labworoyeng - Base Camp Gravel 9 Opening Drains & grass cuttingLamwo Lamwo DLG Aloi – Oboko Gravel 9 Opening Drains & grass cuttingLamwo Lamwo DLG Dibolyec HC II - Dibolyec P/S Gravel 11 Opening Drains & grass cuttingLamwo Lamwo DLG Olebi – Lelapwot Gravel 9 Opening Drains & grass cuttingLamwo Lamwo DLG Corner Ogwec - Aweno Olwi Gravel 18.1 Opening Drains & grass cuttingLamwo Lamwo DLG Lapidiyenyi – Larobi Gravel 14 Opening Drains & grass cuttingLamwo Lamwo DLG Okol-Kal Gravel 8 Opening Drains & grass cuttingLamwo Lamwo DLG Alenyo-Bungu Gravel 10.6 Opening Drains & grass cuttingLamwo Lamwo DLG Jamula-Lamojong Gravel 14.5 Opening Drains & grass cuttingLamwo Lamwo DLG Lagwel p7-Ocetokke Gravel 9.5 Opening Drains & grass cuttingLamwo Lamwo DLG Katum East-Tumangu Gravel 6.5 Opening Drains & grass cuttingLamwo Lamwo DLG Loi Agolo-Ogako HC II Gravel 6 Opening Drains & grass cuttingLamwo Lamwo DLG Katum East-Lagotongu Gravel 5.5 Opening Drains & grass cuttingLamwo Lamwo DLG Paracele-Waligo Gravel 28.5 Opening Drains & grass cutting Lamwo DLG Total 243.4Lamwo Lamwo TC Ogwec Memorial Road Gravel 0.5 Opening Drains & grass cuttingLamwo Lamwo TC Road 001 Gravel 0.94 Opening Drains & grass cuttingLamwo Lamwo TC Road 002 Gravel 0.18 Opening Drains & grass cuttingLamwo Lamwo TC Road 003 Gravel 0.18 Opening Drains & grass cuttingLamwo Lamwo TC Road 004 Gravel 0.18 Opening Drains & grass cuttingLamwo Lamwo TC Road 005 Gravel 0.18 Opening Drains & grass cuttingLamwo Lamwo TC Road 006 Gravel 0.18 Opening Drains & grass cuttingLamwo Lamwo TC Road 007 Gravel 0.42 Opening Drains & grass cutting

296 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Lamwo Lamwo TC Road 008 Gravel 0.24 Opening Drains & grass cuttingLamwo Lamwo TC Road 009 Gravel 0.48 Opening Drains & grass cuttingLamwo Lamwo TC Road 010 Gravel 2.5 Opening Drains & grass cuttingLamwo Lamwo TC Road 011 Gravel 2 Opening Drains & grass cuttingLamwo Lamwo TC Olebi-Pakalabule Earth 3 Opening Drains & grass cuttingLamwo Lamwo TC Olebi-Okora Earth 1 Opening Drains & grass cuttingLamwo Lamwo TC Mosque-Kal Road Gravel 1 Opening Drains & grass cuttingLamwo Lamwo TC Market street Gravel 0.62 Opening Drains & grass cuttingLamwo Lamwo TC Road 012 Gravel 3 Opening Drains & grass cutting Lamwo TC Total 16.6Lamwo Padibe TC Atwol - Padibe Girls P/s Gravel 1.6 Opening Drains & grass cuttingLamwo Padibe TC Atwol – Kolokolo Earth 3.0 Opening Drains & grass cuttingLamwo Padibe TC Road 001 Gravel 1.0 Opening Drains & grass cuttingLamwo Padibe TC Road 002 Gravel 1.1 Opening Drains & grass cuttingLamwo Padibe TC Road 003 Gravel 1.1 Opening Drains & grass cuttingLamwo Padibe TC Road 004 Gravel 1.1 Opening Drains & grass cuttingLamwo Padibe TC Road 005 Gravel 0.9 Opening Drains & grass cuttingLamwo Padibe TC Road 006 Gravel 0.9 Opening Drains & grass cuttingLamwo Padibe TC Anyibi - Ngom Wegi Gravel 1.0 Opening Drains & grass cuttingLamwo Padibe TC Padibe HCIV - Slaughter House Gravel 1.0 Opening Drains & grass cutting Padibe TC Total 12.6Lira C.A.Rs Oloo lango- Agulukere U 2.7 Opening Drains & grass cuttingLira C.A.Rs Aler T.C- Akangi U 5.6 Opening Drains & grass cuttingLira C.A.Rs Omito P/s- otodi village U 1.2 Opening Drains & grass cuttingLira C.A.Rs Alica T.C-Kole Br U 2.7 Opening Drains & grass cuttingLira C.A.Rs Aromo P/s - Otara P/s U 1 Opening Drains & grass cuttingLira C.A.Rs Alira T.C - Te Dam U 7.1 Opening Drains & grass cuttingLira C.A.Rs Kulu Atubu U 1 Opening Drains & grass cuttingLira C.A.Rs Akia Society- Burlobo U 3.8 Opening Drains & grass cuttingLira C.A.Rs Wii Ayama Swamp U 1 Opening Drains & grass cutting C.A.Rs Total 26.1Lira Lira DLG Lira Borobo Adip U 32.0 Opening Drains & grass cuttingLira Lira DLG Ngetta Kole Br U 4.0 Opening Drains & grass cuttingLira Lira DLG Odokomit Kole Br U 6.0 Opening Drains & grass cuttingLira Lira DLG Barr Kole Br U 26.4 Opening Drains & grass cuttingLira Lira DLG Aromo Jn Kole Br U 12.0 Opening Drains & grass cuttingLira Lira DLG Amach Kole Br U 8.0 Opening Drains & grass cuttingLira Lira DLG Rice Scheme Roads U 41.0 Opening Drains & grass cuttingLira Lira DLG Boroboro Amucha U 15.5 Opening Drains & grass cuttingLira Lira DLG Ojungu Amach U 16.0 Opening Drains & grass cuttingLira Lira DLG Agweng Otuke Br U 10.0 Opening Drains & grass cuttingLira Lira DLG Te Owelo Amach Cr U 15.3 Opening Drains & grass cuttingLira Lira DLG Amach Mkt Amokoge U 7.3 Opening Drains & grass cuttingLira Lira DLG Alworo Ps Apach Br U 20.0 Opening Drains & grass cuttingLira Lira DLG Ogur Tc Orit U 13.0 Opening Drains & grass cuttingLira Lira DLG Angolom Walela U 8.0 Opening Drains & grass cuttingLira Lira DLG Cura Akalocero U 15.3 Opening Drains & grass cuttingLira Lira DLG Barr Tc Alebtong Br U 10.3 Opening Drains & grass cuttingLira Lira DLG Arwot Acamonyang U 21.7 Opening Drains & grass cuttingLira Lira DLG Alikpot Alebere U 9.1 Opening Drains & grass cuttingLira Lira DLG Akor Tc Ogur Hqr U 10.5 Opening Drains & grass cuttingLira Lira DLG Aler Obim U 9.1 Opening Drains & grass cuttingLira Lira DLG Ongura Kwoyo Atara U 5.6 Opening Drains & grass cuttingLira Lira DLG Boroboro Ajia U 12.5 Opening Drains & grass cuttingLira Lira DLG Odoro Ayami U 17.4 Opening Drains & grass cuttingLira Lira DLG Barr Pii Odoro U 8.8 Opening Drains & grass cutting Lira DLG Total 354.8Luuka Luuka DLG Busanda – Budhuba – Ikumbya U 9.2 Opening Drains & grass cutting

297Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Luuka Luuka DLG Nawansega – Ikumbya – Nan-tamali U 10 Opening Drains & grass cutting

Luuka Luuka DLG Ikumbya - Kinu U 1.9 Opening Drains & grass cuttingLuuka Luuka DLG Naigobya -Bukoova U 8.4 Opening Drains & grass cuttingLuuka Luuka DLG Bunyiiro -Kiroba Earth 8.35 Opening Drains & grass cuttingLuuka Luuka DLG Budhabangula - Naigobya Earth 9.8 Opening Drains & grass cuttingLuuka Luuka DLG Namalemba - Naigobya Earth 7.7 Opening Drains & grass cuttingLuuka Luuka DLG Bulanga - Waibuga - Busiiro U 16.1 Opening Drains & grass cuttingLuuka Luuka DLG Busula - Nawansega U 12.5 Opening Drains & grass cuttingLuuka Luuka DLG Bukanga - Buwala U 18.2 Opening Drains & grass cuttingLuuka Luuka DLG Bulanga - Kyankuzi U 2.7 Opening Drains & grass cuttingLuuka Luuka DLG Buwologoma - Namukubembe U 8.8 Opening Drains & grass cuttingLuuka Luuka DLG Budooma – Ndoya U 4.6 Opening Drains & grass cuttingLuuka Luuka DLG Kyanvuma - Wandago U 4 Opening Drains & grass cuttingLuuka Luuka DLG Bukoova-Nawaka U 10.6 Opening Drains & grass cuttingLuuka Luuka DLG Busalamu -Waibuga U 4.85 Opening Drains & grass cuttingLuuka Luuka DLG Bulongo-Nabikuyi-Irongo U 16.6 Opening Drains & grass cuttingLuuka Luuka DLG Ikimbya-Bulike U 12.25 Opening Drains & grass cuttingLuuka Luuka DLG Bunirira-Busalamu U 8 Opening Drains & grass cutting Luuka DLG Total 122.3Luuka Luuka TC Ntumba Earth 4.39 Opening Drains & grass cuttingLuuka Luuka TC Kabwakato Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Kiyinga - Kitwekyambogo Earth 3.55 Opening Drains & grass cuttingLuuka Luuka TC Kaligidha Earth 0.68 Opening Drains & grass cuttingLuuka Luuka TC school lane Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Gusite lane Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Ntange BM Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC John Muzira Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Mawata Crescent Earth 2.7 Opening Drains & grass cuttingLuuka Luuka TC Minjo Earth 3.21 Opening Drains & grass cuttingLuuka Luuka TC Bwoye Earth 5.24 Opening Drains & grass cuttingLuuka Luuka TC Kasokoso Earth 0.68 Opening Drains & grass cuttingLuuka Luuka TC Luwano Close Earth 0.17 Opening Drains & grass cuttingLuuka Luuka TC Wunhi Earth 1.86 Opening Drains & grass cuttingLuuka Luuka TC Bulamu Earth 4.56 Opening Drains & grass cuttingLuuka Luuka TC Kikuuli Earth 1.35 Opening Drains & grass cuttingLuuka Luuka TC Mukasa Earth 1.18 Opening Drains & grass cuttingLuuka Luuka TC Office Access Earth 0.17 Opening Drains & grass cuttingLuuka Luuka TC Kadir Earth 4.06 Opening Drains & grass cuttingLuuka Luuka TC Abattoir Earth 0.51 Opening Drains & grass cuttingLuuka Luuka TC Ngobi Earth 1.01 Opening Drains & grass cuttingLuuka Luuka TC Mpango Earth 3.72 Opening Drains & grass cuttingLuuka Luuka TC Bituti Earth 0.68 Opening Drains & grass cuttingLuuka Luuka TC Mpabwe Earth 0.85 Opening Drains & grass cuttingLuuka Luuka TC Welukwagana Busimawu Earth 4.23 Opening Drains & grass cuttingLuuka Luuka TC Abattoir Yokoniya Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Kiiza Regan Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Mugerenge Katumba Earth 1.69 Opening Drains & grass cuttingLuuka Luuka TC Kabwakato Busimawu Earth 1.69 Opening Drains & grass cutting Luuka TC Total 60.0Lwengo Lwengo DLG Kafuzi - Nakyenyi - Lwengo. Earth 10 Opening Drains & grass cuttingLwengo Lwengo DLG Kiwangala - Mbirizi Road. Gravel 15 Opening Drains & grass cuttingLwengo Lwengo DLG Kinoni -Kyamaganda -Kisekka. Earth 8.6 Opening Drains & grass cuttingLwengo Lwengo DLG Makondo -Micunda -Lwengo. Gravel 12.5 Opening Drains & grass cuttingLwengo Lwengo DLG Lwentale - Kyampalakata Katovu. earth 24 Opening Drains & grass cuttingLwengo Lwengo DLG Kitooro - Lusaka. Earth 9.2 Opening Drains & grass cuttingLwengo Lwengo DLG Kitooro -Keikolongo . Gravel 6 Opening Drains & grass cuttingLwengo Lwengo DLG Kyetume-Kalagala-Mayira . Gravel 12 Opening Drains & grass cuttingLwengo Lwengo DLG Kaapa-Kibinge Kito Gravel 10.5 Opening Drains & grass cutting

298 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Lwengo Lwengo DLG Nkoni-Kisansalal-Ngondati . Earth 6.5 Opening Drains & grass cuttingLwengo Lwengo DLG Kitooro - Kamiti - Katuuro. Earth 13 Opening Drains & grass cuttingLwengo Lwengo DLG Kinoni-Kakinga-Nkunyu . Earth 9.2 Opening Drains & grass cuttingLwengo Lwengo DLG Ndagwe-Jjaga-Lwengo . Gravel 15 Opening Drains & grass cutting

Lwengo Lwengo DLG Kyawagonya-Lwamanyonyi-Jja-ga . Earth 10 Opening Drains & grass cutting

Lwengo Lwengo DLG Luti-Buswaga-Ndeeba. Earth 7.5 Opening Drains & grass cuttingLwengo Lwengo DLG Mbirizi-Nakyenyi-Bulasana. Earth 11 Opening Drains & grass cuttingLwengo Lwengo DLG Busubi-Kiswera-Kigaba . Earth 10 Opening Drains & grass cuttingLwengo Lwengo DLG Kyalutwaka-Kalisizo . Earth 6.5 Opening Drains & grass cuttingLwengo Lwengo DLG Kakoma-Nkudwa Earth 6.5 Opening Drains & grass cuttingLwengo Lwengo DLG Nkoni-Nabwewanga-Bwasa Earth 4 Opening Drains & grass cuttingLwengo Lwengo DLG Kyoko-Nzizi Earth 6.5 Opening Drains & grass cutting Lwengo DLG total 213.5Lwengo Kyazanga TC Busia road Earth 1.0 Opening Drains & grass cuttingLwengo Kyazanga TC Rashidi road Earth 1.2 Opening Drains & grass cuttingLwengo Kyazanga TC Kanyonyi Earth 1.8 Opening Drains & grass cuttingLwengo Kyazanga TC Mweru-Lwentale Earth 2.0 Opening Drains & grass cuttingLwengo Kyazanga TC Ebunga Road Earth 1.2 Opening Drains & grass cutting Kyazanga TC Total 7.2Lwengo Lwengo TC Ntumba Earth 4.4 Opening Drains & grass cuttingLwengo Lwengo TC Kabwakato Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Kiyinga - Kitwekyambogo Earth 3.5 Opening Drains & grass cuttingLwengo Lwengo TC Kaligidha Earth 0.7 Opening Drains & grass cuttingLwengo Lwengo TC school lane Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Gusite lane Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Ntange BM Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC John Muzira Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Mawata Crescent Earth 2.7 Opening Drains & grass cuttingLwengo Lwengo TC Minjo Earth 3.2 Opening Drains & grass cuttingLwengo Lwengo TC Bwoye Earth 5.2 Opening Drains & grass cuttingLwengo Lwengo TC Kasokoso Earth 0.7 Opening Drains & grass cuttingLwengo Lwengo TC Luwano Close Earth 0.2 Opening Drains & grass cuttingLwengo Lwengo TC Wunhi Earth 1.9 Opening Drains & grass cuttingLwengo Lwengo TC Bulamu Earth 4.6 Opening Drains & grass cuttingLwengo Lwengo TC Kikuuli Earth 1.4 Opening Drains & grass cuttingLwengo Lwengo TC Mukasa Earth 1.2 Opening Drains & grass cuttingLwengo Lwengo TC Office Access Earth 0.2 Opening Drains & grass cuttingLwengo Lwengo TC Kadir Earth 4.1 Opening Drains & grass cuttingLwengo Lwengo TC Abattoir Earth 0.5 Opening Drains & grass cuttingLwengo Lwengo TC Ngobi Earth 1.0 Opening Drains & grass cuttingLwengo Lwengo TC Mpango Earth 3.7 Opening Drains & grass cuttingLwengo Lwengo TC Bituti Earth 0.7 Opening Drains & grass cuttingLwengo Lwengo TC Mpabwe Earth 0.8 Opening Drains & grass cuttingLwengo Lwengo TC Welukwagana Busimawu Earth 4.2 Opening Drains & grass cuttingLwengo Lwengo TC Abattoir Yokoniya Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Kiiza Regan Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Mugerenge Katumba Earth 1.7 Opening Drains & grass cuttingLwengo Lwengo TC Kabwakato Busimawu Earth 1.7 Opening Drains & grass cutting Lwengo TC Total 60.0Lyantonde Lyantonde DLG Kabula-Kinuuka-Kaliiro Unpaved 13.5 Opening Drains & grass cuttingLyantonde Lyantonde DLG Kasambya-Kitazigolokwa do 12.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Kalagala-Kabatema-Nakaseeta do 17.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Nakinombe-Kyewanula-Buyanja do 10.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Nakinombe-Kabasegwa-Buyanja do 6.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Nakinombe-Kabasegwa-Buyanja do 5.0 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Kinuuka-Kamusenene-Kirin-dimura do 24.5 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Kasagama-Kibeija do 18.3 Opening Drains & grass cutting

299Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Lyantonde Lyantonde DLG Kabutetera-Bugoobe-Kabingo do 18.8 Opening Drains & grass cuttingLyantonde Lyantonde DLG Mpumudde-Buyaga-Kabingo do 24.7 Opening Drains & grass cuttingLyantonde Lyantonde DLG Mpumudde-Rwamabara-Bwiha do 13.2 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Kaliiro-Lugalama-Kyan-toko-Rwemikoma do 9.3 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Kinuuka-Bwamuramira-Kanche-bebe do 9.7 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Kalambikirizo-Kichwamba- -Ka-kinga & Kichwamba link do 9.0 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Nsiika-Kalyamenvu do 9.8 Opening Drains & grass cuttingLyantonde Lyantonde DLG Lwamayongo-Katagengera do 6.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Deziranta-Kyabasiita-Kikaasa do 8.5 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Buyaga-Kabale-Keishango-Rwo-ma do 20.3 Opening Drains & grass cutting

Lyantonde Lyantonde DLG Rwoma-Kisaluwoko do 12.2 Opening Drains & grass cuttingLyantonde Lyantonde DLG Rweshande-Kikoona do 13.1 Opening Drains & grass cuttingLyantonde Lyantonde DLG Gulama-Rwamacunda-Makondo do 8.4 Opening Drains & grass cuttingLyantonde Lyantonde DLG Rwizaliro-Lwemikoma-Nakasozi do 5.3 Opening Drains & grass cuttingLyantonde Lyantonde DLG Buyaga- Kiebe –Nsiika do 4.0 Opening Drains & grass cuttingLyantonde Lyantonde DLG Bwamiramira Kayunga do 2.8 Opening Drains & grass cuttingLyantonde Lyantonde DLG Kisshango Kyemamba road do 2.5 Opening Drains & grass cuttingLyantonde Lyantonde DLG Kiyinda Kitesa Twafada Kakondo do 12.0 Opening Drains & grass cutting

Lyantonde DLG Total 295.9

Manafwa Lwakhakha TC Meru Ibrahim U 1.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Buwuma U 4.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Taxi Park U 0.3 Opening Drains & grass cuttingManafwa Lwakhakha TC Shawuriyako U 0.8 Opening Drains & grass cuttingManafwa Lwakhakha TC Daniel Kitty Road U 1.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Bitonge U 0.5 Opening Drains & grass cuttingManafwa Lwakhakha TC Mamayi U 1.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Market U 1.5 Opening Drains & grass cuttingManafwa Lwakhakha TC Green Valley U 1.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Buwuma Circular U 0.9 Opening Drains & grass cuttingManafwa Lwakhakha TC Namikhoma U 0.4 Opening Drains & grass cuttingManafwa Lwakhakha TC Nambafu U 0.4 Opening Drains & grass cuttingManafwa Lwakhakha TC Bukibayi U 0.4 Opening Drains & grass cuttingManafwa Lwakhakha TC Society U 0.5 Opening Drains & grass cuttingManafwa Lwakhakha TC Ndari Namasanda U 1.0 Opening Drains & grass cuttingManafwa Lwakhakha TC Zachariah U 0.6 Opening Drains & grass cutting Lwakhakha TC Total 15.3Manafwa Manafwa DLG Nambewo-Bukhayaki-Nabutoro U 4.3 Opening Drains & grass cuttingManafwa Manafwa DLG Ikaali-Nambale U 4.0 Opening Drains & grass cuttingManafwa Manafwa DLG Namekhale-Bunyinza-Namboko U 6.7 Opening Drains & grass cuttingManafwa Manafwa DLG Bugobero-Molo U 6.7 Opening Drains & grass cuttingManafwa Manafwa DLG Butiru-Salosalo U 8.6 Opening Drains & grass cuttingManafwa Manafwa DLG Mwikonge-Bupoto U 4.0 Opening Drains & grass cuttingManafwa Manafwa DLG Sibanga-Masaka U 5.2 Opening Drains & grass cuttingManafwa Manafwa DLG Munamba-Nabitsikhi U 7.1 Opening Drains & grass cuttingManafwa Manafwa DLG Bukhaweka-Butiru U 9.5 Opening Drains & grass cuttingManafwa Manafwa DLG Kabbale-Ikaali-Namaloko U 4.5 Opening Drains & grass cuttingManafwa Manafwa DLG Nambola-Bunambale U 6.7 Opening Drains & grass cuttingManafwa Manafwa DLG Lwakhakha-Buwumwa-Namboko U 8.0 Opening Drains & grass cuttingManafwa Manafwa DLG Bupoto-Bumbo U 6.7 Opening Drains & grass cuttingManafwa Manafwa DLG Sibanga-Bunyinza U 8.0 Opening Drains & grass cutting Musipande-Nabukhuya U 3.4 Opening Drains & grass cuttingManafwa Manafwa DLG Mayenze-Shanemba U 1.8 Opening Drains & grass cuttingManafwa Manafwa DLG Kunikina-Wekelekha U 4.1 Opening Drains & grass cutting Manafwa DLG Total 99.3Manafwa Manafwa TC Namaondo U 4.0 Opening Drains & grass cutting

300 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Manafwa Manafwa TC Namakese – Tongoi U 4.0 Opening Drains & grass cuttingManafwa Manafwa TC Wanyera - Namaliko U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Esau-Namutembi U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Walanga U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Wandobere U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Kisenyi U 4.0 Opening Drains & grass cuttingManafwa Manafwa TC Mayenze streets U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Shyambogo-Central U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Liisi –Komola U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Watenga - Mulino U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Mabolo U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Sikayi-Wesonga U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Mungasa – Bumukoya U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Bwirusa - Wanatsusi U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Kanyanya - Bubulo HC U 2.0 Opening Drains & grass cuttingManafwa Manafwa TC Buwele - weswa U 2.0 Opening Drains & grass cutting Manafwa TC Total 40.0Maracha Maracha C A R S Odrua- Ombavu Unpaved 2.1 Opening Drains & grass cuttingMaracha Maracha C A R S Odrua-Itia- Midiowa Unpaved 5.0 Opening Drains & grass cuttingMaracha Maracha C A R S Ojapi-Olua COU Unpaved 4.3 Opening Drains & grass cuttingMaracha Maracha C A R S Anyivu-Edre-Munia-bar Unpaved 5.0 Opening Drains & grass cuttingMaracha Maracha C A R S Ojapi-Aliamu Unpaved 3.3 Opening Drains & grass cuttingMaracha Maracha C A R S Odrua-Oru Unpaved 4.0 Opening Drains & grass cuttingMaracha Maracha C A R S Igumayi-Oru Unpaved 4.0 Opening Drains & grass cuttingMaracha Maracha C A R S Koyi TC- Piago village Unpaved 3.2 Opening Drains & grass cuttingMaracha Maracha C A R S Lurua- Obio village Unpaved 4.3 Opening Drains & grass cuttingMaracha Maracha C A R S Koyi-Milio Unpaved 3.2 Opening Drains & grass cuttingMaracha Maracha C A R S Moiga-Lili Border Unpaved 4.3 Opening Drains & grass cuttingMaracha Maracha C A R S Bonia baba-Alivu B-Midria Unpaved 3.2 Opening Drains & grass cuttingMaracha Maracha C A R S Otravu-Adivu Unpaved 2.6 Opening Drains & grass cuttingMaracha Maracha C A R S Maliava- Lii boarder market Unpaved 4.1 Opening Drains & grass cuttingMaracha Maracha C A R S Juakali- Paidha market Unpaved 1.0 Opening Drains & grass cuttingMaracha Maracha C A R S Olufe-Koriba Unpaved 3.3 Opening Drains & grass cuttingMaracha Maracha C A R S Yayia-Okalio Unpaved 2.3 Opening Drains & grass cuttingMaracha Maracha C A R S Cikoro- Yoyo Unpaved 4.6 Opening Drains & grass cuttingMaracha Maracha C A R S Gbulua- Nyambira- Anyabia Unpaved 7.0 Opening Drains & grass cuttingMaracha Maracha C A R S Etoko- Edee market Unpaved 1.9 Opening Drains & grass cuttingMaracha Maracha C A R S Kovua-Kilemba-Mbafe P/s Unpaved 7.5 Opening Drains & grass cuttingMaracha Maracha C A R S Buramali-Paidha Mkt Unpaved 3.0 Opening Drains & grass cuttingMaracha Maracha C A R S Retriko P/S-Nyamanzile CC Unpaved 1.2 Opening Drains & grass cuttingMaracha Maracha C A R S Alikua- Egamara Unpaved 2.5 Opening Drains & grass cuttingMaracha Maracha C A R S Alikua- Anyavu Unpaved 1.4 Opening Drains & grass cuttingMaracha Maracha C A R S Ario CC- Erafia market Unpaved 1.6 Opening Drains & grass cuttingMaracha Maracha C A R S Worogbo west- Onzoro Unpaved 4.0 Opening Drains & grass cuttingMaracha Maracha C A R S Nelebe- Minako Unpaved 3.6 Opening Drains & grass cuttingMaracha Maracha C A R S Mgbokolo-Ociba Unpaved 2.5 Opening Drains & grass cuttingMaracha Maracha C A R S Offude-Tc-Cashewnut Unpaved 4.1 Opening Drains & grass cuttingMaracha Maracha C A R S Atratraka p/s- Kamadi p/s Unpaved 3.0 Opening Drains & grass cuttingMaracha Maracha C A R S Emve- Ama Unpaved 4.0 Opening Drains & grass cuttingMaracha Maracha C A R S Mundru Nyikia- Ongoro Unpaved 1.0 Opening Drains & grass cuttingMaracha Maracha C A R S Andeni-Mundru-Ogoro Unpaved 5.0 Opening Drains & grass cuttingMaracha Maracha C A R S Ongoro-Nyikia Unpaved 2.0 Opening Drains & grass cuttingMaracha Maracha C A R S Atoro-Baranya Unpaved 3.5 Opening Drains & grass cuttingMaracha Maracha C A R S Eliofe-cubiri-DRC Unpaved 2.0 Opening Drains & grass cuttingMaracha Maracha C A R S Robu p/s- Taliap/s Unpaved 3.5 Opening Drains & grass cuttingMaracha Maracha C A R S Okokoro- Oluvu Unpaved 2.6 Opening Drains & grass cuttingMaracha Maracha C A R S Kijomoro- Alivu Unpaved 1.2 Opening Drains & grass cuttingMaracha Maracha C A R S Alive Gubu Unpaved 2.6 Opening Drains & grass cuttingMaracha Maracha C A R S Gbokua-Curube-Esemayi Unpaved 6.6 Opening Drains & grass cutting

301Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

C A R S Total 141.1Maracha Maracha DLG Alikua-Nyoro Unpaved 5.4 Opening Drains & grass cuttingMaracha Maracha DLG Yivu-Goyigoyi Unpaved 7.2 Opening Drains & grass cuttingMaracha Maracha DLG Goyigoyi-Wanize Unpaved 9.4 Opening Drains & grass cuttingMaracha Maracha DLG Aliku egamara Unpaved 4.8 Opening Drains & grass cuttingMaracha Maracha DLG Enyau bridge-Kijomoro Unpaved 5.0 Opening Drains & grass cuttingMaracha Maracha DLG Oluvu-Ovujo Unpaved 13.5 Opening Drains & grass cuttingMaracha Maracha DLG Simbili-Oleba Unpaved 9.0 Opening Drains & grass cuttingMaracha Maracha DLG Tara-Olua mosque Unpaved 1.9 Opening Drains & grass cuttingMaracha Maracha DLG Erewa-Wadra-Ombiabura Unpaved 5.6 Opening Drains & grass cuttingMaracha Maracha DLG Dada-DRC border Unpaved 6.2 Opening Drains & grass cuttingMaracha Maracha DLG Kololo-Odrua Unpaved 5.0 Opening Drains & grass cuttingMaracha Maracha DLG yivu lala-Munia bar Unpaved 6.3 Opening Drains & grass cuttingMaracha Maracha DLG Okokoro- Oluvu Unpaved 5.5 Opening Drains & grass cuttingMaracha Maracha DLG ovujo simbili Unpaved 7.5 Opening Drains & grass cuttingMaracha Maracha DLG Ombere Unpaved 7.4 Opening Drains & grass cuttingMaracha Maracha DLG Ambidro-Kijomoro Unpaved 9.3 Opening Drains & grass cuttingMaracha Maracha DLG Koyi onzilabori Unpaved 6.2 Opening Drains & grass cuttingMaracha Maracha DLG Nyadri-Tara Unpaved 13.5 Opening Drains & grass cuttingMaracha Maracha DLG Oleba Tc-Retriko Unpaved 9.3 Opening Drains & grass cuttingMaracha Maracha DLG Agii nigo-Okabi Unpaved 11.0 Opening Drains & grass cuttingMaracha Maracha DLG Uganda -DRC border road Unpaved 10.0 Opening Drains & grass cuttingMaracha Maracha DLG Agii andeni DRC border Unpaved 5.6 Opening Drains & grass cuttingMaracha Maracha DLG Uluffe- ambekua Unpaved 2.4 Opening Drains & grass cuttingMaracha Maracha DLG kololo -pajuru Unpaved 5.5 Opening Drains & grass cuttingMaracha Maracha DLG wanzie -ojapi Unpaved 6.0 Opening Drains & grass cuttingMaracha Maracha DLG Abiria-Anyivu-Andayi unpaved 6.0 Opening Drains & grass cuttingMaracha Maracha DLG Lamilaciru-Drc border unpaved 11.0 Opening Drains & grass cuttingMaracha Maracha DLG Aliro-Aluma unpaved 4.5 Opening Drains & grass cuttingMaracha Maracha DLG Etoko-DRC Border unpaved 5.2 Opening Drains & grass cuttingMaracha Maracha DLG Gbulua-Nyambira- DRC unpaved 12.6 Opening Drains & grass cuttingMaracha Maracha DLG Okokoro-Oribani-luo unpaved 3.6 Opening Drains & grass cuttingMaracha Maracha DLG Lurua-Oniba unpaved 5.4 Opening Drains & grass cutting Maracha DLG Total 226.8

Maracha MarachaUrban roads Aluma unpaved 2.5 Opening Drains & grass cutting

Maracha MarachaUrban roads Meki unpaved 1.5 Opening Drains & grass cutting

Maracha MarachaUrban roads Azipi unpaved 2 Opening Drains & grass cutting

Maracha MarachaUrban roads Alija unpaved 2.8 Opening Drains & grass cutting

Maracha MarachaUrban roads Adongoro unpaved 1 Opening Drains & grass cutting

Maracha MarachaUrban roads Kamure unpaved 2.1 Opening Drains & grass cutting

Maracha MarachaUrban roads Auma unpaved 1.7 Opening Drains & grass cutting

Maracha MarachaUrban roads Ruth road unpaved 0.6 Opening Drains & grass cutting

Maracha MarachaUrban roads Didi road unpaved 0.8 Opening Drains & grass cutting

Maracha MarachaUrban roads Transport road unpaved 0.3 Opening Drains & grass cutting

Maracha MarachaUrban roads Eastern road unpaved 0.7 Opening Drains & grass cutting

Maracha MarachaUrban roads Yecua road unpaved 0.6 Opening Drains & grass cutting

Maracha MarachaUrban roads Miri Adua road unpaved 0.15 Opening Drains & grass cutting

Maracha MarachaUrban roads Market lane unpaved 0.38 Opening Drains & grass cutting

302 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

MarachaUrban TT TTroads 17.13

Masaka Masaka DLG Bukunda-Manzi-Kamuzinda Unpaved 9.15 Opening Drains & grass cuttingMasaka Masaka DLG Buwunga-Kitengesa Unpaved 3.93 Opening Drains & grass cuttingMasaka Masaka DLG Kabanda-Katikamu-Kyatokolo Unpaved 4.67 Opening Drains & grass cuttingMasaka Masaka DLG Kyassuma-Lwanyi-Kitengesa Unpaved 5.02 Opening Drains & grass cuttingMasaka Masaka DLG Bbaale-Kayembe-Nakigga Unpaved 7.47 Opening Drains & grass cutting DLG Total 30Masaka Masaka MC Elgin Street P 0.7 Opening Drains & grass cuttingMasaka Masaka MC Edward Street P 0.6 Opening Drains & grass cuttingMasaka Masaka MC Hobart Street p 0.65 Opening Drains & grass cuttingMasaka Masaka MC Kampala Road P 0.30 Opening Drains & grass cuttingMasaka Masaka MC Alex Ssebowa P 1.10 Opening Drains & grass cuttingMasaka Masaka MC Ssese Street p 0.30 Opening Drains & grass cuttingMasaka Masaka MC Jethabai P 0.30 Opening Drains & grass cuttingMasaka Masaka MC Birch Road P 0.60 Opening Drains & grass cuttingMasaka Masaka MC Old Kumbu U 1.20 Opening Drains & grass cuttingMasaka Masaka MC Kigamba Road U 1.20 Opening Drains & grass cuttingMasaka Masaka MC Victoria Road P 0.55 Opening Drains & grass cuttingMasaka Masaka MC Katwe Bypass Road P 1.0 Opening Drains & grass cuttingMasaka Masaka MC Mwami Rd P 0.2 Opening Drains & grass cuttingMasaka Masaka MC Nakayiba _ Kitovu Road P 0.7 Opening Drains & grass cuttingMasaka Masaka MC Kyeyagarire Rd U 2.0 Opening Drains & grass cuttingMasaka Masaka MC Kabula Street P 0.2 Opening Drains & grass cuttingMasaka Masaka MC Bainnes Terrace P 0.3 Opening Drains & grass cuttingMasaka Masaka MC Grant Street P 0.65 Opening Drains & grass cuttingMasaka Masaka MC Mutub Av. P 0.62 Opening Drains & grass cuttingMasaka Masaka MC Nekongolero Road U 2.80 Opening Drains & grass cuttingMasaka Masaka MC Kabulasoke road U 2.40 Opening Drains & grass cuttingMasaka Masaka MC Ssenyange Roads U 6.00 Opening Drains & grass cuttingMasaka Masaka MC Nyendo - Cathedral Rd. P 0.8 Opening Drains & grass cuttingMasaka Masaka MC Kajjansembe Road U 2.2 Opening Drains & grass cuttingMasaka Masaka MC Hill Road P 0.8 Opening Drains & grass cutting

Masaka MC Total 28.17Masindi Masindi DLG Katasentwa-Kina U 5.9 Opening Drains & grass cuttingMasindi Masindi DLG kyangamwoyo- Nyakatogo U 6.6 Opening Drains & grass cuttingMasindi Masindi DLG Labongo- kihonda Walyoba U 7.2 Opening Drains & grass cuttingMasindi Masindi DLG Kasongoire- kimanya U 15.5 Opening Drains & grass cuttingMasindi Masindi DLG Muro- Kihara U 6.3 Opening Drains & grass cuttingMasindi Masindi DLG Pakanyi- Nyakarongo U 0.0 Opening Drains & grass cuttingMasindi Masindi DLG kisalizi- kitongole U 7.7 Opening Drains & grass cuttingMasindi Masindi DLG Biraizi- kilanyi U 8.3 Opening Drains & grass cuttingMasindi Masindi DLG Kisindi –Kihonda U 13.0 Opening Drains & grass cuttingMasindi Masindi DLG Kitamba kijujubwa U 21.7 Opening Drains & grass cuttingMasindi Masindi DLG Butoobe-Kiina-Boazi Road U 2.7 Opening Drains & grass cuttingMasindi Masindi DLG Kinyara- sonso U 10.9 Opening Drains & grass cuttingMasindi Masindi DLG Kidoma- kasomoro U 7.5 Opening Drains & grass cuttingMasindi Masindi DLG Kisindizi-Kinumi U 7.5 Opening Drains & grass cuttingMasindi Masindi DLG Bulima- Byebega U 17.3 Opening Drains & grass cuttingMasindi Masindi DLG Rukondwa- kitonozi- kiina U 9.9 Opening Drains & grass cuttingMasindi Masindi DLG Isimba- kitoka U 10.0 Opening Drains & grass cuttingMasindi Masindi DLG Kyatiri – Kitanyata U 10.0 Opening Drains & grass cuttingMasindi Masindi DLG Kitanyata- Mboira U 8.0 Opening Drains & grass cuttingMasindi Masindi DLG Bulima- kyabateka U 4.3 Opening Drains & grass cuttingMasindi Masindi DLG Kyatiri - Kibibira-Kituumo U 8.6 Opening Drains & grass cuttingMasindi Masindi DLG Kyatiri – Kitwetwe U 6.0 Opening Drains & grass cuttingMasindi Masindi DLG Katagurukwa – kinumi U 9.2 Opening Drains & grass cuttingMasindi Masindi DLG Kimengo- Masindi port U 10.0 Opening Drains & grass cuttingMasindi Masindi DLG Ibaralibi Alimugonza U 24.0 Opening Drains & grass cutting

303Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Masindi Masindi DLG Kibamba- kaborogota U 7.4 Opening Drains & grass cuttingMasindi Masindi DLG Nyambindo- Kitwetwe U 7.4 Opening Drains & grass cuttingMasindi Masindi DLG Bisaju Towasati U 11.5 Opening Drains & grass cutting

Masindi Masindi DLG Rwenziramire-Rwebigwara- kyangamwoyo U 11.7 Opening Drains & grass cutting

Masindi Masindi DLG Kihaguzi- kyakamese U 10.1 Opening Drains & grass cuttingMasindi Masindi DLG Kyangamwoyo- kaikuku- Ntoma U 28.4 Opening Drains & grass cuttingMasindi Masindi DLG Byerima –kaiha U 5.3 Opening Drains & grass cuttingMasindi Masindi DLG kiryampunu- kinumi U 4.8 Opening Drains & grass cutting

Masindi Masindi DLG Katagurukwa – Kibali-Bayegom-ba U 13.0 Opening Drains & grass cutting

Masindi Masindi DLG Kikube-Balyejukira-Kitinwa U 17.0 Opening Drains & grass cutting

Masindi Masindi DLG Balyejukira-Kyakatera-Kyanda-gi-K U 6.5 Opening Drains & grass cutting

Masindi Masindi DLG Ntooma-Tura-Kaikuku U 17.0 Opening Drains & grass cuttingMasindi Masindi DLG Bubanda-Ljamirembe Biseke-Nto U 7.4 Opening Drains & grass cuttingMasindi Masindi DLG Murujeje-Mburabuzi U 10.0 Opening Drains & grass cutting Masindi DLG Total 395.6Masindi Masindi MC Omukama Road from U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Rwebikohi U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Kihande-Rweijere-Kibwona U 7.5 Opening Drains & grass cuttingMasindi Masindi MC Kirunganwa U 2.2 Opening Drains & grass cuttingMasindi Masindi MC Victory Garden U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Kisengya U 2.1 Opening Drains & grass cuttingMasindi Masindi MC Wamara U 1.6 Opening Drains & grass cuttingMasindi Masindi MC Bulyasojo U 1.2 Opening Drains & grass cuttingMasindi Masindi MC Dr. Kununka U 0.8 Opening Drains & grass cuttingMasindi Masindi MC Kijura-kisarabwire U 1.3 Opening Drains & grass cuttingMasindi Masindi MC Academy road U 3.5 Opening Drains & grass cuttingMasindi Masindi MC Kyamunara-Kamunyonga-k U 4.0 Opening Drains & grass cuttingMasindi Masindi MC Kisiita-Habitat U 2.7 Opening Drains & grass cuttingMasindi Masindi MC NTC-Creamland U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Mascesco U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Badugu U 2.7 Opening Drains & grass cuttingMasindi Masindi MC Katengeta-kaborogota U 2.2 Opening Drains & grass cuttingMasindi Masindi MC Kijunjubwa U 2.8 Opening Drains & grass cuttingMasindi Masindi MC Kabarwana-kimurasi U 2.4 Opening Drains & grass cuttingMasindi Masindi MC Majara U 1.8 Opening Drains & grass cuttingMasindi Masindi MC UNRA-Mile 2 U 1.9 Opening Drains & grass cuttingMasindi Masindi MC Rutumba U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Kirasa-Kampala U 2.0 Opening Drains & grass cuttingMasindi Masindi MC Majimazuri U 1.2 Opening Drains & grass cuttingMasindi Masindi MC Henry Mugisa U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Tibanyenda U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Kabalega Crescent U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Baker Crescent U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Karubanga U 0.7 Opening Drains & grass cuttingMasindi Masindi MC Nyangahya River U 1.2 Opening Drains & grass cuttingMasindi Masindi MC Ashton Drive U 0.4 Opening Drains & grass cuttingMasindi Masindi MC Manyuru U 1.3 Opening Drains & grass cuttingMasindi Masindi MC Perse Street U 0.4 Opening Drains & grass cuttingMasindi Masindi MC Bikunya U 0.5 Opening Drains & grass cuttingMasindi Masindi MC Hospital U 0.7 Opening Drains & grass cuttingMasindi Masindi MC Sir Tito Winyi U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Kasigwa U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Kamese U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Baharagate U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Bunyoro Kitara U 0.2 Opening Drains & grass cuttingMasindi Masindi MC Nyangabyaki U 1.6 Opening Drains & grass cutting

304 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Masindi Masindi MC Town View U 4.8 Opening Drains & grass cuttingMasindi Masindi MC Ssebagala U 0.6 Opening Drains & grass cuttingMasindi Masindi MC Rusiribya U 1.1 Opening Drains & grass cuttingMasindi Masindi MC Tongue Street U 0.5 Opening Drains & grass cuttingMasindi Masindi MC Market Street U 0.6 Opening Drains & grass cuttingMasindi Masindi MC Iguru U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Ntuha U 0.6 Opening Drains & grass cuttingMasindi Masindi MC Amanya U 1.2 Opening Drains & grass cuttingMasindi Masindi MC Kandumba drive U 2.1 Opening Drains & grass cuttingMasindi Masindi MC Nyabikere U 1.3 Opening Drains & grass cuttingMasindi Masindi MC Excel U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Karugutu-Rwijere U 3.7 Opening Drains & grass cuttingMasindi Masindi MC Kibyama-katasenywa U 4.0 Opening Drains & grass cuttingMasindi Masindi MC Nyabisense-kitonozi U 1.4 Opening Drains & grass cuttingMasindi Masindi MC Binyinya-kyakabuka U 3.6 Opening Drains & grass cuttingMasindi Masindi MC Katasenywa-Butoobe U 4.1 Opening Drains & grass cuttingMasindi Masindi MC Kalyango-kakwese-k U 4.4 Opening Drains & grass cuttingMasindi Masindi MC Katasenywa-bwita U 2.0 Opening Drains & grass cuttingMasindi Masindi MC Kamurasi-Kisengya U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Kabarwana-kamurasi U 0.6 Opening Drains & grass cuttingMasindi Masindi MC Biizi-Bigando U 4.7 Opening Drains & grass cuttingMasindi Masindi MC Kyamujwara-kijambura U 3.1 Opening Drains & grass cuttingMasindi Masindi MC Kyamugweri-kyamujwara U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Kamurasi-Wanzaala-k U 3.1 Opening Drains & grass cuttingMasindi Masindi MC Nyakatooke-kigulya-k U 9.4 Opening Drains & grass cuttingMasindi Masindi MC Kisarabwire-kihuuba-k U 5.4 Opening Drains & grass cuttingMasindi Masindi MC Kilooya-kiswata U 5.1 Opening Drains & grass cuttingMasindi Masindi MC Zebra-kyema U 17.5 Opening Drains & grass cuttingMasindi Masindi MC Kisanja-kigulya U 4.0 Opening Drains & grass cuttingMasindi Masindi MC Isimba-Bakengere U 6.0 Opening Drains & grass cuttingMasindi Masindi MC Kyema-kitamanya-k U 2.4 Opening Drains & grass cuttingMasindi Masindi MC Kyakasozi-kiduru-B U 3.4 Opening Drains & grass cuttingMasindi Masindi MC Kyema-kyakato U 2.7 Opening Drains & grass cuttingMasindi Masindi MC Kitojo-kirima U 1.6 Opening Drains & grass cuttingMasindi Masindi MC Kabaabalye-kigaju U 1.0 Opening Drains & grass cuttingMasindi Masindi MC Kirima-kyarugangara U 4.1 Opening Drains & grass cuttingMasindi Masindi MC Karujubu-kirima U 2.7 Opening Drains & grass cuttingMasindi Masindi MC Kibwona-Zebra U 3.8 Opening Drains & grass cuttingMasindi Masindi MC Karujubu-kibwona U 2.8 Opening Drains & grass cuttingMasindi Masindi MC Kibwona-Iragara U 3.0 Opening Drains & grass cuttingMasindi Masindi MC Bulyango-kyabadindi U 2.0 Opening Drains & grass cuttingMasindi Masindi MC Iboohe-Kibwona U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Gorora-kihamya U 4.1 Opening Drains & grass cuttingMasindi Masindi MC Kyabasita-kyangulya-kijogo U 1.5 Opening Drains & grass cuttingMasindi Masindi MC Kiswata-Nyakakwali road U 2.0 Opening Drains & grass cuttingMasindi Masindi MC Kijura-Mosque road U 0.6 Opening Drains & grass cuttingMasindi Masindi MC Nyambale road U 2.1 Opening Drains & grass cutting

Masindi MC 204.1Mayuge Mayuge DLG Mpungwe-Kioga Gravel 8.5 Opening Drains & grass cuttingMayuge Mayuge DLG Nkolongo-Malindi Gravel 8 Opening Drains & grass cuttingMayuge Mayuge DLG Busaala-Katuba-Kigulamo Gravel 7 Opening Drains & grass cuttingMayuge Mayuge DLG Busuyi-Busalamu-Wairasa Gravel 7 Opening Drains & grass cuttingMayuge Mayuge DLG Bumwena-Namoni Gravel 16 Opening Drains & grass cuttingMayuge Mayuge DLG Bugadde-Kabaganja Gravel 10 Opening Drains & grass cuttingMayuge Mayuge DLG Mashaga-Bukalenzi Gravel 8 Opening Drains & grass cuttingMayuge Mayuge DLG Kyankuzi-Igeyero Gravel 7 Opening Drains & grass cuttingMayuge Mayuge DLG Kigandalo-Busira Gravel 10 Opening Drains & grass cuttingMayuge Mayuge DLG Bugadde-Kikokoli-Maumu Gravel 9.3 Opening Drains & grass cuttingMayuge Mayuge DLG Bute-Namusenwa-Musita Gravel 7.8 Opening Drains & grass cutting

305Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mayuge Mayuge DLG Bugadde-Bukoba Gravel 5 Opening Drains & grass cuttingMayuge Mayuge DLG Mayuge-Isikiro Gravel 8 Opening Drains & grass cuttingMayuge Mayuge DLG Butangala-Mukonda-Mwezi Gravel 6 Opening Drains & grass cuttingMayuge Mayuge DLG Waitambogwe-Mbaale Gravel 10 Opening Drains & grass cuttingMayuge Mayuge DLG Kityerera-Kibungo Gravel 10 Opening Drains & grass cuttingMayuge Mayuge DLG Kasozi-Kibuye Gravel 7 Opening Drains & grass cuttingMayuge Mayuge DLG Kaluuba-Luubu Gravel 10 Opening Drains & grass cutting

Mayuge DLG Total 154.6Mbale Mbale DLG Border - Bukingala U 5.0 Opening Drains & grass cuttingMbale Mbale DLG Bufumbo - Namatala U 3.6 Opening Drains & grass cuttingMbale Mbale DLG Bugema - Doko U 5.1 Opening Drains & grass cuttingMbale Mbale DLG Bugema - Oxford U 4.0 Opening Drains & grass cuttingMbale Mbale DLG Bukatsa - Nabiri U 2.0 Opening Drains & grass cuttingMbale Mbale DLG Bunawunzu - Madenge U 3.5 Opening Drains & grass cuttingMbale Mbale DLG Burukuru-Bumamali U 3.2 Opening Drains & grass cuttingMbale Mbale DLG Burukuru-Namutembi U 4.3 Opening Drains & grass cuttingMbale Mbale DLG Busano - Buwangwa U 4.0 Opening Drains & grass cuttingMbale Mbale DLG Busano - Khatwelatwela U 2.0 Opening Drains & grass cuttingMbale Mbale DLG Busano Passa - Bukhabusi U 1.0 Opening Drains & grass cuttingMbale Mbale DLG Busiu - Namawanga U 6.3 Opening Drains & grass cuttingMbale Mbale DLG Busiu - Wangale U 5.0 Opening Drains & grass cuttingMbale Mbale DLG Buwalasi - Namwalye U 1.7 Opening Drains & grass cuttingMbale Mbale DLG Buwalula - Nabumali U 5.5 Opening Drains & grass cuttingMbale Mbale DLG Buwalula - Namatsale U 4.0 Opening Drains & grass cuttingMbale Mbale DLG Buzalangizo - Kaama U 2.7 Opening Drains & grass cuttingMbale Mbale DLG Doko - Kolonyi U 6.0 Opening Drains & grass cuttingMbale Mbale DLG Jewa - Kaama U 5.0 Opening Drains & grass cuttingMbale Mbale DLG Kabwangasi - Doko U 6.0 Opening Drains & grass cuttingMbale Mbale DLG Kimwanga - Musese U 2.2 Opening Drains & grass cuttingMbale Mbale DLG Korani - Manafa U 6.2 Opening Drains & grass cuttingMbale Mbale DLG Lwaboba - Busiu TC U 8.0 Opening Drains & grass cuttingMbale Mbale DLG Lwaboba - Kangole U 6.8 Opening Drains & grass cuttingMbale Mbale DLG Lwaboba - Nagirima U 6.0 Opening Drains & grass cuttingMbale Mbale DLG Mukaga - Marale U 3.5 Opening Drains & grass cuttingMbale Mbale DLG Mulatsi - Bukiende U 2.0 Opening Drains & grass cuttingMbale Mbale DLG Mulatsi- Busoba U 4.9 Opening Drains & grass cuttingMbale Mbale DLG Mutoto - Bulujele U 7.7 Opening Drains & grass cuttingMbale Mbale DLG Mutoto - Busimba U 6.0 Opening Drains & grass cuttingMbale Mbale DLG Nabumali - Busano U 6.3 Opening Drains & grass cuttingMbale Mbale DLG Namanyonyi - Buwalasi U 4.0 Opening Drains & grass cuttingMbale Mbale DLG Namwalye - Mulatsi U 7.6 Opening Drains & grass cuttingMbale Mbale DLG Nashikhaso - Namawanga U 3.5 Opening Drains & grass cuttingMbale Mbale DLG Nkoma - Makuduyi U 5.0 Opening Drains & grass cuttingMbale Mbale DLG Railway Station - Bunanimi U 4.3 Opening Drains & grass cuttingMbale Mbale DLG Rongoro - Mulatsi U 4.5 Opening Drains & grass cuttingMbale Mbale DLG Shisala - Makhonje U 3.0 Opening Drains & grass cuttingMbale Mbale DLG Sirra - Musoto U 6.8 Opening Drains & grass cuttingMbale Mbale DLG Tooma - Buwalasi U 3.2 Opening Drains & grass cutting Mbale DLG Total 181.4Mbale Mbale MC Manafwa road, Market lane, U 10 Opening Drains & grass cutting

Mbale MC Total 10Mbarara Mbarara DLG Ekiyenje-Nkaka U 14.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Bukiro-Rubaare-Kagongi-Rub-indi U 36.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Ruhumba-Bwengure U 9.0 Opening Drains & grass cuttingMbarara Mbarara DLG Rutoma-Kashare-Mutonto U 11.5 Opening Drains & grass cuttingMbarara Mbarara DLG Rubindi-Rubaare-Mile22 U 6.0 Opening Drains & grass cuttingMbarara Mbarara DLG Nyamukana-Kibaare-Byanamira U 18.0 Opening Drains & grass cuttingMbarara Mbarara DLG Ndeija-Nyeindo-Nyeihanga U 4.0 Opening Drains & grass cutting

306 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mbarara Mbarara DLG Mwizi-Kikunda-Omukatojo U 14.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Rwakishakizi-Karangara-Bugam-ba-Rukandangye U 6.5 Opening Drains & grass cutting

Mbarara Mbarara DLG Nyakayojo-Kicwamba U 15.0 Opening Drains & grass cuttingMbarara Mbarara DLG Nyakaaguruka-Ihunga-Kabutare U 9.5 Opening Drains & grass cutting

Mbarara Mbarara DLG Nyamukana-Kashuro-Kito-jo-Bugamba U 22.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Rweibogo-Karamurani U 8.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Buteraniro-Nyakaikara-Kon-goro-Kashasha U 17.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Mile2-Rwariire-Kibona U 6.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Bwizibwera-Nyampikye-Kito-okye-Rwenshanku U 10.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Rubaya-Akasusano U 8.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Bunenero-Kaguhanzya-Kyamat-ambarire U 10.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Kinoni-Ngoma U 4.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Kashekure-Kikonkoma-Ibum-ba-Ryamiyonga U 14.0 Opening Drains & grass cutting

Mbarara Mbarara DLG Rubindi-Kashare U 6.0 Opening Drains & grass cuttingMbarara Mbarara DLG Bushwere-Rwentojo-Bugamba U 8.0 Opening Drains & grass cuttingMbarara Mbarara DLG Ntura-Nyaminyobwa-Nkondo U 9.0 Opening Drains & grass cuttingMbarara Mbarara DLG Kinoni-Katereza-Nyakabare U 4.0 Opening Drains & grass cutting Mbarara DLG Total 269.5Mitooma Mitooma DLG NCWERA-BITEREKO-KATI U 26 Opening Drains & grass cutting

Mitooma Mitooma DLG MITOOMA- KABIRA- KASHEN-SHERO U 13 Opening Drains & grass cutting

Mitooma Mitooma DLG KABIRA- RWINTANZI U 12 Opening Drains & grass cuttingMitooma Mitooma DLG MUTARA - KABUCEERA U 16 Opening Drains & grass cuttingMitooma Mitooma DLG Katenga - Bwoma U 9 Opening Drains & grass cuttingMitooma Mitooma DLG Kabira-Katagata- Rwemburara U 7.5 Opening Drains & grass cuttingMitooma Mitooma DLG Mitooma- Rutookye -Kiyanga U 35.5 Opening Drains & grass cuttingMitooma Mitooma DLG Mutara - Kagogo- Kashansha U 7 Opening Drains & grass cuttingMitooma Mitooma DLG Mutara-Bukongoro - Katooma U 6.5 Opening Drains & grass cuttingMitooma Mitooma DLG Mutara - Nyakihita- Kataho U 11 Opening Drains & grass cuttingMitooma Mitooma DLG Katenga - Kakamba - Nkukuru U 10 Opening Drains & grass cuttingMitooma Mitooma DLG Rwanja - Butembe U 8.5 Opening Drains & grass cuttingMitooma Mitooma DLG Omukabira - Nkinga U 11 Opening Drains & grass cutting

Mitooma Mitooma DLG Rwempungu - Kashongorero-Ru-shaya U 16 Opening Drains & grass cutting

Mitooma Mitooma DLG Rwempungu - Kashenshero- Bukuba - Bitereko U 9 Opening Drains & grass cutting

Mitooma Mitooma DLG Kibingo - Ijumo- Rwentookye U 5 Opening Drains & grass cuttingMitooma Mitooma DLG Katunda - Kenjubwe U 7 Opening Drains & grass cutting 210Mitooma Mitooma TC Mitooma - Nshenga U 2.6 Opening Drains & grass cuttingMitooma Mitooma TC Mitooma - Nyakahandangazi U 2 Opening Drains & grass cuttingMitooma Mitooma TC Buharambo- Nyakashojwa U 2.5 Opening Drains & grass cuttingMitooma Mitooma TC Katooma-Rubaya- Katagata U 1.7 Opening Drains & grass cuttingMitooma Mitooma TC Bugarama - Nyampimbi U 2 Opening Drains & grass cuttingMitooma Mitooma TC Mitooma - Kyemengo-Mushunga U 1.6 Opening Drains & grass cuttingMitooma Mitooma TC Mitooma - Katagata- Mushunga U 2 Opening Drains & grass cuttingMitooma Mitooma TC Ryakahimbi- Nyamiko- Ijumo U 1.2 Opening Drains & grass cuttingMitooma Mitooma TC Bihama -Bahindi U 0.9 Opening Drains & grass cuttingMitooma Mitooma TC Mitooma - Bugarama U 2 Opening Drains & grass cuttingMitooma Mitooma TC Buharambo- Bubaare U 4 Opening Drains & grass cutting

Mitooma Mitooma TC Nshenga - Nyabyondo- Buha-rambo U 1.7 Opening Drains & grass cutting

Mitooma Mitooma TC Nyakahandagazi B - Rubaya U 0.8 Opening Drains & grass cutting

Mitooma Mitooma TC Nshenga - Rwenkuba- Ryaka-himbi U 1.5 Opening Drains & grass cutting

307Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mitooma Mitooma TC Buharambo - Rushozi U 0.5 Opening Drains & grass cuttingMitooma Mitooma TC Ruboroga U 0.4 Opening Drains & grass cuttingMitooma Mitooma TC Katooma Road U 0.4 Opening Drains & grass cuttingMitooma Mitooma TC Katooma - Rwakifuru U 0.6 Opening Drains & grass cutting Mitooma TC Total 28.4Mitooma Kashenshero TC Kashenshero- P/S -KYANZIRE U 2 Opening Drains & grass cuttingMitooma Kashenshero TC Kashenshero Town - Ruti U 2 Opening Drains & grass cuttingMitooma Kashenshero TC Akatojo-Runoni U 2 Opening Drains & grass cuttingMitooma Kashenshero TC Ruti - Shongora- Rwankanya U 2 Opening Drains & grass cuttingMitooma Kashenshero TC Nyarubira - Burera U 0.7 Opening Drains & grass cuttingMitooma Kashenshero TC Kasheshero - Ruzizi U 1.3 Opening Drains & grass cuttingMitooma Kashenshero TC Water Tank - Ekyapa U 0.8 Opening Drains & grass cuttingMitooma Kashenshero TC Ekyapa - Kyababari U 0.8 Opening Drains & grass cuttingMitooma Kashenshero TC Kasheshero - Kihungye. U 2 Opening Drains & grass cuttingMitooma Kashenshero TC Burera- Kyanyarugyeshera U 2 Opening Drains & grass cutting

Kashenshero TC Total 15.6

Mityana Mityana DLG Banda – Lusaalira Unpaved 10.2 Opening Drains & grass cuttingMityana Mityana DLG Buswabulongo – Naama Unpaved 0.0 Opening Drains & grass cuttingMityana Mityana DLG Kabasuma – Nabukondo Unpaved 7.2 Opening Drains & grass cuttingMityana Mityana DLG Kakindu – Bekiina Unpaved 6.8 Opening Drains & grass cuttingMityana Mityana DLG Kakindu – Nsozibbirye Unpaved 7.0 Opening Drains & grass cuttingMityana Mityana DLG Kitongo – Maanyi Unpaved 12.2 Opening Drains & grass cuttingMityana Mityana DLG Mwera – Kyalwa Unpaved 4.4 Opening Drains & grass cuttingMityana Mityana DLG Namutamba Circle Unpaved 22.0 Opening Drains & grass cuttingMityana Mityana DLG Wabigalo – Wabiyinja Unpaved 10.0 Opening Drains & grass cuttingMityana Mityana DLG Wabiyinja – Kakindu Unpaved 6.7 Opening Drains & grass cuttingMityana Mityana DLG Wabiyinja – Mpenja Unpaved 9.5 Opening Drains & grass cuttingMityana Mityana DLG Kakindu – Kibibi Unpaved 16.0 Opening Drains & grass cuttingMityana Mityana DLG Kiryokya – Matte Unpaved 14.0 Opening Drains & grass cuttingMityana Mityana DLG Kalangalo – Kamuli Unpaved 7.0 Opening Drains & grass cuttingMityana Mityana DLG Kikonge - Kanyanya Unpaved 8.2 Opening Drains & grass cuttingMityana Mityana DLG Kinene - Kabuwambo – Kkande Unpaved 11.1 Opening Drains & grass cuttingMityana Mityana DLG Kisaana – Kiteete Unpaved 6.2 Opening Drains & grass cuttingMityana Mityana DLG Ndibulungi – Nakaseeta Unpaved 9.0 Opening Drains & grass cuttingMityana Mityana DLG Misigi - Ggulwe – Lubajja Unpaved 11.0 Opening Drains & grass cuttingMityana Mityana DLG Bbambula - Kibanda – Kalyango Unpaved 12.4 Opening Drains & grass cuttingMityana Mityana DLG Kiwawu – Nsozibbirye Unpaved 8.8 Opening Drains & grass cuttingMityana Mityana DLG Kanjuki-Nsabya Unpaved 8.0 Opening Drains & grass cuttingMityana Mityana DLG Ttamu - Nakaziba – Wabiyinja Unpaved 7.4 Opening Drains & grass cuttingMityana Mityana DLG Kyamusisi – Magala Unpaved 7.7 Opening Drains & grass cuttingMityana Mityana DLG Buzibazi - Mpongo – Bbanda Unpaved 10.0 Opening Drains & grass cuttingMityana Mityana DLG Kalaalo - Kiyoganyi- Kalangaalo Unpaved 9.2 Opening Drains & grass cuttingMityana Mityana DLG Kiyoganyi – Lusanja Unpaved 4.4 Opening Drains & grass cuttingMityana Mityana DLG Ngugulo - Mayirye - Gombe. Unpaved 9.5 Opening Drains & grass cuttingMityana Mityana DLG Kikunyu -Kitotolo Namudaali Unpaved 10.0 Opening Drains & grass cuttingMityana Mityana DLG Ssekanyonyi –Namigavu Unpaved 6.0 Opening Drains & grass cuttingMityana Mityana DLG Kasenyi – Mpirigwa Unpaved 8.0 Opening Drains & grass cuttingMityana Mityana DLG Nakwaya – Kabulamuliro Unpaved 10.0 Opening Drains & grass cutting Mityana DLG Total 289.9Moroto Moroto DLG Lia - Tepeth Gravel 2.4 Opening Drains & grass cuttingMoroto Moroto DLG Museum road Earth 2 Opening Drains & grass cuttingMoroto Moroto DLG Rupa - Musupo road Earth 5 Opening Drains & grass cuttingMoroto Moroto DLG Nakonyen - Katikekile Gravel 10 Opening Drains & grass cuttingMoroto Moroto DLG Naoi - Lokisilei Earth 10 Opening Drains & grass cuttingMoroto Moroto DLG Tapac - Lokwakipi road Earth 10 Opening Drains & grass cuttingMoroto Moroto DLG Nakabaat - Narengenya Earth 10 Opening Drains & grass cuttingMoroto Moroto DLG Nadunget - Lokeriaut road Earth 8 Opening Drains & grass cuttingMoroto Moroto DLG Rupa - Lokeriaut road Earth 8 Opening Drains & grass cutting

308 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Moroto Moroto DLG Nawanatau - Acherer - Lotiri Earth 8 Opening Drains & grass cuttingMoroto Moroto DLG Loputuk - Nadunget Earth 12 Opening Drains & grass cuttingMoroto Moroto DLG Kodonyo - Lorengedwat road Earth 10 Opening Drains & grass cuttingMoroto Moroto DLG Rupa - Kadilakeny Earth 7 Opening Drains & grass cutting Moroto DLG Total 102.4Moroto Moroto MC Adyebo U 2 Opening Drains & grass cuttingMoroto Moroto MC Pian U 0.7 Opening Drains & grass cuttingMoroto Moroto MC Jie U 0.8 Opening Drains & grass cuttingMoroto Moroto MC Dodoth U 0.8 Opening Drains & grass cuttingMoroto Moroto MC Narwosi U 1.5 Opening Drains & grass cuttingMoroto Moroto MC Kakoliye Access U 0.7 Opening Drains & grass cuttingMoroto Moroto MC Odeke U 1.6 Opening Drains & grass cuttingMoroto Moroto MC Kitale U 2.5 Opening Drains & grass cuttingMoroto Moroto MC Independence U 1.7 Opening Drains & grass cuttingMoroto Moroto MC Circular U 3.7 Opening Drains & grass cuttingMoroto Moroto MC Soroti U 1.1 Opening Drains & grass cuttingMoroto Moroto MC Rupa U 0.8 Opening Drains & grass cuttingMoroto Moroto MC Municipal access U 0.4 Opening Drains & grass cuttingMoroto Moroto MC Loruk U 1.5 Opening Drains & grass cuttingMoroto Moroto MC Achia U 0.9 Opening Drains & grass cuttingMoroto Moroto MC Narwosi closes U 2.1 Opening Drains & grass cuttingMoroto Moroto MC Angiroi U 1.5 Opening Drains & grass cuttingMoroto Moroto MC Teko Access U 0.6 Opening Drains & grass cuttingMoroto Moroto MC Kamturkana U 1.5 Opening Drains & grass cuttingMoroto Moroto MC Idro U 1.2 Opening Drains & grass cuttingMoroto Moroto MC Lokwang U 1.2 Opening Drains & grass cuttingMoroto Moroto MC Lia street U 1.1 Opening Drains & grass cuttingMoroto Moroto MC Nakapelimen U 2 Opening Drains & grass cuttingMoroto Moroto MC Lopeduru market U 1.2 Opening Drains & grass cuttingMoroto Moroto MC Akamu U 0.9 Opening Drains & grass cuttingMoroto Moroto MC Imagit U 1.9 Opening Drains & grass cuttingMoroto Moroto MC Lomilo U 1.2 Opening Drains & grass cuttingMoroto Moroto MC Lorwor U 1.3 Opening Drains & grass cuttingMoroto Moroto MC Tammukede U 1.1 Opening Drains & grass cuttingMoroto Moroto MC Ojakala U 1.6 Opening Drains & grass cuttingMoroto Moroto MC Nakiloro U 1 Opening Drains & grass cuttingMoroto Moroto MC Lorika U 1.4 Opening Drains & grass cuttingMoroto Moroto MC Singila U 0.5 Opening Drains & grass cuttingMoroto Moroto MC Tepeth (water pumps) U 2 Opening Drains & grass cutting

46Moyo Moyo DLG Itipa - Gango Unpaved 5.3 Opening Drains & grass cuttingMoyo Moyo DLG Obongi - Itipa Unpaved 9 Opening Drains & grass cuttingMoyo Moyo DLG Indilinga - Itipa Unpaved 9.5 Opening Drains & grass cuttingMoyo Moyo DLG Gborokonyo - Waka Unpaved 8.5 Opening Drains & grass cuttingMoyo Moyo DLG Orinya - Belameling Unpaved 16.2 Opening Drains & grass cuttingMoyo Moyo DLG Lefori - Chinyi Unpaved 16.8 Opening Drains & grass cuttingMoyo Moyo DLG Lefori - Kali Unpaved 12 Opening Drains & grass cuttingMoyo Moyo DLG Masaloa - Cohwe Unpaved 2.1 Opening Drains & grass cuttingMoyo Moyo DLG Aluru - Palorinya Unpaved 17 Opening Drains & grass cuttingMoyo Moyo DLG Celecelea - Lama Unpaved 7.4 Opening Drains & grass cuttingMoyo Moyo DLG Lama - Gbalala Unpaved 4.6 Opening Drains & grass cuttingMoyo Moyo DLG Metu - Ayaa Unpaved 6 Opening Drains & grass cuttingMoyo Moyo DLG Erepi - Liri Unpaved 3.9 Opening Drains & grass cuttingMoyo Moyo DLG Metu - Gbari Unpaved 18.9 Opening Drains & grass cuttingMoyo Moyo DLG Amua - Ayaa-Abeso Unpaved 15.8 Opening Drains & grass cuttingMoyo Moyo DLG Metu - Goopi Unpaved 4.5 Opening Drains & grass cuttingMoyo Moyo DLG Laropi - Paanjala Unpaved 18.5 Opening Drains & grass cuttingMoyo Moyo DLG Laropi - Palorinya Unpaved 18.7 Opening Drains & grass cuttingMoyo Moyo DLG Dufile - Arra Unpaved 6.1 Opening Drains & grass cutting

309Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Moyo Moyo DLG Aringa - Losu Unpaved 8 Opening Drains & grass cuttingMoyo Moyo DLG Ngungu - Obogobu Unpaved 8 Opening Drains & grass cuttingMoyo Moyo DLG Erepi Airfield Unpaved 0.0024 Opening Drains & grass cutting Moyo DLG Total 216.8Moyo Moyo CARS Dongo-Angaliachini U 6 Opening Drains & grass cuttingMoyo Moyo CARS Idijo-Dongo-Morobi U 11 Opening Drains & grass cuttingMoyo Moyo CARS Gborokonyo - Morobi U 8 Opening Drains & grass cuttingMoyo Moyo CARS Boyo Road U 1.5 Opening Drains & grass cuttingMoyo Moyo CARS Godoce Road U 1.5 Opening Drains & grass cuttingMoyo Moyo CARS Market Lane U 0.3 Opening Drains & grass cuttingMoyo Moyo CARS Obongi TC - Obongi Mission U 3 Opening Drains & grass cuttingMoyo Moyo CARS Kapalanga Road U 0.4 Opening Drains & grass cuttingMoyo Moyo CARS Oforogo road U 0.2 Opening Drains & grass cuttingMoyo Moyo CARS First Acces Road U 0.2 Opening Drains & grass cuttingMoyo Moyo CARS Gopele - Liwa U 8 Opening Drains & grass cuttingMoyo Moyo CARS Awindiri - Obongi Mission U 1.5 Opening Drains & grass cuttingMoyo Moyo CARS Kapalanga Road - Yakinamiji LS U 1 Opening Drains & grass cuttingMoyo Moyo CARS Arra HC II - Illo U 6.0 Opening Drains & grass cuttingMoyo Moyo CARS Arra TC - Ramogi North U 8.0 Opening Drains & grass cuttingMoyo Moyo CARS Dufile chapel - Pamangara U 4.0 Opening Drains & grass cuttingMoyo Moyo CARS Oppi - Ramogi Dufile U 1.5 Opening Drains & grass cuttingMoyo Moyo CARS Itialo - Paonya U 1.5 Opening Drains & grass cuttingMoyo Moyo CARS Oruba - Hweyo LS U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Main road - Gunya PS U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Gunya PS - Nzerea South LS U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Nzerea North - Nzerea South LS U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Main road - SC HQ - Dufile PS U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Nzerea Central - Kadadari U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Welikovu - Coloa U 8.0 Opening Drains & grass cuttingMoyo Moyo CARS Inya - Lifo U 4.5 Opening Drains & grass cuttingMoyo Moyo CARS Goopi - Vundi U 8.0 Opening Drains & grass cuttingMoyo Moyo CARS Pamenyua - Chala U 10.0 Opening Drains & grass cuttingMoyo Moyo CARS Aya HC II - Alukodu U 5.0 Opening Drains & grass cuttingMoyo Moyo CARS Project road U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Pakoma east - Laropi U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Ubbi South - Laropi market U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Laropi SS - Kiddi cell U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Laropi HC II - Laropi SS U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Laropi center - Cementary U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Uzia hotel - Panyanga HCII U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Paubu - Siria Landing site U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Idrimari - Kuni farmland U 4.0 Opening Drains & grass cuttingMoyo Moyo CARS Idrimari - Ulua Landing site U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Gbalala - Kelihwesimonzo U 1.0 Opening Drains & grass cutting

Moyo Moyo CARS Ferry landing site - Congo land-ing site U 2.5 Opening Drains & grass cutting

Moyo Moyo CARS Kiddi - Laropi HCII U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Congo - Cementery U 2.0 Opening Drains & grass cuttingMoyo Moyo CARS Pachoror cell - Laropi market U 1.0 Opening Drains & grass cuttingMoyo Moyo CARS Obongi SS - Gango U 8.0 Opening Drains & grass cuttingMoyo Moyo CARS Obongi Town - Aliba SC HQ U 5.0 Opening Drains & grass cuttingMoyo Moyo CARS Lubaji LS- Itipa Mkt U 5.0 Opening Drains & grass cuttingMoyo Moyo CARS Tiriko LS - Ngulungulu U 4.0 Opening Drains & grass cutting

Moyo CARs 157.6Moyo Moyo TC Besia Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Lopirigo Road U 0.5 Opening Drains & grass cuttingMoyo Moyo TC Bandasi Road U 1 Opening Drains & grass cuttingMoyo Moyo TC Onama Road U 0.7 Opening Drains & grass cuttingMoyo Moyo TC Aliku Road U 0.3 Opening Drains & grass cutting

310 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Moyo Moyo TC Republic Road U 0.2 Opening Drains & grass cuttingMoyo Moyo TC Power Road U 1 Opening Drains & grass cuttingMoyo Moyo TC OAU U 0.2 Opening Drains & grass cuttingMoyo Moyo TC Didi Close U 0.4 Opening Drains & grass cuttingMoyo Moyo TC MTC PS Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Moyo SS Road U 0.9 Opening Drains & grass cuttingMoyo Moyo TC Lowi Quarter Road U 1.4 Opening Drains & grass cuttingMoyo Moyo TC Ulego Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Mawa Drive U 0.7 Opening Drains & grass cuttingMoyo Moyo TC Illi Valley PS Road U 0.5 Opening Drains & grass cuttingMoyo Moyo TC Kerelu Crescent Street U 1 Opening Drains & grass cuttingMoyo Moyo TC Hothi Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Market lane U 0.2 Opening Drains & grass cuttingMoyo Moyo TC Pamoju Road U 0.8 Opening Drains & grass cuttingMoyo Moyo TC Ojobe Road U 0.7 Opening Drains & grass cuttingMoyo Moyo TC Pipi Road U 0.5 Opening Drains & grass cuttingMoyo Moyo TC Dr. Apiliga Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Okudi Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Bilbao Road U 0.1 Opening Drains & grass cuttingMoyo Moyo TC Romano Vuzi Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Ariju Road U 0.7 Opening Drains & grass cuttingMoyo Moyo TC Odongkara Road U 0.5 Opening Drains & grass cuttingMoyo Moyo TC George Madra Road U 0.5 Opening Drains & grass cuttingMoyo Moyo TC Pump Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Health Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Parego Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Idro Road U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Vale Close U 0.4 Opening Drains & grass cuttingMoyo Moyo TC Golf Course U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Mulago U 0.1 Opening Drains & grass cuttingMoyo Moyo TC Celecelea Road U 0.6 Opening Drains & grass cuttingMoyo Moyo TC Dagula Close U 0.2 Opening Drains & grass cutting

Moyo TC 20.1Mpigi Mpigi C A R S Mbule - Kidandali – Kasozi 10.4 Opening Drains & grass cuttingMpigi Mpigi C A R S Migamba - Katiiti – Wabuuka Gravel 4.4 Opening Drains & grass cuttingMpigi Mpigi C A R S Kyewanise – Kantini Gravel 2.0 Opening Drains & grass cuttingMpigi Mpigi C A R S Kinyika – Kitakyusa Gravel 3.2 Opening Drains & grass cutting

Mpigi Mpigi C A R S Njeru - Sambwe - Katebe – Bukasa Gravel 4.5 Opening Drains & grass cutting

Mpigi Mpigi C A R S Kagenda - Watuba - Njeru – Bukasa Gravel 3.0 Opening Drains & grass cutting

Mpigi Mpigi C A R S Kiduweraba - Magungu – Bula Gravel 6.0 Opening Drains & grass cutting Mpigi C A R S Total 33.5Mpigi Mpigi DLG Buwama - Buwere – Nabiteete Earth 5.14 Opening Drains & grass cuttingMpigi Mpigi DLG Katebo – Buyaaya Gravel 4.5 Opening Drains & grass cuttingMpigi Mpigi DLG Nabitete – Kasooso Earth 3.7 Opening Drains & grass cuttingMpigi Mpigi DLG Kalandazi – Buwungu Earth 6.7 Opening Drains & grass cuttingMpigi Mpigi DLG Buwere – Ntolomwe Gravel 6.0 Opening Drains & grass cuttingMpigi Mpigi DLG Katonga – Muduuma Gravel 7.6 Opening Drains & grass cuttingMpigi Mpigi DLG Muyobozi – Ggavu Earth 4.8 Opening Drains & grass cuttingMpigi Mpigi DLG Butoolo – Sanya – Namugobo Gravel 9.3 Opening Drains & grass cuttingMpigi Mpigi DLG Kayabwe – Kinyika – Muyanga Earth 6.0 Opening Drains & grass cutting Mpigi DLG Total 53.7Mpigi Mpigi DLG Nsamizi – Bboza Gravel 1.5 Opening Drains & grass cuttingMpigi Mpigi DLG Dist H/Q – Katonga Gravel 6.3 Opening Drains & grass cuttingMpigi Mpigi DLG Kalagala - Kafumu – Sseta Gravel 10.7 Opening Drains & grass cuttingMpigi Mpigi DLG Hamidu - Mpana – Mawonve Gravel 1.0 Opening Drains & grass cuttingMpigi Mpigi DLG Kalagala – Nseke Gravel 4.3 Opening Drains & grass cuttingMpigi Mpigi DLG Namulamuzi – Bume Gravel 2.5 Opening Drains & grass cutting

311Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mpigi Mpigi DLG Gogwe - Kelezia road Gravel 2.5 Opening Drains & grass cutting

Mpigi Mpigi DLGBikondo – Lufuka, ,Lufuka- kiko, lufuka – Kasanjerd and Haruna’s garage – Mpami,

Gravel 3.3 Opening Drains & grass cutting

Mpigi Mpigi TC Bumyuka – bitembe – namabo Gravel 4.8 Opening Drains & grass cuttingMpigi Mpigi TC Lungala – Senene - Nabona Gravel 5.8 Opening Drains & grass cuttingMpigi Mpigi TC AbasiBamulanzeki – Busomba Earth 8.0 Opening Drains & grass cutting Mpigi TC Total 153.0Mubende Mubende DLG Kassanda - Kalamba U 19.2 Opening Drains & grass cuttingMubende Mubende DLG Kalamba - Manyogaseka U 18.5 Opening Drains & grass cuttingMubende Mubende DLG Musozi – Kalamba U 16.2 Opening Drains & grass cuttingMubende Mubende DLG Kazigwe - Kampanzi U 16.0 Opening Drains & grass cuttingMubende Mubende DLG Kassanda - Kamuli U 10.4 Opening Drains & grass cutting

Mubende Mubende DLG Namakonkome-Makokoto-Na-bisunsa U 11.6 Opening Drains & grass cutting

Mubende Mubende DLG Kalagala-Lusongodde-Bbira U 8.0 Opening Drains & grass cuttingMubende Mubende DLG Kidongo – Kasozi U 4.8 Opening Drains & grass cuttingMubende Mubende DLG Kigalama - Kamuli U 17.0 Opening Drains & grass cuttingMubende Mubende DLG Bakijulula - Kawuula -Kikoma U 26.4 Opening Drains & grass cuttingMubende Mubende DLG Kitenga-Lulongo U 18.5 Opening Drains & grass cuttingMubende Mubende DLG Kakezi-Kamwaza U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Ngabano – Butta U 18.8 Opening Drains & grass cuttingMubende Mubende DLG Ngabano-Kikoma U 13.0 Opening Drains & grass cuttingMubende Mubende DLG Butta – Namuwuguza U 17.0 Opening Drains & grass cuttingMubende Mubende DLG Kiyuya - Kammondo U 26.0 Opening Drains & grass cuttingMubende Mubende DLG Kiyuni – Kakigando U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Kaweri – Kiyuni U 11.5 Opening Drains & grass cuttingMubende Mubende DLG Kibalinga-Lwebyayi-Kibyayi U 23.0 Opening Drains & grass cuttingMubende Mubende DLG Kagavu-Nabakazi-Kikandwa U 18.5 Opening Drains & grass cuttingMubende Mubende DLG Kisekende - Kattabalanga U 13.0 Opening Drains & grass cuttingMubende Mubende DLG Muyinayina-Lubimbiri U 8.0 Opening Drains & grass cuttingMubende Mubende DLG Nabingola – Kaija U 5.0 Opening Drains & grass cutting

Mubende Mubende DLG Nakawala-Lubimbiri-Ka-jumiro-Kitabowa U 26.0 Opening Drains & grass cutting

Mubende Mubende DLG Kamalenge-Kyakiddu U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Butta - Kampazi U 6.5 Opening Drains & grass cuttingMubende Mubende DLG Butta-Kitta U 7.8 Opening Drains & grass cuttingMubende Mubende DLG Kasambya - Lwabinaga - Kalwana U 14.0 Opening Drains & grass cuttingMubende Mubende DLG Namiringa - Kakindu - Busengejo U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Energo - Kasawo - Kyasansuwa U 10.0 Opening Drains & grass cutting

Mubende Mubende DLG Kasawo - Kyabayima - Kyasansu-wa U 11.2 Opening Drains & grass cutting

Mubende Mubende DLG Butawata - Kattambogo U 6.4 Opening Drains & grass cuttingMubende Mubende DLG Kasolo - Mugungulu-Majanichai U 19.0 Opening Drains & grass cuttingMubende Mubende DLG Kokowe-Namaswanta-Katosi U 12.6 Opening Drains & grass cuttingMubende Mubende DLG Nsozinga-Kitovu-Kachwi U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Kitovu-Lwabusana-Kagavu U 12.0 Opening Drains & grass cuttingMubende Mubende DLG Dyangoma-Bubanda U 7.7 Opening Drains & grass cutting

Mubende Mubende DLG Kamusenene-Nakasagga-Dyan-goma U 10.1 Opening Drains & grass cutting

Mubende Mubende DLG Kirume-Kiwuba U 7.4 Opening Drains & grass cutting

Mubende Mubende DLG Kyamuguluma-Maujjo-Kyabwire- Mugungulu U 15.5 Opening Drains & grass cutting

Mubende Mubende DLG Butawata-Mawujjo-Mugungulu U 9.5 Opening Drains & grass cuttingMubende Mubende DLG Nsozinga-Kitayiza-Kijjomanyi U 7.0 Opening Drains & grass cuttingMubende Mubende DLG Kiryamenvu-Kafunda-Ndeba U 11.5 Opening Drains & grass cuttingMubende Mubende DLG Kafunda-Buzawula-Kyasansuwa U 6.0 Opening Drains & grass cutting

Mubende Mubende DLG Kyetume-Malabigambo-Kasam-bya-Kitego U 10.5 Opening Drains & grass cutting

312 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mubende Mubende DLGKinyonyi-Manyogase-ka-Busilimu- Nsololo-Gambwa

U 12.0 Opening Drains & grass cutting

Mubende Mubende DLG Kyakatebe-Mirembe U 10.0 Opening Drains & grass cuttingMubende Mubende DLG Kyamugugu-Lusaba U 10.0 Opening Drains & grass cutting Mubende DLG Total 613.1

Mubende Mubende T/C Katoma Gravel &Earth 5.4 Opening Drains & grass cutting

Mubende Mubende T/C Katawa Gravel &Earth 1.5 Opening Drains & grass cutting

Mubende Mubende T/C Old Kampala Road Gravel &Earth 6.5 Opening Drains & grass cutting

Mubende Mubende T/C Old FortPortal Road Gravel &Earth 1.5 Opening Drains & grass cutting

Mubende Mubende T/C Nakayima’s Way Gravel 4.0 Opening Drains & grass cuttingMubende Mubende T/C Habib Road Tarmack 0.3 Opening Drains & grass cuttingMubende Mubende T/C Tennis court Road Gravel 0.8 Opening Drains & grass cutting

Mubende Mubende T/C Kiwalabye Road Gravel &Earth 0.8 Opening Drains & grass cutting

Mubende Mubende T/C Kasenyi Road Gravel &Earth 0.4 Opening Drains & grass cutting

Mubende Mubende T/C Daudi Chwa Road Gravel 0.4 Opening Drains & grass cutting

Mubende Mubende T/C Bwire Gravel &Earth 0.2 Opening Drains & grass cutting

Mubende Mubende T/C Lubanga Road Tarmack 0.9 Opening Drains & grass cutting

Mubende Mubende T/C Mutagwanya Lane Gravel &Earth 0.3 Opening Drains & grass cutting

Mubende Mubende T/C Church Road Gravel &Earth 0.8 Opening Drains & grass cutting

Mubende Mubende T/C Ginnery Road Gravel &Earth 0.3 Opening Drains & grass cutting

Mubende Mubende T/C Rwabusyagara Road Gravel &Earth 0.8 Opening Drains & grass cutting

Mubende Mubende T/C Kabalega Close Gravel &Earth 0.3 Opening Drains & grass cutting

Mubende Mubende T/C Makenke Road Gravel &Earth 0.8 Opening Drains & grass cutting

Mubende Mubende T/C Ndahura Road Gravel &Earth 0.7 Opening Drains & grass cutting

Mubende Mubende T/C Walusimbi Lane Gravel &Earth 0.5 Opening Drains & grass cutting

Mubende Mubende T/C Kasaana By-Pass Gravel &Earth 0.3 Opening Drains & grass cutting

Mubende Mubende T/C Bakijjulula Gravel &Earth 0.5 Opening Drains & grass cutting

Mubende Mubende T/C Kabalega Road Gravel &Earth 0.2 Opening Drains & grass cutting

Mubende Mubende T/C Kiryanongo - Nakivubo Gravel &Earth 1.5 Opening Drains & grass cutting

Mubende Mubende T/C Kasenyi Caltex Road Gravel &Earth 0.7 Opening Drains & grass cutting

Mubende Mubende T/C Mivule Gravel &Earth 1.5 Opening Drains & grass cutting

Mubende T/C Total 31.9Mukono Mukono DLG Nakibano - Kabembe Earth 9.10 Opening Drains & grass cuttingMukono Mukono DLG Kigombya - Seeta - Sezibwa Earth 14.00 Opening Drains & grass cutting

Mukono Mukono DLG Kalagi - Kyabakadde - Nama-sumbi Earth 11.10 Opening Drains & grass cutting

Mukono Mukono DLG Nakayaga - Kayanja Earth 12.00 Opening Drains & grass cuttingMukono Mukono DLG Nakifuma - Namakomo Earth 6.20 Opening Drains & grass cuttingMukono Mukono DLG Nakasajja - Nakifuma Earth 21.10 Opening Drains & grass cuttingMukono Mukono DLG Gavu - Kasiiso - Seeta Earth 25.33 Opening Drains & grass cuttingMukono Mukono DLG Bugereka - Nakyeke - Kasawo Earth 21.00 Opening Drains & grass cuttingMukono Mukono DLG Ntenjeru - Bule Earth 17.53 Opening Drains & grass cuttingMukono Mukono DLG Lubugumu - Bugigi Earth 10.50 Opening Drains & grass cutting

313Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mukono Mukono DLG Kibanga – Lwazimiruli - Ngaga Earth 12.00 Opening Drains & grass cuttingMukono Mukono DLG Lwetega - Bugoye - Mugangu Earth 8.50 Opening Drains & grass cuttingMukono Mukono DLG Nsanja – Sango - Muvo Earth 20.00 Opening Drains & grass cuttingMukono Mukono DLG Wagala - Wasswa Earth 8.00 Opening Drains & grass cuttingMukono Mukono DLG Mbalala - Seeta Earth 6.65 Opening Drains & grass cuttingMukono Mukono DLG Kisowera - Kasana Earth 12.30 Opening Drains & grass cuttingMukono Mukono DLG Ntanzi - Salama Earth 4.20 Opening Drains & grass cuttingMukono Mukono DLG Kanana - Kayini - Lugujje Earth 7.30 Opening Drains & grass cuttingMukono Mukono DLG Lutengo - Walusubi Earth 8.00 Opening Drains & grass cuttingMukono Mukono DLG Nakifuma - Kabawala Earth 11.00 Opening Drains & grass cutting

Mukono Mukono DLG Kalagi - Bukooza - Nkulagirire - Magogo - Kukuuta Earth 12.30 Opening Drains & grass cutting

Mukono Mukono DLG Namataba - Kanyogoga Earth 7.30 Opening Drains & grass cuttingMukono Mukono DLG Takajjunge - Nama Earth 4.10 Opening Drains & grass cuttingMukono Mukono DLG Kisowera - Kabembe Earth 4.20 Opening Drains & grass cuttingMukono Mukono DLG Nagojje-Nakibano - Nakifuma Earth 16.80 Opening Drains & grass cuttingMukono Mukono DLG Mbalala - Nakapinyi Earth 2.23 Opening Drains & grass cuttingMukono Mukono DLG Kawututu - Kasokoso - Bulanga Earth 13.60 Opening Drains & grass cuttingMukono Mukono DLG Kyabazala - Kikoma Earth 7.00 Opening Drains & grass cuttingMukono Mukono DLG Kyabazala - Ntonto - Walubira Earth 7.30 Opening Drains & grass cuttingMukono Mukono DLG Kasubi - Ntonto Earth 3.20 Opening Drains & grass cutting

Mukono Mukono DLG Kyabazala - Kiteredde - Nkoko - Kabimbiri Earth 9.70 Opening Drains & grass cutting

Mukono Mukono DLG Ntunda - Namukupa - Kimoli Earth 9.60 Opening Drains & grass cuttingMukono Mukono DLG Wandagi - Nama Earth 8.00 Opening Drains & grass cuttingMukono Mukono DLG Bumbaja - Nsonga Earth 6.70 Opening Drains & grass cuttingMukono Mukono DLG Seeta - Gimbi - Nacyeke Earth 20.30 Opening Drains & grass cuttingMukono Mukono DLG Byafula - Katente Earth 8.69 Opening Drains & grass cuttingMukono Mukono DLG Naluwala - Luute Earth 6.80 Opening Drains & grass cuttingMukono Mukono DLG Nakisunga - Byafula Earth 9.50 Opening Drains & grass cuttingMukono Mukono DLG Kyampisi - Kiwumu Earth 4.50 Opening Drains & grass cuttingMukono Mukono DLG Bunakijja - Katosi Earth 10.00 Opening Drains & grass cutting Mukono DLG Total 417.63Mukono Mukono MC Bishop Tucker Paved 2.2 Opening Drains & grass cuttingMukono Mukono MC Cathedral Paved 0.8 Opening Drains & grass cuttingMukono Mukono MC Dist. Admn. Network Paved 2 Opening Drains & grass cuttingMukono Mukono MC Kauga Gravel 1.6 Opening Drains & grass cuttingMukono Mukono MC Prison – Bugujju Earth 1 Opening Drains & grass cuttingMukono Mukono MC Church – Goma Earth 1 Opening Drains & grass cuttingMukono Mukono MC Bugujju – Ankrah Earth 1 Opening Drains & grass cuttingMukono Mukono MC Bugujju – Nabuti Earth 1 Opening Drains & grass cuttingMukono Mukono MC Wakigu – Nabuti Earth 1 Opening Drains & grass cuttingMukono Mukono MC Seth Lane Earth 0.4 Opening Drains & grass cuttingMukono Mukono MC Nkoyoyo Earth 1.2 Opening Drains & grass cuttingMukono Mukono MC Katali Earth 1 Opening Drains & grass cuttingMukono Mukono MC Sezi- Kongo Earth 0.8 Opening Drains & grass cuttingMukono Mukono MC Katali Nkoyoyo Gravel 0.5 Opening Drains & grass cuttingMukono Mukono MC Valley Avenue Earth 1 Opening Drains & grass cuttingMukono Mukono MC Nabuti – Nsuube Earth 5 Opening Drains & grass cuttingMukono Mukono MC Nabuti-Nsube-Namumira Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Namumira Nile Rose Earth 2.5 Opening Drains & grass cuttingMukono Mukono MC Nile Rose Katali Earth 3 Opening Drains & grass cuttingMukono Mukono MC Lweza Earth 2 Opening Drains & grass cuttingMukono Mukono MC Lweza – Nabuti Earth 0.8 Opening Drains & grass cuttingMukono Mukono MC Kame -Anthony Paved 1 Opening Drains & grass cuttingMukono Mukono MC Kame Road Paved 1.5 Opening Drains & grass cuttingMukono Mukono MC Namuyenje Gravel 1 Opening Drains & grass cuttingMukono Mukono MC Kigombya-Namumira Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Kirangira Earth 1.5 Opening Drains & grass cutting

314 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Mukono Mukono MC Kitete Earth 2.5 Opening Drains & grass cuttingMukono Mukono MC Ssaza Earth 1.2 Opening Drains & grass cuttingMukono Mukono MC Mulyanti Earth 1 Opening Drains & grass cuttingMukono Mukono MC Nabikolo Earth 0.5 Opening Drains & grass cuttingMukono Mukono MC Sekiboobo Earth 1 Opening Drains & grass cuttingMukono Mukono MC Njogezi Close Earth 0.8 Opening Drains & grass cuttingMukono Mukono MC Nasuuti Close Earth 1 Opening Drains & grass cuttingMukono Mukono MC Badiru Kakungulu Earth 0.5 Opening Drains & grass cuttingMukono Mukono MC Katimbo Earth 1.2 Opening Drains & grass cuttingMukono Mukono MC Ntaawo - Nakabago 50% Paved 5.3 Opening Drains & grass cuttingMukono Mukono MC Ziribaggwa Earth 2 Opening Drains & grass cuttingMukono Mukono MC Basiimize Earth 0.5 Opening Drains & grass cuttingMukono Mukono MC Paul Kavuma Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Paul Mukasa Earth 1 Opening Drains & grass cuttingMukono Mukono MC Kyaggwe Road Earth 1 Opening Drains & grass cuttingMukono Mukono MC Badru Kakungulu Earth 1 Opening Drains & grass cuttingMukono Mukono MC Lumuli - Kiwanga Earth 3.5 Opening Drains & grass cuttingMukono Mukono MC Kolo - Kisenyi Earth 2.5 Opening Drains & grass cuttingMukono Mukono MC Kolo - Buwayi Earth 3.5 Opening Drains & grass cuttingMukono Mukono MC Kiwanga - Bbuto Earth 0.3 Opening Drains & grass cuttingMukono Mukono MC Bajjo - Ntawo Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Bajjo - Nyenje (Lwajjali) Earth 1 Opening Drains & grass cuttingMukono Mukono MC Serado - Bajjo Earth 1 Opening Drains & grass cuttingMukono Mukono MC Koob - Musisi Earth 1 Opening Drains & grass cuttingMukono Mukono MC Gulama - Bugujju Earth 0.5 Opening Drains & grass cuttingMukono Mukono MC Gwafu - Bulabiro Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Kigunga - Bajjo Earth 1.5 Opening Drains & grass cuttingMukono Mukono MC Kigunga -Nabuta Earth 1.5 Opening Drains & grass cutting

Mukono MC Total 79.1Nakapiripirit Nakapiripirit DLG Nakapiripirit-Tokora road Gravel 8 Opening Drains & grass cutting DLG Total 67.8Nakaseke Butalangu TC Syda Bbumba-Sempala Kigozi Gravel 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Access to Slaughter slab Earth 0.7 Opening Drains & grass cuttingNakaseke Butalangu TC Koomu Earth 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Taxipark Earth 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Kyabugga-Butibulongo Gravel 0.7 Opening Drains & grass cuttingNakaseke Butalangu TC Bwetagiro-Namanyonyi Gravel 0.6 Opening Drains & grass cuttingNakaseke Butalangu TC Namazzi -Kateregga Gravel 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Bukoba-Kabanda Earth 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Butibulongo-Muwaluzi Earth 0.4 Opening Drains & grass cuttingNakaseke Butalangu TC Kyanya-Kyabugga Gravel 0.4 Opening Drains & grass cutting Butalangu T/C Total 4.6Nakaseke Nakaseke DLG Kalagala-Semuto-Kalege Gravel 3.0 Opening Drains & grass cuttingNakaseke Nakaseke DLG Kiwoko-Kasambya Gravel 7.3 Opening Drains & grass cuttingNakaseke Nakaseke DLG Kyamutakasa-Mijinje Gravel 3.0 Opening Drains & grass cuttingNakaseke Nakaseke DLG Namilali-Katalekamese Gravel 8.8 Opening Drains & grass cuttingNakaseke Nakaseke DLG Namusaale-Lusanja Earth 2.3 Opening Drains & grass cuttingNakaseke Nakaseke DLG Kalagala-Kyamaweno-Kinyogoga Gravel 8.1 Opening Drains & grass cuttingNakaseke Nakaseke DLG Butiikwa-Kapeke-Kagango Gravel 5.9 Opening Drains & grass cuttingNakaseke Nakaseke DLG Lwesindizi-Kijumba-Buwanku Earth 6.6 Opening Drains & grass cuttingNakaseke Nakaseke DLG Nabisojjo-Gayaza-Kiswaga Gravel 7.3 Opening Drains & grass cuttingNakaseke Nakaseke DLG Lugogo-Timuna Gravel 3.7 Opening Drains & grass cuttingNakaseke Nakaseke DLG Kaddunda-Kisimula Gravel 2.3 Opening Drains & grass cuttingNakaseke Nakaseke DLG Nakaseke-Kigegge-Kasambya Gravel 5.2 Opening Drains & grass cuttingNakaseke Nakaseke DLG Kalagala-Kalagi-Mugyenyi Earth 4.4 Opening Drains & grass cuttingNakaseke Nakaseke DLG Rukono-Kimotzi Gravel 3.7 Opening Drains & grass cuttingNakaseke Nakaseke DLG Namilali-Ssembwa- Bulwadda Gravel 3.0 Opening Drains & grass cutting DLG Total 74.6Nakaseke Nakaseke TC Nakaseke-Kiziba Earth 1.0 Opening Drains & grass cutting

315Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Nakaseke Nakaseke TC Nakaseke PTC Gravel 1.0 Opening Drains & grass cuttingNakaseke Nakaseke TC Nakaseke Telecentre Gravel 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Nkata-SDA Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Ssebuufu - Kitanswa Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Nakafu-Kitanswa Earth 1.0 Opening Drains & grass cuttingNakaseke Nakaseke TC Mwagalwa Gravel 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Nakaseke-Kiteredde Earth 1.0 Opening Drains & grass cuttingNakaseke Nakaseke TC Lufula Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Kitanswa - Kanyale Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Sensura Road Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Kiziba-Kiwoko Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Nyansio Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Town Council Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Sebowa Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC MTN Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Masembe Earth 0.5 Opening Drains & grass cuttingNakaseke Nakaseke TC Nanoga Earth 0.5 Opening Drains & grass cutting Ngoma T/C Total 11.0Nakaseke Semuto T/C Kanyiga Street Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Sebbowa Road Earth 0.2 Opening Drains & grass cuttingNakaseke Semuto T/C Serugooti Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Mukalazi Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Serubogo Road Gravel 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Semuto C/U Road Gravel 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Kayondo Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Kikondo-Nsaka-Lule Gravel 0.4 Opening Drains & grass cuttingNakaseke Semuto T/C Kijaguzo-Mugomola Earth 0.3 Opening Drains & grass cuttingNakaseke Semuto T/C Mukiibi Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Sirisa-Kijaguzo Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Semuto-Buwazzi-Kikondo Earth 0.6 Opening Drains & grass cuttingNakaseke Semuto T/C Nsaka - Gomotoka Earth 0.2 Opening Drains & grass cuttingNakaseke Semuto T/C Maseruka Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Bisaso Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Vitali road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Lwanga Road Earth 0.1 Opening Drains & grass cuttingNakaseke Semuto T/C Market Street Earth 0.1 Opening Drains & grass cutting Semuto T/C Total 3.0Nakaseke Ngoma TC Kiruli Rd Earth 0.4 Opening Drains & grass cuttingNakaseke Ngoma TC Kikubo lane Gravel 0.3 Opening Drains & grass cuttingNakaseke Ngoma TC Ngoma TC Rd Earth 0.4 Opening Drains & grass cuttingNakaseke Ngoma TC Kanuma Rd. Gravel 0.9 Opening Drains & grass cutting

Ngoma TC 2.0Nakaseke Kiwoko TC Mosque Noor-Kapeke Earth 1.6 Opening Drains & grass cuttingNakaseke Kiwoko TC Kitooke Earth 0.2 Opening Drains & grass cuttingNakaseke Kiwoko TC Kyabalere-Kiko Earth 0.1 Opening Drains & grass cuttingNakaseke Kiwoko TC Kitooke-Ngoma Earth 0.1 Opening Drains & grass cuttingNakaseke Kiwoko TC Ngoma-Kyeswa Earth 0.9 Opening Drains & grass cuttingNakaseke Kiwoko TC Lukabwe Earth 1.0 Opening Drains & grass cuttingNakaseke Kiwoko TC Kapeeka-Kiwoko Hospital Earth 0.2 Opening Drains & grass cutting

Nakaseke Kiwoko TC Wabitunda-Kasana (Kiwoko Central) Earth 1.6 Opening Drains & grass cutting

Nakaseke Kiwoko TC Lwabijogo-Kiwoko Earth 1.1 Opening Drains & grass cuttingNakaseke Kiwoko TC Kasana - Wabitunda Earth 1.0 Opening Drains & grass cuttingNakaseke Kiwoko TC Kasana - Mabaale Earth 0.5 Opening Drains & grass cuttingNakaseke Kiwoko TC Lwabijogo- Wabitunda Earth 0.9 Opening Drains & grass cuttingNakaseke Kiwoko TC Lukwago Earth 0.2 Opening Drains & grass cuttingNakaseke Kiwoko TC Mawanda Road Earth 0.1 Opening Drains & grass cutting

Kiwoko TC 9.5Nakasongola C.A.R.s Kyakadoko – Kikoiro Gravel 10.0 Opening Drains & grass cutting

316 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Nakasongola C.A.R.s Lwakataba - Kyabaganga - Ka-teebe Gravel 10.6 Opening Drains & grass cutting

C.A.R.s Total 20.6Nakasongola Kakooge TC Nankuumba Lane Gravel 1.0 Opening Drains & grass cuttingNakasongola Kakooge TC Sekamwa lane AB Gravel 0.6 Opening Drains & grass cuttingNakasongola Kakooge TC Kibuuka - Sekibindi lane AC Gravel 0.7 Opening Drains & grass cuttingNakasongola Kakooge TC Maama Naka lane Gravel 0.2 Opening Drains & grass cuttingNakasongola Kakooge TC Kaguta lane - Kirowooza Gravel 0.8 Opening Drains & grass cuttingNakasongola Kakooge TC S.D.A lane Gravel 0.2 Opening Drains & grass cutting

Nakasongola Kakooge TC Lugazi-Kikadde- Lubenge lane ABC Gravel 2.0 Opening Drains & grass cutting

Nakasongola Kakooge TC Roll Toll Lane Gravel 0.4 Opening Drains & grass cuttingNakasongola Kakooge TC Kikadde - Kirowooza - Kasuge AB Gravel 7.5 Opening Drains & grass cutting

Nakasongola Kakooge TC Kabaale - Kyamasanda - Naka-seta AB Gravel 0.6 Opening Drains & grass cutting

Nakasongola Kakooge TC Kibira - Kisiki AB Gravel 1.0 Opening Drains & grass cuttingNakasongola Kakooge TC Disan - Nyombi Lane Gravel 0.2 Opening Drains & grass cuttingNakasongola Kakooge TC Nangoma Lane Gravel 0.2 Opening Drains & grass cutting

Nakasongola Kakooge TC Kibira - Kyansimbi - Kamu Kamu AB Gravel 0.7 Opening Drains & grass cutting

Nakasongola Kakooge TC Senku Lane Gravel 0.2 Opening Drains & grass cutting Kakooge TC Total 16.3Nakasongola Migeera TC Lwamuhuku Gravel 0.8 Opening Drains & grass cuttingNakasongola Migeera TC Bukenya Gravel 0.6 Opening Drains & grass cuttingNakasongola Migeera TC Hajji Abubakar Gravel 0.7 Opening Drains & grass cuttingNakasongola Migeera TC Bagire Gravel 0.4 Opening Drains & grass cuttingNakasongola Migeera TC Namakanga - Mbogo Gravel 1.2 Opening Drains & grass cuttingNakasongola Migeera TC Hajji Mayanja Gravel 0.7 Opening Drains & grass cuttingNakasongola Migeera TC Taxi Park Gravel 0.2 Opening Drains & grass cuttingNakasongola Migeera TC Kiwewa Gravel 1.1 Opening Drains & grass cuttingNakasongola Migeera TC Wasswa Gravel 0.4 Opening Drains & grass cuttingNakasongola Migeera TC Mitogo Gravel 0.8 Opening Drains & grass cuttingNakasongola Migeera TC Makumbi Gravel 1.0 Opening Drains & grass cuttingNakasongola Migeera TC Mbogo Gravel 0.1 Opening Drains & grass cuttingNakasongola Migeera TC Nalugonvu Gravel 0.1 Opening Drains & grass cuttingNakasongola Migeera TC Babirye Gravel 0.1 Opening Drains & grass cuttingNakasongola Migeera TC Mawejje Gravel 0.1 Opening Drains & grass cuttingNakasongola Migeera TC Lubega Gravel 0.8 Opening Drains & grass cuttingNakasongola Migeera TC Nkoyoyo Gravel 0.2 Opening Drains & grass cuttingNakasongola Migeera TC Veterinary Gravel 0.2 Opening Drains & grass cuttingNakasongola Migeera TC Katabu Gravel 0.9 Opening Drains & grass cutting Migeera TC Total 10.4Nakasongola Nakasongola TC Kalubanga Gravel 1.5 Opening Drains & grass cuttingNakasongola Nakasongola TC Valley dam Gravel 1.2 Opening Drains & grass cuttingNakasongola Nakasongola TC Church road Gravel 1.5 Opening Drains & grass cuttingNakasongola Nakasongola TC Kibengo road Earth 2.1 Opening Drains & grass cuttingNakasongola Nakasongola TC Kirabo - Kirojjo Earth 1.4 Opening Drains & grass cuttingNakasongola Nakasongola TC Lonne street Earth 0.5 Opening Drains & grass cuttingNakasongola Nakasongola TC School lane Earth 0.2 Opening Drains & grass cuttingNakasongola Nakasongola TC Sungira II Gravel 0.2 Opening Drains & grass cuttingNakasongola Nakasongola TC Market street Gravel 0.4 Opening Drains & grass cuttingNakasongola Nakasongola TC Rusajju street Gravel 0.2 Opening Drains & grass cuttingNakasongola Nakasongola TC Wabinyonyi-Kirabo 3 Gravel 0.8 Opening Drains & grass cuttingNakasongola Nakasongola TC Kasirye road Gravel 1.0 Opening Drains & grass cuttingNakasongola Nakasongola TC District - Saza Gravel 0.5 Opening Drains & grass cuttingNakasongola Nakasongola TC Town Council - District Gravel 0.5 Opening Drains & grass cutting TC Total 12.0

Namayingo Namayingo DLG Namayingo-Nsono-Syanyon-ja-Luwerere Road

Roads Gangs 13 Opening Drains & grass cutting

317Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Namayingo Namayingo DLG Lwangosia-Isinde Road Roads Gangs 4 Opening Drains & grass cutting

Namayingo Namayingo DLG Lutoro-Busiro Road Roads Gangs 9 Opening Drains & grass cutting

Namayingo Namayingo DLG Bukeda-Bujwanga-simase Road Roads Gangs 8 Opening Drains & grass cutting

Namayingo Namayingo DLG Namayingo-Dohwe-Maruba road Roads Gangs 30 Opening Drains & grass cutting

Namayingo Namayingo DLG Budde-Nalubabwe-Nalendere Road

Roads Gangs 15 Opening Drains & grass cutting

Namayingo DLG Total 79

Namayingo Namayingo TC Mukungu Road Unpaved 1.5 Opening Drains & grass cuttingNamayingo Namayingo TC Dede road Unpaved 0.5 Opening Drains & grass cuttingNamayingo Namayingo TC Buletu road Unpaved 1.7 Opening Drains & grass cuttingNamayingo Namayingo TC Araba road Unpaved 1.3 Opening Drains & grass cuttingNamayingo Namayingo TC Kaitabana Road Unpaved 0.5 Opening Drains & grass cuttingNamayingo Namayingo TC Modha road Unpaved 0.7 Opening Drains & grass cuttingNamayingo Namayingo TC samson road Unpaved 0.8 Opening Drains & grass cuttingNamayingo Namayingo TC Mosque road Unpaved 0.6 Opening Drains & grass cuttingNamayingo Namayingo TC kafa road Unpaved 0.4 Opening Drains & grass cuttingNamayingo Namayingo TC Total 8Namutumba Namutumba DLG Namalemba-Mawembe-Mpande U 10.7 Opening Drains & grass cuttingNamutumba Namutumba DLG Nakawunzo-Ituba U 3.3 Opening Drains & grass cuttingNamutumba Namutumba DLG Bulafa-Bubutya-Kidali U 10.9 Opening Drains & grass cuttingNamutumba Namutumba DLG Igerera-Mawungwe-Izimba U 5.9 Opening Drains & grass cuttingNamutumba Namutumba DLG Nawampandu-Wangobo U 4.1 Opening Drains & grass cuttingNamutumba Namutumba DLG Nawampandu-Ituba-Bulongo U 8.3 Opening Drains & grass cuttingNamutumba Namutumba DLG Ivukula-Nangonde-Nawankima U 22.9 Opening Drains & grass cuttingNamutumba Namutumba DLG Kalamira-Kagulu-Izimba U 9.4 Opening Drains & grass cuttingNamutumba Namutumba DLG Nawampandu Tc-Nakyere U 2.6 Opening Drains & grass cuttingNamutumba Namutumba DLG Idinda-Buwongo U 1.7 Opening Drains & grass cuttingNamutumba Namutumba DLG Nabinyonyi-Namutumba U 12.4 Opening Drains & grass cuttingNamutumba Namutumba DLG Nsinze-Naigombwa U 5.6 Opening Drains & grass cuttingNamutumba Namutumba DLG Kaiti-Kibaale P/S U 10.1 Opening Drains & grass cuttingNamutumba Namutumba DLG Kibaale T/C-Kaliro swamp U 8.5 Opening Drains & grass cuttingNamutumba Namutumba DLG Mpulira-Nawaibete-Nabweyo U 10.9 Opening Drains & grass cuttingNamutumba Namutumba DLG Nawaikona-Nakyere P/S U 9.0 Opening Drains & grass cuttingNamutumba Namutumba DLG Nakisi-Namato-Bulafa U 3.5 Opening Drains & grass cuttingNamutumba Namutumba DLG Sembela-Namato-Kigalama U 5.3 Opening Drains & grass cuttingNamutumba Namutumba DLG Kigalama-Namulu-Nalubabwe U 3.7 Opening Drains & grass cuttingNamutumba Namutumba DLG Nabitula-Ivukula U 3.8 Opening Drains & grass cuttingNamutumba Namutumba DLG Bukonte-Nsinze U 7.1 Opening Drains & grass cuttingNamutumba Namutumba DLG Mazuba-Ivukula-Bugodo U 19.4 Opening Drains & grass cuttingNamutumba Namutumba DLG Matyama-Sembela U 2.1 Opening Drains & grass cuttingNamutumba Namutumba DLG Buwanga-Makenya-Kiwolomero U 8.0 Opening Drains & grass cuttingNamutumba Namutumba DLG Buwaga-Nawandagala-Mpumiro U 10.2 Opening Drains & grass cuttingNamutumba Namutumba DLG Bulange-Mpumiro U 7.5 Opening Drains & grass cuttingNamutumba Namutumba DLG Kyabakaire-Bugobi-Nawansagwa U 14.4 Opening Drains & grass cutting

Namutumba Namutumba DLG Namutumba-Namato-Nawan-sagwa U 7.2 Opening Drains & grass cutting

Namutumba Namutumba DLG Lwamba-Maliga Via Namakoko U 9.5 Opening Drains & grass cuttingNamutumba Namutumba DLG Nsinze-Maliga U 3.7 Opening Drains & grass cuttingNamutumba Namutumba DLG Butogoli-Magoola U 3.4 Opening Drains & grass cuttingNamutumba Namutumba DLG Mpumiro-Buyoboya-Nakasimo U 6.1 Opening Drains & grass cutting

Namutumba Namutumba DLG Bubutya-Bunaibamba-Namuse-no U 6.4 Opening Drains & grass cutting

Namutumba Namutumba DLG Bwayuya-Nalukero-Kilerema U 4.2 Opening Drains & grass cuttingNamutumba Namutumba DLG Nakawunzo-Namuwondo U 2.1 Opening Drains & grass cutting

Namutumba DLG Total 263.8

318 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Namutumba TC kangulumo U 3.1 Opening Drains & grass cuttingNamutumba TC Market close U 0.2 Opening Drains & grass cuttingNamutumba TC Dhikusoka Road U 0.2 Opening Drains & grass cuttingNamutumba TC Mpyangu Road U 0.2 Opening Drains & grass cuttingNamutumba TC Dongo Road U 0.6 Opening Drains & grass cuttingNamutumba TC Nyombi Road U 0.2 Opening Drains & grass cuttingNamutumba TC Musobya Road U 0.5 Opening Drains & grass cuttingNamutumba TC Gwigo Road U 0.3 Opening Drains & grass cuttingNamutumba TC Nsaduri Road U 0.6 Opening Drains & grass cuttingNamutumba TC Kibonde Road U 0.3 Opening Drains & grass cuttingNamutumba TC Diope Road U 0.1 Opening Drains & grass cuttingNamutumba TC Mugoda Road U 0.2 Opening Drains & grass cuttingNamutumba TC Mwanja Road U 0.6 Opening Drains & grass cuttingNamutumba TC Kassaja Road U 0.2 Opening Drains & grass cuttingNamutumba TC Mulondo Road U 0.5 Opening Drains & grass cuttingNamutumba TC Timothy Road U 0.3 Opening Drains & grass cuttingNamutumba TC Fellowship Road U 0.7 Opening Drains & grass cuttingNamutumba TC Buyugu Road U 0.4 Opening Drains & grass cuttingNamutumba TC Mukama Road U 0.3 Opening Drains & grass cuttingNamutumba TC Matayo Road U 0.2 Opening Drains & grass cuttingNamutumba TC wako U 0.9 Opening Drains & grass cuttingNamutumba TC Mutuya U 1.7 Opening Drains & grass cuttingNamutumba TC Namukasa U 0.9 Opening Drains & grass cuttingNamutumba TC Waicha U 1.9 Opening Drains & grass cuttingNamutumba TC Itonko U 1.5 Opening Drains & grass cuttingNamutumba TC Nawaikona U 1.0 Opening Drains & grass cuttingNamutumba TC Ezekiel U 0.4 Opening Drains & grass cuttingNamutumba TC Munobi U 0.6 Opening Drains & grass cuttingNamutumba TC Mabale U 0.3 Opening Drains & grass cuttingNamutumba TC Mkwita U 1.0 Opening Drains & grass cuttingNamutumba TC Gwanswa U 0.3 Opening Drains & grass cuttingNamutumb TC Ngege U 0.3 Opening Drains & grass cutting TC Total 20.0Napak Napak DLG Kangole-Lotome U 3.8 Opening Drains & grass cutting Napak DLG Total 3.8Napak TC Kale Christance U 1.4 Opening Drains & grass cuttingNapak TC Longole Zakayo U 1.1 Opening Drains & grass cutting Napak TC Total 2.5Nebbi Nebbi DLG Nyaravur-Parombo Earth 16.2 Opening Drains & grass cuttingNebbi Nebbi DLG Nebbi-Goli-Kei Earth 6.0 Opening Drains & grass cuttingNebbi Nebbi DLG Wadelai-Kucwiny-Agwok Earth 21.0 Opening Drains & grass cuttingNebbi Nebbi DLG Parombo-Alwi-Panyango Earth 24.0 Opening Drains & grass cuttingNebbi Nebbi DLG Panyimur-Malara-Parombo Earth 15.2 Opening Drains & grass cuttingNebbi Nebbi DLG Nyakagei-Dei Earth 5.0 Opening Drains & grass cuttingNebbi Nebbi DLG Erussi-Acwera Earth 18.0 Opening Drains & grass cutting

Nebbi Nebbi DLG Akaba-Kucwiny-Fualwonga-Pok-wero Earth 14.0 Opening Drains & grass cutting

Nebbi Nebbi DLG GotLandi-Odangala-Erussi Earth 20.0 Opening Drains & grass cuttingNebbi Nebbi DLG Ayila-Oweko-Erussi Earth 16.0 Opening Drains & grass cuttingNebbi Nebbi DLG Pateng-Pajau-Akella Earth 14.0 Opening Drains & grass cuttingNebbi Nebbi DLG Kucwiny-Orango Earth 13.2 Opening Drains & grass cuttingNebbi Nebbi DLG Afoda-Rero Earth 8.0 Opening Drains & grass cuttingNebbi Nebbi DLG Alego-Boro Earth 10.0 Opening Drains & grass cuttingNebbi Nebbi DLG Pajau -Theraling Earth 3.0 Opening Drains & grass cuttingNebbi Nebbi DLG Fualwonga - Lobodegi Earth 5.0 Opening Drains & grass cuttingNebbi Nebbi DLG Emin Pasha -Mutir Earth 3.0 Opening Drains & grass cuttingNebbi Nebbi DLG Kibira -Omier-Azingo Earth 10.0 Opening Drains & grass cuttingNebbi Nebbi DLG Akaba-Paminya-Paceru Earth 12.0 Opening Drains & grass cuttingNebbi Nebbi DLG Akanyo-Kibira Earth 3.0 Opening Drains & grass cutting

319Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Nebbi Nebbi DLG Ossi-Padel Centre-Pangere Earth 8.0 Opening Drains & grass cuttingNebbi Nebbi DLG Raguka-Penji Oryenga Earth 3.0 Opening Drains & grass cuttingNebbi Nebbi DLG Kasatu-Muurusi-Munduryema Earth 5.5 Opening Drains & grass cuttingNebbi Nebbi DLG Angal Trading Centre-Ambere Earth 4.0 Opening Drains & grass cuttingNebbi Nebbi DLG Koch-Nebbi Airfield Earth 3.0 Opening Drains & grass cuttingNebbi Nebbi DLG Anywanda-Athele-Parombo Earth 15.0 Opening Drains & grass cutting Nebbi DLG Total 275.1

Nebbi Nebbi TC Nyipir Lane (Uringi - Adminis-tration Rd) Earth 0.1 Opening Drains & grass cutting

Nebbi Nebbi TC Nyacara west Lane (Nyacara Lane-Nyipir Lane) Earth 0.2 Opening Drains & grass cutting

Nebbi Nebbi TC Pithua (Nyacara West-Pakwach Road) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Umaki (Paidha road-Arua Road) Earth 0.8 Opening Drains & grass cuttingNebbi Nebbi TC Anyiri(Arua Road-Ocego Road) Earth 0.5 Opening Drains & grass cutting

Nebbi Nebbi TC Upano (Pithua Road-Mukalazi Road) Earth 0.1 Opening Drains & grass cutting

Nebbi Nebbi TC Erussi (Uringi Road -Ayila Road) Earth 1.2 Opening Drains & grass cutting

Nebbi Nebbi TC Pawong (Pithua Road-Oyera’s Farm) Earth 1.5 Opening Drains & grass cutting

Nebbi Nebbi TC Professor Gingyera (Pawong Road-Nyacara P.S) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Nyacara Access (Pawong Road-Erussi Road) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Bishop Orombi(Paidha Road-Musevent Road) Gravel 0.5 Opening Drains & grass cutting

Nebbi Nebbi TC Police Cresent (Paidha Road-Ca-thedral Road) Gravel 0.5 Opening Drains & grass cutting

Nebbi Nebbi TC Cathedral (Bishop Orombi Road-Paidha Road) Gravel 0.9 Opening Drains & grass cutting

Nebbi Nebbi TC Museveni (Bishop Orombi-Gad Dribia Road) Gravel 1.8 Opening Drains & grass cutting

Nebbi Nebbi TC Pubidhi Cresent (Cathedral -Gad Dribia Road) Earth 0.8 Opening Drains & grass cutting

Nebbi Nebbi TC Idi Amin (Paidha Road- Cathe-dral Road) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Sam Ringwegi (Omaki Road-Bishop Orombi Rd) Earth 0.2 Opening Drains & grass cutting

Nebbi Nebbi TC Ocego (Pakwach Road-Construc-tion Road) Gravel 0.6 Opening Drains & grass cutting

Nebbi Nebbi TC Alenyo (Museveni Road-Arua Road) Gravel 1.6 Opening Drains & grass cutting

Nebbi Nebbi TC Pubidhi (Cathedral -Namthin River) Earth 3.0 Opening Drains & grass cutting

Nebbi Nebbi TC Makor (Erussi Road-Okeyo Road) Gravel 1.0 Opening Drains & grass cutting

Nebbi Nebbi TC Abindu (Erussi Road-Namrwod-ho River) Earth 1.1 Opening Drains & grass cutting

Nebbi Nebbi TC Dave Showers (Upano Road-Namrwodho River) Gravel 0.6 Opening Drains & grass cutting

Nebbi Nebbi TC Airfield (Pakwach Road-Nyagam River) Gravel 1.2 Opening Drains & grass cutting

Nebbi Nebbi TC Obote (Stadium Road-Anyiri Road) Gravel 1.2 Opening Drains & grass cutting

Nebbi Nebbi TC Stadium (Arua road- Ocego Road) Gravel 1.2 Opening Drains & grass cutting

Nebbi Nebbi TC Construction (Pakwach Road-Arua Road) Gravel 3.0 Opening Drains & grass cutting

Nebbi Nebbi TC Jupanjao (Alenyo Road-Namthin River) Gravel 1.2 Opening Drains & grass cutting

Nebbi Nebbi TC Street I (Pakwach Road -Con-struction Road) Earth 0.2 Opening Drains & grass cutting

Nebbi Nebbi TC Abattoir (Erussi Road- Nebbi Hill) Gravel 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Fundu(Arua Road-Jupanjao Road) Gravel 0.6 Opening Drains & grass cutting

320 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Nebbi Nebbi TC Leng-congi (Paidha Road-Leng-congi village) Earth 1.0 Opening Drains & grass cutting

Nebbi Nebbi TC Uringi Lane (Uringi Road-Pithua Road) Gravel 0.1 Opening Drains & grass cutting

Nebbi Nebbi TC Naro lane(Arua Road-Obote Road) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Progressive Lower(Alenyo Road-Thombu Rd) Earth 1.0 Opening Drains & grass cutting

Nebbi Nebbi TC Paminya Ayila(paminya ay-ila-Dave Shawers Rd) Earth 3.0 Opening Drains & grass cutting

Nebbi Nebbi TC Ayabu Lower(Paidha Road-Pu-bidhi Road) Earth 2.0 Opening Drains & grass cutting

Nebbi Nebbi TC Mukalazi(Pithua Road-Namr-wodho River) Earth 0.6 Opening Drains & grass cutting

Nebbi Nebbi TC Oryema(Paidha Road-Leng congi Road) Earth 0.3 Opening Drains & grass cutting

Nebbi Nebbi TC Oryang(Stadium road-Paul oryek road) Earth 0.4 Opening Drains & grass cutting

Nebbi Nebbi TC Industrial Lane(Arua Road-Got alwala ) Earth 0.3 Opening Drains & grass cutting

Nebbi Nebbi TC Otim(Dave Shawers Road-Guna Road) Earth 0.1 Opening Drains & grass cutting

Nebbi Nebbi TC Dr. Oyirwoth(Pawong-Quarry site) Earth 0.5 Opening Drains & grass cutting

Nebbi Nebbi TC Afere(Arua Road-Jupanjao Road) Earth 0.3 Opening Drains & grass cuttingNebbi TC 37.5

Nebbi Pakwach TC Owere Earth 1.4 Opening Drains & grass cuttingNebbi Pakwach TC Kopio Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Amor Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Amor Ferry Earth 1.3 Opening Drains & grass cuttingNebbi Pakwach TC Jakolo Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Obel Road Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Nyilak Earth 0.4 Opening Drains & grass cuttingNebbi Pakwach TC Nyipir Earth 1.0 Opening Drains & grass cuttingNebbi Pakwach TC Jobi Earth 1.2 Opening Drains & grass cuttingNebbi Pakwach TC River Road Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Wadrif Earth 0.1 Opening Drains & grass cuttingNebbi Pakwach TC Wamara Earth 1.3 Opening Drains & grass cuttingNebbi Pakwach TC Ayara Earth 0.4 Opening Drains & grass cuttingNebbi Pakwach TC Abdalagadin Road Earth 0.1 Opening Drains & grass cuttingNebbi Pakwach TC Owinji Road Earth 0.1 Opening Drains & grass cuttingNebbi Pakwach TC Koko Road Earth 0.3 Opening Drains & grass cuttingNebbi Pakwach TC Rwanga Road Earth 0.4 Opening Drains & grass cuttingNebbi Pakwach TC Acel Earth 0.3 Opening Drains & grass cuttingNebbi Pakwach TC Okol Close Earth 0.1 Opening Drains & grass cuttingNebbi Pakwach TC Market View Road Earth 0.3 Opening Drains & grass cuttingNebbi Pakwach TC Wangkawa Jumedi Road Earth 4.0 Opening Drains & grass cuttingNebbi Pakwach TC Mubogo Earth 0.5 Opening Drains & grass cuttingNebbi Pakwach TC Cengu Earth 0.7 Opening Drains & grass cuttingNebbi Pakwach TC Pakwach Arua Earth 2.5 Opening Drains & grass cutting

Pakwach TC 19.4Ngora Ngora DLG Kapir - Koloin U 3 Opening Drains & grass cuttingNgora Ngora DLG Mukura – Ngora U 15.0 Opening Drains & grass cuttingNgora Ngora DLG Mukura – Nyero U 5.1 Opening Drains & grass cuttingNgora Ngora DLG Agu – Kobuku U 10.2 Opening Drains & grass cuttingNgora Ngora DLG Atoot – Kodike U 18.7 Opening Drains & grass cuttingNgora Ngora DLG Amapu – Kobuku U 3.3 Opening Drains & grass cuttingNgora Ngora DLG Akeit - Ogooma, Kalapata U 16.1 Opening Drains & grass cuttingNgora Ngora DLG Koloin – Kakor U 7.8 Opening Drains & grass cuttingNgora Ngora DLG Mukura – Agogomit U 5.5 Opening Drains & grass cuttingNgora Ngora DLG Ngora - Kobwin, Aciisa U 14.3 Opening Drains & grass cuttingNgora Ngora DLG Atoot - Tiling, Gawa Agu U 13.0 Opening Drains & grass cutting

321Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Ngora Ngora DLG Kapir – Morukakise U 6.6 Opening Drains & grass cuttingNgora Ngora DLG Akeit – Akisim U 5.2 Opening Drains & grass cuttingNgora Ngora DLG Agolitom – Okorom U 7.1 Opening Drains & grass cuttingNgora Ngora DLG Mukura - morukakise, Bisina U 10.0 Opening Drains & grass cuttingNgora Ngora DLG Ngora - Kees Omaditok U 6.5 Opening Drains & grass cuttingNgora Ngora DLG Amugagara - Agirigiroi U 3.2 Opening Drains & grass cuttingNgora Ngora DLG Mukura - Kamodokima U 6.5 Opening Drains & grass cuttingNgora Ngora DLG Ajeelo - Atapar - Akarukei U 7.5 Opening Drains & grass cuttingNgora Ngora DLG Koloin - Osir Adopale U 4.8 Opening Drains & grass cutting Ngora DLG Total 399.9Ngora Ngora TC Omaswa road U 0.2 Opening Drains & grass cuttingNgora Ngora TC Market street I & II U 0.4 Opening Drains & grass cuttingNgora Ngora TC Ogwellan road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Akabwai road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Omuron road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Oriso road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Kobuku Ngora Girls road U 0.4 Opening Drains & grass cuttingNgora Ngora TC Otaok road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Osunge road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Oliso road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Amonyu road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Aeko road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Ngora new road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Eumu road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Oteeten road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Akudo road U 0.1 Opening Drains & grass cuttingNgora Ngora TC St.Aloysius road U 0.4 Opening Drains & grass cuttingNgora Ngora TC Omaido road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Olaro road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Rehema road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Aikomo road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Imaet Close U 0.1 Opening Drains & grass cuttingNgora Ngora TC Omare road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Omio road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Okiror road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Agama road U 0.1 Opening Drains & grass cuttingNgora Ngora TC Akabwai road U 0.1 Opening Drains & grass cuttingNgora Ngora TC st. Josephs’ - kapir road U 0.2 Opening Drains & grass cuttingNgora Ngora TC kabakuli-Ngora High Sch. Road U 0.3 Opening Drains & grass cuttingNgora Ngora TC okiria obore road U 0.3 Opening Drains & grass cuttingNgora Ngora TC st.clere-bkc dem U 0.3 Opening Drains & grass cuttingNgora Ngora TC okisimo-obosai U 0.5 Opening Drains & grass cuttingNgora Ngora TC Oonyu road U 0.2 Opening Drains & grass cuttingNgora Ngora TC oragani road U 0.1 Opening Drains & grass cuttingNgora Ngora TC adoogo road U 0.1 Opening Drains & grass cuttingNgora Ngora TC william lane U 0.1 Opening Drains & grass cuttingNgora Ngora TC omodo road U 0.5 Opening Drains & grass cuttingNgora Ngora TC Omuron road U 0.1 Opening Drains & grass cutting

Ngora TC 6.0Oyam Oyam DLG Akwangi - Obari – Imato U 5.0 Opening Drains & grass cuttingOyam Oyam DLG Otwal- Alibi - Lira Boarder U 10.1 Opening Drains & grass cuttingOyam Oyam DLG Amwa Mkt – Ogwalmulamula U 7.5 Opening Drains & grass cuttingOyam Oyam DLG Minakulu – Opuk U 10.7 Opening Drains & grass cuttingOyam Oyam DLG Barrio – Ototong U 9.0 Opening Drains & grass cuttingOyam Oyam DLG Akwanyogen – Itubara U 6.0 Opening Drains & grass cuttingOyam Oyam DLG Ariek -Ajaka – Abok U 10.4 Opening Drains & grass cuttingOyam Oyam DLG Iceme -Aloni - Otwal railway U 11.0 Opening Drains & grass cuttingOyam Oyam DLG Loro – Adyegi U 29.0 Opening Drains & grass cuttingOyam Oyam DLG Obangangeo - Atipe Kampala U 7.2 Opening Drains & grass cutting

322 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Oyam Oyam DLG Alidi – Awangi U 16.4 Opening Drains & grass cuttingOyam Oyam DLG Barrio - Gulu Boarder U 1.3 Opening Drains & grass cutting

Oyam Oyam DLG Adiigo - Ayaomapwono – We-kwiawe U 12.7 Opening Drains & grass cutting

Oyam Oyam DLG Oyam T/C - Iceme - Otwal – Opeta U 36.0 Opening Drains & grass cutting

Oyam Oyam DLG Oyam T/C Upper-Alao – Amido U 16.4 Opening Drains & grass cuttingOyam Oyam DLG Otwal-Wiagaba U 11.0 Opening Drains & grass cuttingOyam Oyam DLG Aringodyang – Opeta U 13.0 Opening Drains & grass cuttingOyam Oyam DLG Wiagaba-Anyomolyec U 6.3 Opening Drains & grass cuttingOyam Oyam DLG Aber - Kamdini - Gulu road U 6.0 Opening Drains & grass cuttingOyam Oyam DLG Pida – Teopok U 5.5 Opening Drains & grass cuttingOyam Oyam DLG Omarayok – Gwokwikwoyo U 13.0 Opening Drains & grass cuttingOyam Oyam DLG Aminomir – Teopobo U 13.0 Opening Drains & grass cuttingOyam Oyam DLG Adak – Atura U 15.9 Opening Drains & grass cuttingOyam Oyam DLG Adit - Dogatuk – Odiro U 5.6 Opening Drains & grass cuttingOyam Oyam DLG Aleka - Odyekmwoda – Wiagaba U 6.2 Opening Drains & grass cuttingOyam Oyam DLG Congo -Alaro – Acimi U 5.8 Opening Drains & grass cutting

Oyam Oyam DLG Loro Mkt - Amwak - Atop p/s – Adigo U 9.3 Opening Drains & grass cutting

Oyam Oyam DLG Nora - Apala B – Zambia U 15.0 Opening Drains & grass cuttingOyam Oyam DLG Ojwii – wiagaba U 4.5 Opening Drains & grass cuttingOyam Oyam DLG Upper centre - Ajuri – Awio U 14.7 Opening Drains & grass cuttingOyam Oyam DLG Camnono – Teogali U 3.9 Opening Drains & grass cuttingOyam Oyam DLG Dago Opyel – Atura U 7.2 Opening Drains & grass cuttingOyam Oyam DLG Mairo-Zambia U 8.7 Opening Drains & grass cuttingOyam Oyam DLG Otwal Railway-Ojwil U 12.7 Opening Drains & grass cuttingOyam Oyam DLG Awio - Barrio U 13.9 Opening Drains & grass cuttingOyam Oyam DLG Agobadong - Aringo – Angweta U 6.0 Opening Drains & grass cuttingOyam Oyam DLG Okule - Cornerlii – Acimi U 10.2 Opening Drains & grass cuttingOyam Oyam DLG Ngai - Ariek – Opit U 10.5 Opening Drains & grass cuttingOyam Oyam DLG Acaba – Obot U 8.0 Opening Drains & grass cuttingOyam Oyam DLG Oyam Mkt – Tegacia U 3.6 Opening Drains & grass cuttingOyam Oyam DLG ConerLIi-Congo U 8.0 Opening Drains & grass cuttingOyam Oyam DLG Iceme-Ototong U 3.6 Opening Drains & grass cuttingOyam Oyam DLG Ototong-Lalaogi U 17.7 Opening Drains & grass cuttingOyam Oyam DLG Alutkot-Atop-Agengo U 12.5 Opening Drains & grass cuttingOyam Oyam DLG Obangangeo -Alao U 3.7 Opening Drains & grass cuttingOyam Oyam DLG Dogolony-Okure-Ogwet U 13.7 Opening Drains & grass cuttingOyam Oyam DLG Obangangeo-Dogapio U 8.5 Opening Drains & grass cuttingOyam Oyam DLG Minakulu-Orupu U 7.8 Opening Drains & grass cuttingOyam Oyam DLG Odyek--Barlong U 6.6 Opening Drains & grass cuttingOyam Oyam DLG Iceme-obong U 12.0 Opening Drains & grass cuttingOyam Oyam DLG Adyegi-Ayomapwono U 8.2 Opening Drains & grass cutting Oyam DLG Total 520.5Oyam Oyam TC Prof. Ojok Rd Earth 3.6 Opening Drains & grass cuttingOyam Oyam TC Akatakata – Anyeke Earth 1.2 Opening Drains & grass cuttingOyam Oyam TC Rwot Olong Rd Earth 0.6 Opening Drains & grass cuttingOyam Oyam TC Rwot Bua Rd Earth 0.6 Opening Drains & grass cuttingOyam Oyam TC Nebucardnessar Rd Earth 0.6 Opening Drains & grass cuttingOyam Oyam TC Dr. Yaffessi Okullo Epak Rd Earth 0.5 Opening Drains & grass cuttingOyam Oyam TC Office Lanes Gravel 0.8 Opening Drains & grass cuttingOyam Oyam TC Widyang – Atonglela Gravel 2.2 Opening Drains & grass cuttingOyam Oyam TC Alutkot-Abanya Earth 2.7 Opening Drains & grass cuttingOyam Oyam TC Anyeke-Atek Earth 2.7 Opening Drains & grass cuttingOyam Oyam TC Rwot Oyie Earth 0.4 Opening Drains & grass cuttingOyam Oyam TC Obote Avenue Earth 0.8 Opening Drains & grass cuttingOyam Oyam TC Macodwogo road Earth 0.5 Opening Drains & grass cuttingOyam Oyam TC Benayokan (BK) Otia Earth 0.15 Opening Drains & grass cutting

323Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Oyam Oyam TC Ogomarac Road Earth 0.6 Opening Drains & grass cutting Oyam TC Total 17.95Pader Pader C A R S Lagil-Laboye Ps U 4.3 Opening Drains & grass cuttingPader Pader C A R S Wina-Lamincila U 3.0 Opening Drains & grass cuttingPader Pader C A R S Pajule Mission-Oweka U 7.6 Opening Drains & grass cuttingPader Pader C A R S Loken-Latayi PS U 4.5 Opening Drains & grass cuttingPader Pader C A R S Pader-Ogom-Kibong U 8.0 Opening Drains & grass cuttingPader Pader C A R S Pajjule- ogago U 19.0 Opening Drains & grass cuttingPader Pader C A R S Cuk abic-Laminocwida U 6.0 Opening Drains & grass cuttingPader Pader C A R S Acutomer PS-Adoo PS U 5.0 Opening Drains & grass cuttingPader Pader C A R S Aswa arm Bridge-Laparant U 4.2 Opening Drains & grass cuttingPader Pader C A R S Lacekocot-Adoo U 6.0 Opening Drains & grass cuttingPader Pader C A R S Atanga mission Tungtwon U 8.1 Opening Drains & grass cutting Pader C A R S Total 75.7Pader Pader DLG Pader-Latanya-Dure U 17.0 Opening Drains & grass cuttingPader Pader DLG Aruuma-Puranga U 5.2 Opening Drains & grass cuttingPader Pader DLG Kineni-Otingowiye U 17.6 Opening Drains & grass cuttingPader Pader DLG Acolpii-Harambee U 5.0 Opening Drains & grass cuttingPader Pader DLG Puranga-Achola Stream U 18.9 Opening Drains & grass cuttingPader Pader DLG Lapul U 19.0 Opening Drains & grass cuttingPader Pader DLG Laguti-Lanyadyang U 11.2 Opening Drains & grass cuttingPader Pader DLG Atanga-Bolo-Lagile U 36.0 Opening Drains & grass cuttingPader Pader DLG Pajule-Lagwai-Kimiya U 26.0 Opening Drains & grass cuttingPader Pader DLG Lanyatido-Koyolalogi-ocwida U 27.0 Opening Drains & grass cuttingPader Pader DLG Koyolalogi-Bolo-Awere U 27.0 Opening Drains & grass cuttingPader Pader DLG Pader-Lukole U 12.2 Opening Drains & grass cuttingPader Pader DLG Achilibur-Lutanya U 17.0 Opening Drains & grass cuttingPader Pader DLG Puranga-Awere U 20.4 Opening Drains & grass cuttingPader Pader DLG Kilak-Ongany-Koyolalogi U 13.0 Opening Drains & grass cuttingPader Pader DLG Puranga-Adongkena U 6.2 Opening Drains & grass cuttingPader Pader DLG Lakoga-Ogonyo U 8.5 Opening Drains & grass cuttingPader Pader DLG Lakoga-Rachkoko U 6.0 Opening Drains & grass cuttingPader Pader DLG Cukadek-Laminocwida U 7.2 Opening Drains & grass cuttingPader Pader DLG Dagoiwao-Oyuku U 6.0 Opening Drains & grass cuttingPader Pader DLG Pajule-Otok-Oyuku U 20.0 Opening Drains & grass cuttingPader Pader DLG Acholibur-Lutayi U 14.5 Opening Drains & grass cuttingPader Pader DLG Laminchila-Atup-Kilak U 9.0 Opening Drains & grass cuttingPader Pader DLG Lunyiri-Angole U 8.5 Opening Drains & grass cutting Pader DLG Total 358.4Pader Pader T/C EY Komakech U 1.5 Opening Drains & grass cuttingPader Pader T/C Oryem Bosco U 1.0 Opening Drains & grass cuttingPader Pader T/C Moro Adet U 0.3 Opening Drains & grass cuttingPader Pader T/C Padr Kilak U 0.2 Opening Drains & grass cuttingPader Pader T/C Obol Akal U 1.0 Opening Drains & grass cuttingPader Pader T/C Can Ogura U 0.4 Opening Drains & grass cuttingPader Pader T/C Rwot Agako U 1.0 Opening Drains & grass cuttingPader Pader T/C Kalongo U 0.5 Opening Drains & grass cuttingPader Pader T/C Pajul U 0.5 Opening Drains & grass cuttingPader Pader T/C ojwee Akena U 0.9 Opening Drains & grass cuttingPader Pader T/C Okoto Jalon U 0.5 Opening Drains & grass cuttingPader Pader T/C Okoto Patrick Lumumba U 0.5 Opening Drains & grass cuttingPader Pader T/C Mayors Avenue U 0.3 Opening Drains & grass cuttingPader Pader T/C Lobokoloro U 0.5 Opening Drains & grass cuttingPader Pader T/C Market street U 1.0 Opening Drains & grass cuttingPader Pader T/C Air strip U 1.4 Opening Drains & grass cuttingPader Pader T/C Bus park U 1.0 Opening Drains & grass cuttingPader Pader T/C Infront of Biva hotel U 0.4 Opening Drains & grass cuttingPader Pader T/C To oyoo place U 0.5 Opening Drains & grass cuttingPader Pader T/C Pader hotel U 0.6 Opening Drains & grass cutting

324 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Pader Pader T/C Latanya U 0.2 Opening Drains & grass cuttingPader Pader T/C Infront of fr. Oloya Hse U 0.2 Opening Drains & grass cuttingPader Pader T/C Infront of Zoa resident U 0.2 Opening Drains & grass cuttingPader Pader T/C Infront of Mr.Okwir Ray place U 0.2 Opening Drains & grass cuttingPader Pader T/C Towards former barracks U 0.5 Opening Drains & grass cuttingPader Pader T/C Opposite gapco U 0.1 Opening Drains & grass cuttingPader Pader T/C Infront of Brac office U 0.2 Opening Drains & grass cuttingPader Pader T/C Police Barracks U 1.2 Opening Drains & grass cutting

Pader Pader T/C Lupelle and other assorted section U 1.5 Opening Drains & grass cutting

Pader T/C Total 18.1Pallisa Pallisa DLG Agule - Gogonyo U 14. Opening Drains & grass cuttingPallisa Pallisa DLG Pallisa - Gogonyo U 12. Opening Drains & grass cuttingPallisa Pallisa DLG Kakoro - Kidongole U 5.4 Opening Drains & grass cuttingPallisa Pallisa DLG Agule - Kameke - Ladoto U 15. Opening Drains & grass cuttingPallisa Pallisa DLG Pallisa - Agule U 12. Opening Drains & grass cutting

Pallisa Pallisa DLG Kamuge - Kalapata-Boliso -Kumi rd U 6. Opening Drains & grass cutting

Pallisa Pallisa DLG Pallisa - Olok - Apapa U 7. Opening Drains & grass cuttingPallisa Pallisa DLG Kabwangasi- Nasenyi U 7.1 Opening Drains & grass cuttingPallisa Pallisa DLG Kanyum Market - Odipanya U 7.4 Opening Drains & grass cuttingPallisa Pallisa DLG Radio (U)- Nasuleta U 6.3 Opening Drains & grass cuttingPallisa Pallisa DLG Oladot-Butebo U 10. Opening Drains & grass cutting

Pallisa DLG Total 102.2Pallisa Pallisa TC Hudson Street P 0.50 Opening Drains & grass cuttingPallisa Pallisa TC Olinga Road U 0.40 Opening Drains & grass cuttingPallisa Pallisa TC Haji Muloki Road U 0.30 Opening Drains & grass cuttingPallisa Pallisa TC Mutembei Rd. U 0.80 Opening Drains & grass cuttingPallisa Pallisa TC Olok Avenue U 0.20 Opening Drains & grass cuttingPallisa Pallisa TC Hospital Rd. U 0.60 Opening Drains & grass cuttingPallisa Pallisa TC Mugowa Rd. U 0.80 Opening Drains & grass cuttingPallisa Pallisa TC Katukei Rd P 0.54 Opening Drains & grass cuttingPallisa Pallisa TC Okanya Road U 0.50 Opening Drains & grass cuttingPallisa Pallisa TC Kateu Road U 0.24 Opening Drains & grass cuttingPallisa Pallisa TC Anguria Road U 0.50 Opening Drains & grass cuttingPallisa Pallisa TC Omasukei Road U 0.80 Opening Drains & grass cuttingPallisa Pallisa TC Health CD U 0.30 Opening Drains & grass cuttingPallisa Pallisa TC Kasabiti Rd U 0.65 Opening Drains & grass cuttingPallisa Pallisa TC Tukei Road. U 0.45 Opening Drains & grass cuttingPallisa Pallisa TC Outa Road U 0.65 Opening Drains & grass cuttingPallisa Pallisa TC Gogonyo Rd U 4.30 Opening Drains & grass cuttingPallisa Pallisa TC Jamat khan Road U 0.20 Opening Drains & grass cuttingPallisa Pallisa TC Agule Rd U 3.30 Opening Drains & grass cuttingPallisa Pallisa TC Epaju Lane U 0.12 Opening Drains & grass cuttingPallisa Pallisa TC Kaguta Road U 2.00 Opening Drains & grass cuttingPallisa Pallisa TC AbayasLink U 1.10 Opening Drains & grass cuttingPallisa Pallisa TC Omaido Road U 1.20 Opening Drains & grass cuttingPallisa Pallisa TC Bukutu Road U 0.30 Opening Drains & grass cuttingPallisa Pallisa TC Buseta Road U 0.65 Opening Drains & grass cuttingPallisa Pallisa TC Naigere Rd U 0.90 Opening Drains & grass cuttingPallisa Pallisa TC Church Road U 0.80 Opening Drains & grass cuttingPallisa Pallisa TC Kamusini road U 1.50 Opening Drains & grass cuttingPallisa Pallisa TC Nduga U 0.65 Opening Drains & grass cuttingPallisa Pallisa TC Okaude rd U 1.70 Opening Drains & grass cuttingPallisa Pallisa TC Sadik Road U 0.35 Opening Drains & grass cuttingPallisa Pallisa TC Maganda-Lemwa U 1.90 Opening Drains & grass cuttingPallisa Pallisa TC Kaucho Road U 0.54 Opening Drains & grass cuttingPallisa Pallisa TC Komolo Road. U 1.30 Opening Drains & grass cuttingPallisa Pallisa TC Auk rd U 3.50 Opening Drains & grass cutting

325Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Pallisa Pallisa TC Kagwese Rd. U 1.30 Opening Drains & grass cuttingPallisa Pallisa TC Ekaba U 1.70 Opening Drains & grass cuttingPallisa Pallisa TC Omumba rd U 0.49 Opening Drains & grass cuttingPallisa Pallisa TC court rd U 1.20 Opening Drains & grass cuttingPallisa Pallisa TC Ogada rd U 0.25 Opening Drains & grass cuttingPallisa Pallisa TC Isabirye rd U 0.20 Opening Drains & grass cuttingPallisa Pallisa TC Okiring Close P 0.12 Opening Drains & grass cuttingPallisa Pallisa TC Fr Girifin road U 0.15 Opening Drains & grass cuttingPallisa Pallisa TC Tank road U 0.40 Opening Drains & grass cuttingPallisa Pallisa TC Abunieri-Mukenye U 1.50 Opening Drains & grass cuttingPallisa Pallisa TC Obonyo U 0.65 Opening Drains & grass cuttingPallisa Pallisa TC Omaido-Lemwa U 2.40 Opening Drains & grass cuttingPallisa Pallisa TC Wagosi rd U 1.50 Opening Drains & grass cuttingPallisa Pallisa TC Talenga Rd U 1.00 Opening Drains & grass cuttingPallisa Pallisa TC Ezekiel Rd U 1.00 Opening Drains & grass cuttingPallisa Pallisa TC Edeket U 0.82 Opening Drains & grass cuttingPallisa Pallisa TC Atiida U 3.00 Opening Drains & grass cutting Pallisa TC Total 52.2Rakai Rakai DLG Kyotera-Bethlehem-Kalisizo U 37.7 Opening Drains & grass cuttingRakai Rakai DLG Biikira-Nvubu-Nakatogo U 14.0 Opening Drains & grass cuttingRakai Rakai DLG Kibanda-Kakuuto U 12.0 Opening Drains & grass cuttingRakai Rakai DLG Kateera-Minziro U 15.0 Opening Drains & grass cuttingRakai Rakai DLG Ssanje-Kibaale-Kyalulangira U 29.0 Opening Drains & grass cutting

Rakai Rakai DLG Ndeeba-Kacheera-Lwan-ga-Katatenga U 39.0 Opening Drains & grass cutting

Rakai Rakai DLG Ddwaniro-Buyamba-Ttaba U 14.8 Opening Drains & grass cuttingRakai Rakai DLG Nkokko-Kirumba-Bootera U 12.2 Opening Drains & grass cuttingRakai Rakai DLG Kibaale-Kiziba-Ntantamukye U 20.8 Opening Drains & grass cutting

Rakai Rakai DLG Gavu-Malemba-Ka-kunyu-Kamengo U 20.0 Opening Drains & grass cutting

Rakai Rakai DLG Byakabanda-Katerero U 8.0 Opening Drains & grass cuttingRakai Rakai DLG Kifuuta-Kachanga-Kasasa U 20.0 Opening Drains & grass cuttingRakai Rakai DLG Bulanga-Katakula-Kasoga U 10.0 Opening Drains & grass cutting

Rakai Rakai DLG Kisimbanyiriri-Kigan-da-Kalunumo U 6.7 Opening Drains & grass cutting

Rakai Rakai DLG Lwamaggwa-Byezitire-Kacheera U 5.5 Opening Drains & grass cuttingRakai Rakai DLG Beteremu-Katana-Kalagala U 19.0 Opening Drains & grass cuttingRakai Rakai DLG Kabano-Kabaale-Kamuganja U 8.5 Opening Drains & grass cuttingRakai Rakai DLG Misozi-Kyabasimba U 6.0 Opening Drains & grass cuttingRakai Rakai DLG Kagamba-Bbale-Lwentulege U 20.8 Opening Drains & grass cuttingRakai Rakai DLG Kasanvu-Kyakatuma-Kimuli U 16.4 Opening Drains & grass cuttingRakai Rakai DLG Kiswere-Kigeye U 8.0 Opening Drains & grass cuttingRakai Rakai DLG Kikonge-Lwensambya U 12.4 Opening Drains & grass cuttingRakai Rakai DLG Lwanda - Kiwenda-Bukalasa U 14.4 Opening Drains & grass cuttingRakai Rakai DLG Kabira - Kigona – Nazigo U 18.5 Opening Drains & grass cuttingRakai Rakai DLG Kirundamaliga-ButitiBathem U 12.2 Opening Drains & grass cuttingRakai Rakai DLG Lwanda - Bukalasa-Kiwanda U 12.0 Opening Drains & grass cuttingRakai Rakai DLG Kabano-Kabaale-Kamuganja U 11.0 Opening Drains & grass cuttingRakai Rakai DLG kasasa-kifuta U 9.2 Opening Drains & grass cuttingRakai Rakai DLG Bitabago-Kyengeza-kijumba U 20.0 Opening Drains & grass cuttingRakai Rakai DLG Lwoyo - Kasankala – Lwenturege U 9.2 Opening Drains & grass cuttingRakai Rakai DLG Kabira - Kakomero - Kikonge U 11.2 Opening Drains & grass cuttingRakai Rakai DLG Lwanda - Kiganda – Buteyongera U 10.0 Opening Drains & grass cutting Rakai DLG Total 483.5Rakai Kyotera TC old-mutukula P/U 1.0 Opening Drains & grass cuttingRakai Kyotera TC kikuubo(Market) Lanes P 1.0 Opening Drains & grass cuttingRakai Kyotera TC Mitukula-Kamwanyi U 1.6 Opening Drains & grass cuttingRakai Kyotera TC Kanywamugule-Beteremu U 1.0 Opening Drains & grass cuttingRakai Kyotera TC Sendege P 0.6 Opening Drains & grass cutting

326 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Rakai Kyotera TC konkolodiya-Kintu P 0.4 Opening Drains & grass cutting5.6

Rubirizi Katerera TC Kacuba-Kyamwiru- Kanyega-ramire-Bed U 2.5 Opening Drains & grass cutting

Rubirizi Katerera TC Nyabushabe-Kanyegaramire U 1.5 Opening Drains & grass cuttingRubirizi Katerera TC Katerera-kabashekye-Kempunu U 2.2 Opening Drains & grass cutting

Rubirizi Katerera TC Katerera-CompH/S-Kikonjo-Ka-subi road U 1 Opening Drains & grass cutting

Rubirizi Katerera TC Katerera- Mutagambwa-Mbuga B U 2.2 Opening Drains & grass cuttingRubirizi Katerera TC Nyakagyezi-Kyamwiga U 1.5 Opening Drains & grass cuttingRubirizi Katerera TC Mbuga B-Nyakagyezi U 1.3 Opening Drains & grass cutting

Rubirizi Katerera TC Nyakagyezi- Ganafa-Bayaba-Be-gumisa U 2.2 Opening Drains & grass cutting

Rubirizi Katerera TC Myonyo-Kirondo-Omukatooma U 1.7 Opening Drains & grass cuttingRubirizi Katerera TC Omukatoma-Kyamwiga-Myonyo U 1.2 Opening Drains & grass cuttingRubirizi Katerera TC Kabaseke-Mwasaba-kempunu U 0.7 Opening Drains & grass cutting

Rubirizi Katerera TC OMukatoma--Kaguga(Maganja and Tinkasimire road) U 2 Opening Drains & grass cutting

Rubirizi Katerera TC Omukikoona- T/c offices -Nye-hangane-Prutaz,s cpd U 2.2 Opening Drains & grass cutting

Katerera TC Total 22.2Rubirizi Rubirizi DLG Ishasha road Junction-Kazinga U 3 Opening Drains & grass cuttingRubirizi Rubirizi DLG Rugyenda-Kitoma-Rumuri U 2 Opening Drains & grass cuttingRubirizi Rubirizi DLG Nyakasharu-Butoha-Katerera U 4 Opening Drains & grass cuttingRubirizi Rubirizi DLG Rutoto-Ndangaro U 3 Opening Drains & grass cuttingRubirizi Rubirizi DLG Kirugu-Kyeizogombi U 2 Opening Drains & grass cuttingRubirizi Rubirizi DLG Ahakatoma-Kisharu U 3 Opening Drains & grass cuttingRubirizi Rubirizi DLG Omukashasha-Katanda U 2.5 Opening Drains & grass cuttingRubirizi Rubirizi DLG Bururuma-Kyanika-Birehe U 3 Opening Drains & grass cutting

Rubirizi Rubirizi DLG Rwemondo-Rwemitagu-Kan-tungu U 2.5 Opening Drains & grass cutting

Rubirizi Rubirizi DLG Mirarikye-Kafuro-Kyenzaza U 3 Opening Drains & grass cuttingRubirizi Rubirizi DLG Kizirigo-Buzenga-Mugogo U 2 Opening Drains & grass cutting Rubirizi DLG Total 30

Rubirizi Rubirizi TC Kabete-Nyakiziba, Ndekye-Nya-kabuka U 2 Opening Drains & grass cutting

Rubirizi Rubirizi TC ndekyemarket-kigezi U 1.5 Opening Drains & grass cuttingRubirizi Rubirizi TC Mubanda-Ndekye U 1 Opening Drains & grass cuttingRubirizi Rubirizi TC Nyakasharu Posta-Kyakabunda U 1.6 Opening Drains & grass cutting

Rubirizi Rubirizi TC Rugazi-Rukizi-Nyakasharu-Mag-ambo U 1.5 Opening Drains & grass cutting

Rubirizi Rubirizi TC Kabete-Kikuba catholic church U 1 Opening Drains & grass cutting Rubirizi TC Total 8.6Rukungiri Rukungiri DLG Kigaga-Birara U 2.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kakinga-Ahamuyanje U 8.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Mabanga-kahengye U 0.9 Opening Drains & grass cuttingRukungiri Rukungiri DLG Bwambara-Ntungwa U 5.5 Opening Drains & grass cuttingRukungiri Rukungiri DLG Rukungiri-Rubabo-Nyarushanje U 7.5 Opening Drains & grass cuttingRukungiri Rukungiri DLG Bikongozo-kirimbe U 1.5 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kyomera-Nyabukumba-Ihindiro U 11.6 Opening Drains & grass cuttingRukungiri Rukungiri DLG Rwamahwa-kakindo U 10.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kebisoni-Mabanga-Kihanga U 8.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kihanga-Rwemburara U 3.8 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kebisoni-kabingo-Mabanga U 6.7 Opening Drains & grass cuttingRukungiri Rukungiri DLG Omukiyenje-Aharugyera U 1.5 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kashenyi-Rwengiri U 3.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kagashe-Rwakanyegyero U 2.1 Opening Drains & grass cuttingRukungiri Rukungiri DLG St.Francis-Ikuniro-Buhunga U 3.6 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kagashe-Ikuniro-Buhunga U 7.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Buhunga-Rwemburara U 11.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Buyanja-Nyakagyeme U 18.0 Opening Drains & grass cutting

327Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Rukungiri Rukungiri DLG Ruhinda-Rwengiri U 20.1 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kisiizi-Nyarurambi-kamaga U 11.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kirimbe-Nyakisoroza U 3.7 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kazindiro-Kyaburere U 2.9 Opening Drains & grass cuttingRukungiri Rukungiri DLG Ikuniro-Rutooma U 4.5 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kashenyi-Rusheeshe U 4.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Bikurungu-kakoni U 4.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Nyabikuku-Rwakigaju U 12.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Omukiyenje-Ikona U 0.7 Opening Drains & grass cuttingRukungiri Rukungiri DLG Mukinyinya-Kishannda U 10.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Nyakishenyi-Kyabamba U 3.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Bugangari-Nyabitete U 2.7 Opening Drains & grass cuttingRukungiri Rukungiri DLG Omukikunika-Rusheshe U 4.4 Opening Drains & grass cuttingRukungiri Rukungiri DLG Rwakanyegyero-Kihanga U 2.3 Opening Drains & grass cuttingRukungiri Rukungiri DLG Joshwa Stage-Rweshama P/S U 6.0 Opening Drains & grass cuttingRukungiri Rukungiri DLG Kabaranga-Murago-Nyakisoroza U 3.9 Opening Drains & grass cutting

Rukungiri DLG Total 208.4

Rukungiri Rukungiri MC Kagashe – Katwekamwe U 3.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Nyakibale – Kinyasano U 2.2 Opening Drains & grass cuttingRukungiri Rukungiri MC Katerera U 0.7 Opening Drains & grass cuttingRukungiri Rukungiri MC Bweyakye U 0.2 Opening Drains & grass cuttingRukungiri Rukungiri MC Butimba Ring U 1.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Kifunjo U 1.0 Opening Drains & grass cuttingRukungiri Rukungiri MC Bunura U 0.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Stadium Bend U 0.4 Opening Drains & grass cuttingRukungiri Rukungiri MC Valley U 1.4 Opening Drains & grass cuttingRukungiri Rukungiri MC Rukungiri Inn U 0.2 Opening Drains & grass cuttingRukungiri Rukungiri MC Rugarama U 1.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Butagatsi Ring U 0.9 Opening Drains & grass cuttingRukungiri Rukungiri MC Bwambale U 0.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Kayembe U 0.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Nyakibale – Marumba U 2.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Rubabo U 2.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Bwoma – Ndimbirwe U 1.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Kyabalongo U 3.6 Opening Drains & grass cuttingRukungiri Rukungiri MC Ndimbirwe U 1.6 Opening Drains & grass cuttingRukungiri Rukungiri MC Kakonkoma U 2.1 Opening Drains & grass cuttingRukungiri Rukungiri MC Kitimba U 1.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Kyatoko U 2.0 Opening Drains & grass cuttingRukungiri Rukungiri MC Kagashe – Byara U 1.6 Opening Drains & grass cuttingRukungiri Rukungiri MC Kakonkoma – Omukayaga U 2.3 Opening Drains & grass cuttingRukungiri Rukungiri MC Kakyeka – Nyabikuku U 2.4 Opening Drains & grass cuttingRukungiri Rukungiri MC Rujumbura U 0.8 Opening Drains & grass cuttingRukungiri Rukungiri MC Kiyaga U 0.4 Opening Drains & grass cuttingRukungiri Rukungiri MC Kiyaga – Kibale U 3.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Nyamizi – Kareree U 1.7 Opening Drains & grass cuttingRukungiri Rukungiri MC Nyamayenje – Marumba U 2.9 Opening Drains & grass cuttingRukungiri Rukungiri MC Kigina – Kagyera U 1.9 Opening Drains & grass cuttingRukungiri Rukungiri MC Kakyeka – kabwire U 0.9 Opening Drains & grass cuttingRukungiri Rukungiri MC Kataruka ring U 3.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Furuma – Karere U 2.1 Opening Drains & grass cuttingRukungiri Rukungiri MC Kasozi – Kamuri U 3.2 Opening Drains & grass cuttingRukungiri Rukungiri MC Karere Kiziko U 1.5 Opening Drains & grass cuttingRukungiri Rukungiri MC Kigina – kabahirayo U 1.7 Opening Drains & grass cutting

Rukungiri MC 64.8Sembabule Sembabule TC Kisinko-Kinoni U 0.6 Opening Drains & grass cuttingSembabule Sembabule TC Kabuye Road U 0.1 Opening Drains & grass cuttingSembabule Sembabule TC Kyolora-kabosa road U 2.7 Opening Drains & grass cutting

328 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Sembabule Sembabule TC senyondo Road U 0.3 Opening Drains & grass cuttingSembabule Sembabule TC Muteesa road U 0.3 Opening Drains & grass cuttingSembabule Sembabule TC Semirembe-kalamduzi road U 0.7 Opening Drains & grass cuttingSembabule Sembabule TC Church street U 0.1 Opening Drains & grass cuttingSembabule Sembabule TC sembabule-Lujjuja U 1.3 Opening Drains & grass cuttingSembabule Sembabule TC Sebagala Road U 0.6 Opening Drains & grass cuttingSembabule Sembabule TC Kiwula-Kabango road U 1.6 Opening Drains & grass cutting Sembabule TC Total 8.3Serere C.A.Rs Apapai - Ogera - Omongolem Gravel 3.93 Opening Drains & grass cuttingSerere C.A.Rs Kamod - Agule - Alor Earth 3.01 Opening Drains & grass cuttingSerere C.A.Rs Kamod SS - Akoboi HC II Gravel 1.50 Opening Drains & grass cuttingSerere C.A.Rs Kabulabula - Ajuba Gravel 0.00 Opening Drains & grass cuttingSerere C.A.Rs Kadungulu - Ateng Earth 2.00 Opening Drains & grass cuttingSerere C.A.Rs Adwenyi - Agule - Adwenyi Gravel 1.53 Opening Drains & grass cuttingSerere C.A.Rs Kabulabula - Agirigiroi LS Gravel 1.19 Opening Drains & grass cuttingSerere C.A.Rs Adukut - Adiding Gravel 1.29 Opening Drains & grass cuttingSerere C.A.Rs Kabulabula - Opia Gravel 1.19 Opening Drains & grass cuttingSerere C.A.Rs Kabulabula - Akwangalet Gravel 1.72 Opening Drains & grass cuttingSerere C.A.Rs Apapai - Opunoi Gravel 2.90 Opening Drains & grass cuttingSerere C.A.Rs Tiamao - Namutinda Gravel 1.59 Opening Drains & grass cuttingSerere C.A.Rs Aswii - Akuoro - Aarapoo Earth 1.10 Opening Drains & grass cuttingSerere C.A.Rs Okidi T/C - Sambwa U 3.66 Opening Drains & grass cuttingSerere C.A.Rs Pingire - Agule U 1.40 Opening Drains & grass cuttingSerere C.A.Rs Akumoi - Okidi U 1.00 Opening Drains & grass cuttingSerere C.A.Rs Okolonga - Akumoi - Okidi U 1.30 Opening Drains & grass cuttingSerere C.A.Rs Serere Upper shops - Okidi U 3.10 Opening Drains & grass cutting

Serere C.A.Rs Kikoota - Okulonyo - SAARI Earth + Gravel 3.89 Opening Drains & grass cutting

Serere C.A.Rs Serere Uppershops - Okidi Gravel 1.07 Opening Drains & grass cutting

Serere C.A.Rs Serere Uppershops - Akoboi HCII Earth 4.00 Opening Drains & grass cutting

Serere C.A.Rs Kyere - Orupe - Kateta Earth 1.18 Opening Drains & grass cuttingSerere C.A.Rs Iningo - Aminit - Pachoto Gravel 4.00 Opening Drains & grass cuttingSerere C.A.Rs Brooks Corner - Kamusala Gravel 3.20 Opening Drains & grass cuttingSerere C.A.Rs Kateta - Osokotoit - Olagara Gravel 1.22 Opening Drains & grass cuttingSerere C.A.Rs Omagara - Agurur Earth 1.26 Opening Drains & grass cuttingSerere C.A.Rs Ocaapa - Orupe - Mukalu Gravel 1.40 Opening Drains & grass cuttingSerere C.A.Rs Ocokodoro - Aisin - Acomia Gravel 3.50 Opening Drains & grass cuttingSerere C.A.Rs Atiira - Amakio - Oburin Earth 4.20 Opening Drains & grass cuttingSerere C.A.Rs Apokor - Abaango Gravel 0.00 Opening Drains & grass cuttingSerere C.A.Rs Odokai - Obit - Apama Gravel 2.02 Opening Drains & grass cuttingSerere C.A.Rs Ojama - Olupe - Tirinyi Earth 3.57 Opening Drains & grass cuttingSerere C.A.Rs Olupe - Ogiilo - Angole Earth 3.24 Opening Drains & grass cuttingSerere C.A.Rs Tirinyi - Kelim - Omagoro Earth 3.20 Opening Drains & grass cuttingSerere C.A.Rs Kyere - Kamurojo - Olulur Earth 3.90 Opening Drains & grass cutting C.A.Rs Total 314.8Serere Kasilo TC Abal road U 0.8 Opening Drains & grass cuttingSerere Kasilo TC Ojur road U 0.8 Opening Drains & grass cuttingSerere Kasilo TC Ocana road U 0.5 Opening Drains & grass cuttingSerere Kasilo TC Okile road U 1.0 Opening Drains & grass cuttingSerere Kasilo TC Aliau road U 1.1 Opening Drains & grass cuttingSerere Kasilo TC Odeng road U 1.0 Opening Drains & grass cuttingSerere Kasilo TC Bp Obaikol road U 0.9 Opening Drains & grass cuttingSerere Kasilo TC School road U 1.5 Opening Drains & grass cuttingSerere Kasilo TC Eswau road U 0.8 Opening Drains & grass cuttingSerere Kasilo TC Ajumo road U 0.9 Opening Drains & grass cuttingSerere Kasilo TC Ekaju road U 1.4 Opening Drains & grass cuttingSerere Kasilo TC Okupa road U 0.9 Opening Drains & grass cutting Kasilo TC Total 11.5

329Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Serere Serere DLG Pingire - Okidi - Kasilo Gravel 5.1 Opening Drains & grass cuttingSerere Serere DLG Asuret - Magoro - Kyere Gravel 6.7 Opening Drains & grass cuttingSerere Serere DLG Kamod - Akoboi - Atiira Gravel 18.5 Opening Drains & grass cuttingSerere Serere DLG Atiira - Old Mbale Gravel 8 Opening Drains & grass cutting Serere DLG Total 38.3Serere Serere TC Alaso road Earth 0.3 Opening Drains & grass cuttingSerere Serere TC Ebunyu road Earth 0.8 Opening Drains & grass cuttingSerere Serere TC Ekodeu road Earth 0.8 Opening Drains & grass cuttingSerere Serere TC Elangot road Earth 0.2 Opening Drains & grass cuttingSerere Serere TC Emeru road Earth 0.4 Opening Drains & grass cuttingSerere Serere TC Emiru road Earth 0.4 Opening Drains & grass cuttingSerere Serere TC Emorimor road Earth 0.8 Opening Drains & grass cuttingSerere Serere TC Ewongu road Earth 0.6 Opening Drains & grass cuttingSerere Serere TC Ocen CC road Earth 1.5 Opening Drains & grass cuttingSerere Serere TC Oluka road Earth 0.5 Opening Drains & grass cuttingSerere Serere TC Tukei road Earth 1.3 Opening Drains & grass cuttingSerere Serere TC Kikoota - SAARI road Earth 1.3 Opening Drains & grass cuttingSerere Serere TC Kakus - SAARI road Earth 1.2 Opening Drains & grass cuttingSerere Serere TC Odeta road Earth 0.3 Opening Drains & grass cuttingSerere Serere TC Erimu road Earth 0.8 Opening Drains & grass cuttingSerere Serere TC Esabu road Earth 0.5 Opening Drains & grass cuttingSerere Serere TC Engwau road Earth 0.5 Opening Drains & grass cuttingSerere Serere TC Epielu road Earth 0.3 Opening Drains & grass cuttingSerere Serere TC Ajoki road Earth 0.3 Opening Drains & grass cuttingSerere Serere TC Esesa road Earth 0.3 Opening Drains & grass cuttingSerere Serere TC Eriaku road Earth 0.6 Opening Drains & grass cuttingSerere Serere TC Oguli road Earth 0.6 Opening Drains & grass cuttingSerere Serere TC Isaiah Eloku road Earth 0.6 Opening Drains & grass cuttingSerere Serere TC Salvation road Earth 1.2 Opening Drains & grass cuttingSerere Serere TC Erika road Earth 1.4 Opening Drains & grass cuttingSerere Serere TC Adoku - Abilayep road Earth 3.5 Opening Drains & grass cuttingSerere Serere TC Bp Ilukor road Earth 1.8 Opening Drains & grass cuttingSerere Serere TC Iteba road Earth 0.6 Opening Drains & grass cuttingSerere Serere TC Arikod road Earth 1.1 Opening Drains & grass cuttingSerere Serere TC Ogwang road Earth 0.9 Opening Drains & grass cuttingSerere Serere TC Eyagu road Earth 1.4 Opening Drains & grass cuttingSerere Serere TC School road Earth 1.2 Opening Drains & grass cuttingSerere Serere TC Akwenyu road Earth 1.2 Opening Drains & grass cuttingSerere Serere TC Dr. Eselle road Earth 0.5 Opening Drains & grass cuttingSerere Serere TC Elaru road Earth 2.5 Opening Drains & grass cuttingSerere Serere TC Edulu road Earth 1.8 Opening Drains & grass cuttingSerere Serere TC Okilan road Earth 1.3 Opening Drains & grass cuttingSerere Serere TC Ongwara road Earth 2.0 Opening Drains & grass cuttingSerere Serere TC Osuban road Earth 0.9 Opening Drains & grass cuttingSerere Serere TC Market street Earth 1.8 Opening Drains & grass cuttingSerere Serere TC Okalany road Earth 1.6 Opening Drains & grass cuttingSerere Serere TC Dogget road Earth 0.4 Opening Drains & grass cutting Serere TC Total 41.9

Sheema Bugongi Tc Runyinya I - Rutooma Central - Karukwereza U 4 Opening Drains & grass cutting

Sheema Bugongi Tc Runyinya I -Bisharara - Kashenyi- Rwabizi - Rwamuganga U 4 Opening Drains & grass cutting

Sheema Bugongi Tc Kaziko - Kyakajumba U 4.5 Opening Drains & grass cuttingSheema Bugongi Tc Kyabuyongo - Matsya U Opening Drains & grass cuttingSheema Bugongi Tc Kyarukunda - Kyengiri U 3.4 Opening Drains & grass cutting

Sheema Bugongi Tc Kyamurari - Ryakicundiro - Kamushasha U 2.5 Opening Drains & grass cutting

Sheema Bugongi Tc Rwanama - Rukararwe U 3.5 Opening Drains & grass cuttingSheema Bugongi Tc Runyinya Ii - Bisharara U 3 Opening Drains & grass cutting

330 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Sheema Bugongi Tc Rutunguru - Rwempiri U 2 Opening Drains & grass cuttingSheema Bugongi Tc Bugongi - Kasusano U 1.6 Opening Drains & grass cuttingSheema Bugongi Tc Nyabubare Ii - Kyakajumba U 1 Opening Drains & grass cuttingSheema Bugongi Tc Kyakajumba - Kyengiri U 1 Opening Drains & grass cuttingSheema Bugongi Tc Bugongi - Kyarwera U 6 Opening Drains & grass cuttingSheema Bugongi Tc Kaako -Nyakashambya U 1.5 Opening Drains & grass cuttingSheema Bugongi Tc Akamuri - Nyabubare Ii U 2.5 Opening Drains & grass cuttingSheema Bugongi Tc Runyinyaii -Nbisharara - Kihena U 3.1 Opening Drains & grass cuttingSheema Bugongi Tc Isingiro - Kyengiri - Mishenyi U 5 Opening Drains & grass cuttingSheema Bugongi Tc Kyengiri T/C - Karutorogo U 3 Opening Drains & grass cuttingSheema Bugongi Tc Nyabubare I - Murari U 1 Opening Drains & grass cuttingSheema Bugongi Tc Lower Street U 0.9 Opening Drains & grass cuttingSheema Bugongi Tc Industrial Street U 0.3 Opening Drains & grass cuttingSheema Bugongi Tc Kaziko - Kihena U 1 Opening Drains & grass cuttingSheema Bugongi Tc Karukwereza - Karite - Matsya U 1 Opening Drains & grass cuttingSheema Bugongi Tc Bugongi Market - Rwenkurijo U 2 Opening Drains & grass cuttingSheema Bugongi Tc Akacwampare - Kashenyi U 2 Opening Drains & grass cutting

Sheema Bugongi Tc Bishaarara - Kyamurari - Nyabi-shunju U 1.8 Opening Drains & grass cutting

Sheema Bugongi Tc Rutooma Central -Bisharara U 1.2 Opening Drains & grass cutting Bugongi TC Total 58.9Sheema Kabweohe TC Kitohwa - Tree Shade U 4 Opening Drains & grass cuttingSheema Kabweohe Kyamungwe - Mutojo U 3 Opening Drains & grass cuttingSheema Kabweohe Itendero - Nyakabira U 2 Opening Drains & grass cuttingSheema Kabweohe Rwabutura -Kyenkokora U 4 Opening Drains & grass cuttingSheema Kabweohe Roadside - Kemeikyera U 2.4 Opening Drains & grass cuttingSheema Kabweohe Kyenkokora - Muhambo U 2 Opening Drains & grass cutting Itendero T/C 17.4Sheema Sheema TC Kyabandara P/S - Rushogashoga U 4.5 Opening Drains & grass cuttingSheema Sheema TC Kyogyera - Kitete - Rukanja U 5 Opening Drains & grass cuttingSheema Sheema TC Mushanga - Kitohwa U 2.6 Opening Drains & grass cuttingSheema Sheema TC Kyabandara T/C - Kitete U 3 Opening Drains & grass cuttingSheema Sheema TC Nyamufumura - Mushanga U 2.1 Opening Drains & grass cuttingSheema Sheema TC Kateramo - Bangirana U 1.8 Opening Drains & grass cuttingSheema Sheema TC Mushanga - Kazindwa U 2.3 Opening Drains & grass cuttingSheema Sheema TC Nyamufumura Swamp U 2 Opening Drains & grass cuttingSheema Sheema TC Rweyeshera - Kagyera U 2 Opening Drains & grass cuttingSheema Sheema TC Katwe - Nyakashambya U 3 Opening Drains & grass cuttingSheema Sheema TC Nyakashambya - Kibingo U 2 Opening Drains & grass cuttingSheema Sheema TC Kabare - Katokye U 2 Opening Drains & grass cuttingSheema Sheema TC Kyabandara T/C - Bubare U 2 Opening Drains & grass cuttingSheema Sheema TC Nyarubungo - Butagatsi U 2 Opening Drains & grass cuttingSheema Sheema TC Rwanyinakahaire - Karegyero U 2 Opening Drains & grass cuttingSheema Sheema TC Nyakashambya - Kyenkwanzi U 2.2 Opening Drains & grass cuttingSheema Sheema TC Sheema Dist - Mushanga U 4 Opening Drains & grass cuttingSheema Sheema TC Kyabandara P/S -Rwankorera U 1.6 Opening Drains & grass cutting

Sheema Sheema TC Mushanga Social Centre - Kam-abare U 1.5 Opening Drains & grass cutting

Sheema Sheema TC Kamabare - Karushegu - Muk-inga U 3 Opening Drains & grass cutting

Sheema Sheema TC Kyogyera - Rubare Farm U 1.3 Opening Drains & grass cuttingSheema Sheema TC Kitete T/C - Rubare Farm U 2 Opening Drains & grass cuttingSheema Sheema TC Busharizi - Nyakanyinya U 2 Opening Drains & grass cuttingSheema Sheema TC Rugongi - Kyabandara Ward Qtrs U 2 Opening Drains & grass cuttingSheema Sheema TC Mikyerere - Kyabandara T/C U 3 Opening Drains & grass cutting Sheema T/C Total 60.9

Sironko Sironko C A R S Gombe- Bugitimwa HC-Bunase-ke U 2.5 Opening Drains & grass cutting

Sironko Sironko C A R S Sironko river-Nalwanda-Bu-madyemu C.o.u U 2.1 Opening Drains & grass cutting

331Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Sironko Sironko C A R S Dakaye-Kasi-Kasi U 2 Opening Drains & grass cuttingSironko Sironko C A R S Nalugu-Nandago P/S U 4 Opening Drains & grass cuttingSironko Sironko C A R S Kiyanja-Tororo cement U 2.5 Opening Drains & grass cuttingSironko Sironko C A R S Bumaguze-Gombe-Kyambogo U 3 Opening Drains & grass cutting

Sironko Sironko C A R S Gombe- Bugitimwa HC-Bunase-ke U 2.5 Opening Drains & grass cutting

Sironko Sironko C A R S Sironko river-Nalwanda-Bu-madyemu C.o.u U 2.1 Opening Drains & grass cutting

Sironko Sironko C A R S Dakaye-Kasi-Kasi U 2 Opening Drains & grass cuttingSironko Sironko C A R S Nalugu-Nandago P/S U 4 Opening Drains & grass cuttingSironko Sironko C A R S Kiyanja-Tororo cement U 2.5 Opening Drains & grass cuttingSironko Sironko C A R S Bumaguze-Gombe-Kyambogo U 3 Opening Drains & grass cuttingSironko Sironko C A R S Bunawodya-Buzibidi U 1.5 Opening Drains & grass cuttingSironko Sironko C A R S Mutufu-Busiu U 4 Opening Drains & grass cutting

Sironko Sironko C A R S Namuserere-Bumaguze P/S,Tim-ber bridge U 3.6 Opening Drains & grass cutting

Sironko Sironko C A R S Bumalunda-Bunandalo U 3 Opening Drains & grass cuttingSironko Sironko C A R S Nakirungu-Namasiya-Gidongo U 1.8 Opening Drains & grass cuttingSironko Sironko C A R S Nangooli-Kidodo U 3 Opening Drains & grass cuttingSironko Sironko C A R S Namawa-Kyesa U 2.3 Opening Drains & grass cuttingSironko Sironko C A R S Nagudi-Bugusege,Gangi-Kamma U 3 Opening Drains & grass cuttingSironko Sironko C A R S Bunabonyo-Bumutale P/S U 3 Opening Drains & grass cuttingSironko Sironko C A R S Kimome-Bumonge U 3 Opening Drains & grass cuttingSironko Sironko C A R S Koota-Gibisi U 3 Opening Drains & grass cuttingSironko Sironko C A R S Koota-Wakine-Nabudisru U 2.5 Opening Drains & grass cuttingSironko Sironko C A R S Dallo-Nabweya U 2.5 Opening Drains & grass cutting SironkoCARS Total 52.3Sironko Budadiri TC Fr. Layding road U 1.2 Opening Drains & grass cuttingSironko Budadiri TC Wambi-kibale road U 2.2 Opening Drains & grass cuttingSironko Budadiri TC Bugiwume-Bukyambi U 2 Opening Drains & grass cuttingSironko Budadiri TC Kilombe-Bumatofu U 1.2 Opening Drains & grass cuttingSironko Budadiri TC Nangodi-Goobi U 3.2 Opening Drains & grass cuttingSironko Budadiri TC Busiita road U 0.6 Opening Drains & grass cuttingSironko Budadiri TC Kamara-Bayaye U 1.1 Opening Drains & grass cutting

Sironko Budadiri TC Nakiwondwe-Bunyode-Buk-yambi U 2 Opening Drains & grass cutting

Sironko Budadiri TC Mashelo U 1.1 Opening Drains & grass cuttingSironko Budadiri TC Wopulusi U 0.4 Opening Drains & grass cutting Budadiri TC Total 15Sironko Sironko DLG Wakine-Bukumbale U 2.5 Opening Drains & grass cuttingSironko Sironko DLG Buwalasi S/C-Buwalasi TTC U 4.4 Opening Drains & grass cuttingSironko Sironko DLG Nampanga -Bukedea boarder U 1.6 Opening Drains & grass cuttingSironko Sironko DLG Nakiwondwe-Bukyambi U 4.4 Opening Drains & grass cuttingSironko Sironko DLG Buweri-Bumumulo U 12.6 Opening Drains & grass cuttingSironko Sironko DLG Busulani-Bunaseke U 10.0 Opening Drains & grass cuttingSironko Sironko DLG Buhugu-Nabalenzi U 3.0 Opening Drains & grass cuttingSironko Sironko DLG Magga-Dallo U 5.7 Opening Drains & grass cuttingSironko Sironko DLG Buhugu-Bukyabo U 5.0 Opening Drains & grass cuttingSironko Sironko DLG Nakirungu-Kipande U 5.1 Opening Drains & grass cuttingSironko Sironko DLG Kiguli-Maluti U 3.4 Opening Drains & grass cuttingSironko Sironko DLG Nambalenzi-Kisekye U 2.1 Opening Drains & grass cuttingSironko Sironko DLG Buhugu S/C -Nandere U 5.6 Opening Drains & grass cuttingSironko Sironko DLG Madesu-Namukuyu U 3.0 Opening Drains & grass cuttingSironko Sironko DLG Buteza-Namatala U 1.5 Opening Drains & grass cuttingSironko Sironko DLG Namanji-Bumukone U 6.0 Opening Drains & grass cuttingSironko Sironko DLG Bunazami-Bugalabi U 1.5 Opening Drains & grass cuttingSironko Sironko DLG Bugizaza-Busirima U 3.0 Opening Drains & grass cuttingSironko Sironko DLG Busirima-Bumateba U 2.0 Opening Drains & grass cuttingSironko Sironko DLG Kigulya-Bunambasi U 4.2 Opening Drains & grass cuttingSironko Sironko DLG Bubulegesi-Bunegesa U 5.8 Opening Drains & grass cutting

332 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Sironko Sironko DLG Koota-Kiguli U 3.1 Opening Drains & grass cuttingSironko Sironko DLG Kidega-Bugiboni U 5.0 Opening Drains & grass cuttingSironko Sironko DLG Bukhulo-Nalukhuba U 7.0 Opening Drains & grass cuttingSironko Sironko DLG Nampanga -Buwalasi U 3.0 Opening Drains & grass cuttingSironko Sironko DLG Patto-Kaduwa U 5.0 Opening Drains & grass cuttingSironko Sironko DLG Nkonge-Bufumbo U 3.5 Opening Drains & grass cuttingSironko Sironko DLG Bukimali-Bumausi U 4.0 Opening Drains & grass cuttingSironko Sironko DLG Sironko-Bugusege U 10.0 Opening Drains & grass cuttingSironko Sironko DLG Bugusege-Bunazami U 10.3 Opening Drains & grass cuttingSironko Sironko DLG Bunabuka-Bukiyi U 3.5 Opening Drains & grass cuttingSironko Sironko DLG Busamaga-Bukiyiti U 7.0 Opening Drains & grass cuttingSironko Sironko DLG Bumudu-Namanyonyi U 3.2 Opening Drains & grass cuttingSironko Sironko DLG Nakiwondwe-Bugitimwa U 7.0 Opening Drains & grass cuttingSironko Sironko DLG Lango-Kirumbi U 3.1 Opening Drains & grass cuttingSironko Sironko DLG Nakiwondwe-Makutana U 4.2 Opening Drains & grass cuttingSironko Sironko DLG Koota-Nabudisiru U 5.8 Opening Drains & grass cuttingSironko Sironko DLG Kisanja-Kisumu-Nasusi U 4.8 Opening Drains & grass cuttingSironko Sironko DLG Nagudi-Bugusege U 4.0 Opening Drains & grass cuttingSironko Sironko DLG Bulujewa-Bugobiro U 1.0 Opening Drains & grass cuttingSironko Sironko DLG Bugusege-Lusya U 1.0 Opening Drains & grass cuttingSironko Sironko DLG Buboolo-Wopulusi U 2.1 Opening Drains & grass cuttingSironko Sironko DLG Nangooli-Butandiga U 5.2 Opening Drains & grass cuttingSironko Sironko DLG Gombe-Bugiboni U 3.6 Opening Drains & grass cuttingSironko Sironko DLG Namawa-Bunamoli-Kyesha U 5.6 Opening Drains & grass cuttingSironko Sironko DLG kidowa-Lyambaga U 2.4 Opening Drains & grass cuttingSironko Sironko DLG Nadome-Nadiso-Namanyonyi U 2.4 Opening Drains & grass cuttingSironko Sironko DLG Buwalasi-GCS-Bumuwongoti U 2.4 Opening Drains & grass cuttingSironko Sironko DLG Bukiyi SDA_Bumahaga U 1.5 Opening Drains & grass cuttingSironko Sironko DLG Bukiyi -Kibembe U 6.0 Opening Drains & grass cuttingSironko Sironko DLG Nkonge-Nabubolo U 1.3 Opening Drains & grass cuttingSironko Sironko DLG Kibembe-Bunatanyo U 3.0 Opening Drains & grass cuttingSironko Sironko DLG Bumalunda-Bunandalo U 3.0 Opening Drains & grass cutting Sironko DLG Total 226.3Sironko Sironko T/C Wobomba road U 0.7 Opening Drains & grass cuttingSironko Sironko T/C Bishop Masaba Road U 2.8 Opening Drains & grass cuttingSironko Sironko T/C Wereba Road U 0.5 Opening Drains & grass cutting

Sironko Sironko T/CDistrict HQTs (Dorcus wagima, Mauledi, Atilda, Wobudeya, Musiwa & Namoli)

U 1.2 Opening Drains & grass cutting

Sironko Sironko T/C Nafuye U 0.6 Opening Drains & grass cuttingSironko Sironko T/C Elgon Road U 2.1 Opening Drains & grass cuttingSironko Sironko T/C Kibira Road U 2.2 Opening Drains & grass cuttingSironko Sironko T/C Zesui Road U 0.7 Opening Drains & grass cuttingSironko Sironko T/C Mahempe view Road U 1.8 Opening Drains & grass cuttingSironko Sironko T/C Carhedral Road U 0.4 Opening Drains & grass cuttingSironko Sironko T/C Wojambuka Road U 0.4 Opening Drains & grass cuttingSironko Sironko T/C Kiboli Road U 0.35 Opening Drains & grass cuttingSironko Sironko T/C Maridadi U 0.7 Opening Drains & grass cuttingSironko Sironko T/C Murefu U 1.1 Opening Drains & grass cuttingSironko Sironko T/C Mariam U 0.8 Opening Drains & grass cuttingSironko Sironko T/C Watyekere U 0.6 Opening Drains & grass cuttingSironko Sironko T/C Santu U 1 Opening Drains & grass cuttingSironko Sironko T/C Buwalasi View U 1.1 Opening Drains & grass cuttingSironko Sironko T/C Kalitusi U 1.2 Opening Drains & grass cuttingSironko Sironko T/C Nalwali Mujin U 2 Opening Drains & grass cutting Sironko T/C Total 22.3Soroti Soroti DLG Soroti - Lalle U 11 Opening Drains & grass cuttingSoroti Soroti DLG Atirir - Orungo border U 12 Opening Drains & grass cuttingSoroti Soroti DLG Asuret - Omagoro U 10 Opening Drains & grass cutting

333Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Soroti Soroti DLG Lira road - Kamuda - Aboket U 11 Opening Drains & grass cuttingSoroti Soroti DLG Kamuda - Lalle - Ocokcan U 4 Opening Drains & grass cuttingSoroti Soroti DLG Kamuda - Olobai U 9 Opening Drains & grass cuttingSoroti Soroti DLG Gweri - Awoja U 3 Opening Drains & grass cutting

Soroti Soroti DLG Tiriri - Tubur-Abeko-Amuria border U 11 Opening Drains & grass cutting

Soroti Soroti DLG Arapai - Katine - Tubur U 10 Opening Drains & grass cuttingSoroti Soroti DLG Gweri - Awaliwal - Amukaru U 18 Opening Drains & grass cuttingSoroti Soroti DLG Ajonyi - Obitio U 10 Opening Drains & grass cuttingSoroti Soroti DLG Tubur - Acuna U 3 Opening Drains & grass cutting Soroti DLG Total 112Tororo Malaba TC Onyanga road paved 0.4 Opening Drains & grass cuttingTororo Malaba TC Faustino road paved 1.6 Opening Drains & grass cuttingTororo Malaba TC Iteso road paved 0.6 Opening Drains & grass cuttingTororo Malaba TC Ariong daniel Earth 0.2 Opening Drains & grass cuttingTororo Malaba TC Church road Earth 0.1 Opening Drains & grass cuttingTororo Malaba TC Church road Earth 0.3 Opening Drains & grass cuttingTororo Malaba TC Cheregen road Earth 1.1 Opening Drains & grass cuttingTororo Malaba TC Obere road Earth 0.8 Opening Drains & grass cuttingTororo Malaba TC Ariong road Earth 1.0 Opening Drains & grass cuttingTororo Malaba TC Majengo road Earth 1.0 Opening Drains & grass cuttingTororo Malaba TC Ofumbe road Earth 0.6 Opening Drains & grass cuttingTororo Malaba TC Mella road Earth 0.3 Opening Drains & grass cuttingTororo Malaba TC Clement cresent Earth 1.5 Opening Drains & grass cuttingTororo Malaba TC Quary road Earth 2.5 Opening Drains & grass cuttingTororo Malaba TC Ikuruk road Earth 1.0 Opening Drains & grass cuttingTororo Malaba TC Bluasio road Earth 0.5 Opening Drains & grass cuttingTororo Malaba TC Ekabat road Earth 1.5 Opening Drains & grass cuttingTororo Malaba TC Emoi road Earth 1.3 Opening Drains & grass cuttingTororo Malaba TC Muruga road Earth 3.0 Opening Drains & grass cuttingTororo Malaba TC Osere Community road Earth 1.0 Opening Drains & grass cutting Malaba TC Total 30.3Tororo Nagongera TC Oloo Otaba road Earth 1.3 Opening Drains & grass cuttingTororo Nagongera TC Ologo road Earth 0.6 Opening Drains & grass cuttingTororo Nagongera TC Sudulaki road Earth 0.65 Opening Drains & grass cuttingTororo Nagongera TC Kipoiroad Earth 1.7 Opening Drains & grass cuttingTororo Nagongera TC Daya Earth 0.9 Opening Drains & grass cuttingTororo Nagongera TC Adhola Earth 1.35 Opening Drains & grass cuttingTororo Nagongera TC Akidi Earth 0.75 Opening Drains & grass cuttingTororo Nagongera TC Jamwa road Earth 1.1 Opening Drains & grass cuttingTororo Nagongera TC Ramogi M Earth 0.6 Opening Drains & grass cuttingTororo Nagongera TC katandi Road Earth 0.9 Opening Drains & grass cuttingTororo Nagongera TC Ligaga Earth 0.9 Opening Drains & grass cuttingTororo Nagongera TC Staion road Earth 0.65 Opening Drains & grass cuttingTororo Nagongera TC Opetoo road Earth 1.1 Opening Drains & grass cuttingTororo Nagongera TC Were Road Earth 2.1 Opening Drains & grass cuttingTororo Nagongera TC Ochola Opedo Earth 0.55 Opening Drains & grass cuttingTororo Nagongera TC Opedo Road Earth 2 Opening Drains & grass cuttingTororo Nagongera TC Mission road Earth 0.8 Opening Drains & grass cuttingTororo Nagongera TC Nyamiluli road Earth 1.3 Opening Drains & grass cuttingTororo Nagongera TC Ofunbi Road Earth 1.1 Opening Drains & grass cuttingTororo Nagongera TC Seminary road Earth 2.25 Opening Drains & grass cuttingTororo Nagongera TC ramogi (sesera) road Earth 1.4 Opening Drains & grass cuttingTororo Nagongera TC Biranga Road Earth 3 Opening Drains & grass cutting Nagongera TC Total 27.0Tororo Tororo DLG Tororo-Kwapa-Salosalo Gravel 6.5 Opening Drains & grass cuttingTororo Tororo DLG Tuba-Merikit Gravel 1.0 Opening Drains & grass cuttingTororo Tororo DLG Kisoko-Peipei-Petta Gravel 2.5 Opening Drains & grass cuttingTororo Tororo DLG Kisoko-Pajwenda-Poyawo Earth 3.5 Opening Drains & grass cutting

334 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Tororo Tororo DLG Mukuju-Akoret Earth 4.0 Opening Drains & grass cuttingTororo Tororo DLG Morukatipe-Oriyoi Gravel 11.0 Opening Drains & grass cuttingTororo Tororo DLG Paya-Busibira Earth 7.8 Opening Drains & grass cuttingTororo Tororo DLG Osia-Kidera Earth 7.0 Opening Drains & grass cuttingTororo Tororo DLG Mukuju TC-peipei TC Gravel 7.5 Opening Drains & grass cuttingTororo Tororo DLG Pajwenda-Pasindi Gravel 11.0 Opening Drains & grass cuttingTororo Tororo DLG Mukuju PTC-Totokidwe Gravel 11.1 Opening Drains & grass cuttingTororo Tororo DLG Asinge-Morukebu-Kalait Gravel 8.0 Opening Drains & grass cuttingTororo Tororo DLG Poyawo-Mgola-Gule Gravel 10.8 Opening Drains & grass cuttingTororo Tororo DLG Utro-Byemba Gravel 10.2 Opening Drains & grass cuttingTororo Tororo DLG Paya-Nwire-Pakoi Gravel 12.8 Opening Drains & grass cuttingTororo Tororo DLG Maguria-Akworot Gravel 5.9 Opening Drains & grass cuttingTororo Tororo DLG dakimach-Petta Gravel 5.0 Opening Drains & grass cuttingTororo Tororo DLG Paya-Senda Gravel 5.6 Opening Drains & grass cuttingTororo Tororo DLG Kalait-Omiriayi-Kinyili N Gravel 4.6 Opening Drains & grass cuttingTororo Tororo DLG Matawa-Ruywelo Gravel 12.8 Opening Drains & grass cuttingTororo Tororo DLG mella-Adumai Gravel 10.0 Opening Drains & grass cuttingTororo Tororo DLG Angorom-Asinge Gravel 11.7 Opening Drains & grass cutting Tororo DLG Total 128.7Wakiso Wakiso DLG Gombe - Kakerenge Unpaved 10.9 Opening Drains & grass cuttingWakiso Wakiso DLG Nabweru-Wamala Unpaved 6.5 Opening Drains & grass cuttingWakiso Wakiso DLG Gombe - Kungu - Buwambo Unpaved 11.8 Opening Drains & grass cutting

Wakiso Wakiso DLG Kitezi-Kiti-Buwambo - Namu-longe Unpaved 20.2 Opening Drains & grass cutting

Wakiso Wakiso DLG Namugonde - Bugiri Unpaved 5.0 Opening Drains & grass cuttingWakiso Wakiso DLG Gobero - Masuliita Unpaved 7.7 Opening Drains & grass cuttingWakiso Wakiso DLG Masulita-Kirolo Unpaved 9.4 Opening Drains & grass cuttingWakiso Wakiso DLG Kitemu-Nsaggu-Kitovu Unpaved 11.9 Opening Drains & grass cuttingWakiso Wakiso DLG Nakawuka - Namutamala Unpaved 8.6 Opening Drains & grass cuttingWakiso Wakiso DLG Sentema-Mengo Unpaved 13.4 Opening Drains & grass cuttingWakiso Wakiso DLG Seguku - Kasenge - Buddo Unpaved 10.0 Opening Drains & grass cuttingWakiso Wakiso DLG Bunono - Abayita Ababiri Unpaved 3.0 Opening Drains & grass cuttingWakiso Wakiso DLG Namasuba-Ndejje-Kitiko Unpaved 8.2 Opening Drains & grass cuttingWakiso Wakiso DLG Seguku - Bunamwaya-Mutundwe Unpaved 9.4 Opening Drains & grass cuttingWakiso Wakiso DLG Kitagobwa-Mawule-Kasozi Unpaved 10.9 Opening Drains & grass cutting

Wakiso Wakiso DLG Kiwenda - Wamirongo - Kabub-bu Unpaved 9.5 Opening Drains & grass cutting

Wakiso Wakiso DLG Kawanda - Kayunga Unpaved 6.4 Opening Drains & grass cuttingWakiso Wakiso DLG Busukuma-Nabutiti - Kasozi Unpaved 4.9 Opening Drains & grass cuttingWakiso Wakiso DLG Kasozi - Kabubbu Unpaved 5.7 Opening Drains & grass cuttingWakiso Wakiso DLG Lutete-Kitezi-Kawanda Unpaved 8.3 Opening Drains & grass cutting

Wakiso Wakiso DLG Nangabo - Kitetika - Komam-boga Unpaved 5.3 Opening Drains & grass cutting

Wakiso Wakiso DLG Kawempe-Namalere Unpaved 4.o Opening Drains & grass cuttingWakiso Wakiso DLG Manyangwa-Kattabaana Unpaved 7.0 Opening Drains & grass cuttingWakiso Wakiso DLG Kattabaana-Buleesa Unpaved 6.3 Opening Drains & grass cuttingWakiso Wakiso DLG Kawalira - Kakiri (Buwanuka) Unpaved 4.0 Opening Drains & grass cuttingWakiso Wakiso DLG Nsangi-Buloba Unpaved 4.7 Opening Drains & grass cuttingWakiso Wakiso DLG Buloba-Kakiri Unpaved 13.9 Opening Drains & grass cuttingWakiso Wakiso DLG Kisindye-Mabamba Unpaved 9.0 Opening Drains & grass cuttingWakiso Wakiso DLG Mabamba-Bwayise-Kinywante Unpaved 6.3 Opening Drains & grass cuttingWakiso Wakiso DLG Gulwe-Bubajja-Nakusazza Unpaved 5.3 Opening Drains & grass cuttingWakiso Wakiso DLG Kasanje-Bubebbere Unpaved 13.5 Opening Drains & grass cuttingWakiso Wakiso DLG Nsangi-Kalema’s -Manja Unpaved 5.6 Opening Drains & grass cuttingWakiso Wakiso DLG Kikondo - Sokolo - Kasanje Unpaved 8.5 Opening Drains & grass cuttingWakiso Wakiso DLG Kitende-Sekiwunga Unpaved 5.0 Opening Drains & grass cuttingWakiso Wakiso DLG Bulenga - Lubanyi Unpaved 2.3 Opening Drains & grass cuttingWakiso Wakiso DLG Maya-Bulwanyi Unpaved 5.7 Opening Drains & grass cuttingWakiso Wakiso DLG Lutisi-Bembe-Kiguggu Unpaved 14.0 Opening Drains & grass cutting

335Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Wakiso Wakiso DLG Buloba - Bukasa Unpaved 4.8 Opening Drains & grass cuttingWakiso Wakiso DLG Nabukalu - Kkonna Unpaved 9.0 Opening Drains & grass cuttingWakiso Wakiso DLG Nsangi-Mukono-Kitemu Unpaved 4.4 Opening Drains & grass cuttingWakiso Wakiso DLG Namagoma-Manja Unpaved 3.8 Opening Drains & grass cuttingWakiso Wakiso DLG Mikka-Buwembo-Kitayita Unpaved 15.2 Opening Drains & grass cuttingWakiso Wakiso DLG Gobero - Magogo - Mwera Unpaved 12.5 Opening Drains & grass cuttingWakiso Wakiso DLG Nampunge - Ddambwe Unpaved 5.2 Opening Drains & grass cuttingWakiso Wakiso DLG Kitanda - Sayi - Kiwebwa Unpaved 8.8 Opening Drains & grass cuttingWakiso Wakiso DLG Sanga - Nasse - Kiryagonja Unpaved 4.2 Opening Drains & grass cuttingWakiso Wakiso DLG Budo - Kimbejja - Kisozi Unpaved 2.5 Opening Drains & grass cuttingWakiso Wakiso DLG Sserinya - Bbaka - Ddambwe Unpaved 12.6 Opening Drains & grass cuttingWakiso Wakiso DLG Nabingo - Kyengera Unpaved 2.5 Opening Drains & grass cutting

Wakiso Wakiso DLG Bweya - Namulanda & Jjanyi - Dewe Unpaved 9.0 Opening Drains & grass cutting

Wakiso Wakiso DLG Lubowa - Lweza Unpaved 2.5 Opening Drains & grass cuttingWakiso Wakiso DLG Kinaawa - Kyengera Unpaved 2.6 Opening Drains & grass cutting

Wakiso Wakiso DLG Gobero-Muguluka-bembe Paved/Unpaved 9.2 Opening Drains & grass cutting

Wakiso Wakiso DLG Kasangati-Seeta Unpaved 3.3 Opening Drains & grass cuttingWakiso Wakiso DLG Kiwenda - kiziri Unpaved 7.1 Opening Drains & grass cuttingWakiso Wakiso DLG Watuba-Jokorera Unpaved 3.6 Opening Drains & grass cuttingWakiso Wakiso DLG Kibiri-Ndejje Unpaved 2.3 Opening Drains & grass cuttingWakiso Wakiso DLG Nkowe-mende-Ssanga Unpaved 13.2 Opening Drains & grass cutting Wakiso DLG Total 358.8Wakiso Wakiso TC Wakiso Central - Dist Htrs P 1.3 Opening Drains & grass cutting

Wakiso Wakiso TC Kisimbiri A-Wakiso Central -Gombe P 1.9 Opening Drains & grass cutting

Wakiso Wakiso TC Mpunga - Kkona Wakiso Tc Hqtrs P 1.1 Opening Drains & grass cutting

Wakiso Wakiso TC Gombe kitasa U 0.9 Opening Drains & grass cuttingWakiso Wakiso TC Mpunga-salaah U 0.7 Opening Drains & grass cutting Wakiso TC Total 5.9Wakiso Nansana TC Nabweru Lugoba P 2 Opening Drains & grass cuttingWakiso Nansana TC Western Ring Road I P 2 Opening Drains & grass cuttingWakiso Nansana TC Eastern Ring Road P 2.1 Opening Drains & grass cuttingWakiso Nansana TC Nansana Nabweru Kawaala P 2.8 Opening Drains & grass cutting Nansana TC Total 8.9Wakiso Kakiri TC Kikubampanga-Bugeye-Busujja U 4.8 Opening Drains & grass cuttingWakiso Kakiri TC Southern by pass U 2 Opening Drains & grass cuttingWakiso Kakiri TC Bukalango-Kiwumu-Lugeye U 4.8 Opening Drains & grass cuttingWakiso Kakiri TC Bukalango-Kagala U 2.3 Opening Drains & grass cuttingWakiso Kakiri TC Kikajjo-Bukalango U 1 Opening Drains & grass cuttingWakiso Kakiri TC Brian Bukenya U 0.4 Opening Drains & grass cuttingWakiso Kakiri TC Kikajjo-KTC office block U 0.4 Opening Drains & grass cuttingWakiso Kakiri TC Kimbugwe Lane U 0.4 Opening Drains & grass cuttingWakiso Kakiri TC Kiteredde-Kambe 1 U 2.3 Opening Drains & grass cuttingWakiso Kakiri TC Kiteredde-Kambe 2 U 2.3 Opening Drains & grass cuttingWakiso Kakiri TC Nakyerongoosa-Busujja U 4 Opening Drains & grass cuttingWakiso Kakiri TC Nakyerongoosa-Mpeggwe U 0.5 Opening Drains & grass cuttingWakiso Kakiri TC Bubwege-Nakyerongoosa-Kamuli U 4.9 Opening Drains & grass cuttingWakiso Kakiri TC Nakyerongoosa-Lusanja U 1 Opening Drains & grass cuttingWakiso Kakiri TC Ssebbi-Kiteredde U 1.5 Opening Drains & grass cuttingWakiso Kakiri TC Kambe -Naddangira-Kikujji U 2.5 Opening Drains & grass cuttingWakiso Kakiri TC Kikujji road U 0.5 Opening Drains & grass cutting

Kakira TC Total 35.6Wakiso Masuliita TC Bbika-Naliima Road U 2.5 Opening Drains & grass cuttingWakiso Masuliita TC Sekanyama-Mulume U 2 Opening Drains & grass cuttingWakiso Masuliita TC katimu-Kawooya U 3.4 Opening Drains & grass cuttingWakiso Masuliita TC Masulita-Kyaalo-Kisagala U 3.3 Opening Drains & grass cuttingWakiso Masuliita TC Kavuma--Nabalanga U 2.1 Opening Drains & grass cutting

336 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Wakiso Masuliita TC Kanzize-Wanjeyo U 5.0 Opening Drains & grass cuttingWakiso Masuliita TC Lwemigo-Kasumbusi U 2.5 Opening Drains & grass cutting

Wakiso Masuliita TC Yesu Akwagala-Muyomba-Nsu-buga U 5.0 Opening Drains & grass cutting

Wakiso Masuliita TC Kyabumba-Kitawongwa U 1.5 Opening Drains & grass cuttingMasuliita TC 27.3

Wakiso Namayumba TC Busaku-Lwabenge-Water source U 1.6 Opening Drains & grass cuttingWakiso Namayumba TC Gabage bank-Kivule U 0.6 Opening Drains & grass cutting

Wakiso Namayumba TC NTC office-Water tank-NTC office-Hioma Rd U 0.4 Opening Drains & grass cutting

Wakiso Namayumba TC Kijuna - Kasalaba -Kittula C.O.U U 3 Opening Drains & grass cuttingWakiso Namayumba TC Piida - Kyanuuna U 1.9 Opening Drains & grass cuttingWakiso Namayumba TC Buwasa-Kyampisi U 2.6 Opening Drains & grass cuttingWakiso Namayumba TC Buwasa-Kitula-Sempya U 5.2 Opening Drains & grass cutting

Namayumba TC 15.3Wakiso Wakiso CARS Bujjuko - Kawoko U 4 Opening Drains & grass cuttingWakiso Wakiso CARS Resort - Gayaza U 1.5 Opening Drains & grass cuttingWakiso Wakiso CARS Bumali - Kizito U 1.5 Opening Drains & grass cuttingEntebbe Entebbe MC Tamale Ssali Rd P 0.4 Opening Drains & grass cuttingEntebbe Entebbe MC Kitooro Rd P 1 Opening Drains & grass cuttingEntebbe Entebbe MC Berkery Rd P 1.23 Opening Drains & grass cuttingEntebbe Entebbe MC Kampala Rd P 3 Opening Drains & grass cuttingEntebbe Entebbe MC Mugwanya Rd P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Nakiwogo Close P 0.63 Opening Drains & grass cuttingEntebbe Entebbe MC Kiwafu Rd P 3 Opening Drains & grass cuttingEntebbe Entebbe MC Station P 0.65 Opening Drains & grass cuttingEntebbe Entebbe MC Queen P 0.5 Opening Drains & grass cuttingEntebbe Entebbe MC Lunyo P 0.6 Opening Drains & grass cuttingEntebbe Entebbe MC Fulu P 0.25 Opening Drains & grass cuttingEntebbe Entebbe MC Nyondo P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Serumaga P 0.4 Opening Drains & grass cuttingEntebbe Entebbe MC Martyrs P 0.6 Opening Drains & grass cuttingEntebbe Entebbe MC Dr Lubega Rd P 0.9 Opening Drains & grass cuttingEntebbe Entebbe MC Lugard P 1 Opening Drains & grass cuttingEntebbe Entebbe MC Hill P 0.765 Opening Drains & grass cuttingEntebbe Entebbe MC Hill Lane P 0.41 Opening Drains & grass cuttingEntebbe Entebbe MC Appolo Square P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Survey Lane P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Danstan Nsubuga P 3 Opening Drains & grass cuttingEntebbe Entebbe MC Kintu P 0.4 Opening Drains & grass cuttingEntebbe Entebbe MC Manyago P 0.6 Opening Drains & grass cuttingEntebbe Entebbe MC Bugonga P 1 Opening Drains & grass cuttingEntebbe Entebbe MC Circular P 1.5 Opening Drains & grass cuttingEntebbe Entebbe MC Alice Reef P 1 Opening Drains & grass cuttingEntebbe Entebbe MC Mappera Rd P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Sebugwawo P 0.6 Opening Drains & grass cuttingEntebbe Entebbe MC Sewabuga P 1 Opening Drains & grass cuttingEntebbe Entebbe MC Lugard Walk P 0.3 Opening Drains & grass cuttingEntebbe Entebbe MC Uring Cresent P 1.4 Opening Drains & grass cuttingEntebbe Entebbe MC Others P 3 Opening Drains & grass cuttingYumbe Town Council Kuri G 0.4 Opening Drains & grass cuttingYumbe Town Council Kuju G 0.4 Opening Drains & grass cuttingYumbe Town Council Ingule G 0.2 Opening Drains & grass cuttingYumbe Town Council yuku G 0.2 Opening Drains & grass cuttingYumbe Town Council Oluke G 0.3 Opening Drains & grass cuttingYumbe Town Council Chonga G 0.2 Opening Drains & grass cuttingYumbe Town Council Abiriga G 0.2 Opening Drains & grass cuttingYumbe Town Council Diku G 0.9 Opening Drains & grass cuttingYumbe Town Council Akpaka G 0.8 Opening Drains & grass cutting

337Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Yumbe Town Council Charaka G 0.8 Opening Drains & grass cuttingYumbe Town Council Kaguta G 0.8 Opening Drains & grass cuttingYumbe Town Council Bakole G 0.2 Opening Drains & grass cuttingYumbe Town Council Odriga G 1.0 Opening Drains & grass cuttingYumbe Town Council Abadaki G 0.7 Opening Drains & grass cuttingYumbe Town Council Goroga G 0.5 Opening Drains & grass cuttingYumbe Town Council Agobilo G 0.1 Opening Drains & grass cuttingYumbe Town Council Renge G 0.4 Opening Drains & grass cuttingYumbe Town Council Moses Rubbe G 1.4 Opening Drains & grass cuttingYumbe Town Council Biragonga E 1.4 Opening Drains & grass cuttingYumbe Town Council Boma G 4.7 Opening Drains & grass cutting Town Council Total 21.0Yumbe Yumbe DLG Mijale – Kilaji Earth 5.6 Opening Drains & grass cuttingYumbe Yumbe DLG Kuru – Lobe Earth 16.9 Opening Drains & grass cuttingYumbe Yumbe DLG Yumbe – Barakala Earth 9.8 Opening Drains & grass cuttingYumbe Yumbe DLG Bidibidi – Locomgbo Earth 11.5 Opening Drains & grass cuttingYumbe Yumbe DLG Kulikulinga – Kuru Earth 11.0 Opening Drains & grass cuttingYumbe Yumbe DLG Yoyo – Kombge Earth 7.8 Opening Drains & grass cuttingYumbe Yumbe DLG Tara – Lodonga Earth 16.3 Opening Drains & grass cuttingYumbe Yumbe DLG Odravu – Lodonga Earth 12.6 Opening Drains & grass cuttingYumbe Yumbe DLG Koka – Matuma Earth 12.6 Opening Drains & grass cuttingYumbe Yumbe DLG Lodonga – Adibo Earth 8.1 Opening Drains & grass cuttingYumbe Yumbe DLG Okubani – Para Earth 7.0 Opening Drains & grass cuttingYumbe Yumbe DLG Kiiri – Tokuro Earth 10.7 Opening Drains & grass cuttingYumbe Yumbe DLG Tokuro-Ariwa Earth 8.0 Opening Drains & grass cuttingYumbe Yumbe DLG Kurunga-Tokuro Earth 16.4 Opening Drains & grass cuttingYumbe Yumbe DLG Lomunga-Barakala Earth 11.6 Opening Drains & grass cuttingYumbe Yumbe DLG Urunga-Matuma Earth 5.9 Opening Drains & grass cuttingYumbe Yumbe DLG Awoba-Tuliki-Adiba Earth 15.0 Opening Drains & grass cuttingYumbe Yumbe DLG Kuru-llekile-Lodonga Earth 12.0 Opening Drains & grass cuttingYumbe Yumbe DLG Lomunga-kuru Earth 9.4 Opening Drains & grass cuttingYumbe Yumbe DLG Aliodranyusi-Kali Earth 9.2 Opening Drains & grass cuttingYumbe Yumbe DLG Yumbe-Odravu SS Earth 12.0 Opening Drains & grass cuttingYumbe Yumbe DLG Kuru-Lonorojo Earth 6.0 Opening Drains & grass cuttingYumbe Yumbe DLG Lomorojo-Naku-Adibo Earth 14.0 Opening Drains & grass cuttingYumbe Yumbe DLG Yumbe-lobe Earth 17.5 Opening Drains & grass cuttingYumbe Yumbe DLG Rodo-Kaya Earth 16.3 Opening Drains & grass cutting Yumbe DLG Total 145.9Zombo Zombo DLG Lorr-Lendu-Ollu U 7.0 Opening Drains & grass cuttingZombo Zombo DLG Police - Ayaka U 7.0 Opening Drains & grass cuttingZombo Zombo DLG Omoyo-Gamba-Congo Border U 8.0 Opening Drains & grass cuttingZombo Zombo DLG Omua- Alangi U 4.0 Opening Drains & grass cuttingZombo Zombo DLG Zombo- Warr U 6.0 Opening Drains & grass cuttingZombo Zombo DLG Paidha-Otheko U 5.0 Opening Drains & grass cuttingZombo Zombo DLG Aligu-Alangi-Songoli U 7.0 Opening Drains & grass cuttingZombo Zombo DLG Aberi-Zombo U 9.0 Opening Drains & grass cuttingZombo Zombo DLG Yamu-Adiadwol U 5.0 Opening Drains & grass cuttingZombo Zombo DLG Jangokoro-Padea-Owenjo U 4.0 Opening Drains & grass cuttingZombo Zombo DLG Konga-Congambe-Atyenda U 12.0 Opening Drains & grass cuttingZombo Zombo DLG Pakadha-Konga-Akwanji U 10.0 Opening Drains & grass cuttingZombo Zombo DLG Ajei-Jangokoro border U 4.0 Opening Drains & grass cuttingZombo Zombo DLG Ayuda-pakadha-Padea U 8.0 Opening Drains & grass cuttingZombo Zombo DLG Aligu-Awang-Zeu U 12.0 Opening Drains & grass cuttingZombo Zombo DLG Gamba-Alangi-Warr Girls U 6.0 Opening Drains & grass cuttingZombo Zombo DLG Athuda-Andhimandhi U 7.0 Opening Drains & grass cuttingZombo Zombo DLG Nyandima-Atyak U 5.0 Opening Drains & grass cuttingZombo Zombo DLG Theruciru-Asina-Congo border U 5.0 Opening Drains & grass cuttingZombo Zombo DLG Zale-Ayaka U 6.0 Opening Drains & grass cuttingZombo Zombo DLG Pagisi-Namthin U 6.0 Opening Drains & grass cutting

338 Annex 13: DUCAR Network Routine Manual Maintenance FY 2015/16

DUCAR Network Routine Manual Maintenance by Road in FY 2015/16

DistrictDistrict/ Town Council/ Sub County Name

Road / Structure NameSurface Type (P/

UP)

Achieved length (KM)

Implemented Works

Zombo Zombo DLG Ukemu-Pei-Azii U 4.0 Opening Drains & grass cuttingZombo Zombo DLG Palwo-Ayaka-Aringo Chapel U 8.0 Opening Drains & grass cutting Zombo DLG Total 155Zombo Zombo TC Angenja-Zombo Lower U 1.0 Opening Drains & grass cuttingZombo Zombo TC Zombo Lower-Chana U 2.0 Opening Drains & grass cuttingZombo Zombo TC Zombo-Gotlau U 4.0 Opening Drains & grass cuttingZombo Zombo TC Zombo-Olamkule U 3.0 Opening Drains & grass cuttingZombo Zombo TC Karombo-Owope U 1.0 Opening Drains & grass cuttingZombo Zombo TC Congumwochi-Gunguru U 1.0 Opening Drains & grass cuttingZombo Zombo TC Mathurumbe U 3.0 Opening Drains & grass cuttingZombo Zombo TC Angenja-Oyeyo U 3.0 Opening Drains & grass cuttingZombo Zombo TC Gira U 1.0 Opening Drains & grass cuttingZombo Zombo TC Angenja-Riku U 2.0 Opening Drains & grass cuttingZombo Zombo TC Congumwochi-Otheyolembe U 3.0 Opening Drains & grass cuttingZombo Zombo TC Tengo-Aliza U 3.0 Opening Drains & grass cuttingZombo Zombo TC Karombo-Gunguru U 1.0 Opening Drains & grass cuttingZombo Zombo TC Gira-Chana U 1.0 Opening Drains & grass cuttingZombo Zombo TC Karombo U 1.0 Opening Drains & grass cutting Zombo TC Total 30Zombo Zombo CARs Ollu-Patek U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Orengo-Panyango U 6.0 Opening Drains & grass cuttingZombo Zombo CARs Odarlembe U 2.0 Opening Drains & grass cuttingZombo Zombo CARs Ayuda-Kakra U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Acana-Ayuda 1 U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Agoro-Atyak HC II U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Adongo-Amurpii U 6.0 Opening Drains & grass cutting

Zombo Zombo CARs Nyakadhogi-Ora Technical Institute U 3.0 Opening Drains & grass cutting

Zombo Zombo CARs Biton-Oloyoamura U 3.0 Opening Drains & grass cutting

Zombo Zombo CARs Ameri Tr. centreAvogira-Andha-ka-Aziri-Awusonzi PS U 3.0 Opening Drains & grass cutting

Zombo Zombo CARs Ameri tr. Centre-Ameri Bidong village U 4.0 Opening Drains & grass cutting

Zombo Zombo CARs Ndara-Mvuda village U 3.0 Opening Drains & grass cutting

Zombo Zombo CARs Pawo Umbila-Oryan-Kango SC headquarter U 5.0 Opening Drains & grass cutting

Zombo Zombo CARs Anjenje spring-Omua PS-St. Kizito chapel U 5.0 Opening Drains & grass cutting

Zombo Zombo CARs Arissi Jupaneka-Cong Elisa U 5.0 Opening Drains & grass cutting

Zombo Zombo CARs Amissi-Paidha SC headquar-ter-Oryeo U 3.0 Opening Drains & grass cutting

Zombo Zombo CARs Avono-Nyadiel U 5.0 Opening Drains & grass cuttingZombo Zombo CARs Afere-Gotcam U 6.0 Opening Drains & grass cuttingZombo Zombo CARs Lwala-Umol U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Angia-Akwerali U 3.0 Opening Drains & grass cuttingZombo Zombo CARs Azii-Pakia U 5.0 Opening Drains & grass cutting

Zombo Zombo CARs Zale centre-Asada-Jangokoro border U 4.0 Opening Drains & grass cutting

Zombo Zombo CARs Nenkuwengi -Akwerali-Nenku-wengi U 8.0 Opening Drains & grass cutting

Zombo Zombo CARs Ngele sign post-Ora U 6 .0 Opening Drains & grass cutting Zombo CARs Total 183

339Annex 14: National Roads Network Maintenance in FY 2015/16

Annex 14:

National Roads Network Maintenance in FY 2015/16 by Road

340 Annex 14: National Roads Network Maintenance in FY 2015/16

Annex 14: National Roads Network Maintenance in FY 2015/16 by Road

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Old Network Kotido Abim-Achan Pii U RMeM 29.0 Spot gravellingKotido Nakapelimoru-Ketein Kenya Boarder U RMeM 38.5 Spot gravellingKotido Koputh Junction Lolelia U RMeM 22.0 Spot gravellingKotido Kotido-Nakapelimoru U RMeM 18.0 Spot gravellingKotido Nakapelimoru-Lopei Rd U RMeM 54.0 Spot gravellingKotido Kanawat-Apaan-Koputh U RMeM 39.0 Spot gravellingKotido Koputh-Orom Rd U RMeM 5.0 Spot gravellingSub Total 205.5 Spot gravelling New Network Kotido Karenga-Biira U RMeM 32.0 Spot gravellingKotido Akwanamoru-Orongom-Oretta Rd U RMeM 56.0 Spot gravellingKotido Oretta-Kapelibyong Rd U RMeM 19.0 Spot gravellingKotido Kotido-Loslang-Loyoro Rd U RMeM 39.7 Spot gravellingKotido Kiru-Morulem-Oretta Rd U RMeM 35.0 Spot gravellingKotido Lokaterebu-Kacheri-Lolelia Rd U RMeM 41.0 Spot gravellingKotido Kaabong-Kalapata-Piire Rd U RMeM 59.0 Spot gravellingKotido Old Dopeth Bidge Access Rd U RMeM 5.0 Spot gravellingKotido Kabong Bridge U RMeM 23.0 Spot gravellingKotido Longromit Bridge U RMeM 30.0 Spot gravellingSub Total 339.7 Spot gravelling Grand Total Kotido - 545.2 Old Network Spot gravelling

Moroto Nabilatuk-Angatun (Grading,grav-eling U RMeM 24.4 Spot gravelling

Moroto Lokapel-Nabilatuk (Grading,-gravling) U RMeM 21.1 Spot gravelling

Moroto Chosan Angatun Namalu U RMeM 33.0 Spot gravellingMoroto Kitale Road U RMeM 1.5 Spot gravellingSub Total 80.0 Spot gravelling New Network Spot gravellingMoroto Moroto-Rupa-Nakiloro-Nakabat U RMeM 28.0 Spot gravellingMoroto Apeitolim-Iriri U RMeM 47.0 Spot gravellingMoroto Army Barracks Rd U RMeM 1.5 Spot gravellingMoroto Amudat-Loro-Lokitanyala U RMeM 52.0 Spot gravellingMoroto Nabilatuk-Angatun U RM 24.0 Grass cuttingMoroto Matany-Lakopo-Turtuko U RM 32.0 Grass cutting

Moroto Lokapel-Nabilatuk (Grading,-gravling) U RM 21.1 Grass cutting

Moroto Nabilak-Angatun U RM 24.4 Grass cuttingMoroto Kitale Road U RM 44.0 Grass cuttingMoroto Lokeris-Lopei U RM 1.5 Grass cuttingMoroto Turtuko-Apeitolim U RM 37.0 Grass cuttingMoroto Moroto Army baracks U RM 1.5 Grass cuttingMoroto Moroto-Rupa-Nakiloro-Nakabat U RM 1.5 Grass cutting

Moroto Bridge Chosan-Amudat(Chololo bridge) U RM 2.0 FA

Sub Total 317.5 Grand Total Moroto 397.5 Jinja Accesss to Kimaka P RMeM 3.5 Spot gravelling Jinja Accesss to Kamuli U RMeM 2.5 Spot gravelling Jinja Idudi -Busembatya U RMeM 52.0 Spot gravelling Jinja Magamaga-Iziru-Namagera U RMeM 36.0 Spot gravelling Jinja Bugiri-Nankomakaluba U RMeM 41.5 Spot gravelling Jinja Kaliro-Naiwakoke-Irundu U RMeM 52.0 Spot gravelling

341Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Jinja Kamuli-Bukungu& Kamuli-Kaliro rd U Pm 114.0 Spot gravelling Jinja Iganga-Bulopa-Kamuli & Buwenge U PM 106.0 Spot gravelling Jinja Kaitabawala -Busota rd U PM 58.2 Spot gravelling Grand Total Jinja 465.7 Old Network Spot gravelling Soroti Kumi,BrooksCorner-Serere-Soroti U RMeM 86.0 Spot gravelling Soroti Arapai-Katakwi Irriri U RMeM 84.0 Spot gravelling Soroti Kumi-Ladot Plalissa U RMeM 46.0 Spot gravelling

Soroti Amuria-Acowa-Usuk & Katak-wi-Usuk U RMeM 71.0 Spot gravelling

Soroti Katine Ochero U RMeM 70.0 Spot gravelling

Soroti Arapai-Amuria-Obalanga-Alito & Amuria-Kaperyebong U RMeM 105.0 Spot gravelling

Soroti Soroti (Gweri-Kapujani-Toro-ma-Ngariam U RMeM 81.0 Spot gravelling

Soroti Serere Kasilo Kadungulu Kagwara U RMeM 38.0 Spot gravelling Soroti Arapai-Katakwi Irriri U RMeM 84.0 Spot gravelling Soroti Serere-Kateta-Kyere U RMeM 27.0 Spot gravelling Soroti Serere-Pingire-Mugalama U RMeM 45.0 Spot gravelling Soroti Kumi-Ongino-Akide U RMeM 21.0 Spot gravelling Soroti Serere-Bugondo U RMeM 24.0 Spot gravelling Soroti Serere-Pingire Arapo U RMeM 45.0 Spot gravelling Sub Total 827.0 Spot gravelling Soroti New Network Spot gravelling Soroti Kapir Ngora Mukongolo U RMeM 44.0 Spot gravelling Soroti Mukongole Kidongole U RMeM 14.0 Spot gravelling Soroti Katakwi-Usuk Orunge U RMeM 33.0 Spot gravelling Soroti Amuria Kapere byong U RMeM 36.0 Spot gravelling Soroti Soroti-Arapai Railway U RMeM 10.0 Spot gravelling Soroti Brookscorner Soroti U RMeM 24.0 Spot gravelling Soroti Arapai-LiraRd jn U RMeM 9.0 Spot gravelling Soroti Serere Bugondo U RMeM 0.0 Spot gravelling Soroti Arapai-Katakwi Irriri U RMeM 84.0 Spot gravelling Soroti Soroti Dokolo U RMeM 62.0 Spot gravelling Soroti Serere-Pingire-Mulondo U RMeM 45.0 Spot gravelling Soroti Kumi-Brookscorner-Serere-Soroti U PM 86.0 Spot gravelling Soroti Arapai-Katakwi Irriri U PM 84.0 Spot gravelling Soroti Kumi-Ladot Plalissa U PM 46.0 Spot gravelling

Soroti Amuria-Acowa-Usuk & Katak-wi-Usuk U PM 71.0 Spot gravelling

Soroti Katine Ochero U PM 70.0 Spot gravelling

Soroti Arapai-Amuria-Obalanga-Alito & Amuria-Kaperyebong U PM 105.0 Spot gravelling

Soroti Soroti(Gweri-Kapujan-Toroma,Ma-goro-) U PM 81.0 Spot gravelling

Soroti Serere Kasilo Kadungulu Kagwara U PM 38.0 Spot gravelling Soroti Arapai-Katakwi Irriri U PM 84.0 Spot gravelling Sub Total 1,026.0 Spot gravelling Grand Total Soroti 1,853.0 Old Network Mbale Bugema-Busano U RMeM 13.0 Spot gravelling Mbale Simu Corner-Kaseremu U RMeM 10.0 Spot gravelling Mbale Muyembe-Namalu U RMeM 65.0 Spot gravelling Mbale Kamonkoli-Palissa U RMeM 45.0 Spot gravelling Mbale Tirinyi-Palissa U RMeM 19.6 Spot gravelling Mbale Tirinyi-Palissa U PM 19.6 Spot gravelling Mbale Namagumba-Budadiri U PM 8.0 Spot gravelling

342 Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Mbale Nalugugu-Mutufu-Budadiri U PM 0.0 Spot gravelling Mbale Kapchorwa-Suam U PM 63.0 Spot gravelling Mbale Bumbobi-Bubulo U PM 14.0 Spot gravelling Mbale Bubulo-Bududa circular U PM 9.6 Spot gravelling Mbale Bubulo-Busumbu U PM 5.2 Spot gravelling Sub Total U PM 272.0 Spot gravelling New Network Mbale Kadoto-Buteba-Kabwagasi U RMeM 42.0 Spot gravelling Mbale Nalugugu-Elgon U RMeM 19.0 Spot gravelling Mbale Buyaga-Buluganya U RMeM 12.4 Spot gravelling Mbale Nakaloke-Nabwangasi-Kamonkoli U RMeM 12.4 Spot gravelling Mbale Chepsikunya-Girik U RMeM 26.1 Spot gravelling Mbale Girik-Bukwo U RMeM 30.0 Spot gravelling Sub Total 141.9 Grand Total Mbale 413.9 Old Network Tororo Tororo -Busia U RMeM 24.0 Spot gravelling Sub-Total 24.0 Spot gravelling Tororo New Network Spot gravelling Tororo Kachonga-Kidoko U RMeM 22.0Tororo Leresi-Budaka U RMeM 14.0 Spot gravelling Tororo Malaba-Mera-Tuba U RMeM 26.0 Spot gravelling Tororo Nebolola Bukobe U RMeM 9.0 Spot gravelling Sub-Total 71.0

Grand Total Tororo 95.0 Gulu Karuma-Owiny-Pakwach P RMeM 106.0 FAGulu Katikati-Temum-Nwoya U RMeM 35.0 Spot gravelling Gulu Loro-Anyeke-Minakulu U RMeM 32.0 Spot gravelling Gulu Bobi-Ayer U RMeM 56.0 Spot gravelling Gulu Gulu-Rackoko U PM 45.0 RegravellingGulu Aber-Aromo-Awere U PM 39.0 Regravelling Grand Total Gulu 313.0Moyo Adjumani-Sinyanya Landin U RMeM 35.0 RegravellingMoyo Pakele-Pabo U RMeM 63.0 RegravellingMoyo Lodonga-Otumbari U RMeM 19.0 RegravellingMoyo Lomunga-Bidbid-Kochi U RMeM 45.0 RegravellingMoyo Access to Adjimani Prison U RMeM 4.0 RegravellingMoyo Adjumani-Sinyanya Landin U PM 20.0 Regravelling Grand Total Adjumani 186.0 Arua Old Network Arua Adjumani-Nebbi U RMeM 76.0 RegravellingSub-Total 76.0 Regravelling New Network Arua Pakwach -Inde U RMeM 61.0 RegravellingArua Owafa-Kubala-Omugo U RMeM 22.0 RegravellingArua Logiri-Bondo U RMeM 20.0 RegravellingArua Inde-Ocoko U RMeM 33.0 RegravellingArua Wandi-Yumbe U PM 70.0 RegravellingArua Wandi-Rhino camp & Koboko U PM 87.0 RegravellingSub-Total 293.0 Grand Total Adumani 369.0 Kitgum Old Network Kitgum Palabek-Atiak U RMeM 44.0 RegravellingKitgum Maiopei-Agoro Hills U RMeM 48.0 RegravellingSub-Total 92.0 RegravellingKitgum New Network Kitgum Pader-Kalongo-Paimol U RMeM 46.0 Regravelling

343Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Kitgum Ngomoromo-Aweno-Olwiyo-Potika U RMeM 36.0 RegravellingKitgum Padibe-Palabek U RMeM 25.0 RegravellingKitgum Paloga-Potika-Lututuru U RMeM 31.0 RegravellingKitgum Kitgum-Palabek U RMeM 65.0 RegravellingKitgum Padibe -Paloga-Madiopei U RMeM 36.0 RegravellingKitgum Kitgum Matidi-Kalongo-Patongo U RMeM 77.0 RegravellingKitgum Acholibur-Puranga U RMeM 62.0 RegravellingKitgum Patongo-Luke bridge U RMeM 20.0 RegravellingKitgum Ngomoromo-Waligo barrack U RMeM 30.0 Regravelling

Kitgum Pajule-Pader-kwonkic-& Namuko-ra-Adil U PM 86.0 Regravelling

Kitgum Kitgum-Orom& Palabek-Atiak U PM 154.0 RegravellingKitgum Kitgum -Lukung U PM 34.0 RegravellingKitgum Lukung-Ngoromo U PM 4.0 RegravellingKitgum Orom-Locomo-Karenga U PM 43.0 RegravellingKitgum Kilak-Adiang U PM 33.0 RegravellingSub-Total 782.0 Grand TOTAL Kitgum 874.0Lira Old Network Lira Lira -Kamdini P RMeM 68.0 Resealing potholesLira Lira-Aduku U RMeM 35.0 RegravellingLira Agwata-Kachung U RMeM 10.0 RegravellingLira Ngetta-Puranga U RMeM 34.4 RegravellingSub-Total 147.4 New Network Lira Adwari -Okwang-Omwonole U RMeM 45.0 RegravellingLira Adwari-Okee Bridge U RMeM 19.0 RegravellingLira Aduku-Teboke-Loro U RMeM 35.0 RegravellingLira Aloi-Abako-Dokolo U RMeM 45.0 RegravellingLira Abako-Amugo-Lungkudu U RMeM 28.0 RegravellingLira Apac-Chegere-Teboke U RMeM 28.0 RegravellingLira Amii-Kidilane-Atura-Atapara U RMeM 39.0 RegravellingLira Corner cwagere-kwera U RMeM 15.0 RegravellingLira Ngetta-Apala-Adwari U RMeM 46.0 RegravellingLira Lira-Boroboro-Abako U RMeM 30.0 RegravellingLira Dokolo-Namasale U PM 88.0 Regravelling

Lira Lira-Akia,Railway Access & Lira Army B U PM 3.0 Regravelling

Sub-Total 421.0 Grand Total Lira - 568.4 Old Network Hoima Hoima-Kiboga-Lwamata P RMeM 94.5 Pothole RepairHoima Hoima-Kiboga-Lwamata P RMeM 94.9 Pothole RepairHoima Buscruka-Kigorobya U RMeM 17.5 RegravellingHoima Kyenda-Banda-R mayanja U RMeM 36.0 RegravellingHoima Kiziranfumbi-Kabaale U RMeM 25.7 RegravellingHoima Katashiiha-Waaki U RMeM 22.0 Regravelling Hoima Katashiiha-Bugambe U RMeM 16.4 RegravellingHoima Kyenda-Mpongo-swamp-Kisita U RMeM 33.5 RegravellingHoima Bugambe-Buseruka U RMeM 18.2 RegravellingHoima Sebagoro Link U RMeM 8.0 RegravellingHoima Buhima-Kabaale swamp U RMeM 16.0 RegravellingHoima Bukwiri-Byerima-Kikuya U RMeM 18.0 RegravellingHoima Mubooro-Ndaiga U RMeM 30.5 RegravellingHoima Bukwiri-Kyankwazi U PM 29.0 RegravellingHoima Miriwe-Bugambe U PM 7.5 RegravellingHoima Kibaale-Kyebando-Pacwa U PM 45.0 Regravelling

344 Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Hoima Kidoma-Bugambe U PM 12.6 RegravellingHoima Buseruka-Bugambe U PM 17.1 RegravellingHoima Bukwiri-Byerima-Kikuya U PM 17.4 Regravelling Grand Total Hoima 559.8 Old Network Fort Portal Fort portal Kyenjojo P RMeM 50.0 Pothole RepairFort Portal Kyenjojo-Mubende boarder P RMeM 64.0 Pothole RepairFort Portal Fort portal-Rwimi P RMeM 45.4 Pothole RepairFort Portal Itoojo-Sempaya U RMeM 15.0 Regravelling Grand Total Fortportal 174.4 Kampala Old Network Kampala Nyenga-Bulumagi U RMeM 4.0 RegravellingKampala Kampala-Mukono P RMeM 17.0 Pothole RepairKampala BuSubju-Lwamata P RMeM 50.0 Pothole RepairKampala Kampala-Entebe P RMeM 37.0 Pothole RepairKampala Kawuku-Bwerenga U RMeM 7.2 RegravellingKampala Mukono -Kalagi P RMeM 18.5 Pothole RepairKampala Nambole Access P RMeM 3.2 Pothole RepairKampala Nansan-BuSubju P RMeM 46.0 Pothole RepairKampala Kibuye-Salama-Munyonyo P RMeM 8.0 Pothole RepairKampala Bale-Galilaya U RMeM 43.0 RegravellingKampala Buikwe-Kiyindi U RMeM 17.0 RegravellingKampala Bukoloto-Njeru P RMeM 43.0 Pothole RepairKampala Ebbe-Nakiwogo Ferry Landing P RMeM 8.0 Pothole RepairKampala Kalagi-Kayunga P RMeM 33.7 Pothole RepairKampala Kireka-Namugongo P RMeM 7.0 Pothole RepairKampala Lugazi-Buikwe-Nyenga Rd U RMeM 25.0 RegravellingKampala Njeru-Nyenga U RMeM 9.5 RegravellingKampala Nyenga-Railway Access U RMeM 1.0 RegravellingSub-Total 378.1 Kampala New Network Kampala Nazigo-Kireku-Nkokonjeru-Kitimba U RMeM 44.0 RegravellingKampala Kilongo-Kulwe U RMeM 20.7 RegravellingKampala Kisoga-Kibanga port U RMeM 11.0 RegravellingKampala Buikwe-Lugasa U RMeM 9.0 RegravellingKampala Makyelogosa-Mpengwe-Bukere U RMeM 3.5 RegravellingKampala Walwanda-Kikongo U RMeM 19.7 RegravellingKampala Kyampisi-Namataba U RMeM 40.5 RegravellingKampala Kakiri-Lwentama U RMeM 6.0 RegravellingKampala Lweza-Kigo U RMeM 9.0 RegravellingKampala Bweyogere-Bukasa U RMeM 5.0 RegravellingKampala Kijanangabo-Walukoko U RMeM 4.3 RegravellingKampala Kibuye-Busega P RMeM 6.5 Pothole RepairKampala BuSubju-Lwamata P RMeM 50.0 Pothole RepairKampala Gayaza-Kalagi P RMeM 19.0 Pothole RepairKampala SeetaNmilyongo P RMeM 4.0 Pothole RepairSub-Total 252.2 Grand Total Kampala 630.3Mpigi Old Network Mpigi Maddu-Musozi U RMeM 23.0 RegravellingMpigi Kawolongojjo Railway Access U RMeM 3.0 RegravellingMpigi Kasambya Railway Access U RMeM 8.0 RegravellingMpigi Busega-Kamengo-Lwera rd U RMeM 88.0 RegravellingMpigi Busega -Mityana Rd P RMeM 59.0 Pothole RepairMpigi Madu-Kyayi-R.Nakakazi U RMeM 42.0 RegravellingMpigi Bujjuko Railway Access U RMeM 3.0 RegravellingSub-Total 226.0Mpigi New Network

345Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Mpigi Buddo -Nakasozi P RMeM 4.5 Pothole RepairMpigi Nabingo Access P RMeM 2.0 Pothole RepairMpigi Lukolo-Bunjako U RMeM 13.0 RegravellingMpigi Kikongo -Sekanyonyi-Matte U RMeM 32.0 RegravellingMpigi Kayenje-Nkinga-Nakatoke U RMeM 10.5 RegravellingMpigi Kituuma-Kiryokya-Mutema U RMeM 20.5 RegravellingSub-Total 82.5 Grand Total Mpigi 308.5 Masaka Old Network Masaka Kyotera-Mutukula P RMeM 45.0 Pothole RepairMasaka Masaka -Kyotera P RMeM 43.0 Pothole RepairMasaka Masaka -Lweza P RMeM 32.0 Pothole RepairMasaka Masaka-Nyendo P RMeM 5.0 Pothole RepairMasaka Masaka-Bukakata U RMeM 43.0 RegravellingMasaka Kyotera-Rakai p RMeM 22.1 Pothole RepairMasaka Nyendo-Villa Maria p RMeM 10.0 Pothole RepairMasaka Kyapa-Kasensero U RMeM 41.0 RegravellingMasaka Villa-Kabulasoke U RMeM 48.0 RegravellingSub-Total 289.1Masaka New Network Masaka Lukaya -Miwula-Kagorogor U RMeM 62.0 RegravellingMasaka Kyesiga-Malembo U RMeM 17.0 RegravellingMasaka Lyantonde-Ntusi U RMeM 58.0 RegravellingMasaka Ndegeya-PTC Access U RMeM 4.0 RegravellingMasaka Kalangala-Lutoboka U RMeM 4.0 RegravellingMasaka Mukoko-Birinzi-Subga U RMeM 13.0 RegravellingMasaka Bukulula-Kalungu U RMeM 12.0 RegravellingSub-Total 170.0 Grand Total Masaka 459.1 Mbarara Old Network Mbarara Ruti-Mbarara-Lyantonde P RMeM 69.0 Pothole RepairMbarara Mbarara-Ibanda P RMeM 65.0 Pothole RepairMbarara Mbarara-Ishaka P RMeM 62.0 Pothole RepairMbarara Kazo-Burembe U RMeM 30.0 RegravellingMbarara Ruhumba-Byanamira U RMeM 33.0 RegravellingMbarara Nyamukana-Kahambo-Kashuro U RMeM 20.0 RegravellingMbarara Kasshongi-Kantaganya U RMeM 24.0 RegravellingMbarara Kasheni-Mitooma-Kashenshero-Ruh U RMeM 27.0 RegravellingMbarara Sano-Endizi Jn U RMeM 11.0 RegravellingMbarara Nyamitanga-Katete U RMeM 4.0 RegravellingMbarara Nyanga swamp on Rugaga-Rushasha U RMeM 0.0 RegravellingMbarara Rushere -Rwakitura U RMeM 9.0 RegravellingMbarara Rugaga--Rushasha-Rwentaha-Endizi U RMeM 56.0 RegravellingMbarara Ibanda-Kagongo U RMeM 7.0 RegravellingMbarara Nyakabirizi-Burere-Nsiika Access U RMeM 4.0 RegravellingMbarara Ishaka-Rugazi P RMeM 37.0 Pothole RepairMbarara Kyankanda-Bitsya-Ruhoko U RMeM 44.0 RegravellingMbarara Biharwe-Rushozi-Nvakasharar U RMeM 18.0 RegravellingMbarara Ntare--Mutonto-Kacwangobe U RMeM 39.0 RegravellingMbarara Rushere -Kinoni-Nabitenga U RMeM 31.0 RegravellingMbarara Bigusyo-Bihanga U RMeM 13.0 Regravelling

Mbarara Kanyarugiri-Nyamarebe-Ishongoro-ro U RMeM 24.0 Regravelling

Mbarara Kyambura-Kashaka U RMeM 18.0 RegravellingMbarara Ntantamukyi-Kamwema U RMeM 18.0 RegravellingMbarara Access Nyakabirizi-Burere-Nsiika U RMeM 4.0 RegravellingMbarara Muzizi-Buremba-Kakinga Bridge U RMeM 70.3 RegravellingMbarara Nyakayojo-Kibingo PTC U RMeM 3.0 Regravelling

346 Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Mbarara Kityaza-Murema-Bugango U RMeM 27.0 RegravellingMbarara Kahunga-Nyakyera-Rukoni U RMeM 31.0 RegravellingMbarara Isingiro-Ntantamukyi U PM 0.0 RegravellingMbarara Kikagati-Kafunjo U PM 30.0 RegravellingMbarara Nsongezi-Kyaka U PM 13.7 RegravellingMbarara Ruti-Mwizi-Kikagati U PM 0.0 RegravellingMbarara Nyakabirizi-Burere-Nsiika U PM 35.0 RegravellingMbarara Kyambura-Katerera U PM 47.0 RegravellingMbarara Nsika -Bihanga-Katerera U PM 26.0 RegravellingMbarara Kabwohe-Kitagata-Kabira U PM 26.0 RegravellingMbarara Kyankanda-Bitsya-Ruhoko U PM 5.0 RegravellingMbarara Rwenjaza-Kabujogera, U PM 4.0 RegravellingMbarara Kahunga-Nyakyera-Rukoni U PM 58.0 Grand Total Mbarara 1,043.0 Old Network Masindi Masindi-Kafu P RMeM 43.7 ResealingMasindi Park junction-Parra U RMeM 8.0 RegravellingMasindi Kisanja- Park Junction U RMeM 72.0 RegravellingMasindi Bisso-Bukumi U RMeM 8.0 RegravellingMasindi Bukumi-Butiaba U RMeM 9.0 RegravellingMasindi Bukumbi escarpment U RMeM 2.0 RegravellingMasindi Kisanja escarpment p RMeM 0.5 Pothole RepairMasindi Bulisa park junction U RMeM 22.0 RegravellingMasindi Bukumbi-Bulisa-Wanseko U RMeM 51.0 RegravellingMasindi Masindi -Rwekunyu U RMeM 36.0 RegravellingMasindi Rwekunyu-Masindi port U RMeM 7.0 RegravellingSub Total 259.2 New Network Masindi Ngwedo-Bugana-Waiga U RMeM 21.0 RegravellingMasindi Ikoba-Ntoma U RMeM 20.0 RegravellingMasindi Ntoma-Rusangura U RMeM 25.0 RegravellingMasindi Katulikire-Mutunda-Atura U RMeM 21.0 RegravellingMasindi Karongo-Kiwanana-Kisengya U RMeM 22.0 RegravellingMasindi Masindi -Kigumba U PM 39.0 RegravellingMasindi Masindi-Hoima U PM 52.0 RegravellingMasindi Masindi-Biiso U PM 25.0 RegravellingMasindi Kisanja-Para U PM 40.0 RegravellingMasindi Ihungu-Kijunjubwa-Bulyamusenyu U PM 20.0 RegravellingSub Total 285.0 Regravelling Grand Total Masindi 544.2 Kasese Katunguru-Rugazi P RMeM 18.0 ResealingKasese Kasese-Rwimi P RMeM 29.4 ResealingKasese Kasese-Kikorongo P RMeM 22.0 ResealingKasese Kikorongo-Rwentare-Katungu P RMeM 15.1 ResealingKasese Kasese-Kilembe P RMeM 12.5 ResealingKasese Kikorongo-Mpondwe P RMeM 38.3 ResealingKasese Katunguru-Ishaka U RMeM 87.0 RegravellingKasese Rwentare-L.George U RMeM 16.4 RegravellingKasese Rwentare-Katwe-Katojo U RMeM 38.8 RegravellingKasese Katojo-Mudongo-Bwera U RMeM 8.0 RegravellingKasese Kabirizi-Kyarumba U RMeM 26.4 RegravellingKasese Kinyamaseka-Kisinga U RMeM 12.7 RegravellingKasese Nsenyi-Kisinga-Kiburara U RMeM 10.1 RegravellingSub Total U RMeM 334.7 New Network U RMeM Kasese Rugendabara-Kitswamba-Kisangali U RMeM 24.7 RegravellingKasese Muruseghe-Ihandiro U RMeM 7.0 RegravellingKasese Access to Ibuga & Rwimi prison U RMeM 10.0 Regravelling

347Annex 14: National Roads Network Maintenance in FY 2015/16

NATIONAL ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

UNRA Station Road / Structure Name

Surface Type (P/

UP)

Intervention RMM/

RMeM/PM

Achieved length (KM) Implemented Works

Kasese Access to Hima baracks U RMeM 3.7 RegravellingKasese Mubuku-Maliba-Nuyo U RMeM 13.9 RegravellingKasese Access to Rwensama U RMeM 7.0 RegravellingKasese Kasese-Rwimi P PM 29.4 ResealingKasese Rwentare-Katwe-Katojo U PM 38.8 RegravellingKasese Kabirizi-Kyarumba-Kisingo U PM 1.5 RegravellingKasese Bwera-Kithoma-Kiraro U PM 26.4 RegravellingSub Total 162.4 Grand Total Kasese 497.1 Kabale Old Network Kabale Natete-Busanza-Mpaka U PM 2.0 RegravellingKabale Rwashamaire-Rwahi U PM 8.0 RegravellingKabale Butobere-Muyumbu-Rwamucucu U PM 8.0 RegravellingKabale Kanyashande spur U PM 2.3 RegravellingKabale old Kabale U PM 5.0 RegravellingKabale Butobere-Muyumbu-Rwamucucu U RMeM 18.5 RegravellingKabale Rwashamaire-Rwahi U RMeM 38.0 RegravellingKabale Rukungiri-Mitaano-Kanungu U RMeM 15.2 RegravellingKabale Muhanga-Kisizi-Kebiso U RMeM 30.0 RegravellingKabale old Kabale U RMeM 20.2 RegravellingKabale Ikumba-Nfasha-Butogota U RMeM 48.0 RegravellingKabale Hamurwa-Kerere-Kanungu U RMeM 47.0 RegravellingKabale Kanyatorogo-Butogota-Buhoma U RMeM 17.0 RegravellingKabale Katojo-Kihihi U RMeM 17.0 RegravellingKabale L.Bunyonyi U RMeM 4.0 RegravellingKabale Hamurwa-Kerere-Kanungu P RMeM 30.2 Resealing Bridges & Culverts Kabale Kaku Bridge P 3.0 ResealingKabale Kazinga Bridge P 3.0 ResealingKabale Culvert installation 36.0 Culverts Grand Total Kabale 352.4 Mubende Old Network Mubende Mubende -Mityana P RMeM 85.0 ResealingMubende Mityana-Mubende P RMeM 85.0 ResealingMubende Mityana-Mubende P RMeM 85.0 ResealingMubende Mityana-Mubende P RMeM 85.0 ResealingMubende Mubende-Lubale P RMeM 30.0 ResealingMubende Mubende-Lubale P RMeM 30.0 ResealingMubende Myanzi--Kasanda-Kiboga P RMeM 63.0 ResealingSub Total 463.0 New Network Mubende Mityana Access Road U RMeM 2.5 RegravellingMubende Wakitundu-Bukuya-Kitumbi U RMeM 70.0 RegravellingMubende Kasambya-Nabingoola U RMeM 24.0 RegravellingSub Total 96.5 Grand Total Mubende 559.5 Luwero Old Network Luwero Matuga-Semuto-Kapeeka P RMeM 42.0 ResealingSub Total 42.0 ResealingLuwero New Network Luwero Kapeeka-Singo Barracks U RMeM 20.0 RegravellingLuwero Kakiri -Masulita-Mawale U RMeM 23.0 RegravellingLuwero Kalule-Bowa-Nakaseke-Kiwok U RMeM 37.0 RegravellingLuwero Zirobwe-Lwajali-Kabimbiri U RMeM 23.0 RegravellingSub Total 103.0 Grand Total Luwero 145.0

Grand Total UNRA Roads

348 Annex 15: KCCA Road Network Maintenance in FY 2015/16

349Annex 15: KCCA Road Network Maintenance in FY 2015/16

Annex 15:

KCCA Road Network Maintenance in FY

2015/16

350 Annex 15: KCCA Road Network Maintenance in FY 2015/16

Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Central Acacia Avenue P RMM 1.7 Opening Drains & grass cuttingCentral Accesses to Old Taxi Park p RMM 0.3 Opening Drains & grass cuttingCentral Allen P RMM 0.5 Opening Drains & grass cuttingCentral Apollo Kaggwa road p RMM 0.4 Opening Drains & grass cuttingCentral Archer P RMM 0.5 Opening Drains & grass cuttingCentral Archer Lane p RMM 0.2 Opening Drains & grass cuttingCentral Bank Lane P RMM 0.1 Opening Drains & grass cuttingCentral Baskerville Avenue p RMM 0.7 Opening Drains & grass cuttingCentral Bazalabusa Road p RMM 0.5 Opening Drains & grass cuttingCentral Ben Kiwanuka Street p RMM 1.2 Opening Drains & grass cuttingCentral Berkely 1 P RMM 0.6 Opening Drains & grass cuttingCentral Berkely 2 P RMM 0.2 Opening Drains & grass cuttingCentral Bombo Road p RMM 1.5 Opening Drains & grass cuttingCentral Boundary Close p RMM 0.2 Opening Drains & grass cuttingCentral Buganda p RMM 2.1 Opening Drains & grass cuttingCentral Bukoto Street P RMM 1.1 Opening Drains & grass cuttingCentral Burton R/About p RMM 0.1 Opening Drains & grass cuttingCentral Burton Street p RMM 0.5 Opening Drains & grass cuttingCentral Busser Lane p RMM 0.1 Opening Drains & grass cuttingCentral Buxton 2 p RMM 0.2 Opening Drains & grass cuttingCentral Channel Street p RMM 0.2 Opening Drains & grass cuttingCentral Clement Hill P RMM 0.6 Opening Drains & grass cuttingCentral Colville Street p RMM 0.4 Opening Drains & grass cuttingCentral Cooper P RMM 0.3 Opening Drains & grass cuttingCentral Coppice P RMM 0.3 Opening Drains & grass cuttingCentral Coral Close P RMM 0.3 Opening Drains & grass cuttingCentral Coral Crescent p RMM 0.2 Opening Drains & grass cuttingCentral Dastur Street P RMM 0.3 Opening Drains & grass cuttingCentral De Winton P RMM 0.6 Opening Drains & grass cuttingCentral Delhi Gardens P RMM 0.3 Opening Drains & grass cuttingCentral Dundas P RMM 0.3 Opening Drains & grass cuttingCentral Ekobo Avenue P RMM 0.2 Opening Drains & grass cuttingCentral Elgon Terrace P RMM 0.5 Opening Drains & grass cuttingCentral Elizabeth Avenue p RMM 1.2 Opening Drains & grass cuttingCentral Fifth Street P RMM 1.1 Opening Drains & grass cuttingCentral First Street P RMM 0.7 Opening Drains & grass cuttingCentral Fort P RMM 0.3 Opening Drains & grass cuttingCentral George Street p RMM 0.4 Opening Drains & grass cuttingCentral Ginnery Road p RMM 0.3 Opening Drains & grass cuttingCentral Golf Course p RMM 0.8 Opening Drains & grass cuttingCentral Hajji Musa Kasule P RMM 0.5 Opening Drains & grass cuttingCentral Hannington p RMM 0.5 Opening Drains & grass cuttingCentral Hesketh Bell p RMM 0.5 Opening Drains & grass cuttingCentral Hill Lane P RMM 0.6 Opening Drains & grass cuttingCentral Hoima 1 P RMM 1.6 Opening Drains & grass cuttingCentral Ibis Vale P RMM 0.3 Opening Drains & grass cuttingCentral Impala Avenue p RMM 0.8 Opening Drains & grass cuttingCentral Jinja 1 p RMM 2.5 Opening Drains & grass cuttingCentral John Babiiha Avenue P RMM 1.7 Opening Drains & grass cuttingCentral Johnson street P RMM 0.3 Opening Drains & grass cuttingCentral Kafu P RMM 0.5 Opening Drains & grass cuttingCentral Kagera P RMM 0.3 Opening Drains & grass cuttingCentral Kalekezi Close P RMM 0.1 Opening Drains & grass cuttingCentral Kampala road P RMM 1.8 Opening Drains & grass cuttingCentral Kamwokya-Kyebando P RMM 0.7 Opening Drains & grass cuttingCentral Kanjokya Street P RMM 0.9 Opening Drains & grass cuttingCentral Kar P RMM 0.4 Opening Drains & grass cutting

351Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Central Kar Close P RMM 0.4 Opening Drains & grass cuttingCentral Kar Drive P RMM 0.3 Opening Drains & grass cuttingCentral Kasozi P RMM 0.4 Opening Drains & grass cuttingCentral Katonga P RMM 0.3 Opening Drains & grass cuttingCentral katwe rd P RMM 0.6 Opening Drains & grass cuttingCentral Kawalya Kagwa p RMM 0.31 Opening Drains & grass cuttingCentral Kenneth Dale Drive P RMM 0.2 Opening Drains & grass cuttingCentral Kimathi Avenue p RMM 0.5 Opening Drains & grass cuttingCentral King George Vi Way p RMM 0.1 Opening Drains & grass cuttingCentral King George Vi Way Close p RMM 0.1 Opening Drains & grass cuttingCentral Kintu p RMM 0.7 Opening Drains & grass cuttingCentral Kira Road P RMM 5.1 Opening Drains & grass cuttingCentral Kira 1 p RMM 5.1 Opening Drains & grass cuttingCentral Kisenyi P RMM 0.7 Opening Drains & grass cuttingCentral Kisenyi 1 p RMM 0.7 Opening Drains & grass cuttingCentral Kisenyi 2 P RMM 0.8 Opening Drains & grass cuttingCentral Kisozi P RMM 0.2 Opening Drains & grass cuttingCentral Kololo Hill Lane P RMM 1.2 Opening Drains & grass cuttingCentral Kyadondo 1 P RMM 1.6 Opening Drains & grass cuttingCentral Kyadondo 2 p RMM 1.0 Opening Drains & grass cuttingCentral Kyagwe road p RMM 0.4 Opening Drains & grass cuttingCentral Kyagwe 2 P RMM 0.3 Opening Drains & grass cuttingCentral Lower Kololo Terrace P RMM 1.1 Opening Drains & grass cuttingCentral Lubiri ring road p RMM 2.0 Opening Drains & grass cuttingCentral Lugard P RMM 0.3 Opening Drains & grass cuttingCentral Lugogo bypass p RMM 2.3 Opening Drains & grass cuttingCentral Lumumba Avenue p RMM 1.8 Opening Drains & grass cuttingCentral Luwum Street P RMM 0.7 Opening Drains & grass cuttingCentral Mabua P RMM 0.7 Opening Drains & grass cuttingCentral Mackay 1 P RMM 0.4 Opening Drains & grass cuttingCentral Mackenzie Close P RMM 0.2 Opening Drains & grass cuttingCentral Mackenzie Vale p RMM 1.0 Opening Drains & grass cuttingCentral Mackinon P RMM 0.7 Opening Drains & grass cuttingCentral Makerere p RMM 1.2 Opening Drains & grass cuttingCentral Makerere Hill p RMM 1.8 Opening Drains & grass cuttingCentral Makindu Lane P RMM 0.1 Opening Drains & grass cuttingCentral Malcolm-X Avenue P RMM 1.5 Opening Drains & grass cuttingCentral Market Square P RMM 0.2 Opening Drains & grass cuttingCentral Market Street P RMM 0.4 Opening Drains & grass cuttingCentral Martin P RMM 0.8 Opening Drains & grass cuttingCentral Mengo Hill P RMM 0.7 Opening Drains & grass cuttingCentral Mpaabaana Road p RMM 0.4 Opening Drains & grass cuttingCentral Mulwana road p RMM 0.7 Opening Drains & grass cuttingCentral Musajjalumbwa P RMM 1.0 Opening Drains & grass cuttingCentral Musizi Lane P RMM 0.2 Opening Drains & grass cuttingCentral Mutaasa P RMM 0.3 Opening Drains & grass cuttingCentral Muwafu 1 P RMM 0.7 Opening Drains & grass cuttingCentral Mvilli Lane P RMM 0.2 Opening Drains & grass cuttingCentral Mwanga 2 P RMM 1.1 Opening Drains & grass cuttingCentral Nabugabo Road P RMM 0.1 Opening Drains & grass cuttingCentral Nakasero Hill p RMM 1.5 Opening Drains & grass cuttingCentral Nakasero Lane P RMM 0.3 Opening Drains & grass cuttingCentral Nakasero Market square p RMM 0.2 Opening Drains & grass cuttingCentral Nakivubo P RMM 1.2 Opening Drains & grass cuttingCentral Nakivubo Green P RMM 0.4 Opening Drains & grass cuttingCentral Nakivubo Mews P RMM 0.2 Opening Drains & grass cuttingCentral Nakivubo Place P RMM 0.6 Opening Drains & grass cuttingCentral Namirembe P RMM 1.8 Opening Drains & grass cuttingCentral Nasser Lane 1 P RMM 0.0 Opening Drains & grass cutting

352 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Central Nasser road P RMM 0.8 Opening Drains & grass cuttingCentral Nehru Avenue P RMM 0.6 Opening Drains & grass cuttingCentral Ngabo P RMM 0.3 Opening Drains & grass cuttingCentral Nile Avenue P RMM 0.9 Opening Drains & grass cuttingCentral Nkrumah road P RMM 0.1 Opening Drains & grass cuttingCentral Nsalo 1 P RMM 0.4 Opening Drains & grass cuttingCentral Nsalo 2 P RMM 0.5 Opening Drains & grass cuttingCentral Nviri Lane P RMM 0.2 Opening Drains & grass cuttingCentral Nyanza Crescent P RMM 0.2 Opening Drains & grass cuttingCentral Nyonyi Gardens P RMM 0.4 Opening Drains & grass cuttingCentral Old Kampala P RMM 1.1 Opening Drains & grass cuttingCentral Old Kira P RMM 1.2 Opening Drains & grass cuttingCentral Old Port Bell P RMM 1.5 Opening Drains & grass cuttingCentral Park Lane P RMM 0.1 Opening Drains & grass cuttingCentral Parliamentary Avenue P RMM 0.5 Opening Drains & grass cuttingCentral Perryman Gardens P RMM 0.2 Opening Drains & grass cuttingCentral Philip P RMM 1.0 Opening Drains & grass cuttingCentral Pilkington Road P RMM 0.3 Opening Drains & grass cuttingCentral Portal Avenue P RMM 0.3 Opening Drains & grass cuttingCentral Prince Avenue P RMM 0.3 Opening Drains & grass cuttingCentral Prince Charles Drive P RMM 2.7 Opening Drains & grass cuttingCentral Princess Avenue P RMM 0.3 Opening Drains & grass cuttingCentral Proteia Lane P RMM 0.4 Opening Drains & grass cuttingCentral Queen Marys Gardens P RMM 0.4 Opening Drains & grass cuttingCentral Queen’S Lane P RMM 0.3 Opening Drains & grass cuttingCentral Rashid Khamis P RMM 0.9 Opening Drains & grass cuttingCentral Ridgeway P RMM 1.2 Opening Drains & grass cuttingCentral Roscoe P RMM 0.5 Opening Drains & grass cuttingCentral Rotary Avenue P RMM 2.4 Opening Drains & grass cuttingCentral Rubaga P RMM 2.3 Opening Drains & grass cuttingCentral Russel P RMM 0.1 Opening Drains & grass cuttingCentral Siad barre Avenue P RMM 0.3 Opening Drains & grass cuttingCentral School 1 P RMM 0.2 Opening Drains & grass cuttingCentral Second Street P RMM 0.3 Opening Drains & grass cuttingCentral Sepiriya Mukasa Rd P RMM 0.4 Opening Drains & grass cuttingCentral Seventh Street P RMM 1.2 Opening Drains & grass cuttingCentral Sezibwa P RMM 0.8 Opening Drains & grass cuttingCentral Shimon road P RMM 0.8 Opening Drains & grass cuttingCentral Sheraton roundabout P RMM 0.1 Opening Drains & grass cuttingCentral Siad Barre Avenue P RMM 0.5 Opening Drains & grass cuttingCentral Sikh Street P RMM 0.3 Opening Drains & grass cuttingCentral Sir Apollo Kaggwa P RMM 1.4 Opening Drains & grass cuttingCentral Sixth Street P RMM 2.0 Opening Drains & grass cuttingCentral Snay Bin Amir Street P RMM 0.2 Opening Drains & grass cuttingCentral Somero P RMM 0.2 Opening Drains & grass cuttingCentral Speke road P RMM 0.4 Opening Drains & grass cuttingCentral Square I P RMM 0.2 Opening Drains & grass cuttingCentral Ssezibwa P RMM 0.2 Opening Drains & grass cuttingCentral Station P RMM 0.6 Opening Drains & grass cuttingCentral Station Approach P RMM 0.4 Opening Drains & grass cuttingCentral Sturrock road P RMM 0.5 Opening Drains & grass cuttingCentral Summit View P RMM 0.4 Opening Drains & grass cuttingCentral Ternan Avenue P RMM 0.6 Opening Drains & grass cuttingCentral The Square 1 P RMM 0.2 Opening Drains & grass cuttingCentral The Square 2 P RMM 0.2 Opening Drains & grass cuttingCentral Third Street P RMM 0.5 Opening Drains & grass cuttingCentral Upper Kololo Terrace P RMM 1.9 Opening Drains & grass cuttingCentral Wampewo Avenue P RMM 1.0 Opening Drains & grass cuttingCentral Wampewo Avenue R/About P RMM 0.2 Opening Drains & grass cutting

353Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Central Wampewo Close P RMM 0.2 Opening Drains & grass cuttingCentral Wandegeya P RMM 0.5 Opening Drains & grass cuttingCentral William Street P RMM 0.3 Opening Drains & grass cuttingCentral Wilson P RMM 0.5 Opening Drains & grass cuttingCentral Wilson Lane P RMM 0.1 Opening Drains & grass cuttingCentral Windsor Crescent P RMM 0.9 Opening Drains & grass cuttingCentral Windsor Loop P RMM 0.3 Opening Drains & grass cuttingCentral York Terrace P RMM 0.5 Opening Drains & grass cuttingCentral Yusuf Lule P RMM 2.6 Opening Drains & grass cutting Subtotal 130.0Central Access to OPM U RMM 0.5 Opening Drains & grass cuttingCentral Church U RMM 0.5 Opening Drains & grass cuttingCentral Church (Kisenyi) U RMM 0.1 Opening Drains & grass cuttingCentral Coronation U RMM 0.1 Opening Drains & grass cuttingCentral Himbaza-Hashaka U RMM 0.4 Opening Drains & grass cuttingCentral Karim (Kamwokya) U RMM 0.1 Opening Drains & grass cuttingCentral Kasaato U RMM 0.5 Opening Drains & grass cuttingCentral Kasaawa (Kamwokya) U RMM 0.4 Opening Drains & grass cuttingCentral Kiconco (Nakasero) U RMM 0.2 Opening Drains & grass cuttingCentral Kitamanyangamba Rd U RMM 0.2 Opening Drains & grass cuttingCentral Lane Ii U RMM 0.4 Opening Drains & grass cuttingCentral Lane Iii U RMM 0.2 Opening Drains & grass cuttingCentral Lane Iv U RMM 0.3 Opening Drains & grass cuttingCentral Lubaga Place U RMM 0.1 Opening Drains & grass cuttingCentral Lubaga Place U RMM 0.1 Opening Drains & grass cuttingCentral Luzige U RMM 0.5 Opening Drains & grass cuttingCentral Makerere-Kivulu I U RMM 0.2 Opening Drains & grass cuttingCentral Makerere-Kivulu II U RMM 0.1 Opening Drains & grass cuttingCentral Mutaka (Kamwokya) U RMM 0.3 Opening Drains & grass cuttingCentral Nabugabo U RMM 0.1 Opening Drains & grass cuttingCentral Nyanzi (Kamwokya) U RMM 0.2 Opening Drains & grass cuttingCentral Rosebury Lane U RMM 0.5 Opening Drains & grass cuttingCentral Kaliba U RMM 0.5 Opening Drains & grass cuttingCentral Jambula Road U RMM 0.5 Opening Drains & grass cuttingCentral Musoke Road U RMM 0.3 Opening Drains & grass cuttingCentral Mutagubya U RMM 0.2 Opening Drains & grass cuttingCentral Nalubwama U RMM 0.2 Opening Drains & grass cuttingCentral Namarwa U RMM 0.3 Opening Drains & grass cuttingCentral Sebanakita U RMM 0.2 Opening Drains & grass cuttingCentral Seruwu U RMM 0.4 Opening Drains & grass cuttingCentral Sekanolya Road (Kivulu) U RMM 0.2 Opening Drains & grass cutting Subtotal 8.7

Total 138.8 Kawempe Biashara P RMM 0.4 Opening Drains & grass cuttingKawempe Binaisa P RMM 0.9 Opening Drains & grass cuttingKawempe Bombo I P RMM 1.1 Opening Drains & grass cuttingKawempe Buwambo ( Kiteezi rd) P RMM 3.4 Opening Drains & grass cuttingKawempe Bwaise-Nabweru P RMM 1.0 Opening Drains & grass cuttingKawempe Casa Lane P RMM 0.2 Opening Drains & grass cuttingKawempe Dwaliro P RMM 0.8 Opening Drains & grass cuttingKawempe Garden Hill. P RMM 0.2 Opening Drains & grass cuttingKawempe GAYAZA RD P RMM 3.2 Opening Drains & grass cuttingKawempe Junju P RMM 0.4 Opening Drains & grass cuttingKawempe Kalerwe-Ttula P RMM 3.8 Opening Drains & grass cuttingKawempe KANAKULYA RD P RMM 1.5 Opening Drains & grass cuttingKawempe Katego P RMM 0.2 Opening Drains & grass cuttingKawempe Kawaala P RMM 1.3 Opening Drains & grass cuttingKawempe Kawempe-Mbogo P RMM 1.7 Opening Drains & grass cuttingKawempe Kayunga P RMM 0.1 Opening Drains & grass cutting

354 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Kawempe Kimera P RMM 0.5 Opening Drains & grass cuttingKawempe Kitante P RMM 0.9 Opening Drains & grass cuttingKawempe Kitezi P RMM 2.4 Opening Drains & grass cuttingKawempe KITEZI RD/BUWAMBO RD P RMM 2.4 Opening Drains & grass cuttingKawempe Kyanja P RMM 0.8 Opening Drains & grass cuttingKawempe KYEBANDO NSOOBA RD P RMM 0.6 Opening Drains & grass cuttingKawempe Link. P RMM 0.1 Opening drains & cutting grassKawempe Livingstone. P RMM 0.3 Opening drains & cutting grassKawempe Makerere Hill P RMM 1.1 Opening drains & cutting grassKawempe MAMBULE RD P RMM 1.0 Opening drains & cutting grassKawempe Mary Stuart P RMM 0.8 Opening Drains & grass cuttingKawempe Mawanda P RMM 2.0 Opening Drains & grass cuttingKawempe Mbogo road P RMM 0.7 Opening Drains & grass cuttingKawempe Mitchel-Nkurumah (MUK) P RMM 0.3 Opening Drains & grass cuttingKawempe MOTUARY RD P RMM 0.3 Opening Drains & grass cuttingKawempe Muganzi Lwazza P RMM 0.6 Opening Drains & grass cuttingKawempe Mulago Hill P RMM 0.5 Opening Drains & grass cuttingKawempe MULINDO RD P RMM 0.3 Opening Drains & grass cuttingKawempe New Avenue. P RMM 0.3 Opening Drains & grass cuttingKawempe Nkinzi Lane I P RMM 0.1 Opening Drains & grass cuttingKawempe Nkinzi Lane II P RMM 0.1 Opening Drains & grass cuttingKawempe Nkinzi Rd P RMM 0.7 Opening Drains & grass cuttingKawempe Northcote P RMM 0.5 Opening Drains & grass cuttingKawempe Observatory P RMM 0.3 Opening Drains & grass cuttingKawempe Owen P RMM 0.6 Opening Drains & grass cuttingKawempe Pool P RMM 0.8 Opening Drains & grass cuttingKawempe Roko Access. P RMM 0.8 Opening Drains & grass cuttingKawempe School Lane. P RMM 0.2 Opening Drains & grass cuttingKawempe Senate Approach. P RMM 0.4 Opening Drains & grass cuttingKawempe Sir.Apollo Kaggwa P RMM 2.4 Opening Drains & grass cuttingKawempe SPENCON ROAD P RMM 0.6 Opening Drains & grass cuttingKawempe Spencon-Ttula P RMM 0.5 Opening Drains & grass cuttingKawempe Tagore Crescent P RMM 0.3 Opening Drains & grass cuttingKawempe Tennis Court P RMM 0.4 Opening Drains & grass cuttingKawempe The Quarry P RMM 0.2 Opening Drains & grass cuttingKawempe Ttula Spencon. P RMM 0.7 Opening Drains & grass cuttingKawempe TTULA SPENCON/ZADOOKI RD P RMM 1.9 Opening Drains & grass cuttingKawempe Tuffnell Drive P RMM 0.7 Opening Drains & grass cuttingKawempe University P RMM 0.9 Opening Drains & grass cuttingKawempe University Hill Lane P RMM 0.3 Opening Drains & grass cuttingKawempe Upper Mawanda P RMM 0.6 Opening Drains & grass cuttingKawempe Upper Mulago Hill P RMM 1.5 Opening Drains & grass cutting Subtotal 51.2Kawempe Bahai P RMM 3.5 Opening Drains & grass cuttingKawempe Basalirwa P RMM 0.2 Opening Drains & grass cuttingKawempe BASALIRWA RD P RMM 0.2 Opening Drains & grass cuttingKawempe Bisenge P RMM 0.5 Opening Drains & grass cuttingKawempe Bright (Bwaise II) P RMM 0.1 Opening Drains & grass cuttingKawempe Bubajjwe (Bwaise I) P RMM 0.2 Opening Drains & grass cuttingKawempe BUGALANI RD P RMM 0.8 Opening Drains & grass cuttingKawempe Bukenya P RMM 0.2 Opening Drains & grass cuttingKawempe Bukenya Link P RMM 0.1 Opening Drains & grass cuttingKawempe BUKENYA RD P RMM 0.2 Opening Drains & grass cuttingKawempe Busanza P RMM 1.1 Opening Drains & grass cuttingKawempe Busuulwa P RMM 0.4 Opening Drains & grass cuttingKawempe Butakabukirwa P RMM 0.4 Opening Drains & grass cuttingKawempe Bwaise-Kawaala P RMM 1.3 Opening Drains & grass cuttingKawempe Bwebale P RMM 0.8 Opening Drains & grass cuttingKawempe CENTRAL RD P RMM 6.5 Opening Drains & grass cutting

355Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Kawempe Church P RMM 1.1 Opening Drains & grass cuttingKawempe Church 1 P RMM 0.3 Opening Drains & grass cuttingKawempe Church 2 P RMM 1.0 Opening Drains & grass cuttingKawempe Church 3 P RMM 0.1 Opening Drains & grass cuttingKawempe Church Link P RMM 0.1 Opening Drains & grass cuttingKawempe Church road -kyebando P RMM 0.7 Opening Drains & grass cuttingKawempe Chwa II P RMM 0.3 Opening Drains & grass cuttingKawempe City Side P RMM 0.4 Opening Drains & grass cuttingKawempe Close P RMM 0.2 Opening Drains & grass cuttingKawempe Dr. Sembeguya P RMM 2.3 Opening drains & cutting grassKawempe Dwaliro P RMM 0.8 Opening drains & cutting grassKawempe E.Mugalu. P RMM 0.4 Opening drains & cutting grassKawempe Elisa. P RMM 0.4 Opening drains & cutting grassKawempe Ensi egula mirambo P RMM 0.7 Opening drains & cutting grassKawempe Erimiya P RMM 0.3 Opening drains & cutting grassKawempe Express. P RMM 0.3 Opening drains & cutting grassKawempe Eyali aseka P RMM 0.4 Opening Drains & grass cuttingKawempe Farouk Minawa P RMM 1.1 Opening Drains & grass cuttingKawempe Fruit factory access off Matovu rd P RMM 0.1 Opening Drains & grass cuttingKawempe Gaava Access P RMM 0.2 Opening Drains & grass cuttingKawempe Galabuzi P RMM 0.4 Opening Drains & grass cuttingKawempe Haji Mumyuka (Kawempe I) P RMM 0.5 Opening Drains & grass cuttingKawempe Homisdallen P RMM 0.2 Opening Drains & grass cuttingKawempe Homisdallen II P RMM 0.7 Opening Drains & grass cuttingKawempe hood rd P RMM 0.3 Opening Drains & grass cuttingKawempe Jakana Place Drive P RMM 0.7 Opening Drains & grass cuttingKawempe Kabanda P RMM 0.6 Opening Drains & grass cuttingKawempe Kafeero & Police P RMM 1.1 Opening Drains & grass cuttingKawempe Kafeero Hill Lane P RMM 0.5 Opening Drains & grass cuttingKawempe Kajjankemba (Kawempe I) P RMM 0.7 Opening Drains & grass cuttingKawempe Kakembo (Mpererwe) P RMM 0.6 Opening Drains & grass cuttingKawempe Kamani (Kawempe II) P RMM 0.6 Opening Drains & grass cuttingKawempe Kambugu P RMM 0.2 Opening Drains & grass cuttingKawempe Kampala Quality (Kikaaya B) P RMM 0.5 Opening Drains & grass cuttingKawempe KAMYA RD P RMM 0.3 Opening Drains & grass cuttingKawempe Kanakulya P RMM 1.5 Opening Drains & grass cuttingKawempe Kanyanya Church P RMM 1.7 Opening Drains & grass cuttingKawempe Kasakya P RMM 0.2 Opening Drains & grass cuttingKawempe Kasubi-Kawaala P RMM 1.0 Opening Drains & grass cuttingKawempe Katale. P RMM 0.6 Opening Drains & grass cuttingKawempe Katalemwa P RMM 1.0 Opening Drains & grass cuttingKawempe Katalemwa Estate P RMM 0.2 Opening Drains & grass cuttingKawempe Katama Cell P RMM 0.3 Opening Drains & grass cuttingKawempe KATOGO RD P RMM 0.2 Opening Drains & grass cuttingKawempe Katula P RMM 0.6 Opening Drains & grass cuttingKawempe KAVUMA RD P RMM 0.3 Opening Drains & grass cuttingKawempe KAWASE P RMM 0.3 Opening Drains & grass cuttingKawempe Kawempe Muslim Sec School P RMM 0.4 Opening Drains & grass cuttingKawempe Kayemba P RMM 0.2 Opening Drains & grass cuttingKawempe Kazo Tropical Hill P RMM 0.6 Opening Drains & grass cuttingKawempe Keti (Bwaise II) P RMM 0.6 Opening Drains & grass cuttingKawempe Kibaawo-uniport P RMM 0.5 Opening Drains & grass cuttingKawempe Kibuuka (Bwaise I) P RMM 0.3 Opening drains & cutting grassKawempe Kiggundu (Kanyanya) P RMM 0.7 Opening drains & cutting grassKawempe Kiibe P RMM 0.3 Opening Drains & grass cuttingKawempe Kikaaya Police Post P RMM 0.5 Opening Drains & grass cuttingKawempe Kikaaya Primary Sch P RMM 0.3 Opening Drains & grass cuttingKawempe Kirinya P RMM 0.4 Opening Drains & grass cuttingKawempe Kisaasi P RMM 2.3 Opening Drains & grass cutting

356 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Kawempe Kisaasi College Rd P RMM 0.9 Opening Drains & grass cuttingKawempe Kisaasi Pr Sch Rd P RMM 0.4 Opening Drains & grass cuttingKawempe Kisaasi-Kikuru Rd P RMM 1.5 Opening Drains & grass cuttingKawempe Kisalosalo Zone. P RMM 0.6 Opening Drains & grass cuttingKawempe Kitala P RMM 0.5 Opening Drains & grass cuttingKawempe Kitante rd P RMM 0.9 Opening Drains & grass cuttingKawempe Kiwonvu P RMM 0.4 Opening Drains & grass cuttingKawempe Kiwonvu Link P RMM 0.3 Opening Drains & grass cuttingKawempe Kiyanja drain access P RMM 0.3 Opening Drains & grass cuttingKawempe Kizanyiro P RMM 1.5 Opening Drains & grass cuttingKawempe Komamboga Health Centr P RMM 1.5 Opening Drains & grass cuttingKawempe Komambogo - Kyanja P RMM 0.7 Opening Drains & grass cuttingKawempe Kyabakadde P RMM 0.8 Opening Drains & grass cuttingKawempe Kyamaggwa (Mugalu) P RMM 0.5 Opening Drains & grass cuttingKawempe Kyebanda 34X.Road P RMM 0.9 Opening Drains & grass cuttingKawempe Kyebando Central P RMM 0.8 Opening Drains & grass cuttingKawempe Kyebando-Nsooba P RMM 0.6 Opening drains & cutting grassKawempe Kyeyune (Kikaaya B) P RMM 0.6 Opening drains & cutting grassKawempe Lasto Lukoma P RMM 1.0 Opening drains & cutting grassKawempe Lower Mulago. P RMM 0.3 Opening drains & cutting grassKawempe Lower Nsooba P RMM 0.8 Opening drains & cutting grassKawempe Lubega rd P RMM 0.3 Opening drains & cutting grassKawempe Lufula Access P RMM 0.5 Opening drains & cutting grassKawempe Lugoba. P RMM 3.8 Opening drains & cutting grassKawempe Lukadde Ttula. P RMM 0.9 Opening Drains & grass cuttingKawempe Lukadde.2 P RMM 2.4 Opening Drains & grass cuttingKawempe Lumas (Kawempe I) P RMM 0.6 Opening Drains & grass cuttingKawempe Lutalo P RMM 0.5 Opening Drains & grass cuttingKawempe Lutuuma P RMM 0.5 Opening Drains & grass cuttingKawempe Mabanda P RMM 0.2 Opening Drains & grass cuttingKawempe Majimbi P RMM 1.5 Opening Drains & grass cuttingKawempe Manyike P RMM 0.5 Opening Drains & grass cuttingKawempe Matovu P RMM 0.5 Opening Drains & grass cuttingKawempe Mayombwe P RMM 0.4 Opening Drains & grass cuttingKawempe Mbogo High Sch-Ttula P RMM 1.5 Opening Drains & grass cuttingKawempe Mbogo Link P RMM 0.7 Opening Drains & grass cuttingKawempe Mugalu (Mugalu) P RMM 0.6 Opening Drains & grass cuttingKawempe Mugalu E. P RMM 0.4 Opening Drains & grass cuttingKawempe Muganzi Awongererwa P RMM 1.6 Opening Drains & grass cuttingKawempe Muganzi Lwazza P RMM 0.6 Opening Drains & grass cuttingKawempe Mugarura P RMM 0.6 Opening Drains & grass cuttingKawempe Mugerwa (Kawempe I) P RMM 0.4 Opening Drains & grass cuttingKawempe Mukasa P RMM 0.3 Opening Drains & grass cuttingKawempe Mukubira (Makerere I) P RMM 0.2 Opening Drains & grass cuttingKawempe Mulundu P RMM 0.2 Opening Drains & grass cuttingKawempe Mulyanti (Makerere II) P RMM 0.6 Opening Drains & grass cuttingKawempe Musisi P RMM 0.8 Opening Drains & grass cuttingKawempe Mutale (Mpererwe) P RMM 0.5 Opening Drains & grass cuttingKawempe Mutebi (Wandegeya) P RMM 0.5 Opening Drains & grass cuttingKawempe Mutoolo (Kyebando) P RMM 0.4 Opening Drains & grass cuttingKawempe Muwanika P RMM 0.4 Opening Drains & grass cuttingKawempe Muyinda (Kanyanya) P RMM 0.3 Opening Drains & grass cuttingKawempe Mwaze (Mugalu) P RMM 0.1 Opening Drains & grass cuttingKawempe Nababirye Musisi P RMM 0.4 Opening Drains & grass cuttingKawempe Nabisunsa (Bwaise I) P RMM 0.2 Opening Drains & grass cuttingKawempe Nabukalu (Bwaise II) P RMM 0.3 Opening Drains & grass cuttingKawempe Nalule (Mugalu) P RMM 0.4 Opening Drains & grass cuttingKawempe Namasole P RMM 0.4 Opening Drains & grass cuttingKawempe Namere P RMM 1.5 Opening Drains & grass cutting

357Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Kawempe Namuleme (Makerere II) P RMM 0.2 Opening Drains & grass cuttingKawempe Nandujja (Makerere II) P RMM 0.2 Opening drains & cutting grassKawempe Nanfumbambi P RMM 1.8 Opening drains & cutting grassKawempe Nkata P RMM 0.3 Opening drains & cutting grassKawempe Nsanja P RMM 0.6 Opening drains & cutting grassKawempe Nsereko P RMM 0.8 Opening drains & cutting grassKawempe Nsimbe P RMM 1.1 Opening drains & cutting grassKawempe Nsooba (Kyebando West) P RMM 0.3 Opening drains & cutting grassKawempe Nsooba 2 P RMM 0.8 Opening drains & cutting grassKawempe Ntanda (Bwaise II) P RMM 0.3 Opening drains & cutting grassKawempe Odwori P RMM 0.7 Opening Drains & grass cuttingKawempe Off Bahai I P RMM 0.2 Opening Drains & grass cuttingKawempe Off Bahai II P RMM 0.3 Opening Drains & grass cuttingKawempe Owen P RMM 0.6 Opening Drains & grass cuttingKawempe Pastor Luwagga P RMM 0.5 Opening Drains & grass cuttingKawempe Paul Kiyingi. P RMM 0.4 Opening Drains & grass cuttingKawempe Police P RMM 0.2 Opening Drains & grass cuttingKawempe Prof. Ddungu P RMM 0.2 Opening Drains & grass cuttingKawempe Ring 1 P RMM 1.5 Opening Drains & grass cuttingKawempe Ring 2 P RMM 2.0 Opening Drains & grass cuttingKawempe Ring Road (Kyebando) P RMM 0.5 Opening Drains & grass cuttingKawempe Rwakataka. P RMM 0.2 Opening Drains & grass cuttingKawempe Salongo Muyomba. P RMM 0.5 Opening Drains & grass cuttingKawempe Sebbowa. P RMM 0.7 Opening drains & cutting grassKawempe Sebina P RMM 0.3 Opening drains & cutting grassKawempe Sebuliba Mutumba P RMM 0.5 Opening Drains & grass cuttingKawempe Sekanyonyi (Mpererwe) P RMM 0.7 Opening Drains & grass cuttingKawempe Sematimba P RMM 0.6 Opening Drains & grass cuttingKawempe Sendaula P RMM 0.6 Opening Drains & grass cuttingKawempe Senkenge P RMM 0.6 Opening Drains & grass cuttingKawempe Senku P RMM 0.7 Opening Drains & grass cuttingKawempe Sewankambo. P RMM 0.5 Opening Drains & grass cuttingKawempe Sheik Kalumba P RMM 0.6 Opening Drains & grass cuttingKawempe Spencon-Ttula P RMM 0.5 Opening Drains & grass cuttingKawempe Ssabaddu (Bwaise I) P RMM 0.5 Opening Drains & grass cuttingKawempe Ssabaddu (Bwaise I) P RMM 0.5 Opening Drains & grass cuttingKawempe Ssebaggala P RMM 1.2 Opening Drains & grass cuttingKawempe Ssekenge P RMM 0.4 Opening Drains & grass cuttingKawempe Sserunjogi P RMM 0.4 Opening Drains & grass cuttingKawempe St Peters P RMM 1.2 Opening Drains & grass cuttingKawempe St. Kizito P RMM 0.8 Opening Drains & grass cuttingKawempe St. Magaret P RMM 0.7 Opening Drains & grass cuttingKawempe St. Stephen P RMM 1.0 Opening Drains & grass cuttingKawempe Taaka (Mugalu) P RMM 0.3 Opening Drains & grass cuttingKawempe Takuba P RMM 1.1 Opening Drains & grass cuttingKawempe TAMALE RD P RMM 0.7 Opening Drains & grass cuttingKawempe Ttula 2 P RMM 2.1 Opening Drains & grass cuttingKawempe Ttula Access. P RMM 0.3 Opening Drains & grass cuttingKawempe Ttula Mbogo High Sch P RMM 0.7 Opening Drains & grass cuttingKawempe Twamulambirawo P RMM 0.7 Opening Drains & grass cuttingKawempe Up Hill P RMM 0.5 Opening Drains & grass cuttingKawempe Upland (Kyebando West) P RMM 0.5 Opening Drains & grass cuttingKawempe Upper Makerere Hill P RMM 0.5 Opening Drains & grass cuttingKawempe Waliggo-Komambogga P RMM 4.2 Opening drains & cutting grassKawempe Walusimbi P RMM 0.7 Opening drains & cutting grassKawempe West (Makerere University) P RMM 0.3 Opening drains & cutting grassKawempe Zabeti P RMM 0.9 Opening drains & cutting grassKawempe Zinunula P RMM 0.4 Opening drains & cutting grass Subtotal 132.6

358 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Total 183.8 Lubaga Albert Cook P RMM 1.9 Opening Drains & grass cuttingLubaga Apollo Nsibambi P RMM 0.6 Opening Drains & grass cuttingLubaga Bakuli Market Lane 1 P RMM 0.4 Opening Drains & grass cuttingLubaga Bakuli Market Lane 2 P RMM 0.3 Opening Drains & grass cuttingLubaga Balintuma P RMM 1.8 Opening Drains & grass cuttingLubaga Bishop’S Close P RMM 0.4 Opening Drains & grass cuttingLubaga Bishop’S Way P RMM 0.1 Opening Drains & grass cuttingLubaga Butikiro P RMM 0.6 Opening Drains & grass cuttingLubaga Canon Njuba P RMM 0.3 Opening Drains & grass cuttingLubaga Cathedral P RMM 0.8 Opening Drains & grass cuttingLubaga Cathedral Hill P RMM 0.7 Opening Drains & grass cuttingLubaga Gabunga P RMM 0.8 Opening Drains & grass cuttingLubaga Grace P RMM 0.8 Opening Drains & grass cuttingLubaga Hoima P RMM 4.9 Opening Drains & grass cuttingLubaga Hamu Mukasa P RMM 0.6 Opening Drains & grass cuttingLubaga Kabaka’njagala P RMM 1.0 Opening Drains & grass cuttingLubaga Kabuusu P RMM 1.2 Opening Drains & grass cuttingLubaga Kawala P RMM 1.9 Opening Drains & grass cuttingLubaga Kalema P RMM 2.1 Opening Drains & grass cuttingLubaga Kalinda P RMM 0.3 Opening Drains & grass cuttingLubaga Kamalu P RMM 0.4 Opening Drains & grass cuttingLubaga Kasalina P RMM 0.3 Opening Drains & grass cuttingLubaga Kalenge P RMM 0.3 Opening Drains & grass cuttingLubaga Kisingiri Street P RMM 0.2 Opening Drains & grass cuttingLubaga Kitakule P RMM 0.9 Opening Drains & grass cuttingLubaga Kivebulaya P RMM 0.6 Opening Drains & grass cuttingLubaga Kiweewa P RMM 0.7 Opening Drains & grass cuttingLubaga Kyadondo P RMM 0.9 Opening Drains & grass cuttingLubaga Lubya Hill P RMM 0.3 Opening Drains & grass cuttingLubaga Lubaga P RMM 2.7 Opening Drains & grass cuttingLubaga Lubiri Ring P RMM 3.5 Opening Drains & grass cuttingLubaga Masaka P RMM 7.0 Opening Drains & grass cuttingLubaga Makamba P RMM 1.2 Opening Drains & grass cuttingLubaga Masaka road P RMM 1.0 Opening Drains & grass cuttingLubaga Masiro P RMM 2.1 Opening Drains & grass cuttingLubaga Mudeka 1 P RMM 0.1 Opening Drains & grass cuttingLubaga Mutesa 1 P RMM 0.7 Opening Drains & grass cuttingLubaga Mufuya 1 P RMM 0.3 Opening Drains & grass cuttingLubaga Muzito P RMM 2.2 Opening Drains & grass cuttingLubaga Nabulagala P RMM 1.6 Opening drains & cutting grassLubaga Nabunya P RMM 1.3 Opening drains & cutting grassLubaga Nalukolongo 2 P RMM 1.0 Opening drains & cutting grassLubaga Namirembe Cathedral access road P RMM 0.3 Opening drains & cutting grassLubaga Nateete Junction P RMM 0.1 Opening drains & cutting grassLubaga Sentema P RMM 3.0 Opening drains & cutting grassLubaga Stensella P RMM 1.2 Opening drains & cutting grassLubaga Wakaliga P RMM 2.0 Opening drains & cutting grassLubaga Wamala P RMM 0.7 Opening drains & cutting grassLubaga Wankulukuku P RMM 2.6 Opening drains & cutting grassLubaga Wansaso P RMM 0.2 Opening drains & cutting grassLubaga Weraga P RMM 1.1 Opening drains & cutting grassLubaga Willis P RMM 0.7 Opening drains & cutting grass Subtotal 62.3Lubaga Bakuli market RMM 0.9 Opening drains & cutting grassLubaga Bawalakata U RMM 0.6 Opening drains & cutting grassLubaga Busega U RMM 0.9 Opening Drains & grass cuttingLubaga Gabunga U RMM 1.9 Opening Drains & grass cuttingLubaga Kabaka’s lake U RMM 1.8 Opening Drains & grass cutting

359Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Lubaga Kigagga Rd U RMM 0.9 Opening Drains & grass cuttingLubaga Kiggala U RMM 1.1 Opening Drains & grass cuttingLubaga King Fahad Rd U RMM 0.7 Opening Drains & grass cuttingLubaga Kiwuunya U RMM 1.8 Opening Drains & grass cuttingLubaga Mackay Road U RMM 2.4 Opening Drains & grass cuttingLubaga Manyangenda U RMM 0.3 Opening Drains & grass cuttingLubaga Masanyalaze Rd U RMM 0.8 Opening Drains & grass cuttingLubaga Mbubi U RMM 0.4 Opening Drains & grass cuttingLubaga Mutesa 1 U RMM 3.2 Opening Drains & grass cuttingLubaga Mutesa 2 U RMM 1.6 Opening Drains & grass cuttingLubaga Nakibinge U RMM 1.9 Opening Drains & grass cuttingLubaga Namungoona U RMM 1.7 Opening Drains & grass cuttingLubaga Others U RMM 4.1 Opening Drains & grass cuttingLubaga Semakakiro road U RMM 0.5 Opening Drains & grass cuttingLubaga Ssuna U RMM 3.2 Opening Drains & grass cuttingLubaga Wamala U RMM 3.4 Opening Drains & grass cutting Subtotal 2 33.6 - Lubaga Bakuli market U PM 0.9 Grading & culvertingLubaga Basooka Kwavula U PM 1.4 Grading & culvertingLubaga Bawalakata U PM 0.6 Grading & culvertingLubaga Big Sea U PM 0.3 Grading & culvertingLubaga Boom Hotel U PM 2.4 Grading & culvertingLubaga Bulwadda U PM 0.5 Grading & culvertingLubaga Busaato U PM 0.5 Grading & culvertingLubaga Busega U PM 0.9 Grading & culvertingLubaga Busega Community Sch U PM 0.6 Grading & culvertingLubaga Church U PM 1.4 Grading & culvertingLubaga Church Of God U PM 0.9 Grading & culvertingLubaga City college road mutundwe U PM 0.6 Grading & culvertingLubaga Danstan - Nsubuga U PM 0.5 Grading & culvertingLubaga Gabunga U PM 1.9 Grading & culvertingLubaga Ganafa U PM 0.9 Grading & culvertingLubaga Grace U PM 0.6 Grading & culvertingLubaga Hill Top U PM 0.4 Grading & culvertingLubaga Junju U PM 2.4 Grading & culvertingLubaga Kabaka’s Palace U PM 1.5 Grading & culvertingLubaga Kabaka’s lake U PM 1.8 Grading & culvertingLubaga Kabogoza U PM 0.3 Grading & culvertingLubaga Kamulegeya U PM 0.5 Grading & culvertingLubaga Kamanya U PM 1.5 Grading & culvertingLubaga Kataka U PM 0.4 Grading & culvertingLubaga Kawesa U PM 1.4 Grading & culvertingLubaga Kawooya U PM 0.4 Grading & culvertingLubaga Kayima U PM 0.9 Grading & culvertingLubaga Kigagga Rd U PM 0.6 Grading & culvertingLubaga Kaggwa U PM 0.6 Grading & culvertingLubaga Kibazo U PM 0.5 Grading & culvertingLubaga Kiggala U PM 1.1 Grading & culvertingLubaga Kigonya U PM 0.6 Grading & culvertingLubaga Kibumbiro U PM 0.7 Grading & culvertingLubaga King Fahad Rd U PM 0.7 Grading & culvertingLubaga King’s Temple road U PM 0.3 Grading & culvertingLubaga Kintu U PM 0.5 Grading & culvertingLubaga Kisingiri II U PM 0.4 Grading & culvertingLubaga Kitamirike U PM 1.0 Grading & culvertingLubaga Kitebi Sss U PM 0.6 Grading & culvertingLubaga Kiwanuka U PM 0.7 Grading & culvertingLubaga Kiwuunya U PM 1.8 Grading & culvertingLubaga Kiyimba U PM 0.3 Grading & culverting

360 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Lubaga Kosovo road U PM 0.5 Grading & culvertingLubaga Kweba U PM 1.1 Grading & culvertingLubaga Kyabaggu U PM 0.5 Grading & culvertingLubaga Lungujja U PM 1.5 Grading & culvertingLubaga Luyinja road U PM 0.7 Grading & culvertingLubaga Liberty Worship Centre U PM 0.3 Grading & culvertingLubaga Link in Kabowa U PM 0.4 Grading & culvertingLubaga Mulangira U PM 0.6 Grading & culvertingLubaga Mackay Road U PM 2.4 Grading & culvertingLubaga Manyangenda U PM 0.3 Grading & culvertingLubaga Masanyalaze Rd U PM 0.8 Grading & culvertingLubaga Makamba U PM 0.5 Grading & culvertingLubaga Makumbi rd U PM 0.2 Grading & culvertingLubaga Mawejje U PM 0.8 Grading & culvertingLubaga Mbubi U PM 0.4 Grading & culvertingLubaga Michoud U PM 0.7 Grading & culvertingLubaga Misindye U PM 0.9 Grading & culvertingLubaga Mufunya II U PM 0.2 Grading & culvertingLubaga Mugema U PM 3.5 Grading & culvertingLubaga Mugwanya U PM 1.6 Grading & culvertingLubaga Mutagwanya U PM 0.9 Grading & culvertingLubaga Mutesa 1 U PM 3.2 Grading & culvertingLubaga Mutesa 2 U PM 1.6 Grading & culvertingLubaga Mutundwe U PM 4.2 Grading & culvertingLubaga Mwenda U PM 0.4 Grading & culvertingLubaga Nakibinge U PM 1.9 Grading & culvertingLubaga Naava lane U PM 0.1 Grading & culvertingLubaga Ntambi U PM 0.6 Grading & culvertingLubaga Nama U PM 0.4 Grading & culvertingLubaga Nakasolya U PM 0.5 Grading & culvertingLubaga Nsalo U PM 0.2 Grading & culvertingLubaga Namungoona U PM 1.7 Grading & culvertingLubaga Mapeera U PM 1.0 Grading & culvertingLubaga Namirembe Cathedral road U PM 0.3 Grading & culvertingLubaga Nasaka U PM 1.0 Grading & culvertingLubaga Nayiga U PM 0.6 Grading & culvertingLubaga New Pokino U PM 0.5 Grading & culvertingLubaga New Styles U PM 0.6 Grading & culvertingLubaga Old Mubende U PM 3.4 Grading & culvertingLubaga Others U PM 4.1 Grading & culvertingLubaga Safari - Church U PM 0.3 Grading & culvertingLubaga Ssekambwe U PM 0.4 Grading & culvertingLubaga Semakakiro road U PM 0.5 Grading & culvertingLubaga Sembera U PM 1.4 Grading & culvertingLubaga Sembule U PM 1.1 Grading & culvertingLubaga Serebe Kaggwa U PM 0.6 Grading & culvertingLubaga Ssebbanjja U PM 0.3 Grading & culvertingLubaga Ssebaduka U PM 1.2 Grading & culvertingLubaga Ssentamu U PM 0.8 Grading & culvertingLubaga Ssuna-1 U PM 3.2 Grading & culvertingLubaga St Andrew Kaggwa (Loop) U PM 2.3 Grading & culvertingLubaga Sungira Lane U PM 0.7 Grading & culvertingLubaga Super Fm U PM 1.5 Grading & culvertingLubaga Wakaliga B U PM 1.4 Grading & culvertingLubaga Wamala U PM 3.4 Grading & culvertingLubaga Willicient U PM 0.2 Grading & culvertingLubaga Wasula U PM 0.9 Grading & culverting Subtotal 3 101.7 Total 197.6

361Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Makindye Alive P RMM 0.2 Opening Drains & Grass cuttingMakindye Baka Close P RMM 0.5 Opening Drains & Grass cuttingMakindye Bukasa P RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa 1 P RMM 1.1 Opening Drains & Grass cuttingMakindye Bukasa Close P RMM 0.8 Opening Drains & Grass cuttingMakindye Buziga Rise P RMM 0.7 Opening Drains & Grass cuttingMakindye By Pass Mukwano) P RMM 1.6 Opening Drains & Grass cuttingMakindye Cape Town Villa P RMM 2.8 Opening Drains & Grass cuttingMakindye Clock Tower Roundabout P RMM 0.2 Opening Drains & Grass cuttingMakindye Eighth Street P RMM 0.6 Opening Drains & Grass cuttingMakindye Entebbe 2 (Mow) P RMM 3.5 Opening Drains & Grass cuttingMakindye Gaba (Mow) P RMM 3.8 Opening Drains & Grass cuttingMakindye Gaba (Mow) P RMM 3.4 Opening Drains & Grass cuttingMakindye Ggaba (Mow) P RMM 9.0 Opening Drains & Grass cuttingMakindye Ggaba (Mow) P RMM 1.8 Opening Drains & Grass cuttingMakindye Habitat Rise P RMM 0.1 Opening Drains & Grass cuttingMakindye kalungi P RMM 0.6 Opening Drains & Grass cuttingMakindye Kalungu 1 P RMM 0.9 Opening Drains & Grass cuttingMakindye Kayongo P RMM 0.4 Opening Drains & Grass cuttingMakindye katwe P RMM 1.2 Opening Drains & Grass cuttingMakindye kawuku P RMM 0.8 Opening Drains & Grass cuttingMakindye Kevina P RMM 1.3 Opening Drains & Grass cuttingMakindye Kevina P RMM 1.3 Opening Drains & Grass cuttingMakindye Kibuli P RMM 1.8 Opening Drains & Grass cuttingMakindye Kibuli P RMM 1.8 Opening Drains & Grass cuttingMakindye Kibuli P RMM 0.9 Opening Drains & Grass cuttingMakindye Kibuye Roundabout P RMM 0.2 Opening Drains & Grass cuttingMakindye Kisugu P RMM 1.0 Opening Drains & Grass cuttingMakindye Kiwafu Crescent P RMM 0.3 Opening Drains & Grass cuttingMakindye Kiyingi P RMM 0.8 Opening Drains & Grass cuttingMakindye Kutta P RMM 0.4 Opening Drains & Grass cuttingMakindye Lukuli 1 P RMM 5.0 Opening Drains & Grass cuttingMakindye Luwafu P RMM 2.0 Opening Drains & Grass cuttingMakindye Main Access P RMM 0.2 Opening Drains & Grass cuttingMakindye Market Rise P RMM 0.1 Opening Drains & Grass cuttingMakindye Mbogo 1 P RMM 1.0 Opening Drains & Grass cuttingMakindye Mubarrak P RMM 0.5 Opening Drains & Grass cuttingMakindye Mubutu (Makindye) P RMM 2.1 Opening Drains & Grass cuttingMakindye Muganzirwazza P RMM 0.2 Opening Drains & Grass cuttingMakindye Mukwano P RMM 0.1 Opening Drains & Grass cuttingMakindye Mutebi P RMM 0.7 Opening Drains & Grass cuttingMakindye Muwayire P RMM 1.5 Opening Drains & Grass cuttingMakindye Muwuliriza 1 P RMM 0.7 Opening Drains & Grass cuttingMakindye Namasole 2 P RMM 0.8 Opening Drains & Grass cuttingMakindye Namuwongo P RMM 2.0 Opening Drains & Grass cuttingMakindye Namuwongo Project-Road Network P RMM 6.0 Opening Drains & Grass cuttingMakindye Namwongo + Eighth Street P RMM 2.6 Opening Drains & Grass cuttingMakindye Nsambya Estate P RMM 1.5 Opening Drains & Grass cuttingMakindye Park Rise P RMM 0.1 Opening Drains & Grass cuttingMakindye Press House P RMM 0.4 Opening Drains & Grass cuttingMakindye Quarry 1 P RMM 1.2 Opening Drains & Grass cuttingMakindye Queens Way P RMM 1.7 Opening Drains & Grass cuttingMakindye Ring P RMM 1.2 Opening Drains & Grass cuttingMakindye Salaama P RMM 9.1 Opening Drains & Grass cuttingMakindye Salaama2 P RMM 5.5 Opening Drains & Grass cuttingMakindye Seventh Street P RMM 1.8 Opening Drains & Grass cuttingMakindye St. Barnabas P RMM 0.8 Opening Drains & Grass cuttingMakindye Soweto P RMM 1.3 Opening Drains & Grass cuttingMakindye Tankhill (Mow) P RMM 1.5 Opening Drains & Grass cutting

362 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Makindye Tankhill Close 1 P RMM 0.1 Opening Drains & Grass cuttingMakindye Tankhill Close 2 P RMM 0.1 Opening Drains & Grass cuttingMakindye U.N. Rise P RMM 0.1 Opening Drains & Grass cuttingMakindye Yusuf Matovu P RMM 0.2 Opening Drains & Grass cuttingMakindye Zzimwe P RMM 0.6 Opening Drains & Grass cuttingMakindye Wabigalo P RMM 0.4 Opening Drains & Grass cutting Subtotal 96.5 Opening Drains & Grass cuttingMakindye Abasi Road U RMM 0.2 Opening Drains & Grass cuttingMakindye Apass U RMM 1.0 Opening Drains & Grass cuttingMakindye Audi- Kevina U RMM 0.5 Opening Drains & Grass cuttingMakindye Badongo Road U RMM 0.6 Opening Drains & Grass cuttingMakindye Balo U RMM 0.8 Opening Drains & Grass cuttingMakindye Barracks Drive U RMM 0.4 Opening Drains & Grass cuttingMakindye Bbosa U RMM 0.2 Opening Drains & Grass cuttingMakindye Binaisa U RMM 1.2 Opening Drains & Grass cuttingMakindye Bunga Hill U RMM 0.6 Opening Drains & Grass cuttingMakindye Bishop Kiwanuka U RMM 0.2 Opening Drains & Grass cuttingMakindye Bishop Tuttu U RMM 0.3 Opening Drains & Grass cuttingMakindye Bukasa Close 12 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-1 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-10 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-11 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-13 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-14 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-2 U RMM 0.4 Opening Drains & Grass cuttingMakindye Bukasa Close-3 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-4 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-5 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-6 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-7 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-8 U RMM 0.1 Opening Drains & Grass cuttingMakindye Bukasa Close-9 U RMM 0.0 Opening Drains & Grass cuttingMakindye Bukasa-3 U RMM 0.5 Opening Drains & Grass cuttingMakindye bukasa ring U RMM 2.5 Opening Drains & Grass cuttingMakindye Busabala Close U RMM 0.1 Opening Drains & Grass cuttingMakindye Buziga Hill U RMM 0.7 Opening Drains & Grass cuttingMakindye Buziga Ring U RMM 0.4 Opening Drains & Grass cuttingMakindye Buziga Rise U RMM 0.7 Opening Drains & Grass cuttingMakindye Cape Town Villa Link U RMM 0.9 Opening Drains & Grass cuttingMakindye Church (Kikubamutwe) U RMM 1.2 Opening Drains & Grass cuttingMakindye Church 3-Katuso U RMM 0.4 Opening Drains & Grass cuttingMakindye Community church U RMM 0.2 Opening Drains & Grass cuttingMakindye Devine U RMM 1.5 Opening Drains & Grass cuttingMakindye Didi U RMM 0.2 Opening Drains & Grass cuttingMakindye Dolotia Road U RMM 0.4 Opening Drains & Grass cuttingMakindye Dunstan Snubuga U RMM 1.1 Opening Drains & Grass cuttingMakindye Yusufu Lubwama U RMM 0.5 Opening Drains & Grass cuttingMakindye Gava U RMM 0.6 Opening Drains & Grass cuttingMakindye Ggaba By Pass U RMM 2.3 Opening Drains & Grass cuttingMakindye Ggaba dem U RMM 0.4 Opening Drains & Grass cuttingMakindye Ggaba Ttc U RMM 0.5 Opening Drains & Grass cuttingMakindye Gogonya U RMM 1.0 Opening Drains & Grass cuttingMakindye Hanlon 1 U RMM 1.5 Opening Drains & Grass cuttingMakindye Hanlon Close U RMM 0.1 Opening Drains & Grass cuttingMakindye Harvest Church Road U RMM 0.8 Opening Drains & Grass cuttingMakindye Ibrahim Nkata U RMM 0.4 Opening Drains & Grass cuttingMakindye jjaja Muyiya U RMM 0.4 Opening Drains & Grass cuttingMakindye Jamadah U RMM 0.5 Opening Drains & Grass cuttingMakindye Juko U RMM 1.3 Opening Drains & Grass cutting

363Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Makindye Juko Close U RMM 0.2 Opening Drains & Grass cuttingMakindye Kabalagala lane\acacia U RMM 0.2 Opening Drains & Grass cuttingMakindye Kabale Hill U RMM 0.5 Opening Drains & Grass cuttingMakindye Kabuuma U RMM 0.3 Opening Drains & Grass cuttingMakindye Kabambala U RMM 0.5 Opening Drains & Grass cuttingMakindye Kaggwa Road U RMM 0.4 Opening Drains & Grass cuttingMakindye Kagwa U RMM 0.6 Opening Drains & Grass cuttingMakindye Kalungu 1 U RMM 1.5 Opening Drains & Grass cuttingMakindye Kalungu 2 U RMM 0.9 Opening Drains & Grass cuttingMakindye Kansanga hill rd U RMM 0.1 Opening Drains & Grass cuttingMakindye Kansanga-Kiwafu U RMM 1.2 Opening Drains & Grass cuttingMakindye Kanyonza Close U RMM 0.1 Opening Drains & Grass cuttingMakindye Kasanga Parish Church U RMM 1.0 Opening Drains & Grass cuttingMakindye Kasenyi U RMM 0.5 Opening Drains & Grass cuttingMakindye Kasozi U RMM 0.5 Opening Drains & Grass cuttingMakindye Katabira U RMM 0.5 Opening Drains & Grass cuttingMakindye Katuso Infant School U RMM 0.3 Opening Drains & Grass cuttingMakindye Katuso Rise U RMM 0.6 Opening Drains & Grass cuttingMakindye Kawuku U RMM 1.8 Opening Drains & Grass cuttingMakindye Kayemba U RMM 1.2 Opening Drains & Grass cuttingMakindye KCCA Primary school U RMM 0.8 Opening Drains & Grass cuttingMakindye Kevina U RMM 1.3 Opening Drains & Grass cuttingMakindye Kibazo U RMM 1.5 Opening Drains & Grass cuttingMakindye Kibula Bypass U RMM 0.5 Opening Drains & Grass cuttingMakindye Kibuli Dem school U RMM 0.3 Opening Drains & Grass cuttingMakindye Kijjwa U RMM 0.7 Opening Drains & Grass cuttingMakindye Kiliggwajo U RMM 0.8 Opening Drains & Grass cuttingMakindye Kiggundu U RMM 0.3 Opening Drains & Grass cuttingMakindye Kintu Lane U RMM 0.3 Opening Drains & Grass cuttingMakindye Kirombe U RMM 2.1 Opening Drains & Grass cuttingMakindye Kironde U RMM 1.2 Opening Drains & Grass cuttingMakindye Kiruddu 1 U RMM 0.8 Opening Drains & Grass cuttingMakindye Kiruddu 2 U RMM 0.2 Opening Drains & Grass cuttingMakindye Kisugu 1 U RMM 0.7 Opening Drains & Grass cuttingMakindye Kivumbi Road U RMM 0.4 Opening Drains & Grass cuttingMakindye Kiwafu U RMM 2.3 Opening Drains & Grass cuttingMakindye Kiwempe stage U RMM 0.8 Opening Drains & Grass cuttingMakindye kizungu U RMM 0.5 Opening Drains & Grass cuttingMakindye Konge U RMM 1.2 Opening Drains & Grass cuttingMakindye Kyeyune U RMM 0.2 Opening Drains & Grass cuttingMakindye Kyamula Road U RMM 0.5 Opening Drains & Grass cuttingMakindye Kulekana- mirembe U RMM 2.1 Opening Drains & Grass cuttingMakindye Liberty Road U RMM 0.2 Opening Drains & Grass cuttingMakindye Lubega (Gogonya) U RMM 1.0 Opening Drains & Grass cuttingMakindye Lubuga Ring U RMM 1.4 Opening Drains & Grass cuttingMakindye Lukwamuzi U RMM 0.8 Opening Drains & Grass cuttingMakindye Magoba lane U RMM 0.2 Opening Drains & Grass cuttingMakindye Makindye Hill U RMM 0.5 Opening Drains & Grass cuttingMakindye Mayanja drain U RMM 0.2 Opening Drains & Grass cuttingMakindye Maso Ana Close U RMM 0.3 Opening Drains & Grass cuttingMakindye Matovu U RMM 0.8 Opening Drains & Grass cuttingMakindye Matovu Road U RMM 0.6 Opening Drains & Grass cuttingMakindye Mbowa Road U RMM 0.4 Opening Drains & Grass cuttingMakindye Misusera Kabugo U RMM 0.5 Opening Drains & Grass cuttingMakindye Molly & Paul U RMM 0.3 Opening Drains & Grass cuttingMakindye Mponye U RMM 0.3 Opening Drains & Grass cuttingMakindye Mrs M.Kibuuka U RMM 0.4 Opening Drains & Grass cuttingMakindye Mukasa U RMM 3.1 Opening Drains & Grass cuttingMakindye Mukasa Close1 U RMM 0.2 Opening Drains & Grass cutting

364 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Makindye Mukasa Close2 U RMM 0.1 Opening Drains & Grass cuttingMakindye Musoke U RMM 0.3 Opening Drains & Grass cuttingMakindye Muwanga3 U RMM 2.0 Opening Drains & Grass cuttingMakindye Muwuliriza 3 U RMM 0.1 Opening Drains & Grass cuttingMakindye Muwuliriza 4 U RMM 0.03 Opening Drains & Grass cuttingMakindye Muwuliriza 5 U RMM 0.03 Opening Drains & Grass cuttingMakindye Muwuliriza 6 U RMM 0.03 Opening Drains & Grass cuttingMakindye Muwuliriza 7 U RMM 0.1 Opening Drains & Grass cuttingMakindye Muwuliriza 8 U RMM 0.1 Opening Drains & Grass cuttingMakindye Muwuliriza 2 U RMM 0.2 Opening Drains & Grass cuttingMakindye Muyenga X 2 U RMM 0.3 Opening Drains & Grass cuttingMakindye Mwamula Road U RMM 1.2 Opening Drains & Grass cuttingMakindye Mwanga 2 U RMM 0.2 Opening Drains & Grass cuttingMakindye Nabanjja U RMM 1.2 Opening Drains & Grass cuttingMakindye Nabutiti U RMM 0.7 Opening Drains & Grass cuttingMakindye Nabikonde U RMM 0.7 Opening Drains & Grass cuttingMakindye Nakumusana U RMM 0.3 Opening Drains & Grass cuttingMakindye Nalubaale U RMM 0.3 Opening Drains & Grass cuttingMakindye Nambi U RMM 0.5 Opening Drains & Grass cuttingMakindye Namuwongo 10Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 11Th U RMM 0.0 Opening Drains & Grass cuttingMakindye Namuwongo 12Th U RMM 0.0 Opening Drains & Grass cuttingMakindye Namuwongo 13Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 14Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 15Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 16Th U RMM 0.03 Opening Drains & Grass cuttingMakindye Namuwongo 17Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 1St U RMM 0.04 Opening Drains & Grass cuttingMakindye Namuwongo 2Nd U RMM 0.04 Opening Drains & Grass cuttingMakindye Namuwongo 3Rd U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 4Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 5Th U RMM 0.4 Opening Drains & Grass cuttingMakindye Namuwongo 6Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 7Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Namuwongo 8Th U RMM 0.4 Opening Drains & Grass cuttingMakindye Namuwongo 9Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Nanganda/ Kasanga U RMM 0.7 Opening Drains & Grass cuttingMakindye Nantongo U RMM 0.8 Opening Drains & Grass cuttingMakindye Nasta U RMM 0.4 Opening Drains & Grass cuttingMakindye Nsambu U RMM 0.6 Opening Drains & Grass cuttingMakindye Nsambya -Katwe U RMM 0.6 Opening Drains & Grass cuttingMakindye Nsambya sss U RMM 0.4 Opening Drains & Grass cuttingMakindye Nsambya police Road U RMM 1.0 Opening Drains & Grass cuttingMakindye Ntwatwa Road U RMM 0.3 Opening Drains & Grass cuttingMakindye Nyangweso U RMM 0.4 Opening Drains & Grass cuttingMakindye Nyago U RMM 0.1 Opening Drains & Grass cuttingMakindye O.K Muwanga U RMM 0.8 Opening Drains & Grass cuttingMakindye Others U RMM 3.0 Opening Drains & Grass cuttingMakindye Pepsi Cola Qrtr U RMM 0.4 Opening Drains & Grass cuttingMakindye Prince Badru Kakungulu U RMM 1.0 Opening Drains & Grass cuttingMakindye Radio station U RMM 0.7 Opening Drains & Grass cuttingMakindye Ragaa Dee U RMM 0.5 Opening Drains & Grass cuttingMakindye Ring U RMM 1.2 Opening Drains & Grass cuttingMakindye Road Mx1 U RMM 0.8 Opening Drains & Grass cuttingMakindye Salaama1 U RMM 3.7 Opening Drains & Grass cuttingMakindye Sanyu U RMM 1.3 Opening Drains & Grass cuttingMakindye School U RMM 0.4 Opening Drains & Grass cuttingMakindye Semakula U RMM 0.3 Opening Drains & Grass cuttingMakindye Ssempa U RMM 0.4 Opening Drains & Grass cutting

365Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Makindye Ssimbwa U RMM 0.6 Opening Drains & Grass cuttingMakindye Serwaniko U RMM 0.4 Opening Drains & Grass cuttingMakindye Soweto U RMM 1.3 Opening Drains & Grass cuttingMakindye Soya Factory U RMM 0.6 Opening Drains & Grass cuttingMakindye Ssajabi Road U RMM 0.3 Opening Drains & Grass cuttingMakindye Ssekamatte Rd U RMM 0.4 Opening Drains & Grass cuttingMakindye Ssendisa -Makanga U RMM 1.3 Opening Drains & Grass cuttingMakindye Ssenyonga U RMM 1.5 Opening Drains & Grass cuttingMakindye Sseriso Road U RMM 0.7 Opening Drains & Grass cuttingMakindye Ssessanga U RMM 2.1 Opening Drains & Grass cuttingMakindye St.Agnes U RMM 0.6 Opening Drains & Grass cuttingMakindye St. Mbuga U RMM 0.8 Opening Drains & Grass cuttingMakindye St.Pocoano U RMM 1.7 Opening Drains & Grass cuttingMakindye Stanley Sekindi U RMM 0.1 Opening Drains & Grass cuttingMakindye Speaker U RMM 0.5 Opening Drains & Grass cuttingMakindye Tamusuza U RMM 0.5 Opening Drains & Grass cuttingMakindye Tankhill Close 3 U RMM 0.1 Opening Drains & Grass cuttingMakindye Teletubies Road U RMM 0.3 Opening Drains & Grass cuttingMakindye Tyaba Lane U RMM 0.2 Opening Drains & Grass cuttingMakindye U.D.C. Close U RMM 0.2 Opening Drains & Grass cuttingMakindye Ucb Rise U RMM 0.5 Opening Drains & Grass cuttingMakindye Upper Kisugu Close U RMM 0.2 Opening Drains & Grass cuttingMakindye Wabigalo 1St U RMM 0.4 Opening Drains & Grass cuttingMakindye Wabigalo 2Nd U RMM 0.1 Opening Drains & Grass cuttingMakindye Wabigalo 3Rd U RMM 0.1 Opening Drains & Grass cuttingMakindye Wabigalo 4Th U RMM 0.1 Opening Drains & Grass cuttingMakindye Wheeling U RMM 0.5 Opening Drains & Grass cuttingMakindye West Buziga U RMM 0.8 Opening Drains & Grass cuttingMakindye Zzinabala U RMM 0.5 Opening Drains & Grass cuttingMakindye Zikusooka Road U RMM 0.6 Opening Drains & Grass cutting Subtotal 2 116.6 Total 213.1Nakawa Access 2 P RMM 0.1 Opening Drains & Grass cuttingNakawa Army P RMM 0.4 Opening Drains & Grass cuttingNakawa Balikuddembe P RMM 0.3 Opening Drains & Grass cuttingNakawa Banda Close P RMM 0.6 Opening Drains & Grass cuttingNakawa Bandali Rise P RMM 0.7 Opening Drains & Grass cuttingNakawa Bazarabusa P RMM 1.5 Opening Drains & Grass cuttingNakawa Bazarabusa Drive P RMM 0.5 Opening Drains & Grass cuttingNakawa Bbina P RMM 0.5 Opening Drains & Grass cuttingNakawa Boazman P RMM 0.7 Opening Drains & Grass cuttingNakawa Bugolobi Street P RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto Crescent P RMM 1.1 Opening Drains & Grass cuttingNakawa Bukoto Kyebando P RMM 1.0 Opening Drains & Grass cuttingNakawa Bukoto Muslim School P RMM 0.3 Opening Drains & Grass cuttingNakawa Bunyonyi P RMM 0.7 Opening Drains & Grass cuttingNakawa Butabika P RMM 1.4 Opening Drains & Grass cuttingNakawa Butabika P RMM 1.1 Opening Drains & Grass cuttingNakawa Charles Lwanga P RMM 0.2 Opening Drains & Grass cuttingNakawa Chorley crescent P RMM 2.2 Opening Drains & Grass cuttingNakawa Chwa 2 P RMM 2.9 Opening Drains & Grass cuttingNakawa Circular P RMM 0.1 Opening Drains & Grass cuttingNakawa Circular Drive P RMM 0.4 Opening Drains & Grass cuttingNakawa College Avenue P RMM 0.2 Opening Drains & Grass cuttingNakawa Commercial P RMM 0.6 Opening Drains & Grass cuttingNakawa Corporation P RMM 0.3 Opening Drains & Grass cuttingNakawa Dr. Lukwiya P RMM 0.2 Opening Drains & Grass cuttingNakawa Elephant road P RMM 0.3 Opening Drains & Grass cuttingNakawa Edinburgh Avenue P RMM 0.3 Opening Drains & Grass cutting

366 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Estate P RMM 0.8 Opening Drains & Grass cuttingNakawa Factory P RMM 1.3 Opening Drains & Grass cuttingNakawa Faraday P RMM 0.2 Opening Drains & Grass cuttingNakawa Friendship P RMM 0.4 Opening Drains & Grass cuttingNakawa Gamyuka P RMM 0.2 Opening Drains & Grass cuttingNakawa Gluecester Avenue P RMM 0.5 Opening Drains & Grass cuttingNakawa Hanlon 2 P RMM 0.4 Opening Drains & Grass cuttingNakawa Hill Rise P RMM 0.2 Opening Drains & Grass cuttingNakawa Ismail P RMM 1.7 Opening Drains & Grass cuttingNakawa Itek P RMM 0.7 Opening Drains & Grass cuttingNakawa Jinja 2 P RMM 1.1 Opening Drains & Grass cuttingNakawa Kabalega P RMM 0.9 Opening Drains & Grass cuttingNakawa Kabalega Drive P RMM 0.6 Opening Drains & Grass cuttingNakawa Kalitunsi P RMM 0.2 Opening Drains & Grass cuttingNakawa Katale P RMM 0.7 Opening Drains & Grass cuttingNakawa Katalima 1 P RMM 1.0 Opening Drains & Grass cuttingNakawa Katalima 2 P RMM 0.6 Opening Drains & Grass cuttingNakawa Kataza road Kiswa P RMM 0.4 Opening Drains & Grass cuttingNakawa Katalima Bend 1 P RMM 0.2 Opening Drains & Grass cuttingNakawa Katalima Bend 2 P RMM 0.2 Opening Drains & Grass cuttingNakawa Katalima Close P RMM 0.1 Opening Drains & Grass cuttingNakawa Katalima Crescent 1 P RMM 0.9 Opening Drains & Grass cuttingNakawa Katego 2 P RMM 1.3 Opening Drains & Grass cuttingNakawa Kibira P RMM 0.7 Opening Drains & Grass cuttingNakawa Kimera Place P RMM 0.2 Opening Drains & Grass cuttingNakawa Kinawataka P RMM 1.6 Opening Drains & Grass cuttingNakawa Kira 3 P RMM 2.6 Opening Drains & Grass cuttingNakawa Kireka P RMM 1.8 Opening Drains & Grass cuttingNakawa Kisaasi 1 P RMM 2.0 Opening Drains & Grass cuttingNakawa Kisaasi 2 P RMM 4.5 Opening Drains & Grass cuttingNakawa Kisaasi-Kyanja P RMM 3.0 Opening Drains & Grass cuttingNakawa Kiswa P RMM 0.1 Opening Drains & Grass cuttingNakawa Kiwatule P RMM 1.8 Opening Drains & Grass cuttingNakawa Kiwatule- naalya link P RMM 0.7 Opening Drains & Grass cuttingNakawa Kome Crescent P RMM 0.6 Opening Drains & Grass cuttingNakawa Kome Drive P RMM 0.3 Opening Drains & Grass cuttingNakawa Kulubya Road P RMM 0.7 Opening Drains & Grass cuttingNakawa Kyambogo P RMM 1.5 Opening Drains & Grass cuttingNakawa Kyambogo university road P RMM 0.8 Opening Drains & Grass cuttingNakawa Kyanja P RMM 0.6 Opening Drains & Grass cuttingNakawa Lake drive P RMM 1.5 Opening Drains & Grass cuttingNakawa Lake View P RMM 0.2 Opening Drains & Grass cuttingNakawa Lower Biina Church P RMM 0.9 Opening Drains & Grass cuttingNakawa Lower Naguru East1 P RMM 0.8 Opening Drains & Grass cuttingNakawa Lower Naguru East2 P RMM 0.2 Opening Drains & Grass cuttingNakawa Luthuli Avenue P RMM 1.5 Opening Drains & Grass cuttingNakawa Luthuli Close P RMM 0.6 Opening Drains & Grass cuttingNakawa Luthuli Lane P RMM 0.4 Opening Drains & Grass cuttingNakawa Luthuli Rise P RMM 1.5 Opening Drains & Grass cuttingNakawa Martyrs Way1 P RMM 1.0 Opening Drains & Grass cuttingNakawa Martyrs Way2 P RMM 0.6 Opening Drains & Grass cuttingNakawa Mumia P RMM 0.3 Opening Drains & Grass cuttingNakawa Mutesa 2 1 P RMM 0.7 Opening Drains & Grass cuttingNakawa Mutungo P RMM 2.7 Opening Drains & Grass cuttingNakawa Mutungo Hill 1 P RMM 0.9 Opening Drains & Grass cuttingNakawa Mutungo Hill 3 P RMM 0.8 Opening Drains & Grass cuttingNakawa Mutungo Ring P RMM 2.3 Opening Drains & Grass cuttingNakawa Muvule Lane P RMM 0.2 Opening Drains & Grass cuttingNakawa Muwafu 3 P RMM 0.3 Opening Drains & Grass cutting

367Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Muwanga 1 P RMM 0.2 Opening Drains & Grass cuttingNakawa Nabbumba road P RMM 0.4 Opening Drains & Grass cuttingNakawa Nabisunsa Girls P RMM 0.4 Opening Drains & Grass cuttingNakawa Naguru Road P RMM 1.4 Opening Drains & Grass cuttingNakawa Naguru Avenue P RMM 0.8 Opening Drains & Grass cuttingNakawa Naguru Drive 1 P RMM 0.9 Opening Drains & Grass cuttingNakawa Naguru East P RMM 1.7 Opening Drains & Grass cuttingNakawa Naguru summit view P RMM 0.7 Opening Drains & Grass cuttingNakawa Naguru Vale P RMM 0.4 Opening Drains & Grass cuttingNakawa Naguru Vale Close P RMM 0.2 Opening Drains & Grass cuttingNakawa Naguru Valley 1 P RMM 0.8 Opening Drains & Grass cuttingNakawa Nakawa-Jinja P RMM 0.4 Opening Drains & Grass cuttingNakawa Nakawa-Jinja P RMM 0.2 Opening Drains & Grass cutting

Nakawa Nakawa market road( coronation road) P RMM 0.2 Opening Drains & Grass cutting

Nakawa Neptune Avenue P RMM 0.3 Opening Drains & Grass cuttingNakawa Nsimbiziwome P RMM 0.7 Opening Drains & Grass cuttingNakawa Ntinda 1 P RMM 3.0 Opening Drains & Grass cuttingNakawa Ntinda X2 P RMM 0.2 Opening Drains & Grass cuttingNakawa Ntinda 2 P RMM 0.3 Opening Drains & Grass cuttingNakawa Ntinda Avenue P RMM 0.6 Opening Drains & Grass cuttingNakawa Ntinda Rise P RMM 0.2 Opening Drains & Grass cuttingNakawa Ntinda View Crescent P RMM 0.7 Opening Drains & Grass cuttingNakawa Off Our Lady Church P RMM 0.1 Opening Drains & Grass cuttingNakawa Ofwono Close P RMM 0.1 Opening Drains & Grass cuttingNakawa Old kiira rd P RMM 0.8 Opening Drains & Grass cuttingNakawa Our Lady Church P RMM 0.1 Opening Drains & Grass cuttingNakawa Port Bell 1(spring road) P RMM 2.3 Opening Drains & Grass cuttingNakawa Old Port Bell2 P RMM 4.2 Opening Drains & Grass cuttingNakawa Princess Anne Drive P RMM 1.1 Opening Drains & Grass cuttingNakawa Recreation P RMM 0.4 Opening Drains & Grass cuttingNakawa Republic 2 P RMM 0.2 Opening Drains & Grass cuttingNakawa Sadler Road P RMM 0.5 Opening Drains & Grass cuttingNakawa Salmon Rise P RMM 0.3 Opening Drains & Grass cuttingNakawa Semawata P RMM 1.3 Opening Drains & Grass cuttingNakawa Solent Avenue1 P RMM 0.5 Opening Drains & Grass cuttingNakawa Spring (Ct+Nk) P RMM 2.0 Opening Drains & Grass cuttingNakawa Stretcher P RMM 0.3 Opening Drains & Grass cuttingNakawa Suna 2 P RMM 0.3 Opening Drains & Grass cuttingNakawa Sunderland Av. P RMM 0.3 Opening Drains & Grass cuttingNakawa Suwara P RMM 0.7 Opening Drains & Grass cuttingNakawa Transami Road P RMM 0.3 Opening Drains & Grass cuttingNakawa UCB Road P RMM 1.0 Opening Drains & Grass cuttingNakawa Upper Naguru 1 P RMM 0.4 Opening Drains & Grass cuttingNakawa Upper Naguru East1 P RMM 0.9 Opening Drains & Grass cuttingNakawa Vale Close P RMM 0.3 Opening Drains & Grass cuttingNakawa Valley P RMM 0.3 Opening Drains & Grass cuttingNakawa Valley Drive P RMM 0.7 Opening Drains & Grass cuttingNakawa Wanainchi P RMM 0.7 Opening Drains & Grass cuttingNakawa X46 (Ntinda-Kiwatule Area) P RMM 2.8 Opening Drains & Grass cuttingNakawa Younger Avenue P RMM 0.4 Opening Drains & Grass cuttingNakawa Zebra road P RMM 0.4 Opening Drains & Grass cuttingNakawa Zena P RMM 0.1 Opening Drains & Grass cuttingNakawa zone 14 P RMM 0.3 Opening Drains & Grass cutting Subtotal 112.3Nakawa Abbasi road U RMM 0.5 Opening Drains & Grass cuttingNakawa Airstrip U RMM 0.7 Opening Drains & Grass cuttingNakawa Alice (Kiwatule) U RMM 0.3 Opening Drains & Grass cuttingNakawa Alipa Lane (Mutungo) U RMM 0.1 Opening Drains & Grass cutting

368 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Alipo (Mutungo) U RMM 0.2 Opening Drains & Grass cuttingNakawa Army road U RMM 0.4 Opening Drains & Grass cuttingNakawa Avenue U RMM 0.3 Opening Drains & Grass cuttingNakawa Backledge U RMM 0.1 Opening Drains & Grass cuttingNakawa Balikuddembe U RMM 0.5 Opening Drains & Grass cuttingNakawa Balintuma Central (Kiwatule) U RMM 1.2 Opening Drains & Grass cuttingNakawa Banda central U RMM 1.0 Opening Drains & Grass cuttingNakawa Bandali Close U RMM 0.3 Opening Drains & Grass cuttingNakawa Bbiina A (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Bbossa (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Bikumbi (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Binayomba U RMM 0.5 Opening Drains & Grass cuttingNakawa Bishop Campling U RMM 0.2 Opening Drains & Grass cuttingNakawa Bukoto 1 U RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto 10 U RMM 0.1 Opening Drains & Grass cuttingNakawa Bukoto 11 U RMM 0.5 Opening Drains & Grass cuttingNakawa Bukoto 12 U RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto 13 U RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto 14 U RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto 15 U RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto 16 U RMM 1.1 Opening Drains & Grass cuttingNakawa Bukoto 17 U RMM 1.3 Opening Drains & Grass cuttingNakawa Bukoto 18 U RMM 1.1 Opening Drains & Grass cuttingNakawa Bukoto 19 U RMM 0.4 Opening Drains & Grass cuttingNakawa Bukoto 2 U RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto 20 U RMM 0.2 Opening Drains & Grass cuttingNakawa Bukoto 21 U RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto 22 U RMM 2.3 Opening Drains & Grass cuttingNakawa Bukoto 23 U RMM 1.2 Opening Drains & Grass cuttingNakawa Bukoto 24 U RMM 1.3 Opening Drains & Grass cuttingNakawa Bukoto 3 U RMM 0.4 Opening Drains & Grass cuttingNakawa Bukoto 4 U RMM 0.4 Opening Drains & Grass cuttingNakawa Bukoto 5 U RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto 6 U RMM 0.7 Opening Drains & Grass cuttingNakawa Bukoto 7 RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto 8 U RMM 0.3 Opening Drains & Grass cuttingNakawa Bukoto 9 U RMM 0.5 Opening Drains & Grass cuttingNakawa Bukoto Health centre rd U RMM 0.6 Opening Drains & Grass cuttingNakawa Bukoto Kisaasi U RMM 3.1 Opening Drains & Grass cuttingNakawa Bunyonyi Drive U RMM 0.8 Opening Drains & Grass cuttingNakawa Buvuma U RMM 1.4 Opening Drains & Grass cuttingNakawa Canon (Kiwatule) U RMM 0.4 Opening Drains & Grass cuttingNakawa Church(Banda) U RMM 0.6 Opening Drains & Grass cuttingNakawa Church (Ntinda) U RMM 0.2 Opening Drains & Grass cuttingNakawa Church road kyanja U RMM 0.7 Opening Drains & Grass cuttingNakawa Commercial Road (Ntinda) U RMM 0.4 Opening Drains & Grass cuttingNakawa Commercial Street (Luzira) U RMM 0.4 Opening Drains & Grass cuttingNakawa Coronation U RMM 0.3 Opening Drains & Grass cuttingNakawa Dan bagala U RMM 0.5 Opening Drains & Grass cuttingNakawa Edward (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Factory Close U RMM 1.2 Opening Drains & Grass cuttingNakawa Father Jackson U RMM 0.2 Opening Drains & Grass cuttingNakawa Goli Avenue RMM 0.4 Opening Drains & Grass cuttingNakawa Full Gospel U RMM 0.5 Opening Drains & Grass cuttingNakawa Festo Kiziri U RMM 0.8 Opening Drains & Grass cuttingNakawa Gulf (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Hamu U RMM 0.3 Opening Drains & Grass cuttingNakawa Hancock U RMM 0.3 Opening Drains & Grass cuttingNakawa Off Hancock Road (Eureka Hotel) U RMM 0.6 Opening Drains & Grass cutting

369Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Joe Sentamu (Luzira) U RMM 0.3 Opening Drains & Grass cuttingNakawa Kabalega road U RMM 0.6 Opening Drains & Grass cuttingNakawa Kabalega Close U RMM 0.5 Opening Drains & Grass cuttingNakawa Kadudyu (Kiwatule) RMM 0.2 Opening Drains & Grass cuttingNakawa Kaggo (Mbuya) U RMM 1.0 Opening Drains & Grass cuttingNakawa Kakoma U RMM 0.3 Opening Drains & Grass cuttingNakawa Kakungulu RMM 0.2 Opening Drains & Grass cuttingNakawa Kalema 1 U RMM 0.3 Opening Drains & Grass cuttingNakawa Kalinabiri Road U RMM 0.6 Opening Drains & Grass cuttingNakawa Kalundante U RMM 0.4 Opening Drains & Grass cuttingNakawa Kamanyi road U RMM 0.4 Opening Drains & Grass cuttingNakawa Kamuli link U RMM 0.2 Opening Drains & Grass cuttingNakawa Kasule U RMM 0.6 Opening Drains & Grass cuttingNakawa Katabazi road U RMM 0.2 Opening Drains & Grass cuttingNakawa Katazamiti U RMM 0.7 Opening Drains & Grass cuttingNakawa Katalina U RMM 0.3 Opening Drains & Grass cuttingNakawa Kaweesa (Mutungo) U RMM 0.8 Opening Drains & Grass cuttingNakawa Kayinda (Bukoto) U RMM 0.6 Opening Drains & Grass cuttingNakawa Kazinda(Mutungo) U RMM 1.0 Opening Drains & Grass cuttingNakawa Kesington (Kyanja) U RMM 2.0 Opening Drains & Grass cuttingNakawa Kiduuka U RMM 0.2 Opening Drains & Grass cuttingNakawa Kikaawa U RMM 0.8 Opening Drains & Grass cuttingNakawa Kimera 2 U RMM 1.0 Opening Drains & Grass cuttingNakawa Kintu (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Kira Close U RMM 0.2 Opening Drains & Grass cuttingNakawa Kirabira Lane (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Kiraga U RMM 0.5 Opening Drains & Grass cuttingNakawa Kirumira (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Kisaasi-Ntinda U RMM 0.2 Opening Drains & Grass cuttingNakawa Kisalita (Mutungo) U RMM 1.3 Opening Drains & Grass cuttingNakawa Kisekka (Kyanja) U RMM 0.4 Opening Drains & Grass cuttingNakawa Kitaka (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Kiwalimu U RMM 0.6 Opening Drains & Grass cuttingNakawa Kiwanuka U RMM 3.2 Opening Drains & Grass cuttingNakawa Kiwatule-Banda-Kyambogo U RMM 0.6 Opening Drains & Grass cuttingNakawa Kiziri (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Kulambiro Eriya (Kyanja) U RMM 5.1 Opening Drains & Grass cuttingNakawa Kulambiro Ring U RMM 3.1 Opening Drains & Grass cutting

Nakawa Dr.’s Road (Off Kulambiro Ring Road) U RMM 0.9 Opening Drains & Grass cutting

Nakawa Kungu U RMM 0.1 Opening Drains & Grass cuttingNakawa Kyadondo road U RMM 0.5 Opening Drains & Grass cuttingNakawa Kyalema Road U RMM 0.2 Opening Drains & Grass cuttingNakawa Kyalema Close U RMM 0.3 Opening Drains & Grass cuttingNakawa Kyambogo View U RMM 0.9 Opening Drains & Grass cuttingNakawa kyambogo drive U RMM 1.0 Opening Drains & Grass cuttingNakawa Kyanja Hill X35 U RMM 1.2 Opening Drains & Grass cuttingNakawa Kyanja School U RMM 1.7 Opening Drains & Grass cuttingNakawa Kyanja X36 U RMM 2.4 Opening Drains & Grass cuttingNakawa Kyanja X37 U RMM 1.5 Opening Drains & Grass cuttingNakawa Kyanja farm rd U RMM 0.6 Opening Drains & Grass cuttingNakawa Lance road U RMM 0.5 Opening Drains & Grass cuttingNakawa Lake Drive U RMM 0.7 Opening Drains & Grass cuttingNakawa LakeSide U RMM 0.4 Opening Drains & Grass cuttingNakawa Lugumba U RMM 0.5 Opening Drains & Grass cuttingNakawa Mackay Road U RMM 0.6 Opening Drains & Grass cuttingNakawa Magambo road U RMM 0.6 Opening Drains & Grass cuttingNakawa Malt Street U RMM 0.3 Opening Drains & Grass cuttingNakawa Martyrs U RMM 0.2 Opening Drains & Grass cutting

370 Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Mayindo (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Mbarara Lane U RMM 0.7 Opening Drains & Grass cuttingNakawa Mbuya Hill U RMM 0.4 Opening Drains & Grass cuttingNakawa Meera road U RMM 0.6 Opening Drains & Grass cuttingNakawa Meeting Point road U RMM 0.2 Opening Drains & Grass cuttingNakawa Minister’s Village Hotel (Ntinda) U RMM 0.5 Opening Drains & Grass cuttingNakawa Moyo close U RMM 0.4 Opening Drains & Grass cuttingNakawa Mirambo (Mutungo) U RMM 0.1 Opening Drains & Grass cuttingNakawa Mudeka 2 U RMM 0.2 Opening Drains & Grass cuttingNakawa Mugavu U RMM 0.3 Opening Drains & Grass cuttingNakawa Mugulusi U RMM 0.5 Opening Drains & Grass cuttingNakawa Mukabya road U RMM 0.7 Opening Drains & Grass cuttingNakawa Mukasa (Mutungo) U RMM 0.4 Opening Drains & Grass cuttingNakawa Mukiibi (Mutungo) U RMM 0.9 Opening Drains & Grass cuttingNakawa Mumia U RMM 0.4 Opening Drains & Grass cuttingNakawa Murchison Bay U RMM 0.4 Opening Drains & Grass cuttingNakawa Mutungo Hill Drive (Mutungo) U RMM 1.5 Opening Drains & Grass cuttingNakawa Mutungo Hill Close U RMM 1.2 Opening Drains & Grass cuttingNakawa Mutungo Tank U RMM 0.4 Opening Drains & Grass cuttingNakawa Muwafu Curve U RMM 0.3 Opening Drains & Grass cuttingNakawa Muwasi U RMM 0.2 Opening Drains & Grass cuttingNakawa Naabe Road U RMM 0.1 Opening Drains & Grass cuttingNakawa Nabikolo Lane (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Nabiswa (Kiwatule) U RMM 1.8 Opening Drains & Grass cuttingNakawa Naguru Drive 2 U RMM 1.7 Opening Drains & Grass cuttingNakawa Naguru East U RMM 0.1 Opening Drains & Grass cuttingNakawa Naguru Hill (Naguru) U RMM 0.9 Opening Drains & Grass cuttingNakawa Naguru Summit View U RMM 0.1 Opening Drains & Grass cuttingNakawa Nakawa 3 U RMM 0.3 Opening Drains & Grass cuttingNakawa Nakawa 2 U RMM 0.2 Opening Drains & Grass cuttingNakawa Nakawa 4 U RMM 0.2 Opening Drains & Grass cuttingNakawa Nakawa 5 U RMM 0.2 Opening Drains & Grass cuttingNakawa Nakawa 7 U RMM 0.2 Opening Drains & Grass cuttingNakawa Nakawa 8 U RMM 0.4 Opening Drains & Grass cuttingNakawa Nakawa 9 U RMM 0.4 Opening Drains & Grass cuttingNakawa Nakawa Crescent U RMM 1.0 Opening Drains & Grass cuttingNakawa Namuli (Bukoto) U RMM 0.3 Opening Drains & Grass cuttingNakawa Namugera road U RMM 0.3 Opening Drains & Grass cuttingNakawa Ndimuloodi (Mutungo) U RMM 0.2 Opening Drains & Grass cuttingNakawa Noah (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Ntensibe (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa NWSC Road U RMM 0.4 Opening Drains & Grass cuttingNakawa Nyonyintono U RMM 0.5 Opening Drains & Grass cuttingNakawa Nvubya Road U RMM 0.5 Opening Drains & Grass cuttingNakawa Off Bukoto - Kisaasi U RMM 0.5 Opening Drains & Grass cuttingNakawa Offwono U RMM 0.1 Opening Drains & Grass cuttingNakawa Odong road U RMM 0.5 Opening Drains & Grass cuttingNakawa Off Ntinda U RMM 0.2 Opening Drains & Grass cuttingNakawa Papaya rise U RMM 0.4 Opening Drains & Grass cuttingNakawa Okello (Mutungo) U RMM 3.0 Opening Drains & Grass cuttingNakawa Platinum U RMM 0.6 Opening Drains & Grass cuttingNakawa Radio Maria U RMM 2.1 Opening Drains & Grass cuttingNakawa Robert Mugabe U RMM 2.1 Opening Drains & Grass cuttingNakawa Sadler lane U RMM 0.2 Opening Drains & Grass cuttingNakawa Saddler Way U RMM 0.3 Opening Drains & Grass cuttingNakawa Saidi (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Salim Bay U RMM 0.1 Opening Drains & Grass cuttingNakawa Sanyu (Butabika) U RMM 0.3 Opening Drains & Grass cuttingNakawa Silvano (Mutungo) U RMM 0.3 Opening Drains & Grass cutting

371Annex 15: KCCA Road Network Maintenance in FY 2015/16

KCCA ROADS NETWORK - ROADS MAINTAINED IN FY 2015/16

KCCA Division Road / Structure Name Surface

Type (P/UP)

Scope of Works: PM; RMM;

RMeM

Achieved length (KM)

Implemented Works

Nakawa Simba (Kiwatule) U RMM 0.5 Opening Drains & Grass cuttingNakawa Solent Avenue2 U RMM 0.2 Opening Drains & Grass cuttingNakawa Ssebowa rd U RMM 1.1 Opening Drains & Grass cuttingNakawa Ssekabira U RMM 0.3 Opening Drains & Grass cuttingNakawa Ssekitooleko U RMM 0.7 Opening Drains & Grass cuttingNakawa Ssemuwemba (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Ssentamu (Luzira) U RMM 0.7 Opening Drains & Grass cuttingNakawa Ssendawula road U RMM 0.8 Opening Drains & Grass cuttingNakawa Ssepiriya Mukasa (Luzira) U RMM 0.5 Opening Drains & Grass cuttingNakawa Serunjogi Kyanja U RMM 0.4 Opening Drains & Grass cuttingNakawa Ssewanyana (Mutungo) U RMM 0.2 Opening Drains & Grass cuttingNakawa Summary (Mutungo) U RMM 0.3 Opening Drains & Grass cuttingNakawa Suna 1 U RMM 0.7 Opening Drains & Grass cuttingNakawa Tofa (Mutungo) U RMM 0.5 Opening Drains & Grass cuttingNakawa Tucker U RMM 1.4 Opening Drains & Grass cuttingNakawa Tucker Crescent U RMM 1.2 Opening Drains & Grass cuttingNakawa UCB Charity (Bukoto) U RMM 0.3 Opening Drains & Grass cuttingNakawa UCB Nantale U RMM 0.5 Opening Drains & Grass cuttingNakawa Upper Naguru 2 U RMM 0.3 Opening Drains & Grass cuttingNakawa Upper Naguru East2 U RMM 0.2 Opening Drains & Grass cuttingNakawa Valley Curve (Ntinda) U RMM 1.9 Opening Drains & Grass cuttingNakawa Valley road U RMM 1.0 Opening Drains & Grass cuttingNakawa Veronica (Kiwatule) U RMM 0.3 Opening Drains & Grass cuttingNakawa Walusimbi Road U RMM 0.3 Opening Drains & Grass cuttingNakawa Wamala Road U RMM 0.7 Opening Drains & Grass cuttingNakawa X42(Ntinda-Kigowa Area) U RMM 1.2 Opening Drains & Grass cuttingNakawa X43 (Ntinda-Kigowa Area) U RMM 0.1 Opening Drains & Grass cuttingNakawa X44 (Ntinda-Kigowa Area) U RMM 0.5 Opening Drains & Grass cuttingNakawa X45 (Ntinda Kinawataka Area) U RMM 1.2 Opening Drains & Grass cuttingNakawa Yokana U RMM 0.1 Opening Drains & Grass cutting Subtotal 2 132.1

Total 244.4 Grand Total 733.3

372 Annex 16: Detailed Auditor General’s Report for FY 2015/16

1Annex 16: Detailed Auditor General’s Report for FY 2015/16

Prudence - Transperancy - Integrity - Value

Annex 16: Detailed Auditor General’s

Report for FY 2015/16

THE UGANDA ROAD FUND

FINANCIAL STATEMENTSFOR THE YEAR ENDED

30 JUNE 2016

2 Annex 15: KCCA Road Network Maintenance in FY 2015/16

THE UGANDA ROAD FUND

FINANCIAL STATEMENTS

FOR THE FINANCIAL YEAR ENDED 30 JUNE 2016

CONTENTS Page

Abbreviations............................................................................................................................... 1

Institution Information............................................................................................................... 2

Fund Management Boards Report.............................................................................................. 3

Statement of the Fund Management Boards Responsibilities ................................................. 4

Report of the Auditor General .................................................................................................... 6

Financial Statements ..................................................................................................................

Statement of Support Revenue and Expenses ........................................................................... 7

Statement of Financial position ................................................................................................ 8

Statement of change in Fund Balances ...................................................................................... 9

Statement of Cash Flow ............................................................................................................. 10

Notes of Financial Statement .................................................................................................... 11

3Annex 15: KCCA Road Network Maintenance in FY 2015/16

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE

UGANDA ROAD FUND FOR THE YEAR ENDED 30TH JUNE, 2016 THE RT. HON. SPEAKER OF PARLIAMENT

I have audited the financial statements of the Uganda Road Fund for the year ended 30th June 2016. These financial statements comprise of the statement of financial position, statement of financial performance, statement of changes in equity, cash flow statement together with other accompanying statements, notes and accounting policies.

Management Responsibility

Under Article 164 of the Constitution of the Republic of Uganda, 1995 (Amended) and Section 45 of the Public Finance Management Act, 2015 the Accounting Officer is accountable to Parliament for the funds and resources of the Uganda Road Fund. The Accounting Officer is also responsible for the preparation of financial statements in accordance with the requirements of the Public Finance Management Act, 2015, the Financial Reporting Guide, 2008 and for such internal controls as management determines is necessary to enable the preparation of financial statements that are free from material misstatements, whether due to fraud or error.

Auditor’s Responsibility

My responsibility as required by Article 163 of the Constitution of the Republic of Uganda, 1995 (as amended) and Sections 13 and 19 of the National Audit Act, 2008 is to audit and express an opinion on these statements based on my audit. I conducted the audit in accordance with International Standards on Auditing. Those standards require that I comply with the ethical requirements, plan and perform the audit to obtain reasonable assurance whether the financial statements are free from material misstatement.

An audit involves performing audit procedures to obtain evidence about the amounts and disclosures in the financial statements as well as evidence supporting compliance with relevant laws and regulations. The procedures selected depend on the Auditor’s judgment including the assessment of risks of material misstatement of financial statements whether due to fraud or error. In making those risk assessments, the Auditor considers internal control relevant to the entity’s preparation and fair presentation of financial statements in order to design audit procedures that are appropriate in the circumstances but not for purposes of expressing an opinion on the effectiveness of the entity’s -internal control. An audit also includes evaluating the appropriateness

of accounting policies used and the reasonableness of accounting estimates made by management as well as evaluating the overall presentation of the financial statements. I believe that the audit evidence I have obtained is sufficient and appropriate to provide a basis for opinion.

Part “A” of this report sets out my opinion on the financial statements. Part B which forms an integral part of this report presents in detail all the significant audit findings made during the audit which have been brought to the attention of management and will form part of my Annual Report to Parliament.

PART “A”

Opinion

In my opinion, the financial statements of the Uganda Road Fund for the year ended 30th June 2016 are prepared, in all material respects in accordance with Section 51 of the Public Finance Management Act, 2015, and the Financial Reporting Guide, 2008.

Other Matters

Without qualifying my opinion, I consider it necessary to communicate the following matter other than those that are presented in the financial statements.

Non-collection of Designated Funds

URF was not collecting road user charges contrary to section 21 of the Uganda Road Fund Act, 2008 that mandates the Fund to collect them as one of the sources of funding. It was however noted that this was inconsistent with section 14 of the Uganda Revenue Authority (URA) Act that mandates URA to collect all Government revenues.

Non-collection of this revenue has constrained URF from implementing, its mandate as manifested by the road maintenance backlog of 107,109 Km with an annual maintenance requirement estimated at US $ 637.7m,

John F.S. Muwanga AUDITOR GENERALKAMPALA 12th December, 2016

4 Annex 15: KCCA Road Network Maintenance in FY 2015/16

PART “B”

DETAILED REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ROAD FUND FOR THE YEAR ENDED 30TH JUNE, 2016

This Section outlines the detailed audit findings, management responses and my recommendations in respect thereof. 1.0 INTRODUCTION Article 163 (3) of the Constitution of the Republic of Uganda, 1995 (as amended) requires me to audit and report on the public accounts of Uganda and all public offices including the courts, the central and local government administrations, universities, and public institutions of the like nature and any public corporation or other bodies or organizations established by an Act of Parliament. Accordingly, I carried out the audit of the Uganda Road Fund to enable me report to Parliament. 2.0 BACKGROUND INFORMATION The Uganda Road Fund head office is located on 5th Floor, Twed Towers Plot 10 Kafu Road, Nakasero, Kampala. The Fund is a statutory body that was established by the Uganda Road Fund, Act 2008. The objective of the Fund is to facilitate the delivery of road maintenance services and to create an environment that is conducive to the efficient and effective maintenance of public roads. 3.0 ENTITY FINANCING The Uganda Road Fund was financed by Government grants of UGX.357,589278236 and revenue generated from operations of UGX.35,700,000, making a total operating revenue for the year of UGX.357,624,978,236 which constituted 86% of its total approved budget estimates for the year of UGX.417,930,492,052. 4.0 MANDATE AND OBJECTIVES OF THE URF The Uganda Road Fund was established by the Uganda Road Fund, Act 2008, with the objective of facilitating the delivery of road maintenance services and to create an environment that is conducive to the efficient and effective maintenance of public roads.The key functions of the Fund include:- • Funding routine and periodic maintenance

of public roads• Ensuring that public roads are maintained at

all times• Advising ministers on the preparation and

efficient and effective URF

5.0 AUDIT PROCEDURES The audit was carried out in accordance with International Standards on Auditing and accordingly included a review of the accounting records and agreed procedures as was considered necessary. The audit was carried out with regard to the following objectives:-The financial statements have been prepared in accordance with consistently applied Accounting Policies and fairly present the revenues and expenditures for the period and of the financial position as at the end of the period.All URF funds were utilized with due attention to economy and efficiency and only for the purposes for which the funds were provided.Goods and services financed have been procured in accordance with the Government of Uganda procurement regulations.To evaluate and obtain a sufficient understanding of the internal control structure of the URF, assess control risk and identify reportable conditions, including material internal control weaknessesThe URF Management was in compliance with the Government of Uganda financial regulations.All necessary supporting documents, records and accounts have been kept in respect of all URF activities, and are in agreement with the financial statements presented. 6.0 PROCEDURES PERFORMED The following audit procedures were undertaken:-Revenue Obtained all schedules of all revenues collected and reconciled the amounts to the URF cashbooks on the IFMS and bank statements. Expenditure The URF payments vouchers were examined for proper authorization, eligibility and budgetary provision, accountability and support documentation.Internal Control System Reviewed the internal control system and its operations to establish whether sound controls were applied throughout the period. Procurement Reviewed the procurement of goods and services under the URF during the period under review and reconciled with the approved procurement plan.

5Annex 15: KCCA Road Network Maintenance in FY 2015/16

Fixed Assets Management

Reviewed the use and management of the assets of the URF during the period.

Financial Statements

Examined, on a test basis, evidence supporting the amounts and disclosures in the financial statements; assessed the accounting principles used and significant estimates made by

management; as well as evaluating the overall financial statement presentation.

7.0 CATEGORIZATION AND SUMMARY OF FINDINGS

7.1 Categorization of Findings

The following system of profiling of the audit findings is used to better prioritise the implementation of audit recommendations:

No Category Description1 High

significanceHas a significant/material impact, has a high likelihood of reoccurrence, and in the opinion of the Auditor General, it requires urgent remedial action, It is a matter of high risk or high stakeholder interest.

2 Moderate significance

Has a moderate impact, has a likelihood of reoccurrence, and in the opinion of the Auditor General, it requires remedial action. It is a matter of medium risk or moderate stakeholder interest.

3 Low significance

Has a low impact, has a remote likelihood of reoccurrence, and in the opinion of the Auditor General, may not require much attention, though its remediation may add value to the entity. It is a matter of low risk or low stakeholder interest.

7.2 Summary of Findings

No Finding Significance8.1 Non-collection of Designated Funds High8.2 Mischarge of Expenditure UGX.317,430,308 High8.3 Inadequate funding for emergency interventions High8.4 Budget shortfall — UGX.60,341,213,816 Moderate8.5 Outstanding Funds Recoverable from Implementing Agencies UGX 395,233,344 Moderate8.6 Outstanding Commitments — UGX. 206,893,921 Moderate8.7 Delays in implementation of the Project: UGX,99,999,100 Moderate

Board remuneration — UGX.72,000,000 Moderate8.9 Use of Interns to Fill Staffing Gaps Moderate8.10 Failure to Review Accounting Policies and Procedures Manual Moderate8.11 Inconsistency in Quorum of Audit Committee Low8.12 Contract Signing After Expiry of Bid Validity Period UGX.7,300,000 Low

8.0 DETAILED FINDINGS

8.1 Non-collection of designated funds

Audit review of the URF sources of funding revealed that the entity was not collecting road user charges as a source of its financing but was rather dependent on transfers received from the treasury contrary to section 21 of the Uganda Road Fund Act, 2008 that mandates the Fund to collect road user charges as one of the sources of funding. It was also noted on the other hand, that this was inconsistent with section 14 of the Uganda Revenue Authority (URA) Act that mandates URA to collect all Government revenues.

Non collection of this revenue has constrained URF from implementing its mandate as manifested by the road maintenance backlog of 107,020 Km with an annual maintenance need estimated at US $

637.7m. Further, inadequate road maintenance or non-maintenance will lead to loss of the annual investment in roads constructed.

In his response, the Accounting Officer attributed the inability to collect road user charges to the pending amendment of Section 14 of the URA Act given the Solicitor General’s guidance that section 21 (3) of the URF Act could not be lawfully implemented unless section 14 of the URA Act and the first schedule thereto are duly amended. He further explained that they are in liaison with the supervising Ministry for Finance and other stakeholders but efforts had been futile.

I advised the Accounting Officer to continue liaising with the Minister responsible to forge a way forward in harmonizing section 14 of the URA Act which has constrained Uganda Road Fund from implementing its mandate.

6 Annex 16: Detailed Auditor General’s Report for FY 2015/16

8.2 Mischarge of Expenditure

The Parliament of Uganda appropriates funds in accordance with the needs of the country and this appropriation is implemented through the budget in which funds are tagged to particular activities and outputs using account codes and MTEF codes.

A review of the Uganda road Fund expenditures revealed that the entity charged wrong expenditure codes to a tune of UGX. 317,430,308. Mischarges undermine the importance of the budgeting process as well as the intentions of the appropriating authority and the financial statement reporting may be misleading.

Management explained that they undertake activity based budgeting which entails the consolidation of all the expenditure heads under one activity and that during this process all inputted costs are included under the activity.

I advised the Accounting Officer to streamline the budget process to ensure that sufficient funds are allocated to each account and budget controls are fully adhered to such as seeking authority for any reallocations.

8.3 Inadequate funding for emergency interventions

Paragraph 7 (e) of the URF Network management paper analyzing the need for special works budget allocation (special intervention/emergency funding) requires the URF team to be accompanied by the relevant District/Municipality Engineer for the District urban and community access roads (DUCAR) network and some members of District Roads

Committee whilst undertaking verification visits on emergency sites. Further, Paragraph 7 (f) of the same paper requires that all application for emergencies by the districts and urban councils should be preceded by verification visits involving the district roads Committee.

My review of the URF road interventions revealed that the districts’ request for emergency interventions was UGX.19,433,143,955 against a budget of UGX.3,000,000,000, an indication that the budget on the item was inadequate thus leading to the low funding. Further, I established that UGX. 2,045,280,000 was sent to various districts and urban councils as emergency funding for road maintenance, however, the following matters were noted;

• Criteria for the Payments:

It was noted that while there was a set criteria documented to determine the amounts payable to districts and urban councils, this was not followed and thus subjective judgment was used to determine payments leading to districts getting different amounts without clear justification for each release.

• Value for Money element on releases:

It was noted that on average UGX. 30,000,000 was released to various districts and urban councils per quarter as emergency. I was of the view that value for money would be better achieved by concentrating on a few and having substantial roads worked on and completed rather than spreading out which may have little impact.

Inadequate releases for emergency interventions lead to overspreading of the intervention without much impact on road maintenance as some districts needs may be more severe and demanding more resources than others.

In his response, the Accounting Officer explained that during the year, the Fund received 137 requests for emergencies/special interventions and that due to the numerous requests and budgetary constraints they rationalize and allocate “Seed money” to tackle key elements of the emergency and the agencies are advised to budget for the remaining components within their annual budget.

I advised the Accounting Officer to draw the attention of MoFPED to the issue of the funding gap for possible consideration and also consider prioritization of the more severe emergency cases to achieve value for money rather than allocating a uniform amount unilaterally.

8.4 Budget performance shortfall — UGX. 60,341,213,816

A review of the URF budget revealed that out of the approved budget of UGX. 417,930,492,052 for its operations during the financial year 2015/16, they received UGX.357,589,278,236 which resulted into a shortfall of UGX.60,341,213,816 (16%), Further, as a result of the above shortfall some of the planned road works were not undertaken by the end of the year as per details in the table below;

7Annex 16: Detailed Auditor General’s Report for FY 2015/16

S/N Activity Planned Actual Variance/Shortfall1 Mechanized Term maintenance of Road 2,000km 1,224km 776km2 Routine Maintenance of Bridges 350 37 3133 Periodic Maintenance of unpaved roads 2000km 1,645km 355km4 Operation and Maintenance of Ferries 11 9 25 Periodic Maintenance of Urban roads 50km 7.8km 42.2km6 Installation of Culverts —District Rds 5,500 1,559 3,4417 Routine Maintenance of District Rds 25,528km 16,563km 8,965km

Failure to undertake planned road works affects services delivery to the public in the critical area of infrastructure.

In response, the Accounting Officer explained that due to the budgetary constraints, agencies were advised to scale down their planned activities to fit into the available resources.

I advised the Accounting Officer to continuously engage the appropriate authorities for consideration of additional resources.

8.5 Outstanding funds recoverable from implementing agencies

During the year under review, various implementing agencies had outstanding amounts totaling to UGX. 622,665,454 that were to be recovered and refunded to the Uganda Road Fund. The amounts were as a result of funds garnished from court orders and Uganda Revenue Authority, inaccurate measurements, overpayments to contractors, ineligible expenditure and unaccounted for funds among others. These funds have been outstanding for more than one year. It was further observed that recovery of the funds has been delayed. This was a reduction from last year’s amount of UGX. 1,325,063,382 implying UGX. 702,397,928 was recovered during the year.

Management explained that out of the outstanding amount, UGX. 227,432,113 relating to frequent defaulters was referred to the Ministry of Local Government for administrative action and URF had signed a Memorandum of Understanding with the concerned agencies to undertake periodic recoveries regarding the balance of UGX. 395,233,344. They stated that UGX. 114,015,705 had been recovered by end of June, 2016.

I await the outcome of management efforts.

8.6 Outstanding commitments — UGX. 206,893,921

It was noted that UGX.206,893,921 (payables) due to various suppliers remained outstanding at year end contrary to Paragraph 42 (c) of the TAI

Part 1 that provided that no Accounting officer should commit or incur expenditure without the authority of the Accountant General. I also noted that out of the above amount, UGX. 84,949,109 was still outstanding by the time of audit (October 2016) after prioritizing the balance as a first call on the budget of 2016/17 financial year.

Accumulation of creditors affects the cash flow position of suppliers and puts the Fund at the risk of litigation by the suppliers. Further, budgeted activities for the year 2016/17 are affected by the payments as intended outputs cannot be achieved. The Accounting Officer explained that the payables would be settled in the second quarter after resolving account details on IFMS.

I advised the Accounting Officer to ensure that commitment control guidelines are adhered to and supplementary funding is sought to clear the arrears so as to avoid interruptions in the implementation of planned outputs for the current year.

8.7 Delays in project implementation -Detailed engineering design and monitoring of sealing of up to 1.0 Km from gravel to bituminous standard in various Town Councils

URF undertook the above procurement vide reference URF/CONS/14-15/00040/02 for preparation of detailed engineering designs for each of the approved road alignment in seven Town Councils (Lorengechora, Kaabong, Kotido, Butaleja, Mayuge, Manafwa and Serere) including all data collection, field surveys and analysis to cover all aspects of detailed design, Preparation of BOQs based on the approved detailed designs for the upgrading work to suit Force account implementation modality and necessary technical support to the beneficiary agencies during the implementation stage at a cost of UGX.99,999,100.

Review of the project progress revealed that contrary to the special conditions of the contract (GCC 18.1) that required the completion period to be 8.5 calendar months from contract signing date

8 Annex 16: Detailed Auditor General’s Report for FY 2015/16

of 1st July 2015 which would imply completion date of 15th March 2016, the contractor had by the time of this audit (14/7/2016) not completed the project components in Kaabong.

The Accounting Officer confirmed the delays, citing challenges faced by the implementing Town Councils, which included delays in the procurement process, difficulty in accessing construction equipment and unavailability of constructional materials, leading to long haulage distances during project implementation. I advised the Accounting Officer to closely follow up with the consultant to ensure that projects are completed as required.

8.8 Board Remuneration

Public Service Standing Orders bar public officials to concurrently draw two salaries from different government departments. Chapter 3.5 of the URF Administration and Human

Resources Manual provides for nomination of Board members from the public and private sectors by the Minister responsible for roads, with the approval of Cabinet. Further, the schedule 2 of the URF Act requires Board members to sit at least once every three months and thus not as fulltime members.

It was noted that the board was composed of three full time government employees from Ministry of Works, Ministry of Finance and Economic Development and Ministry of Local Government who were earning salaries from their respective Ministries but earned UGX. 72,000,000 in form of monthly retainer during the year. I noted that the Minister appointed members on monthly retainer fee terms instead of sitting allowances on daily rates.

Monthly retainer tantamounts to salary as it is an automatic payment, irrespective of whether or not the board members sit.

In response, the Accounting Officer explained that the payments were in line with Section 8 and 13 of the Uganda Road Fund Act which stipulate the composition and remuneration of the board.

I advised the Accounting Officer to draw the matter to the attention of the Minister and ensure that full time Government employee board members are paid sitting allowances only, to avoid drawing multiple salaries from Government.

8.9 Staffing gaps and use of interns

I noted that out of the thirty four (34) approved

posts for the Road Fund; thirty one (31) positions were filled, leading to a shortfall of 3 vacant posts. The vacant posts were critical to the efficient functioning of the fund and included Head procurement and disposal unit, human resource officer and programme officer- National roads. It was observed that the Fund has enormous workload and as such used interns to fill the staffing gaps.

Further review of the interns’ placement for the period under review revealed that management had taken up interns from various Universities for periods longer than provided for in the policy. It was noted that nine (9) interns had on average been offering services for a period in excess of one year contrary to paragraph 6 (a) of the Road Fund internship policy that requires intern placement to be between 2-3 months.

Failure by Management to recruit the key personnel may hinder service delivery as staff are over worked and may not deliver on planned outputs. Further, retention of interns beyond mandatory period denies other students from getting placement opportunities aimed at equipping students with practical skills in their career development in order to enhance their technical and professional capabilities in preparation for entry into the Labour market and is a pointer to inadequate staff structure.

Management explained that the Road Fund structure of thirty (30), inclusive of support staff is lean. Management further explained that the interns joined the Fund at the peak of activity which included Road User satisfaction surveys, Budgeting monitoring and Evaluation where they rendered services in departments with staffing gaps. The Accounting Officer also indicated that there was a draft policy on internship placement which was awaiting approval by the board.

I advised the Accounting Officer to review their staff structure and where need is confirmed, request for wage ceilings enhancements be submitted to the appropriate authorities. Further the internship policy should be expedited to ensure fair opportunities are availed to all students seeking internship.

8.10 Failure to review Accounting Policies and Procedures Manual (APPM)

Review of previous years audit matters, revealed that management had not carried out review of the manual since it came into force in the year 2010. I noted that though the manual had been reviewed in the current year and presented before top management, the Board had not yet approved

9Annex 16: Detailed Auditor General’s Report for FY 2015/16

it for enforcement in order to have the changes aligned to the PFMA, 2015 and URF regulations.

Failure to review the accounting manual regularly may cause uncertainties and errors in the processing of transactions, considering the changing environments in the accounting profession that may render it inappropriate.

In response, the Accounting Officer explained that the manual was reviewed but was awaiting presentation to the Board for approval, which was expected to be completed by December, 2016.

I advised the Accounting Officer to expedite the process to ensure Board approval.

8.11 Inconsistency in quorum of Audit Committee

Review of the Board Committee minutes revealed that on several occasions the board sat with two members (17th and 18th held on 17/8/2015) while on others it sat with three (19th and 20th held on 18/11/2015 and 29/1/2016 respectively). I was thus unable to ascertain whether minimum quorum was constituted on the first two meetings and whether decisions reached then were binding to the board given the inconsistency under section. 7.1. f of the URF Board Manual that provides for a quorum of three (3) members of the Audit Committee during any sitting and section 7.0 of the Internal Auditing Policies and Procedures Manual which provides for a quorum of two members.

There is a risk that decisions may be taken by a few members who may not actually form a quorum and subsequently lead to legal challenges of the decisions taken.

The Accounting Officer confirmed the inconsistencies between the URF Board Manual and the Internal Audit Policies and Procedures Manual and pledged to harmonize the inconsistencies by December, 2016.

I await the outcome of management’s effort in that regard.

8.12 Contract signing after expiry of bid validity period

Review of a sample of procurement files revealed that the Accounting Officer signed a contract for the procurement of a 7-seater sofa for the Executive Director’s office worth

UGX.7,300,000 after expiry of bid validity contrary to regulation 52(4)(c) of the Public Procurement and Disposal of Public Assets (Rules and Methods For Procurement Of Supplies, Works and Non- Consultancy Services) Regulations, 2014 that requires a bid to be valid up to the date prescribed in the bidding documents. The validity offered by the bidder was up to 25th February 2016 but the contract was signed on 2nd March 2016, five days after the expiry date.

Signing of contracts after expiry of bid validity could result in the bidder making unnecessary claims or management may have no redress in case the bidder withdraws or fails to perform. The Accounting Officer attributed this to the prolonged procurement process and oversight for not confirming the bid validity.

I advised the Accounting Officer to sign contracts before expiry of the bid validity dates or ensure extension of bid validity periods where necessary.

10 Annex 16: Detailed Auditor General’s Report for FY 2015/16

11Annex 16: Detailed Auditor General’s Report for FY 2015/16

GOVERNMENT OF THE REPUBLIC OF UGANDA

UGANDA ROAD FUND

Reports and Financial Statements for the Year Ended 30

June 2016

12 Annex 16: Detailed Auditor General’s Report for FY 2015/16

TABLE OF CONTENTS

S/N Description of Reports and Financial Statements Page1 Statement of Responsibilities of the Accounting Officer 22 Information about the entity 33 Commentary on the Financial Statements by the Head of Accounts 64 Report of the Auditor General 75 Statement of Financial Performance 86 Statement of Financial Position (Balance Sheet) 97 Cash Flow Statement 108 Statement of Appropriation Account [by class of services voted] 129 Statement of Appropriation Account [by nature of expenditure] 1310 Statement reconciling total Expenditure as per Performance and Appropriation 1411 Statement of Revenues collected during the year 1511 Statement of Arrears of Revenues 1612 Statement of Contingent Liabilities 1713 Statement of Non-quantifiable Contingent Liabilities 1814 Statement of Outstanding Commitments 1916 Statement of losses of public money and stores written off, and claims abandoned

during the year20

17 Statement of reported losses of public moneys, stores and other assets whether or not written off

21

18 Summary statement of stores and other assets (physical assets) as at the end of the year

22

19 Letters of Credit Schedule 2320 Project Balances Schedule 2421 Accounting Policies 25-2922 Notes to the Financial Statements 30-36

AnnexesTrial BalanceCertificate of Outstanding Commitments/PayablesPensions PayrollSchedule of InventoriesBank Reconciliations

13Annex 16: Detailed Auditor General’s Report for FY 2015/16

STATEMENT OF RESPONSIBILITIES OF THE ACCOUNTING OFFICER

The financial statements set out on pages 8 to 24 have been prepared in accordance with the provisions of the Public Finance Management Act, 2015 (the Act). The financial statements have been prepared on the modified cash basis of accounting and comply with the generally accepted accounting practice for the public sector. Under the modified cash basis of accounting, only financial assets and liabilities are recognized and presented in these financial statements in order to meet the requirements of the Act.

In accordance with the provisions of Section 45 and Schedule 5 of the Public Finance Management Act, 2015, I am responsible for and personally accountable to Parliament for the activities of the vote to which I am the accounting officer. Further, I am responsible for the regularity and proper use of the money appropriated to the vote to which I am the Accounting Officer. I am also responsible for authorizing any commitments made by the vote and for controlling resources received, held or disposed of by or on account of the vote. Finally, I am responsible for putting in place effective systems of risk management and internal control in respect to all resources and transactions of the vote.

Section 45 (3) of the Act require the Accounting Officer to enter into an annual budget performance contract with the Secretary to the Treasury which shall bind the Accounting Officer to deliver on

the activities in the work plan of the vote for a financial year.

Sections 50 and 51 of the Act respectively require me to prepare and submit half-yearly financial statements of my vote to the Secretary to the Treasury, and also to prepare and submit annual financial statements of my vote to the Auditor General for audit and to the Accountant General within two months after the end of each financial year.

Accordingly, I am pleased to report that I have complied with these provisions in all material respects and I am also pleased to submit the required financial statements in compliance with the Act. I have provided, and will continue to provide all the information and explanations as maybe required in connection with these financial statements.

To the best of my knowledge and belief, these financial statements agree with the books of account, which have been properly kept.

I accept responsibility for the integrity and objectivity of these financial statements, the financial information they contain and their compliance with the Public Finance Management Act, 2015.

ENG. DR MICHAEL M. ODONGO

…………………………….

Date

14 Annex 16: Detailed Auditor General’s Report for FY 2015/16

GENERAL INFORMATION ABOUT THE REPORTING ENTITY

Principal Activity of the Vote

The Uganda Road Fund (URF) was established by the Uganda Road Fund Act, 2008 to facilitate the delivery of road maintenance services and to create an environment that is conducive to the efficient and effective maintenance of public roads. The Fund is to provide its services in the most economic, efficient and effective manner and to manage its affairs in a business-like and cost-effective manner and in accordance with modern management practices and techniques.

The roles of the Fund are defined by the Act to include:

1. Funding routine and periodic maintenance of public roads

2. Ensuring that public roads are maintained at all times; and

3. Advising ministers on the preparation and efficient and effective implementation of the Annual Road Maintenance Programme.

The monies of the Fund principally comprise road user charges including:

a. fuel levies;

b. international transit fees, collected from foreign vehicles entering the country;

c. road licence fees;

d. axle load fines;

e. bridges tolls and road tolls; and

f. weight distance charges;

Key Performance highlights (Statement of Performance)

During the reporting period, the URF disbursed UGX 245.598bn to UNRA towards maintenance of national roads with the following road maintenance output:

i. Routine manual maintenance of 1,000 km of paved national roads;

ii. Routine mechanized maintenance of 1,000km of paved national roads;

iii. Mechanized Term maintenance of 1,224km of paved national roads;

iv. Routine manual maintenance of 7,600 km of unpaved national roads;

v. Routine mechanized maintenance of 5,500 km of unpaved national roads;

vi. Mechanized Term maintenance of 8,000 km of unpaved national roads;

vii. Routine maintenance of 37 bridges; Periodic maintenance of 55 km of paved national roads;

viii. Periodic maintenance of 1,645 km of unpaved national roads;

ix. Street lighting on 55km of selected national roads;

x. Road signage on various roads;

xi. Marking of roads 66km; Demarcation of road reserves 170km;

xii. Operations and maintenance of 15 weigh bridges;

xiii. Operations and maintenance of 9 ferries;

xiv. Operational expenses (10 % of the release);

Disbursed UGX104.155bn towards maintenance of DUCAR roads as follows:

i. Routine manual/mechanized maintenance of 458km of paved city roads;

ii. Routine manual/mechanized maintenance of 177km of unpaved city roads;

iii. Periodic maintenance of 7.8kmof paved city roads;

iv. Routine manual maintenance of 16,563 km of district roads;

v. Routine mechanized maintenance of 12,707km of district roads;

vi. Periodic maintenance of 3,040km of district roads;

vii. Installation of 1,559 culvert lines on district roads;

viii. Maintenance of 149 bridges on district roads.

ix. Routine manual maintenance of 1,591 km of Municipal roads;

x. Routine mechanized maintenance of 629km of Municipal roads;

xi. Periodic maintenance of 176 km of Municipal roads;

xii. Installation of 324 culvert lines on Municipal roads;

xiii. Maintenance of 6 bridges on district roads.

15Annex 16: Detailed Auditor General’s Report for FY 2015/16

A community access road in Kamuli District

The Mbulamuti ferry waiting to cross over to Kayunga District

Road works on Ndejje- Kitiko road imple-mented by Wakiso District.

Pothole filling works ongoing on a Municipality road in Tororo District.

A Truck on a weigh bridge in Luwero District

16 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Risk Management Practice and Internal Control

The vote maintained a system of internal control through the risk register. This register is updated annually. The internal audit department undertakes a risk based review of Designated Agency activities and reports to the Board Audit and Risk Committee. The issues raised are monitored through a tracker updated quarterly with the Ministry of Local Government appraised with the findings.

Staff Payroll

Below is a summary list of the employees under the vote for the financial year just ended 30 June 2016;-

Salary scale Number of Employees at the beginning of the year

1st July 2015

New employees to the vote either through transfers or through recruitment

Number of employees transferred / retired/deceased

Number of Employees at the end of the year

30th June 2016

Specified scaleURF 1 1 0 0 1URF 2 6 0 0 6URF 3 12 0 0 12URF 4 3 0 0 3URF 5 0 0 0 0URF 6 0 0 0 0URF 7 0 0 0 0URF 8 5 0 0 5URF 9 2 0 0 2Total 29 29

Action on Parliamentary Recommendations

The report of the Auditor General FY2014/15 was made sent to Parliament. This report highlights the level of implementation of the audit recommendations (Annex 1).

The accounting policies and notes set out on pages 7 to 36 form an integral part of these financial statements.

…………………………………………………………………………………………….

ENG. DR MICHAEL M. ODONGO

17Annex 16: Detailed Auditor General’s Report for FY 2015/16

COMMENTARY ON THE FINANCIAL STATEMENTS BY THE HEAD OF ACCOUNTS

The appropriation by Parliament remains the only source of financing for the execution of the function of Road Fund. For the FY 2015/16, UGX 417,930,492,052 was voted but actual funds released and utilized in the year was UGX 357,589,278,236. This was down from FY 2014/15 appropriation of UGX 428,101,919,052 by UGX 10,171,427,000 and actual release down from UGX 423,378,492,959 by UGX 65,789,214,723.

However, from the statement of performance, expenditures on employees cost increased from UGX 2,569,059,765 in 2014/15 to UGX 3,264,402,949. This was mainly due to revision in terms of employment and increase in the number of personnel between the years. Correspondingly the expenditures on goods and services consumed increased from UGX 4,544,291,029 to UGX 5,046,752,728 between the two periods and transfers to other Government units declined from

UGX 416,264,994,707 to UGX 349,278,122,559 in the same period. No revenue was collected under the Non-Tax revenue during the year.

From the statement of financial position, the Fund managed to dispense off its entire obligation for the year and closed with a nil for both assets and liabilities. There was no multi-year commitment by the close of the financial year.

During the year the Fund acquired Furniture worth UGX 15,175,000 and office equipment worth UGX 38,721,002. These values have been expensed in the statement of financial performance.

I confirm that the financial statements set out in pages 8 to 36 have been prepared in the format required by the Accountant General and in accordance with the Generally Accepted Accounting Practice for the Public Sector.

I take full responsibility for the completeness and integrity of these Financial Statements.

................................................................................

Mr. John Ocitti

Head of Accounts

18 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Financial Performance

[Based on classification of expenditures by nature]

Note Actual30 June 2016

(Shs)

Actual30 June 2015

(Shs)OPERATING REVENUERevenue Taxes 2External Grants Received 3Transfers received from the Consolidated Fund 4 357,589,278,236 423,378,492,959Transfers from the Contingencies Fund 5Transfers received from Other Government units 6Non – Tax revenue 7 35,700,000 50,000Total operating revenue 357,624,978,236 423,378,542,959OPERATING EXPENSESEmployee costs 8 3,264,402,949 2,569,059,765Goods and services consumed 9 5,046,752,728 4,544,291,029Consumption of property, plant & equipment 10Subsidies 11Transfers to other Organizations 12 349,278,122,559 416,264,994,707Social benefits 13Other operating expenses 14Total operating expenses 357,589,278,236 423,378,345,501Excess of revenue over expenditure from operat-ing activities

35,700,000 197,458

Foreign exchange loss (Gain) 15Finance costs 16Transfers to Treasury 17 35,700,000Excess of Revenue over expenditure for the year 0 197,458

……………..…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

19Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Financial Position

Notes 30 June 2016

(Shs)

30 June 2015

(Shs)ASSETS Cash and cash equivalents 18 0 50,000Receivables 19 0 0Inventories 20 0 0Investments 21 0 0Non-Produced Assets 22 0 0Total Assets 0 50,000LIABILITIESBorrowings 23 0 0Payables 24 0 0Pension Liability 25 0 0Total Liabilities 0 0Net assets (liabilities) 0 50,000REPRESENTED BY:-Amounts due to the Consolidated Fund

Statement of Changes in Equity (net worth)

Schedule

30 June 2016

(Shs)

30 June 2015

(Shs)At 1 July - Net worth Last Year (B/F) 50,000 (147,458)Less: Transfers to the UCF account ( Previous Year Balances) Less: Transfers back to the Contingencies Fund+/- Adjustments ( Cash and cash equivalents)) (50,000)Payables adjustments ( See statement of outstanding commitments)Revaluation reserve Add: Excess of revenue over expenditure for the Year 0 197,458 Closing Net Financial Worth 0 50,000

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

20 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Cash flow Statement for the year ended [Direct Method]

30 June 2016

(Shs)

30 June 2015

(Shs)CASH FLOWS FROM OPERATING ACTIVITIESRevenue from Operating activitiesTaxesExternal Grants ReceivedTransfers received from the Consolidated Fund 357,589,278,236 423,378,542,959Transfers from the Contingencies FundTransfers received from Other Government unitsNon – Tax revenue 35,700,000 0Deposits receivedAdvances recoveredLess Transfer to Treasury (Balances and NTR) (37,700,000)Total Operating revenue 357,589,278,236 423,378,542,959PAYMENTS FOR OPERATING EXPENSES:Employee costs 3,264,402,949 2,569,059,765Goods and services consumed 5,046,752,728 4,544,291,029SubsidiesTransfers to Other Organizations 349,278,122,559 416,264,994,707Social benefitsOther expensesForeign exchange loss/(gain)Net Advances paidDomestic arrears paid during the year 147,458Pension Arrears paid during the YearLosses of cashLetters of Credit receivableTotal payments for operating activities 357,589,278,236 423,378,492,959Net cash inflows/(outflows) from operating activities 0 50,000CASH FLOWS FROM INVESTING ACTIVITIESPurchase of property, plant and equipmentPurchase of non-produced assetsProceeds from sale of property, plant and equipmentPurchase of investmentsProceeds from sale of investmentsNet cash inflows/(outflows) from investing activitiesCASH FLOWS FROM FINANCING ACTIVITIESProceeds from external borrowingsRepayments of external borrowingsProceeds from other domestic borrowingsRepayments of other domestic borrowingsNet cash flows from financing activitiesNet increase (decrease) in cash and cash equivalents 0 50,000

……………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

21Annex 16: Detailed Auditor General’s Report for FY 2015/16

Cash flow Statement for the year ended (continued)

Reconciliation of movement of cash during the year

Notes

30 June 2016

(Shs)

30 June 2015

(Shs)At the beginning of the year 50,000 0Less: Transfers to the UCF account ( Previous Year Balances)Add/ (Less): Adjustments to the opening balance (50,000)Add/ (Less) : Adjustments in cash and cash equivalentsNet increase (decrease) of cash from the Cash flow Statement 50,000At the end of the year 0 50,000

For purposes of the cash flow statement, cash and cash equivalents comprise

30th June 2016

(Shs)

30th June 2015

(Shs)

Cash and bank balances 19 0 50,000

Less bank overdrafts 24

Net cash and bank balances 0 50,000

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

22 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Appropriation Account [Based On Services Voted]

Initial Approved Budget

30 June 2016

(Shs)

(a)

Revised Approved Budget

30 June 2016

(Shs)

(b)

Warrants

30 June 2016

(Shs)

©

Actual

30 June 2016

(Shs)

(d)

Variance

30 June 2016

(Shs)

(b-d)RECEIPTS

Taxes

Non – Tax revenue 0 0 35,700,000 (35,700,000)

Transfers received from the Con-solidated Fund

417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Transfers from the Contingencies FundGrants Received

Transfers received from Other Government unitsLess: Transfer to treasury 0 0

Total receipts 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

EXPENDITURE- by services as per appropriation

Road Fund Secretariat 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Total Expenditure 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Net Receipts/Payments 0 0 0 0

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

23Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Appropriation Account [based on nature of expenditure]

Initial Approved Budget

30 June 2016

(Shs)

(a)

Revised Approved

Budget

30 June 2016

(Shs)

(b)

Warrants

30 June 2016

(Shs)

©

Actual

30 June 2015

(Shs)

(d)

Variance

30 June 2015

(Shs)

(b-d)

RECEIPTS

Taxes

Non – Tax revenue 0 0 35,700,000 (35,700,000)

Transfers received from the Consolidated Fund 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Transfers from the Contingencies Fund

Grants Received

Transfers received from Other Government units

Less transfer to treasury (35,700,000) 35,700,000

Total receipts 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

EXPENDITURE-by nature of expenditure

Employee costs 3,423,110,000 3,423,110,000 3,264,402,949 158,707,051

Goods and services consumed 5,061,382,052 5,061,382,052 5,046,752,728 14,629,324

Consumption of property, plant & equipment

Subsidies

Transfers to other Organizations 409,446,000,000 409,446,000,000 349,278,122,559 60,167,877,441

Social benefits

Other expenses

Domestic arrears paid

Finance costs

Total expenditure 417,930,492,052 417,930,492,052 357,589,278,236 60,341,213,816

Net Receipts/Payments 0 0 0 0

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

24 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Reconciliation between Total Expenditure per Statement of Appropriation Account to Total Expenditure per Statement of Financial Performance

Actual

30th June 2016

(Shs)

Actual

30th June 2015

(Shs)Total expenditure per Appropriation Account 357,589,278,236 423,378,345,501Add:Letters of credit receivable prior year but delivered during the yearForeign exchange losses (gains)

Less:Letters of credit receivable at year-endDomestic Arrears paid

Total Expenditure per Statement of Financial Performance 357,589,278,236 423,378,345,501

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

25Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Revenues collected during the year ended 30th June 2016

[Based on source of revenue] (Memorandum Statement)

Actual30 June

2015(Shs)

Notes

Actual30th June

2016(Shs)

Budget30th June

2016(Shs)

Variance30th June

2016(Shs)

RECEIPTSLocal Services Tax 2Land fees 2Business Licenses 2Other tax revenues 2Investment income 7Dividends 7Rent 7Other property income (disposal of assets) 7Sale of goods and services 7Administrative fees and licenses 7Court fines and Penalties 7Other fines and Penalties 7Miscellaneous Revenue 7Total Revenue

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

26 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Arrears of Revenues [Based on source of revenue]

(Memorandum Statement)

Arrears of Revenue

30 June 2015(Shs)

Total Rev-enue billed during the

year(Shs)

Actual Amounts collected

during the year(Shs)

Amount remitted

to the UCF during the

year(Shs)

Due to Consolidat-

ed Fund(Shs).

Cumulative Arrears of Revenue at

30 June 2016(Shs)

RECEIPTSLocal Services TaxLand feesBusiness LicensesOther tax revenuesInvestment incomeDividendsRentOther property income (disposal of assets)Sale of goods and servicesAdministrative fees and licensesCourt fines and Pen-altiesOther fines and Pen-altiesMiscellaneous Reve-nueTotal operating reve-nue

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

27Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of contingent liabilities and guarantees (Memorandum Statement)

Schedule30 June 2016

(Shs)

30 June 2015

(Shs)DOMESTIC Legal proceedingsGuarantees and indemnitiesGuarantees of bank overdrafts Guarantees under Public Private PartnershipsOther contingent liabilitiesTotal Domestic ContingenciesFOREIGNLegal proceedingsGuarantees and indemnitiesGuarantees of bank overdrafts Guarantees under Public Private PartnershipsOther contingent liabilitiesTotal Foreign Contingencies

Total Contingent Liabilities

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

28 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of non-quantifiable contingent liabilities (Memorandum Statement)

Serialnumber

Brief description of liability, its origin, nature, the uncertainty, and period of identification

Type of liability

Any other comment/responsibil-ity

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

29Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of Outstanding Commitments – [Commitments by nature of expenditure]

Outstand-ing com-

mitments at begin-ning of

year1 July 2015

(Shs)

Adjust-ments to the previ-ous year’s commit-

ments(Shs)

Prior years commit-

ments paid during the

year(Shs)

New out-standing commit-

ments incurred

during the year(Shs)

Cumulative outstand-

ing commit-ments

30 June 2016(Shs)

Operating Commitments (Pay-ables)Employee costsPensionsGoods and services consumedInterest expenseSubsidiesGrants payableSocial benefitsOther operating expensesFinance costTotal operating commitmentsCapital Commitments (Pay-ables) including multi-year onesNon-produced assetsPropertyPlantEquipmentTotal capital commitmentsTotal commitments - PayablesAdd:Commitments for Extraordinary itemsTOTAL COMMITMENTS

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

30 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of losses of public money and stores written off, and claims abandoned during the year

Reference number of reported

loss/write off/claim

abandoned.

Opening Balance as at 1 July 2015

(Shs)

Losses written-off in the YR

ended30th June 2016

(Shs)

CumulativeLosses written-off

as at30th June 2015

(Shs)

Losses of public moneys (cash and cash equivalents)

Total losses of cash written offLosses of stores

Total losses of stores written offOther assetsPropertyPlantEquipmentsTotal losses of other assets written offClaims abandoned

Total value of claims abandoned

Total losses of public funds, stores and claims abandoned

31Annex 16: Detailed Auditor General’s Report for FY 2015/16

Statement of reported losses of public moneys, stores and other assets whether or not written off during the year ended 30th June 2016

Reference number of

reported loss/write off/claim

abandoned.

Opening Balance as at

1 July 2015(Shs)

Losses for the YR ended

30th June 2016(Shs)

Cumulative Losses as at

30th June 2015(Shs)

O/B/Theft Wandegeya Police Station

Losses of public moneys reported (cash and cash equivalents)

13,900,260 0 13,900,260

Total losses of cash 13,900,260 0 13,900,260Losses of stores reported.

Case: 08/15/03/2011 Wandegeya Police station

Laptop computer – Dell Inspiron FCNX7L1

N/A N/A

Total losses of stores reportedLosses of other assetsPropertyPlant

o/B/Theft Wandegeya Police Station

Equipments: safe (Boston capacity 190L 110kg)

1,400,000 0 1,400,000

Total losses of other assets reported

Total losses of public funds, stores and other assets reported

15,300,260 0 15,300,260

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

32 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Summary statement of stores and other assets (physical assets) as at the end of the year

Category/ Description Opening balance1 July 2015

Cost

(Shs)

Additions during the year1

30 June 2016Cost(Shs)

Disposals during the

year30 June 2016

cost(Shs)

Cumulative at 30 June

2016Cost

(Shs)Land Non-Residential buildingsResidential buildingsRoads and bridgesTransport equipmentMotor Vehicles 205,198,936 0 0 205,198,936Trailers/ Semi-trailersShips and other marine vesselsRailway locomotivesAircraftsMotor cycles and BicyclesOther transport equipmentMachinery and equipmentOffice equipment 63,389,620 38,731,002 0 102,120,622 Medical equipmentICT Equipment 40,454,295 0 0 40,454,295Laboratory and research equiptOther Machinery and equipmentFurniture and fittings 370,008,895 15,175,000 385,183,895Classified AssetsCultivated AssetsTotal value of physical assets acquired, disposed of and balances

679,051,746 53,906,002 0 732,957,748

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

33Annex 16: Detailed Auditor General’s Report for FY 2015/16

SCHEDULE OF LETTERS OF CREDIT

Name of Supplier LC Number Due date Bank Currency Amount(Shs)

Total

…………………………………………………………………………………………………

ENG. DR MICHAEL M. ODONGO

34 Annex 16: Detailed Auditor General’s Report for FY 2015/16

SCHEDULE OF PROJECT BALANCES

Project Name End Date Funding Source/Agency

Balance as at 1 July 2015

(Shs)

Disburse-ments for the

Year(Shs)

Payments for the

Year(Shs)

Balance as at 30 June 2016

(Shs)

TOTAL

35Annex 16: Detailed Auditor General’s Report for FY 2015/16

ACCOUNTING POLICIES

These are the specific principles, bases, conventions, rules and practices adopted by the Government of the Republic of Uganda in preparing and presenting the financial statements. The principal accounting policies adopted in the preparation of these financial statements are set out below. These policies have been consistently applied in all material aspects unless otherwise stated.

1. General Information

As required by Section 51(1) of the Public Finance Management Act, 2015, each vote shall prepare annual financial statements for audit, and submit a copy to the Accountant General.

2. Reporting Entity

Uganda Road Fund is a reporting entity of the Government of the Republic of Uganda and is domiciled in Uganda.

The principal address of the entity is:

Uganda Road Fund Plot 10, Kafu Road, Nakasero,5th Floor Twed Towers,P.O. Box 7501,Kampala. T: +256 (0)414 257072/0312178250E: [email protected]: www.roadfund.ug

Uganda Road Fund was established by the Uganda Road Fund Act, 2008 for the purpose of financing routine and periodic maintenance of public roads; to facilitate delivery of road maintenance services; to provide for designated agencies for purposes of the Road Fund; to provide for management of the Fund and for other related matters.

3. The Treasury

The Treasury is established by Section 10 of the Public Finance Management Act, 2015 consisting of: (a) the Minister of Finance; (b) the Secretary to the Treasury; (c) the Accountant General; and (d) any other directorates responsible for economic and finance matters of the Ministry of Finance, Planning and Economic Development.

4. The Consolidated Fund

Is the Consolidated Fund as established by the Article 153 of the Constitution of the Republic of Uganda. As provided by Section 30 of the Public Finance Management Act, 2015 (the Act), it is the Fund into which all revenues or other

money raised or received for the purpose of the Government shall be paid. Except for receivables into another public fund established for a special purpose (for example the Petroleum Fund) where this is authorized by an Act of Parliament, or where a vote, state enterprise or public corporation shall retain revenue collected or received as authorized through an appropriation by Parliament or is a monetary grant exempted under Section 44 of the ACT.

Withdrawals from the Consolidated Fund shall only be done upon the authority of a warrant of expenditure issued by the Minister of Finance to the Accountant General after a grant of credit has been issued to the Minister by the Auditor General in the first instance. The withdrawal can be effected only when: (a) the expenditure has been authorized by an Appropriation Act or a Supplementary Appropriation Act; (b) is a statutory expenditure; (c) for repaying money received in error by the Consolidated Fund; (d) and for paying sums required for an advance, refund, rebate or drawback that are provided for in this and other Act of Parliament.

5. The Contingencies Fund

Established by Section 26 of the Public Finance Management Act, 2015, which in every financial year, shall be replenished with an amount 0.5% of the appropriated annual budget of the Government of the previous financial year without consideration of any supplementary budget. The Fund shall provide funding for natural disasters.

6. Classified expenditures

Classified expenditures are included under supply of goods and services in the Statement of Financial Performance, and are audited separately. The money appropriated for classified expenditure shall only be used for defense and national security purposes. A committee of Parliament comprising the chairpersons of the committees responsible for budget; defense and internal affairs; and another member appointed by the Speaker will be responsible for scrutiny of classified expenditure budget.

7. Basis of preparation of financial statements

The financial statements have been prepared in accordance with the requirements of the Public Finance Management Act, 2015 [the Act] and comply with generally accepted accounting principles. The Financial Statements have consistently been prepared using the modified cash basis of accounting except where stated

36 Annex 16: Detailed Auditor General’s Report for FY 2015/16

otherwise. The modified cash basis of accounting recognizes revenue when cash is received and expenses (except for expenses approved to be accrued) when paid.

8. Going concern consideration

The financial statements have been prepared on a going concern basis.

9. Presentation currency

The reporting and presentation currency is the Uganda Shilling (Shs), which is the functional currency of the Republic of Uganda. Items included in the financial statements are measured in the currency of the primary economic environment in which the entity operates.

10. Reporting Period

The reporting period for these financial statements is from 1 July 2015 to the 30 June 2016. Prior period comparative information has been presented in the current year’s financial statements. Where necessary figures included in the prior period financial statements have been reclassified to ensure that the format in which the information is presented is consistent with the format in the current year’s financial statements.

11. Appropriation

The initial approved budget is the original forecast as presented and approved by Parliament. A revised budget is the initial approved budget adjusted by a supplementary or reallocations/ virements.

12. Revenue

Revenue represents cash and grants in kind received by the entity during the financial year and comprise; taxes, transfers from the Consolidated Fund, transfers from the Contingency Fund, grants received and non-tax revenue. Revenues are recognized as follows;

i. Tax revenues

Tax revenue is recognized when received. Taxes are levied with the authority of Parliament subject to Article 152 of the Constitution of the Republic of Uganda. Payment of tax does not necessarily result into an entitlement to the taxpayer to receive equivalent value of services or benefits.

ii. Grants

Grants are received by the entity either as cash or in-kind. All grants (aid assistance) are recognized

as income when received. In-kind receipts (donations) are recognized at fair value.

iii. Transfers received

Transfers received include; transfers received from the Consolidated Fund, transfers received from the Contingency Fund and transfers received from other government units. All transfers are recognized when received by the Accounting Officers.

iv. Non-Tax Revenue

Non-Tax Revenue includes: interest/gains associated from ownership of shares, proceeds from hire of assets, sale of designated goods and services, and fines/penalties. Non-Tax Revenue, whether directly collected by the entity or collected by another entity on its behalf is recognized when received.

13. Expenses

Generally, expenditure is recognized when it is incurred and settled within the financial year. Qualifying unsettled expenditure is recognized in the Statement of Financial position as payables.

14. Property, Plant and Equipment (physical assets or fixed assets)

Property, plant and equipment (PPE) principally comprises buildings, dams, roads and highways, hydropower stations, plant, vehicles, equipment, and any other infrastructure assets but does not include land and regenerative natural resources such as forests and mineral resources.

Acquisitions of PPE are recorded in the asset register on receipt of the item at cost and expensed fully through the Statement of Financial Performance. Cost of the item is defined as the total cost of acquisition. Where the cost of the PPE cannot be determined accurately, the PPE is stated at fair value. Subsequent repairs and maintenance costs of PPE are also expensed as goods and services consumed in the Statement of Financial Performance.

Proceeds from disposal of property, plant and equipment are recognized as non-tax revenue in the period in which it is received.

15. Translation of transactions in foreign currency

Foreign currency transactions are translated into Uganda Shillings using the exchange rates prevailing at the dates of the transactions (spot rates). These result into realized gains/

37Annex 16: Detailed Auditor General’s Report for FY 2015/16

losses which are recognized in the Statement of Financial Performance. Foreign currency assets and liabilities held by the entity at year-end are translated into Uganda Shillings using the period closing rate for reporting purposes resulting into unrealized gains/losses. The unrealized gains/losses are recognized in the statement of changes in Equity through the revaluation reserve.

16. Revaluation Gains/Losses

Unrealized gains or losses arising from changes in the value of investments, marketable securities held for investment purposes, and from changes in the values of property, plant and equipment are not recognized in the financial statements.

17. Cash and cash equivalents

Cash and cash equivalents are carried in the balance sheet at cost. For the purposes of the cash flow statement, cash and cash equivalents comprise cash on hand, deposits held at call with banks, other short-term highly liquid investments, and bank overdrafts. In the statement of financial position bank overdrafts are included in borrowings.

18. Unspent cash balances

In accordance with the requirement of the Public Finance Management Act, 2015, unspent cash balances by Government entities at the end of the financial year are returned through the Single Treasury Account to the Consolidated Fund in the course of the financial year.

Escrow Account balances are to be recognized in the Financial Position of the responsible entity and expensed through the Financial Performance in the period when funds are utilized.

19. Receivables

i. Advances and other receivables

Receivables are carried at historical cost and are written down by recovered receipts or write –off of unrecoverable amounts (bad debts are written-off with the approval of Parliament, when identified in the Statement of Changes in Equity).

ii. Letters of credit

Procurement of goods and services through letters of credit which are cash covered are recognized in the statement of appropriation when the letter of credit is opened. Outstanding letters of credit at period-end are treated as receivable and expensed through the Statement of Financial Performance in the period when the goods and services are

delivered.

20. Inventories

Comprise consumable supplies expensed in the period when acquired. Inventories that qualify for recognition must be initially reflected at cost. Where they are acquired at no cost, or for nominal consideration, their cost shall be their fair value at the date of acquisition.

21. Investment properties

Investment property principally comprises land, office, commercial and residential buildings, and other physical assets, which is held for long-term rental income and is not occupied internally. Investment property is treated as a long-term investment and is carried at cost.

22. Investments

Investments are classified into three groupings, namely: investments held for trading; investments held-to-maturity; and investments available-for-sale.

Investments that are acquired principally for the purposes of generating profit from short-term fluctuations in price are classified as “trading investments”, and are, therefore, current assets and are treated as monetary assets.

Investments with fixed maturities and there is an intention and ability to hold them to maturity dates are classified as “Investments held-to-maturity”, and are, therefore, non-current assets, and are treated as non- monetary assets.

Investments intended to be held for an indefinite period of time, which may be sold in response to liquidity needs or changes in interest rates, are classified as “investments available-for-sale”, and are therefore non-current assets and regarded as non-monetary assets. However, if there is an expressed intention to sell these within 12 months, then these are treated as current assets and are monetary assets.

Appropriate classification of investments at the time of purchase and re-evaluation of such designation are carried out on a regular basis but any resulting reclassifications are rare and cannot be made from “trading investments” to “investments held to maturity”

All investments in the balance sheet are carried at historical cost. Non-financial assets are measured at net worth. For investments quoted in foreign currency, the historical cost is translated at the closing rate.

38 Annex 16: Detailed Auditor General’s Report for FY 2015/16

23. Projects expenditure

Government projects are a series of undertakings of a reporting entity with specific objectives and a defined time frame and could be either: (a) fully funded by a Government; (b) jointly funded by Government and a development partner; (c) fully funded by a development partner through either budget support or project support; and (d) fully funded by development partner through provision of physical items rather than funds.

Fully or partly Government funded project expenditure is recognized in the statement of financial performance of the reporting entity to the extent of funding received from Government.

24. Borrowings

Borrowings are initially recorded in the Statement of Financial Position [the balance sheet] at cost net of any transaction costs paid.

Interest expense and any other expense on borrowings are recognized in the Statement of Financial Performance when they fall due.

25. Employee benefits

Employee benefits include salaries, pensions and other related-employment costs. Employee benefits are recognized when incurred. No provision is made for accrued leave or reimbursable duty allowances.

26. Contingent liabilities

Contingent liabilities are disclosed in a memorandum statement (Statement of Outstanding Commitments) of the entity when it’s probable that an outflow of economic benefits or service potential will flow from the entity or when an outflow of economic benefits or service potential is probable but cannot be measured reliably. Contingent liabilities comprise

government guarantees issued, court awards that have been appealed by the Attorney General, those arising from Public Private Partnerships (PPPs) etc. Contingent assets are not recognized nor disclosed.

27. Commitments

Commitments include operating and capital commitments arising from non-cancelable contractual or statutory obligations. Interest commitments on loans and commitments relating to employment contracts are not included in the Statement of Outstanding Commitments. Outstanding commitments relating to non-cancelled contractual or statutory obligation where goods have been delivered or service provided are included in the statement of financial position as payables and in the Statement of Outstanding Commitments.

28. Public Private Partnerships

Any investment by the Government in a Public Private Partnership may be through a joint venture or as an associate or as a major shareholder. Except for the latter, these are accounted for as investments whether held for trading purposes or otherwise. The financial statements in that case are consolidated as if the other entity is a controlled entity in accordance with IPSAS 38.

In other instances where the Government provides certain guarantees which could crystalize and result into an outflow of resources, the guarantees are quantified and disclosed in the memorandum Statement of Contingent Liabilities. The amounts disclosed as part of contingent liabilities represent the most likely outflow of resources should certain events crystalize which are assessed annually. If the events crystalize, the amounts become payables through the Statement of Financial Performance and Statement of Financial Position on an accrual basis

39Annex 16: Detailed Auditor General’s Report for FY 2015/16

NOTES TO THE FINANCIAL STATEMENTS

Note 1: Exchange Rates

All monetary amounts in the financial statements are expressed in Uganda Shillings, the functional currency. The Uganda Shilling closing rates (the Bank of Uganda middle rate) for major currencies were:

30 June 2016 (Shs)

30 June 2015(Shs)

United States DollarBritish PoundEuro

Note 2: Tax Revenues

Tax revenues comprise both direct and indirect taxes levied and collected on behalf of Government.

30 June 2016(Shs)

30 June 2015(Shs)

Local Services TaxLand feesBusiness LicensesOther tax revenuesTotal taxation revenues

Note 3: Grants Received

30 June 2016(Shs)

30 June 2015(Shs)

Grants from foreign governmentsGrants from International OrganizationsTotal Grants

Note 4: Transfers Received From the Treasury – Consolidated Fund

30 June 2016(Shs)

30 June 2015(Shs)

Transfers from the treasury- currentTransfers from the treasury- capital 357,589,278,236 423,378,492,959Total Transfers 357,589,278,236 423,378,492,959

Note 5: Transfers Received From the Treasury- Contingencies Fund

30 June 2016(Shs)

30 June 2015(Shs)

Response to natural crisis – location AResponse to natural crisis- location BTotal Transfers for the Year

Note 6: Transfers received from Other Government Units

Comprise funds appropriated under one vote but transferred to another vote for execution of the intended activities. For instance road maintenance funds, grants recognised by treasury but transferred to other executing MALGS, etc

40 Annex 16: Detailed Auditor General’s Report for FY 2015/16

30 June 2016(Shs)

30 June 2015(Shs)

Transfers received from other Gov’t Units- Current (Name of the Government unit)Transfers received from other Gov’t units- Capital (Name of the Government unit)Total

Note 7: Non-Tax Revenues

Comprise non-tax revenues from exchange transactions collected during the year were as follows

30 June 2016(Shs)

30 June 2015(Shs)

Investment incomeDividendsRentOther property income (disposal of assets)Sale of goods and services 35,700,000 50,000Administrative fees and licensesCourt fines and PenaltiesOther fines and PenaltiesMiscellaneous Revenue (197,458)Total Non-Tax Revenue 35,700,000 (147,458)

Note 8: Employee Costs

Employee costs principally comprise:

30 June 2016(Shs)

30 June 2015(Shs)

Wages and salaries 2,373,295,117 2,294,719,150Social contributions 216,605,000 179,036,565Other employment costs 674,502,832 95,304,050Total employee costs. 3,264,402,949 2,569,059,765

Note 9: Goods and Services

Expenditure on goods and services during the year principally comprise the following:

30 June 2016(Shs)

30 June 2015(Shs)

General expenses 1,026,009,653 1,190,449,612Communications 137,965,091 197,779,170Utility and property expenses 1,648,595,708 1,069,117,712Supplies and services 0 0Professional services 1,659,235,058 1,553,428,634Insurances and licenses 24,850,360 49,116,104Travel and transport 439,926,610 410,057,750Maintenance 110,170,248 74,342,047Inventories (goods purchased for resale)Total cost of goods and services 5,046,752,728 4,544,291,029

41Annex 16: Detailed Auditor General’s Report for FY 2015/16

Note 10: Consumption of Property, Plant and Equipment (Fixed Assets)

As explained in accounting policy (15), property, plant and equipment (physical assets) are expensed in the year of purchase i.e. they are depreciated at 100% in the year of purchase using the cash basis of accounting.

30 June 2016(Shs)

30 June 2015(Shs)

Non-Residential buildingsResidential buildingsRoads and bridgesTransport equipment-Machinery and equipmentFurniture and fittingsOther fixed assetsTotal value of property, plant and equipment expensed

Note 11: Subsidies

Subsidies paid during the year are summarized as below:

Actuals30 June 2016

(Shs)

Actuals30 June 2015

(Shs)To public corporationsTo private enterprisesTo private individualsTotal subsidies for the year

Note 12: Transfers to Other Organizations

Transfers made during the year are summarized as below:

Actuals30 June 2016

(Shs)

Actuals30 June 2015

(Shs)Transfer to foreign GovernmentsTransfers to International OrganisationsTransfers to other government units 349,278,122,559 416,264,994,707To resident non-government unitsTotal transfers 349,278,122,559 416,264,994,707

Note 13: Social Benefits

Social benefits paid during the year comprise:

Actuals30 June 2016

(Shs)

Actuals30 June 2015

(Shs)PensionsEmployer Social benefitsTotal social benefits

42 Annex 16: Detailed Auditor General’s Report for FY 2015/16

Note 14: Other Operating Expenses

These comprise:

Actuals30 June 2016

(Shs)

Actuals30 June 2015

(Shs)Property expenses other than interestMiscellaneous other expenses- currentMiscellaneous other expenses- capitalTotal other operating expenses

Note 15: Foreign Exchange Gains and Losses

During the year, foreign exchange losses and gains were as follows:

30 June 2016(Shs)

30 June 2015(Shs)

Realized loss (gain) (SFP)Un/realized loss (gain) (SCE)Net foreign exchange (gains)/ losses

Note 16: Finance costs

Schedule 30th June 2015(Shs)

30th June 2015(Shs)

Interests on external debts (external borrowings)Interests on other domestic borrowings Total finance cost

Note 17: Transfers to the Treasury

These comprise transfers back to the Consolidated Fund of unspent balances from the respective expenditure accounts, transfers of Non tax revenue collected, , unspent salaries, among others

30 June 2016(Shs)

30th June 2015(Shs)

Non-Tax revenue 35,700,000 0Unspent Salary balancesExpenditure account balancesTotal for the year. 35,700,000 0

Note 18: Cash and cash equivalents

30 June 2016(Shs)

30 June 2015(Shs)

DOMESTIC Revenue accounts 0 50,000Expenditure accounts Project accountsCollection accountsCash in transitCash at hand- ImprestOthersSub-total cash and bank balances- domestic 0 50,000FOREIGNRevenue Accounts

43Annex 16: Detailed Auditor General’s Report for FY 2015/16

30 June 2016(Shs)

30 June 2015(Shs)

Project AccountsExpenditure accountsCollection accountsCash in transitCash at hand- ImprestsOthersSub-total cash and bank balances- foreignTotal cash and bank balances 0 50,000

Note 19: Receivables

Comprise the following receivables at the end of the year net of any provision for receivables doubtful of recovery.

30th June 2016(Shs)

30th June 2015(Shs)

DOMESTICLoans (short-term) -othersAdvancesOutstanding letters of creditOther accounts receivableTotal domestic receivablesFOREIGNLoans (short-term) -othersAdvancesOther accounts receivableTotal foreign receivablesTotal receivablesLess provisions against doubtful accountsNet receivables

Note 20: Inventories

Comprise strategic stock and other inventories purchased which have not been expensed.

30 June 2016(Shs)

30 June 2015(Shs)

Strategic stock-petroleum productsOther inventories( goods purchased for re-sale)Total inventories

Note 21: Investments

Comprise investments as follows:

30 June 2016(Shs)

30 June 2015(Shs)

Securities other than shares (long-term)-domesticShares and other equity-domesticSecurities other than shares-foreignTotal investments

44 Annexes to the Financial Statements

Note 22: Non Produced Assets

30 June 2016(Shs)

30th June 2015(Shs)

Land

Cultivated AssetsOther Naturally occurring AssetsTotal Non-Produced Assets

Note 23: Borrowings

30th June 2016(Shs)

30th June 2015(Shs)

DOMESTICLoans from commercial banksInterest payable on bank loans/borrowingsOther / OverdraftTotal domestic borrowingsFOREIGN Loans from commercial banksInterest payable on bank loans/borrowingsOtherTotal foreign borrowingsTotal borrowings

Note 24: Payables

These are principally accounts payables, domestic and otherwise, outstanding at the year-end and comprise:

30 June 2016(Shs)

30 June 2015(Shs)

PayablesTrade Creditors Sundry CreditorsCommitted CreditorsAccountable advancesWithholding tax payableDeposits receivedAdvances from other Government unitsMiscellaneous accounts payablesTotal payables

45Annexes to the Financial Statements

Annex (i): Pension Payroll

Name Last Position held

IPPS no

Pension no.

Supplier no (IFMS) Amount

123

Annex (ii): Schedule of Inventory

Category Opening balance as at 1st July 2015

CostShs

Purchase/ Additions

CostShs

Usage/Disposal

Cost Shs

ObsoleteCostShs

Closing balance30 June

2016CostShs

1 e.g Drug (a), Visa stickers, Passports

Note: No. 25: Pension Liabilities

Category Opening balance as at 1st July 2015

CostShs

Purchase/ Additions

Cost

Shs

Usage/Disposal

Cost

Shs

ObsoleteCost

Shs

Closing balance

30 June 2016CostShs

1 e.g Drug (a), Visa stickers, Passports

46 Annexes to the Financial Statements

UGANDA ROAD FUND

5th Floor, Twed TowersPlot 10, Kafu Road, Nakasero

P.O. Box 7501, KAMPALA, UgandaT: +256 (0)414 257072/0312 229009

F: +256 (0)414 257071E: [email protected]

Financing Road Maintenance