Annual MFF Progress Report 32234013 For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE Project Title MFF - Railway Sector Investment Program (Facility Concept) Project No. 32234-013 Country/ Regional Bangladesh Department SARD Key Dates Approval Date Original Closing Date Revised Closing Date 10 Oct 2006 01 Dec 2011 09 Oct 2016 Division BRM MFF Amount ($ million) 430.00 Source OCR ADF Cofinancing ($ million) N/A Source N/A Facility Summary ADB approved the MFF - Railway Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $430.00 million from ADB’s ADF, OCR on 10 October 2006. Impact: Promote sustainable national economic growth and poverty reduction in Bangladesh. it will achieve this by improving rail transport efficiency and capacity. Outcome: Improve the performance of the railways sector through enhanced efficiency Outputs: BR becomes a commercially focused rail service provider BR corporate governance is improved BR safety record is improved Significant Developments of the Facility: There were no major changes to the roadmap, investment program, and policy and legal framework. Estimated Total No. of Tranches to be Processed 1 Approved Tranches To Date 3 Approved Tranche Amount to Date 380.00 Facility Change in Scope Category Date Proposed Change N/A N/A N/A Tranche Completion Report N/A Facility Completion Report N/A MFF Performance Rating (On Track, Potential Problem, At Risk) On Track 1

Transcript of Annual MFF Progress Report - Asian Development …Division BRM MFF Amount ($ million) 430.00 Source...

Annual MFF Progress Report

32234013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Railway Sector Investment Program (Facility Concept)

Project No. 32234-013

Country/Regional

Bangladesh Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

10 Oct 2006 01 Dec 2011 09 Oct 2016

Division BRM

MFF Amount ($ million)

430.00Source OCR

ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Railway Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $430.00 million from ADB’s ADF, OCR on 10 October 2006.

Impact: Promote sustainable national economic growth and poverty reduction in Bangladesh. it will achieve this by improving rail transport efficiency and capacity.

Outcome: Improve the performance of the railways sector through enhanced efficiency

Outputs: BR becomes a commercially focused rail service provider BR corporate governance is improved BR safety record is improved

Significant Developments of the Facility: There were no major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 3

Approved Tranche Amount to Date

380.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

1

TRANCHE 1 UPDATE

Tranche TitleMFF - Railway Sector Investment Program (Subproject 1)

Project No. 32234-023

Country/Regional Bangladesh Loan/Grant No.

2316, 2317

Project Officer Mohammad Nazrul Islam Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

13 Feb 2007 30 Jun 2011 09 Oct 2016

Division SATC

Tranche Amount($ million)

130.00 Source ADFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32234-023/main

1 DED = Detailed Engineering Design.

2

Tranche Summary

ADB approved the MFF - Railway Sector Investment Program (Subproject 1), not exceeding the aggregate amount of $130.00 million on 13 February 2007. Impact: Promote sustainable national economic growth and poverty reduction in Bangladesh. It will achieve this by improving rail transport efficiency and capacity. Outcome: Improve the performance of the railways sector through enhanced efficiency Outputs: 2316: Double track between Tongi and Bhairab Bazar completed 2317: BR becomes a commercially focused rail service provider 2317: BR corporate governance is improved 2317: BR safety record is improved Implementation Arrangements: Bangladesh Railway is the executing agency for the investment program. Two implementation units were established: (a) the reform implementation unit staffed by qualified officers from BR and the Ministry of Communications, and (b) the project implementation unit headed by the project director who will supervise the investment project. An inter-ministerial committee co-chaired by the Secretary, Ministry of Commerce, and consisting of representatives from Economic Relations Division, Ministry of Establishment, the Prime Minister's Office, Bangladesh Railway, and other agencies, has also been established to oversee, monitor and provide necessary policy guidance. Implementation Status: Loan 2316: The contract for "Construction Of Double Line Track From Tongi To Bhairab Bazar including Signalling on Dhaka-Chittagong" was awarded on 27 July 2011. Construction of the Tongi-Bhairab Bazar Double Track (64 km) is under implementation and expected to be completed by June 2015. The physical progress of the project is 85% as of 31 December 2014. All procurements have been completed and disbursement coming from consultancy service only. Loan 2317: The software for enterprise resource planning and safety equipment have been procured, and requisite training was completed in 2014. Installation and commissioning of various computer, hardware and networking equipment were completed in December 2014. Procurement of videoconferencing equipment and recruitment of the consultants for Enterprise Resource Planning (ERP) software implementation are ongoing. Ministry of Railways (MoR) approved the "Recommendation on Tariff Structure of Bangladesh" report on 9 December 2014. Activities on implementation of Tariff Structure (Tariff Reform) are ongoing. MoR has given in-principle approval for the corporatization of container services on 16 April 2014. The proposal was brought up at the Cabinet Division but has been returned to MoR with the advice of getting comments from the Ministry of Public Administration and Finance. The proposal is being reviewed by both Ministries.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

3

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

113.18 99.63 110.76 99.91

Significant Developments During the Year

Tranche 1 (Loan 2316, 2317) is a loan of $130.00 million from the Asian Development Fund (ADF) and Ordinary Capital Resources (OCR), which was signed on 15 February 2007 and declared effective on 24 April 2007. Tranche 1 is rated On Track. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $113.18 million (99.6%) and $110.76 million (99.9%), respectively. Loan 2316: Construction of the Tongi-Bhairab Bazar Double Track was awarded on 27 July 2011, and the project is now under implementation. The physical progress of the project is 85%. The additional funding for the construction work is being provided by Tranche 2. Loan 2317: The software for enterprise resource planning and safety equipment was procured and requisite training completed in 2014. Installation and commissioning of various computer hardware and networking equipment were completed in December 2014. Procurement of videoconferencing equipment and recruitment of the consultants for ERP software implementation are ongoing. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: The loan agreement and safeguards requirements are being complied with.

1 DED = Detailed Engineering Design.

4

TRANCHE 2 UPDATE

Tranche Title Railway Sector Investment Program - Tranche 2 Project No. 32234-043

Country/Regional Bangladesh Loan/Grant No.

2845

Project Officer Mohammad Nazrul Islam Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Dec 2011 30 Jun 2016 N/A

Division BRM

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32234-043/main

1 DED = Detailed Engineering Design.

5

Tranche Summary

ADB approved the Railway Sector Investment Program - Tranche 2, not exceeding the aggregate amount of $150.00 million on 22 December 2011. Impact: Efficient and safe railway transport in the Dhaka-Chittagong and Dhaka-Ishurdi-Darsana-Khulna/India corridor Outcome: Improved railway transport capacity in the Dhaka-Chittagong and Dhaka-Ishurdi-Darsana-Khulna/India corridors Outputs: 1. Tongi-Bhairab Bazar Double Track completed; 2. Signaling system Darsana-Ishurdi improved 3. Yards rehabilitated and loops extended in the Darsana-Ishurdi-Sirajganj Bazar section Implementation Arrangements: BR will be the Executing Agency for the Program. Two implementation units have been established: (i) the Reform Implementation Unit (RIU) headed by a senior BR officer at the Additional Director General level, who is the Reform Project Director and staffed by suitably qualified officers from the BR and Ministry of Communications (MOC), and (ii) the Project Implementation Unit (PIU) headed by a General Manager from BR who is Project Director for the Investment Project. An interministerial committee co-chaired by the Secretary, MOC and the Secretary, Finance Division, Ministry of Finance (MOF), and consisting of representatives from the Economic Relations Division, MOF, the Ministry of Establishment, the Prime Minister' s Office, BR, and other agencies as determined by the Borrower, has been established to oversee, monitor and provide the necessary policy guidance to both Project Directors. The Director General, BR will report to the interministerial committee on a regular basis. BR has appointed both project directors. Implementation Status: All contracts under Tranche 2 have been awarded, including two in 2014. The overall progress accomplishment of the contractor of signaling contract is 22%. Preparation of final signaling and interlocking plans has been resolved for all the stations. Some changes in scope of work are expected but will be resolved within the provisions of the contract. The contractor has been given all necessary documents to show the utility locations for carrying cable laying works. The contractor has not submitted cable laying plan, and has not started excavation for the cable duct work. The contractor has started construction of equipment, battery and generator rooms at 3 stations--Paksey, Chuadanga and Munshigonj through engagement of local sub-contractors. The overall progress of the loop lines contract is 38.5%. The work is progressing based on the approved contractors program but the progress is still behind schedule and needs to be expedited for retraction. Almost all the test issues including dynamic load test and pulsating test issues for steel sleepers are resolved and the contractor has started procuring at the site. The contractor is preparing to progress with the transportation of required materials to different sites to commence physical work. The track linking work is expected to start soon. Major part of Loan 2845 ($150 million) is being used for additional financing as part of the investment component subproject (TBDLP) of Tranche 1.

1 DED = Detailed Engineering Design.

6

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 23 Apr 2014 The financing percentage under 2 categories namely 01B and 02 were modified. This resulted in financial perecentage being changed in category 02 from 75% to 100%.

Minor Change 23 Oct 2014 The financing percentage under 2 categories namely 01B and 02 were modified. This resulted in financial perecentage being changed in category 01B from 88% to 100% .

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

126.83 100.00 108.81 100.00

1 DED = Detailed Engineering Design.

7

Significant Developments During the Year

Tranche 2 (Loan 2845) is a loan of $150.00 million from Ordinancy Capital Resources (OCR), which was signed on 27 August 2012 and declared effective on 05 November 2012. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $126.83 million (100.0%) and $108.81 million (100.0%), respectively. The physical progress of the rehabilitation of yards and extension of loops at different stations in the Darsana-Ishurdi-Sirajganj Bazar section is at 38.39%. It aims to improve the capacity of the West Zone of Bangladesh Railway (BR) to handle higher volumes of traffic. It will extend the loops for running longer trains and dealing efficiently with the interchange trains received from Indian Railways (IR) at Darsana, Benapole and Rohanpur. By reducing the turn-around time of the trains, BR can also reduce the hire charges payable to IR and improve its financial position. The main objective of goods procurement for the design, supply, installation, testing and commissioning of computer based interlocking (CBI) colour light signalling system at 11 stations between Ishurdi and Darsana is replacement and modernization of the signaling and interlocking system at these 11 stations. The progress is currently at 22%. Consultancy services supervision's physical progress is at 8.06% and is expected to speed up in 2015. Scope Change: There were two minor scope changes for this tranche in 2014. Undertaking and Covenants: The 14 covenants under this tranche are being complied with.

1 DED = Detailed Engineering Design.

8

TRANCHE 3 UPDATE

Tranche Title Railway Sector Investment Program - Tranche 3 Project No. 32234-053

Country/Regional Bangladesh Loan/Grant No.

3097

Project Officer Markus Roesner Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

09 Dec 2013 9 Oct 2016 N/A

Division SATC

Tranche Amount($ million)

100.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32234-053/main

Tranche Summary

ADB approved the Railway Sector Investment Program - Tranche 3, not exceeding the aggregate amount of $100.00 million on 9 December 2013. Impact: Efficient and safe railway transport in Bangladesh. Outcome: Improved railway transport capacity in the main line network of Bangladesh Railway Outputs: New passenger carriages commissioned Implementation Arrangements: The executing agency is Bangladesh Railway and the implementing unit is under the Dhaka, Project Director. Implementation Status: As of 31 December 2014, the procurement of 100 meter gauge railway and of 50 broad gauge railway passenger carriages have been completed. Contract signing was done on 27 November 2014 and ADB received the copies on 8 December 2014.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

9

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

72.39 100.00 0.02 0.00

Significant Developments During the Year

Tranche 3 (Loan 3097) is a loan of $100.00 million from Ordinary Capital Resources (OCR), which was signed on 6 August 2014 and declared effective on 17 September 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $72.39 million (100.0%) and $.02 million (.0%), respectively. . Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: All 9 covenants for Tranche 3 have been complied with or being complied with during 2014.

1 DED = Detailed Engineering Design.

10

Annual MFF Progress Report

32298013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Madhya Pradesh Power Sector Investment Program (Facility Concept)

Project No. 32298-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

29 Mar 2007 31 Dec 2014 N/A

Division INRM

MFF Amount ($ million)

620.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Madhya Pradesh Power Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $620.00 million from ADB’s OCR on 29 March 2007. Impact: Contributed to sustaining economic growth and social development in Madhya Pradesh. Contributed to meeting the energy demand growth in Madhya Pradesh. Outcome: Sustainable and commercially operated power sector companies.Transmission expansion:Improvement in operational efficiency, voltage profile, and power delivery capacity of Madhya Pradesh.Distribution enhancement:Reduction in system losses and improved supply quality and reliability.Capacity of sector institutions strengthened.Improved energy efficiency.Increased private sector participation. Outputs: Transmission expansion: Construction of transmission lines for power evacuation and strengthening of transmission systems. Distribution enhancement in east distribution zone: Installation of remote metering and high-voltage distribution systems; renovation of substation protection system and customer service lines; implementation of SCADA. Distribution enhancement in central distribution zone: Installation of high-voltage distribution system and remote metering for industrial consumers, and consumer metering; renovation of substation protection system, and distribution system strengthening; and distribution transformer metering. Distribution enhancement in west distribution zone: Installation of high-voltage distribution system, substation protection system, SCADA, Jyoti Gram Yojna, distribution system strengthening, distribution transformer metering, and capacitor banks. Nonphysical investments: Development of MIS for power trade function. Establishment of Energy Conservation Fund. Facilitation of private sector participation in distribution through piloting strategic partnership modality and expanding franchising scheme. Financial sustainability of power sector. Significant Developments of the Facility: Three (3) tranches were closed during the year. Tranche 4 (Loan 2347), tranche 5 (Loan 2520) and trance 6 (Loan 2732) were closed on 1 May and 31 December, respectively. Project completion reports for tranche 2 (Loan 2323) and tranche 3 (Loan 2346) were prepared and disclosed.

11

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 6

Approved Tranche Amount to Date

620.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

12

TRANCHE 4 UPDATE

Tranche TitleMFF-Madhya Pradesh Power Sector Investment Program (Tranche 4)

Project No. 32298-053

Country/Regional India Loan/Grant No.

2347

Project Officer Jyotirmoy Banerjee Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

21 Aug 2007 31 Dec 2011 01 May 2014

Division INRM

Tranche Amount($ million)

90.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32298-053/main

1 DED = Detailed Engineering Design.

13

Tranche Summary

ADB approved the MFF-Madhya Pradesh Power Sector Investment Program (Tranche 4), not exceeding the aggregate amount of $90.00 million on 21 August 2007. Impact: Contributed to sustaining economic growth and social development in Madhya Pradesh.Contributed to meeting the energy demand growth in Madhya Pradesh Outcome: - Part A: Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (DISCOM-E)- Part B: Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (DISCOM-C)- Part C: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (DISCOM-W)Distribution losses reduced.Supply quality and reliability improved.DISCOMs financial positions improved. Outputs: Part A: Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (DISCOM-E) Separation of feeder for agricultural consumers, effective consumer metering, and renovation of 33/11 kV substations. Part B: Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (DISCOM-C) Construction of high voltage distribution system in city area, remote metering for high valued consumers, and installation of capacitor banks. Part C: Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (DISCOM-W) Construction of high voltage distribution system in Rural and irrigation area of high value consumers, Bifurcation of Agriculture and Domestic loads , 33 KV bays and S/S renovation , Capacity addition , Capacitor Bank , addition and augmentation of 33 KV and 11 KV lines and I. T. enabling services. Institutional: Corporate Governance improved Human Resources Strengthened Commercial Operations Improved Implementation Arrangements: The MP State acting through 3 DISCOMs - DISCOM C (Bhopal), DISCOM E (Jabalpur) and DISCOM W (Indore) shall be the EA for the project. Implementation Status: The tranche was closed on 1 May 2014. All outputs achieved.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

1 DED = Detailed Engineering Design.

14

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

74.16 100.00 74.16 100.00

Significant Developments During the Year

Tranche 4 (Loan 2347) is a loan of $90.00 million from Ordinary Capital Resources (OCR), which was signed on 7 March 2008, declared effective on 11 June 2008 and closed 1 May 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 4 have reached $74.16 million (100.0%) and $74.16 million (100.0%), respectively. . Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: All covenants were complied.

1 DED = Detailed Engineering Design.

15

TRANCHE 5 UPDATE

Tranche TitleMFF - Madhya Pradesh Power Sector Investment Program - Project 5

Project No. 32298-063

Country/Regional India Loan/Grant No.

2520

Project Officer Jyotirmoy Banerjee Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

13 Apr 2009 30 Jun 2013 31 Dec 2014

Division INRM

Tranche Amount($ million)

166.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32298-063/main

1 DED = Detailed Engineering Design.

16

Tranche Summary

ADB approved the MFF - Madhya Pradesh Power Sector Investment Program - Project 5, not exceeding the aggregate amount of $166.00 million on 13 April 2009. Impact: Improved quality and reliability of power supply to meet demand for sustainable economic growth in Madhya Pradesh. Outcome: Reduction of electric distribution system losses, improved reliability of power, increased system capacity and improved customer connectivity. Outputs: Part A: DISCOM-C: Conversion of low voltage distribution to high voltage (11kV) distribution, introduction of automatic remote meter reading, and renovation and modernization of 33/11kV substations. Part B: DISCOM-E: Conversion of low voltage distribution to high voltage (11kV) distribution, and separation of agricultural feeders from village feeders. Part C: DISCOM-W: Augmentation, renovation and modernization of 33/11kV substations, construction of new 33/11kV substation, installation of capacitor banks in substations, construction of new and augmentation of existing 11kV lines, and enhancement of ITsystems (introduction of SCADA and remote metering reading) Implementation Arrangements: The MP state, acting through 3 DISCOMs - DISCOM C, DISCOM E, DISCOM W, is the EA agency. Each PMU established within the DISCOMs shall implement the subprojects for which the relevant DISCOM is responsible. Implementation Status: The tranche was closed on 31 December 2014. The following project components have been completed: DISCOM-C: (i) Construction of high voltage distribution system (HVDS) in two distribution circles, including the conversion of about 2,460 km of low voltage lines to high voltage lines and contraction of 1,385 km of new 11 kV lines and installation of 13,230 Nos. DTR; and (ii) renovation and modernization of approximately 444 Nos. of 33/11 kV. DISCOM-E: (i) Construction of HVDS in eight distribution division, including conversion of about 4,972 km of low voltage lines to high voltage lines and construction of 709 km of new 11 kV lines and installation of 17,503 distribution transformers and 3,921 ckt. Km LT to HT conversion has been completed; (ii) construction of approximately 1,000 km of 11 kV line to separate agricultural feeders from village feeders, and stringing of 632 Ckt. Km 11 KV line completed and 313 No. DTR installed. DISCOM-W: (i) Augmentation, renovation and modernization of approximately 50 nos. of 33/11 kV substations, - R&M of 44 Nos S/s; (ii) construction of 15 new 33/11 kV substations, 15 Nos New S/s constructed; (iii) installation of approximately 136 nos. of 1,200 kVAR and 150 nos. of 600 kVAR capacitor banks in 33/11 kV substations; (iv) construction of new 1,589.7 km and upgrading of 400 km of 11 kV lines, New 11KV 1051 Km. Augmentation-435 Km; (v) separation of village and agricultural feeders, including construction of new 1,758 km of 11 kV lines, additional 285 km of 33 kV lines, and installation of distribution transformers - 11 KV-1439 Km., DTR-1851 No., 33 KV-272.35 Km; (vi) installation of combined energy metering systems - 2447 Nos. energy meters installed; and (vii) LT System strengthening & Loss Reduction-28 Town.

1 DED = Detailed Engineering Design.

17

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 25 Apr 2014 Extension of Loan closing date by 6 months from 30 June 2014 to 31 December 2014.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

148.31 97.58 121.81 100.00

Significant Developments During the Year

Tranche 5 (Loan 2520) is a loan of $166.00 million from Ordinary Capital Resources (OCR), which was signed on 27 May 2009, declared effective on 7 September 2009 and closed on 31 December 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 5 have reached $148.31 million (97.6%) and $121.81 million (100.0%), respectively. . Scope Change: There was a minor change in scope for this tranche in 2014 to extend the loan closing date for 6 months to 31 December 2014. Undertaking and Covenants: Of the 34 covenants, 19 have been complied with, while 15 are currently being complied with.

1 DED = Detailed Engineering Design.

18

TRANCHE 6 UPDATE

Tranche TitleMadhya Pradesh Power Sector Investment Program - Tranche 6

Project No. 32298-073

Country/Regional India Loan/Grant No.

2732

Project Officer Jyotirmoy Banerjee Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

21 Dec 2010 30 Jun 2014 31 Dec 2014

Division INRM

Tranche Amount($ million)

69.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/32298-073/main

1 DED = Detailed Engineering Design.

19

Tranche Summary

ADB approved the Madhya Pradesh Power Sector Investment Program - Tranche 6, not exceeding the aggregate amount of $69.00 million on 21 December 2010. Impact: Contributed to sustained socio -economic growth in Madhya Pradesh Outcome: Improved operational performances of DISCOMs and MP Tradeco Outputs: Installed HVDS systems Renovated and upgraded distribution system Audited energy and consumer profile reports Computerized system management Implementation Arrangements: The Borrower the State, the DISCOMs and MP Tradeco have ensured that the Project is implemented in accordance with the detailed arrangements set forth in the PAM. Implementation Status: The tranche was closed on 31 December 2014. The following project components have been completed: DISCOM-C: (i) Work completed in 89 of the 132 new 33/11 kV substations and installation of 1,863 km of 33kV lines and 724 km of 11kV lines; (ii)installation of automatic meters on distribution transformers, GIS survey, consumer indexing & asset mapping in 87 Towns; (iii) work completed in 433 Nos. Capacitor Banks with 11 kV capacitor banks at 33/11 kV substations, and distribution transformers; (iv) installation of ME & Meter at 33 & 11 KV feeders at 419 substations; and (v) work completed at 322 substations for MDAS of all 33&11 KV feeders. DISCOM-E: Established Enterprise Resource Planning (ERP) system. DISCOM-W: Established Enterprise Resource Planning (ERP) system; and MPPMCL: established Enterprise Resource Planning (ERP) system.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 10 Apr 2014 Extension of loan closing date of subject loan by 6 months up to 31 December 2014.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

20

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

65.92 95.53 47.23 100.00

Significant Developments During the Year

Tranche 6 (Loan 2732) is a loan of $69.00 million from Ordinary Capital Resources (OCR), which was signed on 10 May 2011, declared effective on 29 June 2011 and closed on 31 December 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 6 have reached $65.92 million (95.5%) and $47.23 million (100.0%), respectively. . Scope Change: There was a minor scope change for this tranche in 2014 extending loan closing date for 6 months to 31 December 2014. Undertaking and Covenants: Of the 26 covenants, 14 have been complied with, while 12 are currently being complied with.

1 DED = Detailed Engineering Design.

21

Annual MFF Progress Report

35290013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - North Eastern Region Capital Cities Development Investment Program

Project No. 35290-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

23 Jun 2009 31 Dec 2015 30 Jun 2016

Division SAUW

MFF Amount ($ million)

200.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - North Eastern Region Capital Cities Development Investment Program for an aggregate amount not exceeding $200.00 million from ADB’s OCR on 23 June 2009. Impact: Improved environment and well-being of urban residents in the five program cities Outcome: Sustainable and increased access to better urban services in five program cities Outputs: Part A: Improved urban infrastructure and services A.1 Expanded and rehabilitated water supply systems A.2 Sewage collection, management, and treatment, and improved sanitation A.3 Solid waste management systems Part B: Strengthened institutional development and investment program management B.1 Urban institutional, financial, and service delivery reforms and strengthened municipal capacity B.2 Improved public utility management B.3 Increased public awareness B.4 Investment program capacity Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 2

Approved Tranche Amount to Date

102.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

22

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

23

TRANCHE 1 UPDATE

Tranche TitleNorth Eastern Region Capital Cities Development Investment Program, Tranche 1

Project No. 35290-023

Country/Regional India Loan/Grant No.

2528

Project Officer Neeta Pokhrel Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Mar 2011 30 Apr 2016 N/A

Division SAUW

Tranche Amount($ million)

30.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/35290-023/main

1 DED = Detailed Engineering Design.

24

Tranche Summary

ADB approved the North Eastern Region Capital Cities Development Investment Program, Tranche 1, not exceeding the aggregate amount of $30.00 million on 1 July 2009. Impact: Improved environment and well-being or urban residents in the five program cities. Outcome: Sustainable and increased access to better urban services in all 5 cities Outputs: The Project will provide prioritized urban infrastructure development subprojects in five cities, supported by a program of institutional development and capacity building. Part A. Improved urban infrastructure and services 1. Expanded and rehabilitated water supply systems 2. Solid waste management systems Part B: Strengthened institutional development and investment program management 3. Urban institutional, financial, and service delivery reforms and strengthened municipal capacity Activities with Milestones Implementation Arrangements: The executing agency is the Ministry of Urban Development (MOUD). An investment program coordination cell (IPCC) has been established in MOUD. IPCC is responsible for the overall management of NERCCDIP in the five cities. The team was tasked to (i) monitor overall the physical progress and implementation, (ii) review the subprojects submitted by the states according to the subproject selection criteria, (iii) consolidate payment and reimbursement requests, (iv) report on the progress of NERCCDIP implementation and other matters, (v) monitor implementation of the overall reform program and compliance with loan covenants, and (vi) provide assistance to the states. Implementation Status: Water supply and solid waste management projects - all subprojects in Aizawl, Agartala and Gangtok have been completed. Subprojects in Kohima and Shillong are nearing completion.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

25

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

22.88 99.73 17.56 100.00

Significant Developments During the Year

Tranche 1 (Loan 2528) is a loan of $25.54 million from Ordinary Capital Resources (OCR), which was signed on 4 August 2009 and declared effective on 19 November 2009. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $22.88 million (99.7%) and $17.56 million (100.0%), respectively. Physical Progress: Works are in various stages of implementation. All subprojects were completed in Aizwal and Gangtok. 3 subprojects were completed in Agartala and 1 subproject completed in Kohima. The remaining subprojects in Kohima and Shillong are nearing completion. Nonphysical Progress: Tranche 1 included consulting services to support design, construction supervision, and management, and institutional development activities. State Governments are implementing these activities. Design, supervision and management consultant in the five States and program management and monitoring consultant in Ministry of Urban Develpment (MoUD) have been recruited and are functioning well. Under capacity building the following were completed: urban institutional, financial, and service delivery reforms and strengthened municipal capacity; increased public awareness, and; investment program capacity while activities to improved public utility management are ongoing. Scope Change: There were no scope changes made for this tranche in 2014. Undertaking and Covenants: There are 13 undertakings and 28 covenants for Tranche 1. All the undertakings and covenants are being complied with by the EA. Five (5) of six (6) Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 1 were submitted on time and reviewed.

1 DED = Detailed Engineering Design.

26

TRANCHE 2 UPDATE

Tranche TitleNorth Eastern Region Capital Cities Development Investment Program - Tranche 2

Project No. 35290-033

Country/Regional India Loan/Grant No.

2834

Project Officer Neeta Pokhrel Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

31 May 2011 30 Jun 2016 N/A

Division SAUW

Tranche Amount($ million)

72.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/35290-033/main

1 DED = Detailed Engineering Design.

27

Tranche Summary

ADB approved the North Eastern Region Capital Cities Development Investment Program - Tranche 2, not exceeding the aggregate amount of $72.00 million on 16 December 2011. Impact: Sustainable urban services in 5 program cities Outcome: Improved access to selected urban services in 5 program cities Outputs: (i) Constructed and rehabilitated water supply infrastructure (ii) Constructed sanitation infrastructure (iii) Constructed and installed SWM infrastructure (iv) Strengthened local government for better financial management and sustainable service delivery (v) Efficient Project Management Unit (PMU) operational Implementation Arrangements: The executing agency is the Ministry of Urban Development (MOUD). An investment program coordination cell (IPCC) will be established in MOUD. IPCC will be responsible for the overall management of the project in the five cities. The team will (i) monitor overall the physical progress and implementation, (ii) review the subprojects submitted by the states according to the subproject selection criteria, (iii) consolidate payment and reimbursement requests, (iv) report on the progress of project implementation and other matters, (v) monitor implementation of the overall reform program and compliance with loan covenants, and (vi) provide assistance to the states. Implementation Status: For Water Supply, Solid Waste Management and Sanitation, 29 of the 41 contracts have been awarded, with physical works in various stages of implementation in all states. On strengthened local government, financial management and sustainable service delivery, reforms are in progress in 3 states, with support from IDC consultants. All Project Management Units have been formed in all 5 states and are functioning efficiently.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

28

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

41.51 100.00 12.22 100.00

Significant Developments During the Year

Tranche 2 (Loan 2834) is a loan of $60 million from Ordinary Capital Resources (OCR), which was signed on 19 November 2012 and declared effective on 19 February 2013. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $41.51 million (100.0%) and $12.22 million (100.0%), respectively. Physical Progress: All subprojects in Aizwal, Shillong, Kohima, Agartala and in Gangtok are in various stages of implementation. Nonphysical Progress: Tranche 2 includes consulting services to support design, construction supervision, and management, and institutional development activities. State Governments are implementing these activities. Accrual accounting work has been completed. The remaining components are in progress. Under capacity building, increased public awareness activities were completed while the following investment program capacity are ongoing: urban institutional, financial, service delivery reforms, strengthened municipal capacity; and improved public utility management. Scope Change: There were no scope changes made for this tranche in 2014. Undertaking and Covenants: There are 13 undertakings and 31 covenants for Tranche 2. All the undertakings and covenants are being complied with by the EA. Five (5) of the six (6) Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 2 were submitted on time and reviewed.

1 DED = Detailed Engineering Design.

29

Annual MFF Progress Report

36330013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Railway Sector Investment Program (Facility) Project No. 36330-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

31 Aug 2011 31 Dec 2018 N/A

Division SATC

MFF Amount ($ million)

500.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Railway Sector Investment Program (Facility) for an aggregate amount not exceeding $500.00 million from ADB’s OCR on 31 August 2011. Impact: Improved transport network and greater mobility Outcome: Energy-efficient, safe, reliable, affordable and environment-friendly railway system developed Outputs: 1. Expanded physical infrastructure and enhanced efficiency of infrastructure use 2. Improved operations efficiency of Indian Railways 3. Clean development mechanism (CDM) application and implementation for the investment program Significant Developments of the Facility: There were no major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 2

Approved Tranche Amount to Date

280.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

30

TRANCHE 1 UPDATE

Tranche Title Railway Sector Investment Program - Tranche 1 Project No. 36330-023

Country/Regional India Loan/Grant No.

2793

Project Officer Markus Roesner Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Oct 2011 30 Jun 2018 N/A

Division SATC

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/36330-023/main

Tranche Summary

ADB approved the Railway Sector Investment Program - Tranche 1, not exceeding the aggregate amount of $150.00 million on 18 October 2011. Impact: Improved transport system in the country Outcome: An energy-efficient, safe, reliable, affordable and environment-friendly railway system developed Outputs: 1. Expanded physical infrastructure and enhanced efficiency of infrastructure use 2. Improved operations efficiency 3. Clean development mechanism (CDM) application and implementation for the investment program Implementation Arrangements: The Ministry of Railways is the executing agency of the facility, with the Rail Vikas Nigam Ltd. as the key implementing agency for the railway improvement component. Retroactive financing and advance contracting for works, goods and consulting services have been approved. Loan proceeds will be disbursed in accordance with ADB's Loan Disbursement Handbook and detailed arrangements agreed upon between the Government and ADB. Implementation Status: One civil works contract was terminated and is under rebidding. All other works contracts have been awarded and ongoing. The piggy-backed technical assistance is ongoing, while the draft financing investment plan for implementing nationally appropriate mitigation action (NAMA) is being prepared.

1 DED = Detailed Engineering Design.

31

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

138.34 97.54 48.65 94.79

Significant Developments During the Year

Tranche 1 (Loan 2793) is a loan of $ 150 million from ordinary capital resources (OCR), which was signed on 9 Jul 2012 and declared effective on 05 October 2012. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $138.34 million (97.5%) and $48.65 million (94.8%), respectively. Works are ongoing, with the remaining two works contracts awarded in February and November 2014. The piggy-backed technical assistance is ongoing. The overseas training for key Indian Railways and Ministry of Railways staff for NAMA implementation has been completed. The draft financing investment plan is being prepared. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 15 undertakings and 47 covenants for Tranche 1, all of which are being complied with.

1 DED = Detailed Engineering Design.

32

TRANCHE 2 UPDATE

Tranche Title Railway Sector Investment Program - Tranche 2 Project No. 36330-033

Country/Regional India Loan/Grant No.

3108

Project Officer Markus Roesner Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

06 Feb 2014 30 Jun 2019 N/A

Division SATC

Tranche Amount($ million)

130.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/36330-033/main

Tranche Summary

ADB approved the Railway Sector Investment Program - Tranche 2, not exceeding the aggregate amount of $130.00 million on 6 February 2014. Impact: Energy-efficient, safe, reliable, affordable and environment-friendly railway transport developed Outcome: Improved railway transport capacity in the project rail routes Outputs: Track components delivered to construction sites for installation Implementation Arrangements: The Ministry of Railways is the executing agency of the facility, with the Rail Vikas Nigam Ltd. as the key implementing agency for the railway improvement component. Rretroactive financing and advance contracting for works, goods and consulting services have been approved. Loan proceeds will be disbursed in accordance with ADB's Loan Disbursement Handbook and detailed arrangements agreed upon between the Government and ADB. Implementation Status: The 2 contracts for supply of rails have been awarded. ADB has approved the award of the contract for the supply of thick web switches in November 2014.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

33

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

107.16 97.42 33.18 100.00

Significant Developments During the Year

Tranche 2 (Loan 3108) is a loan of $ 130 million from ordinary capital resources (OCR), which was signed on 17 February 2014 and declared effective on 28 March 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $107.16 million (97.4%) and $33.18 million (100.0%), respectively. The 2 contracts for the supply of rails have been awarded; ADB has approved the award of the contract for the supply of thick web switches in November 2014. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 23 undertakings and covenants for Tranche 2, which are all being complied with.

1 DED = Detailed Engineering Design.

34

Annual MFF Progress Report

37066013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Rural Roads Sector II Investment Program (Facility Concept)

Project No. 37066-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

20 Dec 2005 31 Mar 2010 N/A

Division INRM

MFF Amount ($ million)

750.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Rural Roads Sector II Investment Program (Facility Concept), not exceeding the aggregate amount of $750.00 million on 20 December 2005. Impact and Outcome: The impact of the MFF is to help reduce poverty and deprivation, and support economic growth of rural communities in India. The outcome is to enhance access to markets, employment opportunities, and social services, including health and education. Outputs: The expected output is to provide better and more efficient physical infrastructure which will lead to improve connectivity between rural and urban communities and greater access to markets and economic activity. Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 5

Approved Tranche Amount to Date

794.85

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

35

TRANCHE 5 UPDATE

Tranche TitleMFF - Rural Roads Sector II Investment Program - Tranche 5

Project No. 37066-063

Country/Regional India Loan/Grant No.

2651

Project Officer Ashok Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

06 Jul 2010 30 Jun 2013 01 Jan 2015

Division INRM

Tranche Amount($ million)

222.20 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37066-063/main

Tranche Summary

ADB approved the MFF - Rural Roads Sector II Investment Program - Tranche 5, not exceeding the aggregate amount of $222.20 million on 6 July 2010. Impact: Contribute to reduction in poverty and deprivation, and support economic growth of the communities connected by Investment Program roads. Outcome: Improved connectivity of rural community to markets, district headquarters, and other centers of economic activity via Investment Program roads Outputs: Construction and upgrading of rural roads into all- weather standard Improved community participation Implementation Arrangements: The executing agency, the Ministry of Rural Development (MORD), will oversee the mandate of the National Rural Roads Development Agency (NRRDA) in relation to the investment program. The NRRDA will be responsible for the supervision of the program. At the state level, the implementing agencies will be the state rural road development agencies (SRRDAs). Each is run by a chief executive officer, supported by suitably qualified technical, legal, financial, and othe professional and administrative staff. Consulting services will be provided for subproject design and execution tasks. Implementation Status: A total of 4,136 km of project roads was completed in June 2014.

1 DED = Detailed Engineering Design.

36

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

200.01 0.00 192.26 0.00

Significant Developments During the Year

Tranche 5 (Loan 2651) is a loan of $222.20 million from ordinary capital resources (OCR), which was signed 2 August 2010 and declared effective on 29 October 2010. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 5 have reached $200.01 million (.0%) and $192.26 million (.0%), respectively. Tranche 5 included non-investment interventions to strengthen the capacity of state-level agencies for the implementation of the program in the area of project planning and design, management oversight for construction activities, safeguards, procurement, and fiduciary arrangements. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: All undertakings and covenants have been complied with.

1 DED = Detailed Engineering Design.

37

Annual MFF Progress Report

37091013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Agribusiness Infrastructure Development Investment Program (Facility)

Project No. 37091-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

16 Sep 2010 31 Dec 2018 31 Dec 2018

Division INRM

MFF Amount ($ million)

170.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Agribusiness Infrastructure Development Investment Program (Facility) for an aggregate amount not exceeding $170.00 million from ADB’s OCR on 16 September 2010. Impact: Greater value of horticulture products captured by the stakeholders of the integrated value chain (IVC) inselected regions of Bihar and Maharashtra. Outcome: Private and public sectors invest and private sector manages at least 8 IVCs for horticultural HVC, which are inclusive of small scale farmers. Outputs: Value chain functioning. Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 2

Approved Tranche Amount to Date

91.90

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

Potential Problem

38

TRANCHE 1 UPDATE

Tranche TitleAgribusiness Infrastructure Development Investment Program - Tranche 1

Project No. 37091-023

Country/Regional India Loan/Grant No.

2669

Project Officer Paolo Spantigati Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

24 Sep 2010 30 Jun 2018 N/A

Division INRM

Tranche Amount($ million)

67.60 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37091-023/main

Tranche Summary

ADB approved the Agribusiness Infrastructure Development Investment Program - Tranche 1, not exceeding the aggregate amount of $67.60 million on 24 September 2010. Impact: Greater value of horticulture products captured by the stakeholders of the integrated value chain (IVC) in Muzaffarpur and Patna-Nalanda regions of Bihar. Outcome: Private and public sectors invest and private sector manages 2 end-to-end IVCs for horticultural high value crops (HVC), which are inclusive of small-scale farmers (through PPP contract). Outputs: A. IVCs Infrastructure in Muzzafarpur and Patna-Nalanda Set Up and Functional B. IVC stakeholders effectively particiapte in and properly manage the IVC C. State Government perform efficiently their regulatory and oversight functions of the IVCs and the PPP contracts Implementation Arrangements: The executing agency for this tranche is Bihar Department of Agriculture and the implementing agencyis Project Management Unit (PMU) within the Department of Agriculture in Bihar. Implementation Status: Contract for technical consultants supporting the PMU for the integrated value chains (IVC) public private partnerships are being finalized and expected to be signed in early 2015.

1 DED = Detailed Engineering Design.

39

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

Tranche 1 (Loan 2669) is a loan of $67.60 million from ordinary capital resources (OCR), which was signed on 9 July 2012 and declared effective on 30 August 2012. On 2 May 2014, the loan amount was reduced to $35.1 million after partial cancellation. Progress: As of 31 December 2014, no contract awards and disbursements were made under Tranche 1. The nonphysical outputs of Project 1 include sound project and PPP contract management systems, program management units (PMUs) that will provide implementation support, consulting services, and liaison and coordination with other line agencies. PMUs will establish and maintain with information on project activities, including procurement procedures and results. PMU will recruit a technical advisory group (TAG) whose main responsibilities include: (i) managing the entire bidding process, monitoring and evaluating IVC implementation during construction and operations; (vi) planning and implementing capacity building and training programs along the IVC; and (vii) preparing subsequent MFF tranches. Activities have yet to start. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Covenants for Tranche 1 are either being complied with or not yet due.

1 DED = Detailed Engineering Design.

40

TRANCHE 2 UPDATE

Tranche TitleAgribusiness Infrastructure Development Investment Program - Tranche 2

Project No. 37091-033

Country/Regional India Loan/Grant No.

2837

Project Officer Paolo Spantigati Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

19 Dec 2011 31 Dec 2015 N/A

Division INRM

Tranche Amount($ million)

24.30 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37091-033/main

Tranche Summary

ADB approved the Agribusiness Infrastructure Development Investment Program - Tranche 2, not exceeding the aggregate amount of $24.30 million on 19 December 2011. Impact: Increased producer returns from HVC from increased private sector investment in value adding infrastructure from value chains in Maharashtra. Outcome: Expanded agricultural value chains and better integration of small scale farmers into IVCs in the Nashik and Aurangabad-Amravati regions Outputs: 1. IVCs Infrastructure in Nashik and Aurangabad-Amravati regions set up and functional 2. IVC stakeholders effectively participate in and manage IVCs 3. Project Management support strengthened Implementation Arrangements: The Maharashtra Department of Cooperation, Marketing and Textile is the executing agency for Tranche 2 and the implementing agency is the Project Management Unit (PMU) within the Maharashtra State Agriculture Marketing Board. Implementation Status: Following the lack of responsive bidders after the first PPP bid, an exercise of restructuring the PPP model and revising the bid documents, to better solicit private sector interest, was initiated in November 2014. The revised bid is expected to be issued in April 2015.

1 DED = Detailed Engineering Design.

41

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.89 100.00 0.49 100.00

Significant Developments During the Year

Tranche 2 (Loan 2837) is a loan of $24.30 million from ordinary capital resources (OCR), which was signed 18 January 2012 and declared effective on 9 April 2012. On 16 January 2014, the loan amount was reduced to $11.2 million after partial cancellation. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $.89 million (100.0%) and $.49 million (100.0%), respectively. The nonphysical outputs include drafting concessionaire agreements and consulting services packages for (i) a technical advisory group (TAG1), (ii) market and value chain design and PPP and PMU implementation support teams (TAG2), (iii) management information systems, and (iv) monitoring and evaluation. Services of TAG 1 and TAG 2 consultants are ongoing and so is the selection process for private sector concessionaires. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Covenants for Tranche 2 are either being complied with or not yet due.

1 DED = Detailed Engineering Design.

42

Annual MFF Progress Report

37139013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Uttaranchal Power Sector Investment Program (Facility Concept)

Project No. 37139-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

30 Mar 2006 30 Jun 2012 30 Mar 2016

Division SAEN

MFF Amount ($ million)

300.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Uttaranchal Power Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $300.00 million from ADB’s OCR on 30 March 2006. Impact: Contribute to economic development in Uttaranchal and the northern region of India through expanded power supply at competitive prices Outcome: Clean Energy Development: (i) expansion of the electric power service area and improvements in the reliability and quality of supply; and (ii) promotion of energy efficiency by renovating, modernizing, and upgrading exisitng hydropower plantsTransmission Expansion:New associated hydropower plants connected to the state's grid and the northern region grid within 6 months of commissioningCapacity Building:Sector sustainability resulting from continued reforms and improvements in operational efficiency Outputs: CLEAN ENERGY DEVELOPMENT: New small hydropower plants Energy efficiency improvements by renovating, modernizing, and upgrading existing hydropower plants Development of hydrometeorological monitoring framework Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 4

Approved Tranche Amount to Date

284.92

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

43

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

Potential Problem

44

TRANCHE 1 UPDATE

Tranche TitleMFF - Uttaranchal Power Sector Investment Program (Subproject 1)

Project No. 37139-023

Country/Regional India Loan/Grant No.

2309

Project Officer Hiroki Kobayashi Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

02 Jan 2007 30 Jun 2012 30 Mar 2016

Division SAEN

Tranche Amount($ million)

41.92 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37139-023/main

1 DED = Detailed Engineering Design.

45

Tranche Summary

ADB approved the MFF - Uttaranchal Power Sector Investment Program (Subproject 1), not exceeding the aggregate amount of $41.92 million on 2 January 2007. Impact: Contribute to economic development in Uttaranchal and the northern region of India through expanded power supply at competitive prices Outcome: Clean Energy Development: (i) expansion of the electric power service area and improvements in the reliability and quality of supply; and (ii) promotion of energy efficiency by renovating, modernizing, and upgrading exisitng hydropower plantsCapacity Building: Sector sustainability resulting from continued reforms and improvements in operational efficiency Outputs: CLEAN ENERGY DEVELOPMENT: New small hydropower plants Energy efficiency improvements by renovating, modernizing, and upgrading existing hydropower plants Development of hydrometeorological monitoring framework CAPACITY BUILDING: Training of the Uttaranchal Energy Department and implementing agencies' staff for project management and implementation; development of human resource management program; upgrading of information technology systems Design of state-level power trading company Energy efficiency improvements by renovating, modernizing, and updgrading existing hydropower plants Energy efficiency improvements by renovating , modernizing, and upgrading existing hydropower plants Development of hydrometeorological monitoring network Implementation Arrangements: The executing agency is Uttarakhand Energy Department (UED) and the implementing agency is the Uttarakhand Jal Vidyut Nigam Limited (UJVNL). Implementation Status: The project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for rebuilding. The reconstruction of the damaged small hydropower (SHP) projects is to be completed by June 2019. There is an expected disbursement of $6.52 million from UJVNL and PMO within the remaining loan period until 30 March 2016. UJVNL estimates $14.56 million in cancellation.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 26 Sep 2014 Extension of loan closing date from 30 June 2014 to 30 March 2016.

1 DED = Detailed Engineering Design.

46

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

37.67 89.87 20.84 49.71

Significant Developments During the Year

Tranche 1 (Loan 2309) is a loan of $41.92 million from ordinary capital resources (OCR), which was signed 22 February 2007 and declared effective on 29 March 2007. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $37.67 million (89.9%) and $20.84 million (49.7%), respectively. The project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for rebuilding. While the loan has been extended, estimates suggest that $12.00 million will remain undisbursed at loan closing on 30 March 2016. A minimum of 3 years and 3 months beyond this will be required to complete the project that will be rebuilt after the disaster. Scope Change: There was a minor scope change for this tranche in 2014. Undertaking and Covenants: Undertaking and covenants are being complied.

1 DED = Detailed Engineering Design.

47

TRANCHE 2 UPDATE

Tranche TitleMFF - Uttarakhand Power Sector Investment Program - Project 2

Project No. 37139-033

Country/Regional India Loan/Grant No.

2498

Project Officer Hiroki Kobayashi Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

23 Dec 2008 30 Jun 2012 30 Mar 2016

Division SAEN

Tranche Amount($ million)

62.40 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37139-033/main

Tranche Summary

ADB approved the MFF - Uttarakhand Power Sector Investment Program - Project 2, not exceeding the aggregate amount of $62.40 million on 23 December 2008. Impact: Contribute to economic development in Uttarakhand and the northern region of India through expanded power supply at competitive prices Outcome: Transmission Expansion: New associated hydropower plants connected to the state's grid and the northern region grid within 6 months of commissioning Outputs: Transmission Expansion: Eight high-voltage transmission lines and associated substations constructed Capacity Building: The Uttarakhand Energy Department and implementing agencies' staff trained for project management and implementation; development of human resource management program; upgrading of information technology systems Implementation Arrangements: The executing agency is the Uttarakhand Energy Department and the implementing agency is Power Transmission Corporation of Uttarakhand Limited. Implementation Status: This project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for completion. A minimum of 3 years and 3 months beyond this will be required to complete the project that will be rebuilt after the disaster.

1 DED = Detailed Engineering Design.

48

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 26 Sep 2014 Extension of loan closing date from 30 June 2014 to 30 March 2016.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

47.28 75.77 5.24 8.39

Significant Developments During the Year

Tranche 2 (Loan 2498) is a loan of $ 62.40 million from ordinary capital resources (OCR), which was signed 25 February 2009 and declared effective on 27 April 2009. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $47.28 million (75.8%) and $5.24 million (8.4%), respectively. Loan 2498 was extended until 30 March 2016 (the end of the MFF availability period) and it is expected that at least $53.7 million will remain undisbursed at that time. Scope Change: There was a minor scope change for this tranche in 2014. Undertaking and Covenants: Undertaking and covenants are being complied.

1 DED = Detailed Engineering Design.

49

TRANCHE 3 UPDATE

Tranche TitleMFF - Uttarakhand Power Sector Investment Program - Project 3

Project No. 37139-043

Country/Regional India Loan/Grant No.

2502

Project Officer Hiroki Kobayashi Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

08 Jan 2009 30 Jun 2012 15 Dec 2015

Division SAEN

Tranche Amount($ million)

30.60 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37139-043/main

Tranche Summary

ADB approved the MFF - Uttarakhand Power Sector Investment Program - Project 3, not exceeding the aggregate amount of $30.60 million on 8 January 2009. Impact: Contribute to economic development in Uttarakhand and the northern region of India through expanded power supply at competitive prices Outcome: Transmission Expansion:New associated hydropower plants connected to the state's grid and the northern region grid within 6 months of commissioning Outputs: Transmission Expansion: Eight high voltage transmission lines and associated substations constructed Capacity Building: The Uttarakhand Energy Department and implementing agencies' staff trained for project management and implementation; development of human resource management program; upgrading of information technology systems Implementation Arrangements: The executing agency is the Uttarakhand Energy Department (UED) and the implementing agency is the Power Transmission Corporation of Uttarakhand Limited (PTCUL). Implementation Status: This project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for completion. This is the only project that is expected to achieve full project completion by the closing date. A minimum of 3 years and 3 months beyond this will be required to complete the four projects that will be rebuilt after the disaster.

1 DED = Detailed Engineering Design.

50

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 26 Sep 2014 Extension of loan closing date from 30 June 2014 to 15 December 2015.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

27.54 89.99 14.11 46.12

Significant Developments During the Year

Tranche 3 (Loan 2502) is a loan of $30.60 million from ordinary capital resources (OCR), which was signed 25 February 2009 and declared effective on 27 April 2009. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $27.54 million (90.0%) and $14.11 million (46.1%), respectively. This project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for completion. This is the only project that is expected to achieve full project completion by the closing date. Scope Change: There was a minor scope change under this tranche in 2014. Undertaking and Covenants: Undertaking and covenants are being complied.

1 DED = Detailed Engineering Design.

51

TRANCHE 4 UPDATE

Tranche TitleUttarakhand Power Sector Investment Program - Tranche 4

Project No. 37139-053

Country/Regional India Loan/Grant No.

2924

Project Officer Hiroki Kobayashi Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

26 Oct 2012 30 Mar 2016 N/A

Division SAEN

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37139-053/main

Tranche Summary

ADB approved the Uttarakhand Power Sector Investment Program - Tranche 4, not exceeding the aggregate amount of $150.00 million on 26 October 2012. Impact: Enhanced Hydropower Development in Uttarakhand. Outcome: Strong and reliable bulk power evacuation system from Uttarakhand to the Northern Grid. Outputs: Uttarakhand Integrated Transmission System for Alaknanda basin completed. Implementation Arrangements: The executing agency is the Uttarakhand Energy Department (UED) and the implementing agency is the Power Transmission Corporation of Uttarakhand Limited (PTCUL). Implementation Status: This project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for completion. A minimum of 3 years and 3 months beyond this will be required to complete the four projects that will be rebuilt after the disaster.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

52

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

75.56 97.57 7.28 100.00

Significant Developments During the Year

Tranche 4 (Loan 2924) is a loan of $150.10 million from ordinary capital resources (OCR), which was signed on 4 June 2013 and declared effective on 30 August 2013. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 4 have reached $75.56 million (97.6%) and $7.28 million (100.0%), respectively. This project was fundamentally delayed by the flood disaster in 2013 that substantial time is required for completion. It is expected that at least $142 million will remain undisbursed at the project's closing date. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Undertaking and covenants are being complied.

1 DED = Detailed Engineering Design.

53

Annual MFF Progress Report

37143013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - North Eastern State Roads Investment Program (Facility Concept)

Project No. 37143-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

21 Jul 2011 30 Jun 2017 30 Jun 2021

Division SATC

MFF Amount ($ million)

200.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - North Eastern State Roads Investment Program (Facility Concept) for an aggregate amount not exceeding $200.00 million from ADB’s OCR on 21 July 2011. Impact: Improved surface transport connectivity in NER. Outcome: Improved mobility and accessibility in the project areas. Outputs: 1. Reconstructed and rehabilitated state roads 2. Improved business process and staff skills of PWDs Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 2

Approved Tranche Amount to Date

200.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

54

TRANCHE 1 UPDATE

Tranche TitleMFF - North Eastern State Roads Investment Program - Tranche 1

Project No. 37143-023

Country/Regional India Loan/Grant No.

2770

Project Officer Chen Chen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Aug 2011 31 Dec 2016 N/A

Division SATC

Tranche Amount($ million)

74.80 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37143-023/main

1 DED = Detailed Engineering Design.

55

Tranche Summary

ADB approved the MFF - North Eastern State Roads Investment Program - Tranche 1, not exceeding the aggregate amount of $74.80 million on 22 August 2011. Impact: Improved surface transport connectivity in NER Outcome: Improved mobility and accessibility in the project areas Outputs: 1. Reconstructed and rehabilitated state roads 2. Improved business process and staff skills Implementation Arrangements: The executing agency is Ministry of Development of North Eastern Region (MDONER) and the implementing agencies are the State Public Works Departments of Assam, Meghalaya and Sikkim. Implementation Status: As of 31 December 2014, the status of civil works in each state is summarized as follows: (i) Assam achieved around 40% of overall physical progress; (ii) Meghalaya is currently in construction preparation stage; and (iii) Sikkim has achieved around 30% of project physical progress. Assam subproject under Tranche 1 has shown the most physical progress but there were delays in payments to the contractor due to delayed process of MDONER and state government to request reimbursement from ADB. To provide handholding support to MDONER in processing withdrawal applications properly and swiftly, ADB engaged a consultant whose assistance will further strengthen the capacity of the MDONER and help mainstream effective and efficient project implementation in processing fund release. The consultant commenced its services on 29 October 2014 and will be engaged until 28 February 2015.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

52.06 97.91 5.83 100.00

1 DED = Detailed Engineering Design.

56

Significant Developments During the Year

Tranche 1 (Loan 2770) is a loan of $74.80 million from ordinary capital resources (OCR), which was signed 9 July 2012 and declared effective on 22 October 2012. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $52.06 million (97.9%) and $5.83 million (100.0%), respectively. Pending payments for consultants and contractors were released to the states in December 2014. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 5 undertakings and 19 covenants for Tranche 1. All have been complied or being complied.

1 DED = Detailed Engineering Design.

57

TRANCHE 2 UPDATE

Tranche TitleNorth Eastern States Roads Investment Program (Project 2)

Project No. 37143-033

Country/Regional India Loan/Grant No.

3073

Project Officer Chen Chen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

02 Dec 2013 31 Mar 2020 N/A

Division SATC

Tranche Amount($ million)

125.20 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/37143-033/main

Tranche Summary

ADB approved the North Eastern States Roads Investment Program (Project 2), not exceeding the aggregate amount of $125.20 million on 2 December 2013. Impact: Improved mobility and accessibility in the project areas in NER Outcome: Improved efficiency of road transport in the projet areas in the states of Assam, Manipur, Mizoram and Tripura Outputs: Reconstructed and rehabilitated state roads Implementation Arrangements: The executing agency is Ministry of Development of North Eastern Region (MDONER) and the implementing agency is the State Public Works Department of Assam, Manipur, Mizoram and Tripura. The implementation period is estimated at 8 years including the pre-construction activities which started in September 2011. The completion date of the project is estimated to be in September 2019. Implementation Status: As of 31 December 2014, all subprojects are at the construction preparation stage.

1 DED = Detailed Engineering Design.

58

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

94.07 100.00 0.00 0.00

Significant Developments During the Year

Tranche 2 (Loan 3073) is a loan of $125.20 million from ordinary capital resources (OCR), which was signed on 17 February 2014 and declared effective on 20 May 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $94.07 million (100.0%) and $.00 million (.0%), respectively. There have been delays in payment to the contractor due to delayed process of MDONER. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 5 undertakings and 21 covenants for Tranche 2. All have been complied or being complied.

1 DED = Detailed Engineering Design.

59

Annual MFF Progress Report

38254013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - North Karnataka Urban Sector Investment Program (Facility Concept)

Project No. 38254-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

06 Dec 2006 30 Jun 2016 05 Dec 2016

Division SAUW

MFF Amount ($ million)

270.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - North Karnataka Urban Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $270.00 million from ADB’s OCR on 6 December 2006. Impact: Improvement of Urban Infrastructure and services resulting in overall improvement in quality of life in project ULBs; and related increase in economic opportunities and growth in north Karnataka and reduced imbalances between north Karnataka and the rest of the state Outcome: Improved basic urban services for at least the 4.3 million people living in the initially identified 25Investment Program ULBs Improved and sustainable infrastructure services within Investment Program ULBs that will in turn benefit the agriculture, industry and tourism sectorsPBDPS and/or PBMC modalities implemented and interest generated in other Indian states Outputs: Implemented investment program for sanitation Implemented investment program for water supply Implemented investment program for slum improvement in Investment Program ULB slums Implemented investment program for nonmunicipal infrastructure Implemented investment program for urban transport improvement Improved institutional capacity Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 4

Approved Tranche Amount to Date

279.30

Facility Change in Scope

Category Date Proposed Change

60

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

61

TRANCHE 1 UPDATE

Tranche TitleMFF - North Karnataka Urban Sector Investment Program (Subproject 1)

Project No. 38254-033

Country/Regional India Loan/Grant No.

2312

Project Officer Tatiana Gallego-Lizon Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

31 Dec 2007 31 Dec 2011 23 Jul 2014

Division SAUW

Tranche Amount($ million)

33.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

1.30

Project Data Sheet http://www.adb.org/projects/38254-033/main

1 DED = Detailed Engineering Design.

62

Tranche Summary

ADB approved the MFF - North Karnataka Urban Sector Investment Program (Subproject 1), not exceeding the aggregate amount of $33.00 million on 26 January 2007. Impact: Improvement of Urban Infrastructure and services resulting in overall improvement in quality of life in project ULBs; and related increase in economic opportunities and growth in north Karnataka and reduced imbalances between north Karnataka and the rest of the state. Outcome: Improved basic urban services and sustainable infrastructure services for 3 Investment Program ULBs Outputs: Implemented investment program for Sanitation - Sewerage Implemented investment program for Water Supply Implemented investment program for Non-Municipal Infrastructure (Equipment) Implemented investment program for Institutional Development Implementation Arrangements: The executing agency, the Karnataka Urban Infrastructure Development and Finance Corp (KUIDFC) in coordination with the regional office based in Dharwad, constitute the Program Management Unit (PMU) for the investment program. The PMU consists of a team of technical, administrative, social, environmental, and financial experts and officials that assist with and monitor the investment program implementation activities. Implementation Status: Water Supply - physical works for bulk, treatment and distribution networks were completed. Connections will be provided under Tranche 4. Sanitation - all 3 packages encountered implementation challenges with contractors and could not be completed; 250 kms. of water and 138 kms. of sewerage networks were completed; 9 kms. of water networks have been rehabilitated; 2,400 and 2,740 households were served with improved water and sanitation facilities, respectively; 9 MLD of additional water treatment capacity have been provided. Non-municipal Infrastructure - improvement of tourism infrastructure, district information centers, and procurement of fire-fighting equipment for target ULBs have been completed. Balance of works will be completed under Tranche 4.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 01 Apr 2014 Minor change in financing plan and reallocation of loan proceeds.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

1 DED = Detailed Engineering Design.

63

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

23.42 100.00 23.42 100.00

Significant Developments During the Year

Tranche 1 (Loan 2312) is a loan of $33.00 million (net value of $23.42 million) from ordinary capital resources (OCR), which was signed on 23 January 2008 and declared effective on 25 April 2008. The tranche was closed on 23 July 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $23.42 million (100.0%) and $23.42 million (100.0%), respectively. Tranche 1 included investment for project preparatory activities, as well as design and support for implementation. All work has been completed. As of closing date of 23 July 2014, net loan amount was $23.42 million. The unutilized amount $0.28 million was cancelled. Scope Change: There was a minor scope change for this tranche in 2014. Undertaking and Covenants: Undertakings and covenants have been complied by the EA including those petaining to reforms. The Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 1 were submitted on time and reviewed.

1 DED = Detailed Engineering Design.

64

TRANCHE 2 UPDATE

Tranche TitleMFF - North Karnataka Urban Sector Investment Program - Tranche 2

Project No. 38254-043

Country/Regional India Loan/Grant No.

2638

Project Officer Ashok Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

14 Jun 2010 30 Jun 2016 N/A

Division SAUW

Tranche Amount($ million)

123.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

7.20

Project Data Sheet http://www.adb.org/projects/38254-043/main

1 DED = Detailed Engineering Design.

65

Tranche Summary

ADB approved the MFF - North Karnataka Urban Sector Investment Program - Tranche 2, not exceeding the aggregate amount of $123.00 million on 14 June 2010. Impact: Improved quality of life relative to the whole state. Outcome: Improved basic urban services for people living in program 22 ULBs. Outputs: Enhance capacity of urban infrastructure - Slum Improvement Enhance capacity of urban infrastructure - Institutional Development Enhance capacity of urban infrastructure - Non-Municipal Enhance capacity of urban infrastructure - Water Supply Enhance capacity of urban infrastructure - Sanitation (Sewerage) Implementation Arrangements: The executing agency is the Karnataka Urban Infrastructure Development and Finance Corp (KUIDFC), and in coordination with the regional office based in Dharwad, constitute the Program Management Unit (PMU) for the investment program. Implementation Status: Physical works for sanitation and water supply are in progress. Five (5) contracts were awarded in 2014, 3 contracts terminated, and 1 contract to be cancelled. A total of 680 kms. of water and 397 kms. of sewerage networks have been completed, 109 kms. water and 29 kms. of sewerage networks rehabilitated, 8.05 kms. of new drains built, 20.48 MLD of additional water treatment capacity provided. Physical works are in progress for slum improvement, with 3,159 and 5,323 households served with improved water and sanitation facilities, respectively. Improvement of tourism infrastructure, district information centers, and procurement of fire-fighting equipment for target ULBs have been completed.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 29 May 2014 Minor change in project implementation agency for Component C (slum improvement - Infrastructure).

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

66

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

109.76 100.00 63.39 95.67

Significant Developments During the Year

Tranche 2 (Loan 2638) is a loan of $123.00 million from ordinary capital resources (OCR) which was signed on 16 December 2010, and declared effective on 1 March 2011. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $109.76 million (100.0%) and $63.39 million (95.7%), respectively. Five (5) contracts were awarded in 2014. Two (2) civil works sewerage packages were retendered and expected to be awarded by early 2015. Tranche 2 included investment assistance for Institutional Development - implementation of property tax with 75% coverage and application of the Fund-Based Accounting System (FBAS) have been achieved in all 25 ULBs. Technical and community education support were provided to project towns to enhance acceptance of volumetric water and sewerage tariffs among citizens. A PPP contract was awarded and mobilized for 24x7 water supply subproject in Ilkal under PBMC. Physical progress is on schedule with most pipe laying works completed, and works on connection provision and installation of meters is ongoing. On slum Improvement, NGOs were mobilized to target slum areas and are implementing community development programs including training and capacity development. Scope Change: There was a minor scope change for this tranche in 2014. Undertaking and Covenants: Undertakings are being complied. 3 of 21 covenants have been complied and the remaining 18 are being complied with by the EA. Activities are onging to improve tariff collection in ULBs. Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 2 were submitted on time and reviewed as per loan covenant.

1 DED = Detailed Engineering Design.

67

TRANCHE 3 UPDATE

Tranche TitleNorth Karnataka Urban Sector Investment Program - Tranche 3

Project No. 38254-053

Country/Regional India Loan/Grant No.

2882

Project Officer Ashok Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Aug 2012 30 Jun 2016 N/A

Division SAUW

Tranche Amount($ million)

60.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

3.50

Project Data Sheet http://www.adb.org/projects/38254-053/main

Tranche Summary

ADB approved the North Karnataka Urban Sector Investment Program - Tranche 3, not exceeding the aggregate amount of $60.00 million on 22 August 2012. Impact: Improved quality of life in program ULBs and increased economic growth relative to the whole state. Outcome: Improved access to better urban services in 8 ULB. Outputs: Upgraded urban infrastructure. Strengthened municipal management and project implementation capacity. Implementation Arrangements: The executing agency is the Karnataka Urban Infrastructure Development and Finance Corp (KUIDFC) in coordination with the regional office based in Dharwad, shall constitute the Program Management Unit (PMU) for the investment program. Implementation Status: For the sanitation works component, seven (7) contracts were awarded, with 44 kms. and 2 kms. of sewerage networks completed and rehabilitated, respectively. For the water supply component, two (2) contracts were awarded with 28.6 kms., water networks completed. For the non-municipal infrastructure component, two (2) contracts were awarded and four (4) UIB building interiors contracts were awarded. Three (3) mapping contracts were awarded for the survey component. The works commenced and physical works are in progress.

1 DED = Detailed Engineering Design.

68

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

44.88 100.00 13.32 100.00

Significant Developments During the Year

Tranche 3 (Loan 2882) is a loan of $60.00 million from ordinary capital resources (OCR), which was signed 19 July 2013 and declared effective on 11 October 2013. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $44.88 million (100.0%) and $13.33 million (100.0%), respectively. Ten (10) contracts were awarded in 2014: four (4) for sanitation, three (3) for building interiors, three (3) for survey. Work commenced and physical works are in progress for all components. On service delivery, majority metering expected with assistance under Tranche 4 on completion. Water collection efficiency remains insufficient. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Undertakings are being complied with. 4 of the 20 covenants have been complied and remaining 16 are being complied with by the EA. The Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 3 were submitted on time and reviewed.

1 DED = Detailed Engineering Design.

69

TRANCHE 4 UPDATE

Tranche TitleNorth Karnataka Urban Sector Investment Program - Project 4

Project No. 38254-063

Country/Regional India Loan/Grant No.

3088

Project Officer Saugata Dasgupta Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

09 Dec 2013 5 Dec 2016 N/A

Division SAUW

Tranche Amount($ million)

63.30 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38254-063/main

Tranche Summary

ADB approved the North Karnataka Urban Sector Investment Program - Project 4, not exceeding the aggregate amount of $63.30 million on 9 December 2013. Impact: Improved quality of life in 14 ULBs in North Karnataka. Outcome: Improved urban service delivery in 14 ULBs in North Karnataka Outputs: Upgraded water supply network Expanded sewerage infrastructure Improved roads and lake development infrastructure Strengthened service delivery management capacity Enhanced project management and implementation capacity Implementation Arrangements: The executing agency is the Karnataka Urban Infrastructure Development and Finance Corp (KUIDFC) in coordination with the regional office based in Dharwad, shall constitute the Program Management Unit (PMU) for the investment program. Implementation Status: Seven (7) contracts were cleared for awarding in 2014. Six (6) contracts were awarded in 2014. Works have commenced and physical works are in progress.

1 DED = Detailed Engineering Design.

70

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

17.14 100.00 2.16 0.00

Significant Developments During the Year

Tranche 4 (Loan 3088) is a loan of $63.30 million from ordinary capital resources (OCR), which was signed on 16 September 2014 and declared effective on 5 December 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 4 have reached $17.14 million (100.0%) and $2.16 million (.0%), respectively. The following 6 contracts were awarded in 2014: 2 contracts for sanitation; 3 for water supply; and 1 contract for non-municipal infrastructure. Physical works are in progress. Service delivery management capacity building has not yet commenced. Project management and implementation capacity buidling is ongoing. Seven (7) contracts were cleared for awarding with a cumulative value of $65.00 million. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Undertakings and covenants are being complied with by the EA. The Auditor's Report and Audited Project Financial Statements for fiscal year 2014 for Tranche 4 were submitted on time and reviewed.

1 DED = Detailed Engineering Design.

71

Annual MFF Progress Report

38255013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Uttarakhand State-Road Investment Program (Facility Concept)

Project No. 38255-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

18 Dec 2006 31 Dec 2017 N/A

Division SATC

MFF Amount ($ million)

550.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Uttarakhand State-Road Investment Program (Facility Concept) for an aggregate amount not exceeding $550.00 million from ADB’s OCR on 18 December 2006. Impact: Increased economic growth and reduced poverty in Uttarakhand Outcome: Improved efficiency and sustainability of road transport in Uttarakhand Outputs: 1. Paved, repaired, or rehabilitated state roads 2. Staff with improved skills in transparent planning (quality control, contract admin, etc) 3. Institutional reforms, etc. Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 3

Approved Tranche Amount to Date

340.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

72

TRANCHE 2 UPDATE

Tranche TitleMFF - Uttarakhand State-Road Investment Program (Subproject 2)

Project No. 38255-033

Country/Regional India Loan/Grant No.

2458

Project Officer Anil Kumar Motwani Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Oct 2008 31 Mar 2013 31 Mar 2015

Division INRM

Tranche Amount($ million)

140.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38255-033/main

1 DED = Detailed Engineering Design.

73

Tranche Summary

ADB approved the MFF - Uttarakhand State-Road Investment Program (Subproject 2), not exceeding the aggregate amount of $140.00 million on 22 October 2008. Impact: Increased economic growth and reduced poverty in Uttarakhand. Outcome: 1. Increased efficiency of inter- and intrastate transport services;2. Enhanced sustainability of road network in good condition; 3. Increased operational transparency and governance of PWD; 4. National road development programs synergized. Outputs: 1. Paved, repaired, or rehabilitated state roads 2. Staff with improved skills and revised operating procedures Implementation Arrangements: The Executing Agency is Public Works Department, Government of Uttarakhand (PWD, GoU). The EA has been assisted by Infrastructure Management Consultant (IMC-2) in the areas of (i) planning, and management information and project management system (MIPMS); (ii) road maintenance; and (iii) human resources strategy and training. IMC-2 also worked with PWD on a strategic plan for rehabilitation and maintenance of PWD roads through area based maintenance contracts. Implementation Status: The civil works for improvement and strengthening of about 898 km of state roads were awarded under 20 contract packages. Most of the civil works contracts have completed. Infrastructure Management Consultant (IMC) engaged under the project has assisted PWD in the implementation of the component in the areas of (i) planning, and management information and project management system (MIPMS); (ii) road maintenance; and (iii) human resources strategy and training. IMC has worked with PWD on a strategic plan for the rehabilitation and maintenance of PWD roads through area based maintenance contracts.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

74

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

114.33 100.00 104.75 100.00

Significant Developments During the Year

Tranche 2 (Loan 2458) is a loan of $140 million equivalent from the ordinary capital resources (OCR), which was signed on 10 February 2009, and declared effective on 22 April 2009. Upon the request of EA, the loan closing date was extended from 31 December 2014 to 31 March 2015 and a partial cancellation of loan amount of $12 million in 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $114.33 million (100.0%) and $104.75 million (100.0%), respectively. Infrastructure Management Consultant engaged under the Project has already completed its services. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Compliance with loan covenant is satisfactory.

1 DED = Detailed Engineering Design.

75

TRANCHE 3 UPDATE

Tranche TitleUttarakhand State-Road Investment Program - Tranche 3

Project No. 38255-043

Country/Regional India Loan/Grant No.

3040

Project Officer Prabhasha Sahu Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

09 Oct 2013 31 Dec 2017 N/A

Division INRM

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38255-043/main

Tranche Summary

ADB approved the Uttarakhand State-Road Investment Program - Tranche 3, not exceeding the aggregate amount of $150.00 million on 9 October 2013. Impact: Improved efficiency and sustainability of road transport in Uttarakhand Outcome: Improved efficiency of road transport in the project areas Outputs: 1. Selected priority roads are resurfaced, upgraded or rehabilitated 2. PWD staff skills and qualifications are improved 3. Road planning and programming uses objective data driven procedures and tools 4. Project management Implementation Arrangements: The Executing Agency is Public Works Department, Government of Uttarakhand (PWD, GoU). The EA will be assisted by 4 construction supervision consultants, 1 program management consultant and 1 project performance auditor. Implementation Status: The Project consists of 18 civil works contracts (14 NCB and 4 ICB); and 6 consulting services contracts. All contracts have been awarded and implementation is in progress.

1 DED = Detailed Engineering Design.

76

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 06 Mar 2014 A minor change in scope was made for this tranche in March 2014 to drop one road (Mundoli Vaan in Chamoli District under package C10) out of 89 roads from the Project scope since the work is included in another government program due to urgent need of rehabilitation work.

Tranche Performance

( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

142.61 100.00 16.18 100.00

Significant Developments During the Year

Tranche 3 (Loan 3040) is a loan of $150.00 million from ordinary capital resources (OCR), which was signed on 24 December 2013 and declared effective on 28 January 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $142.61 million (100.0%) and $16.18 million (100.0%), respectively. . Scope Change: There was minor change in scope for this tranche in 2014. Undertaking and Covenants: There are 43 covenants and undertakings which are generally complied and being complied.

1 DED = Detailed Engineering Design.

77

Annual MFF Progress Report

38272013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Uttarakhand Urban Sector Development Investment Program

Project No. 38272-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

24 Jan 2008 25 Jul 2016 N/A

Division SAUW

MFF Amount ($ million)

350.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Uttarakhand Urban Sector Development Investment Program for an aggregate amount not exceeding $350.00 million from ADB’s OCR on 24 January 2008. Impact: Access of the urban population to water supply and sanitation facilities, improved with focus on weak capacity states. Outcome: People, especially vulnerable households, will have better quality and sustainable urban infrastructure and services in 31 urban towns. Outputs: Water supply infrastructure rehabilitated and constructed in selected towns out of 14 candidate towns. Sewerage infrastructure rehabilitated and constructed in selected towns out of 17 candidate towns. Solid waste management infrastructure rehabilitated and constructed in selected towns out of the 29 candidate towns. ULBs' roles in urban service delivery increases. Operational efficiency in water supply operations increases. Operators of water supply and sewerage systems follow sound financial management. PMU and PIU s subproject management capacity and transparency strengthened. Urban traffic infrastructure improved in 14 small candidate towns. Community infrastructure in selected slums out of 118 slums in Dehradun, Nainital, Haridwar, and Rudrapur upgraded. Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 2

Approved Tranche Amount to Date

160.00

78

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

79

TRANCHE 1 UPDATE

Tranche TitleUttarakhand Urban Sector Development Investment Program - Project 1

Project No. 38272-023

Country/Regional India Loan/Grant No.

2410

Project Officer Saugata Dasgupta Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

01 Feb 2008 31 Dec 2012 25 Jan 2016

Division INRM

Tranche Amount($ million)

60.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38272-023/main

1 DED = Detailed Engineering Design.

80

Tranche Summary

ADB approved the Uttarakhand Urban Sector Development Investment Program - Project 1, not exceeding the aggregate amount of $60.00 million on 1 February 2008. Impact: Improved quality of life for the urban residents in Uttarakhand's selected towns of strategic importance. Outcome: The expected outcome of the Investment Program is increased access to better quality and sustainable urban infrastructure and services for about 1.9 million people expected to be living in Dehradun, Nainital, and Haridwar by the end of project period (2016). Outputs: Implemented water supply subproject in Dehradun Implemented water supply subproject in Nainital Implemented water supply subproject in Haridwar Implemented sewerage subproject in Dehradun Strengthened ULBs Restructured WSS utilities for efficient and financially sustainable service delivery Increased local revenues and improved financial management Prepared PPP packages for selected subprojects Implementation Arrangements: Urban Development Department, Government of uttarakhand (GoU)is the executing and implementing agency for the project. Project Management Unit (PMU) headed by Program Director, Project Implementation Units at Dehradun is established and functional. 2 Project Implementation Units (PIUs) at Dehradun and Nainital established and functtional. Project Management Consultant and Two Design and Supervision Consultants are provding consultancy support to the PMU and PIUs. Implementation Status: Out of 11 civil works contracts and 1 supply contract originally envisaged under the project, 6 contracts have been completed, 5 are under different stages of implementation, with one (1) contract retendered after termination of the original contract and is currently under price evaluation.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

81

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

54.44 100.00 37.29 91.74

Significant Developments During the Year

Tranche 1 (Loan 2410) is a loan of $60.00 million from ordinary capital resources (OCR), which was signed on 23 October 2008 and declared effective on 17 December 2008. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $54.44 million (100.0%) and $37.29 million (91.7%), respectively. Four works contracts have been physically completed to include the following: (i) 20 km of water pipeline has been laid; (ii) 15 water reservoirs were made operational; (iii) 54 pumps were commissioned and (iv) 16 km of sewers were laid. The state has also approved the accrual based double entry accounting manual. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 28 loan covenants, 27 of which have been complied with and 1 covenant for PPP modality is no longer considered.

1 DED = Detailed Engineering Design.

82

TRANCHE 2 UPDATE

Tranche TitleUttarakhand Urban Sector Development Investment Program - Tranche 2

Project No. 38272-033

Country/Regional India Loan/Grant No.

2797

Project Officer Saugata Dasgupta Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

31 Oct 2011 31 Dec 2015 N/A

Division INRM

Tranche Amount($ million)

100.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38272-033/main

1 DED = Detailed Engineering Design.

83

Tranche Summary

ADB approved the Uttarakhand Urban Sector Development Investment Program - Tranche 2, not exceeding the aggregate amount of $100.00 million on 3 November 2011. Impact: People, especially vulnerable households, will have increased access to better quality and sustainable urban infrastructure and services in 31 urban towns. Outcome: UDD and UUDSA provide improved urban services in 5 towns. Outputs: 1. Water supply infrastructure rehabilitated and constructed in Dehradun, Nainital, Haldwani, Ramnagar and Roorkee. 2. Sewerage infrastructure rehabilitated and constructed in Roorkee and designed for Ramnagar. 3. Performance of water supply operations improved in Nainital. 4. PMU and PIU's subproject management capacity and transparency strengthened. Implementation Arrangements: The Urban Development Department (UDD), Government of Uttarakhand (GoU) is the executing agency and implementing agency for the project. Project Management Unit, headed by Program Director is established and functional at Dehradun. 5 Project Implementation Units at Dehradun, Nainital, Ramnagar, Roorkee and Haldwani established and functional. Project Management Consultant and Design and Supervision Consultant recruited under Tranche 1 is providing consultancy support for this Tranche also. Implementation Status: Out of 10 civil works contracts envisaged under the project, 9 works contracts have been awarded and are in different stages of implementation, while 1 contract would be retendered shortly due to a high bid price. UDD is planning to bid the 3 supply contracts for the supply and installation of water meters and the water operator by March 2015.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

84

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

46.15 91.01 13.35 98.00

Significant Developments During the Year

Tranche 2 (Loan 2797) is a loan of $100.00 million from ordinary capital resources (OCR), which was signed on 31 January 2013 and declared effective on 15 April 2013. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $46.15 million (91.0%) and $13.35 million (98.0%), respectively. Two (2) works contracts worth $21.30 million have been awarded. 150 km of water pipeline has been laid and 14 water reservoirs were constructed in 2014. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 20 loan covenants, of which, 18 covenants have been complied and 2 are not yet due.

1 DED = Detailed Engineering Design.

85

Annual MFF Progress Report

38411013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - ORISSA Integrated Irrigated Agriculture & Water Management Investment Program (Facility Concept)

Project No. 38411-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

18 Sep 2008 30 Sep 2017 30 Sep 2017

Division SAER

MFF Amount ($ million)

188.20Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - ORISSA Integrated Irrigated Agriculture & Water Management Investment Program (Facility Concept) for an aggregate amount not exceeding $188.20 million from ADB’s OCR on 18 September 2008. Impact: Enhanced economic growth and reduced poverty in the selected river basins in Orissa with direct benefit to 1.7 million people in the subproject area Institutionalization of effective mechanisms to put into operation PIM-based agriculture growth Outcome: Enhanced productivity, water-use efficiency, and sustainability of irrigated agriculture in the selectedexisting schemes in the river basins having 215,000 hectares (ha) designed command areaImproved institutional performance of irrigation service delivery (with PIM) and water resources management (with IWRM) Outputs: A. Productive and Sustainable Irrigated Agriculture Management Systems 1. Participatory planning and WUA strengthening (a) Participatory scheme planning with feasibility studies and SIP (b) WUA micro plans (c) Strengthened WUAs: viable WUAs set up to become effective community organization, ready to receive investment support and to enhance agriculture production and women s participation 2. Irrigation and associated infrastructure including CAD: good quality infrastructure designed and constructed, following appraised plan and WUA micro plans 3. Agriculture development and livelihood enhancement: stipulated services in SIPs and micro plans provided, and set targets are achieved 4. Sustainable O&M systems established: irrigation schemes operated and maintained on a sustainable basis B. Institutions Strengthened and Project Management Systems Operational 1. Policy, planning, and legal framework (a) State Water Policy revised and implemented, with regular review by WRB (b) State Water Plan updated with basin plans for the four northern river basins (c) WUA Act and Rule refined for more sustainable and inclusive PIM 2. DOWR institutional setup, structure, skill mix, and business processes strengthened (a) Institutional development vision and strategy refined (b) Permanent PIM directorate established (c) Quality control cell established (d) DOWR CDP refined (e) WALMI reforms with autonomy 3. Systems to support sustainable O&M (a) Fund allocation following FC recommendations (b) Water rates

86

revised to meet the allocation needs (c) Collection improved with WUA involvement (d) Land records improved providing WUA-specific data for collection and demand (e) Scheme MIS for O&M performance monitoring and planning (f) DOWR establishes links between water rate collection and allocation (g) Pilot delegation of water tariff collection and retention by WUAs 4. Progress towards IWRM becoming operational (a) Appropriate IWRM functions and institutional arrangements defined (b) Institutions established to make IWRM operational (c) Participatory RBO established with DSS 5. Project management system established and made fully operational - DOWR offices - Line agencies - Local governments - WUAs - NGOs - Private providers 6. Training and Capacity Development: capacities of project institutions are strengthened through training (for project management, PIM, IWRM, and agriculture development) Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

16.50

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

87

TRANCHE 1 UPDATE

Tranche TitleORISSA Integrated Irrigated Agriculture & Water Management Investment Program - Project 1

Project No. 38411-023

Country/Regional India Loan/Grant No.

2444, 8240

Project Officer Cynthia (Cindy) Malvicini Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

26 Sep 2008 30 Sep 2013 31 Mar 2015

Division SAER

Tranche Amount($ million)

16.50 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38411-023/main

1 DED = Detailed Engineering Design.

88

Tranche Summary

ADB approved the ORISSA Integrated Irrigated Agriculture & Water Management Investment Program - Project 1, not exceeding the aggregate amount of $16.50 million on 8 October 2008. Impact: 1. Enhanced economic growth and reduced poverty in the selected river basins with direct benefit to 450,000 people in the tranche-1 subproject area (70,000ha).2. Initial institutionalization of effective mechanisms for Participatory Irrigation Management (PIM) Outcome: 1. Enhanced productivity, water use efficiency, and sustainability of irrigated agriculture in the selected existing schemes in 70,000 ha2. improved institutional performance of irrigation service delivery with empowered WUAs Outputs: Component A: Productive and sustainable irrigated agriculture management systems - A-1. Participatory Planning and WUA Strengthening A-2. Irrigation and associated infrastructure A-3. Agriculture Development and Livelihood Enhancement following micro-plans provided, and targets achieved A-4. Sustainable O&M Systems Established Component B. Institutions Strengthened and Project Management Systems B-1. Policy, Planning and Legal Framework B-2. DOWR Institutional Setup, Structure, Skill Mix, and Business Processes Strengthened B-3. Systems to Support Sustainable O&M B-4. Operationalizing IWRM B-5. Project Management System B-6. Training/Capacity Development Implementation Arrangements: The Department of Water Resources (DOWR) of the State of Orissa serves as the executing agency. DOWR has established a Project Management Unit (PMU) with the assignment of a full time Project Director. The PMU has a multidisciplinary structure comprising staff from DOWR and staff deputed from other line departments or recruited from the market. Assistance is also provided by a multidisciplanry team of consultants for institutional srengthening and project management for capacity development, quality control, and project management. The PMU is responsible for the identification, formulation, implementation, and operation and maintenance of all subprojects including conformance with the State, Nayional and ADB social and environmental safeguards policies. Implementation Status: The project provides a comprehensive approach to improved irrigation management (through structural and non-structural investments). Since start-up, it has been plagued by implementation delays mainly due to limited participation in bidding for civil works and a protracted bidding process. Civil works start up was slow and much oversight and capacity building was provided to support the EA in quality control and contract administration. The implementation arrangements for strengthening water users groups were also complex and required the integration of technical and social staff at field level. This was challenging and required time for fostering and support for the approach. Although the project struggled in its early stages, the midterm review mission fielded on 16-26 September 2013 noted a significant improvement, particularly in the pace of civil works implementation, which provided greater confidence in achieving a satisfactory completion of the project. As of 31 December 2014, overall physical progress on irrigation infrastructure was about 84% on main and distributary works and 77% on minor canals. Tranche 1 is expected to be completed by 31 March 2015 but the government is looking at a possible extension.

1 DED = Detailed Engineering Design.

89

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

39.26 100.00 29.42 92.23

Significant Developments During the Year

Tranche 1 (Loan 2444) is a loan of $16.5 million from ordinary capital resources (OCR), which was signed on 25 February 2009 and declared effective on 4 June 2009. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $39.26 million (100.0%) and $29.42 million (92.2%), respectively. About 84% of the works for modernization of irrigation infrastructure (main and distributary canals) have been completed while progress of minor canal works is about 76%. MILPs, WUA strengthening, and CAD works are also nearing completion. As mentioned above, Tranche 1 is expected to be completed by 31 March 2015 but the government is looking at a possible extension. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: 5 undertakings indicated in the Framework Financing Agreement have been complied with. There are 16 covenants for Tranche 1, of which 15 has been complied, while 1 remains to be complied. DOWR has generally complied satisfactorily with loan covenants associated with Project 1. Safeguards compliance has been satisfactory and has demonstrated good execution and mobilization of capable staff resources. Resettlement implementation is closely monitored by DOWR and ADB.

1 DED = Detailed Engineering Design.

90

Annual MFF Progress Report

38412013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program (Facility Concept)

Project No. 38412-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

19 Oct 2010 30 Sep 2017 30 Sep 2017

Division SAER

MFF Amount ($ million)

120.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program (Facility Concept) for an aggregate amount not exceeding $120.00 million from ADB’s OCR on 19 October 2010. Impact: Reduced economic vulnerability and social disruption caused by flood and riverbank erosion risks in Assam Outcome: FRERM systems in Assam provide enhanced resilience to flood and riverbank erosion risks in selected flood-prone areas along the Brahmaputra River, benefiting about 1 million people Outputs: 3. Institutional and financial capacities of FRERM institutions in Assam developed and strengthened 1. Integrated FRERM planning, institutional and knowledge bases developed and effectively implemented in Assam 2. Comprehensive FRERM nonstructural and structural measures developed, implemented, and sustainably maintained in selected subproject areas, protecting flood-prone areas along 90 km critical reach of the Brahmaputra River having 97,500 ha of urban and productive agriculture land Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

56.90

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

91

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

92

TRANCHE 1 UPDATE

Tranche TitleMFF - Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program - Tranche 1

Project No. 38412-023

Country/Regional India Loan/Grant No.

2684

Project Officer Natsuko Totsuka Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

25 Oct 2010 30 Sep 2014 31 Jul 2016

Division SAER

Tranche Amount($ million)

56.90 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/38412-023/main

1 DED = Detailed Engineering Design.

93

Tranche Summary

ADB approved the MFF - Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program - Tranche 1, not exceeding the aggregate amount of $56.90 million on 25 October 2010. Impact: FRERM systems provide enhanced resilience to flood and riverbank erosion risks in 3 subproject areas benefiting about 1 million people along the Brahmaputra River Outcome: State Government of Assam provides reliable, effective and sustainable FRERM systems in selected subproject areas in Assam along the Brahmaputra River Outputs: A. FRERM planning, institutional and knowledge basis established A.1. FRERM Policy and Plan Framework fully established A.2. Respective roles and key results areas of FRERM institutions clarified and their respective capacities for participatory DRM developed A.3. Improved data and knowledge base for integrated FRERM A.4. Knowledge sharing and regional networking mobilized and effective working relationships established for undertaking regular investigation and planning, and knowledge management activities B. Comprehensive FRERM program implemented with DMC participation B.1. Empowered communities play a role in FRERM Programs B.2. Nonstructural measures are provided to DMCs up to GP; and CBFRM provided to highly vulnerable villages B.3. Cost effective FRERM structural measures provided in the 3 subproject areas B.4. Sustainable FRERM infrastructure monitoring, maintenance and adaptation institutionalized in the 3 subproject areas C. FREMAA Program Management developed C.1. Appropriate project management system established incl. results monitoring with indicators agreed and baseline data determined C.2. Capacities of FRERM institutions strengthened 3. Efficient program management Implementation Arrangements: Assam state government, acting through the Flood and River Erosion Management Agency of Assam (FREMAA), is the executing agency. FREMAA is a special purpose vehicle for executing the project, and anchored to the Water Resources Department (WRD), the Government of Assam. The project management unit of FREMAA manages the overall project implementation, including technical, disaster risk management, safeguards, and financial matters. At each subproject level, subproject implementation offices (SIOs) were established augmenting the existing WRD filed offices. Implementation Status: The first tranche experienced initial start-up delays, but has been making progress with improved performance since 2012. The progress became visible especially in 2014. All major works in two out of three subprojects are in advanced stage. Two major flood embankment rehabilitation works, which were awarded in October to November 2013, also made visible physical progress during 2014. Partially completed riverbank protecion works have demonstrated protection functions during the monsoon seasons in 2013 and 2014. Community-based flood management capacity development activities, which started in April and August 2013, also progressed during 2014 in 32 villages in the two subproject areas (Dibrugarph and Palasbari). Physical works in the Kaziranga subproject area have not commenced, due to an unexpected delay in the environment clearance procedures, and were shifted to the second tranche. Affected by the start-up delays, the loan closing date was extended by 22 months from 30 September 2014 to 31 July 2016, to complete on-going activities in the two subproject areas.

1 DED = Detailed Engineering Design.

94

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

36.89 95.82 18.15 100.00

Significant Developments During the Year

Tranche 1 (Loan 2684) is a loan of $56.90 million from ordinary captial resources (OCR), which was signed on 10 May 2011 and declared effective on 4 August 2011. $7 million of the loan was cancelled in September 2014 and the closing date was extended by 22 months. The current tranche amount is $49.9 million. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $36.89 million (95.8%) and $18.15 million (100.0%), respectively. . Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: The five 5 undertakings indicated in the Framework Financing Agreement have been complied. 26 of the 28 covenants have been complied while 2 remains to be complied.

1 DED = Detailed Engineering Design.

95

Annual MFF Progress Report

39630013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - National Power Grid Development Investment Program (Facility Concept)

Project No. 39630-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

28 Mar 2008 31 Mar 2015 31 Mar 2015

Division SAEN

MFF Amount ($ million)

600.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - National Power Grid Development Investment Program (Facility Concept) for an aggregate amount not exceeding $600.00 million from ADB’s OCR on 28 March 2008. Impact: Increased transmission capacity and affordable and reliable power supply for sustained economic growth Outcome: National Power Grid strengthening and augmentation/expansion with transmission bottlenecks removed and losses reduced Outputs: 800kV HVDC North eastern Northern / Western Inter connector Upgrading transmission corridor from Uttaranchal Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 3

Approved Tranche Amount to Date

676.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

96

TRANCHE 1 UPDATE

Tranche TitleMFF - National Power Grid Development Investment Program (Tranche1)

Project No. 39630-023

Country/Regional India Loan/Grant No.

2415

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

28 Mar 2008 30 Jun 2013 30 Jun 2015

Division INRM

Tranche Amount($ million)

400.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/39630-023/main

Tranche Summary

ADB approved the MFF - National Power Grid Development Investment Program (Tranche1), not exceeding the aggregate amount of $400.00 million on 28 March 2008. Impact: Increased transmission capacity and affordable and reliable power supply for sustained economic growth. Outcome: National Power Grid strengthening and augmentation/expansion with transmission bottlenecks removed and losses reduced. Outputs: +/-800kV HVDC Northeastern Northern /Western Interconnector Implementation Arrangements: The executing agency is Power Grid Corporation of India Ltd. (POWERGRID). It has set up a program management unit (PMU) that will be responsible for processing and implementing the investment program, responsible for construction and commissioning of subprojects, and facilitate submission of the implementation progress reports Implementation Status: All 17 contract packages have been awarded for the inter-connector, with projects are under various stages of implementation.

1 DED = Detailed Engineering Design.

97

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

399.64 99.91 396.06 100.00

Significant Developments During the Year

Tranche 1 (Loan 2415) is a loan of $400 million from ordinary capital resources (OCR), which was signed on 28 March 2008, and declared effective on 25 June 2008. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $399.64 million (99.9%) and $396.06 million (100.0%), respectively. The physical outputs comprises of 800kV HVDC North eastern -Northern/ Western Region Interconnector. The nonphysical outputs of Project 1 included: (i) institutional capacity to strengthen corporate governance and improve operational efficiencies; (ii) enhanced financial viability through financial management, safeguard compliance, human resource management, and information technology. EA will be supported by technical experts in preparation of technical specifications and bidding documents, bidding and evaluation, construction supervision, and testing and commissioning of projects. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: All the covenants were complied or are being complied.

1 DED = Detailed Engineering Design.

98

TRANCHE 2 UPDATE

Tranche TitleMFF - National Power Grid Development Investment Program - Tranche 2

Project No. 39630-033

Country/Regional India Loan/Grant No.

2510

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

03 Mar 2009 30 Jun 2014 31 Dec 2015

Division INRM

Tranche Amount($ million)

200.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/39630-033/main

Tranche Summary

ADB approved the MFF - National Power Grid Development Investment Program - Tranche 2, not exceeding the aggregate amount of $200.00 million on 3 March 2009. Impact: To promote sustained social and economic prosperity and growth in India by providing adequate and reliable power supply. Outcome: Enhanced transmission network reliability and efficiency through expansion and augmentation of the national transmission grid. Outputs: +/-800kV HVDC Northeastern-Northern/Western Interconnector Implementation Arrangements: The executing agency is the Power Grid Corporation of India Ltd. (POWERGRID). It has set up a program management unit (PMU) that will be responsible for processing and implementing the investment program, responsible for construction and commissioning of subprojects, and facilitate submission of the implementation progress reports. Implementation Status: All 11 contract packages have been awarded and are under various stages of implementation.

1 DED = Detailed Engineering Design.

99

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

131.34 100.00 101.52 81.87

Significant Developments During the Year

Tranche 2 (Loan 2510) is a loan of $124.00 million from ordinary capital resources (OCR), which was signed 27 March 2009 and declared effective on 18 May 2009. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $131.34 million (100.0%) and $101.52 million (81.9%), respectively. . Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: All the covenants were complied or are being complied.

1 DED = Detailed Engineering Design.

100

TRANCHE 3 UPDATE

Tranche TitleNational Power Grid Development Investment Program - Tranche 3

Project No. 39630-034

Country/Regional India Loan/Grant No.

2823

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

07 Dec 2011 31 Mar 2015 N/A

Division INRM

Tranche Amount($ million)

76.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/39630-034/main

Tranche Summary

ADB approved the National Power Grid Development Investment Program - Tranche 3, not exceeding the aggregate amount of $76.00 million on 7 December 2011. Impact: Strengthened National Power Grid. Outcome: Enhanced capacity and reliability of supply in the Western and Northern Regions Outputs: New transmission and transformation capacity established in the UTs of D&NH and D&D. Increased capacity of existing substations in the Western and Northern Regions. Implementation Arrangements: POWERGRID is the Executing Agency and Implementing Agency (IA) responsible for day-to-day implementation of the project. A PMU, headed by Executive Director (Corporate Planning), will remain in place with responsibility for day-to-day project coordination and administration. Implementation Status: All the procurement packages were awarded and are at completion stages.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

101

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

74.46 100.00 48.73 97.24

Significant Developments During the Year

Tranche 3 (Loan 2823) is a loan of $76.00 million from ordinary capital resources (OCR), which was signed 30 March 2012 and declared effective on 7 May 2012. $25 million was cancelled in December 2014 so the current net loan amount is $51 million. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $74.46 million (100.0%) and $48.73 million (97.2%), respectively. Only physical outputs are expected under this Tranche. All the subprojects are almost completed. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: The undertakings and covenants are being complied.

1 DED = Detailed Engineering Design.

102

Annual MFF Progress Report

40031013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Rajasthan Urban Sector Development Investment Program

Project No. 40031-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

31 Oct 2007 31 Dec 2014 31 Dec 2016

Division SAUW

MFF Amount ($ million)

273.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Rajasthan Urban Sector Development Investment Program, not exceeding the aggregate amount of $273.00 million on 31 October 2007. Impact and Outcome: The impact of the MFF is to increase economic growth, reduce poverty, and sustain improvements in the urban environment and the quality of life in the 15 initially identified ULBs in Rajasthan. The outcome is to improve access to sustainable urban infrastructure and services for the 1.6 million people in the Investment Program ULBs, and to strengthen the capacity of these ULBs to manage urban services in a sustainable manner by the end of the Program (2014). Outputs: The expected outputs are grouped into two parts. Part A will improve (i) water supply systems in ULBs by rehabilitating, strengthening, and expanding networks and constructing new supply systems; (ii) sewerage and drainage by constructing new systems and extending existing ones; (iii) solid waste collection, processing and treatment, and disposal by developing sanitary landfill sites; (iv) road rehabilitation and road safety; (v) social infrastructure, such as slum improvements and other municipal facilities that may be prioritized as the master plans are updated and finalized; and (vi) infrastructure support for cultural heritage, such as access roads and sanitation facilities. The outputs in Part B will involve (i) capacity building and institutional development to make the state system more responsive, empower local government, improve the financial performance of the local bodies and service providers, and improve urban services overall for citizens; and (ii) management and implementation support for the implementation of the Investment Program. Significant Developments of the Facility: The resource availability period of the MFF was extended by 2 years to 31 December 2016. The loan closing date for Tranche 1 was extended up to 31 December 2014. ADB received a request, duly endorsed by the Borrower, for an extension of the loan closing dates of Tranche 2 and Tranche 3 until 30 June 2016. Beside this, there is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 3

Approved Tranche Amount to 273.00

103

Date

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

104

TRANCHE 1 UPDATE

Tranche TitleMFF - Rajasthan Urban Sector Development Investment Program (Tranche 1)

Project No. 40031-023

Country/Regional India Loan/Grant No.

2366

Project Officer Pushkar Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

08 Nov 2007 30 Jun 2013 31 Dec 2014

Division INRM

Tranche Amount($ million)

60.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40031-023/main

1 DED = Detailed Engineering Design.

105

Tranche Summary

ADB approved the MFF - Rajasthan Urban Sector Development Investment Program (Tranche 1), not exceeding the aggregate amount of $60.00 million on 8 November 2007. Impact: The Project will help increase economic growth, reduce poverty, and sustain improvements in the urban environment and the quality of life in the 3 ULBs in Rajasthan. Outcome: Improved access to urban infrastructure and services of three ULBs to manage urban services Outputs: Improvement in Water Supply in 3 project cities Improvement in sewerage and sanitation Improved solid waste management Improved urban transport Implementation Arrangements: The executing agency is the state government of Rajasthan acting through its Local Self Government Department (LSGD). The LSGD will manage the program in the urban local bodies (ULBs) through an investment program management unit (IPMU), which will (i) monitor the implementation of the investment program, (ii) review subprojects submitted by ULBs and periodic financing requests, (iii) report on the progress of the program. The IPMU is assisted by investment program management consultants (IPMC) in managing the Investment Program and ensuring the technical quality of design and construction. Implementation Status: There are 18 contract packages for civil works that have been awarded, out of which 10 contracts have been physically completed, one (1) contract has been held up due to lack of environmental clearances, while seven (7) contract packages are under advanced stages of implementation. Water Supply - 335 km of water pipelines laid (96% progress achieved); Sewerage and Sanitation - 98 km of sewer pipelines laid (67% of progress achieved); Construction of one STP was completed; Solid Waste Management - 1 MSW landfill site constructed; Urban Transport - Construction of one railway over bridge completed and put in use.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

106

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

53.86 99.74 49.48 91.63

Significant Developments During the Year

Tranche 1 (Loan 2366) is a loan of $60.00 million from ordinary capital resources (OCR), which was signed 17 January 2008 and declared effective on 28 February 2008. Based on the request of the Borrower, partial cancellation of $5.00 million and $1.00 million were undertaken effective 11 March 2014 and 17 June 2014, respectively. The net loan amount at present is $54.00 million. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $53.86 million (99.7%) and $49.48 million (91.6%), respectively. The unliquidated imprest advance under the tranche was liquidated in 2014. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Out of 39 covenants, 31 covenants have been complied, 2 are not yet due, and 6 are under process.

1 DED = Detailed Engineering Design.

107

TRANCHE 2 UPDATE

Tranche TitleRajasthan Urban Sector Development Investment Program - Tranche 2

Project No. 40031-033

Country/Regional India Loan/Grant No.

2506

Project Officer Pushkar Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

19 Jan 2009 30 Jun 2014 30 Jun 2016

Division INRM

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40031-033/main

1 DED = Detailed Engineering Design.

108

Tranche Summary

ADB approved the Rajasthan Urban Sector Development Investment Program - Tranche 2, not exceeding the aggregate amount of $150.00 million on 19 January 2009. Impact: Increased economic growth and sustained improvement in the urban environment and quality of life in the identified urban local bodies (ULBs) in Rajasthan (the Project ULBs) Outcome: Increased access to sustainable urban infrastructure and services for approximately 1.5 million people in the identified 12 Project ULBs by the end of the Project Outputs: Water supply subprojects successfully implemented Sewerage and sanitation subprojects successfully implemented Urban Transport subprojects successfully implemented Urban drainage subprojects successfully implemented Capacity development subproject successfully implemented in all Project ULBs Implementation Arrangements: The executing agency is the state government of Rajasthan acting through its Local Self Government Department (LSGD). The LSGD will manage the program in the urban local bodies (ULBs) through an investment program management unit (IPMU), which will (i) monitor the implementation of the investment program, (ii) review subprojects submitted by ULBs and periodic financing requests, (iii) report on the progress of the program. The IPMU is assisted by investment program management consultants (IPMC) in managing the Investment Program and ensuring the technical quality of design and construction. Implementation Status: Of the 44 civil work contracts awarded under Tranche 2, 15 contracts have been completed, 22 contracts are under implementation, and seven (7) contracts have been terminated. Water Supply - 1,040 km water pipelines laid (86% progress); Sewerage and Sanitation - 263 km sewers laid (71% progress), 7.56 km storm water drains constructed (100% progress); Urban Transport - two (2) bridges over river and four (4) rail over bridges constructed. One (1) rail over bridge is being constructed.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

109

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

122.48 100.00 90.39 97.95

Significant Developments During the Year

Tranche 2 (Loan 2506) is a loan of $131.30 million from ordinary capital resources (OCR), which was signed on 18 February 2009 and declared effective on 20 April 2009. ADB received a request, duly endorsed by the Borrower, for an extension of the loan closing date of Tranche 2 until 30 June 2016. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $122.48 million (100.0%) and $90.39 million (98.0%), respectively. $8.5 million worth of contracts were awarded and $13.2 million was disbursed in 2014. Scope Change: There were no scope changes for this tranche in 2014. However, being a sector loan, several new contracts were identified in December 2011 and added under the project to utilize loan savings, amount realized due to $ appreciation and amount kept under contingencies. Undertaking and Covenants: Out of 44 covenants, 36 covenants are complied, 2 covenants are not yet due, and 6 covenants are under process.

1 DED = Detailed Engineering Design.

110

TRANCHE 3 UPDATE

Tranche TitleRajasthan Urban Sector Development Investment Program - Tranche 3

Project No. 40031-053

Country/Regional India Loan/Grant No.

2725

Project Officer Manoj Sharma Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

13 Dec 2010 30 Jun 2015 30 Jun 2016

Division INRM

Tranche Amount($ million)

63.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40031-053/main

1 DED = Detailed Engineering Design.

111

Tranche Summary

ADB approved the Rajasthan Urban Sector Development Investment Program - Tranche 3, not exceeding the aggregate amount of $63.00 million on 13 December 2010. Impact: Increased access to sustainable urban infrastructure and services for 2.16 million people in the identified 15 ULBs. Outcome: Improved urban services in the 15 ULBs. Outputs: Improved and increased metered water supply service area in Baran and Chittorgarh. Increased sewerage treatment coverage in the 5 ULBs. Reduced flooding through improved urban drainage in Sawai Madhopur. Traffic flow improved as a result of construction of two minor bridges in Sawai Madhopur and one road work in Dholpur. Increased solid waste collection and disposal in 10 ULBs. Fire Fighting strengthened in at least 5 ULBs. Heritage sites in 7 ULBs conserved. Implementing Agencies and IAs effectively manage project financed assets. Implementation Arrangements: The executing agency is the state government of Rajasthan acting through its Local Self Government Department (LSGD). The LSGD will manage the program in the urban local bodies (ULBs) through an investment program management unit (IPMU), which will (i) monitor the implementation of the investment program, (ii) review subprojects submitted by ULBs and periodic financing requests, (iii) report on the progress of the program. The IPMU is assisted by investment program management consultants (IPMC) in managing the Investment Program and ensuring the technical quality of design and construction. Implementation Status: Out of 45 contracts which have been awarded to date, 24 contracts have been completed, one contract terminated and the remaining 20 contracts are under progress. Water Supply - 70% physical progress achieved; Sewerage and Sanitation - 44% physical progress achieved; Urban Transport - two (2) minor bridges completed and one (1) bridge is under advanced stage of implementation.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

112

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

60.72 100.00 30.79 95.59

Significant Developments During the Year

Tranche 3 (Loan 2506) is a loan of $63.00 million from ordinary capital resources (OCR), which was signed on 17 March 2011 and declared effective on 16 June 2011. ADB received a request, duly endorsed by the Borrower, for an extension of the loan closing date of the tranche until 30 June 2016. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $60.72 million (100.0%) and $30.79 million (95.6%), respectively. $8.8 million contracts were awarded and $9.1 million was disbursed in 2014. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: Out of 44 covenants, 38 covenants were complied, 1 covenant is not yet due, and 7 covenants are under process.

1 DED = Detailed Engineering Design.

113

Annual MFF Progress Report

40156013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Sustainable Coastal Protection and Management Investment Program (Facility)

Project No. 40156-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

31 Dec 2010 31 Dec 2019 31 Dec 2019

Division SAER

MFF Amount ($ million)

250.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Sustainable Coastal Protection and Management Investment Program (Facility) for an aggregate amount not exceeding $250.00 million from ADB’s OCR on 29 September 2010. Impact: Improved income and reduced poverty of the coastal communities in the subproject areas of three coastal states Outcome: Protected and managed shorelines in the three states meeting the needs of stakeholders and the environment. Outputs: Sustainable plans and management for shorelines developed (i) Participatory shoreline management plans to meet the long term needs for for shoreline management for 3 state coastlines prepared and endorsed; (ii) Coastal management information system to support planning and management established; (iii) Project management system established and operational, and subprojects for future tranches planned and designed. Coastal Erosion and Instability Reduced: (i) Costal erosion and instability reduced; (ii) Community and private sector engaged in coastal erosion and instability reduction Enhanced capacity for integrated shoreline planning and development - (i) Enhanced capacity for districts and states to plan, design, and implement shoreline protection and management projects; (ii) Enhanced capacity for state/district agencies, local experts/agencies, local bodies and stakholders to provide specialist support for planning, modelling, design, checking and review for coastal protection and management; (iii) Beaches are managed and maintained by the communities and stakeholders; (iv) SEAs formally mandated to coordinate all costal protection and management programs Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework except that tranche 2 preparation is ongoing in both the states.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

114

Approved Tranche Amount to Date

51.56

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

115

TRANCHE 1 UPDATE

Tranche TitleMFF - Sustainable Coastal Protection and Management Investment Program - Tranche 1

Project No. 40156-023

Country/Regional India Loan/Grant No.

2679

Project Officer Harish Varma Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

06 Oct 2010 31 Dec 2014 30 Jun 2017

Division INRM

Tranche Amount($ million)

51.56 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40156-023/main

1 DED = Detailed Engineering Design.

116

Tranche Summary

ADB approved the MFF - Sustainable Coastal Protection and Management Investment Program - Tranche 1, not exceeding the aggregate amount of $51.56 million on 6 October 2010. Impact: Improved income and reduced poverty of the coastal communities in the subproject areas of two coastal states Outcome: Protected and managed shorelines in the two states meeting the needs of stakeholders and the environment Outputs: 1. Sustainable plans and management for shorelines developed - (i) Participatory shoreline management plans to meet the long term needs for shoreline management for 2 state coastlines prepared and endorsed; (ii) coastal management information system, to support planning and management established; (iii) project management system established and operational, and supbrojects for future tranches planned and designed. 2. Coastal Erosion and Instability Reduced - (i) coastal erosion and instability reduced; (ii) community and private sector engaged in coastal erosion and instability reduction 3. Enhanced capacity for integrated shoreline planning and development - (i) Enchanced capacity for districts and states to plan, design, and implement shoreline protection and management projects; (ii) Enhanced capacity for state/district agencies, local experts/agencies, local bodies and stakeholders to provide specialist support for planning, modelling, design, checking and review for coastal protection and management; (iii) beaches are managed and maintained by the communities and stakeholders; (iv) SEAs formally mandated to coordinate all coastal protection and management programs Implementation Arrangements: The state executing agencies (SEAs) for Project-1 are Karnataka Public Works, Ports and Inland Water Transport Department for Karnataka and Maharashtra Maritime Board for Maharashtra. The government of each state has established a program steering committee (PSC) to provide broad project oversight; policy guidance; facilitate interdepartmental coordination; and help institutionalize effective mechanisms to plan, improve, and manage coastal management initiatives. A program management unit (PMU), headed by a project director has been established in each state. Implementation Status: Tranche1 is under implementation at present in the states of Karnataka and Maharashtra. In Karnataka for Ullal subproject, the contract for rehabilitation of breakwaters was awarded in July 2014, contract for offshore reefs was awarded in November 2014 and for sand/beach nourishment process will be started once significant construction progress is achieved for reef and berms. In both Maharashtra and Karnataka states, the process for setting up of coastal infrastructure management unit (CIMU) with coastal management information system (CMIS) is under progress. Development of shoreline management plans (SMPs) for coastal districts and establishment of shoreline management organistions (SMOs) is under progress in both states. Both state have developed training plan for capacity development of officers and other stakeholders and is being implemented.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

117

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

35.15 68.17 10.20 80.35

Significant Developments During the Year

Tranche 1 (Loan 2679) is a loan of $51.56 million from ordinary capital resources (OCR), which was signed on 17 August 2011 and declared effective on 28 November 2011. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $35.15 million (68.2%) and $10.20 million (80.3%), respectively. In Karnataka two (2) packages awarded - rehabilitation of breakwaters in July 2014 (ADB financing about $6.0 million) and offshore reefs (2 nos.) in November 2014 (ADB financing about $16.4 million). In both the states, process setting up of coastal infrastructure management unit (CIMU) is under progress. In Karnataka, government issued order for setting up CIMU on 21 February 2014 with 26 posts and CIMU is being established with deployment of staff. In Maharashtra, CIMU formed at head quarter level under chairmanship of CEO, MMB and 10 members from PMU and MMB staff. Fully operational coastal management information system (CMIS) is under progress in both states. In Karnataka, basic CMIS has been developed in excel format while in Maharashtra CMIS has been developed and uploaded on MMB website and further development of GIS part of CMIS is in progress. Development of shoreline management plans (SMPs) for coastal districts under progress in both states. In Karnataka SMP procedures and 2 SMP plan (for Dakshin Kannada (DK) and Udupi districts) out of 3 districts prepared and approved by PSC. SMP for Uttara Kannada prepared and further consultations process ongoing. In Maharashtra, draft SMP procedures (updated) was prepared and pilot plan for one (Sindhudurg) district out of 6 coastal districts prepared and for remaining districts are under preparation. Consultation for establishment of shoreline management organistions (SMOs) is under progress in both states. In Maharashtra, first SMO formed at Mirya Bay site. Both states have developed training plan for capacity development of officers and other stakeholders and is being implemented. Tranche 2 projects preparation ongoing in both states. In Karnataka, feasibility reports of 3 subprojects submitted and for 2 more subprojects expected to be submitted in January 2015 by PMDCK. In Maharashtra, 16 subprojects identified and prefeasibility studies are yet to be fully taken up. Tranche 1 implementation extended by 30 months until 30 June 2017 to complete the civil works and achieve the intended benefits. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 20 undertakings in project agreement and 30 covenants for Tranche 1. For undertakings, 19 are being complied and one is not yet due. For covenants, 14 were complied, 13 partially complied and 3 not yet due.

1 DED = Detailed Engineering Design.

118

Annual MFF Progress Report

40423013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Rural Connectivity Investment Program (Facility Concept)

Project No. 40423-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

12 Jul 2012 30 Jun 2018 N/A

Division SATC

MFF Amount ($ million)

800.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Rural Connectivity Investment Program (Facility Concept) for an aggregate amount not exceeding $800.00 million from ADB’s OCR on 12 July 2012. Impact: Reduction in poverty and deprivation, and inclusive socioeconomic growth of the communities served by the investment program roads Outcome: Connectivity of selected rural communities in five investment program states of Assam, Chhattisgarh, Madhya Pradesh, Odisha, and West Bengal to markets, district headquarters, and other centers of economic activity is improved and sustainable. Outputs: 1. Selected priority rural roads in five investment program states are constructed to all-weather standard 2. Quality of design of the investment program roads is improved. 3. Maintenance of the investment program roads is improved and sustained. 4. Road safety measures are incorporated into the life cycle of the investment program roads. 5. Qualification and skills of PMGSY engineers, technicians, site supervisors, PRI staff concerned, design consultants, and contractors in the investment program states are improved and maintained. 6. Facility is managed effectively. Significant Developments of the Facility: There were no major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 2

Approved Tranche Amount to Date

527.00

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

119

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

120

TRANCHE 1 UPDATE

Tranche Title Rural Connectivity Investment Program - Tranche 1 Project No. 40423-023

Country/Regional India Loan/Grant No.

2881

Project Officer Ashok Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Aug 2012 31 Dec 2015 N/A

Division INRM

Tranche Amount($ million)

252.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40423-023/main

1 DED = Detailed Engineering Design.

121

Tranche Summary

ADB approved the Rural Connectivity Investment Program - Tranche 1, not exceeding the aggregate amount of $252.00 million on 22 August 2012. Impact: Connectivity of selected rural communities in five RCIP states to markets, district headquarters, and other centers of economic activity is improved and sustainable Outcome: Connectivity of selected communities in five RCIP states prioritized by PMGSY for 2012 sanction is improved and sustainable Outputs: 1. Selected priority rural roads prioritized by PMGSY for 2012 sanction are constructed to all-weather standard 2. Quality of design of RCIP roads is improved 3. Maintenance of RCIP roads is improved and sustainable 4. Road safety measures are incorporated into the lifecycle of RCIP roads 5. Qualification and skills of PMGSY engineers, technicians, site supervisors, concerned staff of PRI, design consultants and contractors in RCIP states is improved and maintained 6. Effective project management provided Implementation Arrangements: The national executing agency is the Ministry of Rural Development (MORD). The state-level executing agencies are Assam Public Works Roads Department, Chhattisgarh State Department of Panchayat and Rural Development, Madhya Pradesh State Department of Panchayat and Rural Development, Odisha State Department of Rural Development, and West Bengal State Department of Panchayat and Rural Development. Implementation Status: About 1,212 km length of roads have been constructed, connecting a total of 338 habitations in 5 states: Assam- 44 km, 11 habitations; Chhattisgarh- 469 km, 181 habitations; Madhya Pradesh- 453 km, 76 habitations; Odisha- 181 km, 21 habitations; and, West Bengal- 64 km, 49 habitations.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

122

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

227.66 98.18 117.15 100.00

Significant Developments During the Year

Tranche 1 (Loan 2881) is a loan of $252.00 million from ordinary capital resources (OCR), which was signed 2 April 2013 and declared effective on 5 June 2013. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $227.66 million (98.2%) and $117.15 million (100.0%), respectively. 509 out of 533 contracts have been awarded, with 24 contracts under bidding: Assam - all 143 contracts awarded; Chhattisgarh - all 83 contracts awarded; Madhya Pradesh - all 112 contracts awarded; Odisha - 148 contracts awarded and 20 under bidding; and West Bengal - 23 contracts awarded and 4 contracts under bidding. Bid documents for RRNMUs and RCTRCs have been approved by ADB which will be bid out shortly. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 32 undertakings and covenants, all of which are being complied.

1 DED = Detailed Engineering Design.

123

TRANCHE 2 UPDATE

Tranche Title Rural Connectivity Investment Program - Tranche 2 Project No. 40423-033

Country/Regional India Loan/Grant No.

3065

Project Officer Ashok Srivastava Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

25 Nov 2013 31 Dec 2017 N/A

Division INRM

Tranche Amount($ million)

275.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40423-033/main

Tranche Summary

ADB approved the Rural Connectivity Investment Program - Tranche 2, not exceeding the aggregate amount of $275.00 million on 25 November 2013. Impact: Improved connectivity of selected rural communities in five RCIP states to markets, district headquarters, and other centers of socio-economic activity. Outcome: Improved accessibility of selected communities in five RCIP states Outputs: 1. Selected rural roads are constructed to all-weather standard 2. Quality of design of RCIP roads is improved 3. Maintenance of RCIP roads is improved and sustainable 4. Road safety measures are incorporated into the lifecycle of RCIP roads 5. Effective project management provided Implementation Arrangements: The national executing agency is the Ministry of Rural Development (MORD). The state-level executing agencies are Assam Public Works Roads Department, Chhattisgarh State Department of Panchayat and Rural Development, Madhya Pradesh State Department of Panchayat and Rural Development, Odisha State Department of Rural Development, and West Bengal State Department of Panchayat and Rural Development. Implementation Status: 148 km of roads have been constructed, and are accessible throughout the year: Assam- 1.5 km; Chhattisgarh- 16 km; Madhya Pradesh- 66 km; and, West Bengal- 64 km.

1 DED = Detailed Engineering Design.

124

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

168.01 100.00 40.77 100.00

Significant Developments During the Year

Tranche 2 (Loan 3065) is a loan of $275.00 million from ordinary capital resources (OCR), which was signed on 11 February 2014 and declared effective on 31 March 2014. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $168.01 million (100.0%) and $40.77 million (100.0%), respectively. State-wise road lists have been approved, while; procurement activities are ongoing for all five (5) states. Scope Change: There were no scope changes for this tranche in 2014. Undertaking and Covenants: There are 27 undertakings and covenants, are of which are being complied.

1 DED = Detailed Engineering Design.

125

Annual MFF Progress Report

40648013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Infrastructure Development Investment Program for Tourism (Facility Concept)

Project No. 40648-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

28 Sep 2010 30 Jun 2020 N/A

Division SAUW

MFF Amount ($ million)

250.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Infrastructure Development Investment Program for Tourism (Facility Concept) for an aggregate amount not exceeding $250.00 million from ADB’s OCR on 28 September 2010. Impact: Enhanced contribution of the tourism sector to sustainable and inclusive economic growth Outcome: Increased volume of domestic and international tourists to destinations within each participating state Outputs: Enhanced quality of natural and cultural attractions Strengthened capacity of sector agencies and local communities for planning, development, management, and marketing of tourist destinations and attractions Greater participation by local communities in tourism-related economic activities Improved basic urban infrastructure and services at tourist destinations and attractions Improved connectivity Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 3

Approved Tranche Amount to Date

210.77

Facility Change in Scope

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

126

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

127

TRANCHE 1 UPDATE

Tranche TitleInfrastructure Development Investment Program for Tourism - Tranche 1

Project No. 40648-023

Country/Regional India Loan/Grant No.

2676

Project Officer Ron H. Slangen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

04 Oct 2010 30 Jun 2017 N/A

Division SAUW

Tranche Amount($ million)

43.42 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40648-023/main

1 DED = Detailed Engineering Design.

128

Tranche Summary

ADB approved the Infrastructure Development Investment Program for Tourism - Tranche 1, not exceeding the aggregate amount of $43.42 million on 4 October 2010. Impact: Enhanced contribution of the tourism sector to sustainable and inclusive economic growth Outcome: Increased volume of domestic and international tourists to destinations within each participating state Outputs: Enhanced quality of natural and cultural attractions Greater participation by local communities in tourism-related economic activities Improved basic urban infrastructure and services at tourist destinations and attractions Improved connectivity Strengthened capacity of concerned sector agencies and local communities for planning, development, management and marketing of tourist destinations and attractions Implementation Arrangements: Punjab: As proposed during the project processing stage, the implementation arrangement, comprising the Department of Tourism (DOT), Government of Punjab (GOP) as the executing agency (EA), a state-level empowered committee (SLEC) chaired by state s' Chief Secretary, with Secretary of the DOT as member secretary and secretaries from relevant line departments; the Punjab Heritage and Tourism Promotion Board (PHTPB) as the Implementation Unit (IA) of the Investment Program housing the Project Management Unit (PMU) headed by the Project Director; Project Implementation Units (PIUs) in Amritsar and Ropar; the project implementation cell with the Forest Department; Project Management Consultant (PMC) and Design and Supervision Consultant (DSC) is in place and is functional. Himachal Pradesh: The Department of Tourism and Civil Aviation (DOTCA), Government of Himachal Pradesh is the executing agency. The Himachal Pradesh Tourism Development Board (HPTDB) is the implementing agency with a fully staffed Project Management Unit (PMU). Two PIUs (Kangra and Shimla) are established and fully staffed and another PIU in Kullu will be established and staffed. A State-Level Empowered Committee (SLEC) was established to take all decisions related to the investment Program on behalf of the State. A team of consultants including the Project Management Consultants (PMC), Design Supervision Consultants (DSC), and NGOs for community-based tourism development (under recruitment) are supporting the PMU and PIUs in project implementation. Implementation Status: Overall progress is satisfactory for Punjab and Himachal Pradesh.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 20 Jan 2014 Inclusion of Goods Category in Punjab

Minor Change 21 Aug 2014 Inclusion of Goods Category in Himachal Pradesh

1 DED = Detailed Engineering Design.

129

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

25.12 100.00 11.55 100.00

Significant Developments During the Year

Tranche 1 (Loan 2676) is a loan of $43.42 million from ordinary capital resources (OCR), which was signed on 20 July 2011, and declared effective on 26 October 2011. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $25.12 million (100.0%) and $11.55 million (100.0%), respectively. 28 contracts for civil works and goods amounting to $12.30 million. Scope Change: There were two (2) minor scope changes for this tranche in 2014. Undertaking and Covenants: Undertakings and pertinent loan covenants are being complied.

1 DED = Detailed Engineering Design.

130

TRANCHE 2 UPDATE

Tranche TitleInfrastructure Development Investment Program for Tourism - Tranche 2

Project No. 40648-033

Country/Regional India Loan/Grant No.

2833

Project Officer Ron H. Slangen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

15 Dec 2011 31 Dec 2017 N/A

Division SAUW

Tranche Amount($ million)

43.84 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40648-033/main

1 DED = Detailed Engineering Design.

131

Tranche Summary

ADB approved the Infrastructure Development Investment Program for Tourism - Tranche 2, not exceeding the aggregate amount of $43.84 million on 15 December 2011. Impact: Increased Volume of domestic and international tourists to destinations within the states of Tamil Nadu and Uttarakhand Outcome: Enhanced tourism environment in Tamil Nadu and Uttarakhand. Outputs: 1. Improved basic urban infrastructure and services at tourist destinations and attractions 2. Improved connectivity 3. Enhanced quality of natural and cultural attractions 4. Greater participation by local communities in tourism-related economic activities 5. Strengthened capacity of sector agencies and local communities for planning, development, management, and marketing of tourist destinations and attractions Implementation Arrangements: Uttarakhand: As proposed during the project processing stage, the implementation arrangement is: the Department of Tourism (DOT), Government of Uttarakhand (GOU) as the EA; a state-level empowered committee (SLEC) chaired by states' Chief Secretary, with Secretary of the DOT as member secretary; and secretaries from relevant line departments. The Uttarakhand Tourism Development Board (UTDB) as the IA of the Investment Program, housing the PMU headed by the Project Director; PIUs in Dehradun, Bhimtal and Kotdwar. PMC and DSCs is in place and is functional. Tamil Nadu: As proposed during the project processing stage, the implementation arrangement is: the Department of Tourism & Culture (DOTC), Government of Tamil Nadu (GOTN) as the EA; a state-level empowered committee (SLEC) chaired by states Chief Secretary, with Secretary of the DOT as member secretary and secretaries from relevant line departments. The Tamil Nadu Tourism Development Commissionerate (TNTDC) as the IA of the Investment Program, housing the PMU headed by the Project Director. PIUs is in place and is functional. PMC and DSC is in place and also functional. Implementation Status: In 2014, (i) 2 contract packages under Quality Enhancement of Natural and Cultural Attractions; (ii) 8 contract packages under Urban Infrastructure and Services Improvement; and (iii) 4 contract packages under Connectivity Improvement, were awarded. All these package are under various stages of implementation.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 21 Jul 2014 Inclusion of provision for procurement of goods in Tamil Nadu

1 DED = Detailed Engineering Design.

132

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

25.00 100.00 2.55 100.00

Significant Developments During the Year

Tranche 2 (Loan 2833) is a loan of $43.84 million from ordinary capital resources (OCR), which was signed on 2 April 2012, and declared effective on 19 June 2012. Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $25.00 million (100.0%) and $2.55 million (100.0%), respectively. 15 contracts for civil works and goods of $16.9 million were awarded. Scope Change: There was a minor scope change for this tranche in 2014. Undertaking and Covenants: Undertakings and pertinent loan covenants are being complied.

1 DED = Detailed Engineering Design.

133

TRANCHE 3 UPDATE

Tranche TitleInfrastructure Development Investment Program for Tourism - Tranche 3

Project No. 40648-034

Country/Regional India Loan/Grant No.

3223

Project Officer Ron H. Slangen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

11 Dec 2014 30 Jun 2020 N/A

Division SAUW

Tranche Amount($ million)

123.51 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/40648-034/main

Tranche Summary

ADB approved the Infrastructure Development Investment Program for Tourism - Tranche 3, not exceeding the aggregate amount of $123.51 million on 11 December 2014. Impact: increased volume of domestic and international tourists to destinations within the states of Himachal Pradesh, Punjab, and Uttarakhand. Outcome: enhanced tourism environment in Himachal Pradesh, Punjab, and Uttarakhand. Outputs: Enhanced quality of natural and cultural attractions Greater participation by local communities in tourism-related economic and livelihood activities Improved basic urban infrastructure and incidental services at tourist destinations and gateways Improved connectivity to tourist attractions Strengthened capacity of sector agencies and local communities for planning, development, management, and marketing of tourist destinations and attractions and promoting private sector participation and small businesses Implementation Arrangements: Not Applicable Implementation Status: Not Yet Effective

1 DED = Detailed Engineering Design.

134

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

135

Annual MFF Progress Report

41036013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Second India Infrastructure Project Financing Facility (IIPFF-II)

Project No. 41036-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

17 Nov 2009 31 Dec 2014 14 May 2014

Division SAPF

MFF Amount ($ million)

700.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Second India Infrastructure Project Financing Facility (IIPFF-II) for an aggregate amount not exceeding $700.00 million from ADB’s OCR on 17 November 2009.

Impact: Improved overall availability and reliability of physical infrastructure

Outcome: Increased private sector participation in infrastructure projects, particularly through PPP

Outputs: 1. Long-term funding for IIFCL to provide long-term financing to subprojects developed through PPPs2. Financing of 14 infrastructure subprojects as provided in the FFA3. Improved institutional capacity of IIFCL in areas of (i) governance framework, including risk managementsystems; and (ii) implementation of updated ESSF

Significant Developments of the Facility: Tranches 1 (Loan 2586), 2 (Loan 2717), and 3 (Loan 2822) were financially closed on 14 September 2011, 23 October 2012, and 14 May 2014 respectively ahead of target closing date.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 3

Approved Tranche Amount to Date

700.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

136

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

137

TRANCHE 3 UPDATE

Tranche TitleMFF - Second India Infrastructure Project Financing Facility (IIPFF II) - PFR3

Project No. 41036-043

Country/Regional India Loan/Grant No.

2822

Project Officer Cheolsu Kim Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

01 Dec 2011 14 Dec 2014 14 May 2014

Division SAPF

Tranche Amount($ million)

240.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41036-043/main

Tranche Summary

ADB approved the MFF - Second India Infrastructure Project Financing Facility (IIPFF II) - PFR3, not exceeding the aggregate amount of $240.00 million on 1 December 2011.

Impact: Containing and reducing fiscal deficit through private sector participation in infrastructure

Outcome: Increased private sector participation in infrastructure projects, particularly through improved lending terms of IIFCL for PPP

Outputs: 1. Provision of long-term credit by IIFCL to PPP infrastructure subprojects2. Improved institutional capacity of IIFCL in areas of (i) governance framework, including riskmanagement systems; and (ii) implementation of updated ESSF

Implementation Arrangements: Not applicable

Implementation Status: Not applicable

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

138

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

240.00 100.00 240.00 100.00

Significant Developments During the Year

Tranche 3 (Loan 2822) is a loan of $240.00 million from ordinary capital resources (OCR), which was signed on 21 March 2012, declared effective on 24 April 2012 and closed on 14 May 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $240.00 million (100.0%) and $240.00 million (100.0%), respectively. .

Scope Change: Not applicable

Undertaking and Covenants: Not applicable

1 DED = Detailed Engineering Design.

139

Annual MFF Progress Report

41116013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Jammu and Kashmir Urban Sector Development Investment Program (Facility Concept)

Project No. 41116-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

31 May 2007 31 Dec 2015 31 Mar 2017

Division SAUW

MFF Amount ($ million)

300.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Jammu and Kashmir Urban Sector Development Investment Program (Facility Concept) for an aggregate amount not exceeding $300.00 million from ADB’s OCR on 31 May 2007.

Impact: Sustainable economic growth through the provision of urban infrastructure services and the promotion of urban management improvement in Jammu and Srinagar, and selected towns with tourism potential in Jammu and Kashmir

Outcome: Improved living environment and employment opportunities for the 2.4 million people living in Srinagar, Jammu and other participating towns with tourism flow, and Improved capacities of participating institutions in managing sector reforms and service delivery

Outputs: Water supply system constructed Development of underground sewerage system and supply of sanitation of maintenance equipment Municipal solid waste processing and treatment with development of sanitary landfill sites Road and junction capacity augmentation and road safety improvements Capacity building and Institutional Development Implemented investment program for other municipal/urban infrstracture GIS created

Significant Developments of the Facility: In early September 2014, Jammu and Kashmir experienced heavy rainfall, and witnessed its worst floods and landslides in nearly 100 years. Most of Srinagar municipal areas were submerged with 3 to 5 meters level of water. Project implementation had been suspended for almost two months, but all works had been gradually resumed by end of the year. Beside this, there is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 3

Approved Tranche Amount to 212.20

140

Date

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

141

TRANCHE 1 UPDATE

Tranche TitleMFF - Jammu and Kashmir Urban Sector Development Investment Program (Subproject 1)

Project No. 41116-023

Country/Regional India Loan/Grant No.

2331

Project Officer Saugata Dasgupta Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

04 Jun 2007 31 Oct 2012 30 Apr 2015

Division INRM

Tranche Amount($ million)

42.20 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41116-023/main

1 DED = Detailed Engineering Design.

142

Tranche Summary

ADB approved the MFF - Jammu and Kashmir Urban Sector Development Investment Program (Subproject 1), not exceeding the aggregate amount of $42.20 million on 4 June 2007.

Impact: Sustainable economic growth though the provision of urban infrastructure services and the promotion of urban management improvement in Jammu and Srinagar, and selected towns with tourism potential in the state of Jammu & Kashmir.

Outcome: Improved living environment in Srinagar and Jammu

Outputs: Water supply system for Srinagar Development of underground sewerage system for part of Jammu Development of SWM treatment facility at Srinagar

Implementation Arrangements: The executing agency is the Economic Reconstruction Agency (ERA), Jammu and Kashmir. The ERA, under its Chief Executive Officer, is responsible for policy direction and strategic oversight. Two project management units (PMUs) have been created under the ERA for the implementation of the ongoing program, one in Jammu and the other one in Srinagar. PMUs identifies appraises, formulates and implements all subprojects and ensure compliance with the social and environmental safeguard policies.

Implementation Status: Of the 9 civil work contracts under the project, 3 contracts have been physically completed, 2 contracts are nearing completion and 4 contracts are at different stages of implementation. Capping activities of the first landfill cell constructed under the project is nearing completion. The second landfill cell has been commissioned. Also, the water supply line from Harwan to Nishat has been commissioned. In early September 2014, Jammu and Kashmir experienced heavy rainfall, and witnessed its worst floods and landslides in nearly 100 years. Most of Srinagar municipal areas were submerged with 3 to 5 meters level of water. Project implementation was severely affected for almost two months.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

143

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

37.05 99.61 31.38 100.00

Significant Developments During the Year

Tranche 1 (Loan 2331) is a loan of $42.20 million from ordinary capital resources (OCR), which was signed on 28 December 2007, and declared effective on 25 March 2008.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $37.05 million (99.6%) and $31.38 million (100.0%), respectively. $1.40 million worth of contracts were awarded and $5.40 million was disbursed in 2014. Interventions under Tranche 1 have benefitted the people of Jammu and Kashmir during recent floods by ensuring supply of water through the Harwan Nishat water pipeline. The second solid waste landfill cell helped the government to quickly clean Srinagar city and scientifically disposes huge quantity of debris after the flood thereby reducing health hazard and outbreak of diseases.

Scope Change: There was no change in scope for Tranche 1 in 2014.

Undertaking and Covenants: Out of the 44 covenants, 34 covenants have been complied, 1 covenant is not yet due, and 9 covenants are under process.

1 DED = Detailed Engineering Design.

144

TRANCHE 2 UPDATE

Tranche TitleJammu and Kashmir Urban Sector Development Investment Program - Tranche 2

Project No. 41116-033

Country/Regional India Loan/Grant No.

2925

Project Officer Ron H. Slangen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

26 Oct 2012 31 Mar 2017 N/A

Division SAUW

Tranche Amount($ million)

110.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41116-033/main

1 DED = Detailed Engineering Design.

145

Tranche Summary

ADB approved the Jammu and Kashmir Urban Sector Development Investment Program - Tranche 2, not exceeding the aggregate amount of $110.00 million on 26 October 2012.

Impact: Improved living environment in Jammu and Srinagar.

Outcome: Improved urban services in Jammu and Srinagar.

Outputs: 1. Improved water supply infrastructure.2. Improved urban transport infrastructure.3. Improved drainage infrastructure.4. Institutional capacity of ERA and ULBs strengthened.5. Project management system operational.

Implementation Arrangements: The executing agency is the Economic Reconstruction Agency (ERA), Jammu and Kashmir. The ERA, under its Chief Executive Officer, is responsible for policy direction and strategic oversight. Two project management units (PMUs) have been created under the ERA for the implementation of the ongoing program, one in Jammu and the other one in Srinagar. PMUs identifies appraises, formulates and implements all subprojects and esnure compliance with the social and environmental safeguard policies.

Implementation Status: All 12 civil works contracts have been awarded. Three small goods packages remains to be awarded and are at an advanced stage of bidding. In early September 2014, Jammu and Kashmir experienced heavy rainfall, and witnessed its worst floods and landslides in nearly 100 years. Most of Srinagar municipal areas were submerged with 3 to 5 meters level of water. Project implementation was severely affected for almost two months. Works gradually resumed in December 2014.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

146

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

74.59 100.00 11.76 77.40

Significant Developments During the Year

Tranche 2 (Loan 2925) is a loan of $110.00 million from ordinary capital resources (OCR), which was signed 16 May 2013 and declared effective on 19 August 2013.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $74.59 million (100.0%) and $11.76 million (77.4%), respectively. $16.40 million of contracts were awarded and $7.10 million was disbursed in 2014. This project covers implementation support and capacity building of government agencies to promote reform agenda. Consultants for implementation support and capacity building are in place.

Scope Change: There were no scope changes in scope for this tranche in 2014.

Undertaking and Covenants: Out of 21 covenants, 16 covenants have been complied and 5 covenants are under process.

1 DED = Detailed Engineering Design.

147

TRANCHE 3 UPDATE

Tranche TitleJammu and Kashmir Urban Sector Development Investment Program - Tranche 3

Project No. 41116-043

Country/Regional India Loan/Grant No.

3132

Project Officer Atsushi Kaneko Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

05 Aug 2014 31 Mar 2017 N/A

Division SAUW

Tranche Amount($ million)

60.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41116-043/main

Tranche Summary

ADB approved the Jammu and Kashmir Urban Sector Development Investment Program - Tranche 3, not exceeding the aggregate amount of $60.00 million on 18 June 2014.

Impact: improved living environment in Srinagar and Jammu.

Outcome: improved urban services in Jammu and Srinagar.

Outputs: Improved water supply infrastructure. Improved urban transport infrastructure. Improved drainage infrastructure. Institutional capacity of the Srinagar and Jammu Municipal Corporations improved.

Implementation Arrangements: Not applicable

Implementation Status: Not applicable

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

148

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

Tranche 3 (Loan 3132) is a loan of $60.00 million from ordinary capital resources (OCR), which was approved on 18 June 2014.

Progress: Not applicable

Scope Change: Not applicable

Undertaking and Covenants: Not applicable

1 DED = Detailed Engineering Design.

149

Annual MFF Progress Report

41598013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - National Capital Region Urban Infrastructure Financing Facility (Facility Concept)

Project No. 41598-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

10 Aug 2010 30 Jun 2017 30 Jun 2018

Division SAUW

MFF Amount ($ million)

150.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - National Capital Region Urban Infrastructure Financing Facility (Facility Concept) for an aggregate amount not exceeding $150.00 million from ADB’s OCR on 10 August 2010.

Impact: Improved quality of life and economic well-being of urban residents in NCR and CMAs

Outcome: Urban residents use improved growthsupporting, public health, and environmental urban infrastructureservices in the intervention cities of NCR and CMAs in accordance with Regional Plan 2021 priorities

Outputs: High quality urban public health and environmental infrastructure created High quality economic growth-related regional and urban infrastructure created Strengthened capacity of NCRPB and subborrowers to scale-up urban infrastructure and improve basic urban services

Significant Developments of the Facility: A minor change in scope was approved for the Facility in 2014 for a one-year extension of the MFF availability period.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

78.00

Facility Change in ScopeCategory Date Proposed Change

Minor Change 17 Nov 2014 One-year extension of the MFF availability period from 30 June 2017 to 30 June 2018

150

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

151

TRANCHE 1 UPDATE

Tranche TitleMFF -National Capital Region Urban Infrastructure Financing Facility -Tranche 1

Project No. 41598-023

Country/Regional India Loan/Grant No.

2660

Project Officer Norio Saito Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Aug 2010 31 Dec 2014 N/A

Division SAUW

Tranche Amount($ million)

78.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41598-023/main

1 DED = Detailed Engineering Design.

152

Tranche Summary

ADB approved the MFF -National Capital Region Urban Infrastructure Financing Facility -Tranche 1, not exceeding the aggregate amount of $78.00 million on 18 August 2010.

Impact: Urban residents use improved urban infrastructure services in the intervention cities of National Capital Region (NCR) and counter magnet areas (CMA) in accordance with Regional Plan 2021 priorities.

Outcome: Improved transport system and connectivity in NCR, and access to safe drinking water in subproject cities.

Outputs: Road network improved in Jhajjar and Sonepat Districts Traffic diverted from Badli city center Multi-Modal Transit Centers (MMTC) developed in Anand Vihar and Sarai Kale Khan Provision of safe drinking water and water supply coverage increased in Panipat City Project Management and capacity building Provision of safe drinking water and water supply coverage increased in Pataudi

Implementation Arrangements: The executing agency is the National Capital Region Planning Board (NCRPB). The Project Sanctioning and Monitoring Group (PSMG) of NCRPB will continue to be the focal point for subproject appraisal, approval, and overall guidance. NCRPB will hire additional staff to strengthen the project management unit (PMU). The project divisions of the various sub-borrowers oversee subproject implementation.

Implementation Status: Two road subprojects completed; four road subprojects in various stages of construction (from 68% to 96%); two water supply subprojects 10% to 23% completed; and one drainage subproject 60% completed. Remaining works will be financed by Tranche 2, if approved, or by NCRPB.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

153

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

60.02 100.00 60.00 100.00

Significant Developments During the Year

Tranche 1 (Loan 2660) is a loan of $60.00 million from ordinary capital resources (OCR), which was signed on 17 March 2011, and declared effective on 29 June 2011. As of 31 December 2014, Tranche 1 was closed and the net loan amount was fully disbursed.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $60.02 million (100.0%) and $60.00 million (100.0%), respectively. All nine subprojects (10 packages) and a project management consultant contract were awarded/committed by June 2014. Two road subprojects were physically completed. Six subprojects (three road, two water supply, and one drainage) will continue to be supported under Tranche 2, if it is approved. Two individual external auditors for the environment and social management system were recruited in November 2014.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are nine (9) undertakings and eight (8) covenants for Tranche 1. The undertakings and covenants are being mostly complied with. In one road subproject, compensation has not been paid to affected people as the implementing agency is claiming the land ownership.

1 DED = Detailed Engineering Design.

154

Annual MFF Progress Report

41603013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Bihar Urban Development Investment Program (Facility Concept)

Project No. 41603-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

01 Mar 2012 31 Dec 2021 N/A

Division SAUW

MFF Amount ($ million)

200.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Bihar Urban Development Investment Program (Facility Concept) for an aggregate amount not exceeding $200.00 million from ADB’s OCR on 29 March 2012.

Impact: Urban population in relatively poor and weak capacity state (Bihar) has improved access to water supply and sanitation facilities.

Outcome: People, especially vulnerable household, will have access to better quality and sustainable urban water supply and sewerage services in Bhagalpur, Darbhanga, Gaya and Muzaffarpur.

Outputs: Water supply infrastructure in 3 towns improved. Sewerage infrastructure in 1 town improved. O&M of the asset created by the subprojects improved. Urban service delivery management improved. Project management and implementation skills and transparency in improved.

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

65.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

155

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

156

TRANCHE 1 UPDATE

Tranche TitleBihar Urban Development Investment Program - Tranche 1

Project No. 41603-023

Country/Regional India Loan/Grant No.

2861

Project Officer Neeta Pokhrel Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

16 Apr 2012 30 Jun 2017 N/A

Division SAUW

Tranche Amount($ million)

65.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

4.00

Project Data Sheet http://www.adb.org/projects/41603-023/main

Tranche Summary

ADB approved the Bihar Urban Development Investment Program - Tranche 1, not exceeding the aggregate amount of $65.00 million on 13 April 2012.

Impact: People, especially vulnerable household, will have increased access to better quality and sustainable urban infrastructure and services in Bhagalpur, Darbhanga, Gaya and Muzaffarpur.

Outcome: BUIDCo and ULB improve infrastructure, operations and sustainability in water supply in Bhagalpur.

Outputs: 1. Water supply infrastructure rehabilitated and newly constructed in Bhagalpur.2. Staffing and skills for water supply operations improved in Bhagalpur.3. Systems for water supply service delivery management improved in Bhagalpur.4. Subproject implemented on time within the budget in a transparent manner.

Implementation Arrangements: Executing agency is UDHD and implementing agency is BUIDCO.

Implementation Status: Design-build-operate contract awarded and is in the design phase. Construction is expected to start in late 2015.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

157

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

46.25 100.00 6.02 100.00

Significant Developments During the Year

Tranche 1 (Loan 2861) is a loan of $65.00 million from ordinary capital resources (OCR), which was signed on 25 March 2013 and declared effective on 6 June 2013. $8.00 million was cancelled from Tranche 1 in November 2014 upon the request of the Government.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $46.25 million (100.0%) and $6.02 million (100.0%), respectively. The only civil works contract under the tranche, a design build and operate contract for Bhagalpur water supply, BWSP1, was awarded in July 2014 and the contractor was mobilized in October 2014.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: The tranche is compliant with all undertakings and covenants.

1 DED = Detailed Engineering Design.

158

Annual MFF Progress Report

41614013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Assam Power Sector Enhancement Investment Program Project No. 41614-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

18 Nov 2009 30 Jun 2015 31 Oct 2019

Division SAEN

MFF Amount ($ million)

200.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Assam Power Sector Enhancement Investment Program for an aggregate amount not exceeding $200.00 million from ADB’s OCR on 18 November 2009.

Impact: A sustainable state power sector with increased T & D capacity to support inclusive economic growth.

Outcome: Enhanced quality and expanded service delivery of electricity through improved technical, commercial, and financial performance and capability of power utilities.

Outputs: Access to power Energy Efficiency enhancement Distribution franchise investment

Significant Developments of the Facility: There was a minor scope change for the Facility in 2014.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 4

Approved Tranche Amount to Date

251.20

Facility Change in ScopeCategory Date Proposed Change

Minor Change 07 Jul 2014 - Change of the Executing Agency - Extension of MFF's availability period from 30 June 2015 to 31 October 2019

Tranche Completion Report N/A

Facility Completion Report N/A

159

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

160

TRANCHE 1 UPDATE

Tranche TitleAssam Power Sector Enhancement Investment Program - Tranche 1

Project No. 41614-023

Country/Regional India Loan/Grant No.

2592

Project Officer Aziz Yusupov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Nov 2009 28 Feb 2014 31 Mar 2013

Division SAEN

Tranche Amount($ million)

61.30 Source TASFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41614-023/main

1 DED = Detailed Engineering Design.

161

Tranche Summary

ADB approved the Assam Power Sector Enhancement Investment Program - Tranche 1, not exceeding the aggregate amount of $60.30 million on 27 November 2009.

Impact: A sustainable state power transmission sector to support inclusive economic growth.

Outcome: Enhanced transmission capacity and quality with physical and institutional capacity development.

Outputs: Nonphysical Investments: Renewable Energy Development Nonphysical Investments: Institutional and/or capacity development of ASEB, APGCL, AEGCL, and LAEDCL Nonphysical Investments: Distribution franchising Physical Investments: Access to power (transmission) Constructed new transmission lines and substations, augmented existing substations, and miscellaneous transmission system improvement activities Physical Investments: Energy efficiency enhancement (transmission loss reduction) Extended and augmented existing substations Nonphysical Investments: Project implementation support

Implementation Arrangements: The GOA and AEGCL will be the executing agency. AEGCL will be responsible for the day-to-day implementation of Tranche 1. A project management unit (PMU), headed by a full-time project director will remain in place for the MFF with responsibility for day-to-day project coordination and administration.

Implementation Status: Implementation of Tranche 1 is satisfactory with respect all indicators. There are six (6) contract packages for the transmission capacity expansion and efficiency enhancement (loss reduction). All contract packages are nearing completion. The consultancy service for Project Implementation (Transmission and Distribution) and Implementation support for Social and Environmental Activities are ongoing.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 16 Oct 2014 - Extension of loan closing date from 31 December 2014 to 30 June 2015.

1 DED = Detailed Engineering Design.

162

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

42.96 100.00 34.70 97.32

Significant Developments During the Year

Tranche 1 (Loan 2592) is a loan of $49.60 million from ordinary capital resources (OCR), which was signed on 15 February 2010 and declared effective on 05 May 2010.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $42.96 million (100.0%) and $34.70 million (97.3%), respectively. All procurement packages under Tranche 1 have been contracted and physical progress of sub-projects is at 86%. Two (2) out of 6 contract packages are 100% complete.

Scope Change: There was a minor scope change for this tranche in 2014.

Undertaking and Covenants: The 2 undertakings have been complied at the time of PFR submission. Out of 28 loan covenants, 9 were complied, 16 are being complied with, 2 are partly complied with, and 1 covenant is not yet due.

1 DED = Detailed Engineering Design.

163

TRANCHE 2 UPDATE

Tranche TitleMFF - Assam Power Sector Enhancement Investment Program - Tranche 2

Project No. 41614-033

Country/Regional India Loan/Grant No.

2677

Project Officer Aziz Yusupov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

05 Oct 2010 30 Nov 2013 30 Jun 2015

Division SAEN

Tranche Amount($ million)

89.70 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41614-033/main

Tranche Summary

ADB approved the MFF - Assam Power Sector Enhancement Investment Program - Tranche 2, not exceeding the aggregate amount of $89.70 million on 5 October 2010.

Impact: A sustainable state power sector with increased transmission and distribution capacity to support inclusive economic growth

Outcome: Enhanced quality and expanded service delivery of electricity in Assam through improved technical, commercial, and financial performance and capability of the power sector utilities

Outputs: Access to power: Constructed new transmission lines and substations, and other transmission system improvement activities Energy efficiency enhancement : Extended and augmented transmission substations, refurbished existing substations, reactive compensation, introduction of new technologies to reduce loss

Implementation Arrangements: The GOA and AEGCL will be the executing agency. AEGCL will be responsible for the day-to-day implementation of Tranche 2. A project management unit (PMU), headed by a full-time project director will remain in place for the MFF with responsibility for day-to-day project coordination and administration.

Implementation Status: Implementation of Tranche 2 is satisfactory with respect all indicators. There are five (5) contract packages for the transmission capacity expansion and efficiency enhancement (loss reduction) and overall progress is 65%. There is no consultancy package for this tranche.

1 DED = Detailed Engineering Design.

164

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

63.09 100.00 40.82 93.60

Significant Developments During the Year

Tranche 2 (Loan 2677) is a loan of $66.90 million from ordinary capital resources (OCR), which was signed on 17 January 2011 and declared effective on 1 April 2011.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $63.09 million (100.0%) and $40.82 million (93.6%), respectively. All procurement packages under Tranche 2 have been contracted. Physical progress of sub-projects under Tranche 2 is 65%.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: The 2 undertakings have been complied at the time of PFR submission. Out of 23 loan covenants, 2 were complied, 19 are being complied with, 1 party complied with, and 1 covenant is not yet due.

1 DED = Detailed Engineering Design.

165

TRANCHE 3 UPDATE

Tranche TitleAssam Power Sector Enhancement Investment Program - Tranche 3

Project No. 41614-035

Country/Regional India Loan/Grant No.

2800

Project Officer Aziz Yusupov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

04 Nov 2011 31 Dec 2014 30 Jun 2015

Division SAEN

Tranche Amount($ million)

50.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41614-035/main

Tranche Summary

ADB approved the Assam Power Sector Enhancement Investment Program - Tranche 3, not exceeding the aggregate amount of $50.00 million on 4 November 2011.

Impact: Enhanced quality and expanded service delivery of electricity in Assam

Outcome: APDCL becomes sustainable company with increased efficiency and distribution network capacity

Outputs: Constructed and augmented distribution lines and substations, and conclusion of electrification programs Renovated and modernized distribution substations.

Implementation Arrangements: The GOA and APDCL will be the executing agency. APDCL will be responsible for the day-to-day implementation of Tranche 3. A project management unit (PMU), headed by a full-time project director will remain in place for the MFF with responsibility for day-to-day project coordination and administration.

Implementation Status: Implementation of Tranche 3 is satisfactory with respect all indicators.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

166

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

29.24 99.91 22.97 100.00

Significant Developments During the Year

Tranche 3 (Loan 2800) is a loan of $33.30 million from ordinary capital resources (OCR), which was signed on 27 February 2012 and declared effective on 16 April 2012.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $29.24 million (99.9%) and $22.97 million (100.0%), respectively. All procurement packages under Tranche 3 have been contracted. Physical progress of sub-projects under Tranche 3 is around 62%. There is no consultancy package for this tranche.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: The 2 undertakings have been complied at the time of PFR submission. Out of 27 loan covenants, 2 were complied, 20 are being complied, 2 are partly complied with, 2 covenants are not yet due, and 1 not applicable.

1 DED = Detailed Engineering Design.

167

TRANCHE 4 UPDATE

Tranche TitleAssam Power Sector Enhancement Investment Program - Tranche 4

Project No. 41614-036

Country/Regional India Loan/Grant No.

3200

Project Officer Aziz Yusupov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

25 Nov 2014 30 Jun 2019 N/A

Division SAEN

Tranche Amount($ million)

50.20 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41614-036/main

Tranche Summary

ADB approved the Assam Power Sector Enhancement Investment Program - Tranche 4, not exceeding the aggregate amount of $50.20 million on 25 November 2014.

Impact: an enhanced quality and expanded service delivery of electricity in Assam.

Outcome: increased operational efficiency and expanded distribution network capacity of Assam Power Distribution Company Ltd. (APDCL).

Outputs: Enhanced capacity of distribution system improved technology of operations and maintenance (O&M) system.

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

168

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

169

Annual MFF Progress Report

41627013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Himachal Pradesh Clean Energy Development Investment Program (Facility Concept)

Project No. 41627-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

23 Oct 2008 30 Sep 2016 N/A

Division INRM

MFF Amount ($ million)

800.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Himachal Pradesh Clean Energy Development Investment Program (Facility Concept) for an aggregate amount not exceeding $800.00 million from ADB’s OCR on 23 October 2008.

Impact: A sustainable state electricity sector and improved state finances.

Outcome: Increased hydropower production, as well as improved planning, implementation, management and sector governance.

Outputs: Capacity development component (i) Project-oriented: Implemented capacity development of various departments of HPPCL, focusing on (a) project preparation, implementation and management (including procurement, disbursements, safeguards compliance, and reporting); (b) financial management and accountability; and (c) knowledge transfer for compliance with ADB policies and procedures (ii) Corporate development: (a) Implemented capacity development to improve governance, fiduciary oversight, and organizational structuring; and (b) Developing in-house expertise within HPPCL on private sector participation modalities and CDM procedures. (iii) Implement enterprise resource planning solution at HPSEB

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework. An amount of $58.00 million was cancelled from Tranche 4 on 26 August 2014 upon the request of Himachal Pradesh Power Corporation Limited (Implementing Agency), and endorsement of Department of Economic Affairs, Government of India.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 4

Approved Tranche Amount to Date

732.10

Facility Change in Scope

170

Category Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

171

TRANCHE 1 UPDATE

Tranche TitleMFF - Himachal Pradesh Clean Energy Development Investment Program (Tranche 1)

Project No. 41627-023

Country/Regional India Loan/Grant No.

2461

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

27 Oct 2008 31 Mar 2014 31 Mar 2016

Division INRM

Tranche Amount($ million)

150.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41627-023/main

1 DED = Detailed Engineering Design.

172

Tranche Summary

ADB approved the MFF - Himachal Pradesh Clean Energy Development Investment Program (Tranche 1), not exceeding the aggregate amount of $150.00 million on 27 October 2008.

Impact: A sustainable state electricity sector and improved state finances.

Outcome: Increased hydropower production, as well as improved planning, implementation, management and sector governance.

Outputs: Capacity development component: (i) Project-oriented: Implemented capacity development of various departments of HPPCL, focusing on (a) project preparation, implementation and management (including procurement, disbursements, safeguards compliance, and reporting); (b) financial management and accountability; and (c) knowledge transfer for compliance with ADB policies and procedures (ii) Corporate development: (a) Implemented capacity development to improve governance, fiduciary oversight, and organizational structuring; and (b) Developing in-house expertise within HPPCL on private sector participation modalities and CDM procedures. (iii) Implement enterprise resource planning solution at HPSEB Tranche 1 funds electro-mechanical contracts and some civil works of the 111 MW Sawra Kuddu Project and Stage 1 of the Kashang Project (65 MW)

Implementation Arrangements: The state has designated Multi-purpose Projects & Power Department of the state (MPPPDCL) as the Project Executing Agency (EA) with overall responsibility for execution of the Investment Program and the Project. The state has designated Himachal Pradesh Power Corporation Limited (HPPCL) as the Implementing Agency (IA) for day to day coordination, implementation, and administration of all components of the project.

Implementation Status: All contracts have been awarded and are under advanced stages of implementation. The physical progress achieved is about 85%.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

173

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

132.16 100.00 131.25 98.86

Significant Developments During the Year

Tranche 1 (Loan 2461) is a loan of $150.00 million from ordinary capital resources (OCR), which was signed on 10 November 2008, and declared effective on 15 December 2008.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $132.16 million (100.0%) and $131.25 million (98.9%), respectively. Disbursement of $12.5 million was achieved under this tranche in 2014. All contracts have been awarded and are under advanced stages of implementation. The physical progress achieved is about 85%. The loan closing date has been extended up to 31 March 2016.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are 29 covenants, of which, 13 covenants have been complied, 14 are being complied, and 2 are not yet due.

1 DED = Detailed Engineering Design.

174

TRANCHE 2 UPDATE

Tranche TitleMFF - Himachal Pradesh Clean Energy Development Investment Program -Tranche 2

Project No. 41627-033

Country/Regional India Loan/Grant No.

2596

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

08 Dec 2009 30 Jun 2014 31 Dec 2015

Division INRM

Tranche Amount($ million)

59.10 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41627-033/main

Tranche Summary

ADB approved the MFF - Himachal Pradesh Clean Energy Development Investment Program -Tranche 2, not exceeding the aggregate amount of $59.10 million on 8 December 2009.

Impact: A sustainable state electricity sector and improved state finances

Outcome: Increased hydropower production.

Outputs: Hydropower generation infrastruction constructed - Subproject proposed for tranche 2: The civil works contract package consisting of the construction of the diversion barrage, power intake, desanding arrangements and gates and hoisting arrangements for the 11 MW Sawra Kuddu hydroelectric project .

Implementation Arrangements: The state has designated Multi-purpose Projects & Power Department of the state (MPPPDCL) as the Project Executing Agency (EA) with overall responsibility for execution of the Investment Program and the Project. The state has designated Himachal Pradesh Power Corporation Limited (HPPCL) as the Implementing Agency (IA) for day to day coordination, Implementation, and administration of all components of the project.

Implementation Status: The single contract for Diversion, Barrage, Intake and Desanding (DBID) Package is under implementation. The physical progress achieved is about 78%.

1 DED = Detailed Engineering Design.

175

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

52.25 93.68 45.53 96.41

Significant Developments During the Year

Tranche 2 (Loan 2596) is a loan of $59.10 million from ordinary capital resources (OCR), which was signed on 12 March 2010 and declared effective on 13 May 2010.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $52.25 million (93.7%) and $45.53 million (96.4%), respectively. Disbursement of $4.30 million was achieved under this tranche in 2014. The single contract for Diversion, Barrage, Intake and Desanding (DBID) Package is under implementation. The physical progress recorded as of date is about 78%. The loan is extended up to 31 March 2015.

Scope Change: There were no scope changes for this tranche in 2014

Undertaking and Covenants: There are 26 covenants, of which, 8 have been complied, 16 are being complied, 1 is not yet due, and 1 is not applicable.

1 DED = Detailed Engineering Design.

176

TRANCHE 3 UPDATE

Tranche TitleMFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3

Project No. 41627-043

Country/Regional India Loan/Grant No.

2687

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Oct 2010 30 Jun 2016 N/A

Division INRM

Tranche Amount($ million)

208.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41627-043/main

Tranche Summary

ADB approved the MFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3, not exceeding the aggregate amount of $208.00 million on 22 October 2010.

Impact: A sustainable state electricity sector and improved state finances.

Outcome: Increased clean energy production

Outputs: Hydropower generation Infrastructure constructed - Subprojects proposed for tranche 3: Construction of the 100 MW Sainj Hydroelectric project, and Stage II and III of the Integrated Kashang Hydroelectric Project (subproject construction includes certain civil works, underground powerhouse, river diversion, intake and desilting, electrical & interconnection works)

Implementation Arrangements: The state has designated Multi-purpose Projects & Power Department of the state (MPPPDCL) as the Project Executing Agency (EA) with overall responsibility for execution of the Investment Program and the Project. The state has designated Himachal Pradesh Power Corporation Limited (HPPCL) as the Implementing Agency (IA) for day to day coordination, Implementation, and administration of all components of the project.

Implementation Status: All contracts have been awarded and are under various stages of implementation. The physical progress achieved is about 58%.

1 DED = Detailed Engineering Design.

177

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

178.66 100.00 136.74 100.00

Significant Developments During the Year

Tranche 3 (Loan 2687) is a loan of $208.00 million from ordinary capital resources (OCR) which was signed on 17 January 2011 and declared effective on 17 March 2011.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 3 have reached $178.67 million (100.0%) and $136.74 million (100.0%), respectively. Disbursement of $30.03 million has been achieved under this tranche in 2014. All contracts have been awarded and are under various stages of implementation. The physical progress achieved is about 58%.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are 17 covenants, of which, 4 have been complied, 11 are being complied, and 2 are not yet due.

1 DED = Detailed Engineering Design.

178

TRANCHE 4 UPDATE

Tranche TitleHimachal Pradesh Clean Energy Development Investment Program - Tranche 4

Project No. 41627-053

Country/Regional India Loan/Grant No.

2914

Project Officer K. Vallabha Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

02 Oct 2012 30 Jun 2018 N/A

Division INRM

Tranche Amount($ million)

315.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/41627-053/main

Tranche Summary

ADB approved the Himachal Pradesh Clean Energy Development Investment Program - Tranche 4, not exceeding the aggregate amount of $315.00 million on 2 October 2012.

Impact: Increased hydropower production and contribution to climate change mitigation with improved project management and sector governance in Himachal Pradesh.

Outcome: Improved capacity of HPPCL to generate and sell electricity from hydropower and manage its operations.

Outputs: 1. Shongtong Karcham Hydroelectric Project becomes operational on time and within budget.2. Data center and disaster recovery center installed in HPPCL corporate facilities and are operational3. Capacity of HPPCL personnel on project management, operations and maintenance improved

Implementation Arrangements: The state has designated Multi-purpose Projects & Power Department of the state (MPPPDCL) as the Project Executing Agency (EA) with overall responsibility for execution of the Investment Program and the Project. The state has designated Himachal Pradesh Power Corporation Limited (HPPCL) as the Implementing Agency (IA) for day to day coordination, Implementation, and administration of all components of the project.

Implementation Status: All contracts have been awarded. The physical work has commenced and about 10% of physical progress has been achieved.

1 DED = Detailed Engineering Design.

179

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

168.25 98.08 30.94 70.10

Significant Developments During the Year

Tranche 4 (Loan 2914) is a loan of $315.00 million from ordinary capital resources (OCR), which was signed on 19 November 2012 and declared effective on 17 January 2013. Upon the request from the government, an amount of $58.00 million was cancelled. Current net loan amount is $257.00 million. All contracts have been awarded. The physical work has commenced and about 10% of physical progress has been achieved as of date. Based on the discussion held with IA, DEA, and ADB at the India TPRM in Delhi from 31 Jul-1Aug 2014, and subsequent endorsement of DEA received on 26 Aug 2014, an amount of $58 million have been cancelled from the loan amount. Disbursement of $2.8 million have been achieved under this tranche, for the CY 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 4 have reached $168.25 million (98.1%) and $30.94 million (70.1%), respectively. Disbursement of $2.80 million has been achieved under this tranche in 2014. All contracts have been awarded. The physical work has commenced and physical progress of about 10% has been achieved.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: The covenants are generally complied or are being complied.

1 DED = Detailed Engineering Design.

180

Annual MFF Progress Report

42265013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF-Assam Urban Infrastructure Investment Program Project No. 42265-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

09 Sep 2011 30 Jun 2018 N/A

Division SAUW

MFF Amount ($ million)

200.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF-Assam Urban Infrastructure Investment Program for an aggregate amount not exceeding $200.00 million from ADB’s OCR on 30 September 2011.

Impact: Urban population in relatively poor and weak capacity state (Assam) has improved access to water supply, sanitation, and urban infrastructure facilities.

Outcome: Improved and sustainable water supply, sanitation, and urban transport system in the selected project cities in Assam.

Outputs: Improved, regular and sustainable metered water supply in Guwahati Increased sewerage treatment coverage in the Guwahati Improved public transport system through implementation of one BRT corridor in Guwahati Solid waste management infrastructure improved in Dibrugarh Improved urban drainage system in Dibrugarh Project management and implementation skills strengthened in the IAs and ULBs.

Significant Developments of the Facility: The Investment Program is being implemented in two tranches. Implementation of the first tranche ($61 million) is currently ongoing while processing of the second tranche ($139 million) was initiated in 2014. A minor change in scope was approved for the facility in 2014 due to the inclusion of drainage improvement in the city of Guwahati and the exclusion of sewerage and bus rapid transit system (BRTS) in the city of Guwahati.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

81.00

Facility Change in Scope

181

Category Date Proposed Change

Minor Change 17 Nov 2014 A minor change in the Investment Program was approved to the outcome and output of the Investment Program due to the inclusion of drainage improvement in the city of Guwahati and the exclusion of sewerage and bus rapid transit system (BRTS) in the city of Guwahati.

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

182

TRANCHE 1 UPDATE

Tranche TitleAssam Urban Infrastructure Investment Program - Tranche 1

Project No. 42265-023

Country/Regional India Loan/Grant No.

2806

Project Officer Vijay Padmanabhan Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Nov 2011 30 Jun 2018 N/A

Division SAUW

Tranche Amount($ million)

81.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/42265-023/main

Tranche Summary

ADB approved the Assam Urban Infrastructure Investment Program - Tranche 1, not exceeding the aggregate amount of $81.00 million on 18 November 2011.

Impact: Improved and sustainable urban services in selected project cities in Assam (synchronized with the MFF's DMF outcome).

Outcome: Efficient and improved pre-distribution water supply infrastructure in Guwahati, and drainage and solid waste management in Dibrugarh (consolidated MFFs DMF outputs)

Outputs: Improved and increased water supply area in project city Solid waste management infrastructure improved in Dibrugarh city Reduced flooding through improved urban drainage in the project cities Implementing agencies and ULBs effectively manage the project

Implementation Arrangements: The Guwahati Development Department (GDD) is the Investment Program's executing agency (EA) and the Implementing Agencies (IAs) are Guwahati Metropolitan Development Authority and Dibrugarh Municipal Board.

Implementation Status: 3 of 4 civil works contracts awarded. After obtaining clearances, works have just started.

1 DED = Detailed Engineering Design.

183

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

39.69 98.27 3.93 100.00

Significant Developments During the Year

Tranche 1 (Loan 2806) is a loan of $81.00 million from ordinary capital Rrsources (OCR), which was signed on 9 March 2012 and declared effective on 25 April 2012. This was subsequently revised to $61.00 million through a partial loan cancellation of $20.00 million in April 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $39.69 million (98.3%) and $3.93 million (100.0%), respectively. The CDTA supporting the non-physical component was completed. Counterpart funds have been provided to ensure government financing of the project costs are addressed. Full staffing of the project management unit (PMU) and project implementation unit (PIU) is yet to be achieved but the PMU is sufficiently supported by the project management consultant (PMC) and design and supervision consultant (DSC) to oversee ongoing works.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are 24 undertakings, of which, 6 undertakings have been complied, 6 are ongoing, and 12 are still being complied. Of the 31 covenants for Tranche 1, 10 covenants have been complied, 9 are ongoing, and 12 are still being complied.

1 DED = Detailed Engineering Design.

184

Annual MFF Progress Report

42266013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Kolkata Environmental Improvement Investment Program (Facility Concept)

Project No. 42266-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

26 Sep 2013 31 Dec 2023 N/A

Division SAUW

MFF Amount ($ million)

400.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Kolkata Environmental Improvement Investment Program (Facility Concept) for an aggregate amount not exceeding $400.00 million from ADB’s OCR on 26 September 2013.

Impact: Improved access to water supply and sanitation in KMC

Outcome: Improved water supply, sewerage, and drainage service quality and operational sustainability in selected areas of KMC

Outputs: Inefficient water supply assets rehabilitated. Sewerage extension to peripheral areas continued. Financial and project management capacity further developed.

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

100.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

185

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

186

TRANCHE 1 UPDATE

Tranche TitleKolkata Environmental Improvement Investment Program - Tranche 1

Project No. 42266-023

Country/Regional India Loan/Grant No.

3053

Project Officer Neeta Pokhrel Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Oct 2013 30 Jun 2019 N/A

Division SAUW

Tranche Amount($ million)

100.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/42266-023/main

1 DED = Detailed Engineering Design.

187

Tranche Summary

ADB approved the Kolkata Environmental Improvement Investment Program - Tranche 1, not exceeding the aggregate amount of $100.00 million on 22 October 2013.

Impact: Improved water supply, sewerage, and drainage service quality and operational sustainability in select areas of KMC

Outcome: Improved operational efficiency and coverage of water supply, sewerage, drainage services in selected areas of KMC.

Outputs: Inefficient water supply assets rehabilitated. Sewerage extension to peripheral areas continued. Financial and project management capacity further developed.

Implementation Arrangements: The Kolkata Municipal Corporation is the executing and implementing agency of the investment program.

Implementation Status: Five out of seven civil works contracts and two out of four consulting service packages were awarded. In May 2014, the executing agency and the team leader jointly evaluated the total cost incurred under the first tranche and identified savings of around $13.00 million, hence the EA considered possible options for additional subproject proposals on the basis of scope and project readiness. ADB and the EA have agreed to implement an additional package to develop sewerage and drainage network within the South Suburban East catchment and also to expand and expedite the GIS modules.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

50.84 100.00 2.45 0.00

1 DED = Detailed Engineering Design.

188

Significant Developments During the Year

Tranche 1 (Loan 3053) is a loan of $100.00 million from ordinary capital resources (OCR), which was signed on 3 March 2014 and declared effective on 30 May 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $50.84 million (100.0%) and $2.45 million (.0%), respectively. There are no issues associated with safeguards or procurement. ADB is supporting KMC financial reform through a small-scale technical assistance with a dedicated team of consultants due for completion on 31 January 2015. This will assist with compliance requirements for Tranche 2 processing.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are 27 project specific covenants for Tranche 1, of which, 18 are being complied and/or compliant to date, while 9 are not yet due. Undertakings and covenants are being generally complied.

1 DED = Detailed Engineering Design.

189

Annual MFF Progress Report

42378014

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Power System Expansion and Efficiency Improvement Investment Program (Facility Concept)

Project No. 42378-014

Country/Regional

Bangladesh Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

28 Nov 2012 31 Dec 2018 N/A

Division SAEN

MFF Amount ($ million)

700.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Power System Expansion and Efficiency Improvement Investment Program (Facility Concept) for an aggregate amount not exceeding $700.00 million from ADB’s OCR on 28 November 2012.

Impact: Increased energy sector contribution to low-carbon economic growth in Bangladesh

Outcome: Increased access to clean and reliable supply of electricity in Bangladesh

Outputs: Improved efficiency in electricity generation, transmission, and distribution Increased renewable energy use Enhanced capacity of power sector agencies and farmer organizations Project management system in place

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 2

Approved Tranche Amount to Date

495.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

190

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

191

TRANCHE 1 UPDATE

Tranche TitlePower System Expansion and Efficiency Improvement Investment Program - Tranche 1

Project No. 42378-015

Country/Regional Bangladesh Loan/Grant No.

2966

Project Officer Zhang Lei Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

12 Dec 2012 31 Dec 2018 N/A

Division SAEN

Tranche Amount($ million)

185.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/42378-015/main

Tranche Summary

ADB approved the Power System Expansion and Efficiency Improvement Investment Program - Tranche 1, not exceeding the aggregate amount of $185.00 million on 12 December 2012.

Impact: Increased access to clean and reliable electricity supply in Bangladesh

Outcome: Improved efficiency in electricity generation, and transmission in Bangladesh

Outputs: 1. Increased generation capacity2. Increased transmission capacity3. Enhanced capacity of power sector agencies4. Project management system in place

Implementation Arrangements: The executing agencies for Tranche 1 include Northwest Power Generation Company Limited (NWPGCL), Bangladesh Power Development Board (BPDB), Power Grid Company of Bangladesh (PGCB), and Power Division of the Ministry of Power, Energy, and Mineral Resources (MPEMR).

Implementation Status: Project implementation is ongoing. All procurement contracts have been awarded. All consulting service contracts were awarded except for Tranche 3 preparation. By end 2014, $19.87 million (10.54%) was disbursed.

1 DED = Detailed Engineering Design.

192

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 03 Feb 2014 (i) Reallocation of USD1.5 million ADB loan from unallocated amount to consulting service for Khulna power plant; and (ii) administration of European Union's Asia Investment Facility (EU/AIF) grant by European Investment Bank (EIB) instead of ADB as originally envisaged.

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

155.24 100.00 19.52 100.00

Significant Developments During the Year

Tranche 1 (Loan 2966) is a loan of $185.00 million from ordinary capital resources (OCR), which was signed on 3 April 2013 and became effective on 25 January 2013.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $155.24 million (100.0%) and $19.52 million (100.0%), respectively. All procurement contracts have been awarded.

Scope Change: There was a minor scope change for this tranche in 2014.

Undertaking and Covenants: There are 26 covenants, of which, 23 are being complied while 2 are not yet due.

1 DED = Detailed Engineering Design.

193

TRANCHE 2 UPDATE

Tranche TitlePower System Expansion and Efficiency Improvement Investment Program - Tranche 2

Project No. 42378-016

Country/Regional Bangladesh Loan/Grant No.

3087

Project Officer Zhang Lei Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

30 Nov 2013 30 Jun 2019 N/A

Division SAEN

Tranche Amount($ million)

310.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/42378-016/main

1 DED = Detailed Engineering Design.

194

Tranche Summary

ADB approved the Power System Expansion and Efficiency Improvement Investment Program - Tranche 2, not exceeding the aggregate amount of $310.00 million on 11 December 2013.

Impact: Increased access to reliable supply of electricity

Outcome: Increased Transmission and Distribution capability in the power system

Outputs: Increased Transmission Capacity Increased south Dhaka distribution network capacity Increased north Dhaka distribution network capacity Efficiently managed project

Implementation Arrangements: Executing agencies for Tranche 2 are Power Grid Company of Bangladesh (PGCB), Dhaka Power Distribution Company Limited (DPDC), Dhaka Electricity Supply Company Limited (DESCO). PGCB will implement transmission component. DPDC will implement south Dhaka distribution network component. DESCO will implement North Dhaka distribution network component.

Implementation Status: For Power Grid Company of Bangladesh (PGCB)'s component, there is one package (1 lot, $31.3 million) to be funded by ADB. 7 bids were submitted on 14 October 2014. PGCB submitted the technical evaluation report (TBER) to ADB on 17 February 2015,. For Dhaka Power Distribution Company (DPDC)'s component, there are two packages (Package B2 consisting of 2 lots, $40 million, and Package B3 consisting of 2 lots, $40 million) funded by ADB. For Lot 1 (substations, $15 million) of Package B2, on 06 February 2015, ADB requested DPDC to seek clarifications from 4 bidders and to submit the final recommendations on technical responsiveness. For Lot 2 (underground cables, $25 million) of Package B2, the Notice of Award was issued on 30 December 2014, and the contract will be signed soon. For Package B3 (2 lots), ADB approved the TBER on 25 January 2015. The financial bid evaluation reports will be sent to ADB in few weeks. For Dhaka Electric Supply Company (DESCO)'s component, there are two packages (Turnkey Package C1 consisting of 3 lots $116 million, and Supply Package C2 consisting of 6 lots, $80 million) funded by ADB. For Package C1, bids were closed in November 2015. For Package C2, ADB has approved TBERs for Lot 2-6, and Lot-1 has been cleared by OSP1 and the concurrence is being processed through Procurement Review System.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

195

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

Tranche 2 (Loan 3087) is a loan of $310.00 million from ordinary capital resources (OCR), which was signed on 11 February 2014 and became effective on 14 March 2014.

Progress: As of 31 December, there were no contract awards or disbursements for this tranche. All bids for procurement packages were closed in 2014.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: There are 19 covenants and all being complied.

1 DED = Detailed Engineering Design.

196

Annual MFF Progress Report

42466014

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Skills for Employment Investment Program Project No. 42466-014

Country/Regional

Bangladesh Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

19 May 2014 30 Jun 2021 N/A

Division SAHS

MFF Amount ($ million)

350.00Source ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Skills for Employment Investment Program for an aggregate amount not exceeding $350.00 million from ADB’s ADF on 19 May 2014.

Impact: increased income and productivity of the working population aged 15 years and over.

Outcome: increased employment in priority sectors and skills for males and females.

Outputs: market responsive inclusive skills training delivered quality assurance system strengthened institutions strengthened effective program management

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

100.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

197

TRANCHE 1 UPDATE

Tranche Title Skills for Employment Investment Program - Tranche 1 Project No. 42466-015

Country/Regional Bangladesh Loan/Grant No.

0391, 3131

Project Officer Brajesh Panth Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

03 Jun 2014 30 Jun 2018 N/A

Division SAHS

Tranche Amount($ million)

100.00 Source ADF

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/42466-015/main

1 DED = Detailed Engineering Design.

198

Tranche Summary

ADB approved the Skills for Employment Investment Program - Tranche 1, not exceeding the aggregate amount of $100.00 million on 3 June 2014.

Impact: increased employment in priority sectors and skills for males and females [NSDP 2 & 3].

Outcome: increased inclusive access to skills training in priority sectors.

Outputs: Market-responsive inclusive skills training delivered, Quality assurance system strengthened, Institutions strengthened, and Effective program management

Implementation Arrangements: The executing agency is the Finance Division of the Ministry of Finance (MOF) and the Skills Development Coordination and Monitoring Unit (SDCMU) under the Finance Division is the implementing agency. Other implementing agencies for tranche 1 include the Directorate of Technical Education under the Ministry of Education, Bureau of Manpower, Employment and Training under the Ministry of Expatriates Welfare and Overseas Employment, 3 Bangladesh Institute of Technical Assistance Centers under the Ministry of Industries, Bangladesh Technical Education Board, National Skill Development Council Secretariat (NSDC-S), and Bangladesh Bank Small and Medium Enterprise (SME) Department. A Skill Development Implementation Committee headed by the Executive Project Director will include representatives from all the implementing agencies and 9 industry associations in 6 priority sectors and Palli-Karma Sahayak Foundation (PKSF) to provide a common forum to discuss implementation issues and to make joint efforts to resolve problems emanating from implementation.

Implementation Status: The recruitment of senior officials, consultants and staff under the SDCMU has been completed. The engagement of the IT firm for the development of the real time trainee tracking system is being finalized. The setting-up of the imprest account was done and the imprest advance of $5.00 million was released on 11 December 2014. The engagement of the industry associations for skills training are also being finalized.

1 DED = Detailed Engineering Design.

199

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 04 Dec 2014 A minor change in implementation arrangement was approved to increase the imprest account ceiling from $3 million to $5 million.

Minor Change 21 Aug 2014 A minor change in implementation arrangement was approved for ADB (c/o OSFMD) to take responsibility of selecting the consultant and do the financial negotiations. The EA retains the responsibility for signing the contract with the consultant, issuing the notice to proceed, and supervising the consultants services. SAHS will prepare the Request for Proposal (RFP) which will be reviewed by Procurement Specialist, OSP1 and after approval, OSFMD will issue the RFP. Tappware Solutions will submit a proposal which will provide details on their current experience on how the system will be designed by adapting the existing system and how the back-up support will be available to fully operationalize the system. The proposal will also provide the estimated costs. In addition to concerned SAHS staff, a staff from OIST will also be tapped to be part of the panel to provide expert advice in the evaluation of the proposal. OSFMD will then conduct the financial negotiations with the firm based on salary slips and documentary evidence to be submitted by the firm.

Minor Change 22 Dec 2014 A minor change in implementation arrangement was approved for the use of a customized grants contract for the engagement of industry associations, Palli-Karma Sahayak Foundation and Bangladesh Bank SME Department.

1 DED = Detailed Engineering Design.

200

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

11.32 100.00 5.00 100.00

Significant Developments During the Year

Tranche (Loan 3131) is a loan of $100.00 million from the Asian Development Fund (ADF), which was approved on 3 June 2014 and declared effective on 24 July 2014. Tranche 1 is on track.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $11.32 million (100.0%) and $5.00 million (100.0%), respectively. The recruitment of senior officials, consultants and staff under the SDCMU has been completed. The engagement of the IT firm for the development of the real time trainee tracking system is being finalized. The setting-up of the imprest account was done and the imprest advance of $5 million was released on 11 December 2014. The engagement of the industry associations for skills training are also being finalized.

Scope Change: There were there (3) minor scope changes for this tranche in 2014.

Undertaking and Covenants: There are 15 covenants, 7 covenants have been complied and 8 are not yet due.

1 DED = Detailed Engineering Design.

201

Annual MFF Progress Report

43253013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Karnataka Integrated and Sustainable Water Resources Management Investment Program

Project No. 43253-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

25 Sep 2014 N/A N/A

Division SAER

MFF Amount ($ million)

150.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Karnataka Integrated and Sustainable Water Resources Management Investment Program for an aggregate amount not exceeding $150.00 million from ADB’s OCR on 25 September 2014.

Impact: improved sustainable water security in selected river basins in Karnataka.

Outcome: integrated water resources management successfully implemented in selected river basins in Karnataka.

Outputs: State and basin institutions strengthened for IWRM Irrigation system infrastructure and management modernized Program management systems operational

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 2

Approved Tranche Amount to Date

106.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

202

TRANCHE 1 UPDATE

Tranche TitleKarnataka Integrated and Sustainable Water Resources Management Investment Program - Project 1

Project No. 43253-023

Country/Regional India Loan/Grant No.

3172

Project Officer Nishanthi Manjula Amerasinghe Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

17 Oct 2014 31 Mar 2019 N/A

Division SAER

Tranche Amount($ million)

31.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43253-023/main

Tranche Summary

ADB approved the Karnataka Integrated and Sustainable Water Resources Management Investment Program - Project 1, not exceeding the aggregate amount of $31.00 million on 17 October 2014.

Impact: integrated water resources management in selected river basins in Karnataka successfully implemented.

Outcome: river basin plan for Krishna-8 (K-8) subbasin successfully implemented.

Outputs: State and basin institutions strengthened for IWRM. Irrigation system infrastructure and management modernized Project and management systems operational

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

203

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

204

Annual MFF Progress Report

43253024

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Karnataka Integrated Urban Water Management Investment Program

Project No. 43253-024

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

28 Mar 2014 N/A N/A

Division SAUW

MFF Amount ($ million)

150.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Karnataka Integrated Urban Water Management Investment Program for an aggregate amount not exceeding $150.00 million from ADB’s OCR on 28 March 2014.

Impact: Improved sustainable water security in selected river basins in Karnataka.

Outcome: Improved water resources management in urban areas in selected river basins in Karnataka

Outputs: Expanded and upgraded UWSS infrastructure. Improved water resource planning, monitoring and service delivery. Strengthened operational and administrative capacity of KUIDFC and ULBs

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 2

Approved Tranche Amount to Date

106.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

205

TRANCHE 1 UPDATE

Tranche TitleKarnataka Integrated Urban Water Management Investment Program - Tranche 1

Project No. 43253-025

Country/Regional India Loan/Grant No.

0399, 3148

Project Officer Pritha Hariram Cawrse Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

29 Jul 2014 30 Sep 2019 N/A

Division SAUW

Tranche Amount($ million)

75.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43253-025/main

Tranche Summary

ADB approved the Karnataka Integrated Urban Water Management Investment Program - Tranche 1, not exceeding the aggregate amount of $75.00 million on 29 July 2014.

Impact: Improved sustainable water security in the Upper Tunga Bhadra subbasin

Outcome: Improved water resources management in selected urban areas of the Upper Tunga Bhadra subbasin

Outputs: Expanded and upgraded UWSS infrastructure in three towns of the Upper Tunga Bhadra subbasin Improved water resource planning, monitoring, and service delivery Strengthened operational and administrative capacity of KUIDFC and ULBs

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

206

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

207

Annual MFF Progress Report

43464013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Himachal Pradesh Clean Energy Transmission Investment Program (Facility Concept)

Project No. 43464-013

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

30 Sep 2011 30 Jun 2018 N/A

Division SAEN

MFF Amount ($ million)

350.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Himachal Pradesh Clean Energy Transmission Investment Program (Facility Concept) for an aggregate amount not exceeding $350.00 million from ADB’s OCR on 30 September 2011.

Impact: Himachal Pradesh power sector transmits clean energy to end users in Himachal Pradesh and India.

Outcome: HPPTCL has sufficient assets and capacity to support its mandate as the state transmission utility company.

Outputs: New transmission system assets are operational HPPTCL's management capacity enhanced HPPTCL manages implementation of the MFF tranches on time and within budget.

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 2

Approved Tranche Amount to Date

223.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

208

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

209

TRANCHE 1 UPDATE

Tranche TitleMFF-Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 1

Project No. 43464-023

Country/Regional India Loan/Grant No.

2794

Project Officer Takeshi Shiihara Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

18 Oct 2011 30 Jun 2018 N/A

Division SAEN

Tranche Amount($ million)

113.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43464-023/main

1 DED = Detailed Engineering Design.

210

Tranche Summary

ADB approved the MFF-Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 1, not exceeding the aggregate amount of $113.00 million on 18 October 2011.

Impact: HPPTL has sufficient assets and capacity to support its mandate as the state transmission utility company

Outcome: HPPTL has increased its asset base and its capacity.

Outputs: New Transmission system assets are operational HPPTCL's management capacity enhanced

Implementation Arrangements: HPPTCL will be the executing agency as well as the implementing agency for the investment program, responsible for supervising subproject implementation and monitoring of subproject operational performance. For these purposes, HPPTCL has established a project management unit located at HPPTCL s headquarters in Shimla, Himachal Pradesh. The project management unit is headed by a project director, and includes staff located at headquarters and in the field at project sites. As HPPTCL was established in 2008 as part of the unbundling of the former state integrated utility company (Himachal Pradesh State Electricity Board), HPPTCL retains staff and considerable transmission system planning and operational experience from the Himachal Pradesh State Electricity Board, and currently has 130 employees. The implementation arrangements are summarized in Table 3 and described in detail in the facility administration manual (FAM).

Implementation Status: A Review Mission was fielded in September 2014 for this tranche. As a result of the mission, the issues of the civil works were identified and action plans were formulated in order to address the issues (e.g. delays caused by continuous land slides). The civil works under the projects are to be resumed/boosted during the year.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

211

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

86.43 98.15 24.95 79.59

Significant Developments During the Year

Tranche 1 (Loan 2794) is a loan of $113.00 million from ordinary capital resources (OCR), which was signed on 15 December 2011 and declared effective on 19 January 2012.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $86.43 million (98.2%) and $24.95 million (79.6%), respectively. The progress of the civil works is expected to be enhanced during the year.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: Loan covenants are being complied, some are partly complied, and there are also some covenants that are not yet due.

1 DED = Detailed Engineering Design.

212

TRANCHE 2 UPDATE

Tranche TitleHimachal Pradesh Clean Energy Transmission Investment Program - Tranche 2

Project No. 43464-026

Country/Regional India Loan/Grant No.

3001

Project Officer Takeshi Shiihara Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

07 May 2013 30 Jun 2018 N/A

Division SAEN

Tranche Amount($ million)

110.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43464-026/main

1 DED = Detailed Engineering Design.

213

Tranche Summary

ADB approved the Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 2, not exceeding the aggregate amount of $110.00 million on 7 May 2013.

Impact: Increased electricity transmission in Himachal Pradesh.

Outcome: Improved capacity of HPPTCL to transmit electricity from hydropower generation sources within and outside of Himachal Pradesh.

Outputs: New Transmission system assets are operational Enterprise resource planning (ERP) system, phase II and additional IT hardware installed in HPPTCL corporate facilities and are operational Capacity of HPPTCL personnel on project management, and transmission utility operations improved

Implementation Arrangements: HPPTCL will be the executing agency as well as the implementing agency for the investment program, responsible for supervising subproject implementation and monitoring of subproject operational performance. For these purposes, HPPTCL has established a project management unit located at HPPTCL s headquarters in Shimla, Himachal Pradesh. The project management unit is headed by a project director, and includes staff located at headquarters and in the field at project sites. As HPPTCL was established in 2008 as part of the unbundling of the former state integrated utility company (Himachal Pradesh State Electricity Board), HPPTCL retains staff and considerable transmission system planning and operational experience from the Himachal Pradesh State Electricity Board, and currently has 130 employees.

Implementation Status: A Review Mission was fielded in September 2014 in relation to Tranche 2. As a result of the mission, an action plan to boost contract awards and disbursements was formulated, which has contributed to the subsequent improvement in project performance and loan effectiveness in November 2014. 12 out of 14 contract packages have been bid out. Two (2) contract packages have been awarded.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

214

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

4.44 22.21 11.00 0.00

Significant Developments During the Year

Tranche 2 (Loan 3001) is a loan of $110.00 million from ordinary capital resources (OCR), which was signed 29 September 2014 and declared effective on 13 November 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $4.44 million (22.2%) and $11.00 million (.0%), respectively. 12 out of 14 contract packages have been bid out. Two (2) contract packages have been awarded. For the 2 contracts awarded, the EA has been discussing with the contractor the design and execution schedule of civil works. The progress over the civil works is expected to be enhanced during 2015.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: Almost all covenants are being complied while some are still not yet due.

1 DED = Detailed Engineering Design.

215

Annual MFF Progress Report

43467014

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Madhya Pradesh Energy Efficiency Improvement Investment Program (Facility Concept)

Project No. 43467-014

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

07 Jul 2011 28 Feb 2015 28 Feb 2018

Division INRM

MFF Amount ($ million)

400.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Madhya Pradesh Energy Efficiency Improvement Investment Program (Facility Concept) for an aggregate amount not exceeding $400.00 million from ADB’s OCR on 7 July 2011.

Impact: Continuous and higher quality supply of electricity to rural households in Madhya Pradesh

Outcome: Improved operational efficiency of electricity distribution in rural areas of Madhya Pradesh

Outputs: 1. Separated power supply to agricultural pumps and households and installed high-voltage distributionsystem (HVDS) 2. Improved upstream 33kV systems3. Installed meters and new household connections4. Access to business development services improved for microenterprises headed by women5. Built capacity of women's self help groups to provide energy-related microenterprise developmentservices and gender sensitive user awareness and energy conservation

Significant Developments of the Facility: Closing date of the MFF was extended from 28 February 2015 to 28 February 2018. Non performing contracts of $100.00 million are being terminated. Bidding document to be followed for Terminated Contracts finalized.

Estimated Total No. of Tranches to be Processed

-

Approved Tranches To Date 2

Approved Tranche Amount to Date

400.00

Facility Change in ScopeCategory Date Proposed Change

Minor Change 01 Jul 2014 Extension of the availability period of the MFF from 28 February 2015 to 28

216

Category Date Proposed Change

February 2018.

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

217

TRANCHE 1 UPDATE

Tranche TitleMadhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 1

Project No. 43467-015

Country/Regional India Loan/Grant No.

2764

Project Officer Jyotirmoy Banerjee Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

27 Jul 2011 28 Feb 2015 28 Feb 2018

Division INRM

Tranche Amount($ million)

200.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43467-015/main

Tranche Summary

ADB approved the Madhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 1, not exceeding the aggregate amount of $200.00 million on 15 July 2011.

Impact: Continuous and higher quality supply of electricity to rural households in Madhya Pradesh

Outcome: Improved operational efficiency of electricity distribution in rural areas of Madhya Pradesh, benefiting 1.4 million households

Outputs: 1. Separate feeders for agricultural pumps and households and installed High Voltage DistributionSystems (HVDS) 2. Installed meters, new household connections.3. Access to business development services improved for women-headed microenterprises4. Built capacity of women self help groups

Implementation Arrangements: The three electricity DISCOMs - DISCOM-C (Bhopal), DISCOM-E (Jabalpur) and DISCOM-W (Indore) are the executing agencies for the investment program. All three DISCOMs have established project management units (PMUs) for implementation of the previous MFF and these units will continue their roles under the investment program. The PMU manager will report directly to chairmen and managing directors of the DISCOMs.

Implementation Status: Physical Progress for DISCOMs Central, East and West is 69%, 60% and 70% respectively.

1 DED = Detailed Engineering Design.

218

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 01 Jul 2014 Extension of Loan closing date from 28 February 2015 to 28 February 2018.

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

183.86 96.66 74.13 98.37

Significant Developments During the Year

Tranche 1 (Loan 2764) is a loan of $200.00 million from ordinary capital resources (OCR), which was signed on 27 February 2012 and declared effective on 9 May 2012.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $183.86 million (96.7%) and $74.13 million (98.4%), respectively. Physical Progress for DISCOMs Central, East and West is 69%, 60% and 70% respectively. Non performing contracts being terminated and bidding documents to be followed for terminated contracts finalized.

Scope Change: The closing date of MFF extended from 28 February 2015 to 28 February 2018.

Undertaking and Covenants: Undertakings and covenants have either been complied or being complied.

1 DED = Detailed Engineering Design.

219

TRANCHE 2 UPDATE

Tranche TitleMadhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 2

Project No. 43467-016

Country/Regional India Loan/Grant No.

2830

Project Officer Jyotirmoy Banerjee Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

15 Dec 2011 28 Feb 2015 28 Feb 2018

Division INRM

Tranche Amount($ million)

200.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/43467-016/main

Tranche Summary

ADB approved the Madhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 2, not exceeding the aggregate amount of $200.00 million on 14 December 2011.

Impact: Improved operational efficiency of electricity distribution in rural areas of Madhya Pradesh

Outcome: Efficient electricity distribution expanded in 15 project districts in Madhya Pradesh

Outputs: 1. Separate feeders for agricultural pumps and households2. Installed High Voltage Distribution Systems (HVDS)3. Installed meters and improved supply quality4. Strengthened 33 kV network

Implementation Arrangements: The three electricity DISCOMs - DISCOM-C (Bhopal), DISCOM-E (Jabalpur) and DISCOM-W (Indore) are the executing agencies for the investment program. All three DISCOMs have established project management units (PMUs) for implementation of the previous MFF and these units will continue their roles under the investment program. The PMU manager will report directly to chairmen and managing directors of the DISCOMs.

Implementation Status: Physical progress for DISCOMS Central, East and West is 51%, 63% and 76% respectively.

1 DED = Detailed Engineering Design.

220

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 01 Jul 2014 Extension of Loan closing date from 28 February 2015 to 28 February 2018.

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

178.68 96.79 77.44 100.00

Significant Developments During the Year

Tranche 2 (Loan 2830) is a loan of $200.00 million from ordinary capital resources (OCR), which was signed on 27 February 2012 and declared effective on 9 May 2012.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 2 have reached $178.68 million (96.8%) and $77.44 million (100.0%), respectively. Physical progress for DISCOMS Central, East and West is 51%, 63% and 76% respectively. Non-performing contracts being terminated and bidding documents to be followed for terminated contracts finalized.

Scope Change: The closing date of MFF extended from 28 February 2015 to 28 February 2018.

Undertaking and Covenants: Undertakings and covenants have either been complied or being complied.

1 DED = Detailed Engineering Design.

221

Annual MFF Progress Report

44167013

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Flood and Riverbank Erosion Risk Management Investment Program

Project No. 44167-013

Country/Regional

Bangladesh Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

26 Jun 2014 30 Jun 2023 N/A

Division SAER

MFF Amount ($ million)

255.00Source ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Flood and Riverbank Erosion Risk Management Investment Program for an aggregate amount not exceeding $255.00 million from ADB’s ADF on 26 June 2014.

Impact: improved livelihoods in the project area.

Outcome: reduced flood and riverbank erosion risks in the subproject areas.

Outputs: Flood and riverbank erosion risk mitigation functioning at priority reaches Strengthened institutional systems for flood and riverbank erosion risk management, and Operational program management systems

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

65.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

222

TRANCHE 1 UPDATE

Tranche TitleFlood and Riverbank Erosion Risk Management Investment Program - Project 1

Project No. 44167-014

Country/Regional Bangladesh Loan/Grant No.

0396, 3138

Project Officer Natsuko Totsuka Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

03 Jul 2014 30 Jun 2019 N/A

Division SAER

Tranche Amount($ million)

65.00 Source ADF

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/44167-014/main

1 DED = Detailed Engineering Design.

223

Tranche Summary

ADB approved the Flood and Riverbank Erosion Risk Management Investment Program - Project 1, not exceeding the aggregate amount of $65.00 million on 3 July 2014.

Impact: improved livelihoods in the project area.

Outcome: reduced flood and riverbank erosion risks in the subproject areas.

Outputs: Flood and riverbank erosion risk mitigation functioning at priority reaches Strengthened institutional systems for flood and riverbank erosion risk management Operational program management system

Implementation Arrangements: The executing agency is the Bangladesh Water Development Board (BWDB) under the Ministry of Water Resources. A project management office (PMO) was established within BWDB to manage project implementation, which is undertaken by subproject management offices (SMOs) in each subproject area. BWDB has overall responsibility for executing the program/project and ensuring achievement of project objectives. The Department of Disaster Management under the Ministry of Disaster Management and Relief will serve as the implementing agency for the community-based flood risk management subcomponent.

Implementation Status: The Project Management Office (PMO) has been fully functioning. Procurement of goods and works has been initiated. The procurement of geotextile bags was advertised. Draft bidding documents for several packages of river protection works and equipment are ready and currently being reviewed by ADB. ADB is assisting BWDB in the recruitment of the Institutional Strengthening and Project Management Consultants (ISPMC). Technical evaluation for the ISPMC package has been completed in December 2014, and financial evaluation is expected to be completed in January 2015. Initial disbursement of $4.87 million was made to the loan and grant imprest accounts in December 2014.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

224

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.31 0.00 4.87 0.00

Significant Developments During the Year

Tranche 1 (Loan 3138) is a loan of $65.00 million from the Asian Development Fund (ADF), which was signed on 14 August 2014 and declared effective on 17 September 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $.31 million (.0%) and $4.87 million (.0%), respectively. Consultancy recruitment and initial procurement of goods and works are underway.

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: Tranche 1 is in its early stages. There are 20 covenants, 2 were complied, 10 are being complied and 8 are not yet due. The project team is working closely with the executing agency to ensure satisfactory compliance with covenants.

1 DED = Detailed Engineering Design.

225

Annual MFF Progress Report

44213015

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title MFF - Secondary Education Sector Investment Program (Facility Concept)

Project No. 44213-015

Country/Regional

Bangladesh Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

27 Sep 2013 30 Jun 2023 N/A

Division SAHS

MFF Amount ($ million)

500.00Source ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the MFF - Secondary Education Sector Investment Program (Facility Concept) for an aggregate amount not exceeding $500.00 million from ADB’s ADF on 27 September 2013.

Impact: Increased employability of secondary education graduates

Outcome: A more efficient and equitable and higher-quality secondary education system

Outputs: Enhanced quality and relevance of secondary education More equitable access and better retention Strengthened secondary education management and governance

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

90.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

226

TRANCHE 1 UPDATE

Tranche TitleSecondary Education Sector Investment Program - Tranche 1

Project No. 44213-016

Country/Regional Bangladesh Loan/Grant No.

3047

Project Officer Eisuke Tajima Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

21 Oct 2013 31 Dec 2017 N/A

Division SAHS

Tranche Amount($ million)

90.00 Source ADF

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/44213-016/main

1 DED = Detailed Engineering Design.

227

Tranche Summary

ADB approved the Secondary Education Sector Investment Program - Tranche 1, not exceeding the aggregate amount of $90.00 million on 21 October 2013.

Impact: A more efficient and equitable and higher-quality secondary education system

Outcome: Improved inclusive participation in secondary education

Outputs: Enhanced quality and relevance of secondary education More equitable access and better retention Strengthened secondary education management and governance

Implementation Arrangements: The executing agency is the Ministry of Education (MOE) and the Directorate of Secondary and Higher Education (DSHE) is key implementing agency. Other MOE agencies involved in secondary education will be co-implementing agencies. An interministerial sector program steering committee led by the MOE Secretary will oversee implementation, approve annual operation plans, review verification of disbursement linked indicator (DLI) achievement, and ensure compliance with fiduciary oversight arrangements. A sector program implementation committee led by the DSHE Director General will coordinate implementation by all agencies, review implementation progress, and recommend approval of annual operation plans. A sector program support unit will support DSHE functional units and field offices in daily implementation, preparing annual operation plans, and compiling progress reports including DLI progress and achievement reports.

Implementation Status: All the disbursement linked indicators (DLIs) for Years 1 and 2 have been satisfied as shown in the reports on DLI achievement. According to the DLI protocol and the interim financial reports for the corresponding periods, government spending on the SESIP Program Budget Head exceeds ADB contibution for the corresponding period. Maximum amount allocated to Years 1 and 2 has been disbursed. One of the major reforms for the project -- decentralization of education management, has been initiated. Donor meetings were initiated which regularly discussed the pathways to to sector-wide approach (SWAP).

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 13 Nov 2014 A minor change in scope and implementation arrangement was approved for the inclusion in the procurement plan of the following non-consulting services/packages: (i) Recruitment/Outsourcing of Support Staff for SESIP Dhaka Offices for $81,000 using shopping method; and (ii) Recruitment/Outsourcing of Support Staff for Thana Education Offices for $202,000 using national competitive bidding.

1 DED = Detailed Engineering Design.

228

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

56.00 100.00 56.00 100.00

Significant Developments During the Year

Tranche 1 (Loan 3047) is a loan of $90.00 million from the Asian Development Fund (ADF), which was signed on 21 November 2013 and declared effective on 6 December 2013.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $56.00 million (100.0%) and $56.00 million (100.0%), respectively. .

Scope Change: There was a minor scope change for this tranche in 2014.

Undertaking and Covenants: There are 18 covenants for Tranche 1. 14 covenants have been complied, 2 were not complied, and two 2 are not yet due. The 2 covenants that are not complied pertain to the project and procurement management information system (PPMIS) and the project website since these are still being developed.

1 DED = Detailed Engineering Design.

229

Annual MFF Progress Report

45148004

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Greater Colombo Water and Wastewater Management Improvement Investment Program (Facility Concept)

Project No. 45148-004

Country/Regional

Sri Lanka Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

25 Oct 2012 31 Dec 2020 N/A

Division SAUW

MFF Amount ($ million)

300.00Source OCR

ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Greater Colombo Water and Wastewater Management Improvement Investment Program (Facility Concept) for an aggregate amount not exceeding $300.00 million from ADB’s ADF, OCR on 25 October 2012.

Impact: Improved urban environment and quality of life for the residents in Greater Colombo

Outcome: Improved water supply and wastewater service and management in Greater Colombo

Outputs: 1. Rehabilitated and expanded water supply system and reduced NRW in Colombo city2. Improved wastewater Services in Greater Colombo3. Reformed institution and capacity building for water supply and wastewater service4. Project management system in place

Significant Developments of the Facility: There is no significant changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 2

Approved Tranche Amount to Date

172.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

230

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

231

TRANCHE 1 UPDATE

Tranche TitleGreater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 1

Project No. 45148-005

Country/Regional Sri Lanka Loan/Grant No.

2947, 2948

Project Officer Kamal Dahanayake Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

16 Nov 2012 30 Jun 2017 N/A

Division SLRM

Tranche Amount($ million)

84.00 Source ADFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/45148-005/main

1 DED = Detailed Engineering Design.

232

Tranche Summary

ADB approved the Greater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 1, not exceeding the aggregate amount of $84.00 million on 22 November 2012.

Impact: Improved water supply and wastewater service and management in Greater Colombo

Outcome: Improved efficiency and financial sustainability of water supply services in Colombo City

Outputs: 1. Rehabilitated water supply network and reduced NRW in Colombo City2. Strengthened institutional structure and capacity of NWSDB.3. Project 1 successfully managed and implemented

Implementation Arrangements: The executing agency is the Ministry of Water Supply and Drainage (MWSD). The Ministry name has changed to Ministry of Urban Development and Water Supply in January 2015. The implementing agency is the National Water Supply Drainage Board (NWSDB), through its Project Management Unit (PMU).

Implementation Status: There are two major packages under Tranche 1 - system rehabilitation in Colombo North area package (ICB 1) and system rehabilitation in Colombo Northeast area package (ICB 2). Both contract packages are design and build contracts. ICB 1 was awarded on 13 November 2014 and ICB 2 is yet to be awarded. The project originally planned to recruit Management Advisory and Supervision Consultancy (MASC) firm. Subsequently, the Government requested to cancel MASC consultancy recruitment and instead decided to recruit individual consultants and one NRW management consulting firm (international). Recruitment of the individual consultants is ongoing, while recruitment of NRW management consulting firm is yet to start. PMU staff is already in place.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 30 Sep 2014 Change in implementation arrangements

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

1 DED = Detailed Engineering Design.

233

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

46.45 100.00 7.68 100.00

Significant Developments During the Year

Tranche 1 (Loan 2947, 2948) is a loan of $84.00 million from ordinary capital resources (OCR) and the Asian Development Fund (ADF), which was signed on 28 June 2013 and declared effective on 25 September 2013.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $46.45 million (100.0%) and $7.68 million (100.0%), respectively. There are two major packages under Tranche 1 - system rehabilitation in Colombo North area package (ICB 1) and system rehabilitation in Colombo Northeast area package (ICB 2). ADB approved the bidding documents of the packages in 2014. ICB 1 was awarded on 13 November 2014 and ICB 2 is yet to be awarded. Recruitment of Individual consultants is ongoing, while the recruitment of NRW management consulting firm (international) is yet to start. Right of way for a land in Gothatuwa proposed for construction work is not confirmed yet. Contract award related to that land will be done after obtaining right of way. Quarterly progress reports (QPR) for the first 3 quarters have not been submitted by EA as there was no significant project progress during that time. EA has submitted QPR for the last quarter of 2014.

Scope Change: There was a minor scope change for this tranche in 2014. Minor change in implementation arrangements was approved on 30 September 2014 to: (i) cancel MASC recruitment, (ii) recruit 6 international consultants individually for the NRW management consultancy work till the firm is recruited, (iii) recruit a NRW management international firm and (iv) recruit 6 national consultants as project advisory and supervision. This minor change applies to Tranches 1 and 2

Undertaking and Covenants: All covenants are being complied.

1 DED = Detailed Engineering Design.

234

TRANCHE 2 UPDATE

Tranche TitleGreater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 2

Project No. 45148-007

Country/Regional Sri Lanka Loan/Grant No.

3029, 3030

Project Officer Kamal Dahanayake Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

26 Sep 2013 30 Jun 2019 N/A

Division SLRM

Tranche Amount($ million)

88.00 Source ADFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/45148-007/main

1 DED = Detailed Engineering Design.

235

Tranche Summary

ADB approved the Greater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 2, not exceeding the aggregate amount of $88.00 million on 26 September 2013.

Impact: Improved water supply and wastewater service and management in Greater Colombo

Outcome: Improved system, efficiency and financial sustainability of water supply and wastewater services in Greater Colombo

Outputs: 1. Rehabilitated and expanded water supply system, and reduced NRW, in Greater Colombo2. Completed designs and improved preparedness for wastewater investments3. Strengthened institutional structure and capacity of service providers4. Project 2 successfully managed and implemented

Implementation Arrangements: The executing agency are the Ministry of Water Supply and Drainage (MWSD). The implementing agency is National Water Supply Drainage Board (NWSDB), through its Project Management Unit (PMU). A Program Steering Committee (PSC) has been established for the entire implementation period of Greater Colombo Water and Wastewater Management Improvement Investment Program (Investment Program) and also for Tranche 2. The PSC is chaired by the Secretary of the Ministry of Finance and Planning and is overseeing project implementation. Other members of the PSC are the Secretary of the MWSD, the Secretary of the Ministry of Local Government and Provincial Councils, and representatives from each of the following: the Department of External Resources, the Department of National Planning, the Ministry of Defense and Urban Development, the Ministry of Ports and Highways, NWSDB, and the Colombo Municipal Council (CMC), and others as required. The implementation arrangements are described in detail in the Facility Administration Manual (FAM) for the Investment Program.

Implementation Status: PMU has been established and staff recruited. Procurement of major civil works contracts is ongoing.

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 05 Nov 2014 Change in component of the project (cofinancing reduced from $101 million to $70 million)

1 DED = Detailed Engineering Design.

236

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

Tranche 2 (Loan 3029/3030) is a loan of $88.00 million from ordinary capital resources (OCR) and the Asian Development Fund (ADF), which was signed on 3 June 2014 and declared effective on 23 September 2014. Cofinancing in the amount of $70.0 was approved in 2014.

Progress: As of 31 December 2014, there were no contract awards and disbursement for this tranche. There are two major civil works packages under Tranche 2: (i) system rehabilitation for NRW reduction in West part of Colombo city (ICB 3); and, (ii) system rehabilitation for NRW reduction in Southern part of Colombo City (ICB 4). Procurement of these packages is ongoing. Right of way for a land in Gothatuwa proposed for construction work is not confirmed yet. Contract award related to that land will be done after obtaining right of way. Quarterly progress reports (QPR) for the first 3 quarters have not been submitted by EA as there was no significant project progress during that time. EA is in the process of submitting QPR for the last quarter of 2014.

Scope Change: There was a minor scope change for this tranche in 2014. A minor change in scope was approved in December 2014 due to change in the component of the project, this also resulted in revising the cofinancing amount (from AFD) from $101.00 million to $70.00 million.

Undertaking and Covenants: All covenants are being complied.

1 DED = Detailed Engineering Design.

237

Annual MFF Progress Report

45224002

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Rajasthan Renewable Energy Transmission Investment Program (Facility Concept)

Project No. 45224-002

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

26 Sep 2013 31 Dec 2018 N/A

Division SAEN

MFF Amount ($ million)

300.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Rajasthan Renewable Energy Transmission Investment Program (Facility Concept) for an aggregate amount not exceeding $300.00 million from ADB’s OCR on 26 September 2013.

Impact: Accelerated development of renewable energy sources in Rajasthan and India

Outcome: Cleaner electricity mix with more efficient and effective generation and transmission system achieved

Outputs: 1. Bulk power transmission system in Rajasthan expanded2. Institutional capacity for renewable energy parks and transmission system developed.

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

62.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

238

TRANCHE 1 UPDATE

Tranche TitleRajasthan Renewable Energy Transmission Investment Program - Tranche 1

Project No. 45224-003

Country/Regional India Loan/Grant No.

3052, 8275

Project Officer Len V. George Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

22 Oct 2013 31 Dec 2016 N/A

Division SAEN

Tranche Amount($ million)

62.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/45224-003/main

Tranche Summary

ADB approved the Rajasthan Renewable Energy Transmission Investment Program - Tranche 1, not exceeding the aggregate amount of $62.00 million on 22 October 2013.

Impact: Accelerated development of renewable energy sources in Rajasthan/India.

Outcome: Cleaner electricity mix with more efficient and effective generation and transmission system

Outputs: 1. Bulk power transmission system in Rajasthan expanded.2. Institutional capacity for renewable energy parks and transmission system developed.

Implementation Arrangements: Rajasthan Rajya Vidyut Prasaran Nigan Limited (RRVPNL), the state transmission licensee in Rajasthan, and the Energy Department of Rajasthan are the executing agencies for the investment program.

Implementation Status: ADB cleared 4 turnkey packages for award. 1 contract was awarded in December 2014 and disbursements have commenced.

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

239

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

23.92 0.00 0.67 0.00

Significant Developments During the Year

Tranche 1 (Loan 3052) is a loan of $62.00 million from ordinary capital resources which was signed on 12 September 2014 and declared effective on 6 November 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $23.92 million (.0%) and $.67 million (.0%), respectively. .

Scope Change: There were no scope changes for this tranche in 2014.

Undertaking and Covenants: Undertakings and covenants are being complied.

1 DED = Detailed Engineering Design.

240

Annual MFF Progress Report

46268001

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Clean Energy Finance Investment Program Project No. 46268-001

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

30 Oct 2014 N/A N/A

Division SAPF

MFF Amount ($ million)

500.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Clean Energy Finance Investment Program for an aggregate amount not exceeding $500.00 million from ADB’s OCR on 30 October 2014.

Impact: increased renewable energy infrastructure.

Outcome: facilitated investment in renewable energy.

Outputs: Enhanced availability of long-term financing to support renewable energy projects Improved institutional capacity of IREDA

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

200.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

241

TRANCHE 1 UPDATE

Tranche Title Clean Energy Finance Investment Program - Tranche 1 Project No. 46268-002

Country/Regional India Loan/Grant No.

3186

Project Officer Anqian Huang Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

17 Nov 2014 30 Apr 2019 N/A

Division SAPF

Tranche Amount($ million)

200.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/46268-002/main

Tranche Summary

ADB approved the Clean Energy Finance Investment Program - Tranche 1, not exceeding the aggregate amount of $200.00 million on 17 November 2014.

Impact: increased renewable energy infrastructure.

Outcome: Facilitated investment in renewable energy.

Outputs: Enhanced availability of long-term financing to support renewable energy projects. Improved institutional capacity of IREDA.

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

242

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

243

Annual MFF Progress Report

47037003

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Green Power Development and Energy Efficiency Improvement Investment Program

Project No. 47037-003

Country/Regional

Sri Lanka Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

15 Jul 2014 N/A N/A

Division SAEN

MFF Amount ($ million)

300.00Source OCR

ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Green Power Development and Energy Efficiency Improvement Investment Program for an aggregate amount not exceeding $300.00 million from ADB’s ADF, OCR on 15 July 2014.

Impact: increased access to clean and reliable power supply.

Outcome: enhanced clean power generation, system efficiency and reliability.

Outputs: Hydropower generation developed and connected to the grid in the Central Province Transmission infrastructure enhanced Efficiency of medium voltage network improved Demand-side management for energy efficiency improved Capacity development support provided to Ceylon Electricity Board.

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

150.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

244

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

245

TRANCHE 1 UPDATE

Tranche TitleGreen Power Development and Energy Efficiency Improvement Investment Program - Tranche 1

Project No. 47037-004

Country/Regional Sri Lanka Loan/Grant No.

3146, 3147

Project Officer Mukhtor Khamudkhanov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

29 Jul 2014 31 Mar 2020 N/A

Division SAEN

Tranche Amount($ million)

150.00 Source ADFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47037-004/main

Tranche Summary

ADB approved the Green Power Development and Energy Efficiency Improvement Investment Program - Tranche 1, not exceeding the aggregate amount of $150.00 million on 29 July 2014.

Impact: enhanced clean power generation, system efficiency and reliability.

Outcome: increased hydropower generation capacity and transmission and medium voltage network efficiency.

Outputs: Hydropower generation developed in the Central Province. Transmission infrastructure capacity enhanced. Efficiency of medium voltage network improved. Demand-side management for energy efficiency improved. Capacity development support provided to CEB.

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

246

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

247

Annual MFF Progress Report

47083001

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Accelerating Infrastructure Investment Facility in India Project No. 47083-001

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

27 Sep 2013 31 Dec 2016 N/A

Division SAPF

MFF Amount ($ million)

700.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Accelerating Infrastructure Investment Facility in India for an aggregate amount not exceeding $700.00 million from ADB’s OCR on 21 October 2013.

Impact: Increased availability of infrastructure

Outcome: Facilitated private sector investment in infrastructure PPPs

Outputs: 1. Enhanced availability of long-term finance for PPP projects2. Improved project management

Significant Developments of the Facility: There is no significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

400.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

On Track

248

TRANCHE 1 UPDATE

Tranche TitleAccelerating Infrastructure Investment Facility in India - Tranche 1

Project No. 47083-002

Country/Regional India Loan/Grant No.

3048

Project Officer Vivek Rao Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

21 Oct 2013 31 Dec 2016 N/A

Division SAPF

Tranche Amount($ million)

400.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47083-002/main

Tranche Summary

ADB approved the Accelerating Infrastructure Investment Facility in India - Tranche 1, not exceeding the aggregate amount of $400.00 million on 21 October 2013.

Impact: Increased availability of infrastructure

Outcome: Facilitated private sector investment in infrastructure PPPs

Outputs: 1. Enhanced availability of long-term finance for PPP subprojects2. Improved project management

Implementation Arrangements: The executing agency is IIFCL. IIFCL as mandated by the Government of India, assumes an apex role in financing projects in India and fostering PPP projects. Its Board of Directors will provide its policy direction and strategic oversight. IIFCL's project management unit (PMU) will monitor day-to-day implementation and the environment and social safeguard management unit (ESMU) shall be responsible for ensuring that all qualified subprojects are in compliance with the Environmental and Social Safeguards Framework (ESSF) and applicable national and state policies.

Implementation Status: Nine subprojects have been approved for financing under tranche 1. Contract awards and disbursements are $368.5 million and $171.4 million respectively. Training for PMU staff is ongoing. Eight officers have been nomiated to particiaote in various programs.

1 DED = Detailed Engineering Design.

249

Tranche Change in Scope

Category Date Approved Proposed Change

Minor Change 10 Mar 2014 For all take-out financing projects where the liability of IIFCL devolves an operation & maintenance (O&M) contractor post commercial operation date (COD), the relevant audited financial statements of the Project Special Purpose Vehicle (SPV) used for determining the debt service coverage ratio (DSCR) would be submitted instead of the lenders' independent engineer's report (LIE). DSCR should at least be 1.

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating ✓Financial ✓Contract Awards ✓Disbursements ✓Safeguards ✓Technical ✓

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

368.01 100.00 171.46 100.00

Significant Developments During the Year

Tranche 1 (Loan 3048) is a loan of $400.00 million from ordinary capital resources (OCR), which was signed on 22 January 2014 and declared effective on 21 February 2014.

Progress: As of 31 December 2014, contract awards and disbursements under Tranche 1 have reached $368.01 million (100.0%) and $171.46 million (100.0%), respectively. Tranche release is on track. There has been significant progress with regard to the implementation of the MIS on an organization wide basis and the progress is expected to be complete by Q1 2015. With regard to risk management, a few technical requirements may not be appropriate given the nature of the organization and ADB is looking to exclude these technical requirements from the compliance requirements. ADB will continue to monitor progress.

Scope Change: There was a minor scope change for this tranche in 2014.

Undertaking and Covenants: Though there are still covenants IIFCL needs to comply with, ADB is assured that these will be complied with soon.

1 DED = Detailed Engineering Design.

250

Annual MFF Progress Report

47101001

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Assam Power Sector Investment Program Project No. 47101-001

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

03 Jul 2014 N/A N/A

Division SAEN

MFF Amount ($ million)

300.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Assam Power Sector Investment Program for an aggregate amount not exceeding $300.00 million from ADB’s OCR on 3 July 2014.

Impact: increased availability of electricity in Assam.

Outcome: increased capacity and efficiency of energy generation and distribution systems in Assam.

Outputs: Generation system upgraded and expanded Distribution system upgraded and expanded Institutional capacity of APGC & APDC strengthened Project management system in place.

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

2

Approved Tranches To Date 1

Approved Tranche Amount to Date

50.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

251

TRANCHE 1 UPDATE

Tranche Title Assam Power Sector Investment Program - Tranche 1 Project No. 47101-002

Country/Regional India Loan/Grant No.

3140

Project Officer Aziz Yusupov Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

11 Jul 2014 30 Jun 2019 N/A

Division SAEN

Tranche Amount($ million)

50.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47101-002/main

Tranche Summary

ADB approved the Assam Power Sector Investment Program - Tranche 1, not exceeding the aggregate amount of $50.00 million on 11 July 2014.

Impact: increased capacity and efficiency of energy generation systems in Assam.

Outcome: increased capacity and efficiency in Lakwa power plant.

Outputs: Generation system upgraded and expanded Institutional capacity of APGC & APDC strengthened.

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

252

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

253

Annual MFF Progress Report

47273002

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title Integrated Road Investment Program Project No. 47273-002

Country/Regional

Sri Lanka Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

25 Sep 2014 30 Sep 2024 N/A

Division SATC

MFF Amount ($ million)

800.00Source OCR

ADF

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the Integrated Road Investment Program for an aggregate amount not exceeding $800.00 million from ADB’s ADF, OCR on 25 September 2014.

Impact: Improved connectivity between rural communities and socioeconomic centers in Sri Lanka

Outcome: Increased transport efficiency on project roads

Outputs: Improved road conditions between the selected rural communities and socioeconomic centers Enhanced capacity of road agencies

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

4

Approved Tranches To Date 2

Approved Tranche Amount to Date

207.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

254

TRANCHE 1 UPDATE

Tranche Title Integrated Road Investment Program-Tranche 1 Project No. 47273-003

Country/Regional Sri Lanka Loan/Grant No.

3171

Project Officer Chen Chen Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

03 Oct 2014 30 Sep 2021 N/A

Division SATC

Tranche Amount($ million)

100.00 Source ADF

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47273-003/main

Tranche Summary

ADB approved the Integrated Road Investment Program-Tranche 1, not exceeding the aggregate amount of $100.00 million on 3 October 2014.

Impact: Improved connectivity between rural communities and socioeconomic centers

Outcome: Increased transport efficiency on project roads

Outputs: 1. Improved road conditions between the selected rural communities and socioeconomic centers inSouthern Province 2. Enhanced capacity of road agencies3. Preparation of projects completed for succeeding projects

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

255

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

256

TRANCHE 2 UPDATE

Tranche Title Integrated Road Investment Program-Tranche 2 Project No. 47273-004

Country/Regional Sri Lanka Loan/Grant No.

3221, 3222

Project Officer Lee Ming Tai Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

11 Dec 2014 30 Sep 2019 N/A

Division SATC

Tranche Amount($ million)

107.00 Source ADFOCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47273-004/main

Tranche Summary

ADB approved the Integrated Road Investment Program-Tranche 2, not exceeding the aggregate amount of $107.00 million on 11 December 2014.

Impact: improved connectivity between rural communities and socioeconomic centers in Sri Lanka

Outcome: increased transport efficiency on project roads.

Outputs: Improved road conditions between the selected rural communities and socioeconomic centers.

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

257

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

258

Annual MFF Progress Report

47341001

For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE

Project Title South Asia Subregional Economic Cooperation Road Connectivity Investment Program

Project No. 47341-001

Country/Regional

India Department SARD

Key Dates

ApprovalDate

Original Closing Date

Revised Closing Date

28 Mar 2014 N/A N/A

Division SATC

MFF Amount ($ million)

500.00Source OCR

Cofinancing($ million)

N/ASource N/A

Facility Summary

ADB approved the South Asia Subregional Economic Cooperation Road Connectivity Investment Program for an aggregate amount not exceeding $500.00 million from ADB’s OCR on 28 March 2014.

Impact: Increased domestic and regional trade through North Bengal and Northeastern Region (NB-NER) of India

Outcome: Improved road connectivity and efficiency of the NB-NER international trade corridor

Outputs: Improved roads for regional connectivity Developed capacity and supported project implementation for MPWD

Significant Developments of the Facility: Not Yet Effective

Estimated Total No. of Tranches to be Processed

1

Approved Tranches To Date 1

Approved Tranche Amount to Date

300.00

Facility Change in ScopeCategory Date Proposed Change

N/A N/A N/A

Tranche Completion Report N/A

Facility Completion Report N/A

MFF Performance Rating (On Track, Potential Problem, At Risk)

N/A

259

TRANCHE 1 UPDATE

Tranche TitleSouth Asia Subregional Economic Conectivity Road Connectivity Investment Program - Tranche 1

Project No. 47341-002

Country/Regional India Loan/Grant No.

3118

Project Officer Tsuneyuki Sakai Department SARD

Key Dates

ApprovalDate

OriginalClosing Date

RevisedClosing Date

01 Apr 2014 30 Jun 2022 N/A

Division SATC

Tranche Amount($ million)

300.00 Source OCR

CofinancingAmount ($ million)

N/A Source N/A

Estimated Cost Overrun ($ million)

N/A

Estimated AmountUsed for DED1

($ million)

N/A

Project Data Sheet http://www.adb.org/projects/47341-002/main

Tranche Summary

ADB approved the South Asia Subregional Economic Conectivity Road Connectivity Investment Program - Tranche 1, not exceeding the aggregate amount of $300.00 million on 1 April 2014.

Impact: Increased domestic and regional trade through NB-NER

Outcome: Improved road connectivity and efficiency of the NB-NER international trade corridor

Outputs: Improved roads for regional connectivity Developed capacity and supported project improvement for MPWD

Implementation Arrangements: Not Applicable

Implementation Status: Not Yet Effective

Tranche Change in ScopeCategory Date Proposed Change

N/A N/A N/A

1 DED = Detailed Engineering Design.

260

Tranche Performance( Quarterly Performance as of 31 Dec 2014 )

On Track Potential Problem Actual Problem

Overall Rating

Financial

Contract Awards

Disbursements

Safeguards

Technical

Contract Awards &Disbursements(Cumulative)

Contract Awards Disbursements

$ million % $ million %

0.00 0.00 0.00 0.00

Significant Developments During the Year

1 DED = Detailed Engineering Design.

261

MFF ANNUAL PROGRESS REPORT DEFINITIONS

Ref. No. Term Meaning

FACILITY UPDATE

1. Project Title - Indicates the MFF name following this naming convention: MFF – {Facility Name}

2. Project No. - Indicates the facility’s 8-digit project number3. Country/Regional - Indicates the name of the country covered by the facility.4. Department - Indicates the name of the department processing the MFF.5. Approved Date - Indicates the date of ADB approval of the facility.6 Original Closing Date - Indicates the facility’s original closing date.7. Revised Closing Date - Indicates the facility’s revised closing date.8. Division - Indicates the name of the division processing the MFF.9. MFF Amount ($ million) - Indicates the approved MFF amount.10. Source - Indicates the funding source/s of the MFF approved amount,

whether it is OCR/ADF.11. Cofinancing Amount ($

million)- Indicates the DVA cofinancing amount. If not applicable, “N/A” is

displayed.12. Source - Indicates the source of the cofinancing amount. If not applicable,

“N/A” is displayed.13. Facility Summary

Impact and Outcome - States the facility’s impact and outcome as indicated in the DMF report.

Outputs - States the facility’s outputs as indicated in the DMF report.Significant Development of the facility

- Describes any significant development of the facility including major changes to the roadmap, investment program, and policy and legal framework.

14. Expected Total No. ofTranches

- Indicates the number of envisioned or pipelined tranches as presented in the RRP, if any.

15. Approved Tranches toDate

- Indicates the number of approved tranches to date.

16. Approved TrancheAmount to Date

- Indicates the current year’s cumulative tranche amount to date.

17. Facility Change in ScopeCategory - Indicates whether the category for the facility’s proposed change is

major or minor.Date Approved - Indicates the date when the request for change in scope for the

facility is approved.Proposed Change - Summarizes the content of the change in scope request; revisions

to outcome, outputs and/or inputs; and new targets and/or indicators.

18. Completed Tranches toDate

- Indicates the URL of the completed tranches’ Project Completion Report (PCR).

19. Facility CompletionReport

- Indicates the URL of the Facility Completion Report (FCR). Note that a facility is completed when all its tranches are closed.

20. Overall MFFPerformance Rating (OnTrack, PotentialProblem, At Risk)

- Indicates the rating of the MFF. The facility will be rated on the basis of 3 separate parameters:

(i) MFF delays, (ii) Tranche performance, and (iii) Compliance with undertakings.

Poor performance (red rating) on account of the 3 indicators will place the facility ‘at risk’ and may lead to its suspension and

262

MFF ANNUAL PROGRESS REPORT DEFINITIONS

Ref. No. Term Meaning

FACILITY UPDATE

possible cancellation; poor performance (red rating) on account of 2 parameters will indicate potential problems and would require RDs to draw an action plan to rectify the facility‘s performance.

MFF Delays - Contributors to MFF Delays are:(i) Substantial delays in tranche processing, and/or (ii) Substantial delays in tranche implementation.

Timeliness in Tranche processing will be evaluated against the tranche sequencing program forecasted in the RRP. Tranches processed …

(i) within one year of the forecasted period will be given an ‘on track‘ (green) rating;(ii) between 1 and 2 years of the forecasted date will be given a ‘Potential problem‘ (yellow) rating, and (iii) beyond 2 years of the forecasted date will be given an ‘at risk‘ (red) rating.

For MFFs where a time-bound tranche sequencing program was not forecasted in the RRP, only, MFF delays will be determined on the following grounds:

(i) if less than 2 years have passed since approval of the previous tranche (up to the stage where the entire MFF has been turned into tranches), a green rating is granted,(ii) if more than 2 years but less than 3 years have elapsed, a yellow rating is given; and(iii) if more than 3 years have elapsed, a red rating applies.

Compliance with MFF undertaking

- The assessment should include compliance with Safeguards and PCP requirements, as well as any timely Reform implementation targets.

(i) Non-compliance with more than 3 undertaking will place the facility in ‘red‘ (unsatisfactory).(ii) Non-compliance with any ‘safeguards‘, ‘PCP‘ and/or ‘reform implementation‘ undertakings will place the MFF in ‘red‘ (unsatisfactory).(iii) Non-compliance with 2 undertakings (other than those outlined in the preceding sentence), will place the facility as ‘partly satisfactory‘. (iv) Compliance with all undertakings with a maximum of one exception (other than those outlined before), will signify a ‘satisfactory‘ criteria.

Tranche Performance - (i) Poor performance (‘at risk‘) on 33% or more of the MFF tranches (by number) would place the MFF ‘at risk‘ (red).(ii) ‘Potential problem‘ rating on 33% or more of the MFF tranches (by number) would categorize the MFF as ‘potential problem‘ (yellow), unless a red rating is triggered.(iii) Other ratings will result ‘on track‘ (green)

263

MFF ANNUAL PROGRESS REPORT DEFINITIONS

Ref. No. Term Meaning

TRANCHE UPDATE

1. Tranche Title - Indicates the tranche name following this naming convention: MFF – {tranche name} (Tranche {tranche no.})

2. Project No. - Indicates the tranche’s 8-digit project number.3. Country/Regional - Indicates the name of the country covered by the tranche.4. Loan/Grant No. - Indicates the tranche’s 4-digit loan number. If loan numbers are

available 5. Project Officer - Indicates the name of the mission leader or project implementation

officer.6 Department - Indicates the name of the department processing the tranche.7. Tranche Approved Date - Indicates the tranche’s date of ADB approval.8. Original Closing Date - Indicates the tranche’s original loan closing date.9. Revised Closing Date - Indicates the tranche’s revised loan closing date.10. Division - Indicates the name of the division processing the tranche.11. Tranche Amount

including cofinancing ($million)

- Indicates the tranche’s total approved and cofinancing amount.

12. Source - Indicates the funding source of the tranche amount, whether it is OCR/ADF.

13. Cofinancing amount ($million)

- Indicates the tranche’s cofinancing amount.

14. Source - Indicates the funding source of the cofinancing amount.15. Estimated Cost Overrun

Amount- Indicates the cost overrun amount incurred by the tranche at the

time of preparation of the MFF Annual Progress Report. If not applicable, “N/A” is indicated.

16. Estimated Amount Usedfor detailed engineeringdesign (DED)

- Indicates the amount used for DED. If not applicable, “N/A” is indicated.

17. Project Data Sheet(PDS)

- Indicates the URL for the tranche’s PDS.

18. Tranche SummaryImpact and Outcome - States the tranche’s impact and outcome as indicated in the DMF

report.Outputs - States the tranche’s outputs as indicated in the DMF reportImplementation Arrangements

- Briefly highlights the tranche’s implementation arrangements.

Implementation Status - Briefly highlights the tranche’s implementation progress.19. Tranche Change in

ScopeCategory - Indicates whether the category for the proposed change is major or

minor.Date Approved - Indicates the date when request for change in scope was approved.Proposed Change - Summarizes the content of the change in scope request; revisions

to outcome, outputs and/or inputs; and new targets and/or indicators.

20. Tranche Performance - Indicates the performance rating of the tranche as indicated in the 2011 MFF Staff instructions and PAI 5.08. It is rated in the following categories: (i) financial, (ii) contract awards, (iii) disbursements, (iv) safeguards, and (v) technical.

21. Contract Awards &Disbursements

- Indicates the tranche’s cumulative amount and rate of the contract awards and disbursement in the year of the preparation of the MFF

264

MFF ANNUAL PROGRESS REPORT DEFINITIONS

Ref. No. Term Meaning

TRANCHE UPDATE

(Cumulative) annual report.22. Significant

Developments Duringthe Year

Physical Progress - Briefly describes the physical progress of the tranche.Nonphysical Progress - Briefly describes the nonphysical progress of the tranche.Scope Change - Briefly describes the tranche’s request for change in scope, if any.Undertaking with Covenants

- Briefly describes the number of undertakings and covenants that the tranche has complied with.

265