Form 1
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I Annual Fixed Cost
1 Return on Equity 5 17.75 32.08 39.96 34.31 34.31 34.31 35.92 35.92 2 Interest on loan capital 6 C 83.11 99.24 160.00 200.22 215.70 207.83 129.58 148.92 3 Depreciation 10 B 18.25 18.54 20.97 30.95 49.49 61.59 62.81 74.75 4 Interest on Working Capital 11 12.38 14.31 19.78 16.86 18.45 14.55 18.49 19.75 5 Operation and Maintenance Expenses 13 E 5.89 14.42 8.15 6.35 12.03 13.04 13.78 14.57
6
Special allowance in lieu of Renovation and
Modernisation / Separate compensatory
allowance
14
7 Other Debits 15 - - - - - - - - 8 Prior period credits / charges 16 (7.54) (0.23) 1.14 0.43 2.98 - - - 9 Total Annual Fixed Cost 129.84 178.37 250.00 289.12 332.95 331.32 260.59 293.90
10 Less: Other Income 17 0.05 0.16 0.18 0.29 0.16 0.16 0.16 0.16 11 Net Annual Fixed Cost 129.80 178.21 249.81 288.83 332.79 331.15 260.43 293.74
II Total Variable Cost 19 A / 19 B 201.85 178.54 262.82 242.15 236.53 138.22 292.54 307.58
III Total Cost 331.65 356.75 512.63 530.98 569.32 469.38 552.97 601.32
Summary of Tariff Proposal for Gas based Thermal Station
FY 2015-16Projected
S. No. ParticularsReference to
Form
Name of the Company
Name of the Project
TANGEDCO
Valuthur Gas Turbine Power Station (VGTPS)
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 3
Name of the Company
Name of the Power Station
Unit
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6)
Rate of Return on Equity % 14% 14% 14% 14% 14% 14% 14% 14%
Target PLF % 79% 54% 88% 65% 87% 80% 84% 85%
Auxiliary Energy Consumption %7% 6% 6% 8% 6% 6% 6% 6%
Gross Station Heat Rate kCal/kWh 1834 1789 1878 1830 1796 1850 1850 1850
Specific Fuel Oil Consumption ml/kWhNA NA NA NA NA NA NA NA
O&M Cost
Cost of Fuel for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
O & M Expenses for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Primary Fuel Stock for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
SecondaryFuel Oil or
Secondary/Alternate liquid
fuel stock for WC
in Months
NA NA NA NA NA NA NA NA
Spares stock as % of Plant &
Equipment Cost on 1.4.2004
for WC
%
1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Recievables for WC in Months 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Prime lending Rate of SBI % 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
Incentive Rate Paise.kWh 25 25 25 25 25 25 25 25
TANGEDCO
Valuthur Gas Turbine Power Station (VGTPS)
FY 2014-15 FY 2015-16
Normative parameters considered for tariff computations
ProjectedParticularsFY 2011-12 FY 2012-13 FY 2013-14
Form 4
Name of the Station Valuthur Gas Turbine Power Station
S.No Norms of Operation FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19 Average
1 2 3 4 5 6 7 8 9 10 111 PLF / PAF (in %) 79.15% 54.00% 87.64% 64.95% 86.63% 80.00% 83.56% 85.30% 74.47%
2 Auxliary consumption (in %) 7.00% 5.76% 5.81% 7.86% 5.65% 6.00% 6.00% 6.00% 6.42%
3Average Gross Station Heat Rate (Kcal /
kWhr)1834 1789 1,878 1,830 1,796 1,850 1,850 1,850 1,835
4Average Gross Calorific value of Gas /
Naphtha (Kcal / Scm / Kg)9655 9684 9,404 9,731 9,735 10,000 10,000 10,000 9,731
5Specific consumption of Gas / Naphtha (Scm /
Kg / kWhr)0.19 0.18 0.20 0.19 0.18 0.19 0.19 0.19 0.19
6 Operating Expenses (Rs in Lakhs)
7Operation and Maintenance expenses (Rs in
Crs. / MW)3.15 7.71 4.35 3.34 12.66 13.72 7.37 7.79 6.24
8Average cost of Gas / Naphtah (Rs // Scm /
MT)7.78 10.31 9.96 11.91 13.27 11.21 11.55 11.89 10.82
Statement showing the performance of Stations during the previous five years
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 5
TANGEDCO
Valuthur Gas Turbine Power Station
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 Equity at the beginning 38.37 90.45 142.36 290.63 290.63 290.63 290.63 290.63
2 Addition during the year 52.08 51.91 5.29 - - - - -
3 Total Equity 90.45 142.36 147.65 290.63 290.63 290.63 290.63 290.63
4 Return on Equity (in %) 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
5 Return on Equity 17.75 32.08 39.96 34.31 34.31 34.31 35.92 35.92
Computation Return on Equity
ProjectedS.No Particulars FY 2014-15
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 6
Name of the Company
Name of the Station
Rs Crores
1 2 9 10 11 9 10 11
1Interest on security deposit - -
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF
cum Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest 0.19 0.21
Total 0.19 0.21
Statement showing other Interest
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2012-13Outstanding
at the
beginning
Net
additionsInterest
S.
no.Particulars
FY 2011-12Outstanding
at the
beginning
Net
additionsInterest
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
FORM-6 C
Name of the Company
Name of the Station
FY 2016-17 FY 2017-18 FY 2018-19
1 Net Interest on Existing Loan 82.93 99.03 159.72 199.95 214.84 206.93 128.65 147.95
2 Interest on Project borrowings
3 Other Interest 0.19 0.21 0.28 0.26 0.86 0.89 0.93 0.97
4 Total Interest 83.11 99.24 160.00 200.22 215.70 207.83 129.58 148.92
FY 2015-16
Abstract of Interest
TANGEDCO
Valuthur Gas Turbine Power Station
S.No
.Particulars FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Projected
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Station
1 2
1Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF
cum Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest
Total
Statement showing other Interest
S.
no.Particulars
Form 6
Rs Crores
9 10 11 9 10 11 13 14 15
-
0.26 0.86
-
-
-
0.28
0.28 0.26 0.86
Interest
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2013-14Outstanding
at the
beginning
Net
additionsInterest
FY 2014-15 FY 2015-16
Outstanding at
the beginning
Net
additionsInterest
Outstanding at
the beginning
Net
additions
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Station
1 2
1Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF
cum Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest
Total
Statement showing other Interest
S.
no.Particulars
Form 6
Rs Crores
16 17 18 19 20 21 22 23 24
0.89 0.93 0.97
- - -
- - -
- - -
0.89 0.93 0.97
Outstanding
at the
beginning
Net
additionsInterest Interest
Outstanding
at the
beginning
Net
additionsInterest
Outstanding
at the
beginning
Net
additions
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2018-19 (Projected)FY 2016-17 (Projected) FY 2017-18 (Projected)
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 101.00 Plant and machinery in generating Stations
including plant foundations(a) Boilers/Plants 22.50 49.84 15.38 44.04 4.78 (b) Cooling towers and circulating water
system
- - - - 0.56
2.00 Buildings and civil Engineering works of a
permenant character, not mentioned
above
- - - - -
(a) Offices and show rooms - - - 1.04 4.16 (b) Containing thermo electric plants - - - - - (c) Temporary errections such as wooden
structures
- - - - -
(d) Roads other than kacha roads - - - - - (e) Others - - - - -
3.00 Transformers, transformer (kiosk) sub
station equipmernt and other fixed
aparatus (including plant foundations)
- - - 0.76 -
(a) Transformers (including foundation)
having a rating of 100 kVA and over.
- - - - -
(b) Others 1.68 0.49 - - - 4.00 Switch gear, including cable connections - - - - -
5.00 Lightening arresters - - - - - (a) Station type - - - - - (b) Pole type - - - - -
(c) Synchronous condensers - - - - - 6.00 Batteries 5.31 1.31 - - - 7.00 (a) Underground cables including joint
boxes and disconnected boxes
- - - - -
(b) Cable duct systems - - - - - 8.00 Meters - - - - - 9.00 Self propelled vehicles - - - - - 10.0 Air-conditioning plants - - - - -
(a) Static - - - - - (b) Portable - - - - -
11.00 (a) Office furniture and fittings - - - - -
(b) Office equipments - - - - -
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of WorksS. No.
TANGEDCO
Valuthur Gas Turbine Power Station
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of WorksS. No.
TANGEDCO
Valuthur Gas Turbine Power Station
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
(c) Internal wirings including fittings and
apparatus
- - - - -
(d) Street light fittings - - - - - 12.0 Motors - - - - -
13.0 Communication equipments - - - - - (a) Radio and higher frequency carrier
system
- - - - -
(b) Telephone lines and telephones - - - - - -
TOTAL 29.49 51.65 15.38 45.85 9.51
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Power Station
Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Opening GFA (Rs. Crores) 274.45 280.05 317.65 660.64 784.41 1,530.55 1,553.71 1,779.81
Addition to GFA (Rs. Crores) 5.59 37.61 17.61 123.77 746.14 23.16 226.10 15.00
Closing GFA (Rs. Crores) 280.05 317.65 335.26 784.41 1,530.55 1,553.71 1,779.81 1,794.81
Average Rate of Depreciation (%) 6.52% 5.84% 6.25% 4.69% 4.82% 5.28% 5.28% 5.28%
Depreciation (Rs. Crores) 18.25 18.54 20.97 30.95 49.49 61.59 62.81 74.75
Form 10 B
TANGEDCO
Valuthur Gas Power Station
Depreciation
Form 11
TANGEDCO
Valuthur Gas Turbine Power Station
(Rs.in Crores)
S.No. Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
1 Fuel Cost 33.64 29.76 43.80 40.36 39.42 23.04 48.76 51.26
2 Fuel Stock
3 O & M expenses 0.49 1.20 0.68 0.53 1.00 1.09 1.15 1.21
4 Maintenance Spares 5.84 6.59 6.98 8.24 15.78 16.46 18.73 19.02
5 Recievables 55.28 59.46 85.44 88.50 94.89 78.23 92.16 100.22
6 Total Working Capital 95.25 97.01 136.90 137.63 151.09 118.81 160.80 171.71
7 Rate of Interest 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
8 Interest on Working Capital 12.38 14.31 19.78 16.86 18.45 14.55 18.49 19.75
Name of the Company
Name of the Project
Computation of Interest on Working Capital
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 A
TANGEDCO
Valuthur Gas Turbine Power Station
Rs. Crores
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Plant & Machinery 4.79 4.81 2.63 7.69 4.08 4.32 4.56 4.82
2 Building - 0.00 0.00 0.01 0.00 0.00 0.00 0.00
3 Civil Works 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01
4 Hydraulic work - - - - - - - -
5 Lines & Cable network - - - - - - - -
6 Vehicles 0.00 0.00 - - - - - -
7 Furniture & Fixtures - - - - - - - -
8 Office equipments 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9Allocation of Head Quarters
Expenses - - - - - - -
Total Expenses 4.79 4.82 2.64 7.70 4.09 4.33 4.57 4.84
10 Less: Capitalisation - - - - -
11Net Repair & Maintenance
expenses 4.79 4.82 2.64 7.70 4.09 4.33 4.57 4.84
Operation and Maintenance expenses - Repairs and Maintenance
Projected
Name of the Company
Name of the Project
FY 2014-15S. No. Details FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 B
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Salary 1.43 1.46 2.17 4.13 3.46 3.98 4.20 4.44
2 Overtime wages 0.01 0.01 0.01 0.04 0.00 0.00 0.00 0.00
3 Dearness Allowance 0.81 1.08 1.99 3.42 4.20 4.44 4.70 4.97
4 Other Allowances 0.21 0.17 0.18 0.35 0.47 0.49 0.52 0.55
5 Bonus & Exgratia 0.02 0.01 0.02 0.04 0.03 0.04 0.04 0.04
Total 1 - 5 2.47 2.73 4.37 7.98 8.16 8.95 9.46 10.01
6 Medical expenses reimbursement 0.01 0.05 0.00 0.00 0.00 0.00 0.00 0.00
7 Leave Travel concession 0.00 0.00 0.00 0.00 0.00
8 Earned Leave encashment 0.37 0.34 0.39 0.70 1.13 1.19 1.26 1.33
10 Staff welfare expenses 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Terminal Benefits 0.27 0.27 0.24 0.55 0.72 0.76 0.80 0.84
12 Board's Contribution to CPS 0.02 0.02 0.04 0.24 0.06 0.07 0.07 0.07
13Thermal/Performance/Commissioning
/ Goldden Jubilee Incentive 0.02 0.04 0.02
14 Allocation of Head Quarters Expenses
Grand Total 3.16 3.45 5.05 9.47 10.07 10.97 11.59 12.26 Less: Capitalisation 4.95 1.22 3.60 -9.45 -3.73 -3.94 -4.17 -4.41Net Expenses (1.79) 2.22 1.45 0.03 6.34 7.02 7.43 7.85
Operation and Maintenance expenses - Employee Cost
ProjectedS. No. Details FY 2014-15
Name of the Company
Name of the Project
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 C
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Rent, Rate & Taxes 0.02 0.04 0.02 0.00 0.05 0.06 0.06 0.062 Insurance 0.00 0.00 0.00 0.01 0.02 0.02 0.02 0.02
3 Telephone / Postage / Telex 0.00 0.01 0.00
0.03 0.01 0.02 0.02 0.02
4
Legal / Audit / Consultancy /
Tech. fee / consultancy
charges
- 0.08 0.00
0.00 0.00 0.00 0.00 0.00
5 Conveyance & Travel 0.09 0.04 0.07 0.14 0.19 0.20 0.22 0.236 Fees & Subscription 0.07 0.11 0.06
7 Books & Periodicals 0.00 0.00 -
8 Printing & Stationery 0.00 0.00 0.02
9 Watch and Ward Expenses. 0.21 0.07 0.16
10Petty Office Maintenance
Expenses. - 0.00
-
11 Miscellaneous Expenses 0.00 0.00 0.00 0.00 0.72 0.77 0.81 0.8612 Freight 0.01 0.02 0.01 0.10 0.30 0.31 0.33 0.35
13Other Purchase related
Expenses. - 0.00
- 0.00 0.00 0.00 0.00 0.00
Other cost 0.64 0.82 0.87 0.92 0.97Total A&G Expenses 0.41 0.38 0.36 0.93 2.13 2.25 2.38 2.51
10 Less: Capitalisation 0.42 0.10 0.31 -2.04 -0.32 -0.34 -0.35 -0.3711 Net Expenses (0.01) 0.28 0.05 (1.11) 1.81 1.91 2.02 2.14
Operation and Maintenance Expenses - Administration and General Expenses
ProjectedS.No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 D
TANGEDCO
Valuthur Gas Turbine Power Station
Rs. Crores
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Water Charges - -
2 Lubricants and Consumables - - -
- -
3 Station Auxiliaries - - -
- -
4 Total expenses - - - - - - - -
Operation and Maintenance Expenses - Operating Expenses
ProjectedS.No. Details
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Net Repair & Maintenance Expenses 9.44 9.50 5.19 7.70 4.09 4.33 4.57 4.84
2 Net Employees Cost (3.53) 4.38 2.86 0.03 6.34 7.02 7.43 7.85
3 Net Admn. & General Expneses (0.02) 0.55 0.10 (1.11) 1.81 1.91 2.02 2.14
4 Operating Expenses
5Total Operation and Maintenance
expenses 5.89 14.42 8.15 6.35 12.03 13.04 13.78 14.57
Projected
Form 13 E
S.No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Total Operation and Maintenance Expenses
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 15
TANGEDCO
Valuthur Gas Turbine Power Station
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1Research & Development
expenses
- - - - -
2Bad & Doubtful debts written off - - - - -
3Miscellaneous losses and written
off/provided for
- - - - -
4 Material cost variance - - - - - 5 Sundry expenses - - - - - 6 Extra ordinary debits - - - - -
7Allocation of Head Quarters
Expenses
- - - - -
Total - - - - - 8 Less: Capitalization - - - 9 Net expenses - - - - -
FY 2015-16Projected
OTHER DEBITS
S.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 12
TANGEDCO
Valuthur Gas Turbine Power Station
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Interest Expenditure
1 Normal Interest Expenditure
2 Interest during construction
Other Expenditure
3 Repairs and Maintenance - - - - -
4 Employee Cost 4.95 1.22 3.60 3.81 4.03
5 Administrative and General Expenditure 0.42 0.10 0.31 0.32 0.34
6 Fabrication Charges - - - - -
7 Depreciation and other related costs 0.11 0.03 0.08 0.05 0.05
8 Other Debits - - - - - - - -
Total 5.47 1.35 3.98 4.19 4.42 - - -
FY 2015-16Projected
Details of Revenue Expenses Capitalised
S.No Particulars
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Form 16
TANGEDCO
Valuthur Gas Turbine Power Station
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
I Income relating to previous year
1 Fuel related gains 5.10 - -
2 Interest income - - -
3 Excess Provisions for revenue
expenses
8.23 0.02
-
4 Other income - 0.01 0.01 -0.01 0 0 0 0
5 Total 13.33 0.03 0.01 (0.01) - - - -
II Expenses / Losses relating to
previous period1 Fuel related losses and expenses 5.10 -
2 Operating expenses 0.02 -
3 Emloyee cost and other revenue
expenditures under provided
0.71 (0.20)
1.15
0.4414848 0 0 0 0
4 Other charges (0.05) - -
5 Total 5.78 (0.20) 1.15 0.44 - - - -
III Net prior period credits / charges (7.54) (0.23) 1.14 0.43 2.98 - - -
PRIOR PERIOD CREDITS / CHARGES
ProjectedSl.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 17
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1Interest on loan and advance to employees 0.01 0.01 0.01
2 Interest on Staff Welfare 0.13
3Interest on Advance to suppliers / Contractors -
4 Interest from Banks
5Income from sale of tender forms, stores,
scraps, etc.,
6 Income from Trading (0.00) 0.00 0.00 0.21 0.21 0.21 0.21 0.21 7 Miscellaneous Receipts 0.05 0.15 0.04 0.08 0.08 0.08 0.08 0.08 8 Allocation from Head Quarters
Total 0.05 0.16 0.18 0.29 0.16 0.16 0.16 0.16
Statement showing other Income
ProjectedS.No Particulars
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 18
TANGEDCO
Valuthur Gas Turbine Power Station
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 VGTPS 95 79.15% 7.00% 658.72 619.21 54.00% 5.76% 449.40 423.50 87.64% 5.81% 729.33 686.93
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 VGTPS 95 64.95% 7.86% 1081.00 996.03 86.63% 5.65% 720.92 680.21 80.00% 6.00% 665.76 625.81
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 VGTPS 95 83.56% 6.00% 1368.81 1286.68 85.30% 6.00% 1397.32 1286.68
Installed
Capacity (in
MW)
FY 2014-15
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
S.No Generating Station
PLF (in %)
Estimated Generation of Power
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14Installed
Capacity (in
MW)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
FY 2016-17
FY 2017-18 FY 2018-19
S.No Generating Station
Installed
Capacity (in
MW)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
Aux.
Consu. (in
%)
S.No Generating Station
FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 19 A
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Capaciy MW 187 187 187 190 95 95 187 187
2 Gross Station Heat Rate Kcal / kWhr 1834 1789 1,878 1,830 1,796 1,850 1,850 1,850
3 Auxiliary Consumption % 7.00% 5.76% 5.81% 7.86% 5.65% 6.00% 6.00% 6.00%
4 Average calorific value of Gas Scm 9655 9684 9,404 9,731 9,735 10,000 10,000 10,000
5 Average cost of Gas Rs / Scm 7.78 10.31 9.96 11.91 13.27 11.21 11.55 11.89
6 Rate of energy from Gas Ps / kWhr 3.20 4.13 3.77 2.43 3.48 2.21 2.27 2.39
7 Net Generation MU 619 424 687 996 680 626 1,287 1,287
8 Total energy cost Rs / Crores 198.27 174.89 259.18 242.15 236.37 138.07 292.39 307.43
9 Fixed Annual Gas Transmission Charges Rs / Crores 3.58 3.65 3.64 - 0.15 0.15 0.15 0.15
10 Total Variable Cost Rs / Crores 201.85 178.54 262.82 242.15 236.53 138.22 292.54 307.58
11 Net Energy charges per unit Ps / kWhr 3.26 4.22 3.83 2.43 3.48 2.21 2.27 2.39
Computation Energy (Variable) Charges - Gas Based
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14
Name of the Company
Name of the Power Station
Sl. No Description Unit
TANGEDCO
Valuthur Gas Turbine Power Station
FY 2014-15Projected
FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 20
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 VGTPS-1 619 129.80 201.85 331.65 5.36 424 178.21 178.54 356.75 8.42 687 249.81 262.82 512.63 7.46
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 VGTPS-1 996 288.83 242.15 530.98 5.33 680 332.79 236.53 569.32 8.37 626 331.15 138.22 469.38 7.50
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)VC (Rs.in Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 VGTPS-1 1287 260.43 292.54 552.97 4.30 1287 293.74 307.58 601.32 4.67
S.No Station
FY 2016-17
FY 2017-18 FY 2018-19
FY 2013-14
Name of the Company TANGEDCO
Abstract of Station wise cost of generation
S.No
Station
S.No Station
FY 2011-12
FY 2014-15
FY 2012-13
FY 2015-16
Petition Formats_VGTPS_FY 2014-15-FY 2015-16.xlsx
Form 1
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I Annual Fixed Cost
1 Return on Equity 5 14.80 26.74 32.71 26.84 26.84 26.84 28.10 28.10
2 Interest on loan capital 6 C 72.34 82.73 133.09 167.12 179.41 168.27 72.63 86.05
3 Depreciation 10 B 15.38 15.48 17.30 24.21 19.14 35.46 36.38 42.09
4 Interest on Working Capital 11 8.17 10.83 11.07 10.16 11.26 13.27 11.39 12.21
5 Operation and Maintenance Expenses 13 E 6.54 7.46 7.74 5.80 13.21 14.18 15.01 15.88
7 Other Debits 15 - - - - - - - -
8 Prior period credits / charges 16 (0.41) 0.01 0.97 1.23 (3.58) - - -
9 Total Annual Fixed Cost 116.81 143.25 202.88 235.36 246.28 258.02 163.51 184.33
Less: Other Income 17 1.93 0.11 0.14 0.15 0.15 0.15 0.15 0.15
Net Annual Fixed Cost 114.88 143.14 202.74 235.21 246.13 257.88 163.36 184.18
II
Total Variable Cost 19 A / 19 B 115.10 130.64 110.15 111.21 120.14 164.14 180.03 189.34
III
Total Cost 229.98 273.77 312.89 346.42 366.27 422.01 343.39 373.52
Summary of Tariff Proposal for Gas based Thermal Station
ProjectedS.
No.
Particulars Reference to
Form
Name of the Company
Name of the Project
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 3
Name of the Company
Name of the Power Station
Unit
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Rate of Return on Equity % 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
Target PLF % 74.68% 76.90% 52.69% 43.81% 42.23% 80.00% 85.20% 87.00%
Auxiliary Energy Consumption %6.05% 6.13% 8.36% 7.84% 9.07% 6.00% 6.00% 6.00%
Gross Station Heat Rate kCal/kWh 1898 1882 2189 2144 2313 1850 1850 1850
Specific Fuel Oil Consumption ml/kWhNA NA NA NA NA NA NA NA
O&M Cost
Cost of Fuel for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
O & M Expenses for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Primary Fuel Stock for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
SecondaryFuel Oil or
Secondary/Alternate liquid
fuel stock for WC
in Months
NA NA NA NA NA NA NA NA
Spares stock as % of Plant &
Equipment Cost on 1.4.2004
for WC
%
1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Recievables for WC in Months 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Prime lending Rate of SBI % 13.00% 14.75% 14.45% 14.50% 14.50% 14.50% 14.50% 14.50%
Incentive Rate Paise.kWh 25 25 25 25 25 25 25 25
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2014-15 FY 2015-16
Normative parameters considered for tariff computations
ProjectedParticularsFY 2011-12 FY 2012-13 FY 2013-14
Form 4
Name of the Station Thirumakottai Gas Turbine Power Station (TKGTPS)
Sl.No Norms of Operation FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19 Average
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)1 PLF / PAF (in %) 74.68% 76.90% 52.69% 43.81% 42.23% 80.00% 85.20% 87.00% 58.06%2 Auxliary consumption (in %) 6.05% 6.13% 8.36% 7.84% 9.07% 6.00% 6.00% 6.00% 7.49%
3Average Gross Station Heat Rate (Kcal /
kWhr)1898 1882 2,189 2,144 2,313 1,850 1,850 1,850 2,215
4Average Gross Calorific value of Gas /
Naphtha (Kcal / Scm / Kg)10459 10453 10453 10000 10000.00 10000.00 10000.00 10000.00 10151
5Specific consumption of Gas / Naphtha (Scm /
Kg / kWhr)0.18 0.18 0.21 0.21 0.23 0.19 0.19 0.19 0.20
6 Operating Expenses (Rs in Lakhs)
7Operation and Maintenance expenses (Rs in
Crs. / MW)5.68 6.54 6.90 5.04 11.76 12.64 13.39 14.18 7.18
8Average cost of Gas / Naphtah (Rs // Scm /
MT)8.84 9.84 10.38 12.53 12.99 11.72 12.07 12.43 11.05
Statement showing the performance of Stations during the previous five years
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 5
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 Equity at the beginning 62.96 148.42 233.60 233.72 233.72 233.72 233.72 233.72
2 Addition during the year 85.46 85.18 0.12 - - - - -
3 Total Equity 148.42 233.60 233.72 233.72 233.72 233.72 233.72 233.72
4 Return on Equity (in %) 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
5 Return on Equity 14.80 26.74 32.71 26.84 26.84 26.84 28.10 28.10
Computation Return on Equity
ProjectedS.No Particulars FY 2014-15
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 6
Name of the Company
Name of the Station
Rs, Crores
1 2 13 14 15 13 14 15
1 Interest on security deposit - -
2Interest on meter caution
deposit
3 Interest on GPF / CPF 0.00 0.16
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges 0.00 0.00
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest 0.01 0.01
Total 0.01 0.18
Statement showing other Interest
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
InterestParticulars
FY 2012-13
Outstanding at
the beginning
Outstanding at
the beginningNet additions Interest Net additions
S.No.
FY 2011-12
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
FORM-6 C
Name of the Company
Name of the Station
Rs, Crores
FY 2016-17 FY 2017-18 FY 2018-19
1 Net Interest on Existing Loan 72.33 82.55 132.895 166.92 178.90 167.74 72.07 85.47
2Interest on Project borrowings
3 Other Interest 0.01 0.18 0.20 0.20 0.51 0.53 0.56 0.58
4 Total Interest 72.34 82.73 133.09 167.12 179.41 168.27 72.63 86.05
FY 2015-16Projected
Abstract of Interest
FY 2011-12 FY 2012-13 FY 2013-14S. No. Particulars FY 2014-15
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Station
1 2
1 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest
Total
Statement showing other Interest
ParticularsS.No.
Form 6
Rs, Crores
13 14 15 13 14 15 13 14 15
0.18 0.20 0.51
- - -
- - -
-
0.00 - -
0.18 0.20 0.51
Statement showing other Interest
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
Outstanding at
the beginningNet additions Interest
FY 2015-16FY 2013-14
Outstanding at
the beginningNet additions
Outstanding at
the beginningNet additions InterestInterest
FY 2014-15
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Station
1 2
1 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest
Total
Statement showing other Interest
ParticularsS.No.
Form 6
Rs, Crores
16 17 18 19 20 21 22 23 24
0.53 0.56 0.58
- - -
- - -
- - -
0.53 0.56 0.58
Statement showing other Interest
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2017-18 FY 2018-19FY 2016-17Outstanding at
the beginningNet additions Interest
Outstanding at
the beginningNet additions Interest
Outstanding at
the beginningNet additions Interest
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1.00 Plant and machinery in generating Stations
including plant foundations(a) Boilers/Plants 0.41 4.05 32.17 50.00 6.49 (b) Cooling towers and circulating water
system
- - 0.75 - -
2.00 Buildings and civil Engineering works of a
permenant character, not mentioned above
- - - - -
(a) Offices and show rooms - - - 0.65 - (b) Containing thermo electric plants - - - - - (c) Temporary errections such as wooden
structures
- - - - -
(d) Roads other than kacha roads - - - - - (e) Others - - - - -
3.00 Transformers, transformer (kiosk) sub
station equipmernt and other fixed
aparatus (including plant foundations)
- - - - -
(a) Transformers (including foundation)
having a rating of 100 kVA and over.
- - - - -
(b) Others - - - - - 4.00 Switch gear, including cable connections - - - - -
5.00 Lightening arresters - - - - - (a) Station type - - - - - (b) Pole type - - - - - (c) Synchronous condensers - - - - -
6.00 Batteries - - - - - 7.00 (a) Underground cables including joint
boxes and disconnected boxes
0.39 0.90 1.07 - -
(b) Cable duct systems - - - - - 8.00 Meters - 0.21 0.62 - -
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of Works FY 2011-12 FY 2012-13Sl. No.
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2013-14
Name of the Company
Name of the Project
FY 2014-15
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of Works FY 2011-12 FY 2012-13Sl. No.
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2013-14
Name of the Company
Name of the Project
FY 2014-15
9.00 Self propelled vehicles - - - - - 10.00 Air-conditioning plants - - - - -
(a) Static - - - - - (b) Portable - - - - -
11.00 (a) Office furniture and fittings - - - - - (b) Office equipments - - - - - (c) Internal wirings including fittings and
apparatus
- - - - -
(d) Street light fittings - - - - - 12.00 Motors - 0.45 - - - 13.00 Communication equipments - - - - -
(a) Radio and higher frequency carrier
system
- - - - -
(b) Telephone lines and telephones - - - - -
TOTAL 0.80 5.61 34.61 50.65 6.49
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Power Station
Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Opening GFA (Rs. Crores) 450.84 454.63 516.40 516.81 587.39 881.16 898.68 1,006.68
Addition to GFA (Rs. Crores) 3.79 61.77 0.41 70.58 293.77 17.52 108.00 43.00
Closing GFA (Rs. Crores) 454.63 516.40 516.81 587.39 881.16 898.68 1,006.68 1,049.68
Average Rate of Depreciation (%) 3.38% 3.00% 3.35% 4.69% 4.82% 5.28% 5.28% 5.28%
Depreciation (Rs. Crores) 15.38 15.48 17.30 24.21 19.14 35.46 36.38 42.09
Form 10 B
TANGEDCO
Thirumakottai Gas Power Station (TKGTPS)
Depreciation
Form 11
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
(Rs.in Crores)
S.No. Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Fuel Cost 19.18 21.77 18.36 18.54 20.02 27.36 30.00 31.56
2 Fuel Stock
3 O & M expenses 0.51 0.59 0.62 0.45 1.06 1.14 1.20 1.27
4 Maintenance Spares 4.82 5.44 5.48 6.18 9.16 9.52 10.61 11.10
5 Recievables 38.33 45.63 52.15 61.04 61.04 70.34 57.23 62.25
6 Total Working Capital 62.84 73.43 76.61 86.22 91.29 108.34 99.05 106.18
7 Rate of Interest 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
8Interest on Working
Capital 8.17 10.83 11.07 10.16 11.26 13.27 11.39 12.21
Name of the Company
Name of the Project
Computation of Interest on Working Capital
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 12
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Other Expenditure
1 Repairs and Maintenance - - - - -
2 Employee Cost 0.35 0.81 0.94 0.99 1.05
3 Administrative and General Expenditure 0.03 0.07 0.08 0.08 0.09
4 Fabrication Charges - - - - -
5 Depreciation and other related costs 0.01 0.02 0.02 0.02 0.02
6 Other Debits - - - - -
Total 0.39 0.90 1.04 1.09 1.16 - - -
FY 2015-16Projected
Details of Revenue Expenses Capitalised
S.No Particulars
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Form 13 A
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Plant & Machinery 1.33 2.65 2.34 5.03 6.72 7.10 7.51 7.94
2 Building - - - - - - - -
3 Civil Works 0.09 0.11 0.07 0.06 0.20 0.21 0.23 0.24
4 Hydraulic work - - - - - - - -
5 Lines & Cable network - - - - - - - -
6 Vehicles 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 Furniture & Fixtures - - 0.00 - 0.00 0.00 0.00 0.00
8 Office equipments 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9Allocation of Head Quarters
Expenses - - - - - - - -
Total Expenses 1.42 2.76 2.41 5.09 6.92 7.32 7.74 8.18
10 Less: Capitalisation - - - - -
11Net Repair & Maintenance
expenses 1.42 2.76 2.41 5.09 6.92 7.32 7.74 8.18
Operation and Maintenance expenses - Repairs and Maintenance
Projected
Name of the Company
Name of the Project
FY 2014-15S.No. Details
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Salary 2.37 2.10 2.30 2.35 2.16 2.48 2.63 2.78
2 Overtime wages 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03
3 Dearness Allowance 1.19 1.66 1.92 2.26 2.50 2.65 2.80 2.96
4 Other Allowances 0.15 0.15 0.14 0.14 0.21 0.22 0.24 0.25
5 Bonus & Exgratia 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Total 1 - 5 3.76 3.96 4.41 4.81 4.93 5.41 5.72 6.05
6 Medical expenses reimbursement - 0.00 0.00 0.00 0.00 0.00
7 Leave Travel concession - 0.00 0.00 0.00 0.00 0.00
8 Earned Leave encashment 0.19 0.17 0.47 0.18 0.23 0.24 0.26 0.27
9 Terminal benefits 0.00 0.17 0.18 0.19 0.20
10 Staff welfare expenses 0.00 - 0.00 0.16 0.00 0.00 0.00 0.00
12 Board's Contribution to CPS 0.01 0.02 0.03
13 Other Cost 0.03 0.05 0.00 0.34 0.09 0.09 0.10 0.10
14 Allocation of Head Quarters Expenses
Grand Total 3.99 4.19 4.92 5.50 5.42 5.93 6.27 6.62
Less: Capitalisation 0.35 0.81 0.94 (5.50) (0.46) (0.46) (0.46) (0.46)
Net Expenses 3.65 3.38 3.98 - 4.96 5.47 5.81 6.17
Employee cost per unit of energy
generated (Rs. Per unit) 0.05 0.05 0.09 - 0.14
Projected
Form 13 B
S.
No.Details FY 2014-15
Name of the Company
Name of the Project
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Operation and Maintenance expenses - Employee Cost
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Rent, Rate & Taxes 0.11 0.01 0.00 0.01 0.02 0.02 0.02 0.02
2 Insurance 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3 Telephone / Postage / Telex 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02
4Legal / Audit / Consultancy /
Tech. fee / consultancy charges 0.06 0.09 0.08 0.06 0.06 0.06 0.06 0.07
5 Conveyance & Travel 0.12 0.09 0.11 0.17 0.13 0.13 0.14 0.15
6 Fees & Subscription 0.00 0.00 -
7 Books & Periodicals 0.00 0.00 0.00
8 Printing & Stationery 0.01 0.01 0.01
9 Watch and Ward Expenses. 0.33 0.40 0.46
10Petty Office Maintenance
Expenses. 0.00 0.00 -
11 Miscellaneous Expenses 0.20 0.01 0.01 0.01 0.01 0.01 0.01 0.01
12 Freight 0.02 0.00 - 0.00 0.00 0.00 0.00 0.00
13Other Purchase related
Expenses. 0.00 0.10 0.09 0.62 0.60 0.64 0.67 0.71
Total A&G Expenses 0.86 0.73 0.76 0.88 0.84 0.89 0.94 0.99
10 Less: Capitalisation 0.03 0.07 0.08 -0.54 -0.04 -0.04 -0.04 -0.05
11 Net Expenses 0.83 0.66 0.68 0.34 0.80 0.85 0.90 0.95
Projected
Form 13 C
S. No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Operation and Maintenance Expenses - Administration and General Expenses
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Water Charges - - - - -
2 Lubricants and Consumables 0.41 0.40 0.29 0.36 0.52 0.55 0.57 0.59
3 Station Auxiliaries - - - - - - - -
4 Total expenses 0.41 0.40 0.29 0.36 0.52 0.55 0.57 0.59
Projected
Form 13 D
S.
No.Details
Name of the Company
Name of the Project
FY 2014-15
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Operation and Maintenance Expenses - Operating Expenses
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Net Repair & Maintenance Expenses 1.42 2.76 2.41 5.09 6.92 7.32 7.74 8.18
2 Net Employees Cost 3.87 3.64 4.35 - 4.96 5.47 5.81 6.17
3 Net Admn. & General Expneses 0.83 0.66 0.68 0.34 0.80 0.85 0.90 0.95
4 Operating Expenses 0.41 0.40 0.29 0.36 0.52 0.55 0.57 0.59
5Total Operation and Maintenance
expenses 6.54 7.46 7.74 5.80 13.21 14.18 15.01 15.88
Projected
Form 13 E
S.No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Total Operation and Maintenance Expenses
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 15
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1Research & Development expenses - - - - -
2 Bad & Doubtful debts written off - - - - -
3Miscellaneous losses and written
off/provided for
- - - - -
4 Material cost variance - - - - -
5 Sundry expenses - - - - -
6 Extra ordinary debits - - - - -
7Allocation of Head Quarters
Expenses
- - - - -
Total - - - - -
8 Less: Capitalization - - -
9 Net expenses - - - - - - - -
FY 2015-16Projected
OTHER DEBITS
S.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 16
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
IIncome relating to previous year
1 Fuel related gains - - -
2 Interest income - -
3 Excess Provisions for revenue
expenses
0.43 - 0.00
4 Other income - - 0.01 -0.01 0 0 0 0
5 Total 0.43 - 0.01 -0.01 - - - -
II Expenses / Losses relating to
previous period
1 Fuel related losses and expenses
2 Operating expenses
3 Emloyee cost and other revenue
expenditures under provided
0.00 0.01 0.68 0.30 0 0 0 0
4 Other charges 0.01 0.00 0.29 0.93 0 0 0 0
5 Total 0.01 0.01 0.98 1.23 - - - -
IIINet prior period credits / charges
(0.41) 0.01 0.97 1.23 (3.58) - - -
PRIOR PERIOD CREDITS / CHARGES
ProjectedSl.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 17
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1Interest on loan and advance to employees 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02
2 Interest on Investments
3Interest on Advance to suppliers / Contractors
4 Interest from Banks
5Income from sale of tender forms, stores, scraps,
etc.,
6 Income from Trading 0.34 0.00 0.02 7 Miscellaneous Receipts 1.58 0.10 0.10 0.12 0.12 0.12 0.12 0.12 8 Allocation from Head Quarters
Total 1.93 0.11 0.14 0.15 0.15 0.15 0.15 0.15
Statement showing other Income
ProjectedSl.No Particulars
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 18
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 TKGTPS 108 74.68% 6.05% 706 663 76.90% 6.13% 727 682
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 TKGTPS 52.69% 8.36% 498 456 43.81% 7.84% 414 382
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 TKGTPS 42.23% 9.07% 399 363 80.00% 6.00% 756 711
Gross (in
MU)
Net (in
MU)
Gross (in
MU)
Net (in
MU)1 TKGTPS 85.20% 6.00% 805 757 87.00% 6.00% 822 773
S.No Generating Station
S.No Generating Station
FY 2016-17
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
FY 2015-16
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
Estimated Generation of Power
FY 2017-18 FY 2018-19
FY 2014-15
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13
FY 2013-14
S.No Generating Station
S.No Generating Station
Installed
Capacity
(in MW)
PLF (in %)
Aux.
Consu. (in
%)
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 19 A
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Capaciy MW 108 108 108 108 108 108 108 108
2 Gross Station Heat Rate Kcal / kWhr 1898 1882 2,189 2,144 2,313 1,850 1,850 1,850
3 Auxiliary Consumption % 6.05% 6.13% 8.36% 7.84% 9.07% 6.00% 6.00% 6.00%
4 Average calorific value of Gas kcal/scm 10459 10453 10,453 10,000 10,000 10,000 10,000 10,000
5 Average cost of Gas Rs / Scm 8.84 9.84 10.38 12.53 12.99 11.72 12.07 12.43
6 Rate of energy from Gas Ps / kWhr 1.71 1.89 2.37 2.91 3.30 2.31 2.38 2.45
7Net Generation MU
663.05 682.18 456.27 381.54 362.89 710.66 756.85 772.84
8Total energy cost Rs / Crores
113.27 128.77 108.23 111.21 119.92 163.92 179.81 189.12
9Fixed Annual Gas Transmission Charges Rs / Crores
1.83 1.87 1.92 - 0.22 0.22 0.22 0.22
10 Total Variable Cost Rs / Crores 115.10 130.64 110.15 111.21 120.14 164.14 180.03 189.34
11Net Energy charges per unit Ps / kWhr 1.74 1.91 2.41 2.91 3.31 2.31 2.38 2.45
Computation Energy (Variable) Charges - Gas Based
Projected
Name of the Company
Name of the Power Station
S. No Description Unit
TANGEDCO
Thirumakottai Gas Turbine Power Station (TKGTPS)
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 20
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 TKGTPS 663.05 114.88 115.10 229.98 3.47 682.18 143.14 130.64 273.77 4.01 456.27 202.74 110.15 312.89 6.86
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 TKGTPS 381.54 235.21 111.21 346.42 9.08 362.89 246.13 120.14 366.27 10.09
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total (Rs.in
Crs)
Cost per unit
(in RS)
1 TKGTPS 710.66 257.88 164.14 422.01 5.94 756.85 163.36 180.03 343.39 4.54 772.84 184.18 189.34 373.52 4.83
FY 2015-16
FY 2013-14FY 2012-13
Abstract of Station wise cost of generation
Sl. No Station
FY 2016-17 FY 2017-18 FY 2018-19
Name of the Company TANGEDCO
Sl. No Station
FY 2011-12
Sl. No Station
FY 2014-15
Petition Formats_TKGTPS_FY 2014-15-FY 2015-16.xlsx
Form 1
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (5) (6)
I Annual Fixed Cost
1 Return on Equity 5 11.52 20.82 28.01 27.80 27.80 27.80 29.11 29.11
2 Interest on loan capital 6 C 49.31 64.43 104.15 128.24 141.95 140.61 57.38 61.03
3 Depreciation 10 B 11.98 11.13 13.87 25.08 24.38 32.18 33.25 33.88
4 Interest on Working Capital 11 5.53 2.62 13.46 8.78 11.89 12.02 10.35 10.84
5 Operation and Maintenance Expenses13 E 5.91 (41.47) 64.23 18.23 9.73 10.54 11.20 11.91
7 Other Debits 15 - - - - - - - -
8 Prior period credits / charges 16 (1.05) (0.09) 6.00 (85.37) (0.25) - - -
9 Extra Ordinary
10 Total Annual Fixed Cost 83.21 57.44 229.72 122.77 215.50 223.14 141.29 146.77
11 Less: Other Income 17 0.02 0.02 0.08 0.70 0.12 0.12 0.12 0.12
12 Net Annual Fixed Cost 83.20 57.42 229.65 122.07 215.37 223.02 141.17 146.64
II Total Variable Cost 19 A / 19 B 73.02 21.85 131.72 129.95 155.83 154.15 170.29 178.87
III Total Cost 156.22 79.27 361.37 252.02 371.20 377.17 311.46 325.52
Summary of Tariff Proposal for Gas based Thermal Station
ProjectedS. No. Particulars
Reference to
Form
Name of the Company
Name of the Project
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 3
Name of the Company
Name of the Power Station
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Rate of Return on Equity % 14% 14% 14% 14% 14% 14% 14% 14%
Target PLF % 47% 6% 72% 57% 64% 80% 86% 88%
Auxiliary Energy Consumption % 7% 8% 7% 8% 2% 6% 6% 6%
Gross Station Heat Rate kCal/kWh 1871 1945 1831 2011 1990 1850 1850 1850
Specific Fuel Oil Consumption ml/kWh NA NA NA NA NA NA NA NA
O&M Cost Cost of Fuel for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
O & M Expenses for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Primary Fuel Stock for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
SecondaryFuel Oil or
Secondary/Alternate liquid
fuel stock for WC
in Months
NA NA NA NA NA
Spares stock as % of Plant &
Equipment Cost on 1.4.2004
for WC
% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Recievables for WC in Months 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Prime lending Rate of SBI % 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
Incentive Rate Paise.kWh 25 25 25 25 25 25 25 25
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
Normative parameters considered for tariff computations
FY 2014-15 FY 2015-16UnitProjected
Particulars FY 2011-12 FY 2012-13 FY 2013-14
Form 4
Name of the Station Kuttalam Gas Turbine Power Station (KGTPS)
S.No Norms of Operation FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19 Average
1 2 3 4 5 6 7 8 9 10 81 PLF / PAF (in %) 47.18% 6.31% 72.49% 56.74% 64.35% 80.00% 85.80% 87.50% 74.88%2 Auxliary consumption (in %) 7.02% 8.50% 7.32% 7.65% 2.00% 6.00% 6.00% 6.00% 5.53%
3Average Gross Station Heat Rate (Kcal /
kWhr)1871 1945 1831 2011.25 1990 1850 1850 1850 1910
4Average Gross Calorific value of Gas /
Naphtha (Kcal / Scm / Kg)10386 10393 10392 10000 10000 10000 10000 10000 10000
5Specific consumption of Gas / Naphtha (Scm /
Kg / kWhr)0.18 0.19 0.18 0.18 0.18 0.18
6 Operating Expenses (Rs in Lakhs)
7Operation and Maintenance expenses (Rs in
Crs. / MW)5.73 (41.24) 63.48 18.08 9.58 10.38 11.04 11.74 12.16
8Average cost of Gas / Naphtah (Rs // Scm /
MT)8.72 13.98 10.90 13.00 13.90 11.89 12.25 12.61 12.73
Statement showing the performance of Stations during the previous five years
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 5
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 Equity at the beginning 49.02 115.57 181.89 218.31 218.31 218.31 218.31 218.31
2 Addition during the year 66.55 66.33 36.42 - - - - -
3 Total Equity 115.57 181.89 218.31 218.31 218.31 218.31 218.31 218.31
4 Return on Equity (in %) 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
5 Return on Equity 11.52 20.82 28.01 27.80 27.80 27.80 29.11 29.11
Computation Return on Equity
FY 2015-16Projected
S. No Particulars FY 2014-15
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 6
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
1 2 9 10 12 9 10 121 Interest on security deposit - -
2Interest on meter caution
deposit -
3 Interest on GPF / CPF - 0.12
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges 0.00 0.00
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest 0.01 0.02
Total 0.01 0.15
S. no. ParticularsInterest
FY 2011-12
Outstanding at
the beginningNet additions Interest
FY 2012-13
Outstanding at
the beginningNet additions
Statement showing other Interest
Name of the Company
Name of the Project
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
FORM-6 C
Name of the Company
Name of the Station
FY 2016-17 FY 2017-18 FY 2018-19
1Net Interest on Existing Loan
49.30 64.28 104.06 128.05 141.47 140.10 56.86 60.49
2Interest on Project borrowings
3 Other Interest 0.01 0.15 0.10 0.20 0.48 0.50 0.52 0.54
4 Total Interest 49.31 64.43 104.15 128.24 141.95 140.61 57.38 61.03
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
Particulars FY 2014-15Projected
FY 2015-16
Abstract of Interest
S. no. FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
1 21 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest
Total
S. no. Particulars
Statement showing other Interest
Name of the Company
Name of the Project
Form 6
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
9 10 12 9 10 12 13 14 15-
0.11 0.20 0.48
- -
- -
0.00 - -
(0.01)
0.10 0.20 0.48
FY 2015-16FY 2013-14
Outstanding at the
beginningNet additions Interest
FY 2014-15
Outstanding at the
beginningNet additions Interest
Statement showing other Interest
Outstanding at
the beginningNet additions Interest
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
1 21 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit
Fund contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to
Govt.
11 Other Interest
Total
S. no. Particulars
Statement showing other Interest
Name of the Company
Name of the Project
Form 6
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
16 17 18 19 20 21 22 23 24
0.50 0.52 0.54
- - -
- - -
- - -
0.50 0.52 0.54
FY 2016-17 (Projected) FY 2017-18 (Projected)
Net additions Interest
Statement showing other Interest
InterestOutstanding at the
beginningNet additions Interest
Outstanding at the
beginning
Outstanding at the
beginningNet additions
FY 2018-19 (Projected)
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 6
1.00 Plant and machinery in generating Stations
including plant foundations
0.00 0.00 0.00 0.00 0.00
(a) Boilers/Plants 2.18 129.69 68.23 10.05 36.42
(b) Cooling towers and circulating water
system
0.00 0.00 0.00 0.00 0.00
2.00 Buildings and civil Engineering works of a
permenant character, not mentioned above
0.00 0.00 0.00 0.00 0.00
(a) Offices and show rooms 0.00 0.00 1.23 7.48 0.00
(b) Containing thermo electric plants 0.00 0.00 0.00 0.00 0.00
(c) Temporary errections such as wooden
structures
0.00 0.00 0.00 0.00 0.00
(d) Roads other than kacha roads 0.00 0.00 0.00 0.00 0.00
(e) Others 0.04 0.00 0.00 0.00 0.00
3.00 Transformers, transformer (kiosk) sub station
equipmernt and other fixed aparatus
(including plant foundations)
0.00 0.00 0.00 0.00 0.00
(a) Transformers (including foundation) having
a rating of 100 kVA and over.
0.00 0.00 1.50 0.00 0.00
(b) Others 0.00 0.00 0.00 0.00 0.00
4.00 Switch gear, including cable connections 0.00 0.00 0.00 0.00 0.00
5.00 Lightening arresters 0.00 0.00 0.00 0.00 0.00
(a) Station type 0.00 0.00 0.00 0.00 0.00
(b) Pole type 0.00 0.00 0.00 0.00 0.00
(c) Synchronous condensers 0.00 0.00 0.00 0.00 0.00
6.00 Batteries 0.00 0.00 0.00 0.00 0.00
7.00 (a) Underground cables including joint boxes
and disconnected boxes
0.00 0.00 0.00 0.00 0.00
(b) Cable duct systems 0.00 0.00 0.85 0.00 0.00
8.00 Meters 0.00 0.00 0.00 0.00 0.00
9.00 Self propelled vehicles 0.00 0.00 0.00 0.00 0.00
10.00 Air-conditioning plants 0.00 0.00 0.00 0.00 0.00
(a) Static 0.00 0.00 0.00 0.00 0.00
(b) Portable 0.00 0.00 0.00 0.00 0.00
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of Works FY 2014-15S.No.
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 6
FY 2015-16Projected
ESTIMATE OF CAPITAL EXPENDITURE
Name of Works FY 2014-15S.No.
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14
11.00 (a) Office furniture and fittings 0.00 0.03 0.00 0.00 0.00
(b) Office equipments 0.00 0.00 0.00 0.00 0.00
(c) Internal wirings including fittings and
apparatus
0.00 0.00 0.00 0.00 0.00
(d) Street light fittings 0.00 0.00 0.00 0.00 0.00
12.00 Motors 0.00 0.00 0.00 0.00 0.00
13.00 Communication equipments 0.00 0.00 0.00 0.00 0.00
(a) Radio and higher frequency carrier system 0.00 0.00 0.00 0.00 0.00
(b) Telephone lines and telephones 0.00 0.00 0.00 0.00 0.00
0.00
TOTAL 2.22 129.72 71.81 17.53 36.42
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 10 B
Name of the Company
Name of the Power Station
Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Opening GFA (Rs. Crores) 351.05 365.84 413.94 535.33 616.25 799.64 819.93 831.93
Addition to GFA (Rs. Crores) 14.79 48.10 121.39 80.92 183.40 20.29 12.00 40.00
Closing GFA (Rs. Crores) 365.84 413.94 535.33 616.25 799.64 819.93 831.93 871.93
Average Rate of Depreciation (%) 3.27% 2.69% 2.59% 4.69% 3.96% 5.28% 5.28% 5.28%
Depreciation (Rs. Crores) 11.98 11.13 13.87 25.08 24.38 32.18 33.25 33.88
TANGEDCO
Kuttalam Gas Power Station (KGTPS)
Depreciation
Form 11
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
(Rs. Crores)
Sl. No. Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
1 Fuel Cost 12.17 3.64 21.95 21.66 25.97 25.69 28.38 29.81
2 Fuel Stock
3 O & M expenses 0.48 -3.47 5.34 1.51 0.80 0.87 0.92 0.98
4 Maintenance Spares 3.87 4.36 5.60 6.48 8.37 8.68 8.81 9.22
5 Recievables 26.04 13.21 60.23 42.00 61.87 62.86 51.91 54.25
6 Total Working Capital 42.56 17.74 93.13 71.65 97.00 98.10 90.02 94.26
7 Rate of Interest 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
8 Interest on Working Capital 5.53 2.62 13.46 8.78 11.89 12.02 10.35 10.84
Name of the Company
Name of the Project
Computation of Interest on Working Capital
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 12
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
Other Expenditure
1 Repairs and Maintenance - - - - -
2 Employee Cost - 44.06 32.72 5.15 1.16 1.16 1.16 1.16
3 Administrative and General Expenditure-
3.75 2.78 1.44 0.10 0.10 0.11 0.12
4 Fabrication Charges - - - - 1.00
5 Depreciation and other related costs - 0.94 0.70 0.94 0.94 0.94 0.94 0.94
6 Other Debits - - -
Total - 48.75 36.20 7.53 3.20 2.20 2.21 2.21
Details of Revenue Expenses Capitalised
FY 2015-16Projected
S.No Particulars
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Form 13 A
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Plant & Machinery 2.10 1.70 94.03 18.20 3.37 3.56 3.77 3.98
2 Building - - - - - - - -
3 Civil Works 0.00 0.01 0.24 0.02 0.20 0.22 0.23 0.24
4 Hydraulic work - - - - - - - -
5 Lines & Cable network 0.00 - - - - - - -
6 Vehicles - - - - - - - -
7 Furniture & Fixtures 0.00 - - 0.00 0.00 0.00 0.00 0.00
8 Office equipments 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00
9Allocation of Head Quarters
Expenses - - - - - - - -
Total Expenses 2.11 1.71 94.27 18.22 3.58 3.78 4.00 4.23
10 Less: Capitalisation - - - - -
11Net Repair & Maintenance
expenses 2.11 1.71 94.27 18.22 3.58 3.78 4.00 4.23
Operation and Maintenance expenses - Repairs and Maintenance
Rs. Crores
Projected
Name of the Company
Name of the Project
FY 2014-15S. No. Details FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 B
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Salary 1.63 1.76 2.12 1.64 2.05 2.35 2.49 2.63
2 Overtime wages 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02
3 Dearness Allowance 1.00 1.30 1.67 2.37 2.36 2.50 2.64 2.79
4 Other Allowances 0.17 0.21 0.20 0.20 0.26 0.27 0.29 0.31
5 Bonus & Exgratia 0.02 0.01 0.02 0.02 0.03 0.03 0.03 0.03
Total 1 - 5 2.82 3.30 4.02 4.27 4.71 5.17 5.47 5.78
6 Medical expenses reimbursement 0.00 0.00 0.00 0.00 0.00 0.00
7 Leave Travel concession - 0.00 0.00 0.00 0.00 0.00
8 Earned Leave encashment 0.19 0.28 0.33 0.38 0.44 0.46 0.49 0.51
10 Staff welfare expenses - - 0.00 0.00 0.00 0.00 0.00 0.00
11 Terminal Benefits 0.09 0.13 0.20 0.35 0.33 0.35 0.37 0.39
12 Other Cost 0.03 0.04 0.09 0.15 0.13 0.14 0.15 0.16
13Thermal/Performance/Commissioning /
Goldden Jubilee Incentive 0.00 - 0.04
14 Allocation of Head Quarters Expenses
Grand Total 3.12 3.76 4.68 5.13 5.61 6.12 6.47 6.84
Less: Capitalisation - 44.06 32.72 (5.15) (1.16) (1.16) (1.16) (1.16)
Net Expenses 3.12 (40.30) (28.04) (0.02) 4.45 4.96 5.31 5.68
Operation and Maintenance expenses - Employee Cost
ProjectedS. No. Details FY 2014-15
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13 FY 2013-14
Rs. Crores
FY 2015-16
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (5) (6) 7 8 9
1 Rent, Rate & Taxes 0.08 0.18 0.16 0.09 0.17 0.18 0.19 0.20
2 Insurance 0.09 0.02 0.01 0.01 0.01 0.01 0.01 0.01
3 Telephone / Postage / Telex 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
4Legal / Audit / Consultancy /
Tech. fee / consultancy charges 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01
5 Conveyance & Travel 0.03 0.11 0.10 0.13 0.13 0.13 0.14 0.15
6 Fees & Subscription - 0.00 -
7 Books & Periodicals 0.00 0.00 0.00
8 Printing & Stationery 0.00 0.00 0.02
9 Watch and Ward Expenses. 0.30 0.34 0.35
10Petty Office Maintenance
Expenses. 0.00 0.00 0.00
11 Miscellaneous Expenses 0.00 0.01 0.00 0.60 0.92 0.97 1.03 1.09
12 Freight 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
13Other Purchase related
Expenses. - 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Total A&G Expenses 0.56 0.69 0.66 1.32 1.65 1.74 1.84 1.95
15 Less: Capitalisation - 3.75 2.78 (1.44) (0.10) (0.10) (0.11) (0.12)
16 Net Expenses 0.56 (3.06) (2.13) (0.12) 1.55 1.64 1.73 1.83
Projected
Form 13 C
S.
No.Details
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Operation and Maintenance Expenses - Administration and General Expenses
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 D
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Water Charges 0.12 0.05 0.07 0.08 0.08 0.08 0.08 0.09
2 Lubricants and Consumables 0.01 0.13 0.05 0.07 0.06 0.07 0.07 0.07
3 Station Auxiliaries - - - - -
4 Total expenses 0.13 0.18 0.12 0.16 0.15 0.15 0.16 0.17
Operation and Maintenance Expenses - Operating Expenses
ProjectedS.No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 E
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Net Repair & Maintenance Expenses 2.11 1.71 94.27 18.22 3.58 3.78 4.00 4.23
2 Net Employees Cost 3.12 (40.30) (28.04) (0.02) 4.45 4.96 5.31 5.68
3 Net Admn. & General Expneses 0.56 (3.06) (2.13) (0.12) 1.55 1.64 1.73 1.83
4 Operating Expenses 0.13 0.18 0.12 0.16 0.15 0.15 0.16 0.17
5Total Operation and Maintenance
expenses 5.91 (41.47) 64.23 18.23 9.73 10.54 11.20 11.91
Total Operation and Maintenance Expenses
ProjectedS.No. Details
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Rs. Crores
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 15
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
(Rs.Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1Research & Development
expenses
- - - - -
2Bad & Doubtful debts written off - - - - -
3Miscellaneous losses and written
off/provided for
- - - - -
4 Material cost variance - - - - -
5 Sundry expenses - - - - -
6 Extra ordinary debits - - - - -
7Allocation of Head Quarters
Expenses
- - - - -
Total - - - - -
8 Less: Capitalization - - -
9 Net expenses - - - - -
OTHER DEBITS
FY 2015-16Projected
S.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 16
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
I Income relating to previous year1 Fuel related gains - - 4.63 -85.3353211 0 0 0 02 Interest income - - - 0 0 0 0 0
3Excess Provisions for revenue expenses 1.10 -
-
0 0 0 0 0
4 Other income (0.00) - 0.00 -0.6279752 0 0 0 05 Total 1.10 - 4.63 (85.96) - - - -
IIExpenses / Losses relating to previous
period1 Fuel related losses and expenses 9.66 0 0 0 02 Operating expenses - 0 0 0 0
3Emloyee cost and other revenue
expenditures under provided
0.02 0.00
0.97
0.5965322 0 0 0 0
4 Other charges 0.03 (0.10) - 0 0 0 05 Total 0.05 (0.09) 10.63 0.60 - - - -
IIINet prior period credits / charges (1.05) (0.09) 6.00 (85.37) (0.25) - - -
Projected
PRIOR PERIOD CREDITS / CHARGES
FY 2015-16Sl.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 17
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (5) (6)
1Interest on loan and advance to employees 0.00 0.01 0.01 0.02 0.02 0.02 0.02 0.02
2 Interest on Investments -
3Interest on Advance to suppliers / Contractors -
4 Interest from Banks -
5Income from sale of tender forms, stores, scraps,
etc.,
-
6 Income from Trading 0.00 - 0.03 0.00 0.00 0.00 0.00 0.00 7 Miscellaneous Receipts 0.01 0.01 0.04 0.68 0.68 0.68 0.68 0.68
8 Allocation from Head Quarters
Total 0.02 0.02 0.08 0.70 0.12 0.12 0.12 0.12
Statement showing other Income
FY 2015-16Projected
S.No Particulars
Name of the Company
Name of the Project
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 18
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
Gross (in
MU)Net (in MU) Gross (in MU) Net (in MU)
1 KGTPS 101 47.18% 7.02% 413.74 384.69 6.31% 8.50% 55.84 51.09
Gross (in
MU)Net (in MU) Gross (in MU) Net (in MU)
1 KGTPS 101 72.49% 7.32% 641.37 594.39 56.74% 7.65% 497.00 458.98
Gross (in
MU)Net (in MU) Gross (in MU) Net (in MU)
1 KGTPS 101 64.35% 2.00% 563.68 552.40 80.00% 6.00% 700.80 658.75
Gross (in
MU)Net (in MU) Gross (in MU) Net (in MU)
1 KGTPS 101 85.80% 6.00% 751.61 706.51 87.50% 6.00% 766.50 720.51
Estimated Generation of Power
Name of the Company
Name of the Project
FY 2011-12 FY 2012-13
FY 2013-14 FY 2014-15
Sl.No Generating Station
Installed
Capacity (in
MW)
PAF (in %)
Aux.
Consu. (in
%)
PAF (in %)Aux. Consu.
(in %)
PAF (in %)Aux. Consu.
(in %)
Projected
FY 2016-17
Projected
FY 2017-18
Projected
FY 2018-19PAF (in %)
Aux. Consu.
(in %)
FY 2015-16
PAF (in %)Aux. Consu.
(in %)
PAF (in %)
Aux.
Consu. (in
%)
PAF (in %)
Aux.
Consu. (in
%)
PAF (in %)
Aux.
Consu. (in
%)
Sl.No Generating Station
Installed
Capacity (in
MW)
Sl.No Generating Station
Installed
Capacity (in
MW)
Sl.No Generating Station
Installed
Capacity (in
MW)
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 19 A
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Capaciy MW 101 101 101 100 100 100 100 100
2 Gross Station Heat Rate Kcal / kWhr 1871 1945 1,831 2,011 1,990 1,850 1,850 1,850
3 Auxiliary Consumption % 7.02% 8.50% 7.32% 7.65% 2.00% 6.00% 6.00% 6.00%
4 Average calorific value of Gas Scm 10386 10393 10392 10000 10000 10000 10000 10000
5 Average cost of Gas Rs / Scm 8.72 13.98 10.90 13.00 13.90 11.89 12.25 12.61
6 Rate of energy from Gas Ps / kWhr 1.69 2.86 2.07 2.83 2.82 2.34 2.41 2.48
7 Net Generation MU 384.69 51.09 594.39 458.98 552.40 658.75 706.51 720.51
8 Total energy cost Rs / Crores 64.98 14.61 123.17 129.95 155.83 154.15 170.29 178.87
9 Fixed Annual Gas Transmission Charges Rs / Crores 8.04 7.24 8.55 0.00 0.00 0.00 0.00 0.00
10 Total Variable Cost Rs / Crores 73.02 21.85 131.72 129.95 155.83 154.15 170.29 178.87
11 Net Energy charges per unit Ps / kWhr 1.90 4.28 2.22 2.83 2.82 2.34 2.41 2.48
Computation Energy (Variable) Charges - Gas Based
FY 2015-16
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14
Name of the Company
Name of the Power Station
S. No Description Unit
TANGEDCO
Kuttalam Gas Turbine Power Station (KGTPS)
FY 2014-15Projected
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 20
Name of the Company TANGEDCO
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
1 KGTPS 384.69 83.20 73.02 156.22 4.06 51.09 57.42 21.85 79.27 15.51 594.39 229.65 131.72 361.37 6.08 458.98 122.07 129.95 252.02 5.49
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in
Crs)
Total
(Rs.in Crs)
Cost per
unit (in RS)
KGTPS 552.40 215.37 155.83 371.20 6.72 658.75 223.02 154.15 377.17 5.73 706.51 141.17 170.29 311.46 4.41 720.51 146.64 178.87 325.52 4.52
FY 2014-15FY 2012-13
FY 2015-16
Abstract of Station wise cost of generation
FY 2013-14
S. No Station
S. No Station
FY 2011-12
FY 2016-17 FY 2017-18 FY 2018-19
Petition Formats_KGTPS_FY 2014-15-FY 2015-16.xlsx
Form 1
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I Annual Fixed Cost
1 Return on Equity 5 18.09 32.702 39.99 32.56 32.56 32.56 34.09 34.09
2 Interest on loan capital 6 C 91.33 101.105 162.468 203.93 220.74 209.48 199.32 190.54
3 Depreciation 10 B 18.81 18.956 21.00 29.37 2.20 117.11 117.11 117.79
4 Interest on Working Capital 11 5.98 5.126 6.87 6.93 9.72 11.77 10.90 10.76
5 Operation and Maintenance Expenses 13 E 5.03 5.901 7.61 9.52 8.12 8.78 9.28 9.81
7 Other Debits 15 - - - - -
8 Prior period credits / charges 16 0.04 0.189 0.97 0.56 0.01 - - -
10 Total Annual Fixed Cost 139.29 163.980 238.91 282.87 273.35 379.70 370.69 362.98
11 Less: Other Income 17 0.22 0.06 0.08 0.03 0.05 0.05 0.05 0.05
12 Net Annual Fixed Cost 139.07 163.92 238.83 282.84 273.30 379.65 370.64 362.93
II Total Variable Cost 19 A / 19 B 49.78 1.03 1.61 6.11 15.77 1.37 1.41 1.45
III Total Cost 188.85 164.95 240.44 288.95 289.07 381.02 372.05 364.38
Summary of Tariff Proposal for Gas based Thermal Station
Sl.
No.Particulars
Reference to
Form
Name of the Company
Name of the Project
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2014-15
Rs. Crores
FY 2011-12 FY 2012-13 FY 2013-14Projected
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company TANGEDCO
Name of the Power Station Basin Bridge Gas Turbine Power Station (BBGTPS)
Unit
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6)
Rate of Return on Equity % 14% 14% 14% 14% 14% 14% 14% 14%
Target PLF % 2.81% 0.04% 0.08% 0.00% 0.00% 0.99% 0.99% 0.99%
Auxiliary Energy Consumption % 0.57% 0.96% 5.06% 0.99% 0.99% 0.99% 0.99% 0.99%
Gross Station Heat Rate kCal/kWh 3221 3820 3482 3219 3432 3219 3219 3219
Specific Fuel Oil Consumption ml/kWh NA NA NA NA NA NA NA NA
O&M Cost 5.04 5.90 7.61 9.52 8.12 8.78 9.28 9.81
Cost of Fuel for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
O & M Expenses for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Primary Fuel Stock for WC in Months 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
SecondaryFuel Oil or Secondary/Alternate liquid fuel stock for WC in Months NA NA NA NA NA NA NA NA
Spares stock as % of Plant & Equipment Cost on 1.4.2004 for WC% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Recievables for WC in Months 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Prime lending Rate of SBI % 13.00% 14.75% 14.45% 14.75% 14.75% 14.75% 14.75% 14.75%
Incentive Rate Paise.kWh 25 25 25 25 25 25 25 25
Form 3
Normative parameters considered for tariff computations
Projected
Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Form 4
Name of the Company TANGEDCO
Name of the Station Basin Bridge Gas Turbine Power Station (BBGTPS)
S.No Norms of Operation FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19 Average
1 2 3 4 5 6 7 8 9 10 11
1 PLF / PAF (in %) 2.81% 0.04% 0.08% 0.00% 0.00% 0.99% 0.99% 0.99% 0.59%
2 Auxliary consumption (in %) 0.57% 0.96% 5.06% 0.99% 0.99% 0.99% 0.99% 0.99% 1.71%
3Average Gross Station Heat Rate (Kcal / kWhr)
3221 3820 3482 3,219 3432 3,219 3,219 3,219 3219
4Average Gross Calorific value of Gas / Naphtha
(Kcal / Scm / Kg)11340 11340 11349 10572 10572 10572.00 10572.00 10572.00 10572
5Specific consumption of Gas / Naphtha (Scm /
Kg / kWhr)0.28 0.34 0.31 0.30 0.32 0.30 0.30 0.30 0.31
6 Operating Expenses (Rs in Lakhs)
7Operation and Maintenance expenses (Rs in Crs.
/ MW)4.20 4.92 6.35 7.93 6.77 7.31 7.73 8.18 6.03
8Average cost of Gas / Naphtah (Rs // Scm / MT)
59.27 73.08 60.64 15.00 15.45 7.11 7.32 7.54 44.69
Statement showing the performance of Stations during the previous five years
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 5
TANGEDCO
Rs Crores
FY 2016-17 FY 2017-18 FY 2018-19
1 Equity at the beginning 76.99 285.67 285.67 285.67 285.67
2 Addition during the year 104.51 104.17 - - - - - -
3 Total Equity 181.50 389.84 285.67 285.67 285.67
4 Return on Equity (in %) 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
5 Return on Equity 18.09 32.70 39.99 32.56 32.56 32.56 34.09 34.09
Computation Return on Equity
Name of the Company
Name of the Project
FY 2011-12 FY 2012-15 FY 2014-15
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2015-16S.No Particulars FY 2014-15Projected
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 6
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
1 2
1 Interest on security deposit - -
2Interest on meter caution
deposit
3 Interest on GPF / CPF 0.13 0.13
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges 0.00 0.00
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest 0.01 0.02
Total 0.14 0.15
Outstanding
at the
beginning
Net additions InterestSl. no. Particulars
FY 2011-12
Outstanding
at the
beginning
Net
additionsInterest
FY 2012-13
Statement showing other Interest
Name of the Company
Name of the Project
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
FORM-6 C
Name of the Company
Name of the Station
Rs crores
FY 2016-17 FY 2017-18 FY 2018-19
1 Net Interest on Existing Loan 91.197 100.95 162.298 203.75 220.26 208.99 198.80 190.01
2 Interest on Project borrowings
3 Other Interest 0.137 0.15 0.17 0.17 0.47 0.49 0.51 0.53
4 Total Interest 91.334 101.11 162.47 203.93 220.74 209.48 199.32 190.54
S. No. Particulars FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
TANGEDCO
FY 2015-16Projected
Basin Bridge Gas Turbine Power Station (BBGTPS)
Abstract of Interest
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
1 2
1 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest
Total
Sl. no. Particulars
Statement showing other Interest
Name of the Company
Name of the Project
Form 6
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
3 4 5 13 14 15
-
0.15 0.17 0.47
-
-
0.00 -
0.02
0.17 0.17 0.47
Interest
FY 2014-15 FY 2015-16
Outstanding
at the
beginning
Net
additionsInterest
FY 2013-14
Outstanding
at the
beginning
Net
additions
Statement showing other Interest
Outstanding
at the
beginning
Net
additionsInterest
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
1 2
1 Interest on security deposit
2Interest on meter caution
deposit
3 Interest on GPF / CPF
4Interest on deposit from
employees
5Interest on Family Benefit Fund
contribution
6Interest on TNEB Spl. PF cum
Gratuity Scheme
7 Cost of raising finance
8 Bank charges
9 Penal interest on E-Tax
10Guarantee Commission to Govt.
11 Other Interest
Total
Sl. no. Particulars
Statement showing other Interest
Name of the Company
Name of the Project
Form 6
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
Outstanding
at the
beginning
Net
additionsInterest
Outstanding
at the
beginning
Net
additionsInterest
Outstanding
at the
beginning
Net
additionsInterest
16 17 18 19 20 21 22 23 24
0.49 0.51 0.53
- - -
- - -
- - -
0.49 0.51 0.53
Statement showing other Interest
Projected Projected ProjectedFY 2016-17 FY 2017-18 FY 2018-19
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 101.00 Plant and machinery in generating Stations
including plant foundations
(a) Boilers/Plants - - 2.67 7.85 -
(b) Cooling towers and circulating water system - - 0.50 - -
2.00 Buildings and civil Engineering works of a
permenant character, not mentioned above
- - - - -
(a) Offices and show rooms - - - - -
(b) Containing thermo electric plants - - - - -
(c) Temporary errections such as wooden
structures
- - - - -
(d) Roads other than kacha roads - - - - -
(e) Others - - - - -
3.00 Transformers, transformer (kiosk) sub station
equipmernt and other fixed aparatus (including
plant foundations)
- - - - -
(a) Transformers (including foundation) having a
rating of 100 kVA and over.
- - - - -
(b) Others - - - - -
4.00 Switch gear, including cable connections - - - - -
5.00 Lightening arresters - - - - -
(a) Station type - - - - -
(b) Pole type - - - - -
(c) Synchronous condensers - - - - -
6.00 Batteries - - - - -
7.00 (a) Underground cables including joint boxes and
disconnected boxes
- - - - -
(b) Cable duct systems - - - - -
8.00 Meters - - - - -
9.00 Self propelled vehicles - - - - -
10.00 Air-conditioning plants - - - - -
(a) Static - - - - -
(b) Portable - - - - -
11.00 (a) Office furniture and fittings - - - - -
(b) Office equipments - - - - -
(c) Internal wirings including fittings and apparatus - - - - -
(d) Street light fittings - - - - -
12.00 Motors - - - - -
13.00 Communication equipments - - - - -
Projected
ESTIMATE OF CAPITAL EXPENDITURE
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14Name of WorksS. No.
Name of the Company
Name of the Project
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 7
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs. Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
Projected
ESTIMATE OF CAPITAL EXPENDITURE
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14Name of WorksS. No.
Name of the Company
Name of the Project
FY 2015-16
(a) Radio and higher frequency carrier system - - - - -
(b) Telephone lines and telephones - - - - -
-
TOTAL 0.00 0.00 3.17 7.85 -
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Name of the Company
Name of the Power Station Basin Bridge Gas Power Station (BBGTPS)
Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Opening GFA (Rs. Crores) 551.33 551.33 626.87 626.88 625.51 2,910.41 2,910.41 2,923.20
Addition to GFA (Rs. Crores) - 75.54 0.01 (1.37) 2,284.90 - 12.79 -
Closing GFA (Rs. Crores) 551.33 626.87 626.88 625.51 2,910.41 2,910.41 2,923.20 2,923.20
Average Rate of Depreciation (%) 3.41% 3.44% 3.35% 4.69% 4.82% 5.28% 5.28% 5.28%
Depreciation (Rs. Crores) 18.81 18.96 21.00 29.37 2.20 117.11 117.11 117.79
Form 10 B
Depreciation
TANGEDCO
Form 11
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs.in Crores)
S.No. Particulars FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
1 Fuel Cost 8.30 0.17 0.27 1.02 2.63 0.23 0.23 0.24
2 Fuel Stock - - - - 0.68
3 O & M expenses 0.42 0.49 0.63 0.79 0.68 0.73 0.77 0.82
4 Maintenance Spares 5.84 6.60 6.64 6.63 29.48 30.85 30.98 30.99
5 Recievables 31.48 27.49 39.98 48.16 48.18 63.50 62.01 60.73
6 Total Working Capital 46.04 34.75 47.52 56.60 81.64 95.31 93.99 92.77
7 Rate of Interest 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
8 Interest on Working Capital 5.98 5.13 6.87 6.93 9.72 11.77 10.90 10.76
Name of the Company
Name of the Project
Computation of Interest on Working Capital
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 12
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) 5 6
Interest Expenditure
1 Normal Interest Expenditure
2 Interest during construction
Other Expenditure
3 Repairs and Maintenance - - - - -
4 Employee Cost - - 0.00 0.00 0.00
5 Administrative and General Expenditure - - 0.00 0.00 0.00
6 Fabrication Charges - - - - -
7 Depreciation and other related costs - - 0.00 0.00 0.00
8 Other Debits - - -
Total - - - - - - - -
FY 2015-16Projected
Details of Revenue Expenses Capitalised
S. No Particulars
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14
Form 13 A
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Plant & Machinery 0.01 0.34 0.86 3.12 1.16 1.22 1.29 1.37
2 Building - - - - - - - -
3 Civil Works 0.11 0.12 0.19 0.17 0.56 0.59 0.62 0.66
4 Hydraulic work - - - - - - - -
5 Lines & Cable network - - - - - - - -
6 Vehicles - - - - - - - -
7 Furniture & Fixtures - - 0.00 - - - - -
8 Office equipments 0.00 0.00 0.00 0.00 0.02 0.02 0.02 0.02
9 Allocation of Head Quarters Expenses - - - - - - - -
Total Expenses 0.12 0.46 1.05 3.30 1.73 1.83 1.94 2.05
10 Less: Capitalisation - - - - - - -
11 Net Repair & Maintenance expenses 0.12 0.46 1.05 3.30 1.73 1.83 1.94 2.05
Operation and Maintenance expenses - Repairs and Maintenance
Rs. In Crores
ProjectedFY 2011-12 FY 2012-13 FY 2013-14
Name of the Company
Name of the Project
FY 2014-15S.No. Details FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 B
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Salary 1.73 1.77 2.04 2.04 2.09 2.40 2.54 2.68
2 Overtime wages - - 0.00 0.00 0.00 0.00 0.00 0.00
3 Dearness Allowance 1.03 1.35 1.82 2.17 2.54 2.68 2.83 3.00
4 Other Allowances 0.23 0.23 0.25 0.24 0.23 0.25 0.26 0.28
5 Bonus & Exgratia 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04
Total 1 - 5 3.00 3.37 4.12 4.47 4.89 5.36 5.67 6.00
6 Medical expenses reimbursement 0.02 0.01 0.01 0.00 0.00 0.00 0.00 0.00
7 Leave Travel concession 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01
8 Earned Leave encashment 0.16 0.16 0.18 0.07 0.06 0.07 0.07 0.08
9 Staff welfare expenses 0.00 0.00 0.00 0.34 0.36 0.38 0.41 0.43
10 Terminal Benefits 0.19 0.28 0.20 0.11 0.11 0.12 0.13 0.13
11 Board's Contribution to CPS 0.02 0.03 0.04
12 Other Cost 0.12 0.06 0.06
13 Allocation of Head Quarters Expenses
Grand Total 3.52 3.91 4.61 5.00 5.44 5.95 6.29 6.65
Less: Capitalisation - - - - -
Net Expenses 3.52 3.91 4.61 5.00 5.44 5.95 6.29 6.65
Operation and Maintenance expenses - Employee Cost
S.No. Details FY 2014-15
Name of the Company
Name of the Project
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14Projected
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 C
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Rent, Rate & Taxes 0.20 0.25 0.22 0.22 0.00 0.00 0.00 0.00
2 Insurance 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03
3 Telephone / Postage / Telex 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01
4Legal / Audit / Consultancy / Tech.
fee / consultancy charges 0.02 0.01 0.00 0.01 0.08 0.08 0.09 0.09
5 Conveyance & Travel 0.02 0.03 0.05 0.07 0.07 0.07 0.07 0.08
6 Fees & Subscription 0.00 0.00 0.00
7 Books & Periodicals 0.00 0.00 0.00
8 Printing & Stationery 0.00 0.00 0.00
9 Watch and Ward Expenses. 1.10 1.18 1.63
10Petty Office Maintenance
Expenses. 0.00 0.00 0.00
11 Miscellaneous Expenses 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00
12 Freight 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00
13 Other Purchase related Expenses. 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00
Other Cost 0.88 0.75 0.80 0.84 0.89
Total A&G Expenses 1.40 1.53 1.95 1.22 0.94 1.00 1.05 1.11
10 Less: Capitalisation - - 0.00 0.00 0.00
11 Net Expenses 1.40 1.53 1.95 1.22 0.94 1.00 1.05 1.11
Operation and Maintenance Expenses - Administration and General Expenses
ProjectedS.No. Details
Name of the Company
Name of the Project
FY 2014-15
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 D
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Water Charges - - - - -
2 Lubricants and Consumables (0.01) - - - -
3 Station Auxiliaries - - - - -
4 Total expenses (0.01) - - - -
Operation and Maintenance Expenses - Operating Expenses
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14Projected
FY 2015-16S.No. Details
Name of the Company
Name of the Project
FY 2014-15
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 13 E
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
Rs. In Crores
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Net Repair & Maintenance Expenses 0.12 0.46 1.05 3.30 1.73 1.83 1.94 2.05
2 Net Employees Cost 3.52 3.91 4.61 5.00 5.44 5.95 6.29 6.65
3 Net Admn. & General Expneses 1.40 1.53 1.95 1.22 0.94 1.00 1.05 1.11
4 Operating Expenses (0.01) - - - - - - -
5 Total Operation and Maintenance expenses 5.03 5.90 7.61 9.52 8.12 8.78 9.28 9.81
Projected
Total Operation and Maintenance Expenses
S.No. Details
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 15
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
1 Research & Development expenses - - - - - - - -
2 Bad & Doubtful debts written off - - - - - - - -
3 Miscellaneous losses and written
off/provided for
- - - - - - - -
4 Material cost variance - - - - - - - -
5 Sundry expenses - - - - - - - -
6 Extra ordinary debits - - - - - - - -
7 Allocation of Head Quarters
Expenses
- - - - - - - -
Total - - - - - - - -
8 Less: Capitalization - - - - - - - -
9 Net expenses - - - - - - - -
Projected
OTHER DEBITS
Sl.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14 FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 16
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
(Rs.in Crores)
FY 2016-17 FY 2017-18 FY 2018-19
I Income relating to previous year
1 Fuel related gains - - - 0
2 Interest income - - - 0
3 Excess Provisions for revenue expenses - 0.02 0.04 0
4 Other income 0.01 - 0.01 -0.0213154 0 0 0 0
5 Total 0.01 0.02 0.05 (0.02) - - - -
II Expenses / Losses relating to previous
period
1 Fuel related losses and expenses -
2 Operating expenses -
3 Emloyee cost and other revenue
expenditures under provided
0.03 0.19 0.84 0.0971783 0 0 0 0
4 Other charges 0.01 0.02 0.17 0.4847803 0 0 0 0
5 Total 0.05 0.21 1.01 0.58 - - - -
III Net prior period credits / charges 0.04 0.19 0.97 0.56 0.01 - - -
PRIOR PERIOD CREDITS / CHARGES
S.No. Details of Expenses
Name of the Company
Name of the Project
FY 2014-15FY 2011-12 FY 2012-13 FY 2013-14Projected
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 17
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (5) (6)
1 Interest on loan and advance to employees 0.06 0.04 0.06
2 Interest on Investments
3 Interest on Advance to suppliers / Contractors 0.00 0.00
4 Interest from Banks
5 Income from sale of tender forms, stores, scraps, etc.,
6 Income from Trading 0.00 - 0.00 0.01 0.01 0.01 0.01 0.01
7 Miscellaneous Receipts 0.16 0.01 0.02 0.01 0.01 0.01 0.01 0.01
8 Allocation from Head Quarters
Total 0.22 0.06 0.08 0.03 0.05 0.05 0.05 0.05
Statement showing other Income
S.No Particulars
Name of the Company
Name of the Project
FY 2014-15
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14
Projected
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 18
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
1 TKGTPS 120 2.81% 0.57% 29.57 29.40 0.04% 0.96% 0.42 0.41 0.08% 5.06% 0.87 0.82
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
1 TKGTPS 0.00% 0.99% 3.00 3.00 0.00% 0.99% 10.51 10.51 0.99% 0.99% 6.31 6.24
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
1 TKGTPS 0.99% 0.99% 6.31 6.24 0.99% 0.99% 6.31 6.24
FY 2017-18
FY 2011-12 FY 2012-13 FY 2013-14
Sl.No Generating Station
FY 2018-19
PLF (in %)Aux. Consu.
(in %)
Sl.No Generating Station PLF (in %)Aux. Consu.
(in %)PLF (in %)
Aux. Consu.
(in %)
PLF (in %)
FY 2014-15 FY 2015-16
Sl.No Generating Station
Installed
Capacity (in
MW)
PLF (in %)Aux. Consu.
(in %)
Name of the Company
Name of the Project
FY 2016-17Aux. Consu.
(in %)
Estimated Generation of Power
PLF (in %)Aux. Consu.
(in %)PLF (in %)
Aux. Consu.
(in %)
PLF (in %)Aux. Consu.
(in %)
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 19 A
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Capaciy MW 120 120 120 120 120 120 120 120
2 Gross Station Heat Rate Kcal / kWhr 3221 3820 3482 3219 3432 3219 3219 3219
3 Auxiliary Consumption % 0.57% 0.96% 5.06% 0.99% 0.99% 0.99% 0.99% 0.99%
4 Average calorific value of Gas Scm 11340 11340 11349 10572 10572 10572.00 10572.00 10572.00
5 Average cost of Gas Rs / Scm 59.27 73.08 60.64 15.00 15.45 7.11 7.32 7.54
6 Rate of energy from Gas Rs / kWhr 16.93 24.86 19.59 20.36 15.01 2.16 2.25 2.30
7 Net Generation MU 29.40 0.41 0.82 3.00 10.51 6.31 6.24 6.31
8 Total energy cost Rs / Crores 49.78 1.03 1.61 6.11 15.77 1.37 1.41 1.45
9 Fixed Annual Gas Transmission Charges Rs / Crores - - - - -
10 Total Variable Cost Rs / Crores 49.78 1.03 1.61 6.11 15.77 1.37 1.41 1.45
11 Net Energy charges per unit Rs / kWhr 16.93 24.86 19.59 20.36 15.01 2.16 2.25 2.30
Computation Energy (Variable) Charges - Gas Based
Name of the Company
Name of the Power Station
S. No Description Unit
TANGEDCO
Basin Bridge Gas Turbine Power Station (BBGTPS)
FY 2014-15
Rs. In Crores
FY 2011-12 FY 2012-13 FY 2013-14Projected
FY 2015-16
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx
Form 20
Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)Cost per unit (in
RS)Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)
Cost per unit (in
RS)Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)
Cost per unit (in
RS)
1 BBGTPS 29.40 139.07 49.78 188.85 0.41 163.92 1.03 164.95 0.82 238.83 1.61 240.44
Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)Cost per unit (in
RS)Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)
Cost per unit (in
RS)
1 BBGTPS 3.00 282.84 6.11 288.95 10.51 273.30 15.77 289.07
Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)Cost per unit (in
RS)Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)
Cost per unit (in
RS)Net Gen (MU) AFC (Rs.in Crs) VC (Rs.in Crs) Total (Rs.in Crs)
Cost per unit (in
RS)
1 BBGTPS 6.31 379.65 1.37 381.02 6.24 370.64 1.41 372.05 6.31 362.93 0.00 362.93
FY 2013-14
FY 2014-15
FY 2011-12
Abstract of Station wise cost of generation
TANGEDCO
Sl. No Station
Sl. No Station
FY 2012-13
FY 2015-16
Name of the Company
Sl. No Station
FY 2016-17 FY 2017-18 FY 2018-19
Petition Formats_BBGTPS_FY 2014-15-FY 2015-16.xlsx