Annexure B: Consultation Materials

165
Annex B Consultation Materials Annex B1: Background Information Document (BID); Annex B2: Consultation Schedule; Annex B3: Development Presentation (given at community meetings); Annex B4: Issues and Concerns Log; Annex B5: Proof of Consultation: Photolog and Attendance Registers from Authority and Community Consultations; Annex B6: Proof of Advertisements; and Annex B7: Proof of Site Notices. Annex B8: Meeting Minute Template

Transcript of Annexure B: Consultation Materials

Page 1: Annexure B: Consultation Materials

Annex B

Consultation Materials Annex B1: Background Information Document (BID); Annex B2: Consultation Schedule; Annex B3: Development Presentation (given at community meetings); Annex B4: Issues and Concerns Log; Annex B5: Proof of Consultation: Photolog and Attendance Registers from Authority and Community Consultations; Annex B6: Proof of Advertisements; and Annex B7: Proof of Site Notices. Annex B8: Meeting Minute Template

Page 2: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP DRAFT SCOPING REPORT

B1

B1 BACKGROUND INFORMATION DOCUMENT (BID)

Page 3: Annexure B: Consultation Materials

Environmental and Social Impact Assessment (ESIA) for the

Muchinga Hydropower Project, Zambia

UMULIMO WABA ERM

Figure 1: Location of the Muchinga HHP

Akatabo Kelyashi Lya Nchito Ikabombwa Elyo Nobwite Bwakulandapo (Background Information Document and Invitation to Comment)

Insert Map

The Muchinga Power Company Limited is an Independent Power Producer (IPP) who own and operate a num-ber of hydropower facilities in Zambia. Agua Imara AS (formerly SN Power Africa) has 51% share in LHPC.

Figure 1: Location of the Muchinga HHP

IFYA PALI AKA KATABO

Page 4: Annexure B: Consultation Materials

Intambo shamalaiti ishipya ukufika kuli 33kV ishakuya ku 14 Miles ukupitila pa Mulun-gushi HPP

Umuseba uwakukuminkanya Muchinga HPP kuli Mulungushi HPP (35Km)

• Utushila twakubomfya panshita yamkule • Ingwenya apakutobela amabwe • Inchende yakukulilapo amayanda yaba-

bomfi

Ubwendo kumunyangala wa Lunsemfwa ukuleta kuchishi-

ba cha Muchinga

• Ukukusha kwamunyangala wa Lunsemfwa pakwalwila amenshi mu bwendo • Ukwalwila amenshi mubwendo ukufuma mu Lwambulu • Inchende yakukulilapo amayanda yaba bomfi

Page 5: Annexure B: Consultation Materials

• Intambo shamalaiti isha 33kV ishakutwala amalaiti panchende yamilimo

• Umusebo wababomfi

Ichishiba chipya pa mumana wa Mkushi

Imisebo yapakashita akanono.

Ubwendo bwa menshi ukufu-ma ku chishiba cha Mkushi ukutwala ku ng’anda yakupanga amalaiti

• Ing’anda yamalaiti iyipya (3 x 85MW tur-bine)

• Amayanda yababomfi ayapakashita akanono

Page 6: Annexure B: Consultation Materials

UBU TANTIKO BWA KUCHECHETA IFINGA TUMBUKAMO (THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS)

Figure 6: EIA Process in Zambia

Page 7: Annexure B: Consultation Materials

Registration and Comment Sheet—Muchinga HPP July 2013

Comments:

Page 8: Annexure B: Consultation Materials

04 July 2013 Dear XXX, As a way of introducing myself, my name is Janet Mkhabela. I work for the Environmental Resources Management (ERM), an environmental consulting firm based in South Africa. ERM was commissioned by the Lunsemfwa Hydropower Company (LHPC) in 2011 to undertake an Environmental and Social Impact Assessment (ESIA) for the proposed development of the Muchinga Hydropower Plant at the confluence of Mkushi and Lunsemfwa Rivers. The scope of the Muchinga project in 2011 comprised of the construction of the dam, inundation areas, pressure tunnel, powerhouse, and workers’ village. However, the LHPC has decided to add some new components to the project which include: • A transmission line and the road connecting the new Mulungushi HPP and the

Muchinga HPP; • Quarry and crushing area; • Multiple permanent and temporary roads in and around the Project Site; and • A transmission line connecting Muchinga HPP and Lunsemfwa HPP. These are significant changes to the project and by Law we are required to restart the ESIA and its related Public Participation Process, thus we write you this communication. We would like to request an audience with His Highness to provide you with more information regarding the project. My colleague, Lindsey Bungartz and I would like to visit His Highness at His palace on the 18th of July 2013 at 10:00am. The purpose of the meeting will be to: 1. Re-introduce the Muchinga Project (including the old and new scope); 2. Discuss potential positive and negative impacts; and 3. Allow his Highness the opportunity to raise concerns and issues regarding

the project. Could His Highness let me know if this day is suitable for Him? Should His Highness have any questions regarding this letter, he can contact me, via email [email protected] or Mr Enock Silwamba (LHPC) 0977780625. Yours Sincerely,

Ms Janet Mkhabela Social Impact and Public Participation Specialist

Page 9: Annexure B: Consultation Materials

Environmental and Social Impact Assessment (ESIA) for the

Muchinga Hydropower Project, Zambia

ERM’s Role

Figure 1: Location of the Muchinga HHP

Background Information Document and Invitation to Comment

Insert Map

Who is MPC? The Muchinga Power Company Limited (MPC) is a joint venture between Lunsemfwa Hydro Power Company Limited (LHPC), Agua Imara AS (formerly SN Power Africa) and eleQtra (InfraCo) Ltd.

Figure 1: Location of the Muchinga HHP

PURPOSE OF THIS DOCUMENT

Page 10: Annexure B: Consultation Materials
Page 11: Annexure B: Consultation Materials
Page 12: Annexure B: Consultation Materials

THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

Figure 6: EIA Process in Zambia

Page 13: Annexure B: Consultation Materials

Registration and Comment Sheet– Muchinga HPP July 2013

Comments:

Page 14: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP DRAFT SCOPING REPORT

B2

B2 CONSULTATION SCHEDULE

Page 15: Annexure B: Consultation Materials

Day Date Project Authority/ Village Teams

AM 1 AM 2 PM 1 PM2

Sunday 14-Jul

15-Jul Mulungushi National Authorities Janet, Lindsey, Friday, and KCI -note taker

15-Jul Muchinga National Authorities Janet, Lindsey, Friday, and KCI -note taker

15-Jul

Mulungushi Chisamba District DCChisamba District Planner

Team 2: Lindsey and 2x KCI , LHPC Rep

9:30 -10:30

Mulungushi & Muchinga

Permanet Provincial SecretaryProvincial Planner

Team 1: Janet and 2x KCI Team, LHPC Rep

9:30 -10:30

Mulungushi Kabwe District DCKabwe District Planner

Team 2: Lindsey and 2x KCI , LHPC Rep

11:30: 12:30

Mulungushi & Muchinga

Kapiri District DCKapiri Mposhi District Planner

Team 1: Janet and 2x KCI Team, LHPC Rep

14:00 -15:30

Mulungushi & Muchinga

Mkushi/ Luano District DCMkushi/Luano District Planner

Team 1: Janet and 2x KCI Team, LHPC Rep

Mulungushi & Muchinga

Chief Mukonchi Team 2: Lindsey and 2x KCI , LHPC Rep

Muchinga Chief Kenyansha Team 1: Janet and 2x KCI Team, LHPC Rep

Mulungushi Chief Chimuka Team 2: Lindsey and 2x KCI , LHPC Rep

Friday 19-Jul Mulungushi & Muchinga

Chief Chembe & assoc villages Team 1 & 2 KCI Team, LHPC Rep

Saturday 20-Jul Mulungushi & Muchinga

Chief Chembe & assoc villages Team 1 & 2 KCI Team, LHPC Rep

Muchinga Consultation at nearby Churchs (TBC)

Team 1: Janet and 2x KCI Team, LHPC Rep

Muchinga Consultation at nearby Churchs (TBC)

Team 2: Lindsey and 2x KCI , LHPC Rep

Old Muchinga Project Affected

H useholdsTeam 1: Janet and 2x KCI Team, LHPC Rep

14:00 - 15:00Public Meeting

15:15 -17:00FGD/ H/h Surveys

Old Muchinga Project Affected Households

Team 2: Lindsey and 2x KCI , LHPC Rep

14:00 - 15:00Public Meeting

15:15 -17:00FGD/ H/h Surveys

MULUNGUSHI AND MUCHINGA CONSULTATION AND SOCIAL IMPACT ASSESSMENT DATA COLLECTION SCHEDULE Timing

Monday 10:00 -12:00

Placement of adverts and possibly printing of Bemba BIDs, visit the Maps office and stats office

12:30 - 14:00

Janet and Lindsey flight from CPT to Lusaka - Overnight stay in Lusaka

Tuesday Teams 1 and 2 travel to KabweAccommodation in Kabwe for 2 Nights x 6 People (16 - 17July)

07:00 - 09:30

Team 1 to start write up of meeting minutes and confirming the scheduled meeting

16-Jul

Wednesday

All day - Travel Time and Meeting

All day - Travel Time and Meeting

17-Jul

18-JulThursday

All day - Travel Time and Meeting

09:00 - 13:30 Travel back to Lunsemfwa HPP

All day - Travel Time and Meeting

All day - Travel Time and Meeting

09:00 - 12:00Public Meeting

21-Jul

Accommodation at Mulungushi HPP (22 -24 July)

Sunday 09:00 - 12:00Public Meeting

Muchinga

Muchinga

Page 16: Annexure B: Consultation Materials

Muchinga Lutampo and Shipili VillagesHouseholds along the project roads

Team 1: Janet and 2x KCI, LHPC Rep

09:00 - 10:00Public Meeting

10:30 -13:00FGD/ H/h Surveys

14:00 - 15:00FGD/ H/h Surveys

Muchinga Kamukawa village Team 2: Lindsey and 2x KCI , LHPC Rep

09:00 - 10:00Public Meeting

10:30 -13:00FGD/ H/h Surveys

14:00 - 15:00FGD/ H/h Surveys

Mulungushi Mulufeya, Mumbi, Buyelela & Namsambila Villages

Team 1: Janet and 2x KCI, LHPC Rep

10:00 - 12:00Public Meeting

12:15 - 14:00H/h Surveys (if req)

Mulungushi Ntimpa Village Team 1: Janet and 2x KCI, LHPC Rep

14:30 - 15:45Hh Survey if req

Mulungushi Kasonde Village Team 1: Janet and 2x KCI, LHPC Rep

16:00 -17:00

Mulungushi Malaya, Kasimba & Sekuta Villages Team 2: Lindsey and 2x KCI , LHPC Rep

10:00 - 12:00Public Meeting

12:15 - 13:30H/h Surveys (if req)

Mulungushi Pungwa, Loyumbika, Kefunga-Loubala Villages

Team 2: Lindsey and 2x KCI , LHPC Rep

14:30 - 15:45Public Meeting

16:00 - 17:30H/h Surveys (if required)

Mulungushi Bulemo,Chipunga & Kaputula Villages

Team 1: Janet and 2x KCI, LHPC Rep

10:30 - 12:00Public Meeting

12:15 - 15:00H/h Surveys (if req)

Mulungushi Kapini, Mingoji & Musopela Villages

Team 2: Lindsey and 2x KCI , LHPC Rep

10:30 - 12:00Public Meeting

None Required here

Mulungushi Villages close to transmission line and road from Muchinga to Mulungushi

Team 1: Janet and 2x KCI, LHPC Rep

10:00 - 12:00Public Meeting

12:15 - 14:00H/h Surveys (if req)

Mulungushi Villages close to transmission line and road from Muchinga to Mulungushi

Team 1: Janet and 2x KCI, LHPC Rep

14:30 - 15:45Public Meeting

Mulungushi Villages close to transmission line and road from Muchinga to Mulungushi

Team 2: Lindsey and 2x KCI , LHPC Rep

10:00 - 12:00Public Meeting

12:15 - 14:00H/h Surveys (if req)

Mulungushi Villages close to transmission line and road from Muchinga to Mulungushi

Team 2: Lindsey and 2x KCI , LHPC Rep

14:30 - 15:45Public Meeting

Friday 26-Jul

Saturday 27-Jul

Tuesday 23-Jul

Teams to capture some of their meeting minutes and plan for a way forward

Lindsey and Janet travel back to South Africa

25-Jul

24-JulWednesday

Thursday Travel to Kabwe for an overnight stay before

travelling to Lusaka and off to SA the next day

Close out day

22-Jul Travel to Mulungushi from Lunsemfwa

Monday

Page 17: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP DRAFT SCOPING REPORT

B3

B3 DEVELOPMENT PRESENTATION (GIVEN AT COMMUNITY MEETINGS)

Page 18: Annexure B: Consultation Materials

08/08/2013

1

The world’s leading sustainability consultancy

Muchinga Hydropower Plant Environmental & Social Impact Assessment

Stakeholder ConsultationJuly 2013

The world’s leading sustainability consultancy

Introduction

A joint venture between Lunsemfwa Hydro Power Company Limited (LHPC), Agua Imara AS (formerly SN Power Africa) and eleQtra(InfraCo) Ltd

Independent environmental consulting firm

Assisted by Jacob Chishiba of Zambia

The world’s leading sustainability consultancy

Purpose of the Meeting

3

To share information about the Muchinga HPP Project

To allow informants to raise concerns/ questions about the Project

To provide responses to concerns and questions, where possible, or to explore further as part of ESIA

The world’s leading sustainability consultancy

Project Motivation

4

Zambia has an estimated 6,000MW hydropower energy potential – clean & renewable energy

There is an energy deficit in Zambia, which is hindering the economic growth, industrial development and rural electrification

Increase energy generation in the country – in turn contributing to improved economic growth and industrial development

Page 19: Annexure B: Consultation Materials

08/08/2013

2

The world’s leading sustainability consultancy

5

Location of Muchinga HPP

Insert Map

The world’s leading sustainability consultancy

Existing Infrastructure at Lunsemfwa HPP

6

There is an existing HHP on the Lunsemfwa River

18MW installed capacity

Diversion dam, weir and canal

Penstock drop down the escarpment

3 turbines located in a surface power house

The world’s leading sustainability consultancy

New 330kV transmission line to the 14 Mile substation via Mulungushi HPP

Pressure tunnel from existing Lunsemfwa diversion canal to new Muchinga Dam

New dam on the Mkushi River

Paved access road from Muchinga HPP to Mulungushi HPP (35km)

• New surface powerhouse 3 x 85MW turbines

• Temporary accommodation, construction and batching camp

Pressure tunnel from Mkushi Dam to powerhouse

• Temporary internal roads• Quarry, spoils and crushing

facilities• Accommodation construction and

batching camp

• 33kV power line to supply the project during construction

• Internal access road

• Upgrade of Lunsemfwa diversion canal from diversion weir to pressure tunnel

• Transfer of flow from Lwanbulu into tunnel• Accommodation construction and batching camp

Temporary access roads

PROJECT DESCRIPTION

The world’s leading sustainability consultancy

Purpose of the ESIA

8

Undertaken to improve the environmental performance of a development, and to assist in government decision-making in issuing the environmental license

The Muchinga HPP ESIA will comply with:

Zambia’s Environmental Management Act (EMA) (Act 12 of 2011)

International standards and good practices (e.g. World Bank Group, International Finance Corporation (IFC)

Equator Principles

International Hydropower Association (IHA)

World Commission on Dams (WCD)

Page 20: Annexure B: Consultation Materials

08/08/2013

3

The world’s leading sustainability consultancy

ESIA Phases

9The world’s leading sustainability consultancy

Potential Environmental Impacts

10

A change in downstream river morphology due to sediment transport, could impact on riverine ecosystems

Loss of habitat at the inundation area of the Muchinga Dam

Impacts to terrestrial and aquatic fauna

Impact on aquatic and riverine habitats downstream from the Mkushi Dam

Impact on water quality which may have adverse impacts to downstream users

Impacts to soils and subsequent impacts to downstream water quality

The world’s leading sustainability consultancy

11The world’s leading sustainability consultancy

Potential Socio-economic Impacts

12

Positive impacts on the local economy

Impact on fishing activities (positive and negative)

Impact on current land use practices (esp. agricultural activities)

Loss of natural resources due to land clearing and inundation

Impacts related to in-migration: pressure on social infrastructureincreased access to the Luano GMA

Potential impacts on community health and safety

Potential impacts on cultural heritage resources

Page 21: Annexure B: Consultation Materials

08/08/2013

4

The world’s leading sustainability consultancy

Potential Cumulative Impacts

13

Lunsemfwa River Sub-Catchment:

Changes in river flow regimes

Water quality issues Biodiversity impacts

Downstream Users:

Impacts on natural resource

Impacts on agriculture

Impacts on health –nutrition

Downstream Users The world’s leading sustainability consultancy

ESIA Team

14

Environmental Resources Management (ERM)Mike Everett– project directorZoe Day – project manager

Specialist StudiesCultural hertiage Socio-economic Terrestrial ecology Aquatic ecologyHydrogeology

Further specialists will be appointed after scoping if required

The world’s leading sustainability consultancy

Next Steps

15

Scoping: June – July 2013

Baseline Studies: June – August 2013

Impact Assessment: August – September 2013

Reporting: February 2014

ESIA Disclosure: 2014

The world’s leading sustainability consultancy

Questions?

16

Thank you!

Page 22: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP DRAFT SCOPING REPORT

B4

B4 ISSUES AND CONCERNS LOG

Page 23: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

National Authorities Meeting

15-Jul-13 Government Officials Wildlife Authority Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Protected Areas How far is the Project from the nearest projected area?

It is adjacent to the Luano GMA, LHPC have obtained the necessary permissions to develop the Project so close to a GMA

National Authorities Meeting

15-Jul-13 Government Officials Wildlife Authority Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Protected Areas The Lukanga Swamps are in located near Kabwe and they are fed by rivers and aquifers. There is a concern that the tunnel and construction activities will impact of these swamps.

This will be explored during the ESIA, we can include an overlay showing the proximity to of the swamps to the project, but they are over 100km from the site.

To be further investigated by the ERM team

National Authorities Meeting

15-Jul-13 Government Officials Wildlife Authority Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Groundwater The Department of Water has been mapping the ground water in the area, and it shows that the Lukanga Swamp aquifer is quite extensive.

Noted.

National Authorities Meeting

15-Jul-13 Government Officials ERB Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Groundwater The above should be consolidated into the ESIA

Boreholes have been drilled (up to 50) and seismic surveys are being conducted as part of the goetech studies. This information can shared and there is potential to collaborate with Government on this.

National Authorities Meeting

15-Jul-13 Government Officials ERB Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Emergency Preparedness Is there an emergency preparedness plan in place? What will happen and who will be effected if the dam wall fails?

Dam safety is always a top concern, and LHPC are currently looking at the integrity of existing dams and the proposed new one. The communities below the dam that may be impacts by such an event will be mapped out during the ESIA.

National Authorities Meeting

15-Jul-13 Government Officials ERB Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Community Involvement Involvement of the chiefs, headman and communities is key in Project, sensitising them to the Project and ensuring that they are included and involved.

Recommendations included in the ESIA focus on maximising local employment and community involvement, creating opportunity for the local community.

National Authorities Meeting

15-Jul-13 Government Officials ERB Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Community Development Often with power generating projects, the local communities do not actually benefit from the power coming out of their area. The power lines just pass through without providing power

LHPC is aware of this, and does contribute towards the Rural Electrification Programme.

National Authorities Meeting

15-Jul-13 Government Officials OPPI Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Compensation How will you prevent people from settling on land ear-marked for the 330kV servitude once they find out where it will be, just to claim compensation.

The existing communities will be mapped as part of the SIA, and then people who settle in the area following the mapping may not be eligible for compensation.

National Authorities Meeting

15-Jul-13 Government Officials ERB Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Existing HHPs Will the Project impact on existing HPPs?

The existing Mulungushi and Lumsenfwa HHPs will cease to operate once these projects come online.

National Authorities Meeting

15-Jul-13 Government Officials Wildlife Authority Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Resettlement Will people be relocated? It is likely that a few households/ homestead might have to be relocated within their villages, especially those who reside close to the power lines and proposed roads.

National Authorities Meeting

15-Jul-13 Government Officials Wildlife Authority Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Water Quality There is a concern that in projects such as this, the water need of the downstream communities, including fauna, flora and human communities. The project could have unforeseen impacts on downstream users, and funds could be set aside to deal with these

The potential impacts on downstream communities will be explored in the ESIA. Like any other development there will be a contingency budget in place that will be used to mitigate any negative impacts on the natural environment and people should the need occur.

National Authorities Meeting

15-Jul-13 Government Officials OPPI Janet Mkhabela, Lindsey Bungartz, Friday Chibwe

Water Flow Water will be diverted from the Lumsenfwa diversion weir to the new HHP, correct. So there is quite a long stretch of river where the flows will change.

This is correct, there will be a 20km stretch of the Lumsenfwa, where at present it is 5km.

Page 24: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Provincial Authorities Meeting

16-Jul-13 Government Officials Provincial Planners Janet Mkhabela, Dannie Mkonde

Borrow Pits Borrow pits/ quarries' tend to cause a lot of soil erosion and poses a danger to communities, how will this be mitigated?

This will be investigated in the in the ESIA. There are currently no people residing close to the borrow pit sites as such they are not expected to harm anyone but these will be fenced of when in use and signage will be placed to warn those who wander close to the areas.

Provincial Authorities Meeting

16-Jul-13 Government Officials Provincial Planners Janet Mkhabela, Dannie Mkonde

Site Visit for Authorities The Provincial planners and some other key stakeholders need to see these sites.

The request has been noted and it will be forwarded to the LHPC for consideration.

Provincial Authorities Meeting

16-Jul-13 Government Officials Provincial Planners Janet Mkhabela, Dannie Mkonde

CSR Programmes What CSR considerations have been made by the company?

Nothing concrete at present, the LHPC is waiting for the SIA to see what the immediate needs of the communities are. But they have undertaken some CSR projects in the past such as the upgrading/ renovation of the maternity ward at Kabwe General Hospital

Mkushi District Authorities' Meeting

17-Jul-13 Government Officials District Planners Janet Mkhabela, Dannie Mkonde

Affected People How many people will be affected by the project?

Not sure at present, but we anticipate that a large number of people will be affected by various activities associated with the project, especially those who reside along the roads that will transport goods and other services to and from site.

Mkushi District Authorities' Meeting

17-Jul-13 Government Officials District Planners Janet Mkhabela, Dannie Mkonde

Communication The LHPC better communicate with all the relevant stakeholders including Districts, Chiefs and communities.

Noted. Conversations with Chiefs are already underway

Mkushi District Authorities' Meeting

17-Jul-13 Government Officials District Planners Janet Mkhabela, Dannie Mkonde

Communication Districts need to be engaged better and any documents signed between Chiefs and LHPC should also be forwarded to the District offices for record keeping and for assistance to the LHPC should something go wrong

Noted.

Mkushi District Authorities' Meeting

17-Jul-13 Government Officials District Planners Janet Mkhabela, Dannie Mkonde

Land Issues Chiefs can only give up to 200ha of land, if more land is required then the Council Commissioner of Lands need to approve the request.

Noted.

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials District Administrator Janet Mkhabela, Dannie Mkonde

Site Visit for Authorities District authorities need to visit the site so that they can see for themselves where the project is going to be located and how it is likely to affect people.

The request has been noted and it will be forwarded to the LHPC for consideration.

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials District Administrator Janet Mkhabela, Dannie Mkonde

General Thank you for informing us of the project.

Noted.

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials District Administrator Janet Mkhabela, Dannie Mkonde

Economic Benefits The project will have good impacts in terms of economic development of the District, as such the LHPC has its support.

Noted

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials District Administrator Janet Mkhabela, Dannie Mkonde

Access to the Luano Valley

Gaining access to the Luano Valley will significantly improve the lives of the population in this area.

Noted.

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials DEBS Janet Mkhabela, Dannie Mkonde

Economic Development Kapiri mposhi lacks developments and any development that is likely to facilitate economic development of the district is welcomed.

Noted.

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials DEBS Janet Mkhabela, Dannie Mkonde

CSR Programmes What CSR considerations have been made by the company?

Nothing concrete at present, the LHPC is waiting for the SIA to see what the immediate needs of the communities are. But they have undertaken some CSR projects in the past such as the upgrading/ renovation of the maternity ward at Kabwe General Hospital

Kapiri Mposhi Authorities' Meeting

17-Jul-13 Government Officials DEBS Janet Mkhabela, Dannie Mkonde

CSR Programmes With the project there is a likelihood of CSR spill over from other development that will be induced by the increased electricity generation in the district.

Yes, there is a potential for other developments coming out of the implementation of the project.

Page 25: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

Communication LHPC does not engage with Chiefs in the area unless they want something.

Noted.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

Job Creation Promises of job creation by the LHPC is not false because the company employs a limited number of people and none of which are from Mukonchi Chiefdom. They bring people from other places and from other chiefdoms

Noted. The issue of your people not being employed by the LHPC will be passed on to the company to address. Please note that there will be plenty of temporary jobs as part of construction but limited jobs as part of operations.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

CSR Programmes The promises related to CSR are also an non-starter. The LHPC doesn’t give back to me as a Chief, how are they going to give back to my people then?

Noted.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

General Chief Mukonchi has no objection to the proposed project.

Noted.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

Communication The LHPC should put adequate attention to and improve on offering services to the locals and stop paying lip services. If they can come and lie to me as a chief about their promises what more of my subjects?

Noted.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

Unmet Promises LHPC makes empty promises; for instance, they promised to build a house for the chief but this has not been fulfilled yet.

Noted.

Traditional Authority's Meeting

17-Jul-13 Traditional Authorities HRH Chief Mukonchi Lindsey Bungartz, Felix Chisha, Derrick Mwape, Enock Silwamba

Communication The Chief is aware of the proposed Muchinga project; and has been waiting for the LHPC to engage him about the project.

Noted.

Traditional Authority's Meeting

18-Jul-13 Traditional Authorities HRH Chief Kanyanshye

Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula

Loss of Land How many households are likely to loose land because of the project?

This information is not available at present. This will be determined later on during the resettlement action plan household survey.

Traditional Authority's Meeting

18-Jul-13 Traditional Authorities HRH Chief Kanyanshye

Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula

General Provide the Chief with the same map you are using for the consultation.

Noted. The requested map was sent to the Chief.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality What will be the quality of water during construction?

The water quality should remain the same unless a non-routine event occurs something that can get the water dirty or contaminated.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Flow How low will the water levels be and when will this happen?

The environmental flow studies are being undertaken at present. Its important to note that the water levels will be affected upstream only, downstream there will be no effects. You are located downstream so you will not be affected.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Flow Usually water levels go down faster here than up there, clarify how worse that will be?

Again the environmental flow studies will provide a better information once completed.

Page 26: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Community Benefits When will the benefits for the community come?

Usually benefits linked to project start 1 to 2 years once operations begin.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality Won’t there be changes in the colour of water?

Not expected unless a non-routine event occurs.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Resettlement Chimika Village which is upstream near the proposed powerhouse. Will they be resettled then?

Chimika village is located 20km from the powerhouse so its not likely to be affected.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Community Benefits Will there be educational benefits? Yes, community benefits will be based on the immediate needs of each affected community.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Job Creation Are there jobs for women? Yes there will be opportunities for women especially in the construction camps as chefs, cleaners, etc. Furthermore, women can sell some of their food produce to the construction camps to feed the workers.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Community Benefits What will the company do for us? CSR programmes will be in place which will deal with benefits to communities. The community benefits will be based on the immediate needs of each affected community.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality Concerned about water quality Nothing will change the water quality unless a non-routine event occurs.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality What if you kill the fish because o f the changes in the water quality?

No.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Grievance Protocol The LHPC offices are far away from the chembe communities and it will not be practical for people to go and report any changes to the water quality and many people could die before LHPC hears about eventualities such as that

There will be community liaison officers during construction who will be able facilitate easy communication between the LHPC and the communities so no one will need to walk long distance to report anything.

Page 27: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality The last time you were here you said you will sink boreholes for us since water in the river will be contaminated during construction of dam.

No we did not say that: what we said was that construction activities closest to the river are likely to cause sedimentation and change the quality of the water but all necessary measures will be adapted to ensure that this doesn’t occur. Further, should the water quality change such that it is not safe to consume a contingency budget will be used to make that alternative portable water sources are available for the communities. Those present at the meeting suggested that the LHPC should just drill boreholes for them now rather than wait until something bad happens. We said that the suggestion will be noted and passed onto the LHPC for consideration.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Water Quality I support that there was no such promise from you people that you will sink a borehole here. Most people who are saying that did not even attend the first meeting you called. It’s good that you have clarified this issue to the people and we welcome your message today. You are welcome here

Yes, and thank you. Please in the future ensure that when relaying information to other people you do not distort it. Cause this can cause tension and unnecessary fears.

Village/Community Meeting 20-Jul-13 Downstream DwellersChembe Central, Sipunu, Chindebele, and others

Chembe Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Communication Will we be updated on the progress of the project?

Yes, we (consultants) will be returning in March to feedback on the specialist findings and to go through some of the mitigation measures that have been developed with you.

Village/Community Meeting 21-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

New Apostolic Church Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Project Commencement When is the project going to commencing?

In 2018. Pre-construction activities will are likely to commence earlier, say, 2016.

Village/Community Meeting 21-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Pentecostal Assemblies of God Church

Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

CSR Programmes What benefits are there for the Church? Could we assume that you are just using the Church to disseminate your project only?

Note sure yet but that will be determined later in the project when the LHPC starts rolling out CSR projects and programs

Village/Community Meeting 21-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Pentecostal Assemblies of God Church

Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Benefits for the Directly Affected

Are there benefits for those that will be directly affected?

Not really, but those directly affected will receive compensation should they experience economic or physical losses of land.

Village/Community Meeting 21-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Roman Catholic Church

Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Disadvantages of Being Close to the Project

What are the disadvantages of being in the project area, won’t we be affected?

The project area is very far from here but since the road might be nearby, maybe you might have more dust and noise from trucks passing through this place enroute to the project area.

Page 28: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Janet Mkhabela, Dannie Mkonde, Alick Kamanga, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Community Benefits Do you have any plans for community/school? Look at how dilapidated this school is, it’s a safety hazard to the pupils.

The LHPC has in the recent past built 2 classroom blocks and has even given this school free electricity. The company has also built a teachers’ house. CSR is still top priority. Advised the school management ton put all the requests in writing like other schools have been doing since it is easier for LHPC to make follow-ups that way

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Alick Kamanga, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Resettlement What will happen to those who are directly affected?

There will be compensation for those that will be directly affected. However, displacement will be avoided at all cost unless in areas where there will be no options.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Alick Kamanga, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Concern re Pressure Tunnel

There are rumours that the pressure tunnel will pass through villages?

No. the tunnel will be approx. 100m below ground. No villages will be affected even though some activities such as mining above these tunnels will be restricted to avoid damage. Agricultural activities will be allowed.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Alick Kamanga, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Working Conditions and Salaries

The project sounds good on paper but salaries/wages from such projects tend to be so low, that we don’t even feel excited about such projects. Kindly ensure that workers engaged on this project are properly paid and that proper working conditions are put in place.

Noted.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Alick Kamanga, Lindsey Bungartz, Felix Chisha, Derrick Mwape

Job Creation What is in it for our women, because we have very strong women here, stronger than men?

Positions will be opened to both sexes.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Janet Mkhabela, Dannie Mkonde, Levy Ntinga

Nepotism LHPC is known for nepotism when it comes to employment. Please ensure that the employment opportunities are distributed evenly.

Noted. We will make sure that sure a mitigation measure is provided.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Janet Mkhabela, Dannie Mkonde, Levy Ntinga

Concern re Pressure Tunnel

I do not want to have a pressure tunnel below my house.

Noted. But the tunnel will be 100 to 150 metres below ground so you will see it or hear it.

Village/Community Meeting 22-Jul-13 Upstream DwellersKalungeleka, Kwambumba, Lutampo, Shipili and others

Kanyanshye Chiefdom Janet Mkhabela, Dannie Mkonde, Levy Ntinga

Previous Resettlement We were resettled before by the LHPC so we are wondering if we are going to be resettled again.

No you will not be resettled unless you are too close to the road and there is no alternative for the realignment of the road in a particular area.

The community acknowledged that they were resettled from the property boundary of the LHPC by ZCCM and they were fairly compensated.

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Job Creation How are we going to take part in employment?

Locals will be given top priority based on skill, education and experienced. Basic training will be offered prior to project commencement.

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Employment Criteria What is the application/ qualification criteria?

A criteria will be set in the Employment and Recruitment Policy and communicated with the general public.

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Resettlement Will those too close to the road be resettled?

Some might have too, especially those too close to certain sections that may need to be extended. But those who are affected will be consulted individually by the LHPC and relevant consultants.

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Communication Headman must ensure that we are updated on project progress so that we know when to apply for jobs.

Noted.

Page 29: Annexure B: Consultation Materials

Consultation Type Date Type of Stakeholders Organisation ERM & LHPC Representatives

Discussion Areas Issue Description Response/Action Description Additional Notes

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Project Commencement When is the project commencing? In 2018. Pre-construction activities will are likely to commence earlier, say, 2016.

Village/Community Meeting 25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Working Conditions and Salaries

Are we to relocate to project site once jobs are given?

Not sure if everyone will be expected to stay at the camp or not. This will be clarified close to the commencement of construction.

25-Jul-13 Upstream DwellersSipaida

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Road Will the road pass through our village?

Yes, through some areas of the greater Sipaida village.

Ad hoc Meeting 26-Jul-13 Upstream Dwellers Mlenge Market

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

NRC Cards When are we expected to receive our NRC cards back?

We have heard of this issue about the NRC cards being taken by the LHPC contractor. The LHPC has been made aware of this and it will be address shortly.

Village/Community Meeting 26-Jul-13 Upstream DwellersCelemente and Chimika

Mukonchi and Chembe Chiefdoms

Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Water Supply Problems The main problem in these villages is the shortage of water, will the LHPC assist in this regard?

It is possible to assist only through the CSR programmes. This will be active once the project has started operating.

Village/Community Meeting 26-Jul-13 Upstream DwellersCelemente and Chimika

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Road Will the road follow the current Longolong road or will it be a new one completely?

From what we have seen of the road, its following some existing foot trails. A Google Earth map was shown to stakeholders of where the road will be located.

Village/Community Meeting 26-Jul-13 Upstream DwellersCelemente and Chimika

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Job Creation How are we going to take part in employment?

Locals will be given top priority based on skill, education and experienced. Basic training will be offered prior to project commencement.

Village/Community Meeting 26-Jul-13 Upstream DwellersCelemente and Chimika

Mukonchi Chiefdom Janet Mkhabela, Dannie Mkonde, Brenda Lautula, Lindsey Bungartz, Felix Chisha, Derrick Mwape, Levy Ntinga

Employment Criteria What is the application/ qualification criteria?

A criteria will be set in the Employment and Recruitment Policy and communicated with the general public.

Page 30: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP

B12

B5 PROOF OF CONSULTATION: PHOTOLOG AND ATTENDANCE REGISTERS FROM AUTHORITY AND COMMUNITY CONSULTATIONS (Incl.)

INVITATION LETTERS TO THE CHIEFS AND GOVERMENT AUTHORITIES

B5.1 PHOTOLOG

Page 31: Annexure B: Consultation Materials

04 July 2013 Dear XXX, As a way of introducing myself, my name is Janet Mkhabela. I work for the Environmental Resources Management (ERM), an environmental consulting firm based in South Africa. ERM was commissioned by the Lunsemfwa Hydropower Company (LHPC) in 2011 to undertake an Environmental and Social Impact Assessment (ESIA) for the proposed development of the Muchinga Hydropower Plant at the confluence of Mkushi and Lunsemfwa Rivers. The scope of the Muchinga project in 2011 comprised of the construction of the dam, inundation areas, pressure tunnel, powerhouse, and workers’ village. However, the LHPC has decided to add some new components to the project which include: • A transmission line and the road connecting the new Mulungushi HPP and the

Muchinga HPP; • Quarry and crushing area; • Multiple permanent and temporary roads in and around the Project Site; and • A transmission line connecting Muchinga HPP and Lunsemfwa HPP. These are significant changes to the project and by Law we are required to restart the ESIA and its related Public Participation Process, thus we write you this communication. We would like to request an audience with His Highness to provide you with more information regarding the project. My colleague, Lindsey Bungartz and I would like to visit His Highness at His palace on the 18th of July 2013 at 10:00am. The purpose of the meeting will be to: 1. Re-introduce the Muchinga Project (including the old and new scope); 2. Discuss potential positive and negative impacts; and 3. Allow his Highness the opportunity to raise concerns and issues regarding

the project. Could His Highness let me know if this day is suitable for Him? Should His Highness have any questions regarding this letter, he can contact me, via email [email protected] or Mr Enock Silwamba (LHPC) 0977780625. Yours Sincerely,

Ms Janet Mkhabela Social Impact and Public Participation Specialist

Page 32: Annexure B: Consultation Materials
Page 33: Annexure B: Consultation Materials
Page 34: Annexure B: Consultation Materials
Page 35: Annexure B: Consultation Materials
Page 36: Annexure B: Consultation Materials
Page 37: Annexure B: Consultation Materials
Page 38: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP

B19

B5.2 ATTENDANCE REGISTERS FROM AUTHORITY AND COMMUNITY CONSULTATIONS

Page 39: Annexure B: Consultation Materials
Page 40: Annexure B: Consultation Materials
Page 41: Annexure B: Consultation Materials
Page 42: Annexure B: Consultation Materials
Page 43: Annexure B: Consultation Materials
Page 44: Annexure B: Consultation Materials
Page 45: Annexure B: Consultation Materials
Page 46: Annexure B: Consultation Materials
Page 47: Annexure B: Consultation Materials
Page 48: Annexure B: Consultation Materials
Page 49: Annexure B: Consultation Materials
Page 50: Annexure B: Consultation Materials
Page 51: Annexure B: Consultation Materials
Page 52: Annexure B: Consultation Materials
Page 53: Annexure B: Consultation Materials
Page 54: Annexure B: Consultation Materials
Page 55: Annexure B: Consultation Materials
Page 56: Annexure B: Consultation Materials
Page 57: Annexure B: Consultation Materials
Page 58: Annexure B: Consultation Materials
Page 59: Annexure B: Consultation Materials
Page 60: Annexure B: Consultation Materials
Page 61: Annexure B: Consultation Materials
Page 62: Annexure B: Consultation Materials
Page 63: Annexure B: Consultation Materials
Page 64: Annexure B: Consultation Materials
Page 65: Annexure B: Consultation Materials
Page 66: Annexure B: Consultation Materials
Page 67: Annexure B: Consultation Materials
Page 68: Annexure B: Consultation Materials
Page 69: Annexure B: Consultation Materials
Page 70: Annexure B: Consultation Materials
Page 71: Annexure B: Consultation Materials
Page 72: Annexure B: Consultation Materials
Page 73: Annexure B: Consultation Materials
Page 74: Annexure B: Consultation Materials
Page 75: Annexure B: Consultation Materials
Page 76: Annexure B: Consultation Materials
Page 77: Annexure B: Consultation Materials
Page 78: Annexure B: Consultation Materials
Page 79: Annexure B: Consultation Materials
Page 80: Annexure B: Consultation Materials
Page 81: Annexure B: Consultation Materials
Page 82: Annexure B: Consultation Materials
Page 83: Annexure B: Consultation Materials
Page 84: Annexure B: Consultation Materials
Page 85: Annexure B: Consultation Materials
Page 86: Annexure B: Consultation Materials
Page 87: Annexure B: Consultation Materials
Page 88: Annexure B: Consultation Materials
Page 89: Annexure B: Consultation Materials
Page 90: Annexure B: Consultation Materials
Page 91: Annexure B: Consultation Materials
Page 92: Annexure B: Consultation Materials
Page 93: Annexure B: Consultation Materials
Page 94: Annexure B: Consultation Materials
Page 95: Annexure B: Consultation Materials
Page 96: Annexure B: Consultation Materials
Page 97: Annexure B: Consultation Materials
Page 98: Annexure B: Consultation Materials
Page 99: Annexure B: Consultation Materials
Page 100: Annexure B: Consultation Materials
Page 101: Annexure B: Consultation Materials
Page 102: Annexure B: Consultation Materials
Page 103: Annexure B: Consultation Materials
Page 104: Annexure B: Consultation Materials
Page 105: Annexure B: Consultation Materials
Page 106: Annexure B: Consultation Materials
Page 107: Annexure B: Consultation Materials
Page 108: Annexure B: Consultation Materials
Page 109: Annexure B: Consultation Materials
Page 110: Annexure B: Consultation Materials
Page 111: Annexure B: Consultation Materials
Page 112: Annexure B: Consultation Materials
Page 113: Annexure B: Consultation Materials
Page 114: Annexure B: Consultation Materials
Page 115: Annexure B: Consultation Materials
Page 116: Annexure B: Consultation Materials
Page 117: Annexure B: Consultation Materials
Page 118: Annexure B: Consultation Materials
Page 119: Annexure B: Consultation Materials
Page 120: Annexure B: Consultation Materials
Page 121: Annexure B: Consultation Materials
Page 122: Annexure B: Consultation Materials
Page 123: Annexure B: Consultation Materials
Page 124: Annexure B: Consultation Materials
Page 125: Annexure B: Consultation Materials
Page 126: Annexure B: Consultation Materials
Page 127: Annexure B: Consultation Materials
Page 128: Annexure B: Consultation Materials
Page 129: Annexure B: Consultation Materials
Page 130: Annexure B: Consultation Materials
Page 131: Annexure B: Consultation Materials
Page 132: Annexure B: Consultation Materials
Page 133: Annexure B: Consultation Materials
Page 134: Annexure B: Consultation Materials
Page 135: Annexure B: Consultation Materials
Page 136: Annexure B: Consultation Materials
Page 137: Annexure B: Consultation Materials
Page 138: Annexure B: Consultation Materials
Page 139: Annexure B: Consultation Materials
Page 140: Annexure B: Consultation Materials
Page 141: Annexure B: Consultation Materials
Page 142: Annexure B: Consultation Materials
Page 143: Annexure B: Consultation Materials
Page 144: Annexure B: Consultation Materials
Page 145: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP

17

B6 PROOF OF ADVERTISEMENTS

Page 146: Annexure B: Consultation Materials
Page 147: Annexure B: Consultation Materials
Page 148: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP

19

B7 PROOF OF SITE NOTICES

Page 149: Annexure B: Consultation Materials

v

NOTIFICATION OF AN ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE MUCHINGA HYDROPOWER PROJECT

The Muchinga Power Company Limited (MPC) is considering developing a 255MW hydropower project (HPP) on the Mkushi River, approximately 6km from the confluence of the Lunsemfwa and Mkushi Rivers. The Mulungushi HPP will be located in the Central Province of Zambia, approximately 80km to the south-east of Kabwe, and it is situated within the greater Lunsemfwa River Catchment. Project activities will include:

• Construction of a new surface powerhouse • Construction of a new dam on the Mkushi River • Construction of a pressure tunnel from the existing Lunsemfwa Diversion Weir to the

Muchinga Dam • Construction of a pressure tunnel from Mkushi Dam to new power house, which will have 3 x

85MW turbines • Construction of an access road, approximately 35km in length, from the Mulungushi HPP to

the Muchinga HPP • Additional onsite infrastructure such as internal roads, construction camps, quarries and

batching plants

PUBLIC PARTICIPATION PROCESS An Environmental and Social Impact Assessment (ESIA) will need to be completed for this Project in terms of the Zambian Environmental Management Act (EMA) (Act 12 of 2011) and submitted to the Zambian Environmental Management Authority (ZEMA) for their consideration. Environmental Resources Management (ERM), an independent environmental assessment consultancy, has been appointed to undertake the ESIA and associated public participation processes in collaboration with a local partner, Kaizen Consulting International (KCI). This advertisement serves as notification of the commencement of the public participation process for the ESIA. You are invited to register as a stakeholder and to participate in the ESIA and public participation processes. As a stakeholder you will be kept informed of the ESIA process, you will have the opportunity to comment on the ESIA and raise your issues/concerns about the Project.

To register as a stakeholder, you can contact Mr Friday Chibwe Projects Manager at LHPC, by email: [email protected] or by telephone on +260

215 224597. For additional information on the Project, you can visit the Project website: http://www.erm.com/MuchingaESIA

Page 150: Annexure B: Consultation Materials

v

ICHISHIBISHO CHAMILIMO YAKUCHENCHENTA IMIKALILE YAMPANGA IYO ILI KUNCHENDE KUNTU KUKABELA IMILIMO YABA MUCHINGA HYDROPOWER PROJECT

Imilimo ikabombwa itantikwe ifi:

• Ukukula ing’anda yakupangilamo amalaiti • Ukukula ichishiba chipya pamumana wa Mkushi • Ukwimba ubwendo ubulekuminkanya umumana wa Lunsemfwa kuchishiba cha Muchinga • Ukwimba ubwendo ukufuma ku chishiba cha Mkushi ukutwala kung’anda ipya

iyakupangilamo amalaiti umo mukaba ba mashini batatu aba 85MW • Ukupanga umusebo uulepele amakumi yatatu na tusano (35Km) ukufuma ku Mulungushi HPP

ukufika ku Muchinga HPP • Ukukula fyonse ifikafwaikwa ifyapala utumisebo twa tondo, amayanda yababomfi, nefyashala.

construction camps, quarries and batching plants

INSHILA YAKU SENDELAMO ULUBALI KUBEKALA CHALO Umulimo waku chenchenta uwa ESIA ulefwaikwa ukupwa pakuti iyi inchito itwalilile ukulingana nolupapulo lwa misungile ya nchende twikalamo (EMA) (Ichipandwa chalenga lkumi limo nafibili ica mu mwaka wa 2011), (Act 12 of 2011), elyo panuma nokutwala iyi ESIA kuli ba ZEMA bene pakutila nabo bachenchente ubukumu buli muli iyi inchito. Akamapani ketwa Environmental Resources Management (ERM) ako kaibombela mumilimo yamisungile ya mpanga, kalisontwa ukuchita uyu mulimo uulemona pa misungile ya mpanga elyo nembali abekala chalo benga sendamo ukwampana pamo nakampani kamuchalo chesu aketwa Kaizen Consulting International (KCI). Ichi ichishibisho chiletuchinkulako ukutendeka kwa kweba abekala chalo ukutila inshita yafika iyakusendamo ulubali muli uyu ESIA. Mukwai muli abaitwa bonse ukulembesha ngoulefwaya ukusendamo ulubali muli iyi ESIA. Ngaulya chikumishe, twakulamichinkulako atemwa ukumyeba efyo uyu ESIA aleyenda, kaili mwakulapelwa inshita yakuti naimwe mwalandapo pali uyu ESIA pakuti naimwe mwatwebako amasakamiko atemwa ubukumu bwa iyi imilimo. Ngamulefwaya ukulembesha nga ulefwaya ukusendamo ulubali, moneni batata ba FRIDAY CHIBWE,

bakakumba bamilimo ku LHPC, batumineni pa email: [email protected] atemya pali lamya +260 215 224597. Ngamulefwaya ukwishibilapo nafimbi pali iyi milimo, kabiyeni ku:

http://www.erm.com/MuchingaESIA

Page 151: Annexure B: Consultation Materials

Site Notices

Provincial Office

Mlenge Informal Market

Lunsemfwa General Store Road to Lunsemfwa HPP and Project Site

Chembe Health Centre Celemente Community School

Page 152: Annexure B: Consultation Materials

ENVIRONMENTAL RESOURCES MANAGEMENT MULUNGUSHI HPP

24

B8 MEETING MINUTES TEMPLATE

Page 153: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: National Authorities Meeting

Venue

Golden Peacock Hotel, Lusaka

Date of Meeting

15 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response The above should be consolidated into the ESIA

Boreholes have been drilled (up to 50) and seismic surveys are being conducted as part of the goetech studies. This information can share and there is potential to collaborate with Government on this.

Is there an emergency preparedness plan in place? What will happen and who will be affected if the dam wall fails?

Dam safety is always a top concern, and LHPC are currently looking at the integrity of existing dams and the proposed new one. The communities below the dam that may be impacts by such an event will be mapped out during the ESIA.

Involvement of the chiefs, headman and communities is key in Project, sensitising them to the Project and ensuring that they are included and involved.

Recommendations included in the ESIA focus on maximising local employment and community involvement, creating opportunity for the local community.

Often with power generating projects, the local communities do not actually benefit from the power coming out of their area. The power lines just pass through without providing power

LHPC is aware of this, and does contribute towards the Rural Electrification Programme.

How will you prevent people from settling on land ear-marked for the 330kV servitude once they find out where it will be, just to claim compensation?

The existing communities will be mapped as part of the SIA, and then people who settle in the area following the mapping may not be eligible for compensation.

Will the Project impact on existing HPPs?

The existing Mulungushi and Lumsenfwa HHPs will cease to operate once these projects come online.

Will people be relocated? It is likely that a few households/ homestead might have to be relocated within their villages, especially those who reside close to the power lines and proposed roads.

There is a concern that in projects such as this, the water need of the downstream communities, including fauna, flora and human communities. The project could have unforeseen impacts on downstream users, and funds could be set aside to deal with these.

The potential impacts on downstream communities will be explored in the ESIA. Like any other development there will be a contingency budget in place that will be used to mitigate any negative impacts on the natural environment and people should the need occur.

Water will be diverted from the Lumsenfwa diversion weir to the new HHP, correct. So there is quite a long stretch of river where the flows will change.

This is correct; there will be a 20km stretch of the Lumsenfwa, where at present it is 5km.

Page 154: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Provincial Authorities Meeting

Venue

Provincial Office

Date of Meeting

16 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response Borrow pits/ quarries' tend to cause a lot of soil erosion and poses a danger to communities, how will this be mitigated?

This will be investigated in the in the ESIA. There are currently no people residing close to the borrow pit sites as such they are not expected to harm anyone but these will be fenced of when in use and signage will be placed to warn those who wander close to the areas.

The Provincial planners and some other key stakeholders need to see these sites.

The request has been noted and it will be forwarded to the LHPC for consideration.

What CSR considerations have been made by the company?

Nothing concrete at present, the LHPC is waiting for the SIA to see what the immediate needs of the communities are. But they have undertaken some CSR projects in the past such as the upgrading/ renovation of the maternity ward at Kabwe General Hospital.

Page 155: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Kapiri Mposhi District Authorities Meeting

Venue

Kapiri Mposhi District Office

Date of Meeting

17 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response District authorities need to visit the site so that they can see for themselves where the project is going to be located and how it is likely to affect people.

The request has been noted and it will be forwarded to the LHPC for consideration.

Thank you for informing us of the project.

Noted.

The project will have good impacts in terms of economic development of the District; as such the LHPC has its support.

Noted

Gaining access to the Luano Valley will significantly improve the lives of the population in this area.

Noted.

Kapiri mposhi lacks developments and any development that is likely to facilitate economic development of the district is welcomed.

Noted.

With the project there is a likelihood of CSR spill over from other development that will be induced by the increased electricity generation in the district.

Yes, there is a potential for other developments coming out of the implementation of the project.

What CSR considerations have been made by the company?

Nothing concrete at present, the LHPC is waiting for the SIA to see what the immediate needs of the communities are. But they have undertaken some CSR projects in the past such as the upgrading/ renovation of the maternity ward at Kabwe General Hospital.

Page 156: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Mkushi District Authorities Meeting

Venue

Mkushi District

Date of Meeting

17 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response How many people will be affected by the project?

Not sure at present, but we anticipate that a large number of people will be affected by various activities associated with the project, especially those who reside along the roads that will transport goods and other services to and from site.

The LHPC better communicate with all the relevant stakeholders including Districts, Chiefs and communities.

Noted. Conversations with Chiefs are already underway

Districts need to be engaged better and any documents signed between Chiefs and LHPC should also be forwarded to the District offices for record keeping and for assistance to the LHPC should something go wrong.

Noted.

Chiefs can only give up to 200ha of land, if more land is required then the Council Commissioner of Lands need to approve the request.

Noted.

Page 157: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: HRH Chief Mukonchi Meeting

Venue

HRH Chief Mukonchi’s Palace

Date of Meeting

17 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response LHPC does not engage with Chiefs in the area unless they want something.

Noted.

A promise of job creation by the LHPC is not false because the company employs a limited number of people and none of which are from Mukonchi Chiefdom. They bring people from other places and from other chiefdoms.

Noted. The issue of your people not being employed by the LHPC will be passed on to the company to address. Please note that there will be plenty of temporary jobs as part of construction but limited jobs as part of operations.

The promises related to CSR are also an non-starter. The LHPC doesn’t give back to me as a Chief, how are they going to give back to my people then?

Noted.

Chief Mukonchi has no objection to the proposed project.

Noted.

The LHPC should put adequate attention to and improve on offering services to the locals and stop paying lip services. If they can come and lie to me as a chief about their promises what more of my subjects?

Noted.

LHPC makes empty promises; for instance, they promised to build a house for the chief but this has not been fulfilled yet.

Noted.

The Chief is aware of the proposed Muchinga project; and has been waiting for the LHPC to engage him about the project.

Noted.

Page 158: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: HRH Chief Kanyanshye Meeting

Venue

HRH Chief Kanyanshye’s Palace

Date of Meeting

18 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response How many households are likely to loose land because of the project?

This information is not available at present. This will be determined later on during the resettlement action plan household survey.

Provide the Chief with the same map you are using for the consultation.

Noted.

Page 159: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Downstream Dwellers Meeting

Venue

Chembe Central Village

Date of Meeting

20 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response What will be the quality of water during construction?

The water quality should remain the same unless a non-routine event occurs something that can get the water dirty or contaminated.

How low will the water levels be and when will this happen?

The environmental flow studies are being undertaken at present. It is important to note that the water levels will be affected upstream only; downstream there will be no effects. You are located downstream so you will not be affected.

Usually water levels go down faster here than up there, clarify how worse that will be?

Again the environmental flow studies will provide better information once completed.

When will the benefits for the community come? Usually benefits linked to project start 1 to 2 years once operations begin.

Won’t there be changes in the colour of water? Not expected unless a non-routine event occurs.

Chimika Village which is upstream near the proposed powerhouse. Will they be resettled then?

Chimika village is located 20km from the powerhouse so it is not likely to be affected.

Will there be educational benefits? Yes, community benefits will be based on the immediate needs of each affected community.

Are there jobs for women? Yes there will be opportunities for women especially in the construction camps as chefs, cleaners, etc. Furthermore, women can sell some of their food produce to the construction camps to feed the workers.

What will the company do for us? CSR programmes will be in place which will deal with benefits to communities. The community benefits will be based on the immediate needs of each affected community.

Concerned about water quality Nothing will change the water quality unless a non-routine event occurs.

What if you kill the fish because of the changes in the water quality?

This is not expected, unless an extreme event occurs.

The LHPC offices are far away from the Chembe communities and it will not be practical for people to go and report any changes to the water quality and many people could die before LHPC hears about eventualities such as that.

There will be community liaison officers during construction who will be able facilitate easy communication between the LHPC and the communities so no one will need to walk long distance to report anything.

The last time you were here you said you will sink boreholes for us since water in the river will be contaminated during construction of dam.

No we did not say that; what we said was that construction activities closest to the river are likely to cause sedimentation and change the quality of the water but all necessary measures will be adapted to ensure that this doesn’t occur.

Page 160: Annexure B: Consultation Materials

Meeting minutes

Comment/ Issue Response Further, should the water quality change such that it is not safe to consume a contingency budget will be used to make that alternative portable water sources are available for the communities. Those present at the meeting suggested that the LHPC should just drill boreholes for them now rather than wait until something bad happens. We said that the suggestion will be noted and passed onto the LHPC for consideration.

I support that there was no such promise from you people that you will sink a borehole here. Most people who are saying that did not even attend the first meeting you called. It’s good that you have clarified this issue to the people and we welcome your message today. You are welcome here.

Yes, and thank you. Please in the future ensure that when relaying information to other people you do not distort it. This can cause tension and unnecessary fears.

Will we be updated on the progress of the project? Yes, we (consultants) will be returning in March to feedback on the specialist findings and to go through some of the mitigation measures that have been developed with you.

Page 161: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Meetings at Local Churches

Venue

New Apostolic Church; Pentecostal Assemblies of God Church; and Roman Catholic Church

Date of Meeting

21 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response When is the project going to commencing? In 2018. Pre-construction activities will are likely

to commence earlier, say, 2016.

What benefits are there for the Church? Could we assume that you are just using the Church to disseminate your project only?

Note sure yet but that will be determined later in the project when the LHPC starts rolling out CSR projects and programs

Are there benefits for those that will be directly affected?

Not really, but those directly affected will receive compensation should they experience economic or physical losses of land.

What are the disadvantages of being in the project area, won’t we be affected?

The project area is very far from here but since the road might be nearby, maybe you might have more dust and noise from trucks passing through this place en-route to the project area.

Page 162: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Upstream Dwellers: Kalungeleka, Kwambumba, Lutampo, Shipili and others Meetings

Venue

Chimbolo Community School and Lunsemfwa Primary School

Date of Meeting

22 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response Do you have any plans for community/school? Look at how dilapidated this school is, it’s a safety hazard to the pupils.

The LHPC has in the recent past built 2 classroom blocks and has even given this school free electricity. The company has also built a teachers’ house. CSR is still top priority. Advised the school management ton put all the requests in writing like other schools have been doing since it is easier for LHPC to make follow-ups that way.

What will happen to those who are directly affected? There will be compensation for those that will be directly affected. However, displacement will be avoided at all cost unless in areas where there will be no options.

There are rumours that the pressure tunnel will pass through villages?

No. the tunnel will be approx. 100m below ground. No villages will be affected even though some activities such as mining above these tunnels will be restricted to avoid damage. Agricultural activities will be allowed.

The project sounds good on paper but salaries/wages from such projects tend to be so low, that we don’t even feel excited about such projects. Kindly ensure that workers engaged on this project are properly paid and that proper working conditions are put in place.

Noted.

What is in it for our women, because we have very strong women here, stronger than men?

Positions will be opened to both sexes.

LHPC is known for nepotism when it comes to employment. Please ensure that the employment opportunities are distributed evenly.

Noted. We will make sure that sure a mitigation measure is provided.

I do not want to have a pressure tunnel below my house.

Noted. But the tunnel will be 100 to 150 metres below ground so you will see it or hear it.

We were resettled before by the LHPC so we are wondering if we are going to be resettled again.

No you will not be resettled unless you are too close to the road and there is no alternative for the realignment of the road in a particular area.

Page 163: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Upstream Dwellers: Sipaida Village Meetings

Venue

Headman Sipaida’s House

Date of Meeting

25 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response How are we going to take part in employment?

Locals will be given top priority based on skill, education and experienced. Basic training will be offered prior to project commencement.

What are the application/ qualification criteria?

Criteria will be set in the Employment and Recruitment Policy and communicated with the general public.

Will those too close to the road be resettled?

Some might have too, especially those too close to certain sections that may need to be extended. But those who are affected will be consulted individually by the LHPC and relevant consultants.

Headman must ensure that we are updated on project progress so that we know when to apply for jobs.

Noted.

When is the project commencing? In 2018. Pre-construction activities will are likely to commence earlier, say, 2016.

Are we to relocate to project site once jobs are given?

Not sure if everyone will be expected to stay at the camp or not. This will be clarified close to the commencement of construction.

Will the road pass through our village? Yes, through some areas of the greater Sipaida village.

Page 164: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Upstream Dwellers: Ad Hoc Meeting

Venue

Mlenge Informal Market

Date of Meeting

26 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response When are we expected to receive our NRC cards back?

We have heard of this issue about the NRC cards being taken by the LHPC contractor. The LHPC has been made aware of this and it will be address shortly.

Page 165: Annexure B: Consultation Materials

Meeting minutes Subject/Ref

Muchinga HPP: Scoping Phase Consultation: Celemente and Chimika Villages’ Meeting

Venue

Celemente Village

Date of Meeting

26 July 2013

Present

See attendance register

Distribution

N/A

Comment/ Issue Response The main problem in these villages is the shortage of water; will the LHPC assist in this regard?

It is possible to assist only through the CSR programmes. This will be active once the project has started operating.

Will the road follow the current Longolong road or will it be a new one completely?

From what we have seen of the road, it is following some existing foot trails. A Google Earth map was shown to stakeholders of where the road will be located.

How are we going to take part in employment?

Locals will be given top priority based on skill, education and experienced. Basic training will be offered prior to project commencement.

What is the application / qualification criterion?

Criteria will be set in the Employment and Recruitment Policy and communicated with the general public.