ANNEXURE-1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy to the members of the EAC during the EAC meeting. I. PROJECT DETAILS 1. Na me of the proj ect Mining of Sand, Stone & Bajri from Kundlu Khad Proposed by Sh. Mohan Singh prop. M/s Jai Mata Stone Crusher. 2. Na me of the Company, Address Tele No. & E-mail Head of organization Company Name: M/s Jai Mata Stone Crusher Address : Mauza/Mohal Dalahthon Tehsil: Nalagarh, Distt. Solan, Himachal Pradesh Telephone : Fax : -- Email id : [email protected] 3. If a Joi nt venture, the names & addresses of the JV partners including their share Not applicable 4. Lati tude and Longi tude of the project Latitude Longitude 31 0 10’ 18.5” N 76 0 41’21.5” E 31 0 10’ 00.5” N 76 0 40’10.2” E 5. Whe t her the proj ec t is in the Critically Polluted Area (CPA) No 6. C o st of th e pr oject Rs. 55 Lakhs 7. Whe t her new o r expa ns io n project. If expansion New Project (1,40,400 TPA) For renewal of mine lease (i) From …… MT to …….MT -- (ii) What is the % of expansion -- 8. If for expan sion, whet her the application is under 7(ii) of the EIA Notification, 2006 -- 9. No. and Date of the ToR/ and revised ToR, if any, letter issued by the MoEF (if this is a case for EC) Previous grant ToR Letter number: J-11015/147/2011 - IA.II(M) Issue date: 21st September,2011 10. No. and Date of the EC and the revised EC letter issued by the MoEF (if this is a case No

Transcript of ANNEXURE-1 BasicInformation in word format and a signed...

ANNEXURE-1

Basic Information

Important Note: Please send the information by e-mail in word format and a signed &

scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy to

the members of the EAC during the EAC meeting.

I. PROJECT DETAILS

1. Name of the project Mining of Sand, Stone & Bajri from Kundlu KhadProposed by Sh. Mohan Singh prop. M/s Jai MataStone Crusher.

2. Name of the Company,Address Tele No. & E-mailHead of organization

Company Name: M/s Jai Mata Stone CrusherAddress : Mauza/Mohal DalahthonTehsil: Nalagarh, Distt. Solan, Himachal PradeshTelephone :Fax : --Email id : [email protected]

3. If a Joint venture, the names& addresses of the JVpartners including theirshare

Not applicable

4. Latitude and Longitude ofthe project

Latitude Longitude

31010’ 18.5” N 76041’21.5” E

31010’ 00.5” N 760 40’10.2” E

5. Whether the project is in theCritically Polluted Area(CPA)

No

6. Cost of the project Rs. 55 Lakhs7. Whether new or expansion

project. If expansionNew Project (1,40,400 TPA)For renewal of mine lease

(i) From …… MT to…….MT

--

(ii) What is the % ofexpansion

--

8. If for expansion, whetherthe application isunder 7(ii)of the EIA Notification, 2006

--

9. No. and Date of the ToR/ andrevised ToR, if any, letterissued by the MoEF (if this isa case for EC)

Previous grant ToR Letter number:J-11015/147/2011-IA.II(M)Issue date: 21st September,2011

10. No. and Date of the EC andthe revised EC letter issuedby the MoEF (if this is a case

No

for reconsideration. If so,what specificreconsideration(s) beingsought by the proponent)

11. If the project wasconsidered in EAC, Pl. givedates of the meeting (s)

No

12. Type of Mine:(Opencast/Underground/mixed)

Open-cast Mine

13. Capacity of the mine appliedfor

1,40,400 TPA

14. ML Area 12.45 Hectare(i) As per block

allotment12.45 Hectare

(ii) As per approvedmine plan

12.45 Hectare

15. Date of approval of mineplan, mine closure plan,status & date

Scheme of Mining including Mine Closure PlanDate of approval: 17 September 2016Status: approved

16. Date of Board’s approval -----17. Date of Ground water

clearance and surface waterapproval

Not Applicable

18. Existing Ground water levelin (M)

Pre-monsoon period 5.01 m bglPost-monsoon period 28.76 m bgl

19. Date of mine closureapproval

------

20. Any river/Nallah flowingnear or adjacent to theproposed mine. If yes,please give details

Project belongs to Kundlu khad, tributary of Satluj River

Details of Mine Lease-1. Date ofentering intooriginal leasedeed.

1. Date of 1st leaserenewal

1. Date of 2nd leaserenewal

1. Date of 3rd leaserenewal

6.11.2005 10.3.2010

2. Date of expiryof original leasedeed

2. Whetherrenewal or deemedrenewal

2. Whether renewalor deemed renewal

2. Whether renewalor deemed renewal

5.11.2010 20.09.2012

3. Date of expiry of1st lease renewal/deemed renewal

3. Date of expiry of2nd lease renewal/deemed renewal

3. Date of expiry of2nd lease renewal/deemed renewal[also for subsequentrenewals]

II. TECHNICAL DETAILS

21. Geological Reserve

(i) Total geological reserve 7,31,250 MT

(ii) Mineable reserve 7,02,000Tonnes

(iii) Extractable reserve 96,525 TPA

(iv) Percent (%) of extraction

(v) Range of ground water level 3 mbgl- 38.2 mbgl in buffer zone

(vi) Total estimated water requirement 3.3 KLD (Tanker Supply)

(vii) Details of intersecting ground water

level

No

22. Details of Deposits -

(i) Depth of over body -

(ii) Grade of ore -

(iii) Stripping ratio -

23. Method of mining Open Cast manual mining

24. Life of mine -

25. Whether ambient air quality seasonal data has

been monitored. If so, from which season to

which season and whether the results are

within the prescribed limits

The ambient air quality is

monitored for the PM2.5, SO2, NO2, &

PM10 are carried out 24 hourly

twice a week at each station. The

study was done in post monsoon

season for a period of three months

(Oct 2011 to Dec 2011). All the

parameters are well within limit

prescribed by CPCB as NAQS 2009.

26. Whether the monitoring report of earlier EC

from MoEF Regional Office has been obtained,

in case the proposal is for expansion

EC has not obtained

27. Details of O.B.

(i) External OB dumps Not Applicable

(ii) No of OB dumps Not Applicable

(iii) Area of each dump Not Applicable

(iv) Height of each dump Not Applicable

(v) Quantity (in MCm) of OB in each dump Not Applicable

(vi) Year of back filling Not Applicable

(vii) No. of OB dumps reclaimed None after end of mine life

(viii) If garland drains and settlement facility

for

runoff created

Not Applicable

(ix) Whether runoff water being utilized Not Applicable

28. Details of Internal Dumps Not Applicable

(i) Number of internal dumps

(ii) Area of each dump

(iii) Height of each dump

(iv) Quantity of wastes filled (MCm) 5,850 tonnes per year

29. Utilization potential of wastes Silt & Clay

(i) Within the mines Plantation purpose

(ii) Outside mines Plantation purpose

(iii) Efforts made by proponent -

30. Details of final Mine Voids -

(i) Area Not Applicable

(ii) Depth Not Applicable

31. Details of Quarry

(i) Total quarry area 65,000 cubic meter

(ii) Backfilled quarry area of …..ha shall be

reclaimed with plantation

Not applicable

(iii) A void of ….. ha at a depth of …… m

which is proposed to be converted into a

water body

Not applicable

(iv) Green belt (Safety zone)created in ha 0.08 Ha

32. Details of Land usage

(i) Pre-mining It is river bed mining. River bed

will be excavated in slice of 1m

thickness leaving

(ii) Post- Mining

(iii) Core area

33. Details of Forest issues

(i) Total forest area involved (in ha) for

mining lease

No forest land involved

(ii) Total broken forest area Not Applicable

(iii) Status of Forest Clearance and extend

of forest land diverted in ha

Not Applicable

(iv) Is there any National Park, eco-

sensitive Zones, within 10 km radius? If

so, give the details

Forest Name Distance from

lease area &

direction

Kala Amb PF 2 Km in NEdirection

Rajwaen PF 2.5 Km in SEdirection

Ratwari PF 2.5 Km in SEdirection

Luhund PF 4 Km in SWdirection

Aduwal PF 5.5 Km in SEDirection

(v) Extent of forest land in the project

(including safety zone and all types of

forest land) (in ha)

Not applicable

(vi) Total forest land for which Stage-1 FC

is available (give area in ha), provide

breakup of this area in following

format

Not applicable

Area (in ha) Stage-1 FC issued

vide letter no. &

date

Validity period of earlier FC

granted

Not applicable Not applicable Not applicable

(vii) Balance forest land for which Stage-1

FC is not available (give area in ha)

Not applicable

(viii) Details of wild life issues involved, if

any. If so, whether WL management

plan has been prepared; pl. indicate the

status

Not Applicable

(ix) Whether schedule-I species, if yes

conservation plan is approved by

CWLW?

Not applicable

34. Costs of the project

(i) Total capital Cost Rs 30 lakhs

(ii) Cost of Production Rs 60 per tones (excluded royalty)

(iii) Sale Price Rs 400 per tones

(iv) CSR cost Rs 1,50,000

(v) R&R Cost Not Applicable

(vi) No of PAFs Not Applicable

(vii) Cost for implementing EMP

35. Details of villages/habitation in mine lease

area

Not applicable

(i) Inside the lease Not applicable

(ii) Surrender by lease Not applicable

(iii) Extent of cropland acquired/ being

acquired in ha

Not applicable

36. Details of transportation of mineral

(i) In pit None

(ii) Surface to siding None

(iii) Siding to loading None

(iv) Quantity being transported by

Road/Rail/conveyer /ropeway

520 Tonnes per day

(v) Proposed change in transportation

means it any, give details

Existing mode of transportation

will be used

37. Details of reclamation It is river bed mining.

Material will be replenished each

year during the monsoon.

(i) Afforestation shall be done covering an

area of: ………. ha at the end of mining.

This will include:

(ii) Reclaimed external OB dump (in ha)

(iii) Internal dump (in ha)

(iv) Green belt (in ha) 0.08 ha

(v) Density of tree plantation (in no of

plants)

12 trees per 100 sqm

(vi) Void (in ha) at a depth of (in m )which

is proposed to be converted into

water body

No rain water storage is proposed

(vii) Others in ha (such as excavation

area along ML boundary, along

roads and infrastructure,

embankment area and in township

located outside the lease etc)

None

(viii) Agriculture and horticulture None

(ix) Fisheries None

(x) ECO Tourist/recreation spot None

III. LEGAL ISSUES

38. Any court case pending. If so, please provide a list

with details as annexure

Litigation court case pending

against the project Attached

annexure- no IV (court case

detail, LOI Mining officer letter

& Mining plan approval letter)

Environment (Protection) Act Yes

Air (P&CP) Act --

Water (P&CP) Act --

MMRD Act --

The Factories Act --

Other land R&R related cases No R&R related case against the

project.

39. Any violation cases pending. If so, please provide

a list with details as annexure Give details of

actual production vis-à-vis sanctioned capacity

since the inception of mine in following format or

since 1993-94 as applicable:

Yes Violation Case pending

Against lease holder for illegal

mining without obtaining EC

Year Actual production (MTPA) Excess production beyond

the EC sanctioned capacity

2006-07 26222 EC not sanctioned

2007-08 20354 EC not sanctioned

2008-09 17071 EC not sanctioned

2009-10 6963 EC not sanctioned

IV. PUBLIC HEARING ISSUES

41. Date and Place of public hearing Date: 3/06/2013Place: Mauza Dhalantha TehsilNalagarh District Solan , H.P.

42. The designation of officer presided over the PH Chaired By:- C.P. Verma, ADC,Solan & Sh PraveenGupta, HPPCB, Representativefrom mining deptt.Representative of Deptt.Of Science, Environment &Technology Shimla & RegionalTransport Officer, Solan

43. Issues raised during Public Hearing andassurance given along with the financialprovisions and action plan, if any, by the projectproponent. (Please attach as an annexure in atabular form.)

PH minutes attached asAnnexure.- I

44. Number of representation received in writingfrom the district and outside of district, pleasegive details

103 peoples attended the publichearing

V Consultant;45 Name of the EIA consultant who prepared the

EIA/EMP report.

M/s Shivalik Solid WasteManagement ltd. (UPL ENVIROInfrastructure Group Co.) Village-Majra, P. O. Dabhota, Tehsil

Nalagarh, Distt. Solan, HimachalPradesh

46 Whether the consultant has been accredited bythe QCI and NABET as per the MoEF OM dated2nd December, 2009.

Yes

47 Name of specialists/consultants involved inmaking EIA report and in collecting data.

Attached -II

VI Other Information48 One page summary for TOR and EC separately as

applicable.Enclosed as Annexure-III

49 Brief Background of the Project as per table:

1) Details of PP and Group companies

(a)Financial Position(b)Group companies(c)Legal issues(d) Past and current litigations

M/s Jai Mata Stone Crusher

GoodNoDetailed are enclosed asAnnexure-II

2). Social, economic and environmental aspects ofthe project in brief.

Socio-economic conditions of thesurrounding villages indicate thatemployment generation isseasonally. The occupationalactivities are agriculture and cattlerearing. The mining activity willprovide employment to localpeople which will increase socio-economic status of the area. TheSands is the main raw material formaking roads & filling material.The mining activity will providedirect employment to local peopleand indirect employment ofsemiskilled and unskilled workersengaged in transportation, tradingand other allied activities, whichwill improve socio- economicstatus of the areaEnvironmental- As the mininglease area is part of active rivercourse and suffer floods everymonsoon season, the landdegradation impact due to theexcavation of sand, stone and bajriundertaken during dry period ofthe year will get replenished byfresh material and there shall benot be any change in land usepattern in core zone i.e. mininglease area.

Plantation will be done along theroad-sides and also at the crushersite after consultation with localvillagers/authority.

com
Text Box
Annexure-I
com
Text Box
ANNEXURE-II

Annexure - Vii

Declaration by Experts contributing in the EIA of Mining of Sand, Stone & Bajri from Kundlu

Khad Proposed by Sh. Mohan Singh prop. M/s Jai Mata Stone Crusher(12.45 ha).

I, hereby, certify that I was part of the EIA team in the following capacity that will develope the

above mentioned EIA after amendment in TOR.

EIA Coordinator:

Name: Ms. Daksha Gupta

Signature:

Period of Involvement: May 2011 to till date

Functional area Experts:

S. No. Functional Areas Name of the Expert/s Signature

1. AP* Vishal Duggal

2. WP* Vishal Duggal

3. SHW* Daksha Gupta

4. SE* Sayantani Chaterjee

5. EB* S Brahma

6. HG* Tapan Majumdar

7. GEO* Subhash Chander Sharma

8. SC* BS Lole

9. AQ* Suketu Shah

10. NV* Viney Kurakula

11. LU* Viney Kurakula

12. RH* Swapan Kumar Bandhopadya

**Please attach additional sheet if required.

S. No. Functional Areas Name of the TM/FAA Signature1. AP* Muzaffar Ahmad

Suman Lata

2. WP* Muzaffar Ahmad

Shivani Dutt

&Suman Lata

3. SHW* Niraj Kumari Parihar

4. EB* Shivani Dutt

5. SC* S Brahma

&

Sanjay Sharma

6. NV* Niraj Kumari Parihar

7. RH* Ashok Kumar Sharma

Declaration by the Head of the Accredited Consultant Organization/ AuthorizedpersonI, Ashok Sharma, hereby, confirm that above mentioned experts will prepare the EIA ofMining of Sand, Stone & Bajri from Kundlu Khad Proposed by Sh. Mohan Singh prop. M/s JaiMata Stone Crusher. I also confirm that the consultant organization shall be fullyaccountable for any mis-leading information mentioned in this statement.

Signature:

Name: Ashok Kumar Sharma

Designation: CEO

Name of the EIA Consultant Organization: Shivalik Solid Waste Management Ltd.

NABET Certificate No. & Issue Date:NABET/EIA/1417/SA002 29th October 2017

Annexure-III

PROJECT SUMMARY

The proposed project is the riverbed mining of Sand, Stone and Bajri from Kundlu Khad located near

Mauza/Mohal Dalahthon in Tehsil Nalagarh, District Solan, Himachal Pradesh. The applicant applied

for the renewal of mining lease for total 165-09 Bighas (12.4503 Hectare), the lease has been

sanctioned in favours of Sh Mohan Singh Prop. M/s Jai Mata Stone Crusher, vide letter no. Udyog –

Bhu (Khani -4) Laghu-81/96-VoI-I2200 dated 25-05-2016, the period of letter of intent is for one

year i.e. up to 19.09.2016. Further proponent applied for extension for validity of LOI.

As per MoEF &CC, New Delhi Gazette S.O.no. 1533 dated 14th September 2006 and amended gazette

S.O. no. 141 dated 15.01.2016 thereafter, the proposed mining project is categorized as category ‘A’

project due to the formation of cluster of two individual mine greater than 50 ha detail is mentioned

below. As per mining officers letter stating that mine lease area forming cluster an area of 102.2426

Hectare.

S.No Name of mine lease Area in Hectare

1 M/s Jai Mata Stone Crusher 12.4503 Hectare, (165-09 Bighas)

2 M/s Nalagarh Stone Crusher 89.7923Hectare, (1069-18 Bighas)

Total Area 102.2426 Ha

The proposed project activity will be carried out from Kundlu Khad. This is a primary tributary of

Satluj River. It has been proposed to collect 1,40,400 TPA of Sand, Stone & Bajri.

About 5,850 TPA mine waste will be generated which contains silt and clay mixture. It is used for

plantation work and rest of the material will be backfilled in the excavated pits. As per the approved

mine plan vide letter no. Udyog – Bhu (Khani -4) Laghu-81/96-Vol-I-6844 dated 17-09-2016, the

lease is situated in the Kundlu Khad, a Primary Tributary of the Satluj River are the major drainage

system in dun. Kundlu Khad originates at a height of 1420 meters above mean sea level, from Okhu

forest area. The area is approachable from the NH 21 A. The area comprises of boulders, pepples,

river born bajri, sand and clay deposit which belong to the siwalik formation.