ANNEXURE-1
Basic Information
Important Note: Please send the information by e-mail in word format and a signed &
scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy to
the members of the EAC during the EAC meeting.
I. PROJECT DETAILS
1. Name of the project Mining of Sand, Stone & Bajri from Kundlu KhadProposed by Sh. Mohan Singh prop. M/s Jai MataStone Crusher.
2. Name of the Company,Address Tele No. & E-mailHead of organization
Company Name: M/s Jai Mata Stone CrusherAddress : Mauza/Mohal DalahthonTehsil: Nalagarh, Distt. Solan, Himachal PradeshTelephone :Fax : --Email id : [email protected]
3. If a Joint venture, the names& addresses of the JVpartners including theirshare
Not applicable
4. Latitude and Longitude ofthe project
Latitude Longitude
31010’ 18.5” N 76041’21.5” E
31010’ 00.5” N 760 40’10.2” E
5. Whether the project is in theCritically Polluted Area(CPA)
No
6. Cost of the project Rs. 55 Lakhs7. Whether new or expansion
project. If expansionNew Project (1,40,400 TPA)For renewal of mine lease
(i) From …… MT to…….MT
--
(ii) What is the % ofexpansion
--
8. If for expansion, whetherthe application isunder 7(ii)of the EIA Notification, 2006
--
9. No. and Date of the ToR/ andrevised ToR, if any, letterissued by the MoEF (if this isa case for EC)
Previous grant ToR Letter number:J-11015/147/2011-IA.II(M)Issue date: 21st September,2011
10. No. and Date of the EC andthe revised EC letter issuedby the MoEF (if this is a case
No
for reconsideration. If so,what specificreconsideration(s) beingsought by the proponent)
11. If the project wasconsidered in EAC, Pl. givedates of the meeting (s)
No
12. Type of Mine:(Opencast/Underground/mixed)
Open-cast Mine
13. Capacity of the mine appliedfor
1,40,400 TPA
14. ML Area 12.45 Hectare(i) As per block
allotment12.45 Hectare
(ii) As per approvedmine plan
12.45 Hectare
15. Date of approval of mineplan, mine closure plan,status & date
Scheme of Mining including Mine Closure PlanDate of approval: 17 September 2016Status: approved
16. Date of Board’s approval -----17. Date of Ground water
clearance and surface waterapproval
Not Applicable
18. Existing Ground water levelin (M)
Pre-monsoon period 5.01 m bglPost-monsoon period 28.76 m bgl
19. Date of mine closureapproval
------
20. Any river/Nallah flowingnear or adjacent to theproposed mine. If yes,please give details
Project belongs to Kundlu khad, tributary of Satluj River
Details of Mine Lease-1. Date ofentering intooriginal leasedeed.
1. Date of 1st leaserenewal
1. Date of 2nd leaserenewal
1. Date of 3rd leaserenewal
6.11.2005 10.3.2010
2. Date of expiryof original leasedeed
2. Whetherrenewal or deemedrenewal
2. Whether renewalor deemed renewal
2. Whether renewalor deemed renewal
5.11.2010 20.09.2012
3. Date of expiry of1st lease renewal/deemed renewal
3. Date of expiry of2nd lease renewal/deemed renewal
3. Date of expiry of2nd lease renewal/deemed renewal[also for subsequentrenewals]
II. TECHNICAL DETAILS
21. Geological Reserve
(i) Total geological reserve 7,31,250 MT
(ii) Mineable reserve 7,02,000Tonnes
(iii) Extractable reserve 96,525 TPA
(iv) Percent (%) of extraction
(v) Range of ground water level 3 mbgl- 38.2 mbgl in buffer zone
(vi) Total estimated water requirement 3.3 KLD (Tanker Supply)
(vii) Details of intersecting ground water
level
No
22. Details of Deposits -
(i) Depth of over body -
(ii) Grade of ore -
(iii) Stripping ratio -
23. Method of mining Open Cast manual mining
24. Life of mine -
25. Whether ambient air quality seasonal data has
been monitored. If so, from which season to
which season and whether the results are
within the prescribed limits
The ambient air quality is
monitored for the PM2.5, SO2, NO2, &
PM10 are carried out 24 hourly
twice a week at each station. The
study was done in post monsoon
season for a period of three months
(Oct 2011 to Dec 2011). All the
parameters are well within limit
prescribed by CPCB as NAQS 2009.
26. Whether the monitoring report of earlier EC
from MoEF Regional Office has been obtained,
in case the proposal is for expansion
EC has not obtained
27. Details of O.B.
(i) External OB dumps Not Applicable
(ii) No of OB dumps Not Applicable
(iii) Area of each dump Not Applicable
(iv) Height of each dump Not Applicable
(v) Quantity (in MCm) of OB in each dump Not Applicable
(vi) Year of back filling Not Applicable
(vii) No. of OB dumps reclaimed None after end of mine life
(viii) If garland drains and settlement facility
for
runoff created
Not Applicable
(ix) Whether runoff water being utilized Not Applicable
28. Details of Internal Dumps Not Applicable
(i) Number of internal dumps
(ii) Area of each dump
(iii) Height of each dump
(iv) Quantity of wastes filled (MCm) 5,850 tonnes per year
29. Utilization potential of wastes Silt & Clay
(i) Within the mines Plantation purpose
(ii) Outside mines Plantation purpose
(iii) Efforts made by proponent -
30. Details of final Mine Voids -
(i) Area Not Applicable
(ii) Depth Not Applicable
31. Details of Quarry
(i) Total quarry area 65,000 cubic meter
(ii) Backfilled quarry area of …..ha shall be
reclaimed with plantation
Not applicable
(iii) A void of ….. ha at a depth of …… m
which is proposed to be converted into a
water body
Not applicable
(iv) Green belt (Safety zone)created in ha 0.08 Ha
32. Details of Land usage
(i) Pre-mining It is river bed mining. River bed
will be excavated in slice of 1m
thickness leaving
(ii) Post- Mining
(iii) Core area
33. Details of Forest issues
(i) Total forest area involved (in ha) for
mining lease
No forest land involved
(ii) Total broken forest area Not Applicable
(iii) Status of Forest Clearance and extend
of forest land diverted in ha
Not Applicable
(iv) Is there any National Park, eco-
sensitive Zones, within 10 km radius? If
so, give the details
Forest Name Distance from
lease area &
direction
Kala Amb PF 2 Km in NEdirection
Rajwaen PF 2.5 Km in SEdirection
Ratwari PF 2.5 Km in SEdirection
Luhund PF 4 Km in SWdirection
Aduwal PF 5.5 Km in SEDirection
(v) Extent of forest land in the project
(including safety zone and all types of
forest land) (in ha)
Not applicable
(vi) Total forest land for which Stage-1 FC
is available (give area in ha), provide
breakup of this area in following
format
Not applicable
Area (in ha) Stage-1 FC issued
vide letter no. &
date
Validity period of earlier FC
granted
Not applicable Not applicable Not applicable
(vii) Balance forest land for which Stage-1
FC is not available (give area in ha)
Not applicable
(viii) Details of wild life issues involved, if
any. If so, whether WL management
plan has been prepared; pl. indicate the
status
Not Applicable
(ix) Whether schedule-I species, if yes
conservation plan is approved by
CWLW?
Not applicable
34. Costs of the project
(i) Total capital Cost Rs 30 lakhs
(ii) Cost of Production Rs 60 per tones (excluded royalty)
(iii) Sale Price Rs 400 per tones
(iv) CSR cost Rs 1,50,000
(v) R&R Cost Not Applicable
(vi) No of PAFs Not Applicable
(vii) Cost for implementing EMP
35. Details of villages/habitation in mine lease
area
Not applicable
(i) Inside the lease Not applicable
(ii) Surrender by lease Not applicable
(iii) Extent of cropland acquired/ being
acquired in ha
Not applicable
36. Details of transportation of mineral
(i) In pit None
(ii) Surface to siding None
(iii) Siding to loading None
(iv) Quantity being transported by
Road/Rail/conveyer /ropeway
520 Tonnes per day
(v) Proposed change in transportation
means it any, give details
Existing mode of transportation
will be used
37. Details of reclamation It is river bed mining.
Material will be replenished each
year during the monsoon.
(i) Afforestation shall be done covering an
area of: ………. ha at the end of mining.
This will include:
(ii) Reclaimed external OB dump (in ha)
(iii) Internal dump (in ha)
(iv) Green belt (in ha) 0.08 ha
(v) Density of tree plantation (in no of
plants)
12 trees per 100 sqm
(vi) Void (in ha) at a depth of (in m )which
is proposed to be converted into
water body
No rain water storage is proposed
(vii) Others in ha (such as excavation
area along ML boundary, along
roads and infrastructure,
embankment area and in township
located outside the lease etc)
None
(viii) Agriculture and horticulture None
(ix) Fisheries None
(x) ECO Tourist/recreation spot None
III. LEGAL ISSUES
38. Any court case pending. If so, please provide a list
with details as annexure
Litigation court case pending
against the project Attached
annexure- no IV (court case
detail, LOI Mining officer letter
& Mining plan approval letter)
Environment (Protection) Act Yes
Air (P&CP) Act --
Water (P&CP) Act --
MMRD Act --
The Factories Act --
Other land R&R related cases No R&R related case against the
project.
39. Any violation cases pending. If so, please provide
a list with details as annexure Give details of
actual production vis-à-vis sanctioned capacity
since the inception of mine in following format or
since 1993-94 as applicable:
Yes Violation Case pending
Against lease holder for illegal
mining without obtaining EC
Year Actual production (MTPA) Excess production beyond
the EC sanctioned capacity
2006-07 26222 EC not sanctioned
2007-08 20354 EC not sanctioned
2008-09 17071 EC not sanctioned
2009-10 6963 EC not sanctioned
IV. PUBLIC HEARING ISSUES
41. Date and Place of public hearing Date: 3/06/2013Place: Mauza Dhalantha TehsilNalagarh District Solan , H.P.
42. The designation of officer presided over the PH Chaired By:- C.P. Verma, ADC,Solan & Sh PraveenGupta, HPPCB, Representativefrom mining deptt.Representative of Deptt.Of Science, Environment &Technology Shimla & RegionalTransport Officer, Solan
43. Issues raised during Public Hearing andassurance given along with the financialprovisions and action plan, if any, by the projectproponent. (Please attach as an annexure in atabular form.)
PH minutes attached asAnnexure.- I
44. Number of representation received in writingfrom the district and outside of district, pleasegive details
103 peoples attended the publichearing
V Consultant;45 Name of the EIA consultant who prepared the
EIA/EMP report.
M/s Shivalik Solid WasteManagement ltd. (UPL ENVIROInfrastructure Group Co.) Village-Majra, P. O. Dabhota, Tehsil
Nalagarh, Distt. Solan, HimachalPradesh
46 Whether the consultant has been accredited bythe QCI and NABET as per the MoEF OM dated2nd December, 2009.
Yes
47 Name of specialists/consultants involved inmaking EIA report and in collecting data.
Attached -II
VI Other Information48 One page summary for TOR and EC separately as
applicable.Enclosed as Annexure-III
49 Brief Background of the Project as per table:
1) Details of PP and Group companies
(a)Financial Position(b)Group companies(c)Legal issues(d) Past and current litigations
M/s Jai Mata Stone Crusher
GoodNoDetailed are enclosed asAnnexure-II
2). Social, economic and environmental aspects ofthe project in brief.
Socio-economic conditions of thesurrounding villages indicate thatemployment generation isseasonally. The occupationalactivities are agriculture and cattlerearing. The mining activity willprovide employment to localpeople which will increase socio-economic status of the area. TheSands is the main raw material formaking roads & filling material.The mining activity will providedirect employment to local peopleand indirect employment ofsemiskilled and unskilled workersengaged in transportation, tradingand other allied activities, whichwill improve socio- economicstatus of the areaEnvironmental- As the mininglease area is part of active rivercourse and suffer floods everymonsoon season, the landdegradation impact due to theexcavation of sand, stone and bajriundertaken during dry period ofthe year will get replenished byfresh material and there shall benot be any change in land usepattern in core zone i.e. mininglease area.
Plantation will be done along theroad-sides and also at the crushersite after consultation with localvillagers/authority.
Declaration by Experts contributing in the EIA of Mining of Sand, Stone & Bajri from Kundlu
Khad Proposed by Sh. Mohan Singh prop. M/s Jai Mata Stone Crusher(12.45 ha).
I, hereby, certify that I was part of the EIA team in the following capacity that will develope the
above mentioned EIA after amendment in TOR.
EIA Coordinator:
Name: Ms. Daksha Gupta
Signature:
Period of Involvement: May 2011 to till date
Functional area Experts:
S. No. Functional Areas Name of the Expert/s Signature
1. AP* Vishal Duggal
2. WP* Vishal Duggal
3. SHW* Daksha Gupta
4. SE* Sayantani Chaterjee
5. EB* S Brahma
6. HG* Tapan Majumdar
7. GEO* Subhash Chander Sharma
8. SC* BS Lole
9. AQ* Suketu Shah
10. NV* Viney Kurakula
11. LU* Viney Kurakula
12. RH* Swapan Kumar Bandhopadya
**Please attach additional sheet if required.
S. No. Functional Areas Name of the TM/FAA Signature1. AP* Muzaffar Ahmad
Suman Lata
2. WP* Muzaffar Ahmad
Shivani Dutt
&Suman Lata
3. SHW* Niraj Kumari Parihar
4. EB* Shivani Dutt
5. SC* S Brahma
&
Sanjay Sharma
6. NV* Niraj Kumari Parihar
7. RH* Ashok Kumar Sharma
Declaration by the Head of the Accredited Consultant Organization/ AuthorizedpersonI, Ashok Sharma, hereby, confirm that above mentioned experts will prepare the EIA ofMining of Sand, Stone & Bajri from Kundlu Khad Proposed by Sh. Mohan Singh prop. M/s JaiMata Stone Crusher. I also confirm that the consultant organization shall be fullyaccountable for any mis-leading information mentioned in this statement.
Signature:
Name: Ashok Kumar Sharma
Designation: CEO
Name of the EIA Consultant Organization: Shivalik Solid Waste Management Ltd.
NABET Certificate No. & Issue Date:NABET/EIA/1417/SA002 29th October 2017
Annexure-III
PROJECT SUMMARY
The proposed project is the riverbed mining of Sand, Stone and Bajri from Kundlu Khad located near
Mauza/Mohal Dalahthon in Tehsil Nalagarh, District Solan, Himachal Pradesh. The applicant applied
for the renewal of mining lease for total 165-09 Bighas (12.4503 Hectare), the lease has been
sanctioned in favours of Sh Mohan Singh Prop. M/s Jai Mata Stone Crusher, vide letter no. Udyog –
Bhu (Khani -4) Laghu-81/96-VoI-I2200 dated 25-05-2016, the period of letter of intent is for one
year i.e. up to 19.09.2016. Further proponent applied for extension for validity of LOI.
As per MoEF &CC, New Delhi Gazette S.O.no. 1533 dated 14th September 2006 and amended gazette
S.O. no. 141 dated 15.01.2016 thereafter, the proposed mining project is categorized as category ‘A’
project due to the formation of cluster of two individual mine greater than 50 ha detail is mentioned
below. As per mining officers letter stating that mine lease area forming cluster an area of 102.2426
Hectare.
S.No Name of mine lease Area in Hectare
1 M/s Jai Mata Stone Crusher 12.4503 Hectare, (165-09 Bighas)
2 M/s Nalagarh Stone Crusher 89.7923Hectare, (1069-18 Bighas)
Total Area 102.2426 Ha
The proposed project activity will be carried out from Kundlu Khad. This is a primary tributary of
Satluj River. It has been proposed to collect 1,40,400 TPA of Sand, Stone & Bajri.
About 5,850 TPA mine waste will be generated which contains silt and clay mixture. It is used for
plantation work and rest of the material will be backfilled in the excavated pits. As per the approved
mine plan vide letter no. Udyog – Bhu (Khani -4) Laghu-81/96-Vol-I-6844 dated 17-09-2016, the
lease is situated in the Kundlu Khad, a Primary Tributary of the Satluj River are the major drainage
system in dun. Kundlu Khad originates at a height of 1420 meters above mean sea level, from Okhu
forest area. The area is approachable from the NH 21 A. The area comprises of boulders, pepples,
river born bajri, sand and clay deposit which belong to the siwalik formation.