CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED TO RAILWAY ACTIVITIES Validity: 15.12.2019 12.12.2020 Version: 9.1 Update: 30.06.2020

Transcript of ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR...

Page 1: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

CFR NETWORK STATEMENT - 2020

ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES

RELATED TO RAILWAY ACTIVITIES

Validity: 15.12.2019 – 12.12.2020

Version: 9.1

Update: 30.06.2020

Page 2: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 2 / 13

Content

1. Regional Branch CFR Bucharest .............................................................................................. 3

1.1 Giurgiu Port Station ............................................................................................................................ 3

1.2 Olteniţa Port Station ........................................................................................................................... 3

2. Regional Branch CFR Craiova .................................................................................................. 4

2.1 Drobeta Turnu Severin Station .......................................................................................................... 4

2.2 Calafat Station ..................................................................................................................................... 4

2.3 Corabia Station .................................................................................................................................... 4

2.4 Turnu Măgurele Station ...................................................................................................................... 4

2.5 Zimnicea Station ................................................................................................................................. 4

3. Regional Branch CFR Timişoara .............................................................................................. 5

3.1 Orşova Station ..................................................................................................................................... 5

3.2 Orşova Port Station ............................................................................................................................ 5

4. Regional Branch CFR Galaţi ..................................................................................................... 6

4.1 Galaţi Station ....................................................................................................................................... 6

4.2 Brăila Station ....................................................................................................................................... 7

4.3 Barboşi Station .................................................................................................................................... 7

5. Regional Branch CFR Constanţa .............................................................................................. 8

5.1 Constanţa Port Zone A Station .......................................................................................................... 8

5.2 Constanţa Port Zona B Station ........................................................................................................ 10

5.3 Constanţa Port Mol 5 Station ........................................................................................................... 11

5.4 Constanţa Port Station ..................................................................................................................... 12

5.5 Mangalia Station ................................................................................................................................ 12

5.6 Călăraşi Station ................................................................................................................................. 13

Page 3: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 3 / 13

1. REGIONAL BRANCH CFR BUCHAREST

1.1 Giurgiu Port Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Main line Port (den. veche Giurgiu Canal - Cioroiu, km 74+102-75+568, de la sch.nr. 304

maneuver Lr = 1466 m No Yes LFI without RTE

2 Line 1 st. Giurgiu Port maneuver

Lc = 202 m Lr =169 m

No Yes LFI without RTE

3 Line 2 st. Giurgiu Port maneuver

Lc = 244 m Lr = 211 m

No Yes LFI without RTE

4 Diag. 507- 509 - Lr = 60 m No Yes LFI without RTE

5 CF line between sch.507 – sch. 510 aferent L1 maneuver Lr = 60 m No Yes LFI without RTE

6 Sch. 505 aferent L1 - Lr = 33 m No Yes LFI without RTE

7 Sch. 507 aferent L1 - Lr = 33 m No Yes LFI without RTE

8 Sch. 509 aferent L1 - Lr =33 m No Yes LFI without RTE

9 Sch. 510 aferent L1 - Lr = 33 m No Yes LFI without RTE

1.2 Olteniţa Port Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line VIII Oltenita Port km 81+ 440 – 81+ 915 maneuver L = 474 m No Yes LFI without RTE

2 Line X Oltenita Port km 81+540 – 81+ 924 maneuver L = 384 m No

3 Current line Oltenita Port km 81+073 – 81+ 420

- L = 347 m No

4 Line IX Oltenita Port km 81+ 440 – 81+ 924 maneuver L = 484 m No

5 Line III Oltenita Port km 80+402 – 81+022 maneuver L = 620 m No Yes LFI without RTE

6 Line II Oltenita Port km 80+357 – 81+092 maneuver L = 735 m No Yes LFI without RTE

7 Line XI Oltenita Port km 81+503 – 81+875 maneuver L = 372 m No

8 Line XII Oltenita Port km 81+265 – 81+875 maneuver L = 610 m No

9 Line II Oltenita Port km 81+ 000 – 81+145 maneuver L = 930 m No Yes LFI without RTE

Page 4: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 4 / 13

2. REGIONAL BRANCH CFR CRAIOVA

2.1 Drobeta Turnu Severin Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 line 37 maneuver 212 Yes LFI ADPF

2.2 Calafat Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 line 9Pa maneuver 65 Yes - -

2 line 10P avoidance 42 Yes - -

3 lines: 1Pa,1Pb, 2P, 3P, 4P, 5P, 6P, 9Pb, 9Pc, 11P, 12P

- - No - Lines 3P, 4P, 5P have scrapping approval

2.3 Corabia Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Current line Corabia- Corabia Port - - No - -

2 lines 1CP, 3CP - - No - Lines 1CP, 3CP, have scrapping approval

2.4 Turnu Măgurele Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 lines 1N, 2N, 1, 2, 3, 4, 5 - - No - Belong to the group of lines Port Turnu Magurele

2 line Flamanda - - No - Belong to the group of lines Port Turnu Magurele

2.5 Zimnicea Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Collector line Port Zimnicea- Zimnicea

- - No - -

Page 5: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 5 / 13

3. REGIONAL BRANCH CFR TIMISOARA

3.1 Orşova Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line 11 Pull port 656 No

connection from st. Orşova inadequate condition closed line

3.2 Orşova Port Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line 1P upload - download

686 No connection from line 1P by Exchange. ”c” at LFI Santier Naval Orsova - line in conservation

access through His; inadequate condition, closed line

2 Line 2P upload - download

454 No

without connection to the CF line; inadequate condition, closed line

3 Line 3P scale 835 No

without connection to the CF line; inadequate condition, closed line

4 Line 4P storage 426 No

without connection to the CF line; inadequate condition, closed line

Page 6: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 6 / 13

4. REGIONAL BRANCH CFR GALATI

4.1 Galaţi Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Lane rolling depot lines 45 - 47 maneuver 435 Yes

cu LFI PBN LOGISTICS SA, LFI SC CITY GAS SRL şi LFI SC UNICOM OIL TERMINAL SA

Included lines 1 si 2 Pacura

2 Sing line maneuver 356 Yes

3 fence line maneuver 907 Yes

4 Line 1 Cheu maneuver 773 Yes

5 Line 2 Cheu maneuver 716 Yes

6 Normal CF connection for SC CITY GAZ SRL maneuver 58 Yes

7 Taken over linesUNICOM OIL TERMINAL maneuver 305 Yes

8 Racord cf dane Apatita Gl Larga - Bazin Lemnarie

maneuver 540 Yes

9 Racord Larga Ana - Bazin Dane maneuver 1429 Yes

10 Line Opritor dane maneuver 135 Yes

11 Line Galati Calatori - Port Docuri maneuver 1525 Yes Public

12 Line nr. 1 maneuver 595 Yes

13 Line nr. 2 maneuver 654 Yes

14 Line nr. 3 Cale Larga maneuver 887 Yes

15 Line nr. 4 maneuver 86 Yes

16 Line nr. 6 maneuver 521 Yes

17 Line nr.8 maneuver 101 Yes

18 Line nr. 9 maneuver 80 Yes

19 Line nr. 10 maneuver 92 Yes

20 Line nr. 11 maneuver 347 Yes

21 Line nr.12 maneuver 93 Yes

22 Line CF Dana 26 - 28 maneuver 447 Yes

Page 7: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 7 / 13

4.2 Brăila Station

(Group Brăila Port)

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line nr. I receiving-shipping

998 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila

2 Line nr. II receiving-shipping

677 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila

3 Triple Line receiving-shipping

668 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila

4 Line 1 dead accumulation Bruto

239 No

5 Line 1 private upload - download

749 No

6 Line shed upload - download

498 No

7 Line current Vad maneuver 319 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila

8 Line 2 sorting Port receiving-shipping

519 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1

9 Line 3 sorting Port receiving-shipping

519 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1

10 Line 4 sorting Port receiving-shipping

1158 No With LFI R.A. A.Z.L. Brăila Perimeter 1

11 Line shooting sorting shooting 80 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1

12 Line wall ramp upload - download

84 Yes

4.3 Barboşi Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line nr. 1 receiving-shipping

582 Yes With LFI SC ROMPORTMET SA

2 Line nr. 2 receiving-shipping

528 Yes With LFI SC ROMPORTMET SA

3 Line nr. 3 receiving-shipping

576 Yes With LFI SC ROMPORTMET SA

4 Line nr. 4 receiving-shipping

548 Yes With LFI SC ROMPORTMET SA

5 Line nr. 5 receiving-shipping

572 Yes With LFI SC ROMPORTMET SA

6 Line nr. 6 Avoidance 95 Yes

7 Line nr. 7 shooting 89 Yes

Page 8: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 8 / 13

5. REGIONAL BRANCH CFR CONSTANTA

5.1 Constanţa Port Zone A Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 L1 – receiving-shipping maneuver 741 Yes From firing line 1, through the switch 47S connects LFI SC Santierul Naval SA C-ta L max convoi = 200 m

2 L2 – receiving-shipping maneuver 723 Yes

3 L3 – receiving-shipping maneuver 744 Yes

4 L4 – receiving-shipping maneuver 318 Yes

5 L1 – washing cars maneuver 306 No

6 L2 – washing cars maneuver 86 No

7 L3 – washing cars maneuver 137 No

8 L4 – washing cars maneuver 450 Yes

9 L5 – washing cars maneuver 449 Yes

10 L1 – sorting Port Nou maneuver 227 No

11 L2 – sorting Port Nou maneuver 229 No

12 L3 – sorting Port Nou maneuver 290 No

13 L4 – sorting Port Nou maneuver 387 Yes

14 L5 – sorting Port Nou maneuver 334 No

15 L6 – sorting Port Nou maneuver 186 Yes

16 L7 – sorting Port Nou maneuver 283 Yes

17 L1 – big sorting maneuver 241 Yes

18 L2 – big sorting maneuver 241 Yes

19 L3 – big sorting maneuver 196 Yes

20 L4 – big sorting maneuver 218 Yes

21 L4 – little sorting maneuver 274 Yes L1 and L2 through the switch 105 and 107 connects LFI SNTFM CFR MARFA - close

L3 ,through the switch 109 connects LFI SC Romania Euroest SA-Remiza Loc. (si SC Tehnotrans SRL) L max convoi = 100 m

22 L1 – third Concrete maneuver 245 Yes

23 L2 – third Concrete maneuver 167 Yes

24 L3 – third Concrete maneuver 232 No

25 L4 – third Concrete maneuver 232 No

26 L5 – third Concrete maneuver 233 No

27 L1 – warehouses upload/ download 139 Yes

28 L2 – warehouses upload/ download 139 Yes

29 L3 – warehouses upload/ download 324 No

30 L1 – north Quay upload/ download 559 Yes

31 L2 – north Quay upload/ download 559 Yes

32 L3 – north Quay upload/ download 590 Yes

33 L4 – north Quay upload/ download 622 No

34 L5 – north Quay upload/ download 589 No

35 L6 – north Quay upload/ download 267 No

36 L8 – north Quay upload/ download 325 No

37 L6 – timber upload/ download 267 Yes

38 L4 – Genovez Quay upload/ download 274 No

39 L5 – Genovez Quay upload/ download 259 Yes

40 L1 – train maritime upload/ download 262 No

Page 9: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 9 / 13

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

41 L2 – train maritime upload/ download 254 No

42 L3 – train maritime upload/ download 311 No

43 L4 – train maritime upload/ download 264 No

44 L1 – sorting old port maneuver 601 Yes Din prel.liniei 1,prin mac.237 se racord. LFI CN APM SA – Danele 0-7 L max convoi = 450 m

45 L2 – sorting old port maneuver 321 Yes

46 L3 – sorting old port maneuver 312 Yes

47 L4 – sorting old port maneuver 373 Yes Din prel.liniei 1,prin mac.237 se racord. LFI CN APM SA – Digul de Nord L max convoi = 450 m

48 L5 – sorting old port maneuver 242 Yes

49 L6 – sorting old port maneuver 260 Yes

50 L7 – sorting old port maneuver 260 Yes Din prel.liniei 4,prin mac.231 se racord. LFI CN APM SA – Danele 6-7 L max convoi = 300 m

51 L8 – sorting old port maneuver 332 Yes

52 L1 – sorting silage 1 maneuver 419 Yes

Din prel.liniei 3, prin mac.60 se racord. LFI SC SILO-PORT SRL L max convoi = 104 m

53 L2 – sorting silage 1 maneuver 383 Yes

54 L3 – sorting silage 1 maneuver 438 Yes

55 L4 – sorting silage 1 maneuver 267 No

56 L5 – sorting silage 1 maneuver 252 Yes

57 L6 – sorting silage 1 maneuver 292 Yes

58 L1 – sorting silage 2 maneuver 400 Yes

Din prel.liniei 3, prin mac.50 se racord. LFI SC NIVA PRODCOM SRL L max convoi = 104 m

59 L2 – sorting silage 2 maneuver 371 Yes

60 L3 – sorting silage 2 maneuver 404 Yes

61 L4 – sorting silage 2 maneuver 364 Yes

62 L5 – sorting silage 2 maneuver 341 No

63 L6 – sorting silage 2 maneuver 425 No

64 L1 – sorting silage 3 maneuver 301 Yes Din prel.liniei 4, prin mac.40 se racord. LFI SC NIVA PRODCOM SRL L max convoi = 104 m

65 L2 – sorting silage 3 maneuver 340 Yes

66 L3 – sorting silage 3 maneuver 371 Yes

67 L4 – sorting silage 3 maneuver 272 No

68 L5 – sorting silage 3 maneuver 144 Yes Din prel.liniei 5, prin TDJ 36/38 se racord. LFI SC FRIAL SA linia 1 L max convoi = 106 m

69 L6 – sorting silage 3 maneuver 169 Yes Din prel.liniei 6, prin mac.48 se racord. LFI SC FRIAL SA linia 2 L max convoi = 140 m

70 L1 – Ceremag upload/ download 172 No

71 L2 – Ceremag upload/ download 244 Yes

72 L3 – Ceremag upload/ download 244 No

73 L1 – Cheu Cereale upload/ download 556 No (pe Dane 20 si 21)

74 L2 – Cheu Cereale upload/ download 556 No

75 L3 – Cheu Cereale upload/ download 500 No

76 L4 – Cheu Cereale upload/ download 470 No

77 L5 – Cheu Cereale upload/ download 280 Yes

78 L6 – Cheu Cereale upload/ download 10 No

79 L1 – sorting Mol 1 maneuver 121 Yes

80 L2 – sorting Mol 1 maneuver 168 No

81 L3 – sorting Mol 1 maneuver 172 Yes

82 L4 – sorting Mol 1 maneuver 161 Yes

83 L5 – sorting Mol 1 maneuver 181 Yes

84 L6 – sorting Mol 1 maneuver 138 No

85 L7 – sorting Mol 1 maneuver 111 Yes

86 L8 – sorting Mol 1 maneuver 130 Yes

87 L1 – berths Mol 1 upload/ download 670 Yes

Page 10: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 10 / 13

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

88 L2 – berths Mol 1 upload/ download 670 Yes

89 L3 – berths Mol 1 upload/ download 668 Yes

90 L4 – berths Mol 1 upload/ download 668 No

5.2 Constanţa Port Zona B Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line 1 old sorting Maneuver 275 Yes

2 Line 2 old sorting Maneuver 263 Yes

3 Line 3 old sorting Maneuver 409 Yes

4 Line 4 old sorting Maneuver 394 Yes

5 Line 5 old sorting Maneuver 394 Yes

6 Line 6 old sorting Maneuver 300 Yes

7 Line 7 old sorting Maneuver 263 Yes

8 Line 8 old sorting Maneuver 239 Yes

9 Line 9 old sorting Maneuver 157 Yes

10 Line 10 old sorting Maneuver 135 Yes

11 Line 11 old sorting Maneuver 360 Yes

12 Line 12 old sorting Maneuver 328 Yes

13 Line 13 old sorting Maneuver 454 Yes

14 Line 14 old sorting Maneuver 261 Yes

15 Line 1 new sorting Maneuver 292 Yes

16 Line 2 new sorting Maneuver + weighing

315 Yes

17 Line 3 new sorting Maneuver 353 Yes

18 Line 4 new sorting Maneuver 335 Yes

19 Line 5 new sorting Maneuver 405 Yes

20 Line 6 new sorting Maneuver 336 Yes

21 Line 7 new sorting Maneuver 213 Yes

22 Line 8 new sorting Maneuver 174 Yes

23 Line 9 new sorting Maneuver 213 Yes

24 Line 10 new sorting Maneuver 283 Yes

25 Line 11 new sorting Maneuver 308 Yes

26 Line 12 new sorting Maneuver + weighing

206 Yes

27 Line 13 new sorting Maneuver 206 Yes OMV PETROM SA

28 Line 1 berths 35 Maneuver + Upload/download

701 Yes

29 Line 2 berths 35 Maneuver + Upload/download

728 Yes

30 Line 3 berths 35 Maneuver + Upload/download

834 Yes

31 Line 4 berths 35 Maneuver + Upload/download

763 Yes

32 Line 5 berths 35 Maneuver + Upload/download

763 Yes

33 Line 6 berths 35 Maneuver + Upload/download

768 Yes

34 Line 7 berths 35 Maneuver + Upload/download

768 Yes

Page 11: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 11 / 13

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

35 Line 1 berths 44 Maneuver + Upload/download

351 Yes

36 Line 2 berths 44 Maneuver + Upload/download

351 Yes

37 Line 3 berths 44 Maneuver + Upload/download

+ weighing

328 Yes

38 Line 4 berths 44 Maneuver + Upload/download

25 Yes

39 Line 5 berths 44 Maneuver + Upload/download

331 Yes

40 Line 1 berths 45 Maneuver + Upload/download

817 Yes

41 Line 2 berths 45 Maneuver + Upload/download

817 Yes

42 Line 3 berths 45 Maneuver + Upload/download

+ weighing

422 Yes

43 Line 4 berths 45 Maneuver + Upload/download

422 Yes

44 Line 5 berths 45 Maneuver + Upload/download

375 Yes

45 Line 6 berths 45 Maneuver + Upload/download

375 Yes

46 Line 7 berths 45 Maneuver + Upload/download

399 Yes

47 Line 1 A2

Maneuver 438 Yes SC CHIMPEX SA Magazii 2,3,4 POST REVIZIE Liniile 1,2,3 PAE Constanta

48 Line 1F Home / exp + locomotive crossing

693 Yes

5.3 Constanţa Port Mol 5 Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 1Z P/E 745 Yes CRH Ciment sa Bucuresti

2 2Z P/E 742 Yes CRH Ciment sa Bucuresti

3 3TZone V Maneuver 529 Yes

4 4TZone V Maneuver 300 Yes

5 5TZone V Maneuver 307 Yes

6 6TZone V Maneuver 308 Yes North Star Shipping Dana64

7 7TZone V Maneuver 395 Yes

8 8TZone V Maneuver 271 Yes

9 9TZone V Maneuver 270 Yes

10 1TZone IV Maneuver 111 Yes

11 2TZone IV Maneuver 187 No

12 3TZone IV Maneuver 201 No

13 4TZone IV Maneuver 273 Yes Chimpex Descarcare Uree

14 5TZone IV Maneuver 368 Yes

15 6TZone IV Maneuver 414 Yes

Page 12: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 12 / 13

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

16 7TZone IV Maneuver 255 Yes

17 8TZone IV Maneuver 184 Yes

18 9TZone IV Maneuver 205 Yes

19 10TZone IV Maneuver 243 Yes

20 11TZone IV Maneuver 227 Yes Chimpex Incarcare Fosfat

21 1TZone III Maneuver 429 Yes

22 2TZone III Maneuver 392 Yes

23 3TZone III Maneuver 374 Yes

24 4TZone III Maneuver 374 Yes

25 5TZone III Maneuver 392 Yes

26 6TZone III Maneuver 437 Yes SC Frial Liniile 1,2,3

27 7TZone III Maneuver 133 Yes SC Frial Liniile 1,2,3

28 8TZone III Maneuver 123 Yes

29 9TZone III Maneuver 416 Yes

30 10TZone III Maneuver 420 Yes

31 1 berths 49 Upload/download 1200 Yes

32 2 berths 49 Upload/download 1200 Yes

33 3 berths 49 Upload/download 684 Yes

34 4 berths 49 Upload/download 684 Yes

35 1 berths 54 Upload/download 881 Yes

36 2 berths 54 Upload/download 881 Yes

37 2bis D54 Upload/download 1104 Yes

38 3 berths 54 Upload/download 1104 Yes

39 3 berths 54 Upload/download 918 Yes

40 1 berths 59 Upload/download 879 Yes

41 2 berths 59 Upload/download 879 Yes

42 3 berths 59 Upload/download 1123 Yes

43 1 berths 64 Upload/download 776 Yes

44 2 berths 64 Upload/download 780 Yes

5.4 Constanţa Port Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Line 1 Maneuver 345 Yes LFI CNAPMC Mol 1 Sud si Zona Libera, LFI APM Terminal , LFI CNAPMC Poarta 10 Port, LFI SCHENKER Logistics,

5.5 Mangalia Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Connection line Mangalia – Mangalia Port

Maneuver 9334 Yes LFI Callatis Gas Constanta Terminal GPL Mangalia, LFI COMCM Sa Constanta PL Mangalia

Page 13: ANNEX 9.d PORT MARITIME AND INLAND ...cfrsa.cfr.ro/files/ddr/2020 Network Statement/Annex 9d...CFR NETWORK STATEMENT - 2020 ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES RELATED

Compania Naţională de Căi Ferate “CFR” S.A. România

13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 13 / 13

5.6 Călăraşi Station

No. Infrastructure element Affectation Lenght

[m] Operable

Connection with LFI

Observation

1 Connection line Calarasi Sud - Calarasi Port

Maneuver 3450 No

2 Calarasi Port L1 Upload/download 504 No LFI 3 T , LFI ADPF Giurgiu

3 Calarasi Port L2 Upload/download 480 No

4 Calarasi Port L3 Upload/download 448 No