Ankit sharma PTS

download Ankit sharma PTS

of 37

Transcript of Ankit sharma PTS

  • 8/4/2019 Ankit sharma PTS

    1/37

    ANKIT SHARMA 1

    By :ANKIT SHARMAVII SEM ECEJECRC

  • 8/4/2019 Ankit sharma PTS

    2/37

    ANKIT SHARMA 2

    SUN SHINE AUTOMATION INDIA LIMITED

    SIEMENS

    Authorized

    Service

    Business

    Partner

    Automation

    & Drives

    Division.

  • 8/4/2019 Ankit sharma PTS

    3/37

    What is Automation ?

    Automation is basically the delegation of human control

    function to technical equipment for

    Increasing Productivity

    Increasing Quality

    Reducing Cost

    Increasing Safety in working conditions

    ANKIT SHARMA 3

  • 8/4/2019 Ankit sharma PTS

    4/37

    Productivity

    Quality Labour Cost

    Plant

    Total Automation Manufacturing

    Competitiveness

    Solution

    Automation applied to plant

    ANKIT SHARMA 4

  • 8/4/2019 Ankit sharma PTS

    5/37

    Manual Control

    Hard wired logic Control

    Electronic Control using Logic GatesProgrammable Logic Controller

    ANKIT SHARMA 5

  • 8/4/2019 Ankit sharma PTS

    6/37

    A Programmable logical controller is a specializedcomputer used to control machines and processes.

    It uses a programmable memory to storeinstructions and specific functions that includeON/OFF control ,sequencing, arithmetic and datahandling.

    ANKIT SHARMA 6

  • 8/4/2019 Ankit sharma PTS

    7/37

    Reduced space Energy saving

    Ease of maintenance Economical Greater life & reliability Tremendous flexibility

    Shorter project time Easier storage, archiving and documentation

    ANKIT SHARMA 7

  • 8/4/2019 Ankit sharma PTS

    8/37

    Too much work required in connecting wires.

    Difficulty with changes or replacements.

    Difficulty in finding errors; requiring skillful workforce.

    ANKIT SHARMA 8

    http://upload.wikimedia.org/wikipedia/commons/2/2c/Automate_siemens_codeur_analyseur_de_trame.JPG
  • 8/4/2019 Ankit sharma PTS

    9/37

    The PLC is programmed interface between the field I/p element

    like limit switches, sensors, push button and the final control

    elements like actuator, solenoid/control valves, drives,

    hooters etc

    PLC consist of :-

    1. Power Supply

    2. CPU with Processor and Program memory

    3. Input Module4. Output Module

    5. Comm Port

    6. Programming Device [PC/Laptop]

    ANKIT SHARMA 9

  • 8/4/2019 Ankit sharma PTS

    10/37

    ANKIT SHARMA 10

    1. SMALL - it covers units with up to 128 I/Os and memories up to 2

    Kbytes.

    - these PLCs are capable of providing simple to advance

    levels or machine controls.

    2. MEDIUM - have up to 2048 I/Os and memories up to 32 Kbytes.

    3. LARGE - the most sophisticated units of the PLC family. They have

    up to 8192 I/Os and memories up to 750 Kbytes.

    - can control individual production processes or entire

    plant.

    PLC Size

  • 8/4/2019 Ankit sharma PTS

    11/37

    ANKIT SHARMA 11

    Hardware configuration

    A pictorial view---

    Powersupply

    CPUSignal Module

  • 8/4/2019 Ankit sharma PTS

    12/37

    Configuration of PLC : Siemens

    CPU

    External Power

    Supply

    I/O Modules

    ANKIT SHARMA 12

  • 8/4/2019 Ankit sharma PTS

    13/37

  • 8/4/2019 Ankit sharma PTS

    14/37

    ANKIT SHARMA 14

    Configuration of PLC : Modicon

    8 Analog Inputs 1Analog Output

    Up/Down FastCounter

    Up Counter

    Programming Terminal PC Connection

    Unitelway Port for connectionof up to 5 Slaves PCMCIA memory expansion port

    PCMCIA communications port

    Built in display for I/O(in-rack, AS-i) and Diag

    I/O Modules

  • 8/4/2019 Ankit sharma PTS

    15/37

    Function block diagrams (FBDs)

    Structured text (ST)Instruction List (IL)

    Sequential function charts (SFCs)

    Ladder logic.

    ANKIT SHARMA 15

  • 8/4/2019 Ankit sharma PTS

    16/37

    In PLC programming things (I\O) are Either True Or

    FalseIn case the inputs are true the rung becomes true and

    an output occurs.

    It is a graphical language very popular for

    programming

    ANKIT SHARMA 16

  • 8/4/2019 Ankit sharma PTS

    17/37

    Power flows through these contacts when they

    are closed. The normally open (NO) is true whenthe input or output status bit controlling the

    contact is 1. The normally closed (NC) is true

    when the input or output status bit controlling

    the contact is 0.

    ANKIT SHARMA 17

  • 8/4/2019 Ankit sharma PTS

    18/37

    ANKIT SHARMA 18

  • 8/4/2019 Ankit sharma PTS

    19/37

    ANKIT SHARMA 19

  • 8/4/2019 Ankit sharma PTS

    20/37

    ANKIT SHARMA 20

  • 8/4/2019 Ankit sharma PTS

    21/37

    ANKIT SHARMA 21

  • 8/4/2019 Ankit sharma PTS

    22/37

    ANKIT SHARMA 22

  • 8/4/2019 Ankit sharma PTS

    23/37

    Machine controls,

    Packaging,

    Material handling,similar Sequential task as well as Process control.

    ANKIT SHARMA 23

  • 8/4/2019 Ankit sharma PTS

    24/37

    Modicon

    Allen Bradley

    SiemensABB

    Mitsubishi

    GE FanucOmron

    Messung

    ANKIT SHARMA 24

  • 8/4/2019 Ankit sharma PTS

    25/37

    SCADA is Supervisory Control and Data Acquisition SCADA refers to a system that collects data from

    various sensors at factory or plant & then sends thisdata to central computer which manage or controldata.

    SCADA is used to control chemical plant processes, oiland gas pipelines, electrical generation andtransmission equipment, manufacturing facilities,

    water purification and distribution infrastructure, etc.

    ANKIT SHARMA 25

  • 8/4/2019 Ankit sharma PTS

    26/37

    Typically, there are three major elements that

    make up a SCADA system:

    The master terminal unit (MTU)

    The remote terminal unit (RTU)

    The communications equipment

    ANKIT SHARMA 26

    Basic System Components

  • 8/4/2019 Ankit sharma PTS

    27/37

    The MTU is known as Master Transmission Unit

    It is the heart of the system

    The MTU communicates with other peripheraldevices in the facility like monitors, printers, andother

    The primary interface to the operator is the

    monitor or CRT . Representation of valves, pumps, etc. As incoming

    data changes, the screen is updated

    ANKIT SHARMA 27

  • 8/4/2019 Ankit sharma PTS

    28/37

    Connected to sensors in the

    process, converting sensor signal to digital

    one and sending digital data to the

    supervisory system. As the name suggest it is remotely located in

    the plant that sends data to MTU.

    Relationship between MTU and RTU is

    typically defined as a master and slave.

    The major difference between the MTU and

    RTU is that the MTU initiates virtually all

    communications between the two.ANKIT SHARMA 28

  • 8/4/2019 Ankit sharma PTS

    29/37

    Communication equipment is required for bi-

    directional communications between an RTU and the

    MTU.

    This can be done through public transmission media or

    atmospheric means

    SCADA systems are capable of communicating using a

    wide variety of media such as Fiber optics, dial-up, or

    dedicated voice grade telephone lines, or radio

    frequency ANKIT SHARMA 29

  • 8/4/2019 Ankit sharma PTS

    30/37

    Features of typical SCADA software

    Dynamic process graphic

    Real-time and Historical trending Alarms

    Recipe Management

    Security

    Device connectivity

    Database connectivity

    ANKIT SHARMA 30

  • 8/4/2019 Ankit sharma PTS

    31/37

    ANKIT SHARMA 31

    Example Alarm Page

  • 8/4/2019 Ankit sharma PTS

    32/37

    Example Trending Chart

    ANKIT SHARMA 32

  • 8/4/2019 Ankit sharma PTS

    33/37

    Wonder ware : In Touch

    Intellution : Fix DMACS

    Merz : AspicAllen Bradley : Rsview

    Siemens : WinCC

    GE Fanuc : CimplicityKPIT : ASTRA

    ANKIT SHARMA 33

  • 8/4/2019 Ankit sharma PTS

    34/37

    ANKIT SHARMA 34

    CONCLUSION

    Using a SCADA system for their controls ensures a commonframework not only for the development of the specific applicationsbut also for operating the detectors. Operators experience the same"look and feel" whatever part of the experiment they control.However, this aspect also depends to a significant extent on properengineering.

    PLC is an industrial computer control system that continuouslymonitors the state of input devices and makes decisions based upona custom program to control the state of output devices. A digitallyoperating electronic system, designed for use in an industrialenvironment, which uses a programmable memory for the internal

    storage of user oriented instruction for implementing specificfunctions such as logic, sequencing, timing, counting, arithmetic, tocontrol various types of machines or processes through digital oranalog inputs.

  • 8/4/2019 Ankit sharma PTS

    35/37

    SCADA and Industrial Automation Security,http://www.scadasec.nethttp://www.ea.doe.gov/pdfs/21stepsbooklet.pdf

    Critical Infrastructure Protection: Challenges and Efforts to

    Secure Control Systemshttp://www.gao.gov/new.items/d04354.pdf

    Myths and Facts Behind Cyber Security of IndustrialControls http://www.pimaweb.org/conferences/

    SCADA Gospel Archives (edited archives of the SCADAmailing list)http://members.iinet.net.au/~ianw/archive/book1

    ANKIT SHARMA 35

  • 8/4/2019 Ankit sharma PTS

    36/37

    ANKIT SHARMA 36

  • 8/4/2019 Ankit sharma PTS

    37/37