1 Andhra Power Sector Reforms -Energy Accounting and Boundary metering- August 27, 2010 Hyderabad

Transcript of Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV...

Page 1: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

1

Andhra Power Sector Reforms

-Energy Accounting and Boundary metering-

August 27, 2010

Hyderabad

Page 2: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

2

Contents

• Reform background

• Reform drivers

• Highlights of Reform Act

• Establishment of KERC

• GoK Actions

• Lessons learned

Page 3: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

3

Purpose and Approach

• Unbundled entities need to have transactions at arms length – for energy handled, common assets shared and other costs

• Working group formed to assess and prepare the implementation roadmap

• Boundary areas between T & D identified

• Principles to be followed in settling energy accounting between entities

Page 4: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

4

The Energy Billing Center The EBC is established in 1st April 2001 with DFID

funding.

This project is planned to be implemented in three phases Phase1 : T-D Billing based manual readings

Phase2 : T-D Billing to be done based on MRI data

Phase3 : On line metering data acquisition for billing

EBC deals with following major activities T-D Energy Certification

G-T Energy Certification

Transmission Losses Calculation

Discom to Discom Energy & Cost Settlement

Open Access Settlements within State

Page 5: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

5

G-T Interface metering points

Sr. No. Metering Point Type No. of Metering

Points

1 APGENCO-APTRANSCO 88

2 PGCIL/CGS 41

3 NTPC 4

4 INTER-STATE 7

5 IPPs 15

6 CPPs 5

7 APGPCL 6

8 132kV EHT PDs 12

G-T SUB-TOTAL: 178

Page 6: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

6

Location of G-T Meters

For APGENCO – At HV side of Gen T/F

For PGCIL/CGS – At LV side of Out going Fdr.

For NTPC – At HV side of Out going Fdr.

For IPPs, CPPs & – At HV side of Out going Fdr.

EHT PDs

Page 7: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

7

T-D Interface metering points (As on Feb’10)

S. No. Metering Point

Type Sub category CPDCL EPDCL NPDCL SPDCL TOTAL

1 PTR LVs 33KV (or) 11KV 249 106 152 195 702

2 EHT Consumers 220kV Industrial 4 3 2 0 9

3 EHT Consumers 132kV Industrial 41 34 18 17 110

4 EHT Consumers 132kV Rly.Traction 8 17 13 25 63

5 G-D -- 9 2 15 1 27

6 D-D -- 7 13 4 10 34

7 PDs (33kV,11kV) -- 52 27 9 60 148

DISCOM TOTAL 370 202 213 308 1093

Page 8: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

8

Location of T-D Meters

For Power T/Fs – At LV side

For EHT Consumers – At APTRANSCO

Sub-Stations

For NCE’s PDs – As per PPAs

Page 9: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

9

ANDHRA PRADESH TRANSMISSION

SYSTEM

(AS ON 31st AUGUST, 2008)400kV

220kV

132kV

33kV

CGS/PGCIL

G-T M.P. - (41)

220kV APGENCO

33kV PRIVATE DEVELOPERS

T-D M.P. - (134)

132kV EHT

CONSUMERS

T-D M.P. - (94)

220kV EHT

CONSUMERS

T-D M.P. - (7)

220kV INTER-STATE

132kV INTER-STATE

G-T M.P. - (1) G-T M.P. - (17)

G-T M.P.- (59) G-T M.P. - (6)

132kV TRACTION

FEEDERS

T-D M.P. - (61)

33kV LVs T-D M.P. – (609)

GEN

GEN

GEN

220kV IPPs (4)

GEN

G-T M.P. -

(13)

INTER-DISCOM

33kV T-D M.P. – (13)

400/220kV

220/132kV

132/33kV 220/33kV

GEN

132kV PRIVATE

DEVELOPERS (12)

G-T M.P. -

(12)

132kV IPP (2), cpp(1)

132/66kV

11kV

INTER-DISCOM

11kV T-D M.P. – (15)

132/11kV

11kV LVs M.P. – (51)

33kV LVs T-D M.P. – (12)

66kV LVs T-D M.P. – (1)

GENCO-DISCOM

11kV T-D M.P. – (17)

GENCO-DISCOM

33kV T-D M.P. – (9)

GEN11kV PRIVATE DEVELOPERS

T-D M.P. - (7)

GEN

220kV APGPCL (2)

G-T M.P. -

(6)

GEN

132kV APGENCO

G-T M.P. -

(3)

400kV APGENCO

GEN

G-T M.P. - (10)

GEN

220kV CPP (2)

G-T M.P. -

(4)

400kV NTPC SIMHADRI

GEN

G-T M.P. - (4)

G-T: 176, T-D: 1030, TOTAL METERING POINTS = 1206

ANDHRA PRADESH TRANSMISSION

SYSTEM

(AS ON 31st AUGUST, 2008)400kV

220kV

132kV

33kV

CGS/PGCIL

G-T M.P. - (41)

220kV APGENCO

33kV PRIVATE DEVELOPERS

T-D M.P. - (134)

132kV EHT

CONSUMERS

T-D M.P. - (94)

220kV EHT

CONSUMERS

T-D M.P. - (7)

220kV INTER-STATE

132kV INTER-STATE

G-T M.P. - (1) G-T M.P. - (17)

G-T M.P.- (59) G-T M.P. - (6)

132kV TRACTION

FEEDERS

T-D M.P. - (61)

33kV LVs T-D M.P. – (609)

GEN

GEN

GEN

220kV IPPs (4)

GEN

G-T M.P. -

(13)

INTER-DISCOM

33kV T-D M.P. – (13)

400/220kV

220/132kV

132/33kV 220/33kV

GEN

132kV PRIVATE

DEVELOPERS (12)

G-T M.P. -

(12)

132kV IPP (2), cpp(1)

132/66kV

11kV

INTER-DISCOM

11kV T-D M.P. – (15)

132/11kV

11kV LVs M.P. – (51)

33kV LVs T-D M.P. – (12)

66kV LVs T-D M.P. – (1)

GENCO-DISCOM

11kV T-D M.P. – (17)

GENCO-DISCOM

33kV T-D M.P. – (9)

GEN11kV PRIVATE DEVELOPERS

T-D M.P. - (7)

GEN

220kV APGPCL (2)

G-T M.P. -

(6)

GEN

132kV APGENCO

G-T M.P. -

(3)

400kV APGENCO

GEN

G-T M.P. - (10)

GEN

220kV CPP (2)

G-T M.P. -

(4)

400kV NTPC SIMHADRI

GEN

G-T M.P. - (4)

G-T: 176, T-D: 1030, TOTAL METERING POINTS = 1206

Page 10: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

10

EBC ACTIVITIES

Collection Monthly manual readings of

G-T and T-D interface meters.

Manual data feeding into Energy Billing

System.

Generation of T-D Monthly Energy Abstract

Page 11: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

11

T-D Manual Readings entering form in EBS

Page 12: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

12

Sample T-D Energy Certificate

Page 13: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

13

EBC ACTIVITIES Contd...

MRI data collection from G-T & T-D points

Validation of MRI data

Conversion MRI data into PRN format

Uploading of MRI data to Oracle DB

Comparison of Manual Vs MRI energies

Analysis of MRI data for missing points

Preparation of PDSM points report.

Page 14: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

14

Sample MRI data validation

MRI data

missing

Page 15: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

15

Sample PRN format of a Meter

"M Serial","AP003623"

"Location","MAHABOOBNAGA"

"ExtMulFac",360000.000

"Dates", "02-04-2007","02-04-27 ","02-04-2 007","02-04-2007","02- 04-2007","02-04-2007","01-04-2007

"Units", "KVA(E)" , "KVA(I)"," KVAr(Ld)" ,"KVAr(Lg)" ,"KW(E)" , "KW(I)" , "KVA(E)" , "KVA(I)"

"Interval", " ", " ","@ W(I)" ," @ W(I)" , "", " ", " ", " ","

"00:30", 0.00, 35856.00,0.00, 14472.00, 0.00, 32832.00, 0.00, 34560.00,

"01:00", 0.00, 35856.00,0.00, 14472.00, 0.00, 32832.00, 0.00, 21600.00,

"01:30", 0.00, 35424.00,0.00, 13824.00, 0.00, 32616.00, 0.00, 21816.00,

"02:00", 0.00, 34992.00,0.00, 13392.00, 0.00, 32400.00, 0.00, 34776.00,

Page 16: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

16

Sample PRN format of a Meter Version,3.1

M Serial,"AP003784"

Location,"K M PALLY"

ExtMulFac,360000.000

-1.0 indicates ALL POTENTIALS MISSING

Security: FAIL

"Dates", "01-09-2008","01-09-2008","01-09-2008","01-09-2008","01-09-2008","01-09-2008","31-08-2008","31-08-2008","31-08-2008","31-08-2008","31-08-2008","31-08-2008","30-08-2008","30-08-2008","30-08-2008","30-08-2008","30-08-2008","30-08-2008",

"Units", "KVA(E)" , "KVA(I)" ,"KVAr(Ld)" ,"KVAr(Lg)" , "KW(E)" , "KW(I)" , "KVA(E)" , "KVA(I)" ,"KVAr(Ld)" ,"KVAr(Lg)" , "KW(E)" , "KW(I)" , "KVA(E)" , "KVA(I)" ,"KVAr(Ld)" ,"KVAr(Lg)" , "KW(E)" , "KW(I)" ,

Interval, " ", " ","@ W(I)" ,"@ W(I)" , " ", " ", " ", " ","@ W(I)" ,"@ W(I)" , " ", " ", " ", " ","@ W(I)" ,"@ W(I)" , " ", " ",

"00:30", 31536.00, 0.00, 19008.00, 0.00, 25056.00, 0.00, 28080.00, 0.00, 14688.00, 0.00, 24192.00, 0.00, 25704.00, 0.00, 13608.00, 0.00, 21816.00, 0.00,

"01:00", 30888.00, 0.00, 18360.00, 0.00, 24840.00, 0.00, 27864.00, 0.00, 14688.00, 0.00, 23760.00, 0.00, 27216.00, 0.00, 14688.00, 0.00, 23112.00, 0.00,

"01:30", 29808.00, 0.00, 18144.00, 0.00, 23760.00, 0.00, 26784.00, 0.00, 14040.00, 0.00, 22680.00, 0.00, 26352.00, 0.00, 14040.00, 0.00, 22032.00, 0.00,

"02:00", 31104.00, 0.00, 18576.00, 0.00, 25056.00, 0.00, 27864.00, 0.00, 14472.00, 0.00, 23760.00, 0.00, 27216.00, 0.00, 14904.00, 0.00, 22896.00, 0.00,

"02:30", 31536.00, 0.00, 18360.00, 0.00, 25272.00, 0.00, 27648.00, 0.00, 14688.00, 0.00, 23544.00, 0.00, 27864.00, 0.00, 15120.00, 0.00, 23544.00, 0.00,

"03:00", 31104.00, 0.00, 18792.00, 0.00, 25056.00, 0.00, 29808.00, 0.00, 16200.00, 0.00, 25056.00, 0.00, 29808.00, 0.00, 15984.00, 0.00, 25056.00, 0.00,

"03:30", 33912.00, 0.00, 19440.00, 0.00, 27864.00, 0.00, 32832.00, 0.00, 17064.00, 0.00, 28080.00, 0.00, 33264.00, 0.00, 17280.00, 0.00, 28512.00, 0.00,

"04:00", 34344.00, 0.00, 19440.00, 0.00, 28296.00, 0.00, 33696.00, 0.00, 17280.00, 0.00, 28728.00, 0.00, 33696.00, 0.00, 17496.00, 0.00, 28728.00, 0.00,

"04:30", 33048.00, 0.00, 18792.00, 0.00, 27216.00, 0.00, 33696.00, 0.00, 17280.00, 0.00, 29160.00, 0.00, 33912.00, 0.00, 17496.00, 0.00, 29160.00, 0.00,

"05:00", 33480.00, 0.00, 18792.00, 0.00, 27648.00, 0.00, 34344.00, 0.00, 17280.00, 0.00, 29592.00, 0.00, 34344.00, 0.00, 17280.00, 0.00, 29592.00, 0.00,

"05:30", 34776.00, 0.00, 19224.00, 0.00, 28944.00, 0.00, 33912.00, 0.00, 16848.00, 0.00, 29376.00, 0.00, 35208.00, 0.00, 17712.00, 0.00, 30456.00, 0.00,

"06:00", 34776.00, 0.00, 19224.00, 0.00, 29160.00, 0.00, 32832.00, 0.00, 16632.00, 0.00, 28296.00, 0.00, 33912.00, 0.00, 17064.00, 0.00, 29376.00, 0.00,

"06:30", 30888.00, 0.00, 17928.00, 0.00, 25272.00, 0.00, 29808.00, 0.00, 15552.00, 0.00, 25704.00, 0.00, 25488.00, 0.00, 14256.00, 0.00, 21168.00, 0.00,

"07:00", 27000.00, 0.00, 16632.00, 0.00, 20952.00, 0.00, 28728.00, 0.00, 15120.00, 0.00, 24192.00, 0.00, 21168.00, 0.00, 12744.00, 0.00, 16848.00, 0.00,

"07:30", 22896.00, 0.00, 14904.00, 0.00, 17496.00, 0.00, 25704.00, 0.00, 13608.00, 0.00, 21816.00, 0.00, 9288.00, 0.00, 5616.00, 0.00, 7344.00, 0.00,

"08:00", 26136.00, 0.00, 15552.00, 0.00, 20952.00, 0.00, 27432.00, 0.00, 14040.00, 0.00, 23760.00, 0.00, 14256.00, 0.00, 8208.00, 0.00, 11664.00, 0.00,

"08:30", 32832.00, 0.00, 18360.00, 0.00, 27432.00, 0.00, 28296.00, 0.00, 13824.00, 0.00, 24624.00, 0.00, 17496.00, 0.00, 9288.00, 0.00, 14904.00, 0.00,

"09:00", 36072.00, 0.00, 20304.00, 0.00, 29592.00, 0.00, 31968.00, 0.00, 15120.00, 0.00, 28080.00, 0.00, 18792.00, 0.00, 10584.00, 0.00, 15552.00, 0.00,

"09:30", 39096.00, 0.00, 19224.00, 0.00, 34128.00, 0.00, 34776.00, 0.00, 16416.00, 0.00, 30672.00, 0.00, 31968.00, 0.00, 17280.00, 0.00, 26784.00, 0.00,

Page 17: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

17

Sample MRI vs. Manual Energies Report

Load

Survey Start End diff Remarks

1

A.P.Carbides (220kV Kurnool)

16MVA 132/33 kV Transformer#1 AP003592 HH174729 3.12404 3.10332

2

A.P.Carbides (220kV Kurnool)

15MVA 132/33 kV Transformer#2 AP003602 HH174729 6.73038 6.72744

3

Achampet 16MVA 132/33 kV

Transformer#1 KAB01909 HH174690 3.96348 3.94159

4

Achampet 16MVA 132/33 kV

Transformer#2 KAB01923 HH174690 4.0503 4.02841

5

Adoni 16MVA 132/33 kV

Transformer#1 AP003590 HH174720 5.35392 5.32908

6

Adoni 31.5MVA 132/33 kV

Transformer#2 KAU05194 HH174720 8.2848 8.304

7

Adoni 16MVA 132/11 kV

Transformer#3 AP003603 HH174720 0.84586 0.8526

8

Alampur 16MVA 132/33 kV

Transformer#1 GEC05766 HH208655 2.66235 2.6555

August 2008 - Manual/MRI Energies(MU) Comparison Statement for APCPDCL

S.No. Transfer Point Meter No MRI No

Energy (MU)

Page 18: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

18

EBC ACTIVITIES Contd...

Transmission loss calculation in APTRANSCO

network based on MRI data

This is one of the input for calculation of T&D

Loss.

Page 19: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

19

Sample Transmission Loss statement INPUT NET ENERGY (MU) OUTPUT

APGENCO TOTAL 2143.51 DISCOM MU

THERMAL 1705.22

220kV/33kV,132kV/33kV,132/11kV

Power Tr. & 220kV,132kV EHT

Feeders

HYDEL 438.29 CPDCL 2053.67

C.G.S EPDCL 636.81

CGS ( Injection at AP-Periphery) 1213.04 NPDCL 767.01

NTPC-SIMHADRI 639.49 SPDCL 975.34

APGPCL TOTAL 104.07 Total 4432.82

APGPCL Stage-I 23.41

APGPCL Stage-II 80.67

IPPs TOTAL 401.59 Losses MU

GVK 86.67 With in State 184.73

Spectrum 87.75 Total Losses 184.73

Lanco 149.66

Reliance 78.03 % Tr. Losses 4.00

VGPL -0.53

Gowthami 0.00

Konaseema 0.00

M.P.Ps TOTAL 7.79

LVS -0.04

Srivatsa 7.83

CPPs TOTAL 25.07

HWP 7.81

NBFA # 7.18

VSP 10.07

NCEs (132kv

above) TOTAL 42.25

Clarion Power Corporation Ltd 4.16

Ganapathi Sugars Ltd. 6.87

GMR Technologies Ltd. 3.52

Kakatiya Cement & Sugar Industries Ltd. 5.86

Nagarjuna Green Power Ltd. (NGPL) 4.39

Sagar Sugar & Allied Products Ltd. 4.24

Jeypore Sugars Ltd. 3.80

Nizam Deccan Sugars Ltd. 9.42

Others

(132 Kv PDs) TOTAL 40.74

R.V.K. Energy Pvt. Ltd 5.50

Sriba Industries Ltd. 6.28

Rain Calcining Ltd. 28.96

TOTAL INPUT IN MU 4617.55

Page 20: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

20

EBC ACTIVITIES Contd... As Per G.O.Ms.58 Dt. 07-06-2005

APTRANSCO relieved from all trading activities w.e.f

10th June 2005.

All PPAs with APTRANSCO were vested on DISCOMs

Under 3rd transfer scheme.

Further all Generation Capacities have been allocated

to Discoms as follows:

CPDCL: 43.42% (46.06%*) EPDCL:16.89% (15.80%*)

SPDCL: 22.83% (22.27%*) NPDCL:16.86% (15.87%*)

(* values are new % allocations as per G.O.Ms No.53,

Dtd.28-4-2008)

Page 21: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

21

EBC ACTIVITIES Contd...

From 10th June 2005 EBC started doing D-D

Energy and Cost settlement on15 mints Interval.

For which IBSS model has been developed by

M/s. Deloitte Consultants.

Further IBSS is upgraded in Advanced Java

application (FBSS).

Page 22: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

22

EBC ACTIVITIES Contd...

D to D Settlement Activities: (Inputs Preparation)

APGENCO stations Variable Costs from Power

Purchase wing (APPCC)

SLBPH Energy Input and its VC from CE/ Comml./

APPCC

Inter State Power Purchase Costs from Power Purchase

wing (APPCC)

Daily Generators/Discoms schedules from SLDC wing

Collection of REA data from SRPC.

Page 23: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

23

EBC ACTIVITIES Contd...

Discom to Discom Settlement Activities:

Coordinating APBSC meeting for review and certification

of D-D energy and cost settlement.

Submission of APBSC approved D-D settlements reports

to APPCC

On approval of D-D settlement reports by APPCC the

same will be sent to Dy.CCA (PP,S&BR) of APPCC for

further action

Page 24: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

24

IBSS WORKING MODALITY

PDSM

Inputs

Settlement

Calculation Module

Report

Generation Module

EBS II

Inputs

System

Outputs

DCM-1

Transmission Loss

& Pricing Module

Unscheduled

Interchange

Module

DCM-2

Imbalance Pricing

Module

REA

Inputs

RAC

Inputs

SLDC

Inputs

PPA

Inputs

INPUTS EBS

IBSS

OUTPUTS

Ex-Ante Price

Signal Module

Page 25: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

25

EBC ACTIVITIES Contd...

Implementation of IBSC for OA Users as per APERC

Regulation No.2 of 2006.

OA Users System Software development is under

progress

Procurement of Hardware for web based OA application

is under progress.

Presently Settlement is being done for M/s. SPPL

(OAG) and M/s. Zuari Cements Ltd.

Page 26: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

26

Open Access System Flow

Master Data

Inputs Schedule Inputs Actual Inputs

Net Capacities calculations at exit

point after Re-allocation of schedules

Settlement

Module

Reports

Module

Data

Substitution

Model

Missing

MRI

data

No

Yes

Page 27: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

27

Lessons Learnt

• Created a system that ensures bulk energy flows – reduced dis-agreements between T & D, as well as intra-Discoms

• System ready for introducing “Open Access” – market creation

• System congenial to help in moving from single buyer to multi-buyer

• Helps in load research and understanding the load duration details for a Discom

Page 28: Andhra Power Sector Reforms...Sub category CPDCL EPDCL NPDCL SPDCL TOTAL 1 PTR LVs 33KV (or) 11KV 249 106 152 195 702 2 EHT Consumers 220kV Industrial 4 3 2 0 9 3 EHT Consumers 132kV

28

Thank you