ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants coming from 12 companies (EURESCOM Shareholders) Michalis Mavis P614 EURESCOM Project Supervisor

Transcript of ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project...

Page 1: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 1

Access Network in EURESCOM Projects, and the P614 Project

Umberto Ferrero CSELT (P614 Project Leader)

Participants coming from 12 companies (EURESCOM Shareholders)

Michalis MavisP614 EURESCOM Project Supervisor

Page 2: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 2

• P614 is becoming increasingly popular as a

reference source of independent broadband

access network recommendations-WEB sites

http://www.cselt.it/Cselt/euresc/P614 http://www.eurescom.de

-request for reprints and documents from operators,

-manufacturers, journalist and consultants all over the world

• Conferences, magazines, workshops

• Deliverables are public domain

P614 as source of “access network” information

Page 3: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 3

EURESCOM and the access network: managing the European diversity

• Shareholders

- over 20 Telecom Operators (Telcos)

- ... with several service and network scenarios

- no “one size fits all” approach

• Identification of areas of common interest

• Access network-related studies since 1991

- Common results (EURESCOM P306 and P413)

- Customer-specific customization

FSAN

ATM - PON

Page 4: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 4

Access network in EURESCOMP306: Access network evolution and preparation for implementation

P413: Optical networking in the local loop

1992-94

1994-96

1996-98

WOMANWORKSHOP

BAHNWORKSHOP

P614: Implementation strategies for advanced access networks

• Outline of specifications for broadband access networks

• Migration paths towards B-ISDN access networks

• Exploration of broadband radio access

• FTTx enabling technologies

• FTTH architectures, services and technical issues

• Techno-economic evaluation and comparison of identified B-

ISDN/ATM based network alternatives

ANCITWORKSHOP

Page 5: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 5

ADSL/ADSL/FTTExchFTTExch

PONPONFTTCabFTTCab

PONPONFTTHFTTH

RadioRadio

PONPONFTTB/CFTTB/C

ONU

ONU

HFCHFCFN

BS

P614 addresses several access

network architectures

Page 6: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 6

Access as a commodity?

Satellite

CATV network

PowerlinesPSTN(existing copper plant)

Broadbandoverlay network

Fixed radio accessMobile

Several access infrastructures can be exploited in the same area

USER

Page 7: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 7

Target technologies for fixed access• FSAN based PON solutions

- identified as technology of choice by EURESCOM P306 (April 1994, “Guidelines for broadband access networks”)

- full PON specification now available (ITU-T G.983)

- approaching market availability

• Point to point systems

• ... both complemented by a range of high speed copper access systems

• ATM common platform

Page 8: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 8

FTTx enabling technologiesTopics addressed by P614

• Component technology- Maturity and cost

• Outside plant technology- Cabling, ducting, connectors, cabinets

- Powering

- Testing

• Transmission technology- Point to point links (access and drop)

- Exploitation of WDM

- Alternative drop technologies (CDSL, powerlines)

RFI on Plastic Optical Fibres (POFs)

Page 9: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 9

Down to earth

• ... or under the ground: the importance of outside plant technologies

- powering

- cabinets

- digging, ducting

- cabling

• 70% of the access network costs is due to infrastructure: how this burden can be reduced?

- Re-using copper wires

- Adopting innovative installation techniques!

Page 10: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 10

Optical cabling elements for FTTx

FTTC/Cab

FTTB

FTTH

FTTH/A

Manhole

Duct Duct / direct buried

LEX

O

L

T

MDFOM

Cables : Connectors :

Splices in enclosure : Splitter :

MDF : main distribution fram e OM : optical monitoring

ONU

ONU

ONUONU

ONU

ONU

Page 11: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 11

Broadband RADIO ACCESS

P614 is also addressingissues related to radioaccess

Advantages of radio access:• potentially low cost

• fast deployment

• progressive investments

Drawbacks• partial coverage

• spectrum availability

• lack of standardisation

UMTS

Terrestrial solutions

LMDS / MMDS

GEO, LEO

Satel

lites

RLANBroadbandData Network

Set TopUnit

Hub StationAir InterfaceUnit

VideoServer

PublicTelephoneNetwork

SubscriberRF Unit

SubscriberNetworkInterface Unit

Fibre/Wireless

CABINET

LOCALEXCHANGE(HEAD-END)

BOX

VERTICALCABLING

HOMENETWORK

SERVICE1

CORE NETWORKCORE NETWORK(ATM, IP,(ATM, IP,

POTS/ISDN)POTS/ISDN)

SERVICE2

SERVICE3

PRIMARYACCESS NETWORK

SECONDARYACCESS NETWORK

CUSTOMER

Page 12: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 12

Techno-economic evaluation

Rationale

• Techno-economics is an on-going concern

• Advantages of comparison carried out by an independent body with the PNOs direct expertise

Targets

• Update of former results

• Realistic price of equipment for new technologies

• Comparison of identified B-ISDN network alternatives

• Broadband radio evaluation

• Flexible adaptation of results to local needs

Page 13: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 13

• What is the cost of bandwidth ?• Are ADSL and HDSL solutions attractive ?• HFC technology is a cheap solution, or not ?• What about the BPON architecture ?• FTTx (but how close to the customer ?) x = ???

CAPACITY UPGRADE

• What is the cost to upgrade ?• What is the financial risk ?

Some techoeconomic considerations

INITIAL INVESTMENT

$

$$$

Page 14: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 14

The challenge of the broadband access network implementation

• Time for real deployment- focus on practical issues

• End of a single architecture- access network as a combination of technologies, keeping a

comprehensive overall network perspective

• Ability to support the changing needs of Operators - there is still opportunity for cooperation in a competitive environment

- coordinated contribution to standardization bodies

- techno-economic evaluations

The three key messages

Page 15: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 15

P614 Deliverables

Title Planned issue date

D1 An analysis of the relative benefits of proposed SNI standards April 1997

D2 Target B-ISDN access network architectures December 1997

D3 Techno-economic analysis of major factors of B-ISDN/ATM upgrades September 1997

D4 Opportunities for broadband radio technologies in the access network January 1998

D5 Optical technologies for advanced access networks: early results December 1997

D6 Evolution paths towards target B-ISDN access networks July 1998

D7 Optical technologies for advanced access networks: final results September 1998

D8 Elaboration of common FTTH guidelines July 1998

D9 Contributing to standardisation bodies and other fora April 1998

D10 Techno-economic evaluation of B-ISDN access networks

architectures, scenarios and business cases

September 1998

D11 Evaluation of Broadband Home Networks for residential and small

business

September 1998

D12 FTTH: Definition of the suitable powering architectures * February 1998

D13 FTTH: Definition of access network quality and cost * February 1998

D14 FTTH: Definition of related service offer strategies * February 1998

* Deliverables to be produced following approval by the Board of Governors.

Page 16: ANCIT WORKSHOP Torino 30-31 March 1998 1 Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.

ANCIT WORKSHOPTorino 30-31 March 1998 16

WHAT AFTER P614 ?

A number of advanced access networks are available Interoperability and field operation testing is needed

Considering that ...

P614 proposes ...

The creation of a co-ordination platform for lab testing of broadband access equipment, broadband home network technologies, fixed-mobile broadband access network demonstrations co-ordinating these activities with the FSAN actions

.

.

.

.

Proposals for WP-1999