Ancillary services: Research results from wind power plants · ancillary service products (research...

36
General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. Users may download and print one copy of any publication from the public portal for the purpose of private study or research. You may not further distribute the material or use it for any profit-making activity or commercial gain You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. Downloaded from orbit.dtu.dk on: Aug 06, 2020 Ancillary services: Research results from wind power plants Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Hansen, Anca Daniela; Altin, Müfit; Zeni, Lorenzo; Basit, Abdul Publication date: 2014 Document Version Peer reviewed version Link back to DTU Orbit Citation (APA): Sørensen, P. E. (Author), Cutululis, N. A. (Author), Hansen, A. D. (Author), Altin, M. (Author), Zeni, L. (Author), & Basit, A. (Author). (2014). Ancillary services: Research results from wind power plants. Sound/Visual production (digital)

Transcript of Ancillary services: Research results from wind power plants · ancillary service products (research...

Page 1: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights.

Users may download and print one copy of any publication from the public portal for the purpose of private study or research.

You may not further distribute the material or use it for any profit-making activity or commercial gain

You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim.

Downloaded from orbit.dtu.dk on: Aug 06, 2020

Ancillary services: Research results from wind power plants

Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Hansen, Anca Daniela; Altin, Müfit; Zeni, Lorenzo;Basit, Abdul

Publication date:2014

Document VersionPeer reviewed version

Link back to DTU Orbit

Citation (APA):Sørensen, P. E. (Author), Cutululis, N. A. (Author), Hansen, A. D. (Author), Altin, M. (Author), Zeni, L. (Author), &Basit, A. (Author). (2014). Ancillary services: Research results from wind power plants. Sound/Visual production(digital)

Page 2: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

Ancillary services: Research results from wind power plants

Poul Sørensen, Nicolaos Cutululis, Anca D. Hansen, Müfit Altin, Lorenzo Zeni, Abdul Basit

Page 3: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Program outline Ancillary Services: Research Results From Wind Power Plants

• Characteristics and requirements for ancillary service provision to

European power systems - now and in the future

• Technical capabilities required by wind power plants in order to provide ancillary services - a focus on state-of-the-art industry and R&D (simulation based) perspectives

• What are the economic incentives and barriers to providing ancillary services?

• What are the next steps for researchers, developers, system operators and turbine manufacturers to allow further penetration of wind into European grids?

Windpower Monthly - Grid support and ancillary services

2 2014-06-04

Page 4: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Definitions of ancillary services • CIGRÉ report - overview of International Practices

– definitions for ancillary services can differ significantly based on who is using the terms. While some definitions emphasize the importance of ancillary services for system security and reliability, others mention the use of ancillary services to support electricity transfers from generation to load and to maintain power quality

• Some TSOs are including more specific types of ancillary services than others because

– differences in the definitions (above) – some of the required properties of the generation plants are

embedded in conventional power plants using directly grid connected synchronous generators.

– new ancillary service products seem to pop up in power systems with large scale penetration of renewables.

Windpower Monthly - Grid support and ancillary services

3 2014-06-04

Page 5: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Requirements for – and types of – ancillary services • Active power reserves (using ENTSO-E glossary)

– Frequency containment reserves (FCR) – Frequency restoration reserves (FRR) – Replacement reserves (RR)

• Properties required to maintain power system stability today (Energinet.dk terminology)

– Short-circuit power – Continuous voltage control – Voltage support during faults – Inertia

• Possible new ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising power – Power oscillation damping – Black-start capability

Windpower Monthly - Grid support and ancillary services

4 2014-06-04

Page 6: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

RESERVICES CONSORTIUM www.reservices-project.eu

Sharon Wokke Project Manager European Wind Energy Association Rue d’Arlon 80 1040 Brussels (Belgium) Tel: 0032 2 213 18 39 [email protected]

Page 7: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Windpower Monthly - Grid support and ancillary services

6 2014-06-04

Page 8: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

State of the art technical capabilities in industry • Horns Rev 2002 (Kristoffersen et.al.) according to first DK technical

requirements – Primary frequency control – Secondary frequency control – Reactive power neutral

• Today +

– Continuous voltage control – Voltage support during faults – “Inertia” under development – verification?

• REserviceS presentation more details?

Windpower Monthly - Grid support and ancillary services

7 2014-06-04

Page 9: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

Simulation based verification of ancillary services from wind power Anca D. Hansen, Müfit Altin DTU Wind Energy

Page 10: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

9 2014-06-04

Background

PSO project EaseWind Enhanced Ancillary Services from Wind Power Plants

Partners: Vestas Technology R&D DTU Wind Energy DTU Compute AAU IET Objective

to develop technical solutions for enabling wind power to have similar power plant characteristics as conventional generation units.

Wind power replacing conventional power plants!

Windpower Monthly - Grid support and ancillary services

Page 11: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Ancillary services from wind power plants

10

The ancillary services from wind power plants are supported by communication and control at the power plant level.

2014-06-04 Windpower Monthly - Grid support and ancillary services

Page 12: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

11

Simple generic wind power plant model follows the basic structure of the IEC standard Type IV wind turbine model

includes additional adjustments to reflect the dynamics relevant for active power and grid frequency control capabilities.

Pitchcontroller Aerodynamic Mechanical

model

Staticgenerator

Wind speed(CorWind)

P, Q measurements

P control

Q control

v

vFilter

MPPT Power referenceselection

LVRT

wtWPPCP

Optimal speedreference

Wind speedfilter

filtgen _ω

refgen _ω

filtgen _ω

Estimatedavailable power

filtgen _ω

wtMPPTP

wtrefP

wtmeasP

wtmeasP

wtmeasQ

wtrefQwt

WPPCQ

wtrefP

wtavailableP

Pcmdi

Qcmdi

wtaeroP

wtmeasP

rotω

θ

filtgen _ω

2014-06-04 Windpower Monthly - Grid support and ancillary services

Page 13: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Wind speed 0.6pu

Short-term overproduction capability Wind speed 0.93pu Wind speed 1.1pu

Below rated wind speed, the overproduction is followed by recovery period

The higher the wind speed, the shorter the recovery period

The higher the overproduction power: the longer the recovery period and the larger the power underproduction -> frequency stability might

be affected the higher the shaft torque -> high mechanical stress of the turbine

No power recovery above rated wind speed

0 5 10 15 20 25 30 35 400.2485

0.249

0.2495 Aerodynamic power [pu]

0 5 10 15 20 25 30 35 40-0.005

0

0.005ωgen - ωrot [pu]

0 5 10 15 20 25 30 35 40-1

0

1

Time [sec]

Pitch Angle [deg]

0 5 10 15 20 25 30 35 400.2

0.25

0.3

Electrical power [pu]

0 5 10 15 20 25 30 35 400.8

0.85

0.9 Rotor Speed [pu]

0 5 10 15 20 25 30 35 400.2

0.25

0.3

0.35

0.4Shaft Torque [pu]

0 5 10 15 20 25 30 35 400.6

0.8

1 Aerodynamic power [pu]

0 5 10 15 20 25 30 35 40-0.06-0.04-0.02

00.02

ωgen - ωrot [pu]

0 5 10 15 20 25 30 35 40-1

0

1

Time [sec]

Pitch Angle [deg]

0 5 10 15 20 25 30 35 400

0.5

1

Electrical power [pu]

0 5 10 15 20 25 30 35 400.70.80.9

11.1 Rotor Speed [pu]

0 5 10 15 20 25 30 35 40-0.5

00.5

11.5 Shaft Torque [pu]

0 5 10 15 20 25 30 35 400.8

1

1.2

Aerodynamic power [pu]

0 5 10 15 20 25 30 35 40

-0.01

0

0.01

ωgen - ωrot [pu]

0 5 10 15 20 25 30 35 4002468

Time [sec]

Pitch Angle [deg]

0 5 10 15 20 25 30 35 400.9

11.11.2

Electrical power [pu]

0 5 10 15 20 25 30 35 400.95

1

1.05 Rotor Speed [pu]

0 5 10 15 20 25 30 35 40

1

1.2

1.4 Shaft Torque [pu]

2014-06-04 Windpower Monthly - Grid support and ancillary services

12

Page 14: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

13

Wind power plant control architecture

2014-06-04 Windpower Monthly - Grid support and ancillary services

Page 15: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Enhanced ancillary services

2014-06-04 Windpower Monthly - Grid support and ancillary services

14

WPP Active or Reactive Power output POD controller

PODQ∆I

P PODP∆

Active Power or Current Magnitude

time

time

IR controllerIRP∆f∆

dtdf /

1pu Grid Frequency

time

P

time

WPP Power Output∆

SP controllerSPP∆δ∆

θ∆

Load Angle

Time

WPP power output

Time

Page 16: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

WPP Inertial response capability

5 10 15 20 25 30 35 400.98

0.985

0.99

0.995

1

1.005

[pu]

Grid frequency

Without IRWith IR

5 10 15 20 25 30 35 400.2

0.21

0.22

0.23

0.24

0.25

0.26

0.27

0.28

0.29

[pu]

WPP power

5 10 15 20 25 30 35 40

0.856

0.858

0.86

0.862

0.864

0.866

[s]

[pu]

Gen. speed5 10 15 20 25 30 35 40

-1.25

0.00

1.00

2.00

3.00

4.00

5.00

[deg

]

Pitch angle

2014-06-04 Windpower Monthly - Grid support and ancillary services

15

Page 17: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

WPP synchronise power capability

δ∆

0 5 10 15 20 25 30 35 40350

400

450

500

550Load change

[MW

]

0 5 10 15 20 25 30 35 405

10

15

20Rotor angle deviation

[deg

]

0 5 10 15 20 25 30 35 40340

360

380

400WPP power

Time [s]

[MW

]

Without SPWith SP

2014-06-04 Windpower Monthly - Grid support and ancillary services

16

Page 18: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC

2014-06-04 Windpower Monthly - Grid support and ancillary services

17

Page 19: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC

WP 3 – Communication and control in clusters of wind power plants

connected to offshore HVDC grids PhD student: Lorenzo Zeni

Page 20: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC Results – status

L. Zeni et.al. From paper in Cigré session 2014

2014-06-04 Windpower Monthly - Grid support and ancillary services

19

VDC,1

VDC,WPP

VDC,2

P1,Q1 P2,Q2

P,Q P,QSG1 SG2

0.5*Zline 0.5*Zline

PWPP,QWPP

P,Q

Grid 2

Grid 1

VSC1 (w chopper)

VSC2 (w chopper)

Bus 1 Bus 2Bus 3

Investigation on system services provision

Onshore AC voltage control and LVRT

Onshore frequency control and power

oscillation damping

Offshore network control

Important results obtained and lines for future work were drawn.

DC voltage control

Page 21: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC

Two strategies are compared: 1. Communication-based control (with communication delay) 2. Coordinated control mirroring the frequency in DC voltage

2014-06-04 Windpower Monthly - Grid support and ancillary services

20

Frequency support through HVDC P2P example

Page 22: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC On the inertial contribution

2014-06-04 Windpower Monthly - Grid support and ancillary services

21

0 2 4 6 8 100.35

0.4

0.45

0.5

A2

- Pre

f [pu]

0 2 4 6 8 100.35

0.4

0.45

0.5

B2

- Pre

f [pu]

Time [s]

(a)

(b)

(b)

(a)

Power reference to WPP (a) From controller (b) Ramp-limited

Communication

Coordinated control

The initial power support is heavily limited by the ramp limiter (0.1 pu/s): relaxation of this figure?

Page 23: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

OffshoreDC Conclusions

• Onshore frequency variations can be mirrored offshore • Hence, WPPs can provide frequency control through

HVDC with communication-less scheme • In a P2P connection, communication-based and

coordinated solutions are equivalent, as far as frequency control and inertial response are concerned

• Fast control actions are inhibited by ramp rate limiters in the WPP

2014-06-04 Windpower Monthly - Grid support and ancillary services

22

Page 24: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

23

Consortium and budget

Spain (5) RED ELECTRICA DE ESPAÑA IBERDROLA ITT COMILLAS GAMESA ABB S.A.

Belgium (6) ELIA SYSTEM OPERATOR EWEA CORESO UNIVERSITY LIEGE UNIVERSITY LEUVEN UNIVERSITE LIBRE BRUXELLES

Denmark (3) DONG ENERGY ENERGINET DTU ENERGY

France (2) RTE EDF

United Kingdom (2) ALSTOM GRID UNIVERSITY OF STRATHCLYDE

Germany (3) FRAUNHOFER IWES 50 HzT SIEMENS Wind Power

Italy RSE

Ireland UCD

The Netherlands TENNET Portugal

INESC-PORTO

Norway SINTEF

Total budget: 56.8 M€ EU contribution: 31.8 M€

10 European Member States 1 Associated Country

DFFV conference, Herning

Page 25: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

24

Demo 4 - The challenge

DFFV conference, Herning

0° 15° E

60° N

Synchronous Area

2020 2030

MW MW

Continental 21,421 57,685

Nordic 4,924 14,669

GB 13,711 33,601

Ireland 1,419 3,219

2030 map

Page 26: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

• There must be sufficient primary reserves in the power system synchronous area to replace lost production corresponding to dimensioning fault

• This brings power system from normal state to alert state

• Frequency restoration (secondary / tertiary) reserves will return system to normal state in 15 minutes

• Larger faults (loss of generation) may bring system into disturbed (or emergency) state

• Therefore, maximum 15 minute wind power forecast errors are essential to esure adequacy of primary reserves

Large scale challenge: Adequacy of primary reserves

DFFV conference, Herning 25 2014-03-26

Nordic grid code 2007

Synchronous Area Dimensioning faultt MW

Continental 3,000 Nordic 1,200 GB 1,800 Ireland 500

Page 27: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

• Result for 2020 indicates that there is sufficient primary reserves with current dimensioning fault to cover offshore wind power variability in the four main European synchronous areas

• Result for 2030 indicates that there is not sufficient primary reserves with current dimensioning fault to cover offshore wind power variability in Continental and GB synchronous areas

• Current requirements for primary reserves should be revised by 2030 to maintain secure operation

Upscaling results and conclusion

DFFV conference, Herning 26 2014-03-26

Synchronous Area HWSD HWEP Dimensioning faultt

MW MW MW Continental 4,729 3,933 3,000 Nordic 1096 1082 1,200 GB 4,418 4,440 1,800 Ireland 439 438 500

Synchronous Area HWSD HWEP Dimensioning faultt

MW MW MW Continental 1,661 1,548 3,000 Nordic 480 483 1,200 GB 1,212 1,222 1,800 Ireland 224 224 500

2020

2030

Page 28: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Simulation of balancing (Simba)

• Simba idea – Simulation of intra hour balancing

as supplement to day ahead – Uses inputs from “day-ahead

market model” – Main imbalance included today is

from wind • Applications of Simba

– Planning of investment – Assessment of new market

designs (e.g. towards real time) – Assessment of cost / value of

reserves – Assessment of needs for reserve

capacities – Economic optimisation of system

services – Assessment of flexible demand

support to system balancing

Windpower Monthly - Grid support and ancillary services

27 2014-06-04

Import Export

Simulation of Balancing (Simba)

Page 29: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

CorWind Simulation of wind power fluctuations and forecast errors

Windpower Monthly - Grid support and ancillary services

28 2014-06-04

Page 30: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Modelling chain

Windpower Monthly - Grid support and ancillary services

29 2014-06-04

Spot market model

(e.g. WILMAR)

Wind power model

(CorWind) Intra-hour balancing

model (Simba)

Pw,DA[1h]

Pw,HA[5m]

Pw,pos[5m]

Ptraded,DA[1h]

Secondary control model (PhD)

Pplan[5m]

Pw,pos[5m]

Pavail[1h]

Power system scenario

Pinst

Pw,inst

Page 31: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Automatic Generation Control in a power system with high wind power penetration – Danish case study

30 Windpower Monthly - Grid support and ancillary services

2014-06-04

fnominal

factual BACE PI

controller ∆Pset

pfCHP+ -

PCHP

++

PLOAD

PDCHP

Pexchange

Pwind

∆P

∆f/R

PGEN

-

-

-+

∆PDCHP+

++

+90 MW

-90 MWpfDCHP

∆PCHP

AGC model Model overview

Result: simulated AGC performance

Page 32: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Wind Power integration into the Automatic Generation Control of power systems

31 Windpower Monthly - Grid support and ancillary services

2014-06-04

Aggregated Wind Turbine modelSimBa

Frequency droop

Fmeasure

Wind Power Plant

Controller

Pref_WT

Pavailable

Pref

Pmeasure

Active power

Controller

Static Generator

ip_cmd

Pmeasure

AGC

+

+

Pref (freq)

ΔP_WF∆Pset

∆P > dP_avail

|∆P| < |curtailing|

∆P < 0

dPavailable

Curtailing Power

yes

no

yes

yes

no

no

∆P_WF = ∆Pset∆P_CHP = 0

∆P_WF = -1*|curtailing|∆P_CHP = |curtailing| -|∆Pset|

∆P_WF = dP_avail∆P_CHP = ∆Pset - Available

∆P_WF = dP_avail∆P_CHP = 0

Aggregated WPP model Secondary (AGC) dispatch with wind

Page 33: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Summary and reflections on technical capabilities • WPPs can provide basic ancillary services and replace conventional power

plants • Also possible to provide enhanced ancillary services – emulating

synchronous generators (inertia-like response, power oscillation damping and synchronizing power)

– … but is this the optimal solution in future systems? • Ancillary services can also be provided from HVDC connected WPPs

32 Windpower Monthly - Grid support and ancillary services

2014-06-04

Page 34: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Economic incentives and barriers • Incentives:

– Technical requirements for grid connection! – Higher prices for reserves than for power (e.g. low – and even

negative power prices) – Co-generation with other production technologies (ramp support) – Enables higher wind power penetration

• Barriers: – Symmetric (up/down) requirement (Spain – TWENTIES)

• Downwards reserves from WPPs is feasible with high penetration

• … loads are more feasible as upwards reserves – Length (= prediction horizon) of reserve products – Development costs for new products – Additional hardware costs – Verification needs for new products – costly certifications

33 Windpower Monthly - Grid support and ancillary services

2014-06-04

Page 35: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

TPWind Technology Platform New strategic research agenda (SRA) / Market deployment strategy 2014 • Issues – very similar to REserviceS

– Frequency support – Voltage support – System restoration support

• Research priorities – Further development of enhanced wind power capabilities from

wind turbine level up to cluster level, including the related design tools and models;

– Testing and verification of frequency and voltage capabilities, and methods of proving compliance of new solutions for advanced capabilities with Grid Codes and standards;

– Harmonisation, standardisation and interoperability of methods and technologies for delivering ancillary services with wind power.

34 Windpower Monthly - Grid support and ancillary services

2014-06-04

Page 36: Ancillary services: Research results from wind power plants · ancillary service products (research references) – Fast frequency response (and inertia support) – Synchronising

DTU Wind Energy, Technical University of Denmark

Next steps to allow further penetration of wind into European grids? • Researchers

– Propose strategies for ancillary services to ensure system strategy – from wind and other sources

• Special focus on power system security with increasing levels of non-synchronous generation

• Not necessarily emulation of synchronous generators!! – Develop and implement new controls in simulation tools – Simulation based validation of ancillary services from wind – Develop tools to assess the value of new ancillary services

• Developers / owners – Assess the value of new ancillary services

• System operators – Propose and verify new strategies to ensure system security

• Turbine manufacturers – Develop and implement new ancillary service capabilities in full WPP

scale

35 Windpower Monthly - Grid support and ancillary services

2014-06-04