Anatomy of an
Effective PM
Program at United
Water Springfield
![Page 2: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/2.jpg)
2
Presentation Highlights
¢ PM Basics
¢ Origin of the Springfield Program
¢ Developing the Program
¢ Conclusions
![Page 3: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/3.jpg)
3
Effective Preventative Maintenance
What is
Preventative Maintenance?
![Page 4: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/4.jpg)
4
Effective Preventative Maintenance
The care and servicing by personnel for the
purpose of maintaining equipment and
facilities in satisfactory operating condition by
providing for systematic inspection, detection,
and correction of incipient failures either
before they occur or before they develop into
major defects
![Page 5: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/5.jpg)
5
Effective Preventative Maintenance
Part 1
“care and servicing by personnel for the
purpose of maintaining equipment”
![Page 6: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/6.jpg)
6
Effective Preventative Maintenance
Part 2
“inspection, detection, and correction of
incipient failures either before they
occur or before they develop into major
defects”
![Page 7: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/7.jpg)
7
Effective Preventative Maintenance
RPM Work Order – A Repair Work Order
generated from the performance of a
Preventative Maintenance Work Order
An important metric to track and helps to
prevent Emergency Work Orders
![Page 8: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/8.jpg)
8
Effective Preventative Maintenance
wear on centrifuge discharge port
![Page 9: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/9.jpg)
9
Effective Preventative Maintenance
Preventative Maintenance
Program for facility centrifuges
and associated equipment
![Page 10: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/10.jpg)
10
Effective Preventative Maintenance
2 Centrifuges were installed in 2008
replacing 4 belt filter presses and
became operational in 2009 as part
of a sludge dewatering upgrade
![Page 11: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/11.jpg)
11
Effective Preventative Maintenance
2 Centrysis 21HC Centrifuges
1 Spare Rotating Assembly
Polymer Storage, Makeup, and Pumping
Systems
Conveying Systems – 5 Conveyors
![Page 12: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/12.jpg)
12
Effective Preventative Maintenance
Centrifuge Production
40,000 Wet Tons Per Year
@ 25% Solids
Polymer – 14 lbs Active Polymer / DT
![Page 13: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/13.jpg)
13
Effective Preventative Maintenance
A great opportunity to start a
PM program from scratch on
new equipment
![Page 14: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/14.jpg)
14
Effective Preventative Maintenance
Where do PM’s come from?
¢ Manufacturers Recommendations*
¢ Staff Recommendations
¢ Experience
* To avoid warranty issues
![Page 15: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/15.jpg)
15
Effective Preventative Maintenance
Example of Staff Recommendation/Experience:
¢ Metal greased bearings on shafted sludge
conveyors that required monthly maintenance
replaced with nylon bearings that only
required maintenance every six months
![Page 16: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/16.jpg)
16
Effective Preventative Maintenance
Example of Staff Recommendation/Experience:
¢ Combine multiple short PM’s into one larger
PM
¢ Shorten or lengthen the time between PM’s
![Page 17: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/17.jpg)
17
Effective Preventative Maintenance
Who does the PM?
The person that can add the
most value to the task
![Page 18: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/18.jpg)
18
Effective Preventative Maintenance
In general:
Assign 90-day or less PM tasks or
simple PM tasks to your Operators
and free up Mechanics for higher
level functions.
![Page 19: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/19.jpg)
19
Effective Preventative Maintenance
Today’s operators are smarter and more
capable than ever before, not only in terms of
formal academic achievement, but relative to
interest and desire to be part of the
maintenance solution.
Avoid the “I operate it, you fix it” mentality!
![Page 20: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/20.jpg)
20
Effective Preventative Maintenance
Components of a PM Task
• Accurate Task Instructions (SOPs)
• Job Safety Analysis
• Equipment Specific LO/TO Procedures
• CMMS – Computerized Maintenance
Management System
![Page 21: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/21.jpg)
21
Effective Preventative Maintenance Equipment Specific LO/TO Procedure
![Page 22: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/22.jpg)
22
Effective Preventative Maintenance
United Water Springfield Job Hazard Analysis
Job: Monthly Centrifuge Polymer Make Up Units PM
Job Description: Perform monthly PM on centrifuge polymer make up units, LO/TO and test equipment, remove flow sensor and clean tip, take apart polymer check valve and clean components
Job Hazards:
1. Ergonomic – bending, standing lifting, congested area 2. Falls – working on elevated platform 3. Stored Energy – process water line under pressure, equipment must be depressurized,
locked out, tagged, and tested 4. Slips and Trips – work area may be wet, polymer is extremely slippery
Hazard Controls:
1. Test LO/TO before starting work 2. PPE – hard hat, safety glasses, safety shoes, gloves 3. Check floor for polymer spills and clean if needed 4. Use proper lifting and bending technique 5. Clean jobsite after completion
Task Related Safety Information
![Page 23: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/23.jpg)
23
Effective Preventative Maintenance
Accurate Task Instructions
![Page 24: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/24.jpg)
24
Effective Preventative Maintenance
Grease fi(ng for bearing – grease un1l fresh grease comes out of plug hole on opposite side of sha9
Grease fi(ng for sha9 seal – three squirts
![Page 25: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/25.jpg)
25
Effective Preventative Maintenance CMMS Program
![Page 26: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/26.jpg)
26
Effective Preventative Maintenance
![Page 27: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/27.jpg)
27
Effective Preventative Maintenance PM Assignment Board
![Page 28: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/28.jpg)
28
Effective Preventative Maintenance
PM Assignment Board Value
• A visual tool that clearly establishes performance expectations
• Promotes accountability
![Page 29: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/29.jpg)
29
Effective Preventative Maintenance
11 PM’s Done by Operators 4 day – 1
7 day – 2 30 day – 3 90 day – 1
180 day – 2 365 day – 2 730 day – 2
~191 PM’s Per Year
![Page 30: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/30.jpg)
30
Effective Preventative Maintenance
Completion – Failure Rate 2012 to 2014
4 Day PM Conveyors
7 Day PM Centrifuges
30 Day PM Poly Units
30 Day PM Centrifuges
30 Day PM Conveyors
90 Day PM Poly Units
180 Day PM Centrifuges
180 Day PM Hydraulic Units (2)
365 Day PM Belt
Conveyor
730 Day PM Conveyors
730 Day PM Poly Pumps Total
2012 -‐ Completed 88 52 12 12 10 4 2 4 1 1 186 2012 -‐ Failure 3 2 5
2013 -‐ Completed 91 52 12 12 12 4 3 1 1 188 2013 -‐ Failure 2 1 3
2014 -‐ Completed 92 52 12 12 12 4 2 4 1 1 192 2014 -‐ Failure 0
![Page 31: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/31.jpg)
31
Effective Preventative Maintenance
Completion – Failure Rate 2012 to 2014
Total PM Work Orders 574 Total -‐ Completed 566 Total -‐ Failed 8 CompleMon Rate 98.6%
![Page 32: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/32.jpg)
32
Effective Preventative Maintenance
![Page 33: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/33.jpg)
33
Effective Preventative Maintenance
![Page 34: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/34.jpg)
34
Effective Preventative Maintenance
![Page 35: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/35.jpg)
35
Effective Preventative Maintenance
![Page 36: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/36.jpg)
36
Effective Preventative Maintenance
![Page 37: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/37.jpg)
37
Effective Preventative Maintenance
![Page 38: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/38.jpg)
38
Effective Preventative Maintenance
![Page 39: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/39.jpg)
39
Effective Preventative Maintenance
![Page 40: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/40.jpg)
40
Effective Preventative Maintenance
Major Centrifuge Maintenance In House – Every 5,000 Hours Back to Manufacturer – Every 15,000 Hours
![Page 41: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/41.jpg)
41
Effective Preventative Maintenance
0
10
20
30
40
50
2010 2011 2012 2013 2014
Cent 1 Y Avg
Cent 2 Y Avg
Cent 1 D Avg
Cent 2 D Avg
Shutdown
Alarm
Centrifuge Vibration Levels
![Page 42: Anatomy of an Effective PM Program at United Water Springfield](https://reader030.fdocuments.net/reader030/viewer/2022012915/61c642d3a1c00d4d913817b1/html5/thumbnails/42.jpg)
42
Effective Preventative Maintenance
Conclusions • CMMS System provides strategic value • Whiteboard provides tactical value • Our effective preventative maintenance
program is a very important part of our overall maintenance program
• Use metrics to measure the effectiveness of your program