Analyzing the Domestic Nuclear Revival Eric P. Loewen, Ph ... · “The Path Between the Seas: The...
12
2 nd Annual Nuclear Construction Summit Charlotte, NC Analyzing the Domestic Nuclear Revival Eric P. Loewen, Ph.D. VP/President Elect American Nuclear Society October 25, 2010
Transcript of Analyzing the Domestic Nuclear Revival Eric P. Loewen, Ph ... · “The Path Between the Seas: The...
2nd Annual Nuclear Construction SummitCharlotte, NC
Analyzing the Domestic Nuclear RevivalEric P. Loewen, Ph.D.
VP/President Elect American Nuclear Society
October 25, 2010
8671
150
8166 7169
135
7964
46
109
7865
5746
57
103
79
59
GEN 2900 MWe
GEN 3+ - EPRExport 1000 MWe(China)
GEN 2 - N41500 MWe
GEN 21300 MWe
63,5 79,3 124,3 63,5Average (# of months)
OL3
TSN1&2**
62,3
Estimated average construction time for reactor series
FA3
Time between 1st concrete and nuclear operation (# of months)*
1
* Based on the first four units in the reactor series** Source CGNPC