Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM...

11
Analytical Framework for Intelligence The Office of Intelligence and Investigative Liaison (OIIL) has embarked on the development of U.S. For more information on AFI . please contact epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000001

Transcript of Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM...

Page 1: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

Analytical Framework for Intelligence

The Office of Intelligence and Investigative Liaison (OIIL) has embarked on the development of U.S.

For more information on AFI . please contact

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000001

Page 2: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

GOALS AND CAPABILITIBS

KEY FEATURES

1. Improved Effectiveness and Efficiency

2.

3.

4.

5. Improved Capabilities

6. Adherence to All Privacy and Security Policies

BUILDING ON CURRENT SYSTEM CAPABILITIES

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002

Page 3: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000003

Page 4: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

U.S. DEPARTMENT OF HOMELAND SECURTIY U.S. CustOtllS and Border Protection· Office ofIllteUigence and Investigative Liaison

''Value-Added Intelligence SupportillgAulerica's Frontline"

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000004

EZD0O1M
Line
EZD0O1M
Line
Page 5: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

What is AIl? • AFI is a multi-year investment to nrl"IVIC

duction and dissem

• full suite of to enhance analysts all-

sl within: -~onsolidation & Research I

& Reporting - Production Management

iY.t U.LDEPAlrlllENTOFIIOIIElANDSECUUn" ·v . l1.s.~ ................. OMctol""" ..... Ia, ...... u...

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000005

EZD0O1M
Line
EZD0O1M
Line
Page 6: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

(urrent State & Future Goals • Legacy systems are not sufficiently i

• fu

• -~nd consolidate access to • tools and methods

and information • metrics

iY.t U.LDEPAlrlllENTOFIIOIIElANDSECUUn" ·v . l1.s.~ ................. OMctol""" • .... Ia, ...... u...

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000006

EZD0O1M
Line
EZD0O1M
Line
Page 7: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

System Intedration • AFI funds and enhances current

• N":~ u.s. o U'AJ;1MtlII1'(Jf"HOM£L.\NDS£CtlUTV -'Q'!; 1J.$.c:-....... ~· cec.""tzHI • . ... Ia, .............

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000007

EZD0O1M
Line
EZD0O1M
Line
Page 8: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

(urrent State Ipelration.al as of 8/10/2012

Conference

• • •

iY.t U.LDEPAlrlllENTOFIIOIIElANDSECUUn" ·v . l1.s.~ ................. OMctol""" • .... Ia, ...... u...

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000008

EZD0O1M
Line
EZD0O1M
Line
Page 9: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

• • • • • I

I I

I I-I

iY.t U.LDEPAlrlllENTOFIIOIIElANDSECUUn" ·V . l1.s.~ ................. OMctol""" • .... Ia, ...... u...

UNCLASSIFIED /I FOR OFFICIAL USE ONLY

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000009

EZD0O1M
Line
EZD0O1M
Line
Page 10: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

AFI Weekly Requirement/Development Meeting Meeting Minutes

Meeting Description/Purpose: AFI Requirements-Development – Begin 2.0 and beyond planning Date: 03/23/2011 Time: 1030-1130 Location: Dial-in Phone Number: N/A Dial-in Access Code: N/A Scribe: Chair: Facilitator:

Distribution and Attendee List: A = attendees present; T = present via teleconference; C = cannot attend; G = invited guest; D = distribution only;

A A A A

Meeting Agenda:

No. Agenda Item Name and Purpose Presented By Scheduled Time

Actual Time

1. Review Search/Report Structure 20 min

2. Overview of GIS Capabilities in AFI 1.5 20 min

3. Access? 10 min

4. Meeting Wrap Up 10 min

TOTAL TIME: 60 min

Read Ahead Material/Attachments:

No. Read Ahead Material/Attachments or Reference Location 1. None 2.

Action Items:

No. Create Date Action Item Assigned

Planned Close Date

Actual Close Date

Status

1. 03/23/11 Get answer to Report billing question

03/30/11 Pending answer from

Agenda Item Summary: 1. Discuss Access

• Many of the sources provide separate Search and Report functions • The Search function supports querying on many fields but only returns summary information and a

specific key for the Report details. Requirement/Development Meeting

Page 1 2/2/2015

U//FOUO

(b) (7)(E)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000010

Page 11: Analytical Framework for Intelligence - EPIC · 05/02/2015  · BUILDING ON CURRENT SYSTEM CAPABILITIES epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000002. epic.org 14-04-08-CBP-FOIA-20150205-Production-p3

AFI Weekly Requirement/Development Meeting Meeting Minutes

• The Report function can only be queried with the specific key and returns that specific report. •

• has already asked about the billing ramifications and is waiting for an answer 2. Demo of geospatial implementation in

• Demo of o

– this is a nice feature. o

o • Demo into the Tools menu

o o o o

3.

4. The BRT will research the status of the data sources and integration requirements

5. The BRT will continue to identify geospatial information, sources, and requirements for future releases

Next Meeting: Agenda for next meeting:

Version 2.0 priorities Date: 03/30/2011

Time: 14:00 – 16:00 Hrs. Location:

Facilitator:

Scribe:

Requirement/Development Meeting

Page 2 2/2/2015

U//FOUO

(b) (7)(E)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (5)

(b) (6), (b) (7)(C)

(b) (7)(E)

(b) (7)(E)

(b) (5)

(b) (7)(E)

(b) (6), (b) (7)(C), (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

epic.org 14-04-08-CBP-FOIA-20150205-Production-p3 000011