CADIA VALLEY OPERATIONS Analyst Site Visit 3 December 2007 General Manager – Tony McPaul

Transcript of Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5...

Page 1: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

CADIA VALLEY OPERATIONS

Analyst Site Visit3 December 2007

General Manager –

Tony McPaul

Page 2: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

2

Telfer

Gosowong

Cadia Valley

● Cracow

347.8 koz

116.7 koz

560.7 koz / 61.1 kt

627.1 koz / 27.8 kt

2006/2007 Gold & Copper Production

Newcrest Operations & Projects

Page 3: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

3

Cadia Valley’s History of Mining Dates Back to 1851

Newcrest key milestones:

1990 Commenced activities in the Cadia Valley

1992 Cadia Hill discovered

1995 Cadia East discovered

1996 Ridgeway discovered

1998 Cadia Hill open pit mine commissioned

2002 Ridgeway underground mine commissioned

2007 Ridgeway Deeps development approved(A$545M)

Cadia Valley History

Page 4: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

4

• 2006/2007 Production 560,700 Oz Au & 61,100t Cu

• One Open Pit Mine

• One Underground Sublevel Cave Mine

• Underground Mine will Transition to Block Cave in 2010

• Process in Excess of 20Mt of Ore per Annum

Cadia Valley Operations

Page 5: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

5

Total Cadia Valley• Mineral Resource: 31.0 Moz Au & 4.6 Mt Cu

• Ore Reserves: 16.0 Moz Au & 2.2 Mt Cu

Cadia East Projects• Mineral Resource: 21.4 Moz Au & 3.7 Mt Cu

• Ore Reserves: 10.8 Moz Au & 1.7 Mt Cu

Reserves and Resources as at 30 June 2007

Cadia Valley Reserves and Resources

Page 6: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

6

• Owner Operated Fleet– Conventional truck/shovel operation– Modular Mining Despatch System– Life-of-fleet vendor maintenance contracts

• Drill & Blast 15 metre benches– Contract bulk explosives (Dyno)– Conventional grade control –

blast hole sampling

Cadia Hill Open Pit

Page 7: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

7

Cadia Hill Open Pit

• 21 Cat 793C Haul Trucks• 2 Komatsu Demag H655

Face Shovels• 1 Cat 994 Loader• 2 Komatsu WA 1200

Loader• 3 Drill rigs• 2 Dozers & 2 Wheel Dozers• 2 Graders• 1 Grid Roller and 1 Impact

Roller• 3 Water carts• 1 EX1100 Excavator• 1 PC800 Rock Hammer

Page 8: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

8

• Blind transverse SLC

• Large ore body footprint

• Ore pass system to transfer level and underground gyratory crusher

• Conveyor to surface

Ridgeway Mine

Page 9: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

9

Ridgeway Cave Zone

Area approximately 27 Acres

Ridgeway Underground Mine

Page 10: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

10

Page 11: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

11

• Target Zero continuing– Revised Safety Toolbox

• Wellness for Life Program• In-house training conducted to improve

standardisation – Safe Behaviour Observation (SBO)– First Aid– OHS Consultation

• DuPont study trip• Introduction of Post Induction Training

covering:– Action Employees Can Take (AECT– See Stop Control– Target Zero– Newcrest Values & Business Improvement– JSEA

Cadia Valley Safety Initiatives

Page 12: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

12

Security of Future Water Supply

• Recycle ±

80% of all site water

• Make-up water 18 -

20 ML/day

• ±

10ML/day treated effluent from Orange, Blayney & Millthorpe

Cadia Valley Operations

Page 13: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

13

Security of Future Water Supply

• Sufficient water for current operations until April 2008 (if no further rain)

• A range of options being pursued:– Brown’s Creek mine– Bathurst grey water– Spring Terrace farm agreement– Enhanced management of on-site water storages

Cadia Valley Operations

Page 14: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

14

Cadia Valley Development Projects

Page 15: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

15

Sublevel Caving

• The orebody is developed, drilled and blasted in progressive levels from the top down

• Rock above caves upwards progressively as ore drawn out

• Suitable for steeply dipping orebodies with reasonably strong orebody rock enclosed by weaker overlying and wall rocks. (Logan 2002)

Page 16: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

16

• Low mine operating costs, equivalent to many pits

• Lower environmental impacts than pits

• Rock caves progressively upwards due to the undercutting and drawing of the broken, caved ore beneath

Air gap

Crown Pillar

Air gap

Crown Pillar

Block Caving

Page 17: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

17

• A form of cave mining in which the orebody is undercut and caved progressively in a series of usually parallel panels

• The draw rate is variable across the panel

• Applied to larger ore bodies than block caving

• Low mine operating costs

• Lower establishment costs compared with block caving due to progressive panel approach

Panel Caving

Crown pillar

Cave back

Cave ore

Surface

Next panel

Undercut advance

Drawpoints

Crown pillar

Cave back

Cave ore

Surface

Next panel

Undercut advance

Drawpoints

Page 18: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

18

Panel & Block Caving (PC)Sublevel Caving (SLC)Sublevel Stoping (SLS)

Reducing Underground Mining Costs

1/2 1/2

Underground Bulk Mining Methods

Page 19: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

19

Ridgeway Deeps

Cadia Hill Pit

Cadia East Pit

Cadia East Panel Cave

Ridgeway

Cadia Valley Development Projects

Page 20: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

20

• Capital expenditure of A$545M largely over the next two financial years

• Full production in 2010

• Project cash cost A$111/oz after by-product credits (at average copper price of US$1.43/lb)

• Proforma production profile– Gold ~

180,000 oz pa

– Copper ~ 22,000 t pa– Over 8 years

SLC

BC

Ridgeway Deeps Block Cave Project

Page 21: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

21

Ridgeway Deeps Development

Page 22: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

22

Ridgeway Deeps Progress to Date

Page 23: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

23

RW Subsidence

Cadia Hill

Plant

Cadia East Ore body

Cadia Extended

Cadia East Orebody Location

Page 24: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

24

• Proforma production profile

@ 14 Mtpa – Gold 140,000 –

150,000 oz

– Copper 50,000 –

60,000 t

10 year life

Cadia East Open Pit Project

Page 25: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

25

• Conventional Load & Haul highest NPV– Large Electric Shovel > 40m3

– Ultra-Class Trucks > 300t

• Eliminated– Truck Hoist: high capital, capacity limits– IPCC: capacity limits, insufficient tonnes

• Watching emerging technologies Bucyrus 495 loading Komatsu 930E (300t)

Truck Hoist SystemIn Pit Crush and Conveying System

CEP Mining Options

Page 26: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

26

• Panel Caving mining method

• Proforma production profile

@ 24 Mtpa – Gold 450,000 –

600,000 oz

– Copper 60,000 –

80,000 t

30 year life

Current

Cadia East Underground Project

Page 27: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

27

Mine Location Nominal Production Rate Mtpa

Projects Proposed Cadia East Panel Cave NSW, Australia 24

Current Operations Northparkes NSW, Australia 5 Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South Africa 11 Salvador Chile 12 Henderson Colorado, USA 14 Grasberg Papua, Indonesia 15 Andina Chile 17 Kiruna Northern Sweden 25 El Teniente Chile 51

Cadia East Underground Project

Page 28: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

28

Cadia East Decline Development

Page 29: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

29

First Ore Exposed Cadia East: 31 October 2007

Page 30: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

30

• Currently assessing a range of project options for the Cadia Valley

• Focusing on developing a profile of growth going forward

• Principally relate to the timing of Cadia East developments

Project Outlook

Page 31: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

31

• Other potential opportunities subject of early stage assessment

• Longer term, processing rates in the Cadia Valley expected to exceed 24Mtpa

• Currently a work-in-progress

• Expect to provide a better idea of timing in January or February 2008

Project Outlook

Page 32: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

32

Resource 1. CE Eastern Cu Zone

2. CE West

Reserve 3. RW Deeps Lift 2

Growth 4. RW Extension – NW

5. RW Extension – S

6. CQ West

7. Northern Corridor

9. Big Cadia / Skarn

10. CQ Deeps / High Grade Lodes

11. RW High Grade / UR333

Infrastructure 8. Wire Gully

11

8

7

4

2

6

3

1

5

9

10

11

Province Development Prospects

Location of Targets

Page 33: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

33

Big Cadia Model

Looking NW

Big Cadia• Grow resource -

Unclassified to Inferred

• 3000m drill program• U/G access via RW north decline?

Little Cadia• Recognising strike extension

>1.4km• System not understood• Potential for high grade –

needs defining

Cadia Skarns Prospect –

Big & Little Cadia

Page 34: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

34

Uplift Opportunity• Currently re-modelling SLC option• Two drill holes designed to validate high grade lode potential• Further encouraging mineralisation to west –

follow up drilling FYE08• Underground access via development (off RW North decline)

Cadia Quarry Prospect

Page 35: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

35

Main Decline

Conveyor InclineSLC

Block Cave

Cave Outline

Surface

RW Deeps Lift 2

• Extension and Infrastructure• Lift 2 concept Inferred only• Possible repeat of Lift 1 (BC)

Ridgeway Deeps Lift 2 Prospect

Page 36: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

36

Conceptual Targets (no Resource conversion FYE08)

• Wire Gully

• Northern Corridor

• Cadia West Lodes

• RW North West

• RW South

Other Prospects

Page 37: Analyst Site Visit 3 December 2007 General Manager – Tony ... · Ridgeway NSW, Australia 5.5 Mount Isa (Copper) Qld., Australia 6.5 Olympic Dam S.A., Australia 9 Palabora South

37

• Cadia Valley will continue to be a major element in Newcrest’s asset portfolio for some decades to come

• Newcrest is likely to spend in excess of A$2 billion on project development in the Cadia Valley

• Focusing on developing a profile of growth going forward

Conclusions