ANALISIS METODE VALUE ENGINEERING UNTUK
EFISIENSI BIAYA (STUDI KASUS: PROYEK APARTEMEN
YUKATA SUITES ALAM SUTERA TANGERANG)
ANALYSIS OF VALUE ENGINEERING METHOD FOR COST
EFFICIENCY (CASE STUDY: APARTMENT PROJECT YUKATA
SUITES ALAM SUTERA TANGERANG)
SKRIPSI
Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Sarjana Teknik
Program Studi Teknik Sipil Fakultas Teknik
Universitas Sebelas Maret
Disusun Oleh :
GABRIEL KUSUMO HENDRIANTO
I0114050
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
2018
commit to user
library.uns.ac.id digilib.uns.ac.id
ii
commit to user
library.uns.ac.id digilib.uns.ac.id
ii
commit to user
library.uns.ac.id digilib.uns.ac.id
ABSTRAK
Gabriel Kusumo Hendrianto, 2018. Analisis Metode Value Engineering untuk
Efisiensi Biaya (Studi Kasus: Proyek Apartemen Yukata Suites alam Sutera
Tangerang). Skripsi, Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas
Maret Surakarta.
Value engineering (VE) adalah aplikasi metodologi nilai (value methodology) pada
sebuah proyek atau layanan yang telah direncanakan atau dikonsepkan untuk
mencapai peningkatan nilai (value).Tujuan dari penelitian ini adalah untuk
mengetahui jenis pekerjaan yang dapat diefisiensikan dengan metode VE dan
seberapa besar pengaruh VE terhadap biaya proyek konstruksi. Analisis VE
dilakukan pada proyek pembangunan Apartemen Yukata Suites Alam Sutera
Tangerang.
Tahapan studi VE dikenal dengan istilah value engineering job plan yang dibagi
menjadi lima tahap, yaitu tahap informasi, kreatif, analisis, pengembangan dan
rekomendasi. Tahap pertama yaitu tahap informasi yaitu mengumpulkan sebanyak
mungkin data mengenai proyek yang akan dianalisis. Tahap kedua adalah kreatif
adalah tahapan yang berisi alternatif-alternatif yang disarankan. Tahap ketiga
analisis yaitu tahap yang berisi perhitungan biaya dan analisis fungsi komponen
pekerjaan tersebut. Tahap keempat yaitu tahap pengembangan yaitu tahap dimana
alternative disajikan secara final dan kemungkinanannya untuk di
implementasikan. Tahapan terkahir yaitu presentasi adalah tahap untuk
meyakinkan kepada para pengambil keputusan tentang apa yang sudah
dikembangkan oleh tim studi VE.
Pengaruh dari analisis VE yang telah dilakukan yaitu mendapatkan cost saving pada
pekerjaan struktur sebesar Rp. 2.084.020.787,53. Biaya proyek yang telah
direncanakan sebelumnya sebesar Rp. 280.500.000.000,00 dan biaya proyek
setelah dilakukan analisis VE sebesar Rp. 278.207.577.133,72. Alternatif terbaik
yang disarankan adalah penggunaan tangga pracetak dan pengurangan dimensi
pada struktur kolom.
Kata Kunci: Value Engineering, Struktur, Precast, Kolom.
commit to user
library.uns.ac.id digilib.uns.ac.id
ABSTRACT
Gabriel Kusumo Hendrianto, 2018, Analysis of Value Engineering Method for
Cost Efficiency (Case Study: Apartment Project Yukata Suites Alam Sutera
Tangerang) Undergraduate Thesis, Civil Engineering, Engineering Faculty
Universitas Sebelas Maret.
Value Engineering is application of value methodology in a project or services that
have been planned or conceptualized to achieve value enhancement. The aims of
this study are to find out the type of work that can be streamlined by VE method
and how much influence of VE towards the cost of construction projects. VE
analysis performed in construction project Yukata Suites Apartment Alam Sutera,
Tangerang.
Stages of VE study known as Value engineering job plan are divided into five stages.
Those are information, creative, analysis, development and recommendation stage.
First stage, Information stage is collecting as much data about project to be
analyzed. The second stage is creative, stage that containing suggested alternatives.
Third one is analysis stage that contains cost calculation and the analysis of work
component’s functions. Fourth stage is development stage where the final
alternatives are being presented along with the possibility for being implemented.
Final stage is presentation to convince the decision-makers about things that
already developed by VE’s study team.
The project cost that already planned before analysis is Rp. 280,500,000,000.00
and the project cost after VE analysis has been done reduced into Rp.
278,207,577,133.72. The VE analysis give impact in cost saving with amount Rp.
2,084,020,787.53. The best suggested alternatives are the use of precast staircase
and dimension reduction in column structure.
Keywords: Value Engineering, Structure, Precast, Column.
commit to user
library.uns.ac.id digilib.uns.ac.id
PRAKATA
Puji syukur penulis haturkan kehadirat Tuhan YME atas limpahan rahmat dan
hidayah-Nya sehingga penulis dapat menyelesaikan skripsi dengan judul Analisis
Metode Value Engineering Untuk Efisiensi Biaya (Studi Kasus: Proyek Apartemen
Yukata Suites Alam Sutera Tangerang) guna memenuhi syarat memperoleh gelar
Sarjana Teknik di Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas
Maret Surakarta.
Penyusunan skripsi ini dapat berjalan lancar tidak lepas dari bimbingan, dukungan
dan motivasi dari berbagai pihak. Dengan segala kerendahan hati, pada kesempatan
ini penulis menyampaikan terima kasih kepada:
1. Segenap Pimpinan Fakultas Teknik dan Program Studi Teknik Sipil
Universitas Sebelas Maret Surakarta.
2. Ir. Sugiyarto M.T. selaku Dosen Pembimbing I.
3. Ir. Ary Setyawan M.Sc.,P.hD. selaku Dosen Pembimbing II.
4. Segenap Bapak dan Ibu dosen pengajar di Program Studi Teknik Sipil Fakultas
Teknik Universitas Sebelas Maret Surakarta.
5. Rekan-rekan mahasiswa Program Studi Teknik Sipil.
6. Semua pihak yang telah memberikan bantuan dan dukungan kepada penulis
dengan tulus dan ikhlas.
Penulis menyadari skripsi ini masih jauh dari kesempurnaan. Penulis
mengharapkan saran dan kritik yang bersifat membangun untuk perbaikan di masa
mendatang. Akhir kata semoga skripsi ini bermanfaat bagi penyusun khususnya dan
pembaca umumnya.
Surakarta, Agustus 2018
Gabriel Kusumo Hendrianto
commit to user
library.uns.ac.id digilib.uns.ac.id
ix
DAFTAR ISI
Halaman Judul ....................................................................................................... i
Halaman Persetujuan ............................................................................................. ii
Halaman Pengesahan ............................................................................................ iii
Motto ..................................................................................................................... iv
Halaman Persembahan .......................................................................................... v
Abstrak .................................................................................................................. vi
Abstract ................................................................................................................. vii
Prakata ..................................................................................................................viii
Daftar Isi................................................................................................................ ix
Daftar Gambar ....................................................................................................... xii
Daftar Tabel .........................................................................................................xiii
BAB 1 PENDAHULUAN ...................................................................................... 1
1.1 Latar Belakang .................................................................................................. 1
1.2 Rumusan Masalah ............................................................................................. 2
1.3 Batasan Masalah ................................................................................................ 2
1.4 Tujuan Penelitian .............................................................................................. 2
1.5 Manfaat Penelitian ............................................................................................ 3
BAB 2 TINJAUAN PUSTAKA ............................................................................. 4
2.1 Pengertian Value Engineering........................................................................... 4
2.2 Landasan Teori ........................................................................................................... 5
2.2.1 Sejarah Value Engineering ............................................................................. 5
2.2.2 Perkembangan Value Engineering di Indonesia ............................................ 8
2.2.3 Karakteristik Value Engineering .................................................................... 9
2.2.4 Sebab Unnecessary Cost .............................................................................. 10
2.2.5 Elemen Utama Dalam Value Engineering ................................................... 12
2.3 Tahapan-tahapan Value Engineering .............................................................. 13
2.3.1 Tahap Informasi ........................................................................................... 13
2.3.2 Tahap Kreatif ............................................................................................... 16
commit to user
library.uns.ac.id digilib.uns.ac.id
x
2.3.3 Tahap Analisis .............................................................................................. 16
2.3.4 Tahap Pengembangan .................................................................................. 17
2.3.5 Tahap Presentasi........................................................................................... 17
2.4 Apartemen ....................................................................................................... 17
2.5 Struktur Kolom .............................................................................................. 18
2.5.1 Pengertian Kolom......................................................................................... 18
2.5.2 Jenis- Jenis Kolom ....................................................................................... 18
2.5.3 Contoh Efisiensi Biaya Metode Value Engineering .................................... 21
2.6 Struktur Tangga ............................................................................................... 19
2.6.1 Tangga Utama .............................................................................................. 20
2.6.2 Tangga Darurat............................................................................................. 20
2.7 Contoh Efisiensi Biaya Metode Value Engineering ....................................... 21
2.7.1 Deskripsi Proyek .......................................................................................... 21
2.7.2 Desain Awal Jalan ........................................................................................ 21
2.7.3 Tahap Rekayasa Nilai .................................................................................. 21
2.7.4 Desain Akhir Jalan ....................................................................................... 22
2.7.5 Kesimpulan .................................................................................................. 23
2.8 Lokasi Penelitian ............................................................................................. 24
2.9 Studi Pustaka ................................................................................................... 26
BAB 3 METODE PENELITIAN.......................................................................... 27
3.1 Metode Penelitian............................................................................................ 27
3.2 Metode Pengumpulan Data ............................................................................. 27
3.3 Metode Analisis .............................................................................................. 28
3.3.1 Tahap Informasi ........................................................................................... 28
3.3.2 Tahap Kreatif ............................................................................................... 28
3.3.3 Tahap Analisis .............................................................................................. 29
3.3.4 Tahap Pengembangan .................................................................................. 29
3.3.5 Tahap Presentasi........................................................................................... 29
3.4 Alur Penelitian ................................................................................................ 30
BAB 4 ANALISIS DAN PEMBAHASAN .......................................................... 32
4.1 Umum .............................................................................................................. 32
4.2 Tahap Informasi .............................................................................................. 32
commit to user
library.uns.ac.id digilib.uns.ac.id
xi
4.2.1 Data Umum Proyek ...................................................................................... 32
4.2.2 Biaya Keseluruhan Proyek ........................................................................... 33
4.2.3 Analisis Hukum Pareto ................................................................................ 34
4.2.4 Pemilihan Pekerjaan ..................................................................................... 38
4.3 Tahap Kreatif .................................................................................................. 40
4.3.1 Beton Pracetak ............................................................................................. 43
4.3.2 Keuntungan dan Kerugian Beton Precast .................................................... 44
4.3.3 Metode Pelaksanaan Tangga Pracetak ......................................................... 45
4.4 Tahap Analisis ................................................................................................. 49
4.4.1 Estimasi Biaya Pekerjaan Tangga ................................................................ 48
4.4.2 Analisis Fungsi Pekerjaan Tangga ............................................................... 51
4.4.3 Analisis Kelebihan dan Kekurangan ............................................................ 52
4.4.4 Estimasi Biaya Pekerjaan Kolom ................................................................. 52
4.4.5 Anaisis Fungsi Pekerjaan Kolom ................................................................. 57
4.5 Tahap Pengembangan ..................................................................................... 57
4.6 Tahap Presentasi.............................................................................................. 59
BAB 5 KESIMPULAN DAN SARAN ................................................................ 60
5.1 Kesimpulan ..................................................................................................... 60
5.2 Saran ................................................................................................................ 61
Daftar Pustaka ....................................................................................................... 62
Lampiran ............................................................................................................... 64
commit to user
library.uns.ac.id digilib.uns.ac.id
xii
DAFTAR GAMBAR
Gambar 2.1 Grafik Hukum Distribusi Pareto ....................................................... 15
Gambar 2.2 Peta Lokasi Penelitian VE ................................................................. 24
Gambar 2.3 Kondisi Lalu Lintas Penelitian VE.................................................... 24
Gambar 2.4 Detail Lokasi Penelitian VE .............................................................. 25
Gambar 2.5 Kondisi Eksisting Luar Lokasi Penelitian VE................................... 25
Gambar 3.1 Diagram Alur Penelitian.................................................................... 31
Gambar 4.1 Lokasi Proyek Apartemen Yukata Suites Alam Sutera .................... 33
Gambar 4.2 Grafik Analisis Hukum Pareto Biaya Keseluruhan Proyek .............. 35
Gambar 4.3 Diagram Biaya Tiap Pekerjaan ......................................................... 35
Gambar 4.4 Grafik Analisis Hukum Pareto pada Pekerjaan Struktur ................... 37
Gambar 4.5 Bekisting Tangga Pracetak dengan Tulangan Besi Terpasang ......... 46
Gambar 4.6 Penyimpanan Tangga Pracetak ......................................................... 46
Gambar 4.7 Pemasangan dengan Alat Bantu Tower Crane .................................. 47
Gambar 4.8 Pemasangan Tangga Pracetak pada Dowel dan Balok ...................... 47
commit to user
library.uns.ac.id digilib.uns.ac.id
xiii
DAFTAR TABEL
Tabel 2.1 Breakdown Biaya .................................................................................. 14
Tabel 2.6 Perbandingan Rigid Pavement dengan Precast Prestressed Concrete
Pavement ............................................................................................................... 24
Tabel 4.1 Rekapitulasi Biaya Keseluruhan Proyek ............................................... 33
Tabel 4.2 Hasil Analisis Hukum Pareto Biaya Keseluruhan Proyek .................... 34
Tabel 4.3 Hasil Analisis Hukum Pareto pada Pekerjaan Struktur ........................ 36
Tabel 4.4 Pekerjaan Eksisting Kolom K1 ............................................................. 38
Tabel 4.5 Pekerjaan Eksisting Kolom K1A .......................................................... 38
Tabel 4.6 Pekerjaan Eksisting Kolom K1B .......................................................... 39
Tabel 4.7 Pekerjaan Eksisting Kolom K1C .......................................................... 39
Tabel 4.8 Pekerjaan Eksisting Kolom K1D .......................................................... 39
Tabel 4.9 Pekerjaan Eksisting Kolom K1E .......................................................... 40
Tabel 4.10 Pekerjaan Eksisting Kolom K1F ......................................................... 40
Tabel 4.11 Alternatif Dimensi Kolom K1............................................................. 41
Tabel 4.12 Alternatif Dimensi Kolom K1A .......................................................... 41
Tabel 4.13 Alternatif Dimensi Kolom K1B .......................................................... 42
Tabel 4.14 Alternatif Dimensi Kolom K1C .......................................................... 42
Tabel 4.15 Alternatif Dimensi Kolom K1D .......................................................... 42
Tabel 4.16 Alternatif Dimensi Kolom K1E .......................................................... 43
Tabel 4.17 Alternatif Dimensi Kolom K1F .......................................................... 43
Tabel 4.18 Harga Satuan 1 m3 Pekerjaan Beton Tangga Fc’ 29,05 Mpa .............. 48
Tabel 4.19 Harga Satuan Pekerjaan Bekisting Tangga ......................................... 49
Tabel 4.20 Harga Satuan Pekerjaan Tulangan Besi Beton Tangga ...................... 50
Tabel 4.21 Rekapitulasi Biaya Pekerjaan Tangga Eksisting ................................. 50
Tabel 4.22 Rekapitulasi Biaya Pekerjaan Tangga Precast ................................... 51
Tabel 4.23 Analisis Fungsi Pekerjaan Tangga ...................................................... 51
Tabel 4.24 Analisis Kelebihan dan Kekurangan Tangga Pracetak ....................... 52
Tabel 4.25 Harga Satuan Pekerjaan Kolom Fc’ 41,5 Mpa ................................... 53
Tabel 4.26 Harga Satuan Pekerjaan Kolom Fc’ 33,2 Mpa ................................... 53
Tabel 4.27 Harga Satuan Pekerjaan Kolom Fc’ 31,5 Mpa ................................... 54
commit to user
library.uns.ac.id digilib.uns.ac.id
xiv
Tabel 4.28 Harga Satuan Pekerjaan Kolom Fc’ 29,5 Mpa ................................... 54
Tabel 4.29 Harga Satuan Pekerjaan Bekisting Kolom .......................................... 55
Tabel 4.30 Harga Satuan Pekerjaan Tulangan Besi Beton Kolom ....................... 56
Tabel 4.31 Rekapitulasi Biaya Proyek Kolom Eksisting ...................................... 56
Tabel 4.32 Rekapitulasi Biaya Proyek Kolom Alternatif ..................................... 57
Tabel 4.33 Analisis Fungsi Pekerjaan Kolom ....................................................... 57
Tabel 4.34 Hasil Analisis Biaya Alternatif ........................................................... 58
Tabel 4.35 Rekapitulasi Hasil Akhir Penghematan Biaya .................................... 59
Tabel 5.1 Rekapitulasi Akhir Penghematan Biaya Pekerjaan VE ........................ 60
Tabel 5.2 Rekapitulasi Hasil Akhir Penghematan Biaya Keseluruhan ................. 60