No. Sat. Koef. Harga Satuan (Rp)1 3 5. 6.
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi m2 1.000Pekerja OH 0.100 60,000.00 Mandor OH 0.050 80,000.00
Jumlah 2 Pengukuran dan pasangan bouwplank m 1.000
Kayu meranti balok m3 0.012 3,300,000.00 Paku biasa 2" - 5 " kg 0.020 15,000.00 Kayu meranti papan (MC) 2/20 m3 0.007 1,750,000.00 Pekerja oh 0.100 60,000.00 Tukang Kayu oh 0.100 70,000.00 Kepala Tukang Kayu oh 0.010 75,000.00 Mandor oh 0.005 80,000.00
Jumlah 3 Direksi Keet dan Gudang m2 1.000Sewa Direksikeet dan Gudang bln 7.000 1,650,000.00
Jumlah 4 Pembuatan pagar sementara seng gelombang m1 1.000
tinggi 2 m
Dolken kayu Gelam 8-10/400 cm bt 1.100 14,000.00 Seng Gelombang Uk. (0,8 x 1,50) lbr 1.000 52,000.00 Kayu Meranti Kaso 5/7 m3 0.025 3,300,000.00 Paku Asbes kg 0.060 16,000.00 Cat Meni Besi kg 0.450 35,000.00 Pekerja oh 0.400 60,000.00 Tukang Kayu oh 0.200 70,000.00 Kepala Tukang Kayu oh 0.020 75,000.00 Mandor oh 0.020 80,000.00
Jumlah
5 Biaya Listrik kerja ls 1.000Sewa Genset hr 90.000 60,000.00 Solar lt 450.000 6,500.00 Olie lt 20.000 30,000.00
Jumlah 6 Biaya Air Kerja ls 1.000
Air kerja bln 6.000 750,000.00 Jumlah
7 Papan Nama Proyek 80 x 120 cm, t = 250 cm unit 1.000
Kayu Meranti papan t= 2 cm m3 0.050 5,750,000.00
Seng Plat BJLS 30 m2 1.620 80,000.00
Paku kg 0.600 15,000.00 Cat Kayu kg 1.500 44,000.00
Beton Cor K225 m3 0.100 815,662.00
Pekerja OH 2.000 60,000.00
Tukang Kayu OH 1.000 70,000.00 Tukang cat OH 1.000 70,000.00 Mandor OH 1.000 80,000.00
Jumlah II. PEKERJAAN TANAH1 Galian Tanah Biasa Sedalam 1m m3 1.000
Pekerja OH 0.750 60,000.00 Mandor OH 0.025 80,000.00
Jumlah 2 Bor Pondasi Strous dia 30 cm m3 1.000
Pekerja OH 1.440 60,000.00 Mandor OH 0.072 80,000.00 Sewa alat bor strous jam 1.200 15,000.00
Jumlah 3 Urugan Pasir m3 1.000
Pasir Urug m3 1.100 120,000.00
Pekerja OH 0.300 60,000.00 Mandor OH 0.100 80,000.00
Jumlah
ANALISA HARGA SATUAN PEKERJAAN
2Uraian Pekerjaan
TAHUN 2014
-
8/10/2019 analisa2014-xls
2/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
4 Urugan Tasirtu m3 1.000
Tasirtu m3 1.200 85,000.00 Sewa stemper hari 0.009 100,000.00 Pekerja OH 0.250 60,000.00 Mandor OH 0.025 80,000.00
Jumlah
5 Urugan Tanah Kembali m3 1.000Pekerja OH 0.102 60,000.00 Mandor OH 0.019 80,000.00
Jumlah 6 Buangan Tanah Galian m3 1.000
Pekerja OH 0.200 60,000.00 Mandor OH 0.040 80,000.00
Jumlah III. PEKERJAAN PASANGAN PONDASI
1 Batu kosongan Aanstampeng m3 1.000Batu kali belah m3 1.2000 135,000.00 Pasir Urug m3 0.3000 120,000.00 Pekerja oh 0.7800 60,000.00 Tukang Batu oh 0.3900 70,000.00 Kepala Tukang Batu oh 0.0390 75,000.00 Mandor oh 0.0390 80,000.00
Jumlah 2 Pondasi Batu kali1:5 m3 1.000
Batu kali belah m3 1.100 135,000.00 Semen Portland kg 136.000 1,120.00 Pasir Pasang m3 0.544 158,000.00 Pekerja oh 1.500 60,000.00 Tukang Batu oh 0.750 70,000.00 Kepala Tukang Batu oh 0.075 75,000.00 Mandor oh 0.075 80,000.00
Jumlah 3 Pasangan Pondasi rollag batu bata 1:3 m3 1.000
Batu bata merah 5x11x22 cm bh 70.000 575.00 Semen Portland zak 0.287 56,000.00 Pasir pasang m3 0.040 158,000.00 Pekerja oh 0.300 60,000.00
Tukang Batu oh 0.100 70,000.00 Kepala Tukang Batu oh 0.010 75,000.00 Mandor oh 0.015 80,000.00
Jumlah 1 m2 Jumlah 1 m3 8.333 89,614.40
IV. PEKERJAAN PASANGAN DINDING TEMBOK1 Pasang Dinding Bata 1:3 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 575.00 Semen Portland 50 kg zak 0.287 56,000.00 Pasir Pasang m3 0.040 158,000.00 Pekerja OH 0.300 60,000.00 Tukang Batu OH 0.100 70,000.00 Kepala Tukang Batu OH 0.010 75,000.00 Mandor OH 0.015 80,000.00
Jumlah Jumlah 1 m3 8.330 89,614.40
2 Pasang Dinding Bata 1:5 1/2 Bata m2 1.000Batu Bata Merah bh 70.000 575.00 Semen Portland 50 kg zak 0.194 56,000.00 Pasir Pasang m3 0.045 158,000.00 Pekerja OH 0.300 60,000.00 Tukang Batu OH 0.100 70,000.00 Kepala Tukang Batu OH 0.010 75,000.00 Mandor OH 0.015 80,000.00
Jumlah
V. PEKERJAAN PLESTERAN, BENANGAN DAN ACIAN
1 Plesteran Tebal 15mm Campuran 1 : 3 m2 1.000Semen Portland 50 kg zak 0.156 56,000.00 Pasir pasang m3 0.023 158,000.00 Pekerja OH 0.300 60,000.00 Tukang Batu OH 0.150 70,000.00
Kepala Tukang Batu OH 0.015 75,000.00 Mandor OH 0.015 80,000.00
Jumlah
2 Plesteran Tebal 15mm Campuran 1 : 5 m2 1 000
-
8/10/2019 analisa2014-xls
3/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
Mandor OH 0.015 80,000.00 Jumlah
3 Benangan Sudut 1 : 2 m 1.000Semen Portland zak 0.010 56,000.00 Pasir Pasang m3 0.013 158,000.00 Pekerja OH 0.080 60,000.00
Tukang Batu OH 0.040 70,000.00 Kepala Tukang Batu OH 0.040 75,000.00 Mandor OH 0.004 80,000.00
Jumlah 4 Acian Beton m2 1.000
Semen Portland zak 0.065 56,000.00 Pekerja OH 0.200 60,000.00 Tukang Batu OH 0.100 70,000.00 Kepala Tukang Batu OH 0.010 75,000.00 Mandor OH 0.010 80,000.00
Jumlah VI. PEKERJAAN PONDASI MINI PILE
1 Pemancangan Tiang Pancang 25X25 cm, l= 12 m m 1.000 Mini pile 250 x 250 mm, panjang 12 m m 1.000 130,000.00
Mandor oh 0.125 80,000.00 Sewa Crane 30 ton Jam 0.218 130,000.00
Sewa Hammer Tiang Pancang Jam 0.218 150,000.00 Jumlah
2 Penyambungan Tiang Pancang 25x25 cm bh 1.000 Joint sambungan Tiang Pancang bh 1.000 30,000.00
Kawat Las Electroda kg 0.500 35,000.00 Oli lt 0.050 30,000.00 Solar lt 1.000 6,500.00 Sewa Welding Set hr 0.050 50,000.00 Tukang Las oh 0.250 70,000.00
Jumlah
-
8/10/2019 analisa2014-xls
4/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
3 Pemotongan ujung tiang pancang 25x25 cm ttk 1.000
Pekerja oh 0.420 60,000.00 Tukang Las oh 0.250 70,000.00 Mandor oh 0.020 80,000.00
Jumlah VII. PEKERJAAN BETON
1 Beton Lantai Kerja 1:3:5 m3 1.000Semen Portland 40 kg zak 5.750 52,000.00 Pasir beton m3 0.558 160,000.00 Batu pecah mesin 1/2 m3 0.541 240,000.00
Air (biaya air tawar) lt 215.000 20.00 Pekerja OH 1.200 60,000.00 Tukang Batu OH 0.200 70,000.00 Kepala Tukang Batu OH 0.020 75,000.00 Mandor OH 0.060 80,000.00
Jumlah 2 Beton Rabat beton 1:3:5 m3 1.000
Semen Portland 40 kg zak 6.900 52,000.00 Pasir beton m3 0.518 160,000.00 Batu pecah mesin 1/2 m3 0.533 240,000.00
Air (biaya air tawar) lt 215.000 20.00 Pekerja OH 1.650 60,000.00 Tukang Batu OH 0.275 70,000.00 Kepala Tukang Batu OH 0.028 75,000.00 Mandor OH 0.083 80,000.00
Jumlah 3 Beton K-225 m3 1.000
Semen Portland 40 kg zak 9.275 52,000.00 Pasir beton m3 0.436 160,000.00 Batu pecah mesin 1/2 m3 0.551 240,000.00
Air (biaya air tawar) lt 215.000 20.00 Pekerja OH 1.650 60,000.00 Tukang Batu OH 0.275 70,000.00 Kepala Tukang Batu OH 0.028 75,000.00 Mandor OH 0.083 80,000.00
Jumlah 4 Beton K-300 m3 1.000
Semen Portland 40 kg zak 10.325 52,000.00 Pasir beton m3 0.426 160,000.00 Batu pecah mesin 1/2 m3 0.537 240,000.00
Air (biaya air tawar) lt 215.000 20.00 Pekerja OH 1.650 60,000.00 Tukang Batu OH 0.275 70,000.00 Kepala Tukang Batu OH 0.028 75,000.00 Mandor OH 0.083 80,000.00
Jumlah 5 Pembesian Dengan Besi Ulir 39 kg 1.000
Besi beton ulir kg 1.050 9,600.00 Kawat beton (bendrat) kg 0.015 16,000.00 Pekerja OH 0.007 60,000.00 Tukang Besi OH 0.007 70,000.00 Kepala Tukang Besi OH 0.001 75,000.00 Mandor OH 0.000 80,000.00
Jumlah 6 Pembesian Dengan Besi Polos U-24 kg 1.000
Besi beton polos kg 1.050 9,400.00 Kawat beton (bendrat) kg 0.015 16,000.00 Pekerja OH 0.007 60,000.00 Tukang Besi OH 0.007 70,000.00 Kepala Tukang Besi OH 0.001 75,000.00 Mandor OH 0.000 80,000.00
Jumlah
-
8/10/2019 analisa2014-xls
5/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
7 Pembesian Wiremesh M6 m2 1.000Wiremesh M6 (210 x 495 cm ) lbr 0.0900 400,000.00 Kawat beton kg 0.0300 16,000.00 Pekerja OH 0.1500 60,000.00 Tukang Besi OH 0.0300 70,000.00 Kepala Tukang Besi OH 0.0150 75,000.00
Mandor OH 0.0300 80,000.00 Jumlah
8 Bekisting Untuk Pile Cap m2 1.000Batako Ukuran 9 x 19 x 39 cm bh 14.000 2,000.00 Pasir Pasang m3 0.027 158,000.00 Semen PC Kg 7.500 1,120.00 Pekerja HO 0.320 60,000.00 Tukang Batu HO 0.100 70,000.00 Kepala Tukang Batu HO 0.010 75,000.00 Mandor/Pengawas HO 0.005 80,000.00
Jumlah 9 Bekisting Untuk Sloof, Kolom, Ring Praktis m2 1.000
Kayu meranti papan (MC) m3 0.022 1,750,000.00 Kayu meranti usuk m3 0.002 3,300,000.00 Paku biasa 2"- 5" kg 0.300 15,000.00 Minyak Begesting ltr 0.100 6,500.00
Jumlah bahan Pekerja OH 0.520 60,000.00 Tukang Kayu OH 0.260 70,000.00 Kepala Tukang Kayu OH 0.026 75,000.00 Mandor OH 0.026 80,000.00
Jumlah upah Bahan Begesting 2x pakai 0.500 50,250.00 Upah bgesting 2 x pakai 1.000 53,430.00
Jumlah begesting 2 x pakai 10 Bekisting Kolom Struktur m2 1.000
Kayu meranti usuk m3 0.010 3,300,000.00 Paku biasa 2"- 5" kg 0.400 15,000.00 Minyak Begesting ltr 0.200 6,500.00 Balok Kayu Meranti m3 0.015 3,650,000.00 Multiplek tebal 12 mm lbr 0.350 158,000.00
Dolken Kayu Gelam 8-10/400 cm btg 2.000 14,000.00 Jumlah bahan Pekerja OH 0.660 60,000.00 Tukang Kayu OH 0.330 70,000.00 Kepala Tukang Kayu OH 0.033 75,000.00 Mandor OH 0.033 80,000.00
Jumlah upah Bahan Begesting 2x pakai 0.500 178,350.00 Upah bgesting 2 x pakai 1.000 67,815.00
Jumlah begesting 2 x pakai 11 Bekisting Balok Struktur m3 1.000
Kayu meranti usuk m3 0.020 3,300,000.00 Paku biasa 2"- 5" kg 0.400 15,000.00 Minyak Begesting ltr 0.200 6,500.00 Balok Kayu Meranti m3 0.018 3,650,000.00 Multiplek tebal 12 mm lbr 0.350 158,000.00
Dolken Kayu Gelam 8-10/400 cm btg 2.000 14,000.00 Jumlah bahan
Pekerja OH 0.660 60,000.00 Tukang Kayu OH 0.330 70,000.00 Kepala Tukang Kayu OH 0.033 75,000.00 Mandor OH 0.033 80,000.00
Jumlah upah Bahan Begesting 2x pakai 0.500 222,300.00 Upah bgesting 2 x pakai 1.000 67,815.00
Jumlah begesting 2 x pakai
-
8/10/2019 analisa2014-xls
6/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
12 Bekisting Plat Lantai m3 1.000
Kayu meranti usuk m3 0.0238 3,300,000.00 Paku biasa 2"- 5" kg 0.4000 15,000.00 Minyak Begesting ltr 0.2000 6,500.00 Balok Kayu Meranti m3 0.0150 3,650,000.00 Multiplek tebal 12 mm lbr 0.3500 158,000.00
Dolken Kayu Gelam 8-10/400 cm btg 6.0000 14,000.00 Jumlah bahan
Pekerja OH 0.660 60,000.00 Tukang Kayu OH 0.330 70,000.00 Kepala Tukang Kayu OH 0.033 75,000.00 Mandor OH 0.033 80,000.00
Jumlah upah Bahan Begesting 2x pakai 0.500 279,890.00 Upah bgesting 2 x pakai 1.000 67,815.00
Jumlah begesting 2 x pakai 13 Bekisting Tangga m3 1.000
Kayu meranti usuk m3 0.030 3,300,000.00 Paku Usuk kg 0.400 15,000.00 Minyak Begesting ltr 0.150 6,500.00 Balok Kayu Kamper 3/5 m3 0.015 3,650,000.00 Multiplek tebal 9 mm lbr 0.350 106,000.00
Jumlah bahan Pekerja OH 0.660 60,000.00 Tukang Kayu OH 0.330 70,000.00 Kepala Tukang Kayu OH 0.033 75,000.00 Mandor OH 0.033 80,000.00
Jumlah upah Bahan Begesting 2x pakai 0.500 197,825.00 Upah bgesting 2 x pakai 1.000 67,815.00
Jumlah begesting 2 x pakai 14 Beton Poer PC-2 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting m2 3.790 68,016.00 Besi beton polos U24 kg 57.750 11,104.50 Besi beton ulir U39 kg 96.871 11,314.50
Jumlah
15 Beton Poer PC-3 m3 1.000Beton K300 m3 1.000 865,262.00 Begesting m2 2.710 68,016.00 Besi beton ulir U39 kg 159.384 11,314.50
Jumlah 16 Beton Poer PC-4 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting m2 2.580 68,016.00 Besi beton ulir U39 kg 224.991 11,314.50
Jumlah 17 Beton Poer PC-5 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting m2 2.160 68,016.00 Besi beton ulir U39 kg 175.225 11,314.50
Jumlah 18 Pondasi strous dia 30 cm m3 1.000
Beton K300 m3 1.000 865,262.00 Besi beton polos U24 kg 89.000 11,104.50
Jumlah 19 Beton Sloof S-1 40/70 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 5.000 78,555.00 Besi beton polos U24 kg 49.193 11,104.50 Besi beton ulir U39 kg 89.143 11,314.50
Jumlah 20 Beton Sloof S-2 30/60 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 6.660 78,555.00 Besi beton polos U24 kg 64.494 11,104.50 Besi beton ulir U39 kg 86.667 11,314.50
Jumlah
21 Beton Sloof S-3 30/50 m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 6.660 78,555.00 Besi beton polos U24 kg 59.232 11,104.50
-
8/10/2019 analisa2014-xls
7/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
Besi beton polos U24 kg 252.947 11,104.50 Besi beton ulir U39 kg 0.000 11,314.50
Jumlah 23 Beton Kolom K-1 30/40 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 11.660 156,990.00
Besi beton polos U24 kg 49.090 11,104.50 Besi beton ulir U39 kg 156.000 11,314.50
Jumlah 24 Beton Kolom K-2 40/40 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 10.000 156,990.00 Besi beton polos U24 kg 42.325 11,104.50 Besi beton ulir U39 kg 156.000 11,314.50
Jumlah 25 Beton Kolom K-3 30/30 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 13.330 156,990.00 Besi beton polos U24 kg 36.036 11,104.50 Besi beton ulir U39 kg 138.667 11,314.50
Jumlah 26 Beton Kolom praktis 15/15 m3 1.000
Beton K225 m3 1.000 815,662.00 Begesting 2x pakai m2 13.330 78,555.00 Besi beton polos U24 kg 191.483 11,104.50
Jumlah 27 Beton Balok Latai dan ring balk 15/15 m3 1.000
Beton K225 m3 1.000 815,662.00 Begesting 2x pakai m2 13.330 78,555.00 Besi beton polos U24 kg 162.620 11,104.50
Jumlah 28 Beton Plat anak tangga dan bordes tangga 1 (Utama) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 8.330 166,727.50 Besi beton polos U24 kg 191.047 11,104.50
Jumlah 29 Beton balok bordes 20/40 m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 12.500 178,965.00 Besi beton polos U24 kg 40.480 11,104.50 Besi beton ulir U39 kg 117.000 11,314.50
Jumlah
-
8/10/2019 analisa2014-xls
8/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
30 Beton balok B-1 (35/70) m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 6.160 178,965.00 Besi beton polos U24 kg 60.771 11,104.50 Besi beton ulir U39 kg 117.796 11,314.50
Jumlah
31 Beton balok B-2A (30/60) m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 7.000 178,965.00 Besi beton polos U24 kg 66.560 11,104.50 Besi beton ulir U39 kg 128.267 11,314.50
Jumlah 32 Beton balok B-2B (30/60) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 7.000 178,965.00 Besi beton polos U24 kg 66.560 11,104.50 Besi beton ulir U39 kg 96.200 11,314.50
Jumlah 33 Beton balok B-3 (30/50) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 7.060 178,965.00 Besi beton polos U24 kg 44.462 11,104.50
Besi beton ulir U39 kg 97.760 11,314.50 Jumlah
34 Beton balok B-4 (25/40) m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 8.100 178,965.00 Besi beton polos U24 kg 56.253 11,104.50 Besi beton ulir U39 kg 115.440 11,314.50
Jumlah 35 Beton balok RB-1 (20/40) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 9.500 178,965.00 Besi beton polos U24 kg 65.980 11,104.50 Besi beton ulir U39 kg 78.000 11,314.50
Jumlah 36 Beton balok RB-2 (20/30) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 9.330 178,965.00 Besi beton polos U24 kg 55.956 11,104.50 Besi beton ulir U39 kg 104.000 11,314.50
Jumlah 37 Beton balok RB-3 (30/50) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 8.660 178,965.00 Besi beton polos U24 kg 52.729 11,104.50 Besi beton ulir U39 kg 55.467 11,314.50
Jumlah 38 Beton balok RB-4 (30/60) m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 8.330 178,965.00 Besi beton polos U24 kg 47.831 11,104.50 Besi beton ulir U39 kg 60.667 11,314.50
Jumlah 39 Beton plat lantai t= 15 cm m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 6.667 207,760.00 Besi beton polos U24 kg 172.000 11,104.50 Besi beton ulir U39 kg 0.000 11,314.50
Jumlah
-
8/10/2019 analisa2014-xls
9/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
39 Beton plat lantai t= 12 cm m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 8.333 207,760.00 Besi beton polos U24 kg 152.000 11,104.50 Besi beton ulir U39 kg 0.000 11,314.50
Jumlah
40 Beton plat lantai t= 10 cm m3 1.000Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 10.000 207,760.00 Besi beton polos U24 kg 132.000 11,104.50 Besi beton ulir U39 kg 0.000 11,314.50
Jumlah 41 Beton lisplank t= 8 cm m3 1.000
Beton K300 m3 1.000 865,262.00 Begesting 2x pakai m2 12.500 207,760.00 Besi beton polos U24 kg 156.000 11,104.50 Besi beton ulir U39 kg 0.000 11,314.50
Jumlah 42 Beton plat lantai dasar t= 8 cm m3 1.000
Beton K225 m3 1.000 815,662.00 Begesting m2 0.100 68,016.00 Wire mesh M6 m2 12.500 51,105.00
Jumlah 43 Beton plat dasar tandon t= 25 cm m3 1.000
Beton K300 m3 1.000 815,662.00 Begesting 2x pakai m2 3.000 78,555.00 Besi beton polos U24 kg 0.000 11,104.50 Besi beton ulir U39 kg 101.000 11,314.50
Jumlah 44 Beton plat dinding tandon t= 15 cm m3 1.000
Beton K300 m3 1.000 815,662.00 Begesting 2x pakai m2 13.333 207,760.00 Besi beton polos U24 kg 0.000 11,104.50 Besi beton ulir U39 kg 121.000 11,314.50
Jumlah 45 Beton plat tutup tandon t= 15 cm m3 1.000
Beton K300 m3 1.000 815,662.00
Begesting 2x pakai m2 6.667 207,760.00 Besi beton polos U24 kg 0.000 11,104.50 Besi beton ulir U39 kg 121.000 11,314.50
Jumlah VIII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 m2 1.000
Usuk Galvalum m1 3.000 17,000.00
Paku sekrup bh 6.000 500.00
Mandor OH 0.005 80,000.00 Kepala Tukang OH 0.001 75,000.00 Tukang OH 0.100 70,000.00 Pekerja OH 0.100 60,000.00
Jumlah
2 m2 1.000
Reng galvalum 3x4 cm t= 0,5 mm m1 4.000 8,000.00 Paku sekrup bh 10.000 500.00 Mandor OH 0.005 80,000.00 Kepala Tukang OH 0.001 75,000.00 Tukang OH 0.100 70,000.00 Pekerja OH 0.100 60,000.00
Jumlah
Pemasangan Usuk Galvalum 7,5x3,5 cm t= 0,75 mm
Pemasangan Reng Galvalum 3x4 cm t= 0,5 mm
-
8/10/2019 analisa2014-xls
10/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
3 m1 1.00020 cm t= 12 mm
Hollow galvalum 4x4 cm t= 0,75 mm m1 2.600 17,000.00 Kalsiplank lebar 20 cm, t= 12 mm m1 1.100 20,000.00 Paku sekrup bh 6.000 500.000 Mandor OH 0.005 80,000.00
Kepala Tukang OH 0.020 75,000.00 Tukang OH 0.200 70,000.00 Pekerja OH 0.100 60,000.00
Jumlah 4 Pemasangan Genteng Exel Monier m2 1.000
Genteng Monier Xl bh 10.000 7,800.00 Pekerja OH 0.150 60,000.00 Tukang OH 0.075 70,000.00 Kepala Tukang OH 0.008 75,000.00 Mandor OH 0.008 80,000.00
Jumlah 5 Pemasangan Wuwung Genteng Monier Xl m 1.000
Semen PC 40 kg zak 0.160 52,000.00 Pasir Pasang m3 0.032 158,000.00 Genteng Wuwung Monier Xl lbr 5.000 9,500.00 Pekerja OH 0.400 60,000.00
Tukang OH 0.200 70,000.00 Kepala Tukang OH 0.020 75,000.00 Mandor OH 0.002 80,000.00
Jumlah
6 m 1.000
Pipa PVC 3" Tipe AW ljr 0.300 53,000.00 Pekerja OH 0.081 60,000.00 Tukang OH 0.135 70,000.00
Jumlah IX PEKERJAAN PELAPIS LANTAI DAN DINDING
1 m2 1.000
Semen PC 40 kg zak 0.233 52,000.00 Semen Berwarna Yiyitan kg 1.940 9,500.00 Pasir Pasang m3 0.018 158,000.00
Tegel Keramik Dinding 20x25 cm m2 1.060 67,000.00 Pekerja OH 0.900 60,000.00 Tukang Batu OH 0.450 70,000.00 Kepala Tukang Batu OH 0.045 75,000.00 Mandor OH 0.045 80,000.00
Jumlah 2 Pemasangan Keramik Lantai 20x20 cm m2 1.000
Semen PC 40 kg zak 0.233 52,000.00 Semen Berwarna Yiyitan kg 1.500 9,500.00 Pasir Pasang m3 0.045 158,000.00 Tegel Keramik 20x20 cm m2 1.068 66,000.00 Pekerja OH 0.700 60,000.00 Tukang Batu OH 0.350 70,000.00 Kepala Tukang Batu OH 0.035 75,000.00 Mandor OH 0.035 80,000.00
Jumlah
3 Pemasangan Lantai Keramik 40x40cm Polished m2 1.000Keramik 40x40 cm Polished m2 1.050 67,000.00 Semen kg 11.380 1,120.00 Pasir Pasang m2 0.045 158,000.00 Semen Warna kg 1.620 9,500.00 Pekerja OH 0.700 60,000.00 Tukang Batu OH 0.350 70,000.00 Kepala Tukang Batu OH 0.035 75,000.00 Mandor OH 0.035 80,000.00
Jumlah
Lisplank Rangka Hollow 4x4 cm, t : 0,75 mm (Kalsiplank
Pemasangan Talang Pembuluh Pipa PVC 3 " Tipe AW
Pemasangan Tegel Keramik Dinding 20x25cm
-
8/10/2019 analisa2014-xls
11/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
4 Pemasangan Lantai Keramik 40x40cm Unpolished m2 1.000Keramik 40x40 cm Unpolished m2 1.050 67,000.00 Semen kg 11.380 1,120.00 Pasir Pasang m2 0.045 158,000.00 Semen Warna kg 1.620 9,500.00 Pekerja OH 0.700 60,000.00
Tukang Batu OH 0.350 70,000.00 Kepala Tukang Batu OH 0.035 75,000.00 Mandor OH 0.035 80,000.00
Jumlah
5 m2 1.000
Homogenous Tile 60x60 m2 1.050 160,000.00 Semen kg 10.000 1,120.00 Pasir Pasang m3 0.045 158,000.00 Semen Warna kg 1.500 9,500.00 Pekerja OH 0.260 60,000.00 Tukang Batu OH 0.130 70,000.00 Kepala Tukang Batu OH 0.013 75,000.00 Mandor OH 0.013 80,000.00
Jumlah 6 Pemasangan Step Noshing Tangga m1 1.000
Step Noshing 8x30 cm bh 3.500 10,000.00 Semen kg 11.400 1,120.00 Pasir Pasang m2 0.003 158,000.00 Semen Warna kg 0.025 9,500.00 Pekerja OH 0.090 60,000.00 Tukang Batu OH 0.090 70,000.00 Kepala Tukang Batu OH 0.009 75,000.00 Mandor OH 0.005 80,000.00
Jumlah X PEKERJAAN KUSEN PINTU DAN JENDELA1 Pemasangan Kusen Aluminium 4 " m 1.000
Kusen Aluminium 4 " X 1 3/4" m' 1.050 82,000.00 Skrup/ripet buah 1.000 400.00 Sealent tube 4.000 2,200.00 Pekerja OH 0.150 60,000.00 Tukang besi OH 0.250 70,000.00
Kepala Tukang besi OH 0.022 75,000.00 Mandor OH 0.025 80,000.00
Jumlah 2 Pemasangan Kusen Aluminium 3 " m 1.000
Kusen Aluminium 3 " X 1 3/4" m' 1.050 80,000.00 Skrup/ripet buah 1.000 400.00 Sealent tube 4.000 2,200.00 Pekerja OH 0.150 60,000.00 Tukang besi OH 0.250 70,000.00 Kepala Tukang besi OH 0.022 75,000.00 Mandor OH 0.025 80,000.00
Jumlah 3 Frame Daun Pintu Aluminium 4,5x6,5 cm (ambang atas) m 1.000
Frame Daun Pintu Aluminium 4,5x6,5 m 1.050 84,000.00 Karet Kusen Aluminium m 1.000 2,200.00 Skrup/ Rivet bh 4.000 400.00 Pekerja OH 0.150 60,000.00 Tukang OH 0.250 70,000.00 Kepala Tukang OH 0.022 75,000.00 Mandor OH 0.025 80,000.00
Jumlah
Pasang Lantai Homogenous Tile 60x60
-
8/10/2019 analisa2014-xls
12/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
4 Frame Daun Pintu Aluminium 4,5x11 cm (ambang bwh) m 1.000Frame Daun Pintu Aluminium 4,5x11 cm (amb bwh) m 1.050 87,000.00 Karet Kusen Aluminium m 1.000 2,200.00 Skrup/ Rivet bh 4.000 400.00 Pekerja OH 0.150 60,000.00 Tukang OH 0.250 70,000.00
Kepala Tukang OH 0.022 75,000.00 Mandor OH 0.025 80,000.00
Jumlah 5 Frame Daun Jendela Aluminium m 1.000
Frame Daun Jendela Aluminium m 1.050 78,000.00 Karet Kusen Aluminium m 1.000 2,200.00 Skrup/ Rivet bh 4.000 400.00 Pekerja OH 0.150 60,000.00 Tukang OH 0.250 70,000.00 Kepala Tukang OH 0.022 75,000.00 Mandor OH 0.025 80,000.00
Jumlah 6 Ventilasi aluminium uk. 1"x3 " m 1.000
Vebtilasi aluminium 1 "x 3 " m 1.050 22,000.00 Skrup/ Rivet bh 4.000 400.00 Pekerja OH 0.150 60,000.00
Tukang OH 0.150 70,000.00 Kepala Tukang OH 0.010 75,000.00 Mandor OH 0.020 80,000.00
Jumlah 7 Pasang Kaca polos t= 5 mm m2 1.000
Kaca polos t= 5 mm m2 1.050 80,000.00 Pekerja OH 0.015 60,000.00 Tukang OH 0.150 70,000.00 Kepala Tukang OH 0.015 75,000.00 Mandor OH 0.008 80,000.00
Jumlah 8 Pasang Kaca t= 6 mm m2 1.000
Kaca polos t= 6 mm m2 1.050 112,000.00 Pekerja OH 0.015 60,000.00 Tukang OH 0.150 70,000.00
Kepala Tukang OH 0.015 75,000.00 Mandor OH 0.008 80,000.00 Jumlah
9 Pasang Kaca Polos Tebal 8 mm m2 1.000Kaca Tebal Polos 8mm m2 1.050 175,000.00 Pekerja OH 0.015 60,000.00 Tukang OH 0.150 70,000.00 Kepala Tukang OH 0.015 75,000.00 Mandor OH 0.008 80,000.00
Jumlah 10 Pasang Kaca Stopsol Tebal 8 mm m2 1.000
Kaca Stopsol Tebal 8 mm m2 1.050 530,000.00 Pekerja OH 0.020 60,000.00 Tukang OH 0.200 70,000.00 Kepala Tukang OH 0.020 75,000.00 Mandor OH 0.010 80,000.00
Jumlah 11 Pasang Kaca Tempered Stopsol Tebal 12 mm m2 1.000
Kaca Tempered Stopsol Tebal 12mm m2 1.050 1,250,000.00 Pekerja OH 0.025 60,000.00 Tukang OH 0.250 70,000.00 Kepala Tukang OH 0.025 75,000.00 Mandor OH 0.013 80,000.00
Jumlah
-
8/10/2019 analisa2014-xls
13/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
12 Pasang Multiplek t= 12 mm m2 1.000Multiplek t= 12 mm (122X244 cm lbr 0.350 158,000.00 Pekerja OH 0.0250 60,000.00 Tukang OH 0.0750 70,000.00 Kepala Tukang OH 0.0075 75,000.00 Mandor OH 0.0013 80,000.00
Jumlah 13 Pasang aluminium Composit Panel m2 1.000
Aluminium Composit Panel m1 1.0500 160,000.00 Baut sekrup/ripet bh 20.0000 1,000.00 Pekerja OH 0.040 60,000.00 Tukang besi OH 0.400 70,000.00 Kepala Tukang besi' OH 0.040 75,000.00
Mandor OH 0.0200 80,000.00 Jumlah
14 Pasang aluminium Composit Panel ACP Pergoreted 3 cm m2 1.000Aluminium Composit Panel ACP Perforeted 3 cm m1 1.0500 220,000.00 Baut sekrup/ripet bh 20.0000 1,000.00 Pekerja OH 0.040 60,000.00 Tukang besi OH 0.400 70,000.00 Kepala Tukang besi' OH 0.040 75,000.00
Mandor OH 0.0200 80,000.00
Jumlah 15 Pintu aluminium Type P1 unit 1.000
Kusen aluminium silver 4 " m1 9.560 125,450.00 Frame daun pintu 4,5x6,5 cm m1 9.840 122,150.00 Frame daun pintu 4,5x11 cm m1 1.440 125,300.00 Multiplek t= 12 mm m2 2.310 62,716.50 HPL m2 6.390 64,000.00 Frame Vision aluminium uk 20x70 cm m1 3.600 40,000.00 Kaca 5 mm vision m2 0.310 97,125.00 Kaca polos 6 mm m2 1.060 130,725.00 Full Handle set 2.000 300,000.00 Engsel steinlish stel 3.000 30,000.00 Door Closer set 2.000 300,000.00 Lock case Cylinder set 1.000 165,000.00 Door Stoper set 2.000 30,000.00
Flush Bolt 12 " bh 1.000 60,000.00 Flush Bolt 6 " bh 1.000 40,000.00 Jumlah
16 Pintu Type PU (Pintu Utama) unit 1.000Kaca Tempered Stopsol t= 12 mm m2 7.840 1,334,375.00 Kaca Stopsol t= 8 mm m2 5.840 574,000.00 Full Handle Steinlissteel t= 60 cm stel 4.000 340,000.00 Bottom Patch Fiting set 4.000 150,000.00 Bottom Lock Fitting set 4.000 175,000.00 Floor Hinge set 4.000 1,200,000.00 Fixed Top Pin set 4.000 110,000.00 Top Patch Fitting set 4.000 220,000.00 Dinding Lapis panel aluminium m2 8.900 223,000.00 Rangka Hollow 40x40x1,2 mm m1 56.600 33,371.45 Cor beton 20x20 cm (balok gantung) m3 0.280 4,333,071.92
Jumlah
-
8/10/2019 analisa2014-xls
14/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
17 Pintu aluminium Type P2 unit 1.000Kusen aluminium silver 4 " m1 10.120 125,450.00 Frame daun pintu 4,5x6,5 cm m1 10.120 122,150.00 Frame daun pintu 4,5x11 cm m1 1.720 125,300.00 Kaca polos 8 mm m2 2.800 196,875.00 Jalusi 1"x3 " m1 5.160 46,550.00
Full Handle 5540 cm set 2.000 256,000.00 Engsel steinlish stel 3.000 30,000.00 Door Closer set 2.000 300,000.00 Lock case set 1.000 165,000.00 Flush Bolt 12 " bh 1.000 60,000.00 Flush Bolt 6 " bh 1.000 40,000.00
Jumlah 18 Pintu aluminium Type P3 unit 1.000
Kusen aluminium silver 4 " m1 9.560 125,450.00 Frame daun pintu 4,5x6,5 cm m1 9.840 122,150.00 Frame daun pintu 4,5x11 cm m1 1.440 125,300.00 Multiplek t= 12 mm m2 2.310 62,716.50 HPL m2 6.390 64,000.00 Frame Vision aluminium uk 20x70 cm m1 3.600 40,000.00 Kaca 5 mm vision m2 0.310 97,125.00 Jalusi aluminium 1"X3 " m1 4.200 46,550.00
Full Handle set 2.000 300,000.00 Engsel steinlish stel 3.000 30,000.00 Door Closer set 2.000 300,000.00 Lock case Cylinder set 1.000 165,000.00 Door Stoper set 2.000 30,000.00 Flush Bolt 12 " bh 1.000 60,000.00 Flush Bolt 6 " bh 1.000 40,000.00
Jumlah 19 Pintu aluminium Type P4 unit 1.000
Kusen aluminium silver 4 " m1 4.480 125,450.00 Frame daun pintu 4,5x6,5 cm m1 10.120 122,150.00 Frame daun pintu 4,5x11 cm m1 1.720 125,300.00 Multiplek t= 12 mm m2 0.970 62,716.50 HPL m2 1.940 64,000.00 Lever Handle set 1.000 140,000.00
Engsel steinlish stel 2.000 30,000.00 Lock case set 1.000 165,000.00 Jumlah
20 Pintu aluminium Type P5 unit 1.000Kusen aluminium silver 4 " m1 7.660 125,450.00 Frame daun pintu 4,5x6,5 cm m1 5.050 122,150.00 Frame daun pintu 4,5x11 cm m1 0.850 125,300.00 Multiplek t= 12 mm m2 1.380 62,716.50 HPL m2 2.760 64,000.00 Frame Vision aluminium uk 20x70 cm m1 1.800 40,000.00 Kaca 5 mm vision m2 0.150 97,125.00 Kaca polos 6 mm m2 0.610 130,725.00 Lever Handle set 1.000 140,000.00 Engsel steinlish stel 2.000 30,000.00 Lock case Cylinder set 1.000 165,000.00
Jumlah
-
8/10/2019 analisa2014-xls
15/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
21 Pintu aluminium Type P6 unit 1.000Kusen aluminium silver 4 " m1 7.660 125,450.00 Frame daun pintu 4,5x6,5 cm m1 5.050 122,150.00 Frame daun pintu 4,5x11 cm m1 0.850 125,300.00 Multiplek t= 12 mm m2 1.380 62,716.50 HPL m2 2.760 64,000.00
Frame Vision aluminium uk 20x70 cm m1 1.800 40,000.00 Kaca 5 mm vision m2 0.150 97,125.00 Jalusi aluminium 1"x3 " m1 5.100 46,550.00 Lever Handle set 1.000 140,000.00 Engsel steinlish stel 2.000 30,000.00 Lock case Cylinder set 1.000 165,000.00
Jumlah 22 Pintu aluminium Type P7 unit 1.000
Kusen aluminium silver 4 " m1 5.010 125,450.00 Frame daun pintu 4,5x6,5 cm m1 4.930 122,150.00 Frame daun pintu 4,5x11 cm m1 1.460 125,300.00 Multiplek t= 12 mm m2 0.990 62,716.50 HPL m2 1.990 64,000.00 Lever Handle set 1.000 140,000.00 Engsel steinlish stel 2.000 30,000.00 Lock case set 1.000 165,000.00
Jumlah 23 Pintu aluminium Type P8 unit 1.000
Kusen aluminium silver 4 " m1 4.260 125,450.00 Frame daun pintu 4,5x6,5 cm m1 6.280 122,150.00 Multiplek t= 12 mm m2 0.700 62,716.50 HPL m2 1.400 64,000.00 Handle HDL DKS set 1.000 125,000.00 Engsel steinlish stel 2.000 30,000.00 Lock case Window set 1.000 140,000.00
Jumlah 24 Pintu aluminium Type P9 unit 1.000
Kusen aluminium silver 4 " m1 3.500 125,450.00 Frame daun pintu 4,5x6,5 cm m1 3.340 122,150.00 Multiplek t= 12 mm m2 0.300 62,716.50 HPL m2 0.600 64,000.00
Handle HDL DKS set 1.000 125,000.00 Engsel steinlish stel 1.000 30,000.00 Lock case Window set 1.000 140,000.00
Jumlah 25 Jendela aluminium Type J1 unit 1.000
Kusen aluminium silver 4 " m1 16.150 125,450.00 Grame daun jendela kaca m1 5.960 115,850.00 Kaca polos t= 5 mm m2 3.810 97,125.00 Sealent m1 24.600 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah 26 Jendela aluminium Type J2 unit 1.000
Kusen aluminium silver 4 " m1 16.600 125,450.00 Grame daun jendela kaca m1 6.120 115,850.00 Kaca polos t= 5 mm m2 3.920 97,125.00
Sealent m1 22.100 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah
-
8/10/2019 analisa2014-xls
16/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
27 Jendela aluminium Type J3 unit 1.000Kusen aluminium silver 4 " m1 16.150 125,450.00 Frame daun jendela kaca m1 5.960 115,850.00 Jalusi aluminium 1"x3 " m1 14.400 46,550.00 Kaca polos t= 5 mm m2 1.880 97,125.00 Sealent m1 9.400 2,200.00
Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah 28 Jendela aluminium Type J4 unit 1.000
Kusen aluminium silver 4 " m1 16.600 125,450.00 Frame daun jendela kaca m1 6.120 115,850.00 Jalusi aluminium 1"x3 " m1 15.120 46,550.00 Kaca polos t= 5 mm m2 2.010 97,125.00 Sealent m1 11.300 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah 29 Jendela aluminium Type J5 unit 1.000
Kusen aluminium silver 4 " m1 5.560 125,450.00 Frame daun jendela kaca m1 3.240 115,850.00 Jalusi aluminium 1"x3 " m1 3.840 46,550.00
Kaca polos t= 5 mm m2 0.430 97,125.00 Sealent m1 2.700 2,200.00 Cathment 12 " set 1.000 65,000.00 Handle Lock CH 400 Dekson set 1.000 60,000.00
Jumlah 30 Jendela aluminium Type J6 unit 1.000
Kusen aluminium silver 4 " m1 31.800 125,450.00 Frame daun jendela kaca m1 11.580 115,850.00 Jalusi aluminium 1"x3 " m1 20.100 46,550.00 Kaca polos t= 5 mm m2 6.630 97,125.00 Sealent m1 38.100 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 3.000 60,000.00
Jumlah 31 Jendela aluminium Type J7 unit 1.000
Kusen aluminium silver 4 " m1 26.500 125,450.00 Frame daun jendela kaca m1 7.840 115,850.00 Jalusi aluminium 1"x3 " m1 16.800 46,550.00 Kaca polos t= 5 mm m2 5.400 97,125.00 Sealent m1 26.600 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah 32 Jendela aluminium Type BV unit 1.000
Kusen aluminium silver 4 " m1 2.000 125,450.00 Frame daun jendela kaca m1 1.520 115,850.00 Kaca polos t= 5 mm m2 1.100 97,125.00 Sealent m1 1.400 2,200.00 Cathment 12 " bh 2.000 65,000.00 Handle Lock CH 400 Dekson set 1.000 60,000.00
Jumlah
33 Curtain Wall 1 (CW1A) unit 1.000Kusen aluminium silver 4 " m1 14.600 125,450.00 Frame daun jendela kaca m1 9.760 115,850.00 Kaca polos t= 6 mm m2 2.480 130,725.00 Sealent m1 17.000 2,200.00 Cathment 12 " set 4.000 65,000.00 Handle Lock CH 400 Dekson set 4.000 60,000.00
Jumlah
-
8/10/2019 analisa2014-xls
17/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
34 Curtain Wall 1 (CW1B) unit 1.000Kusen aluminium silver 4 " m1 15.600 125,450.00 Kaca polos t= 6 mm m2 3.040 130,725.00 Sealent m1 20.000 2,200.00
Jumlah 35 Curtain Wall 1 (CW1C) unit 1.000
Kusen aluminium silver 4 " m1 29.900 125,450.00 Kaca polos t= 6 mm m2 6.880 130,725.00 Sealent m1 42.400 2,200.00
Jumlah 36 Curtain Wall 1 (CW2) unit 1.000
Kusen aluminium silver 4 " m1 19.100 125,450.00 Frame daun jendela kaca m1 9.120 115,850.00 Kaca polos t= 6 mm m2 4.400 130,725.00 Sealent m1 24.040 2,200.00 Cathment 12 " set 2.000 65,000.00 Handle Lock CH 400 Dekson set 2.000 60,000.00
Jumlah XI PEKERJAAN SUN SCREEN, SECONDARY SKIN, RAILIING1 PENGELASAN/FEBRIKASI DENGAN LAS LISTRIK CM 10.000
Kawat las listrik kg 0.400 35,000.00 Solar ltr 0.300 6,500.00
Minyak Pelumas ltr 0.040 28,000.00 Sewa Alat Welding Set (Min 5 jam) jam 0.170 50,000.00 Mandor OH 0.002 80,000.00 Tukang besi OH 0.020 70,000.00 Kepala Tukang besi OH 0.002 75,000.00 Pekerja OH 0.002 60,000.00
Jumlah 2 FEBRIKASI DAN PEMASANGAN PIPA BAJA (ELECTRODA) M1 1.000
Kawat las listrik kg 0.006 35,000.00 Solar ltr 0.005 6,500.00 Minyak Pelumas ltr 0.001 28,000.00 Sewa Alat Welding Set (Min 5 jam) jam 0.210 50,000.00 Mandor OH 0.002 80,000.00 Tukang besi OH 0.060 70,000.00 Kepala Tukang besi OH 0.006 75,000.00
Pekerja OH 0.028 60,000.00 Jumlah 3 FEBRIKASI DAN PEMASANGAN BAJA (ELECTRODA) KG 1.000
Pengelasan besi baja cm 0.200 27,400.00 Mandor OH 0.001 80,000.00 Tukang besi OH 0.001 70,000.00 Kepala Tukang besi OH 0.000 75,000.00 Pekerja OH 0.001 60,000.00
Jumlah 4 PEK BESI SIKU TERMASUK PEMASANGAN DAN ELECTRODA KG 1.000
Besi siku kg 1.050 12,000.00 Pemasangan dan febrikasi besi siku kg 1.000 5,657.50
Jumlah 5 PEK BESI WF TERMASUK PEMASANGAN DAN ELECTRODA KG 1.000
Besi WF 200.100.5,5.7 kg 1.050 12,000.00 Pemasangan dan febrikasi besi siku kg 1.000 5,657.50
Jumlah 6 PEK BESI KANAL C TERMASUK PEMASANGAN DAN ELECTRODA KG 1.000
Besi Kanal C 150.50.20.3,2 kg 1.050 12,000.00 Pemasangan dan febrikasi besi siku kg 1.000 5,657.50
Jumlah 6 PEK BESI PLAT TERMASUK PEMASANGAN DAN ELECTRODA KG 1.000
Besi Plat kg 1.050 12,000.00 Pemasangan dan febrikasi besi siku kg 1.000 5,657.50
Jumlah
-
8/10/2019 analisa2014-xls
18/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
6 PEK BESI TRACK STANK DIA 16 MM PEMASANGAN DAN ELECTROD KG 1.000Besi Track stank (besi beton) O 16 mm kg 1.050 9,600.00 Pemasangan dan febrikasi besi siku kg 1.000 5,657.50
Jumlah 6 PEK BESI IKATAN ANGIN DIA 12 MM PEMASANGAN DAN ELECTRO KG 1.000
Besi Ikatan angin (besi beton) O 12 mm kg 1.050 9,600.00
Pemasangan dan febrikasi besi siku kg 1.000 5,657.50 Jumlah
5 FEBRIKASI DAN PASANG PIPA BESI HOLLOW 20.20 M1 1.000Besi Hollow 20x20x2 mm m1 1.050 7,000.00 Pemasangan dan febrikasi m1 0.250 17,246.05
Jumlah 6 FEBRIKASI DAN PASANG PIPA BESI HOLLOW 20.40 M1 1.000
Besi Hollow 20x40X2 MM m1 1.050 14,000.00 Pemasangan dan febrikasi m1 0.500 17,246.05
Jumlah 7 FEBRIKASI DAN PASANG PIPA BESI HOLLOW 40.40 M1 1.000
Besi Hollow 40x40X2,3 MM m1 1.050 17,000.00 Pemasangan dan febrikasi m1 0.900 17,246.05
Jumlah 8 FEBRIKASI DAN PASANG PIPA BESI HOLLOW 40.80 M1 1.000
Besi Hollow 40x80x3,2 mm m1 1.050 21,000.00
Pemasangan dan febrikasi m1 1.500 17,246.05 Jumlah
9 FEBRIKASI DAN PASANG PIPA BESI HOLLOW 75.75 M1 1.000Besi Hollow 75x75x3,8 mm m1 1.050 28,000.00 Pemasangan dan febrikasi m1 1.750 17,246.05
Jumlah 10 FEBRIKASI DAN PASANG PIPA STEINLIS DIA 2 1/2 " M1 1.000
Pipa Steinlis 2 1/2 " m1 1.050 350,000.00 Pemasangan dan febrikasi m1 2.940 17,246.05
Jumlah 11 FEBRIKASI DAN PASANG PIPA STEINLIS DIA 1 " M1 1.000
Pipa Steinlis 1 " m1 1.050 175,000.00 Pemasangan dan febrikasi m1 2.500 17,246.05
Jumlah 12 FEBRIKASI DAN PASANG PIPA BSP DIA 2 1/2 " M1 1.000
Pipa BSP 2 1/2 " m1 1.050 200,000.00 Pemasangan dan febrikasi m1 2.940 17,246.05 Jumlah
13 FEBRIKASI DAN PASANG PIPA BSP DIA 1 " M1 1.000Pipa BSP 1 " m1 1.050 125,000.00 Pemasangan dan febrikasi m1 1.200 17,246.05
Jumlah 14 Secundary Skin Hall dan Lobby uk 1720x850 cm unit 1.000
Besi siku 50.50.5 kg 395.850 18,257.50 Hollow Galvanis 40x80x3,2 mm m1 300.900 47,919.08 Cat besi m2 87.190 20,315.00 Dinabolt M10 bh 217.200 3,000.00
Jumlah 15 Railing Tangga Utama m1 1.000
Hand railing pipa steinlis dia 2 1/2 " m1 1.000 418,203.39 Acrylic t= 8 mm m1 2.200 247,500.00
Tiang Steinlis pipa dia 2 1/2 " m1 1.260 418,203.39 Pipa steinlis dia 1 " m1 0.750 226,865.13 Penjepit Acrylic platt steinlis m1 1.900 25,000.00 Base Plate bh 1.000 56,000.00
Jumlah 16 Hand Railing Tangga Utama m1 1.000
Hand railing pipa steinlis dia 2 1/2 " m1 1.100 418,203.39 Suport hand Rilling steinlis dia 2 1/2 bh 1.000 50,000.00
Jumlah
-
8/10/2019 analisa2014-xls
19/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
17 Railing Tangga 2 m1 1.000Untuk panjang reiling m1 8.500
Hand railing pipa BSP dia 2 1/2 " t= 3,2 mm m1 8.500 260,703.39 Kolom Railing Hollow 40x40x2,3 mm m1 11.700 33,371.45 Hollow 20x20x2 mm m1 23.000 11,661.51 Base Plate bh 1.000 56,000.00
Cat pipa railing m2 22.000 20,315.00 Jumlah 8,5 M Jumlah 1 M
18 Hand Railing Tangga 2 m1 1.000Untuk panjang reiling m1 5.600
Hand railing pipa BSP dia 2 1/2 " m1 5.600 260,703.39 Cat pipa railing m2 1.344 20,315.00 Suport hand Rilling steinlis dia 2 1/2 bh 4.000 50,000.00
Jumlah 5 M Jumlah 1 M
XII PEKERJAAN PLAFOND1 Pas. Plafond Kalsiboard 6 mm Rangka Hollow m2 1.000
Besi Hollow 40/40 m 0.750 33,371.45 Besi Hollow 20/20 m 2.000 23,323.03 Kalsiboard EG Uk. 240x120x6 mm lbr 0.382 62,000.00 Paku Asbes Skrup 4 bh 4.000 500.00
Pekerja OH 0.150 60,000.00 Tukang Kayu OH 0.250 70,000.00 Kepala Tukang Kayu OH 0.025 75,000.00 Mandor OH 0.075 80,000.00
Jumlah 2 Pas. Plafond Gypsumboard 9 mm Rangka Hollow m2 1.000
Besi Hollow 40/40 m 0.750 33,371.45 Besi Hollow 20/20 m 2.000 23,323.03 Gypsum Board Uk. 240x120x9 mm lbr 0.382 84,000.00 Paku Asbes Skrup 4 bh 4.000 500.00 Pekerja OH 0.150 60,000.00 Tukang Kayu OH 0.250 70,000.00 Kepala Tukang Kayu OH 0.025 75,000.00 Mandor OH 0.075 80,000.00
Jumlah
3 Pemasangan List Gypsum m1 1.000Lis Gypsum m 1.050 26,000.00 Sekrup bh 4.000 500.00 Pekerja OH 0.050 60,000.00 Tukang Kayu OH 0.050 70,000.00 Kepala Tukang Kayu OH 0.005 75,000.00 Mandor OH 0.003 80,000.00
Jumlah 4 Pemasangan List Aluminium siku m1 1.000
Lis aluminium siku m 1.050 10,000.00 Sekrup bh 4.000 500.00 Pekerja OH 0.050 60,000.00 Tukang Kayu OH 0.050 70,000.00 Kepala Tukang Kayu OH 0.005 75,000.00 Mandor OH 0.003 80,000.00
Jumlah
XIII PEKERJAAN CAT1 Pengerjaan Cat Dinding Interior m2 1.000
Alkalin kg 0.120 25,000.00 Cat Tembok Interior klg 0.360 20,000.00 Pekerja OH 0.028 60,000.00 Tukang cat OH 0.042 70,000.00 Kepala Tukang cat OH 0.004 75,000.00 Mandor OH 0.003 80,000.00
Jumlah
-
8/10/2019 analisa2014-xls
20/38
No. Sat. Koef. Harga Satuan (Rp)Uraian Pekerjaan
2 Pengerjaan Cat Dinding Exterior m2 1.000Alkalin kg 0.120 25,000.00 Cat Tembok Exterior klg 0.360 115,000.00 Pekerja OH 0.028 60,000.00 Tukang cat OH 0.042 70,000.00 Kepala Tukang cat OH 0.004 75,000.00
Mandor OH 0.003 80,000.00 Jumlah
3 Pengerjaan Cat besi m2 1.000Cat besi kg 0.100 45,000.00 Kuas bh 0.010 10,000.00 Pekerja OH 0.020 60,000.00 Tukang cat OH 0.200 70,000.00 Kepala Tukang cat OH 0.004 75,000.00 Mandor OH 0.003 80,000.00
Jumlah
4 Pengerjaan Waterproofing m2 1.000
Water Proofing dan Scredding kg 0.350 42,000.00 Pekerja OH 0.050 60,000.00 Tukang cat OH 0.075 70,000.00 Kepala Tukang cat OH 0.008 75,000.00 Mandor OH 0.003 80,000.00
Jumlah
XIV PEKERJAAN SALURAN
1 Saluran beton precast U 30 cm m1 1.000Saluran beton U30 cm m1 1.000 140,000.00 Galian tanah m3 0.160 47,000.00 Urugan pasir bawah saluran m3 0.040 158,000.00
Jumlah 2 Saluran beton precast U 60 cm m1 1.000
Saluran beton U60 cm m1 1.000 270,000.00 Galian tanah m3 0.590 47,000.00 Urugan pasir bawah saluran m3 0.070 158,000.00
Jumlah 3 Saluran PVC bawah lantai m1 1.000
PVC dia 6 " m1 1.000 98,000.00 Material bantu 10 % dari bahan m1 0.100 98,000.00
Pekerja OH 0.080 60,000.00 Tukang OH 0.135 70,000.00 Kepala Tukang OH 0.014 75,000.00 Mandor OH 0.004 80,000.00
Jumlah
-
8/10/2019 analisa2014-xls
21/38
A. PEKERJAAN ELECTRICAL
No Vol. Satuan
Harga
Satuan
(Rp)
Harga
(Rp)
1 3 4 5 61 Inst. Penerangan, NYM 3x2,5 mm (o) PVC HI dia. 20mm 236,730
a Kabel NYM 3 x 2.5 mm2 9.0 m 15,600 140,400b Pipa Conduit 20 HI 9.0 m 5,200 46,800c Klem Pipa Conduit 10.0 bh 650 6,500d T.Doost 2.0 bh 1,950 3,900e Socket Conduit 3.0 bh 650 1,950f Fisher 21.0 bh 195 4,095g Lasdop 3.0 bh 195 585J Upah Instalasi Kabel + Pipa 1.0 ls 32,500 32,500
Jumlah Total 236,7302 Inst. Stop kontak, NYM 3x2,5 mm (o) PVC HI dia. 20mm 256,230
a Kabel NYM 3 x 2.5 mm2 10.0 m 15,600 156,000b Pipa Conduit 20 HI 10.0 m 5,200 52,000c Klem Pipa Conduit 11.0 bh 650 7,150
d T.Doost 1.0 bh 1,950 1,950e Socket Conduit 3.0 bh 650 1,950f Fisher 21.0 bh 195 4,095g Lasdop 3.0 bh 195 585J Upah Instalasi Kabel + Pipa 1.0 ls 32,500 32,500
TOTAL 256,2303 Instalasi antar tiang lampu taman kabel NYFGBY4x2,5mm2 679,780
a Kabel NFGBY 4 x 2.5 mm2 20.0 m' 33,800 676,000g Lasdop 4.0 bh 195 780J Upah gelar kabel 1.0 ls 3,000 3,000
TOTAL Rp. 679,7804 Galian Kabel lewat Taman/Paving & urug kembali 36,075
a Galian & Uruk kembali 1.0 m' 23,400 23,400b Batu Bata 11.0 bh 975 10,725c Pasir 0.0 m3 195,000 1,950
TOTAL 36,075
5 Lampu SL 50 WATT 115 050a Lampu SL 50 WATT 1.0 bh 110,500 110,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 115,0506 Lampu SL 18 WATT 63,050
a Lampu SL 18 WATT 1.0 bh 58,500 58,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 63,0507 Lampu SL 11 WATT 50 050
a Lampu SL 11 WATT 1.0 bh 45,500 45,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 50,0508 Exhause Fan Toilet 100 cfm /50 Watt 603,200
a Exhause Fan Toilet 100 cfm /50 Watt 1.0 bh 585,000 585,000b Upah Pasang 0.2 OH 91,000 18,200
Jumlah Total 603,200
9 Lampu Down Light (Teme VHO SD, koridor ) 459,550a Lampu Down Light (Teme VHO SD, koridor ) 1.0 bh 455,000 455,000b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 459,550
Uraian Pekerjaan
2
ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL DAN ELEKTRICAL
TAHUN 2014
-
8/10/2019 analisa2014-xls
22/38
10 Lampu Taman SL 1 x18 watt (termasuk tiang lampu dan pondasi) 1,103,050a Lampu SL 18 WATT 1.0 bh 58,500 58,500
Tiang + Pondasi 1.0 ls 1,040,000 1,040,000b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 1,103,05011 Fiting lampu E 27 37,050
a Fiting lampu E 27 1.0 bh 32,500 32,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 37,05012 Stop Kontak 1 Phase, 200 VA 50,050
a Stop Kontak 1 Phase, 200 VA 1.0 bh 45,500 45,500
b Upah Pasang 0.1 OH 91,000 4,550Jumlah Total 50,050
13 Saklar Tunggal 37,050a Saklar Tunggal 1.0 bh 32,500 32,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 37,05014 Saklar Ganda 63,050
a Saklar Ganda 1.0 bh 58,500 58,500b Upah Pasang 0.1 OH 91,000 4,550
Jumlah Total 63,05015 '-Kabel NYFGBY 4 X 50mm2 BC 50mm2 121,940
a Kabel NYFGBY 4 X 50mm2 BC 50mm2 1.0 m' 84,500 84,500g Spatu Kabel dia.50 4.0 bh 8,450 33,800J Upah Pasang 0.0 ls 91,000 3,640
TOTAL Rp. 121,940
15 '-Kabel NYY 4 X 4mm2 + BC 4mm2 95,940a Kabel NYY 4 X 4mm2 + BC 4mm2 1.0 m' 58,500 58,500g Spatu Kabel dia.50 4.0 bh 8,450 33,800J Upah Pasang 0.0 ls 91,000 3,640
TOTAL Rp. 95,94015 '-Kabel NYY 4 X 10mm2 + BC 10mm2 108,940
a '-Kabel NYY 4 X 10mm2 + BC 10mm2 1.0 m' 71,500 71,500g Spatu Kabel dia.50 4.0 bh 8,450 33,800J Upah Pasang 0.0 ls 91,000 3,640
TOTAL Rp. 108,940
B. PEKERJAAN MEKANIKAL
No Vol. Satuan
Harga
Satuan
(Rp)
Harga
(Rp)
1 3 4 5 6PIPA PVC Class AW
1 Pipa 100 mm / 4 (PVC "AW" ) 124,560Pipa 100 mm / 4 (PVC "AW" ) 1.00 M 83,460.00 83,460Fitting 1.00 ls 12,000.00 12,000Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 22,000.00 22,000Testing 1.0 ls 1,600.00 1,600
Sub Total 124,5602 Pipa 80 mm / 3" (PVC "AW" ) 100,650
Pipa 80 mm / 3" (PVC "AW" ) 1.00 M 53,950.00 53,950Fitting 1.00 ls 19,800.00 19,800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000
Upah Pasang 1.00 M 19,800.00 19,800Testing 1.0 ls 1,600.00 1,600Sub Total 100 650
Uraian Pekerjaan
2
-
8/10/2019 analisa2014-xls
23/38
3 Pipa 65 mm / 2 (PVC "AW" ) 79,860Pipa 65 mm / 2 (PVC "AW" ) 1.00 M 35,360.00 35,360Fitting 1.00 ls 19,800.00 19,800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 17,600.00 17,600Testing 1.0 ls 1,600.00 1,600
Sub Total 79,8604 pipa 50 mm / 2 (PVC "AW" ) 67,530
pipa 50 mm / 2 (PVC "AW" ) 1.00 M 27,430.00 27,430
Fitting 1.00 ls 19,800.00 19,800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 13,200.00 13,200Testing 1.0 ls 1,600.00 1,600
Sub Total 67,5305 50 mm / 2 PIPA PVC "D" ( pipa Ventilasi ) 63,130
Pipa PVC 1.00 M 27,430.00 27,430Fitting 1.00 ls 19,800.00 19,800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 63,1306 Floor drain 50 205,100Floor drain 50 1.00 M 195,000.00 195,000Material Bantu 1.00 ls 1,300.00 1,300Upah Pasang 1.00 M 8,800.00 8,800
Sub Total 205,1007 Clean Out 50 205,100
Clean Out 50 1.00 M 195,000.00 195,000Material Bantu 1.00 ls 1,300.00 1,300Upah Pasang 1.00 M 8,800.00 8,800
Sub Total 205,1008 Clean Out 100 335,100
Clean Out 100 1.00 M 325,000.00 325,000Material Bantu 1.00 ls 1,300.00 1,300Upah Pasang 1.00 M 8,800.00 8,800
Sub Total 335,100
PIPA PPR PN - 109 Pipa 40 mm / 1 88,610
Pipa 40 mm / 1 1.00 M 52,910.00 52,910Fitting 1.00 ls 19,800.00 19,800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 88,61010 Pipa 32 mm / 1" 61,320
Pipa 32 mm / 1" 1.00 M 33,540.00 33,540Fitting 1.00 ls 11,880.00 11,880Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 61,320
-
8/10/2019 analisa2014-xls
24/38
11 Pipa. 25 mm / 1" 40,810Pipa. 25 mm / 1" 1.00 M 21,710.00 21,710Fitting 1.00 ls 3,200.00 3,200Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 40,81012 Pipa 20 mm / 1/4" 30,870
Pipa 20 mm / 1/4" 1.00 M 14,170.00 14,170
Fitting 1.00 ls 800.00 800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,000.00 1,000Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 30,87013 Pipa 15 mm / 1/2" 27,010
Pipa 15 mm / 1/2" 1.00 M 10,010.00 10,010Fitting 1.00 ls 800.00 800Support 1.00 ls 3,200.00 3,200Material Bantu 1.00 ls 1,300.00 1,300
Alat Kerja 1.0 ls 1,300.00 1,300Upah Pasang 1.00 M 8,800.00 8,800Testing 1.0 ls 1,600.00 1,600
Sub Total 27,010
-
8/10/2019 analisa2014-xls
25/38
No
1
A. BAHAN MENGGUNAKAN BESI/LOGAM1 Besi Beton ulir BJTD-40 Rp. 9,600.00 per Kg
2 Besi Beton polos BJTP-24 Rp. 9,400.00 per Kg
3 Besi Siku Rp. 12,000.00 per Kg
4 Besi WF 200.100.5,5.8 Rp. 12,000.00 per Kg
5 Besi plat Rp. 12,000.00 per Kg
6 Besi Kanal C 150.50.50.3,2 Rp. 12,000.00 per Kg
7 Baut mur HTB A325O 5/8"X2 1/2 " Rp. 6,500.00 per bh
8 Baut angkur dia 19 mm - 60 cm Rp. 75,000.00 per bh
9 Baut keras Rp. 50,000.00 per bh
10 Base Plate steinlis dia 2 1/2 " Rp. 56,000.00 per bh
11 Suport Hand railing steinlis dia 2 1/2 " Rp. 50,000.00 per bh
12 Besi Hollow 20.20.2 MM Rp. 7,000.00 per m113 Besi Hollow 20.40.2 MM Rp. 14,000.00 per m1
14 Besi Hollow 40.40,2,3 MM Rp. 17,000.00 per m1
15 Besi Hollow 40.80.3,2 mm Rp. 21,000.00 per m1
16 Besi Hollow 75,75.3,8 mm Rp. 28,000.00 per m1
17 Pipa BSP dia 2 1/2 " Rp. 200,000.00 per m1
18 Pipa BSP dia 1 " Rp. 125,000.00 per m1
19 Pipa Steinlis Steel dia 2 1/2 " Rp. 350,000.00 per m1
20 Pipa Steinlis Steel dia 1 " Rp. 175,000.00 per m1
21 Elektrode Baja Rp. 35,000.00 per Kg
22 Kawat Bendrat Rp. 16,000.00 per Kg
23 Wire mesh M6 (210X495 cm) Rp. 400,000.00 per lbr
24 Pintu Pagar Besi Rp. 900,000.00 per m1
25 Tutup Manhole besi plat t 2 mm Rp. 485,000.00 per unit
26 Pipa udara Rp. 145,000.00 per Bh
B. BAHAN MENGGUNAKAN BATU, PASIR, PC
1 Pasir Beton Rp. 160,000.00 per m3
2 Pasir Pasang Rp. 158,000.00 per m3
3 Pasir Urug Rp. 120,000.00 per m3
4 Air Tawar Rp. 20.00 per lt
5 Semen Portland (1 zak = 50 Kg) Rp. 56,000.00 per zak
6 Semen Portland (1 zak = 50 Kg) Rp. 1,120.00 per Kg
7 Semen Portland (1 zak = 40 Kg) Rp. 52,000.00 per zak
8 Tasirtu Rp. 85,000.00 per m3
9 Batu bata merah Rp. 575.00 per bh
10 Batako 9 x 19 x 39 Rp. 2,000.00 per bh11 Batu kali belah 15/20 Rp. 135,000.00 per m3
12 Batu pecah mesin 1/2 Rp. 240,000.00 per m3
13 Batu pecah mesin 2/3 Rp. 175,000.00 per m3
14 Batu kerikil (bulat 1-2 cm) Rp. 195,000.00 per m3
15 Beton panel ukuran 2400x400x40 Rp. 125,000.00 per m1
16 Koral beton 2/3 Rp. 196,700.00 per m3
17 Split 2/3 Pecah Mesin Rp. 175,000.00 per m3
18 Semen PC Warna Rp. 12,000.00 per Kg
19 Semen Berwaran Yiyitan Rp. 9,500.00 per Kg
20 Saluran beton precast U 30 cm Rp. 140,000.00 per m1
DAFTAR HARGA SATUAN BAHAN DAN UPAH
Uraian Bahan dan Tenaga Kerja Harga Satuan Satuan
2 3 4
-
8/10/2019 analisa2014-xls
26/38
No Uraian Bahan dan Tenaga Kerja Harga Satuan Satuan
21 Saluran beton precast U 60 cm Rp. 270,000.00 per m1
22 Bak kontrol 40x40 cm Rp. 225,000.00 per m1
23 Bak kontrol 70x70 cm Rp. 295,000.00 per m1
24 Ijuk Rp. 18,100.00 per Kg
C BAHAN CAT/MINYAK/KUAS
1 Cat Besi Rp. 45,000.00 per Kg
2 Cat Kayu Rp. 44,000.00 per Kg
3 Cat Meni Besi Rp. 35,000.00 per Kg4 Cat Tembok Interior Rp. 20,000.00 per Kg
5 Cat Tembok Exterior Rp. 115,000.00 per Kg
6 Amplas Rp. 4,000.00 per Lbr
7 Kuas Cat 3" Rp. 10,000.00 per Bh
8 Kuas Cat 6" Rp. 15,000.00 per Bh
9 Minyak Cat (Thiner A) Rp. 20,000.00 per ltr
10 Minyak begesting Rp. 6,500.00 per ltr
11 Minyak Pelumas Rp. 28,000.00 per ltr
12 Alkalin Rp. 25,000.00 per Kg
13 Solar Rp. 6,500.00 per ltr
14 Serat Fiber Rp. 9,000.00 per m2
15 Sealent Rp. 40,000.00 per tube16 Oli Rp. 30,000.00 per ltr
17 Silicone sealant Rp. 5,500.00 per m1
18 Waterproof Rp. 42,000.00 per Kg
D BAHAN KAYU, TRIPLEK, MULTIPLEK
1 Kayu Meranti balok/usuk 5/7 Rp. 3,300,000.00 per m3
2 Kayu Meranti balok/usuk 6/15 Rp. 3,650,000.00 per m3
3 Kayu Meranti papan begesting (MC) Rp. 1,750,000.00 per m3
4 Kayu Meranti Papan 2/20,4/10 Rp. 5,750,000.00 per m3
5 Kayu Kamper (Slimar) Rp. 9,400,000.00 per m3
6 Kayu Kamper (Papan) Rp. 9,500,000.00 per m3
7 Kayu Kamper (Usuk) Rp. 9,200,000.00 per m3
8 Kayu Kamper Rp. 9,000,000.00 per m39 Kayu Dolken O 8- 10 Panjang 4 m1 Rp. 8,000.00 per btg
10 Kayu Gelam 8 - 12 cm panjang : 4 m Rp. 14,000.00 per btg
11 Triplek tebal 4 mm uk 120x240 cm Rp. 60,000.00 per Lbr
12 HPL (122x244 cm) Rp. 195,000.00 per lbr
13 HPL Rp. 64,000.00 per m2
14 Multiplex 12 mm 120x240 Rp. 158,000.00 per Lbr
15 Multiplex 9 mm 120x240 Rp. 106,000.00 per Lbr
16 Multiplex 4mm 120x240 Rp. 60,000.00 per Lbr
17 Multiplex 6mm 120x240 Rp. 74,000.00 per Lbr
18 Lis Gypsum Rp. 26,000.00 per m
19 Lem Kayu Rp. 12,000.00 per Kg
-
8/10/2019 analisa2014-xls
27/38
No Uraian Bahan dan Tenaga Kerja Harga Satuan Satuan
E BAHAN PAKU, BAUT MUR, ANGKUR
1 Paku 2 s/d 5" Rp. 15,000.00 per Kg
2 Paku Asbes Rp. 16,000.00 per Kg
3 Paku Reng Rp. 14,000.00 per Kg
4 Paku Klem (No.4)/ Paku Usuk Rp. 15,000.00 per Kg
5 Angkur pintu besi Rp. 22,000.00 per Bh
6 Baut Skerup Rp. 1,000.00 per Bh
7 Paku Sekrup Rp. 500.00 per bh8 Skrup/ Ripet Rp. 400.00 per Bh
9 Angkur Rp. 6,000.00 per Bh
10 Dinabolt M10 Rp. 3,000.00 per Bh
11 Paku triplek/Eternit Rp. 17,000.00 per Kg
F BAHAN PENUTUP ATAP
1 Seng Gelombang Uk.0,8x1,5 Rp. 50,000.00 per Lbr
2 Seng gelombang BJLS 30 (80 x 180 cm) Rp. 52,000.00 per Lbr
3 Seng BJLS 30 Rp. 80,000.00 per M2
3 Asbes gelombang kecil 105x250 cm Rp. 75,000.00 per Lbr
4 Genteng Ex Monier Xl Rp. 7,800.00 per bh
5 Wuwung Genteng Ex Monier Xl Rp. 9,500.00 per m
6 Kalsiboard EG Uk. 240x120x 6 mm Rp. 62,000.00 per Lbr7 Gypsum Board Uk. 240x120x 9 mm Rp. 84,000.00 per Lbr
8 Kalsiplank lebar 20 cm t; 12 mm (panjang 3 m1) Rp. 60,000.00 per Lbr
9 Kalsiplank lebar 20 cm t; 12 mm ( Rp. 20,000.00 per m1
10 Usuk Galvalum 7,5x3,5 t= 0,75 mm Rp. 17,000.00 per m2
11 Reng Galvalum 3x4 cm t= 0,5 mm Rp. 8,000.00 per m1
G BAHAN KACA
1 Kaca Polos tebal 5 mm Rp. 80,000.00 per m2
2 Kaca Polos tebal 6 mm Rp. 112,000.00 per m2
3 Kaca Polos tebal 8 mm Rp. 175,000.00 per m2
4 Kaca Stopsol tebal 8 mm Rp. 530,000.00 per m2
5 Kaca Tempered Stopsol tebal 12 mm Rp. 1,250,000.00 per m2
6 Acrylic t = 8 mm Rp. 247,500.00 per m27 Plat steinlis penjepit Acrylic Rp. 25,000.00 per m1
8 Kaca Nako uk 15x80 cm tebal 5 mm + accesories Rp. 13,000.00 per Lbr
H BAHANG ENGSEL, GRENDEL, KUNCI, HANDLE
1 Cathment 12 " Rp. 65,000.00 per bh
2 Fixed Top Pin Rp. 110,000.00 per set
3 Top Patch Fiiting Rp. 220,000.00 per set
4 Door Closer Rp. 300,000.00 per set
5 Door Stoper Rp. 30,000.00 per unit
6 Kunci Gembok Rp. 80,000.00 per Bh
7 Floor Hinge Rp. 1,200,000.00 per stel
8 Bottom Patch Fitting Rp. 150,000.00 per unit
9 Bottom Lock Fitting Rp. 175,000.00 per unit
10 Lockase case cylinder Rp. 165,000.00 per set
11 Lockase Window Bolt Rp. 140,000.00 per set
12 Flush Bolt 6 " Rp. 40,000.00 per Set
13 Flush Bolt 12 " Rp. 60,000.00 per Set
14 Engsel pintu steinlish 4x3x3 mm Rp. 30,000.00 per stel
15 Full Handle HS Pull Rp. 300,000.00 per stel
16 Full Handle Stainleesstel t= 60 cm Rp. 340,000.00 per stel
17 Full Handle Rp. 256,000.00 per stel
18 Lever Handle Rp. 140,000.00 per stel
19 Handle HDS DKS Rp. 125,000.00 per stel
-
8/10/2019 analisa2014-xls
28/38
No Uraian Bahan dan Tenaga Kerja Harga Satuan Satuan
20 Handle Lock Jendela Rp. 60,000.00 per stel
I BAHAN TIANG PANCANG
1 Mini pile 250 x 250 mm, panjang 12 m Rp. 130,000.00 per m1
2 Joint sambungan tiang pancang Rp. 30,000.00 per bh
J BAHAN ALUMINIUM
1 Aluminium kusen pintu & jendela 4"X1 3/4" Rp. 82,000.00 per m1
2 Aluminium kusen pintu & jendela 3"X1 3/4" Rp. 80,000.00 per m1
3 Aluminium frame daun jendela Rp. 78,000.00 per m14 Aluminium frame daun pintu 4,5x6,5 cm Rp. 84,000.00 per m1
5 Aluminium frame daun pintu 4,5x11 cm Rp. 87,000.00 per m1
6 Aluminium ventilasi 1 'x 3 " Rp. 22,000.00 per m1
7 Aluminium frame vison Rp. 40,000.00 per m1
8 Spigot aluminium Rp. 12,000.00 per m1
9 Aluminium Composit Panel (ACP) Rp. 160,000.00 per m2
10 Aluminium Composit Panel Perforeted 3 mm (ACP) Rp. 220,000.00 per m2
11 Karet Kusen Aluminium Rp. 2,200.00 per m1
12 Sielent Rp. 2,200.00 per m1
13 Lis plafond aluminium siku Rp. 10,000.00 per m1
14 Base Plate 8 mm Rp. 47,000.00 per m1
15 Angkur dinabolt Rp. 9,500.00 per bhK BAHAN PELAPIS LANTAI DAN DINDING
1 Homogenous Tile 60x60 Rp. 160,000.00 per m2
2 Keramik 40x40 Polished Rp. 67,000.00 per m2
3 Keramik 40x40 Unpolished Rp. 67,000.00 per m2
4 Tegel Keramik Dinding 20x25 cm Rp. 67,000.00 per m2
5 Tegel Keramik Lantai 20x20 cm Rp. 66,000.00 per m2
6 Step Noshing 3x 8 cm Rp. 10,000.00 per bh
L. SANITAIR
1 Closet Duduk Rp. 1,960,000.00 per unit
2 Closet Jongkok Rp. 325,000.00 per unit
3 Wastafel Meja + kran Rp. 845,000.00 per unit
4 Toilet Sprayer Rp. 275,000.00 per bh5 Floor Drain Rp. 225,000.00 per bh
6 Soap Holder Rp. 65,000.00 per bh
7 Paper Holder Rp. 75,000.00 per bh
8 Robe Hook Rp. 85,000.00 per bh
9 Kran Rp. 140,000.00 per bh
10 Kitchen Zink + Kran Rp. 645,000.00 per bh
11 Sambungan Pipa PVC 3" Tipe AW Rp. 10,000.00 per bh
12 Sambungan Pipa Tee 3" Tipe AW Rp. 14,000.00 per bh
13 Pipa Pvc dia 6 " Type AW Rp. 98,000.00 per M1
14 Pipa Pvc dia 3 " Type AW Rp. 53,000.00 per M1
13 Klem penggantung pipa Rp. 13,000.00 per bh
14 Floor drain 3 " Rp. 225,000.00 per bh
14 Rol TBA Rp. 8,721.00 per btg
15 Klem PVC Rp. 2,500.00 per bh
N. LAIN-LAIN
1 Sewa Direksikeet dan Gudang Rp. 1,650,000.00 per bln
2 Pengadaan Air kerja Rp. 750,000.00 per bln
-
8/10/2019 analisa2014-xls
29/38
No Uraian Bahan dan Tenaga Kerja Harga Satuan Satuan
M UPAH TENAGA KERJA
1 Pekerja Rp. 60,000.00 per hari
2 Tukang kayu Rp. 70,000.00 per hari
3 Kepala Tukang kayu Rp. 75,000.00 per hari
4 Tukang batu Rp. 70,000.00 per hari
5 Kepala Tukang Batu Rp. 75,000.00 per hari
6 Tukang besi Rp. 70,000.00 per hari
7 Kepala tukang besi Rp. 75,000.00 per hari8 Tukang cat Rp. 70,000.00 per hari
9 Kepala tukang cat Rp. 75,000.00 per hari
10 Tukang listrik Rp. 70,000.00 per hari
11 Kepala tukang listrik Rp. 75,000.00 per hari
12 Mandor Rp. 80,000.00 per hari
13 Operator Rp. 100,000.00 per hari
14 Tukang Pipa Rp. 70,000.00 per hari
15 Tukang Las Rp. 70,000.00 per hari
N SEWA PERALATAN
1 Sewa alat bantu (1 set @3alat) Rp. 1,000.00 per jam
2 Sewa welding set (min 5 jam) Rp. 50,000.00 per hari
3 Sewa Crane Tiang pancang Rp. 125,000.00 per jam4 Sewa Hammer Tiang Pancang Rp. 150,000.00 per jam
5 Sewa Tamper Rp. 100,000.00 per jam
6 Sewa Alat Bantu Strauss Pile Rp. 15,000.00 per jam
7 Sewa Crane 30 ton Rp. 130,000.00 per jam
8 Sewa Genset Rp. 60,000.00 per hari
10 Mobilisasi dan Demobilisasi Tenaga kerja Rp. 3,000,000.00 per ls
11 Mobilisasi dan Demobilisasi Tiang Pancang Rp. 15,000,000.00 per ls
-
8/10/2019 analisa2014-xls
30/38
15
8
-
8/10/2019 analisa2014-xls
31/38
1.22
2.44
2.9768
65,506.58
-
8/10/2019 analisa2014-xls
32/38
750,000.00
2.98
251,948.40
-
8/10/2019 analisa2014-xls
33/38
-
8/10/2019 analisa2014-xls
34/38
-
8/10/2019 analisa2014-xls
35/38
NAMA KEGIATAN
PEKERJAANLOKASI
II PEKERJAAN GEDUNG KANTOR DAN ADMINISTRASI
No SatuanHarga
(Rp)
1 3 6Elektrikal
1 Kabel NYFGBY 4 X 50mm2 BC 50mm2 m' 84,500.002 Kabel NYY 4 X 6mm2 + BC 6mm2 m' 54,600.003 Kabel NYM 3 x 2.5 mm2 m' 15,600.004 Kabel NYM 2 x 2,5 mm2 m' 10,400.005 Kabel NFGBY 4 x 2.5 mm2 m' 33,800.006 Kabel NYY 4 X 4mm2 + BC 4mm2 m' 58,500.007 Kabel NYY 4 X 10mm2 + BC 10mm2 m' 71,500.008 Kabel try lantai 1 ukuran 100mm x 300mm m' 250,0009 Kabel try Riser ukuran 100mm x 300mm m' 250,00010 MCCB 3 Phase 160 A36KA bh 450,00011 MCCB 3 Phase 40 A/18KA bh 550,00012 MCCB 3 Phase 30 A/18KA bh 550,00013 MCCB 3 Phase 20 A/18KA bh 550,00014 MCB 1 Phase 16 A/4,5 KA bh 65,00015 MCB 1 Phase 10 A/4,5 KA bh 65,00016 MCB 3 Phase 40 A/18 KA 350,00017 Amper meter bh 250,00018 Volt meter bh 250,00019 VSS bh 250,00020 Fuse 2 A bh 25,00021 Lampu Indikator bh 75,00022 Cu Bar bh 350,00023 Box Panel LVMDP+ Wiring bh 1,250,00024 Juction Box Telepon 10 pair unit 205,00025 PABX 1 Line 10 Extantion unit 6,500,00026 Outlet Telepon bh 65,00027 Pesawat telephone bh 250,000
28 Instalasi outlet telepon dengan kabel ITC 2 x 2 x d.0,6 mm titik 265,00029 dalam conduit PVC HI dia. 20 mm30 Instalasi AC 1Phase/220 Volt ttk 275,00031 Instalasi pipa drain AC.pipa PVC 25mm2 / ttk 15,00032 Stop Kontak 1 Phase, 200 VA bh 45,500.0033 Saklar Tun 0.15 bh 32,500.0034 Saklar Ganda bh 58,500.0035 Lampu SL 50 WATT bh 110,500.0036 Lampu SL 18 WATT bh 58,500.0037 Lampu SL 11 WATT bh 45,500.0038 Lampu Down Light (Teme VHO SD, koridor ) bh 455,000.0039 Lampu Taman SL 1 x18 watt (termasuk tiang lampu dan pondasi) bh 2,730,000.0040 Fiting lampu E 27 bh 32,500.0041 Exhause Fan Toilet 100 cfm /50 Watt bh 585,000.00
TB-SS Unit 205,000
Power Amplifier 160 Watt bh 12,500,000Paging Mic. Call bh 8,500,000DVD/CD/MP3/Radio Tuner bh 2,500,000Horn Speaker 15 Watt bh 350,000Instalasi Horn Speaker Kabel NYMHY 2 x 1.5 mm ttk 265,000
dalam conduit PVC HI dia. 20 mmPenyambungan
1 Pemasangan Listrik Dengan Daya 79 kVA ls 295,500,000.002 Penyambungan Telepon (dengan 3 sambungan ) ls 6,500,000.003 Pemasangan /Sambungan PDAM Dia.Pipa 2" ls 12,000,000.00
Material Bantu
1 Pipa Conduit 20 HI m' 5,200.00
HARGA BAHAN
Uraian Pekerjaan
2
-
8/10/2019 analisa2014-xls
36/38
2 Klem Pipa Conduit bh 650.00
3 T.Doost bh 1,950.004 Socket Conduit bh 650.00
5 Fisher bh 195.006 Lasdop bh 195.00
7 Batu Bata bh 975.00
8 Pasir m3 195,000.00
9 Spatu Kabel dia.50 bh 8,450.00
Upah
1 Upah Instalasi Kabel + Pipa ls 32,500.002 Upah Pasang OH 91,000.00
3 Galian & Uruk kembali m' 23,400.004 Tiang + Pondasi ls 1,040,000.00
Mekanik
-
8/10/2019 analisa2014-xls
37/38
PIPA PPR PN - 10
1 Pipa 15 mm / 1/2" m' 10,010.002 Pipa 20 mm / 1/4" m' 14,170.003 Pipa. 25 mm / 1" m' 21,710.004 Pipa 32 mm / 1" m' 33,540.005 Pipa 40 mm / 1 m' 52,910.00
PIPA PVC Class AW1 Pipa 150 mm / 6 (PVC "AW" ) m' 98,000.002 Pipa 100 mm / 4 (PVC "AW" ) m' 83,460.00
3 Pipa 80 mm / 3" (PVC "AW" ) m' 53,950.004 Pipa 65 mm / 2 (PVC "AW" ) m' 35,360.005 pipa 50 mm / 2 (PVC "AW" ) m' 27,430.006 80 mm / 3" (PIPA HIDER AIR BERSIH ) LS 2,000,000.007 Floor drain 80 bh 225,000.008 Floor drain 50 bh 195,000.009 Clean Out 50 bh 195,000.00
10 Clean Out 100 bh 325,000.0011 Clean Out 100 bh 325,000.0012 Fitting ls 12,000.0013 Support ls 3,200.0014 Material Bantu ls 1,300.0015 Alat Kerja ls 1,000.0016 Upah Pasang M 22,000.0017 Testing ls 1,600.00
18Gate Valve 40 mm / 2"
bh 600,00019 Gate Valve 40 mm / 1" bh 450,00020 Gate Valve 25 mm / 1" bh 225,00021 Bak kontrol 40x40 unit 450,00022 Bak kontrol 60x60 unit 450,00023 Septic Tank Bio Filter Kap. 6 m SET 15,000,000
24 Pompa Air Sanyo c/w assesoris unit 7,500,00024 Material Bantu Ls 500,000
25 Pengadaan Bak Tandon Atas Kapasitas 1 m3 unit 4,500,000
26 Air terminal lightning protection radius 80m unit 25,000,00027 Conecting Sleeve unit 250,00028 NYY kabel 1x70 mm m1 95,00029 Material Instalasi ls 500,00030 Grounding System ttk 2,500,00031 Ijin ijin dari Instansi yang terkait lot 4,500,000
-
8/10/2019 analisa2014-xls
38/38