AN E VENING MONSOON SKYLINE OF THE RIVERDALE RIVERFRONT SHOT FR OM THE MUNDHWA BRIDGE
AUGUST 2020MONTHLY UPDATE
Refer your family member to be a part of this Luxurious River front Community
LIMITED EDITION LUXURIOUS 3 BHK RIVERFRONT RESIDENCES
Referral Reward Slab
₹1,50,000/-
Site Address: New Kharadi - Shivane Riverside Road, Behind Zensar IT Park, Kharadi, Pune 411 014 Maha RERA Registration No.: Riverdale Suites - P52100014163 | Riverdale Heights - P52100008035 | Riverdale Residences - P52100004692
+91 7620 974 974 www.riverdalepune.com
K H A R A D I , P U N E
₹1,50,000/- ₹1,00,000/-Suites
₹50,000/-
Referral Reward Slab
This pandemic has made us realize the importance of family living close by. You could refer your sibling or your relative and make the comfort of family being nearer a reality.
YOUR PARENTS SILVER JUBILEE CELEBRATIONS ARE THAT MUCH MORE SPECIAL WHEN THE ENTIRE FAMILY CELEBRATES
Precious moments like these are not just timeless but can be aplenty when his family lives on another �oor within the same community
Riverdale Heights
2 BHK - Tower A | B | C | D
RIVERDALE HEIGHTS AS SEEN FROM THE NEW KHARADI-SHIVANE RIVERSIDE ROAD
Tower - A & B
POSSESSION DELIVERED AT
TOWER A & B
Tower - C
Above Terrace slab Completed/ Terrace Water-proo�ng work complete/ Toilet
rdWater-proo�ng 23 Floor Complete
rd23 Floor Internal Door Frame Fixing Complete/Reception Lobby wall Flooring complete/ Reception Lobby wall cladding work-in-progress/Lobby Parking Paver work in progress
rd Living Balcony SS Railing 23 Floor complete/ Staircase Railing Complete/ Staircase Fire Door installed/ Garbage Chute installation complete
rdWall Gypsum Plasters 23 Floor complete/rd Balcony Waterproo�ng 23 Floor complete/
Solar Panel, Water Puri�er & Inverter installation in progress/ Pressurization Fan installed
rd23 Floor Toilet wall Dado work-in-progressrd& 23 Floor Toilet Flooring complete/ CP &
rd Sanitary Fittings �xing 23 Floor complete/ Podium Garden soil �lling in progress
Kitchen Platform & Kitchen Dado of rd23 Floor complete/ Kitchen Cabinet th20 Floor work-in-progress
Unitized Glass Curtain Wall installation complete/ rdDoor shutters �xing 23 Floor complete/
Flooring 23rd Floor complete
rdInternal Wall Paint 23 Floor complete / rdWall putty & Primer Paint 23 Floor complete/
rdElectrical Switch installation 23 Floor in progress
Lift Architrave, Lift Lobby Flooring & Lift Lobby rdFalse ceiling 23 Floor complete/ Passenger Lift
installation complete/ Service Lift installationin progress
External Texture Paint work-in-progress/Aluminum Sliding Door, Toilet & Utility
rdWindows 23 Floor complete
ALL INTERNAL WORKS COMPLETE.
OC AWAITED
Tower - DAbove Terrace slab Completed/ Plumbing & Electrical work 100% completed/ Terrace
rd Water-proo�ng complete/ 23 Floor wall Gypsum plasters complete
Staircase Railing work in progress/ P1, P2 & P3 Parking painting, External Texture
thPaint, 17 Floor Flooring & Passenger Lift Granite Architrave complete
th nd18 Floor Kitchen Dado & 22 Floor Kitchen Platform work-in-progress/ Plumbing work
nd22 �oor in Progress/ Internal Painting work-in-progress
th19 Floor Toilet Water-proo�ng in progress/th18 Floor Toilet Wall Dado work-in-progress/
Living Balcony Sliding Door, Utility & Toilet nd thwindow 2 to 4 Floor installation in progress
st21 Floor Internal Door Frame Fixing work-in-progress/ Curtain Wall (Façade) &Passenger Lift installation in progress/Pressurization Fan installation in progress
GIVEN THE EXTREME MAN POWER CONSTRAINTS FACED BY THE INDUSTRY AND THE OVERALL
SLOW DOWN DUE TO IN-AVAILABILITY OF LABOUR, WE
HAVE YET BEEN ABLE TO KEEP THE SITE WORK FORCE AT THE LABOUR
CONSTRUCTION CAMP AND CONSTRUCTION & FINISHING
ACTIVITY IS IN PROGRESS.
Tower - E
Terrace Slab complete/ Over Head Water Tank RCC work complete
Above Terrace Water-proo�ng complete/rdPlumbing 23 Floor work complete
rdDrainage piping 23 �oor work complete/ rdElectrical conduiting and chasing 23
Floor complete
Electrical cabling work complete/ rdWall Gypsum Plasters 23 �oor complete/
Internal Paint Flat series work-in-progress
nd rdFloor Tiling Flat Series 1 & 2, 2 to 23 Floor/nd rd nd rd9 & 10, 2 to 23 Floor/ 5 & 6, 2 to 23 Floor/
nd rd7 & 8, 2 to 23 Floor work complete/ Flat Series nd th3 & 4 Flooring work-in-progress - 2 to 10
th rdcomplete- 11 to 23 Work-in-progress
AAC Block works complete/ External Paint work in progress/ Water-proo�ng done
rdup to 23 �oor
Fire Staircase Railing complete/ Toilet CP & Sanitary �xing work-in-progress/ Passenger & service Lift installation complete/ External Paint work in progress.
Internal Door Frame Fixing complete/rd 23 Floor Kitchen Platform Fixing complete/
st nd th thDoor Shutter �xing Flat series 1 , 2 & 5 to 9 & th10 in progress
Kitchen Utility Aluminum sliding window &Cabinet Flat Series 1, 2, 9 & 10 installations
ndcomplete for 22 Floors / Flat Series 1, 2, 9 & 10 complete/ Flat Series 5, 6, 7 & 8 work in progress
nd th2 to 12 Floor Lobby False Ceiling/ Lift Installations/ st rdLobby Flooring 1 to 23 Floor complete/
Lift Door Fixed/ Lift Architrave & Lift Granite Architrave complete
ODU Balcony Block Work complete/ ODU Balcony MS Grill & Railing work-in-progress/ ODU Flooring
rdwork – Flat Series1, 8, 9, 10 completed up 23 Floor/ st thODU Flooring work Flat Series 1 & 10 work-in-progress
Unitized Glass Curtain Wall (facade) installations in progress West side Flat Series 1, 2, 9 & 10 complete
ndup to 22 Floor & East side 5, 6, 7 & 8 complete up to nd22 Floor, 3 & 4 work-in-progress
Staircase ceiling putty & Fire staircase complete/ East side podium work-in-progress/ Kitchen Utility Aluminum sliding window Flat Series 1, 2, 9 & 10 complete. Series 5, 6, 7 & 8 work-in-progress
Living Room Sliding Door – Flat Series 1 & 2 completed rdup to 23 Floor. Flat Series 9 & 10 completed up to
rd23 Floor. Flat Series 5,6,7 & 8 work-in-progress
Fire �ghting works complete/rd23 �oor Dado Wall Tiling Kitchen/rd23 Floor Dado Wall Tiling Toilets complete
EXTERNAL WORKS
Clubhouse Interior �nishes (furniture, gaming zone, library, Gymnasium) complete
Swimming Pool testing complete/ Curtain Wall (Facade) installation Tower A & B complete &Curtain Wall installation Tower C & E in progress
Tower A & B Private Garden Plantation complete/Tower C Private Garden Soil �lling complete/ Tower D Private garden water-proo�ng in progress Podium Green Landscape plantation complete
Ramp Driveway complete/ DG installations work complete/ Tower A & B Curtain Wall (Façade) installation complete/ Tower E Curtain Wall (Façade) installation in progress
Fire �ghting installed all parking levels/ Tower A & B Tower Ribbons in progress
Step Garden Landscape Garden Soil �lling in progress/ STP complete/ Jogging Track &Badminton court work-in-progress/ Basket Ball court complete
Main Entry Security Cabin with Green Landscape complete / Main Entry Bridge Paver �xing complete
Tower A & B Entrance Lobby & Double Height Reception Lobby complete
External Driveway Paver �xing complete Lobby Level Parking Paver �xing complete/ OWC Complete
Electrical Transformer Room complete/All Parking Lighting works complete
Water Treatment Plant work complete
UGWT Pumps installed and charged & Fire Panels Charged
Riverdale SuitesSuites
th19 Floor Aluform assembling & reinforcement work in progress/th9 Floor AAC Block work-in-progress
Plinth Level PCC, Complete/ thCeiling Gypsum 8 Floor in progress
Internal Plumbing & electrical work-in-progress
thWall Gypsum 5 Floor in progress/ st thWater-proo�ng 1 to 4 Floor in progress
Electrical conduiting work-in-progress
Riverdale Residences
E2 & E3- Parking level Electrical & Panel Rooms thblock work complete/ E3 - Electrical upto10
thFloor & Plumbing upto 17 Floor completed
E1 –Parking P3 complete & Podium Level part slab complete/ Scooter Parking Floor &Podium Level Club House RCC work-in-progress
E1– Under Ground Water Tank RCC Raft and th thWalls/ E2- 12 Floor & E3- 10 Floor Door frame
�xing work-in-progress/ E3- Texture – Surface preparation for external paint
Ramp and Underground Water Tank RCC walls/E2 & E3- Scooter Parking Underground servicesFloor concreting & Podium & Parking level RCC Parapet in progress
E2 – Parking External Plaster/ E3 – Fire Staircase Block work-in-progress/ E2- Toilet Dado �xing &
thE3- Toilet Dado 5 Floor �xing in progress/E1 – Boundary wall work in progress
stE2- 21 Floor wall Gypsum work-in-progress/thE3- 20 Floor wall Gypsum work-in-progress &
E2 & E3 - Lift lobby wall Gypsum work in progress/ Lift Lobby AAC Block work in progress
thE3- 24 Floor MIVAN (Aluform) assembling/ E2- Terrace Floor MIVAN (Aluform) assembling/
E1 - Podium level slab complete/ E2- Electrical upto th th12 Floor & Plumbing upto 10 Floor completed
th thE2- 11 Floor & E3 - 14 Floor Toilet th thWater-proo�ng/ E2- 11 Floor & E3- 18 Floor
Toilet Concealed- Plumbing work-in-progress/ Toilet Flooring work-in-progress
th thE2- 16 & E3- 14 Floor Fire Fighting pipe installation/ E2 & E3- Podium & Parking level RCC Parapet &Fire Fighting line installation in progress
th thE2- 12 Floor & E3- 18 Floor Drainage piping/ E3- Kitchen Platform work-in-progress/
ndKitchen Dado works in progress/ E1 - 2 Floor/ E1 - Club House multipurpose hall PT Slab completereinforcement in progress at E1 Podium Level