Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG)...

84
Containment, Reliability & Safety by Design Maintenance Training for Teikoku Model R Ammonia Pump 03-14-2011

Transcript of Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG)...

Page 1: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Maintenance Trainingfor

TeikokuModel R

Ammonia Pump

03-14-2011

Page 2: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Pump Internals

•Centrifugal Pump•Single Stage•Enclosed Impeller•Stator & Rotor “Canned”•True Secondary

Containment•Product Lubricated &

Cooled Motor•Carbon Sleeve Bearings•304 SS w/ Hard Chrome

SleevesThrust Collars

03-14-2011

Page 3: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Exploded View

03-14-2011

Page 4: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Type RReverse Circulation

03-14-2011

Page 5: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Type RReverse Circulation

03-14-2011

Page 6: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Restriction OrificeRear Bearing Housing

03-14-2011

Page 7: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Type R & RWReverse Circulation Piping Arrangement

Note 1:Piping must becontinuously risingNote 2:Piping must returnto vapor zoneNote 3:No check valvesallowed in pipingNote 4:Each pump musthave separate pipe

06-16-2012

Page 8: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Sleeve Bearing Details

Bearing WithSpiral Grooves Only

Bearing WithSpiral & Straight Grooves

Refer to pump specific cross sectional drawingfor correct Sleeve Bearing type and location

03-14-2011

Page 9: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Type RCross Sectional Drawing

03-14-2011

Page 10: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

TeikokuVertical Type R Cross

Sectional Drawing

03-14-2011

Page 11: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Canned Motor Pumps

Precision Liquid Film BearingsLubrication Provided by RefrigerantLiquid Cooled Canned MotorTrue Secondary ContainmentDirection of Rotation IndicationTRG Bearing Wear Monitor

03-14-2011

Page 12: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Rotary Guardian (TRG)

Pump Mounted Meter

03-14-2011

Page 13: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Rotary Guardian (TRG)

03-14-2011

Page 14: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku TRG Volt Meter Scale

03-14-2011

Page 15: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku Rotary Guardian (TRG)

GREENNormal Operation

YELLOW or REDStop Pump and Check for Possible Causes

Single PhaseUnbalanced Input PowerLoose Connections

PEGGED REDPump Rotating in Reverse DirectionPinched TRG WiresTCO Wires Connected to TRG Terminals

Initial Readings

03-14-2011

Page 16: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Checks Prior to Disassembly

Has the motor been meggered?Has the pump been decontaminated?Are you familiar with the pumped fluid?Has the Stator Can been breached?Is your work area clean?Do you have the required tools?

03-14-2011

Page 17: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Unbolt Pump Case / Volute

03-14-2011

Page 18: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Pump Case / Volute

03-14-2011

Page 19: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Pump Case Gasket

03-14-2011

Page 20: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Bend Down Impeller Lock Tab

03-14-2011

Page 21: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Impeller Lock Bolt

03-14-2011

Page 22: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Slide Impeller Off Shaft

03-14-2011

Page 23: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Key

03-14-2011

Page 24: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Adjusting Washers(If Required)

Measure and Record Quantity and Thickness

03-14-2011

Page 25: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Unbolt Front Bearing Housing (Adapter)

03-14-2011

Page 26: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Loosen Front Bearing Housing

Jack Bolt Holes Facilitate Removal

03-14-2011

Page 27: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Front Bearing Housing (Adapter)

Warning: Rotor & Shaft Sleeve may slide out03-14-2011

Page 28: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Unbolt Rear Bearing Housing

03-14-2011

Page 29: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Slide Out Rear Bearing Housing

03-14-2011

Page 30: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Gasket

03-14-2011

Page 31: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Carefully Remove Rotor Assembly

CAUTION:Support Rotor AssemblyDo Not Allow Rotor Assemblyto Drop and Hit Stator Liner

03-14-2011

Page 32: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Visual Inspection

Check Filter & Circulation Pipe (If Required)Check Stator Liner for contact marks/wearCheck Rotor Liner for contact marks/wearCheck for wear, scratches & scoring on:• Shaft Sleeves• Thrust Collars• Bearings – Inside Bore• Bearings – Thrust Face

03-14-2011

Page 33: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Inspect & Record Bearing Wear

01-06-2011

Page 34: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Bend Down Lock Tab

03-14-2011

Page 35: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Rear Lock BoltLeft Hand Threads

CAUTION:Left Hand Threads

03-14-2011

Page 36: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Shaft Sleeves & Thrust Collars

WARNING:WARNING:Key/Pin may be loose Key/Pin may be loose and fall out unnoticedand fall out unnoticed

03-14-2011

Page 37: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Set Screw From Front & Rear Bearing Housings

03-14-2011

Page 38: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Slide Out Bearing FromFront & Rear Bearing Housings

Note: Some heat on thebearing housing may beused to assist with theremoval of the bearing

03-14-2011

Page 39: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Remove Adjusting Washers fromRear Bearing Housing Only (If Required)

Measure and Record Thickness and Quantity

03-14-2011

Page 40: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Measure & Record Balance GrooveInside & Outside Diameters

03-14-2011

Page 41: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Measure & Record Impeller BackWear Ring Inside & Outside Diameters

03-14-2011

Page 42: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Measure & Record Impeller FrontWear Ring Outside Diameter

03-14-2011

Page 43: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Measure & Record Pump CaseWear Ring Inside Diameter

03-14-2011

Page 44: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

RadialClearances

ChartHorizontal

Mount

03-14-2011

Page 45: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

RadialClearances

ChartVerticalMount

03-14-2011

Page 46: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Reassembly of Pump

Insure that work space is cleanClean & dry all componentsInspect all componentsMegger check motorCheck resistance of windings

03-14-2011

Page 47: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Sleeve Bearing Details

Bearing WithSpiral Grooves Only

Bearing WithSpiral & Straight Grooves

Refer to pump specific cross sectional drawingRefer to pump specific cross sectional drawingfor correct Sleeve Bearing type and locationfor correct Sleeve Bearing type and location

03-14-2011

Page 48: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Adjusting Washers IntoRear Bearing Housing Only (If Required)

03-14-2011

Page 49: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Bearing IntoFront & Rear Bearing Housings

Flat washermust beinstalledas shown

V-Groovesmust belocated onoutside end

03-14-2011

Page 50: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Set Screw Into Front & Rear Bearing Housings

Make SureBearing IsSeated WhenTighteningSet Screw

Do not overtightenset screw

03-14-2011

Page 51: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Thrust Collar Detail

InboardSide

OutboardSide

Chamfer

03-14-2011

Page 52: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Shaft Sleeves & Thrust Collars

Line up slot in Thrust Collar& Shaft Sleeve to Pin

Outboard SideChamfer SideInboard Side

05-03-201003-14-2011

Page 53: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Shaft Sleeve Lock Bolt,Lock Washer & Flat Washer

Lock washer tabmust fit into slotand extend beyondface of flat washer

03-14-2011

Page 54: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Torque Lock Bolt – Refer to Chart

Left Hand Threads

Lock Washer tabmust fit into slot inShaft Sleeve

03-14-2011

Page 55: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

TorqueValues

forBolting

03-14-2011

Page 56: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Bend Up Tabs on Lock Washer

03-14-2011

Page 57: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Check Front Rotor Shaft Sleevefor Proper Engagement into Pin/Key

03-14-2011

Page 58: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Verify Correct Installation of Sleeve

Correct Not Correct

03-14-2011

Page 59: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Carefully Slide Rotor into Stator

CAUTION:Support Rotor AssemblyDo Not Allow Rotor Assemblyto Drop and Hit Stator Liner

03-14-2011

Page 60: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Rear Gasket

03-14-2011

Page 61: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Rear Bearing Housing

Vent line/hole must belocated at top

03-14-2011

Page 62: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Rear Bearing Housing Bolting

03-14-2011

Page 63: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Torque Rear Bearing Housing BoltsCross Pattern - Refer to Chart

03-14-2011

Page 64: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Front Bearing Housing (Adapter)

03-14-2011

Page 65: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Front Bearing Housing Bolting

03-14-2011

Page 66: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Check Axial End Play (Playing Gap)Refer to Chart – Adjust as Required

Note: Rotor Must Rotate Freely Without Contact

03-14-2011

Page 67: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Axial End Play (Playing Gap)

01-06-2011

Page 68: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Verify Correct Installation of Sleeve

Correct Not Correct

03-14-2011

Page 69: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Adjusting Washers(If Required)

Warning: Make sure Shaft Sleeve is engaged in Pin/Key

03-14-2011

Page 70: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Impeller Key

03-14-2011

Page 71: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Impeller On Shaft

03-14-2011

Page 72: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Impeller Lock Bolt,Lock Washer & Flat Washer

Lock Washer tab mustfit into slot & extendbeyond face of flat washer

Lock washertab must fitinto keyway

03-14-2011

Page 73: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Torque Impeller Lock BoltRefer to Chart

Rotor Assembly Must Rotate Freely Without Contact

01-06-2011

Page 74: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

0.25 ( +/- 0.010” )

01-06-2011

Measurement of Standard “g” GapTypes A or E

Page 75: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Pull Impeller Forward

Measurement of Standard “g” GapTypes A or E

01-06-2011

Page 76: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Tolerance of“g” Gap =

+/- 0.25 mm(+/- 0.010”)

Measurement“g” Gap

Standard DesignTypes A or E

01-06-2012

Page 77: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Bend up Tabs on Lock Washer

01-06-2011

Page 78: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Pump Case Gasket

01-06-2011

Page 79: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Pump Case / Volute

01-06-2011

Page 80: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Install Pump Case / Volute Bolting

01-06-2011

Page 81: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Torque Pump Case Volute BoltingUse Cross Pattern – Refer to Chart

01-06-2011

Page 82: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Check For Free Rotation

01-06-2011

Page 83: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Electrical Considerations

Thermal Cutout Devices IncorporatedBearing Monitors Functioning ProperlyMonitor Motor Amps and/or LoadSet Overload Relays at 1.10 to 1.15 Above Normal Operating Current

01-06-2011

Page 84: Ammonia Pump Maintenance Training · Teikoku Model R Ammonia Pump ... Teikoku Rotary Guardian (TRG) Pump Mounted Meter 03-14-2011. ... Ammonia Pump Maintenance Training Author:

Containment, Reliability & Safety by Design

Teikoku-USA Repair Centers

Field Service

Chempump959 Mearns RoadWarminster, PA 18974Terry Flynn(267) 468-1028

ChempumpState Route 2 NorthBelmont, WV 26134John Ebersbach(267) 486-1026

Teikoku USA5880 Bingle RoadHouston, TX 77092Paul Grogg(281) 246-2852

Teikoku USA5880 Bingle RoadHouston, TX 77092Keith Yutzy(713) 805-7574

03-09-2011