Reference Project name: Research project in Alzey, Germany Client: Wilhelm Faber GmbH Contract value: 100,000.00 € Project duration: 2003 Project description: Research project for testing alternative aeration and bottom liner systems Results achieved: Design and conception of the test Construction of the test area Construction of the test windrow Scientific execution of the tests

description

Ambra success references

Transcript of Ambra Success Cases

Page 1: Ambra Success Cases

Reference

Project name: Research project in Alzey,

Germany

Client: Wilhelm Faber GmbH

Contract value: 100,000.00 €

Project duration: 2003

Project description: Research project for testing alternative aeration and bottom liner

systems

Results achieved: • Design and conception of the test

• Construction of the test area

• Construction of the test windrow

• Scientific execution of the tests

Page 2: Ambra Success Cases

Reference

Project name: Pilot project for the introduction of

an integrated waste management

system in Atlacomulco, Mexiko

Client: Secretaría de Ecología del Estado

de México

Contract value: approx. 460,000.00 €

Project duration: Since 2002

Project description: • Waste recycling

• Composting

• Residual waste treatment

Landfilling

Results achieved: • Conceptual design and introduction of the industrial plant as a pilot

project

• Implementation of the FABER-AMBRA® system for residual waste

treatment and composting

• Conceptual design and introduction of the separate waste

collection system

Page 3: Ambra Success Cases

Reference

Project name: Mechanical-biological waste pre-

treatment

Client: Samae

(Public utility company Blumenau,

Brazil)

Contract value: approx. 300,000.00 R$/a

Project duration: Since 2002

Project description: • Introduction of a controlled waste landfill

• Implementation of the waste pre-treatment for 50,000 t/a

Results achieved: • Realization of a pilot operation for mechanical-biological waste

treatment

• Conceptual design and introduction of the industrial plant

• Implementation of the FABER-AMBRA® system

• Operation-accompanying consulting to ensure the quality standards

Page 4: Ambra Success Cases

Reference

Project name: Mechanical waste treatment plant

Diekirch, Luxembourg

Client: Sidec, Luxembourg

Contract value: approx. 3,450,000.00 €

Project duration: 2001 – 2002

Project description: • Hall constructed out of steel with embankment walls, 2,600 m²

• Mounted surfaces 6,000 m²

Results achieved: • Construction of a plant for the mechanical waste treatment as the

prime contractor

• Comminution, metal separation, homogenization

• Construction of the required infrastructure such as access roads,

waste delivery place, drainage

Page 5: Ambra Success Cases

Reference

Project name: Mechanical-biological waste

treatment, Phitsanulok, Thailand

Client: Municipal authorities of

Phitsanulok

Contract value: approx. 500,000.00 €

Project duration: Since the year 2000

Project description: Introduction of the FABER-AMBRA® system for the pre-treatment of

waste

Results achieved: • Realization of a pilot operation for mechanical-biological waste

treatment

• Conceptual design and introduction of the industrial plant

• Implementation of the FABER-AMBRA® system

Page 6: Ambra Success Cases

Reference

Project name: Conversion of the landfill operation

Client: Municipal authorities of

São Sebastião

Contract value: approx. 1,000,000.00 €

Project duration: Since 2000

Project description: • Introduction of a controlled waste landfill

• PPP-cooperation project with the GTZ for the know-how transfer

• Implementation of the waste pre-treatment for 30,000 t/a

Results achieved: • Realization of a pilot operation for mechanical-biological waste

treatment

• Conceptual design and introduction of the industrial plant

• Implementation of the FABER-AMBRA® system

• Supply of the required equipment for the waste treatment

Page 7: Ambra Success Cases

Reference

Project name: Introduction of the FABER-

AMBRA® system in Rio de

Janeiro, Brazil

Client:

Contract value: approx. 1,000,000.00 €

Project duration: 1999 – 2001

Project description: • Research project for the introduction of a mechanical-biological waste

treatment system in Brazil as a pilot project

• Scientific assistance by the technical University of Braunschweig and

the UFRJ, Rio de Janeiro

Results achieved: • Application, design and coordination of the project plan

• Supply of the required equipment for the waste treatment

• Construction of the test windrows

Page 8: Ambra Success Cases

Reference

Project name: Waste pre-treatment on the landfill

of Meisenheim

Client: Local government authorities of

Bad Kreuznach

Contract value: approx. 1,100,000.00 €/a

Project duration: 1994 – 1999

Project description: • Operation of the plant for mechanical-biological waste pre-treatment

for a maximum of 53,000 t/a

Results achieved: • Separation of recyclable, bulky and hazardous materials

• Mechanical waste treatment

• Biological waste treatment

• Low-emission landfilling of the waste

Page 9: Ambra Success Cases

Reference

Project name: Landfill of Meisenheim

Client: Local government authorities of

Bad Kreuznach

Contract value: approx. 5,000,000.00 €

Project duration: 1993 – 1994

Project description: • Construction of a hall made of steel (20 x 40 m) for the mechanical

treatment

• Surface preparation for the biological waste treatment

Results achieved: • Construction of the plant as the prime contractor

• Delivery of the engineering machinery

• Construction of the required infrastructure

• Winter security preparation for the new landfill area

Page 10: Ambra Success Cases

Reference

Project name: Mechanical-biological waste

treatment, Cul de Sac, St. Martin

Client: Verde

Contract value: approx. 1,400,000.00 €

Project duration: Since 2006

Project description: • Introduction of the FABER-AMBRA® system on an existing landfill for

the pre-treatment of waste

• Quality security, training and support

Results achieved: • Implementation of the FABER-AMBRA® system

• Supply of the required equipment for the waste treatment

Page 11: Ambra Success Cases

Reference

Project name: "Support to the Waste

Management to Commune of Villa

Alemana"

Client: Municipality of Villa Alemana

Contract value: ca. 484.400,00 €

Project duration: 12 months

Project description: • Development of a project of investigation applied (project pilot) for

Mecanichal-Biological Treatment (MBT) of waste.

• "Waste Management Integrated Plan for the Municipality of Villa

Alemana" and a proposal of integration of the neighboring

communes members from the Marga-Marga Association of

Municipalities: Limache, Olmué and Quilpue - V Region-Chile.

Results achieved: Urban Waste Management Integrated Plan

The systematic proposals of the Villa Alemana Urban Waste

Management Integrated Plan are summarized in the creation of public

policy for the municipal management of solid urban waste;

development and preparation of the population through environmental

education; enhancement and treatment of solid waste so that the

environmental and economic impacts are minimized and conditions

and training for the social integration of scavengers, through new ways

of working in cooperatives and into the municipal cleaning system.

MBT

The project consisted in 4 windrows construction and monitoring of

biological stabilization:

• Windrow 1, 3 and 4: mixed solid household waste;

• Windrow 2: organic green waste in order to generate a compost of

high quality

Page 12: Ambra Success Cases

Reference

Project name: Mecanical-biological waste

treatment in Semarang,

Indonesien

Client: ITR PT. Iman Tatakerta Raharja

Contract value: approx. 1.900.000 €

Project duration: Since May 2011

Project description: • Introduction of the FABER-AMBRA® system for the pre-treatment of

municipal waste

• 350 t/d

• Quality assurance, training and support

Results achieved: • Implementation of the FABER-AMBRA® system

• Supply of the required equipment for the waste treatment

Page 13: Ambra Success Cases

Reference

Project name: Pilot project for the introduction of

an integrated waste management

system in Karaganda, Kazakhstan

• Feasibility Study

• Project Development

• Quality Managament

Client: Kazakh Government

Contract value: approx. 1,100,000.00 €

Project duration: 2012/2013

Project description: • Feasibility Study for a region with 800,000 inhabitants

• Implementation

• Complete waste management of 800 t/d over 20 years

• Feasibility Study completed and tender ongoing

Results achieved: • Our project is the technical basis for a huge international

consultancy for the development of a new system to cover the

waste management costs by fees