CURRICULAM VITAE Personal Details Application for the Post of : Sr. Construction Engineer Current Post / Previous Post Worked : Sr. Construction Engineer Name : A.MANIGANDAN Father Name : K.Arumugam Permanent Address : No. 33, Boyar Street, Kallapalayampudur Naranapuram – po, Palladam, Tiruppur, Tamilnadu, India-641664 Contact No. / E- Mail +917358853801 INDIA +971507019723 UAE [email protected] [email protected] Correspondence Address : M 3, Bldg. No. 133, Sector- ME - 09, Sabiya Musaffah, Abudhabi, UAE Date of Birth : 8/5/1973 Educational Qualification : Diploma in Mechanical Engineering, 1995 Batch Additional qualification : R.T. Level-II U.T. Level-II M.P.T. Level-II D. P .T. Level-II Religion : Hindu

Transcript of A.Manigandan -CV 24-06-15

Page 1: A.Manigandan -CV 24-06-15

CURRICULAM VITAEPersonal Details

Application for the Post of

: Sr. Construction Engineer

Current Post / Previous Post Worked

: Sr. Construction Engineer

Name : A.MANIGANDANFather Name : K.Arumugam

Permanent Address

: No. 33, Boyar Street, KallapalayampudurNaranapuram – po, Palladam, Tiruppur, Tamilnadu,India-641664

Contact No. / E-Mail

+917358853801 INDIA+971507019723 [email protected]@yahoo.com

Correspondence Address

: M 3, Bldg. No. 133, Sector- ME - 09,Sabiya Musaffah, Abudhabi, UAE

Date of Birth : 8/5/1973

Educational Qualification

: Diploma in Mechanical Engineering, 1995 Batch

Additional qualification

: R.T. Level-II

U.T. Level-IIM.P.T. Level-IID. P .T. Level-II

ReligionNationalityPassport No..Date of Expiry

::::

HinduIndianJ858066802-09-2022

Languages Known : Tamil, Malayalam, Kannadam, Hindi, Telugu, English

Present Salary per Month

: AED 12000/- PM +free Accommodation, bonus, Gratuity transportation, Medical At site,

Page 2: A.Manigandan -CV 24-06-15

Telephone Expenses,Expecting Salary per /Month

: Best In the Industry + Family Accomodation

Notice Period : 1 Month

My Job Carriers1. Worked as a QC Engineer from the period February 1998 to August 2003 = 5 Years 7 months2. Worked as a Project In charge (India) / Sr. Construction Engineer (Overseas) from the period September 2003 to till date

Work Experience I have an Experience in Refineries, Petrochemicals, Power Plant s (Thermal, Gas and Nuclear), Construction of ship Piping, and other manufacturing plants. In my service I worked piping, structural steel materials fabrication and erection, rotary and static equipment’s installations, static equipment’s assembling, conducting of Pneumatic and Hydro tests at site and shops.

KEY SKILLS• Having an experience in welding supervision and manpower control at site

• Having a work experience of ASME Sec. IX, ASME Sec. II Part-C, ASME Sec.-VIII, ASME Sec.-V, ASME B- 31.3, IS 2062, etc.

• Preparation of WPS and PQR’s according to the client requirement and the standards

• I have an experience in manpower field control and control the production activities day by day

• Monitoring of all site related documents progress reports and daily DPR’s• Controlling of quality control department and to achieve the defect free production

with good quality.• Controlling of site execution erection and fabrication activities to complete the job

at schedule period• Having an experience in Raw Material Inspection as per the client requirements• Having an experience in NDT Activities like Radiography Interpretation and Dye

Penetrate tests Florescent and Non Florescent tests.• Having an experience in materials like Carbon Steel, Stainless Steel, Alloy Steels,

Incoloy Steels, Nickel Steels, Titanium, Copper, Cupronickel, Brass, and Structural Steels.

• Having an experience in controlling of manpower staffs and workers at site.

Page 3: A.Manigandan -CV 24-06-15

• Having an experience in conducting of tool box talk and controlling of site HSE activities

• Having an Experience in making of monthly Invoices• Having an experience and controlling of material handlers and store keepers at site • Having an experience in making of final Reconciliation Statements.• Having an experience in conducting of internal meeting with co staffs and

coworkers to get good quality of job achievement at stipulated period.• Having an experience in conducting of Pneumatic and Hydro tests • Making a good relationship with clients, attending the progress meeting and

archiving the client’s requirements and their needs at site.• Bringing good moral of the company at site.

WORK EXPERIENCE DETAILS22) Period : Jan 08th 2015to Till Date

Organization : M/s Maa Kuthari Global Contracting LLC, Abu DhabiPosition : Sr. Construction Engineer Project : Union Chloride Project ( Alkali Project) I CAD III, Abudhabi

Main Contractor : FATAJob : Fabrication and erection Pipe Lines, Fabrication of Tanks and

Installation, Fabrication and Erection of Structural Steel, Erection of Equipment Static and Rotary Erection and Alignments, Pneumatic and Hydro testing, Pre commissioning and ETC

Page 4: A.Manigandan -CV 24-06-15

21) Period : May 20th 2014to Till DateOrganization : M/s Maa Kuthari Global Contracting LLC, Abu DhabiPosition : Sr. Construction Engineer Project : Abudhabi Polymer Company Ltd, Borouge – 3 Al Ruwais, Abudhabi

Main Contractor : Technimont ICB and Samsung Joint venture CompanyJob : Erection of Pipe Lines, Punch List and Pneumatic and Hydro testing

Working as Mechanical engineer in Tecnimont ICB and Samsung joint venture Company through Maakuthari global LLC Abudhabi, UAE as a Mechanical Inspection Engineer / Piping engineer

Duties and Responsibilities:

• Working as a Construction Pipe lines checker and checking and approving authority for RMC .

• Working as a Pressure testing coordinator from contractor side and inspecting the pressure testing activities, installation check and pressure leakages. And approval

20) Period : March 09th 2013 to Feb”14Organization : M/s Maa Kuthari Global Contracting LLC, Abu DhabiPosition : Sr. Construction Engineer Project : Tokoyama Polysilicon Manufacturing Plant –TMP-2, Samalaju,

Sarawak, MalaysiaMain Contractor : Chiyoda Sarawak, - Japan.Job : Erection of Pipe Lines, Punch List and Pneumatic and Hydro testing

Duties and Responsibilities:• Mobilization of manpower at site, tools and tackles with all respects for project startup

• Collection of documents and updating• Daily monitoring site activities and attending the client daily meeting and the follow up

for daily target achievement.• Field manpower and staffs control at site.• Review of daily progress reports and achievements.• Site Administration and HSE Activities follow ups,• Daily site work planning• Inspection of all workers and staffs site activities and safe working atmospheres,• Daily conducting tool box talk and site activities discussion,• Keeping good communication and relationship with clients

Page 5: A.Manigandan -CV 24-06-15

• Keeping good quality of production. • Maintained good Safety at site and Zero Accident,• Co-ordination for punch list attending and maintaining the record and completion timely• Conducting of Pneumatic and Hydro tests as per the client requirements. • Managing all construction activities at site Start to End.

19) Period : August 2010 to March 2013 Organization : M/s Maa Kuthari Projects Pvt. Ltd, ChennaiProject : Thermal Power Plant 2x150 MWMain Contractor : Thermax Instrumentation ( I ) Ltd, PuneOwner : Meenakshi Energy Pvt. Ltd, Tamminipatnam,Gudur, APPosition : Construction Manager Job : Fabrication and Erection of Pipe lines Above Ground and Under

Ground (Plant Drain, Firefighting System, Fire Water Pump House connection, ACW Pump House Connection)

Materials : IS 2062, IS 3589, IS 2062,Duties and Responsibilities:

• Site mobilization with All site requirements like tools and tackles, consumables, manpower mobilization, accommodation, transportation, etc

• Making of site management system according to the requirements of the client,• Collection of drawings, specification and safety regulation and safety requirements,• Site production control activities• Daily site work planning underground and above ground • Fabrication fittings • Manpower engagement,• Daily progress maintenance with all records• Site quality control and conducting class to the labors how to improve an progress with

good quality of job• Group discussion with internal workers and site staffs,• Preparing the hydro test and pneumatic test and NDT Tests• Preparation of monthly invoice,• Keeping the good communication with client, co-staffs and workers,• Conducting of welder qualification test according to the WPS / PQR,• Standards followed ASME Sec. IX, ASME Sec. II, ASME Sec. VIII, ASME Sec. V.

ASME B 31.3, IS 2062 and Thermax Instrumentation ( I) Ltd Standard Specifications.• Material issue and monitoring the records,• Controlling of Stores, Planning, Executions, QA/QC,

Page 6: A.Manigandan -CV 24-06-15

• Making of material reconciliation documents with all related documents• Making of final invoice with all required documents and demobilization,

18) Period : March 2010 to August 2010Organization : M/s Maa Kuthari Projects Pvt. Ltd, ChennaiProject : Sulfur Recovery UnitMain Contractor : C/o Satnam Global Projects Pvt. Ltd, DelhiOwner : GGS Refinery, Bhatinda Punjab.Position : Construction ManagerMaterials : Carbon Steel and Structural SteelJob : Fabrication and erection of pipe lines

Duties and Responsibilities:• Collection of drawings, and specification, mobilization of suitable manpower’s and staffs,

• Attending the minutes of meeting with the client and owner and obtaining the job at the right time and margin period,

• Welder qualification tests, • Fabrication at site as per the specified standards • Conducting NDT tests, hydro test, pneumatic tests according to the line specifications• Job description with internal staffs and workers, • Following and explaining to the workers and staffs to follow the safety norms• Maintaining the daily site activities records,• Manpower controlling• Making of daily target sheets with availability of materials at stores• Suitable manpower’s engaging for the suitable job• Making of Monthly invoice as per the work done at site• Preparing of manpower wages sheets• Updating of daily progress reports• Making of material reconciliation statements and reducing the scarp materials • Planning for good progress with minimum manpower without injury and good quality job

( Minimum manpower and maximum output)

17) Period : June 2009 to September 2009Organization : M/s Xicon International, MumbaiProject : 11 KV Power plant (Gas Engine)Contractor : Rolls Royce ( I ) Ltd. DelhiOwner : GETP Power Generation, (GETP Textile Park Surat,). GujaratPosition : Construction ManagerMaterial : A 106 Gr B, IS 2062, IS 3589, SA 240

Job : Erection of Gas engine and mounting of all related pipe lines with fabrication, duct Fabrication and erection and 30M Chimney Erection with all Structures.

Page 7: A.Manigandan -CV 24-06-15

Duties and Responsibilities:• Communication with client / owner regarding of job requirements and attending the meetings

and fulfilling the discussed points.

• Manpower mobilization, with all tools and tackles• Conducting welder test according to the ASME Sec. IX• Making of WPS & PQR’s according to the requirements of ASME Sec. II Part C, ASME

Sec. IX, ASME B 31.3, ASME Sec. VIII Div 1 Appendix. IV, ASME Sec. v, IS 2062, etc

• Conducting of material procedure qualification tests• Following the clients specification and requirements as per the standards • Follow-up and monitoring of daily job activities, manpower handling and controlling of

site management staffs,• Giving and guide lines to the staffs and workers to achieve the quality job with zero

accident.• Improving the quality requirements and safety norms• Daily progress reports maintaining and making of invoices against the work done on the

current month• Submitting of monthly material reconciliation statements to the clients• Piping NDT Inspection Like UT and RT• Hydro and pneumatic testing and pipe blowing/ cleaning, sand blasting and painting

activities according to ASME Sec V, / ASME. SSPC • Commissioning and final box up and final hand over• Final documentation, and final billing activities

16) Period : November 2008 to April 2009Organization : M/s Om Sakthi Engineering Works, ChennaiProject : Nuclear Power Corporation of India Limited Contractor : Larsen & Toubro I LtdOwner : Nuclear Power Corporation of India Limited Position : Construction ManagerMaterial : A 106 Gr B, Titanium B 861, 862Job : Fabrication and Erection of Titanium Pipe job at Sea Water Pump

House and Erection of Carbon Steel Pipes at Reactor - 1 Hull.Duties and Responsibilities:

• Conducting of welder qualification test for Titanium and Carbon Steel ,

• Collection of drawings from the client, drawing study and updating with material availability,

• Material issue and getting the site clearance and site work permit,• Conducting daily toolbox meeting.• Site work progress monitoring and making of monthly invoice

Page 8: A.Manigandan -CV 24-06-15

• Administration activities• Spools erection activities• Keeping of all QC Documents up to date

15) Period : July 2008 to November 2008Organization : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiProject : EVA Plant ErectionContractor : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiOwner : Reliance Petrochemical Limited, Dehaj , Gujarat Position : Construction ManagerMaterial : Carbon Steel Pipes, Stainless Steel Pipes, and Structural SteelJob : Dismantled, Fabrication and Erection of EVA Plant with All

respectsDuties and Responsibilities:

• Worked as a Hydro test and Pneumatic test Coordinator at site.

• Checking of Loops Files,• Attending punch points and completing of incomplete lines, supports, fixing of

fittings, etc.• Inspection offer and marking on the P&I Diagram,• Updating the status system wise.• Giving feed back to the Client and Our HO.• Monitoring and planning daily activities to avoid of zero progress• Managing and guidance to the hydro test workers and staffs.

14) Period : April 2008 to July 2008Organization : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiProject : Jamnagar Expansion Refinery Project (JERP)Contractor : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiOwner : Reliance Refineries Division Jamnagar, GujaratPosition : Construction ManagerMaterial : A 106 Gr B, Job : Carbon Steel Pipe Fabrication work.

Duties and Responsibilities:• Worked as a site in charge with all company responsibilities

• Communicating with client• Welder qualification• Drawing issue, material issue, attending the minutes of meeting, monitoring site activities • Site manpower control, material arrangement and co coordinating with co staffs to

improve the daily targets.• Full filing the client requirements as per their priority wise spool fabrication and timely

dispatching.

Page 9: A.Manigandan -CV 24-06-15

• Maintaining the good quality of job and safety norm with zero accidents.• Conducting the daily toolbox meeting and observing the workers following the PPE’s

properly are not.• Observing the workers and staffs mentality and keeping them for job• Maintaining the good communication with workers, staffs and clients and bring the good

moral of the job activities.• Making of material statement and job completion statement • NDT Test like RT and PT , hydro test, pneumatic tests, • Preparation of monthly invoice and material reconciliation statements• Final bill activities and final material submission,

13) Period : December 2007 to March 2008Organization : M/s Kasukurthi Sujatha Con. Pvt. Ltd. Hyderabad Project : CNG GAS ProjectContractor : M/s Kasukurthi Sujatha Con. Pvt. Ltd. Hyderabad Owner : Mahanagar Gas Limited, Bandra Kurla Complex, MumbaiPosition : Construction ManagerMaterial : IS 3589 Job : Under Ground Carbon Steel Pipe Fabrication and Erection work

Throughout Mumbai CityDuties and Responsibilities:

• Worked as a site in charge with all company responsibilities

• Communicating with client• Welder qualification• Drawing issue, material issue, attending the minutes of meeting, monitoring site activities • Site manpower control, material arrangement and co coordinating with co staffs to

improve the daily targets.• Making and arranging of daily /weekly/monthly work permit at city limits from Mumbai

Municipal Corporation.• Controlling of Excavation and it should reach the permission given by Mumbai

Municipal Corporation. And completing the job at given time• Maintaining the good quality of job and safety norm with zero accidents.• Conducting the daily toolbox meeting and observing the workers following the PPE’s

properly are not.• Observing the workers and staffs mentality and keeping them for job• Maintaining the good communication with workers, staffs and clients and bring the good

moral of the job activities.• Making of material statement and job completion statement • NDT Test like RT and PT , hydro test, pneumatic tests, flushing, etc

Page 10: A.Manigandan -CV 24-06-15

• Preparation of monthly invoice and material reconciliation statements• Final bill activities and final material submission,

12) Period : September 2007 to December 2007Organization : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiProject : Jamnagar Expansion Refinery Project (JERP)Contractor : M/s Code Engg. P Ltd, CBD Belapur, Navi MumbaiOwner : Reliance Refineries Division Jamnagar, GujaratPosition : Construction ManagerMaterial : A 106 Gr B, Job : Carbon Steel Pipe Fabrication work.

Duties and Responsibilities:• Worked as a site in charge with all company responsibilities

• Communicating with client• Welder qualification• Drawing issue, material issue, attending the minutes of meeting, monitoring site activities • Site manpower control, material arrangement and co coordinating with co staffs to

improve the daily targets.• Full filing the client requirements as per their priority wise spool fabrication and timely

dispatching.• Maintaining the good quality of job and safety norm with zero accidents.• Conducting the daily toolbox meeting and observing the workers following the PPE’s

properly are not.• Observing the workers and staffs mentality and keeping them for job• Maintaining the good communication with workers, staffs and clients and bring the good

moral of the job activities.• Making of material statement and job completion statement • NDT Test like RT and PT , hydro test, pneumatic tests, • Preparation of monthly invoice and material reconciliation statements• Final bill activities and final material submission,

11) Period : July 2007 to September 2007Organization : M/s Yeoman Marine Services, Severi, Mumbai Project : construction of Navy ShipsContractor : Mazagon Dock Ltd, MumbaiOwner : Indian Navy Coast Guard.Position : Construction ManagerMaterial : Carbon Steel and Copper and CuproNickel Job : Piping Erection

Duties and Responsibilities:• Collecting of Drawings

Page 11: A.Manigandan -CV 24-06-15

• Welder Qualification • Manpower control• Daily target achieving• Making of jigs and fixtures,• Checking of fabricated spools, and erection at specified area ,• Inspection offering for templates and pipe erection,• Maintaining daily progress report and inspection reports• Following safety norms and achieving zero accident with good and Quality Job Progress.

10) Period : April 2005 to January 2007Organization : M/s Ultra Dimension, Visakhapatnam Project : Vizag Vessel ProjectContractor : M/s Ultra Dimension, Visakhapatnam

Owner : Indian Navy Coast Guard. Ship Building Centre, Godavari Gate, Visakhapatnam

Position : Construction Manager / Quality Control InchargeMaterial : Carbon Steel, Stainless Steel, Copper,

Cuppro nickel, Aluminium, bronze, nab, Titanium, etcJob : Pipe Fabrication and Erection, Pipe Bending, Hydrotest,

Helium Leek Test, Pneumatic Test and Acid Cleaning with all NDT Activities

Duties and Responsibilities:• Receiving of Drawings and approved standard specifications

• Making of material statement• Arrangements and preparing welder qualification test and procedure qualification tests

according to WPS• Inspection of fabricated spools before and after with proper templates• Inspection of spool layout with accepted limitations• Offering of client inspection, and rejected spools rectification• Welding inspection with standard acceptance criteria’s• Welding supervision with conducting the classes for welders to improve the weld quality

and zero repairs• Full filing the manpower requirements and monitoring their mentality related with a job.• Achieving the daily targets• Conducting NDT Tests and hydro test and Pneumatic testing according the specified

standards.

Page 12: A.Manigandan -CV 24-06-15

• Daily inspection like Marking and Cutting , Bending, cutting and edge preparation, fit up, welding, NDT Test, Chemical cleaning and dispatching of spools these documents are prepared daily and it will keeping permanently.

09) Period : September 2003 to April 2005Organization : M/s High Precision hydraulic , Mumbai Project : Vizag Vessel ProjectContractor : M/s Precision hydraulic , Mumbai

Owner : Indian Navy Coast Guard. Ship Building Centre, Godavari Gate, Visakhapatnam

Position : Construction Manager / QC In chargeMaterial : Carbon Steel, Stainless Steel, Copper,

Cuppro nickel, Aluminium, bronze, nab, Titanium, etcJob : Pipe Fabrication and Erection, Pipe Bending, Hydrotest, Helium

Leek Test, Pneumatic Test and Acid Cleaning with all NDT Activities

Duties and Responsibilities:• Receiving of Drawings and approved standard specifications

• Making of material statement• Arrangements and preparing welder qualification test and procedure qualification tests

according to WPS• Inspection of fabricated spools before and after with proper templates• Inspection of spool layout with accepted limitations• Offering of client inspection, and rejected spools rectification• Welding inspection with standard acceptance criteria’s• Welding supervision with conducting the classes for welders to improve the weld quality

and zero repairs• Full filing the manpower requirements and monitoring their mentality related with a job.• Achieving the daily targets• Conducting NDT Tests and hydro test and Pneumatic testing according the specified

standards. • Daily inspection like Marking and Cutting , Bending, cutting and edge preparation, fit up,

welding, NDT Test, Chemical cleaning and dispatching of spools these documents are prepared daily and it will keeping permanently

08) Period : 15th June2003 to 31st August 2003Organization : M/s Petron Engg. Mumbai Project : LNG Receiving Terminal

Page 13: A.Manigandan -CV 24-06-15

Contractor : M/s Petron Engg. Mumbai Owner : Hazira Port, Surat

Position : QC EngineerMaterial : Carbon Steel, Stainless Steel, Alloy Steel and Structural SteelJob : Piping Fabrication & Erection, Equipment Erection Structural Steel

Fabrication and Erection Duties and Responsibilities:

• Preparing of Quality Documents

• Preparation of WPS and PQR’s• Welder Qualification Test Conducting • NDT Activities • Site Supervision of Quality Control Activities

07) Period : 30th March 2002 to 13th June 2003Organization : M/s Petron Engg. Mumbai Project : construction of 400 TPD High Viscous Polyester Bottle

Grade chips PlantContractor : M/s Lurgi ( I ) LtdOwner : M/s South Asia petrochem, Haldia, W.B

Position : QC Engineer

Material : Carbon Steel, Stainless Steel, and Structural SteelJob : Piping Fabrication & Erection, Equipment Erection Structural

Steel Fabrication and Erection Duties and Responsibilities:

• Raw material inspection with test certificates and making of procedure qualification of un identified materials.

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1• Consumables inspection and maintain the backing register and internal audit of stores

records,• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Inspection of rotary and static equipment’s erection and alignments

Page 14: A.Manigandan -CV 24-06-15

• Inspection of sand blasting and painting activities• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Preparation of hydro test and pneumatic test reports• Conducting hydro test and pneumatic tests• Making of final history sheets

06) Period : 4th September 2002 to 25th November 2002Organization : M/s Petron Engg. Mumbai Project : 80 Mets height Chimney FabricationContractor : M/s Wartsila (I) Ltd.

Owner : M/s Hindustan Lever chemicals Ltd, Haldia, West Bengal.Position : QC EngineerMaterial : Stainless SteelJob : Stainless Steel Chimney Fabrication and erection

Duties and Responsibilities:• Raw material inspection with test certificates and making of procedure qualification of un-

identified materials.

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1• Consumables inspection and maintain the backing register and internal audit of stores

records,• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Making of final history sheets

05) Period : 27th December 2001 to 29thMarch2002Organization : M/s Petron Engg. Mumbai Project : Catalyst Dewaxing UnitContractor : LG Engineering ( I ) Ltd

Page 15: A.Manigandan -CV 24-06-15

Owner : M/s Indian Oil Corporation Ltd, Haldia, W.B.Position : QC EngineerMaterial : Carbon Steel, Stainless Steel, NACE, Alloy Steel, Nickel Steel, and

Structural SteelJob : Piping Fabrication & Erection, Equipment Erection Structural

Steel Fabrication and Erection Duties and Responsibilities:

• Raw material inspection with test certificates and making of procedure qualification of Un-identified materials.

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1• Consumables inspection and maintain the backing register and internal audit of stores

records,• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3 • Inspection of PWHT Records and marking of radiography and PWHT Tests as per the

Requirements of ASME B 31.3 and ASME Sec. V• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Inspection of rotary and static equipments erection and alignments• Inspection of sand blasting and painting activities• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Preparation of hydro test and pneumatic test reports• Conducting hydro test and pneumatic tests• Making of final history sheets

04) Period : 6th April 2001 to 25th December2001Organization : M/s Petron Engg. Mumbai Project : Diesel Hydro De- sulfurisation UnitContractor : Samsung Engineering ( I ) Ltd Owner : M/s Indian Oil Corporation Ltd, Barauni, Bihar.Position : QC EngineerMaterial : Carbon Steel, Stainless Steel, NACE, Alloy Steel, Nickel Steel, and

Structural Steel

Page 16: A.Manigandan -CV 24-06-15

Job : Piping Fabrication & Erection, Equipment Erection Structural Steel Fabrication and Erection

Duties and Responsibilities:• Raw material inspection with test certificates and making of procedure qualification of un

identified materials.

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1• Consumables inspection and maintain the backing register and internal audit of stores

records,• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3 • Inspection of PWHT Records and marking of radiography and PWHT Tests as per the

Requirements of ASME B 31.3 and ASME Sec. V• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Inspection of rotary and static equipments erection and alignments• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Preparation of hydro test and pneumatic test reports• Conducting hydro test and pneumatic tests• Making of final history sheets

03) Period :28th February 2000 to 4th April 2001Organization :M/s Petron Engg. Mumbai Project: Erection of Co-Incinerator package with Waste Heat Boiler /Fludiesd Catalyst Cracking UnitContractor: Zecco Engineering and Engineers India/ Wartsila I Ltd, and Barat Heavy Pressure Vessels (I) Ltd VisakhapatnamOwner: M/s Indian Oil Corporation Ltd, Haldia, W.B.Position: QC EngineerMaterial: Carbon Steel and Structural SteelJob: Piping Fabrication & Erection, Equipment Erection Structural Steel Fabrication and Erection

Duties and Responsibilities:• Raw material inspection with test certificates and making of procedure qualification of un

identified materials.

Page 17: A.Manigandan -CV 24-06-15

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1• Consumables inspection and maintain the backing register and internal audit of stores

records,• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3 • Inspection of PWHT Records and marking of radiography and PWHT Tests as per the

Requirements of ASME B 31.3 and ASME Sec. V• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Inspection tube erection and tube expansion• Inspection of rotary and static equipments erection and alignments• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Preparation of hydro test and pneumatic test reports• Conducting hydro test and pneumatic tests• Making of final history sheets

02) 15th July 1998 to 27th February 2000M/s Petron Engg. Mumbai Project: Fabrication and Erection of Plant Flare Line System Contractor Engineers India Ltd Owner: M/s Haldia Petrochemical, Haldia, W.B Position: QC EngineerMaterial: Carbon Steel, Stainless Steel, Low Alloy Steel and Structural SteelJob: Piping Fabrication & Erection, Equipment Erection Structural Steel Fabrication and Erection Duties and Responsibilities:

• Raw material inspection with test certificates and making of procedure qualification of un identified materials.

• Drawing collection and updating• WPS & PQR Preparation as per the requirements of ASME B 31.3 and ASME Sec. II

Part C• Conducting Welder Qualification Tests Piping and Structural Steel as per the

requirements and standards of ASME Sec. IX, AWS D1.1

Page 18: A.Manigandan -CV 24-06-15

• Consumables inspection and maintain the backing register and internal audit of stores records,

• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3 • Inspection of PWHT Records and marking of radiography Tests as per the Requirements

of ASME B 31.3 and ASME Sec. V• Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Inspection of rotary and static equipments erection and alignments• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client• Preparation of hydro test and pneumatic test reports• Conducting hydro test and pneumatic tests• Making of final history sheets

01) 10th February 1998 to 14th July 1998M/s Petron Engg. Mumbai Project: Erection Quench Tower AT Naphtha Cracker UnitContractor: L &T and Toyo Egg. (I) Ltd.Owner: M/s Haldia Petrochemical, Haldia, W.B Position: Trainee / QC EngineerMaterial: Carbon Steel, Job: assembly, welding and Erection of Quench TowerDuties and Responsibilities:

• Drawing collection and updating

• Conducting Welder Qualification Tests Piping and Structural Steel as per the requirements and standards of ASME Sec. IX,

• Consumables inspection and maintain the backing register and internal audit of stores records,

• NDT Inspection as per the standard ASME Sec. V, ASME B 31.3 • Preparation of Daily Progress reports and maintaining the record up to date• Monitoring site weld and quality control.• Management of labors at site• Attending the client meeting and doing the follow-up at site as per the requirements of

client

I hereby declare that the above furnished information is true to the best of my knowledge and belief.

Page 19: A.Manigandan -CV 24-06-15

A.Manigandan Phone: 919600518861