Integrated Logistics Solution for Your Overseas Project Integrated Logistics Solution for Your Overseas Project 2018 VER.01 KORAB GLOBAL CO., LTD. ALWAYS THINK CUSTOMER FIRST!!!

Transcript of ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001...

Page 1: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

2018 VER.01

KORAB GLOBAL CO., LTD.

ALWAYS THINK CUSTOMER FIRST!!!

Page 2: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

KORAB GLOBAL CO., LTD is..

FAST FACTS

AIMS OF 2018

MAIN CLIENTS

PERFORMANCE RECORD

OFFICE DETAIL

CONTACT PERSONS

CONTENTS

Page 3: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

전세계적으로 불안한 경제상황으로 인하여 세계각국과 상사들은 각자의 경쟁력을 키우기 위해 총성 없

는 전쟁을 하고 있는 것이 작금의 상황입니다. 이러한 어려운 상황 속에서 특화된 아이템으로 미래 지

속적인 성장을 이룩하는 회사 만이 안정된 영속성을 지킬 수 있다고 생각합니다.

㈜코랍글로벌은 2003년 “고객을 먼저 생각하는 기업”이라는 슬로건을 앞세워 전세계 수출.입 시장

에 안정적인 물류 서비스를 제공하기 시작하였고, 이와 함께 특화된 대 이라크 재건 사업을 통해 국내

굴지의 대기업들과의 상호협력으로 성공적인 물류 서비스를 이행 할 수 있었습니다. 또한 인도네시아

의 오지인 반다아체 쓰나미 발생 후 재건 물자운송을 성공적으로 이행 하였습니다.

그 동안의 전세계 여러 수출.입 국가에서의 축적된 운송, 통관대행, 창고보관, 각종 인.허가 서류 서비

스를 바탕으로, 최근 당사는 국 내외의 각종 발전소 조달장비 운송, 해양플랜트 조달장비 토탈 물류 시

스템 제공, 제 3국에서 생산되어지는 물품의 3PL 진행 및 요르단 알카트라나 열병합 발전소에 이은 알

마나커 열병합 발전소운송 프로젝트를 성공적으로 수행하였으며, 아울러 이라크 카밧 발전, 변전소 운

송 프로젝트를 수주하여 IS의 위협에 의한 어려움에도 현재까지 성공적으로 통관을 포함한 일괄 운송

을 진행할 뿐만 아니라 독일 SIEMENS의 당진4호기 발전소 운송 물량도 완벽하게 수행하여, 고객사

로부터 코랍글로벌 서비스 품질의 우수성을 인정 받고 있습니다.

KORAB GLOBAL CO., LTD is

Page 4: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

이러한 안정되고 정확한 서비스는 그 동안 엄격한 법규준수, 안전관리와 내부 통제시스템에 의해 제공

될 수 있었으며, 2013년도 대한민국 관세청으로 부터 “AEO(Authorized Economic

Operator)”를 인증 받으면서, 당사 서비스의 품질을 증명하였습니다.

더욱 더 믿을 수 있는 ㈜ 코랍글로벌로 거듭 날 수 있도록 만전에 만전을 기하겠습니다.

“고객을 먼저 생각하는 기업” 이라는 슬로건에 맞게 더욱 더 고객사들의 입장과 상황을 헤아려 미리

대처하는 서비스를 제공하도록 노력 하겠습니다.

감사합니다.

대표이사김기영

KORAB GLOBAL CO., LTD is

Page 5: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

1. 회사 개요

구 분 내 역 발 행 처

법 인 명 ㈜ 코랍글로벌

설 립 일 2003년 10월 14일

대표이사 김 기 영

본 사 서울 중구 무교동 95 어린이재단빌딩 401호

부 산 지 점 부산 중구 중앙 동 4가 75 KT 서 부산사옥 7층

인 천 지 점 인천 광역시 연수구 송도미래로 30, E동 1303호(송도동, 스마트밸리)

라이센스국제 물류 주선 업 (구 복합 운송 주선 업)화물 운송 주선 업물품 공급 업 (내.외국물품)

서울특별시장부산세관장부산세관장

주요사업

해운수출.입 업무항공수출.입 업무HEAVY CARGO 서비스BULK, PROJECT 서비스

특화사업이라크, 중동지역 화물서비스해외 PLANT PROJECT 서비스

공인인증

AEO 공인인증(관세청 종합인증우수업체)ISO 9001, ISO 14001경영 혁신 형 중소기업(MAIN-BIZ)정품소프트웨어 모범기업 인증

관세청장ICR중소기업청장한국마이크로소프트(유)

Page 6: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

2. 회사 연혁

년,월,일 내 역 발 행 처

2003.10.14 ㈜ 코랍글로벌 사업자등록 국세청

2003.10.23 국제물류주선업(구 복합운송주선업) 등록 서울특별시청

2004.01.07 한국국제물류협회(KIFFA) 회원등록 한국국제물류협회

2005.03.10 서울 본사 현 사무소 확장 이전 어린이재단빌딩

2006.04.10 부산 사무소 개설 운영 프라자빌딩

2006.06.20 한국무역협회 가입, 무역업고유번호 부여 한국무역협회 회장

2009.12.27 서울 본사 현 사무소 확장 어린이재단빌딩

2010.10.24 경영 혁신 형 중소기업 선정 중소기업청장

2012.01.10 ISO 9001, ISO 14001 인증획득 ICR

2012.04.30 부산 사무소 확장 이전 KT 서 부산사옥

2012.05.10 서울특별시 모범납세자 선정 서울특별시장

2013.05.15 AEO 공인 인증(관세청 종합인증 우수업체) 관세청

2013.06.03 (사)한국AEO 진흥협회 회원 사 가입 (사)한국AEO진흥협회

2013.07.12 서울 본사 현 사무소 확장 어린이재단빌딩

2014.01.14 정품소프트웨어 모범기업 인증 한국마이크로소프트(우)

2014.02.13 산학협력 가족회사 인증 한국해양대학교

2016.04.01 SIEMENS 정식업체등록 SIEMENS

2017.08.29 인천 사무소 개설 운영 스마트밸리

FAST FACTS

Page 7: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

3. LICENSE, CERTIFICATION AND REGISTRATION

Company Registration Certificate of International

Forwarding Business

Certificate of TransportationForwarding Business

Certificate of Goods Supplier

Page 8: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

3. LICENSE, CERTIFICATION AND REGISTRATION

Certification of AEOCertification of Innovative

Managing Medium sized enterprise

Certification of ISO 14001

Certification of ISO 9001

Page 9: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

Certification of KIFFA/ IATA

Certification of Member of Korea AEO promotion

association

License by Korea Trade Association

3. LICENSE, CERTIFICATION AND REGISTRATION

Certification of Good Exemplary company using

original software

Page 10: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

Certification of Good Exemplary Taxpayer

Certification of Family Member of National Research Foundation Korea

3. LICENSE, CERTIFICATION AND REGISTRATION

Page 11: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

4. AEO(관세청종합인증우수업체) 공인인증획득

코랍글로벌은 2012년 3월 관세청 AEO 공인 인증 중소기업 지원사업 대상업체로 참여하여 1년 여 동안 예비심사 3차례,

관세청 서류심사, 관세청 현장심사 1차례, 관세청 공인 심사위원회 종합심사를 거쳐 2013년 5월 15일 AEO (관세청

종합인증 우수업체) 인증을 획득하였으며, 한국AEO진흥협회 회원 사로 등록 되어 있습니다.

Page 12: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

FAST FACTS

5. 회사조직도

EXECUTIVESSALES

MANAGERS

감 사서삼기

이 사이경식

상무유남혁

이사송민석

부장안종훈

부장서상윤

차장주철현

차장김기석

사원김형록

PROJECT

TEAM

OCEAN/AIR

OPERATION

부장배승만

차장손영민

차장백경열

대리장수진

계장박진용

차장최현혜

대리성유정

계장정한솔

계장류혜민

사원오소정

사원이세정

사원김묘성

ACCOUNT/MANAGE/ HR

부장백수현

과장이미정

계장김범준

-중국-

지사장안종훈

-이라크-

Mr. Mohamed(Iraq Erbil)

OCEAN/AIR

OPERATION

지사장김철현

과장오혁오

차장김선례

계장김진희

사원한희정

영 업 부 업 무 부 부산지사

대표이사 김 기 영

관리부

해외지사

DEVELOPMENT

/ OPERATION

과장김민환(서울본사)

본부장강민수(순천사무소)

에너지사업부

TRUCKING

OPERATION

지사장박동일

차장김승업

과장이원준

대리변성애

인천지사

Page 13: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

OUTSTANDING ACHIEVEMENT OF 2017

매출액 : US$20,000,000.00

해상운송 : 500,000 TONS

항공운송 : 200 TONS

AIMS OF 2018

매출액 US$22,000,000.00

서비스 품질의 증대 및 물류원가 절감

SERVICE EXCELLENCE 강화

성과에 대한 보상과 자부심

AIMS OF 2017

Page 14: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

MAIN CLIENTS

주요고객사

Page 15: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

COUNTRYOF SITE

KICK OFF /STATUS

CLIENT PROJECT DETAILWORKING

SCOPEMAIN ITEM VOLUME

AZERBIJANFEB 2009 / FINALIZED

DAEWOOINT’L

Public Transportation Supply For Azerbaijan Government

OFFSHOREONSHORE

T/S CONTROL

DAEWOO BUSCONSTRUCTION VEHICLE

80,000R/T

AZERBIJANJAN 2012 / FINALIZED

DAEWOOINT’L

Public Transportation Supply for Azerbaijan Government

OFFSHOREONSHORE

T/S CONTROL

DAEWOO BUSAPPROX 350 UNITS

25,000R/T

CHINAFEB 2013 / FINALIZED

E-TEC E&C

TANGSHAN OCI ChemicalSUNFAR Factory Construction

OFFSHOREONSHORE

STEEL STRUCTURE, MACHINERY

10,000R/T

DJIBOUTIFEB 2008 / FINALIZED

KEANGNAMENT.

Construction Materials Delivery to DJIBOUTI

OFFSHOREONSHORE

CONSTRUCTIONMATERIALS

12,000R/T

ETHIOPIAAPR 2009 / FINALIZED

KEANGNAMENT.

Third Party Handling from Eritrea to Ethiopia

OFFSHOREONSHORE

CONSTRUCTIONMATERIALS

30,000R/T

INDONESIAMAR 2006 / FINALIZED

HEC, SEC, TATA

Bandar Ache(Tsunami site) Relief Materials

OFFSHOREONSHORE

CONSTRUCTION VEHICLEAPPROX 200 UNITS

14,000R/T

INDONESIAAPR 2016 / FINALIZED

DAEAH ENC SARULLA Project OFFSHORECONSTRUCTION

MATERIALS2,500R/T

IRANSEP 2008 / FINALIZED

WINTECOCORP.

Gas Tank Project for Iran OFFSHORESHELL PLATE

PIPE LINE, ACC.10,000R/T

IRAQFEB 2004 / FINALIZED

DAEWOOINT’L

Relief Materials for Zaytun Troop dispatch

OFFSHOREONSHORE

CONSTRUCTION VEHICLE,EQUIPMENTS

10,000R/T

PERFORMANCE RECORD

15

Page 16: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

COUNTRYOF SITE

KICK OFF /STATUS

CLIENT PROJECT DETAILWORKING

SCOPEMAIN ITEM VOLUME

IRAQMAR 2004 / FINALIZED

SUBNEXKOREA

Heavy Equipments for IRAQ Reconstruction Project

OFFSHOREONSHORE

CONSTRUCTION VEHICLE,EQUIPMENTS

50,000R/T

IRAQDEC 2006 / FINALIZED

UIENERGY

SULAYMANIA Energy PlantOFFSHOREONSHORE

STRUCTURES, PLATE,CONSTRUCTION GOODS

20,000R/T

IRAQDEC 2007 / FINALIZED

HYUNDAIHEAVY IND.

IRAQ BASRAH Relief materials OFFSHOREONSHORE

CONSTRUCTION VEHICLE,EQUIPMENTS

30,000R/T

IRAQSEP 2009 / FINALIZED

VIZROSYSERBIL Power Plant Construction M

aterials OFFSHOREONSHORE

TRANSFORMER,ENGINE

23,000R/T

IRAQMAY 2014 / ONGOING

POSCO E&C

IRAQ KHABAT Unit 1 & 2 BAZYAN Project

OFFSHOREONSHORE

CONSTRUCTION GOODSSIEMENS STG, GTG

120,000R/T

JORDANMAR 2009 / FINALIZED

LOTTEE&C

LOTTE E&C LPG Tank Plant Materiel

OFFSHOREONSHORE

SHELL PLATEPIPE LINE, ACC.

20,000R/T

JORDANMAY 2009 / FINALIZED

LOTTEE&C

LOTTE E&C Jordan Generate Turbine

OFFSHOREONSHORE

CONSTRUCTION GOODS 20,000R/T

JORDANDEC 2010 / FINALIZED

LOTTEE&C

LOTTE E&C AL QATRANA Combined Power Plant Project

OFFSHOREONSHORE

FOUNDATION

SIEMENS STG, GTG,HRSG AND MACHINERY

50,000R/T

JORDANDEC 2012 / FINALIZED

LOTTEE&C

LOTTE E&C AL MANAKHER Diesel Power Plant Project

OFFSHOREONSHORE

INSTALLATION

WARTSILA ENGINE 38 UNIT(14.5*4.1*6.1M / 308MT)

80,000R/T

PERFORMANCE RECORD

16

Page 17: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

COUNTRYOF SITE

KICK OFF /STATUS

CLIENT PROJECT DETAILWORKING

SCOPEMAIN ITEM VOLUME

KOREADEC 2008 /FINALIZED

SAMBOOCONS.

DANGJIN Water Power PlantFoundation Equipment

OFFSHOREONSHORE

STEEL STRUCTURE,MACHINERY

5,000R/T

KOREAFEB 2009 / FINALIZED

LOTTE E&C

DONGNAM AREA CESCogeneration Power Plant

OFFSHOREONSHORE

HITACHI GTG, HRSG 15,000R/T

KOREANOV 2009 / FINALIZED

LOTTE E&C

PANGYO Cogeneration Power Plant Project

OFFSHOREONSHORE

GE TURBINE, GENERATOR

30,000R/T

KOREAAPR 2010 /FINALIZED

HYUNDAICONS.

GOYANG SAMSONG Power Plant Project

ONSHOREMITSUBISHI TURBINE,

GENERATOR30,000R/T

KOREAJAN 2011 / FINALIZED

KOREAMOTIE

BP SKARV Marine Project(Offshore Mining Area #8)

OFFSHOREONSHORE

VESSEL GENERATOR,BURNER BOOM & WINCH

100,000R/T

KOREAMAY 2011 / FINALIZED

UNIDINCHEON Potassium Synthesis

Factory construction OFFSHOREONSHORE

CONSTRUCTION GOODS 15,000R/T

KOREAAUG 2011 / FINALIZED

UNIDKUNSAN Factory

Equipment Extension OFFSHOREONSHORE

DIFFENBACHER MDF MACHINE,

CONSTRUCTION GOODS25,000R/T

KOREAMAY 2012 / FINALIZED

UNIDKUNSAN Factory

Power Plant ProjectOFFSHOREONSHORE

HEAT RECOVERY PLANT 10,000R/T

KOREAJUN 2012 / FINALIZED

LOTTE E&C

HONAM Petro Chemical ULSAN SF-Project

OFFSHOREONSHORE

MACHINERY,CONSTRUCTION GOODS

4,000R/T

PERFORMANCE RECORD

17

Page 18: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

COUNTRYOF SITE

KICK OFF /STATUS

CLIENT PROJECT DETAILWORKING

SCOPEMAIN ITEM VOLUME

KOREAJAN 2013 / FINALIZED

LOTTEE&C

Cogeneration Power Plantfor DAEGU City TES

OFFSHOREONSHORE

SIEMENS GTG 1 SET(12.3*3.9*4.1M / 344MT)

15,000R/T

KOREANOV 2013 / FINALIZED

E-TECE&C

ASIA CEMENT FactoryHeat Recovery Facility Extension

OFFSHOREONSHORE

BOILER, CONDENSOR 6,000R/T

KOREAMAY 2014 / FINALIZED

LOTTEE&C

B-Project CHUNGJUBeer Factory Phase II Extension

OFFSHOREONSHORE

KRONES BREWERY TANK(18.5*4.8*4.8M / 32 UNITS)

15,000R/T

KOREADEC 2014 / FINALIZED

SIEMENSTurbine & Generator Transit To GWANGYANG via BUSAN

T/S CONTROLFAS BARGE

SIEMENS TURBINE(134MT)GENERATOR(158MT)

2,000R/T

KOREADEC 2015 / FINALIZED

E-TEC E&C

Gunjang EgergyPower plant project

OFFSHOREONSHORE

SIEMENS TURBINE(210MT)GENERATOR(225MT)

15,000R/T

KOREADEC 2015 / FINALIZED

SIEMENS Dangjin 4 Power plant project ONSHORESIEMENS TURBINE(310MT)

GENERATOR(300MT)30,000R/T

MADAGASCARAPR 2009 / FINALIZED

KEANGNAMENT.

AMBATOVY Nickel Mine1st Project

OFFSHORECONSTRUCTION

MATERIALS80,000R/T

MADAGASCAROCT 2009 / FINALIZED

KEANGNAMENT.

AMBATOVY Nickel Mine2st Project

OFFSHORECONSTRUCTION

MATERIALS25,000R/T

MALAYSIASEP 2016 / FINALIZED

WINTECOCORP.

PETRONAS RAPID PROJECTOFFSHOREONSHORE

SHELL PLATEPIPE LINE, ACC.

20,000R/T

PERFORMANCE RECORD

18

Page 19: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

COUNTRYOF SITE

KICK OFF /STATUS

CLIENT PROJECT DETAILWORKING

SCOPEMAIN ITEM VOLUME

OMANMAR 2007 / FINALIZED

SAMBOOCONS.

SALARAH Construction Materials OFFSHORESTEEL STRUCTURE,

MACHINERY30,000R/T

PHILIPPINEAPR 2007 / FINALIZED

HANJIN SUBIC Dockyard

Equipment Delivery Project OFFSHORE

STEEL STRUCTURES,CONSTRUCTION GOODS

20,000R/T

PHILIPPINEAUG 2016 / FINALIZED

DAEAH ENCPAGBILAO Thermal

Power Station ProjectOFFSHOREONSHORE

CONSTRUCTION GOODS 25,000R/T

SAUDI ARABIASEP 2015 / ONGOING

SAIPEM JAZAN IGCC Project OFFSHORE ABSORBER 100,000R/T

VIETNAMDEC 2015 / FINALIZED

DAEAH ENC NSRP ProjectOFFSHOREONSHORE

CONSTRUCTION GOODS 2,000R/T

PERFORMANCE RECORD

19

Page 20: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 사우디 JAZAN 복합 가스융합 발전 프로젝트 (IGCC)

2. 물량/주기기: 100,000 R/T & Doosan Mecatec Absorbers

3. 기간/주기기제원: 2015 Sep. - On Going & Absorber (1000 MT/ 941 x 7 x 8 m)

프로젝트수행사진

PERFORMANCE RECORD

Page 21: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 사우디 JAZAN 복합 가스융합 발전 프로젝트 (IGCC)

2. 물량/주기기: 100,000 R/T & Doosan Mecatec Absorbers

3. 기간/주기기제원: 2015 Sep. - On Going & Absorber (1000 MT/ 941 x 7 x 8 m)

프로젝트수행사진

PERFORMANCE RECORD

Page 22: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 당진 4 GS EPS 복합화력발전(450 MW)

2. 물량/주기기: 30,000 R/T & Siemens 8000H Single Shaft Type

3. 기간/주기기제원: 2015 Nov. - 2017.Feb. & GTG (309 MT/ 14.6 x 4.6 x 3.9 m/ SIEMENS)

프로젝트수행사진

PERFORMANCE RECORD

Page 23: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 당진 4 GS EPS 복합화력발전(450 MW)

2. 물량/주기기: 30,000 R/T & Siemens 8000H Single Shaft Type

3. 기간/주기기제원: 2015 Nov. - 2017.Feb. & GTG (309 MT/ 14.6 x 4.6 x 3.9 m/ SIEMENS)

프로젝트수행사진

PERFORMANCE RECORD

Page 24: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 대구혁신도시 발전설비공사(408 MW)

2. 물량/주기기: 15,000 R/T & Siemens 8000H Single Shaft Type

3. 기간/주기기제원: 2012 Sep. - 2014.Oct. & GTG (344 MT/ 12.3 x 3.9 x 4.1 m/ SIEMENS)

프로젝트수행사진

PERFORMANCE RECORD

Page 25: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 판교열병합발전소 건설공사

2. 물량/주기기: 30,000 R/T & GE GTG MS7001EA , STG & HRSG

3. 기간/주기기제원: 2008 Feb. - 2010.Nov. & GTG (290 MT/ 12.1 x 3.8 x 4.0 m/GE)

PERFORMANCE RECORD

프로젝트수행사진

Page 26: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 판교열병합발전소 건설공사

2. 물량/주기기: 30,000 R/T & GE GTG MS7001EA , STG & HRSG

3. 기간/주기기제원: 2008 Feb. - 2010.Nov. & GTG (290 MT/ 12.1 x 3.8 x 4.0 m/GE)

PERFORMANCE RECORD

프로젝트수행사진

Page 27: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

PERFORMANCE RECORD

1. 프로젝트명: 판교열병합발전소 건설공사

2. 물량/주기기: 30,000 R/T & GE GTG MS7001EA , STG & HRSG

3. 기간/주기기제원: 2008 Feb. - 2010.Nov. & GTG (290 MT/ 12.1 x 3.8 x 4.0 m/GE)

프로젝트수행사진

Page 28: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 동남권역 유통단지 발전소 건설공사

2. 물량/주기기: 15,000 R/T & HITACHI GTG H-25 & HRSG

3. 기간/주기기제원: 2007 Aug. - 2009.Apr. & GTG (58 MT/ 7.5 x 3.1 x 2.8m/ HITACHI)

PERFORMANCE RECORD

프로젝트수행사진

Page 29: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Iraq Khabat Thermal Power Station(300MW) & Bazyan Substation Project

2. 물량/주기기: 120,000 R/T & SIEMENS GTG & HRSG

3. 기간/주기기제원: 2014 May - Generator (230 MT/ 10.5 x 3.9 x 3.6 m/SIEMENS)

PERFORMANCE RECORD

프로젝트수행사진

Page 30: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

PERFORMANCE RECORD

1. 프로젝트명: Iraq Khabat Thermal Power Station(300MW) & Bazyan Substation Project

2. 물량/주기기: 120,000 R/T & SIEMENS GTG & HRSG

3. 기간/주기기제원: 2014 May - Generator (230 MT/ 10.5 x 3.9 x 3.6 m/SIEMENS)

프로젝트수행사진

Page 31: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Jordan Al Manakher Power Plant (573 MW)

2. 물량/주기기: 80,000 R/T & W18V50DF Wartsila x 38 UNITS

3. 기간/주기기제원: 2012 Dec. - & Diesel Engine (308 MT/ 14.5 x 4.1 x 6.1 m/ WARTSILA)

PERFORMANCE RECORD

프로젝트수행사진

Page 32: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

PERFORMANCE RECORD

프로젝트수행사진

1. 프로젝트명: Jordan Al Manakher Power Plant (573 MW)

2. 물량/주기기: 80,000 R/T & W18V50DF Wartsila x 38 UNITS

3. 기간/주기기제원: 2012 Dec. - & Diesel Engine (308 MT/ 14.5 x 4.1 x 6.1 m/ WARTSILA)

Page 33: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Jordan Al Qatrana Power Plant (400 MW)

2. 물량/주기기: 50,000 R/T & SIEMENS, #SGT5-2000E (STG,GTG)

3. 기간/주기기제원: 2010 Dec. - 2012.Dec. & GTG (230 MT/ 9.9 x 3.9 x 3.7 m/ SIEMENS)

PERFORMANCE RECORD

프로젝트수행사진

Page 34: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 충주 롯데주류 맥주공장 증설 2차(B-Project)

2. 물량/주기기: 15,000 R/T & KRONES CORP., BREWERY TANK

3. 기간/주기기제원: 2012 Sep. - 2014.Oct. & Tank (23 MT/ 18.5 x 4.8 x 4.8 m/ 32 unit)

PERFORMANCE RECORD

프로젝트수행사진

Page 35: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 에티오피아/에리트리아 간 건설장비 삼국간 운송

2. 물량/기간: 30,000 R/T & 2009. Apr - 2010. Apr.

PERFORMANCE RECORD

프로젝트수행사진

Page 36: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Marine Project (포항 제 8광구)

2. 물량/기간: 100,000 R/T & 2009. Oct - 2010. Dec.

PERFORMANCE RECORD

프로젝트수행사진

Page 37: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Iran Oil Tank Construction

2. 물량/기간: 10,000 R/T & 2007. Oct - 2008. Dec.

PERFORMANCE RECORD

프로젝트수행사진

Page 38: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: Salarah construction materials in Oman

2. 물량/기간: 30,000 R/T & 2007. Mar ~ 2008. Dec.

PERFORMANCE RECORD

프로젝트수행사진

Page 39: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 이라크 자이툰 부대 보급물자 및 아르빌 지원물자 운송

2. 물량/기간: 10,000 R/T & 2004 - 2008

PERFORMANCE RECORD

프로젝트수행사진

Page 40: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

PERFORMANCE RECORD

1. 프로젝트명: 이라크 자이툰 부대 보급물자 및 아르빌 지원물자 운송

2. 물량/기간: 10,000 R/T & 2004 - 2008

프로젝트수행사진

Page 41: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

PERFORMANCE RECORD

프로젝트수행사진

1. 프로젝트명: 이라크 자이툰 부대 보급물자 및 아르빌 지원물자 운송

2. 물량/기간: 10,000 R/T & 2004 - 2008

Page 42: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

1. 프로젝트명: 삼성중공업 조선소 메카크레인 운송

2. 물량/기간: 600 MT x 1 Unit & 2013. Oct.

PERFORMANCE RECORD

프로젝트수행사진

Page 43: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

업무시간 오전 08:30 – 오후 18:00

주소 서울 중구 무교동 95 어린이재단빌딩 401호

대표전화 02-775-8339

팩스 02-775-8340

업무시간 오전 08:30 – 오후 18:00

주소 부산 중구 중앙 동 4가 75 KT 서 부산사옥 7층

대표전화 051-469-5073

팩스 051-469-5075

Head Office

Busan Branch

OFFICE DETAIL

업무시간 오전 08:30 – 오후 18:00

주소 인천 광역시 연수구 송도 미래로 30, E동 1303호 (송도동, 스마트밸리)

대표전화 032-817-5555

팩스 032-210-6618

Incheon Branch

Page 44: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

EXECUTIVES

대표이사 김 기 영 [email protected] 02-775-8339

SALES DEPARTMENT IN SEOUL MAIN OFFICE

상무 유 남 혁 [email protected] 02-775-1280

이사 송 민 석 [email protected] 02-775-1281

부장 안 종 훈 [email protected] 02-775-8232

부장 서 상 윤 [email protected] 02-775-8233

차장 주 철 현 [email protected] 02-775-1285

차장 김 기 석 [email protected] 02-775-1284

사원 김 형 록 [email protected] 02-775-1282

PROJECT TEAM IN SEOUL MAIN OFFICE

부장 배 승 만 [email protected] 02-775-1283

차장 손 영 민 [email protected] 02-775-1287

차장 백 경 열 [email protected] 02-775-1289

대리 장 수 진 [email protected] 02-775-1066

계장 박 진 용 [email protected] 02-775-8237

CONTACT PERSONS

Page 45: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

OPERATION DEPARTMENT IN SEOUL MAIN OFFICE

차장 최 현 혜 [email protected] 02-775-1063

대리 성 유 정 [email protected] 02-775-1068

계장 정 한 솔 [email protected] 02-775-1064

계장 류 혜 민 [email protected] 02-775-2018

사원 오 소 정 [email protected] 02-775-8339

사원 이 세 정 [email protected] 02-775-1286

사원 김 묘 성 [email protected] 02-775-8339

ACCOUNTING / MANAGING / HUMAN RESOURCES DEPARTMENT

부장 백 수 현 [email protected] 02-775-1061

과장 이 미 정 [email protected] 02-775-1069

계장 김 범 준 [email protected] 02-775-1062

CONTACT PERSONS

Page 46: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

BUSAN OFFICE

이사 김 철 현 [email protected] 051-469-5076

차장 김 선 례 [email protected] 051-469-5073

과장 오 혁 오 [email protected] 051-469-5074

계장 김 진 희 [email protected] 051-469-5070

사원 한 희 정 [email protected] 051-469-5072

INCHEON OFFICE

이사 박 동 일 [email protected] 070-4741-5365

차장 김 승 업 [email protected] 070-4741-5367

과장 이 원 준 [email protected] 070-4741-5368

대리 변 성 애 [email protected] 070-4741-5366

ENERGY SECTION

본부장 강 민 수 [email protected] 061-722-5478

과장 김 민 환 [email protected] 02-775-8234

CONTACT PERSONS

Page 47: ALWAYS THINK CUSTOMER FIRST!!! KORAB GLOBAL CO., LTD. · 2012.01.10 iso 9001, iso 14001 인증획득 icr 2012.04.30 부산사무소확장이전 kt 서부산사옥 2012.05.10 서울특별시모범납세자선정

Integrated Logistics Solution for Your Overseas ProjectIntegrated Logistics Solution for Your Overseas Project

WE ARE THE SOLUTION

www.korab.co.kr

THANK YOU!